Jumlah : 171,611,166.694
PPN 10 % :
Total : 171,611,166.694
Dibulatkan : 171,611,000.000
Terbilang : -
Ditetapkan oleh,
RINCIAN HARGA PENAWARAN
PEKERJAAN GEDUNG WORKSHOP
DS.RANGKILING,KEC.SOROLANGUN,PROV.JAMBI
IV PEKERJAAN ATAP
Ikatan angin besi bulat Ø 16 mm + klem
3 Kg 55.12 8,955.40 10,120.00 19,075.40 493,621.65 557,814.40 1,051,436.05
Trackstang besi bulat Ø 12 mm + klem
4 Kg 29.12 8,955.40 10,120.00 19,075.40 260,781.25 294,694.40 555,475.65
Talang datar Zink alum + rangka hollo 20x 40 x 2,3 (40 cm)
5 Kg 14.70 6,555.63 14,800.00 21,355.63 96,367.80 217,560.00 313,927.80
Pelat besi 3 mm untuk pengait atap
6 Kg 31.09 8,692.40 14,900.00 23,592.40 270,211.95 463,181.40 733,393.35
Rangka listplank L 45.45.5
7 Kg 332.76 6,555.63 14,800.00 21,355.63 2,181,458.83 4,924,862.80 7,106,321.63
Atap zinkalum warna standart 0.35 mm
8 m² 113.60 21,338.00 138,000.00 159,338.00 2,423,996.80 15,676,800.00 18,100,796.80
9 Listplank zinkalum 0.5 mm m² 24.12 21,338.00 138,000.00 159,338.00 514,672.56 3,328,560.00 3,843,232.56
10 Rabung Rabung seng BJLS 35 K m¹ 24.12 3,512.25 23,645.00 27,157.25 84,715.47 570,317.40 655,032.87
12 Pelat buhul tebal 6 mm Kg 156.70 8,692.40 14,900.00 23,592.40 1,362,113.86 2,334,855.33 3,696,969.19
6 Besi siku 200.100.5,5 kg 22.20 6,555.63 6,555.63 13,111.27 145,535.04 145,535.04 291,070.08
Dibuat oleh,
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
5 1 M3 beton K - 300
1.200 ready mix K 635,000.00 762,000.00
0.00 762,000.00 0.00 762,000.00
Biaya yang diperlukan untuk pek. 100 k 1,237,450.00 1,060,250.00 0.00 2,297,700.00
21 1 m² lisplank zingnalum
1.050 m² atap zin 120,000.00 126,000.00
6.000 bh baut 2,000.00 12,000.00
0.200 tukang besi 78,800.00 15,760.00
0.100 pekerja 52,500.00 5,250.00
0.005 mandor 65,600.00 328.00
21,338.00 138,000.00 0.00 159,338.00
22 1 m² plafond triplek 4 mm
1.050 m² triplek 4 47,000.00 49,350.00
0.020 kg paku bias 10,906.00 218.12
0.500 pekerja 52,500.00 26,250.00
0.025 mandor 65,600.00 1,640.00
27,890.00 49,568.12 0.00 77,458.12
INGGU SARNAINI
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
an material,pemancangan
16 dan penyambungan V pile 28.28.28
a. Upah , bahan dan peralatan
m¹ 1.000 220,000.00 220,000.00
220,000.00
Jumlah 220,000.00
0ver head 0.1 22,000.00
###
1 m³ Base Coarse A
a. UpahPekerja Jam 0.1071 6,562.50 702.84
Mandor Jam 0.0178 8,200.00 145.96
848.80
c. Peralatan
Dump Tru Jam 0.2463 #REF! #REF!
Motor Gra Jam 0.0044 #REF! #REF!
Vibratory Jam 0.0067 #REF! #REF!
Air Pema Ls 1.0000 3,000.00 3,000.00
Alat bant Ls 1.0000 1,000.00 1,000.00
#REF!
Jumlah #REF!
0ver head 0.1 #REF!
Harga satuan #REF!
1 m¹ Pekerjaan
17 cerocok kayu laut
a. UpahPekerja jam 0.063 6,562.50 410.16
410.16
c. Peralatan
excavator jam 0.031 #REF! #REF!
#REF!
Jumlah #REF!
0ver head 0.1 #REF!
Harga satuan 1 Kg #REF!
1m² memasang
18 Kembali Pas. Coneblok
a. upahPekerja jam 1.400 6,562.50 9,187.50
Mandor jam 0.093 8,200.00 765.06
9,952.56
Jumlah #REF!
0ver head 0.1 #REF!
Harga satuan #REF!
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
100 Kg Pekerjaan
19 Besi profil WF/gording CNP
a. UpahPekerja jam 24 6,562.50 157,500.00
Tukang jam 24 9,850.00 236,400.00
Mandor jam 8 8,200.00 65,600.00
459,500.00
Jumlah 2,403,500.00
Jumlah 24,035.00
0ver head 0.1 2,403.50
Harga satuan 26,438.50
1 Kg Pekerjaan20
Track stang dan ikatan angin
a. UpahPekerja jam 0.020 6,562.50 131.25
Tukang jam 0.040 9,850.00 394.00
Mandor jam 0.003 8,200.00 24.60
549.85
Jumlah 15,393.60
0ver head 0.1 1,539.36
Harga satuan 1 Kg 16,932.96
1 kg memasang
21 besi siku
a. UpahPekerja jam 0.0933 6,562.50 612.50
Tukang jam 0.2667 9,850.00 2,626.67
Mandor jam 0.0047 8,200.00 38.27
3,277.43
Jumlah 18,077.43
0ver head 0.1 1,807.74
Harga satuan 19,885.18
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
1 kg memasang
22 pelat besi polos
a. UpahPekerja jam 0.0560 6,562.50 367.50
Tukang jam 0.1600 9,850.00 1,576.00
Mandor jam 0.0028 8,200.00 22.96
1,966.46
Jumlah 18,866.46
0ver head 0.1 1,886.65
Harga satuan 20,753.11
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 159,838.00
0ver head 0.1 15,983.80
Harga satuan ###
1 m¹ Pasang 24
Rabung Atap seng BJLS 35
a. UpahPekerja jam 0.2000 6,562.50 1,312.50
Tukang jam 0.1600 9,850.00 1,576.00
Mandor jam 0.0160 8,200.00 131.20
3,019.70
Jumlah 48,359.70
0ver head 0.1 4,835.97
Harga satuan 53,195.67
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
1 m²25
lisplank zingnalum
a. UpahPekerja jam 0.4200 6,562.50 2,756.25
Tukang jam 1.2000 9,850.00 11,820.00
Mandor jam 0.0210 8,200.00 172.20
14,748.45
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 141,248.45
0ver head 0.1 14,124.85
Harga satuan ###
100
26m² cat tembok
a. UpahPekerja jam 40.0000 6,562.50 262,500.00
Tukang jam 60.0000 9,850.00 591,000.00
Mandor jam 2.0000 8,200.00 16,400.00
869,900.00
Jumlah 23,199.50
0ver head 0.1 2,319.95
Harga satuan 25,519.45
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
27 1 m2 Plesteran 1
a. UpahPekerja jam 2.0020 6,562.50 13,138.13
Tukang jam 1.4980 9,850.00 14,755.30
Mandor jam 0.1400 8,200.00 1,148.00
29,041.43
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 45,364.43
0ver head 0.1 4,536.44
Harga satuan 49,900.87
1 m² Pasangan
28 lobang angin
a. UpahPekerja jam 0.8000 15,000.00 12,000.00
Tukang jam 0.3000 500.00 150.00
Mandor jam 0.1000 25,000.00 2,500.00
14,650.00
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 96,477.00
0ver head 0.1 9,647.70
Harga satuan ###
Total
Harga Satuan Jlh. Harga
No. Uraian Satuan Koefisien Harga
(Rp) (Rp)
(Rp)
1 m²29
Pasangan plafond
a. UpahPekerja jam 2.6667 6,562.50 17,500.00
Mandor jam 0.1333 8,200.00 1,093.33
18,593.33
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 71,584.94
0ver head 0.1 7,158.49
Harga satuan 78,743.44
1 m² Pasangan
30 Dinding 1/2 Bata
a. UpahPekerja hr 0.3754 6,562.50 2,463.40
Tukang hr 0.1873 9,850.00 1,844.41
Mandor hr 0.0096 8,200.00 78.93
4,386.74
C. Peralatan
Alat bant ls 1.0000 500.00 500.00
500.00
Jumlah 82,035.74
0ver head 0.1 8,203.57
Harga satuan 90,239.31
INGGU SARNAINI
PERHITUNGAN VOLUME BESI
PEKERJAAN GEDUNG WORKSHOP
jumlah 93.637 kg
jumlah 115.070 kg
1bh = 0.589 m³
1bh = 115.070 kg
jadi 1m³ beton pondasi, besi = 195.498 kg
ctt : 5% untuk sambungan, bhan terbuang,bengkoan
pondasi 1 bh volume 0.5886 m³
Panjang Jumlah Koefisien Berat
No Ø Besi(mm) Lebar (m¹) Tinggi (m¹) Panjang /keliling(m¹) Jumlah Jumlah Berat Besi (Kg) Keterangan
(m¹) (Kg/m¹)
a b b c=axb d e=cxd
Pelat Lantai Beton bertulang
1 10 0.416666666666667 81 81 33.75 0.617 20.824 melintang
2 10 16 3.08333333333 4 64 0.617 39.488 mamanjang 16 m
jumlah 60.312 kg
pjg 24.3
lbr 16