KEGIATAN :
REHAB. GEDUNG DAN BANGUNAN KANTOR WILAYAH KEMENTERIAN AGAMA D.I. YOGYAKARTA
PROGRAM :
DUKUNGAN MANAJEMEN
PEKERJAAN :
REHAB. GEDUNG DAN BANGUNAN ( INTERIOR RUANGAN )
LOKASI :
KOTA YOGYAKARTA
TAHUN ANGGARAN :
2022
DAFTAR ISI
GAMBAR RENCANA REHAB. GEDUNG DAN BANGUNAN ( INTERIOR RUANGAN)
NO. KODE JUDUL GAMBAR SKALA NO. LEMBAR NO. KODE JUDUL GAMBAR SKALA NO. LEMBAR
01 - COVER NTS - 28 ARS - KWL DENAH EKSISTING RUANG KABAG T.U. ( LANTAI 1 ) 1 : 50 25
02 - DAFTAR GAMBAR NTS A 29 ARS - KWL DENAH EKSISTING RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 26
03 - DAFTAR GAMBAR NTS B 30 ARS - KWL DENAH EKSISTING RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 27
04 ARS - KWL SITE DENAH LANTAI 1 1 : 250 01 32 ARS - KWL DENAH EKSISTING RUANG AULA ( LANTAI 3 ) 1 : 75 29
05 ARS - KWL SITE DENAH LANTAI 2 1 : 250 02 33 ARS - KWL RENCANA BONGKARAN KARPET RUANG KABAG T.U. ( LANTAI 1 ) 1 : 50 30
06 ARS - KWL SITE DENAH LANTAI 3 1 : 250 03 34 ARS - KWL RENCANA BONGKARAN KARPET & KERAMIK RUANG AULA ( LANTAI 3 ) 1 : 75 31
07 ARS - KWL PERSPEKTIF INTERIOR VIEW (1) RUANG KA. KANWIL LANTAI 1 NTS 04 35 ARS - KWL RENCANA BONGKARAN JARINGAN & CENTRAL LAMA RUANG AULA ( LANTAI 3 ) 1 : 75 32
08 ARS - KWL PERSPEKTIF INTERIOR VIEW (2) RUANG KA. KANWIL LANTAI 1 NTS 05 36 ARS - KWL RENCANA PENAMBAHAN DINDING SERONG RUANG AULA ( LANTAI 3 ) 1 : 75 33
09 ARS - KWL PERSPEKTIF INTERIOR VIEW (3) RUANG KA. KANWIL & RUANG SEKRETARIS NTS 06 37 ARS - KWL DETAIL DINDING SERONG AULA 1 : 50 34
LANTAI 1
38 ARS - KWL RENCANA FINISHING LANTAI GRANITE RUANG KABAG T.U ( LANTAI 1 ) 1 : 50 35
10 ARS - KWL PERSPEKTIF INTERIOR VIEW (4) RUANG KABAG T.U. LANTAI 1 NTS 07 39 ARS - KWL RENCANA FINISHING LANTAI RUANG AULA ( LANTAI 3 ) 1 : 75 36
11 ARS - KWL PERSPEKTIF INTERIOR VIEW (5) RUANG KABAG T.U. LANTAI 1 NTS 08 40 ARS - KWL RENCANA PASANGAN KARPET TILE RUANG AULA ( LANTAI 3 ) 1 : 75 37
12 ARS - KWL PERSPEKTIF INTERIOR VIEW (6) RUANG ISTIRAHAT KABAG T.U. & RUANG NTS 09 41 ARS - KWL RENCANA ORNAMEN RUANG KA. KANWIL 1 : 50 38
SEKRETARIS LANTAI 1
42 ARS - KWL RENCANA ORNAMEN RUANG KABAG T.U. ( LANTAI 1 ) 1 : 50 39
13 ARS - KWL PERSPEKTIF INTERIOR VIEW (7) RUANG RAPAT 1;3;5 NTS 10 43 ARS - KWL RENCANA ORNAMEN RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 40
14 ARS - KWL PERSPEKTIF INTERIOR VIEW (8) RUANG RAPAT 1;3;5 NTS 11 44 ARS - KWL RENCANA ORNAMEN RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 41
15 ARS - KWL PERSPEKTIF INTERIOR VIEW (9) RUANG RAPAT 1;3;5 NTS 12 45 ARS - KWL RENCANA ORNAMEN RUANG RAPAT 5 ( LANTAI 3 ) 1 : 50 42
16 ARS - KWL PERSPEKTIF INTERIOR VIEW (10) RUANG RAPAT 1;3;5 NTS 13 46 ARS - KWL RENCANA ORNAMEN RUANG AULA ( LANTAI 3 ) 1 : 75 43
17 ARS - KWL PERSPEKTIF INTERIOR VIEW (11) AULA LANTAI 3 NTS 14 47 ARS - KWL REHAB DAUN PINTU RUANG AULA ( LANTAI 3 ) 1 : 75 44
18 ARS - KWL PERSPEKTIF INTERIOR VIEW (12) AULA LANTAI 3 NTS 15 48 ARS - KWL DETAIL ORNAMEN ( OJ1 ) 1 : 25 ; 1 : 10 45
19 ARS - KWL PERSPEKTIF INTERIOR VIEW (13) AULA LANTAI 3 NTS 16 49 ARS - KWL DETAIL ORNAMEN ( OJ1.A ) 1 : 25 ; 1 : 10 46
20 ARS - KWL PERSPEKTIF INTERIOR VIEW (14) AULA LANTAI 3 NTS 17 50 ARS - KWL DETAIL ORNAMEN ( OJ1.B ) 1 : 25 ; 1 : 10 47
21 ARS - KWL SKEMA MATERIAL RUANG KA. KANWIL LANTAI 1 NTS 18 51 ARS - KWL DETAIL ORNAMEN ( OP ) 1 : 25 ; 1 : 10 48
22 ARS - KWL SKEMA MATERIAL RUANG KABAG. T.U. LANTAI 1 NTS 19 52 ARS - KWL RENCANA GORDEN DAN VITRASE RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 49
23 ARS - KWL SKEMA MATERIAL RUANG RAPAT 1;3;5 NTS 20 53 ARS - KWL RENCANA GORDEN DAN VITRASE RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 50
24 ARS - KWL SKEMA MATERIAL RUANG RAPAT 1;3;5 NTS 21 54 ARS - KWL RENCANA GORDEN DAN VITRASE RUANG RAPAT 5 ( LANTAI 3 ) 1 : 50 51
25 ARS - KWL SKEMA MATERIAL RUANG AULA LANTAI 3 NTS 22 55 ARS - KWL RENCANA GORDEN DAN VITRASE RUANG AULA ( LANTAI 3 ) 1 : 75 52
26 ARS - KWL SKEMA MATERIAL RUANG AULA LANTAI 3 NTS 23 56 ARS - KWL DETAIL GORDEN DAN VITRASE 1 : 25 53
27 ARS - KWL DENAH EKSISTING RUANG KA. KANWIL & SEKRETARIS ( LANTAI 1 ) 1 : 50 24
NO. KODE JUDUL GAMBAR SKALA NO. LEMBAR NO. KODE JUDUL GAMBAR SKALA NO. LEMBAR
57 ARS - KWL RENCANA WALLPAPER DINDING RUANG KA. KANWIL 1 : 50 54 81 ARS - KWL RENCANA PLAFOND RUANG KA. KANWIL & SEKRETARIS 1 : 50 78
58 ARS - KWL RENCANA WALLPAPER DINDING RUANG KABAG T.U. ( LANTAI 1 ) 1 : 50 55 82 ARS - KWL DETAIL PLAFOND RUANG KA. KANWIL & SEKRETARIS 1 : 50 79
59 ARS - KWL RENCANA WALLPAPER DINDING RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 56 83 ARS - KWL RENCANA PLAFOND RUANG KABAG T.U. (LANTAI 1 ) 1 : 50 80
60 ARS - KWL RENCANA WALLPAPER DINDING RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 57 84 ARS - KWL DETAIL PLAFOND RUANG KABAG T.U. (LANTAI 1 ) 1 : 50 81
61 ARS - KWL RENCANA WALLPAPER DINDING RUANG RAPAT 5 ( LANTAI 3 ) 1 : 50 58 85 ARS - KWL RENCANA PLAFOND RUANG RAPAT 1 ; 3 ; 5 1 : 50 82
62 ARS - KWL RENCANA WALLPAPER DINDING RUANG AULA (LANTAI 3 ) 1 : 75 59 86 ARS - KWL DETAIL PLAFOND RUANG RAPAT 1 ; 3 ; 5 1 : 50 83
63 ARS - KWL RENCANA PELAPIS DINDING & KOLOM RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 60 87 ARS - KWL RENCANA PLAFOND RUANG AULA ( LANTAI 3 ) 1 : 75 84
64 ARS - KWL RENCANA PELAPIS DINDING & KOLOM RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 61 88 ARS - KWL DETAIL PLAFOND RUANG AULA ( LANTAI 3) 1 : 50 85
65 ARS - KWL RENCANA PELAPIS DINDING & KOLOM RUANG RAPAT 4 ( LANTAI 3 ) 1 : 50 62 89 ARS - KWL DETAIL PLAFOND RUANG AULA ( LANTAI 3) 1 : 50 86
67 ARS - KWL DETAIL PELAPIS DINDING ( A1 ) 1 : 25 64 90 ME - KWL RENCANA INSTALASI TITIK LAMPU RUANG KA. KANWIL & SEKRETARIS 1 : 50 87
68 ARS - KWL DETAIL PELAPIS KOLOM ( A2 ) 1 : 25 65 91 ME - KWL RENCANA INSTALASI TITIK LAMPU RUANG KABAG T.U. ( LANTAI 1 ) 1 : 50 88
69 ARS - KWL RENCANA BACKDROUP RUANG KA. KANWIL 1 : 50 66 92 ME - KWL RENCANA INSTALASI TITIK LAMPU RUANG RAPAT 1 ; 3 ; 5 1 : 50 89
70 ARS - KWL RENCANA BACKDROUP RUANG KABAG T.U. (LANTAI 1 ) 1 : 50 67 93 ME - KWL RENCANA INSTALASI TITIK LAMPU RUANG AULA ( LANTAI 3 ) 1 : 75 90
71 ARS - KWL RENCANA BACKDROUP & FURNITURE RUANG RAPAT 1 ( LANTAI 1 ) 1 : 50 68 94 ME - KWL RENCANA INSTALASI SOUND SYSTEM RUANG RAPAT 1 ; 3 ; 5 1 : 50 91
72 ARS - KWL RENCANA BACKDROUP & FURNITURE RUANG RAPAT 3 ( LANTAI 2 ) 1 : 50 69 95 ME - KWL RENCANA INSTALASI SOUND SYSTEM RUANG AULA ( LANTAI 3 ) 1 : 75 92
UTARA
PROGRAM
KEGIATAN
KM/WC KM/WC
FFL -0.04 FFL -0.04
PEKERJAAN
KM/WC KM/WC
FFL -0.04 FFL -0.04
R. KABAG. TU R. PERENCANAAN
LOKASI
TAHUN ANGGARAN
CORIDOR CORIDOR CORIDOR CORIDOR
FFL -0.02 FFL -0.02 FFL -0.02 FFL -0.02
R. KEPEGAWAIAN
R. KA. KANWIL
HALAMAN KANOPY
FFL -0.60 FFL -0.40
R. RAPAT R. RAPAT
UTARA
PROGRAM
KEGIATAN
KM/WC KM/WC
FFL +3.96 FFL +3.96
PEKERJAAN
KM/WC KM/WC
FFL +3.96 FFL +3.96
R. EMIS R. SISKOHAT
FFL +4.00 FFL +4.00
LOKASI
VOID
TAHUN ANGGARAN
CORIDOR CORIDOR CORIDOR CORIDOR
FFL +3.98 FFL +3.98 FFL +3.98 FFL +3.98
R. PONTREN R. PENAMAS
FFL +4.00 FFL +4.00
R. MAPENDA R. HAZAWA
FFL +4.00 FFL +4.00
VOID
R. RAPAT R. RAPAT
FFL +4.00 FFL +4.00
UTARA
PROGRAM
KEGIATAN
KM/WC KM/WC
FFL +7.96 FFL +7.96
PEKERJAAN
KM/WC KM/WC
FFL +7.96 FFL +7.96
R. BUDHA R. HINDU
FFL +8.00 FFL +8.00
LOKASI
VOID
TAHUN ANGGARAN
CORIDOR CORIDOR CORIDOR CORIDOR
FFL +7.98 FFL +7.98 FFL +7.98 FFL +7.98
R. KATHOLIK R. KRISTEN
FFL +8.00 FFL +8.00
R. RAPAT R. RAPAT
FFL +8.00 FFL +8.00
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 1 " ( R. KA. KANWIL )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 3 " ( R. KA. KANWIL )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERPEKTIF " 5 " ( R. KA. KANWIL )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 7 " ( R. KABAG T.U. )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 9 " ( R. KABAG T.U. )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 11 " ( R. ISTIRAHAT KABAG T.U. )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERPEKTIF " 13 " ( R. RAPAT 1;3;5 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERPEKTIF " 15 " ( R. RAPAT 1;3;5 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERPEKTIF " 17 " ( R. RAPAT 1;3;5 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERPEKTIF " 19 " ( R. RAPAT 1;3;5 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 21 " ( AULA LANTAI 3 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 23 " ( AULA LANTAI 3 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 25 " ( AULA LANTAI 3 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
PROGRAM
KEGIATAN
PEKERJAAN
PERSPEKTIF " 27 " ( AULA LANTAI 3 )
Skala 1 : NTS
LOKASI
TAHUN ANGGARAN
3 3 2
A
2
1 1 PROGRAM
Plafond PVC
SHUNDA PLAFOND 9 mm KEGIATAN
WHITE ASH WOOD
2 PEKERJAAN
B Plafond PVC
SHUNDA PLAFOND 8 mm
MAPLE WOOD LOKASI
3 TAHUN ANGGARAN
Plafond PVC
SHUNDA PLAFOND 8 mm
MODERN TEAK WOOD
1)
1) Badan Ornamen
Plywood 18 mm
Kawung Plywood 12 mm
Finish HPL TACO 0.7 mm - TH 373 H
Finish HPL TACO 0.7 mm - TH 356 H SANDY RHUMBA
BALTIMORE TEAK
3
2
1
1 PROGRAM
Plafond PVC
A SHUNDA PLAFOND 9 mm
WHITE ASH WOOD
KEGIATAN
B 2 PEKERJAAN
Plafond PVC
SHUNDA PLAFOND 8 mm
MAPLE WOOD LOKASI
3 TAHUN ANGGARAN
Plafond PVC
SHUNDA PLAFOND 8 mm
MODERN TEAK WOOD
1)
1) Badan Ornamen
Plywood 18 mm
Kawung Plywood 12 mm
Finish HPL TACO 0.7 mm - TH 373 H
Finish HPL TACO 0.7 mm - TH 356 H SANDY RHUMBA
BALTIMORE TEAK
3 2 1
1
Plafond PVC
SHUNDA PLAFOND 9 mm
WHITE ASH WOOD
PROGRAM
B A 2 KEGIATAN
4 Plafond PVC
SHUNDA PLAFOND 8 mm
C MAPLE WOOD
PEKERJAAN
3
6 LOKASI
Plafond PVC
SHUNDA PLAFOND 8 mm
MODERN TEAK WOOD TAHUN ANGGARAN
5
4
Wallpaper POLARIS VOL3/ DREAM
WORLD warna bermotif
(Gambar hanya sebagai ilustrasi)
BALTIMORE TEAK
Rak Backdroup
1) Plywood 18 mm
Finish HPL TACO 0.7 mm - TH 356 H
BALTIMORE TEAK
1)
6
Wall Decor
Bondjin
2) Kaca bening tebal 5 mm
161-3
7
D 7 PROGRAM
D 8 Plafond PVC
SHUNDA PLAFOND 9 mm
8 WHITE ASH WOOD
KEGIATAN
8
8
8 PEKERJAAN
TAHUN ANGGARAN
1)
1) Badan Ornamen
Plywood 18 mm
Finish HPL TACO 0.7 mm - TH 356 H
BALTIMORE TEAK
1 2 1 1
1
Plafond PVC
A B SHUNDA PLAFOND 9 mm
WHITE ASH WOOD
PROGRAM
4 4
3 3 2 KEGIATAN
Plafond PVC
5 SHUNDA PLAFOND 8 mm
6 MODERN TEAK WOOD PEKERJAAN
C 3
LOKASI
Wall Decor
5 Bondjin
161-3
9 8 7
Plafond PVC
SHUNDA PLAFOND 9 mm
7 WHITE ASH WOOD
PROGRAM
D 8 KEGIATAN
Plafond PVC
E SHUNDA PLAFOND 8 mm
MAPLE WOOD
PEKERJAAN
9
LOKASI
Plafond PVC
SHUNDA PLAFOND 8 mm
MODERN TEAK WOOD TAHUN ANGGARAN
10
10
2)
1)
1) Badan Ornamen
1)
1) Plywood 18 mm
Finish HPL TACO 0.7 mm 3
- TH 356 H
Kawung dan lis timbul Plywood 12 mm
BALTIMORE TEAK
Finish HPL TACO 0.7 mm - TH 373 H
SANDY RHUMBA
PROGRAM
KEGIATAN
R. SEKRETARIS
FFL ±0.00
R. KERJA KA. KANWIL
FFL ±0.00
PEKERJAAN
CORIDOR
FFL -0.02 LOKASI
2
TAHUN ANGGARAN
R. TAMU
FFL ±0.00
LANTAI GRANITE
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
LOKASI
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
LANTAI KARPET FFL ±0.00
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
LANTAI GRANITE
A B C
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
A B C
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
A B C
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
A B C D E F
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
LOKASI
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
01
R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
FFL ±0.00
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
02 KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
01 FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
A B C D E F
LEGENDA
1 01 Pembongkaran keramik dan karpet lama KODE NO. LBR JML. LBR
RENCANA BONGKARAN KARPET & KERAMIK RUANG AULA ( LANTAI 3 ) 2 02 Pembongkaran jendela eksisting (dilakukan perbaikan dinding yang terdampak bongkaran
SKALA 1 : 75
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
PEKERJAAN
PLAFOND PLAFOND
FFL +3.40 FFL +3.40 LOKASI
03
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR PLAFOND PLAFOND
FFL +7.98 FFL +3.05 FFL +3.05
03 03 03
03
2
PLAFOND PLAFOND
FFL +3.40 FFL +3.40
A B C D E F
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
PEKERJAAN
D1
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
D1
D1
A B C D E F
LEGENDA
SKALA 1 : 75
SATUAN KERJA :
PROGRAM
PEKERJAAN
AREA PANGGUNG
LOKASI
TAHUN ANGGARAN
Dinding serong
Dinding
belakang panggung
KODE NO. LBR JML. LBR
Pelapis dinding tinggi 1 m, finish
HPL 0.7 mm
Dinding Timur
ISOMETRI DINDING SERONG DETAIL DINDING SERONG
SATUAN KERJA :
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
LOKASI
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
F1 R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
FFL ±0.00
SP
1
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
F2
CORIDOR R. AULA
FFL +7.98 FFL +7.99
A B C D E F
LEGENDA
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
4 SP
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
KT1
CORIDOR R. AULA
FFL +7.98 FFL +8.00
A B C D E F
1 KT1 Pasangan karpet tile Umicron uk. 50x50 cm, tebal 6 mm KODE NO. LBR JML. LBR
RENCANA PASANGAN KARPET TILE RUANG AULA ( LANTAI 3 ) Pasangan spon hitam
SP SP : START POINT
underlayer 5mm
SKALA 1 : 75
Lantai plesteran
perb. campuran 1 Pc : 5 Ps, finish acian
SATUAN KERJA :
PROGRAM
KEGIATAN
R. SEKRETARIS
FFL ±0.00
R. KERJA KA. KANWIL
FFL ±0.00
OJ1 PEKERJAAN
CORIDOR
FFL -0.02 LOKASI
2
TAHUN ANGGARAN
OJ1 OP
R. TAMU
FFL ±0.00
OJ1 OJ1
LEGENDA
RENCANA ORNAMEN RUANG KA. KANWIL 1 OJ1 Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
LOKASI
OJ1
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
FFL ±0.00
OJ1
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
LEGENDA
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
OP PEKERJAAN
OJ1 LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
OJ1.A
1
A B C
L NO. KODE KETERANGAN
E
G 1 Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
KODE NO. LBR JML. LBR
OJ1
E
N 2 OJ1.A Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
D
A 3 OP Pasangan ornamen penutup pintu Plywood 18 mm + HPL motif jati
KEGIATAN
OP PEKERJAAN
OJ1 LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
OJ1.A
1
A B C
L NO. KODE KETERANGAN
E
G 1 Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
KODE NO. LBR JML. LBR
OJ1
E
N 2 OJ1.A Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
D
A 3 OP Pasangan ornamen penutup pintu Plywood 18 mm + HPL motif jati
KEGIATAN
OP PEKERJAAN
OJ1 LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
OJ1.B
1
A B C
L NO. KODE KETERANGAN
E
G 1 Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
KODE NO. LBR JML. LBR
OJ1
E
N 2 OJ1.B Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati
D
A 3 OP Pasangan ornamen penutup pintu Plywood 18 mm + HPL motif jati
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
OJ1 OP OJ1 OP
PEKERJAAN
OJ1
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
OJ1
A B C D E F
LEGENDA
1 OJ1 Pasangan ornamen penutup jendela Plywood 18 mm + HPL motif jati KODE NO. LBR JML. LBR
SKALA 1 : 75
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
R R
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
A B C D E F
LEGENDA
REHAB DAUN PINTU RUANG AULA ( LANTAI 3 ) 1 R Rehab daun pintu kayu / finishing HPL baru luar dalam
SKALA 1 : 75
SATUAN KERJA :
5.0 10.0 5.0 13.8
13.8
20.0 75.0 75.0 20.0
85.6 85.6 8.8
3.0 3.6 3.6 3.6
5.0
10.0 Plywood 18 mm
30.0 5.0 18.8 Rangka ornamen PN1 18.8 30.0 18.8
10.0 hollow 40x40x1,2 mm
5.0
A
A 3.6
Plywood 18mm
Finish HPL TACO 0.7 mm Rongga u/ Rongga u/
50.0 gantungan gorden gantungan gorden
Warna BALTIMORE TEAK Plywood 18 mm PROGRAM
Rangka ornamen PN1
hollow 40x40x1,2 mm
5.0
135.0 135.0
KEGIATAN
50.0
LOKASI
Ornamen kawung tempel
plywood 12 mm
135.0 135.0
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA
105.0 List timbul plywood 12 mm TAHUN ANGGARAN
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA
3.6
25.0 160.0 25.0 20.0 25.0 160.0 25.0 20.0 20.0
210.0 210.0
TAMPAK DEPAN TAMPAK SAMPING POTONGAN " A " POTONGAN " B " POTONGAN " C "
5.5 5.5
HPL TACO 0.7 mm Rongga u/
TH 356 H 9.0 9.0 gantungan gorden
BALTIMORE TEAK
1.0 1.0
9.0 9.0 8.2
1.0 1.0
9.0 9.0 16.4
1.0 1.0
HPL TACO 0.7 mm 9.0 9.0 JUDUL GAMBAR SKALA
TH 373 H
SANDY RHUMBA 5.5 5.5
Plywood 18mm
Finish HPL TACO 0.7 mm
50.0
Warna BALTIMORE TEAK
PROGRAM
5.0
50.0
KEGIATAN
9.0 9.0
Kolom sisi kanan-kiri jendela Kolom
300.0 1.0 1.0
sisi kanan-kiri
jendela 9.0 9.0
1.0 1.0
50.0 9.0 9.0
1.0 1.0
9.0 9.0 JUDUL GAMBAR SKALA
5.5 5.5
50.0
89.6
32.2 Plywood 18mm 32.2
Finish HPL TACO 0.7 mm 62.5 PROGRAM
Warna BALTIMORE TEAK
14.0
5.0 KEGIATAN
173.9
TAHUN ANGGARAN
86.5 86.5
93.6
1.0
Balok lengkung
atas jendela 0.5 9.0 9.0 0.5
Kawung
Plywood 12 mm
Finish HOL TACO 0.7 mm
Warna SANDY RHUMBA
25.0 25.0
Kolom
sisi kanan-kiri
5.5 5.5
jendela
268.6 9.0 9.0
50.0 60° 60° A 50.0
1.0 1.0
9.0 9.0
1.0 1.0
A 9.0 9.0
Angle Point 175.0
1.0 1.0
50.0 50.0
Kolom sisi kanan-kiri jendela 9.0 9.0 JUDUL GAMBAR SKALA
5.5 5.5
Kolom sisi kanan-kiri jendela 100.0
50.0 50.0
LOKASI
Ornamen kawung tempel
plywood 12 mm
135.0 135.0
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA
105.0 List timbul plywood 12 mm TAHUN ANGGARAN
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA
3.6
25.0 160.0 25.0 20.0 25.0 160.0 25.0 20.0 20.0
210.0 210.0
TAMPAK DEPAN TAMPAK SAMPING POTONGAN " A " POTONGAN " B " POTONGAN " C "
DETAIL ORNAMEN ( OP )
Skala 1 : 25
1.0
5.5 5.5
HPL TACO 0.7 mm
9.0 9.0
TH 356 H
1.0 1.0 BALTIMORE TEAK
9.0 9.0
1.0 1.0
9.0 9.0
1.0 1.0
9.0 9.0 JUDUL GAMBAR SKALA
HPL TACO 0.7 mm
5.5 5.5 TH 373 H
SANDY RHUMBA
KEGIATAN
PEKERJAAN
G LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
G
1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
KEGIATAN
PEKERJAAN
G LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
G
1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
KEGIATAN
PEKERJAAN
G LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
G
1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
4
G G
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
G G G G
A B C D E F
LEGENDA
Penggantung
Muka plafond
CH +3.00
PROGRAM
Gorden
(pasang sisi bagian dalam) KEGIATAN
Gorden
(pasang sisi bagian dalam)
Vitrase
(pasang sisi bagian luar)
TAHUN ANGGARAN
82.0
155.0
KETERANGAN :
KODE NO. LBR JML. LBR
- Pasangan Gorden dan vitrase terpasang, warna dan motif menyesuaikan
SATUAN KERJA :
W1 W1 PROGRAM
KEGIATAN
R. SEKRETARIS
W1 W1 FFL ±0.00
R. KERJA KA. KANWIL
FFL ±0.00
PEKERJAAN
CORIDOR
W1 FFL -0.02 LOKASI
2
TAHUN ANGGARAN
W1
W1
R. TAMU
FFL ±0.00
W1
W1
JUDUL GAMBAR SKALA
1
R. RAPAT 1
FFL ±0.00
SKALA 1 : 50
SATUAN KERJA :
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
W1
LOKASI
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
W1
R. KABAG T.U.
FFL ±0.00
W1
2
W1 W1 W1
R. SEKRETARIS
FFL ±0.00
W1
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
W1 W1
PEKERJAAN
W1 LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
2
W1
W1
W1 W1
1
W1 W1
A B C
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
W1 W1
PEKERJAAN
W1 LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
2
W1
W1
W1 W1
1
W1 W1
A B C
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
W1 W1
PEKERJAAN
W1 LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
2
W1
W1
W1 W1
1
W1 W1
A B C
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
4
W1
PEKERJAAN
W2
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
W1 W1
W2
W1
A B C D E F
LEGENDA
RENCANA WALLPAPER DINDING RUANG AULA ( LANTAI 3 ) 2 W2 Finish cat warna terang khusus untuk dinding serong
SKALA 1 : 75
SATUAN KERJA :
KEGIATAN
A1 A2 A1
PEKERJAAN
A1 LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
2 A2
A1
A1
A2 A2
A1 A1
A1
1
A1 A1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
Pekerjaan pelapis dinding Plywood 18mm Finish HPL TACO 0.7 mm,
1 A1 warna BALTIMORE TEAK, keliling ruangan, setinggi 1 m
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
A1 A2 A1
PEKERJAAN
A1 LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
2 A2
A1
A1
A2 A2
A1 A1
A1
1
A1 A1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
Pekerjaan pelapis dinding Plywood 18mm Finish HPL TACO 0.7 mm,
1 A1 warna BALTIMORE TEAK, keliling ruangan, setinggi 1 m
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
A1 A2 A1
PEKERJAAN
A1 LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
2 A2
A1
A1
A2 A2
A1 A1
A1
1
A1 A1
A B C
LEGENDA :
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
Pekerjaan pelapis dinding Plywood 18mm Finish HPL TACO 0.7 mm,
1 A1 warna BALTIMORE TEAK, keliling ruangan, setinggi 1 m
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
4
A1
PEKERJAAN
A1
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
A1
A1
A1
A B C D E F
LEGENDA :
Muka plafond
CH +3.00
PROGRAM
Wallpaper/ cat ekspose,
menyesuaikan rencana
KEGIATAN
200.0
PEKERJAAN
300.0
TAHUN ANGGARAN
Tali air U Plat stainless stell
10 mm
Plywood 9 mm 100.0
Finish HPL TACO 0.7 mm
Warna BALTIMORE TEAK
Muka lantai
SP
Dinding
Plywood 9 mm
Finish HPL TACO 0.7 mm
Warna BALTIMORE TEAK DENAH PELAPIS DINDING
JUDUL GAMBAR SKALA
Dinding
Plywood 9 mm
Finish HPL TACO 0.7 mm
Warna BALTIMORE TEAK
KETERANGAN : KODE NO. LBR JML. LBR
Tali air U Plat stainless stell - Pasangan pelapis dinding Plywood 9 mm Finish HPL TACO 0.7 mm, warna BALTIMORE TEAK tinggi : 1 m
10 mm untuk Ruang Rapat 1 ; 3 ; 5 dan Ruang Aula lantai 3, sisi atas pelapis ditutup wallpaper kecuali dinding
serong aula.
DETAIL " A " - Profil bonjin fiber 6 cm terpasang untuk Ruang Rapat 1 ; 3 ; 5 dan Ruang Aula lantai 3, tinggi 1 m dari lantai.
SP : START POINT; tali air U Plat stainless stell 10 mm dipasangkan dengan jarak 100 cm, dimulai
SP dari tengah bentang bidang yang akan dipasangkan dengan buangan tepi-tepi bidang.
SATUAN KERJA :
Muka plafond
CH +3.00 50.0 50.0
PROGRAM
TAHUN ANGGARAN
50.0 50.0
Muka lantai
TAMPAK " A " TAMPAK " B " POTONGAN TAMPAK " B "
Plywood 9 mm
3.6 3.6 Finish HPL TACO 0.7 mm
80.0 Warna BALTIMORE TEAK
3.6
HPL TACO 0.7 mm
TH 356 H
TAMPAK " A " 40.0 TAMPAK " A " BALTIMORE TEAK
87.2 Kolom
DETAIL PELAPIS KOLOM ( A2 )
Skala 1 : 25
DETAIL " A "
TAMPAK " B "
PROGRAM
3
B1
KEGIATAN
R. SEKRETARIS
FFL ±0.00
R. KERJA KA. KANWIL
FFL ±0.00
PEKERJAAN
CORIDOR
FFL -0.02 LOKASI
2
TAHUN ANGGARAN
R. TAMU
FFL ±0.00
LEGENDA
SKALA 1 : 50
SATUAN KERJA :
AREA KM/ WC
FFL -0.04
PROGRAM
CORIDOR KEGIATAN
FFL -0.02
3
PEKERJAAN
B2
LOKASI
R. ISTIRAHAT
FFL ±0.00 TAHUN ANGGARAN
R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
FFL ±0.00
CORIDOR
FFL -0.02
JUDUL GAMBAR SKALA
LEGENDA
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
PEKERJAAN
F1
LOKASI
TAHUN ANGGARAN
R. RAPAT 1
FFL ±0.00
2
B3
F2
F1
1
A B C
RENCANA BACKDROUP & FURNITURE RUANG RAPAT 1 ( LANTAI 1 ) 2 F1 Pasangan rak baru kanan dan kiri Backdroup lama plywood 18mm + kaca 5mm
KEGIATAN
PEKERJAAN
F1
LOKASI
TAHUN ANGGARAN
R. RAPAT 3
FFL +4.00
2
B3
F2
F1
1
A B C
LEGENDA
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
2 F1 Pasangan rak baru kanan dan kiri Backdroup lama plywood 18mm + kaca 5mm
RENCANA BACKDROUP & FURNITURE RUANG RAPAT 3 ( LANTAI 2 ) 3 F2 Meja dan rak saji plywood 18 mm terangka + HPL jadi terpasang
SKALA 1 : 50
SATUAN KERJA :
KEGIATAN
PEKERJAAN
F1
LOKASI
TAHUN ANGGARAN
R. RAPAT 5
FFL +8.00
2
B3
F2
F1
1
A B C
LEGENDA
KODE NO. LBR JML. LBR
NO. KODE KETERANGAN
2 F1 Pasangan rak baru kanan dan kiri Backdroup lama plywood 18mm + kaca 5mm
RENCANA BACKDROUP & FURNITURE RUANG RAPAT 5 ( LANTAI 3 ) 3 F2 Meja dan rak saji plywood 18 mm terangka + HPL jadi terpasang
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
CORIDOR
FFL +7.98
KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
R. LPTO/BP4
FFL +8.00
CORIDOR R. AULA
FFL +7.98 FFL +8.00
P Pg B4
A B C D E F
LEGENDA
RENCANA BACKDROUP & PARTISI RUANG AULA ( LANTAI 3 ) 2 Pg Pasangan rehabilitasi trap panggung ( penambahan trap )
530.0
20.0 20.0
90.0 90.0
PEKERJAAN
Pintu kamuflase VISUALISASI
530.0
TAMPAK DEPAN TAMPAK SAMPING
- Ornamen Kawung plywood 12 mm
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA LOKASI
- Background pasangan HPL Lama 1.0 1.0 1.0
DETAIL BACKDROUP ( B1 ) RUANG KA. KANWIL
Skala 1 : 50 10.0 10.0 10.0 10.0 Ornamen Kawung plywood 12 mm
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA TAHUN ANGGARAN
10.0 10.0
1.0 1.0
10.0 10.0
1.0 1.0
HPL TACO 0.7 mm
10.0 10.0
TH 373 H
SANDY RHUMBA
DETAIL ORNAMEN KAWUNG
BACKDROUP R. KA.KANWIL 1.0 1.0
& KABAG. T.U. 10.0 10.0
Skala 1 : 10
20.0 20.0
165.0 165.0
HPL backdroup lama
terpasang
275.0 275.0
VISUALISASI
530.0
TAMPAK DEPAN TAMPAK SAMPING
- Ornamen Kawung plywood 12 mm
Finish HPL TACO 0.7 mm
Warna SANDY RHUMBA KODE NO. LBR JML. LBR
- Background pasangan HPL Lama
DETAIL BACKDROUP ( B2 ) RUANG KABAG T.U.
Skala 1 : 50
KETERANGAN :
Pasang Ornamen Kawung plywood 12 mm finish HPL TACO 0.7 mm, warna SANDY RHUMBA
Background pasangan HPL Lama
SATUAN KERJA :
30.0 30.0
PEKERJAAN
List backdroup baru Ornamen Kawung plywood 12 mm VISUALISASI
Finish HPL TACO 0.7 mm
50.0 540.0 50.0 Warna SANDY RHUMBA
TAMPAK DEPAN Karpet hijau pelapis TAMPAK SAMPING
backdroup baru
LOKASI
1.0 1.0 1.0
1.0 1.0 1.0
DETAIL BACKDROUP ( B3 ) RUANG RAPAT 1;3;5
Skala 1 : 50 10.0 10.0 10.0 10.0 Ornamen Kawung plywood 12 mm
Finish HPL TACO 0.7 mm 9.0 9.0 9.0 9.0 Ornamen
Warna SANDY RHUMBA Kawung plywood 12 mm
Finish HPL TACO 0.7 mm TAHUN ANGGARAN
Warna SANDY RHUMBA
HPL TACO 0.7 mm
10.0 10.0 TH 373 H 9.0 9.0
SANDY RHUMBA
1.0 1.0 1.0 1.0
10.0 10.0 9.0 9.0
1.0 1.0 1.0 1.0
520.0
40.0 440.0 40.0
Ornamen Kawung plywood 12 mm
Finish HPL TACO 0.7 mm Warna SANDY RHUMBA
20.0 30.0 20.0
12.0
penambahan tinggi
backdroup 30 cm
180.0 150.0 180.0
290.0 290.0
KETERANGAN :
DETAIL BACKDROUP ( B4 ) RUANG AULA Pasang Ornamen Kawung plywood 12 mm finish HPL TACO 0.7 mm, warna SANDY RHUMBA
Skala 1 : 50 Background pasangan HPL Lama
SATUAN KERJA :
50.0
65.0 65.0
kaca kaca PROGRAM
22.0
tebal 5 mm tebal 5 mm
50.0
65.0 65.0
kaca kaca
20.0 tebal 5 mm tebal 5 mm
PEKERJAAN
2.0 270.0 270.0
DENAH RAK
Plywood 18mm
Finish HPL 0.7 mm
50.0 65.0 65.0
Plywood 18 mm Plywood 18 mm
LOKASI
Finish HPL 0.7 mm Finish HPL 0.7 mm
22.0
POTONGAN " A " POTONGAN " B " TAMPAK DEPAN TAMPAK SAMPING VISUALISASI
DETAIL FURNITURE " F1 "
Skala 1 : 25 Pintu rak full kaca
tebal 5 mm
Plywood 18mm Plywood 18mm Plywood 18mm Plywood 18mm
Finish HPL TACO 0.7 mm Finish HPL TACO 0.7 mm Finish HPL TACO 0.7 mm Finish HPL TACO 0.7 mm
HPL TACO 0.7 mm
Warna BALTIMORE TEAK Warna BALTIMORE TEAK Warna BALTIMORE TEAK Warna BALTIMORE TEAK TH 356 H
BALTIMORE TEAK
50.0 50.0 50.0 50.0 70.0 70.0 50.0 50.0 50.0 50.0
40.5
85.0
40.5
10.0
POTONGAN " A " POTONGAN " B " TAMPAK SAMPING TAMPAK DEPAN
Besi hollow 20x20x1,2 mm Besi hollow 20x20x1,2 mm Besi hollow 20x20x1,2 mm Besi hollow 20x20x1,2 mm
Finish Zinc Chromate Finish Zinc Chromate Finish Zinc Chromate Finish Zinc Chromate JUDUL GAMBAR SKALA
95.0 95.0
50.0 50.0 50.0 50.0 200.0 VISUALISASI
Besi hollow 20x20x1,2 mm DENAH KAKI MEJA DENAH MEJA TAMPAK ATAS
Finish Zinc Chromate
SATUAN KERJA :
PROGRAM
KEGIATAN
LOKASI
TAHUN ANGGARAN
Balok ring
CH +3.50
PROGRAM
50.0 50.0
Profil timbul 2 cm
Warna BALTIMORE TEAK Plywood 18mm PEKERJAAN
Finish HPL TACO 0.7 mm
Warna BALTIMORE TEAK
50.0 50.0
Profil timbul 2 cm VOID
Warna BALTIMORE TEAK LOKASI
290.0 290.0
Kaca bening
tebal 5 mm 55.0 Plywood 18mm 55.0 TAHUN ANGGARAN
Finish HPL 0.7 mm
Profil bonjin fiber 6
Warna SANDY RHUMBA
cm terpasang Meja sound
Plywood 18mm
Finish HPL 0.7 mm
Warna SANDY RHUMBA
List bondjin
fiber 6 cm
100.0 100.0
Tali air U Plat stainless stell 10 mm
Muka lantai
10.0
25.0 100.0 100.0 100.0 25.0 135.0
TAMPAK DEPAN TAMPAK SAMPING
350.0 145.0
Plywood 18mm
Finish HPL TACO 0.7 mm
Warna BALTIMORE TEAK
Plywood 18mm
Finish HPL 0.7 mm
Warna SANDY RHUMBA
JUDUL GAMBAR SKALA
Meja sound
135.0 135.0
TAMPAK RUANG SOUND AULA 150.0 150.0 HPL TACO 0.7 mm
Skala 1 : 25 TH 373 H
SANDY RHUMBA
10.0 10.0
PROGRAM
PEKERJAAN
Plywood 18 mm
Rangka Wall Stud dan Wall Track
76 mm tebal 0.40 mm
120.0 120.0
VOID
LOKASI
290.0 290.0
Kaca bening, Kaca bening,
tebal 5 mm tebal 5 mm
TAHUN ANGGARAN
Meja sound
Plywood 18mm
Finish HPL 0.7 mm
Warna SANDY RHUMBA
Dinding bata
PERTEMUAN
DENGAN Dynabolt Ø 10 mm
Meja sound DINDING
Plywood 18mm, finish HPL 0.7 mm Sealant
Lubang akses Warna SANDY RHUMBA Dinding bata Lubang akses
lebar 70 cm 72.5 lebar 70 cm
Rangka Wall Track 76 mm
75.0 90.0 90.0 75.0 tebal 0.40 mm
Plywood 18 mm
JUDUL GAMBAR SKALA
145.0 DETAIL JOIN
Skala 1 : 10
Kaki meja sound
Plywood 18mm
60.0 Paper tape & pengomponan
72.5 Finish HPL 0.7 mm
Warna SANDY RHUMBA
Plywood 18 mm
KODE NO. LBR JML. LBR
Rangka Wall Track 76 mm
tebal 0.40 mm
POTONGAN " B " 55.0 60.0 60.0 60.0 60.0 55.0 Corner beads
PERTEMUAN
350.0
SUDUT 90 ° Screw
SATUAN KERJA :
3
60.0 182.5 60.0
KEGIATAN
C2
60.0 60.0
PLAFOND 257.5
82.5
50.0 C1 CH+3.20
332.5 PEKERJAAN
26.3 LED EFFECT
10.0
PLAFOND INDIRECT
60.0 LED EFFECT
CH+3.10
CORIDOR
FFL -0.02 LOKASI
LED EFFECT 332.5 PLAFOND 60.0
60.0 CH+3.00
2 LED EFFECT
60.0 282.5 60.0
PLAFOND TAHUN ANGGARAN
C2 60.0 CH+3.00 60.0
60.0 C3
LED EFFECT
60.0
692.5
50.0 60.0 282.5 60.0
60.0 PLAFOND 60.0
992.5 26.3 LED EFFECT CH+3.00
SHUNDA PLAFOND 9 mm
C1 50.0
WHITE ASH WOOD 82.5 121.3 121.3
SHUNDA PLAFOND 8 mm
C2
MAPLE WOOD LED EFFECT LED EFFECT LED EFFECT
50.0
60.0
PLAFOND INDIRECT
50.0 CH+3.20 LED EFFECT 50.0
60.0 C3 60.0
60.0 525.0 60.0
SHUNDA PLAFOND 8 mm
C3
MODERN TEAK WOOD PLAFOND INDIRECT
CH+3.20 LED EFFECT C2
PLAFOND
60.0 C1 CH+3.00
60.0
JUDUL GAMBAR SKALA
1
60.0 765.0 60.0
885.0 327.5
PROGRAM
60.0 60.0 60.0 50.0 82.5 50.0 121.3 50.0 121.3 50.0 60.0 60.0 60.0 60.0 207.5 60.0
PEKERJAAN
LOKASI
TAHUN ANGGARAN
MUKA LANTAI MUKA LANTAI
1052.5
10.0 10.0
20.0 20.0
60.0 60.0 60.0 50.0 26.3 60.0 60.0 60.0 60.0 26.3 50.0 60.0 60.0 110.0 60.0 60.0 60.0
MUKA LANTAI
PROGRAM
KEGIATAN
3
INDIRECT PEKERJAAN
60.0 40.0 422.5 40.0 LED EFFECT 60.0
40.0
INDIRECT
C2 LOKASI
60.0
LED EFFECT C3
PLAFOND
C1 CH+3.20 215.0
45.0
TAHUN ANGGARAN
INDIRECT
60.0
LED EFFECT C3
45.0 C2 PLAFOND
CH+3.00 60.0
INDIRECT PLAFOND
2 565.0 65.0
LED EFFECT CH+3.00 C3
PLAFOND 60.0
45.0
C1 CH+3.00
SHUNDA PLAFOND 8 mm
C3
MODERN TEAK WOOD 60.0 502.5 60.0 60.0 127.5 60.0
JUDUL GAMBAR SKALA
622.5 685.0
PROGRAM
CH +3.00
10.0 CH +3.00
10.0 CH +3.00 CH +3.00
10.0 CH +3.00 CH +3.00
10.0 CH +3.00
20.0 10.0 10.0 20.0 20.0 10.0 10.0 10.0 10.0 10.0 20.0
60.0 40.0 422.5 40.0 60.0 60.0 40.0 60.0 45.0 60.0 45.0 65.0 45.0 60.0 45.0 60.0 40.0 60.0
PEKERJAAN
LOKASI
TAHUN ANGGARAN
MUKA LANTAI MUKA LANTAI
DETAIL ( B1 ) PLAFOND RUANG KABAG. T.U. DETAIL ( B2 ) PLAFOND RUANG KABAG. T.U.
Skala 1 : 50 Skala 1 : 50
335.0
10.0 10.0
CH +3.20
CH +3.00
10.0 10.0 CH +3.00
20.0 20.0
MUKA LANTAI
PROGRAM
3
INDIRECT INDIRECT
60.0 LED EFFECT C1 LED EFFECT 60.0
PEKERJAAN
LOKASI
C2
C3
2 572.5 412.5 572.5
PLAFOND
CH+3.20
C1
C2 C1
INDIRECT PLAFOND
80.0
LED EFFECT CH+3.20
40.0
60.0
A B C
SKALA 1 : 50
SATUAN KERJA :
707.5
PROGRAM
CH +3.00
10.0 CH +3.00 CH +3.00
10.0 CH +3.00
TAHUN ANGGARAN
MUKA LANTAI
1185.0
CH +3.00
10.0 CH +3.00 CH +3.00 CH +3.00 CH +3.00
10.0 CH +3.00
10.0 CH +3.00
60.0 80.0 142.5 145.0 145.0 142.5 80.0 200.0 100.0 60.0
MUKA LANTAI
PROGRAM
212.5
120.0
C1
INDIRECT
C1 LED EFFECT LOKASI
PLAFOND 32.5
CH+3.30 DETAIL " A "
R512.5 100.0
3 292.5 PLAFOND
CH+3.10 TAHUN ANGGARAN
C3 INDIRECT
C2
LED EFFECT
C1 C1
CORIDOR
C1
FFL +7.98 PLAFOND INDIRECT PLAFOND INDIRECT PLAFOND C1 PLAFOND PLAFOND
825.0 CH+3.30 LED EFFECT C1 CH+3.30 LED EFFECT CH+3.30 CH+3.50 CH+3.30 200.0
INDIRECT
122.8 122.8 LED EFFECT
PLAFOND
CH+3.10 C3
100.0
292.5 100.0
R512.5
200.0
2
PLAFOND
CH+3.30
32.5
C1
SHUNDA PLAFOND 9 mm
C1
WHITE ASH WOOD JUDUL GAMBAR SKALA
A B C D E F
120.0 120.0
LEGENDA
60.0 60.0
DETAIL " A " DETAIL " B " NO. KODE KETERANGAN
SHUNDA PLAFOND 8 mm 1 C1 Plafond PVC 9 mm EX. SHUNDA PLAFOND, Rangka hollow 40/40 + 20/40 cm (motif : White Ash Wood)
C2 SHUNDA PLAFOND 8 mm
MAPLE WOOD C3 PLAFOND PLAFOND KODE NO. LBR JML. LBR
MODERN TEAK WOOD 2 C2 Plafond PVC 8 mm EX. SHUNDA PLAFOND, Rangka hollow 40/40 + 20/40 cm (motif : Maple Wood)
CH+3.40 CH+3.40
C3 C3 3 C3 Plafond PVC 8 mm EX. SHUNDA PLAFOND, Rangka hollow 40/40 + 20/40 cm (motif : Modern Teak Wood)
RENCANA PLAFOND RUANG AULA ( LANTAI 3 ) PLAFOND PLAFOND NOTE : Profil tepi dan ornamen plafond PVC EX. SHUNDA PLAFOND, warna cerah (motif : menyesuaikan)
CH+3.50 CH+3.50
SKALA 1 : 75 C2 C2
PLAFOND INDIRECT PLAFOND INDIRECT
CH+3.30 LED EFFECT CH+3.30 LED EFFECT
SATUAN KERJA :
1735.0
PROGRAM
10.0 10.0
CH +3.50 CH +3.50
CH +3.40
KEGIATAN
20.0 10.0 20.0 10.0 20.0 10.0
CH +3.30 10.0 CH +3.30 CH +3.30
20.0 20.0
60.0 586.3 30.0 60.0 30.0 586.3 60.0 45.0 100.0 177.5
PEKERJAAN
LOKASI
TAHUN ANGGARAN
MUKA LANTAI
1735.0
296.3 120.0 230.0 120.0 230.0 120.0 296.3 85.0 120.0 117.5
CH +3.00
10.0 10.0 CH +3.00
20.0 20.0
60.0 236.3 30.0 60.0 30.0 230.0 30.0 60.0 30.0 230.0 30.0 60.0 30.0 236.3 60.0 85.0 30.0 60.0 30.0 117.5
MUKA LANTAI
1332.5
PROGRAM
10.0 10.0
KEGIATAN
10.0 CH +3.10 CH +3.10
10.0
1332.5
PEKERJAAN
LOKASI
TAHUN ANGGARAN
MUKA LANTAI
945.0
120.0 120.0 32.5 100.0 40.0 120.0 40.0 100.0 32.5 120.0 120.0
20.0 20.0
60.0 60.0 30.0 60.0 30.0 32.5 100.0 40.0 30.0 60.0 30.0 40.0 100.0 32.5 30.0 60.0 30.0 60.0 60.0
MUKA LANTAI
PROGRAM
KEGIATAN
R. SEKRETARIS
FFL ±0.00
CORIDOR
FFL -0.02 LOKASI
2
TAHUN ANGGARAN
R. TAMU
FFL ±0.00
A B NOTE : " Saklar dan stop kontak menyesuaikan eksisting " KODE NO. LBR JML. LBR
PROGRAM
KEGIATAN
3
PEKERJAAN
LOKASI
R. KABAG T.U.
FFL ±0.00
R. SEKRETARIS
FFL ±0.00
A B C NOTE : " Saklar dan stop kontak menyesuaikan eksisting " KODE NO. LBR JML. LBR
PROGRAM
KEGIATAN
PEKERJAAN
R. RAPAT 1;3;5
LOKASI
TAHUN ANGGARAN
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
CORIDOR
FFL +7.98
A B C D E F
SKALA 1 : 75
SATUAN KERJA :
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
R. RAPAT 1;3;5
M A
1
SKALA 1 : 50
SATUAN KERJA :
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI
3
TAHUN ANGGARAN
CORIDOR
FFL +7.98 M
A B C D E F
NOTE : " Speaker menyesuaikan eksisting +
Semua jalur instalasi tertanam dan tidak terlihat dari luar"
SKALA 1 : 75