II.PEKERJAAN TANAH
1.Pekerjaan 1 m³ tanah pondasi sedalam 1 m
No Uraian kode Satuan Koefisien Harga satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.75 82,000
Mandor L.04 OH 0.025 100,000
jumlah harga pekerja
B BAHAN
Jumlah harga bahan
C ALAT
Jumlah harga alat
D Jumlah (A+B+C)
E Overhead & privot 10%
F Jumlah total
8000
5000
13000
13000
1,355
14,355
8000
9,500
1,500
500
19500
30000
300
17500
47800
67300
6730
74030
61500
2500
64000
64000
6400
70400
41000
5000
46000
46000
4600
50600
24600
1000
25600
115200
115200
140800
14080
154880
59860
37050
5850
3900
106660
196800
49248
246048
352708
35270.8
387978.8
123000
71250
11250
7500
213000
196800
254520
55290
506610
719610
71961
791571
132000
26125
42000
83000
283125
467460
57236
102606
627302
910427
91042.7
Jumlah harga (Rp)
41600
24700
3900
2600
72800
112500
4500
500
117500
190300
19030
209330
52800
31350
4950
3300
92400
100000
6000
1000
49500
43750
40000
240250
332650
33265
365915
Jumlah harga (Rp)
52800
31350
4950
3300
92400
100000
6000
1000
49500
40000
196500
288900
28890
317790
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KERJA
TAHUN ANGGARAN 2016
KABUPATEN SOLOK SELATAN SELATAN
1 2 3 4 5
SATUAN BAHAN
A
LOKAL
B BAHAN KAYU
Kayu Panjang
5 Bulat, dia. 5 - 15 Batang 20,000
cm (Dolken)
Bambu ukuran
7 sedang Batang 17,500
8 Ijuk Saringan kg 20,000
Ukiran Papan
10 Minang Interior M2 650,000
Paku Pancing
12 60x230 kg 20,000
16 Pagar BRC :
Ukuran 90 vcm -
2,4 mm M1 240,000
Tiang M1 95,000
Kuda-kuda Baja
Ringan M2 150,000
BAHAN
D
PENUTUP ATAP
1 Seng Gelombang
BJLS 20 Warna
Perabung Genteng
6 Metal M' 33,000
Terpal Talang
4 Hitam M' 8,500
Poli Carbonat
6 (Setara Twin Light) M2 130,000
BAHAN
E DINDING DAN
LOTENG
Triplex, Tebal 3
1 mm Lbr 50,000
Plywood tebal 4
8 mm (90 x 220) cm Lbr 65,000
Kosen Aluminium
9 4" (warna hitam/ m' 75,000
abu-abu)
BAHAN
F PENGGANTUNG
/ PENGUNCI
Kunci Tanam Merk
1 Ses Set 175,000
Engsel Jendela
8 Bh 12,000
Peluru 3"
9 Hak Angin Bh 15,000
10 Hak Angin Antik Bh 8,000
Tarikan Pintu
11 Ganda Set 120,000
BAHAN
G PABRIKASI
LOKAL
1 Batu Bata Bh 900 di lokasi
2 Batu tempel hitam Bh 110,000
3 Paving Block Bh 3,500
BAHAN
KERAMIK,
H
SEMEN DAN
ASPAL
Borger/Plin
1 Keramik Biasa M² 8,500
Borger/Plin
2 Keramik Motif M² 27,000
Keramik Dinding
4 KWI, Ukr 20 x 20 M² 58,000
Keramik Lantai KW
6 I, Ukr 30 x 30 M² 55,000
I BAHAN CAT
DAN FINISHING
Cat ICI
6 kg 110,000
Weathershield
ALAT - ALAT
J
LISTRIK
1 Kabel NYM 3 x 2,5 M1 17,000
2 Kabel NYM 3 x 3 m M1 19,000
3 PVC Hight Impact d M1 3,300
4 Coupling/Socket di Bh 1,500
5 Clamp Cable dia 20 Bh 4,000
6 Junction Box Bh 5,000
K UPAH KERJA
1 Kepala Tukang Hari 150,000
2 Mandor Hari 100,000
3 Tukang Batu Hari 95,000
4 Tukang Kayu Hari 95,000
5 Tukang Cat Hari 95,000
6 Tukang Besi Hari 95,000
Tukang Beronjong Hari 95,000
7
8 Tukang Listrik Hari 95,000
9 Tukang Las Hari 95,000
10 Tukang Gali Hari 95,000
11 Tukang Aspal Hari 95,000
12 Tukang Pipa Hari 95,000
13 Operator Hari 130,000
Pembantu
Operator Hari 95,000
14
15 Mekanik Hari 105,000
14,355 Rp.
74,030
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
HARGA SATUAN (Rp) JUMLAH (Rp)
0
0
0
0
0
0