Anda di halaman 1dari 3

JUMLAH

PPN 10%
TOTAL
DIBULATKAN
Terbilang :
# Empat Puluh Sembilan Milyar Sembilan Ratus Juta Rupiah #
#NAME?
Rp 49,900,000,000.00

Juta Rupiah #
ENGINEERING
ESTIMATE (EE)
REKAP TOTAL
Kegiatan :
PENYEDIAAN FASILITAS PELAYANAN
FASILITAS KESEHATAN UNTUK UKM DAN UKP UNTUK KEWENANGAN DAERAH KABUPATEN/ KOTA
Pekerjaan :
STUDY KELAYAKAN (FS), MASTER PLAN PENYUSUNAN DOKUMEN LINGKUNGAN HIDUP, DED PEMBANGUNAN RUMAH SAKIT PRATAMA BUNYU
Tahun Anggaran :
2021

NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

A BANGUNAN UTAMA 1.00 Rp 28,620,573,000.00 Rp 28,620,573,000.00


B BANGUNAN RAWAT INAP TYPE 1 3.00 Rp 752,129,000.00 Rp 2,256,387,000.00
C BANGUNAN RAWAT INAP TYPE 2 2.00 Rp 626,165,000.00 Rp 1,252,330,000.00
D BANGUNAN VIP 1.00 Rp 1,451,996,000.00 Rp 1,451,996,000.00
E BANGUNAN RUMAH DUKA 1.00 Rp 1,022,331,000.00 Rp 1,022,331,000.00
F BANGUNAN NURSE STATION 1.00 Rp 771,733,000.00 Rp 771,733,000.00
G BANGUNAN LAB DAN RADIOLOGI 1.00 Rp 1,076,275,000.00 Rp 1,076,275,000.00
H BANGUNAN LAUNDRY DAN DAPUR 1.00 Rp 1,119,769,000.00 Rp 1,119,769,000.00
I BANGUNAN KAMAR JENAZAH 1.00 Rp 904,554,000.00 Rp 904,554,000.00
J BANGUNAN MUSHOLLA 1.00 Rp 1,390,828,000.00 Rp 1,390,828,000.00
K LANDSCAPE 1.00 Rp 8,254,204,000.00 Rp 8,254,204,000.00
L KORIDOR 1.00 Rp 1,779,020,000.00 Rp 1,779,020,000.00

JUMLAH NILAI PEKERJAAN Rp 49,900,000,000.00


Terbilang :

# Empat Puluh Sembilan Milyar Sembilan Ratus Juta Rupiah #

Tanjung Selor,
Desember 2021

,Dibuat oleh
CV. SAINS ART
CONSULINDO

Ir. Hanik Arifiyanto, ST

Direktur

Anda mungkin juga menyukai