NAMA KEGIATAN
PENYUSUNAN DOKUMEN PERENCANAAN
PRASARANA BANGUNAN PEMERINTAH DI DAERAH
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT SURABAYA
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
KONSULTAN PERENCANA
NAMA KEGIATAN
KODE NOMOR NAMA GAMBAR KETERANGAN KODE NOMOR NAMA GAMBAR KETERANGAN
ARS 01 STANDAR SIMBOL DAN SINGKATAN MEP 17 RENC. INSTALASI AIR BERSIH LT. 1,2,3
DETAIL GROUND TANK
ARS 02 STANDAR DETAIL ARSITEKTUR DETAIL RUMAH POMPA
NAMA PEKERJAAN
ARS 03 LAY OUT EXISTING MEP 18 RENC. INSTALASI AIR BEKAS LT. 1,2,3
ARS 04 LAY OUT GRAND DESIGN LT 1 RENC. INSTALASI AIR KOTOR LT. 1,2,3
DETAIL SEPTIC TANK BIO FILTER
ARS 05 LAY OUT GRAND DESIGN LT 2
MEP 19 RENC. INSTALASI AIR HUJAN LT. 1,2,3
ARS 06 LAY OUT GRAND DESIGN LT 3 DETAIL PIPA AIR HUJAN LOKASI PEKERJAAN
ARS 01 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
SUMBU (AS) MATERIAL = PLESTER GURAT FINISH CAT NAMA GAMBAR SKALA
Y TISSUE HOLDER
= BATU ALAM
BATA
X = INDIKASI UNTUK SUMBU X Y = INDIKASI UNTUK SUMBU Y = KACA CLEAR 6mm
X
X
Y
DETAIL PARTISI = GYPSUM BOARD 9mm FINISH CAT
WASTAFEL
REVISI PAVING
ATAP = ATAP METAL + ALUMINIUM FOIL DOUBLE SIDE
KLOSET DUDUK
9 = NOMOR REVISI
9 KACA / CERMIN
KLOSET DUDUK
* CATATAN : PENAMAAN MTERIAL DAN MATERIAL YANG DIPAKAI ( CACAT )
N TANGGA TANAH ASLI
MENYESUAIKAN DESAIN PERENCANAAN
T N = NAIK T = TURUN
DIVIDER DIBUAT OLEH TANDA TANGAN
(PENYEKAT)
RAMP TANAH URUG
BAWAH ATAS
URUGAN SIRTU
9 9 = CODE FINISHING A
INDIKASI TAMPAK
Y (DALAM RUANGAN)
NOTASI FINISHING D Y Y B DIPERIKSA OLEH TANDA TANGAN
ARS 02 23
TABEL PERTEMUAN PROFIL KUSEN DETAIL PERTEMUAN ELEMEN LANTAI - DINDING
DINDING JENDELA SLIMAR JENDELA MATI PEMERINTAH KOTA SURABAYA
WATER PROOFING WATER PROOFING 30
PAS. BATA RINGAN DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SETINGGI 20 CM SETINGGI 20 CM SERTA PERTANAHAN KOTA SURABAYA
PAS. BATA T=100mm 20 10
SCREED LANTAI Jl. TAMAN SURYA No. 1 SURABAYA
SPESI SCREED LANTAI
KUSEN PINTU SPESI
TALI AIR 5mm X 5mm KERAMIK LANTAI KERAMIK TANGGA
KERAMIK LANTAI KONSULTAN PERENCANA
STEP NOZING
1
PLIN KERAMIK 1 PLIN GRANIT / KAYU 1 SCREED
10
10
KERAMIK LANTAI KERAMIK LANTAI
50
1,75
1.
1. 5.
NAMA KEGIATAN
18
4
1. 6.
4
TYPE KUSEN
4
4,8
3
DETAIL PLIN RATA PLESTERAN DETAIL PLIN MENONJOL
4
10 10
2. 1,7 10 4. 3,38
1,7
1,8
1,7 2.
2,77
2,77
3. 7.
2. 3,5
BETON PLAT LANTAI
4
BALOK BETON PLAT BESI T.5mm (FLASHING)
2,5
2,77
7
3,3
13
10
KERAMIK LANTAI
GEDUNG INSPEKTORAT
SCREED LANTAI
2,91 3.
3,5 WATER PROOFING
2,5
6.
1,75
2,19
8. 10. 7.
SETINGGI 20 CM
3,3
8 8 8 8 DARI BETON
4
3,38
NAMA GAMBAR SKALA
TYPE KUSEN 7 4,8 7 PLAT LANTAI
4.
4
9.
1,8
7 5.
4 15 10 15
6.
1,75
4,8 40
3
20
A
B>A
KUSEN JENDELA CONSTRUCTION
B
SEALENT
SLIMAR
BALOK BETON
STYROFOAM
3,38
3,5 4,8
10. 3. 0. 3,5 3,5
1,8
3. 3. 4. 5. 4
2,5
2,5
2,5
3,3
4
3,3
3,3
TYPE KUSEN
10. DETAIL PERTEMUAN WATERPROOFING KAMAR MANDI
4
7
3,38 7
4. 5. 6. 10. *NOTE : SETELAH PEKERJAAN WATERPROOFING HARUS DILAKUKAN TES GENANG DULU
1,75
4 3,38 4
1,8
4. 5.
SEBELUM MELANJUTKAN KE PEKERJAAN KERAMIK LANTAI
4
1,8
3
30
8
4
RING HOLLOW
DYNABOLT M6 x2 RAILING HOLLOW / PIPA BESI ROD HANGER Ø 8mm
KERAMIK LANTAI FIN CAT DOFF
SAMBUNGAN LAS 15
HOLLOW METAL FURING 40x40mm SIKU ALUMINIUM
SAMBUNGAN LAS PLAT FLENDES 60x75x8mm
8
BALOK PRAKTIS BP
PLAT FLENDES 60x75x8mm
TIANG RAILLING HOLLOW METAL FURING 20x40mm DIBUAT OLEH TANDA TANGAN
HOLLOW 40x40x2mm
DYNABOLT M6 x2
40
EQ EQ
TIANG RAILLING 6 60
60
2
HOLLOW 40x40x2mm
DYNABOLT M6 x2 60
60
RING HOLLOW
BALOK LISPLANK 01 60
PLAT FLENDES 60x75x8mm
60
8
2 EQ 2
DETAIL RAILLING DI DINDING PARAPET
ARS 03 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
NAMA PEKERJAAN
D G D G D G
1530 1530 1530
E F E F E F
500 600 430 500 600 430 500 600 430 LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
10 10 10 10 10 10
JAN JAN JAN
+8.80
ME ±0.00 ±0.05 ME +4.90 +4.85 +4.85 NAMA GAMBAR SKALA
BV EXISTING DIBONGKAR BV EXISTING DIBONGKAR BV EXISTING DIBONGKAR
±0.00 DITUTUP PASANGAN BATA +4.90 DITUTUP PASANGAN BATA DITUTUP PASANGAN BATA
KM/WC KM/WC
+4.85 IRBAN +8.75
500
500
500
500
500
500
4 +8.80
PANTRY
PANTRY
PANTRY
+8.80
+8.80
+4.90
±0.00
500
500
500
500
500
R.KASUBAG
±0.00
8 8 8 8 8 8
R.
JENDELA EXISTING DIBONGKAR R. KERJA STAF RAPAT
R.KASUBAG DITUTUP PASANGAN BATA +8.80
+8.80
±0.00
2400
2400
2400
2400
2400
2400
500
500
500
500
500
500
R. ISTIRAHAT OPEN R. RAPAT
+4.90 +4.90
R.KONSULTASI
±0.00
7 7 7 7 7 7
R.RAPAT
±0.00
6 6 6 6 6 6
500
500
500
500
500
500
5 R.TUNGGU 5 5 R. IRBAN 2 R. TUNGGU 5 5 5
±0.00
+4.90 +4.90
MUSHOLAH
R. DIBUAT OLEH TANDA TANGAN
MUSHOLA R. PERPUSTAKAAN +8.80
KONSULTASI
±0.00 +8.80
400
400
400
400
400
400
+4.90 SAJI/PERSIAPAN
±0.00
+8.80
MAIN
ENTRANCE t.wudlu
2 2 2 2 2 2
D G D G D G
NOTASI
ARS 04 23
AP
AT
L
TAI
DE
T
HA
LI PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
30.00
PLAFOND PLAFOND NAMA KEGIATAN
+11.50 +11.80 +11.50 +11.80
390
LT. 3
+8.80 +8.80 +8.80
NAMA PEKERJAAN
PLAT ATAP EXISTING DIBONGKAR PLAFOND
+7.60 +7.90
390
D G DINDING DAN JENDELA EXISTING
1530
INFORMASI DIBONGKAR LT. 2
E F +4.90 +4.90
500 600 430 LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
490
10 10 PLAFOND PLAFOND
+2.70 +3.00 +3.00
500
30
9 9
500
POTONGAN 1 EXISTING
SKALA 1:100
8 8
2400
2400
500
500
+13.00 DAK
+12.70
7 7
PLAFOND
+11.50 +11.80
390
6 6 DINDING DAN JENDELA EXISTING
500
500
DIBONGKAR
LT. 3
+8.80 +8.80 +8.80
5 5
PLAFOND
+7.60 +7.90
390
DIBUAT OLEH TANDA TANGAN
400
400
INFORMASI LT. 2
+4.90 +4.90
2 2
490
PLAFOND PLAFOND
+2.70 +3.00 +3.00
E 1530 F
30
D G
1100
POTONGAN 2 EXISTING
SKALA 1:100
ARS 05 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
D G
1650 1640 NAMA KEGIATAN
E F
162.5 500 600 540
260 212.5 107.5 220
100
10 NAMA PEKERJAAN
75
JAN
ME ±0.00 ±0.05
±0.00
550.22
GARDEN
275
PARKIR SEPEDA MOTOR
PANTRY
LOKASI PEKERJAAN
±0.00
R.SEKRETARIS
150
±0.00
GEDUNG INSPEKTORAT
9
115
RUANG NAMA GAMBAR SKALA
RAPAT
±0.00
250
500
R.KASUBAG
±0.00
R.KASUBAG
±0.00
2400
500
R.KONSULTASI
±0.00
3130
R.RAPAT
±0.00
6
500
R.TUNGGU 5
±0.00
R.
KONSULTASI
400
±0.00
MAIN
ENTRANCE
2
ARS 06 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
NAMA PEKERJAAN
D G D D
1640 1625 1625
E F E F E F
162.5 500 600 540 500 600 100 300 125 500 600 100 300 125 LOKASI PEKERJAAN
260 212.5 107.5 220
GEDUNG INSPEKTORAT
115
100
100
10 10 10 10
75
JAN
+8.80
ME ±0.00 ±0.05 ME +4.90 NAMA GAMBAR SKALA
±0.00 +4.90
GARDEN
teras
350
350
KM/WC KM/WC
275
+4.85 IRBAN +8.75
500
500
R. ARSIP +8.80 R. ARSIP
4
+4.90 +4.90
PANTRY
PANTRY
PANTRY
+8.80
+8.80
+4.90
+4.90
±0.00
150
150
150
±0.00 R.
IRBAN 1
9 9 +4.90 9 9 9
117.5
115
RUANG
RAPAT
±0.00
250
250
500
500
500
500
R.KASUBAG
132.5
±0.00
8 8 R. KERJA STAF 8 8 8
+4.90 R.
R. KERJA STAF RAPAT
R.KASUBAG +8.80 +8.80
2500
±0.00
2400
2400
2400
2400
500
500
500
500
500
R.KONSULTASI
±0.00
7 7 7 7 7
R.RAPAT
±0.00
6 6 6 6 6
500
500
500
500
500
R.TUNGGU 5 5 5 5 5
±0.00 R. IRBAN 2 R. TUNGGU
+4.90 +4.90
R. DIBUAT OLEH TANDA TANGAN
MUSHOLA R. PERPUSTAKAAN +8.80
KONSULTASI +8.80
400
400
400
400
400
+4.90 SAJI/PERSIAPAN
±0.00
+8.80
MAIN
ENTRANCE t.wudlu
2 2 2 2
D G D G D G
ARS 07 23
AP
AT
IL
TA
DE
H AT
LI PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
+13.00 +13.00
30.00
PLAFOND PLAFOND NAMA KEGIATAN
+11.50 +11.80 +11.50 +11.80
+8.80 +8.80
NAMA PEKERJAAN
D G PLAFOND
1530 +7.60 +7.90
E F
500 600 430
INFORMASI
+4.90
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
10 10 PLAFOND PLAFOND
+2.70 +3.00 +3.00
R. SEKERTARIS INFORMASI
±0.00 ±0.00
500
500
30
9 9
POTONGAN 1 RENCANA
500
500
SKALA 1:100
8 8
2400
2400
500
500
BETON B-NOL
+ FLASHING
7 7 +13.00 DAK EXISTING DAK BARU DAK
+12.70 +12.70 +12.70
PLAFOND PLAFOND
6 6
500
500
390
LT. 3
+8.80 +8.80 +8.80
5 5
PLAFOND
+7.60 +7.90 DIBUAT OLEH TANDA TANGAN
390
400
400
INFORMASI LT. 2
+4.90 +4.90
2 2
490
PLAFOND PLAFOND
+2.70 +3.00 +3.00
DISETUJUI OLEH TANDA TANGAN
D G
30
DENAH RENCANA ATAP
SKALA 1:100
POTONGAN 2 RENCANA
SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR
ARS 08 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
HOMOGENOUS TILE
POLISHED - 60X60 CM
D G D D
NAMA KEGIATAN
1640 1625 1625
E F E F E F
162.5 500 600 540 500 600 100 300 125 500 600 100 300 125
260 212.5 107.5 220
115
100
100
NAMA PEKERJAAN
10 10 10 10
75
350
350
275
500
500
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
150
150
150
9 9 9 9 9
117.5
115
NAMA GAMBAR SKALA
250
250
500
500
500
500
132.5
8 8 8 8 8
2500
HOMOGENOUS TILE
2400
2400
2400
2400
POLISHED - 60X60 CM
500
500
500
500
500
7 7 7 7 7
6 6 6 6 6
500
500
500
500
500
5 5 5 5 5
+8.80
400
400
400
400
400
2 2 2 2
D G D G D G
DENAH RENCANA KERAMIK LANTAI 1 DENAH RENCANA KERAMIK LANTAI 2 DENAH RENCANA KERAMIK LANTAI 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
ARS 09 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
HOMOGENOUS TILE
60X60 CM (UNPOLISHED)
KLOSET DUDUK
TYPE ONEPIECE
2 NAMA KEGIATAN
JET SHOWER
NAMA PEKERJAAN
1 1
300
300
168.44
190.48
190 168.44
ARS 09 23
TYPE P1 TYPE P2 TYPE BV PEMERINTAH KOTA SURABAYA
SKALA 1 : 25 SKALA 1 : 25 TYPE J1 SKALA 1 : 25 DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SKALA 1 : 25 SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
50
50
50
5mm 5mm
SKALA 1 : 25 kaca bening kaca bening kaca bening 5mm
35
35
5mm 5mm 5mm
20
20
20
kaca bening kaca bening kaca bening
35
35
5mm 5mm 5mm
50
165
60
60
60
kaca bening kaca bening kaca bening
35
35
NAMA KEGIATAN
Solid Wood Panel (SWP)
270
daun pintu
daun pintu
daun pintu
kaca bening kaca bening kaca bening kaca bening kaca bening
35
35
5mm 5mm 5mm 5mm 5mm
210
210
210
210
110
110
110
50 50 50 NAMA PEKERJAAN
170
90
20
20
20
LOKASI PEKERJAAN
90 80 70 50 50 50
GEDUNG INSPEKTORAT
kusen aluminium 4" kusen aluminium 4" kusen aluminium 4" 80 90 80
270
NAMA GAMBAR SKALA
P2
P2
P3
P1 BV
P2 BV
BV
PG
BV
BV
BV
J1
J1
P1 P2
P1
J1
+8.80
DENAH RENCANA KUSEN LT. 1 DENAH RENCANA KUSEN LT. 2 DENAH RENCANA KUSEN LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR
ARS 10 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
HANGER HOLLOW METAL FURING 20x40mm Jl. TAMAN SURYA No. 1 SURABAYA
1
1
HOLLOW METAL FURING 20X40MM
1
N.S. NAMA KEGIATAN
10
5
1
1
60 NAMA PEKERJAAN
60 60
DETAIL RANGKA PLAFOND HOLLOW METAL FURING 40X40MM
N.S. LOKASI PEKERJAAN
60 N.S.
60
GEDUNG INSPEKTORAT
+8.80
DENAH RENCANA PLAFON LT. 1 DENAH RENCANA PLAFON LT. 2 DENAH RENCANA PLAFON LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
KODE GBR NOMOR GBR JUMLAH GBR
ARS 11 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
NOTASI
= SAKLAR TUNGGAL
= LAMPU LED SLIM PANEL = LAMPU LED BULB 14.5 WATT
45 WATT ARMATUR DOWNLIGHT 4" = SAKLAR GANDA
= STOP KONTAK (EL. 150CM DARI LANTAI)
= LAMPU LED TUBE 1 x 16 WATT = LAMPU LED BULB 6.5 WATT NAMA PEKERJAAN
= STOP KONTAK AC (EL. 320CM DARI LANTAI)
ARMATUR KAP OUTBOW ARMATUR DOWNLIGHT 4"
= BOX PANEL
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
+8.80
DENAH TITIK LAMPU LT. 1 DENAH TITIK LAMPU LT. 2 DENAH TITIK LAMPU LT. 3
SKALA 1:100 SKALA 1:100 SKALA 1:100
MEP 12 23
RESAPAN SEPTICTANK
BIOFILTER PIPA PVC AW Ø 4"
KAP. 5 M3
PEMERINTAH KOTA SURABAYA
200 300 300 DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
JAN
KONSULTAN PERENCANA
ME ±0.00 ±0.05
±0.00
GARDEN
PARKIR SEPEDA MOTOR
PANTRY
NAMA KEGIATAN
±0.00
R.SEKRETARIS
±0.00
NAMA PEKERJAAN
RUANG
RAPAT
±0.00
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
R.KASUBAG
±0.00
NAMA GAMBAR SKALA
R.KASUBAG
±0.00
R.KONSULTASI
±0.00
R.RAPAT
±0.00
R.TUNGGU
±0.00
R.
KONSULTASI
±0.00
MEP 13 23
TUTUP MANHOLE
PLAT BETON TB. 6MM PEMERINTAH KOTA SURABAYA
PLAT BETON TEBAL 15 CM DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
230 SERTA PERTANAHAN KOTA SURABAYA
15 70 60 70 15 Jl. TAMAN SURYA No. 1 SURABAYA
PAVING STONE EXISTING
KONSULTAN PERENCANA
15
Ø10-100
Ø10-100
PIPA VENT
PVC AW Ø2"
NAMA KEGIATAN
PLAT BETON
190
TEBAL 15 CM
235
SEPTICTANK
BIOFILTER Ø10-150
KAP. 5 M3
Ø10-150
NAMA PEKERJAAN
10
5 25
RABATAN BETON TEBAL 5CM LOKASI PEKERJAAN
PONDASI PLAT
URUGAN PASIR
45 165 50
GEDUNG INSPEKTORAT
305
TUTUP MANHOLE
PIPA VENT PLAT BETON TB. 6MM
PVC AW Ø2"
PLAT BETON TEBAL 15 CM 360
360
15 45 60 30 60 30 60 45 15 PAVING STONE EXISTING
15
Ø10-100 Ø10-100
Ø10-100
MUKA TANAH ASAL Ø10-100
DARI TOILET 60 60 60
KE RESAPAN
Ø10-100
Ø10-100
Ø10-100
Ø10-100
PVC AW Ø 4" PVC AW Ø 4"
230
LUBANG LUBANG LUBANG
205
60
60
60
SEPTICTANK PLAT BETON 190 MANHOLE MANHOLE MANHOLE
BIOFILTER TEBAL 15 CM
KAP. 5 M3
Ø10-150
Ø10-100
Ø10-100
Ø10-100
Ø10-100
Ø10-150 Ø10-100
Ø10-100
5
5 25
25
395
50
Ø10-100
DARI TOILET
200
230
265
165
KE RESAPAN
Ø10-100
Ø10-100
Ø10-100
Ø10-100
Ø10-100
Ø10-100
A
50
DENAH SEPTIC TANK BIO FILTER 5M3 PLAT BETON TEBAL 25 CM
SKALA 1:25
DENAH PONDASI PLAT
KODE GBR NOMOR GBR JUMLAH GBR
SKALA 1:25
MEP 14 23
275
TUTUP MANHOLE TUTUP MANHOLE 50 175 50
PLAT BETON TB. 6MM PLAT BETON TB. 6MM
Ø10-150 PEMERINTAH KOTA SURABAYA
PLAT BETON TEBAL 15 CM Ø10-150 PLAT BETON TEBAL 15 CM DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
240 180 SERTA PERTANAHAN KOTA SURABAYA
15 45 60 30 60 30 15 15 45 60 45 15 Jl. TAMAN SURYA No. 1 SURABAYA
PAVING STONE EXISTING PAVING STONE EXISTING
KONSULTAN PERENCANA
15
15
Ø10-100
50
Ø10-150 Ø10-100
Ø10-150
DARI TOILET PIPA VENT
KE RESAPAN
PVC AW Ø2"
Ø10-100 Ø10-100
PVC AW Ø 4" PVC AW Ø 4"
PLAT BETON Ø10-100 Ø10-100
150
150
SEPTICTANK PLAT BETON TEBAL 15 CM
SEPTICTANK NAMA KEGIATAN
195
195
BIOFILTER
215
115
TEBAL 15 CM BIOFILTER
Ø10-100
Ø10-100
KAP. 2 M3
Ø10-150 KAP. 2 M3 Ø10-150
Ø10-150 Ø10-150
ROLAG BATA ROLAG BATA
5 Ø10-100
5 25
10 20
NAMA PEKERJAAN
25
50
Ø10-100
LOKASI PEKERJAAN
Ø10-150
PLAT BETON TEBAL 15 CM Ø10-150 D
240 240
15 210 15
15
Ø10-150
Ø10-150
Ø10-150
Ø10-150
DARI TOILET LUBANG LUBANG
150
180
180
60
60
KE RESAPAN MANHOLE MANHOLE
C
15
60
PVC D Ø 3"
PVC D Ø 3"
Dari Ovour KM Dari Septictank
1
100
Pasir urug
10 15 25 80 25 15 10
10 15 25 80 25 15 10
140
140
160
180 160
DIPERIKSA OLEH TANDA TANGAN
180
DENAH SUMUR RESAPAN
SKALA 1:25
POTONGAN 1
SKALA 1:25
MEP 15 23
PIPA AIR BERSIH PIPA AIR BERSIH
PVC AW Ø 1" PVC AW Ø 3/4"
JAN
KONSULTAN PERENCANA
ME ±0.00 ±0.05
GROUND ±0.00
GARDEN
WATER
TANK
PANTRY
NAMA KEGIATAN
±0.00
R.SEKRETARIS
±0.00
NAMA PEKERJAAN
RUANG
RAPAT
±0.00
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
R.KASUBAG
±0.00
NAMA GAMBAR SKALA
R.KASUBAG
±0.00
R.KONSULTASI
±0.00
R.RAPAT
±0.00
CATATAN:
Instalasi Air Bersih baru dari Ground Tank baru,
dihubungkan ke Instalasi Air Bersih Existing
yang berada pada Shaft Existing
R.TUNGGU
Instalasi Air Bersih pada Kamar Mandi Baru, ±0.00
diambil dari Instalasi Air Bersih Existing
yang berada pada Shaft Existing
R.
KONSULTASI
±0.00
MEP 13 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
*
fc' = Tegangan hancur karakteristik dari silinder
berumur 28 hari
4.2 WATERPROOFING LOKASI PEKERJAAN
2.3.JARAK BAJA TULANGAN WATERPROOFING DIPASANG DISEMUA PERMUKAAN BETON
YANG BERHUBUNGAN DENGAN TANAH, AIR ( DI TOILET, DI ATAP,
GEDUNG INSPEKTORAT
DI SALURAN-SALURAN DSB.)
a > 1,7 d
SERTA DIJAMIN 100% TIDAK BOCOR OLEH KONTRAKTOR
JARAK BERSIH INI JUGA TIDAK BOLEH WATERPROOFING
KURANG DARI 4/3 UKURAN TERBESAR NAMA GAMBAR SKALA
d AGREGAT KASAR (a > 4/3 x 30MM)
a
2. STANDARD PENGATURAN BAJA TULANGAN
STANDARD INI SESUAI DENGAN SK SNI ST-15-1991-03 a
d
d d
3 KOLOM2 / BALOK PRAKTIS DAN LISPLANK WATERPROOFING (HARUS TAHAN SINAR ULTRAVIOLET)
c PLESTERAN
d
SENGKANG
d d
SENGKANG
YANG TIDAK KONSTRUKTIF PELAT BETON
a r d
r
5d 2d
3.2.LISPLANK YG TIDAK KONSTRUKTIF HARUS DIBERI TULANGAN
>
Ø8 - 200 TEBAL 80MM PELAT BETON
135° 2dp
DAN STEKNYA DISEDIAKAN LEBIH DULU
135°
5d
>
±1.000
c KHUSUS DINDING
r PELINDUNG DARI STEROFOAM
r
(OPEN CUT)
> 8d
±1.000
stek Ø 8 stek Ø 8
WATERPROOFING
pas bata PASIR PADAT 70MM
PLESTERAN 30MM
KOLOM stek Ø 8 KOLOM
KETERANGAN
±1.000
STR 16 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
PENGATURAN BAJA TULANGAN PENJANGKARAN SAMB. PELAT DG. LISPLANK PENULANGAN SEKITAR LOBANG PLAT
Arah pendek
lapis pertama
ARAH BENTANG PENDEK - PENULANGAN SEKITAR LOBANG YANG TERLETAK DIDAERAH A & B
NAMA PEKERJAAN
Lx/2 Ly
PELAT PELAT PENULANGAN (ATAS BAWAH) SEPERTI YANG TERTERA DALAM TABEL. (MAK UKURAN 500mm)
15d
PENULANGAN POKOK PLAT
Lx/4
- PENULANGAN SEKITAR LOBANG YANG TERLETAK PADA DAERAH C
ARAH BENTANG PENDEK MEMANJANG
Ld
Ld
DIAGONAL & DAERAH A & B DENGAN UKURAN > 500mm
MELINTANG
Lx/4
Lx/4 A C A HARUS DITINJAU SENDIRI.
Lx
1 - D13
Ld
15d Ø8 1 - D10
PLAT
x t LOKASI PEKERJAAN
Ld
C C
Lx
Ld
B
Lx/2
Peil
ALTERNATIF 15d PELAT Ø10 , D13 1 - D13 1 - D13
Lx/4
Ly/2
GEDUNG INSPEKTORAT
< 500mm
A A
Lx/4
15d
C
Lx/4 Lx/4 KE BALOK TEPI D13 1 - D16 1 - D13 Ld < 500mm Ld
Ly ATAU KE DINDING
Arah panjang Lx/4 Lx/4 Ly-Lx/2 Lx/4
D13, D16 1 - D16 1 - D16
DENAH PLAT lapis kedua NAMA GAMBAR SKALA
Ld
Ld
*Tiap 1m2 dipasang kaki ayam min.4 bh ARAH BENTANG PANJANG
PENJANGKARAN DETAIL HUBUNGAN DINDING PELAT PENJANGKARAN KE PELAT PENULANGAN SEKITAR LUBANG DINDING
PENULANGAN SEKITAR LUBANG (mm)
PADA KOLOM Ld TEBAL DINDING PENULANGAN POKOK
Ld
Ld Ld Ld (mm) (mm) ARAH MEMANJANG & TANDA
Ld Ld DINDING DINDING DIAGONAL
SINGLE ARAH MELINTANG
Ld
D13 - 200
TUL. PELAT 100 t2
PENULANGAN TUNGGAL 1 - D13 1 - D13
Ld
120 PADA KEDUA ARAH t2
SINGLE
KOLOM KOLOM D13 - 150
Ld Ld Ld Ld 150 1 - D16 1 - D16
DINDING PENULANGAN TUNGGAL
DINDING
Ld
PADA BALOK DINDING DINDING
D13- 200
PELAT DOUBLE 180
PENULANGAN RANGKAP 2 - D16 2 - D16
200 PADA KEDUA ARAH
Ld
Ld
Ld
TUL. PELAT
Ld
Ld
Ld
Ld
SAMBUNGAN LEWATAN JARAK / DETAIL SENGKANG TIDAK TETAP PENJANGKARAN BALOK ANAK PEMBERHENTIAN BESI BETON
1). U M U M 3). TAMPAK ATAS 4). STANDARD DETAIL TULANGAN TUMPUAN
A=Lo/4 B = Lo/2 A=Lo/4 1). BALOK MENERUS
a a). TULANGAN ATAS BERBEDA c). TINGGI BALOK BERBEDA
15d BALOK INDUK Lo/4 Lo/2 Lo/4
Ld
BALOK INDUK BALOK INDUK
Ld
Ld
Ld
SATU TEMPAT (BERSELINGAN).
25d
25d
Ld
BALOK ANAK 135°
Ld
a 15d 15d 15d 15d 15d 15d 15d 15d
15d 15d 15d 15d
Ld
BALOK
BALOK INDUK - TIDAK BOLEH LEBIH DARI 3 BATANG BAJA TULANGAN BERHENTI
135°
KETERANGAN : Ld DISETIAP POTONGAN
b
a). DIAMETER(D) < 30 - PEMBERHENTIAN BAJA TULANGAN MUTU BJTD-40 TANPA KAIT
Ld
KOLOM
b). TIDAK LEBIH DARI 50% TULANGAN TARIK DISAMBUNG BERSAMA-SAMA b b a < 150mm KOLOM - PENULANGAN PADA UJUNG BALOK HARUS MENUTUP
BALOK INDUK DIBUAT OLEH TANDA TANGAN
a < 1/2b
STR 17 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
NAMA PEKERJAAN
LOKASI PEKERJAAN
PENJANGKARAN PENGATURAN BESI BETON PENYERONGAN BESI BETON DETAIL SENGKANG
- KALAU JUMLAH
1 3 GEDUNG INSPEKTORAT
PENULANGAN KOLOM
SENGKANG BERBEDA
LT.1 B 1
Ld
A 6
B 1
SENGKANG = +
STEK 50%
A 6
NAMA GAMBAR SKALA
Ld
B B
Ld
>(15d+t)
t
PENJANGKARAN KOLOM
>15d
- Ld
TERATAS 50% KEDALAM
KOLOM
100mm 100mm
TERBAWAH 50% KELUAR
A A
Ld
300 MM
2
100mm 100mm
d
15d
PENULANGAN MENERUS
>15d
SAMPAI DENGAN LT.1 = +
>(15d+t)
d
PONDASI
t
- Ld
POER
300 MM
PENJANGKARAN PONDASI PELAT PENUH PENJANGKARAN BALOK PONDASI DETAIL SENGKANG BALOK PONDASI PILE CAP YANG LEBIH RENDAH DARI SLOOF
PEMBERHENTIAN BAJA TULANGAN MUTU BJTD-40
TANPA KAIT 15d
Ld 15d
SLOOF
15d 15d 15d
Ld
Ld
Ld
SENGKANG PENGIKAT
DITERUSKAN KE POER
Ld
PASANGAN BATA
15d 15d
PILE CAP
B=Lo/4 A=Lo/2 B=Lo/4
LANTAI KERJA Lo
PASIR PADAT
PONDASI
HUBUNGAN PONDASI TIANG KE PILE CAP PENJANGKARAN TULANGAN SLOOF KE PILE CAP BESI PENUNJANG/KAKI AYAM UNTUK PILE CAP
a TULANGAN UTAMA
PAS. BATA TULANGAN GESER MIN (PRAKTIS)
D = TULANGAN UTAMA
Stek 40d
STR 18 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
NAMA KEGIATAN
1.1 DETAIL PENULANGAN BALOK DENGAN ELVASI BEDA 1.2 DETAIL PENULANGAN BALOK GANTUNG
NAMA PEKERJAAN
A
ld ld
t<hb
BALOK UTAMA LOKASI PEKERJAAN
hb
hb
GEDUNG INSPEKTORAT
B
hb hb
ld NAMA GAMBAR SKALA
LDH
3D13 3D13
LS LS LD
LD 3D13
350
Ø8-150
t<hb
HB
120
HB
4D13
HB
150 LD LD Ø8-150
3000
120
HB HB
LD LD
POTONGAN A-A TAMPAK DEPAN POTONGAN B-B
SEKALA 1:20 SEKALA 1:20 SEKALA 1:20
1.3 DETAIL PENULANGAN PLAT UNTUK ELVASI BEDA DENGAN TULANGAN BIASA 1.4 DETAIL PENULANGAN PLAT UNTUK ELVASI BEDA UNTUK TULANGAN WIREMESH
T
HB
h
h
t
t
ld ld ls
HB
h h h
ldh
DIBUAT OLEH TANDA TANGAN
ld ld ld ld ld ld ld
ls
ld
T
T
h
h
h
h
t
t
t h h t ld h t
STR 19 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
KONSULTAN PERENCANA
KOLOM K2
10
50
NAMA KEGIATAN
25
50
160
D16-150
D16-125 D16-125
40
35
35
NAMA PEKERJAAN
D16-125 D16-150
STROUSS PILE Ø40CM STROUSS PILE Ø40CM
D16-125 PANJANG 11 M PANJANG 11 M
PANJANG 11 M
PANJANG 11 M
PANJANG 11 M
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
STROUSS PILE Ø40CM
PANJANG 11 M
D16-125
57.5
60
65
D16-125
150
110
D16-125
D16-125
120
115
D16-125
D16-125
100
250
500
500
D16-125
D16-150
D16-150
62.5 135 62.5
D16-125
320
260
250
240
370
D16-150
DETAIL P2 D16-150
100
210
SKALA 1:25
500
500
60
beg. spiral
Ø8 - 150
DIBUAT OLEH TANDA TANGAN
62.5
65
500
260
40 DETAIL P3
DETAIL P1 DETAIL STROUSS Ø40CM SKALA 1:25
SKALA 1:25 SKALA 1 : 10
DISETUJUI OLEH TANDA TANGAN
400
400
STR 20 23
TABEL PENULANGAN KOLOM
TYPE K1 - 40/40 K2 - 35/35
40
35
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
Jl. TAMAN SURYA No. 1 SURABAYA
40 35
40 40 KONSULTAN PERENCANA
TULANGAN 12 D 16 8 D 16
KOLOM K1 KOLOM K1
45
30
30
NAMA PEKERJAAN
40
40
45
50
50
20 20
STROUSS PILE Ø40CM 25 25
25
PANJANG 11 M 25 25
beg. spiral
PANJANG 11 M
Ø8 - 150 LOKASI PEKERJAAN
TUL. ATAS 4 D 13 4 D 13 4 D 13 4 D 13 2 D 13 2 D 13 4 D 13
TUL. TENGAH 2 Ø 10 2 Ø 10 2 Ø 10
10 D13 TUL. BAWAH 4 D 13 4 D 13 4 D 13 4 D 13 2 D 13 2 D 13 4 D 13 GEDUNG INSPEKTORAT
SENGKANG Ø8 - 125 Ø8 - 150 Ø8 - 100 Ø8 - 150 Ø8 - 100 Ø8 - 150 Ø8 - 100
20 425 20
37.5
62.5
100
D16-140
D16-140
350
425
100
D16-140
D16-140
37.5
DETAIL P4
DIPERIKSA OLEH TANDA TANGAN
SKALA 1:25
STR 21 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
TABEL PENULANGAN BALOK LANTAI 2 & 3 Jl. TAMAN SURYA No. 1 SURABAYA
30
30
9
40
40
40
40
14
45
50
50
5
20 20 NAMA KEGIATAN
25 25 20 20
25
25 25
Ø8-200
Bondek t=1.2 mm
TUL. ATAS 5 D 16 3 D 16 7 D 16 4 D 16 4 D 16 3 D 16 2 D 16 2 D 16 4 D 16 Arah alur ke arah benang
TUL. TENGAH 2 Ø 10 2 Ø 10 2 Ø 10 pendek
TUL. BAWAH 3 D 16 5 D 16 4 D 16 7 D 16 3 D 16 4 D 16 2 D 16 2 D 16 2 D 16 NAMA PEKERJAAN
SENGKANG Ø10 - 125 Ø10 - 150 Ø10 - 100 Ø10 - 100 Ø10 - 125 Ø10 - 150 Ø8 - 100 Ø8 - 125 Ø10 - 100
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
80 80 80 80
B4 B4 B4 B4
B4
100
100
100
100
B4
BK
BK
BK
BK
BK B2 25/40 BK B2 25/40
1 1 1 1 1 1 1 1
B4
B4
B4 B4
B3 20/40
B3 20/40
B3 20/40
B2 25/40
B2 25/40
B2 25/40
Ø10-125
350
350
350
350
Ø8-200
B4
Ø10-125
B4
500
500
500
500
Ø10-125
Ø8-200
Ø10-125
BK B2 25/40 BK B2 25/40
1' 1' 1' 1'
BK
Ø10-125
B4
BK
BK
B3 20/40
B4
Ø8-200
B4 B4
267.5
267.5
267.5
267.5
B4 B4
B4
2 2 2 B4 2
B4
BK B2 25/40
B1 25/50
Ø10-125
Ø10-125
250
250
250
250
B4
B3 20/40
500
500
500
500
B4
B4
Ø10-125
Ø8-200
B4
2'' 2'' 2'' 2''
100
100
100
100
BK
BK B4 BK 25/45
2''' 2''' 2''' 2'''
3 3 3 3
200
B4
B4
B1 25/50
B1 25/50
BK B4 BK
500
500
500
500
500
500
500
500
Ø10-125
B4
Ø8-200
B4
BK B4 BK
3' 3' 3' 3'
4 4 4 4 4 4 4 4
32.5
32.5
32.5
32.5
DIBUAT OLEH TANDA TANGAN
A B C A B C A B C A B C
STR 22 23
PEMERINTAH KOTA SURABAYA
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN
SERTA PERTANAHAN KOTA SURABAYA
30
30
30
40
40
5 5
10
20 20 20 NAMA KEGIATAN
25 25
Ø8-200
Bondek t=1.2 mm
TUL. ATAS 4 D 13 3 D 13 3 D 13 2 D 13 4 D 13 Arah alur ke arah benang
TUL. TENGAH 2 Ø 10 2 Ø 10 pendek
TUL. BAWAH 3 D 13 4 D 13 2 D 13 3 D 13 3 D 13 NAMA PEKERJAAN
SENGKANG Ø10 - 125 Ø10 - 150 Ø8 - 100 Ø8 - 150 Ø10 - 125
LOKASI PEKERJAAN
GEDUNG INSPEKTORAT
A A' C A A' C
150 280 100 440 100 440
80 80
BA2
BKA
BKA
100
100
BKA BA1 25/40
1 1 1 1
BA2
500
BA1 25/40
BA1 25/40
BA1 25/40
BA2 BA2 20/30
350
350
BA2
500
500
Ø10-150
Ø10-150
Ø8-200
Ø10-150
70
70
BKA
BA2
160
BKA
BA2 BA2 20/30 BA2
80
80
2 2
1500
1500
1500
430 430
A B A B
STR 23 23