PEMERINTAH REPUBLIK INDONESIA

KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL KALIMANTAN TENGAH
SATKER PERENCANAAN DAN PENGAWASAN JALAN NASIONAL
PROVINSI KALIMANTAN TENGAH

PEKERJAAN :
PR-01
PERENCANAAN TEKNIK LONGSEGMEN JALAN
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH

GAMBAR RENCANA
PPK 1.1. PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU
NAMA RUAS NO. RUAS STATIONING TARGET PANJANG
KUJAN - RUNTU 004 STA. 0+000 - STA. 42+420 42.42 KM
RUNTU - SIMPANG RUNTU 005 STA. 0+000 - STA. 21+440 21.44 KM

TAHUN ANGGARAN 2021


I. UMUM
NIP. 19711101199703 1 002
DAFTAR ISI
NO. JUDUL GAMBAR NO.LEMBAR JLH.LEMBAR

I UMUM

COVER I.1 1

LEMBAR PENGESAHAN I.2 1

DAFTAR ISI I.3 2

SIMBOL DAN LEGENDA I.4 1

PETA LOKASI PROYEK I.5 1

PETA LOKASI QUARRY I.6 1

REKAPITULASI KUANTITAS I.7 1

II PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU

004 - KUJAN - RUNTU

TIPIKAL POTONGAN MELINTANG I.8 4

STRIP MAP I.9 1

005 - RUNTU - SIMPANG RUNTU

TIPIKAL POTONGAN MELINTANG I.10 4

STRIP MAP I.11 1

III PRESERVASI JEMBATAN

PEMELIHARAAN BERKALA JEMBATAN SEI ARUT I.12 3

PEMELIHARAAN BERKALA JEMBATAN SEI KUNUP I.13 4

PEMELIHARAAN BERKALA JEMBATAN SEI BUKIT SINTANG I.14 2

PEMELIHARAAN RUTIN BOX RUNTU 12 I.15 1

PEMELIHARAAN RUTIN BOX RUNTU 13 I.16 2

PEMELIHARAAN BERKALA JEMBATAN SEI RIMBA I.17 4

PEMELIHARAAN RUTIN JEMBATAN SEI SABABILAH I.18 4

PEMELIHARAAN BERKALA JEMBATAN SEI SELAT I I.19 4

PEMELIHARAAN RUTIN BOX RUNTU 18 I.20 1

PEMELIHARAAN RUTIN JEMBATAN SELAT II I.21 3

PEMELIHARAAN BERKALA JEMBATAN SELAT III I.22 4

PEMELIHARAAN RUTIN JEMBATAN SEI SULUNG I I.23 4

PEMELIHARAAN RUTIN JEMBATAN SEI SULAT I.24 3


DAFTAR ISI
NO. JUDUL GAMBAR NO.LEMBAR JLH.LEMBAR

PEMELIHARAAN BERKALA BOX RUNTU 22.3 I.25 1

PEMELIHARAAN RUTIN BOX BANDANG I.26 1

PEMELIHARAAN RUTIN JEMBATAN SEI KUJANG I.27 3

IV GAMBAR STANDART

- RAMBU LALU LINTAS 01 - 02 2

- GORONG GORONG PIPA BETON DAN HEAD WALL 01 - 02 2

- PLAT DUICKER 01 1

- MARKA JALAN 01 1

- GUARD RAIL 01 1

- SEPARATOR 01 1

- RETAINING WALL 01 1
-

KUJAN - RUNTU - SP. RUNTU

SIMBOL DAN LEGENDA

PERGESERAN VERTIKAL DARI TITIK PVI


KABUPATEN/KOTA MADYA PATOK KILO METER TIMBUNAN TANAH (FILL) EV KE BAGIAN LENGKUNG VERTIKAL

KECAMATAN SAWAH GALIAN TANAH (CUT) LV LENGHT OF VERTICAL CURVE

KOTA LAIN RAWA GORONG-GORONG RENCANA N NORT (Y)

. . . BATAS KABUPATEN/KOTA MADYA WADUK GORONG-GORONG YANG SUDAH ADA E EAST (X)

JALAN PROPINSI MUKA TANAH ASLI JEMBATAN RENCANA PVI POINT OF VERTICAL INTERSECTION

JALAN KABUPATEN/KOTAMADYA PADANG RUMPUT/ALANG-ALANG JEMBATAN YANG SUDAH ADA TC TANGENT OF CURVE

JALAN KERETA API KEBUN KELAPA B LEBAR JALAN (B = Bp + 2Bs) CT CURVE OF TANGENT

SUNGAI/ANAK SUNGAI SEMAK BELUKAR Bp LEBAR PERKERASAN V KECEPATAN RENCANA

10
GARIS KETINGGIAN (KONTUR) LADANG Bs LEBAR BAHU JALAN AZ AZIMUTH
5

DMJ
GORONG-GORONG KOTAK (BOX CULVERT) HUTAN SEKUNDER Bg LEBAR DASAR SALURAN DAERAH MILIK JALAN

BANGUNAN / RUMAH KEBUN KARET W LEBAR PELEBARAN PADA TIKUNGAN 0 DIAMETER

BANGUNAN YANG DIGUSUR ARAH UTARA BS e SUPER ELEVASI PERKERASAN


KEMIRINGAN MELINTANG BAHU JALAN
(KEMIRINGAN MELINTANG)

MESJID C
L AS JALAN (CENTER LINE) % PERSEN
SALURAN DIPERKERAS SEBELAH KIRI DAN KANAN

GEREJA SALURAN DIPERKERAS SEBELAH KANAN STA STATION R JARI-JARI TIKUNGAN

KUBURAN ISLAM SALURAN DIPERKERAS SEBELAH KIRI Ka/Ki KANAN/KIRI L PANJANG TIKUNGAN

MAN
KUBURAN KRISTEN MUKA AIR NORMAL LP LAPIS PERMUKAAN PI/PPV LENGKUNG HORIZONTAL/VERTICAL

MAB
REL PENGAMAN MUKA AIR BANJIR LPA LAPIS PONDASI ATAS AWAL DAN AKHIR LENGKUNG VERTICAL

RAMBU LALU LINTAS TIANG PENUNTUN LPB LAPIS PONDASI BAWAH KM KILO METER

BENCH MARK (BM) TIANG PENUNTUN RENCANA S KELANDAIAN JALAN MAKS MAKSIMUM

PATOK TRIANGULASI TEMBOK PENAHAN TANAH Elev. ELEVASI (KETINGGGIAN) MIN MINIMUM
-

KUJAN - RUNTU - SP. RUNTU

004 - KUJAN - RUNTU

Pemeliharaan Rutin = 16.32 KM


Pemeliharaan Rutin Kondisi = 7.00 KM
Penunjangan / Holding = 15.60 km

005 - RUNTU - SIMPANG RUNTU

Pemeliharaan Rutin = 13.00 KM


Pemeliharaan Rutin Kondisi = 1.24 KM
Penunjangan / Holding = 7.20 km
-

KUJAN - RUNTU - SP. RUNTU


-

KUJAN - RUNTU - SP. RUNTU


II.PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU 004
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH KUJAN - RUNTU
TAHUN ANGGARAN 2021

RUAS JALAN KUJAN - RUNTU


REGULER
Awal Jembatan Sei Arut Awal Jembatan Lamandau

Kujan

42+420
PEMELIHARAAN RUTIN
KUJAN - RUNTU
PANJANG PENANGANAN : 16.32 KM

NAMA RUAS STASIONING PANJANG RUAS


KUJAN - RUNTU STA. 07+000 - STA. 07+100 0.10 KM
STA. 08+100 - STA. 09+000 0.90 KM
STA. 10+700 - STA. 16+200 5.50 KM
STA. 16+500 - STA. 17+000 0.50 KM
STA. 17+500 - STA. 18+350 0.85 KM
STA. 33+950 - STA. 42+420 8.47 KM
-

004
KUJAN - RUNTU

Variasi Sesuai eksisting dilapangan Variasi

Eksisting Aspal
Pembersihan drainase (belum dilaksanakan) CL
Eksisting lapis pondasi aggregat kelas S
Pengendalian tanaman (belum dilaksanakan)

Variasi Sesuai eksisting dilapangan Variasi

CL
Pembersihan drainase (sudah dilaksanakan) Eksisting Aspal
Perbaikan lapis pondasi aggregat kelas S tebal minimal = 12.5 cm

Pengendalian tanaman (sudah dilaksanakan)


5% 5%

Detail D
Skala 1 : 50
004
KUJAN - RUNTU

Variasi Sesuai eksisting dilapangan Variasi

Eksisting Aspal
Galian Saluran (belum dilaksanakan) CL
Eksisting lapis pondasi aggregat kelas S
Pengendalian tanaman (belum dilaksanakan)

Variasi Sesuai eksisting dilapangan Variasi

CL
Galian Saluran (sudah dilaksanakan) Eksisting Aspal
Perbaikan lapis pondasi aggregat kelas S tebal minimal = 12.5 cm

Pengendalian tanaman (sudah dilaksanakan)


5% 5%
PEMELIHARAAN RUTIN KONDISI
KUJAN - RUNTU
PANJANG PENANGANAN : 7.00 KM

NAMA RUAS STASIONING PANJANG RUAS


KUJAN - RUNTU STA. 00+000 - STA. 07+000 7.00 KM
004
KUJAN - RUNTU

Variasi Sesuai eksisting dilapangan Variasi

CL

Variasi Sesuai eksisting dilapangan Variasi

CL
PENUNJANGAN / HOLDING
KUJAN - RUNTU
PANJANG PENANGANAN : 15.60 KM

NAMA RUAS STASIONING PANJANG RUAS


KUJAN - RUNTU STA. 18+350 - STA. 33+950 15.60 KM
004 TIPIKAL POTONGAN
KUJAN - RUNTU MELINTANG HOLDING

Variasi Sesuai eksisting dilapangan Variasi

CL

Detail G-G
Skala 1 : 25
KUJAN - RUNTU
SEGMEN 1
STA. 7+100 - STA. 8+104
STA.7+100 STA. 7+600 STA. 8+100 STA. 8+104

KETERANGAN :

BADAN JALAN SALURAN PAS. BATU JEMBATAN

BAHU JALAN
PASANGAN BATU GORONG-2

PELEBARAN BOX CULVERT PLAT DUICKER


8+100 7+100

8+104

KM. 249+000 - KM. 252+000


7+150

STA. 8+104
7+200

7+250

7+300

7+350

7+400

7+450

7+500

7+550

7+600

7+650

7+700

7+750

7+800

7+850

7+900

7+950

8+000

8+050
STA. 8+100

8+100
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 7+100 - STA 7+700
STA 7+750 - STA 7+850
STA 8+050 - STA 8+100

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting

(Space) 0.25 0.25 (Space)


3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 7+700 - STA 7+750
STA 7+850 - STA 8+050
STA 8+100 - STA 8+104

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
DIREKTORAT JENDERAL BINA MARGA

4
10
8+
0
10
3.97 8+
10
: 8+
EP

0
05
8+

9.60
04
: 8+
CT
SATKER P2JN PROVINSI KALIMANTAN TENGAH

6.38 0
00 00
8+
: 8+
TC

0
95
7+

0
90
7+

41
9.
87
7+
CT:

0
85
7+

0
80
7+

0
75
PROVINSI

7+
NO. RUAS
NO. PAKET

NAMA JALAN

0
70
7+

0
65
7+

0
60
7+

5
4.4
59
: 7+
TC

0
55
7+
KSO

0
50
7+
INDRACITRA
PT. WIRA WIDYATAMA

PT. RANCANGTAMA BANGUNMANDIRI

0
45
7+

0
40
7+

3
1.0
36
: 7+
CT

0
35
7+

00
7+3

7+250

7+200

.22
TC: 7+168

7+150

.00 7+100
BP: 7+100
95
.0
0

95.00

Station 7+265.394
Northing 9,746,324.937 m
Easting 576,607.718 m
Direction
Delta
R 625.000 m
V 60.00 Kmh
Tc 97.178 m
Es 7.510 m
Lc 192.812 m
Ls1 - m
Ls2 - m
ELEVASI ELEVASI
THETA -
Ts - m
LT - m
108.000 108.000
e 3.40 %

106.000 106.000

104.000 104.000

0.48%
102.000 1.77% -2.78% 102.000
1.66%

100.000 2.35% 100.000

3.52%
98.000 98.000

3.64%

96.000 96.000

94.000 94.000

SUPER Ki=-3.40% Ki=-3.40% SUPER


ELEVASI ELEVASI
Ka=3.40% Ka=3.40%
100.647

101.530

101.809

100.490
95.064

96.882

98.643

99.818

100.232

101.130

101.394

100.076
94.649

96.467

98.228

99.403

STA. 7+100 7+150 7+200 7+250 7+300 7+350 7+400 7+450


A
AR
UT

103.0
0

103.0
0
ELEVASI ELEVASI

112.000 112.000
-1.81%
3.63%

110.000 110.000

%
108.000 7.03 108.000

106.000 106.000
1%
7.6

104.000 104.000
0%
7.8

2.42%
102.000 102.000
2.30%
-1.22% 2.12%
-1.26%
100.000 100.000

98.000 98.000

SUPER SUPER
ELEVASI 105.451 ELEVASI
100.490

100.573

101.752

108.966

110.884

110.146
99.839
100.076

100.146

101.329

105.056

108.552

110.467

109.732
99.424

STA. 7+450 7+500 7+550 7+600 7+650 7+700 7+750 7+800


A
R
TA
U

GARIS IMPIT ST

CT: 7+879.41

TC: 8+006.38

CT: 8+049.60
7+800

EP: 8+103.9
7+850

7+900

7+950
A.7

8+000

7
8+050

8+100
800

8+104
8+028.000
9,746,971.839
576,203.781

700.000
60.00
21.618
0.334
43.222
ELEVASI - ELEVASI
-
-
118.000 -
118.000
-
3.00
116.000 116.000

%
112.000 11
.24 112.000

110.000 110.000
-4.36%

108.000 8.3
3% 108.000

-4.63
%
106.000 8.4
3% 106.000
1.31%
-1.92%
1.88%
104.000 104.000

102.000 102.000

SUPER SUPER
ELEVASI ELEVASI
110.146

108.056

105.743

104.617

105.349

109.180

114.717
107.641

105.271
109.732

104.202

104.897

108.766

114.299
STA. 7+800 7+850 7+900 7+950 8+000 8+050 8+100 8+125
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 7+150
98

EL.: 96.88
EL.: 96.78

EL.: 96.78
-3.00% -3.00%
-5.00% -5.00%

96

94

96.882
96.47
92 92
-10 0 10

STA 7+100
96

EL.: 95.06
EL.: 94.96

EL.: 94.96
-3.00% -3.00%
-5.00% -5.00%

94
95.064
94.65

92 92
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 7+250
102

EL.: 99.94
EL.: 99.82
EL.: 99.70
100 3.40% -5.00% 100

-1
-3.40%

00
.0
-5.00%

%0
98

99.818
99.40
96 96
-10 0 10

STA 7+200
100 100

EL.: 98.76
EL.: 98.64
EL.: 98.52

3.40% -5.00%
-3.40%
-5.00%

98

96
98.643
98.23

94 94
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 101.81
EL.: 101.70

EL.: 101.70
STA 7+400
102 -3.00% -3.00%
-5.00% -5.00%

100 100

101.809
101.39
98 98
-10 0 10

EL.: 101.65
EL.: 101.53
STA 7+350

EL.: 101.41
102
3.40% -5.00%
-3.40%
-5.00%

100 100

101.530
101.13
98 98
-10 0 10

STA 7+300
102

EL.: 100.77
EL.: 100.65
EL.: 100.53

3.40% -5.00%

-1
-3.40%

00
.0
-5.00%

0%
100 100

98
100.647
100.23

96 96
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 99.84
EL.: 99.73

EL.: 99.73
STA 7+500
100 -3.00% -3.00%
-5.00%
100
-5.00%

98

99.839
99.42
96 96
-10 0 10

STA 7+450
102

EL.: 100.49
EL.: 100.38

EL.: 100.38
-3.00% -3.00%
-5.00% -5.00%

100 100

98
100.490
100.08

96 96
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 7+600
104

EL.: 101.75
EL.: 101.65

EL.: 101.65
102
-3.00% -3.00%
-5.00% -5.00%

100 100

101.752
101.33
98 98
-10 0 10

STA 7+550
102

EL.: 100.57
EL.: 100.47

EL.: 100.47
-3.00% -3.00%
-5.00% -5.00%

100 100

98
100.573
100.15

96 96
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 7+700
110 110

EL.: 108.97
EL.: 108.86

EL.: 108.86
-3.00% -3.00%
-5.00% -5.00%

108

106

108.966
108.55
104 104
-10 0 10

STA 7+650
108

EL.: 105.45
EL.: 105.35

EL.: 105.35
106
-3.00% -3.00%
-5.00% -5.00%

104

102
105.451
105.06

100 100
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 7+800
112

EL.: 110.15
EL.: 110.04

EL.: 110.04
-3.00% -3.00%
110 -5.00% -5.00%
110

108

110.146
109.73
106 106
-10 0 10

STA 7+750
112

EL.: 110.88
EL.: 110.78

EL.: 110.78
-3.00% -3.00%
-5.00% -5.00%

110 110

108
110.884
110.47

106 106
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 105.74
EL.: 105.64

EL.: 105.64
STA 7+900
106
-3.00% -3.00%
-5.00% -5.00%

104

105.743
105.27
102 102
-10 0 10

STA 7+850
110 110

EL.: 108.06
EL.: 107.95

EL.: 107.95
-3.00%
108 -5.00%
-3.00%
-5.00%

106
108.056
107.64

104 104
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 8+000

EL.: 105.35
EL.: 105.24

EL.: 105.24
106

-3.00% -3.00%
-5.00% -5.00%

104

102

105.349
104.90
100 100
-10 0 10

STA 7+950
106

EL.: 104.62
EL.: 104.51

EL.: 104.51
-3.00% -3.00%
-5.00% -5.00%

104

102
104.617
104.20

100 100
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 8+100
116

EL.: 114.72
EL.: 114.61

EL.: 114.61
-3.00% -3.00%
-5.00% -5.00%

114

112

114.717
114.30
110 110
-10 0 10

STA 8+050
112

110 110

EL.: 109.18
EL.: 109.07

EL.: 109.07
-3.00% -3.00%
-5.00% -5.00%

108

106
109.180
108.77

104 104
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 8+104
116

EL.: 115.16
EL.: 115.06

EL.: 115.06
-3.00% -3.00%
-5.00% -5.00%

114

112
115.163
114.75

110 110
-10 0 10
KUJAN - RUNTU
SEGMEN 2
STA. 8+900 - STA. 10+707
STA.8+900 STA. 9+400 STA. 9+900 STA. 10+100 STA. 10+600

STA.10+600 STA. 10+707

KETERANGAN :

BADAN JALAN SALURAN PAS. BATU JEMBATAN

BAHU JALAN
PASANGAN BATU GORONG-2

PELEBARAN BOX CULVERT PLAT DUICKER


9+900 8+900

KM. 249+000 - KM. 252+000


9+950 8+950

10+000 9+000

10+050 9+050

10+100 9+100

10+150 9+150

10+200 9+200

10+250 9+250

10+300 9+300

10+350 9+350

10+400 9+400

10+450 9+450

10+500 9+500

10+550 9+550

10+600 9+600

10+650 9+650

10+700 9+700
STA. 10+707

10+707

9+750

9+800

9+850
STA. 9+900

9+900
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 8+900 - STA 9+100
STA 10+400 - STA 10+500
STA 10+600 - STA 10+707

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 9+100 - STA 9+150
STA 9+400 - STA 9+450
STA 9+700 - STA 9+750
STA 9+900 - STA 10+000
STA 10+200 - STA 10+250
STA 10+300 - STA 10+350

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting

(Space) 0.25 0.25 (Space)


3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 9+150 - STA 9+400
STA 9+750 - STA 9+900
STA 10+000 - STA 10+200
STA 10+500 - STA 10+600

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 9+450 - STA 9+700
STA 10+250 - STA 10+300
STA 10+350 - STA 10+400

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
EP
: 10
+7
07
.49

10
+7
CT 07
: 10
+6
95
.21 10
+7
00

TC
: 10
+6
83
.58

10
+6
50

CT
: 10
+6
11
.10

10
+6
00

10+550

TC: 10+519.19

10+500

10+450

CT: 10+447.04

5.16
TC: 10+41

0
10+40

6.06
CT: 10+35

10+350

TC: 10+297
.89 10+300

CT: 10+27
7.19

10+
250
10+

TC: 10+172.79
200

CT: 10+125.82
10+150

10+
100

10
+0
50

10+0
00

TC: 9+987.0
6

9+950

9+900
CT: 9+894.8
9

9+85
0
-
-

9+8
00

TC
: 9+7
56.
18

9+7
50

9+7
00

CT
: 9+6
59.
73

9+6
50

9+
60
0

9+
55
0
9+
50
0

9+
45
0

TC
: 9+
41
8.2
3

9+
40
0

CT
: 9+
36
0.2
9

TC
: 9+
33
9+

7.3
4
35
0

CT
: 9+
30
2.0
3
9+
30
0

9+
25
0

TC
: 9+
19
8.6
1

9+
20
0

9+
15
0

9+
10
0

CT
: 9+
07
0.8
7

9+
05
0
-
-

TC
: 8+
99
1.1
9+

1
00
0

8+
95
0

BP
: 8+
90
0.0
0
8+
90
0
Station 9+250.506
Northing 9,748,051.438 m
Easting 575,656.177 m
Direction
Delta
R 500.000 m
V 60.00 Kmh
Tc 51.894 m
Es 2.686 m
116.000 116.000
Lc 103.418 m
Ls1 - m
-5.74 Ls2 - m
%
ELEVASI
114.000 THETA - ELEVASI
114.000
-5.75 Ts - m
%
LT - m
112.000 e 4.70 % 112.000
-7.4
6%

110.000 -7.5
110.000
3%

108.000 108.000
-10
.30
%

106.000 106.000

-10
.19
%
104.000 104.000

102.000 102.000
-7.2
1%

2.32% -0.27% -0.08%


100.000 100.000
-1.03% 2.32%
-0.98%

98.000 98.000

SUPER Ki=4.70% SUPER


ELEVASI ELEVASI
2.32%
Ka=-4.70%
115.248

112.375

108.507

103.394

100.452

100.402
99.809

99.306
114.833

111.960

108.090

102.979

100.040
98.891
99.394

99.983
STA. 8+900 8+950 9+000 9+050 9+100 9+150 9+200 9+250
ELEVASI ELEVASI

112.000 112.000

110.000 110.000

108.000 6.30
% 108.000

-2.43%

-0.27%
106.000 % -1.25% 1.84% 106.000
7.08

104.000 104.000
3.14%

102.000 102.000

100.000 100.000

98.000 98.000

SUPER Ki=4.70% Ki=-4.70% SUPER


ELEVASI ELEVASI
Ka=-4.70% Ka=4.70%

103.481
100.402

102.012

105.440

104.242

104.105

104.399

107.508
101.597

105.025

103.827

103.690

103.066

103.963

107.093
99.983

STA. 9+250 9+300 9+350 9+400 9+450 9+500 9+550 9+600


A
R
A
T
U

9+95
CT: 9+
CT: 9+659.73

0
894.89
9+600

TC: 9+756.18

9+90
9+650

0
9+700

9+850
9+750

9+800
Station 9+826.155
Northing 9,748,556.171 m
Easting 575,400.633 m
Direction
Delta
R 425.000 m
V 60.00 Kmh
Tc 69.976 m
Es 5.722 m
Lc 138.708 m
Ls1 - m
Ls2 - m
THETA -
Ts - m
LT - m
ELEVASI e 4.70 % ELEVASI

112.000 112.000
%
5.43

110.000 % 110.000
5.34

%
108.000 6.56 108.000

%
6.78
106.000 -6.1 106.000
8%

104.000 8% 104.000
7.6
-6.0
7%

102.000 102.000
2.42%
-3.48% 2.33%
0.13%

100.000 100.000

98.000 98.000

SUPER Ki=-4.70% Ki=-4.70% Ki=-4.70% SUPER


ELEVASI ELEVASI
Ka=4.70% Ka=4.70% Ka=4.70%
107.508

104.440

101.407

100.953

102.062

105.684

109.019

111.766
108.611
107.093

104.025

100.992

100.546

101.645

105.269

111.318
STA. 9+600 9+650 9+700 9+750 9+800 9+850 9+900 9+950
ELEVASI ELEVASI

112.000 112.000

110.000 110.000

-2.76%
2.99%
108.000 108.000
5.03% -6.8
5%

106.000 7.13
%
-7.8 106.000
1%

-0.61% -1.49%
-3.57% 2.05% -0.70% 0.54%
104.000 1.27% 104.000
%
6.78

102.000 102.000

100.000 100.000

98.000 98.000

SUPER Ki=8.00% Ki=8.00% Ki=-8.00% Ki=-8.00% SUPER


ELEVASI ELEVASI
Ka=-8.00% Ka=-8.00% Ka=8.00% Ka=8.00%
111.766

115.064

118.175

118.365

114.747

114.142

114.519

114.358
111.318

114.649

117.775

117.953

114.332

113.730

114.096

113.950
STA. 9+950 10+000 10+050 10+100 10+150 10+200 10+250 10+300
ELEVASI ELEVASI

112.000 112.000

110.000 4.75%
110.000
2.75% -1.75%

1.92% 4.81%
-7.8
108.000 9% 108.000
%
6.35
-7.9
3%
106.000 106.000

8%
-7.4 9.6
9%
104.000 104.000

-7.2 2%
3% 9.7
102.000 102.000
2.06%

100.000 100.000

98.000 98.000

SUPER Ki=-8.00% Ki=-8.00% Ki=6.20% Ki=6.20% Ki=8.00% Ki=8.00% SUPER


ELEVASI ELEVASI
Ka=8.00% Ka=8.00% Ka=-6.20% Ka=-6.20% Ka=-8.00% Ka=-8.00%

113.671

116.131
114.358

115.439

114.910

111.448

107.762

109.455
113.950

115.005

114.495

111.034

107.347

109.040

113.260

115.716
STA. 10+300 10+350 10+400 10+450 10+500 10+550 10+600 10+650
ELEVASI ELEVASI

112.000

110.000

108.000

106.000

-0.64%
1.66%
104.000
4.75%

102.000

100.000

98.000

SUPER Ki=-6.20% Ki=-6.20% SUPER


ELEVASI ELEVASI
Ka=6.20% Ka=6.20%
116.131

116.731
115.716

116.319

STA. 10+650 10+700 10+725


PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 8+950
114

EL.: 111.96
EL.: 111.85

EL.: 111.85
112 -5.00%
-3.00% -3.00%
-5.00%

110 110

153.460
111.960
108 108
-10 0 10

STA 8+900
116

EL.: 114.83
EL.: 114.73

EL.: 114.73
-3.00% -3.00%
-5.00% -5.00%

114

112
156.333
114.833

110 110
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+050
104

EL.: 102.98
EL.: 102.87

EL.: 102.87
-3.00% -3.00%
-5.00% -5.00%

102

100 100

144.790
102.979
98 98
-10 0 10

STA 9+000
110 110

EL.: 108.09
EL.: 107.98

EL.: 107.98
-3.00% -3.00%
108 -5.00% -5.00%

-1
00
.0
0%
106
149.590
108.090

104 104
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+150
100 100

EL.: 98.89
EL.: 98.79

EL.: 98.79
-3.00% -3.00%
-5.00% -5.00%

98

96

140.391
98.891
94 94
-10 0 10

STA 9+100

EL.: 99.39
100
EL.: 99.29

EL.: 99.29
100
-3.00% -3.00%
-5.00% -5.00%

98

96
140.894
99.394

94 94
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+250
102

EL.: 100.15

EL.: 99.98

EL.: 99.82
-5.00% 4.70%
100 -4.70%
-5.00%
100

98

141.483
99.983
96 96
-10 0 10

STA 9+200
102
EL.: 100.17

EL.: 100.04

EL.: 99.91
-5.00% 3.60%
100 -3.60%
-5.00% 100

98
141.540
100.040

96 96
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+350
106

EL.: 105.03
EL.: 104.92

EL.: 104.92
-3.00% -3.00%
-5.00% -5.00%

104

102

146.525
105.025
100 100
-10 0 10

STA 9+300
104
EL.: 101.73

EL.: 101.60

EL.: 101.46
102
-5.00% 3.81%
-3.81%
-5.00%

100 100
143.097
101.597

98 98
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+450
108

106

EL.: 103.85
EL.: 103.69
EL.: 103.53
104 4.70% -5.00%

-1
00
-4.70%

.0
0%
-5.00%

102

145.190
103.690
100 100
-10 0 10

EL.: 103.83
EL.: 103.72

EL.: 103.72
STA 9+400
104 -3.00% -2.97%
-5.00% -5.00%

102
145.327
103.827

100 100
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+550
106

EL.: 104.13
EL.: 103.96
EL.: 103.80
4.70% -5.00%
104 -4.70%
-5.00%

102

144.463
103.963
100 100
-10 0 10

STA 9+500

EL.: 103.23
104

EL.: 103.07
EL.: 102.90

4.70% -5.00%
-4.70%
-5.00%

102

100 100
144.566
103.066

98 98
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+650
106

EL.: 104.19
EL.: 104.02
EL.: 103.86
4.70% -5.00%

104 -5.00%
-4.70%

102

145.525
104.025
100 100
-10 0 10

STA 9+600

EL.: 107.26
108

EL.: 107.09
EL.: 106.93

4.70% -5.00%
-4.70%
-5.00%

106

104
148.593
107.093

102 102
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+750
102

EL.: 100.58
EL.: 100.55
EL.: 100.44
1.07% -5.00%
-3.00%
-5.00%

100 100

98

142.046
100.546
96 96
-10 0 10

STA 9+700
102

EL.: 100.99
EL.: 100.89

EL.: 100.89
-3.00% -3.00%
-5.00% -5.00%

100 100

98
142.492
100.992

96 96
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+850
108

EL.: 105.43
EL.: 105.27
106

EL.: 105.10
4.70% -5.00%
-4.70%
-5.00%

104

146.769
105.269
102 102
-10 0 10

STA 9+800
104

EL.: 101.81
EL.: 101.64
EL.: 101.48

102 -5.00%
4.70%
-4.70%
-5.00%

100 100
143.145
101.645

98 98
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 9+950

EL.: 111.32
EL.: 111.21

EL.: 111.21
112

-3.00% -3.00%
-5.00% -5.00%

110 110

108

152.818
111.318
106 106
-10 0 10

STA 9+900
110 110

EL.: 108.66
EL.: 108.61
EL.: 108.51

1.42% -5.00%
-3.00%
-5.00%

108

106
150.111
108.611

104 104
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+050
120 120

EL.: 118.05

EL.: 117.77

EL.: 117.49
118 -5.00%
8.00%

-8.00%
-5.00%

116

159.275
117.775
114 114
-10 0 10

STA 10+000
116
EL.: 114.93

EL.: 114.65

EL.: 114.37
-5.00%
8.00%

-8.00%
-5.00%

114

112
156.149
114.649

110 110
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+150
116

EL.: 114.33
EL.: 114.23

EL.: 114.23
-3.00% -3.00%
-5.00% -5.00%

114

112

155.832
114.332
110 110
-10 0 10

STA 10+100
120 120
EL.: 118.23

EL.: 117.95

EL.: 117.67
-5.00%
8.00%
118 -8.00%
-5.00%

116
159.453
117.953

114 114
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+250
116

EL.: 114.38
EL.: 114.10
EL.: 113.82
-5.00%
8.00%

114 -5.00%
-8.00%

112

155.596
114.096
110 110
-10 0 10

STA 10+200
116

EL.: 114.01
EL.: 113.73
EL.: 113.45

114 8.00%
-5.00%

-8.00%
-5.00%

112
155.230
113.730

110 110
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+350

EL.: 115.29
116

EL.: 115.01
EL.: 114.73
-5.00%
8.00%

-8.00%
-5.00%

114

112

156.505
115.005
110 110
-10 0 10

STA 10+300
116

EL.: 114.17
EL.: 113.95
EL.: 113.73

-5.00%
6.34%
114 -6.34%
-5.00%

112
155.450
113.950

110 110
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+450
112

EL.: 111.14

EL.: 111.03

EL.: 110.93
-5.00% 2.95%
-3.00%
-5.00%

110 110

108

152.534
111.034
106 106
-10 0 10

STA 10+400
118

116

EL.: 114.50
EL.: 114.43

EL.: 114.39
-1.93% -3.00%
-5.00% -5.00%

114

112
155.995
114.495

110 110
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+550

EL.: 109.32
110 110

EL.: 109.04

EL.: 108.76
-5.00%
8.00%

-8.00%
-5.00%

108

106

150.540
109.040
104 104
-10 0 10

STA 10+500

EL.: 107.35
EL.: 107.24

EL.: 107.24
108

-3.00% -3.00%
-5.00% -5.00%

106

104
148.847
107.347

102 102
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+650
118

EL.: 115.72
EL.: 115.61

EL.: 115.61
116
-3.00% -3.00%
-5.00% -5.00%

114

157.216
115.716
112 112
-10 0 10

STA 10+600
116

EL.: 113.54

EL.: 113.26
114

EL.: 112.98
-5.00%
8.00%

-8.00%
-5.00%

112

110 110
154.760
113.260

108 108
-10 0 10
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 10+707
118

EL.: 116.27
EL.: 116.16

EL.: 116.16
-3.00% -3.00%
-5.00% -5.00%

116

114

157.768
116.268
112 112
-10 0 10

STA 10+700
118

EL.: 116.40
EL.: 116.32
EL.: 116.21

2.22% -5.00%
-3.00%
-5.00%

116

114
157.819
116.319

112 112
-10 0 10
KUJAN - RUNTU
SEGMEN 3
STA. 16+200 - STA. 16+725
STA.16+200 STA. 16+700 STA. 16+725

KETERANGAN :

BADAN JALAN SALURAN PAS. BATU JEMBATAN

BAHU JALAN
PASANGAN BATU GORONG-2

PELEBARAN BOX CULVERT PLAT DUICKER


16+200

KM. 249+000 - KM. 252+000


16+250

16+300

16+350

16+400

16+450

16+500

16+550

16+600

16+650

16+700
STA. 16+725

16+725
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 16+200 - STA 16+450

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting

(Space) 0.25 0.25 (Space)


3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 16+450 - STA 16+725

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
16
+20
0

BP
:1
6+
200
.0
0

16
+2
50

TC
:1
6+
28
1.6
UTARA

16
+3
00
25
+7
16

CT
1
.2

:1
25
+7

6+
16

31
:
EP

1.9
16+350

5
TC
:1
6+
32
335.45

4.9
4.00

3
00
+7

CT: 16+
357.78
16

TC: 16+
CT
:1
6+
37
4.9
2
6
.4
87
6 +6
:1
CT TC
16 :
+4 16
00 +3
91
.4
7
50

CT
+6

:1
16

6+
41
3.6
1

16 TC
+4 : 16
00

50 +4
+6

44
.09
9

16
8.7
60
6+
:1
TC

550
16+
0

00
1.0

16+5
56
6+
:1
CT
A
AR
UT
9
44.0
+4
: 16
TC

16+
50 0
450
16+
TC: 16+324.93
CT: 16+311.95

.61
413
CT

16+
9

: 16
81.6

:
CT
+33
16+2

7
5.4

91.4
5
TC:

16+3
TC

2
74.9
16+300

: 16

TC:
16+3
+ 35
7.7

400
CT:
8

16+
16+
350
16
+5
50
50
0

16+2
00.0
16+2
BP:
00

Station 16+402.575
16+2

Northing 9,751,529.458 m
Station 16+519.372
Station 16+330.269 Station 16+366.699
Station 16+296.911 Northing 9,751,427.826 m
Northing 9,751,563.648 m Northing 9,751,557.226 m Easting 571,915.780 m
Northing 9,751,582.508 m Easting 571,858.088 m
Easting 571,975.613 m Easting 571,939.593 m Direction
Easting 572,003.341 m
Direction Direction Delta Direction
Direction
Delta Delta R 115.000 m Delta
Delta
R 115.000 m R 25.000 m R 25.000 m V 60.00 Kmh R 73.000 m
V 60.00 Kmh V 60.00 Kmh V 60.00 Kmh Tc 11.107 m V 60.00 Kmh
Tc 15.219 m Tc 5.340 m Es 0.535 m Tc 75.279 m
Tc 8.920 m
Es 1.003 m Es 0.564 m Lc 22.146 m
Es 1.544 m Es 31.862 m
Lc 30.263 m Lc 10.521 m Ls1 - m
Lc 17.137 m Lc 116.912 m
Ls1 - m Ls1 - m Ls2 - m
Ls1 - m Ls1 - m
Ls2 - m Ls2 - m THETA -
-
Ls2 - m Ls2 - m
THETA THETA - Ts - m
Ts - m Ts - m THETA - THETA -
ELEVASI LT - m
LT - m LT - m Ts - m Ts - m ELEVASI
e 6.10 %
e 6.10 % e 8.00 % LT - m LT - m 1.24%
e 8.00 % e 7.50 %
%
6.79
104.000 99.000
4%
10.7

%
.46
102.000 13 97.000

100.000 95.000
-10 %
.9 4
% .43
13

98.000 93.000

96.000 7.19
% 91.000

-7.2 %
1% 6.09
94.000 -10
.35
89.000
% 3.83%
-4.36%
-1.00% -0.32% 3.90%
0.51%
92.000 87.000

90.000 85.000

SUPER Ki=6.10% Ki=6.10% Ki=8.00% Ki=8.00% Ki=-8.00% Ki=-8.00% Ki=-6.10% Ki=-6.10% Ki=7.50% SUPER
ELEVASI ELEVASI
Ka=-6.10% Ka=-6.10% Ka=-8.00% Ka=-8.00% Ka=8.00% Ka=8.00% Ka=6.10% Ka=6.10% Ka=-7.50%
100.986

100.650
95.517

90.340

87.887

88.772

98.597
92.035
100.571

100.250
95.110

89.897

81.170

88.359

91.608

98.182
STA. 16+200 16+250 16+300 16+350 16+400 16+450 16+500 16+550
RA A
UT
GARIS IMP

CT: 16+561.00

TC: 16+608.79
IT STA.16
16+550

16+600

CT:
16+650

16+
687
6 .4
550

EP
Station 16+648.449

: 16
16+

+72
Northing 9,751,512.468 m

700

5.21
Easting 571,719.111 m
Direction

16 +
72 5
Delta
R 250.000 m
V 60.00 Kmh
Tc 39.663 m
Es 3.127 m
Lc 78.670 m
Ls1 - m
Ls2 - m
THETA -
Ts - m
LT - m
e 4.00 %
ELEVASI ELEVASI
-0.25%
-3.78%

99.000 99.000
-11
.40
%

97.000 97.000

-9.
94%
95.000 95.000

93.000 -10
.09
93.000
%

91.000 91.000
-9.
36%

89.000 89.000

87.000 87.000

85.000 85.000

SUPER Ki=7.50% Ki=4.00% Ki=4.00% SUPER


ELEVASI ELEVASI
Ka=-7.50% Ka=-4.00% Ka=-4.00%
100.650

100.506

96.688

91.680
100.091
100.250

96.272

91.265

STA. 16+550 16+600 16+650 16+700 16+750


PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 16+250
98

EL.: 95.52
EL.: 95.41

EL.: 95.41
96
-3.00% -3.00%
-5.00% -5.00%

94

92

95.517
95.11
90 90
-15 -10 -5 0 5 10 15

STA 16+200
102

EL.: 100.99
EL.: 100.88

EL.: 100.88
-3.00% -3.00%
-5.00% -5.00%

100 100

98
100.986
100.57

96 96
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 87.94
Jembatan

EL.: 87.89
EL.: 87.83
STA 16+350

EL.: 87.41
EL.: 87.29
88 -1.62% 1.61% -5.00%

-1
-5.00%

0
%

0.
00
00

%
00.
-1
86

:1

-1
-1

:1
84

EL.: 82.59
5.00%

82

-1
:1
80 80

87.887
81.17
78 78
-15 -10 -5 0 5 10 15

STA 16+300
92
EL.: 90.55

EL.: 90.34

EL.: 90.13
-5.00% 6.10%
-6.10%
-5.00%
90 90

88
90.340
89.90

86 86
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 16+450
94

EL.: 92.30

EL.: 92.04

EL.: 91.77
-5.00% 7.50%

0%

1
1:
.0
92

00
-7.50%

-1
-5.00%

90 90

92.035
91.61
88 88
-15 -10 -5 0 5 10 15

STA 16+400
90 90

EL.: 88.99
EL.: 88.77
EL.: 88.56

-5.00%
6.10%
-6.10%
-5.00%
0%
.0
00
-1

88

86
88.772
88.36

84 84
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 101.98
STA 16+550
102

EL.: 100.91

EL.: 100.65

EL.: 100.39

1
1:
-5.00% 7.50%

-7.50%
-5.00%

100 100

98

100.650
100.25
96 96
-15 -10 -5 0 5 10 15

STA 16+500
104

102

100 100

1
1:
EL.: 98.86

EL.: 98.60

EL.: 98.33
-5.00%
7.50%

-7.50%
-5.00%

98

96
98.597
98.18

94 94
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 16+650
98

EL.: 96.83

EL.: 96.69

EL.: 96.55
-5.00% 4.00%
-4.00%
-5.00%

96

94

96.688
96.27
92 92
-15 -10 -5 0 5 10 15

STA 16+600
102
EL.: 100.54

EL.: 100.51

EL.: 100.40
-5.00% 0.91%
-3.00%
-5.00%

100 100

98
100.506
100.09

96 96
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 16+725

EL.: 89.32
90 90

EL.: 89.21

EL.: 89.21
-3.00% -3.00%
-5.00% -5.00%

88

86

89.320
88.91
84 84
-15 -10 -5 0 5 10 15

STA 16+700
94
EL.: 91.69

EL.: 91.68

EL.: 91.58
92
-5.00% 0.16% -3.00%
-5.00%

90 90
91.680
91.27

88 88
-15 -10 -5 0 5 10 15
KUJAN - RUNTU
SEGMEN 4
STA. 17+000 - STA. 17+535
STA.17+000 STA17+500 STA17+535

KETERANGAN :

BADAN JALAN SALURAN PAS. BATU JEMBATAN

BAHU JALAN
PASANGAN BATU GORONG-2

PELEBARAN BOX CULVERT PLAT DUICKER


17+000

STA. 17+000 - STA. 17+535


17+050

17+100

17+150

17+200

17+250

17+300

17+350

17+400

17+450

17+500
STA. 17+535

17+535
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 17+000 - STA 17+150
STA 17+400 - STA 17+535

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting

(Space) 0.25 0.25 (Space)


3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 17+150 - STA 17+300

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 17+300 - STA 17+350

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
TIPIKAL POTONGAN MELINTANG (EKSISTING)

Jalan Eksiting

CL

Eksisting Jalan Aspal

6.00

TIPIKAL POTONGAN MELINTANG (RENCANA)


STA 17+350 - STA 17+400

Laston Lapis Aus (AC-WC), t = 4.0 cm Laston Lapis Aus (AC-WC), t = 4.0 cm
Lapis Perekat - Aspal Cair/Emulsi Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Aus (AC-BC), t = 6.0 cm
CL Laston Lapis Aus (AC-BC), t = 6.0 cm
Lapis Perekat - Aspal Cair/Emulsi Rencana Lapis Perekat - Aspal Cair/Emulsi
Laston Lapis Pondasi (AC-Base), t = 9.5 cm Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pengikat - Aspal Cair/Emulsi Lapis Pengikat - Aspal Cair/Emulsi
Lapis Pondasi Agregat Kelas A, t=22.0 cm Lapis Pondasi Agregat Kelas A, t=22.0 cm
Marka Jalan Termoplastik
( Warna Kuning )
Marka Jalan Termoplastik Solid (warna putih) Marka Jalan Termoplastik Solid (warna putih)
Lapis Pondasi Agregat Kelas S, t=19.5 cm B Lapis Pondasi Agregat Kelas S, t=19.5 cm
A -3.00%
Timbunan Pilihan, t = 22.0 cm -3.00% -5.00% Timbunan Pilihan, t = 22.0 cm
-5.00%

B
A DETAIL A

Jalan Eksiting
Renc. Sal. Pas. Batu 15cm
(Space) 0.25 0.25 (Space)
3.50 3.50
Jalur Lalu Lintas Jalur Lalu Lintas

Variasi 7.00 Variasi


Bahu Jalan Badan Jalan Bahu Jalan
Variasi

DETAIL DAN POTONGAN Marka Jalan Termoplastik Solid (warna putih)

Laston Lapis Aus (AC-WC), t = 4.0 cm Lapis Pondasi Agregat Kelas S, t=19.5 cm
Laston Lapis Aus (AC-BC), t = 6.0 cm Timbunan Pilihan, t = 22.0 cm
Laston Lapis Pondasi (AC-Base), t = 9.5 cm
Lapis Pondasi Agregat Kelas A, t=22.0 cm
Potongan A - A Potongan B - B
AC-WC, t = 4.0 cm AC-WC, t = 4.0 cm
AC-BC, t = 6.0 cm AC-BC, t = 6.0 cm
AC-Base, t = 9.5 cm
Agg. Kls A, t = 22.0 cm DETAIL A
EP: 17+534.96
17+535

CT: 17+516.64

TC:
17+5
03.48

17+5
00

CT:
17+4
86.9
0

4.00
DIREKTORAT JENDERAL BINA MARGA

TC
:1
7+
45
9.3
8

17
+4
5 0
SATKER P2JN PROVINSI KALIMANTAN TENGAH

CT
:1
7+
42
7.0
1

17
+4
00

TC
:1
7+
37
9.
17

CT
:1
7+
34
4.
55
17
+3
50
PROVINSI
NO. RUAS
NO. PAKET

NAMA JALAN

17+
300

17+250

TC: 17+234.27
KSO

INDRACITRA
PT. WIRA WIDYATAMA

17+200
PT. RANCANGTAMA BANGUNMANDIRI

CT: 17+181.49

17+1
50

TC:
17+
123
.7 8

17+
100

CT:
17+
087
.51

TC: 17+080.5
4

17+050

CT: 17+043.2
5

TC: 17
+025
.07

BP: 17
+000
.00
17+0
00
TC:
17+
2
34.2

17+300

CT
7

: 17
17+250

+34
4.5
5
-

CT:
17+

17+
181

350
CT: 17+087.51

.49

17+
TC: 17

TC: 17+123.78

20 0
+080
.54
CT: 17
TC: 17+025

17+100
+043

17+150
BP: 17+000

.25
.07

17+0
.00

50

UTARA
Station 17+292.037
Station 17+152.954
17+000

Northing 9,751,556.283 m
Station 17+084.048 Northing 9,751,599.798 m
Easting 571,196.696 m
Northing 9,751,596.770 m Easting 571,329.463 m
Direction
Easting 571,398.348 m Direction
Delta
Station 17+034.170 Direction Delta
R 150.000 m
Northing 9,751,608.373 m Delta R 160.000 m
V 60.00 Kmh
Easting 571,446.881 m R 25.000 m V 60.00 Kmh
Tc 57.768 m
Direction Tc 29.169 m
V 60.00 Kmh Es 10.740 m
Delta Es 2.637 m
Tc 3.505 m Lc 110.285 m
R 150.000 m Lc 57.705 m
Es 0.245 m Ls1 - m
V 60.00 Kmh Ls1 - m
Tc 9.103 m
Lc 6.965 m Ls2 - m
Ls2 - m
Es 0.276 m Ls1 m THETA -
THETA -
Lc 18.184 m Ls2 - m Ts - m Ts - m
ELEVASI Ls1 - m THETA - LT - m LT - m ELEVASI
Ls2 - m Ts - m e 3.00 % e 7.80 %
THETA - LT - m
Ts - m e 6.50 %
102.000 LT - m
% 112.000
e 3.00 % .91
12

100.000 110.000
9%
9.4

98.000 2.04% -3.15% 108.000


% -6.2
6.20 0% 6%
9.2
96.000 0%
106.000
.5
10 -11
.36
%

%
94.000 10
.56 .92
% 104.000
12

92.000 .56
% 103.000 102.000
10

-4.68 %
% 6.41
90.000 %
101.000 100.000
-3.71% 7.28
-0.39%

88.000 98.000

SUPER Ki=-3.00% Ki=-3.00% Ki=6.50% Ki=6.50% Ki=-3.00% Ki=-3.00% Ki=7.80% Ki=7.80% SUPER
ELEVASI ELEVASI
Ka=3.00% Ka=3.00% Ka=-6.50% Ka=-6.50% Ka=3.00% Ka=3.00% Ka=-7.80% Ka=-7.80%
102.378

108.253

109.073

105.383
91.337

89.274

92.926

97.445

101.963

107.843

108.673

104.968
92.511
90.922

86.313

97.042

STA. 17+000 17+050 17+100 17+150 17+200 17+250 17+300 17+350


17+

TC
35

: 17
0

+37
.17 9
-

EP:
CT: 17+4

17+
534
CT:

.96
TC: 17+4
27.01

TC: 17+503.48

17+
CT: 17+486.90
17+4

516.6
00

59

17+
4
.38

535
17+450

17+500
Station 17+403.241
Station 17+473.175
Northing 9,751,603.610 m
Northing 9,751,613.767 m
Easting 571,090.290 m Station 17+510.101
Easting 571,020.795 m
Direction
Direction Northing 9,751,612.349 m
Delta
Delta Easting 570,983.818 m
R 175.000 m
R 150.000 m Direction
V 60.00 Kmh
V 60.00 Kmh Delta
Tc 24.071 m
Tc 13.798 m R 50.000 m
Es 1.648 m
Es 0.633 m V 60.00 Kmh
Lc 47.842 m
Lc 27.519 m Tc 6.618 m
Ls1 - m
Ls1 - m Es 0.436 m
Ls2 - m
Ls2 - m Lc 13.160 m
THETA -
THETA - Ls1 - m
Ts - m
ELEVASI LT - m
Ts - m Ls2 - m ELEVASI
LT - m THETA -
e 7.40 %
e 7.80 %
Ts m
LT - m
108.000 108.000
e 8.00 %

106.000 106.000

104.000 104.000
-11
.28
%

102.000 102.000
-4.66
%
-0.95%
100.000 -0.80%
-0.70%
100.000
-1.95%
-1.25%

98.000 98.000

96.000 96.000

94.000 94.000

SUPER Ki=-7.40% Ki=-7.40% Ki=-7.80% Ki=-7.80% Ki=-8.00% Ki=-8.00% SUPER


ELEVASI ELEVASI
Ka=7.40% Ka=7.40% Ka=7.80% Ka=7.80% Ka=8.00% Ka=8.00%
99.173
105.383

100.852

100.092

99.548

99.184
104.968

100.426

99.678

99.137

STA. 17+350 17+400 17+450 17+500 17+550


PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

Jembatan
STA 17+050
90

EL.: 89.28
90

EL.: 89.27
EL.: 89.17
0.16% -5.00%
-3.00%
-5.00%

89

88

-1
:1
87

89.274
86.31
86

85 85
-15 -10 -5 0 5 10 15

STA 17+000

EL.: 91.34
92
EL.: 91.23

EL.: 91.23
-3.00% -3.00%
-5.00% -5.00%

-1
%

00
00

91

.0
.
00

%0
-1

90 90

89

88
91.337
90.92

87

86 86
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 17+150
99

EL.: 97.55
EL.: 97.45
EL.: 97.34
98
3.00% -5.00%
-3.00%
-5.00%

97

96

95

94

97.445
97.04
93

92 92
-15 -10 -5 0 5 10 15

EL.: 92.93
EL.: 92.82

EL.: 92.82
STA 17+100
93 -5.00%
-3.00% -3.00%
-5.00%

92

91

90 90
92.926
92.51

89

88 88
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 17+250
110 110

EL.: 108.53

EL.: 108.25
109

EL.: 107.98
-5.00%
7.80%

-7.80%

108 -5.00%

107

108.253
107.84
106

105 105
-15 -10 -5 0 5 10 15

STA 17+200
105

104

EL.: 102.38
EL.: 102.27

EL.: 102.27
103

-3.00% -3.00%
-5.00% -5.00%

102

101

100 100

99
102.378
101.96

98

97 97
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 17+400
102

EL.: 101.11
EL.: 100.85
EL.: 100.59
-5.00%
101 7.40%

-7.40%
-5.00%

100 100

99

100.852
100.43
98

97 97
-15 -10 -5 0 5 10 15

STA 17+350

EL.: 105.48

EL.: 105.38

EL.: 105.28
106
-5.00% 2.64%
-3.00%
-5.00%

105

105.383
104.97
104

103 103
-15 -10 -5 0 5 10 15

STA 17+300
EL.: 109.35

110 110

EL.: 109.07

EL.: 108.80
-5.00%
7.80%

109 -7.80%
-5.00%

108
109.073
108.67

107

106 106
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

EL.: 99.68
STA 17+500

EL.: 99.55
EL.: 99.42
100 100
3.67% -5.00%
-3.67%
-5.00%

99

98

97

96

99.548
99.14
95

94 94
-15 -10 -5 0 5 10 15

Jembatan
STA 17+450
101

EL.: 100.12
EL.: 100.09
EL.: 99.99 0.80% -5.00%
-3.00%
100 -5.00%
100

99

-1
:1
98
1:
-1

97

96
100.092
99.68

95

94 94
-15 -10 -5 0 5 10 15
PAKET PEKERJAAN : - Diperiksa oleh :
PT. WIRA WIDYATAMA
PR- O1 PERENCANAAN TEKNIK LONG SEGMENT JALAN - KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA

TAHUN ANGGARAN 2021

STA 17+535
100 100

EL.: 99.06
EL.: 98.95

EL.: 98.95
-3.00% -3.00%
99 -5.00% -5.00%

98
99.059
98.64

97

96 96
-15 -10 -5 0 5 10 15
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU 005
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH RUNTU - SIMPANG RUNTU
TAHUN ANGGARAN 2021

RUAS JALAN RUNTU - SIMPANG RUNTU


REGULER
SP 3 Runtu - P.Bun - P.Lada Awal Jembatan Sei Arut

Kujan

21+440
PEMELIHARAAN RUTIN
RUNTU - SIMPANG RUNTU
PANJANG PENANGANAN : 13.00 KM

NAMA RUAS STASIONING PANJANG RUAS


RUNTU - SIMPANG RUNTU STA. 00+000 - STA. 05+000 5.00 KM
STA. 12+200 - STA. 12+900 0.70 KM
STA. 14+140 - STA. 21+440 7.30 KM
-

005
RUNTU - SIMPANG RUNTU

Variasi Sesuai eksisting dilapangan Variasi

Eksisting Aspal
Pembersihan drainase (belum dilaksanakan) CL
Eksisting lapis pondasi aggregat kelas S
Pengendalian tanaman (belum dilaksanakan)

Variasi Sesuai eksisting dilapangan Variasi

CL
Pembersihan drainase (sudah dilaksanakan) Eksisting Aspal
Perbaikan lapis pondasi aggregat kelas S tebal minimal = 12.5 cm

Pengendalian tanaman (sudah dilaksanakan)


5% 5%

Detail D
Skala 1 : 50
005
RUNTU - SIMPANG RUNTU

Variasi Sesuai eksisting dilapangan Variasi

Eksisting Aspal
Galian Saluran (belum dilaksanakan) CL
Eksisting lapis pondasi aggregat kelas S
Pengendalian tanaman (belum dilaksanakan)

Variasi Sesuai eksisting dilapangan Variasi

CL
Galian Saluran (sudah dilaksanakan) Eksisting Aspal
Perbaikan lapis pondasi aggregat kelas S tebal minimal = 12.5 cm

Pengendalian tanaman (sudah dilaksanakan)


5% 5%
PEMELIHARAAN RUTIN KONDISI
RUNTU - SIMPANG RUNTU
PANJANG PENANGANAN : 1.24 KM

NAMA RUAS STASIONING PANJANG RUAS


RUNTU - SIMPANG RUNTU STA. 12+900 - STA. 14+140 1.24 KM
005
RUNTU - SIMPANG RUNTU

Variasi Sesuai eksisting dilapangan Variasi

CL

Variasi Sesuai eksisting dilapangan Variasi

CL
PENUNJANGAN / HOLDING
RUNTU - SIMPANG RUNTU
PANJANG PENANGANAN : 7.20 KM

NAMA RUAS STASIONING PANJANG RUAS


RUNTU - SIMPANG RUNTU STA. 05+000 - STA. 12+200 7.20 KM
005 TIPIKAL POTONGAN
RUNTU - SIMPANG RUNTU MELINTANG HOLDING

Variasi Sesuai eksisting dilapangan Variasi

CL

Detail G-G
Skala 1 : 25
III.PRESERVASI JEMBATAN
PEMELIHARAAN BERKALA JEMBATAN SEI ARUT
BENTANG 92.70 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.12.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
PENANGANAN JEMBATAN
TAHUN ANGGARAN 2021

ARAH RUNTU

4.700 4.200

6.300

2.000
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 50
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

Penutup

Diafragma

0
210
20
0

Kawat Galvanis Zn Heksagonal


dan PVC

50
80

Isian batu ukuran 200 mm

0
20

100

DENAH ANYAMAN
SKALA 1 : 50
DIMENSI BRONJOMNG
SKALA 1 : 50
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 60
DETAIL SIAR MUAI
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN BERKALA JEMBATAN SEI KUNUP
BENTANG 10.30 M
PAKET PEKERJAAN: I.13.1
PT. WIRA WIDYATAMA
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

ABUTMENT GANTUNG PENGGANTIAN SIAR MUAI

ARAH KUJAN ARAH RUNTU


9.000

PAPAN NAMA TIDAK ADA

PENGGANTIAN SIAR MUAI ABUTMENT GANTUNG

RENCANA
BRONJONG

ARAH RUNTU

4.200
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.13.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 50
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

Penutup

Diafragma

0
210
20
0

Kawat Galvanis Zn Heksagonal


dan PVC

50
80

Isian batu ukuran 200 mm

0
20

100

DENAH ANYAMAN
SKALA 1 : 50
DIMENSI BRONJOMNG
SKALA 1 : 50
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.13.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH
1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.13.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 60
DETAIL SIAR MUAI
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN BERKALA JEMBATAN SEI BUKIT SINTANG
BENTANG 94.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.14.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
PENANGANAN JEMBATAN
TAHUN ANGGARAN 2021

KE KUJAN KE RUNTU

KE KUJAN KE RUNTU
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.14.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN RUTIN BOX RUNTU 12
BENTANG 6.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.15.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 TIPIKAL PENANGANAN OPRIT
PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA BOX CULVERT
TAHUN ANGGARAN 2021

TAMPAK ATAS BOX


CULVERT
PEMELIHARAAN RUTIN BOX RUNTU 13
BENTANG 6.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.16.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 TIPIKAL PENANGANAN OPRIT
PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA BOX CULVERT
TAHUN ANGGARAN 2021

7.100

LEBAR BOX CULVERT


LEBAR JALAN
ARAH KUJAN ARAH RUNTU

6000

BOX CULVERT

7.100

2000
1000
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.16.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH
1 : 50
INDRACITRA
TAHUN ANGGARAN 2021

Penutup

Diafragma

0
210
20
0

Kawat Galvanis Zn Heksagonal


dan PVC

50
80

Isian batu ukuran 200 mm

0
20

100

DENAH ANYAMAN
SKALA 1 : 50
DIMENSI BRONJOMNG
SKALA 1 : 50
PEMELIHARAAN BERKALA JEMBATAN SEI RIMBA
BENTANG 15.50 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.17.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

ABUTMENT GANTUNG
PENGGANTIAN SIAR MUAI

ARAH KUJAN ARAH RUNTU


JALAN

PAPAN NAMA TIDAK ADA

PENGGANTIAN SIAR MUAI

PONDASI SUMURAN TERLIHAT

PENGECATAN SANDARAN

PONDASI SUMURAN TERLIHAT 6.000


PAKET PEKERJAAN: I.17.2
PT. WIRA WIDYATAMA
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 50
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

Penutup

Diafragma

0
210
20
0

Kawat Galvanis Zn Heksagonal


dan PVC

50
80

Isian batu ukuran 200 mm

0
20

100

DENAH ANYAMAN
SKALA 1 : 50
DIMENSI BRONJOMNG
SKALA 1 : 50
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.17.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.17.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN RUTIN JEMBATAN SEI SABABILAH
BENTANG 16.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.18.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

1
2

RENCANA
PAS. BATU
L = 15 M

PAPAN NAMA TIDAK ADA


PENGGANTIAN SIAR MUAI

ARAH KUJAN ARAH RUNTU


JALAN

PENGGANTIAN SIAR MUAI

1
PAS. BATU TIDAK ADA 2
RENCANA
PAS. BATU
L = 15 M

PENGECATAN SANDARAN

2.500

4.100
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.18.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH
1 : 50
INDRACITRA
TAHUN ANGGARAN 2021

PIPA SULING2 SAMBUNGAN DILATASI


PADA TIAP JARAK 20 M
30 TABEL DIMENSI DINDING PENAHAN TANAH
TIAP JARAK 2 M TEBAL 3 cm
DINDING PENAHAN TANAH PC : PS = 1 : 4
H (m) D (m) B (m)

1.00 0.40 0.60

1.50 0.40 0.85


H=VARIASI

H=VARIASI
200 200

100
1 2.00 0.40 1.10
200

2.50 0.40 1.35


2

100
3.00 0.40 1.60

MATERIAL POROUS
DIBUNGKUS IJUK

PIPA SULING2
D

TIAP JARAK 2 M

B D

PENEMPATAN PIPA SULING - SULING


DETAIL DINDING PENAHAN SKALA. 1 : 100
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.18.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.18.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN BERKALA JEMBATAN SEI SELAT I
BENTANG 25.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.19.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

1 1
2 2

RENCANA
RENCANA
PAS. BATU
PAS. BATU
L = 15 M
L = 15 M

PENGGANTIAN SIAR MUAI PENGGANTIAN SIAR MUAI

ARAH KUJAN ARAH RUNTU


JALAN

PAPAN NAMA TIDAK ADA

ASPAL KASAR

1 PARAPET PECAH
1
2 RENCANA RENCANA 2
PAS. BATU PAS. BATU
L = 15 M L = 15 M

PENGECATAN SANDARAN

3.000

3.000
7.000
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.19.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH
1 : 50
INDRACITRA
TAHUN ANGGARAN 2021

PIPA SULING2 SAMBUNGAN DILATASI


PADA TIAP JARAK 20 M
30 TABEL DIMENSI DINDING PENAHAN TANAH
TIAP JARAK 2 M TEBAL 3 cm
DINDING PENAHAN TANAH PC : PS = 1 : 4
H (m) D (m) B (m)

1.00 0.40 0.60

1.50 0.40 0.85


H=VARIASI

H=VARIASI
200 200

100
1 2.00 0.40 1.10
200

2.50 0.40 1.35


2

100
3.00 0.40 1.60

MATERIAL POROUS
DIBUNGKUS IJUK

PIPA SULING2
D

TIAP JARAK 2 M

B D

PENEMPATAN PIPA SULING - SULING


DETAIL DINDING PENAHAN SKALA. 1 : 100
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.19.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.19.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN RUTIN BOX RUNTU 18
BENTANG 8.70 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.20.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 TIPIKAL PENANGANAN OPRIT
PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA BOX CULVERT
TAHUN ANGGARAN 2021

TAMPAK ATAS BOX


CULVERT
PEMELIHARAAN RUTIN JEMBATAN SELAT II
BENTANG 25.50 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.21.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

PENGGANTIAN SIAR MUAI PENGGANTIAN SIAR MUAI

LEBAR JALAN
JEMBATAN
7000
ARAH KUJAN ARAH RUNTU

RENCANA
PATOK PENGARAH

RENCANA
PATOK PENGARAH

TUMPUKAN KAYU JBT EKSISTING


1.500 TUMPUKAN KAYU JBT EKSISTING

6.700
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.21.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI 1 : 60
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

15

15

TAMPAK ATAS

5 0.20
0.
05 05
0. BETON K.250
PUTIH 20
0.20

HITAM 20
85
POTONGAN A-A
PUTIH 20 SKALA 1 : 25
A

HITAM 20

65

ANGKER D16

PATOK PENGARAH
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.21.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN BERKALA JEMBATAN SELAT III
BENTANG 20.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.22.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

PENGGANTIAN SIAR MUAI PENGGANTIAN SIAR MUAI

PARAPET PECAH

ARAH KUJAN ARAH RUNTU

RENCANA RENCANA
PATOK PENGARAH PATOK PENGARAH

TULANGAN GIRDER TERLIHAT, P = 2.5 m


PAPAN NAMA TIDAK ADA
ASPAL KASAR

ARAH RUNTU RENCANA


PATOK PENGARAH
RENCANA
PATOK PENGARAH

1.500 1.500

4.000
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.22.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH INDRACITRA
1 : 60
TAHUN ANGGARAN 2021

15

15

TAMPAK ATAS

5 0.20
0.
05 05
0. BETON K.250
PUTIH 20
0.20

HITAM 20
85
POTONGAN A-A
PUTIH 20 SKALA 1 : 25
A

HITAM 20

65

ANGKER D16

PATOK PENGARAH
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.22.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.22.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN RUTIN JEMBATAN SEI SULUNG I
BENTANG 20.50 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.23.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

PENGGANTIAN SIAR MUAI POTENSI TERGERUS

ARAH KUJAN ARAH RUNTU

PENGGANTIAN SIAR MUAI

PAS. BATU RENGGANG

ARAH RUNTU

3.500 3.500
4.700

0.700
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.23.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH
1 : 50
INDRACITRA
TAHUN ANGGARAN 2021

Penutup

Diafragma

0
210
20
0

Kawat Galvanis Zn Heksagonal


dan PVC

50
80

Isian batu ukuran 200 mm

0
20

100

DENAH ANYAMAN
SKALA 1 : 50
DIMENSI BRONJOMNG
SKALA 1 : 50
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.23.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.23.4
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN RUTIN JEMBATAN SEI SULAT
BENTANG 20.50 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.24.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

PERGANTIAN SIAR MUAI PERGANTIAN SIAR MUAI

LEBAR JALAN
ARAH KUJAN ARAH RUNTU

JEMBATAN
7000
TIDAK ADA PAPAN NAMA JEMBATAN

ARAH KUJAN ARAH RUNTU

5300
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.24.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.24.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


PEMELIHARAAN BERKALA BOX RUNTU 22.3
BENTANG 6.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.26.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 TIPIKAL PENANGANAN OPRIT
PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA BOX CULVERT
TAHUN ANGGARAN 2021

0.500

RENCANA 1.000
0.500
BRONJONG
0.5x0.5x1.00 M 2.000

RENCANA BETON
PEMELIHARAAN RUTIN BOX BANDANG
BENTANG 9.50 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.26.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 TIPIKAL PENANGANAN OPRIT
PT. RANCANGTAMA BANGUNMANDIRI 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA BOX CULVERT
TAHUN ANGGARAN 2021

\\zyan-pc\WORD JEMBATAN KALTENG\JEMBATAN PROV. KALTENG\62. BOX BANDANG\ARAH HULU\TimePhoto_20210414_085419.jpg \\zyan-pc\WORD JEMBATAN KALTENG\JEMBATAN PROV. KALTENG\62. BOX BANDANG\ARAH PULANG\TimePhoto_20210414_085110.jpg

\\zyan-pc\WORD JEMBATAN KALTENG\JEMBATAN PROV. KALTENG\62. BOX BANDANG\ARAH HILIR\TimePhoto_20210414_085351.jpg


\\zyan-pc\WORD JEMBATAN KALTENG\JEMBATAN PROV. KALTENG\62. BOX BANDANG\ARAH PERGI\TimePhoto_20210414_085236.jpg
PEMELIHARAAN RUTIN JEMBATAN SEI KUJANG
BENTANG 20.00 M
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.27.1
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PENANGANAN JEMBATAN 1 : 150
PROVINSI KALIMANTAN TENGAH INDRACITRA
TAHUN ANGGARAN 2021

PERGANTIAN SIAR MUAI PERGANTIAN SIAR MUAI

LEBAR JALAN
ARAH KUJAN ARAH RUNTU

JEMBATAN
7000
TIDAK ADA PAPAN NAMA JEMBATAN

ARAH KUJAN ARAH RUNTU

5100
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.27.2
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1 PT. RANCANGTAMA BANGUNMANDIRI
PROVINSI KALIMANTAN TENGAH 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021
PAKET PEKERJAAN:
PT. WIRA WIDYATAMA I.27.3
PRESERVASI JALAN KUJAN - RUNTU - SP. RUNTU KSO
RUAS JALAN NASIONAL SATKER PJN-1
PROVINSI KALIMANTAN TENGAH
PT. RANCANGTAMA BANGUNMANDIRI
DETAIL SIAR MUAI 1 : 60
INDRACITRA
TAHUN ANGGARAN 2021

LEBAR

PLAT LANTAI JEMBATAN


IV. GAMBAR STANDART
-

KUJAN - RUNTU - SP. RUNTU

TANDA-TANDA LALU LINTAS


PENGATUR PENGARAH DAN TAMBAHAN

REMARKS :

TYPE W 1a TIKUNGAN KE KIRI


TYPE W 1b TIKUNGAN KE KANAN
TYPE W 1c TIKUNGAN TAJAM KE KIRI
TYPE W 1d TIKUNGAN TAJAM KE KANAN
TYPE W 1e TIKUNGAN GANDA, TIKUNGAN PERTAMA KE KIRI
TYPE W 1f TIKUNGAN GANDA, TIKUNGAN PERTAMA KE KANAN
W 1a W 1b W 1c W 1d W 1e W 1f W 1g W 1h
TYPE W 1g BANYAK TIKUNGAN, TIKUNGAN PERTAMA KE KIRI
TYPE W 1h BANYAK TIKUNGAN, TIKUNGAN PERTAMA KE KANAN
TYPE W 1i PENGARAH TIKUNGAN KE KANAN
TYPE W 1j PENGARAH TIKUNGAN KE KIRI
TYPE W 2a TURUNAN
TYPE W 2b TURUNAN CURAM
TYPE W 2c TANJAKAN
W 1i W 1j W 2a W 2b W 2c W 2d W 3a W 3b TYPE W 2d TANJAKAN TERJAL
TYPE W 3a PENYEMPITAN DI KIRI DAN KANAN JALAN
TYPE W 3b PENYEMPITAN DI KIRI JALAN
TYPE W 3c PENYEMPITAN DI KANAN JALAN
TYPE W 3d JEMBATAN ATAU PENYEMPITAN DI JEMBATAN
TYPE W 3e PENGURANGAN LAJUR KIRI
TYPE W 3f PENGURANGAN LAJUR KANAN
W 3c W 3d W 3e W 3f W 4 W 5 W 6a W 6b TYPE W 4 JEMBATAN ANGKAT
TYPE W 5 TEPI AIR
TYPE W 6a JALAN TIDAK RATA
TYPE W 6b JALAN CEMBUNG ATAU JEMBATAN CEMBUNG
TYPE W 6c JALAN CEKUNG
TYPE W 7 JALAN LICIN
TYPE W 8 KERIKIL LEPAS
W 6c W 7 W 8 W 9a W 9b W 10 W 11 W 12 TYPE W 9a LONGSORAN TANAH ATAU BATU DARI KIRI
TYPE W 9b LONGSORAN TANAH ATAU BATU DARI KANAN
TYPE W 10 PENYEBERANGAN ORANG
TYPE W 11 BANYAK ANAK-ANAK
TYPE W 12 BANYAK ORANG BERSEPEDA DAN SERING MENYEBERANG JALAN
TYPE W 13a BANYAK SATWA JINAK DAN SERING MENYEBERANG JALAN
TYPE W 13b BANYAK SATWA LIAR DAN SERING MENYEBERANG JALAN
W 13a W 13b W 14 W 15 W 16 W 17 W 18a W 18b TYPE W 14 ADA PEKERJAAN DI JALAN
TYPE W 15 LAMPU PENGATUR LALU LINTAS
TYPE W 16 LINTASAN PESAWAT TERBANG
TYPE W 17 ANGIN DARI SAMPING
TYPE W 18a LALU LINTAS DUA ARAH
TYPE W 18b AWAL BANGUNAN PEMISAH UNTUK LALU LINTAS DUA ARAH
TYPE W 18c AKHIR BANGUNAN PEMISAH UNTUK LALU LINTAS DUA ARAH
W 18c W 18d W 19a W 19b W 19c W 19d W 19e W 19f TYPE W 18d AWAL BANGUNAN PEMISAH UNTUK LALU LINTAS SATU ARAH
TYPE W 19a PERSIMPANGAN EMPAT
TYPE W 19b PERSIMPANGAN TIGA SISI KIRI
TYPE W 19c PERSIMPANGAN TIGA SISI KANAN
TYPE W 19d PERSIMPANGAN TIGA SERONG KIRI
TYPE W 19e PERSIMPANGAN TIGA SERONG KIRI
TYPE W 19f PERSIMPANGAN TIGA SERONG KANAN
W 19g W 19h W 19i W 19j W 19k W 19l W 19m W 20a TYPE W 19g PERSIMPANGAN TIGA SERONG KANAN
TYPE W 19h PERSIMPANGAN TIGA TIPE T
TYPE W 19i PERSIMPANGAN TIGA TIPE Y
TYPE W 19j PERSIMPANGAN TIGA GANDA KIRI KANAN
TYPE W 19k PERSIMPANGAN TIGA GANDA KANAN KIRI
TYPE W 19l PERSIMPANGAN TIGA GANDA KIRI
TYPE W 19m PERSIMPANGAN TIGA GANDA KANAN
W 20b W 20c W 20d W 20e W 20f W 21a W 21b W 22a TYPE W 20a PERSIMPANGAN EMPAT DENGAN PRIORITAS
TYPE W 20b PERSIMPANGAN TIGA SISI KIRI DENGAN PRIORITAS
TYPE W 20c PERSIMPANGAN TIGA SISI KANAN DENGAN PRIORITAS
TYPE W 20d PERSIMPANGAN TIGA SERONG KIRI DENGAN PRIORITAS
TYPE W 20e PERSIMPANGAN TIGA SERONG KANAN DENGAN PRIORITAS
TYPE W 20f PERSIMPANGAN BUNDARAN DENGAN PRIORITAS
TYPE W 21a TINGGI LUAS BEBAS ... M
W 22b W 23 TYPE W 21b LEBAR LUAS BEBAS .....M
TYPE W 22a PERSILANGAN DATAR DENGAN LINTASAN KERETA API BERPINTU
TYPE W 22b PERSILANGAN DATAR DENGAN KERETA API TANPA PINTU
TYPE W 23 HATI-HATI
TYPE W 24a RAMBU TAMBAHAN MENYATAKAN JARAK 450 M
TYPE W 24b RAMBU TAMBAHAN MENYATAKAN JARAK 300 M
W 24a W 24b W 24c TYPE W 24c RAMBU TAMBAHAN MENYATAKAN JARAK 150 M

SUMBER : GAMBAR STANDART BINA MARGA


-

KUJAN - RUNTU - SP. RUNTU

,
RAMBU TIPE "W""R"
1
"G3"&"G4"

2
135
25 75 25
RAMBU TIPE "G" DI LAS L'

i j
5 TAMPAK ATAS
DITUTUP DENGAN LAS R = 3.50
BATANG PIPA RAMBU RAMBU TIPE"G2"
BATANG PIPA RAMBU

e
j i

TEPI BAHU JALAN


PLAT 0.45x3.50x2500

f
TEPI BAHU JALAN
TEPI RAMBU DI LAS PADA BATANG

h
TEPI BAHU JALAN
BATANG PIPA RAMBU

TEPI RAMBU
175

175
60
60 DETAIL SUDUT PAPAN RAMBU

175
60 PLAT 0.45 x 3.50

DI LAS PADA BATANG


S 195
BATANG PIPA RAMBU
X

X
S

b
L
BATANG BAJA GALVANIS

X1
S DIAMETER DALAM 4 ATAU 5

X
20 x 20
URUGAN YANG DIPADATKAN
URUGAN YANG DIPADATKAN
5 5
50

URUGAN YANG DIPADATKAN


LIHAT GAMBAR DETAIL PONDASI
LIHAT GAMBAR DETAIL PONDASI

50

5 10
50
DI LAS PADA SETIAP SISI
LIHAT GAMBAR DETAIL PONDASI

BETON KLAS "C"

c
TYPE RAMBU DENGAN SATU PAPAN PENYANGGA

50
d
TYPE RAMBU DENGAN DUA PAPAN PENYANGGA KETINGGIAN DARI PERAMBUAN TYPE PENGGANTUNG

120

5
20 45 20 24 35 24
26 32 15 60 15 10 20 20 20 20 20 20 DETAIL DAN PANJANG TIANG
32
130 40x40

50
24
20

50
75 25 10
20

20
DETAIL PONDASI

50 50

50
50
83

35

90

50
85

45

6 10 6
30
77

22
90

50

50
27
24
20

G2
R G1
50

W R1 R DIMENSI RAMBU DAN PERLETAKAN BAUT 12 26 12


2

20
50 20
100 12 26 12
5 10 5
10 20 20 20 20 10

15

12
15
60
40

50
26
15
15

12
G3
G4
A

DIMENSI RAMBU DAN PERLETAKAN BAUT


TAMPAK BELAKANG

JUMLAH MATERIAL YANG DIPERLUKAN


UNTUK SETIAP PONDASI
CATATAN :
U R A I A N SATUAN JUMLAH W R R R G1 G2 G3 G4 A
1.UNTUK KETENTUAN UMUM LIHAT LEMBAR No.
G A L I A N M3 a 37 37 34 25 40 - 15 25

b 225+X 2.UNTUK CATATAN DAN SIMBOL LIHAT LEMBAR No.


223+X 222+X 209+X 210+X - 200+X 210+X
225+X
P E R A N C A H M2
c 20 20 20 20 20 - 20 20 3.SEMUA UKURAN DALAM CENTIMETER KECUALI KETENTUAN LAIN
DIPASANG PADA BATANG RAMBU

BETON KLAS "C" M3 d 20 20 20 20 20 - 20 20 4.TIPE RAMBU SEPERTI DITENTUKAN PADA LEMBAR INI
e 14.5 19.5 19 10 20 - 15 10
URUGAN PADAT M3 5.LOKASI RAMBU SESUAI DAFTAR ATAU PETUNJUK DIREKSI
f 22.5 175 15 15 20 - - 15

o 5 5 5 5 4 4 4 4
* COR DITEMPAT
h 22.5 175 15 15 20 - - 15
305+X 250+X
L 300+X 299+X 283+X 275+X
305+X1 127
225+X 275+X

i 22.5 17.5 13 15 20 - 13 13

j 5 5 3 5 5 - 26 5

L' 55 45 32 40 50 - 88 36
TAMPAK BELAKANG
X - BERVARIASI MENURUT TIMBUNAN ATAU LERENG GALIAN ( S )
X, = ( 60 X S ) + X
-

KUJAN - RUNTU - SP. RUNTU

0.20

0.20

0.20
DIAMETER LUAR +0.40
T

T
DIAMETER LUAR
D

D
D

T
0.20

0.20

0.20
0.30 0.30 0.30 0.30
0.60 0.60
DIAMETER LUAR +0.40

POTONGAN A

C
L GORONG-GORONG PIPA

LEBAR GALIAN JIKA D<0.60 A=0.30 JIKA D<0.60 A=0.30 LEBAR GALIAN
JIKA D>0.60 A=0.40 JIKA D>0.60 A=0.40
A DIAMETER LUAR A B DIAMETER LUAR B

LAPISAN BAWAH
0.30

0.30
B

B
0.8

0.8

0.15 DIAMETER LUAR 0.15

LAPISAN BAWAH
LAPISAN
TANAH
BAWAH
KERAS
TANAH KERAS
-

KUJAN - RUNTU - SP. RUNTU

A A

F F

K M K K M
0.30 0.30 0.30

L
0.30
S

G
L L
0.20
E

K M K K M
0.30 0.30
0.30

0.30 A
0.30
H D
G
H
E
0.20
0.30 E

B F B
C
-

KUJAN - RUNTU - SP. RUNTU

TIMBUNAN
400

A S A
TEMBOK SAYAP
150
KERB PASANGAN BATU
B1
PERMUKAAN PELAT
200 200

A
400

200

STRUKTUR TUMPUAN
T

BETON K-250 T SAMBUNGAN TEMBOK SAYAP


400

200

B2
200

1.5 : 1
B3
TEMBOK SAYAP
TUMPUAN
PASANGAN BATU 400

H IN 2 ROWS LENGTH 500mm. H

400

TEMBOK PASANGAN BATU


YANG DIPOTONG

400

400

POTONGAN C-C
100 100

400

100
S
B
A S
100

TUMIT PASANGAN
300
BATU

GORONG-GORONG PELAT BETON POTONGAN A-A

PERMUKAAN PELAT MASONRY BOTTOM SLAB

TUMPUAN PELAT

400

KERB
Pelebaran

STRUKTUR LAMA
TEMBOK SAYAP
PASANGAN BATU
BAGIAN BETON YANG
B DIBOBOK DAN TULANGAN
D

YANG TERBUKA
F
SAMBUNGAN TEMBOK SAYAP
APRON PASANGAN
APRON PASANGAN BATU
T
BATU
B
200

400

C
H

100

300

620 620

TEMBOK SAYAP PASANGAN BATU YANG


DIBONGKAR DAN PASANGAN BATU
G

DETAIL PELEBARAN
C
TUMIT PASANGAN BATU TEMBOK SAYAP PASANGAN BATU POTONGAN B-B

APRON PASANGAN BATU

TEMBOK TEPI DC-1 TO TIPE DC-7


-

KUJAN - RUNTU - SP. RUNTU


-

KUJAN - RUNTU - SP. RUNTU


-

KUJAN - RUNTU - SP. RUNTU

MEDIAN YANG DITINGGIKAN, 1 BETON K300 0.20


BAGIAN PENGELUARAN 0.20
BETON K300
ATAU TROTOAR
2

BETON K300

TIPE F/G TIPE F/G


MORTAR SEMEN (1:3)
MORTAR SEMEN (1:3)
BETON (KELAS-Bo) a% a%
BETON (KELAS-Bo)
0.50 0.50
0.05 0.25
0.05 0.25
1.00 0.30
0.30
TIDAK UNTUK DISKALA
1 2
TIPE-D POTONGAN 1-1
TIPE-A KERB SAMPING

BETON K300

BETON K-300 18 27
BETON K300 0.20 0.20
BETON K-300
BADAN JALAN JALUR LAMBAT
r = 5or4
TROTOAR
10%

21 10 60
MORTAR SEMEN (1:3)
MORTAR SEMEN (1:3)
BETON (KELAS-Bo)
BETON (KELAS-Bo)
0.05 0.25 0.05 0.25 KERB SAMPING TIPE F
0.30 0.25 0.25
0.30

TIPE-B POTONGAN 2-2


KERB GANDA TIPE A

BETON K-300 18 27
3
600
0.60
0.10 0.10 0.40 0.10
TROTOAR 0.03 0.03 r = 5or4 40

10%
BETON K-250
BIDANG PEMISAH
PASANGAN BATU PECAH
ATAU TROTOAR 21 10 60
0.20
(BATU KOSONG)
0.05 0.05
0.20

BETON K-250
0.03 KERB SAMPING TIPE G

TIPE-C PERMUKAAN JALAN


BETON K-250
BUKAAN SALURAN
MORTAR SEMEN (1:3)

BETON (KELAS-Bo)

0.25 0.08
3

TIPE-E POTONGAN 3-3


-

KUJAN - RUNTU - SP. RUNTU