Anda di halaman 1dari 93

PEMERINTAH KABUPATEN SIMALUNGUN

DINAS PEKERJAAN UMUM DAN TATA RUANG

GAMBAR RENCANA
Jasa Konsultasi Perencanaan - Paket 2

RUAS JALAN :
GIRSANG I - GIRSANG II ( 1627)

KONSULTAN PERENCANA :
PEMERINTAH KABUPATEN SIMALUNGUN
DINAS PEKERJAAN UMUM DAN TATA RUANG

LEMBAR PENGESAHAN GAMBAR RENCANA


Jasa Konsultasi Perencanaan - Paket 2
RUAS JALAN :

GIRSANG I - GIRSANG II ( 1627)


DISIAPKAN OLEH KONSULTAN PERENCANA :
CV. Rekayasa Geomatika Indonesia

Yans Prya M. Sembiring Meliala ST, MT Bagas Raja Sulaiman, ST


DIREKTUR TEAM LEADER

MENGETAHUI : DISETUJUI OLEH : DISETUJUI OLEH :

KEPALA DINAS PEKERJAAN UMUM DAN TATA RUANG


KABUPATEN SIMALUNGUN PPK PERENCANAAN, PPTK PERENCANAAN,

HOTBINSON DAMANIK, ST, MT ANTON BANJARNAHOR, ST JOHN RIANTO SINAGA, ST


NIP. 19750825 200604 1 002 NIP. 198306172009021002 NIP. 19770401 200701 1 004
DINAS PEKERJAAN UMUM DAN TATA RUANG

KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

DAFTAR ISI Lokasi Pekerjaan

GIRSANG 1 - GIRSANG 2
(1627)
BAGIAN GAMBAR NO. LEMBAR BAGIAN GAMBAR NO. LEMBAR

A UMUM J GAMBAR STANDAR


KONSULTAN PERENCANA
LEMBAR PENGESAHAN A.01 ALINEMEN HORIZONTAL J.01

DAFTAR ISI A.02 PERBAIKAN PERKERASAN ASPAL J.02

SIMBOL DAN SINGKATAN A.03 PERKERASAN BETON SEMEN J.03

LEGENDA A.04 SALURAN SAMPING J.04

PETA LOKASI PEKERJAAN A.05 PEMATAH ARUS (STORDAM) J.05

PETA LOKASI QUARRY A.06 GORONG-GORONG PLAT BETON J.06 DIGAMBAR DIRENCANAKAN

RINGKASAN VOLUME PEKERJAAN A.07 GORONG-GORONG PIPA BETON J.07 - J.07.A

B TYPICAL CROSS SECTION B.01 - B.03 GORONG-GORONG KOTAK (BOX CULVERT) J.08 - J.08.B

C SEGMENTASI PENANGANAN C.01 DINDING PENAHAN TANAH J.09

D ALINEMEN LAYOUT D.01 BRONJONG J.10 Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader
E SITUASI & POTONGAN MEMANJANG (PLAN & PROFILE) E.01 - E.06 TEMBOK KANTILEVER J.11
DIPERIKSA/ DISETUJUI OLEH
F POTONGAN MELINTANG (CROSS SECTION) F.01 - F.09 KERB J.12
PPTK PERENCANAAN,
G RENCANA PERKERASAN BETON SEMEN G.01 MARKA JALAN J.13

H RENCANA DRAINASE H.01 - H.02 REL PENGAMAN (GUARD RAIL) J.14 - J.14.A

I RENCANA STRUKTUR I.01 RAMBU LALU LINTAS J.15 - J.15.B


JOHN RIANTO SINAGA, ST
RAMBU LALU LINTAS SEMENTARA (MASA KONSTRUKSI) J.16 NIP. 19770401 200701 1 004
PPK PERENCANAAN,
PATOK KILOMETER DAN PATOK PENGARAH J.17

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG

SIMBOL DAN SINGKATAN KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

GIRSANG 1 - GIRSANG 2
(1627)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG

KABUPATEN SIMALUNGUN
LEGENDA
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

GIRSANG 1 - GIRSANG 2
(1627)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG

KABUPATEN SIMALUNGUN
KE LUBUK PAKAM
KE MEDAN

KETERANGAN
TEBING TINGGI
KE LUBUK PAKAM KE PELABUHAN
TANJUNG KASAU KUALA TANJUNG
KABUPATEN
SERDANG BEDAGAI SIMP. KERAPU Jasa Konsultansi Perencanaan Jalan - Paket 02

SILAU DUNIA BDR. TINGGI


INDRAPURA
Lokasi Pekerjaan
2501 2402
0802 SEI LANGGEI

DAMAK KITANG
GIRSANG 1 - GIRSANG 2
2401 KABUPATEN
KE MEDAN MARUBUN LOKKUNG 0803 PANDUMAN PANOMBEAN BATUBARA (1627)
JL. KARTINI
0606 NEGERI DOLOK 0801
KABUPATEN 2411
0702
SERDANG BEDAGAI PERDAGANGAN
LIMAPULUH
KABUPATEN
BAHOAN

0805
0701

SP. MAYANG KONSULTAN PERENCANA


DELI SERDANG TINGGI RAJA 0804
PEMATANG
SINASIH SP. PJ. NAGORI
SERBELAWAN BANDAR KEK SEI BEJANGKAR
PARAPAT HULUAN SP. DOLOK
2301 SEI MANGKEI
2101
SINDAR MERANGIR
2202 TITI BESI 2601
KABANJAHE RAYA LARAS
2302
2602 PASAR BARU
0118 SP. PSR. BARU 2702
2201 BOLUK
BAWANG BAH GUNUNG
2701
SUKADAME KERASAAN
2603 TINJOAN
1805 ADIL MAKMUR
SARAN PADANG
SILINDUK
KARIAHAN BDR. SIANTAR
0602 SINAKSAK 1904
0601 2103 BANDAR KE KISARAN
0603 HUTA SAING DOLOK
BAH SULUNG
2001
1902 MALELA
SP. CINGKES MARIAH DOLOK 0117 SP. SIGAGAK KR. SARI MALELA 2801
KABUPATEN 0120 2002
KARO
BOSI SINOMBAH 0612 SILOU HULUAN 0119 JL. H. ULAKMA SINAGA
1901
DLK.
1703
1801
BAH JAMBI DIGAMBAR DIRENCANAKAN
0611
SP. SIGONRANG KOTA 1701 MARLAWAN
PEMATANG SP. SERAPUH 2902 2901
SINAR BARU PAMATANG RAYA
SP. PANGALBUAN SIANTAR BT. 6 HUTA BAYU
MEREK 0411 PANOMBEIAN SP. SIONGGANG
TIGA RAJA 0113 NAGAHUTA NAGOJOR
SARIBUDOLOK SP. SIGODANG
1001
1702
2801
BTG. MARIAH TJ. MARIAH 1002
SP. BAGE MARJANJI
SP. HARANGGAOL 0114 0903 POKAN BARU
0507 SP. RAYA MRS 3006
KE SIDIKALANG 0115 SP. PANEI
BAGE HULUAN BANGUN TANI SP. RAYA
0508 0116 0116 PANEI SIMARIMBUN
TONGGING 0301
TAMBUN BAH 0902 SP. NAGOJOR 3005
TIGA TONGAH
MARISI 1308 BOLON
RUNGGU PARTUAKAN
1101
DLK. SARIBU Bagas Raja Sulaiman, ST
TIGA BALATA TANAH JAWA Yuda Rahmat Hidayat Sembiring
HARANGGAOL 1307
Team Leader
1301
SIDAMANIK Draftman
0302
SP. RAJANIHUTA 1201 TIGA URUNG
KABUPATEN PROVINSI SUMATERA UTARA
TONDUHAN
SIPINTUANGIN SAIT BUTTU TIGA DOLOK 1501
3101 BUNTU BAYU
ASAHAN
DIPERIKSA/ DISETUJUI OLEH
1302
SIMPANG SALBE GORBUS SP. KAWAT TANGGA BATU
TIGARAS 1303 SP. BUNTU
KE KISARAN PPTK PERENCANAAN,
SIMPANG TIGA TURUNAN
DANAU TOBA 1202
3105
KABUPATEN
DAIRI TAMBUN REA HUTA MULA
SP. SIPOLHA SP. PALANG 3106 SP. RONDANG
SIMANINDO
1204 1205 AEK NAULI 3107
SIPOLHA RONDANG U
TJ. DOLOK
SIMP. KEHUTANAN
JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PARAPAT PPK PERENCANAAN,
KABUPATEN 0 5 10 Km
TOBA SAMOSIR
PULAU SUMATERA
SIPANGAN BOLON
KABUPATEN
SAMOSIR
TOMOK
KE BALIGE

LEGENDA KABUPATEN ANTON BANJARNAHOR, ST


SIMALUNGUN NIP. 198306172009021002
IBUKOTA KABUPATEN
JUDUL GAMBAR SKALA
KOTA KECAMATAN
LOKASI PEKERJAAN BATAS KABUPATEN
NO. RUAS : 1627 JALAN NASIONAL
NAMA RUAS JALAN : GIRSANG I - GIRSANG II JALAN PROVINSI
PANJANG RUAS : 2.90 KM' TAHUN
JALAN KABUPATEN NO. LEMBAR UKURAN KERTAS PERENCANAAN

JALAN LAIN
PENGENAL RUAS
PROVINSI SUMATERA UTARA A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG

KABUPATEN SIMALUNGUN

KE LUBUK PAKAM
KE MEDAN KETERANGAN
06 BQ, ST

Jasa Konsultansi Perencanaan Jalan - Paket 02


KOTARIH
TEBING TINGGI
08 PS KE PELABUHAN
TANJUNG KASAU KUALA TANJUNG
KABUPATEN
KE LUBUK PAKAM AMP SERDANG BEDAGAI SIMP. KERAPU
Lokasi Pekerjaan
SILAU DUNIA 07 BP BDR. TINGGI
INDRAPURA

GIRSANG 1 - GIRSANG 2
05 BQ,SR
(1627)
SEI LANGGEI

04 BQ,SR,PS 24 BP, PS
DAMAK KITANG PANOMBEAN KABUPATEN
KE MEDAN MARUBUN LOKKUNG CMP
PANDUMAN
BATUBARA
KONSULTAN PERENCANA
NEGERI DOLOK KABUPATEN
SERDANG BEDAGAI PERDAGANGAN
22 BP LIMAPULUH
KABUPATEN SINDAR SP. MAYANG
DELI SERDANG
UJUNG MERIAH
RAYA
23 BP, PS PEMATANG
BANDAR KEK SEI BEJANGKAR
SP. PJ. NAGORI SEI MANGKEI
SP. DOLOK 21 PS
MERANGIR SERBELAWAN
KABANJAHE
10 BP TITI BESI
LARAS PASAR BARU
SP. PSR. BARU
09 BP, PS BOLUK
BAWANG
03 BQ TINJOAN
SUKADAME 20 BP, PS KERASAAN
SARAN PADANG
CMP
02 BQ
SINAKSAK
BANDAR KE KISARAN
DIGAMBAR DIRENCANAKAN
HUTA SAING DOLOK
MALELA
SP. DOKAN
SP. CINGKES SP. SIGAGAK KR. SARI MALELA
19 BP, PS 18 BP, PS
BAH SULUNG
AMP 11 PS
TAMBUSAN DLK.
AMP
KABUPATEN SP. SIGONRANG MARLAWAN
KARO PAMATANG RAYA CMP SP. SERAPUH
MEREK SP. PANGALBUAN BT. 6 HUTA BAYU
PANOMBEIAN SP. SIONGGANG
TIGA RAJA KOTA
SARIBUDOLOK PEMATANG NAGOJOR
AMP BTG. MARIAH TJ. MARIAH SP. SIGODANG
SIANTAR
SP. BAGE 17 BP, PS U
SP. RAYA MRS
KE SIDIKALANG
HULUAN
12 BP SP. PANEI
Bagas Raja Sulaiman, ST
BANGUN TANI SP. RAYA
PANEI SIMARIMBUN
16 BP, PS Yuda Rahmat Hidayat Sembiring
BAH TONGAH
SP. NAGOJOR Draftman Team Leader
TIGA
RUNGGU BOLON PARTUAKAN
01 BQ 13 BP,PS
HARANGGAOL
TIGA BALATA AMP MARUBUN JAYA
TANAH JAWA
0 5 10 Km
DIPERIKSA/ DISETUJUI OLEH
SIDAMANIK
SP. RAJANIHUTA
14 BP, PS TONDUHAN
KABUPATEN
ASAHAN
PPTK PERENCANAAN,
SIPINTUANGIN SAIT BUTTU BUNTU BAYU
TIGA DOLOK
SP. KAWAT
SIMPANG SALBE
TIGARAS
GORBUS
SP. BUNTU
KE KISARAN KETERANGAN :
SIMPANG TIGA
15 BP, PS TURUNAN BQ : BATU QUARRY, BATU KALI
KABUPATEN
DAIRI TAMBUN REA HUTA MULA
BP : BATU PADAS/ BATU BELAH
TAMBUN RAYA SP. PALANG
ST : SIRTU
SIMANINDO AEK NAULI PS : PASIR JOHN RIANTO SINAGA, ST
SIPOLHA
AMP : ASPHALT MIXING PLANT NIP. 19770401 200701 1 004
TJ. DOLOK
SIMP. KEHUTANAN CMP : CONCRETE MIXING PLANT PPK PERENCANAAN,
KABUPATEN
TOBA SAMOSIR

PARAPAT

SIPANGAN BOLON
KABUPATEN
SAMOSIR CATATAN :
TOMOK
INFORMASI INI HANYA UNTUK PANDUAN PENYEDIA JASA ANTON BANJARNAHOR, ST
PENYEDIA JASA BERTANGGUNGJAWAB ATAS KONFIRMASI KETERSEDIAAN NIP. 198306172009021002
KE BALIGE
MATERIAL SESUAI DENGAN SPESIFIKASI
JUDUL GAMBAR SKALA

NO. MATERIAL LOKASI NO. MATERIAL LOKASI NO. MATERIAL LOKASI NO. MATERIAL LOKASI
01 BATU QUARRY SIPISO-PISO KEC. PAM. SILIMAHUTA 08 PASIR BANDAR PAMAH KAB. SERDANG BEDAGAI 15 BATU PADAS, PASIR BUNTU TURUNAN KKEC. HATONDUHAN 22 BATU PADAS BOMBONGAN KEC. BANDAR
02 BATU QUARRY TALUN KONDOT KEC. PANOMBEIAN PANEI 09 PASIR SARAN PADANG KEC. DOLOK SILOU 16 BATU PADAS, PASIR PAM. TANAH JAWA KEC. TANAH JAWA 23 BATU PADAS, PASIR BAHAPAL KEC. BANDAR HULUAN
TAHUN
03 BATU QUARRY SIKORA-KORA KEC. TAPIAN DOLOK 10 BATU PADAS SAMBOSAR KEC. RAYA KAHEAN 17 BATU PADAS, PASIR SIONGGANG KEC. SIANTAR 24 BATU PADAS, PASIR BANDAR SILAU KEC. BANDAR MASILAM NO. LEMBAR UKURAN KERTAS PERENCANAAN
04 BATU QUARRY, SIRTU SIPIS-PIS KAB. SERDANG BEDAGAI 11 PASIR SIMP. SIGODANG KEC. PANEI 18 BATU PADAS, PASIR PARBUTARAN KEC. BOSAR MALIGAS 25
05 BATU QUARRY, SIRTU PAMELA KAB. SERDANG BEDAGAI 12 BATU PADAS GUNUNG MARIAH KEC. PANEI 19 BATU PADAS, PASIR BAH JAMBI KEC. JAWA MARAJA BAH JAMBI 26
06 BATU QUARRY, SIRTU KOTARIH KAB. SERDANG BEDAGAI 13 BATU PADAS, PASIR BAHLIRAN KEC. PANEI 20 BATU PADAS, PASIR TANJUNG PINGGIR KOTA P.SIANTAR 27
07 BATU PADAS SILAU DUNIA KEC. SILOU KAHEAN 14 BATU PADAS, PASIR KASINDIR KEC. JORLANG HATARAN 21 PASIR PERDAGANGAN KEC. BANDAR 28 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN
STA 0+067.86
NORTHING 294361.7327 m
STA 0+215.04
NORTHING 294485.3170 m KETERANGAN
EASTING 495414.1084 m
EASTING 495428.9407 m
DIRECTION N32° 52' 55"E
DIRECTION N4° 02' 31"W
Δ 42.6568
Δ 35.6088 PI Jasa Konsultansi Perencanaan Jalan - Paket 2
R 30.000 m

0+150
R 30.000 m 2
V 40 Km/hr
V 40 Km/hr
STA 0+150.56 Tc - m
AWAL PEKERJAAN Tc - m
STA 0+000 NORTHING 294425.9439 m Es 0.468 m
X=495433.7242
Y=294294.0386
Es
Lc
0.196
6.843
m
m
EASTING 495375.7247 m
DIRECTION N39° 39' 03"W
Lc
Ls1
10.533
12.000
m
m
Lokasi Pekerjaan
Ls1 12.000 m

4
Z=1004.587 Δ 72.5328 Ls2 12.000 m
Ls2 12.000 m

0+
10
R 30.000 m

0
θ 11.2700
θ 11.2700
V 40 Km/hr Ts1 17.858 m GIRSANG I - GIRSANG II (1627)
Ts1 15.770 m Tc - m Ts2 17.858 m
Ts2 15.770 m
Es 3.100 m LT 34.533 m
LT 30.843 m

0
20
0+
Lc 26.176 m

3
e - max - %
e - max - %
Ls1 12.000 m
Ls2 12.000 m
PI
KONSULTAN PERENCANA
θ 11.2700 3

0+050
0+000

Ts1 28.199 m

5
Ts2 28.199 m
PI
1 LT 50.176 m
e - max - %

2
1

GIRSANG-1
DIGAMBAR DIRENCANAKAN
0+250

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.0+000.00 - STA.0+225.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 0+064
PI 0+071 PI 0+134 PI 0+161 PI 0+209 PI 0+220
E1 A3 2023
DINAS PEKERJAAN UMUM
STA 0+317.45
STA 0+282.79
NORTHING 294502.5304 m
NORTHING 294518.9731 m STA 0+378.31 DAN TATA RUANG
EASTING 495511.4369 m NORTHING 294530.4332 m STA 0+445.40
EASTING 495480.8542 m
DIRECTION N75° 32' 20"E
DIRECTION N61° 44' 07"E EASTING 495571.1064 m NORTHING 294541.2452 m KABUPATEN SIMALUNGUN
Δ 21.3772 DIRECTION N67° 18' 02"E EASTING 495634.7876 m
Δ 13.8034 R 60.000 m Δ 34.0645 DIRECTION N64° 26' 22"E
R
V
45.000
40
m
Km/hr
V 40 Km/hr R 12.000 m Δ 11.3503 KETERANGAN
Tc - m V 40 Km/hr R 90.000 m
Tc - m Es 0.376 m Tc - m V 40 Km/hr
Es 0.010 m Lc 13.408 m Es 0.182 m Tc - m
Lc 1.879 m Ls1 9.000 m Lc 4.154 m Es 0.048 m Jasa Konsultansi Perencanaan Jalan - Paket 2
Ls1 9.000 m Ls2 9.000 m Ls1 3.000 m Lc 5.852 m
Ls2 9.000 m θ 4.2870 Ls2 3.000 m Ls1 12.000 m
θ 5.7054 Ts1 15.841 m θ 7.1150 Ls2 12.000 m
Ts1
Ts2
9.971
9.971
m
m
Ts2
LT
15.841
31.408
m
m
Ts1
Ts2
5.191
5.191
m
m
θ
Ts1
3.8125
14.958 m
Lokasi Pekerjaan
LT 19.879 m

0+300
e - max - % LT 10.154 m Ts2 14.958 m
e - max - %

0+350
PI e - max - % LT 29.852 m

0+450
0+250
5 e - max - %
PI
7
GIRSANG I - GIRSANG II (1627)
PI
m PI 6
PI
0+

PI
20
0

0
0+40
4 9
m 3

7
STA 0+362.88
KONSULTAN PERENCANA

8
NORTHING 294524.4540 m PI

10
6
8
m EASTING 495556.8123 m
5

Km/hr DIRECTION N83° 06' 45"E


Δ 15.8120 STA 0+407.58

9
m
R 30.000 m NORTHING 294524.6201 m
m
V 40 Km/hr EASTING 495600.0270 m
m
Tc - m DIRECTION S78° 38' 06"E
m
Es 0.022 m Δ 36.9257
m
Lc 2.304 m R 30.000 m
Ls1 6.000 m V 40 Km/hr
m
Ls2 6.000 m Tc - m
m
θ 5.7054 Es 0.759 m
m
Ts1 7.182 m Lc 13.359 m
%
Ls1 6.000 m
Ts2
LT
7.182
14.304
m
m Ls2 6.000 m
DIGAMBAR DIRENCANAKAN
e - max - % θ 5.7054
0+150.56 Ts1 13.038 m
294425.9439 m Ts2 13.038 m
495375.7247 m LT 25.359 m
N39° 39' 03"W e - max - %
72.5328

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.0+225.00 - STA.0+450.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PIPI0+282
0+284 PI 0+311 PI 0+324 PI PI
0+362
0+364 PI 0+376
PI 0+380 PI 0+401 PI 0+414 PI 0+442
PI 0+448
E2 A3 2023
STA
NORTHING DINAS PEKERJAAN UMUM
EASTING
DIRECTION DAN TATA RUANG
Δ
STA 0+662.79 R KABUPATEN SIMALUNGUN
NORTHING 294546.2418 m V
EASTING 495842.9770 m Tc
DIRECTION N58° 22' 58"E Es KETERANGAN
STA 0+445.40 Δ 46.4333 Lc
NORTHING 294541.2452 m R 12.000 m Ls1
EASTING 495634.7876 m V 40 Km/hr Ls2
DIRECTION N64° 26' 22"E Tc - m θ Jasa Konsultansi Perencanaan Jalan - Paket 2
11.3503 Es 0.490 m Ts1
90.000 m Lc 6.745 m Ts2
40 Km/hr Ls1 3.000 m LT

0+550
- m Ls2 3.000 m e - max Lokasi Pekerjaan

0+500
0.048 m θ 7.1150

0+70
PI

0
PI
5.852 m 10
11 Ts1 6.665 m PI
12.000 m Ts2 6.665 m 15

12.000 m LT 12.745 m

0
GIRSANG I - GIRSANG II (1627)

0+60
0+450

12
3.8125 e - max - %

0+
65
0
11
Ts1 14.958 m

15
STA 0+570.51 PI
Ts2 14.958 m NORTHING 294561.3559 m 13
PI PI

e - max
29.852
-
m
%
9 STA 0+521.17
NORTHING 294559.8622 m
EASTING 495757.7112 m 14
KONSULTAN PERENCANA

13
DIRECTION N88° 16' 06"E
10

EASTING 495708.3059 m

14
Δ 23.4693 PI
0+400

DIRECTION N75° 47' 23"E R 60.000 m 12


STA 0+673.90
Δ 12.4786 V 40 Km/hr STA 0+641.90
NORTHING 294543.2523 m
PI R 90.000 m Tc - m NORTHING 294534.7818 m
8
EASTING 495854.2793 m
V 40 Km/hr Es 0.334 m EASTING 495824.3615 m
DIRECTION S75° 11' 02"E
Tc - m Lc 12.628 m DIRECTION S68° 15' 45"E
Δ 38.6129
Es 0.081 m Ls1 12.000 m Δ 53.3549
9

R 3.000 m
Lc 7.624 m Ls2 12.000 m R 12.000 m
0+407.58 V 40 Km/hr
Ls1 12.000 m θ 5.7054 V 40 Km/hr
294524.6201 m Tc - m
Ls2 12.000 m Ts1 18.500 m Tc - m
495600.0270 m Es 0.045 m
θ 3.8125 Ts2 18.500 m Es 0.302 m
S78° 38' 06"E Lc 1.033 m
Ts1 15.855 m Lc 5.327 m
36.9257
30.000 m Ts2 15.855 m
LT
e - max
36.628
-
m
% Ls1 6.000 m
Ls1
Ls2
1.000
1.000
m
m
DIGAMBAR DIRENCANAKAN
LT 31.624 m Ls2 6.000 m
40 Km/hr θ 9.4389
- m e - max - % θ 13.9598
Ts1 1.560 m
Ts1 9.144 m
0.759 m Ts2 1.560 m
Ts2 9.144 m
13.359 m LT 3.033 m
LT 17.327 m
6.000 m e - max - %
e - max - %
6.000 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.0+450.00 - STA.0+675.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 0+517
PI 0+525 PI 0+564 PI 0+577 PI 0+639
PI 0+644 PI 0+659
PI 0+666
PIPI0+673
0+674
E3 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
STA 0+714.18
STA 0+847.41 KABUPATEN SIMALUNGUN
NORTHING 294460.5711 m
NORTHING 294559.5413 m EASTING 495977.8057 m
EASTING 495891.2169 m
DIRECTION N66° 12' 11"E
DIRECTION S18° 52' 53"E KETERANGAN
Δ 6.1868
Δ 56.8074 R 120.000 m
R 22.000 m V 40 Km/hr
V 40 Km/hr Tc - m Jasa Konsultansi Perencanaan Jalan - Paket 2

0+750
Tc - m Es 0.001 m
Es 0.601 m PI
Lc 0.970 m
16
Lc 10.173 m Ls1 12.000 m

0+800
Ls1
Ls2
12.000
12.000
m
m
PI
Ls2
θ
12.000
2.8618
m Lokasi Pekerjaan

16
PI
θ 15.1570 15 17
PI
Ts1 12.493 m
Ts1 18.169 m
0+70
0
STA 0+768.73 18
NORTHING 294528.6441 m Ts2 12.493 m
Ts2 18.169 m STA 0+810.79 LT 24.970 m
EASTING 495938.7752 m GIRSANG I - GIRSANG II (1627)

17
15

LT 34.173 m NORTHING 294492.0056 m PI e - max - %


DIRECTION S56° 59' 22"E

0
85
0+
e - max - % EASTING 495960.4766 m 19
Δ 26.3508
DIRECTION S30° 38' 19"E
R 60.000 m
Δ 13.6383
V
Tc
40
-
Km/hr
m
R 30.000 m KONSULTAN PERENCANA
V 40 Km/hr

18
Es 0.514 m STA 0+825.27
0+662.79 Tc - m

0+900
Lc 15.645 m NORTHING 294481.6145 m
294546.2418 m Es 0.006 m EASTING 495970.6086 m PI
Ls1 12.000 m
495842.9770 m Lc 1.166 m 21
Ls2 12.000 m DIRECTION S44° 16' 37"E PI
N58° 22' 58"E PI Ls1 6.000 m
14 θ 5.7054 Δ 25.3957 20
46.4333 Ls2 6.000 m STA 0+893.81
PI Ts1 20.084 m R 12.000 m
12.000 m θ 5.7054 Km/hr NORTHING 294415.2936 m
13 Ts2 20.084 m V 40

19
40 Km/hr 0+650

Ts1 6.603 m EASTING 495988.0048 m STA 0+935.13


LT 39.645 m Tc - m STA
- m 14
Ts2 6.603 m Es 0.057 m DIRECTION S12° 41' 40"E NORTHING 294389.4765 m NORTHING
e - max - %
0.490 m LT 13.166 m Lc 2.339 m Δ 39.3883 EASTING 496021.1478 m EASTING
6.745 m e - max - % Ls1 3.000 m R 20.000 m DIRECTION S52° 04' 58"E DIRECTION
3.000 m STA 0+673.90 Ls2 3.000 m V 40 Km/hr Δ 14.4939 Δ
3.000 m NORTHING 294543.2523 m θ 7.1150 Tc - m R 90.000 m R DIGAMBAR DIRENCANAKAN
7.1150 PI EASTING 495854.2793 m Ts1 Es 0.030 m V 40 Km/hr V
12 4.217 m
6.665 m DIRECTION S75° 11' 02"E Lc 2.181 m Tc - m Tc
Ts2 4.217 m
6.665 m Δ 38.6129 Ls1 12.000 m
0+60

LT 8.339 m Es 0.264 m Es
0

12.745 m R 3.000 m e - max Ls2 12.000 m Lc 13.776 m Lc


- %
- % V 40 Km/hr θ 16.5705 Ls1 9.000 m Ls1
Tc - m Ts1 13.437 m Ls2 9.000 m Ls2
Es 0.045 m Ts2 13.437 m θ 2.8618

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.0+675.00 - STA.0+900.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 0+708 PI 0+718 PI 0+761 PI 0+776 PIPI0+810


0+811 PI PI
0+824
0+826 PIPI0+847
0+848 PI PI
0+892
0+895
E4 A3 2023
STA 0+847.41
NORTHING 294460.5711 m
EASTING 495977.8057 m
DINAS PEKERJAAN UMUM
DIRECTION S18° 52' 53"E DAN TATA RUANG
Δ 6.1868 STA 1+073.04 STA 1+118.09
R 120.000
40
m
Km/hr
NORTHING 294296.1339 m NORTHING 294263.8384 m KABUPATEN SIMALUNGUN
V EASTING 496117.0246 m
Tc - m EASTING 496145.1245 m
Es 0.001 m
DIRECTION S41° 01' 05"E
Δ 32.1098
DIRECTION S54° 35' 42"E
Δ 27.8176
KETERANGAN
Lc 0.970 m R 12.000 m
Ls1 12.000 m R 12.000 m
V 40 Km/hr V 40 Km/hr
Ls2 12.000 m Tc - m Tc - m
θ 2.8618 Es 0.148 m Jasa Konsultansi Perencanaan Jalan - Paket 2
Ts1 12.493 m Es 0.085 m
Lc 3.745 m Lc 2.846 m
Ts2 12.493 m Ls1 3.000 m
LT 24.970 m Ls1 3.000 m
Ls2 3.000 m Ls2 3.000 m
e - max - %
Lokasi Pekerjaan

1+000
0

θ
85

7.1150
0+

θ 7.1150
Ts1 4.968 m Ts1 4.486 m
PI Ts2 4.968 m Ts2 4.486 m
23 LT 9.745 m LT 8.846 m

1+050
e - max - % e - max - % GIRSANG I - GIRSANG II (1627)
18

PI
0+825.27

21
0+950

1+100
0+900

24
294481.6145 m PI
PI
25
495970.6086 m 21 STA 1+020.63 PI
PI 27
S44° 16' 37"E PI
20
22 NORTHING 294335.7308 m
EASTING 496082.5818 m PI KONSULTAN PERENCANA

22
25.3957 STA 1+004.63
STA 0+893.81 26

0
1+15
12.000 m DIRECTION S18° 16' 50"E
NORTHING 294415.2936 m NORTHING 294351.5229 m STA 1+086.89

20

23
Δ 22.7374 PI
19

Km/hr
EASTING 495988.0048 m STA 0+935.13 STA 0+959.67 EASTING 496077.3650 m NORTHING 294282.2666 m 28
m R 12.000 m
DIRECTION S12° 41' 40"E NORTHING 294389.4765 m NORTHING 294369.9287 m DIRECTION S65° 54' 42"E EASTING 496119.1982 m
0.057 m V 40 Km/hr STA 1+152.99
Δ 39.3883 EASTING 496021.1478 m EASTING 496036.1956 m Δ 47.6312 DIRECTION S8° 54' 29"E
2.339 m Tc - m NORTHING 294232.5727 m
R 20.000 m DIRECTION S52° 04' 58"E DIRECTION S37° 35' 20"E R 12.000 m Δ 45.6869

24
3.000 m Es 0.033 m EASTING 496160.9026 m
V 40 Km/hr Δ 14.4939 Δ 28.3229 V 40 Km/hr R 12.000 m
3.000 m Lc 1.782 m DIRECTION S26° 46' 39"E
Tc - m R 90.000 m R 12.000 m Tc - m V 40 Km/hr
7.1150 Ls1 3.000 m Δ 14.6478
Es 0.030 m V 40 Km/hr V 40 Km/hr Es 0.528 m Tc - m
4.217 m Ls2 3.000 m R 45.000 m
Lc 2.181 m Tc - m Tc - m Lc 6.996 m Es 0.146 m
4.217 m θ 7.1150 V 40 Km/hr
Ls1 12.000 m Es 0.264 m Es 0.091 m Ls1 3.000 m Lc 3.721 m
8.339 m Ts1 3.926 m Tc - m
Ls2 12.000 m Lc 13.776 m Lc 2.952 m Ls2 3.000 m Ls1 6.000 m
% Ts2 3.926 m Es 0.007 m
θ 16.5705 Ls1 9.000 m Ls1
Ls2
3.000
3.000
m
m
θ
Ts1
7.1150
6.814 m
LT 7.782 m Ls2 6.000 m
Lc 1.594 m
DIGAMBAR DIRENCANAKAN
Ts1 13.437 m Ls2 9.000 m e - max - % θ 13.9598
Ts2 13.437 m θ 2.8618 θ 7.1150 Ts2 6.814 m Ts1 8.163 m Ls1 15.000 m
LT 26.181 m Ts1 15.952 m Ts1 4.542 m LT 12.996 m Ts2 8.163 m Ls2 5.000 m
e - max - % Ts2 15.952 m Ts2 4.542 m e - max - % LT 15.721 m θ 9.4389
LT 31.776 m LT 8.952 m e - max - % Ts1 12.920 m
e - max - % e - max - % Ts2 12.920 m
LT 21.594 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.0+900.00 - STA.1+125.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 0+928 PI 0+942 PI 0+958


PI 0+961 PI 1+001
PI 1+008 PIPI1+020
1+021 PI 1+071
PI 1+075 PI 1+085
PI 1+088 PI 1+117
PI 1+119
E5 A3 2023
1+

DINAS PEKERJAAN UMUM


40
0

29 DAN TATA RUANG


KABUPATEN SIMALUNGUN
1+118.09
294263.8384 m
KETERANGAN
496145.1245 m
DIRECTION S54° 35' 42"E
27.8176 Jasa Konsultansi Perencanaan Jalan - Paket 2
12.000 m

1+150
40 Km/hr 1+
35
0

- m

0
PI

1+20
PI
0.085
2.846
m
m
28 29
28
Lokasi Pekerjaan
3.000 m

24
PI
3.000 m 27
1+
10
0

7.1150
STA 1+152.99

25
4.486 m GIRSANG I - GIRSANG II (1627)
NORTHING 294232.5727 m STA 1+193.63
4.486 m NORTHING 294192.7556 m

0
1+25
EASTING 496160.9026 m
8.846 m
23

DIRECTION S26° 46' 39"E EASTING 496169.4602 m


- % DIRECTION S12° 07' 47"E
PI PI
Δ
R
14.6478
45.000 m Δ 25.0122 KONSULTAN PERENCANA
R 30.000 m

1+300
25 26 V 40 Km/hr STA 1+311.16
V 40 Km/hr

26
Tc - m NORTHING 294077.9405 m
Es 0.007 m Tc - m EASTING 496143.2010 m
Lc 1.594 m Es 0.007 m DIRECTION S12° 52' 57"W
Ls1 15.000 m Lc 1.294 m Δ 82.3001
22

STA 1+086.89 Ls2 5.000 m Ls1 12.000 m PI R 30.000 m

27
NORTHING 294282.2666 m θ 9.4389 Ls2 12.000 m 30
Km/hr
V 40
EASTING 496119.1982 m Ts1 12.920 m θ 11.2700 Tc - m
DIRECTION S8° 54' 29"E Ts2 12.920 m Ts1 12.777 m Es 6.824 m
Δ 45.6869 LT 21.594 m Ts2 12.777 m Lc 37.117 m
R 12.000 m e - max - % LT 25.294 m Ls1 6.000 m
V 40 Km/hr e - max - % Ls2 6.000 m
Tc - m
θ 5.7054
DIGAMBAR DIRENCANAKAN
Es 0.146 m
Ts1 29.255 m
Lc 3.721 m
Ts2 29.255 m
Ls1 6.000 m
LT 49.117 m
Ls2 6.000 m
e - max - %
θ 13.9598
Ts1 8.163 m
Ts2 8.163 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.1+125.00 - STA.1+350.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN
PIPI1+155
1+157 PIPI1+193
1+194 PI 1+288 PI 1+325
E6 A3 2023
PI
DINAS PEKERJAAN UMUM
STA 1+454.12
NORTHING 294024.3800 m
31
STA 1+483.82
NORTHING 293975.2219 m
DAN TATA RUANG
EASTING 496285.8292 m EASTING 496231.4925 m
KABUPATEN SIMALUNGUN

1+450
DIRECTION S69° 25' 03"E DIRECTION S47° 51' 52"W
Δ 117.2822 Δ 44.0603
R
V
35.000
40
m
Km/hr
R
V
6.000
40
m
Km/hr
KETERANGAN
Tc - m Tc - m
PI
Es 18.284 m Es 0.060 m

30
32
Lc 59.790 m Lc 1.690 m
Ls1 12.000 m Jasa Konsultansi Perencanaan Jalan - Paket 2
Ls1 3.000 m
Ls2 12.000 m Ls2 3.000 m
θ 9.7022 θ 13.9598
Ts1 63.678 m Ts1 3.981 m
Ts2 63.678 m 1+400
29
Ts2
1+
500
3.981 m Lokasi Pekerjaan
LT 83.790 m LT 7.690 m
e - max - % e - max - %
31

GIRSANG I - GIRSANG II (1627)

STA 1+558.61
KONSULTAN PERENCANA
NORTHING 293977.7430 m
EASTING 496156.4787 m
DIRECTION N88° 04' 31"W STA 1+727.73
Δ 28.3907 NORTHING 293885.4752
R 30.000 m EASTING 496062.5136
V 40 Km/hr 1+
550
DIRECTION S12° 50' 40"E
Tc - m PI Δ 6.8932
R 45.000
28

Es 0.039 m 33
1+350

Lc 3.063 m
32
V 40
Ls1 12.000 m Tc -
Ls2 12.000 m
35 Es 0.016
Lc 2.415
θ
Ts1
11.2700
13.715 m
STA 1+673.99
Ls1 3.000
DIGAMBAR DIRENCANAKAN
NORTHING 293961.5039 m
Ts2 13.715 m EASTING 496045.1783 m Ls2 3.000
LT 27.063 m DIRECTION N86° 48' 07"W θ 1.9090
e - max - % PI Ts1 4.211

0
Δ 106.0424

60
1+
34
R 30.000 m Ts2 4.211
V 40 Km/hr LT 8.415
STA 1+311.16 Tc - m e - max -
STA 1+603.55

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.1+350.00 - STA.1+575.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 1+402 PI 1+462 PIPI1+483


1+485 PI 1+557
PI 1+560
E7 A3 2023
EASTING 496156.4787 m
STA 1+864.45
DIRECTION N88° 04' 31"W
Δ 28.3907 NORTHING 293755.6274 DINAS PEKERJAAN UMUM

38
EASTING 496102.5292
R
V
30.000
40
m
Km/hr DIRECTION S14° 39' 42"E DAN TATA RUANG
Tc - m Δ 17.8488
Es 0.039 m 1+550
STA 1+727.73
R 45.000 KABUPATEN SIMALUNGUN
Lc 3.063 m PI V

1+
NORTHING 293885.4752 m

80
33 Tc

0
Ls1
Ls2
12.000
12.000
m
32

m
EASTING 496062.5136 m
DIRECTION S12° 50' 40"E
Es 0.012 KETERANGAN
θ 11.2700 Lc 2.108
Δ 6.8932 Ls1 12.000
Ts1 13.715 m
R 45.000 m PI
Ls2 12.000

37
Ts2 13.715 m
LT 27.063 m
35 V 40 Km/hr
38
θ 7.5825 Jasa Konsultansi Perencanaan Jalan - Paket 2
Tc - m Ts1 13.122
e - max - % STA 1+673.99 Es 0.016 m Ts2 13.122
NORTHING 293961.5039 m Lc 2.415 m LT 26.108
294077.9405 m EASTING 496045.1783 m
496143.2010 m PI
34
1+
60
0 DIRECTION N86° 48' 07"W
Ls1
Ls2
3.000
3.000
m
m
e - max Lokasi Pekerjaan
S12° 52' 57"W Δ 106.0424 θ 1.9090
STA 1+603.55

1+
R 30.000 m

75
0
Ts1 4.211 m STA 1+796.48
m NORTHING 293957.5513 m V 40 Km/hr Ts2 4.211 m NORTHING 293821.4112 m
Km/hr EASTING 496115.9198 m 33

Tc - m GIRSANG I - GIRSANG II (1627)


LT 8.415 m EASTING 496085.3182 m
m DIRECTION S63° 32' 03"W Es 14.251 m e - max - % PI DIRECTION S25° 26' 08"E
Δ 29.6639 Lc 49.549 m

36
m 37
Δ 10.7740
m R 30.000 m Ls1 6.000 m
R 45.000 m
m
m
V
Tc
40
-
Km/hr
m
Ls2
θ
6.000
5.7054
m
PI
36
V 40 Km/hr KONSULTAN PERENCANA
Es 0.058 m Tc - m
Ts1 42.893 m

1+
Es 0.017 m

70
0
m Lc 3.730 m Ts2 42.893 m STA 1+748.47
Ls1 12.000 m NORTHING 293864.8371 m Lc 2.473 m
m LT 61.549 m
Ls2 12.000 m EASTING 496064.6649 m Ls1 6.000 m
m e - max - %
θ 11.2700 DIRECTION S5° 57' 04"E Ls2 6.000 m
%
Ts1 14.072 m Δ 19.4844 θ 3.8125

35
0
65
1+
Ts2 14.072 m R 20.000 m Ts1 7.251 m
LT 27.730 m V 40 Km/hr Ts2 7.251 m
e - max - % Tc - m LT 14.473 m
Es 0.005 m e - max - %

34
Lc 0.858 m
Ls1 6.000 m
Ls2 6.000 m DIGAMBAR DIRENCANAKAN
θ 8.5136
Ts1 6.469 m
Ts2 6.469 m
LT 12.858 m
e - max - %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.1+575.00 - STA.1+800.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 1+601
PI 1+605 PI 1+637 PI 1+687 PI PI 1+729
1+727 PIPI1+748
1+749 PI PI
1+795
1+798
E8 A3 2023
DINAS PEKERJAAN UMUM
STA 2+008.59 DAN TATA RUANG
NORTHING 293612.6386 m
EASTING 496115.8502 m KABUPATEN SIMALUNGUN
DIRECTION S9° 23' 10"E
Δ 28.8151
1+727.73
293885.4752 m
R 60.000 m KETERANGAN
V 40 Km/hr
496062.5136 m Tc - m
S12° 50' 40"E Es 0.489 m
Lc 15.273 m Jasa Konsultansi Perencanaan Jalan - Paket 2
m Ls1 15.000 m
Km/hr Ls2 15.000 m
m θ 7.1150
m
m
Ts1
Ts2
22.985
22.985
m
m
Lokasi Pekerjaan
m LT 45.273 m

1+850
m e - max - %

2+000
1+950
PI

1+900
GIRSANG I - GIRSANG II (1627)
1+800

m 39 PI
41
m
STA 1+864.45
m PI
PI NORTHING 293755.6274 m 40

38
% 38 EASTING 496102.5292 m
KONSULTAN PERENCANA

41
STA 1+911.06

40
DIRECTION S14° 39' 42"E
1+750

39
NORTHING 293708.9495 m
37

050
Δ 17.8488

2+
EASTING 496099.9300 m
R 45.000 m
DIRECTION S3° 11' 14"W
V 40 Km/hr
Δ 12.5732
STA 1+796.48 Tc - m
R 90.000 m
NORTHING 293821.4112 m Es 0.012 m
V 40 Km/hr
36

42
EASTING 496085.3182 m Lc 2.108 m
1+748.47 Tc - m
DIRECTION S25° 26' 08"E Ls1 12.000 m
293864.8371 m Es 0.084 m
Δ 10.7740 Ls2 12.000 m
496064.6649 m Lc 7.773 m
R 45.000 m θ 7.5825
S5° 57' 04"E Ls1 12.000 m
V 40 Km/hr Ts1 13.122 m
19.4844 Ls2 12.000 m
Tc - m Ts2 13.122 m
20.000 m LT 26.108 m
θ 3.8125
Km/hr Es
Lc
0.017
2.473
m
m e - max - %
Ts1 15.930 m DIGAMBAR DIRENCANAKAN
m Ts2 15.930 m
Ls1 6.000 m LT 31.773 m
0.005 m
Ls2 6.000 m e - max - %
0.858 m
6.000 m θ 3.8125
Ts1 7.251 m
6.000 m
Ts2 7.251 m
8.5136
LT 14.473 m
6.469 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.1+800.00 - STA.2+025.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PIPI
1+863
1+865 PI 1+907
PI 1+915 PI 2+001 PI 2+016
E9 A3 2023
NORTHING 293612.6386 m
EASTING 496115.8502 m
DIRECTION S9° 23' 10"E DINAS PEKERJAAN UMUM
Δ
R
28.8151
60.000 m DAN TATA RUANG
V 40 Km/hr
Tc - m KABUPATEN SIMALUNGUN
Es 0.489 m
Lc
Ls1
15.273
15.000
m
m
STA
NORTHING
KETERANGAN
Ls2 15.000 m EASTING
θ 7.1150 DIRECTION
Ts1 22.985 m Δ
Ts2 22.985 m R Jasa Konsultansi Perencanaan Jalan - Paket 2
LT 45.273 m V
2+000

e - max - % Tc
Es

2+250
PI
41
PI
Lc Lokasi Pekerjaan

2+200
45 Ls1

2+150
PI
Ls2
θ
41

44

0
2+05
PI Ts1 GIRSANG I - GIRSANG II (1627)

46
43 Ts2
LT

45
STA 2+151.63

2+100
STA 2+232.52 e - max

44
NORTHING 293476.3901 m
42

EASTING 496108.5297 m
DIRECTION S19° 56' 40"E
NORTHING 293395.9877 m
EASTING 496117.9958 m KONSULTAN PERENCANA
PI DIRECTION S6° 42' 53"E STA 2+310.87
42 STA 2+092.01 Δ 13.2298 Δ 6.6390 NORTHING 293328.7745
NORTHING 293533.3182 m R 60.000 m

43
R 60.000 m EASTING 496091.7898
EASTING 496087.8720 m V 40 Km/hr Km/hr
V 40 DIRECTION S42° 22' 42"W
DIRECTION S19° 25' 44"W Tc - m Tc - m
Es Δ 14.7355
Δ 39.3734 0.008 m Es 0.002 m
47

R 60.000
R 30.000 m Lc 1.905 m Lc 0.959 m V 40
V 40 Km/hr Ls1 12.000 m Ls1 6.000 m Tc -
Tc - m Ls2 12.000 m Ls2 6.000 m Es 0.323
Es 0.327 m θ 5.7054
θ 2.8618 Lc 12.432
Lc 8.814 m Ts1 12.989 m Ts1 6.484 m Ls1 3.000
Ls1 12.000 m Ts2 12.989 m Ts2 6.484 m Ls2 3.000
Ls2 12.000 m LT 25.905 m LT 12.959 m θ 1.4320 DIGAMBAR DIRENCANAKAN
θ 11.2700 e - max - % e - max - % Ts1 9.259
Ts1 16.874 m Ts2 9.259
Ts2 16.874 m LT 18.432
LT 32.814 m e - max -
e - max - %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.2+025.00 - STA.2+250.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 2+087PI 2+096 PIPI2+151


2+153 PIPI2+232
2+233
E 10 A3 2023
DINAS PEKERJAAN UMUM
STA 2+263.90
NORTHING 293365.4422 m DAN TATA RUANG
EASTING 496125.2467 m
DIRECTION S13° 21' 14"E STA 2+390.61 KABUPATEN SIMALUNGUN
Δ 55.7322 NORTHING 293275.0320 m
STA 2+349.02 PI
R
V
30.000
40
m
Km/hr NORTHING 293308.0141 m
EASTING 496034.0352 m
DIRECTION S37° 52' 07"W
51
KETERANGAN
EASTING 496059.6820 m

2+
50
STA

0
Tc - m Δ 64.2111
Es 1.304 m DIRECTION S57° 06' 50"W NORTHING
R 20.000 m
Lc 17.379 m Δ 19.2454 EASTING
V 40 Km/hr
Ls1 12.000 m R 60.000 m DIRECTION Jasa Konsultansi Perencanaan Jalan - Paket 2
Tc - m

2+
Km/hr

25
V 40

0
Δ

51
Ls2 12.000 m

2+450
PI
Es 1.824 m
45
θ 11.2700 Tc - m R
Lc 16.470 m
Ts1 22.024 m Es 0.618 m V
Ls1 6.000 m
Ts2 22.024 m Lc 17.155 m
Ls2 6.000 m
PI
49
PI Tc Lokasi Pekerjaan

0
2+30
50
LT 41.379 m Ls1 3.000 m STA 2+482.39 Es

46
θ 8.5136
e - max - % Ls2 3.000 m NORTHING 293188.3454 m Lc
Ts1 15.604 m

50
PI PI θ 1.4320 EASTING 496044.8043 m Ls1
46 Ts2 15.604 m
44 Ts1 11.674 m DIRECTION S23° 03' 22"W Ls2
STA 2+310.87 Ts2 11.674 m
LT 28.470 m STA 2+445.63 GIRSANG I - GIRSANG II (1627)
Δ 39.4699 θ
2+

e - max - %
200

NORTHING 293328.7745 m NORTHING 293223.2659 m

47
LT 23.155 m R 30.000 m Ts1
EASTING 496091.7898 m EASTING 496059.6675 m
e - max - % V 40 Km/hr Ts2
DIRECTION S42° 22' 42"W 2+
40
0 DIRECTION S26° 20' 33"E
Tc - m LT
Δ 14.7355 Δ 49.3987
Es 0.922 m e - max KONSULTAN PERENCANA

0
R 20.000 m

2+35
STA 2+232.52 R 60.000 m
45

PI
V 40 Km/hr Lc 14.692 m
NORTHING 293395.9877 m V 40 Km/hr 47
Tc - m Ls1 6.000 m

49
EASTING 496117.9958 m Tc - m
Es 0.825 m Ls2 6.000 m
DIRECTION S6° 42' 53"E Es 0.323 m
Lc 12.432 m Lc 11.300 m θ 5.7054
Δ 6.6390 PI Ts1 13.785 m

48
R 60.000 m Ls1 3.000 m 48 Ls1 6.000 m
Ls2 6.000 m Ts2 13.785 m
V 40 Km/hr Ls2 3.000 m
LT 26.692 m
Tc - m θ 1.4320 θ 8.5136
Ts1 12.247 m e - max - %
Es 0.002 m Ts1 9.259 m
Lc 0.959 m Ts2 9.259 m Ts2 12.247 m
Ls1 6.000 m LT 18.432 m LT 23.300 m
Ls2 6.000 m e - max - % e - max - %
θ
Ts1
2.8618
6.484 m
DIGAMBAR DIRENCANAKAN
Ts2 6.484 m
Km/hr LT 12.959 m
e - max - %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.2+250.00 - STA.2+475.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 2+254 PI 2+271 PI 2+305 PI 2+317 PI 2+340 PI 2+358 PI 2+381 PI 2+397 PI 2+439 PI 2+451 PI 2+475
E 11 A3 2023
DINAS PEKERJAAN UMUM
STA 2+677.25
DAN TATA RUANG
NORTHING 292994.6102 m
EASTING 496053.7233 m
KABUPATEN SIMALUNGUN
DIRECTION S1° 24' 39"E

293275.0320 m
Δ
R
66.8809
45.000 m
KETERANGAN
496034.0352 m V 40 Km/hr
S37° 52' 07"W Tc - m
Es 5.007 m Jasa Konsultansi Perencanaan Jalan - Paket 2
m Lc 40.617 m
Km/hr Ls1 12.000 m
m Ls2 12.000 m
m
Lokasi Pekerjaan

2+650
θ 7.5825
m PI Ts1 35.814 m
m

2+550
54

2+600
Ts2 35.814 m
m LT 64.617 m
PI
52 PI e - max - %
m PI 53 GIRSANG I - GIRSANG II (1627)

2+50

54
0
2+450

m 51
STA 2+577.15 STA 2+599.92
m PI
STA 2+525.45 NORTHING 293094.3443 m

52

53
%
49 NORTHING 293071.9662 m
NORTHING 293146.2046 m EASTING 496056.1352 m
EASTING 496057.2179 m DIRECTION S1° 11' 46"W
EASTING 496051.8182 m
DIRECTION S10° 55' 08"W KONSULTAN PERENCANA
DIRECTION S16° 24' 49"E
51
PI Δ 9.7229 Δ 12.3297
50

STA 2+445.63 50
STA 2+482.39 Δ 17.6098 R 60.000 m R 60.000 m
2+
70
0

NORTHING 293223.2659 m NORTHING 293188.3454 m R 60.000 m V 40 Km/hr V 40 Km/hr


EASTING 496059.6675 m EASTING 496044.8043 m V 40 Km/hr Tc - m Tc - m
DIRECTION S26° 20' 33"E Tc - m Es 0.037 m
55
STA 2+730.48
DIRECTION S23° 03' 22"W Es 0.100 m
Δ 49.3987 Es 0.088 m Lc 4.188 m NORTHING 292969.5985 m
Δ 39.4699 Lc 6.918 m
R 20.000 m Lc 6.491 m Ls1 6.000 m EASTING 495998.9161 m
R 30.000 m Ls1 6.000 m
V 40 Km/hr Ls1 12.000 m Ls2 6.000 m DIRECTION S65° 28' 12"W
V 40 Km/hr Ls2 6.000 m
Tc - m Ls2 12.000 m θ 2.8618 Δ 44.5320
Tc - m θ 2.8618 PI

2+750
Es 0.825 m θ 5.7054 Ts1 8.107 m R 5512.000 m
Es 0.922 m Ts1 9.485 m
Lc 11.300 m Ts1 15.327 m Ts2 8.107 m V 40 Km/hr
Lc 14.692 m Ts2 9.485 m PI
Ls1 6.000 m Ts2 15.327 m LT 16.188 m Tc - m 56
Ls1 6.000 m LT 18.918 m
Ls2 6.000 m Ls2 6.000 m LT 30.491 m e - max - % e - max - %
Es 0.127 m DIGAMBAR DIRENCANAKAN
θ 8.5136 e - max - % Lc 3.479 m
θ 5.7054
Ts1 12.247 m Ls1 6.000 m

56
Ts1 13.785 m
Ts2 12.247 m Ls2 6.000 m
Ts2 13.785 m
LT 23.300 m θ 13.9598
LT 26.692 m
e - max - % Ts1 8.020 m
e - max - %
Ts2 8.020 m
LT 15.479 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.2+475.00 - STA.2+700.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 2+489 PI 2+522
PI 2+529 PI 2+575
PI 2+579 PI 2+596
PI 2+603 PI 2+653 PI 2+694
E 12 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
STA 2+677.25
KABUPATEN SIMALUNGUN
NORTHING 292994.6102 m
EASTING 496053.7233 m
DIRECTION S1° 24' 39"E
STA 2+754.12
NORTHING 292946.9944 m
KETERANGAN
Δ 66.8809 EASTING 495990.2672 m
R 45.000 m DIRECTION S20° 56' 17"W
V 40 Km/hr Δ 33.3230
Jasa Konsultansi Perencanaan Jalan - Paket 2
Tc - m R 12.000 m PI

2+
80
V 40 Km/hr

0
Es 5.007 m 57

Lc 40.617 m Tc - m ALHIR PEKERJAAN


Es 0.013 m
Ls1
Ls2
12.000
12.000
m
m Lc 1.132 m
STA 2+859
X=495963.4204
Y=292872.4434
Lokasi Pekerjaan
θ 7.5825 Ls1 6.000 m

57
PI
54 Ls2 6.000 m Z=1040.092
Ts1 35.814 m
θ 13.9598
2+

Ts2 35.814 m
65
0

LT 64.617 m Ts1 6.688 m GIRSANG I - GIRSANG II (1627)

0
85
Ts2 6.688 m

2+
e - max - %
LT 13.132 m

0
70
2+

9
85
2+
e - max - %
GI KONSULTAN PERENCANA
54

2+750
STA 2+813.81 RS
AN

58
NORTHING 292888.4544 m
STA 2+730.48 PI EASTING 496003.1219 m
G-
55

59
56
NORTHING 292969.5985
PI m DIRECTION S12° 23' 06"E
2
2+
600

EASTING 495998.9161
55 m Δ 80.4215

56
DIRECTION S65° 28' 12"W R 22.000 m
Δ 44.5320 V 40 Km/hr
R 12.000 m Tc - m
V 40 Km/hr Es 2.285 m
53

STA 2+599.92 Tc - m Lc 19.240 m


NORTHING 293071.9662 m Es 0.127 m Ls1 12.000 m
EASTING 496051.8182 m Lc 3.479 m Ls2 12.000 m
DIRECTION S10° 55' 08"W Ls1 6.000 m θ 15.1570
Δ 12.3297 Ls2 6.000 m Ts1 24.930 m DIGAMBAR DIRENCANAKAN
R 60.000 m θ 13.9598 Ts2 24.930 m
V 40 Km/hr Ts1 8.020 m LT 43.240 m
Tc - m Ts2 8.020 m e - max - %
Es 0.100 m LT 15.479 m
Lc 6.918 m e - max - %
Ls1 6.000 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Plan dan Profil


STA.2+700.00 - STA.2+859.38 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

PI 2+728
PI 2+732 PIPI2+753
2+755 PI 2+801 PI 2+820
E 13 A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+000
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

-5.00% -3.00% -3.00% -3.77%


Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+050
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-3.00% 2.29% 2.29%


-5.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (1) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F1
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+100
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
-0.88% -0.33% 0.33% -0.12% (1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+150
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (2) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F2
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+200
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
4.00% 4.00% -4.00% -5.00%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+250
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-0.39% 0.10% -0.10% -0.61%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (3) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F3
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+300
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
0.45% 0.85% -0.85% -1.45%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+350
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-2.21% -1.52% 1.52% 1.21%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (4) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F4
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+400
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

3.78% 3.76%
-4.76% -3.78%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+450
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00% JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (5) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F5
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+500
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
4.00% 4.00% -4.00% -5.00%

Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+550
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (6) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F6
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+600
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
0.62% 0.99% -0.99% -1.62%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+650
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-1.46% -0.85% 0.85% 0.46%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (7) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F7
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+700
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

1.86% 2.09% -2.09% -2.86% Girsang I - Girsang II


(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+750
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (8) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F8
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+800
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

-1.60% 1.60% 1.29%


Girsang I - Girsang II
-2.29%
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+850
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

3.57% 3.62% -3.62% -4.57%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (9) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F9
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
0+900
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
-2.70% 2.70% 2.54%
-3.54%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

0+950
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-0.48% 0.02% -0.02% -0.52%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (10) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 10
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+000
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
3.81%
(1627)
3.84% -3.84% -4.81%

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+050
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

0.18% 0.60% -0.60% -1.18%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (11) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 11
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+100
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
-1.31% -0.72% 0.72% 0.31% (1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+150
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


4.00% 4.00% -4.00% -5.00% NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (12) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 12
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+200
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
3.44% 3.50% -3.50% -4.44%

Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+250
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


-1.36% -0.77% 0.77% 0.36% NIP. 19770401 200701 1 004
0.36%
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (13) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 13
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+300
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
-5.00% -4.00% 4.00% 4.00% (1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+350
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-2.10% -1.42% 1.42% 1.10%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (14) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 14
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+400
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
3.72% 3.75% -3.75% -4.72%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+450
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (15) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 15
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+500
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
2.08% 2.29% -2.29% -3.08%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+550
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

3.24% 3.14%
-4.14% -3.24%
JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (16) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 16
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+600
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
3.68% 3.72% -3.72%
(1627)
-4.68%

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+650
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00%
-5.00% -4.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (17) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 17
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+700
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

-1.32% 1.32% 0.99%


-1.99%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+750
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

3.80% 3.78%
-4.78% -3.80% JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (18) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 18
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+800
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
4.00% 4.00% -4.00% -5.00%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+850
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (19) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 19
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
1+900
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
(1627)
-2.63% 2.63% 2.46%
-3.46%

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

1+950
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-1.31% -0.72% 0.72% 0.31%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (20) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 20
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+000
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
3.94% 3.94% -3.94% -4.94%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+050
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

-0.31% 0.17% -0.17% -0.69%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (21) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 21
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+100
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
3.41% 3.33%
-4.33% -3.41%

Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+150
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

3.89% 3.91% -3.91% -4.89%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (22) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 22
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+200
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

Girsang I - Girsang II
(1627)
-1.37% -0.78% 0.78% 0.37%

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+250
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

2.33% 2.51% -2.51% -3.33%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (23) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 23
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+300
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

4.00% 4.00%
Girsang I - Girsang II
-4.00% -5.00%
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+350
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


4.00%
-5.00% -4.00% 4.00%
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (24) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 24
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+400
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
3.52% 3.46%
-4.46% -3.52%

Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+450
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00%
JOHN RIANTO SINAGA, ST
4.00% -4.00% -5.00%
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (25) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 25
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+500
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

-2.07% -1.39% 1.39% 1.07% Girsang I - Girsang II


(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+550
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00% -4.00% -5.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (26) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 26
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+600
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
4.00% 4.00%
-4.00%
-5.00%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+650
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

3.38% 3.45% -3.45% -4.38%


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (27) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 27
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+700
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan
2.44% 2.62% -2.62% -3.44%
Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+750
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

4.00% 4.00%
-5.00% -4.00%

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (28) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 28
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+800
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

3.83% 3.85% -3.85% -4.83%


Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

2+850
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

-8 -4 0 4 8 ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (29) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 29
A3 2023
DINAS PEKERJAAN UMUM
KABUPATEN SIMALUNGUN
2+859
KETERANGAN

Jasa Konsultansi Perencanaan Jalan - Paket 02

Lokasi Pekerjaan

-5.00% -3.00% -3.00% -5.00%


Girsang I - Girsang II
(1627)

KONSULTAN PERENCANA

-8 -4 0 4 8

DIGAMBAR DIRENCANAKAN

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

Cross Section
Section Sheet - (30) 1:100

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

F 30
A3 2023
STA 0+150.56 DINAS PEKERJAAN UMUM DAN TATA RUANG
NORTHING 294425.9439 m
EASTING 495375.7247 m KABUPATEN SIMALUNGUN
STA 0+067.86
DIRECTION N39° 39' 03"W
NORTHING 294361.7327 m
Δ 72.5328
EASTING 495428.9407 m
R 30.000 m
DIRECTION N4° 02' 31"W
Δ 35.6088
V 40 Km/hr KETERANGAN
Tc - m
R 30.000 m
Km/hr Es 3.100 m
V 40
Lc 26.176 m
Tc - m PI Ls1 12.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02

0+150
Es 0.196 m 2
Ls2 12.000 m
Lc 6.843 m
Ls1 12.000 m θ 11.2700
Ts1 28.199 m
Ls2 12.000 m
θ 11.2700
Ts2 28.199 m Lokasi Pekerjaan
Parapat Ts1 15.770 m
LT 50.176 m

4
e - max - %
Ts2 15.770 m

0+
10
0
LT 30.843 m GIRSANG I - GIRSANG II
e - max - %
(1627)

0
20
0+
3
PI
KONSULTAN PERENCANA
3

0+050
0+000

5
PI
1

2
1

R
V
Tc
Es
Lc
Ls1
Ls2
Ts1
e - max

θ
Ts2
LT

30.000
DIGAMBAR DIRENCANAKAN

0.468
10.533

40
12.000
12.000
11.270

-
17.858
17.858
34.533
-
0+250

Km/hr
m
6

m
m
m
m
m
m
m
%
Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST
Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 0+064
PI 0+071 PI 0+134 PI 0+161 PI 0+209 PI 0+220
Plan dan Profil
STA.0+000.00 - STA.0+225.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E1
A3 2023
STA 0+215.04
NORTHING 294485.3170 m STA 0+378.31
EASTING 495414.1084 m NORTHING 294530.4332 m DINAS PEKERJAAN UMUM DAN TATA RUANG
EASTING 495571.1064 m
DIRECTION N32° 52' 55"E
Δ 42.6568 DIRECTION N67° 18' 02"E KABUPATEN SIMALUNGUN
R 30.000 m Δ 34.0645
V 40 Km/hr R 12.000 m
m

V
Tc - m 40 Km/hr
KETERANGAN
m
m
m
%

Es 0.468 m Tc - m
Lc 10.533 m Es 0.182 m
0
12.000
11.270
28.199
28.199

Ls1 Lc 4.154
50.176

12.000 m m
Ls2 12.000 m Ls1 3.000 m
-

θ 11.2700 Ls2 3.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02


Ts1 17.858 m θ 7.1150
Ts2 17.858 m Ts1 5.191 m
e - max

Ts2
Ts1

LT 34.533 m 5.191 m
θ

Ts2

Lokasi Pekerjaan
LT

e - max - % LT 10.154 m
e - max - %

0+300

0+350
PI

0+450
GIRSANG I - GIRSANG II

0+250
5
PI
PI 7 (1627)
PI 6
PI
0+

PI
20
0

0
0+40
3 4 9

7
KONSULTAN PERENCANA

8
PI

10
6
8
STA
5

STA 0+282.79 STA 0+317.45 STA 0+362.88 STA 0+407.58 NORTH 0+445
ING .40
EASTIN 29
NORTHING 294518.9731 m NORTHING 294524.4540 m G 4 4541.2452

9
NORTHING 294502.5304 m NORTHING 294524.6201 m
EASTING 495480.8542 m EASTING 495511.4369 m EASTING 495556.8123 m EASTING 495600.0270 m DIREC 9 5 634
TION
DIRECTION N75° 32' 20"E DIRECTION N61° 44' 07"E DIRECTION N83° 06' 45"E Δ N64° .7876
DIRECTION S78° 38' 06"E 26' 2
Δ 13.8034 Δ 21.3772 Δ 15.8120 Δ 36.9257 R 11.35 2"E
03
R 45.000 m R 60.000 m R 30.000 m R 30.000 m V 90.00
0
V 40 Km/hr V 40 Km/hr V 40 Km/hr V 40 Km/hr Tc 40
Tc - m Es - Km/hr
Tc - m - m Tc Tc - m
Es 0.010 m Es 0.376 m Es 0.022 m Es 0.759 m Lc 0.048
Lc 1.879 m Lc 13.408 m Lc 2.304 m Lc 13.359 m Ls1 5.852
Ls1 9.000 m Ls1 9.000 m Ls1 6.000 m 6.000 m Ls2 12.00 m
Ls1 0
θ 12.00 m
Ls2 9.000 m Ls2
θ
9.000 m Ls2 6.000 m Ls2 6.000 m
Ts1 3.812
0
m DIGAMBAR DIRENCANAKAN
θ 5.7054 4.2870 θ 5.7054 θ 5.7054 5
Ts1 Ts1 15.841 Ts1 7.182 m Ts2 14.95
9.971 m m Ts1 13.038 m 8
Ts2 7.182 m LT 14.95 m
Ts2 9.971 m 15.841 m Ts2 Ts2 13.038 m 8
e - ma 29.85 m
LT 19.879 m LT 31.408 m LT 14.304 m LT 25.359 m x 2
e - max - m
e - max - % - % e - max - % e - max - % %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PIPI0+282
0+284 PI 0+311 PI 0+324 PI PI
0+362
0+364 PI 0+376
PI 0+380 PI 0+401 PI 0+414 PI 0+442
PI 0+448
Plan dan Profil
STA.0+225.00 - STA.0+450.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E2
A3 2023
4
N5 958
8° 42
Es 46 22 .97
L 12 .43 ' 58 70 m
Ls c .0 3
40 00 3 E m
" E
DI AST
Ls 1 RE IN DINAS PEKERJAAN UMUM DAN TATA RUANG
2 0. - C G
6. 490 Δ TIO
Ts Km m

θ
L
Ts 1
2 3
3. 45
00
7
m
/h
r
R N
KABUPATEN SIMALUNGUN
e- T 7. .00 0 Tc

V
ma m
6 11 0 m
x . 5

Es
2 m 6 66 0 m
0.433 m

Lc 1
29453 12 .66 5 m
KETERANGAN

Ls 2
0 6 4 .7 5
1.1
49557 ' 02"E

Ls
45 0
1 8 m Ts 1 .60

θ
N67° 45

-
m 1 12 0.17 1
34.06 m m 1 .0 3

Ts
L
e- T
0 15 2.0 00

2
12.00 Km/hr
%
ma .1 00
40 m x 57 Jasa Konsultansi Perencanaan Jalan - Paket 02

18 8.16
- 0

.1 9
1
m 34

69
0.182 .1

m
m 73
4.154 m

-
0+550

m
3 .0 0 0
m Lokasi Pekerjaan

m
m
0

0+500
3.0 0 %

0+70
PI

0
5 0
7.11 m PI
11 PI
5.191
10
m 15
5.191 m GIRSANG I - GIRSANG II

0
0+60
4
10.15
0+450

12
% (1627)

0+
-

65
11

15
PI
13
PI PI
9
STA 0+445.40 STA 0+521.17
14
KONSULTAN PERENCANA

13
10

NORTHING 294541.2452 m NORTHING 294559.8622 m STA 0+570.51

14
PI
EASTING NORTHING 294561.3559 m
0+400

495708.3059 m

DI
EASTING 495634.7876 m 12

RE
DIRECTION N75° 47' 23"E EASTING 495757.7112 m

CT
DIRECTION N64° 26' 22"E

IO
Δ 12.4786 DIRECTION N88° 16' 06"E R

N
PI Δ 11.3503
R 90.000 m Δ 23.4693

V
8
R 90.000 m

Tc
7.58 V 40 Km/hr V 40 Km/hr R 60.000 m
0+40 6201 m

Es
4. m Tc - m V 40 Km/hr

Lc 1
Tc -
29452 .0270 m
9

Ls 2
T H ING 6 00 Es 0.048 m Es 0.081 m Tc - m

Ls
N O R 4 9 5 E
TI NG ° 3 8' 06" Lc 5.852 m Lc 7.624 m Es 0.334 m

θ
E A S S 7 8 7

Ts 2
TIO N 5 Ls1 12.000 m Lc 12.628 m

1.
DIREC 36.92 Ls1 12.000 m 1

1
m
1 .00

03
Ts
0 Ls2 12.000 12.000 m e - LT
30.00 Km/hr m m Ls1 9. .00 0

3
Ls2 12.000
ma
40 m θ 3.8125 θ 3.8125 Ls2 12.000 m x 1 438 0
V - m Ts1 14.958 m Ts1 15.855 m θ 5.7054 1. .560 9
3. 605
DIGAMBAR DIRENCANAKAN
Tc 0.7 5 9 m Ts2 14.958 m Ts2 15.855 m Ts1 18.500 m 03
5 9 LT m 3
Es 13.3 m LT 29.852 m 31.624 m Ts2 18.500

m
Lc 6.00 0 m - % e - max - % LT 36.628 m
e - max

m
Ls1 6.00 0 e - max - %

m
4
5.705

%
Ls2 m
8
θ 13.03 m
8
Ts1 13.03 m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 0+517
PI 0+525 PI 0+564 PI 0+577 PI 0+639
PI 0+644 PI 0+659
PI 0+666
PIPI0+673
0+674
Plan dan Profil
STA.0+450.00 - STA.0+675.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E3
A3 2023
STA 0+714.18 STA 0+825.27 STA 0+847.41
NORTHING 294559.5413 m NORTHING 294481.6145 m
NORTHING 294460.5711 m DINAS PEKERJAAN UMUM DAN TATA RUANG
EASTING 495891.2169 m EASTING 495970.6086 m EASTING 495977.8057 m
STA 0+662.79 DIRECTION N66° 12' 11"E DIRECTION S44° 16' 37"E
DIRECTION S18° 52' 53"E KABUPATEN SIMALUNGUN
NORTHING 294546.2418 m Δ 56.8074 Δ 25.3957 Δ 6.1868
EASTING 495842.9770 m R 22.000 m R 12.000 m R 120.000 m STA
DIRECTION N58° 22' 58"E V 40 Km/hr V 40 Km/hr V 40 Km/hr
Δ 46.4333 Tc
Es
-
0.601
m
m
Tc
Es
- m Tc - m
NORTHING
EASTING
KETERANGAN
R 12.000 m 0.057 m Es 0.001 m
Km/hr Lc 10.173 m Lc 2.339 DIRECTION
V 40 m Lc 0.970 m
Tc - m Ls1 12.000 m Ls1 3.000 m Ls1 12.000 m
Es 0.490 m Ls2 12.000 m Ls2 3.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02
Ls2 12.000 m

0+750
Lc 6.745 m θ 15.1570 θ 7.1150 θ 2.8618
3.000 m Ts1 18.169 m PI Ts1 4.217 Tc
Ls1 m Ts1 12.493 m
3.000 m Ts2 18.169 m
16
Ts2 4.217 Es
Ls2 m Ts2 12.493 m

0+800
Lc
θ
Ts1
7.1150
6.665 m
LT
e - max
34.173
-
m
%
PI
LT
e - max
8.339
- %
m LT
e - max
24.970
-
m
%
Ls1 Lokasi Pekerjaan
Ls2

16
PI PI
Ts2 6.665 m 15 STA 0+673.90 17 18 θ
0+70
0

LT 12.745 m NORTHING 294543.2523 m


- % Ts1 GIRSANG I - GIRSANG II
e - max EASTING 495854.2793 m Ts2

17
15

DIRECTION S75° 11' 02"E PI (1627)

0
85
LT

0+
19
Δ 38.6129 e - max
R 3.000 m STA 0+641.90 STA 0+768.73
V
Tc
40
-
Km/hr
m
NORTHING 294534.7818 m
EASTING 495824.3615 m
NORTHING 294528.6441 m
EASTING 495938.7752 m
KONSULTAN PERENCANA

18
Es 0.045 m DIRECTION S68° 15' 45"E DIRECTION S56° 59' 22"E

0+900
Lc 1.033 m Δ 53.3549 Δ STA 0+810.79
26.3508
Ls1 1.000 m R 12.000 m R NORTHING 294492.0056 m PI
60.000 m 21
Ls2 1.000 m V 40 Km/hr V 40 Km/hr EASTING 495960.4766 m
PI PI
14 θ 9.4389 Tc - m Tc - m DIRECTION S30° 38' 19"E 20
Ts1 1.560 m Es 0.302 m Es Δ 13.6383
PI 0.514 m STA 0+893.81
13 Ts2 1.560 m Lc 5.327 m Lc R 30.000 m
15.645 m

19
0+650

NORTHING 294415.2936 m STA


LT 3.033 m Ls1 6.000 m Ls1 12.000 V 40 Km/hr
m EASTING 495988.0048 m NORTHING 294389.4765
e - max - m
14

% Ls2 6.000 Ls2 12.000 m Tc - m


DIRECTION S12° 41' 40"E EASTING 496021.1478
θ 13.9598 θ 5.7054 Es 0.006 m
Δ 39.3883 DIRECTION S52° 04' 58"E
Ts1 9.144 m Ts1 20.084 m Lc 1.166 m
R 20.000 m Δ
Ts2 9.144 m Ls1 6.000 m
PI
LT 17.327 m
Ts2
LT
20.084
39.645
m
m Ls2 6.000 m V 40 Km/hr R
V
DIGAMBAR DIRENCANAKAN
12 e - max - % θ 5.7054 Tc - m
e - max - % Es Tc
Ts1 6.603 m 0.030 m
Lc Es
0+60

Ts2 6.603 m 2.181 m


0

Ls1 12.000 m Lc
LT 13.166 m
Ls2 12.000 m Ls1
e - max - %
θ 16.5705 Ls2
Ts1 13.437 m θ

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 0+708 PI 0+718 PI 0+761 PI 0+776 PIPI0+810


0+811 PI PI
0+824
0+826 PIPI0+847
0+848 PI PI
0+892
0+895
Plan dan Profil
STA.0+675.00 - STA.0+900.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E4
A3 2023
Δ 6.1868
R 120.000 m STA 1+004.63 STA 1+020.63 STA 1+086.89
V 40 Km/hr NORTHING 294351.5229 m NORTHING 294335.7308 m NORTHING 294282.2666 m DINAS PEKERJAAN UMUM DAN TATA RUANG
Tc - m EASTING 496077.3650 m EASTING 496082.5818 m EASTING 496119.1982 m STA 1+118.09
Es 0.001 m DIRECTION S65° 54' 42"E DIRECTION S18° 16' 50"E DIRECTION S8° 54' 29"E NORTHING 294263.8384 m KABUPATEN SIMALUNGUN
Lc 0.970 m Δ 47.6312 Δ 22.7374 Δ 45.6869 EASTING 496145.1245 m
Ls1 12.000 m R 12.000 m R 12.000 m R 12.000 m DIRECTION S54° 35' 42"E
Ls2 12.000 m V 40 Km/hr V 40 Km/hr V 40 Km/hr Δ 27.8176
θ 2.8618 Tc - m Tc - m Tc - m R
V
12.000
40
m
Km/hr
KETERANGAN
Ts1 12.493 m Es 0.528 m Es 0.033 m Es 0.146 m
Ts2 12.493 m Lc 6.996 m Lc 1.782 m Lc 3.721 m Tc - m
LT 24.970 m Ls1 3.000 m Ls1 3.000 m Ls1 6.000 m Es 0.085 m
e - max - % Ls2 3.000 m Ls2 3.000 m Ls2 6.000 m Lc 2.846 m Jasa Konsultansi Perencanaan Jalan - Paket 02
θ 7.1150 θ 7.1150 13.9598 Ls1 3.000 m
θ
Ts1 6.814 m Ts1 3.926 m Ts1 8.163 m Ls2 3.000 m
Ts2 6.814 m Ts2 3.926 m Ts2 8.163 m θ 7.1150
LT 12.996 m LT 7.782 m 15.721 m Ts1 4.486 m
Lokasi Pekerjaan

1+000
LT
0
85
0+

e - max - % e - max - % e - max - % Ts2 4.486 m


LT 8.846 m
PI
23
e - max - %

1+050
GIRSANG I - GIRSANG II
(1627)
18

PI

21
0+950

1+100
0+900

24
STA 0+810.79 PI
PI
NORTHING 294492.0056 m 21
25
PI
PI
495960.4766 m
KONSULTAN PERENCANA
EASTING 27
PI 22
DIRECTION S30° 38' 19"E 20 PI

22
26

0
1+15
Δ 13.6383 STA 0+893.81
0+935.13 STA 0+959.67

20
m

23
R 30.000 STA PI
19

NORTHING 294415.2936 m STA 1+073.04 28


V 40 Km/hr NORTHING 294389.4765 m NORTHING 294369.9287 m NORTHING 294296.1339 m
EASTING 495988.0048 m
Tc - m EASTING 496021.1478 m EASTING 496036.1956 m EASTING 496117.0246 m
DIRECTION S12° 41' 40"E
Es 0.006 m DIRECTION S52° 04' 58"E DIRECTION S37° 35' 20"E DIRECTION S41° 01' 05"E NO STA
Δ 39.3883 R
Δ 28.3229 EA THIN

24
Lc 1.166 m Δ 14.4939 Δ 32.1098
m
R 20.000 m
R 90.000 m R 12.000 m DIR STIN G 1
Ls1 6.000
V 40 Km/hr R 12.000 m EC G
T 29 +15
Ls2 6.000 m V 40 Km/hr V 40 Km/hr V Δ ION 49 23 2.99
4
Tc - m 40 Km/hr
θ 5.7054 Tc - m Tc - m Tc - R S2 616 2.57
Es 0.030 m
0.091 m m V 6° 0.9 27
Ts1 6.603 m Es 0.264 m Es Es 0.148 14 46' 026 m
Lc 2.181 m m m Tc . 3
Ts2 6.603 m
Ls1 12.000 m Lc 13.776 m Lc 2.952 Lc 3.745 m Es 45 6478 9"E m
13.166 m Ls1 9.000 m Ls1 3.000 m .00 NO
LT 12.000 m Ls1 3.000 m Lc 40 0 R
e - max - %
Ls2
θ 16.5705 Ls2 9.000 m Ls2 3.000 m Ls2 3.000 m
Ls1 -
EA THIN
S DIGAMBAR DIRENCANAKAN
θ 2.8618 θ 7.1150 Ls2 0.0 K
m D IRE TING G
Ts1 13.437 m θ 7.1150 1. 07 m/ CT
m Ts1 4.542 m θ h Δ ION
Ts2 13.437 m Ts1 15.952 Ts1 4.968 m Ts1 15 594 m r
Ts2 15.952 m Ts2 4.542 m Ts2 .00 m R
LT 26.181 m 4.968 m Ts2 5. 0
LT 31.776 m LT 8.952 m LT 9.745 L 9.4 000 m V
e - max - %
- % e - max - % m e- T 12 89 3 m Tc
e - max e - max ma Es
- % x 12 .920 m
21 .920 Lc
.59 Ls1
4

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 0+928 PI 0+942 PI 0+958


PI 0+961 PI 1+001
PI 1+008 PIPI1+020
1+021 PI 1+071
PI 1+075 PI 1+085
PI 1+088 PI 1+117
PI 1+119
Plan dan Profil
STA.0+900.00 - STA.1+125.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E5
A3 2023
1+
40
0

9
8.0 4
m DINAS PEKERJAAN UMUM DAN TATA RUANG
+ 11 .838 5 m
1 26 12 3 4
KABUPATEN SIMALUNGUN
29

4 . "E
29 6145 ' 42
49 ° 35 76 m r
/h
4 1 Km
S5 27.8 00
N . 0 m
TIO 12 0
I
D ΔR EC 4
- 5
m
m KETERANGAN
R . 0 8 m
0 46 m
V 2 .8 0 DI
Tc 0 RE
3.0 00 m CTIOJasa Konsultansi Perencanaan Jalan - Paket 02
Es 3.0 150 N
Lc m
.1 86

1+150
7 m R
Ls1 4 .4 6
8 %
V
Ls2 4
1+

. Tc
35
0

4 46

0
.8 PI Es

1+20
θ 8 PI
Ts1
Ts2
- 28 29
28 Ls1
Lc
Lokasi Pekerjaan
LT ax Ls2

24
m PI θ
e- 27 Ts
1+

12
10
0

STA 1+152.99 STA 1+193.63 Ts2 1 12 .00 GIRSANG I - GIRSANG II

25
NORTHING 294192.7556 m 11 .00 0
NORTHING 294232.5727 m e - LT (1627)
EASTING 496160.9026 m EASTING 496169.4602 m ma 13 .270 0
13 .715 0

0
1+25
DIRECTION S12° 07' 47"E x
DIRECTION S26° 46' 39"E 27 .715
23

Δ 14.6478 Δ 25.0122 .0
- 63
PI PI
R
V
45.000 m R
V
30.000 m
STA 1+311.16
KONSULTAN PERENCANA
40 Km/hr 40 Km/hr

1+300
25 26
Tc Tc NORTHING 294077.9405 m %
- m - m

26
Es Es 0.007 EASTING 496143.2010 m
0.007 m m
Lc Lc DIRECTION S12° 52' 57"W
1.594 m 1.294 m
Ls1 15.000 Ls1 12.000 Δ 82.3001
m m m
4 R 30.000 m
3.0 9
22

Ls2 5.000 m Ls2 12.000 m


07 .133 6 m PI V 40 Km/hr

27
+
1 29 6 4 θ 9.4389 θ 11.2700 30
4 .02 E Tc - m
29 6117 ' 05" Ts1 12.920 m Ts1 12.777 m
9 1 m r Es 6.824 m
ING 4 ° 0 98
1 /h
Ts2 12.920 m Ts2 12.777 m
O RTH ING S4 2.10 00 Km LT 21.594 m LT 25.294 m
Lc 37.117 m
N ST ON 3 .0 m Ls1 6.000 m
EA CTI 12 0 e - max - % e - max - %
R E 4 m Ls2 6.000 m
I
D Δ m
- 8 θ 5.7054
R 4
0.1 45
m
Ts1 29.255 m
DIGAMBAR DIRENCANAKAN
V m
c 3.7 00 Ts2 29.255 m
T 3.0 00
E s m LT 49.117 m
3.0 150
Lc . 1 8
m e - max - %
7 96
Ls1 4 . 8 m
Ls2 6
4.9 45
%
θ 9.7
Ts 1 -

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PIPI1+155
1+157 PIPI1+193
1+194 PI 1+288 PI 1+325
Plan dan Profil
STA.1+125.00 - STA.1+350.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E6
A3 2023
STA 1+454.12
PI
31
DINAS PEKERJAAN UMUM DAN TATA RUANG
STA 1+483.82
NORTHING 294024.3800 m
EASTING 496285.8292 m
NORTHING 293975.2219 m
496231.4925 m
KABUPATEN SIMALUNGUN
EASTING

1+450
DIRECTION S69° 25' 03"E
DIRECTION S47° 51' 52"W
Δ 117.2822 Δ 44.0603
R 35.000 m
V 40 Km/hr
R
V
6.000
40
m
Km/hr KETERANGAN
Tc - m Tc - m
Es 18.284 m PI
Es 0.060 m

30
32
Lc 59.790 m Lc 1.690 m
Ls1 12.000 m 3.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02
Ls1
Ls2 12.000 m Ls2 3.000 m
θ 9.7022
θ 13.9598
Ts1 63.678 m Ts1 3.981 m
Ts2
LT
63.678
83.790
m
m 1+400
29
STA 1+558.61 1+
500
Ts2 3.981 m Lokasi Pekerjaan
NORTHING 293977.7430 m LT 7.690 m
e - max - % EASTING 496156.4787 m e - max - %
DIRECTION N88° 04' 31"W
31

GIRSANG I - GIRSANG II
Δ 28.3907
R 30.000 m (1627)
V 40 Km/hr
Tc - m STA
Es 0.039
3.063
m
m
NORTHIN
EASTING
G
KONSULTAN PERENCANA
Lc 1+603.55 N
Ls1 12.000 m STA 513 m DIRECTIO
293957.5
Ls2 12.000 m NORTHING 496115.9198 m
θ 11.2700 EASTING 03"W
S63° 32'
Ts1 13.715 m DIRECTION 29.6639
Ts2 13.715 m Δ m
30.000
LT 27.063 m R Km/hr
550 40
m
1+

e - max - % PI
V -
28

33 Tc 8 m
1+350
0.0 5
Es 0 m
3.73
32

Lc m
12.000 m
Ls1
12.000
Ls2 0
6 m θ
11 .2 7 0
m DIGAMBAR DIRENCANAKAN
1.1 405 m 14.072 m
1
3 . 9 0 Ts1 7 2
14.0
1+ 077 .201 "W Ts2 m
4 3 7 27.730
29 614 2' 5 m hr LT -
%
49 2° 5 001 / PI

0
60
1+
T A NG Km 34 e - max
S HI 3
RT NG S1 82. .000 m
NO STI ION 3 0 0 m
EA ECT 4 m
R -
DI m

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 1+402 PI 1+462 PIPI1+483


1+485 PI 1+557
PI 1+560
Plan dan Profil
STA.1+350.00 - STA.1+575.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E7
A3 2023
θ m
11.2700
Ts1
13.715
Ts2 m STA 1+603.55 1+796.48 STA ING DINAS PEKERJAAN UMUM DAN TATA RUANG

38
13.715 STA
LT m
NORTHING 293821.4112 m TH
27.063 NORTHING 293957.5513 m NOR TING
e - max
-
m
%
EASTING 496115.9198 m EASTING 496085.3182 m E S CTION
A
E
KABUPATEN SIMALUNGUN
DIRECTION S63° 32' 03"W DIRECTION S25° 26' 08"E DIR
.45 4 m
Δ 29.6639 Δ 10.7740 864 7
0
1+55

PI
R 30.000 m 45.000 m 1+ 55.62 92 m

1+
R 7 .52

80
33

0
3
32

V
Tc
40
-
Km/hr
m
V
Tc
40
-
Km/hr
m STA ING
T H
9
2 102 42"E
496 ° 39' 8 m r
KETERANGAN
m
m m NOR TING S14 7.848 /h
40
5 m Es 0.058 Es 0.017
EAS CTION 1 .000 Km
7.9 0 Lc 3.730 m 2.473 m E 45 m
07 .201 W Lc PI R
I 40

37
4 m 38 D Δ m
29 143 ' 57" Ls1 12.000 m Ls1 6.000 - Jasa Konsultansi Perencanaan Jalan - Paket 02
6 m
49 ° 52 01 m r Ls2 12.000 m Ls2 6.000 m R 1 2
2
S1 82.30 00 /h V 0.0 08 m
Km θ 11.2700 θ 3.8125
0 .0 m m Tc 2.1 00 m
Ts1 14.072 m 7.251 0
3 0
4 m Ts1
m Es 12. 000
-
2 4
6.8 117
m
m PI
34
1+
60
0
Ts2
LT
14.072
27.730
m
m
Ts2
LT
7.251
14.473 m
Lc
Ls1
12. 825
7.5 122
m
m Lokasi Pekerjaan
.
37 0 0
m e - max - % e - max - % Ls2 13. 122 m
13. 108

1+
%

75
0 θ

0
6. 00
6.0 054 m Ts1 26. GIRSANG I - GIRSANG II
-
5.7 255
m Ts2
33

9. 55 m LT x (1627)
Ls 2 2 a
2 9.2 17 % PI
e-
m

36
θ 9.1
37
T s 1 4
-
Ts2
LT ax STA 1+673.99
PI STA 1+748.47 KONSULTAN PERENCANA
m 36 NORTHING 293864.8371 m
e- NORTHING 293961.5039 m EASTING 496064.6649 m

1+
70
0
EASTING 496045.1783 m STA 1+727.73
DIRECTION S5° 57' 04"E
DIRECTION N86° 48' 07"W NORTHING 293885.4752 m Δ 19.4844
Δ 106.0424 EASTING 496062.5136 m 20.000 m
R
R 30.000 m DIRECTION S12° 50' 40"E V 40 Km/hr
Km/hr Δ 6.8932

35
0
40

65
V m

1+
Tc -
Tc - m R 45.000 m
Es 0.005 m
Es 14.251 m V 40 Km/hr
Lc 0.858 m
Lc 49.549 m Tc - m
Ls1 6.000 m
Ls1 6.000 m Es 0.016 m
34
Ls2 6.000 m
Ls2 6.000 m Lc 2.415 m
θ 8.5136
Ls1 3.000 m
θ
Ts1
5.7054
42.893 m Ls2 3.000 m Ts1 6.469 m
m
DIGAMBAR DIRENCANAKAN
Ts2 6.469
Ts2 42.893 m PI θ 1.9090 m
35 LT 12.858
LT 61.549 m Ts1 4.211 m
e - max - %
e - max - % Ts2 4.211 m
LT 8.415 m
e - max - %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 1+601
PI 1+605 PI 1+637 PI 1+687 PI PI
1+727
1+729 PIPI1+748
1+749 PI PI
1+795
1+798
Plan dan Profil
STA.1+575.00 - STA.1+800.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E8
A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG
KABUPATEN SIMALUNGUN

S
NOR TA
T
EAS HING 1+
KETERANGAN
DIR TING 293 796.4
ECT 8 8
ION 496 21.41
S25 085.3 12 m
°2 182 Jasa Konsultansi Perencanaan Jalan - Paket 02
10. 6' 08" m
774 E
45. 0
000
40
m
0.0
2.4
-
17
Km/
m
hr Lokasi Pekerjaan
73 m
6.0

1+850
0
6.0 0 m

2+000
0

1+950
3.8 0 m PI GIRSANG I - GIRSANG II

1+900
1
7.2 25
1+800

m 39 PI
(1627)
51 41

m PI
m PI 40

38
m 38
KONSULTAN PERENCANA

41
40
% STA 1+864.45 STA 2+008.59
1+750

39
STA 1+911.06
37

NORTHING

050
293612.6386 m

2+
NORTHING 293755.6274 m NORTHING 293708.9495 m
496102.5292 m EASTING 496115.8502 m
EASTING EASTING 496099.9300 m
DIRECTION S9° 23' 10"E
DIRECTION S14° 39' 42"E DIRECTION S3° 11' 14"W
Δ 17.8488 Δ 28.8151
Δ 12.5732
R 45.000 m R 60.000 m
R 90.000 m
36

42
V 40 Km/hr V 40 Km/hr
V 40 Km/hr
- m Tc - m STA 2+092.01
Tc Tc - m
m Es 0.489 m NORTHING 293533
Es 0.012 Es 0.084 m .3182 m
m Lc 15.273 m EASTING 496087.8720 m
Lc 2.108 Lc 7.773 m
m Ls1 15.000 m DIRECTION S19° 25'
S Ls1 12.000 Ls1 12.000 m 44"W
NOR TA Ls2 12.000 m Ls2 15.000 m Δ 39.3734
THI Ls2 12.000 m
EAS NG 1+ θ 7.1150 R 30.000
DIR TING
ECT
293 748.4
864 7
θ
Ts1
7.5825
13.122 m
θ 3.8125
Ts1 22.985 m V 40
m
Km/hr
DIGAMBAR DIRENCANAKAN
I 4 Ts1 15.930 m
Δ ON S 96064 .8371 Ts2 13.122 m Ts2 15.930 m
Ts2 22.985 m Tc - m
5° .
R 5 664 m LT 26.108 m LT 45.273 m Es 0.327 m
V 19. 7' 04" 9 m LT 31.773 m
e - max - Lc 8.814
484 E e - max - % e - max - % % m
Tc 20. 4 Ls1 12.000
00 m
Es 40 0 Ls2 12.000
Lc m m
- Km/ θ 11.2700
Ls1 0.0 hr
05

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PIPI
1+863
1+865 PI 1+907
PI 1+915 PI 2+001 PI 2+016
Plan dan Profil
STA.1+800.00 - STA.2+025.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E9
A3 2023
DINAS PEKERJAAN UMUM DAN TATA RUANG
KABUPATEN SIMALUNGUN
S
NOR TA
THI
EAS NG 2+
DIR TING 293 263.9
ECT
ION 496 65.44
3 0 KETERANGAN
Δ S13 125.2 22
R °2 46
V 55. 1' 14 7
732 "E
Tc 30. 2
00 Jasa Konsultansi Perencanaan Jalan - Paket 02
Es 40 0
Lc - m
Km/
2+000

Ls1 1.3 hr
17. 4 0 m
Ls2 379

2+250
PI
41 θ
Ts1 PI
12.
12. 00
0
0 m
m
Lokasi Pekerjaan

2+200
Ts2 45 11. 0 0 m
2

2+150
LT 22. 700 m
PI
e- 02
22. 4
41

44 max
41. 24
0 GIRSANG I - GIRSANG II

0
m

2+05
PI
2+008.59 379

46
43 m (1627)
293612.6386 m -
m

45
496115.8502 m

2+100
%

44
S9° 23' 10"E e-
28.8151
60.000 m
42

STA 2+232.52
max
KONSULTAN PERENCANA
PI STA 2+151.63 NORTHING 293395.9877 m
40 Km/hr STA 2+092.01
NORTHING 293533.3182 m
42 NORTHING 293476.3901 m EASTING 496117.9958 m
- m
496108.5297 m

43
EASTING 496087.8720 m EASTING DIRECTION S6° 42' 53"E
0.489 m
DIRECTION S19° 25' 44"W DIRECTION S19° 56' 40"E Δ 6.6390
15.273 m
Δ 13.2298 R 60.000 m
15.000 m Δ 39.3734 47

R 60.000 m V 40 Km/hr
15.000 m R 30.000 m
V 40 Km/hr Tc - m
7.1150 V 40 Km/hr
Tc - m Es 0.002 m
22.985 m Tc - m
Es 0.008 m Lc 0.959 m
22.985 m Es 0.327 m
Lc 1.905 m Ls1 6.000 m S
45.273 m Lc 8.814 m NOR TA
Ls1 12.000 m Ls2 6.000 m
- % Ls1 12.000 m THI
Ls2 12.000 m θ 2.8618 EAS NG
Ls2 12.000 m
5.7054 DIR TING 293 DIGAMBAR DIRENCANAKAN
θ 11.2700 θ Ts1 6.484 m ECT
4 328
I
Ts1 Ts1 12.989 m Ts2 6.484 m Δ ON S 9609 .7745
16.874 m m R 42° 1.78
Ts2 12.989 LT 12.959 m 2 9
Ts2 16.874 m
25.905 m V 14. 2' 42 8
LT 32.814 m LT e - max - % 735 "W
- % Tc 6 0.0 5
e - max - e - max 0
% Es 40 0
Lc -
Ls1 0.3
23

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 2+087PI 2+096 PIPI2+151


2+153 PIPI2+232
2+233
Plan dan Profil
STA.2+025.00 - STA.2+250.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E 10
A3 2023
0
2+349.02
Ls1 6.00
18
STA 2+263.90
NORTHING 293308.0141 m
Ls2 2.86 m
7
EASTING 496059.6820 m STA 2+482.39 θ 8.10 m
NORTHING 293365.4422 m DIRECTION S57° 06' 50"W NORTHING 293188.3454 m 8.10
7 m DINAS PEKERJAAN UMUM DAN TATA RUANG
EASTING 496125.2467 m Ts1 88
Δ 19.2454 EASTING 496044.8043 m 16.1
DIRECTION S13° 21' 14"E R 60.000 m DIRECTION S23° 03' 22"W
Ts2
LT
- KABUPATEN SIMALUNGUN
Δ 55.7322 ax
V 40 Km/hr Δ 39.4699
R 30.000 m e-m
Tc - m STA 2+390.61 R 30.000 m
V 40 Km/hr PI
Es V 40 Km/hr
Tc
Es
-
1.304
m
m
Lc
0.618
17.155
m
m
NORTHING 293275.0320 m
EASTING 496034.0352 m Tc - m
51
KETERANGAN

2+
50
Ls1 Es 0.922 m

0
3.000 m DIRECTION S37° 52' 07"W
Lc 17.379 m
Ls2 3.000 m Δ 64.2111 Lc 14.692 m
Ls1 12.000 m
θ 1.4320 R 20.000 m Ls1 6.000 m
Ls2 12.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02
Ts1 11.674 m V 40 Km/hr Ls2 6.000 m
θ PI 11.2700

2+
25
0
Ts2 θ 5.7054

51
11.674 - m

2+450
Ts1 45 22.024 m m Tc
LT 23.155 m Es 1.824 m Ts1 13.785 m
Ts2 22.024 m
e - max - % Lc 16.470 m Ts2 13.785 m
5.45
LT 41.379 m
% Ls1 6.000 m LT 26.692 m
PI
49
PI 2+52 .2046 m Lokasi Pekerjaan

2+300
e - max - 50 4 6 m
Ls2 6.000 m e - max - % STA 2931 179

46
R T H ING 496057.2 "E
θ 8.5136 NO 24' 4
9

50
NG
EASTI ON S16° 6098
PI
PI
46 Ts1 15.604 m
44 E C T I 1 7 . m GIRSANG I - GIRSANG II
Ts2 15.604 m DIR 0 r
m Δ 60.00 Km/h (1627)
2+

LT 28.470
20
0

40 m

47
e - max - % R
V - m
0.088 m
2+

Tc
40
0

Es 6.491
12.00
0
m KONSULTAN PERENCANA

350
m

2+
Lc
45

PI STA 2+445.63 0 0 0
STA 2+310.87 47 Ls1 12.
NORTHING 293223.2659 m 5 4
5.70 m

49
NORTHING 293328.7745 m EASTING 496059.6675 m Ls2 7
EASTING 496091.7898 m θ 15.32 m
DIRECTION S26° 20' 33"E 7
52 m Ts1 15.32 m
32. 77 DIRECTION S42° 22' 42"W PI Δ 49.3987
30.49
1
2+2 95.98 8 m %

48
Δ 14.7355 48 Ts2
3 9 5 R 20.000 m -
293 7.9 LT
STA ING 49611 ' 53"E R 60.000 m V 40 Km/hr
e-m
ax
T H 42 V 40 Km/hr Tc - m
NOR TING S6° .6390 m
hr
EAS CTION 6
. 000 Km/ Tc - m Es 0.825 m
E 60 m Es 0.323 m Lc 11.300 m
DIR Δ 40 m Lc 12.432 m Ls1 6.000 m
R - m
02 Ls1 3.000 m Ls2 6.000 m
V 0.0 9 m Ls2 3.000 DIGAMBAR DIRENCANAKAN
5 m θ 8.5136
Tc 0.9 0 m θ
0 1.4320 Ts1 12.247 m
Es 6.0 0
0 Ts1 9.259 m Ts2 12.247 m
Lc 6.0 18 m
Ls1 6 Ts2 9.259 m LT 23.300 m
2.8 84 m
Ls2 6.4 4 m LT 18.432 m e - max - %
8
θ 6.4 59 % e - max - %
Ts1 2 . 9
1
Ts2 -

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 2+254 PI 2+271 PI 2+305 PI 2+317 PI 2+340 PI 2+358 PI 2+381 PI 2+397 PI 2+439 PI 2+451 PI 2+475
Plan dan Profil
STA.2+250.00 - STA.2+475.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E 11
A3 2023
STA 2+599.92 STA 2+677.25 STA 2+730.48
STA 2+577.15 NORTHING 293071.9662 m NORTHING 292994.6102 m NORTHING 292969.5985 m DINAS PEKERJAAN UMUM DAN TATA RUANG
NORTHING 293094.3443 m EASTING 496051.8182 m EASTING 496053.7233 m EASTING 495998.9161 m
EASTING 496056.1352 m DIRECTION S10° 55' 08"W DIRECTION S1° 24' 39"E DIRECTION S65° 28' 12"W KABUPATEN SIMALUNGUN
DIRECTION S1° 11' 46"W Δ 12.3297 Δ 66.8809 Δ 44.5320
NORT 9.7229 R 60.000 m R 45.000 m R 12.000 m
HING 2+48 Δ
40 Km/hr
2931 2.39 60.000 m V 40 Km/hr V 40 Km/hr V
8
4960 8.3454
R
V 40 Km/hr Tc - m Tc - m Tc - m KETERANGAN
S23° 44.8043 m Tc - m Es 0.100 m Es 5.007 m Es 0.127 m
03' m Lc 3.479 m
39.4 22"W Es 0.037 m Lc 6.918 m Lc 40.617 m
699 m 6.000 m m Ls1 6.000 m
30.0 Lc 4.188 Ls1 Ls1 12.000
00 m 6.000 m m Ls2 6.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02
40 m Ls1 6.000 Ls2 Ls2 12.000
Ls2 6.000 m θ 2.8618 θ 7.5825 θ 13.9598
- Km/h
r 9.485 m m Ts1 8.020 m
0.92 m θ 2.8618 Ts1 Ts1 35.814
2 Ts2 8.020 m
14.6 m Ts1 8.107 m Ts2 9.485 m Ts2 35.814 m
92
Lokasi Pekerjaan

2+650
6.00 8.107 m LT 18.918 m 64.617 m LT 15.479 m
0 m Ts2 LT
6.00 16.188 m e - max - % e - max - % PI e - max - %
0 m LT 54

2+550

2+600
5.70 m e - max - %
54
13.7
8
13.7 5
PI
8 m 52 PI GIRSANG I - GIRSANG II
26.6 5 PI 53

2+50
m (1627)

54
92

0
2+450

51
m PI
%

52

53
49

KONSULTAN PERENCANA
51
PI
50

0
50 2+
70

STA 2+525.45
NORTHING 293146.2046 m
EASTING 496057.2179 m 55

DIRECTION S16° 24' 49"E


NORT 2+44 Δ 17.6098
HING
2932 5.63 R 60.000 m
2
4960 3.2659 V 40 Km/hr PI

2+750
5 m
S26° 9.6675 Tc - m 55
20' 3 m Es
49.3 3"E 0.088 m PI
98
20.0 7 Lc 6.491 m 56

40
00
m
Ls1 12.000 m DIGAMBAR DIRENCANAKAN
Km/h Ls2 12.000 m
- r θ DIR

56
0.82 m 5.7054 ECT
5 Ts1 15.327 ION
11.3 m m
00 Ts2
6.000 m 15.327 m
6.00 m LT 30.491 m V
0
8.51 m e - max - % Tc
36
12.2 Es
47

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 2+489 PI 2+522
PI 2+529 PI 2+575
PI 2+579 PI 2+596
PI 2+603 PI 2+653 PI 2+694
Plan dan Profil
STA.2+475.00 - STA.2+700.00 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E 12
A3 2023
.48 5 m
730 8
2+ 69.59 61 m
9 2 9 .91
2 998 12"W STA DINAS PEKERJAAN UMUM DAN TATA RUANG
STA ING 495 ° 28' 0
2+813.81
T H 2 m r NORTHING 292888.4544 m
R
NO STING S65 4.53 0 Km/h EASTING KABUPATEN SIMALUNGUN
EA CTIO N 4 0 496003.1219 m
E 1 2.0 m DIRECTION S12° 23' 06"E
R
DI Δ 40 m
- Δ 80.4215
R 7 m
2 R 22.000
0.1 79
V
Tc 3.4 00
m
m V 40
m
Km/hr KETERANGAN
Es 6.0 00 Tc - m
.25 2 m Lc 6.0 598 m Es 2.285 m
677 0 Ls1
9
13. 020 m Lc
2+ 94.61 33 m 19.240 m
2 9 .72 Ls2 8. 20 m Ls1 12.000 m Jasa Konsultansi Perencanaan Jalan - Paket 02
9
2 053 9"E 8.0 79 %
θ Ls2
496 24' 3 9 12.000
PI
4 m

2+
15.

80
Ts1

0
m r 57
S1° 6.880 /h - θ 15.1570
6 000 Km Ts2 Ts1 24.930 m
45. 0 m LT x
4
-
m
m
e-
ma Ts2
LT
24.930
43.240
m
m
Lokasi Pekerjaan
0 7

57
PI
5.0 17 m 54
e - max - %
6
40. 000 m
2+

12. 000
65

GIRSANG I - GIRSANG II
0

12. 825 m (1627)

0
85
2+
7.5 814 m
Ls2 35. 814 m

0
70
2+

9
85
35. 617

2+
θ %
.
KONSULTAN PERENCANA
54

Ts1 64

2+750
-
Ts2
Siborong - Borong

58
LT x STA 2+754.12
ma PI NORTHING 292946.9944 m
e-

55

59
56
EASTING 495990.2672 m
PI
2+
600

55 DIRECTION S20° 56' 17"W

56
Δ 33.3230
R 12.000 m
V 40 Km/hr
Tc - m
53

Es 0.013 m
Lc 1.132 m
Ls1 6.000 m
Ls2 6.000 m
θ 13.9598 DIGAMBAR DIRENCANAKAN
Ts1 6.688 m
Ts2 6.688 m
LT 13.132 m
e - max - %

Yuda Rahmat Hidayat Sembiring Bagas Raja Sulaiman, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

PI 2+728
PI 2+732 PIPI2+753
2+755 PI 2+801 PI 2+820
Plan dan Profil
STA.2+700.00 - STA.2+859.38 1:1000

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

E 13
A3 2023
G
GAMBAR STANDAR
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN
LENGKUNG HORIZONTAL Jasa Konsultansi Perencanaan Jalan -
Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


ALINEMEN HORIZONTAL

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.01 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


PERBAIKAN PERKERASAN ASPAL

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.02 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN
DETAIL PERKERASAN BETON SEMEN Dowel panjang 45 cm, jarak maks. 30 cm
PADA BADAN JALAN Sambungan melintang (tanpa jeda pengecoran)
KETERANGAN
- alur/ celah dibentuk maks. 5 mm (kondisi beton plastis), atau
Sambungan memanjang (pada as jalan)
- dipotong dengan menggunakan gergaji beton (kondisi beton mengeras)
dengan lidah/ alur Jasa Konsultansi Perencanaan Jalan -
- kedalaman celah 5 cm, diisi dengan asphalt sealant
celah diisi dengan asphalt sealent Paket 1

400 Sambungan melintang (dengan jeda pengecoran), Lokasi Pekerjaan


celah diisi dengan asphalt sealant
Pembuatan alur permukaan
Dowel
Sambungan melintang pada saat kondisi beton plastis DAMAK KITANG - SILAU DUNIA (0802)
(dowel)
Sambungan memanjang Tie Bar
(tie bar) t

Dasar pengecoran dilapis KONSULTAN PERENCANA


dengan membran plastik
b/2
b/2
Arah lalu lintas

as
b/2
lu lint 8 cm 4 cm
b/2 ur la
ISOMETRIK RIGID PAVEMENT Jal Lidah/ alur

400 400

Perlu diperhatikan : DIGAMBAR DIRENCANAKAN


DENAH SAMBUNGAN RIGID PAVEMENT - 1/2 bagian dowel (pada sambungan melintang) harus bebas/ tidak melekat
SKALA 1 : 25 pada beton dengan cara dilumuri gemuk atau dibungkus pipa pvc.

- Penghentian/ jeda pengecoran tidak diperbolehkan dilakukan


tanpa sambungan melintang, apabila pengecoran terpaksa harus dihentikan
Sokong maka harus disiapkan sambungan melintang.
Rizky Aditama, ST Parlindungan Sihotang, ST
- Perawatan beton muda dilakukan dengan penyemprotan curing compound
Dasar & dinding pengecoran 5 cm Draftman Team Leader
x7 (setelah bekisting dibuka)
dilapis dengan membran plastik ma
DIPERIKSA/ DISETUJUI OLEH

t PPTK PERENCANAAN,

DETAIL BEKISTING

Persambungan max. 5 mm Persambungan max. 5 mm


Begel dudukan tie bar Dowel jarak 30, panjang 45 cm JOHN RIANTO SINAGA, ST
Kondisi-1 Tie Bar (Ulir) D16 - 70, panjang 60 cm Kondisi-1 Begel dudukan dowel NIP. 19770401 200701 1 004
Pengecoran menerus Perkerasan Beton Pengecoran menerus Perkerasan Beton
PPK PERENCANAAN,
5.0 0.5 Tie bar D16 (ulir) panjang 60 cm 0.5
5.0
Dowel panjang 45 cm
t/2 t/2
t t (1/2 bagian bebas)
t/2 begel dudukan Ø8 t/2
begel dudukan Ø8
60 45
30 30 22.5 22.5
dowel tetap dowel bebas ANTON BANJARNAHOR, ST
Kondisi-2 Kondisi-2
NIP. 198306172009021002
Dengan jeda pengecoran 70 10 Dengan jeda pengecoran
30 10
(pemasangan bekisting) 70 (pemasangan bekisting) 30
Bagian yang di cor Bagian yang di cor 30 JUDUL GAMBAR SKALA
Bekisting dengan lidah/ alur Bekisting
Isometrik pemasangan Tie Bar
Bagian yang akan Bagian yang akan Isometrik pemasangan Dowel PERKERASAN BETON SEMEN
dicor selanjutnya dicor selanjutnya
DETAIL PERKERASAN NON SKALA
60 45 BETON SEMEN BADAN JALAN
30 30 22.5 22.5
DETAIL SAMBUNGAN MEMANJANG DETAIL SAMBUNGAN MELINTANG
SKALA 1 : 25 SKALA 1 : 25 TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.03 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN
Sambungan beton
DETAIL PERKERASAN BETON SEMEN PADA BAHU JALAN - celah dibentuk maks. 5 mm (kondisi beton plastis), atau
- dipotong dengan menggunakan gergaji beton (kondisi beton mengeras) KETERANGAN
- kedalaman celah 5 cm, diisi dengan asphalt sealant

Pembuatan alur permukaan Jasa Konsultansi Perencanaan Jalan -


pada saat kondisi beton plastis Paket 1
Perawatan beton muda dilakukan dengan
penyemprotan curing compound (setelah bekisting dibuka)
Lokasi Pekerjaan

Dowel Lapis AC-WC


DAMAK KITANG - SILAU DUNIA (0802)
Agregat pondasi
Perkerasan beton

Pembuatan alur permukaan


Agregat pondasi KONSULTAN PERENCANA
Lapis AC-WC 400 as
Dasar pengecoran dilapis pada saat kondisi beton plastis
lu lint
dengan membran plastik Agregat pondasi la
ur
Jal
Dowel
Perkerasan bahu beton
t ahu
400 Agregat pondasi s a rb
Sambungan melintang (tanpa jeda pengecoran) inta leb
lalu l TANPA SAMBUNGAN DOWEL
- alur/ celah dibentuk maks. 5 mm (kondisi beton plastis), atau ur
- dipotong dengan menggunakan gergaji beton (kondisi beton mengeras) Jal
- kedalaman celah 5 cm, diisi dengan asphalt sealant ahu
t
a rb
leb
DENGAN SAMBUNGAN DOWEL
DIGAMBAR DIRENCANAKAN
Perlu diperhatikan :
ISOMETRIK BAHU RIGID BETON
- 1/2 bagian dowel (pada sambungan melintang) harus bebas/ tidak melekat
pada beton dengan cara dilumuri gemuk atau dibungkus pipa pvc.

- Penghentian/ jeda pengecoran tidak diperbolehkan dilakukan


tanpa sambungan melintang, apabila pengecoran terpaksa harus dihentikan
maka harus disiapkan sambungan melintang. Rizky Aditama, ST Parlindungan Sihotang, ST
Draftman Team Leader

- Perawatan beton muda dilakukan dengan penyemprotan curing compound


(setelah bekisting dibuka) DIPERIKSA/ DISETUJUI OLEH
PPTK PERENCANAAN,

Bahu Rigid Lapis AC-WC

3 cm
Persambungan max. 5 mm
Dowel jarak 30, panjang 45 cm JOHN RIANTO SINAGA, ST
Kondisi-1 t
Begel dudukan dowel NIP. 19770401 200701 1 004
Pengecoran menerus Perkerasan Beton
PPK PERENCANAAN,
5.0 0.5
Dowel panjang 45 cm
t/2
t (1/2 bagian bebas)
t/2
begel dudukan Ø8 DETAIL SAMBUNGAN BETON DAN ASPAL
45 SKALA 1 : 25
22.5 22.5
dowel tetap dowel bebas
Kondisi-2 ANTON BANJARNAHOR, ST
Dengan jeda pengecoran NIP. 198306172009021002
30 10
(pemasangan bekisting) 30
Bagian yang di cor 30 JUDUL GAMBAR SKALA
Bekisting Sokong
Bagian yang akan Isometrik pemasangan Dowel
PERKERASAN BETON SEMEN
dicor selanjutnya m
Dasar & dinding pengecoran 5c
x7 DETAIL PERKERASAN NON SKALA
45 dilapis dengan membran plastik ma BETON SEMEN BAHU JALAN
22.5 22.5
DETAIL SAMBUNGAN MELINTANG
SKALA 1 : 25 t TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN
DETAIL BEKISTING
J.03.A A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

50 DETAIL PENUTUP SALURAN Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader
3
DIPERIKSA/ DISETUJUI OLEH
variasi 30 variasi
5 5 PPTK PERENCANAAN,
Ø12 - 15
Beton fc'=20 Mpa

15 DETAIL PENULANGAN

Ø12 - 15
variasi JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


SALURAN SAMPING

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.04 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

± 0.000
1.00 DAMAK KITANG - SILAU DUNIA (0802)
0
37.45
0.2
1 1
0.10 30.41

2 2

0.50 0.50

KONSULTAN PERENCANA
0.50 0.50

b
0.20 0.20

POTONGAN B - B
PANDANGAN ATAS

CL
DIGAMBAR DIRENCANAKAN
1 1
2 2

1.17

0.20

20 20

Rizky Aditama, ST
POTONGAN C - C
Parlindungan Sihotang, ST
1.00 Draftman Team Leader

0.10

0.70
DIPERIKSA/ DISETUJUI OLEH
0.20
0.20 CL 0.20
PPTK PERENCANAAN,
b

1 1
0.20
2 2

MATERIAL
FILTER

POTONGAN A - A
20 20

JOHN RIANTO SINAGA, ST


POTONGAN D - D NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


PEMATAH ARUS (STORDAM)

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.05 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

B1
B

W
DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

CL
L

SALURAN BAHU BAHU SALURAN


JALUR LALU LINTAS
SAMPING JALAN JALAN SAMPING

TAMPAK ATAS

DIGAMBAR DIRENCANAKAN

B1

B 25 15 30 Kupingan, Pasangan batu 1:3, Ø16 - 40


finishing plesteran
30

Elevasi renc. badan jalan


Ø16 - 40
20

Beton bertulang fc'=20 Mpa Ø12 - 20


Urugan kembali hasil galian Rizky Aditama, ST Parlindungan Sihotang, ST
Draftman Team Leader
H
Pasangan batu 1:3, finishing plesteran

Ø12 - 15 (maks.) DIPERIKSA/ DISETUJUI OLEH


20

PPTK PERENCANAAN,

20
Galian struktur sesuai
40

elevasi rencana

10 C 10 50 50
L B1
W

POTONGAN MELINTANG POTONGAN MEMANJANG DETAIL PENULANGAN


JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

DIMENSI GORONG-GORONG PLAT BETON

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


GORONG-GORONG PLAT BETON

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.06 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA


GAMBAR STANDAR
GORONG-GORONG PIPA BETON
NON SKALA
DETAIL GORONG-GORONG

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.07 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
GORONG-GORONG PIPA BETON
NON SKALA
KEPALA GORONG-GORONG
(HEAD WALL)

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.07.A A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
GORONG-GORONG KOTAK
(BOX CULVERT) NON SKALA

DETAIL BOX CULVERT TUNGGAL

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.08 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
GORONG-GORONG KOTAK
(BOX CULVERT) NON SKALA

DETAIL BOX CULVERT KEMBAR

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.08.A A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA


GAMBAR STANDAR
GORONG-GORONG KOTAK
(BOX CULVERT) NON SKALA
DETAIL TEMBOK SAYAP

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.08.B A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG

JALUR
KABUPATEN SIMALUNGUN
JALUR BAHU
BAHU LALIN
LALIN

30 30
KETERANGAN

PASANGAN BATU
ADUKAN CAMP 1:3 Jasa Konsultansi Perencanaan Jalan -
BALOK 30 x 30 CM
FINISHING PLESTERAN Paket 1
URUGAN PILIHAN JARAK MAX. 400 CM
1 H
3 URUGAN PILIHAN
PIPA RESAPAN PVC 2"
JARAK 2 M (CTC)
PASANGAN BATU Lokasi Pekerjaan
ADUKAN CAMP 1:3
BALOK BETON BERTULANG 30 x 30 CM FINISHING PLESTERAN
JARAK MAX. 250 CM 1
H
3 DAMAK KITANG - SILAU DUNIA (0802)
GALIAN STRUKTUR H1
HINGGA KEDALAMAN RENCANA
PIPA RESAPAN PVC 2"
B
B1 JARAK 2 M (CTC) KONSULTAN PERENCANA

TEMBOK PENAHAN TANAH TIPE-A


(TEMBOK SEDERHANA, H < 3,0 M)

GALIAN STRUKTUR
HINGGA KEDALAMAN RENCANA
H1
20
TELAPAK PONDASI
TEMBOK PENAHAN TANAH TIPE-B BETON BERTULANG
(TEMBOK SEDERHANA, H > 3,0 M) B
30
B1 DIGAMBAR DIRENCANAKAN

1 H
JALUR 3
BAHU
LALIN
30
Rizky Aditama, ST Parlindungan Sihotang, ST
30 6 Ø16 Draftman Team Leader
Ø8 - 15
H2 DIPERIKSA/ DISETUJUI OLEH
BETON fc'=20 Mpa
PAS. BATU MORTAR SALURAN Untuk penulangan ditangga PPTK PERENCANAAN,
40 lihat detail 3

PIPA RESAPAN PVC 2"


B DETAIL 1
B1
JARAK 2 M (CTC) PENULANGAN BALOK/ KOLOM POTONGAN MEMANJANG TEMBOK PENAHAN

TEMBOK PENAHAN TANAH TIPE-C JOHN RIANTO SINAGA, ST


(TEMBOK PENAHAN TEBING) NIP. 19770401 200701 1 004
Ø12 - 20 (MEMANJANG) BETON fc'=20 Mpa PPK PERENCANAAN,
BETON fc'=20 Mpa
20
Ø12 - 20 (MEMANJANG)
Ø12 - 20 (MELINTANG)
Ø12 - 20 (MELINTANG)

B1 ANTON BANJARNAHOR, ST
NIP. 198306172009021002
DETAIL 2 DETAIL 3
PENULANGAN TELAPAK PONDASI (DI TANGGA)
JUDUL GAMBAR SKALA
PENULANGAN TELAPAK PONDASI

GAMBAR STANDAR
NON SKALA
DINDING PENAHAN TANAH

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.09 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

JALUR
LALIN
BAHU KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

Ø12 - 20 (MEMANJANG) BETON fc'=20 Mpa

20

JOHN RIANTO SINAGA, ST


Ø12 - 20 (MELINTANG)
NIP. 19770401 200701 1 004
B PPK PERENCANAAN,

PENULANGAN TELAPAK PONDASI

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
BRONJONG NON SKALA

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.10 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


TEMBOK KANTILEVER

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.11 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


KERB

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.12 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR NON SKALA


MARKA JALAN

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.13 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

APPROAD END TREATMENT Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

PLAN - NORMAL CONDITIONS

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

ELEVATION
DIPERIKSA/ DISETUJUI OLEH
PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

PLAN - RESTRICTED ROW CONDITIONS

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
REL PENGAMAN (GUARD RAIL)
NON SKALA
DENAH

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.14 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN
POST BOLTS AND HOLES

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)


STEEL BEAM GUARD RAIL
ASSEMBLY DETAILS
KONSULTAN PERENCANA

PROFILE AND ELEVATION

D
RECTANGULAR WASHER
SHIM
DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader
D

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,
BEAM MOUNTING DETAILS SECTION D - D / C-C

FRONT ELEVATION
C JOHN RIANTO SINAGA, ST
NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002
SIDE VIEW
END BLOCK DETAILS
JUDUL GAMBAR SKALA
NOTES :

GAMBAR STANDAR
REL PENGAMAN (GUARDRAIL)
NON SKALA
DETAIL

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN
POST MOUNTING DETAIL ON CULVERT STRUCTURES

J.14.A A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

TANAH LONGSOR
DIMUSIM HUJAN
ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
RAMBU LALU LINTAS
NON SKALA
RAMBU PERINGATAN
(TIPE W)

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.15 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
RAMBU LALU LINTAS
NON SKALA
RAMBU LARANGAN (TIPE P)
RAMBU PERINTAH (TIPE R)

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.15.A A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
RAMBU LALU LINTAS NON SKALA
PEMASANGAN RAMBU

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.15.B A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN
STANDAR RAMBU LALU LINTAS Jasa Konsultansi Perencanaan Jalan -
SELAMA PELAKSANAAN PEKERJAAN KONSTRUKSI Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
RAMBU LALU LINTAS NON SKALA
SEMENTARA
(MASA KONSTRUKSI)

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.16 A3 2023
DINAS PEKERJAAN UMUM
DAN TATA RUANG
KABUPATEN SIMALUNGUN

KETERANGAN

Jasa Konsultansi Perencanaan Jalan -


Paket 1

Lokasi Pekerjaan

DAMAK KITANG - SILAU DUNIA (0802)

KONSULTAN PERENCANA

DIGAMBAR DIRENCANAKAN

Rizky Aditama, ST Parlindungan Sihotang, ST


Draftman Team Leader

DIPERIKSA/ DISETUJUI OLEH


PPTK PERENCANAAN,

JOHN RIANTO SINAGA, ST


NIP. 19770401 200701 1 004
PPK PERENCANAAN,

ANTON BANJARNAHOR, ST
NIP. 198306172009021002

JUDUL GAMBAR SKALA

GAMBAR STANDAR
PATOK KILOMETER & NON SKALA
PATOK PENGARAH

TAHUN
NO. LEMBAR UKURAN KERTAS PERENCANAAN

J.17 A3 2023

Anda mungkin juga menyukai