Anda di halaman 1dari 26

PEMERINTAH KOTA SURABAYA

DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN,


CIPTA KARYA DAN TATA RUANG KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

NAMA KEGIATAN
PENYUSUNAN DOKUMEN PERENCANAAN
PRASARANA BANGUNAN PEMERINTAH DI DAERAH

LOKASI PEKERJAAN
GEDUNG INSPEKTORAT SURABAYA
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN

DAFTAR ISI GAMBAR SERTA PERTANAHAN KOTA SURABAYA


Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN
KODE NOMOR NAMA GAMBAR KETERANGAN KODE NOMOR NAMA GAMBAR KETERANGAN

ARS 01 STANDAR SIMBOL DAN SINGKATAN MEP 17 RENC. INSTALASI AIR BERSIH LT. 1,2,3
DETAIL GROUND TANK
ARS 02 STANDAR DETAIL ARSITEKTUR DETAIL RUMAH POMPA
NAMA PEKERJAAN
ARS 03 LAY OUT EXISTING MEP 18 RENC. INSTALASI AIR BEKAS LT. 1,2,3

ARS 04 LAY OUT GRAND DESIGN LT 1 RENC. INSTALASI AIR KOTOR LT. 1,2,3
DETAIL SEPTIC TANK BIO FILTER
ARS 05 LAY OUT GRAND DESIGN LT 2
MEP 19 RENC. INSTALASI AIR HUJAN LT. 1,2,3
ARS 06 LAY OUT GRAND DESIGN LT 3 DETAIL PIPA AIR HUJAN LOKASI PEKERJAAN

ARS 07 LAY OUT RENCANA STR 20 STANDARD DETAIL STRUKTUR


GEDUNG INSPEKTORAT
ARS 08 DENAH LANTAI 1 STR 21 STANDARD DETAIL STRUKTUR
DENAH LANTAI 2
STR 22 STANDARD DETAIL STRUKTUR
DENAH LANTAI 3 NAMA GAMBAR SKALA
TAMPAK SISI TIMUR STR 23 STANDARD DETAIL STRUKTUR
TAMPAK SISI UTARA
STR 24 DENAH PONDASI
TAMPAK SISI SELATAN
DETAIL PONDASI
ARS 09 TAMPAK SISI BARAT
STR 25 DENAH SLOOF DAN KOLOM
POTONGAN A-A
DENAH BALOK RING DAN BALOK LATAI LT. 1
POTONGAN B-B
DENAH BALOK LEVEL DAN PLAT LEVEL LT. 1
POTONGAN C-C
TABEL PENULANGAN KOLOM
POTONGAN D-D
TABEL PENULANGAN SLOOF
ARS 10 DENAH KUSEN LANTAI 1
STR 26 DENAH BALOK & KOLOM LT. 2
DENAH KUSEN LANTAI 2
DENAH PENULANGAN PLAT LT. 2
DENAH KUSEN LANTAI 3
DENAH BALOK RING DAN BALOK LATAI LT. 2
DETAIL KUSEN
DENAH BALOK LEVEL DAN PLAT LEVEL LT. 2
ARS 11 DENAH SUNSCREEN LANTAI 1 TABEL PENULANGAN BALOK
DENAH SUNSCREEN LANTAI 2 TABEL PENULANGAN KOLOM
DENAH SUNSCREEN LANTAI 3 DETAIL PENULANGAN PLAT
DETAIL SUNSCREEN
STR 27 DENAH BALOK & KOLOM LT. 3
ARS 12 DENAH KERAMIK LANTAI 1 DENAH PENULANGAN PLAT LT. 3
DENAH KERAMIK LANTAI 2 DENAH BALOK RING DAN BALOK LATAI LT. 3
DENAH KERAMIK LANTAI 3 DENAH BALOK LEVEL DAN PLAT LEVEL LT. 3
DETAIL PEMASANGAN KERAMIK TABEL PENULANGAN BALOK
TABEL PENULANGAN KOLOM
ARS 13 DENAH TOILET LANTAI 1
DETAIL PENULANGAN PLAT
DENAH TOILET LANTAI 2
DENAH TOILET LANTAI 3 STR 28 DETAIL PENULANGAN TANGGA
POTOGAN TOILET A-A POTONGAN TANGGA
POTOGAN TOILET B-B

ARS 14 DENAH TANGGA LANTAI 1 STR 29 DENAH PEKERJAAN STEKAN KOLOM


DENAH TANGGA LANTAI 2 DENAH PEKERJAAN WATERPROOFING
DENAH TANGGA LANTAI 3 DENAH PEKERJAAN ATAP PENUTUP VOID
POTOGAN TANGGA A-A DIBUAT OLEH TANDA TANGAN
POTOGAN TANGGA B-B

ARS 15 RENCANA PLAFOND LANTAI 1


RENCANA PLAFOND LANTAI 2
RENCANA PLAFOND LANTAI 3
DETAIL RANGKA PLAFOND

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

ARS 01 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

SIMBOL & SINGKATAN KONSULTAN PERENCANA

SYMBOL & ABREVIATIONS


NAMA KEGIATAN
N
UTARA INDIKASI GARIS MATERIAL FINISHING NOTASI TOILET / AREA BASAH
W E N = NORTH (UTARA) W = WEST (BARAT) GARIS PROYEKSI
LAKI - LAKI
= HOMOGENEOUS TILE 60x60cm-POLISHED
S S = SOUTH (SELATAN) E = EAST (TIMUR)
GARIS SUMBU (AS)
= HOMOGENEOUS TILE 60x60cm-ROCK NAMA PEKERJAAN
TAMPAK GARIS BATAS LANTAI = HOMOGENEOUS TILE 30x30cm-ROCK PEREMPUAN
X X
Y Y X = NOMOR TAMPAK Y = NOMOR LEMBAR REFERENSI = KERAMIK 30x30cm

X GARIS DIMENSI = PAVING BLOCK FLOORDRAIN


LOKASI PEKERJAAN
POTONGAN X = JARAK DARI AS KE AS
X Y
Y = JARAK DARI SISI KE SISI
Y = PLESTER+ACI FINISH CAT WEATHERSHIELD GEDUNG INSPEKTORAT
X = NOMOR POTONGAN Y = NOMOR LEMBAR REFERENSI Z Z = JARAK DARI AS KE SISI ROOFDRAIN
= PLESTER+ACI FINISH CAT INTERIOR

SUMBU (AS) MATERIAL = PLESTER GURAT FINISH CAT NAMA GAMBAR SKALA
Y TISSUE HOLDER
= BATU ALAM
BATA
X = INDIKASI UNTUK SUMBU X Y = INDIKASI UNTUK SUMBU Y = KACA CLEAR 6mm
X

= KACA CLEAR 8mm KRAN


BATA TAHAN AIR
± 0.000 INDIKASI PEIL = KACA TEMPERED 12mm

± 0.000 PEIL LANTAI UTAMA PADA POTONGAN


BATA RINGAN = GRILL AL.HOLLOW 50x50x1.2mm
PEIL PERMUKAAN LAIN PADA POTONGAN
DINDING + AL.HOLLOW 20x40x1.2mm
JET WASHER
± 0.000 PEIL PADA DENAH = AL.HOLLOW 10x10cm
BATA RINGAN TAHAN AIR

± 0.000 = PARTISI GYPSUM 12mm FINISH CAT


PENUNJUK PEIL PADA LANTAI RANGKA METAL
PLESTERAN / SPESI (GAMBAR DETAIL / POTONGAN)
= PLYWOOD FINISH CAT
SHOWER
PENUNJUK PEIL PADA PLAFOND
± 0.000 KACA / JENDELA

X
Y
DETAIL PARTISI = GYPSUM BOARD 9mm FINISH CAT
WASTAFEL

X = NOMOR DETAIL Y = NOMOR LEMBAR REFRENSI BETON (SKALA BESAR)


PLAFOND = CALSIBOARD 6mm FINISH CAT

= EXPOSE BETON FINISH CAT


URINOIR
BETON (SKALA KECIL), KOLOM DAN BALOK PRAKTIS
JUDUL GAMBAR
X ABC ABC = JUDUL GAMBAR 1 : 100 = SKALA GAMBAR BETON RINGAN / DINDING PENAHAN TANAH
Y SKALA 1 : 100
KLOSET JONGKOK
X = NOMOR DETAIL/POTONGAN Y = NOMOR LEMBAR REFERNSI
= GENTENG KARANGPILANG
RUMPUT

REVISI PAVING
ATAP = ATAP METAL + ALUMINIUM FOIL DOUBLE SIDE
KLOSET DUDUK
9 = NOMOR REVISI

9 KACA / CERMIN
KLOSET DUDUK
* CATATAN : PENAMAAN MTERIAL DAN MATERIAL YANG DIPAKAI ( CACAT )
N TANGGA TANAH ASLI
MENYESUAIKAN DESAIN PERENCANAAN

T N = NAIK T = TURUN
DIVIDER DIBUAT OLEH TANDA TANGAN
(PENYEKAT)
RAMP TANAH URUG

BAWAH ATAS
URUGAN SIRTU

X% KEMIRINGAN AIR URUGAN TANAH KEMBALI


X % = PRESENTASI KEMIRINGAN
DISETUJUI OLEH TANDA TANGAN
NOTASI FINISHING URUGAN PASIR
9

LANTAI/DINDING/PLAFOND DINDING PLAFOND


9 ( BIDANG ) (POTONGAN) (POTONGAN)

9 9 = CODE FINISHING A
INDIKASI TAMPAK
Y (DALAM RUANGAN)
NOTASI FINISHING D Y Y B DIPERIKSA OLEH TANDA TANGAN

ABCD = NOMOR TAMPAK


X Y
X = TYPE KUSEN PINTU / JENDELA C Y = NOMOR LEMBAR

KODE GBR NOMOR GBR JUMLAH GBR

ARS 02 23
TABEL PERTEMUAN PROFIL KUSEN DETAIL PERTEMUAN ELEMEN LANTAI - DINDING
DINDING JENDELA SLIMAR JENDELA MATI PEMERINTAH KOTA SURABAYA
WATER PROOFING WATER PROOFING 30
PAS. BATA RINGAN DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SETINGGI 20 CM SETINGGI 20 CM SERTA PERTANAHAN KOTA SURABAYA
PAS. BATA T=100mm 20 10
SCREED LANTAI Jl. TAMAN SURYA No. 1 SURABAYA
SPESI SCREED LANTAI
KUSEN PINTU SPESI
TALI AIR 5mm X 5mm KERAMIK LANTAI KERAMIK TANGGA
KERAMIK LANTAI KONSULTAN PERENCANA
STEP NOZING

1
PLIN KERAMIK 1 PLIN GRANIT / KAYU 1 SCREED

10

10
KERAMIK LANTAI KERAMIK LANTAI

50
1,75
1.
1. 5.
NAMA KEGIATAN

18
4
1. 6.
4

TYPE KUSEN

4
4,8

3
DETAIL PLIN RATA PLESTERAN DETAIL PLIN MENONJOL
4

10 10
2. 1,7 10 4. 3,38
1,7
1,8

1,7 2.
2,77

2,77
3. 7.
2. 3,5
BETON PLAT LANTAI

4
BALOK BETON PLAT BESI T.5mm (FLASHING)
2,5
2,77

7
3,3

DYNABOLT M6 SIKADUR COMBIFLEX NAMA PEKERJAAN


BALOK BETON
SIKADUR 731
BALOK BETON
ADHESIVE PLAT BETON
KUSEN JENDELA STEK Ø10-200mm
50 TANGGA
MATI 5 40 5
BALOK BETON
WATERPROOFING
CHAMPER LOKASI PEKERJAAN
DETAIL PERTEMUAN LANTAI
DYNABOLT M6 DETAIL ANAK TANGGA

13

10
KERAMIK LANTAI
GEDUNG INSPEKTORAT
SCREED LANTAI
2,91 3.
3,5 WATER PROOFING
2,5

6.
1,75
2,19

8. 10. 7.
SETINGGI 20 CM
3,3

8 8 8 8 DARI BETON
4

3,38
NAMA GAMBAR SKALA
TYPE KUSEN 7 4,8 7 PLAT LANTAI
4.
4

9.
1,8

7 5.
4 15 10 15
6.
1,75

4,8 40
3

DETAIL DILATASI DAK ATAP

20
A
B>A
KUSEN JENDELA CONSTRUCTION

B
SEALENT
SLIMAR
BALOK BETON

STYROFOAM
3,38
3,5 4,8
10. 3. 0. 3,5 3,5
1,8

3. 3. 4. 5. 4
2,5

2,5
2,5

3,3
4

3,3

3,3

TYPE KUSEN
10. DETAIL PERTEMUAN WATERPROOFING KAMAR MANDI
4

7
3,38 7
4. 5. 6. 10. *NOTE : SETELAH PEKERJAAN WATERPROOFING HARUS DILAKUKAN TES GENANG DULU
1,75

4 3,38 4
1,8

4. 5.
SEBELUM MELANJUTKAN KE PEKERJAAN KERAMIK LANTAI
4
1,8
3

4,8 7 DETAIL DILATASI AREA BALKON / SELASAR

DETAIL PERTEMUAN RAILLING DETAIL PERTEMUAN SELASAR DETAIL PLAFOND

30

8
4

6 HANGER HOLLOW METAL FURING 20x40mm


TIANG RAILLING
HOLLOW 40x40x2mm
30

RING HOLLOW
DYNABOLT M6 x2 RAILING HOLLOW / PIPA BESI ROD HANGER Ø 8mm
KERAMIK LANTAI FIN CAT DOFF
SAMBUNGAN LAS 15
HOLLOW METAL FURING 40x40mm SIKU ALUMINIUM
SAMBUNGAN LAS PLAT FLENDES 60x75x8mm
8

BALOK PRAKTIS BP
PLAT FLENDES 60x75x8mm
TIANG RAILLING HOLLOW METAL FURING 20x40mm DIBUAT OLEH TANDA TANGAN
HOLLOW 40x40x2mm

DYNABOLT M6 x2
40

EQ EQ

*NOTE : DIMENSI DAN TIPE RAILLING FLOOR DRAIN


MENYESUAIKAN DESAIN KONSULTAN SELASAR
80

PLAT LANTAI BETON


DETAIL RAILLING DI LANTAI

4 60 DISETUJUI OLEH TANDA TANGAN


15 DINDING PARAPET
10
PAS BATA TRASRAAM

TIANG RAILLING 6 60
60
2

HOLLOW 40x40x2mm

DYNABOLT M6 x2 60
60
RING HOLLOW

PLAT FLENDES 60x75x8mm SAMBUNGAN LAS


20

BALOK LISPLANK 01 60
PLAT FLENDES 60x75x8mm
60
8

DYNABOLT M6 x2 SALURAN PIPA


TIANG RAILLING AIR HUJAN 3"
PLESTERAN + ACIAN HOLLOW 40x40x2mm
15mm
DIPERIKSA OLEH TANDA TANGAN
RING BALOK
DINDING PARAPET
EQ EQ SALURAN PIPA AIR HUJAN 3" DETAIL RANGKA PLAFOND
DIKLEM PADA KOLOM
N.S.
*NOTE : DIMENSI DAN TIPE RAILLING
MENYESUAIKAN DESAIN KONSULTAN
SUN SCRREN ALUMINIUM

2 EQ 2
DETAIL RAILLING DI DINDING PARAPET

KODE GBR NOMOR GBR JUMLAH GBR

ARS 03 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN

NAMA PEKERJAAN

D G D G D G
1530 1530 1530

E F E F E F
500 600 430 500 600 430 500 600 430 LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

10 10 10 10 10 10
JAN JAN JAN
+8.80
ME ±0.00 ±0.05 ME +4.90 +4.85 +4.85 NAMA GAMBAR SKALA
BV EXISTING DIBONGKAR BV EXISTING DIBONGKAR BV EXISTING DIBONGKAR
±0.00 DITUTUP PASANGAN BATA +4.90 DITUTUP PASANGAN BATA DITUTUP PASANGAN BATA
KM/WC KM/WC
+4.85 IRBAN +8.75
500

500

500

500

500

500
4 +8.80
PANTRY

PANTRY
PANTRY
+8.80

+8.80
+4.90
±0.00

KM/WC KM/WC KM/WC KM/WC


R.SEKRETARIS +8.75
+4.85 +4.85 +8.75
±0.00 R.
IRBAN 1
9 9 9 +4.90 9 9 9
R.ARSIP R.ARSIP
±0.00 +4.90
500

500

500

500

500

500
R.KASUBAG
±0.00

8 8 8 8 8 8
R.
JENDELA EXISTING DIBONGKAR R. KERJA STAF RAPAT
R.KASUBAG DITUTUP PASANGAN BATA +8.80
+8.80
±0.00
2400

2400

2400

2400

2400

2400
500

500

500

500

500

500
R. ISTIRAHAT OPEN R. RAPAT
+4.90 +4.90

R.KONSULTASI
±0.00

7 7 7 7 7 7
R.RAPAT
±0.00

6 6 6 6 6 6
500

500

500

500

500

500
5 R.TUNGGU 5 5 R. IRBAN 2 R. TUNGGU 5 5 5
±0.00
+4.90 +4.90
MUSHOLAH
R. DIBUAT OLEH TANDA TANGAN
MUSHOLA R. PERPUSTAKAAN +8.80
KONSULTASI
±0.00 +8.80
400

400

400

400

400

400
+4.90 SAJI/PERSIAPAN
±0.00
+8.80

MAIN
ENTRANCE t.wudlu
2 2 2 2 2 2

150 180 100


500 600 430 500 600 430 500 600 430
E 1530 F E 1530 F E 1530 F DISETUJUI OLEH TANDA TANGAN

D G D G D G

DENAH EXISTING LANTAI 1 DENAH EXISTING LANTAI 2 DENAH EXISTING LANTAI 3


SKALA 1:100 SKALA 1:100 SKALA 1:100

DIPERIKSA OLEH TANDA TANGAN

NOTASI

= PEKERJAAN PEMBONGKARAN DINDING + KUSEN EXISTING

KODE GBR NOMOR GBR JUMLAH GBR

ARS 04 23
AP
AT
L
TAI
DE
T
HA
LI PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

+13.00 +13.00 DAK


+12.70

30.00
PLAFOND PLAFOND NAMA KEGIATAN
+11.50 +11.80 +11.50 +11.80

390
LT. 3
+8.80 +8.80 +8.80

NAMA PEKERJAAN
PLAT ATAP EXISTING DIBONGKAR PLAFOND
+7.60 +7.90

390
D G DINDING DAN JENDELA EXISTING
1530
INFORMASI DIBONGKAR LT. 2
E F +4.90 +4.90
500 600 430 LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

490
10 10 PLAFOND PLAFOND
+2.70 +3.00 +3.00

NAMA GAMBAR SKALA

R. SEKERTARIS INFORMASI LT. 1


±0.00 ±0.00 ±0.00
500

500

30
9 9

500 600 430


500

500

POTONGAN 1 EXISTING
SKALA 1:100
8 8
2400

2400
500

500

PLAT ATAP EXISTING DIBONGKAR

+13.00 DAK
+12.70
7 7

PLAFOND
+11.50 +11.80

390
6 6 DINDING DAN JENDELA EXISTING
500

500

DIBONGKAR
LT. 3
+8.80 +8.80 +8.80

5 5
PLAFOND
+7.60 +7.90

390
DIBUAT OLEH TANDA TANGAN
400

400

INFORMASI LT. 2
+4.90 +4.90

2 2

490
PLAFOND PLAFOND
+2.70 +3.00 +3.00

DISETUJUI OLEH TANDA TANGAN


R. SEKERTARIS INFORMASI LT. 1
500 600 430 ±0.00 ±0.00 ±0.00

E 1530 F

30
D G

DENAH EXISTING ATAP


SKALA 1:100

500 600 DIPERIKSA OLEH TANDA TANGAN

1100

POTONGAN 2 EXISTING
SKALA 1:100

KODE GBR NOMOR GBR JUMLAH GBR

ARS 05 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

D G
1650 1640 NAMA KEGIATAN
E F
162.5 500 600 540
260 212.5 107.5 220

100
10 NAMA PEKERJAAN

75
JAN
ME ±0.00 ±0.05

±0.00

550.22

GARDEN

275
PARKIR SEPEDA MOTOR

PANTRY
LOKASI PEKERJAAN

±0.00
R.SEKRETARIS

150
±0.00
GEDUNG INSPEKTORAT
9

115
RUANG NAMA GAMBAR SKALA
RAPAT
±0.00

250
500
R.KASUBAG
±0.00

R.KASUBAG
±0.00

2400
500
R.KONSULTASI
±0.00
3130

R.RAPAT
±0.00
6

500
R.TUNGGU 5
±0.00

R.
KONSULTASI

400
±0.00

MAIN
ENTRANCE
2

150 180 100


500 600 430
E 1530 F
DIBUAT OLEH TANDA TANGAN
D G

DISETUJUI OLEH TANDA TANGAN

LAY OUT LANTAI 1

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

ARS 06 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN

NAMA PEKERJAAN

D G D D
1640 1625 1625

E F E F E F
162.5 500 600 540 500 600 100 300 125 500 600 100 300 125 LOKASI PEKERJAAN
260 212.5 107.5 220

GEDUNG INSPEKTORAT

115
100

100
10 10 10 10

75
JAN
+8.80
ME ±0.00 ±0.05 ME +4.90 NAMA GAMBAR SKALA
±0.00 +4.90
GARDEN

teras
350

350
KM/WC KM/WC

275
+4.85 IRBAN +8.75

500

500
R. ARSIP +8.80 R. ARSIP
4
+4.90 +4.90
PANTRY

PANTRY
PANTRY
+8.80

+8.80
+4.90

+4.90
±0.00

KM/WC KM/WC KM/WC KM/WC


R.SEKRETARIS +8.75
+4.85 +4.85 +8.75

150

150
150

±0.00 R.
IRBAN 1
9 9 +4.90 9 9 9

117.5
115

RUANG
RAPAT
±0.00
250

250
500

500

500

500
R.KASUBAG

132.5
±0.00

8 8 R. KERJA STAF 8 8 8
+4.90 R.
R. KERJA STAF RAPAT
R.KASUBAG +8.80 +8.80

2500
±0.00
2400

2400

2400
2400

500

500

500

500
500

R. ISTIRAHAT OPEN R. RAPAT


+4.90 +4.90

R.KONSULTASI
±0.00

7 7 7 7 7
R.RAPAT
±0.00

6 6 6 6 6
500

500

500

500

500
R.TUNGGU 5 5 5 5 5
±0.00 R. IRBAN 2 R. TUNGGU
+4.90 +4.90
R. DIBUAT OLEH TANDA TANGAN
MUSHOLA R. PERPUSTAKAAN +8.80
KONSULTASI +8.80
400

400

400

400

400
+4.90 SAJI/PERSIAPAN
±0.00
+8.80

MAIN
ENTRANCE t.wudlu
2 2 2 2

150 180 100


500 600 430 500 600 430 500 600 430

E 1530 F E 1530 F E 1530 F DISETUJUI OLEH TANDA TANGAN

D G D G D G

DENAH RENCANA LANTAI 1 DENAH RENCANA LANTAI 2 DENAH RENCANA LANTAI 3


SKALA 1:100 SKALA 1:100 SKALA 1:100

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

ARS 07 23
AP
AT
IL
TA
DE
H AT
LI PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

+13.00 +13.00

30.00
PLAFOND PLAFOND NAMA KEGIATAN
+11.50 +11.80 +11.50 +11.80

+8.80 +8.80

NAMA PEKERJAAN
D G PLAFOND
1530 +7.60 +7.90

E F
500 600 430

INFORMASI
+4.90
LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

10 10 PLAFOND PLAFOND
+2.70 +3.00 +3.00

NAMA GAMBAR SKALA

R. SEKERTARIS INFORMASI
±0.00 ±0.00
500

500

30
9 9

500 600 430

POTONGAN 1 RENCANA
500

500

SKALA 1:100

8 8
2400

2400
500

500

BETON B-NOL
+ FLASHING
7 7 +13.00 DAK EXISTING DAK BARU DAK
+12.70 +12.70 +12.70

PLAFOND PLAFOND
6 6
500

500

+11.50 +11.80 +11.50 +11.80

390
LT. 3
+8.80 +8.80 +8.80

5 5

PLAFOND
+7.60 +7.90 DIBUAT OLEH TANDA TANGAN

390
400

400

INFORMASI LT. 2
+4.90 +4.90

2 2

490
PLAFOND PLAFOND
+2.70 +3.00 +3.00
DISETUJUI OLEH TANDA TANGAN

500 600 430


R. SEKERTARIS INFORMASI LT. 1
E 1530 F ±0.00 ±0.00 ±0.00

D G

30
DENAH RENCANA ATAP
SKALA 1:100

DIPERIKSA OLEH TANDA TANGAN


500 600 100 300 125

PONDASI EXISTING PONDASI BARU

POTONGAN 2 RENCANA
SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR

ARS 08 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

HOMOGENOUS TILE
POLISHED - 60X60 CM

D G D D
NAMA KEGIATAN
1640 1625 1625

E F E F E F
162.5 500 600 540 500 600 100 300 125 500 600 100 300 125
260 212.5 107.5 220

115
100

100
NAMA PEKERJAAN
10 10 10 10

75

350

350
275

500

500
LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

150

150
150
9 9 9 9 9

117.5
115
NAMA GAMBAR SKALA

250

250
500

500

500

500
132.5
8 8 8 8 8

2500
HOMOGENOUS TILE

2400

2400

2400
2400

POLISHED - 60X60 CM

500

500

500

500
500

7 7 7 7 7

6 6 6 6 6
500

500

500

500

500
5 5 5 5 5

+8.80
400

400

400

400

400
2 2 2 2

150 180 100


500 600 430 500 600 430 500 600 430

E F E F E F DIBUAT OLEH TANDA TANGAN


1530 1530 1530

D G D G D G

DENAH RENCANA KERAMIK LANTAI 1 DENAH RENCANA KERAMIK LANTAI 2 DENAH RENCANA KERAMIK LANTAI 3
SKALA 1:100 SKALA 1:100 SKALA 1:100

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

ARS 09 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

HOMOGENOUS TILE HOMOGENOUS TILE


60X60 CM 60X60 CM KONSULTAN PERENCANA

HOMOGENOUS TILE
60X60 CM (UNPOLISHED)
KLOSET DUDUK
TYPE ONEPIECE
2 NAMA KEGIATAN
JET SHOWER

KRAN SHOWER SET KRAN SHOWER SET

NAMA PEKERJAAN
1 1

300

300
168.44

KLOSET DUDUK KLOSET DUDUK LOKASI PEKERJAAN


TYPE ONEPIECE TYPE ONEPIECE
KRAN SHOWER SET
JET SHOWER GEDUNG INSPEKTORAT

FLOOR DRAIN NAMA GAMBAR SKALA


2

190.48
190 168.44

DENAH TOILET POTONGAN 1-1 POTONGAN 2-2


SKALA 1:25 SKALA 1:25 SKALA 1:25

DIBUAT OLEH TANDA TANGAN

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

ARS 09 23
TYPE P1 TYPE P2 TYPE BV PEMERINTAH KOTA SURABAYA
SKALA 1 : 25 SKALA 1 : 25 TYPE J1 SKALA 1 : 25 DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SKALA 1 : 25 SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

TYPE P3 KONSULTAN PERENCANA


kaca bening kaca bening kaca bening

50

50

50
5mm 5mm
SKALA 1 : 25 kaca bening kaca bening kaca bening 5mm

35

35
5mm 5mm 5mm
20

20

20
kaca bening kaca bening kaca bening

35

35
5mm 5mm 5mm
50

165
60

60

60
kaca bening kaca bening kaca bening

35

35
NAMA KEGIATAN
Solid Wood Panel (SWP)

Solid Wood Panel (SWP)

Solid Wood Panel (SWP)


5mm 5mm 5mm
270

270
daun pintu

daun pintu

daun pintu
kaca bening kaca bening kaca bening kaca bening kaca bening

35

35
5mm 5mm 5mm 5mm 5mm
210

210

210

210
110

110

110
50 50 50 NAMA PEKERJAAN
170

90
20

20

20
LOKASI PEKERJAAN
90 80 70 50 50 50

GEDUNG INSPEKTORAT
kusen aluminium 4" kusen aluminium 4" kusen aluminium 4" 80 90 80
270
NAMA GAMBAR SKALA

P2
P2
P3

P1 BV

P2 BV
BV
PG
BV
BV

BV

J1

J1
P1 P2
P1

J1

J1 DIBUAT OLEH TANDA TANGAN

DISETUJUI OLEH TANDA TANGAN

+8.80

DIPERIKSA OLEH TANDA TANGAN

DENAH RENCANA KUSEN LT. 1 DENAH RENCANA KUSEN LT. 2 DENAH RENCANA KUSEN LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR

ARS 10 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
HANGER HOLLOW METAL FURING 20x40mm Jl. TAMAN SURYA No. 1 SURABAYA

ROD HANGER Ø 8mm 10 KONSULTAN PERENCANA

HOLLOW METAL FURING 40x40mm SIKU ALUMINIUM 1 1 5 1 1 1

HOLLOW METAL FURING 20x40mm

1
1
HOLLOW METAL FURING 20X40MM

1
N.S. NAMA KEGIATAN

10

5
1
1
60 NAMA PEKERJAAN

10 DETAIL LIST GYPSUM


60
60 SKALA 1:2

60 60
DETAIL RANGKA PLAFOND HOLLOW METAL FURING 40X40MM
N.S. LOKASI PEKERJAAN
60 N.S.
60
GEDUNG INSPEKTORAT

NAMA GAMBAR SKALA

DIBUAT OLEH TANDA TANGAN

DISETUJUI OLEH TANDA TANGAN

+8.80

DIPERIKSA OLEH TANDA TANGAN

DENAH RENCANA PLAFON LT. 1 DENAH RENCANA PLAFON LT. 2 DENAH RENCANA PLAFON LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR

ARS 11 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN
NOTASI

= SAKLAR TUNGGAL
= LAMPU LED SLIM PANEL = LAMPU LED BULB 14.5 WATT
45 WATT ARMATUR DOWNLIGHT 4" = SAKLAR GANDA
= STOP KONTAK (EL. 150CM DARI LANTAI)
= LAMPU LED TUBE 1 x 16 WATT = LAMPU LED BULB 6.5 WATT NAMA PEKERJAAN
= STOP KONTAK AC (EL. 320CM DARI LANTAI)
ARMATUR KAP OUTBOW ARMATUR DOWNLIGHT 4"
= BOX PANEL

LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

NAMA GAMBAR SKALA

DIBUAT OLEH TANDA TANGAN

DISETUJUI OLEH TANDA TANGAN

+8.80

DIPERIKSA OLEH TANDA TANGAN

DENAH TITIK LAMPU LT. 1 DENAH TITIK LAMPU LT. 2 DENAH TITIK LAMPU LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100

KODE GBR NOMOR GBR JUMLAH GBR

MEP 12 23
RESAPAN SEPTICTANK
BIOFILTER PIPA PVC AW Ø 4"
KAP. 5 M3
PEMERINTAH KOTA SURABAYA
200 300 300 DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

JAN
KONSULTAN PERENCANA
ME ±0.00 ±0.05

±0.00

GARDEN
PARKIR SEPEDA MOTOR

PANTRY
NAMA KEGIATAN

±0.00
R.SEKRETARIS
±0.00

NAMA PEKERJAAN

RUANG
RAPAT
±0.00
LOKASI PEKERJAAN

GEDUNG INSPEKTORAT
R.KASUBAG
±0.00
NAMA GAMBAR SKALA

R.KASUBAG
±0.00

R.KONSULTASI
±0.00

R.RAPAT
±0.00
R.TUNGGU
±0.00

R.
KONSULTASI
±0.00

MAIN DIBUAT OLEH TANDA TANGAN


ENTRANCE

PIPA PVC AW Ø 4"

SEPTICTANK DISETUJUI OLEH TANDA TANGAN


BIOFILTER RESAPAN
KAP. 2 M3

DIPERIKSA OLEH TANDA TANGAN

DENAH RENCANA INSTALASI AIR KOTOR


SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR

MEP 13 23
TUTUP MANHOLE
PLAT BETON TB. 6MM PEMERINTAH KOTA SURABAYA
PLAT BETON TEBAL 15 CM DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
230 SERTA PERTANAHAN KOTA SURABAYA
15 70 60 70 15 Jl. TAMAN SURYA No. 1 SURABAYA
PAVING STONE EXISTING
KONSULTAN PERENCANA

15
Ø10-100
Ø10-100

PIPA VENT
PVC AW Ø2"

NAMA KEGIATAN
PLAT BETON

190
TEBAL 15 CM

235
SEPTICTANK
BIOFILTER Ø10-150
KAP. 5 M3
Ø10-150

NAMA PEKERJAAN

10

5 25
RABATAN BETON TEBAL 5CM LOKASI PEKERJAAN
PONDASI PLAT
URUGAN PASIR

45 165 50
GEDUNG INSPEKTORAT
305

POTONGAN B NAMA GAMBAR SKALA


SKALA 1:25

TUTUP MANHOLE
PIPA VENT PLAT BETON TB. 6MM
PVC AW Ø2"
PLAT BETON TEBAL 15 CM 360
360
15 45 60 30 60 30 60 45 15 PAVING STONE EXISTING

15
Ø10-100 Ø10-100
Ø10-100
MUKA TANAH ASAL Ø10-100
DARI TOILET 60 60 60
KE RESAPAN

Ø10-100

Ø10-100

Ø10-100

Ø10-100
PVC AW Ø 4" PVC AW Ø 4"

230
LUBANG LUBANG LUBANG

205

60

60

60
SEPTICTANK PLAT BETON 190 MANHOLE MANHOLE MANHOLE
BIOFILTER TEBAL 15 CM
KAP. 5 M3
Ø10-150

Ø10-100
Ø10-100

Ø10-100
Ø10-100
Ø10-150 Ø10-100

Ø10-100
5

5 25
25

PLAT BETON TEBAL 15 CM


RABATAN BETON TEBAL 5CM
URUGAN PASIR PONDASI PLAT

40 305 40 DENAH PLAT BETON PENUTUP


435 SKALA 1:25
POTONGAN A
SKALA 1:25

395

PLAT BETON TEBAL 15 CM 50 122.5 50 122.5 50 DIBUAT OLEH TANDA TANGAN


B
360
15 330 15
PIPA VENT
Ø10-150 PVC AW Ø2"
Ø10-150
Ø10-100
15

50
Ø10-100

DISETUJUI OLEH TANDA TANGAN


SEPTICTANK
PVC AW Ø 4" BIOFILTER PVC AW Ø 4"
KAP. 5 M3

DARI TOILET
200

230

265
165
KE RESAPAN
Ø10-100

Ø10-100

Ø10-100

Ø10-100

Ø10-100

Ø10-100
A

DIPERIKSA OLEH TANDA TANGAN


15

50
DENAH SEPTIC TANK BIO FILTER 5M3 PLAT BETON TEBAL 25 CM

SKALA 1:25
DENAH PONDASI PLAT
KODE GBR NOMOR GBR JUMLAH GBR
SKALA 1:25

MEP 14 23
275
TUTUP MANHOLE TUTUP MANHOLE 50 175 50
PLAT BETON TB. 6MM PLAT BETON TB. 6MM
Ø10-150 PEMERINTAH KOTA SURABAYA
PLAT BETON TEBAL 15 CM Ø10-150 PLAT BETON TEBAL 15 CM DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
240 180 SERTA PERTANAHAN KOTA SURABAYA
15 45 60 30 60 30 15 15 45 60 45 15 Jl. TAMAN SURYA No. 1 SURABAYA
PAVING STONE EXISTING PAVING STONE EXISTING

KONSULTAN PERENCANA

15

15
Ø10-100

50
Ø10-150 Ø10-100
Ø10-150
DARI TOILET PIPA VENT
KE RESAPAN
PVC AW Ø2"
Ø10-100 Ø10-100
PVC AW Ø 4" PVC AW Ø 4"
PLAT BETON Ø10-100 Ø10-100

150

150
SEPTICTANK PLAT BETON TEBAL 15 CM
SEPTICTANK NAMA KEGIATAN

195

195
BIOFILTER

215
115
TEBAL 15 CM BIOFILTER

Ø10-100

Ø10-100
KAP. 2 M3
Ø10-150 KAP. 2 M3 Ø10-150

Ø10-150 Ø10-150
ROLAG BATA ROLAG BATA

5 Ø10-100

5 25

10 20
NAMA PEKERJAAN
25

50
Ø10-100

PLAT BETON TEBAL 25 CM


50 175 50 50 115 50

LOKASI PEKERJAAN

POTONGAN D POTONGAN D DENAH PONDASI PLAT GEDUNG INSPEKTORAT


SKALA 1:25 SKALA 1:25
SKALA 1:25
PIPA VENT NAMA GAMBAR SKALA
PVC AW Ø2"

Ø10-150
PLAT BETON TEBAL 15 CM Ø10-150 D
240 240
15 210 15
15

Ø10-150

Ø10-150

PVC AW Ø 4" PVC AW Ø 4" 60 60


SEPTICTANK
BIOFILTER
KAP. 2 M3

Ø10-150

Ø10-150
DARI TOILET LUBANG LUBANG
150

180

180
60

60
KE RESAPAN MANHOLE MANHOLE

C
15

PLAT BETON TEBAL 10 CM

DENAH SEPTIC TANK BIO FILTER 2M3


SKALA 1:25
DENAH PLAT BETON PENUTUP
SKALA 1:25

Plat Beton Tebal 10cm


Tutup Kontrol 30x30cm TUL. Ø10 - 10

DIBUAT OLEH TANDA TANGAN


Pasangan trastram 1pc:3ps

Pasangan batu bata tanpa spesi

60
PVC D Ø 3"
PVC D Ø 3"
Dari Ovour KM Dari Septictank

Pasangan batu bata


Lapisan Ijuk
tanpa spesi
Lapisan Kerikil
210

1
100

Tutup Kontrol 30x30cm Lapisan Ijuk

DISETUJUI OLEH TANDA TANGAN


Lapisan Kerikil
PVC D Ø 3"
Dari Septictank
Pasangan trastram 1pc:3ps
30
20

Pasir urug
10 15 25 80 25 15 10
10 15 25 80 25 15 10
140
140
160
180 160
DIPERIKSA OLEH TANDA TANGAN
180
DENAH SUMUR RESAPAN
SKALA 1:25
POTONGAN 1
SKALA 1:25

KODE GBR NOMOR GBR JUMLAH GBR

MEP 15 23
PIPA AIR BERSIH PIPA AIR BERSIH
PVC AW Ø 1" PVC AW Ø 3/4"

PEMERINTAH KOTA SURABAYA


DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

JAN
KONSULTAN PERENCANA
ME ±0.00 ±0.05

GROUND ±0.00

GARDEN
WATER
TANK

PARKIR SEPEDA MOTOR

PANTRY
NAMA KEGIATAN

±0.00
R.SEKRETARIS
±0.00

NAMA PEKERJAAN

RUANG
RAPAT
±0.00
LOKASI PEKERJAAN

GEDUNG INSPEKTORAT
R.KASUBAG
±0.00
NAMA GAMBAR SKALA

R.KASUBAG
±0.00

R.KONSULTASI
±0.00

R.RAPAT
±0.00
CATATAN:
Instalasi Air Bersih baru dari Ground Tank baru,
dihubungkan ke Instalasi Air Bersih Existing
yang berada pada Shaft Existing
R.TUNGGU
Instalasi Air Bersih pada Kamar Mandi Baru, ±0.00
diambil dari Instalasi Air Bersih Existing
yang berada pada Shaft Existing
R.
KONSULTASI
±0.00

MAIN DIBUAT OLEH TANDA TANGAN


ENTRANCE

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

DENAH RENCANA INSTALASI AIR BERSIH


SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR

MEP 13 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

1. MUTU BAHAN YANG DIGUNAKAN 2.2. SELIMUT BETON (MM)

*) MUTU BAJA TULANGAN


BAGIAN PELAT DINDING BALOK KOLOM POER SLOOF
MUTU BETONfc'
KONTRUKSI POLOS ULIR 4. FLOOR HARDENER & WATERPROOFING NAMA KEGIATAN
DENGAN PLESTER 10 15 20 25
fy=240Mpa(BJTP-24)<Ø8 fy=240Mpa(BJTD-40)>D10

KOLOM , SW KOLOM 30mpa & 35mpa TANPA PLESTER 20 25 30 35


- PARKIR & JALAN MOBIL = 5Kg AGREGATE MURNI / M2
BALOK, SLOOF, - RUANG M.E. = 3Kg AGREGATE MURNI / M 2
PELAT KOLOM 30 mpa BERHUBUNGAN DNG.
25 30 35 40 75 50 2 NAMA PEKERJAAN
(KENA) TANAH - RAMP = 7Kg AGREGATE MURNI / M
PILE CAP KOLOM 30 mpa
PARKIR 25 30 35 40

*
fc' = Tegangan hancur karakteristik dari silinder
berumur 28 hari
4.2 WATERPROOFING LOKASI PEKERJAAN
2.3.JARAK BAJA TULANGAN WATERPROOFING DIPASANG DISEMUA PERMUKAAN BETON
YANG BERHUBUNGAN DENGAN TANAH, AIR ( DI TOILET, DI ATAP,
GEDUNG INSPEKTORAT
DI SALURAN-SALURAN DSB.)
a > 1,7 d
SERTA DIJAMIN 100% TIDAK BOCOR OLEH KONTRAKTOR
JARAK BERSIH INI JUGA TIDAK BOLEH WATERPROOFING
KURANG DARI 4/3 UKURAN TERBESAR NAMA GAMBAR SKALA
d AGREGAT KASAR (a > 4/3 x 30MM)

a
2. STANDARD PENGATURAN BAJA TULANGAN
STANDARD INI SESUAI DENGAN SK SNI ST-15-1991-03 a

2.1.UMUM a. PADA ATAP


2.4.PANJANG PENYAMBUNGAN/PENJANGKARAN - JIKA PELAT/BETON HANYA BERFUNGSI
PRINSIP PENULANGAN KOLOM & BALOK
SEBAGAI PENUTUP ATAP
Ld = 50 d untuk d > 25MM
a
c Ld = 40 d untuk d < 25MM
d c b b c d d
d c d = DIAMETER BAJA TULANGAN
min 30MM
d

d
d d
3 KOLOM2 / BALOK PRAKTIS DAN LISPLANK WATERPROOFING (HARUS TAHAN SINAR ULTRAVIOLET)
c PLESTERAN
d
SENGKANG
d d
SENGKANG
YANG TIDAK KONSTRUKTIF PELAT BETON

3.1.UNTUK DINDING BT. BATA SETIAP LUAS ±10 2M


DAN DI SUDUT-SUDUT PERTEMUAN HARUS DIBUAT
KOLOM-KOLOM/BALOK PRAKTIS
- JIKA BERFUNGSI SEBAGAI PENUTUP ATAP + PARKIR
KAIT BENGKOKAN F 120 x 120 DENGAN BESI 4Ø10 SENGKANG Ø8-200
STEKNYA DISEDIAKAN LEBIH DULU FLOOR HARDENER +
SUDUT BENTUK r SUDUT BENTUK r WATERPROOFING
LETAK DINDING LIHAT GAMBAR ARSITEKTUR (KRISTALIN)

a r d
r
5d 2d
3.2.LISPLANK YG TIDAK KONSTRUKTIF HARUS DIBERI TULANGAN
>
Ø8 - 200 TEBAL 80MM PELAT BETON
135° 2dp
DAN STEKNYA DISEDIAKAN LEBIH DULU

UNTUK BALOK LETAK LISPLANK INI LIHAT GAMBAR ARSITEKTUR


SENGKANG
80MM b. PADA BASEMENT
b DIBUAT OLEH TANDA TANGAN
r 3.2.STEK HUBUNGAN PAS.BATADENGAN BETON - PADA DINDING BASEMENT
> 1,25d
>90° > 5d
BALOK
> 5dp UNTUK DAERAH GALIAN TERBUKA
> 6d

135°
5d
>

UNTUK SENGKANG DINDING BETON


stek Ø 8

±1.000
c KHUSUS DINDING
r PELINDUNG DARI STEROFOAM
r
(OPEN CUT)
> 8d

SELAIN DISETUJUI OLEH TANDA TANGAN


DIATAS

±1.000
stek Ø 8 stek Ø 8
WATERPROOFING
pas bata PASIR PADAT 70MM
PLESTERAN 30MM
KOLOM stek Ø 8 KOLOM
KETERANGAN
±1.000

d = diameter batang polos


dp = diameter pengenal batang yang di profil LT.KERJA 50MM
DIPERIKSA OLEH TANDA TANGAN

±1.000 ±1.000 ±1.000

KODE GBR NOMOR GBR JUMLAH GBR

STR 16 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN

PENGATURAN BAJA TULANGAN PENJANGKARAN SAMB. PELAT DG. LISPLANK PENULANGAN SEKITAR LOBANG PLAT
Arah pendek
lapis pertama
ARAH BENTANG PENDEK - PENULANGAN SEKITAR LOBANG YANG TERLETAK DIDAERAH A & B
NAMA PEKERJAAN
Lx/2 Ly
PELAT PELAT PENULANGAN (ATAS BAWAH) SEPERTI YANG TERTERA DALAM TABEL. (MAK UKURAN 500mm)
15d
PENULANGAN POKOK PLAT

Lx/4
- PENULANGAN SEKITAR LOBANG YANG TERLETAK PADA DAERAH C
ARAH BENTANG PENDEK MEMANJANG

Ld
Ld
DIAGONAL & DAERAH A & B DENGAN UKURAN > 500mm
MELINTANG

Lx/4
Lx/4 A C A HARUS DITINJAU SENDIRI.
Lx
1 - D13

Ld
15d Ø8 1 - D10
PLAT

x t LOKASI PEKERJAAN

Ld
C C

Lx

Ld
B

Lx/2
Peil
ALTERNATIF 15d PELAT Ø10 , D13 1 - D13 1 - D13
Lx/4

Ly/2
GEDUNG INSPEKTORAT

< 500mm
A A

Lx/4
15d
C
Lx/4 Lx/4 KE BALOK TEPI D13 1 - D16 1 - D13 Ld < 500mm Ld
Ly ATAU KE DINDING
Arah panjang Lx/4 Lx/4 Ly-Lx/2 Lx/4
D13, D16 1 - D16 1 - D16
DENAH PLAT lapis kedua NAMA GAMBAR SKALA

Ld
Ld
*Tiap 1m2 dipasang kaki ayam min.4 bh ARAH BENTANG PANJANG

PENJANGKARAN DETAIL HUBUNGAN DINDING PELAT PENJANGKARAN KE PELAT PENULANGAN SEKITAR LUBANG DINDING
PENULANGAN SEKITAR LUBANG (mm)
PADA KOLOM Ld TEBAL DINDING PENULANGAN POKOK

Ld
Ld Ld Ld (mm) (mm) ARAH MEMANJANG & TANDA
Ld Ld DINDING DINDING DIAGONAL
SINGLE ARAH MELINTANG

Ld
D13 - 200
TUL. PELAT 100 t2
PENULANGAN TUNGGAL 1 - D13 1 - D13
Ld
120 PADA KEDUA ARAH t2
SINGLE
KOLOM KOLOM D13 - 150
Ld Ld Ld Ld 150 1 - D16 1 - D16
DINDING PENULANGAN TUNGGAL
DINDING

Ld
PADA BALOK DINDING DINDING
D13- 200
PELAT DOUBLE 180
PENULANGAN RANGKAP 2 - D16 2 - D16
200 PADA KEDUA ARAH

Ld
Ld

Ld

TUL. PELAT
Ld

Ld
Ld

D13 - 200 DOUBLE t


250
PELAT PENULANGAN RANGKAP 2 - D20 2 - D20
300
Ld

Ld

BALOK BALOK Ld Ld PADA KEDUA ARAH


Ld Ld PENGAKHIRAN
Ld UJUNG DINDING
Ld Ld

SAMBUNGAN LEWATAN JARAK / DETAIL SENGKANG TIDAK TETAP PENJANGKARAN BALOK ANAK PEMBERHENTIAN BESI BETON
1). U M U M 3). TAMPAK ATAS 4). STANDARD DETAIL TULANGAN TUMPUAN
A=Lo/4 B = Lo/2 A=Lo/4 1). BALOK MENERUS
a a). TULANGAN ATAS BERBEDA c). TINGGI BALOK BERBEDA
15d BALOK INDUK Lo/4 Lo/2 Lo/4

SAMB. DAERAH ATAS TIDAK BOLEH Ld

Ld
BALOK INDUK BALOK INDUK

Ld
Ld

Ld
SATU TEMPAT (BERSELINGAN).

25d

25d
Ld
BALOK ANAK 135°

Ld
a 15d 15d 15d 15d 15d 15d 15d 15d
15d 15d 15d 15d
Ld
BALOK

Ld b a < 150mm KOLOM KOLOM


SAMB. DAERAH BAWAH SAMB. DAERAH BAWAH Lo/4 Lo/2 Lo/4 a < 1/2b Lo
Lo/4 Lo/2 Lo/4 Lo/4 Lo/2 Lo/4
TUMPUAN LAPANGAN TUMPUAN
Lo/8 C=Lo/4 Lo/4 C=Lo/4 Lo/8 2). CANTILEVER
Lo Lo
Lo b). TULANGAN BAWAH BERBEDA d). TINGGI BALOK BERBEDA
Lo
a
MENERUS BALOK ANAK BALOK INDUK Ld
Ld

PENYAMB. BAJA TULANGAN ATAS PADA DAERAH B


PANJANG LEWATAN Ld *) KETERANGAN :
PENYAMB. BAJA TULANGAN BAWAH PADA DAERAH C
25d

BALOK INDUK - TIDAK BOLEH LEBIH DARI 3 BATANG BAJA TULANGAN BERHENTI
135°
KETERANGAN : Ld DISETIAP POTONGAN
b
a). DIAMETER(D) < 30 - PEMBERHENTIAN BAJA TULANGAN MUTU BJTD-40 TANPA KAIT

Ld
KOLOM
b). TIDAK LEBIH DARI 50% TULANGAN TARIK DISAMBUNG BERSAMA-SAMA b b a < 150mm KOLOM - PENULANGAN PADA UJUNG BALOK HARUS MENUTUP
BALOK INDUK DIBUAT OLEH TANDA TANGAN
a < 1/2b

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

STR 17 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN

NAMA PEKERJAAN

LOKASI PEKERJAAN
PENJANGKARAN PENGATURAN BESI BETON PENYERONGAN BESI BETON DETAIL SENGKANG
- KALAU JUMLAH
1 3 GEDUNG INSPEKTORAT
PENULANGAN KOLOM
SENGKANG BERBEDA
LT.1 B 1

Ld
A 6
B 1
SENGKANG = +

STEK 50%
A 6
NAMA GAMBAR SKALA
Ld
B B

Ld

>(15d+t)

t
PENJANGKARAN KOLOM

>15d
- Ld
TERATAS 50% KEDALAM
KOLOM

100mm 100mm
TERBAWAH 50% KELUAR
A A

Ld
300 MM
2
100mm 100mm

d
15d
PENULANGAN MENERUS

>15d
SAMPAI DENGAN LT.1 = +

>(15d+t)

d
PONDASI

t
- Ld
POER
300 MM

PENJANGKARAN PONDASI PELAT PENUH PENJANGKARAN BALOK PONDASI DETAIL SENGKANG BALOK PONDASI PILE CAP YANG LEBIH RENDAH DARI SLOOF
PEMBERHENTIAN BAJA TULANGAN MUTU BJTD-40
TANPA KAIT 15d
Ld 15d

SLOOF
15d 15d 15d
Ld

Ld
Ld

SENGKANG PENGIKAT
DITERUSKAN KE POER
Ld
PASANGAN BATA
15d 15d
PILE CAP
B=Lo/4 A=Lo/2 B=Lo/4
LANTAI KERJA Lo
PASIR PADAT
PONDASI

- PEMUTUSAN BAJA TULANGAN BETON ATAS PADA DAERAH B.


- PEMUTUSAN BAJA TULANGAN BETON BAWAH PADA DAERAH A.

HUBUNGAN PONDASI TIANG KE PILE CAP PENJANGKARAN TULANGAN SLOOF KE PILE CAP BESI PENUNJANG/KAKI AYAM UNTUK PILE CAP

a TULANGAN UTAMA
PAS. BATA TULANGAN GESER MIN (PRAKTIS)
D = TULANGAN UTAMA
Stek 40d

PILE CAP 30CM 30CM 30CM

SLOOF PILE CAP SLOOF D = D TUL. UTAMA PILE CAP


JARAK = 300 MM DIBUAT OLEH TANDA TANGAN
75 mm
Screed 30 mm
Waterproofing URAIAN TULANGAN UTAMA
TIANG Lt. kerja 50 mm
PONDASI Pasir padat 70 mm
Tanah dasar dipadatkan

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

STR 18 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

NAMA KEGIATAN

1.1 DETAIL PENULANGAN BALOK DENGAN ELVASI BEDA 1.2 DETAIL PENULANGAN BALOK GANTUNG
NAMA PEKERJAAN

A
ld ld

t<hb
BALOK UTAMA LOKASI PEKERJAAN

hb

hb
GEDUNG INSPEKTORAT
B
hb hb
ld NAMA GAMBAR SKALA

LDH
3D13 3D13
LS LS LD
LD 3D13

350
Ø8-150
t<hb

3D13 3D13 3D13

HB

120
HB

4D13

HB
150 LD LD Ø8-150
3000
120
HB HB

LD LD
POTONGAN A-A TAMPAK DEPAN POTONGAN B-B
SEKALA 1:20 SEKALA 1:20 SEKALA 1:20

1.3 DETAIL PENULANGAN PLAT UNTUK ELVASI BEDA DENGAN TULANGAN BIASA 1.4 DETAIL PENULANGAN PLAT UNTUK ELVASI BEDA UNTUK TULANGAN WIREMESH

UNTUK t<h UNTUK t<h


ld
ld ld ld LD ld ld ld ls
T

T
HB
h

h
t

t
ld ld ls
HB
h h h

ldh
DIBUAT OLEH TANDA TANGAN
ld ld ld ld ld ld ld
ls
ld
T

T
h

h
h

h
t

t
t h h t ld h t

DISETUJUI OLEH TANDA TANGAN

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

STR 19 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA

KONSULTAN PERENCANA

KOLOM K2

10
50
NAMA KEGIATAN
25

50

160
D16-150
D16-125 D16-125

40
35

35
NAMA PEKERJAAN

D16-125 D16-150
STROUSS PILE Ø40CM STROUSS PILE Ø40CM
D16-125 PANJANG 11 M PANJANG 11 M

PANJANG 11 M

PANJANG 11 M

PANJANG 11 M
LOKASI PEKERJAAN

GEDUNG INSPEKTORAT
STROUSS PILE Ø40CM
PANJANG 11 M

NAMA GAMBAR SKALA

500 600 100 425

PLAT TEBAL 35CM PLAT TEBAL 35CM PLAT TEBAL 40CM


260
260
17.5 17.5
120 17.5 17.5 225
225
350
500

D16-125

57.5

60
65
D16-125
150

110
D16-125
D16-125

120
115

D16-125
D16-125

100
250
500

500

D16-125

D16-150
D16-150
62.5 135 62.5
D16-125

320
260

250
240

370
D16-150

DETAIL P2 D16-150

100

210
SKALA 1:25
500

500

60
beg. spiral
Ø8 - 150
DIBUAT OLEH TANDA TANGAN
62.5
65

10 D13 62.5 135 62.5


500

500

260

40 DETAIL P3
DETAIL P1 DETAIL STROUSS Ø40CM SKALA 1:25
SKALA 1:25 SKALA 1 : 10
DISETUJUI OLEH TANDA TANGAN
400

400

500 600 430


DIPERIKSA OLEH TANDA TANGAN

DENAH PONDASI dan SLOOF


SKALA 1:100

KODE GBR NOMOR GBR JUMLAH GBR

STR 20 23
TABEL PENULANGAN KOLOM
TYPE K1 - 40/40 K2 - 35/35

40

35
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
40 35

40 40 KONSULTAN PERENCANA

TULANGAN 12 D 16 8 D 16

SENGKANG Ø10 - 100 Ø10 - 100

KOLOM K1 KOLOM K1

TABEL PENULANGAN SLOOF NAMA KEGIATAN


D16-140 TYPE S1 - 25/50 S2 - 25/40 S3 - 20/30 SK1 - 25/45
TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN
D16-140

45

30

30
NAMA PEKERJAAN

40

40

45
50

50
20 20
STROUSS PILE Ø40CM 25 25
25
PANJANG 11 M 25 25
beg. spiral

PANJANG 11 M
Ø8 - 150 LOKASI PEKERJAAN
TUL. ATAS 4 D 13 4 D 13 4 D 13 4 D 13 2 D 13 2 D 13 4 D 13
TUL. TENGAH 2 Ø 10 2 Ø 10 2 Ø 10
10 D13 TUL. BAWAH 4 D 13 4 D 13 4 D 13 4 D 13 2 D 13 2 D 13 4 D 13 GEDUNG INSPEKTORAT
SENGKANG Ø8 - 125 Ø8 - 150 Ø8 - 100 Ø8 - 150 Ø8 - 100 Ø8 - 150 Ø8 - 100

NAMA GAMBAR SKALA


40

DETAIL STROUSS Ø40CM


SKALA 1 : 10

PLAT TEBAL 45CM


465

20 425 20

37.5
62.5
100

D16-140
D16-140
350

425
100

D16-140
D16-140

DIBUAT OLEH TANDA TANGAN


100
62.5

37.5

DISETUJUI OLEH TANDA TANGAN

82.5 100 100 100 82.5

DETAIL P4
DIPERIKSA OLEH TANDA TANGAN
SKALA 1:25

KODE GBR NOMOR GBR JUMLAH GBR

STR 21 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA

TABEL PENULANGAN BALOK LANTAI 2 & 3 Jl. TAMAN SURYA No. 1 SURABAYA

TYPE B1 - 25/50 B2 - 25/40 B3 - 20/40 B4 - 20/30 BK1 - 25/45 KONSULTAN PERENCANA


TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN
Di Las sambungan shear connector dengan
Ø10-125 besi tulangan
Shear Connector Ø10-150

30

30

9
40

40

40

40

14
45
50

50

5
20 20 NAMA KEGIATAN
25 25 20 20
25
25 25
Ø8-200
Bondek t=1.2 mm
TUL. ATAS 5 D 16 3 D 16 7 D 16 4 D 16 4 D 16 3 D 16 2 D 16 2 D 16 4 D 16 Arah alur ke arah benang
TUL. TENGAH 2 Ø 10 2 Ø 10 2 Ø 10 pendek
TUL. BAWAH 3 D 16 5 D 16 4 D 16 7 D 16 3 D 16 4 D 16 2 D 16 2 D 16 2 D 16 NAMA PEKERJAAN
SENGKANG Ø10 - 125 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 125 Ø10 - 150 Ø8 - 100 Ø8 - 125 Ø10 - 100

DETAIL PLAT LANTAI DENGAN BALOK BETON


SKALA 1:10

LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

NAMA GAMBAR SKALA

A A' C A A' C A A' C A A' C


100 440 100 440 100 440 100 440

80 80 80 80

B4 B4 B4 B4

B4
100

100

100

100
B4

BK

BK

BK

BK
BK B2 25/40 BK B2 25/40
1 1 1 1 1 1 1 1

B4
B4
B4 B4
B3 20/40

B3 20/40

B3 20/40

B2 25/40

B2 25/40

B2 25/40
Ø10-125
350

350

350

350
Ø8-200
B4

Ø10-125

B4
500

500

500

500
Ø10-125

Ø8-200
Ø10-125
BK B2 25/40 BK B2 25/40
1' 1' 1' 1'

BK
Ø10-125

B4
BK

BK
B3 20/40
B4

Ø8-200
B4 B4
267.5

267.5

267.5

267.5
B4 B4
B4

2 2 2 B4 2
B4

BK B2 25/40
B1 25/50

2' 2' 2' 2'


Ø10-125
Ø10-125

Ø10-125
Ø10-125
250

250

250

250
B4
B3 20/40
500

500

500

500
B4

B4

Ø10-125
Ø8-200

B4
2'' 2'' 2'' 2''
100

100

100

100
BK

BK B4 BK 25/45
2''' 2''' 2''' 2'''
3 3 3 3
200
B4
B4

B1 25/50

B1 25/50

BK B4 BK
500

500

500

500
500

500

500

500
Ø10-125
B4

Ø8-200
B4

BK B4 BK
3' 3' 3' 3'
4 4 4 4 4 4 4 4
32.5

32.5

32.5

32.5
DIBUAT OLEH TANDA TANGAN

100 225 85 100 225 85 100 225 85 100 225 85

A' A'' A' A'' A' A'' A' A''


430 110 430 110 430 110 430 110

A B C A B C A B C A B C

DISETUJUI OLEH TANDA TANGAN


DENAH BALOK LANTAI 2 DENAH PLAT LANTAI 2 DENAH BALOK LANTAI 3 DENAH PLAT LANTAI 3
SKALA 1:100 SKALA 1:100 SKALA 1:100 SKALA 1:100

DIPERIKSA OLEH TANDA TANGAN

KODE GBR NOMOR GBR JUMLAH GBR

STR 22 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA

TABEL PENULANGAN BALOK ATAP Jl. TAMAN SURYA No. 1 SURABAYA

TYPE BA1 - 25/40 BA2 - 20/30 BKA - 20/30 KONSULTAN PERENCANA


TUMPUAN LAPANGAN TUMPUAN LAPANGAN TUMPUAN
Di Las sambungan shear connector dengan
Ø10-150 besi tulangan
Shear Connector Ø10-150

30

30

30
40

40

5 5

10
20 20 20 NAMA KEGIATAN
25 25

Ø8-200
Bondek t=1.2 mm
TUL. ATAS 4 D 13 3 D 13 3 D 13 2 D 13 4 D 13 Arah alur ke arah benang
TUL. TENGAH 2 Ø 10 2 Ø 10 pendek
TUL. BAWAH 3 D 13 4 D 13 2 D 13 3 D 13 3 D 13 NAMA PEKERJAAN
SENGKANG Ø10 - 125 Ø10 - 150 Ø8 - 100 Ø8 - 150 Ø10 - 125

DETAIL PLAT LANTAI DENGAN BALOK BETON


SKALA 1:10

LOKASI PEKERJAAN

GEDUNG INSPEKTORAT

NAMA GAMBAR SKALA

A A' C A A' C
150 280 100 440 100 440

80 80

BA2 BA2 20/30

BA2

BKA
BKA

100

100
BKA BA1 25/40
1 1 1 1

BA2
500

BA1 25/40

BA1 25/40

BA1 25/40
BA2 BA2 20/30

350

350
BA2
500

500
Ø10-150

Ø10-150
Ø8-200
Ø10-150

BKA BA1 25/40


1' 1'

70

70
BKA
BA2
160

BKA
BA2 BA2 20/30 BA2

80

80
2 2
1500

1500
1500

430 430

A B A B

DIBUAT OLEH TANDA TANGAN

DISETUJUI OLEH TANDA TANGAN

135.00 135.00 135.00

DIPERIKSA OLEH TANDA TANGAN

DENAH ATAP EXISTING DENAH BALOK ATAP DENAH PLAT ATAP


SKALA 1:100 SKALA 1:100 SKALA 1:100

KODE GBR NOMOR GBR JUMLAH GBR

STR 23 23

Anda mungkin juga menyukai