Agustus 2022

K P
I LI
M
2 B
U I P
LN
2018 = Frequency deviation + 0.2
Hz around 10 %

K P
I
2019 = Frequency deviation + 0.2
Hz around 4.3 %

L
2020 = Frequency deviation + 0.2

I
Hz around 1.7 % 2021 = Frequency deviation + 0.2
Hz around 0.6 %

M
2 B
100%

90%

80%

70%
GF Pembangkit SJB
60

50

U I P
Free Governor

N
40
60%

Axis Title
L
139 GF Aktif(total aktif+aktif 30
50% nok)

P
40% GF Tidak Aktif (tdk aktif)
20

30%
10

K
20%

I
0
10% PJB IP TJB IPP
7 Aktif 56 55 4 22

L
0%
Total 56 56 4 28

I
146

Total Ramp Rate Free Governor AKTIF


Free Governor Aktif : 95,2 %

M
1003,83 MW/menit

HRSG, pembangkit <30 MW, Cikarang, KDL dan PLTP uap basah tidak diperhitungkan
2 B
P
97,50%

I
97,00% 97,26%
96,50%

U
96,00%
95,50%

N
95,00%
95,21%
94,50%

L
94,52% 94,52% 94,52%
94,00%
93,50%

P
93,00%
2021 TW1 TW2 TW3 TW4

I LI
Status ON/OFF
belum bisa
K
M
dimonitor di JCC
2 B
U I P
LN
K P
I LI
M
2 B
U I P
LN
K P
I LI
M
Total Ramp Rate AGC/LFC Aktif
AGC/LFC Aktif Uji : 64.3 % 805.62 MW/menit

06
2 B
U I P
LN
K P
I LI
M
Total Ramp Rate AGC/LFC Aktif
AGC/LFC Aktif : 57,3 % 715.62 MW/menit
2 B
P
2018 2019 2020 2021 2022 2023

U I
LN
K P
I LI
M
2 B
I P
90,00%
80,00%

U
70,00%
60,00%
59,65%
63,16%
69,01%
76,61%

N
50,00%
51,18%
40,00%

L
30,00%
20,00%

P
10,00%
0,00%
2021 TW1 TW2 TW3 TW4

I LIK 15
Pembangkit
6
Pembangkit
10
Pembangkit
12
Pembangkit
Rata-rata Aktivatisi LFC/AGC per triwulan = 12 Pembangkit

M
2 B
P
• •

I


N U
L

P
• •
• •

K

I
• •

M I L
• •
2 B
P
• •

I

U
• •

N

L


K P•

I

L
•I •

M
• •

• •
2 B
U I P
LN

K P •


o

I
o

L

M I •


2 B






o
o

U I P
N
• •

L

P
• •

K

I

L
o

I
o

M


2 B
U I P
LN
K P
I LI
M 07
2 B
U I P
LN
K P
I LI
M 07
Otomatisasi dispatch berdasarkan optimalisasi JROS

2 B
P
oleh AGC dengan mode control Scheduler.

Weather Monitoring
System
ROT

U I
LN Short Term Load
Forecast
ROB

K P IntraDay ROH ROM

I LI Front-End DCS

M
SCADA Pembangkit

02
2 B
P
Kit telah Uji Scheduling

I
Kit Aktif Scheduling Rencana Kit diuji Waktu
Scheduling

U
PLTU JAWA POWER #5 PLTU CEP
PLTU LONTAR #3 AGUSTUS 2022
PLTU JAWA POWER #6 PLTU LBE

N
PLTU TJ JATI BARU #5 AGUSTUS 2022

L
PLTU TANJUNG JATI #1 PLTU PITON 1,2 PLTU PEC #7 & #8 AGUSTUS 2022

PLTU TANJUNG JATI #2

PLTU TANJUNG JATI #3

K P
PLTU LABUAN #1

PLTU CILACAP #4

I LI PLTGU TAMBAKLOROK #2

PLTU PEC#3

M PLTU IDMYU #2
04
2 B
Kuantitas cadangan : ketersediaan besarnya cadangan untuk

I P
mendukung kontrol free governor berdasarkan kapasitas
headroom dan besarnya droop.

U
Kualitas cadangan : kecepatan respon primer dan kemampuan
lamanya bertahan (sustain).

LN Salah satu penyebab dari ketidakmampuan pembangkit


dalam memberikan kualitas respon primer yang baik dikenal

P
dengan fenomena active power withdrawal, di mana
pembangkit berusaha kembali ke setpoint dispatch inisialnya

K
beberapa saat setelah respon primer diberikan

I LI
Perbaikan respon primer dapat diatasi dengan penambahan
limiter sesuai spesifikasi range MW pembangkit.

M
Nama Kit Merk DCS DMN (MW)
Target Setting Setting Limiter
Keterangan (Eksisting)

2 B Eviden

P
Limiter (Eksisting)

I
PLTU SRLYA #1 Yokogawa 371.5 11.145 18 MW ▪ Tuneable bisa auto/manual dengan 2 mode
PLTU SRLYA #2 Yokogawa 371.5 11.145 18 MW (limiter 1 menggunakan hidrolik kontrol
mitsubishi dan limiter 2 dari DCS yokogawa)

U
PLTU SRLYA #3 Yokogawa 371.5 11.145 18 MW
PLTU SRLYA #4 Yokogawa 371.5 11.145 18 MW ▪ Kondisi masih menggunakan LFC
PLTU SRLYA #5 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38

N
PLTU SRLYA #6 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38

L
PLTU SRLYA #7 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38 Eviden Surat 0661/150/IP/2022
Tanggal 28 Juni 2022

P
PLTU LABUAN #1 Siemens 280 8.4 8 MW sudah terpasang
PLTU LABUAN #2 Siemens 280 8.4 8 MW sudah terpasang
PLTU SRLYA #8 Foxboro ( Scheneider) 540 13.5 10 MW sudah terpasang
PLTU PRATU #1 Valmet 323 8.075 10 MW sudah terpasang

K
PLTU PRATU #2 Valmet 323 8.075 10 MW sudah terpasang

I
PLTU PRATU #3 Valmet 323 8.075 10 MW sudah terpasang

L
PLTU LONTAR #1 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang

I
PLTU LONTAR #2 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang
PLTU LONTAR #3 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang
PLTU LBE #1 ABB 625 15.625 17 MW sudah terpasang semula 35 diubah ke 17 surat no 2022-LBE/PLNP2B-

M
LTR-0068 Tanggal 13 Juli 2022
PLTU JAWA 7 #1 Beijing GUODIAN ZHISHEN 991 19.82 tanggal 26 September 2022 Setting limiter Free surat no 190/SGPJB/08/2022
CONTROL 40 MW Governor diset ke nilai 21 MW
PLTU JAWA 7 #2 Beijing GUODIAN ZHISHEN 991 19.82 tanggal 26 September 2022 Setting limiter Free surat no 190/SGPJB/08/2022
CONTROL 40 MW Governor diset ke nilai 21 MW
Nama Kit Merk DCS
DMN Target Setting Setting Limiter
Keterangan (Eksisting)

2 B
Keterangan (Target)

P
(MW) Limiter (Eksisting)

I
PLTU INDRAMAYU #1 Foxboro 290 ± 8.70 10 MW sudah terpasang
BA perubahan setting limiter tanggal 12
PLTU INDRAMAYU #2 Foxboro 290 ± 8.70 10 MW sudah terpasang
Juli 2022
PLTU INDRAMAYU #3 Foxboro 290 ± 8.70 10 MW sudah terpasang

U
PLTU IPP CIREBON #1 Emerson 660 masih manual, rencana akan dirubah terkait Surat No. CPS-OPS-LO-VII-22-041
± 16.50 20 MW pergantian DCS Mei 2022
PLTU ADIPALA #1 Emerson 615 surat 0661/150/IP/2022 tanggal 28 Juni

N
(Ovation) ± 15.38 10 MW sudah terpasang 2022
PLTU REMBANG #20 Foxboro 280 ± 8.40 10 MW sudah terpasang awalna 6 resetting ke 10 BA resetting DCS 11 Juli 2022

L
PLTU REMBANG #10 Foxboro 280 ± 8.40 10 MW sudah terpasang awalna 6 resetting ke 10 BA resetting DCS 11 Juli 2022
PLTU CLCAP #1 Foxboro 281 terdapat fasilitas, belum diaktifkan, rencana surat 0996/GM1&2-S2P/VII/2022 25 Juli

P
± 8.43 8 MW diterapkan ketika OH Agustus 2023 2022
PLTU CLCAP #2 Foxboro 281 terdapat fasilitas, belum diaktifkan, rencana surat 0996/GM1&2-S2P/VII/2022 25 Juli
± 8.43 8 MW diterapkan ketika OH Oktober 2022 2022
PLTU CLCAP #3 Emerson 614 sudah ada fasilitas, belum diaktifkan, rencana diskusi

K
± 15.35 - dengan internal

I
PLTU CLCAP #4 Emerson 945 ± 18.90 - memastikan dulu ke tim engineer
PLTU BATANG #1 Mitsubishi 1000 ± 20.00 - setting bisa dilakukan oleh operator, menunggu COD

I L
PLTU BATANG #2 Mitsubishi 1000 ± 20.00 - setting bisa dilakukan oleh operator, menunggu COD
PLTU TJATI #1 Toshiba 660.8 ± 16.52 15 MW sudah terpasang
PLTU TJATI #2 Toshiba 660.8 ± 16.52 15 MW sudah terpasang

M
PLTU TJATI #3 Toshiba 661.1 ± 16.53 15 MW sudah terpasang
PLTU TJATI #4 Toshiba 661.1
± 16.53 15 MW sudah terpasang
PLTU TJATI #5 Toshiba 1000
± 20.00 - konfirmasi ke engineer
PLTU TJATI #6 Toshiba 1000 ± 20.00 - konfirmasi ke engineer
Nama Kit Merk DCS DMN (MW)
Target Setting
Limiter
Setting Limiter
(Eksisting)
Keterangan (Eksisting)

2 B
Keterangan (Target)

PLTU PITON #1

PLTU PITON #2

PLTU TJ AWAR2 #1
PLTU TJ AWAR2 #2
Emerson

Emerson

FoxBoro
FoxBoro
370

370

323
323
± 11.10

± 11.10
± 9.69
± 9.69
- 8 MW & +16
MW
- 8 MW & +16
MW
3 MW
3 MW
sudah terpasang

U
sudah terpasang

I P
BA resetting tanggal 28 Maret 2022
BA resetting tanggal 28 Maret 2022
ok

ok
diminta untuk resetting kembali
diminta untuk resetting kembali

N
PLTU PAITON #9 Emerson 615 ± 15.38 15 MW BA resetting tanggal 4 Juli 2022 BA resetting DCS
PLTU PACITAN #1 FoxBoro 280 8.40 8.4 MW BA resetting tanggal 1 Agt 2022 ok

L
PLTU PACITAN #2 FoxBoro 280 8.40 8.4 MW BA resetting tanggal 1 Agt 2022 ok
PLTU PEC #7 Emerson 610 ± 15.25 17 MW sudah terpasang surat No. 193/PE-LT/VII/2022

P
PLTU PEC #8 Emerson 610 ± 15.25 17 MW sudah terpasang surat No. 193/PE-LT/VII/2022
PLTU PEC #3 Mitsubishi 813 ± 16.26 20 MW sudah terpasang surat No. 193/PE-LT/VII/2022
PLTU Jawa Power #5 Siemens 610 ± 15.25 20 MW sudah terpasang
PLTU Jawa Power #6 Siemens 610 ± 15.25 20 MW sudah terpasang

K
PLTU CELUKAN BAWANG #1 Guodian Nanjing 125 surat No.

I
Automation Co. Ltd ± 3.75 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022
PLTU CELUKAN BAWANG #2 Guodian Nanjing 125 surat No.

L
Automation Co. Ltd ± 3.75 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022

I
PLTU CELUKAN BAWANG #3 Guodian Nanjing 130 surat No.
Automation Co. Ltd ± 3.90 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022