A. KEBUTUHAN MATERIAL
1 ............... Mtr Gaspijp 1.5’ /Dackstd
2 ............... Bh Deckschoref 3/8’ x 2
3 ............... Bh Loden Manchet + Stroop 1.5’
4 ............... Bh Pole Bracket 3’
5 ............... Bh Starin Hook & Clamp 1 ½’
Rencana :
> Pasang SUTR Konst : 6 ............... Bh Service Wedge Clamp
- TR 1 = 1 Set 7 ............... Bh Bund Cond Conc 6-35/6-35 mm
- TR 2 = 0 Set 8 ............... Bh Bund Cond Conc 6-35/6-70 mm
- TR 3 = 1 Set
- Tiang 9 m = 2 buah 9 ............... Bh Twisted Cable 6/10/16 mm
- Twisted Insulated Cable 10 ............... Bh Bimetal Conc 6-35/16-50 mm
3X70 mm2 + 1X50 mm2 = 74 Mtr Jl. Kavli 11 ............... Bh Kwh Meter 1 Phase A
- Pondasi Tiang = 1 Tiang ng RT.0
4/RW.0 12 ............... Bh Kwh Meter 3 Phase A
- Trackscure + Ground = 1 buah TR-RA257B1C1B4 37 mtr 5
- Perluasan JTR 2 gawang TR 1
13 ............... Bh Pembatas MCB A
37 mtr 20 mtr
TR 3 10 mtr
14 ............... mm² Twisted Cable
15 ............... Bh Connector
B. DATA TRAFO
1. No. Gardu = RA257
2. Kapasitas = 100 kVA
Rencana : 3. Hasil Ukur = %
4. Bulan Ukur =
- TC 2x10 mm2 = 30 Meter
5. Phasa R= Amp
- Pasang SR 1phs MCB 16A
S= Amp
T= Amp
N= Amp
6. Panjang jurusan = Km
7. Keterangan =