RAE Free Gov Dan AGC
RAE Free Gov Dan AGC
U I P
LN
Agustus 2022
K P
I LI
M
2 B
U I P
LN
2018 = Frequency deviation + 0.2
Hz around 10 %
K P
I
2019 = Frequency deviation + 0.2
Hz around 4.3 %
L
2020 = Frequency deviation + 0.2
I
Hz around 1.7 % 2021 = Frequency deviation + 0.2
Hz around 0.6 %
M
2 B
100%
90%
80%
70%
GF Pembangkit SJB
60
50
U I P
Free Governor
N
40
60%
Axis Title
L
139 GF Aktif(total aktif+aktif 30
50% nok)
P
40% GF Tidak Aktif (tdk aktif)
20
30%
10
K
20%
I
0
10% PJB IP TJB IPP
7 Aktif 56 55 4 22
L
0%
Total 56 56 4 28
I
146
M
1003,83 MW/menit
HRSG, pembangkit <30 MW, Cikarang, KDL dan PLTP uap basah tidak diperhitungkan
2 B
P
97,50%
I
97,00% 97,26%
96,50%
U
96,00%
95,50%
N
95,00%
95,21%
94,50%
L
94,52% 94,52% 94,52%
94,00%
93,50%
P
93,00%
2021 TW1 TW2 TW3 TW4
I LI
Status ON/OFF
belum bisa
K
M
dimonitor di JCC
2 B
U I P
LN
K P
I LI
M
2 B
U I P
LN
K P
I LI
M
Total Ramp Rate AGC/LFC Aktif
AGC/LFC Aktif Uji : 64.3 % 805.62 MW/menit
06
2 B
U I P
LN
K P
I LI
M
Total Ramp Rate AGC/LFC Aktif
AGC/LFC Aktif : 57,3 % 715.62 MW/menit
2 B
P
2018 2019 2020 2021 2022 2023
U I
LN
K P
I LI
M
2 B
I P
90,00%
80,00%
U
70,00%
60,00%
59,65%
63,16%
69,01%
76,61%
N
50,00%
51,18%
40,00%
L
30,00%
20,00%
P
10,00%
0,00%
2021 TW1 TW2 TW3 TW4
I LIK 15
Pembangkit
6
Pembangkit
10
Pembangkit
12
Pembangkit
Rata-rata Aktivatisi LFC/AGC per triwulan = 12 Pembangkit
M
2 B
P
• •
I
•
•
•
•
N U
L
•
P
• •
• •
K
•
I
• •
•
M I L
• •
2 B
P
• •
I
•
•
U
• •
N
•
•
L
•
•
•
K P•
•
•
I
•
L
•I •
•
M
• •
• •
2 B
U I P
LN
•
K P •
•
o
I
o
L
•
M I •
•
2 B
•
•
•
•
•
•
o
o
U I P
N
• •
L
•
P
• •
K
•
I
•
•
L
o
I
o
•
M
•
•
2 B
U I P
LN
K P
I LI
M 07
2 B
U I P
LN
K P
I LI
M 07
Otomatisasi dispatch berdasarkan optimalisasi JROS
2 B
P
oleh AGC dengan mode control Scheduler.
Weather Monitoring
System
ROT
U I
LN Short Term Load
Forecast
ROB
I LI Front-End DCS
M
SCADA Pembangkit
02
2 B
P
Kit telah Uji Scheduling
I
Kit Aktif Scheduling Rencana Kit diuji Waktu
Scheduling
U
PLTU JAWA POWER #5 PLTU CEP
PLTU LONTAR #3 AGUSTUS 2022
PLTU JAWA POWER #6 PLTU LBE
N
PLTU TJ JATI BARU #5 AGUSTUS 2022
L
PLTU TANJUNG JATI #1 PLTU PITON 1,2 PLTU PEC #7 & #8 AGUSTUS 2022
K P
PLTU LABUAN #1
PLTU CILACAP #4
I LI PLTGU TAMBAKLOROK #2
PLTU PEC#3
M PLTU IDMYU #2
04
2 B
Kuantitas cadangan : ketersediaan besarnya cadangan untuk
I P
mendukung kontrol free governor berdasarkan kapasitas
headroom dan besarnya droop.
U
Kualitas cadangan : kecepatan respon primer dan kemampuan
lamanya bertahan (sustain).
P
dengan fenomena active power withdrawal, di mana
pembangkit berusaha kembali ke setpoint dispatch inisialnya
K
beberapa saat setelah respon primer diberikan
I LI
Perbaikan respon primer dapat diatasi dengan penambahan
limiter sesuai spesifikasi range MW pembangkit.
M
Nama Kit Merk DCS DMN (MW)
Target Setting Setting Limiter
Keterangan (Eksisting)
2 B Eviden
P
Limiter (Eksisting)
I
PLTU SRLYA #1 Yokogawa 371.5 11.145 18 MW ▪ Tuneable bisa auto/manual dengan 2 mode
PLTU SRLYA #2 Yokogawa 371.5 11.145 18 MW (limiter 1 menggunakan hidrolik kontrol
mitsubishi dan limiter 2 dari DCS yokogawa)
U
PLTU SRLYA #3 Yokogawa 371.5 11.145 18 MW
PLTU SRLYA #4 Yokogawa 371.5 11.145 18 MW ▪ Kondisi masih menggunakan LFC
PLTU SRLYA #5 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38
N
PLTU SRLYA #6 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38
L
PLTU SRLYA #7 ABB 575.2 3 % DMN (18 MW) sudah terpasang
± 14.38 Eviden Surat 0661/150/IP/2022
Tanggal 28 Juni 2022
P
PLTU LABUAN #1 Siemens 280 8.4 8 MW sudah terpasang
PLTU LABUAN #2 Siemens 280 8.4 8 MW sudah terpasang
PLTU SRLYA #8 Foxboro ( Scheneider) 540 13.5 10 MW sudah terpasang
PLTU PRATU #1 Valmet 323 8.075 10 MW sudah terpasang
K
PLTU PRATU #2 Valmet 323 8.075 10 MW sudah terpasang
I
PLTU PRATU #3 Valmet 323 8.075 10 MW sudah terpasang
L
PLTU LONTAR #1 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang
I
PLTU LONTAR #2 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang
PLTU LONTAR #3 Foxboro ( Scheneider) 280 8.4 7 MW sudah terpasang
PLTU LBE #1 ABB 625 15.625 17 MW sudah terpasang semula 35 diubah ke 17 surat no 2022-LBE/PLNP2B-
M
LTR-0068 Tanggal 13 Juli 2022
PLTU JAWA 7 #1 Beijing GUODIAN ZHISHEN 991 19.82 tanggal 26 September 2022 Setting limiter Free surat no 190/SGPJB/08/2022
CONTROL 40 MW Governor diset ke nilai 21 MW
PLTU JAWA 7 #2 Beijing GUODIAN ZHISHEN 991 19.82 tanggal 26 September 2022 Setting limiter Free surat no 190/SGPJB/08/2022
CONTROL 40 MW Governor diset ke nilai 21 MW
Nama Kit Merk DCS
DMN Target Setting Setting Limiter
Keterangan (Eksisting)
2 B
Keterangan (Target)
P
(MW) Limiter (Eksisting)
I
PLTU INDRAMAYU #1 Foxboro 290 ± 8.70 10 MW sudah terpasang
BA perubahan setting limiter tanggal 12
PLTU INDRAMAYU #2 Foxboro 290 ± 8.70 10 MW sudah terpasang
Juli 2022
PLTU INDRAMAYU #3 Foxboro 290 ± 8.70 10 MW sudah terpasang
U
PLTU IPP CIREBON #1 Emerson 660 masih manual, rencana akan dirubah terkait Surat No. CPS-OPS-LO-VII-22-041
± 16.50 20 MW pergantian DCS Mei 2022
PLTU ADIPALA #1 Emerson 615 surat 0661/150/IP/2022 tanggal 28 Juni
N
(Ovation) ± 15.38 10 MW sudah terpasang 2022
PLTU REMBANG #20 Foxboro 280 ± 8.40 10 MW sudah terpasang awalna 6 resetting ke 10 BA resetting DCS 11 Juli 2022
L
PLTU REMBANG #10 Foxboro 280 ± 8.40 10 MW sudah terpasang awalna 6 resetting ke 10 BA resetting DCS 11 Juli 2022
PLTU CLCAP #1 Foxboro 281 terdapat fasilitas, belum diaktifkan, rencana surat 0996/GM1&2-S2P/VII/2022 25 Juli
P
± 8.43 8 MW diterapkan ketika OH Agustus 2023 2022
PLTU CLCAP #2 Foxboro 281 terdapat fasilitas, belum diaktifkan, rencana surat 0996/GM1&2-S2P/VII/2022 25 Juli
± 8.43 8 MW diterapkan ketika OH Oktober 2022 2022
PLTU CLCAP #3 Emerson 614 sudah ada fasilitas, belum diaktifkan, rencana diskusi
K
± 15.35 - dengan internal
I
PLTU CLCAP #4 Emerson 945 ± 18.90 - memastikan dulu ke tim engineer
PLTU BATANG #1 Mitsubishi 1000 ± 20.00 - setting bisa dilakukan oleh operator, menunggu COD
I L
PLTU BATANG #2 Mitsubishi 1000 ± 20.00 - setting bisa dilakukan oleh operator, menunggu COD
PLTU TJATI #1 Toshiba 660.8 ± 16.52 15 MW sudah terpasang
PLTU TJATI #2 Toshiba 660.8 ± 16.52 15 MW sudah terpasang
M
PLTU TJATI #3 Toshiba 661.1 ± 16.53 15 MW sudah terpasang
PLTU TJATI #4 Toshiba 661.1
± 16.53 15 MW sudah terpasang
PLTU TJATI #5 Toshiba 1000
± 20.00 - konfirmasi ke engineer
PLTU TJATI #6 Toshiba 1000 ± 20.00 - konfirmasi ke engineer
Nama Kit Merk DCS DMN (MW)
Target Setting
Limiter
Setting Limiter
(Eksisting)
Keterangan (Eksisting)
2 B
Keterangan (Target)
PLTU PITON #1
PLTU PITON #2
PLTU TJ AWAR2 #1
PLTU TJ AWAR2 #2
Emerson
Emerson
FoxBoro
FoxBoro
370
370
323
323
± 11.10
± 11.10
± 9.69
± 9.69
- 8 MW & +16
MW
- 8 MW & +16
MW
3 MW
3 MW
sudah terpasang
U
sudah terpasang
I P
BA resetting tanggal 28 Maret 2022
BA resetting tanggal 28 Maret 2022
ok
ok
diminta untuk resetting kembali
diminta untuk resetting kembali
N
PLTU PAITON #9 Emerson 615 ± 15.38 15 MW BA resetting tanggal 4 Juli 2022 BA resetting DCS
PLTU PACITAN #1 FoxBoro 280 8.40 8.4 MW BA resetting tanggal 1 Agt 2022 ok
L
PLTU PACITAN #2 FoxBoro 280 8.40 8.4 MW BA resetting tanggal 1 Agt 2022 ok
PLTU PEC #7 Emerson 610 ± 15.25 17 MW sudah terpasang surat No. 193/PE-LT/VII/2022
P
PLTU PEC #8 Emerson 610 ± 15.25 17 MW sudah terpasang surat No. 193/PE-LT/VII/2022
PLTU PEC #3 Mitsubishi 813 ± 16.26 20 MW sudah terpasang surat No. 193/PE-LT/VII/2022
PLTU Jawa Power #5 Siemens 610 ± 15.25 20 MW sudah terpasang
PLTU Jawa Power #6 Siemens 610 ± 15.25 20 MW sudah terpasang
K
PLTU CELUKAN BAWANG #1 Guodian Nanjing 125 surat No.
I
Automation Co. Ltd ± 3.75 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022
PLTU CELUKAN BAWANG #2 Guodian Nanjing 125 surat No.
L
Automation Co. Ltd ± 3.75 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022
I
PLTU CELUKAN BAWANG #3 Guodian Nanjing 130 surat No.
Automation Co. Ltd ± 3.90 8.5 MW sudah aktif dan terpasang 022/DIR.OPS/GEB.SITE/VII/2022
M
2 B
U I P
LN
K P
I LI
M