A. KEBUTUHAN MATERIAL
MENJADI 13200VA & PERLUASAN JARINGAN 2 GAWANG 1 ............... Mtr Gaspijp 1.5’ /Dackstd
2 ............... Bh Deckschoref 3/8’ x 2
3 ............... Bh Loden Manchet + Stroop 1.5’
4 ............... Bh Pole Bracket 3’
5 ............... Bh Starin Hook & Clamp 1 ½’
6 ............... Bh Service Wedge Clamp
KEBUTUHAN : 7 ............... Bh Bund Cond Conc 6-35/6-35 mm
8 ............... Bh Bund Cond Conc 6-35/6-70 mm
- MCB 3x20A 9 ............... Bh Twisted Cable 6/10/16 mm
RB610D3A4
- TC = 4x16mm TR3A 36 mtr
TR2 10 ............... Bh Bimetal Conc 6-35/16-50 mm
30 mtr
18
11 ............... Bh Kwh Meter 1 Phase A
- SR = 18 Meter Jl. Kesamben Wetan
mt
r 12 ............... Bh Kwh Meter 3 Phase A
13 ............... Bh Pembatas MCB A
14 ............... mm² Twisted Cable
15 ............... Bh Connector
Rencana : -7.350869° 112.607240°
> Pasang SUTR Konst : B. DATA TRAFO
- TR 2 = 1 Set
- TR 3A = 1 Set 1. No. Gardu = RB610
- Tiang 9 m = 1 buah 2. Kapasitas = 200 kVA
- Twisted Insulated Cable 3. Hasil Ukur = %
3X70 mm2 + 1X50 mm2 = 66 Mtr 4. Bulan Ukur =
- Perluasan JTR 2 gawang 5. Phasa R= Amp
S= Amp
T= Amp
N= Amp
6. Panjang jurusan = Km
7. Keterangan =