Anda di halaman 1dari 1

PROYEK PEMBANGUNAN PEMBERI TUGAS

TERMINAL PENUMPANG BORE PILE SATKER BANDAR UDARA PANGSUMA


BANDAR UDARA PANGSUMA GALIAN PUTUSSIBAU - KALBAR
PUTUSSIBAU - KALBAR KONTRAKTOR PELAKSANA PT. JMA - WGE KSO
KONSULTAN PENGAWAS PT.KENCANA RANCANGTAMA KONSULTAN

BORE PILE NO. : …………………………… TANGGAL : ……………………………….

DIAMETER : …………………………… ELEVASI : ……………………………….

0.00 FFL 0.00 FFL

MUKA TANAH MUKA TANAH

paraf pelaksana paraf pelaksana

(.................................) (.................................)

0.00 FFL 0.00 FFL

BOSP MUKA TANAH BOSP MUKA TANAH

L = ............. M L = ............. M

paraf pelaksana paraf pelaksana


BOSP BOSP

(.................................) L = ............. M (.................................) L = ............. M

Mengetahui, Diperiksa oleh, Diajukan oleh :


SATKER UPBU BANDAR UDARA Konsultan Pengawas Kontraktor
PT. KENCANA RANCANGTAMA
PANGSUMA-PUTUSSIBAU KONSULTAN PT. JMA - WGE KSO

Tim Teknis Inspector Site Engineer

FLS-009

Anda mungkin juga menyukai