Anda di halaman 1dari 1

LEGENDA

42+70 48+71
50
42+ R.4
+5
0 Bench Mark
3 48

R.
30.686 30.221 Patok Poligon
16

49
0 30.6 31.193 2
.33 7
30.728
0 55 30 30 .83 8 30.730
0.
30.405
31.2.417 31.143 31 .698 8 30 .93 8 29.907
80 30 .112 31.149 30 .319
31 .393
.4 30 .00 6 30.978
00 R

3 0 .80 8 5
1 30 .94 531.003

42
3 4 9
31 .219
POLITEKNIK NEGERI

30 0.7 969
.2 2
5 31.1 30 .01 Sungai

R.

3 9 . 11

45
.22

43+
= 31

2 0.7 96
2

49
3 0.8
X

3
Jembatan/Sadap/Check ( B Ra. 3 )

+5
68
SEMARANG

50
.4 58

0
30.8
30 0.8 887 7

3 1.2 89
Hm. 41+17 0

31.1 05
Lama ( B Ra. 5 ) 5

3 0.4 70

30.4 61
3 .6
3 0. 12 0

31.2 45
31 1.22 64
7+

31.3
30
3 0. 97

34
Bangunan Bagi

.3 4
Jalan Prof. H. Soedarto, S.H. Tembalang

27
Y
4 3 0.

69
00
+5

30 .68 14
3

.9
=
Semarang 50275 PO BOX 6199/SMS

30 0.8 917 4
.1 4
30
41
92

3 9. 7

90
2 0.8 99
3 0.8
5
Telp. (024) 7473347, 7499585, 7499586, Fax. (024) 7472396

R.
32

3
17

32
10 u

.4

50
41 41+

00
.9 07 http://www.polines.ac.id, E-mail : sekretariat@polines.ac.id

3 1. 37

30
30 0.9 144 3 b Bangunan Sadap
R.

3 0.9

3 0.5 56 4
e

3 1. 47
00

R.44
3 0. 91 4

31 1.3 13 1
3
3 0. 1 T
3 0.9

.5 49

7
30.989
31.369

30 .91 6
30.307
54

31.286

R.4
3

31.311

30 1.03 55
.1
2

3 0.0 45
.18 2
KERJA PROYEK

57
3 1.0 90
31 6

3 1.0

8
7 31.0.049 6 Corongan

30 .79 9

3
30 .8642
30 .20
.46 0 6

0
30 .405 1 3 1.0 72

31 .213
Teb
+5
JURUSAN TEKNIK SIPIL

30

31 .070
3
31 0.34 4 31.3 BM.GBG.05

1
40

.17
3 .28 3
31 .28 X = 500225.391

T
Saluran Sekunder Ranggah

44+50
31
2016/2017

eb
Y = 9252689.672 Pemasukan

3 0.4 385 7

30.564
31.2150

u
30.40
3 1. 65

31.273
31.276
3 0.

31 1.3 26
Z = + 31.061

.3 14

46+50
12
u
40

31.428
30.228
31.410
b

31.221
31.015
30.317
R.

e
Gorong - gorong

R .4
0
.0

80
0
RENCANA

5
.6
20

31 .51 75
30

31 .50 6
30 1.4
0

30.5 67
.61 8
50

31.4.388
0

30 .245
3
Gorong - Gorong silang

31 .333

45
=

31

3 1. 26 6
3 1. 1
X

3 0.8

3 0.2 43 6
31 1.4 95 2
3

.4 09
30.862

54
31.285
Talang

Y
30.280

=
Pemasukan 31.472

92
31.494

52
Hm. 40+00
.3)

80
46
Ra Pemasukan

0.
Siphon

R.
)

00
(B .5
k Ra Hm. 45+58
ec
B
a(
/ Ch La
m
45+50
ap Jembatan
ad
.S ka
n
ka
n
/B
tan su su
ba 7
Pe
ma 05+
0
Pe
ma 8
5+
5 JUDUL GAMBAR SKALA
J em 1+1 62 .4 .4 Jembatan Orang
. 4 31.0 94 Hm Hm
Hm x. + 30.0
De r. +
+ 33.00 Ds
Bang. Terjun POTONGAN
+ 32.00

MEMANJANG
+ 31.00 Bang. Penguras
SALURAN SEKUNDER
+ 30.00
Bang. Pelimpah Samping RANGGAH B.D
+ 29.00
SONOKELING - BRA.8
Desa
+ 28.00

1.00 1.00
+ 27.00
1 1 Sawah

+ 26.00
1
m
1 1
m w 1
DIPERIKSA TGL TTD
Lining lama h
Jalan Aspal
+ 25.00 Lining lama
b

+ 24.00 Jalan Tanah


Bidang Persamaan + 23.00 Basuki Setyo Budi S.T., M.T
RUAS 3 RUAS 4 NIP : 195911271988031002
PATOK HEKTOMETER Tegalan

NOMOR PROFIL R.40 40+50 R.41 +17 41+50 R.42 +50 +70 R.43 43+50 R.44 44+50 R.45 +50 +58 R.46 46+50 R.47 47+50 R.48 +50 +71 R.49 49+50 R.50
Arah Aliran
30.516 31.508 31.475 4000.000

30.426 31.314 31.385 4050.000

30.341 31.284 31.405 4100.000

30.049 31.066 31.062 4117.000

30.513 31.349 31.561 4150.000

30.464 31.224 31.270 4200.000

30.417 31.112 31.255 4250.000

30.405 31.193 31.143 4270.000

30.393 31.219 31.319 4300.000

30.405 31.261 31.127 4350.000

30.307 31.286 31.369 4400.000

30.400 31.273 31.215 4450.000

30.388 31.245 31.467 4500.000

30.280 31.472 31.285 4550.000

30.295 31.409 31.432 4600.000

30.228 31.410 31.221 4650.000

30.213 31.070 30.864 4700.000

30.144 30.913 30.907 4750.000

30.127 30.970 30.887 4800.000

30.008 30.946 30.938 4850.000

29.907 30.978 30.730 4871.000

29.969 30.711 30.785 4900.000

29.917 30.874 30.814 4950.000

30.055 31.045 31.036 5000.000


JARAK PROFIL / JARAK LANGSUNG 50 50 17 33 50 50 20 30 50 50 50 50 50 8 42 50 50 50 50 50 21 29 50 50
Rel Kereta Api
DIGAMBAR
ELEVASI TANGGUL KIRI
Nama : Tantowi Ferdinanzah
YANG ADA

ELEVASI TANGGUL KANAN Sal. Tersier

ELEVASI DASAR SALURAN PADA AS


Kelas : KS - 3D
Pasangan Lama
ELEVASI TANAH ASLI PADA AS SALURAN
NIM : 3.12.14.3.17
Pasangan Batu Kali Baru Program Studi : Konstruksi Sipil
30.54 31.48 31.73

30.51 31.45 31.70

30.49 31.43 31.68

30.48 31.40 31.65


30.43 31.35 31.60

30.41 31.33 31.58

30.38 31.30 31.55

30.34 31.26 31.51

30.33 31.25 31.50

30.31 30.23 31.48

30.28 31.20 31.45

30.24 31.16 31.41

30.21 30.13 21.38

30.18 31.10 31.35

30.14 31.06 31.31


30.14 31.06 31.31

30.11 31.03 31.28

30.08 31.00 31.25

30.05 30.97 31.22

30.01 30.93 31.18

29.98 30.90 31.15

29.95 30.87 31.12

29.93 30.85 31.10

29.91 30.83 31.08

29.88 30.80 31.05

29.85 30.77 31.02


ELEVASI TANGGUL

ELEVASI MUKA AIR RENCANA Pasang Batu Kali Bongkar Pasang TANGGAL TTD LEMBAR
ELEVASI DASAR SALURAN
Galian Tanah
TRACE SALURAN
RENCANA

ELEVASI DASAR SALURAN PEMB. KANAN

ELEVASI DASAR SALURAN PEMB. KIRI


0 40 80 120 160 200m
TYPE BANGUNAN
SKALA H
DIMENSI SALURAN DAN DATA TAMBAHAN RUAS 3
0 2 4 6 8 10m
CATATAN/REVISI
LENING KIRI
LENING KANAN SKALA V
40+50

42+00

43+50

46+50

47+50

RUAS 3
A = 1063.80 Ha

V = 0.55 m/dt
b = 2,350 m
h = 0,940 m
m1= 1,5 m2 = 1,5
k = 60
i = 0.000499
w = 0.25 m

Anda mungkin juga menyukai