42+70 48+71
50
42+ R.4
+5
0 Bench Mark
3 48
R.
30.686 30.221 Patok Poligon
16
49
0 30.6 31.193 2
.33 7
30.728
0 55 30 30 .83 8 30.730
0.
30.405
31.2.417 31.143 31 .698 8 30 .93 8 29.907
80 30 .112 31.149 30 .319
31 .393
.4 30 .00 6 30.978
00 R
3 0 .80 8 5
1 30 .94 531.003
42
3 4 9
31 .219
POLITEKNIK NEGERI
30 0.7 969
.2 2
5 31.1 30 .01 Sungai
R.
3 9 . 11
45
.22
43+
= 31
2 0.7 96
2
49
3 0.8
X
3
Jembatan/Sadap/Check ( B Ra. 3 )
+5
68
SEMARANG
50
.4 58
0
30.8
30 0.8 887 7
3 1.2 89
Hm. 41+17 0
31.1 05
Lama ( B Ra. 5 ) 5
3 0.4 70
30.4 61
3 .6
3 0. 12 0
31.2 45
31 1.22 64
7+
31.3
30
3 0. 97
34
Bangunan Bagi
.3 4
Jalan Prof. H. Soedarto, S.H. Tembalang
27
Y
4 3 0.
69
00
+5
30 .68 14
3
.9
=
Semarang 50275 PO BOX 6199/SMS
30 0.8 917 4
.1 4
30
41
92
3 9. 7
90
2 0.8 99
3 0.8
5
Telp. (024) 7473347, 7499585, 7499586, Fax. (024) 7472396
R.
32
3
17
32
10 u
.4
50
41 41+
00
.9 07 http://www.polines.ac.id, E-mail : sekretariat@polines.ac.id
3 1. 37
30
30 0.9 144 3 b Bangunan Sadap
R.
3 0.9
3 0.5 56 4
e
3 1. 47
00
R.44
3 0. 91 4
31 1.3 13 1
3
3 0. 1 T
3 0.9
.5 49
7
30.989
31.369
30 .91 6
30.307
54
31.286
R.4
3
31.311
30 1.03 55
.1
2
3 0.0 45
.18 2
KERJA PROYEK
57
3 1.0 90
31 6
3 1.0
8
7 31.0.049 6 Corongan
30 .79 9
3
30 .8642
30 .20
.46 0 6
0
30 .405 1 3 1.0 72
31 .213
Teb
+5
JURUSAN TEKNIK SIPIL
30
31 .070
3
31 0.34 4 31.3 BM.GBG.05
1
40
.17
3 .28 3
31 .28 X = 500225.391
T
Saluran Sekunder Ranggah
44+50
31
2016/2017
eb
Y = 9252689.672 Pemasukan
3 0.4 385 7
30.564
31.2150
u
30.40
3 1. 65
31.273
31.276
3 0.
31 1.3 26
Z = + 31.061
.3 14
46+50
12
u
40
31.428
30.228
31.410
b
31.221
31.015
30.317
R.
e
Gorong - gorong
R .4
0
.0
80
0
RENCANA
5
.6
20
31 .51 75
30
31 .50 6
30 1.4
0
30.5 67
.61 8
50
31.4.388
0
30 .245
3
Gorong - Gorong silang
31 .333
45
=
31
3 1. 26 6
3 1. 1
X
3 0.8
3 0.2 43 6
31 1.4 95 2
3
.4 09
30.862
54
31.285
Talang
Y
30.280
=
Pemasukan 31.472
92
31.494
52
Hm. 40+00
.3)
80
46
Ra Pemasukan
0.
Siphon
R.
)
00
(B .5
k Ra Hm. 45+58
ec
B
a(
/ Ch La
m
45+50
ap Jembatan
ad
.S ka
n
ka
n
/B
tan su su
ba 7
Pe
ma 05+
0
Pe
ma 8
5+
5 JUDUL GAMBAR SKALA
J em 1+1 62 .4 .4 Jembatan Orang
. 4 31.0 94 Hm Hm
Hm x. + 30.0
De r. +
+ 33.00 Ds
Bang. Terjun POTONGAN
+ 32.00
MEMANJANG
+ 31.00 Bang. Penguras
SALURAN SEKUNDER
+ 30.00
Bang. Pelimpah Samping RANGGAH B.D
+ 29.00
SONOKELING - BRA.8
Desa
+ 28.00
1.00 1.00
+ 27.00
1 1 Sawah
+ 26.00
1
m
1 1
m w 1
DIPERIKSA TGL TTD
Lining lama h
Jalan Aspal
+ 25.00 Lining lama
b
NOMOR PROFIL R.40 40+50 R.41 +17 41+50 R.42 +50 +70 R.43 43+50 R.44 44+50 R.45 +50 +58 R.46 46+50 R.47 47+50 R.48 +50 +71 R.49 49+50 R.50
Arah Aliran
30.516 31.508 31.475 4000.000
ELEVASI MUKA AIR RENCANA Pasang Batu Kali Bongkar Pasang TANGGAL TTD LEMBAR
ELEVASI DASAR SALURAN
Galian Tanah
TRACE SALURAN
RENCANA
42+00
43+50
46+50
47+50
RUAS 3
A = 1063.80 Ha
V = 0.55 m/dt
b = 2,350 m
h = 0,940 m
m1= 1,5 m2 = 1,5
k = 60
i = 0.000499
w = 0.25 m