Anda di halaman 1dari 1

GKIR

.CAN
1=P
8.02m CC.0
TM1
TM1
TM1 22.37m
45.83m

30.94m
TM1
19.19m TM1
REJO
TM1 DRIYO
46.48m RAYA
TM1
48.64m
EJO
TM5
DRIYOR
RAYA
37.87m

REKAPITULASI. REKAPITULASI. TM1


36.27m
NO KONSTRUKSI VOLUME NO KONSTRUKSI VOLUME TM1
42.99m
1 TR PENJANGGA. 14 TM.1
TM8
REJO
2 TR SUDUT.
15 TM.2
D RIYO
3 TR AWAL.
16 TM.4 RAYA
RYA
G SU
.WIN GKIR
4 1=P
TR AKHIR. TM.4 C
17 N
CC.0 = P.CA
2
CC.0
5 TIANG BETON TR. 18 TM.5

6 SUTR TC 3x70 mm2 TM.8 A

7 SR TC 2x10 mm2
19

20 TM.10
Gambar Rencana Rehab SUTM A3C 150mm
menjadi MVTIC 150mm = 338,60 ms
TREK SCHOER TR.
8 21 TIANG BETON TM.

9 KONTR MAST TR.


22 JOINTING KABEL

P.CANGKIR
DROEK SCHOER TR.
10 23 SKTM.20 KV

11 GTT 24 TREK SCHOER TM.

12 GTT 3 x ..... 25 DROEK SCHOER TM.

13 GARDU CUBICLE 26 KONTR MAST TM.

PT PLN ( PERSERO )
UID JAWA TIMUR
ULP TAMAN
UP3 SURABAYA BARAT
JL. RY KEDAMEAN DS BRINGKANG

Gambar Rencana Rehab SUTM A3C 150mm


menjadi MVTIC150mm = 338.60 kms
P.CANGKIR
DIGAMBAR DISETUJUI DIKETAHUI NO . RENCANA

TANGGAL
NOOR SAADILAH PRADANA M. SYAFI ‘I

Anda mungkin juga menyukai