HARGA (Rp)
NO URAIAN PEKERJAAN VOLUME
SATUAN
1 2 3 4
A PEKERJAAN PERSIAPAN
1 Pek. Pemerataan Lokasi & Mobilisasi 1 Ls 500,000.00
2 Pek. Pembersihan dan Prasati 1 Ls 500,000.00
Sub Total :
B PEK. KONSTRUKSI
I PEKERJAAN JALAN P = 666 M' L = 2.50 M
Dibulatkan :
Sampang, ………………………
…………………………………. ………………………………..
KMAS)
."
TEN BANGKALAN
KABUPATEN BANGKALAN
HARGA (Rp)
JUMLAH
5
500,000.00
500,000.00
1,000,000.00
28,423,093.69
5,159,606.63
165,417,441.94
199,000,142.26
200,000,142.26
200,000,000.00
Sampang, ………………………
Konsutan Perencana :
CV. ……………………………….
………………………………..
KELOMPOK MASYARAKAT (POKMAS)
" ……………………………………... "
DESA ……………………….. KECAMATAN …………………….. KABUPATEN BANGKALAN
REKAPITULASI
NO URAIAN PEKERJAAN
A. PEKERJAAN PERSIAPAN
B. PEK. KONSTRUKSI
Total :
Dibulatkan :
Sampang, ……………………
…………………………………. ………………………………
POKMAS)
………... "
KABUPATEN BANGKALAN
HARGA
1,000,000.00
199,000,142.26
200,000,142.26
200,000,000.00
Sampang, ………………………
Konsutan Perencana :
CV. ……………………………….
………………………………..
HARGA SATUAN POKOK KEGIATAN
PEMERINTAH KABUPATEN BANGKALAN
TAHUN 2017
100,000.00
140,000.00
120,000.00
70,000.00
60,000.00
720,000.00
153,000.00
1,363,000.00
4,995,000.00
30,780,000.00
960,000.00
36,735,000.00
73,320.00
1,272,000.00
200,000.00
925,000.00
421,600.00
2,891,920.00
40,989,920.00
17,079.13
600,000.00
420,000.00
360,000.00
210,000.00
180,000.00
11,880,000.00
459,000.00
14,109,000.00
13,627,600.00
8,365,900.00
4,665,500.00
1,456,875.00
84,645,000.00
3,600,000.00
116,360,875.00
1,495,728.00
3,816,000.00
600,000.00
2,775,000.00
8,686,728.00
139,156,603.00
99,397.57
100,000.00
70,000.00
2,880,000.00
3,050,000.00
39,195,000.00
9,734,000.00
7,656,250.00
56,585,250.00
1,099,800.00
1,272,000.00
2,371,800.00
62,007,050.00
413,380.33
KELOMPOK MASYARAKAT (POKMAS)
" ……………………………………... "
DESA ……………………….. KECAMATAN …………………….. KABUPATEN BANGKALAN
2 Pek. Lapis Pondasi Bawah (Telford) 5% 2.58 0.64 0.64 0.64 0.64
Jumlah Rencana 100.00 0.25 2.25 3.00 4.64 5.86 11.64 15.64 18.00 18.00
Rencana Komulatif 0 0.25 2.50 5.50 10.14 16.00 27.65 43.29 61.29 79.29
Realisasi
Deviasi
RENCANA
Sampang, …………………
…………………………………. ………………………………
der
Skala
M10 M11 M12
100
50
Konsutan Perencana :
CV. ANTIQUE DESIGN CONSULTAN
………………………………..