Anda di halaman 1dari 10

DAFTAR GAMBAR

PEMERINTAH KOTA PALU


NOMOR JUDUL GAMBAR DINAS PENATAAN RUANG
00.1 COVER DAN PERTANAHAN
00.2 PERSPEKTIF BANGUNAN JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444
00.3 3D INDIKATIF
00.4 3D INDIKATIF NOMOR BERKAS
00.5 3D INDIKATIF
CATATAN:
00.6 3D INDIKATIF
01-1 SITE PLAN
01-2 SITE EKSISTING
01-3 LANDSCAPING PLAN NAMA PEMOHON TANDA TANGAN
02-1 DENAH EKSISTING LANTAI DASAR
02-2 DENAH EKSISTING LANTAI 1 Hj. HASDANIATY S. DJAFAR, S.E
02-3 DENAH EKSISTING LANTAI 2
02-4 DENAH RENCANA LANTAI DASAR LOKASI
02-5 DENAH LANTAI 1 JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8
02-6 DENAH LANTAI 2 KELURAHAN : TAWANJUKA
02-7 RENCANA ATAP
KECAMATAN : TATANGA
03-1 TAMPAK DEPAN
03-2 SIDE ELEVATION JENIS BANGUNAN:
03-3 REAR ELEVATION
RUMAH TINGGAL (3 Lt)
03-4 SIDE ELEVATION (ENTRY)
03-5 SECTION 01 PENANGGUNG JAWAB STRUKTUR & DESAIN
03-6 SECTION 02 ARSITEK ANNE RUFAIDA, S.Ars
03-7 SECTION 03
STRUKTUR

DRAFTER BAHARUDIN BASRI, S.Ars

NAMA GAMBAR SKALA

COVER 1:1

LUASAN:

BGN INDUK TERAS TOTAL LUAS

659,16 M2 13,39 M 2 385.60 M2

KODE JML LBR TGL/BLN/THN

ARS 74 18/03/2022

MENGETAHUI / MENYETUJUI
KEPALA BIDANG PENGENDALIAN RUANG

EMY AWALI, ST
PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PEMERINTAH KOTA PALU
DINAS PENATAAN RUANG
10,000 DAN PERTANAHAN
8,000 JALAN JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444

GSB
NOMOR BERKAS

CATATAN:

36,400
12,180 3,800 20,420

6,075 3,245 2,605 270 5,500 350 4,000 4,000 4,000 3,000 3,355
EXPOSED AGGREGATE DRIVEWAY
NAMA PEMOHON TANDA TANGAN
W21 1,500 - 1,200 SH 1,500 - 1,200 SH 1,000
1,600 W40 300 489
1,500
1,800 - 1,500 - 1,500 SH 116 W28
W25 W26 W29 W30 W31

W2
0S -

1,5 0 SH
W2
1,789 SH

40 5800
H

40
LINE OF WALL ABOVE

2
80
1,800 - 1,500 - 1,800 - 1,500 - W27 600 - -
1,800 1,500 - 1,500 - 1,800 - 1,500 -

15 68
0-

53
D.P
1,
1,800 - 1,500 SH 1,500 SH 1,200 SH
2,400 SH1,200 SH D.P
600 - 1,150 SW 1,150 SW
900 SH 1,800
1,200
- 1,500
SH SH1,200 SH 600 SH 1,200 SH

Hj. HASDANIATY S. DJAFAR, S.E

1,800 - 1,500 SH

15
2,700 D.P D.P PLANTER BOX

130
BED 5

315
1,800 - 1,500 SH
2,600

820
OUTDOOR

820
D26
PARAPET WALL

D28
BED 1 BED 2 BED 3

1,200 SH
MASTER ±0.00 ENS ENS

1,500 -
W19
120

4,300
BEDROOM 1o Pitch Roof with
CHANGING 720 720 DECK
LOKASI

1,500 - 1,500 SH
300mm UPSTAND

820
o
3 Pitch Roof with 300mm UPSTAND

D25
D17 D18 +0.18

20

820

820

550
1,200 SH
1,500 -
1,800 - 1,500 SH
BED 6

10,400
W39
WIR WIR

W18
120
+0.10
COVER
SITEROBE
2,600

o
1 Pitch Roof with D.P
192.88 m2 57
PARAPET WALL
820 ROBE
JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8

315
300mm UPSTAND ROBE
258.97 mSPA2
MAKE UP MAKE UP
820 820 TABLE TABLE 820 D20

D.P
130
D16 D19

D.P

SH 76
D15 1,950

300mm UPSTAND
3o Pitch Roof with
D.P

820

1,800 - 600 - 600


D29
min.1000mm SELECTED

82
820

820
D14
230.73 m2

D21

720
D22
BATH

SW
BALUSTRADE

W33
KELURAHAN : TAWANJUKA

W34 - 1,500
D24 D30

30
SERVICE AREA 3,850
3,000

12

13

14

15

16

17

18
DOWN

15

15
PLANTER BOX
DOWN

900 SH
WIR ±000
2,750

1,800

4,450
820
D23
2,400 - 1,800

D13 - 3,030
SITTING
D27
VO
11
KECAMATAN : TATANGA

303
STUDY

3,000
GYM

GYM
ID

300
300
D31
10

720
500 SW 1,500
3o Pitch Roof with 300mm UPSTAND OFFICE

- SW
720 +0.10 9

900 SH
BATH

1,800 -
VVOO

SW
ENS

820
- 900

W35
IDID

1,200
W41

UP
W38
300 -

600600
1,800 - 1,800 -

1,200
1,200 SH 1,200 SH fwg
JENIS BANGUNAN:

1
1,500 - 1,625 1,500
600- -3,000
2,400SH
SH 1,500600
- 3,000
- 2,400
SHSH
850

1,080 TILED PORCH


4,970 1,105 1,845 3,195 3,075 2,425 350 4,000 4,000 4,000 3,000 3,355
RUMAH TINGGAL (3 Lt)
TILED PORCH

PENANGGUNG JAWAB STRUKTUR & DESAIN


ARSITEK ANNE RUFAIDA, S.Ars
SITE PLAN 1:200 STRUKTUR

DRAFTER BAHARUDIN BASRI, S.Ars

NAMA GAMBAR SKALA


36,400
12,180 3,800 20,420
SITE PLAN 1:200
6,075 3,245 2,605 270 5,500 350 4,000 4,000 4,000 3,000 3,355
EXPOSED AGGREGATE DRIVEWAY
1,000
LUASAN:
1,600

1,800 -
0S -

1,8 0 SH

1,789 SH
40 800
H

40

1,800 - 1,800 - 1,800 - 1,800 -


00
1,

1,800 - 1,500 SH 1,500 SH 2,400 SH 900 SH 1,800 - 1,500 SH 600 SH


-

BGN INDUK TERAS TOTAL LUAS

1,800 - 1,500 SH
2,700
1,800 - 1,500 SH
2,600

659,16 M2 13,39 M 2 385.60 M2

4,300
1,800 - 1,500 SH

10,400
SITE COVER KODE JML LBR TGL/BLN/THN
2,600

258.97 m2 1,950

1,800 - 1,500 SH
ARS 74 18/03/2022
2,750

4,450
2,400 - 1,800

MENGETAHUI / MENYETUJUI
820

1,200
500 SW
300 -

1,800 - 1,800 -
1,200 SH 1,200 SH
KEPALA BIDANG PENGENDALIAN RUANG
850

1,080 TILED PORCH


4,970 1,105 1,845 3,195 3,075 2,425 350 4,000 4,000 4,000 3,000 3,355

TILED PORCH

BLOK PLAN 1:200 EMY AWALI, ST


PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PEMERINTAH KOTA PALU
DINAS PENATAAN RUANG
DAN PERTANAHAN
JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444

NOMOR BERKAS

CATATAN:

NAMA PEMOHON TANDA TANGAN


A
03-4
01
SECTION
Hj. HASDANIATY S. DJAFAR, S.E
3,655 OVERALL

608 15 597 300 15 658 15 198 15 448 215 15 235 308 15

608 15
LIVING ROOM
597 15 113
ENTRY
1,057
STORAGE
15
PACKAGING/GROUNDING COFFEE ROASTERY
898 15 308 15 LOKASI
95 150 73 37 30 163 30 57 270 620 358 90 93 150 210 0 65 195
JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8
15

15

15

1,000
145 15

145 15

145 15

15
57

PLANTER BOX GENERATOR


82

100
98

1,800 -
250
KELURAHAN : TAWANJUKA
0S -

1,8 0 SH
1,789 SH
PORCH 2.88 m2

40 800
H

40
W03
89

1,800 - 1,800 - 1,800 - 1,800 -

00

D.P
1,
1,800 - 1,500 SH D02 1,500 SH 2,400 SH D.P 900 SH 1,800 - 1,500 SH 600 SH
15

-
W0
4
W05

1,800 - 1,500 SH
W0

8
2,700
KECAMATAN : TATANGA
15

15

15

15
15

15
15
W07 W08 W09 W10 W11
95

155
90

W12
1,800 - 1,500 SH

GROUNDING
OHC

COFFEE ROASTERY
PACKAGING

580
ENTRY 02

KITCHEN
W02
150

JENIS BANGUNAN:

PACKING/GROUNDING
DINING

STORAGE
LIVING ROOM +0.25 +0.43
SECTION
CARPORT

STORAGE

4,350

420

427
2
CARPORT 36.00 m

D04
±0.00
600

553

250
DW
COFFEE
LIVING

KITCHEN
505

535

535

535
1 2
ROASTERY
75

LINE OF WALL ABOVE


1,055 OVERALL

RUMAH TINGGAL (3 Lt)


1,800 - 1,500 SH

352
UP
665

1,055
MW
1

+430 A
W01
150

D08
810

2
03-3

15
900 D05

D.P
3
A 1,400 1,950

15
03-1
PENANGGUNG JAWAB STRUKTUR & DESAIN
4
PUBLIC 78.46 m2

100
LIVING 150.72 m2 D03

1,800 - 1,500 SH
D12 5
133

6 800 1,500 820 135 210


820
15

ENTRY

ENTRY
W13

150
ENTRY

ARSITEK
7
D09 D07

155 15

15
15
ANNE RUFAIDA, S.Ars

280
03

12

13

14

15

16

17

18
1,000
STORE BELOW +0.25 SECTION

F
ENTRY

2,400 - 1,800

LOBBY
STAIRS
BED 4
PORCH

BED 4
275

STORE BELOW

438
WET KITCHEN
260

15
273

10

12

13

14

15

16

17

18

19
11

WET
8

DISPLAY
D11
180

D01

STRUKTUR
11

89
OHC

330

15
KITCHEN

315
315
10
720

720

STAIRS
D10

VOID ABOVE
ENS/BATH

ENS DISPLAY
9

PORCH BATH
28

W17 W16
ID
15

15

185

V O OVE

820

160
110
D06
3.49 m2

1,200
fwg
500 SW

135
W14

DRAFTER BAHARUDIN BASRI, S.Ars

UP
W15 300 -

1,800 - 1,800 -
AB
50
70

70

70

1,200 SH 1,200 SH
88

40
8

1
15
15

15

15

15

15

15
15

15
15

15
242 120 80 120 50 NAMA GAMBAR SKALA
15 162 15 420 15 113 222 15 185 15 408 15 410 120 15 565 15
15 DISPLAY
15 162 15 420 15 185 15 135 80 105 15 408 15 875 15 235 323
ENTRY BED 4 ENS BATH WET KITCHEN

2,717 BUILDING OVERALL


DENAH RENCANA LANTAI DASAR 1:160

A
03-2

LUASAN:

DENAH LANTAI DASAR - Skala 1:160 BGN INDUK TERAS TOTAL LUAS

659,16 M2 13,39 M 2 385.60 M2

KODE JML LBR TGL/BLN/THN

ARS 74 18/03/2022

MENGETAHUI / MENYETUJUI
KEPALA BIDANG PENGENDALIAN RUANG

EMY AWALI, ST
PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PEMERINTAH KOTA PALU
DINAS PENATAAN RUANG
DAN PERTANAHAN
JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444

NOMOR BERKAS

CATATAN:

A
03-4
NAMA PEMOHON TANDA TANGAN
01
2,548 OVERALL SECTION

120 315 565 1,548


Hj. HASDANIATY S. DJAFAR, S.E
120 15 300 15 535 15 420 15 185 15 185 15 398 15 285 15
CHANGING MASTER BEDROOM BED 1 ENS ENS BED 2 BED 3

15
10 23 179 23 19 159 120 65 120 109 80 120 40 120 80 115 130 115 80 120 40 120 155 120 105 LOKASI
W23 W24
W21 1,500 - 1,200 SH 1,500 - 1,200 SH
1,500 -
JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8
15
70

70

W25 W26 W28 W29 W30 W31


0

W2
0S -

1,5 0 SH
W2

118

118

118

118
1,789 SH
40 500
H

40
LINE OF WALL ABOVE

2
1,500 - 1,500 - W27 600 - 1,500 - 1,500 - 1,500 -

00
40

D.P
1,

1,200 SH 1,200 SH D.P


600 - 1,150 SW 1,150 SW 1,200 SH 1,200 SH 1,200 SH
15

-
KELURAHAN : TAWANJUKA
15

15

15

15

15
130
MASTER BEDROOM

KECAMATAN : TATANGA

ENS
218
BED 1 BED 2 BED 3
1,200 SH
CHANGING

MASTER ENS ENS 02


543

PARAPET WALL
1,500 -

SECTION
W19
120

BEDROOM
473

BED 1

BED 2
393

393
CHANGING 720 720
420

420
JENIS BANGUNAN:

498
528

D17 D18
20

15
820

820
1,200 SH
1,500 -
1,013 OVERALL

1,013 OVERALL
WIR WIR
W18
120

WIR
188
ROBE A
RUMAH TINGGAL (3 Lt)

15
820
ROBE MAKE UP MAKE UP
ROBE 03-3

15
820 820 TABLE TABLE 820 D20

D.P

143 15
A
130

D15 D16 D19


15

15
15

15

BATH
03-1

143
1,800 - 600 - 600
min.1000mm SELECTED
820

820

115
D14

230.73 m2

D21

720
BATH

D22

SW
BALUSTRADE
PENANGGUNG JAWAB STRUKTUR & DESAIN

W33

36 60
D24
225

3,850 03

12

13

14

15

16

17

18
DOWN

15

15

15
900 SH
SECTION
WIR
ARSITEK ANNE RUFAIDA, S.Ars

820
D23
SITTING

W34

STUDY
90
SITTING
WIR

430

430
425

11

OFFICE
375

VO
STUDY
15

72
ID

300

300

300
STRUKTUR
10
720

OFFICE
D13

900 SH
1,800 -
ENS

1,200 SW

ENS VO
185

W35
ID

90
600 -

UP
W38

DRAFTER BAHARUDIN BASRI, S.Ars

50
8

1
600 - 2,400 SH 600 - 2,400 SH
15

15

15

15

15

15

15
W37 W36
1,108 240 160 240 800 NAMA GAMBAR SKALA
15 300 15 535 15 1,163 15 165 15 175 15
BATH
15 420 15 535 15 820 15 343 120 15 220 15

15 420 15 335 15 185 15 420 15 385 15 463 15 220 15


DENAH LANTAI 1 1:150
WIR ENS VOID SITTING STUDY OFFICE
A
2,548 OVERALL
03-2
LUASAN:

DENAH LANTAI 1 - Skala 1:150 BGN INDUK TERAS TOTAL LUAS

659,16 M2 13,39 M 2 385.60 M2

KODE JML LBR TGL/BLN/THN

ARS 74 18/03/2022

MENGETAHUI / MENYETUJUI
KEPALA BIDANG PENGENDALIAN RUANG

EMY AWALI, ST
PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PEMERINTAH KOTA PALU
DINAS PENATAAN RUANG
DAN PERTANAHAN
JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444

NOMOR BERKAS

CATATAN:

A
03-4
NAMA PEMOHON TANDA TANGAN
01
SECTION

2,120 OVERALL Hj. HASDANIATY S. DJAFAR, S.E


8 15 320 15 200 15 1,033 440 60 15
BED 5 DECK
8 15 320 15 200 15 435 15 1,083 15
BED 6 SPA
LOKASI
129 150 286

W40 300 489


1,500 - 1,500 SH 116
JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8
15

15

15 68

68

68
53
D.P
D.P
15

KELURAHAN : TAWANJUKA

15
D.P D.P PLANTER BOX
60

60
BED 5
240

BED 5
315

KECAMATAN : TATANGA

820
OUTDOOR

820
D26

D28
168

02
±0.00 SECTION

DECK
DECK

300
15

JENIS BANGUNAN:
1,500 - 1,500 SH

820
D25
+0.18
15

550
BED 6

BED 6
240

W39
773

+0.10
963 OVERALL

963 OVERALL
PARAPET WALL 192.88 m2 57
A
RUMAH TINGGAL (3 Lt)
315
SPA
308

SPA 03-3

D.P

895
A

76

190
15

03-1
300mm UPSTAND
3o Pitch Roof with

820
D29

82
D30 PENANGGUNG JAWAB STRUKTUR & DESAIN

30
SERVICE AREA 3,000 03

12

13

14

15

16

17

18
SERVICE AREA

15

15

15

15
PLANTER BOX
DOWN
±000 SECTION
ARSITEK ANNE RUFAIDA, S.Ars
1,500 - 3,030
423

D27 11

STAIRS
303

3,000
GYM
GYM

GYM
300

300

300
300
STRUKTUR

D31
15

10
600 - 900 SW

720 +0.10 9
BATH/VOID

BATH VO
ID
145

W41

fwg
DRAFTER BAHARUDIN BASRI, S.Ars

1
1,500 - 1,625 1,500 - 3,000 SH 1,500 - 3,000 SH
15

15

15

30

15

15
W43 W42
643 300 83 300 795 NAMA GAMBAR SKALA
8 15 535 15 180 255 15 1,023 60 15
JACUZZI MASSAGE
8 15 170 15 150 15 185 15 820 15 463 15 160 60 15
BATH VOID GYM DENAH LANTAI 2 1:150
2,120 OVERALL

A
03-2
LUASAN:
FLOOR AREAS
DENAH LANTAI 2 - Skala 1:150 BGN INDUK TERAS
GROUND FLOOR
TOTAL LUAS
CARPORT 36.00
659,16 M2 13,39 M 2 PORCH 385.60 M2 2.88
LIVING 150.72
KODE JML LBR PORCH TGL/BLN/THN3.49
PUBLIC 78.46
ARS 74 18/03/2022
271.55 m2
FIRST FLOOR
LIVING 230.73
MENGETAHUI / MENYETUJUI
230.73 m2
KEPALA BIDANG PENGENDALIAN
SECOND FLOOR RUANG
LIVING 192.88
192.88 m2
TOTAL 695.16 m2

EMY AWALI, ST
PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PEMERINTAH KOTA PALU
DINAS PENATAAN RUANG
DAN PERTANAHAN
JL. BALAI KOTA SELATAN NO. 1 PALU
TELP. 0451-44444

NOMOR BERKAS

CATATAN:

A
03-4
NAMA PEMOHON TANDA TANGAN
01
SECTION

Hj. HASDANIATY S. DJAFAR, S.E

LOKASI

JALAN : BTN TAWANJUKA MAS, BLOK B, NO. 8

D.P
D.P D.P KELURAHAN : TAWANJUKA
PARAPET WALL KECAMATAN : TATANGA
02
SECTION
1o Pitch Roof with
3o Pitch Roof with 300mm UPSTAND 300mm UPSTAND JENIS BANGUNAN:

1o Pitch Roof with D.P

300mm UPSTAND
A
03-3 RUMAH TINGGAL (3 Lt)
A

D.P
03-1 D.P

PENANGGUNG JAWAB STRUKTUR & DESAIN


03
SECTION
ARSITEK ANNE RUFAIDA, S.Ars
3o Pitch Roof with 300mm UPSTAND STRUKTUR

DRAFTER BAHARUDIN BASRI, S.Ars

NAMA GAMBAR SKALA

RENCANA ATAP 1:150

A
03-2
LUASAN:

RENCANA ATAP - Skala 1:150 BGN INDUK TERAS TOTAL LUAS

659,16 M2 13,39 M 2 385.60 M2


FLOOR AREAS
KODE LBR FLOORTGL/BLN/THN
JMLGROUND
CARPORT 36.00
ARS 74 PORCH 18/03/2022 2.88
LIVING 150.72
PORCH 3.49
MENGETAHUI / MENYETUJUI
PUBLIC 78.46
KEPALA BIDANG PENGENDALIAN RUANG271.55 m2
FIRST FLOOR
LIVING 230.73
TOTAL 230.73 m2

EMY AWALI, ST
PENATA TINGKAT I
Nip. 19740615 200003 2 007

GSPublisherVersion 0.59.100.100
PRELIMINARY FOR DISCUSSION - REV D (21/03/2022)
6,075 3,230
BOUNDARY

BOUNDARY
ROOF PITCH 3° WITH 300mm
UPSTAND BEHIND PARAPET WALL

E-02 SIDE ELEVATION

CLIENT DRAWING NAME ISSUE SCALE JOB NUMBER DRAWING REVISION


Email
Fildzah Muqsitha Djafar SIDE ELEVATION
D
annerufaida01@ gmail.com 1:100
LOCATION
D 21/03/2022 PRELIM ISSUE AR
A3 03-2
Phone DESIGNER @
+62 811 458 4883 Tawanjuka, Kec. Palu Sel., Kota Palu, Sulawesi E:\!!WORK\ARCHITECTURE\220316 - ROASTERY HOUSE\220316\ROASTERY
Tengah HOUSE_ar220316.pln
GSPublisherVersion 0.59.100.100
PRELIMINARY FOR DISCUSSION - REV D (21/03/2022)
1,525

BOUNDARY

BOUNDARY
PARAPET WALL
ROOF PITCH 3° WITH 300mm UPSTAND

920
ROOF ROOF

SECOND FLOOR
2,900
ROOF PITCH 3° WITH
300mm UPSTAND

SECOND FLOOR SECOND FLOOR

200
FIRST FLOOR
2,900
11,100

FIRST FLOOR FIRST FLOOR


240
GROUND FLOOR
3,260

GROUND FLOOR GROUND FLOOR


680

E-03 REAR ELEVATION

CLIENT DRAWING NAME ISSUE SCALE JOB NUMBER DRAWING REVISION


Email
Fildzah Muqsitha Djafar REAR ELEVATION
D
annerufaida01@ gmail.com 1:100
LOCATION
D 21/03/2022 PRELIM ISSUE AR
A3 03-3
Phone DESIGNER @
+62 811 458 4883 Tawanjuka, Kec. Palu Sel., Kota Palu, Sulawesi E:\!!WORK\ARCHITECTURE\220316 - ROASTERY HOUSE\220316\ROASTERY
Tengah HOUSE_ar220316.pln
GSPublisherVersion 0.59.100.100
PRELIMINARY FOR DISCUSSION - REV D (21/03/2022)
3,230 6,075
BOUNDARY

BOUNDARY
ROOF PITCH 3° WITH 300mm UPSTAND
ROOF PITCH 3° WITH 300mm UPSTAND
920
SECOND FLOOR
2,900

ROOF PITCH 3° WITH 300mm UPSTAND


PARAPET WALL
200
FIRST FLOOR

ROOF PITCH 3° WITH 300mm UPSTAND


2,900
11,100
240
GROUND FLOOR
680 3,260

E-04 SIDE ELEVATION (SIDE ENTRY)

CLIENT DRAWING NAME ISSUE SCALE JOB NUMBER DRAWING REVISION


Email
Fildzah Muqsitha Djafar SIDE ELEVATION (ENTRY)
D
annerufaida01@ gmail.com 1:100
LOCATION
D 21/03/2022 PRELIM ISSUE AR
A3 03-4
Phone DESIGNER @
+62 811 458 4883 Tawanjuka, Kec. Palu Sel., Kota Palu, Sulawesi E:\!!WORK\ARCHITECTURE\220316 - ROASTERY HOUSE\220316\ROASTERY
Tengah HOUSE_ar220316.pln
GSPublisherVersion 0.59.100.100
PRELIMINARY FOR DISCUSSION - REV D (21/03/2022)
PARAPET WALL
ROOF PITCH 3° WITH 300mm UPSTAND

ROOF

GYM
2,900

ROOF PITCH 3° WITH 300mm UPSTAND


PARAPET WALL
SERVICE AREA

SECOND FLOOR
3,100

ROOF PITCH 3° WITH 300mm UPSTAND


PARAPET WALL
WALK IN ROBE SITTING STUDY OFFICE

FIRST FLOOR
3,500

3,260

SIDE ENTRY WET KITCHEN DISPLAY COFFEE ROASTERY ENTRY


ENTRY BED 4

GROUND FLOOR

SECTION 03

CLIENT DRAWING NAME ISSUE SCALE JOB NUMBER DRAWING REVISION


Email
Fildzah Muqsitha Djafar SECTION 03
D
annerufaida01@ gmail.com 1:100
LOCATION
D 21/03/2022 PRELIM ISSUE AR
A3 03-7
Phone DESIGNER @
+62 811 458 4883 Tawanjuka, Kec. Palu Sel., Kota Palu, Sulawesi E:\!!WORK\ARCHITECTURE\220316 - ROASTERY HOUSE\220316\ROASTERY
Tengah HOUSE_ar220316.pln
GSPublisherVersion 0.59.100.100

Anda mungkin juga menyukai