Anda di halaman 1dari 227

GAMBAR PERENCANAAN

PEKERJAAN LANJUTAN DED ( DETAIL ENGINEERING DESIGN)


JEMBATAN P. BINTAN - P. DOMPAK DAN REVIEW DESIGN

TANJUNGPINANG, 19 DESEMBER 2012


Catatan :

DAFTAR GAMBAR DAFTAR GAMBAR


NO NO. GAMBAR JUDUL GAMBAR KETERANGAN NO NO. GAMBAR JUDUL GAMBAR KETERANGAN
GENERAL ARR, 55 STR-1-50 POTONGAN TIPIKAL DIAPHRAGMA HANGER DI MAIN SPAN
1 STR-GA-01 CATATAN UMUM 56 STR-1-51 POTONGAN 1 - 12 DAN 13
2 STR-GA-02 DENAH PONDASI DAN TAMPAK ATAS 57 STR-1-52 POTONGAN 14
3 STR-GA-03 POTONGAN MEMANJANG 58 STR-1-53 SEGMENTASI BOX DI P7
CONCRETE DIMENSI 59 STR-1-54 POTONGAN 1 - 12
4 STR-1-01 DIMENSI PILECAP P5a 60 STR-1-55 POTONGAN 13
5 STR-1-02 DIMENSI PILECAP P6 LEMBAR 1-2 61 STR-1-56 POTONGAN 14
6 STR-1-03 DIMENSI PILECAP P6 LEMBAR 2-2 62 STR-1-57 PLAN I GIRDER JOIN DENGAN BOX
7 STR-1-04 DIMENSI PILECAP P6a-6b 63 STR-1-58 TIPIKAL PLAN I GIRDER LEMBAR 1-2 REVISI

8 STR-1-05 DIMENSI PILECAP P7 LEMBAR 1-2 64 STR-1-59 TIPIKAL PLAN I GIRDER LEMBAR 2-2 Tanggal
No. Catatan dan Revisi
9 STR-1-06 DIMENSI PILECAP P7 LEMBAR 2-2 65 STR-1-60 LONG SECTION SOP
10 STR-1-07 DIMENSI PILECAP P7a 66 STR-1-61 TYPICAL CROSS SECTION SLAB ON PILE
11 STR-1-07a DIMENSI PILECAP P8 & P8a LEMBAR 1 - 2 TENDON
12 STR-1-07b DIMENSI PILECAP P8 & P8a LEMBAR 2 - 2 67 STR-2-01 SKEMATIK TENDON JEMBATAN UTAMA
13 STR-1-08 DIMENSI PILECAP I-GIRDER (TIPIKAL) 68 STR-2-02 LAYOUT TENDON JEMBATAN UTAMA LEMBAR 1-3
14 STR-1-09 DIMENSI PILECAP ABT-3 69 STR-2-03 LAYOUT TENDON JEMBATAN UTAMA LEMBAR 2-3
15 STR-1-10 DIMENSI PIER P6 LEMBAR 1-2 70 STR-2-04 LAYOUT TENDON JEMBATAN UTAMA LEMBAR 3-3
16 STR-1-11 DIMENSI PIER P6 LEMBAR 2-2 71 STR-2-05 POTONGAN TENDON LEMBAR 1-14
17 STR-1-12 DIMENSI PIER P6a 72 STR-2-06 POTONGAN TENDON LEMBAR 2-14
18 STR-1-13 DIMENSI PIER P6b 73 STR-2-07 POTONGAN TENDON LEMBAR 3-14
19 STR-1-14 DIMENSI PIER P7 LEMBAR 1 - 2 74 STR-2-08 POTONGAN TENDON LEMBAR 4-14
20 STR-1-15 DIMENSI PIER P7 LEMBAR 2 - 2 75 STR-2-09 POTONGAN TENDON LEMBAR 5-14 DINAS PEKERJAAN UMUM
STR-1-16 DIMENSI PIER P7a STR-2-10 POTONGAN TENDON LEMBAR 6-14 PROVINSI KEPULAUAN RIAU
21 76
22 STR-1-17 DIMENSI PIER P8 & P8a LEMBAR 1-5 77 STR-2-11 POTONGAN TENDON LEMBAR 7-14
23 STR-1-18 DIMENSI PIER P8 & P8a LEMBAR 2-5 78 STR-2-12 POTONGAN TENDON LEMBAR 8-14
24 STR-1-19 DIMENSI PIER P8 & P8a LEMBAR 3-5 79 STR-2-13 POTONGAN TENDON LEMBAR 9-14
25 STR-1-20 DIMENSI PIER P8 & P8a LEMBAR 4-5 80 STR-2-14 POTONGAN TENDON LEMBAR 10-14 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
26 STR-1-21 DIMENSI PIER P8 & P8a LEMBAR 5-5 81 STR-2-15 POTONGAN TENDON LEMBAR 11-14 TELP. (0771) 443415

27 STR-1-22 DIMENSI PIER P9 82 STR-2-16 POTONGAN TENDON LEMBAR 12-14


KUASA PENGGUNA ANGGARAN
28 STR-1-23 DIMENSI PIER P10 83 STR-2-17 POTONGAN TENDON LEMBAR 13-14 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
29 STR-1-24 DIMENSI PIER P11 84 STR-2-18 POTONGAN TENDON LEMBAR 14-14
30 STR-1-25 DIMENSI PIER P12 85 STR-2-19 LAYOUT HANGER JEMBATAN PELENGKUNG LEMBAR 1-3
31 STR-1-26 DIMENSI PIER P13 86 STR-2-20 LAYOUT HANGER JEMBATAN PELENGKUNG LEMBAR 2-3
PURWANTA,ST
32 STR-1-27 DIMENSI PIER P14 87 STR-2-21 LAYOUT HANGER JEMBATAN PELENGKUNG LEMBAR 3-3 NIP. 19660921 199203 1 010
33 STR-1-28 DIMENSI PIER P15 88 STR-2-22 TIPIKAL POTONGAN HANGER
Nama Paket Pekerjaan
34 STR-1-29 DIMENSI PIER P16 89 STR-2-23 DETAIL BLISTER LEMBAR 1-2
35 STR-1-30 DIMENSI PIER P17 90 STR-2-24 DETAIL BLISTER LEMBAR 2-2
Pekerjaan lanjutan DED (Detail Engineering Design)
36 STR-1-31 DIMENSI PIER P18 91 STR-2-25 POTONGAN TENDON DI PIER HEAD Jembatan P.Bintan - P. Dompak
dan Review Design
37 STR-1-32 DIMENSI PIER P19 TULANGAN
38 STR-1-33 DIMENSI PIER P20 LEMBAR 1-2 92 STR-3-01
Konsultan Perencana
39 STR-1-34 DIMENSI PIER P20 LEMBAR 2-2 93 STR-3-01a TULANGAN PILECAP P5a
40 STR-1-35 DIMENSI ABT-2 LEMBAR 1-2 94 STR-3-02 DIMENSI PILECAP P6 LEMBAR 1-2
DIMENSI ABT-2 LEMBAR 3-2 DIMENSI PILECAP P6 LEMBAR 2-2
PT. MULTI PHI BETHA
41 STR-1-36 95 STR-3-02a CONSULTING ENGINEERS
42 STR-1-37 DIMENSI PIER P21 96 STR-3-03 TULANGAN PILE CAP P6a,P6b,P7a LEMBAR 1 - 2
TANGGAL :
43 STR-1-38 DIMENSI PIER P22 97 STR-3-04 TULANGAN PILE CAP P6a,P6b,P7a LEMBAR 2 - 2
44 STR-1-39 DIMENSI PIER P23 98 STR-3-04a TULANGAN PILECAP P8 & P8a LEMBAR 1 - 2 DISETUJUI Ir. Muhammad Ridwan Msc

45 STR-1-40 DIMENSI PIER P24 99 STR-3-04b TULANGAN PILECAP P8 & P8a LEMBAR 2 - 2
DIPERIKSA Altho Sagara,ST
46 STR-1-41 DIMENSI PIER P25 100 STR-3-05 TULANGAN PILE CAP
47 STR-1-42 DIMENSI PIER P26 101 STR-3-06 TULANGAN PIER P6 LEMBAR 1 - 4 DIGAMBAR Rohendy
48 STR-1-43 DIMENSI PIER P27 102 STR-3-07 TULANGAN PIER P6 LEMBAR 2 - 4
DIMENSI PIER P28 TULANGAN PIER P6 LEMBAR 3 - 4 Judul Gambar :
49 STR-1-44 103 STR-3-08
50 STR-1-45 DIMENSI PIER P29 104 STR-3-09 TULANGAN PIER P6 LEMBAR 4 - 4
DAFTAR GAMBAR
51 STR-1-46 DIMENSI PIER P30 105 STR-3-10 TULANGAN PIER P6a LEMBAR 1 - 4
52 STR-1-47 DIMENSI PIER ABT-3 LEMBAR 1-2 106 STR-3-11 TULANGAN PIER P6a LEMBAR 2 - 4
53 STR-1-48 DIMENSI PIER ABT-3 LEMBAR 2-2 107 STR-3-12 TULANGAN PIER P6a LEMBAR 3 - 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

54 STR-1-49 SEGMENTASI BOX DI P6 108 STR-3-13 TULANGAN PIER P6a LEMBAR 4 - 4


109 STR-3-14 TULANGAN PIER P6b LEMBAR 1 - 4
Catatan :

DAFTAR GAMBAR DAFTAR GAMBAR


NO NO. GAMBAR JUDUL GAMBAR KETERANGAN NO NO. GAMBAR JUDUL GAMBAR KETERANGAN
110STR-3-15 TULANGAN PIER P6b LEMBAR 2 - 4 164 STR-3-69 TULANGAN PIER HEAD
111 STR-3-16 TULANGAN PIER P6b LEMBAR 3 - 4 165 STR-3-70 TULANGAN BOX MAIN SPAN LEMBAR 1 - 6
112 STR-3-17 TULANGAN PIER P6b LEMBAR 4 - 4 166 STR-3-71 TULANGAN BOX MAIN SPAN LEMBAR 2 - 6
113 STR-3-18 TULANGAN PIER P7 LEMBAR 1 - 4 167 STR-3-72 TULANGAN BOX MAIN SPAN LEMBAR 3 - 6
114 STR-3-19 TULANGAN PIER P7 LEMBAR 2 - 4 168 STR-3-73 TULANGAN BOX MAIN SPAN LEMBAR 4 - 6
115 STR-3-20 TULANGAN PIER P7 LEMBAR 3 - 4 169 STR-3-74 TULANGAN BOX MAIN SPAN LEMBAR 5 - 6
116 STR-3-21 TULANGAN PIER P7 LEMBAR 4 - 4 170 STR-3-75 TULANGAN BOX MAIN SPAN LEMBAR 6 - 6
117 STR-3-22 TULANGAN PIER P7a LEMBAR 1 - 4 171 STR-3-76 TULANGAN BALOK PELENGKUNG (SIDE SPAN) REVISI

118 STR-3-23 TULANGAN PIER P7a LEMBAR 2 - 4 172 STR-3-77 TULANGAN BALOK PELENGKUNG (MAIN SPAN)
No. Tanggal Catatan dan Revisi
119 STR-3-24 TULANGAN PIER P7a LEMBAR 3 - 4 173 STR-3-78 REINFORCEMENT OF ARCH CROSS SECTION
120 STR-3-25 TULANGAN PIER P7a LEMBAR 4 - 4 174 STR-3-79 TIPIKAL TULANGAN BLISTER
121 STR-3-26 TULANGAN PIER P8 LEMBAR 1 - 5 175 STR-3-80 DETAIL BLISTER LEMBAR 1-3
122 STR-3-27 TULANGAN PIER P8 LEMBAR 2 - 5 176 STR-3-81 DETAIL BLISTER LEMBAR 2-3
123 STR-3-28 TULANGAN PIER P8 LEMBAR 3 - 5 177 STR-3-82 DETAIL BLISTER LEMBAR 3-3
124 STR-3-29 TULANGAN PIER P8 LEMBAR 4 - 5 178 STR-3-83 DIMENSI. TULANGAN DAN PROFIL TENDON I GIRDER
125 STR-3-30 TULANGAN PIER P8 LEMBAR 5 - 5 179 STR-3-84 TULANGAN PLAT LANTAI LEMBAR 1 - 2
126 STR-3-31 TULANGAN PIER P8a LEMBAR 1 - 3 180 STR-3-85 TULANGAN PLAT LANTAI LEMBAR 2 - 2
127 STR-3-32 TULANGAN PIER P8a LEMBAR 2 - 3 181 STR-3-85a DENAH DIAPHRAGMA LEMBAR 1 - 2
128 STR-3-33 TULANGAN PIER P8a LEMBAR 3 - 3 182 STR-3-85b DENAH DIAPHRAGMA LEMBAR 2 - 2
129 STR-3-34 TULANGAN PIER P9 LEMBAR 1 - 2 183 STR-3-86 DIMENSI DIAPHRAGMA UJUNG
130 STR-3-35 TULANGAN PIER P9 LEMBAR 2 - 2 184 STR-3-87 TULANGAN DIAPHRAGMA UJUNG DINAS PEKERJAAN UMUM
STR-3-36 TULANGAN PIER P10 LEMBAR 1 - 2 STR-3-88 DIMENSI DIAPHRAGMA TENGAH PROVINSI KEPULAUAN RIAU
131 185
132 STR-3-37 TULANGAN PIER P10 LEMBAR 2 - 2 186 STR-3-89 TULANGAN DIAPHRAGMA TENGAH
133 STR-3-38 TULANGAN PIER P11 LEMBAR 1 - 2 187 STR-3-90 DIMENSI DAN TULANGAN RC PELAT
134 STR-3-39 TULANGAN PIER P11 LEMBAR 2 - 2 188 STR-3-91 TULANGAN PLAT SOP LEMBAR 1 - 2
135 STR-3-40 TULANGAN PIER P12 LEMBAR 1 - 2 189 STR-3-92 TULANGAN PLAT SOP LEMBAR 2 - 2 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
136 STR-3-41 TULANGAN PIER P12 LEMBAR 2 - 2 190 STR-3-93 TULANGAN CAPING BEAM SOP TELP. (0771) 443415

137 STR-3-42 TULANGAN PIER P13 LEMBAR 1 - 2 191 STR-3-94 DETAIL TULANGAN TANGGA
KUASA PENGGUNA ANGGARAN
138 STR-3-43 TULANGAN PIER P13 LEMBAR 2 - 2 192 STR-3-95 TULANGAN TIPICAL PLAT PEDESTRIAN SLAB ON PILE LEMBAR 1-2 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
139 STR-3-44 TULANGAN PIER P14 LEMBAR 1 - 2 193 STR-3-96 TULANGAN TIPICAL PLAT PEDESTRIAN SLAB ON PILE LEMBAR 2-2
140 STR-3-45 TULANGAN PIER P14 LEMBAR 2 - 2
141 STR-3-46 TULANGAN PIER P15 LEMBAR 1 - 2
PURWANTA,ST
142 STR-3-47 TULANGAN PIER P15 LEMBAR 2 - 2 NIP. 19660921 199203 1 010
143 STR-3-48 TULANGAN PIER P16 LEMBAR 1 - 2
TULANGAN PIER P16 LEMBAR 2 - 2 Nama Paket Pekerjaan
144 STR-3-49
145 STR-3-50 TULANGAN PIER P17 LEMBAR 1 - 2
Pekerjaan lanjutan DED (Detail Engineering Design)
146 STR-3-51 TULANGAN PIER P17 LEMBAR 2 - 2 Jembatan P.Bintan - P. Dompak
dan Review Design
147 STR-3-52 TULANGAN PIER P18 LEMBAR 1 - 2
148 STR-3-53 TULANGAN PIER P18 LEMBAR 2 - 2
Konsultan Perencana
149 STR-3-54 TULANGAN PIER P19 LEMBAR 1 - 2
150 STR-3-55 TULANGAN PIER P19 LEMBAR 2 - 2
TULANGAN PIER P20 LEMBAR 1 - 2
PT. MULTI PHI BETHA
151 STR-3-56
CONSULTING ENGINEERS
152 STR-3-57 TULANGAN PIER P20 LEMBAR 2 - 2
TANGGAL :
153 STR-3-58 TULANGAN ABT-2
154 STR-3-59 TULANGAN PIER 21 DISETUJUI Ir. Muhammad Ridwan Msc

155 STR-3-60 TULANGAN PIER 22


DIPERIKSA Altho Sagara,ST
156 STR-3-61 TULANGAN PIER 23
157 STR-3-62 TULANGAN PIER 24
DIGAMBAR Rohendy
158 STR-3-63 TULANGAN PIER 25
TULANGAN PIER 26 Judul Gambar :
159 STR-3-64
160 STR-3-65 TULANGAN PIER 27
DAFTAR GAMBAR
161 STR-3-66 TULANGAN PIER 28
162 STR-3-67 TULANGAN PIER 29
163 STR-3-68 TULANGAN PIER 30 SKALA JUMLAH GAMBAR NOMOR LEMBAR
Catatan :

2
-

600x400 600x400 600x400 600x400 600x400 600x400


600x400

600x400

600x400

600x400

600x400

600x400

600x400
REVISI

No. Tanggal Catatan dan Revisi

600x400 600x400 600x400 600x400 600x400 600x400

1
-
600x400

600x400

600x400

600x400

600x400

600x400

600x400
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

600x400 600x400 600x400 600x400 600x400

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

5000 5000 5000 5000 5000 5000 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
30000

DENAH BALOK 1 PURWANTA,ST


- NIP. 19660921 199203 1 010
SKALA 1 : 100
Nama Paket Pekerjaan
30000
Pekerjaan lanjutan DED (Detail Engineering Design)
5000 5000 5000 5000 5000 5000 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


POTONGAN 1 2
SKALA 1 : 50 - DIPERIKSA Altho Sagara,ST

5000 5000

200
400 DIGAMBAR Rohendy

200
Judul Gambar :
600
DENAH BALOK

POTONGAN 2 2 POTONGAN 2 2 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 - -
SKALA 1 : 50
-----
Catatan :

2 3
- -

600x400 600x400 600x400 600x400 600x400 600x400

REVISI

D16-300 No. Tanggal Catatan dan Revisi


600x400

600x400

600x400

600x400

600x400

600x400

600x400
D16-300
D16-300

D16-300

D16-300

D16-300
600x400 600x400 600x400 600x400 600x400 600x400

1
-

D16-300 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
600x400

600x400

600x400

600x400

600x400

600x400

600x400
D16-300
D16-300

D16-300

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


600x400 600x400 600x400 600x400 600x400 600x400 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
5000 5000 5000 5000 5000 5000

30000
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


TULANGAN PELAT LANTAI 1
SKALA 1 : 100 - Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

D16-300 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
D16-300 D16-300 D16-300 D16-300 D16-300 D16-300
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

D16-300 D16-300 D16-300 D16-300 D16-300 D16-300


DIPERIKSA Altho Sagara,ST

D16-300
DIGAMBAR Rohendy

Judul Gambar :
POTONGAN 1 2 TULANGAN PELAT LANTAI
SKALA 1 : 50 - LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

-----
Catatan :

4 D19

200
D13-150

200
4 D19

REVISI

No. Tanggal Catatan dan Revisi

POTONGAN 1 1
SKALA 1 : 25 -

D16-300

D16-300 D16-300 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

D16-300 D16-300
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
D16-300 D16-300 TELP. (0771) 443415

D16-300
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
POTONGAN 2 2
SKALA 1 : 50 -
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
D16-300
D16-300 D16-300
Konsultan Perencana
D16-300 D16-300

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
D16-300 D16-300
DISETUJUI Ir. Muhammad Ridwan Msc
D16-300
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN 3 3 Judul Gambar :


SKALA 1 : 50 -
TULANGAN PELAT LANTAI
LEMBAR 2 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

-----
A
-

850 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400

1700 200 200 200 200 200 200 200 200 200 200 200 200
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

50200

50700

1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 850

200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200 200
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1700
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
DIMENSI CAPING BEEM 1- TELP. (0771) 443415
SKALA 1 : 100

2000
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

250
PURWANTA,ST
NIP. 19660921 199203 1 010

L=16.2m Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

15000
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

1200
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 2- DIMENSI CAPING BEEM


SKALA 1 : 100

SKALA JUMLAH GAMBAR NOMOR LEMBAR

1 : 100 --------
Catatan :

16 D25-100

40D
REVISI

No. Tanggal Catatan dan Revisi


SK, D16-100
3 D25-400

3 D25-400

16 D25-100
30 D25
D16 - 100
A DINAS PEKERJAAN UMUM
- PROVINSI KEPULAUAN RIAU

TULANGAN POKOK 30 D25


SPIRAL D16-100

SPIRAL D16-100
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
L=16.2m TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
POTONGAN A 1-
SKALA 1 : 50
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

40D
dan Review Design

Konsultan Perencana
TULANGAN CAPING BEEM 1-
SKALA 1 : 50 PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN CAPING BEEM DAN


TULANGAN BOR PILE
TULANGAN BOR PILE 1-
SKALA 1 : 50 SKALA JUMLAH GAMBAR NOMOR LEMBAR

1 : 100 --------
Concrete dimensi
Catatan :

1. Pondasi baru menggunakan

2. Pondasi lama tidak digunakan


3. Penambahan tebal pile cap 500mm
8000 (detail terlampir)
2000
3000 600 800 600 3000

2000
REVISI

No. Tanggal Catatan dan Revisi


HWL+3.070
1000 2000 2000 2000 1000
B SKIRTING PANEL SKIRTING PANEL
STR-1-01

8000
1000 2000 2000 2000 1000 L=21m
HWL+0.700
1000

1000
A
1400
2000

2000
STR-1-01 DINAS PEKERJAAN UMUM
POTONGAN A 2 PROVINSI KEPULAUAN RIAU

SKALA 1 : 100 STR-1-01


600 800 600
8000
2000

5560
2760

2000
8000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
2000

2000
1400

8000
1220 1400 2760 1400 1220
PURWANTA,ST
2000 NIP. 19660921 199203 1 010
1000

1000

Nama Paket Pekerjaan

2000
1000 2000 2000 2000 1000
Pekerjaan lanjutan DED (Detail Engineering Design)
8000 Jembatan P.Bintan - P. Dompak
dan Review Design

HWL+3.070 Konsultan Perencana

DIMENSI PILECAP P5a 1 SKIRTING PANEL


1000 2000 2000 2000 1000
SKIRTING PANEL PT. MULTI PHI BETHA
SKALA 1 : 100 STR-1-01 CONSULTING ENGINEERS
TANGGAL :
L=21m
HWL+0.700 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
POTONGAN B 3
SKALA 1 : 100 STR-1-01 DIMENSI PILECAP P5a

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-01
Catatan :

1. Pondasi Existing ditambah

2. penambahan pile cap 500mm


(detail terlampir)

B
STR-1-03

14800

3344 8111 3344


SKIRTING PANEL
REVISI

No. Tanggal Catatan dan Revisi

1100
3344
A
STR-1-03

2700
1400
DINAS PEKERJAAN UMUM

3600
PROVINSI KEPULAUAN RIAU

600 800 600 PILECAP EXISTING


14800

14800
5560
2760
8111

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

3600
1400 PURWANTA,ST
2000 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

2700
dan Review Design
3344

Konsultan Perencana

PT. MULTI PHI BETHA

1100
CONSULTING ENGINEERS
TANGGAL :

1100 2700 7200 2700 1100 DISETUJUI Ir. Muhammad Ridwan Msc

14800 DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI PILECAP P6 1 DIMENSI PILECAP P6


SKALA 1 : 100 STR-1-02 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-02
Catatan :

1. Pondasi Existing ditambah

2. penambahan pile cap 500mm


(detail terlampir)
6200 2000 6200
PILECAP EXISTING

2500
3250
REVISI

250
HWL+3.070 Tanggal

500

500
No. Catatan dan Revisi

1100 2700 3600 3600 2700 1100


SKIRTING PANEL 14800
SKIRTING PANEL
HWL+0.700

POTONGAN B 2 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
SKALA 1 : 100 STR-1-02

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
4420 1400 2760 1400 4420 SELAKU PEJABAT PEMBUAT KOMITMEN

PILECAP EXISTING

PURWANTA,ST
NIP. 19660921 199203 1 010
2500

Nama Paket Pekerjaan


3250

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

HWL+3.070
500

Konsultan Perencana
1100 2700 3600 3600 2700 1100

14800 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SKIRTING PANEL SKIRTING PANEL
TANGGAL :
HWL+0.700
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 1 DIMENSI PILECAP P6


SKALA 1 : 100 STR-1-02 LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-03
Catatan :

8000
2000
3000 600 800 600 3000

1500
2250
REVISI

No. Tanggal Catatan dan Revisi


HWL+3.070

500
1000 2000 2000 2000 1000
B SKIRTING PANEL SKIRTING PANEL
STR-1-04

8000
1000 2000 2000 2000 1000 L=21m
HWL+0.700
1000

1000
A
1400
2000

2000
STR-1-04 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

600 800 600


POTONGAN A 2
SKALA 1 : 100 STR-1-04
8000
2000

5560
2760

2000
8000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
2000

2000
1400

8000 PURWANTA,ST
2000 NIP. 19660921 199203 1 010
1220 1400 2760 1400 1220
1000

1000

Nama Paket Pekerjaan


1000 2000 2000 2000 1000

1500
Pekerjaan lanjutan DED (Detail Engineering Design)
8000 Jembatan P.Bintan - P. Dompak

2250
dan Review Design

HWL+3.070

500
Konsultan Perencana

DIMENSI PILECAP P6a-6b 1 SKIRTING PANEL


1000 2000 2000 2000 1000
SKIRTING PANEL PT. MULTI PHI BETHA
SKALA 1 : 100 STR-1-04 CONSULTING ENGINEERS
TANGGAL :
L=21m
HWL+0.700 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
POTONGAN B 3
SKALA 1 : 100 STR-1-04 DIMENSI PILECAP P6a-6b

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-04
Catatan :

B
STR-1-06

14800

3344 8111 3344


SKIRTING PANEL
REVISI

No. Tanggal Catatan dan Revisi

1100
3344
A
STR-1-06

2700
1400

1400
DINAS PEKERJAAN UMUM

3600
PROVINSI KEPULAUAN RIAU

600 800 600 600 800 600


14800

14800
5560
2760

5560
2760
8111

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

3600
1400

1400
PURWANTA,ST
3650 2000 3500 2000 3650 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

2700
dan Review Design
3344

Konsultan Perencana

PT. MULTI PHI BETHA

1100
CONSULTING ENGINEERS
TANGGAL :

1100 2700 7200 2700 1100 DISETUJUI Ir. Muhammad Ridwan Msc

14800 DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

DIMENSI PILECAP P7 1 Judul Gambar :

SKALA 1 : 100 STR-1-05 DIMENSI PILECAP P7


LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-05
Catatan :

3450 2000 3500 2000 3450

2000
2750
REVISI

HWL+3.070 Tanggal

500
No. Catatan dan Revisi

1100 2700 3600 3600 2700 1100


14800
SKIRTING PANEL SKIRTING PANEL
HWL+0.700

POTONGAN B 2 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
SKALA 1 : 100 STR-1-05

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

4420 1400 2760 1400 4420


PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


2000
2750

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

HWL+3.070
500

Konsultan Perencana
1100 2700 3600 3600 2700 1100

14800 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SKIRTING PANEL SKIRTING PANEL
TANGGAL :
HWL+0.700
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 1 DIMENSI PILECAP P7


SKALA 1 : 100 STR-1-05 LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-06
Catatan :

8000
2000
3000 600 800 600 3000

1500
2250
REVISI

No. Tanggal Catatan dan Revisi


HWL+3.070

500
1000 2000 2000 2000 1000
B SKIRTING PANEL SKIRTING PANEL
STR-1-07

8000
1000 2000 2000 2000 1000 L=21m
HWL+0.700
1000

1000
A
1400
2000

2000
STR-1-07 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

600 800 600


POTONGAN A 2
SKALA 1 : 100 STR-1-07
8000
2000

5560
2760

2000
8000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
2000

2000
1400

8000 PURWANTA,ST
2000 NIP. 19660921 199203 1 010
1220 1400 2760 1400 1220
1000

1000

Nama Paket Pekerjaan


1000 2000 2000 2000 1000

1500
Pekerjaan lanjutan DED (Detail Engineering Design)
8000 Jembatan P.Bintan - P. Dompak

2250
dan Review Design

HWL+3.070

500
Konsultan Perencana

DIMENSI PILECAP P7a 1 SKIRTING PANEL


1000 2000 2000 2000 1000
SKIRTING PANEL PT. MULTI PHI BETHA
SKALA 1 : 100 STR-1-07 CONSULTING ENGINEERS
TANGGAL :
L=21m
HWL+0.700 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
POTONGAN B 3
SKALA 1 : 100 STR-1-07 DIMENSI PILECAP P7a

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-07
Catatan :

6680
C
STR-1-07b

250
B

1000
STR-1-07b

1500
REVISI

2850
7200 No. Tanggal Catatan dan Revisi

5400
1800 3600 1800
6680

1980
1800

3930
2620

2500
1700
2500 3000 1700 1500
1000 2000

800
3000

2000
4780
1400

3600

1200
3600

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

250
1000
HWL+3.070

500
20000
10800

2760

7200
SKIRTING PANEL
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
L=21m L=21m TELP. (0771) 443415

HWL+0.700 KUASA PENGGUNA ANGGARAN


3600

BIDANG BINA MARGA


1400

SELAKU PEJABAT PEMBUAT KOMITMEN


A
STR-1-07a
PURWANTA,ST
NIP. 19660921 199203 1 010
1800
2620

1800 3600 4780 Nama Paket Pekerjaan


1800

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN ~ A 2
5400

Konsultan Perencana
SKALA 1 : 100 STR-1-07a
2850

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


1500

DIPERIKSA Altho Sagara,ST


1000
250

DIGAMBAR Rohendy

1000 1000 Judul Gambar :

DIMENSI PILECAP P8 & P8a


LEMBAR 1 - 2
DIMENSI PILECAP P8 & P8a 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 100 STR-1-07a
STR-1-07a
Catatan :

1500 5470 5470 1500


2850 2620 2620 2850

250 1400 2760 1400 250

2000
250 1200
REVISI
HWL+3.070
500
No. Tanggal Catatan dan Revisi

HWL+0.700

L=21m

5400 3600 3600 5400


DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

POTONGAN ~ B 1
SKALA 1 : 100 STR-1-07a
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
250 1500 16500 1500 250 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


1200

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
1000 5400 7200 5400 1000
Judul Gambar :

DIMENSI PILECAP P8 & P8a


POTONGAN ~ C 2 LEMBAR 2 - 2

SKALA 1 : 100 STR-1-07a SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-07b
Catatan :

B
STR-1-08

12400
4400 3600 4400

1200 2000 1200 1200 2000 1200


1200

1200
900
A REVISI
4400

4400
2000

2800

2800

2000
1000
STR-1-08
No. Tanggal Catatan dan Revisi

900
1200

1200
4400 4400 1000

4400

DIMENSI PILECAP I-GIRDER 1 800 2800 800


DINAS PEKERJAAN UMUM
SKALA 1 : 100 STR-1-08 PROVINSI KEPULAUAN RIAU

1500
2250
HWL+3.070

500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


L=21m BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+0.700
PURWANTA,ST
NIP. 19660921 199203 1 010

4400 4400 Nama Paket Pekerjaan


1500

1200 2000 1200 1200 2000 1200 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
POTONGAN B 3 dan Review Design

SKALA 1 : 100 STR-1-08


1500

1500

Konsultan Perencana
2250

PT. MULTI PHI BETHA


HWL+3.070
500

CONSULTING ENGINEERS
1000 2000 1000 1000 2000 1000
TANGGAL :
4000 4000
DISETUJUI Ir. Muhammad Ridwan Msc

L=21m L=21m DIPERIKSA Altho Sagara,ST

HWL+0.700
DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 3 DIMENSI PILECAP I-GIRDER (TIPIKAL)


SKALA 1 : 100 STR-1-08
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-08
Catatan :

1000
REVISI

No. Tanggal Catatan dan Revisi

1500
1000 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1000
20000
A
STR-1-08 L=

850 1300 850 DINAS PEKERJAAN UMUM


POTONGAN A 2 PROVINSI KEPULAUAN RIAU

SKALA 1 : 100 STR-1-09


1058

1500

1500

HWL+3.070

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


600 1800 600 TELP. (0771) 443415

3000
20000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
HWL+0.700 SELAKU PEJABAT PEMBUAT KOMITMEN

L=21m
600

850 1300 850


PURWANTA,ST
NIP. 19660921 199203 1 010
1800

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

DIMENSI PILE CAP ABT-3 1


dan Review Design

SKALA 1 : 100 STR-1-09 Konsultan Perencana


3100

300 700 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 700 300

2500
20000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

POTONGAN B 3
DISETUJUI Ir. Muhammad Ridwan Msc

SKALA 1 : 100 STR-1-09 DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI PILECAP ABT-3

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-09
Catatan :

A
STR-1-011

3600 3600

REVISI

No. Tanggal Catatan dan Revisi

300

1000 500
B
STR-1-11
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

6511
DIMENSI PIER P6

5011
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
1000 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

6200 600 800 600 6200


PURWANTA,ST
C NIP. 19660921 199203 1 010
2500

STR-1-11
Nama Paket Pekerjaan
3250

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
250

dan Review Design


HWL+3.070
500

Konsultan Perencana

SKIRTING PANEL SKIRTING PANEL


PT. MULTI PHI BETHA
CONSULTING ENGINEERS

HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
DIMENSI PIER P6 1 DIMENSI PIER P6
SKALA 1 : 100 STR-1-10
LEMBAR 1-2
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-10
Catatan :

15400
2700 1400 800 2800 2800 800 1400 2700

250
450

450
250

450

450
REVISI

467

467
1000 1800 1800 1000 4100 No. Tanggal Catatan dan Revisi

1400
1915
600 1000 1400 600

3500
2650
150 PELAT INJAK

2000

800

800

5560
2760
200
500
300

300
800 700

500
3700

1400 1400

1000

1400
2760
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
2000
6511

6511
1940

DIMENSI PIER P6

POTONGAN B
5011
2 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
SKALA 1 : 100 STR-1-10 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


2085

BIDANG BINA MARGA


4420 1400 2760 1400 4420 SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST

1400
NIP. 19660921 199203 1 010
2500

Nama Paket Pekerjaan


3250

600 800 600 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

5560
2760
dan Review Design
HWL+3.070
500

Konsultan Perencana
1100 2700 3600 3600 2700 1100
14800 PT. MULTI PHI BETHA
SKIRTING PANEL CONSULTING ENGINEERS

1400
HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


2000

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
POTONGAN A 1 POTONGAN C 3 DIMENSI PIER P6
SKALA 1 : 100 STR-1-10 SKALA 1 : 100 STR-1-10
LEMBAR 2-2
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-11
Catatan :

A
STR-1-12

2500 2500
15400

2700 1400 800 2800 2800 800 1400 2700

REVISI

250

250
550

550
549

549
955
No. Tanggal Catatan dan Revisi

337

367
RAILING 1500
600 600

1200

1820
Plat t=150

250

400

563
Beam @ 2.5m

300
1600 1250

1000 500

1000 500
4160 790 5500 790 4160

1400 1400

1400
2760

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

5560
2760
8285

8285
6785

6785
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

1400
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

8000 2000
2000 8000
PURWANTA,ST
3000 600 800 600 3000 1220 1400 2760 1400 1220 POTONGAN B 2 NIP. 19660921 199203 1 010

SKALA 1 : 100 STR-1-12 Nama Paket Pekerjaan

B
1500

1500

Pekerjaan lanjutan DED (Detail Engineering Design)


2250

STR-1-12 Jembatan P.Bintan - P. Dompak


dan Review Design
250

1400
HWL+3.070
500

Konsultan Perencana
1000 2000 2000 2000 1000 1000 2000 2000 2000 1000
PT. MULTI PHI BETHA
600 800 600 CONSULTING ENGINEERS
L=21m TANGGAL :

5560
2760
L=21m
HWL+0.700 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

1400
Judul Gambar :
DIMENSI PIER P6a 1 POTONGAN A 2 2000
SKALA 1 : 100 SKALA 1 : 100 DIMENSI PIER P6a
STR-1-12 STR-1-12

POTONGAN B 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-1-12


Catatan :

A
STR-1-13
2500 2500
15400

2700 1400 800 2800 2800 800 1400 2700

250

250
550

550
549

549
REVISI

955
337

367
No. Tanggal Catatan dan Revisi
RAILING 1500
600 600

1200

1820
Plat t=150

250

400

563
Beam @ 2.5m
300

1600 1250

1400
1000 500

1000 500
4160 790 5500 790 4160

1400 1400

2760

5560
2760
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1400
8938

8938
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
7438

TELP. (0771) 443415


2000
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
POTONGAN B 2 SELAKU PEJABAT PEMBUAT KOMITMEN

SKALA 1 : 100 STR-1-13


8000
PURWANTA,ST
2000 8000 NIP. 19660921 199203 1 010
3000 600 800 600 3000 1220 1400 2760 1400 1220
Nama Paket Pekerjaan

1400
B Pekerjaan lanjutan DED (Detail Engineering Design)
1500

1500

Jembatan P.Bintan - P. Dompak


STR-1-13 dan Review Design
2250

600 800 600


250

Konsultan Perencana
HWL+3.070
500

5560
2760
1000 2000 2000 2000 1000 1000 2000 2000 2000 1000 PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

L=21m L=21m

1400
DISETUJUI Ir. Muhammad Ridwan Msc
HWL+0.700
DIPERIKSA Altho Sagara,ST

2000
DIGAMBAR Rohendy

Judul Gambar :
DIMENSI PIER P6b 1 POTONGAN A 2 POTONGAN B 3
SKALA 1 : 100 STR-1-13 SKALA 1 : 100 STR-1-13 SKALA 1 : 100 STR-1-13 DIMENSI PIER P6b

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-13
Catatan :

A
STR-1-15

REVISI

3500
No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

8753
8711

8522

8531
8512
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

3450 2000 3500 2000 3450

PURWANTA,ST
600 800 600 600 800 600 NIP. 19660921 199203 1 010
2000

Nama Paket Pekerjaan


2750

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

DIMENSI PIER P7 1
Judul Gambar :

SKALA 1 : 100 STR-1-14 DIMENSI PIER P7


LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-14
Catatan :

15400
2700 1400 800 2800 2800 800 1400 2700

250
450

450
250

450

450
467

467

1400
1000 1800 1800 1000 4100

250
1915
600 1000 1400 600 REVISI

3500
2650
PELAT INJAK No. Tanggal Catatan dan Revisi
600 800 600

150
2000

5560
2760
800

800
200

2063
500
800

3700
170

1400
2000

DINAS PEKERJAAN UMUM


1940

PROVINSI KEPULAUAN RIAU

970
POTONGAN B 2
SKALA 1 : 100 STR-1-15
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
3795

B KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
STR-1-15 SELAKU PEJABAT PEMBUAT KOMITMEN
4420 1400 2760 1400 4420

PURWANTA,ST
NIP. 19660921 199203 1 010
2000

Nama Paket Pekerjaan


2750

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN A 1 Judul Gambar :

SKALA 1 : 100 STR-1-14 DIMENSI PIER P7


LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-15
Catatan :

A
STR-1-16

2500 2500
15400

2700 1400 800 2800 2800 800 1400 2700

250

250
550

550
549

549
955
337

367
REVISI
RAILING 1500
600 600
No. Tanggal Catatan dan Revisi

1200

1820
Plat t=150

250

400

563
225
Beam @ 2.5m
300

300
1600 1250

1400
1000 500

1000 500
4160 790 5500 790 4160
5500

B
STR-1-16
2760

5560
2760
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1400
9372

9372
7872

7872
2000 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

POTONGAN B 2 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SKALA 1 : 100 STR-1-16 SELAKU PEJABAT PEMBUAT KOMITMEN

8000
2000

1400
8000 PURWANTA,ST
NIP. 19660921 199203 1 010
3000 600 800 600 3000 1220 1400 2760 1400 1220
Nama Paket Pekerjaan

C 600 800 600 Pekerjaan lanjutan DED (Detail Engineering Design)


1500

1500

STR-1-16 Jembatan P.Bintan - P. Dompak

5560
2760
dan Review Design

Konsultan Perencana
HWL+3.070
1000 2000 2000 2000 1000 1000 2000 2000 2000 1000
PT. MULTI PHI BETHA

1400
CONSULTING ENGINEERS
TANGGAL :
L=21m L=21m
HWL+0.700 2000 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
DIMENSI PIER P7a 1 POTONGAN A 2 POTONGAN B 3
SKALA 1 : 100 STR-1-16 SKALA 1 : 100 STR-1-16 SKALA 1 : 100 STR-1-16 DIMENSI PIER P7a

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-16
Catatan :

3000

F H
STR-1-19 STR-1-21

1400
G
STR-1-20

6680
1000
5440 560 700

2760

5560
250
E- 425 REVISI

No. Tanggal Catatan dan Revisi


725 1345
1000 2500 2930

3245

1400
800 1700 800 2530

240
150

500
413

1000

1000
800
D- 300

1000 500 2150

1000

1000
A 850
POTONGAN ~ A 2

1000
STR-1-17 SKALA 1 : 100 STR-1-17

3000
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
8930

1400
9530
7430

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

7530
1000
B C KUASA PENGGUNA ANGGARAN
STR-1-17 STR-1-17 BIDANG BINA MARGA

2760

5560
SELAKU PEJABAT PEMBUAT KOMITMEN

3930 PURWANTA,ST
2500 NIP. 19660921 199203 1 010
1700

1400
1500 Nama Paket Pekerjaan
1000 2000
800

3000 Pekerjaan lanjutan DED (Detail Engineering Design)


2000

Jembatan P.Bintan - P. Dompak


3600 dan Review Design

Konsultan Perencana
HWL+3.070 POTONGAN ~ B 2
SKALA 1 : 100 STR-1-17 PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :
1500
DISETUJUI Ir. Muhammad Ridwan Msc
HWL+0.700

1500
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN ~ C 3 DIMENSI PIER P8 & P8a


LEMBAR 1-5
DIMENSI PIER P8 & P8a 1 SKALA 1 : 100 STR-1-17
SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 100 STR-1-17

STR-1-17
Catatan :

6680
2530 725 1345 2530 6700

3000

3000

3000
4400
REVISI

No. Tanggal Catatan dan Revisi


6900
1500 2500 2500 50

4220
2850

2850

50

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

15400
5500

5560 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
50

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


2850

Pekerjaan lanjutan DED (Detail Engineering Design)


4220

EXPANSION JOIN Jembatan P.Bintan - P. Dompak


dan Review Design

Konsultan Perencana

200 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
4400

DISETUJUI
3000

Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

850 Judul Gambar :

DIMENSI PIER P8 & P8a


LEMBAR 2-5

POTONGAN ~ D 1 POTONGAN ~ E 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 - SKALA 1 : 100 -


STR-1-18
Catatan :

3000 14000 3000

REVISI
2324

Tanggal

3000
No. Catatan dan Revisi

150
500 150
563
413

300

1000 500

1200
1000
1250 1500 250
3000

4220

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

8930
9530

7730
7430
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

1500 5470 5470 1500 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


1400 2760 1400
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana
HWL+3.070
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


HWL+0.700
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI PIER P8 & P8a


LEMBAR 3-5
POTONGAN ~ F 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 100 STR-1-17

STR-1-19
Catatan :

REVISI

2480
No. Tanggal Catatan dan Revisi

1000

1200
250 1250 250

1000
3000 4220 5560 4220 3000

1000
16500
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
9530

9530
7730
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
7530

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010
1400 2760 1400
Nama Paket Pekerjaan
1500
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
1200

dan Review Design

Konsultan Perencana
HWL+3.070
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


HWL+0.700
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI PIER P8 & P8a


LEMBAR 4-5

POTONGAN ~ G 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 STR-1-17

STR-1-20
Catatan :

250
REVISI

2480
No. Tanggal Catatan dan Revisi

1000

250 1250 1250 250

1000
3000 3000

1000

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
9530

9530
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
7530

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


250 1500 250 250 1500 250
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
1200

dan Review Design

Konsultan Perencana
HWL+3.070
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


HWL+0.700
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

5400 7200 5400


DIMENSI PIER P8 & P8a
LEMBAR 5-5
POTONGAN ~ H 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 100 STR-1-17

STR-1-21
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-22
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI
800 800 1000 3000

1000

1000
No. Tanggal Catatan dan Revisi

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000

DINAS PEKERJAAN UMUM


8061

8061
PROVINSI KEPULAUAN RIAU

1000 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

4400 B 4400 4400


KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA

1500
STR-1-22 SELAKU PEJABAT PEMBUAT KOMITMEN
800 2800 800 1200 2000 1200 1200 2000 1200

PURWANTA,ST
1500

1500

1500
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


HWL+3.070 HWL+3.070 Pekerjaan lanjutan DED (Detail Engineering Design)
1000 2000 1000 1000 2000 1000 1000 2000 1000 Jembatan P.Bintan - P. Dompak
dan Review Design
4000 4000 4000
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

10000
DIMENSI PIER P9 1 2000 6000 2000
POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc

SKALA 1 : 100 STR-1-22 SKALA 1 : 100 STR-1-22 DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-22 STR-1-22
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-23
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
1000 3000 REVISI
800 800

1000

1000
Tanggal

1500
No. Catatan dan Revisi

2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000

7263
DINAS PEKERJAAN UMUM
7763

PROVINSI KEPULAUAN RIAU

1000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


B 4400 TELP. (0771) 443415
STR-1-23
800 4400
2800 4400
KUASA PENGGUNA ANGGARAN

1500
BIDANG BINA MARGA
800 1200 2000 1200 1200 2000 1200 SELAKU PEJABAT PEMBUAT KOMITMEN
1500

1500

1500
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
4000 4000 4000 dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DIMENSI PIER P10 1 10000 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc

SKALA 1 : 100 STR-1-23 2000 6000 2000 SKALA 1 : 100 STR-1-23


DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-23 STR-1-23
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-24
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
1000 3000 REVISI
800 800

1000

1000

1500
No. Tanggal Catatan dan Revisi

2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 7442 5000 2000 6000 2000 5000

7442
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


4400 B 4400 4400 TELP. (0771) 443415

1500
STR-1-24
800 2800 800 1200 2000 1200 1200 2000 1200 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
1500

1500

1500
PURWANTA,ST
NIP. 19660921 199203 1 010

HWL+3.070 HWL+3.070 Nama Paket Pekerjaan


1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
DIMENSI PIER P11 1 10000 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc
SKALA 1 : 100 STR-1-24 2000 6000 2000 SKALA 1 : 100 STR-1-24
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-24 STR-1-24
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-25
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI

800 800 1000 3000

1000

1000
No. Tanggal Catatan dan Revisi

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000

DINAS PEKERJAAN UMUM


7122

7122
PROVINSI KEPULAUAN RIAU

1000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


4400 B 4400 4400 TELP. (0771) 443415

1500
STR-1-25
800 2800 800 1200 2000 1200 1200 2000 1200 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
1500

1500

1500
PURWANTA,ST
NIP. 19660921 199203 1 010
HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000 Nama Paket Pekerjaan

4000 4000 4000 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

10000
DIMENSI PIER P12 1 2000 6000 2000 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc

SKALA 1 : 100 STR-1-25 SKALA 1 : 100 STR-1-25 DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-25 STR-1-25
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-26
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI
800 800 1000 3000

1000

1000
No. Tanggal Catatan dan Revisi

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
6801

6801
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1000

4400 B 4400 4400 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

1500
STR-1-26 TELP. (0771) 443415
800 2800 800 1200 2000 1200 1200 2000 1200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
1500

1500

1500
PURWANTA,ST
HWL+3.070 HWL+3.070 NIP. 19660921 199203 1 010
1000 2000 1000 1000 2000 1000 1000 2000 1000
Nama Paket Pekerjaan
4000 4000 4000
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
DIMENSI PIER P13 1 10000 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc
SKALA 1 : 100 STR-1-26 2000 6000 2000 SKALA 1 : 100 STR-1-26
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-26 STR-1-26
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-27
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI
800 800 1000 3000

1000

1000
No. Tanggal Catatan dan Revisi

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
6480

6480
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
1000

4400 B 4400 4400

1500
STR-1-27 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
800 2800 800 1200 2000 1200 1200 2000 1200
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
1500

1500

1500
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070 PURWANTA,ST


1000 2000 1000 1000 2000 1000 1000 2000 1000 NIP. 19660921 199203 1 010

4000 4000 4000 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
DIMENSI PIER P14 1 POTONGAN A 2 TANGGAL :

SKALA 1 : 100 STR-1-27 10000 SKALA 1 : 100 STR-1-27 DISETUJUI Ir. Muhammad Ridwan Msc
2000 6000 2000
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-27 STR-1-27
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-28
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI

800 800 1000 3000 No. Tanggal Catatan dan Revisi

1000

1000

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
6160

6160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
1000

4400 B 4400 4400

1500
STR-1-28
800 2800 800 1200 2000 1200 1200 2000 1200 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
1500

1500

1500
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070 PURWANTA,ST


1000 2000 1000 1000 2000 1000 1000 2000 1000 NIP. 19660921 199203 1 010

4000 4000 4000


Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
DIMENSI PIER P15 1 POTONGAN A 2 TANGGAL :

SKALA 1 : 100 STR-1-28 10000 SKALA 1 : 100 STR-1-28


DISETUJUI Ir. Muhammad Ridwan Msc
2000 6000 2000
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000
900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-28 STR-1-28
Catatan :
14000
3000 500 13000 500 3000
A
STR-1-29
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
1000 3000 REVISI
800 800

1000

1000

1500
No. Tanggal Catatan dan Revisi

2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5839 5000 2000 6000 2000 5000

1000 5839
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

4400 B 4400 4400

1500
STR-1-29
800 2800 800 1200 2000 1200 1200 2000 1200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1500

1500

1500
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

DIMENSI PIER P16 1 POTONGAN A 2 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SKALA 1 : 100 STR-1-29 SKALA 1 : 100 STR-1-29
TANGGAL :

10000 DISETUJUI Ir. Muhammad Ridwan Msc


2000 6000 2000
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000

DIMENSI PIER P16


900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-29 STR-1-29
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-30
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI

800 800 1000 3000 No. Tanggal Catatan dan Revisi

1000

1000

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
5518

1000 5518
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

4400 B 4400 4400

1500
STR-1-30
800 2800 800 1200 2000 1200 1200 2000 1200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1500

1500

1500
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

DIMENSI PIER P17 1 POTONGAN A 2 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SKALA 1 : 100 STR-1-30 SKALA 1 : 100 STR-1-30
TANGGAL :

10000 DISETUJUI Ir. Muhammad Ridwan Msc


2000 6000 2000
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000

DIMENSI PIER P17


900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-30 STR-1-30
Catatan :

14000
A 3000 500 13000 500 3000
STR-1-31

1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
REVISI

No. Tanggal Catatan dan Revisi

800 800 1000 3000

1000

1000

1500
2000

2000
1000

1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
5198

5198
DINAS PEKERJAAN UMUM
1000 PROVINSI KEPULAUAN RIAU

4400 B 4400 4400

1500
STR-1-31
800 2800 800 1200 2000 1200 1200 2000 1200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
1500

1500

1500
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000 PURWANTA,ST
NIP. 19660921 199203 1 010
4000 4000 4000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


DIMENSI PIER P18 1 POTONGAN A 2 CONSULTING ENGINEERS
TANGGAL :
SKALA 1 : 100 STR-1-31 SKALA 1 : 100 STR-1-31
10000 DISETUJUI Ir. Muhammad Ridwan Msc
2000 6000 2000
DIPERIKSA Altho Sagara,ST
900

DIGAMBAR Rohendy

Judul Gambar :
2800

2800
1000

DIMENSI PIER P18


900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-31 STR-1-31
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-32
1500
2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300

2620
2620

2100
REVISI

No. Tanggal Catatan dan Revisi

800 800 1000 3000

1000
1000

1500
2000

2000
1000
1000

500
1000 4000 1000
150 2800 150 5000 2000 6000 2000 5000
4877

4881
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

4400 4400 4400

1500
800 2800 800 B 1200 2000 1200 1200 2000 1200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
STR-1-32 TELP. (0771) 443415
1500

1500

1500
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000 PURWANTA,ST
NIP. 19660921 199203 1 010
4000 4000 4000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


DIMENSI PIER P19 1 10000
POTONGAN A 2 CONSULTING ENGINEERS
TANGGAL :
SKALA 1 : 100 STR-1-32 SKALA 1 : 100 STR-1-32
2000 6000 2000
DISETUJUI Ir. Muhammad Ridwan Msc
900

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
2800

2800
1000

Judul Gambar :
900

DIMENSI PIER P19

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-32 STR-1-32
Catatan :

14000
A B 3000 500 13000 500 3000
STR-1-33 STR-1-34

REVISI
2000 2000 2000 2000 2000 2000
1600 No. Tanggal Catatan dan Revisi
Slope 2% Slope 2%

300
760

2620
550
2505

2100
2735

1000 3000
1000

1000
800

1500
2000

2000
1000

1000

500
1000 4000 1000 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
5000 2000 6000 2000 5000
4680

4680
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
1000 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


4400 4400 4400 BIDANG BINA MARGA
C SELAKU PEJABAT PEMBUAT KOMITMEN

1500
800 2800 800 STR-1-34 1200 2000 1200 1200 2000 1200

PURWANTA,ST
NIP. 19660921 199203 1 010
1500

1500

1500
Nama Paket Pekerjaan

HWL+3.070 HWL+3.070 Pekerjaan lanjutan DED (Detail Engineering Design)


1000 2000 1000 1000 2000 1000 1000 2000 1000 Jembatan P.Bintan - P. Dompak
dan Review Design
4000 4000 4000
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIMENSI PIER P20 1 POTONGAN A 2 DIGAMBAR Rohendy


SKALA 1 : 100 STR-1-33 SKALA 1 : 100 STR-1-33
Judul Gambar :

DIMENSI PIER P20


LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-33
Catatan :

14000
3000 500 13000 500 3000

Slope 2% Slope 2%

250

745
3480

4120

2735
REVISI

No. Tanggal Catatan dan Revisi

1000

500
1000 4000 1000
5000 2000 6000 2000 5000

4680
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1500
1500

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
250

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
HWL+3.070 SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN B 1 Konsultan Perencana

SKALA 1 : 100 STR-1-33


PT. MULTI PHI BETHA
10000 CONSULTING ENGINEERS
2000 6000 2000 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


900

DIPERIKSA Altho Sagara,ST


2800

2800
1000

DIGAMBAR Rohendy

Judul Gambar :
900

DIMENSI PIER P20


POTONGAN C 2
LEMBAR 2-2

SKALA 1 : 100 STR-1-33 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-34
Catatan :

REVISI
14000
A B 3000 500 13000 500 3000
No. Tanggal Catatan dan Revisi

STR-1-35 STR-1-36

1200 800 2000 2000 2000 2000 2000 2000


Slope 2% Slope 2%

300
500 500 790

550
2500

2620
2100
1000 3000
1000 DINAS PEKERJAAN UMUM

1500
2000

2000
PROVINSI KEPULAUAN RIAU
1000

500
6018

1000 4000 1000


5304

5000 2000 6000 2000 5000 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

3188
4400
C KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA

2000
STR-1-36 4400
SELAKU PEJABAT PEMBUAT KOMITMEN
1200 2000 1200 1200 2000 1200 1200 2000 1200

PURWANTA,ST
NIP. 19660921 199203 1 010
1500

1500

1500
Nama Paket Pekerjaan

HWL+3.070 Pekerjaan lanjutan DED (Detail Engineering Design)


1000 2000 1000 1000 2000 1000 1000 2000 1000 Jembatan P.Bintan - P. Dompak
dan Review Design
4000 4000 4000
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIMENSI ABT-2 1 POTONGAN A 2 DIGAMBAR Rohendy


SKALA 1 : 100 STR-1-35 SKALA 1 : 100 STR-1-35
Judul Gambar :

DIMENSI ABT-2
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-35
Catatan :

14000
3000 500 13000 500 3000

Slope 2% Slope 2%

250

745
REVISI

No. Tanggal Catatan dan Revisi

3480

4120

2735
1000

500
1000 4000 1000
5000 2000 6000 2000 5000

3188
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1500
1500

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
250

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
HWL+3.070 SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN B 1 Konsultan Perencana

SKALA 1 : 100 STR-1-35


PT. MULTI PHI BETHA
10000 CONSULTING ENGINEERS
2000 6000 2000 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


900

DIPERIKSA Altho Sagara,ST


2800

2800
1000

DIGAMBAR Rohendy

Judul Gambar :
900

DIMENSI ABT-2
LEMBAR 2-2
POTONGAN C 2
SKALA 1 : 100 STR-1-35 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-36
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-37
1200 2000 2000 2000 2000 2000 2000 REVISI

Slope 2% Slope 2% Tanggal


No. Catatan dan Revisi

300

2620
2620

2100
800 800 1000 3000

1000
1000

1500
2000

2000
1000
1000

500
1000 4000 1000
DINAS PEKERJAAN UMUM
2800 5000 2000 6000 2000 5000 PROVINSI KEPULAUAN RIAU

4400
2826

2829

800 2800 800 1200 2000 1200 1200 2000 1200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


B TELP. (0771) 443415
STR-1-37
1500

1500

1500

1500
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000 PURWANTA,ST
NIP. 19660921 199203 1 010
4000 4000 4000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


DIMENSI PIER P21 1 POTONGAN A 2 CONSULTING ENGINEERS
TANGGAL :
SKALA 1 : 100 STR-1-37 10000 SKALA 1 : 100 STR-1-37
DISETUJUI Ir. Muhammad Ridwan Msc
2000 6000 2000

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy
2800

2800
1000

Judul Gambar :

DIMENSI PIER P21


900

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-37 STR-1-37
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-38
REVISI
1200 2000 2000 2000 2000 2000 2000 No. Tanggal Catatan dan Revisi
Slope 2% Slope 2%

300

2620
2620

2100
800 800 1000 3000

1000
1000

1500
2000

2000
1000
1000

500
1000 4000 1000 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
2800 5000 2000 6000 2000 5000
2507

2510

800 800 1200 2000 1200 1200 2000 1200


JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
B
1500

1500

1500

1500
STR-1-38 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

HWL+3.070 HWL+3.070
1000 2000 1000 1000 2000 1000 1000 2000 1000 PURWANTA,ST
NIP. 19660921 199203 1 010
4000 4000 4000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


DIMENSI PIER P22 1 POTONGAN A 2 CONSULTING ENGINEERS
10000 TANGGAL :
SKALA 1 : 100 STR-1-38 SKALA 1 : 100 STR-1-38
2000 6000 2000 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy
2800

2800
1000

Judul Gambar :
900

DIMENSI PIER P22

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN B 3
SKALA 1 : 100 STR-1-38 STR-1-38
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-39

1200 2000 2000 2000 2000 2000 2000


Slope 2% Slope 2%

300
REVISI

No. Tanggal Catatan dan Revisi

2620
2620

2100
800 800 1000 3000

1000
1000

1500
2000

2000
1000
1000

500
1000 4000 1000
5000 2000 6000 2000 5000
2188

4400 2192
DINAS PEKERJAAN UMUM
1200 2000 1200 1200 2000 1200 PROVINSI KEPULAUAN RIAU
800 2800 800

B
1500

1500

1500
STR-1-39

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
HWL+3.070 HWL+3.070 KUASA PENGGUNA ANGGARAN
1000 2000 1000 1000 2000 1000 1000 2000 1000 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4000 4000 4000

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

DIMENSI PIER P23 1 POTONGAN A 2 Konsultan Perencana


SKALA 1 : 100 STR-1-39
10000
SKALA 1 : 100 STR-1-39

2000 6000 2000 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
900

DISETUJUI Ir. Muhammad Ridwan Msc


2800

2800
1000

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN B 3 DIMENSI PIER P23


SKALA 1 : 100 STR-1-39

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-39
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-40

1200 2000 2000 2000 2000 2000 2000


Slope 2% Slope 2%
REVISI

300
No. Tanggal Catatan dan Revisi
2620

2620
2100
800 800 1000 3000
1000

1000

1500
2000

2000
1000

1000

500
4400 1000 4000 1000
5000 2000 6000 2000 5000
1869

800 2800 800 1869


DINAS PEKERJAAN UMUM
1200 2000 1200 PROVINSI KEPULAUAN RIAU
1200 2000 1200

B
1500

1500

1500
STR-1-40

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
HWL+3.070 HWL+3.070 KUASA PENGGUNA ANGGARAN
1000 2000 1000 1000 2000 1000 1000 2000 1000 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4000 4000 4000

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

DIMENSI PIER P24 1 POTONGAN A 2 Konsultan Perencana


10000
SKALA 1 : 100 STR-1-40 SKALA 1 : 100 STR-1-40
2000 6000 2000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
900

TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


2800

2800
1000

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN B 3 DIMENSI PIER P24


SKALA 1 : 100 STR-1-40

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-40
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-41

1200 2000 2000 2000 2000 2000 2000


REVISI
Slope 2% Slope 2%

Tanggal

300
No. Catatan dan Revisi
2620

2620
2100
800 800 1000 3000
1000

1000

1500
2000

2000
1000

1000

500
1000 4000 1000
4400 5000 2000 2000 5000
DINAS PEKERJAAN UMUM
1551

1551
6000 PROVINSI KEPULAUAN RIAU
800 2800 800

B 1200 2000 1200 1200 2000 1200

1500

1500
STR-1-41
2000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
HWL+3.070 HWL+3.070 KUASA PENGGUNA ANGGARAN
1000 2000 1000 1000 2000 1000 1000 2000 1000 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4000 4000 4000

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

DIMENSI PIER P25 1 POTONGAN A 2 Konsultan Perencana


10000
SKALA 1 : 100 STR-1-41 SKALA 1 : 100 STR-1-41
2000 6000 2000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
900

TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


2800

2800
1000

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN B 3 DIMENSI PIER P25


SKALA 1 : 100 STR-1-41

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-41
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-42

1200 2000 2000 2000 2000 2000 2000


Slope 2% Slope 2%
REVISI

300
No. Tanggal Catatan dan Revisi
2620

2620
2100
800 800 1000 3000
1000

1000

1500
2000

2000
6000
1000

1000
4400

500
800 2800 800 1000 4000 1000
5000 2000 2000 5000
1232

1232 1200 2000 1200


1200 2000 1200 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
B
1500

1500

1500
STR-1-42

HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
DIMENSI PIER P26 1 10000
POTONGAN A 2 dan Review Design

SKALA 1 : 100 STR-1-42 2000 6000 2000 SKALA 1 : 100 STR-1-42


Konsultan Perencana

PT. MULTI PHI BETHA


900

CONSULTING ENGINEERS
2800

2800
1000

TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


900

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN B 3 Judul Gambar :

SKALA 1 : 100 STR-1-42


DIMENSI PIER P26

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-42
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-43

1200 2000 2000 2000 2000 2000 2000


REVISI
Slope 2% Slope 2%

No. Tanggal Catatan dan Revisi

300
2620

2620
2100
800 800 1000 3000 6000
1000

1000

1500
2000

2000
1000 4000 1000
1000

1000
2000 2000

500
5000 5000
800 2800 800
913

913
1200 2000 1200 1200 2000 1200 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
B
1500

1500

1500
STR-1-43

HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
DIMENSI PIER P27 1 POTONGAN A 2 dan Review Design

SKALA 1 : 100 STR-1-43 10000 SKALA 1 : 100 STR-1-43


Konsultan Perencana
2000 6000 2000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
900

TANGGAL :
2800

2800
1000

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

POTONGAN B 3 Judul Gambar :

SKALA 1 : 100 STR-1-43 DIMENSI PIER P27

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-43
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-44

1200 2000 2000 2000 2000 2000 2000 REVISI

Slope 2% Slope 2% No. Tanggal Catatan dan Revisi

300
2620

2620
2100
800 800 1000 3000
1000

1000
6000

1500
2000

2000
4400 1000 4000 1000
1000

1000
800 2800 800 5000 2000 2000 5000

500
DINAS PEKERJAAN UMUM
595

595
1200 2000 1200 1200 2000 1200 PROVINSI KEPULAUAN RIAU
B
1500

1500

1500
STR-1-44

HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
DIMENSI PIER P28 1 POTONGAN A 2 dan Review Design

SKALA 1 : 100 STR-1-44 10000 SKALA 1 : 100 STR-1-44


2000 6000 2000 Konsultan Perencana

PT. MULTI PHI BETHA


900

CONSULTING ENGINEERS
TANGGAL :
2800

2800
1000

DISETUJUI Ir. Muhammad Ridwan Msc


900

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN B 3 Judul Gambar :

SKALA 1 : 100 STR-1-44


DIMENSI PIER P28

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-44
Catatan :

14000
3000 500 13000 500 3000
A
STR-1-45
REVISI
1200 2000 2000 2000 2000 2000 2000 No. Tanggal Catatan dan Revisi
Slope 2% Slope 2%

300
2620

2620
2100
800 800 1000 3000
1000

1000
6000

1500
2000

2000
1000 4000 1000
4400
276 1000

276 1000
5000 2000 2000 5000

500
800 2800 800
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

1000
1200 2000 1200 1200 2000 1200
B
1500

2000

2000
STR-1-45

HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
DIMENSI PIER P29 1 10000
POTONGAN A 2 dan Review Design

SKALA 1 : 100 STR-1-45 2000 6000 2000 SKALA 1 : 100 STR-1-45


Konsultan Perencana

PT. MULTI PHI BETHA


900

CONSULTING ENGINEERS
2800

2800
1000

TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


900

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN B 3 Judul Gambar :

SKALA 1 : 100 STR-1-45


DIMENSI PIER P29

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-45
Catatan :

14000
3000 500 13000 500 3000
A REVISI
STR-1-46
No. Tanggal Catatan dan Revisi
1200 2000 2000 2000 2000 2000 2000
Slope 2% Slope 2%

300
2620

2620
2100
800 800 1000 3000 6000
1000

1000

1500
2000

2000
4400 1000 4000 1000
2800
1000

800 2800 800 1000 5000 2000 2000 5000


DINAS PEKERJAAN UMUM

500
PROVINSI KEPULAUAN RIAU

1200 2000 1200 1200 2000 1200

1500
B
1750

2000

2000
STR-1-46

HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1000 2000 1000 1000 2000 1000 1000 2000 1000
4000 4000 4000 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
DIMENSI PIER P30 1 POTONGAN A 2 dan Review Design

SKALA 1 : 100 STR-1-46


10000 SKALA 1 : 100 STR-1-46
Konsultan Perencana
2000 6000 2000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
900

TANGGAL :
2800

2800
1000

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


900

DIGAMBAR Rohendy

POTONGAN B 3 Judul Gambar :

SKALA 1 : 100 STR-1-46 DIMENSI PIER P30

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-46
Catatan :

A B REVISI
STR-1-47 STR-1-48
No. Tanggal Catatan dan Revisi

14000
3000 500 13000 500 3000

1150 500 500 2000 2000 2000 2000 2000 2000

1050 300
500 500

2620
1650

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
4150
1000
3001

3001

3001
350
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
1500

850 1300 850 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
C SELAKU PEJABAT PEMBUAT KOMITMEN
1500

1500

STR-1-48

PURWANTA,ST
600 1800 600 1000 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1000 NIP. 19660921 199203 1 010

3000 20000 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

DIMENSI ABT-3 1 POTONGAN A 2 TANGGAL :

SKALA 1 : 100 STR-1-47 SKALA 1 : 100 STR-1-47 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI PIER ABT-3


LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-47
Catatan :

14000
3000 500 13000 500 3000

Slope 2% Slope 2%
REVISI

300
Tanggal

517
No. Catatan dan Revisi

500
5360

4133
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
1500

1000 1800 1800 1800 1800 1800 1800 1800 1800 1800 1800 1000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
20000 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1
Jembatan P.Bintan - P. Dompak
dan Review Design

SKALA 1 : 100 STR-1-47


Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
1300

DISETUJUI Ir. Muhammad Ridwan Msc

20000 DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN C 2
Judul Gambar :

SKALA 1 : 100 STR-1-47 DIMENSI PIER ABT-3


LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-48
Catatan :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1
3000 10 @ 5000 = 50000 3900 3600 3600 3900 9 @ 5000 = 45000 3000 3000

3500
3000

REVISI

No. Tanggal Catatan dan Revisi


6500 2000 6500

POTONGAN MEMANJANG 1
SKALA 1 : 400 STR-1-49

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1
3000 10 @ 5000 = 50000 3900 7200 3900 9 @ 5000 = 45000 3000 3000
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
15400

15400
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

TOP SLAB 2 PURWANTA,ST


NIP. 19660921 199203 1 010
SKALA 1 : 400 STR-1-49
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PT. MULTI PHI BETHA
3000 10 @ 5000 = 50000 3900 7200 3900 9 @ 5000 = 45000 3000 3000 CONSULTING ENGINEERS
TANGGAL :
2000
DISETUJUI Ir. Muhammad Ridwan Msc

Altho Sagara,ST
1400

DIPERIKSA

DIGAMBAR Rohendy

Judul Gambar :

1750 1250
2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 15000 12502500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2250 SEGMENTASI BOX DI P6

BOTTOM SLAB 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 400 STR-1-49

STR-1-49
Catatan :
A
STR-1-50

15400

2700 1400 800 2800 2800 800 1400 2700


REVISI

No. Tanggal Catatan dan Revisi


250

250
550

550
549

549
955
337

367
RAILING 1500
600 600
1200

1820
Plat t=150

DINAS PEKERJAAN UMUM


250

400

563
PROVINSI KEPULAUAN RIAU

225
Beam @ 2.5m
1600 1250

4160 790 5500 790 4160


JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

POTONGAN DIAPHRAGM HANGER DI MAIN SPAN (TIPIKAL) 1 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SKALA 1 : 50 STR-1-50 SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
3000

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
225

563
Judul Gambar :

POTONGAN TIPIKAL DIAPHRAGMA


HANGER DI MAIN SPAN
800
SKALA JUMLAH GAMBAR NOMOR LEMBAR
POTONGAN A 2
SKALA 1 : 50 STR-1-50 STR-1-50
Catatan :

15400

2000 2160 740 2800 2800 740 2160 2000

250
250

250
550

550
550

550
1600 1200 1200 1600
REVISI

No. Tanggal Catatan dan Revisi


RAILING
600 600

3000

1816
1200

Plat t=150 400 550 2400 550 400

225
250

400

563

563
Beam @ 2.5m
1600 1250

4160 790 5500 790 4160


DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 1 - 12 1
SKALA 1 : 50 STR-1-49

15400 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
2000 2160 740 2800 2800 740 2160 2000
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
250

250
PURWANTA,ST
NIP. 19660921 199203 1 010

1600 500 1400 500 1600


Nama Paket Pekerjaan

RAILING Pekerjaan lanjutan DED (Detail Engineering Design)


600 600 Jembatan P.Bintan - P. Dompak

1816
3300

dan Review Design


1200

Konsultan Perencana
Plat t=150
1400
PT. MULTI PHI BETHA
250

400

CONSULTING ENGINEERS

863
TANGGAL :
Beam @ 2.5m
525

1600 1250 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


4160 790 5500 790 4160
DIGAMBAR Rohendy

POTONGAN 13 2
Judul Gambar :

SKALA 1 : 50 STR-1-49 POTONGAN 1 - 12 DAN 13

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-51
Catatan :

15400

2000 2160 740 2800 2800 740 2160 2000


250

250
REVISI

No. Tanggal Catatan dan Revisi


1600 500 1400 500 1600

600 600

1816
1000

2000
1400

3500
2650

PELAT INJAK
1400
150

2000 800

850

850
200 DINAS PEKERJAAN UMUM
500
PROVINSI KEPULAUAN RIAU

800
700
3700

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

1500
TELP. (0771) 443415
1400 1400
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2760
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
1940

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
5560
Judul Gambar :

POTONGAN 14
POTONGAN ~ 14 1
SKALA 1 : 50 STR-1-49 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-52
Catatan :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1

3000 3000 9 @ 5000 = 45000 3750 3750 3750 3750 10 @ 5000 = 50000 3000

3000
3000

REVISI

No. Tanggal Catatan dan Revisi

LONG POTONGAN 1
SKALA 1 : 400 STR-1-53

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1

3000 3000 9 @ 5000 = 45000 3750 3750 3750 3750 10 @ 5000 = 50000 3000

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
15400

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

TOP SLAB 2 PURWANTA,ST


NIP. 19660921 199203 1 010
SKALA 1 : 400 STR-1-53
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 12 11 10 9 8 7 6 5 4 3 2 1
PT. MULTI PHI BETHA
3000 3000 9 @ 5000 = 45000 3750 7500 3750 10 @ 5000 = 50000 3000 CONSULTING ENGINEERS
TANGGAL :
2000 2000
DISETUJUI Ir. Muhammad Ridwan Msc

Altho Sagara,ST
5500

1400

DIPERIKSA

DIGAMBAR Rohendy

Judul Gambar :

1250 1750
2250 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 25001250 15000 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 2500 SEGMENTASI BOX DI P7

BOTTOM SLAB 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 400 STR-1-53

STR-1-53
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

15400

2000 2160 740 2800 2800 740 2160 2000

250
250

250
550

550
550

550
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
1600 1200 1200 1600

RAILING
600 600

3000

1816
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
1200

TELP. (0771) 443415

Plat t=150 400 550 2400 550 400 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

225
250

400

563
Beam @ 2.5m
PURWANTA,ST
1600 1250 NIP. 19660921 199203 1 010

4160 790 5500 790 4160 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
SECTION 1 - 12 1 dan Review Design

SKALA 1 : 50 STR-1-53
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN 1 - 12

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-54
Catatan :

15400

2000 2160 740 2800 2800 740 2160 2000


250

250
REVISI

No. Tanggal Catatan dan Revisi


1600 500 500 1600

600 600

1816
1000

2000
1400

3500
2650

PELAT INJAK
1400
150

800
2000

850

850
200 DINAS PEKERJAAN UMUM
500 PROVINSI KEPULAUAN RIAU

800
3700

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
1400 1400
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2760 PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
1940

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

5560
Judul Gambar :

POTONGAN 13
SECTION 13 2
SKALA 1 : 50 STR-1-53 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-55
Catatan :

REVISI

No. Tanggal Catatan dan Revisi


15400

2000 2160 740 2800 2800 740 2160 2000


250

250
550

550
550

550
1600 500 1400 500 1600

600 600

1816
DINAS PEKERJAAN UMUM

3500
PROVINSI KEPULAUAN RIAU
2650

PELAT INJAK
150

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
800

2000
1063

1063
725 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

4100 850 5500 850 4100


PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SECTION 14 3 TANGGAL :

SKALA 1 : 50 STR-1-53 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN 14

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-56
Catatan :

REVISI

No. Tanggal Catatan dan Revisi


40600
6680
1500
6700
1500
1260

1000
3000

3000
2000
2000
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

2000

20000
15400

2000
EXPANSION JOIN JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

2000
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2000
200
PURWANTA,ST

3000
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

1000
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
PLAN I GIRDER JOIN DENGAN BOX 1 TANGGAL :
SKALA 1 : 200 STR-1-57
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

PLAN I GIRDER JOIN DENGAN BOX

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-57
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

40250

1500 38600 1500

1000
3000
DINAS PEKERJAAN UMUM

2000
PROVINSI KEPULAUAN RIAU

2000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

2000
KUASA PENGGUNA ANGGARAN
20000

BIDANG BINA MARGA


SELAKU PEJABAT PEMBUAT KOMITMEN

2000
PURWANTA,ST
NIP. 19660921 199203 1 010

2000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

2000
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

3000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

1000
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

TIPIKAL PLAN I GIRDER PIER P9 ~ P20 1 Judul Gambar :


SKALA 1 : 150 STR-1-58
TIPIKAL PLAN I GIRDER
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-58
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

40000

1200 38600

1000
3000
DINAS PEKERJAAN UMUM

2000
PROVINSI KEPULAUAN RIAU

2000
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

2000
KUASA PENGGUNA ANGGARAN
20000

BIDANG BINA MARGA


SELAKU PEJABAT PEMBUAT KOMITMEN

2000
PURWANTA,ST
NIP. 19660921 199203 1 010

2000
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

2000
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

3000
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

1000
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

TIPIKAL PLAN I GIRDER ABT2 ~ ABT3 1 Judul Gambar :


SKALA 1 : 150 STR-1-59
TIPIKAL PLAN I GIRDER
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-59
Catatan :

172150
4150 168000

7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000

REVISI
0.8 % No. Tanggal Catatan dan Revisi
11430

11334
11397

11365

11302

11270

10982
11238

11207

10950
11046

10887

10855
11078

10823
11174

11142

10664
10759

10727

10474
10695
10919

10440
10632
11014

10504
10600
10791

10568

10536

10409

10346
10377
11110

10249
10313

10281

10154

10059
10219

10186

10122

10091
HWL+3.070

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

POTONGAN MEMANJANG SOP 1


SKALA 1 : 600 STR-1-60 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

172150
Pekerjaan lanjutan DED (Detail Engineering Design)
2100 7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana
4000 4000 4000 4000 4000

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

BALOK 200x400 DIGAMBAR Rohendy

Judul Gambar :

DENAH SOP 2 LONG SECTION SOP


SKALA 1 : 600 STR-1-60

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-60
Catatan :

200 3500 13500

1000 4000 4000 4000 1000


Asplat
slab t=250
BALOK 200x400 slab t=150 Slope 2% Slope 2% slab t=150 BALOK 200x400

250

500
250
REVISI

No. Tanggal Catatan dan Revisi


VAR

VAR
VAR
CSP CSP
VAR

VAR
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
15000

15000
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


4000
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
POTONGAN SLAB ON PILE 1 dan Review Design

SKALA 1 : 100 STR-1-57


Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
250

250

250
500

500

500
DISETUJUI Ir. Muhammad Ridwan Msc
250

250

250
DIPERIKSA Altho Sagara,ST
250 300 250 200 400 200 200 500 200
800 800 DIGAMBAR Rohendy
900
Judul Gambar :

TYPICAL CROSS SECTION


SLAB ON PILE
POTONGAN ~ 2 2 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-1-57

STR-1-61
TENDON
6-19

T1
T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T12
T13
T14
T15
T16
T17
T18

70000 120000

35000 35000 40000 40000

B1

BE1 BE3 B2 B3

B4
BE2 B5
B6
6-19 6-22 6-19
6-19

SKEMATIK TENDON JEMBATAN UTAMA


SKALA 1 : 400 STR-3
Catatan :

6-19

T1
T2
T3
T4
T5
T6
T7
T8
T9 REVISI
T10
No. Tanggal Catatan dan Revisi
T11
T12
T13
T14
T15
T16
T17
T18

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
70000
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

40000 35000 35000 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
B7 dan Review Design

B8 BE4 BE5 Konsultan Perencana

BE6
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
6-19 6-22 6-19 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

1 Judul Gambar :

STR-3-01 SKEMATIK TENDON JEMBATAN UTAMA

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-01
Catatan :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
3000 10 @ 5000 = 50000 3900 3600 3600 3900 9 @ 5000 = 45000 3000 3000

T7+T8 T9+T10 T11+T12 T13 T14 T15 T16 T17 T18


T5+T6 T3+T4 T1 T1 T3+T4 T5+T6
T14 T13 T11+T12 T9+T10 T7+T8
T18 T17 T16 T15
T2 B3 B4 B5 B6

3500
T2 B2 B1 B1 B2
BE3
3000

BE1+BE2 BE3
BE1+BE2
REVISI

1000 1500 1500 1500 No. Tanggal Catatan dan Revisi

POTONGAN MEMANJANG 1
SKALA 1 : 400 STR-3-02

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
3000 10 @ 5000 = 50000 3900 7200 3900 9 @ 5000 = 45000 3000 3000
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

T17 T15 T13 T11 T9 T7 T5 T3 T1+T2 T1+T2 T3 T5 T7 T9 T11 T13 T15 T17
T18 T16 T14 T12 T10 T8 T6 T4 T4 T6 T8 T10 T12 T14 T16 T18

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
T18 T16 T14 T12 T10 T8 T6 T4 T1+T2 T1+T2 T4 T6 T8 T10 T12 T14 T16 T18
T17 T15 T13 T11 T9 T7 T5 T3 T3 T5 T7 T9 T11 T13 T15 T17 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

LAYOUT TOP TENDON 2 PURWANTA,ST


NIP. 19660921 199203 1 010
SKALA 1 : 400 STR-3-02
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 CONSULTING ENGINEERS
TANGGAL :
3000 10 @ 5000 = 50000 3900 7200 3900 9 @ 5000 = 45000 3000 3000
DISETUJUI Ir. Muhammad Ridwan Msc
2000
DIPERIKSA Altho Sagara,ST

BE1 BE1 BE3 BE3 B2 B1 B1 B3 B2 B4 B6


BE2 BE2 B5 DIGAMBAR Rohendy
1400

BE2 BE2 B5
BE1 BE1 BE3 BE3 B2 B1 B1 B3 B2 B4 B6 Judul Gambar :

LAYOUT TENDON JEMBATAN UTAMA


LEMBAR 1 - 3

LAYOUT BOTTOM TENDON 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 400 STR-3-02


STR-2-02
Catatan :

27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

3000 3000 9 @ 5000 = 45000 3750 3750 3750 3750 10 @ 5000 = 50000 3000

T13 T11+T12 T9+T10 T7+T8 T5+T6 T3+T4 T1 T1 T3+T4 T5+T6 T7+T8 T9+T10 T11+T12 T13 T14 T15 T16 T17 T18
T18 T17 T16 T15 T14

3000
T2 T2
3000

B3 B7 B7 B8 BE4 BE4 BE5+BE6 BE5+BE6


B6 B5 B4 B8

REVISI

No. Tanggal Catatan dan Revisi

POTONGAN MEMANJANG 1
SKALA 1 : 400 -

27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

3000 3000 9 @ 5000 = 45000 3750 3750 3750 3750 10 @ 5000 = 50000 3000

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

T17 T15 T13 T11 T9 T7 T5 T3 T1+T2 T1+T2 T3 T5 T7 T9 T11 T13 T15 T17
T18 T16 T14 T12 T10 T8 T6 T4 T4 T6 T8 T10 T12 T14 T16 T18
15400

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
T18 T16 T14 T12 T10 T8 T6 T4 T1+T2 T1+T2 T4 T6 T8 T10 T12 T14 T16 T18
T17 T15 T13 T11 T9 T7 T5 T3 T3 T5 T7 T9 T11 T13 T15 T17 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

LAYOUT TOP TENDON 2 PURWANTA,ST


NIP. 19660921 199203 1 010
SKALA 1 : 400 -
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 CONSULTING ENGINEERS
TANGGAL :
3000 3000 9 @ 5000 = 45000 3750 7500 3750 10 @ 5000 = 50000 3000
DISETUJUI Ir. Muhammad Ridwan Msc

2000 2000
DIPERIKSA Altho Sagara,ST

B6 B4 B8 B3 B7 B7 B8 BE4 BE4 BE5 BE5


B5 BE6 BE6
5500

DIGAMBAR Rohendy
1400

B5 BE6 BE6
B6 B4 B8 B3 B7 B7 B8 BE4 BE4 BE5 BE5 Judul Gambar :

LAYOUT TENDON JEMBATAN UTAMA


LEMBAR 2 - 3

LAYOUT BOTTOM TENDON 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 400 -
STR-2-03
Catatan :

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
3000 10 @ 5000 = 50000 3900 7200 3900 9 @ 5000 = 45000 3000 3000 3000
CLOSURE
REVISI

No. Tanggal Catatan dan Revisi

238 TENDON 6-4 @ 500 6 TENDON 6-4 @500

LAYOUT TRANSVERSAL TENDON 1 DINAS PEKERJAAN UMUM


SKALA 1 : 400 STR-3-04 PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

10 @ 5000 = 50000 9 @ 5000 = 45000 PURWANTA,ST


3000 3900 7200 3900 3000 3000 3000 NIP. 19660921 199203 1 010
CLOSURE

2000 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
1400

dan Review Design

Konsultan Perencana
TENDON 5-3

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

LAYOUT TRANSVERSAL TENDON DI PEDESTRIAN 2 DISETUJUI Ir. Muhammad Ridwan Msc


SKALA 1 : 400 STR-3-04
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

LAYOUT TENDON JEMBATAN UTAMA


LEMBAR 3 - 3

SKALA JUMLAH GAMBAR NOMOR LEMBAR

TENDON TRANSVERSAL DI PEDESTRIAN = 5-3 STR-2-04


Catatan :

15400

4775

T18 T18

150
100

100
250

250
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200 429 325 250
BE1 BE2 BE1 BE2
Plat t=150

456 250

706
250

725

563
225
Beam @ 2.5m
1600 1250

2000 2160 790 5500 790 4160


DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 1 1
SKALA 1 : 50 STR-2-05

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

4225 961
175
250

T18 T18 PURWANTA,ST


T17 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE1 BE2 BE2 BE1


364 218 DIGAMBAR Rohendy

2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 2 2 LEMBAR 1-14
SKALA 1 : 50 STR-2-05
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-05
Catatan :

15400

3577 1198 947

175

250
T17 T16 T18 T18 T16 T17

150
100

100
250

250
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 BE1 BE2 BE2 BE1
250200
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 3 1
SKALA 1 : 50 STR-2-06

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

3116 1109 1178 668


250

T16 T18 T18 T16 PURWANTA,ST


T17 T15 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan
175

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE1 BE2 BE2 BE1


DIGAMBAR Rohendy
250200
2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 4 2 LEMBAR 2-14
SKALA 1 : 50 STR-2-06
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-06
Catatan :

15400

2841 756 1178 1044 417 1464

250
175
T17 T15 T14 T16 T18 T18 T16 T14 T15 T17

150
100

100
250

250
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 BE1 BE2 BE2 BE1
250200
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 5 1
SKALA 1 : 50 STR-2-07

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2750 431 1044 1149 651 225 1450


175

250

T14 T16 T18 T18 T16 T14 PURWANTA,ST


T17 T15 T15 T15 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE1 BE2 BE2 BE1


DIGAMBAR Rohendy
250200
2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 6 2 LEMBAR 3-14
SKALA 1 : 50 STR-2-07
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-07
Catatan :

15400

2750 225 651 599 550 957 318 200 1450

T17 T15 T13 T11 T12 T14 T16 T18 T18 T16 T14 T12 T11 T13 T15 T17

150
100

100
250

250
250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200 429 250
BE3 BE3
Plat t=150

340 250
250

725

563
225
Beam @ 2.5m
1600 1250

2000 2160 790 5500 790 4160


DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 7 1
SKALA 1 : 50 STR-2-08

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
200
2750 200 318 396 560 550 560 515 200 1450
250

T9 T10 T12 T14 T16 T18 T18T16 T14 T12 T10 T9 PURWANTA,ST
T17 T15 T13 T11 T11 T13 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan
175

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE3 BE3


250 DIGAMBAR Rohendy

2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 8 2 LEMBAR 4-14
SKALA 1 : 50 STR-2-08
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-08
Catatan :

15400
200 334 200
2750 200 235 505 550 505 334 235 200 1450

250
T17 T15 T13 T11 T9 T7 T8 T10 T12 T14 T16 T18 T18 T16 T14 T12 T10 T8 T7 T9 T11 T13 T15 T17

150
100

100
250

250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 BE3 BE3
250
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 9 1
SKALA 1 : 50 STR-2-09

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
200 200 421 550 421 254 200 200 1450
2750 200 200 254 200 200
250

T6 T8 T10T12T14T16T18 T18T16T14T12T10 T8 T6 PURWANTA,ST


T17T15T13T11 T9 T7 T5 T5 T7 T9 T11T13T15T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan
175

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE3 BE3


DIGAMBAR Rohendy
250
2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 10 2 LEMBAR 5-14
SKALA 1 : 50 STR-2-09
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-09
Catatan :

15400
200 200 200 550 200 200 200 1450
2750 200 200 200 275 275 200 200 200

250
T17T15T13T11 T9 T7 T5 T3 T4 T6 T8 T10T12T14T16T18 T18T16T14T12T10 T8 T6 T4 T3 T5 T7 T9 T11T13T15T17

150
100

100
250

250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 BE3 BE3
250
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 11 1
SKALA 1 : 50 STR-2-10

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
200 200 200 275 200 200 200 1450
2750 200 200 200 275 275 275 200 200 200

T4 T6 T8 T10T12T14T16T18 T18T16T14T12T10 T8 T6 T4 PURWANTA,ST


T17 T15 T13 T11 T9 T7 T5 T3 T3 T5 T7 T9 T11 T13 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
T1 T1 Nama Paket Pekerjaan

6-4 @ 500 T2 T2 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 BE3 BE3


DIGAMBAR Rohendy
250
2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 12&16 2 LEMBAR 6-14
SKALA 1 : 50 STR-2-10
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-10
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

15400
200 200 200 275 200 200 200 1450
2750 200 200 200 275 275 275 200 200 200

T17 T15 T13 T11 T9 T7 T5 T3 T1 T4 T6 T8 T10 T12 T14T16 T18 T18 T16T14 T12 T10 T8 T6 T4 T1 T3 T5 T7 T9 T11 T13 T15 T17

150
100

100
375

DINAS PEKERJAAN UMUM


250

250
PROVINSI KEPULAUAN RIAU
175
175

T2 T2
6-4 @ 500
1600 500 1400 500 1600

RAILING JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


600 600

1816
TELP. (0771) 443415

3300
1200

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
Plat t=150 SELAKU PEJABAT PEMBUAT KOMITMEN
1400
250

400

PURWANTA,ST

863
NIP. 19660921 199203 1 010
Beam @ 2.5m
525

1600 1250 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


4160 790 5500 790 4160 Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN 13&15 1 Konsultan Perencana


SKALA 1 : 50 STR-2-11
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN TENDON
LEMBAR 7-14

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-11
Catatan :

15400
200 200 200 275 200 200 200 1450
2750 200 200 200 275 275 275 200 200 200

T17 T15 T13 T11 T9 T7 T5 T3 T1 T4 T6 T8 T10 T12 T14T16 T18 T18 T16T14 T12 T10 T8 T6 T4 T1 T3 T5 T7 T9 T11 T13 T15 T17

150
100

100
375
250

250
175
REVISI
T2 T2
6-4 @ 500 No. Tanggal Catatan dan Revisi
1600 500 1400 500 1600

600 600

1816
1000

2000
1400

3500
2650

PELAT INJAK
1400
150

2000 800

850

850
200 DINAS PEKERJAAN UMUM
500
PROVINSI KEPULAUAN RIAU

800
700
3700

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

1500
TELP. (0771) 443415
1400 1400
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2760
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
1940

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
5560
Judul Gambar :

POTONGAN TENDON
POTONGAN 14 1 LEMBAR 8-14
SKALA 1 : 50 STR-2-12
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-12
Catatan :

15400
200
200 200 200 550 200 200 1450
2750 200 200 200 275 275 200 200 200

250
T17T15T13T11 T9 T7 T5 T3 T4 T6 T8 T10T12T14T16T18 T18T16T14T12T10 T8 T6 T4 T3 T5 T7 T9 T11T13T15T17

150
100

100
250

250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200 429 250
B1 B1
Plat t=150

340 250
250

725

563
225
200
Beam @ 2.5m
1600 1250 B2 B2
250
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 17 1
SKALA 1 : 50 STR-2-13

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

15400
200 200 421 550 421 254 200 200 1450 PURWANTA,ST
2750 200 200 254 200 200 NIP. 19660921 199203 1 010
250

T17T15T13T11 T9 T7 T5 T6 T8 T10T12T14T16T18 T18T16T14T12T10 T8 T6 T5 T7 T9 T11T13T15T17 Nama Paket Pekerjaan


150
100

100
250

250
Pekerjaan lanjutan DED (Detail Engineering Design)
175

Jembatan P.Bintan - P. Dompak


dan Review Design
6-4 @ 500
Konsultan Perencana

RAILING
PT. MULTI PHI BETHA
3000

600
CONSULTING ENGINEERS
1200

TANGGAL :

Plat t=150 950 2400 950 DISETUJUI Ir. Muhammad Ridwan Msc
250

DIPERIKSA Altho Sagara,ST

563
225
200

Beam @ 2.5m DIGAMBAR Rohendy

1600 1250 B2 B1 B1 B2
Judul Gambar :
250 200
2000 2160 790 5500 790 4160 POTONGAN TENDON
LEMBAR 9-14

POTONGAN 18 2 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-2-13
STR-2-13
Catatan :

15400
200 334 200
2750 200 235 505 550 505 334 235 200 1450

250
T17 T15 T13 T11 T9 T7 T8 T10 T12 T14 T16 T18 T18 T16 T14 T12 T10 T8 T7 T9 T11 T13 T15 T17

150
100

100
250

250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 B2 B1 B1 B2
250 200
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 19 1
SKALA 1 : 50 STR-2-14

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
200
2750 200 318 396 560 550 560 515 200 1450
250

T9 T10 T12 T14 T16 T18 T18T16 T14 T12 T10 T9 PURWANTA,ST
T17 T15 T13 T11 T11 T13 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan
175

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 B2 B1 B1 B2
DIGAMBAR Rohendy
250 200
2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
LEMBAR 10-14
POTONGAN 20 2
SKALA 1 : 50 STR-2-14
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-14
Catatan :

15400

2750 225 651 599 550 957 318 200 1450

T17 T15 T13 T11 T12 T14 T16 T18 T18 T16 T14 T12 T11 T13 T15 T17

150
100

100
250

250
250
175
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150
250

563
225
200
Beam @ 2.5m
1600 1250 B2 B2
250
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 21 1
SKALA 1 : 50 STR-2-15

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2750 431 1044 1149 651 225 1450


175

250

T14 T16 T18 T18 T16 T14 PURWANTA,ST


T17 T15 T15 T15 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150 950 2400 950
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250
DIGAMBAR Rohendy

2000 2160 790 5500 790 4160 Judul Gambar :

POTONGAN TENDON
POTONGAN 22 2 LEMBAR 11-14
SKALA 1 : 50 STR-2-15
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-15
Catatan :

15400

2841 756 1178 1044 417 1464

250
175
T17 T15 T14 T16 T18 T18 T16 T14 T15 T17

150
100

100
250

250
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200 429 250
B4 B4
Plat t=150

340 250
250

725

563
225
200
Beam @ 2.5m
1600 1250 B3 B3
250
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 23 1
SKALA 1 : 50 STR-2-16

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

3116 1109 1178 668


250

T16 T18 T18 T16 PURWANTA,ST


T17 T15 T15 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan
175

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
429 250
1200

B6 B6
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
Plat t=150
340 250

TANGGAL :
250

725

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 B3 B4 B5 B5 B4 B3
DIGAMBAR Rohendy
250200
200 Judul Gambar :
2000 2160 790 5500 790 4160
POTONGAN TENDON
LEMBAR 12-14
POTONGAN 24 2
SKALA 1 : 50 STR-2-16
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-16
Catatan :

15400

3577 1198 947

175

250
T17 T16 T18 T18 T16 T17

150
100

100
250

250
6-4 @ 500

REVISI
RAILING No. Tanggal Catatan dan Revisi

3000
600
1200

Plat t=150 950 2400 950


250

563
225
200
Beam @ 2.5m
1600 1250 B3 B4 B5 B6 B6 B5 B4 B3
250200 200
200
2000 2160 790 5500 790 4160
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN 25 1
SKALA 1 : 50 STR-2-17

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


15400 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

4225 961
175
250

T18 T18 PURWANTA,ST


T17 T17
150 NIP. 19660921 199203 1 010
100

100
250

250
Nama Paket Pekerjaan

6-4 @ 500 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

RAILING
Konsultan Perencana
3000

600
1200

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
Plat t=150
TANGGAL :
250

DISETUJUI Ir. Muhammad Ridwan Msc

563
225
200

Beam @ 2.5m DIPERIKSA Altho Sagara,ST

1600 1250 B3 B4 B5 B6 B6 B5 B4 B3
DIGAMBAR Rohendy
250200 200
200 Judul Gambar :
2000 2160 790 5500 790 4160
POTONGAN TENDON
LEMBAR 13-14
POTONGAN 26 2
SKALA 1 : 50 STR-2-17
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-17
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

15400

4775

T18 T18

150
100

100
250

250
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
6-4 @ 500

RAILING

3000
600 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
1200

KUASA PENGGUNA ANGGARAN


Plat t=150 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
250

563
225
200

Beam @ 2.5m PURWANTA,ST


NIP. 19660921 199203 1 010
1600 1250 B3 B4 B5 B6 B6 B5 B4 B3
250200 200 Nama Paket Pekerjaan
200
2000 2160 790 5500 790 4160 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
POTONGAN 27 1
SKALA 1 : 50 STR-2-18 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN TENDON
LEMBAR 14-14

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-18
Catatan :

70000

15000 HANGER @10000 = 40000 15000

8000

REVISI
6000
No. Tanggal Catatan dan Revisi

10500

6-22
6-22
4000

6-22

6-22
6-22

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
PROFIL HANGER 1
SKALA 1 : 300 STR-2-19

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
70000 SELAKU PEJABAT PEMBUAT KOMITMEN

6500 3000 3000 10 @ 5000 = 50000 3900 7200 3900


PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana
15000 10000 10000 10000 10000 15000

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DENAH HANGER 2 DIGAMBAR Rohendy

SKALA 1 : 300 STR-2-19 Judul Gambar :

LAYOUT HANGER JEMBATAN PELENGKUNG


LEMBAR 1 - 3

SKALA JUMLAH GAMBAR NOMOR LEMBAR


120000
10000 HANGER @10000 = 100000

8000

18000
PROFIL HANGER 1
SKALA 1 : 300 STR-2-20

3900 7200 3900 9 @ 5000 = 45000 3000 3000 3000 3000 3000 9 @ 5000 = 45000

10000 10000 10000 10000 10000 10000 10000 10000 10000 10000

DENAH HANGER 2
SKALA 1 : 300 STR-2-20
Catatan :

10000

REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


3900 7200 3900 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


10000 10000
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

LAYOUT HANGER JEMBATAN PELENGKUNG


SHEET 2 - 3

SKALA JUMLAH GAMBAR NOMOR LEMBAR


Catatan :

A
STR-2-22

70000
REVISI

15000 HANGER @10000 = 40000 15000 No. Tanggal Catatan dan Revisi

B
STR-2
-22

10500

6-22
6-22
6-22

6-22
6-22
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


PROFIL HANGER 1 TELP. (0771) 443415

SKALA 1 : 300 STR-2-21 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


70000 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


15000 10000 10000 10000 10000 15000
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

LAYOUT HANGER JEMBATAN PELENGKUNG


SHEET 3 - 3

DENAH HANGER 2
SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 300 STR-2-21
Catatan :

400 600 400


400 600 400

600
REVISI

No. Tanggal Catatan dan Revisi

1800
1200
HANGER
1400

POTONGAN ~ B 2
SKALA 1 : 50 STR-2-21
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

15400 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
2700 1400 800 2800 2800 800 1400 2700 SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
250

250
550

550
NIP. 19660921 199203 1 010
549

549
955
Nama Paket Pekerjaan
337

367
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
RAILING 1500 dan Review Design
600 600
Konsultan Perencana
1200

1820

Plat t=150 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
250

400

563
DISETUJUI Ir. Muhammad Ridwan Msc
Beam @ 2.5m
1600 1250 DIPERIKSA Altho Sagara,ST

4160 790 5500 790 4160 DIGAMBAR Rohendy

Judul Gambar :

POTONGAN ~ A 1 TIPIKAL POTONGAN HANGER


SKALA 1 : 50 STR-2-21
SKALA JUMLAH GAMBAR NOMOR LEMBAR
Catatan :

A C
STR-2-23 STR-2-23

287 1200 287 1200

0
R400

R400
223

223
B D

725

725
STR-2-23 STR-2-23

REVISI

No. Tanggal Catatan dan Revisi

DETAIL BLISTER TIPE 1 (TIPIKAL) 1 DETAIL BLISTER TIPE 2 (TIPIKAL) 4


SKALA 1 : 50 STR-2-23 SKALA 1 : 50 STR-2-23

667 992
417 250 417 325 250
340 223

456 223
678
DINAS PEKERJAAN UMUM
725

725
PROVINSI KEPULAUAN RIAU
500

POTONGAN ~ A 2 POTONGAN ~ C 5 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
SKALA 1 : 50 STR-2-23 SKALA 1 : 50 STR-2-23
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
286 1200
Konsultan Perencana
417
667
500

PT. MULTI PHI BETHA


992
250

825
250 325

CONSULTING ENGINEERS
287 1200 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
POTONGAN ~ B 3 POTONGAN ~ D 6
SKALA 1 : 50 SKALA 1 : 50 Judul Gambar :
STR-2-23 STR-2-23
DETAIL BLISTER
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-23
Catatan :

290 1766 303


667
417 250
REVISI

220
R40
222

340 222
0
R400
No. Tanggal Catatan dan Revisi

00

725
725

725
500
200

DETAIL BLISTER TIPE 3 (TIPIKAL) 1 POTONGAN ~ A 2


SKALA 1 : 50 STR-2-24 SKALA 1 : 50 STR-2-24

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


667

Pekerjaan lanjutan DED (Detail Engineering Design)


500

Jembatan P.Bintan - P. Dompak


250

dan Review Design


290 1766 303
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

POTONGAN ~ B 3 DISETUJUI Ir. Muhammad Ridwan Msc


SKALA 1 : 50 STR-2-24
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DETAIL BLISTER
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-24
Catatan :

20000

300 2 x 6-12

00
1200

R30
REVISI

No. Tanggal Catatan dan Revisi

1650
1000

1650 1650

200
3850 3850

4500 11000 4500

PROFIL TENDON DI PIERHEAD 1 DINAS PEKERJAAN UMUM


SKALA 1 : 75 STR-2-25 PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

1500
PURWANTA,ST
300 900 300 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

2 x 6-12 Pekerjaan lanjutan DED (Detail Engineering Design)


1200

Jembatan P.Bintan - P. Dompak


dan Review Design

Konsultan Perencana
2 x 6-12
1000

PT. MULTI PHI BETHA

200
CONSULTING ENGINEERS
3500 1300 900 1300 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

POTONGAN ~ 1 2 POTONGAN ~ 2 3 DIGAMBAR Rohendy


SKALA 1 : 75 STR-2-25 SKALA 1 : 75 STR-2-25
Judul Gambar :

POTONGAN TENDON DI PIER HEAD

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-2-25
TULANGAN
Catatan :

HWL+3.070

5000
REVISI

No. Tanggal Catatan dan Revisi

21000
SEA BED

B1 24 D13

VAR
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
3000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
740

1 PURWANTA,ST
STR-03-01 NIP. 19660921 199203 1 010
POTONGAN 1 2
SKALA 1 : 20 STR-03-01 Nama Paket Pekerjaan
L2 = 10000

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
B2 24 D13 dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
740

1
SKALA 1 : 50 STR-03-01 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-03-01
Catatan :
B
STR-03-01a

19x4 F6 D16-200

79 F1 D19-100
F3 F4 25 F2a D19-100 29 F2 D19-100 25 F2a D19-100
F4a
F3a F3a

F4a

F2 F2 F2 REVISI

No. Tanggal Catatan dan Revisi


F1
HWL+3.070

A
STR-03-01a

HWL+0.700
F3a F3a
F4a

F3 F4 F4a
POTONGAN A 2
SKALA 1 : 100 STR-03-01a DINAS PEKERJAAN UMUM
19x4 F6 D16-200 PROVINSI KEPULAUAN RIAU

TULANGAN PILECAP P5a 1


SKALA 1 : 100 STR-03-01a
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
B KUASA PENGGUNA ANGGARAN
STR-03-01a
BIDANG BINA MARGA
19x4 F6 D16-200 SELAKU PEJABAT PEMBUAT KOMITMEN

29 F2 D19-100
79 F1 D19-100 PURWANTA,ST
NIP. 19660921 199203 1 010

4x19 F6 D16-200

4x19 F6 D16-200
Nama Paket Pekerjaan
2 F5 D16 2 F5 D16
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
79 F4 D19-100 79 F4 D19-100 dan Review Design
C
STR-03-01a
HWL+3.070 Konsultan Perencana
6 F3 D19-100 6 F3 D19-100

A 4 F3a D19-100 4 F3a D19-100 PT. MULTI PHI BETHA


STR-1-01 CONSULTING ENGINEERS
TANGGAL :

HWL+0.700 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

19x4 F6 D16-200
POTONGAN B 3
SKALA 1 : 100 STR-03-01a TULANGAN PILECAP P5a

POTONGAN C 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-03-01a


STR-03-01a
Catatan :

2. penambahan pile cap 500mm


(detail terlampir)

B B
STR-3-02a STR-3-02a
14 F3a D19-100 14 F3a D19-100
25 F4 D19-100 25 F4 D19-100
REVISI

No. Tanggal Catatan dan Revisi

32 F2a D19-100
79 F3 D19-100

14 F3a D19-100

14 F3a D19-100
25 F4 D19-100

32 F1a D19-100 79 F1 D19-100 32 F1a D19-100

DINAS PEKERJAAN UMUM


A A PROVINSI KEPULAUAN RIAU
STR-3-02a STR-3-02a

79 F3 D19-100

79 F2 D19-100

79 F3 D19-100
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

14 F3a D19-100

14 F3a D19-100
Nama Paket Pekerjaan

32 F2a D19-100
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
25 F4 D19-100 79 F3 D19-100 dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


14 F3a D19-100 14 F3a D19-100 CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

TULANGAN BAWAH PILECAP P6 1 TULANGAN ATAS PILECAP P6 2 DIGAMBAR Rohendy

SKALA 1 : 100 STR-3-02 SKALA 1 : 100 STR-3-02 Judul Gambar :

DIMENSI PILECAP P6
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-1-02
Catatan :

143 F2 D19-100 REVISI

32 F1a D19-100 79 F1 D19-100 32 F1a D19-100 No. Tanggal Catatan dan Revisi

F5 D16-500 50 F3a D16-200


F5 D16-500

F1b D16-100 F1b D16-100

21 F4 D19-100 21 F4 D19-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

POTONGAN A 1
SKALA 1 : 100 STR-1-02

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010
143 F1 D19-100
Nama Paket Pekerjaan
32 F2a D19-100 79 F2 D19-100 32 F2a D19-100
Pekerjaan lanjutan DED (Detail Engineering Design)
F5 D16-500 25 F3a D16-200 Jembatan P.Bintan - P. Dompak
dan Review Design
F5 D16-500
F1b D16-100 F1b D16-100 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

21 F4 D19-100 21 F4 D19-100 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

7 F3 D16-200 7 F3 D16-200 DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN B 2 Judul Gambar :


SKALA 1 : 100 STR-1-02
TULANGAN PILE CAP P6
LEMBAR 2 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-02a
Catatan :

REVISI
79 F2 D19-100
No. Tanggal Catatan dan Revisi
79 F1 D19-100

F5 D16-500 F5 D16-500

B
STR-3-03

79 F3 D32-100

F5 D16-500
79 F4 D32-100

79 F1 D19-100
POTONGAN A 1 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
SKALA 1 : 100 STR-3-03
F5 D16-500

F5 D16-500

A 79 F3 D32-100
STR-3-03 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


79 F2 D19-100

79 F4 D32-100

BIDANG BINA MARGA


SELAKU PEJABAT PEMBUAT KOMITMEN

79 F1 D19-100
PURWANTA,ST
79 F2 D19-100 NIP. 19660921 199203 1 010
F5 D16-500
F5 D16-500 F5 D16-500 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
TULANGAN PILE CAP P6a,P6b,P7a 2
SKALA 1 : 100 STR-3-03 Konsultan Perencana
79 F4 D32-100

PT. MULTI PHI BETHA


79 F3 D32-100 CONSULTING ENGINEERS
TANGGAL :

POTONGAN B 2 DISETUJUI Ir. Muhammad Ridwan Msc


SKALA 1 : 100 STR-3-03
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PILE CAP P6a,P6b,P7a


LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-03
Catatan :

REVISI
103 F2 D19-100
No. Tanggal Catatan dan Revisi
103 F1 D19-100
B
STR-3-04 F5 D16-500 F5 D16-500

F5 D16-500
103 F3 D32-100
103 F4 D32-100
103 F2 D19-100

103 F4 D32-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
POTONGAN A 1
STR-3-04
A SKALA 1 : 100
STR-3-04
F5 D16-500

F5 D16-500 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


103 F1 D19-100 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
103 F1 D19-100
103 F2 D19-100
103 F3 D32-100
PURWANTA,ST
F5 D16-500 F5 D16-500
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
F5 D16-500 dan Review Design
103 F4 D32-100
Konsultan Perencana
103 F3 D32-100

TULANGAN PILE CAP P7 2 PT. MULTI PHI BETHA


STR-3-04 CONSULTING ENGINEERS
SKALA 1 : 100
TANGGAL :

POTONGAN B 2 DISETUJUI Ir. Muhammad Ridwan Msc


SKALA 1 : 100 STR-3-04
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PILE CAP P7


LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-04
Catatan :

6680
C
-

B
STR-1-04a
45 F2b D19-100
REVISI

No. Tanggal Catatan dan Revisi

45 F4b D19-100 6680

107 F2 D19-100

42 F1a D19-100

42 F1b D19-100
42 F3a D19-100

42 F3b D19-100
71 F1 D19-100
1 F5 D16-500 107 F2a D19-100
2 F5 D16-500 22 F1a D19-100 20 F1b D19-100
71 F1 D19-100

71 F3 D32-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

HWL+3.070 71 F3 D32-100 22 F3a D19-100 20 F3b D19-100


107 F4 D32-100 107 F4a D19-100
10800

107 F2a D19-100


107 F2 D19-100
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

107 F4a D19-100


HWL+0.700 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
107 F4 D32-100
A
STR-1-04a
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN ~ A 2 Konsultan Perencana


45 F2b D19-100 SKALA 1 : 100 STR-1-04a
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
45 F4b D19-100 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PILECAP P8 & P8a


LEMBAR 1 - 2
TULANGAN PILECAP P8 & P8a 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR
SKALA 1 : 100 STR-1-04a
STR-3-04a
Catatan :

71 F1 D19-100
107 F2 D19-100

2 F5 D16-500 2 F5 D16-500

REVISI
HWL+3.070
107 F4 D32-100 No. Tanggal Catatan dan Revisi
71 F3 D32-100

HWL+0.700

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

POTONGAN ~ B 1
SKALA 1 : 100 STR-1-04b
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

20 F1b D19-100
PURWANTA,ST
45 F2b D19-100 107 F2a D19-100 45 F2b D19-100 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
HWL+3.070
45 F4b D19-100 107 F4a D19-100 45 F4b D19-100 Konsultan Perencana

20 F3b D19-100
PT. MULTI PHI BETHA
CONSULTING ENGINEERS

HWL+0.700 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PILECAP P8 & P8a


POTONGAN ~ C 2 LEMBAR 2 - 2

SKALA 1 : 100 STR-1-04b SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-04b
Catatan :

2
STR-3-05

20 F1 D16-200
1 REVISI

Tanggal

20 F4 D25-200
No. Catatan dan Revisi
STR-3-05

20 F2 D16-200
13-12-2013 REVISI TULANGAN

20 F3 D25-200

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

TULANGAN PILE CAP P19,P21,P30 1


SKALA 1 : 50 STR-3-05
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

20 F2 D16-200 20 F1 D16-200
PURWANTA,ST
20 F1 D16-200 20 F2 D16-200 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

F5 2 D16-500 F5 2 D16-500 F5 2 D16-500 F5 2 D16-500 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

20 F4 D25-200 20 F3 D25-200 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

20 F3 D25-200 20 F4 D25-200 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN ~ 1 2 POTONGAN ~ 2 3 TULANGAN PILE CAP


SKALA 1 : 50 STR-3-05 SKALA 1 : 50 STR-3-05
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-05
Catatan :

B
STR-3-08

A REVISI

No. Tanggal Catatan dan Revisi


STR-3-07

18 P2 D19-100

16 P4 D16-100

16 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
C
STR-3-09
14 P3 D19-100 14 P3 D19-100
15 P4 D16-200 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

15 P3 D16-200
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
D
STR-3-09
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

E Jembatan P.Bintan - P. Dompak


38 P4 D16-100

38 P3 D16-100

dan Review Design


STR-3-09
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6
LEMBAR 1 - 4

TULANGAN PIER P6 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 75 STR-3-06
STR-3-06
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

14 P3 D19-100 10 P9 D22-100 14 P3 D19-100

29 P8 D16-100

16 P4 D16-100

16 P4 D16-100
16 P3 D16-100

16 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
15 P4 D16-200

15 P4 D16-200
15 P3 D16-200

15 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010
38 P4 D16-100

38 P4 D16-100
38 P3 D16-100

38 P3 D16-100
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 1 TULANGAN PIER P6


LEMBAR 1 - 4
SKALA 1 : 100 STR-3-06 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-07
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

11 P7 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
14 P7 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010
33 P7 D16-100

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
29 P6 D16-100
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6
POTONGAN B 1 LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 STR-3-06
STR-3-08
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

61 P5 D16-100 61 P5 D16-200
61 P1 D16-100 61 P1 D16-200
18 P2 D19-100 18 P2 D19-100

38 P4 D16-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
15 P4 D16-200

18 P2 D19-100 18 P2 D19-100
DINAS PEKERJAAN UMUM
29 P8 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100
14 P7 D16-100 14 P7 D16-100 33 P7 D16-100 33 P7 D16-100 PROVINSI KEPULAUAN RIAU

13x7 P7a D16-200 13x17 P7a D16-200


18 P2 D19-100 18 P2 D19-100 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
15 P4 D16-200 38 P4 D16-100

20 P9 D22-100 PURWANTA,ST
18 P2 D19-100 18 P2 D19-100 NIP. 19660921 199203 1 010

61 P1 D16-100 61 P1 D16-200
Nama Paket Pekerjaan
61 P5 D16-100 61 P5 D16-200
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
POTONGAN C 1 POTONGAN D 2 POTONGAN E 3
SKALA 1 : 75 STR-3-06 SKALA 1 : 75 STR-3-06 SKALA 1 : 75 STR-3-06 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6
LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-09
Catatan :

B
STR-3-12

A REVISI

STR-3-11 No. Tanggal Catatan dan Revisi

18 P2 D19-100

21 P4 D16-100

21 P3 D16-100
C
STR-3-13
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
14 P3 D19-100 14 P3 D19-100

20 P4 D16-200

20 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
D SELAKU PEJABAT PEMBUAT KOMITMEN

STR-3-13
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

E Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
38 P4 D16-100

38 P3 D16-100

dan Review Design


STR-3-13
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6a


TULANGAN PIER P6a 1 LEMBAR 1 - 4

SKALA 1 : 75 STR-3-10 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-10
Catatan :

14 P3 D19-100 10 P9 D22-100 14 P3 D19-100 REVISI

No. Tanggal Catatan dan Revisi

29 P8 D16-100

23 P4 D16-100

23 P4 D16-100
23 P3 D16-100

23 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
21 P4 D16-200

21 P4 D16-200
21 P3 D16-200

21 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010
36 P4 D16-100

36 P4 D16-100
36 P3 D16-100

36 P3 D16-100
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN A 1 TULANGAN PIER P6b


LEMBAR 1 - 4
SKALA 1 : 100 STR-3-14 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-15
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

18 P7 D16-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
17 P7 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


30 P7 D16-100

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

29 P6 D16-100 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6b


POTONGAN B 1 LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 -
STR-3-16
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

61 P5 D16-100 61 P5 D16-200
61 P1 D16-100 61 P1 D16-200
18 P2 D19-100 18 P2 D19-100

36 P4 D16-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
21 P4 D16-200

18 P2 D19-100 18 P2 D19-100
DINAS PEKERJAAN UMUM
29 P8 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100
17 P7 D16-100 17 P7 D16-100 30 P7 D16-100 30 P7 D16-100 PROVINSI KEPULAUAN RIAU

13x9 P7a D16-200 13x15 P7a D16-200


18 P2 D19-100 18 P2 D19-100 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
21 P4 D16-200 36 P4 D16-100

20 P9 D22-100 PURWANTA,ST
18 P2 D19-100 18 P2 D19-100 NIP. 19660921 199203 1 010

61 P1 D16-100 61 P1 D16-200
Nama Paket Pekerjaan
61 P5 D16-100 61 P5 D16-200
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
POTONGAN C 1 POTONGAN D 2 POTONGAN E 3
SKALA 1 : 75 STR-3-14 SKALA 1 : 75 STR-3-14 SKALA 1 : 75 STR-3-14 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P6b


LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-17
Catatan :

B
STR-3-20
A
STR-3-19
REVISI

No. Tanggal Catatan dan Revisi

18 P2 D19-100

21 P4 D16-100

21 P3 D16-100
C
STR-3-21

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
14 P3 D19-100 14 P3 D19-100
20 P4 D16-200

20 P3 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


D BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
STR-3-21

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

E Pekerjaan lanjutan DED (Detail Engineering Design)


38 P4 D16-100

38 P3 D16-100

Jembatan P.Bintan - P. Dompak


STR-3-21 dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7
LEMBAR 1 - 4

TULANGAN PIER P7 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 75 STR-3-18
STR-3-18
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

14 P3 D19-100 10 P9 D22-100 14 P3 D19-100

29 P8 D16-100

21 P4 D16-100

21 P4 D16-100
21 P3 D16-100

21 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
20 P4 D16-200

20 P4 D16-200
20 P3 D16-200

20 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


38 P4 D16-100

38 P4 D16-100
38 P3 D16-100

38 P3 D16-100
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7
POTONGAN A 1 LEMBAR 1 - 4

SKALA 1 : 100 STR-3-18 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-19
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

17 P7 D16-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
16 P7 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


34 P7 D16-100

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


29 P6 D16-100
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7
POTONGAN B 1 LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 STR-3-18
STR-3-20
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

61 P5 D16-100 61 P5 D16-200
61 P1 D16-100 61 P1 D16-200
18 P2 D19-100 18 P2 D19-100

38 P4 D16-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
20 P4 D16-200

18 P2 D19-100 18 P2 D19-100
DINAS PEKERJAAN UMUM
29 P8 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100
16 P7 D16-100 16 P7 D16-100 34 P7 D16-100 34 P7 D16-100 PROVINSI KEPULAUAN RIAU

13x9 P7a D16-200 13x17 P7a D16-200


18 P2 D19-100 18 P2 D19-100 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
20 P4 D16-200 38 P4 D16-100

20 P9 D22-100 PURWANTA,ST
18 P2 D19-100 18 P2 D19-100 NIP. 19660921 199203 1 010

61 P1 D16-100 61 P1 D16-200
Nama Paket Pekerjaan
61 P5 D16-100 61 P5 D16-200
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
POTONGAN C 1 POTONGAN D 2 POTONGAN E 3
SKALA 1 : 75 STR-3-18 SKALA 1 : 75 STR-3-18 SKALA 1 : 75 STR-3-18 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7
LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-21
Catatan :

B
STR-3-24

REVISI
A No. Tanggal Catatan dan Revisi

STR-3-23

18 P2 D19-100

23 P4 D16-100

23 P3 D16-100
C
STR-3-25 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

14 P3 D19-100 14 P3 D19-100
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
23 P4 D16-200

23 P3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

D PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-25
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

E Konsultan Perencana

STR-3-25
37 P4 D16-100

37 P3 D16-100

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7a


LEMBAR 1 - 4

TULANGAN PIER P7a 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 75 -
STR-3-22
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

14 P3 D19-100 10 P9 D22-100 14 P3 D19-100

29 P8 D16-100

23 P4 D16-100

23 P4 D16-100
23 P3 D16-100

23 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
23 P4 D16-200

23 P4 D16-200
23 P3 D16-200

23 P3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana
37 P4 D16-100

37 P4 D16-100
37 P3 D16-100

37 P3 D16-100
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7a


POTONGAN A 1 LEMBAR 1 - 4

SKALA 1 : 100 STR-3-22 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-23
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

19 P7 D16-100

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
19 P7 D16-200

SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana
33 P7 D16-100

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
29 P6 D16-100
TULANGAN PIER P7a
POTONGAN B 1 LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 STR-3-22
STR-3-24
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

61 P5 D16-100 61 P5 D16-200
61 P1 D16-100 61 P1 D16-200
18 P2 D19-100 18 P2 D19-100

37 P4 D16-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
23 P4 D16-200

18 P2 D19-100 18 P2 D19-100
DINAS PEKERJAAN UMUM
29 P8 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100
19 P7 D16-100 19 P7 D16-100 33 P7 D16-100 33 P7 D16-100 PROVINSI KEPULAUAN RIAU

13x9 P7a D16-200 13x17 P7a D16-200


18 P2 D19-100 18 P2 D19-100 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
14 P3 D19-100

14 P3 D19-100

14 P3 D19-100

14 P3 D19-100
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
23 P4 D16-200 37 P4 D16-100

20 P9 D22-100 PURWANTA,ST
18 P2 D19-100 18 P2 D19-100 NIP. 19660921 199203 1 010

61 P1 D16-100 61 P1 D16-200
Nama Paket Pekerjaan
61 P5 D16-100 61 P5 D16-200
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
POTONGAN C 1 POTONGAN D 2 POTONGAN E 3
SKALA 1 : 75 STR-3-22 SKALA 1 : 75 STR-3-22 SKALA 1 : 75 STR-3-22 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P7a


LEMBAR 1 - 4

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-25
Catatan :

A B C
STR-3-27 STR-3-28 STR-3-29

REVISI

No. Tanggal Catatan dan Revisi

19 P2 D19-100

12 P4a D16-100
12 P3a D16-100
8 P2a D19-100

D
10 P4 D16-100
10 P3 D16-100
STR-3-30

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

14 P3 D19-100 14 Pb D19-100
22 P4 D16-200
22 P3 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA

E SELAKU PEJABAT PEMBUAT KOMITMEN

STR-3-30
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
F
39 P4 D16-100
39 P3 D16-100

STR-3-30 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8
LEMBAR 1 - 5

TULANGAN PIER P8 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 75 STR-3-26
STR-3-26
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

14 P3 D19-100 14 P3 D19-100
10 P9 D22-100

12 P4a D16-100

12 P4a D16-100
12 P3a D16-100

12 P3a D16-100
29 P8 D16-100

10 P4 D16-100

10 P4 D16-100
10 P3 D16-100

10 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

22 P4 D16-200

22 P4 D16-200
22 P3 D16-200

22 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
39 P4 D16-100

39 P4 D16-100
39 P3 D16-100

39 P3 D16-100
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8
LEMBAR 2 - 5

POTONGAN A 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-3-26 STR-3-27


Catatan :

REVISI

No. Tanggal Catatan dan Revisi

17 P7 D16-100 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
18 P7 D16-200

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
35 P7 D16-100

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
29 P6 D16-100
Judul Gambar :

TULANGAN PIER P8
LEMBAR 3 - 5

POTONGAN B 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-3-26 STR-3-28


Catatan :

REVISI

No. Tanggal Catatan dan Revisi

14 P3b D19-100 14 P3b D19-100

10 P4 D16-100

10 P4 D16-100
10 P3 D16-100

10 P3 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

22 P4 D16-200

22 P4 D16-200
22 P3 D16-200

22 P3 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
39 P4 D16-100

39 P4 D16-100
39 P3 D16-100

39 P3 D16-100
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8
LEMBAR 4 - 5

POTONGAN C 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-3-26 STR-3-29


Catatan :

REVISI

No. Tanggal Catatan dan Revisi

19 P2 D19-100 8 P2a D19-100 19 P2 D19-100 8 P2a D19-100

14 P3b D19-100

14 P3b D19-100
14 P3 D19-100

14 P3 D19-100
22 P4 D16-200 38 P4 D16-200

DINAS PEKERJAAN UMUM


19 P2 D19-100 8 P2a D19-100 19 P2 D19-100 8 P2a D19-100 PROVINSI KEPULAUAN RIAU
29 P8 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100

29 P6 D16-100
18 P7 D16-100 18 P7 D16-100 18 P7 D16-100 18 P7 D16-100

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


13x9 P7a D16-200 13x9 P7a D16-200 TELP. (0771) 443415

19 P2 D19-100 8 P2a D19-100 19 P2 D19-100 8 P2a D19-100 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

14 P3b D19-100

14 P3b D19-100
14 P3 D19-100

14 P3 D19-100
PURWANTA,ST
22 P4 D16-200 38 P4 D16-200
NIP. 19660921 199203 1 010

19 P2 D19-100 8 P2a D19-100 19 P2 D19-100 8 P2a D19-100 Nama Paket Pekerjaan


30 P9 D22-100
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN D 1 POTONGAN E 1 POTONGAN F 1 Konsultan Perencana


SKALA 1 : 75 STR-3-26 SKALA 1 : 75 STR-3-26 SKALA 1 : 75 STR-3-26

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8
LEMBAR 5 - 5

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-30
Catatan :

A
STR-3-32

REVISI

No. Tanggal Catatan dan Revisi


15 P2 D19-100

24 P1 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

23 P1 D16-200
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

C PURWANTA,ST
STR-3-33
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

33 P1 D16-100
Konsultan Perencana

D PT. MULTI PHI BETHA


STR-3-33 CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8a


LEMBAR 1 - 3

TULANGAN PIER P8a 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 75 STR-3-31
STR-3-31
Catatan :

REVISI

No. Tanggal Catatan dan Revisi


13 P3 D19-100 13 P3 D19-100

10 P9 D22-100
41 P4 D16-100 56 P4 D16-200 41 P4 D16-100
24 P1 D16-100

24 P1 D16-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

15 P2 D19-100 15 P2 D19-100 15 P2 D19-100 15 P2 D19-100

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


23 P1 D16-200

23 P1 D16-200
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
33 P1 D16-100

33 P1 D16-100
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8a


LEMBAR 2 - 3

POTONGAN A 1 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 100 STR-3-31 STR-3-32


Catatan :

REVISI

No. Tanggal Catatan dan Revisi

61 P1 D16-100 61 P1 D16-200
DINAS PEKERJAAN UMUM
13 P3 D19-100 13 P3 D19-100 PROVINSI KEPULAUAN RIAU
15 P2 D19-100

15 P2 D19-100

15 P2 D19-100

15 P2 D19-100
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

13 P3 D19-100 13 P3 D19-100
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

POTONGAN B 1 POTONGAN C 1 Pekerjaan lanjutan DED (Detail Engineering Design)


SKALA 1 : 50 STR-3-31 SKALA 1 : 50 STR-3-31 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P8a


LEMBAR 3 - 3

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-33
Catatan :

P9
A
STR-3-34

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100
16 P1 D32-100
20 P2 D32-100 20 P2 D32-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

70 P3 D16-150
B
70 P3 D16-150

STR-3-35

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


14 B1 D22 TELP. (0771) 443415

31 B3 D16-200 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
6x224 P5 D16-150
4x24 P4 D16-150

4x24 P4 D16-150
6x24 P5 D16-150

PURWANTA,ST
NIP. 19660921 199203 1 010

C 2 B2 D16-500
Nama Paket Pekerjaan
STR-3-35
Pekerjaan lanjutan DED (Detail Engineering Design)

D Jembatan P.Bintan - P. Dompak


dan Review Design
STR-3-35
HWL+3.070 HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P9 1 POTONGAN A 2 TULANGAN PIER P9


SKALA 1 : 100 STR-3-34 SKALA 1 : 100 STR-3-34 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-34
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x24 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
70 P3 D16-150 70 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x24 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-34
SKALA 1 : 25 STR-3-34 STR-3-34
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P9
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-35
Catatan :

P10
A
STR-3-36

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100
16 P1 D32-100
20 P2 D32-100 20 P2 D32-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

B
68 P3 D16-150

68 P3 D16-150
STR-3-37

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


14 B1 D22 TELP. (0771) 443415

31 B3 D16-200 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4x23 P4 D16-150

4x23 P4 D16-150
6x23 P5 D16-150

6x23 P5 D16-150

PURWANTA,ST
NIP. 19660921 199203 1 010

C 2 B2 D16-500
Nama Paket Pekerjaan
STR-3-37
Pekerjaan lanjutan DED (Detail Engineering Design)

D Jembatan P.Bintan - P. Dompak


dan Review Design
STR-3-37
HWL+3.070 HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P10 1 POTONGAN A 2 TULANGAN PIER 10


SKALA 1 : 100 STR-3-36 SKALA 1 : 100 STR-3-36 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-36
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x23 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
68 P3 D16-150 68 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x23 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-36
SKALA 1 : 25 STR-3-36 STR-3-36
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 10
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-37
Catatan :

P11
A
STR-3-38

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100
16 P1 D32-100
20 P2 D32-100 20 P2 D32-100
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

B
65 P3 D16-150

65 P3 D16-150
STR-3-39

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


14 B1 D22 TELP. (0771) 443415

31 B3 D16-200 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4x23 P4 D16-150

4x23 P4 D16-150
6x23 P5 D16-150

6x23 P5 D16-150

PURWANTA,ST
NIP. 19660921 199203 1 010

C 2 B2 D16-500
Nama Paket Pekerjaan
STR-3-39
Pekerjaan lanjutan DED (Detail Engineering Design)

D Jembatan P.Bintan - P. Dompak


dan Review Design
STR-3-39
HWL+3.070 HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P11 1 POTONGAN A 2 TULANGAN PIER 11


SKALA 1 : 100 STR-3-38 SKALA 1 : 100 STR-3-38 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-38
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x23 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
65 P3 D16-150 65 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x23 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-38
SKALA 1 : 25 STR-3-38 STR-3-38
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 11
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-39
Catatan :

P12
A
STR-3-40

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

B
65 P3 D16-150

65 P3 D16-150
STR-3-41

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


14 B1 D22 TELP. (0771) 443415

31 B3 D16-200 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4x22 P4 D16-150

4x22 P4 D16-150
6x22 P5 D16-150

6x22 P5 D16-150

PURWANTA,ST
NIP. 19660921 199203 1 010

C 2 B2 D16-500
Nama Paket Pekerjaan
STR-3-41
Pekerjaan lanjutan DED (Detail Engineering Design)

D Jembatan P.Bintan - P. Dompak


dan Review Design
STR-3-41
HWL+3.070 HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P12 1 POTONGAN A 2 TULANGAN PIER 12


SKALA 1 : 100 STR-2-08 SKALA 1 : 100 STR-2-08 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-40
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x22 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
65 P3 D16-150 65 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x22 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-40
SKALA 1 : 25 STR-3-40 STR-3-40
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 12
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-41
Catatan :

P13
A
STR-3-42

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

B
STR-3-43
61 P3 D16-150

61 P3 D16-150
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
14 B1 D22 TELP. (0771) 443415

31 B3 D16-200 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
4x22 P4 D16-150

4x22 P4 D16-150
6x22 P5 D16-150

6x22 P5 D16-150

PURWANTA,ST
NIP. 19660921 199203 1 010

C 2 B2 D16-500
Nama Paket Pekerjaan
STR-3-43
Pekerjaan lanjutan DED (Detail Engineering Design)

D Jembatan P.Bintan - P. Dompak


dan Review Design
STR-3-43
HWL+3.070 HWL+3.070
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P13 1 POTONGAN A 2 TULANGAN PIER 13


SKALA 1 : 100 STR-3-42 SKALA 1 : 100 STR-3-42 LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-42
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x22 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
61 P3 D16-150 61 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x22 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-42
SKALA 1 : 25 STR-3-42 STR-3-42
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 13
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-43
Catatan :

P14
A
STR-3-44

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100

DINAS PEKERJAAN UMUM


B PROVINSI KEPULAUAN RIAU
STR-3-45
59 P3 D16-150

59 P3 D16-150
14 B1 D22
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
31 B3 D16-200 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
4x21 P4 D16-150

4x21 P4 D16-150
6x21 P5 D16-150

6x21 P5 D16-150
SELAKU PEJABAT PEMBUAT KOMITMEN

C 2 B2 D16-500 PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-45
Nama Paket Pekerjaan
D Pekerjaan lanjutan DED (Detail Engineering Design)
STR-3-45
HWL+3.070 HWL+3.070 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

TULANGAN PIER P14 1 POTONGAN A 2 Judul Gambar :


SKALA 1 : 100 STR-2-12 SKALA 1 : 100 STR-2-12
TULANGAN PIER 14
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-44
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x21 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
59 P3 D16-150 59 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x21 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-44
SKALA 1 : 25 STR-3-44 STR-3-44
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 14
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-45
Catatan :

P15
A
STR-3-46

REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


16 P1 D32-100 16 P1 D32-100 20 P2 D32-100 PROVINSI KEPULAUAN RIAU
20 P2 D32-100
57 P3 D16-150

57 P3 D16-150
B 14 B1 D22
STR-3-47
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
31 B3 D16-200 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
4x21 P4 D16-150

4x21 P4 D16-150
6x21 P5 D16-150

6x21 P5 D16-150
SELAKU PEJABAT PEMBUAT KOMITMEN

C 2 B2 D16-500 PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-47
Nama Paket Pekerjaan
D Pekerjaan lanjutan DED (Detail Engineering Design)
STR-3-47
HWL+3.070 HWL+3.070 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

TULANGAN PIER P15 1 POTONGAN A 2 Judul Gambar :


SKALA 1 : 100 STR-3-46 SKALA 1 : 100 STR-3-46
TULANGAN PIER 15
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-46
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x21 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
57 P3 D16-150 57 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x21 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-46
SKALA 1 : 25 STR-3-46 STR-3-46
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 15
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-47
Catatan :

P16
A
STR-3-48
REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


16 P1 D32-100 16 P1 D32-100 20 P2 D32-100 PROVINSI KEPULAUAN RIAU
20 P2 D32-100
55 P3 D16-150

55 P3 D16-150
B 14 B1 D22
STR-3-49
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
31 B3 D16-200 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
4x20 P4 D16-150

4x20 P4 D16-150
6x20 P5 D16-150

6x20 P5 D16-150
SELAKU PEJABAT PEMBUAT KOMITMEN

C 2 B2 D16-500 PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-49
Nama Paket Pekerjaan
D Pekerjaan lanjutan DED (Detail Engineering Design)
STR-3-49
HWL+3.070 HWL+3.070 Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

TULANGAN PIER P16 1 POTONGAN A 2 Judul Gambar :


SKALA 1 : 100 STR-3-48 SKALA 1 : 100 STR-3-48
TULANGAN PIER 16
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-48
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x20 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
55 P3 D16-150 55 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x20 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-48
SKALA 1 : 25 STR-3-48 STR-3-48
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 16
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-49
Catatan :

P17
A
STR-3-50

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100
53 P3 D16-150

53 P3 D16-150
B 14 B1 D22
DINAS PEKERJAAN UMUM
STR-3-51
31 B3 D16-200 PROVINSI KEPULAUAN RIAU
4x20 P4 D16-150

4x20 P4 D16-150
6x20 P5 D16-150

6x20 P5 D16-150
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

C 2 B2 D16-500
KUASA PENGGUNA ANGGARAN
STR-3-51 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

D
STR-3-51
HWL+3.070 HWL+3.070 PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


TULANGAN PIER P17 1 POTONGAN A 2 CONSULTING ENGINEERS

SKALA 1 : 100 STR-3-50 SKALA 1 : 100 STR-3-50 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 17
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-50
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x20 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
53 P3 D16-150 53 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x20 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-50
SKALA 1 : 25 STR-3-50 STR-3-50
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 17
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-51
Catatan :

P18
A
STR-3-52

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100
DINAS PEKERJAAN UMUM
51 P3 D16-150

51 P3 D16-150
B 14 B1 D22
PROVINSI KEPULAUAN RIAU

STR-3-53
31 B3 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


4x19 P4 D16-150

4x19 P4 D16-150
6x19 P5 D16-150

6x19 P5 D16-150
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
C 2 B2 D16-500 SELAKU PEJABAT PEMBUAT KOMITMEN

STR-3-53

D PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-53
HWL+3.070 HWL+3.070
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
TULANGAN PIER P18 1 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc
SKALA 1 : 100 STR-3-52 SKALA 1 : 100 STR-3-52
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 18
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-52
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x19 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
51 P3 D16-150 51 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x19 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-52
SKALA 1 : 25 STR-3-52 STR-3-52
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 18
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-53
Catatan :

P19
A
STR-3-54

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100
DINAS PEKERJAAN UMUM
B PROVINSI KEPULAUAN RIAU
49 P3 D16-150

49 P3 D16-150
14 B1 D22
STR-3-55
31 B3 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


4x19 P4 D16-150

4x19 P4 D16-150
6x19 P5 D16-150

6x19 P5 D16-150
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
C 2 B2 D16-500 SELAKU PEJABAT PEMBUAT KOMITMEN

STR-3-55

D PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-55
HWL+3.070 HWL+3.070
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
TULANGAN PIER P19 1 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc
SKALA 1 : 100 STR-3-54 SKALA 1 : 100 STR-3-54
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 19
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-54
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x19 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
49 P3 D16-150 49 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x19 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-54
SKALA 1 : 25 STR-3-54 STR-3-54
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER P19


LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-55
Catatan :

A
STR-3-56

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100 20 P2 D32-100


20 P2 D32-100
DINAS PEKERJAAN UMUM
B PROVINSI KEPULAUAN RIAU
47 P3 D16-150

47 P3 D16-150
14 B1 D22
STR-3-57
31 B3 D16-200

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG

4x19 P4 D16-150
6x19 P5 D16-150
4x19 P4 D16-150

TELP. (0771) 443415


6x19 P5 D16-150

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
C 2 B2 D16-500 SELAKU PEJABAT PEMBUAT KOMITMEN

STR-3-57

D PURWANTA,ST
NIP. 19660921 199203 1 010
STR-3-57
HWL+3.070 HWL+3.070
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
TULANGAN PIER P20 1 POTONGAN A 2 DISETUJUI Ir. Muhammad Ridwan Msc
SKALA 1 : 100 STR-3-56 SKALA 1 : 100 STR-3-56
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 20
LEMBAR 1-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-56
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 16 P1 D32-100

4x19 P4 D16-150 14 B1 D22 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
20 P2 D32-100

20 P2 D32-100

20 P2 D32-100

20 P2 D32-100
47 P3 D16-150 47 P3 D16-150 2 B2 D16-500 2 B2 D16-500
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
31 B3 D16-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
14 B1 D22
16 P1 D32-100 16 P1 D32-100

6x19 P5 D16-150 PURWANTA,ST


NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)

POTONGAN B 1 POTONGAN C 2 POTONGAN D 3 Jembatan P.Bintan - P. Dompak


dan Review Design
SKALA 1 : 25 SKALA 1 : 25 STR-3-56
SKALA 1 : 25 STR-3-56 STR-3-56
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER 20
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-57
Catatan :

A
STR-3-58

REVISI

No. Tanggal Catatan dan Revisi

16 P1 D32-100 20 P2 D32-100
20 P2 D32-100

14 B1 D22
42 P3 D16-150

42 P3 D16-150
31 B3 D16-200

16 P1 D32-100 B
STR-3-58
-
DINAS PEKERJAAN UMUM
2 B2 D16-500 PROVINSI KEPULAUAN RIAU

C
STR-3-58
HWL+3.070 HWL+3.070 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

TULANGAN ABT-2 1 16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
SKALA 1 : 100 STR-3-58 dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

42 P3 D16-150 DIPERIKSA Altho Sagara,ST


31 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN ABT-2
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-58 SKALA 1 : 50 STR-3-58


STR-3-58
Catatan :

P21
A
STR-3-59

REVISI

No. Tanggal Catatan dan Revisi


35 P3 D16-150

35 P3 D16-150
14 B1 D22
19 B3 D16-200
16 P1 D32-100 20 P2 D32-100
B
STR-3-59
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

2 B2 D16-500
HWL+3.070 HWL+3.070

C JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
STR-3-59
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

TULANGAN PIER P21 1 POTONGAN A 2 Nama Paket Pekerjaan


SKALA 1 : 100 STR-3-59 SKALA 1 : 100 STR-3-59
16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

35 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 21
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-59 SKALA 1 : 50 STR-3-59


STR-3-59
Catatan :

P22
A
STR-3-60

REVISI

No. Tanggal Catatan dan Revisi


33 P3 D16-150

33 P3 D16-150
14 B1 D22
19 B3 D16-200

B
STR-3-60
16 P1 D32-100 20 P2 D32-100 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

2 B2 D16-500
HWL+3.070 HWL+3.070

C JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
STR-3-60
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

TULANGAN PIER P22 1 POTONGAN A 2 Nama Paket Pekerjaan


SKALA 1 : 100 STR-3-60 SKALA 1 : 100 STR-3-60
16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

33 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 22
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-60 SKALA 1 : 50 STR-3-60


STR-3-60
Catatan :

P23
A
STR-3-61

REVISI

No. Tanggal Catatan dan Revisi


31 P3 D16-150

31 P3 D16-150
14 B1 D22
19 B3 D16-200

B
STR-3-61
16 P1 D32-100 20 P2 D32-100 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

2 B2 D16-500
HWL+3.070 HWL+3.070

C JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
STR-3-61
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

TULANGAN PIER P23 1 POTONGAN A 2 Nama Paket Pekerjaan


SKALA 1 : 100 STR-3-61 STR-3-61
SKALA 1 : 100
16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

31 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 23
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-61 SKALA 1 : 50 STR-3-61


STR-3-61
Catatan :

P24
A
STR-3-62

REVISI

No. Tanggal Catatan dan Revisi


28 P3 D16-150

28 P3 D16-150
14 B1 D22
19 B3 D16-200

B
STR-3-62
16 P1 D32-100 20 P2 D32-100 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

2 B2 D16-500
HWL+3.070 HWL+3.070

C JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
STR-3-62
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

TULANGAN PIER P24 1 POTONGAN A 2 Nama Paket Pekerjaan


SKALA 1 : 100 STR-3-62 SKALA 1 : 100 STR-3-62
16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

28 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 24
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-62 SKALA 1 : 50 STR-3-62


STR-3-62
Catatan :

P25
A
STR-3-63

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
26 P3 D16-150

26 P3 D16-150
19 B3 D16-200

B
STR-3-63
16 P1 D32-100 20 P2 D32-100

2 B2 D16-500
HWL+3.070 HWL+3.070
DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-63

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P25 1 POTONGAN A 2
SKALA 1 : 100 STR-3-63 SKALA 1 : 100 STR-3-63
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

26 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 25
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-63 SKALA 1 : 50 STR-3-63


STR-3-63
Catatan :

P26
A
STR-3-64

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
24 P3 D16-150

24 P3 D16-150
19 B3 D16-200

B
STR-3-64
16 P1 D32-100 20 P2 D32-100

2 B2 D16-500
HWL+3.070 HWL+3.070
DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-64

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P26 1 POTONGAN A 2
SKALA 1 : 100 STR-3-64 SKALA 1 : 100 STR-3-64
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

24 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 26
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-64 SKALA 1 : 50 STR-3-64


STR-3-64
Catatan :

P27
A
STR-3-65

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
22 P3 D16-150

22 P3 D16-150
19 B3 D16-200

16 P1 D32-100
B 20 P2 D32-100
STR-3-65

2 B2 D16-500
HWL+3.070 HWL+3.070
DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-65

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P27 1 POTONGAN A 2
SKALA 1 : 100 STR-3-65 SKALA 1 : 100 STR-3-65
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

22 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 27
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-65 SKALA 1 : 50 STR-3-65


STR-3-65
Catatan :

P28
A
STR-3-66

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
20 P3 D16-150

20 P3 D16-150
19 B3 D16-200

16 P1 D32-100
B 20 P2 D32-100
STR-3-66

2 B2 D16-500
HWL+3.070 HWL+3.070
DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-66

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P28 1 POTONGAN A 2
SKALA 1 : 100 STR-3-66 SKALA 1 : 100 STR-3-66
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

20 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 28
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-66 SKALA 1 : 50 STR-3-66


STR-3-66
Catatan :

P29
A
STR-3-67

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
18 P3 D16-150

18 P3 D16-150
19 B3 D16-200

16 P1 D32-100
B 20 P2 D32-100
STR-3-67

HWL+3.070 HWL+3.070 2 B2 D16-500


DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-67

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P29 1 POTONGAN A 2
SKALA 1 : 100 STR-3-67 SKALA 1 : 100 STR-3-67
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

18 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 29
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-67 SKALA 1 : 50 STR-3-67


STR-3-67
Catatan :

P30
A
STR-3-68

REVISI

No. Tanggal Catatan dan Revisi

14 B1 D22
16 P3 D16-150

16 P3 D16-150
19 B3 D16-200

16 P1 D32-100
B 20 P2 D32-100
STR-3-68

HWL+3.070 HWL+3.070 2 B2 D16-500


DINAS PEKERJAAN UMUM
C PROVINSI KEPULAUAN RIAU

STR-3-68

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
TULANGAN PIER P30 1 POTONGAN A 2
SKALA 1 : 100 STR-3-68 SKALA 1 : 100 STR-3-68
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

16 P1 D32-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

14 B1 D22
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
20 P2 D32-100

20 P2 D32-100

TANGGAL :

2 B2 D16-500 2 B2 D16-500 DISETUJUI Ir. Muhammad Ridwan Msc

16 P3 D16-150 DIPERIKSA Altho Sagara,ST


19 B3 D16-200
DIGAMBAR Rohendy

14 B1 D22 Judul Gambar :

TULANGAN PIER 30
16 P1 D32-100

POTONGAN B 3 POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 50 STR-3-68 SKALA 1 : 50 STR-3-68


STR-3-68
Catatan :

A B
STR-3-69 STR-3-69
2x12 PH1 D32
134 W2 D16-150

6 W1 D16-300
12 PH1a D19 12 PH1a D19

12 PH2 D32 12 PH2 D32

REVISI

12 PH3a D32 12 PH3a D32 No. Tanggal Catatan dan Revisi

W2a D16-200

TULANGAN PIER HEAD 1


SKALA 1 : 100 STR-3-69

C
STR-3-69

12+12 PH1 D32 12+12 PH1 D32 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
W6 D13-500 W2a D16-250 W6 D13-500
W2 D19-250 W2 D19-250
6 W1 D16-300

6 W1 D16-300

6 W1 D16-300
W2a D16-250
5 PH5 D16 5 PH5 D16 5 PH5 D16 5 PH5 D16
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
12 PH2 D32 W3 D25-250 12 PH2 D32 W3 D25-250 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


5 W5 D16-300

5 W5 D16-300

5 W5 D16-300

5 W5 D16-300
BIDANG BINA MARGA
6 PW1 D25-150 SELAKU PEJABAT PEMBUAT KOMITMEN

W4 D16-250 W4 D16-250
PURWANTA,ST
NIP. 19660921 199203 1 010
5 PH4 D16 5 PH4 D16 5 PH4 D16 5 PH4 D16
12 PH3 D32 12 PH3 D32 5 W2a D16-200 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


POTONGAN A 2 POTONGAN B 3 Jembatan P.Bintan - P. Dompak
dan Review Design
SKALA 1 : 100 STR-3-69 SKALA 1 : 100 STR-3-69
Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
5 PH5 D16
TANGGAL :
134 W3 D25-250
DISETUJUI Ir. Muhammad Ridwan Msc

5 W5 D16-300
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PIER HEAD

POTONGAN C 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 100 STR-3-69
STR-3-69
Catatan :
34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
21 A2 D16-150
34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150
21 A3 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
21x2 A4 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
21x2 A4a D16-150 PIER TABLE = 15000
34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150
41 A1 D16-200
T&B
6 A1 D16

REVISI

No. Tanggal Catatan dan Revisi


64 A1 D16-200
T&B
6 A1 D16
41 A1 D16-200
T&B

1 2 3 DINAS PEKERJAAN UMUM


STR-3-74 STR-3-74 STR-3-75 PROVINSI KEPULAUAN RIAU

TULANGAN TOP SLAB 1


SKALA 1 : 250 STR-3-70
21 A5 D16-150 PIER TABLE = 15000 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
21 A9 D13-150 34 A5 D22-150 34 A5 D22-150 34 A5 D22-150
34 A5 D16-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150
34 A5 D16-150 34 A5 D16-150
34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D22-150 34 A9 D22-150 34 A9 D22-150 KUASA PENGGUNA ANGGARAN
34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 BIDANG BINA MARGA

12 A1 D16-200
12 A1 D16-200
SELAKU PEJABAT PEMBUAT KOMITMEN

12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200

3500
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

TULANGAN WEB 2 Pekerjaan lanjutan DED (Detail Engineering Design)


SKALA 1 : 250 Jembatan P.Bintan - P. Dompak
STR-3-70
dan Review Design
21 A6a D13-150
21 A6 D13-150
Konsultan Perencana
34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150
PIER TABLE = 15000
34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :
3 A1 D16

DISETUJUI Ir. Muhammad Ridwan Msc


20 A1a D13-200

DIPERIKSA Altho Sagara,ST


T&B

DIGAMBAR Rohendy
3 A1 D16

Judul Gambar :

TULANGAN BOX MAIN SPAN


LEMBAR 1 - 6

SKALA JUMLAH GAMBAR NOMOR LEMBAR

TULANGAN BOTTOM SLAB 3


SKALA 1 : 250 STR-3-70 STR-3-70
21 A2 D16-150 Catatan :
34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 21 A3 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 21x2 A4 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
21x2 A4a D16-150
34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 21 A2 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 21 A3 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 21x2 A4 D16-150
PIER TABLE = 15000
34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 21x2 A4a D16-150

41 A1 D16-200
T&B
6 A1 D16
REVISI

No. Tanggal Catatan dan Revisi

64 A1 D16-200
T&B
6 A1 D16
41 A1 D16-200
T&B
TULANGAN TOP SLAB 1 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
SKALA 1 : 250 STR-3-71

21 A5 D16-150
PIER TABLE = 15000 21 A9 D13-150
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D16-150 34 A5 D16-150 21 A5 D16-150 TELP. (0771) 443415
34 A5 D22-150 34 A5 D22-150 34 A5 D22-150
34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 21 A9 D13-150
34 A9 D22-150 34 A9 D22-150 34 A9 D22-150 KUASA PENGGUNA ANGGARAN

12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
BIDANG BINA MARGA

12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200

SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

TULANGAN WEB 2 Pekerjaan lanjutan DED (Detail Engineering Design)


SKALA 1 : 250 Jembatan P.Bintan - P. Dompak
STR-3-71
dan Review Design
21 A6a D13-150
21 A6 D13-150
Konsultan Perencana
34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 21 A6a D13-150
PIER TABLE = 15000
34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 21 A6 D13-150
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

3 A1 D16 T&B 3 A1 D16


DISETUJUI Ir. Muhammad Ridwan Msc

42 A1a D13-200
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN BOX MAIN SPAN


LEMBAR 2 - 6

SKALA JUMLAH GAMBAR NOMOR LEMBAR

TULANGAN BOTTOM SLAB 3


SKALA 1 : 250 STR-3-71 STR-3-71
21 A2 D16-150 Catatan :
21 A3 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150
21x2 A4 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
21x2 A4a D16-150
21 A2 D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150
21 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
21x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
PIER TABLE = 15000
21x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150
20 A1 D16-200
T&B
6 A1 D16

REVISI

No. Tanggal Catatan dan Revisi


64 A1 D16-200
T&B
6 A1 D16
20 A1 D16-200
T&B

TULANGAN TOP SLAB 1 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
SKALA 1 : 250 STR-3-72

21 A5 D16-150
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
21 A9 D13-150 PIER TABLE = 15000 TELP. (0771) 443415
34 A5 D16-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D22-150 34 A5 D22-150 34 A5 D22-150
21 A5 D16-150 34 A5 D16-150
34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D22-150 34 A9 D22-150 34 A9 D22-150 KUASA PENGGUNA ANGGARAN
21 A9 D13-150 34 A9 D13-150
BIDANG BINA MARGA

12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200

SELAKU PEJABAT PEMBUAT KOMITMEN


12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

TULANGAN WEB 2 Pekerjaan lanjutan DED (Detail Engineering Design)


SKALA 1 : 250 Jembatan P.Bintan - P. Dompak
STR-3-72
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :
3 A1 D16

DISETUJUI Ir. Muhammad Ridwan Msc


20 A1a D13-200

DIPERIKSA Altho Sagara,ST


T&B

DIGAMBAR Rohendy
3 A1 D16

Judul Gambar :

TULANGAN BOX MAIN SPAN


LEMBAR 3 - 6

SKALA JUMLAH GAMBAR NOMOR LEMBAR

TULANGAN BOTTOM SLAB 3


SKALA 1 : 250 STR-3-72 STR-3-72
21 A2 D16-150 Catatan :
34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150 34 A2 D16-150
21 A3 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
21x2 A4 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
21x2 A4a D16-150
34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150 34x2 A4a D16-150 34 A2 D16-150
34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150 34 A3 D16-150
34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150 34x2 A4 D16-150
PIER TABLE = 15000
34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150 34x2 A4a D16-150

41 A1 D16-200
T&B
6 A1 D16
REVISI

No. Tanggal Catatan dan Revisi

64 A1 D16-200
T&B
6 A1 D16
41 A1 D16-200
T&B
TULANGAN TOP SLAB 1 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
SKALA 1 : 250 STR-3-73

21 A5 D16-150

PIER TABLE = 15000 21 A9 D13-150


JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D19-150 34 A5 D16-150 34 A5 D16-150 34 A5 D16-150
34 A5 D22-150 34 A5 D22-150 34 A5 D22-150 TELP. (0771) 443415
34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150 34 A9 D13-150
34 A9 D22-150 34 A9 D22-150 34 A9 D22-150
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA

12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200
12 A1 D16-200

SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

TULANGAN WEB 2 Pekerjaan lanjutan DED (Detail Engineering Design)


SKALA 1 : 250 Jembatan P.Bintan - P. Dompak
STR-3-73
dan Review Design
21 A6a D13-150
21 A6 D13-150
Konsultan Perencana
34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150 34 A6a D13-150
PIER TABLE = 15000
34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150 34 A6 D13-150
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

3 A1 D16 T&B 3 A1 D16


DISETUJUI Ir. Muhammad Ridwan Msc

42 A1a D13-200
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN BOX MAIN SPAN


LEMBAR 4 - 6

SKALA JUMLAH GAMBAR NOMOR LEMBAR

TULANGAN BOTTOM SLAB 3


SKALA 1 : 250 STR-3-73 STR-3-73
Catatan :
CL BOX GIRDER
7700

20 A1 D16-200 6 A1 D16 32 A1 D16-200 6 A1 D16 20 A1 D16-200


A2 D16-150

A3 D16-150
A4a D13-150 A4 D13-150 A9 D13-150 A4 D13-150 A4a D13-150
32 A1 D16-200 A9 D13-150

12 A

0
21 A1 D16-200 21 A1 D16-200

-20
REVISI

1
12 A

D16

00
-2
D16
No. Tanggal Catatan dan Revisi

1 D
A5 D16-150 A5 D16-150

D16
1
-20

12 A
16-2

1
A7 D16-150 A7 D16-150

12 A
00
15 A1a D13-200 22 A1a D13-200 15 A1a D13-200
A6a D13-150

A4a D13-150 A8 D13-150 A8 D13-150 A4a D13-150


A6 D13-150
15 A1a D13-200 2 A1b D16 2 A1b D16
15 A1a D13-200
3 A1 D16 20 A1a D13-200 3 A1 D16
800 625 2750 625 800
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
POTONGAN - 1 1
SKALA 1 : 50 STR-3-70

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
CL BOX GIRDER
KUASA PENGGUNA ANGGARAN
7700 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

20 A1 D16-200 6 A1 D16 32 A1 D16-200 6 A1 D16 20 A1 D16-200


A2 D16-150 PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


A3 D16-150
A4a D13-150 A4 D13-150 A9 D13-150 A4 D13-150 A4a D13-150 Pekerjaan lanjutan DED (Detail Engineering Design)
32 A1 D16-200 A9 D13-150 Jembatan P.Bintan - P. Dompak
12 A

dan Review Design

0
21 A1 D16-200 21 A1 D16-200

-20
1
12 A

D16

00
Konsultan Perencana

16-2
D16
1 D

A5 D19-150 A5 D19-150

1
-20

12 A

1 D
PT. MULTI PHI BETHA
16-2

A7 D16-150 A7 D16-150 CONSULTING ENGINEERS

12 A
00

15 A1a D13-200 22 A1a D13-200 15 A1a D13-200 TANGGAL :

A6a D13-150 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


A4a D13-150 A8 D13-150 A8 D13-150 A4a D13-150
A6 D13-150
15 A1a D13-200 2 A1b D16 2 A1b D16
15 A1a D13-200 DIGAMBAR Rohendy

3 A1 D16 20 A1a D13-200 3 A1 D16 Judul Gambar :

800 625 2750 625 800 TULANGAN BOX MAIN SPAN


LEMBAR 5 - 6

POTONGAN - 2 2 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 50 STR-3-70

STR-3-74
Catatan :

REVISI
CL BOX GIRDER
No. Tanggal Catatan dan Revisi
7700

20 A1 D16-200 6 A1 D16 32 A1 D16-200 6 A1 D16 20 A1 D16-200


A2 D16-150

A3 D16-150
A4a D13-150 A4 D13-150 A9 D13-150 A4 D13-150 A4a D13-150
32 A1 D16-200 A9 D13-150

12 A

0
21 A1 D16-200 21 A1 D16-200

-20
1 D
12 A

D16

00
DINAS PEKERJAAN UMUM

16-2
16-2
1 D

A5 D22-150 A5 D22-150 PROVINSI KEPULAUAN RIAU

1
12 A

1 D
00
16-2

A7 D16-150 A7 D16-150

12 A
00

15 A1a D13-200 22 A1a D13-200 15 A1a D13-200


A6a D13-150 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

A4a D13-150 A8 D13-150 A8 D13-150 A4a D13-150 KUASA PENGGUNA ANGGARAN


A6 D13-150 BIDANG BINA MARGA
2 A1b D16 2 A1b D16 SELAKU PEJABAT PEMBUAT KOMITMEN
15 A1a D13-200 15 A1a D13-200
3 A1 D16 20 A1a D13-200 3 A1 D16
800 625 2750 625 800 PURWANTA,ST
NIP. 19660921 199203 1 010

POTONGAN - 3 1 Nama Paket Pekerjaan


SKALA 1 : 50 STR-3-70
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN BOX MAIN SPAN


LEMBAR 6 - 6

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-75
A
STR-3-78

STEEL PLATE t=30mm


STEEL PLATE t=30mm

TULANGAN BALOK PELENGKUNG (SIDE SPAN) 1


SKALA 1 : 200 STR-3-76
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN BALOK PELENGKUNG


(SIDE SPAN)

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-76
B
STR-3-78

STEEL PLATE t=30mm

STEEL PLATE t=30mm

TULANGAN BALOK PELENGKUNG


SKALA 1 : 200
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
K PELENGKUNG 1
TANGGAL :
STR-3-77
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN BALOK PELENGKUNG


(MAIN SPAN)

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-77
Catatan :

200 300 200


200 300 200
X 4 A1 D25 REVISI
4 A1 D25 STEEL PLATE t=30mm No. Tanggal Catatan dan Revisi

3A
32
STEEL PLATE t=30mm

2D
3A
2

2D
D3

3A
300
2D

32
2

A4 D16-300
3A
300

32
A4 D13-300
A5 D16-300

900
6 A1 D25

6 A1 D25
A5 D13-300

900
6 A1 D25

6 A1 D25

600
A3 D16-150
600

A3 D13-150

7 A2 D32 DINAS PEKERJAAN UMUM


7 A2 D32 PROVINSI KEPULAUAN RIAU
700
700

POTONGAN A 1 POTONGAN B 1 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
SKALA 1 : 50 STR-3-76 SKALA 1 : 50 STR-3-76 KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

300 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
STEEL PLATE t=30mm dan Review Design

Konsultan Perencana
0
36

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :
DETAIL X 1 REINFORCEMENT OF ARCH
SKALA 1 : 50 STR-3-76 CROSS SECTION

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-78
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

2 b1 D22
9 b4 D19-100

4 tb1 D22
2 b2 D22 + 9 b3 D19-100
2 b6 D22
1
STR-3-79

tb1 D22 4 tb1 D22

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

TIPIKAL TULANGAN BLISTER 1 SECTION ~ 2 3


SCALE 1 : 50 STR-3-79
SKALA 1 : 50 STR-3-79

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2 b1 D22
PURWANTA,ST

4 tb1 D22
2 b2 D22 + 9 b3 D19-100
4 tb1 D22 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


tb1 D22 2 b6 D22

20 b5 D13-100 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

SECTION ~ 3 3
SCALE 1 : 50 STR-3-79 PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TIPIKAL TULANGAN BLISTER

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-79
Catatan :

2 3 2 3
STR-3-80 STR-3-80 STR-3-80 STR-3-80

3 b3 D19-100
6 b3 D19-100 6 b3 D19-100
2 b2 D22 2 b2 D22
6 b4 D19-100 6 b4 D19-100
2 b2 D22 2 b2 D22 2 b1 D22 2 b1a D22
6b 6b
2 b1 D22 3D 2 b1 D22 3 D19 bursting steel bursting steel
19-1 -10
6b 00 6b 0
bursting steel 4D bursting steel 4D 2 b6 D22 2 b6 D22
19- 19-
100 100
2 b6 D22
2 b3 D19-150 1 2 b6 D22
2 b3 D19-150 1
STR-3-80 STR-3-80

17 b5 D13-10
0
REVISI
17 b5 D13-10 17 b5 D13-10
0 0 0
17 b5 D13-10
No. Tanggal Catatan dan Revisi

6 b4 D19-100
6 b4 D19-100
17 b5 D13-100 6 b4 D19-100
17 b5 D13-100
17 b5 D13-100 17 b5 D13-100

6 b4 D19-100
bursting steel
bursting steel
2 b2 D22 2 b2 D22

DINAS PEKERJAAN UMUM


17 b5 D13-100 PROVINSI KEPULAUAN RIAU

6 b3 D19-100

2 b3 D19-150 6 b3 D19-100
2 b3 D19-150

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


POTONGAN ~ 1 3 POTONGAN ~ 1 4 POTONGAN ~ 1 4 TELP. (0771) 443415
SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

2 b1 D22 2 b1 D22 PURWANTA,ST


9 b4 D19-100 9 b4 D19-100 9 b4 D19-100 2 b1 D22 NIP. 19660921 199203 1 010

2 b2 D22 + 9 b3 D19-100 2 b2 D22 + 9 b3 D19-100 2 b2 D22 + 9 b3 D19-100 Nama Paket Pekerjaan


4t

4t

4t
2 b6 D22 2 b6 D22 2 b6 D22

b1
b1

b1

D22
D22

D22

Pekerjaan lanjutan DED (Detail Engineering Design)


4 tb1 D22 4 tb1 D22
7 tb1 D22 Jembatan P.Bintan - P. Dompak
dan Review Design

4 tb1 D22 7 tb1 D22 4 tb1 D22

Konsultan Perencana
POTONGAN ~ 2 5 POTONGAN ~ 2 7 POTONGAN ~ 2 9
SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


2 b1 D22 2 b1 D22
2 b1 D22
4 tb1 D22 4 tb1 D22
DIPERIKSA Altho Sagara,ST
4t

4t

4t
b1 D
b1

b1

4 tb1 D22
D22

D22

22
2 b6 D22
DIGAMBAR Rohendy
2 b6 D22 2 b6 D22

17 b5 D13-100 17 b5 D13-100 Judul Gambar :

17 b5 D13-100
DETAIL BLISTER
LEMBAR 1-3
POTONGAN ~ 3 6 POTONGAN ~ 3 8 POTONGAN ~ 3 10
SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80 SKALA 1 : 50 STR-3-80

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-80
Catatan :

A C
STR-3-49 STR-3-49

144 600 144 600

111

111
B D

362

362
STR-3-49 STR-3-49

REVISI

No. Tanggal Catatan dan Revisi

DETAIL BLISTER TIPE 1 (TIPIKAL) 1 DETAIL BLISTER TIPE 2 (TIPIKAL) 4


SKALA 1 : 50 STR-3-81 SKALA 1 : 50 STR-3-81

334 496
209 125 209 162 125

170 111

228 111
339
DINAS PEKERJAAN UMUM
362

362
PROVINSI KEPULAUAN RIAU
250

POTONGAN ~ A 2 POTONGAN ~ C 5 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
SKALA 1 : 50 STR-3-81 SKALA 1 : 50 STR-3-81
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
143 600 dan Review Design

Konsultan Perencana

125 162 209


333
250

PT. MULTI PHI BETHA


125

412

CONSULTING ENGINEERS
144 600
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

POTONGAN ~ B 3 POTONGAN ~ D 6 DIGAMBAR Rohendy

SKALA 1 : 50 STR-3-81 SKALA 1 : 50 STR-3-81 Judul Gambar :

DETAIL BLISTER
LEMBAR 2-3

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-81
Catatan :

REVISI

No. Tanggal Catatan dan Revisi


145 883 152 333
208 125

110
111

170 111
362
362

362
250
100

DETAIL BLISTER TIPE 3 (TIPIKAL) 1 POTONGAN ~ A 2 DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
SKALA 1 : 50 STR-3-82 SKALA 1 : 50 STR-3-82

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
250
125

PURWANTA,ST
145 883 152 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

POTONGAN ~ B 3 Konsultan Perencana

SKALA 1 : 50 STR-3-82
PT. MULTI PHI BETHA
CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DETAIL BLISTER
LEMBAR 3-3

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-82
Catatan :

38600

2100 300 1800 1950 3600 2400 5200 800 6000 800 5200 2400 3600 1950 1800 300
250 250

TAMPAK SAMPING 1
SKALA 1 : 150 STR-3-83

REVISI
200 2250 1400 400400 3000 2100 400
400 5100 400 5100 400
400 5100 400
400 2100 3000 400
400 1400 2250 200
400 No. Tanggal Catatan dan Revisi
2100

38600

TULANGAN I GIRDER 2
SKALA 1 : 150 STR-3-83

38600
C1 5-9 C3 5-19
C2 5-19 C4 5-19 DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU
300 600 600

300 600 600


300 300

300 300
2100

996
774

407
223

4300 6000 6000 6000 6000 6000 4300


JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
PROFIL TENDON 3 KUASA PENGGUNA ANGGARAN
SKALA 1 : 150 STR-3-83
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

800 800 Nama Paket Pekerjaan


100 600 100 100 600 100
Pekerjaan lanjutan DED (Detail Engineering Design)
40 70

120 70

400 225

225

225
130

130

Jembatan P.Bintan - P. Dompak


dan Review Design
C1 5-9
735

735

Konsultan Perencana
C2 5-19

300
200 270 335 335 335

200
1280
1560

600
PT. MULTI PHI BETHA
335

335

600
C3 5-19 CONSULTING ENGINEERS
TANGGAL :
605

605

C4 5-19

300 300
250 250
50

DISETUJUI Ir. Muhammad Ridwan Msc

150
250

200

200

100
700 700 150 200 DIPERIKSA Altho Sagara,ST
200 150
POTONGAN ~ 1 POTONGAN ~ 2 POTONGAN ~ 3 POTONGAN ~ 4 POTONGAN ~ 5 POTONGAN ~ 6 POTONGAN ~ 7 POTONGAN ~ 8 POTONGAN ~ 9 DIGAMBAR Rohendy

Judul Gambar :

DIMENSI. TULANGAN
DAN PROFIL TENDON I GIRDER

POTONGAN 4 SKALA JUMLAH GAMBAR NOMOR LEMBAR


SKALA 1 : 50 STR-3-83

STR-3-83
Catatan :

1
STR-3-53

T5

REVISI

No. Tanggal Catatan dan Revisi


T2

T4

194 T1 D16-200

194 T3 D16-200

103 T4 D13-200
103 T2 D13-200
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

T1 T3

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

T5
Konsultan Perencana

TULANGAN PLAT LANTAI 1 PT. MULTI PHI BETHA


CONSULTING ENGINEERS
SKALA 1 : 150 STR-3-84
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PLAT LANTAI


LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-84
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

103 T2 D13-200

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

Slope 2% 194 T1 D16-200 Slope 2%

T5 D13-200 T5 D13-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
194 T3 D16-200 TELP. (0771) 443415
103 T4 D13-200
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak

POTONGAN ~ 1 1 dan Review Design

SKALA 1 : 75 STR-3-85 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PLAT LANTAI


LEMBAR 2 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-85
Catatan :

A B
STR-3-85b STR-3-85b
REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DENAH DIAPHRAGMA 1 DIGAMBAR Rohendy

Judul Gambar :
SKALA 1 : 150 STR-3-85a
DENAH DIAPHRAGMA
LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-85a
Catatan :

20000

REVISI

Tanggal
520

No. Catatan dan Revisi


355
1325

1000 3000 2000 2000 2000 2000 2000 2000 3000 1000

DINAS PEKERJAAN UMUM


POTONGAN ~ A 1 PROVINSI KEPULAUAN RIAU

SKALA 1 : 75 STR-3-85a

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
20000

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
520
355

Konsultan Perencana

PT. MULTI PHI BETHA


1325

CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


1000 3000 2000 2000 2000 2000 2000 2000 3000 1000
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

POTONGAN ~ B 1 Judul Gambar :

SKALA 1 : 75 STR-3-85a DENAH DIAPHRAGMA


LEMBAR 2 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-85b
Catatan :

60

60
REVISI

No. Tanggal Catatan dan Revisi

1530

1650

1530

1650
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DIMENSI DIAPHRAGM UJUNG 1 DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI DIAPHRAGMA UJUNG

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-86
Catatan :

REVISI

D4 2 D13 No. Tanggal Catatan dan Revisi

D3 15 D13 D4 2 D13 D4 2 D13

D1 2 D13 D3 15 D13 D3 15 D13


D2 D13-150

D2 D13-150

D2 D13-150
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


D3 15 D13
Pekerjaan lanjutan DED (Detail Engineering Design)
D1 2 D13

D1 2 D13

Jembatan P.Bintan - P. Dompak


dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TULANGAN DIAPHRAGM UJUNG 1 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN DIAPHRAGMA UJUNG

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-87
Catatan :

60

60
REVISI

No. Tanggal Catatan dan Revisi

1530

1650

1530

1650
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS

DIMENSI DIAPHRAGM TENGAH 1 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DIMENSI DIAPHRAGMA TENGAH

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-88
Catatan :

REVISI
D4 2 D13
D4 2 D13 No. Tanggal Catatan dan Revisi

D3 17 D13 D3 11 D13
D4 2 D13

D1 2 D13 D3 15 D13
D1 2 D13
D2 D13-150

D2 D13-150
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


D3 17 D13 D3 11 D13
Pekerjaan lanjutan DED (Detail Engineering Design)
D1 2 D13

D1 2 D13

D1 2 D13

D1 2 D13
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TULANGAN DIAPHRAGM TENGAH 1 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

TULANGAN DIAPHRAGMA TENGAH

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-89
Catatan :

R2 14 D13

R1 10 D13

R1 10 D13
1000

1000
REVISI

No. Tanggal Catatan dan Revisi

2400 70 R2 24 D13

R1 10 D13
70

2400
R2 24 D13

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU
DETAIL DIMENSI RC PELAT BENTANG 40M (TIPE 1) 1 DETAIL PENULANGAN RC PELAT (TIPE 1) 3
SKALA 1 : 20 KEBUTUHAN RC PELAT : 2 X 39 = 78 BUAH STR-3-59 SKALA 1 : 20 STR-3-59

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

R2 14 D13 Nama Paket Pekerjaan

R1 10 D13

R1 10 D13
1000

1000

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
1400 70 R2 14 D13 TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


R1 10 D13
DIPERIKSA Altho Sagara,ST
70

DIGAMBAR Rohendy
1400
R2 14 D13
Judul Gambar :

DIMENSI DAN TULANGAN RC PELAT


DETAIL DIMENSI RC PELAT BENTANG 40M (TIPE 2) 2 DETAIL PENULANGAN RC PELAT (TIPE 2) 4
SKALA 1 : 20 KEBUTUHAN RC PELAT : 6 X 39 = 234 BUAH STR-3-59 SKALA 1 : 20 STR-3-59 SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-90
Catatan :

A B
STR-3-61
STR-3-61
L L L L
1 1 1 1 1 1 1 1
4 L 4 L 4 L 4 L 4 L 4 L 4 L 4 L

REVISI

No. Tanggal Catatan dan Revisi

1 1 1
2 L 2 L 2 L

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

71 S3a D16-200
71 S1a D16-200

71 S3 D16-200
71 S1 D16-200
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
S2 D13-150 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


S4 D13-150
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

DENAH TULANGAN PLAT SOP 1 Judul Gambar :

SKALA 1 : 75 STR-3-60 TULANGAN PLAT SOP


LEMBAR 1 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-91
Catatan :

71 S1 D16-200
REVISI

No. Tanggal Catatan dan Revisi


S5 D13-150 S5 D13-150
S2 D13-150

70 S3a D13-200
71 S3 D16-200

S4 D13-150

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

POTONGAN ~ A 1
SKALA 1 : 50 STR-3-61
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
71 S1 D16-200

PURWANTA,ST
S5 D13-150 S5 D13-150 NIP. 19660921 199203 1 010
S2 D13-150
Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design
S4 D13-150
71 S3 D16-200 Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST


POTONGAN ~ B 2
SKALA 1 : 50 STR-3-61 DIGAMBAR Rohendy

Judul Gambar :

TULANGAN PLAT SOP


LEMBAR 2 - 2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-92
Catatan :

B C

3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200
4 CS1 D16-200 4 CS1 D16-200
2 CT3 D19 2 CT2 D19 3 CT1 D19 2 CT2 D19 2 CT3 D19
REVISI

No. Tanggal Catatan dan Revisi

A 2 CB3 D19 2 CB2 D19 4 CB1 D19 2 CB3 D19

TULANGAN CAPING BEAM SOP 1


SKALA 1 : 50 STR-3-62
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200 17 CS1 D16-200 3 CS2 D16-200
4 CS1 D16-200 4 CS1 D16-200 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415
2 CT3 D19 2 CT2 D19 2 CT2 D19 2 CT3 D19
KUASA PENGGUNA ANGGARAN
BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
3 CT1 D19 NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

POTONGAN ~ A 2 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
SKALA 1 : 50 STR-3-62 dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
2 CT2 D19
TANGGAL :
3 CT1 D19 3 CT1 D19
DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

3 CS2 D16-200 2 CB2 D19 17 CS1 D16-200


DIGAMBAR Rohendy

4 CB1 D19 4 CB1 D19 Judul Gambar :

TULANGAN CAPING BEAM SOP

SKALA JUMLAH GAMBAR NOMOR LEMBAR

POTONGAN ~ B 3 POTONGAN ~ C 4
SKALA 1 : 50 STR-3-62 SKALA 1 : 50 STR-3-62 STR-3-93
Catatan :

15@0.3625=2720
D16-300

15@0.150=1121 D16-300

D13 B6 D16-150
D13 REVISI

C No. Tanggal Catatan dan Revisi


-

D16-300 B2 2 D16
B5 D16-150

B4 7 D16-150

B3 D16-150
B5 D16-150
B B2 2 D16
-

B4 7 D16-150
B3 D16-150
B1 D16-150
DINAS PEKERJAAN UMUM
PROVINSI KEPULAUAN RIAU

B6 D16-150

POTONGAN A JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415
SKALA 1 : 100 POTONGAN B KUASA PENGGUNA ANGGARAN
SKALA 1 : 100 BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

15@0.3625=2720 630
PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

A D16-300 Konsultan Perencana


-
D16-300
B5 D16-150
D13-300

D13-300
1500

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
B2 2 D16
TANGGAL :
D16-300
DISETUJUI Ir. Muhammad Ridwan Msc

B2 2 D16
DIPERIKSA Altho Sagara,ST
B3 D16-150
DIGAMBAR Rohendy

Judul Gambar :

DETAIL TULANGAN TANGGA


DENAH TANGGA POTONGAN C
SKALA 1 : 50 SKALA 1 : 100
SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-94
Catatan :
28000
4000 4000 4000 4000 4000 4000 4000

D13-400 D13-400 D13-400 D13-400 D13-400 D13-400 D13-400 D13-400


D13-200

4200
D13-400 D13-400 D13-400 D13-400 D13-400 D13-400 D13-400

D13-200
REVISI

No. Tanggal Catatan dan Revisi

A B
STR-3-64 STR-3-64

TULANGAN TIPICAL PLAT PEDESTRIAN 1


SKALA 1 : 100 STR-3-64

DINAS PEKERJAAN UMUM


4200 PROVINSI KEPULAUAN RIAU

13 D13-400

2 D16 2 D16
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
TELP. (0771) 443415

2 D16 2 D16 KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN
12 D13-400
13 D13-400

PURWANTA,ST
NIP. 19660921 199203 1 010

POTONGAN ~ A 2 Nama Paket Pekerjaan

SKALA 1 : 25 STR-3-64 Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

4200 Konsultan Perencana

13 D13-400
12 D13-400 PT. MULTI PHI BETHA
CONSULTING ENGINEERS
2 D16 2 D16
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc


2 D16 2 D16
DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy
13 D13-400
Judul Gambar :

TULANGAN TIPICAL PLAT PEDESTRIAN


SLAB ON PILE
LEMBAR 1-2

POTONGAN ~ B 3 SKALA JUMLAH GAMBAR NOMOR LEMBAR

SKALA 1 : 25 STR-3-64
STR-3-95
Catatan :

A B REVISI
STR-3-65 STR-3-65
No. Tanggal Catatan dan Revisi

18 D13-400

5 D16 3 D16 5 D16

3 D16 5 D16 3 D16

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

TULANGAN BALOK PEDESTRIAN 1 JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


SKALA 1 : 25 STR-3-65 TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan


5D16 3D16
Pekerjaan lanjutan DED (Detail Engineering Design)
Jembatan P.Bintan - P. Dompak
dan Review Design
400

400
18 D13-400 18 D13-200 Konsultan Perencana

3D16 5D16
PT. MULTI PHI BETHA
300 300 CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

POTONGAN ~ A 2 POTONGAN ~ B 3 DIPERIKSA Altho Sagara,ST


SKALA 1 : 25 STR-3-65 SKALA 1 : 25 STR-3-65
DIGAMBAR Rohendy

Judul Gambar :

TULANGAN TIPICAL PLAT PEDESTRIAN


SLAB ON PILE
LEMBAR 2-2

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-3-96
GENERAL
Catatan :

STRAND PRESTRESS
CATATAN UMUM
Semua strand harus memenuhi standar ASTM A416-85 Grade 270
dengan spesifikasi minimal sebagai berikut :
- Catatan ini untuk semua gambar yang tercantum, kecuali ditentukan lain.
- Tipe = 7 wire low relaxation
- Semua gambar dibaca bersamaan dengan spesifikasi.
- Diameter nominal = 15,2 mm (0,6") & Diameter = 12,7 mm (0,5")
- Apabila referensi dibuat berdasarkan permintaan khusus digambar,
Kontraktor dapat mengajukan alternatif, selama sesuai dan memenuhi - Luas nominal = 140 mm2 (0,6") & 98 mm2 (0,5")
standar dan kriteria desain. - Kuat leleh = 1670 Mpa
- Informasi gambar yang kurang jelas, harus di klarifikasi pada engineer. - Kuat tarik = 1860 MPa
Tindakan yang berdasarkan interpretasi pribadi tidak diijinkan. Jika diperlukan
perbaikan atau informasi tambahan pada gambar yang berikutnya atau bantuan - Maksimum relaksasi setelah 1000 h = 2,5%
dari engineer, Kontraktor diminta untuk merinci informasi tersebut langsung pada - Breaking load = 260,4 kN (0,6") & 182,2 kN (0,5")
gambar kerja.
- Modulus Elastisitas Nominal = 195000 Mpa
- Metoda Pelaksanaan yang terkait dengan penggalian perubahan bentuk tanah asli
REVISI
harus dilakukan perhitungan lebih dahulu sebelum pelaksanaan dan di ajukan ke konsultan pengawas/ TENDON
pemberi tugas untuk diperiksa dan di setujui No. Tanggal Catatan dan Revisi
- Harus dilakukan penyelidikan tanah yang detail dan dapat memberikan data propertis tanah dan jenis - Tiap tendon harus memenuhi standar strand ASTM A 416-85 grade 270
tanah dengan lebih akurat
seperti yang disebutkan diatas.
- Struktur di desain sebagai struktur beton bertulang
- Semua dimensi dalam mm dan elevasi dalam meter kecuali disebutkan lain - Terdapat beberapa tipe dimensi tendon yang digunakan pada desain ini :
- Beban desain sesuai dengan " Peraturan pembebanan Indonesia" 5-9,5-19, untuk I-Girder 6-4,6-19,6-22 untuk box girder main span

- Jembatan telah didesain untuk beban dan metode kontruksi yang telah diasumsikan Arti dari simbol tendon dijelaskan sebagai berikut :
berdasarkan kriteria desain, atau sesuai catatan.
6-19 (S.E)
Untuk alasan tertentu, Kontraktor dapat mengajukan alternatif metode konstruksi
dengan analisis dapat dibuktikan ketahanannya, memenuhi kondisi layak dan kekuatan, arah stressing : (S.E) = single live end, (B.E) = both live end
serta tidak mengubah dimensi jembatan akhir dan sistem konstruksi. banyaknya strandds
diameter strandd (6 artinya diameter 0.5")
BETON
- Mutu beton I-Girder - Mutu beton box Girder Main span Desain angkur yang digunakan pada gambar :
I-Girder prategang : fc' = 50 Mpa Box : fc' = 41,5 Mpa = angkur hidup
Pelat pracetak : fc' = 30 Mpa Arch : fc' = 41,5 Mpa
= angkur mati DINAS PEKERJAAN UMUM
Pelat dek : fc' = 30 Mpa Pier : fc' = 41,5 Mpa PROVINSI KEPULAUAN RIAU
Pelat injak : fc' = 30 Mpa Pile cap : fc' = 30 Mpa = coupler
Pier dan abutment : fc' = 30 Mpa Tiang bor : fc' = 30 Mpa
Pilecap : fc' = 30 Mpa - Dimensi blister, recess dan angkur dapat disesuaikan / dibuat lebih detail nanti
Tiang bor : fc' = 30 Mpa pada gambar kerja berdasarkan rekomendasi dari pabrik.
TULANGAN - Tendon diletakan pada permukaan yang halus sesuai dengan koordinat yang sudah
JL. PERALATAN NO.1, KM.7 TANJUNGPINANG
- Baja tulangan harus berulir grade (fy = 400 MPa) ditentukan. TELP. (0771) 443415

- - duct tendon harus semi-kaku, dan dilapis baja galvanis :


KUASA PENGGUNA ANGGARAN
friksi = 0.2/rad, wobble = 0.003/m. BIDANG BINA MARGA
- Selimut beton 50mm untuk struktur atas dan 70mm untuk struktur bawah SELAKU PEJABAT PEMBUAT KOMITMEN
(berhubungan langsung dengan tanah) PENARIKAN TENDON
- Notasi diameter jarak tulangan,jumlah tulangan digambar sebagai berikut : - Final jacking force untuk tiap tendon tidak boleh lebih dari 75% gaya ultimate
minimum. dan tendon lateral tidak boleh lebih dari 75% gaya minimum. atau terbatas besarnya jacking PURWANTA,ST
ke titik berat tulangan sebelahnya NIP. 19660921 199203 1 010
design Banyaknya Gaya Ultimate Jacking Force
b. 9 D16 berarti 9 buah diameter 16 tulangan ulir Strand di tendon Minimum (KN) (KN) Nama Paket Pekerjaan
- Untuk gambar pelaksanaan (shop drawing) kontraktor harus menunjukan semua detail 5-9 9 1653 1240
5-19 19 3488 2616
pertemuan tulangan ,termasuk panjang penyaluran,dan sebagainya Pekerjaan lanjutan DED (Detail Engineering Design)
6-4 4 1042 782 Jembatan P.Bintan - P. Dompak
- Kontraktor bertanggung jawab untuk persiapan jadwal pengadaan tulangan. 6-19 19 4948 3711 dan Review Design
- Pengelasan pada tulangan tidak diijinkan tanpa persetujuan dari Engineer. 6-22 22 5729 4297
- Diperbolehkan menggunakan Coupler. Persyaratan material, pengetesan dan Konsultan Perencana
- Drawn in, dibatasi tidak lebih dari 7mm.
pemasangan harus memenuhi standar spesifikasi.
- Kuat tekan minimum beton pada saat penarikan harus 80% untuk kuat tekan
- Panjang tulangan / penyaluran harus disesuaikan dengan jarak tertentu, sehingga
PT. MULTI PHI BETHA
tidak lebih dari 50% tulangan yang saling menumpang di tiap Cross Section umur 28 hari, atau ditentukan lain sesuai persetujuan direksi pekerjaan
CONSULTING ENGINEERS
(penampang melintang) - Dalam recessed pada angkur tendon, beton dicor setelah tendon di stressing
TANGGAL :
- Kecuali ditentukan berbeda di gambar, perencanaan dan panjang tulangan / penyaluran
dan grouting. Semua tulangan sementara diatur kembali dan tulangan yang
tulangan, secara umum sebagai berikut : DISETUJUI Ir. Muhammad Ridwan Msc
terpotong disambung contoh coupler prior menuju letak beton atas.
Panjang penyaluran = 40* diameter
Panjang tumpangan untuk tekan = 20* diameter DIPERIKSA Altho Sagara,ST

Panjang tumpangan untuk tarik atau area yang distressing = 40* diameter STAY CABLE
DIGAMBAR Rohendy
Panjang tumpangan untuk sengkang tertutup = 40* diameter -
- Notasi tulangan pada gambar: grade 270 seperti yang disebutkan diatas. Setiap strand dilapisi dengan polythene sheath untuk memberi Judul Gambar :
6 D16-150 (T) perlindungan lebih terhadap korosi.
Lokasi yang ditunjuk - Kabel di lapisi dengan HDPE duct yang tahan terhadap sinar ultra violet. CATATAN UMUM
Jarak tulangan
- Angkur kabel dan dimensi duct dapat disesuaikan berdasarkan rekomendasi pabrik
Diameter tulangan
- Persyaratan terkait sistem stay, harus memenuhi asumsi bahwa strand dapat di inspeksi atau diganti secara SKALA JUMLAH GAMBAR NOMOR LEMBAR
Banyaknya tulangan
individual.
- Kuat tekan minimum pada beton pada saat penarikan kabel harus memenuhi ketentuan ahli yang berkepentingan. STR-GA-01
APPR
30000 45000

APPR
30000 45000

DOMPAK ISLAND
APPROACH SPAN = 165000 END SPAN
45000 45000 45000 35000 35000

12480

15400

14000
APPROACH SPAN = 165000 END SPAN
45000 45000 45000 35000 35000
OVERALL LENGTH

MAIN SPAN = 260000


40000 40000 40000 35000 35000

TAMPAK ATAS ALT.2 2


SKALA 1 : 500 STR-GA-02

OVERALL LENGTH

MAIN SPAN = 260000


40000 40000 40000 35000 35000

DENAH PONDASI ALT.2 1


SKALA 1 : 500 STR-GA-02
L LENGTH OF BRIDGE = 953350

6000 34600 40250 40250 40250 40250

L LENGTH OF BRIDGE = 953350

6000 34600 40250 40250 40250 40250


APPROACH SPAN = 483350
40250 40250 40250 40250 40250

APPROACH SPAN = 483350


40250 40250 40250 40250 40250
40250 40250 172150

40250 40250 172150


40000 40000 40000 40000

0
40000 40000 40000 40000
440000
40000 40000 40000 40000 40000 40000

440000
40000 40000 40000 40000 40000 40000
Catatan :

40000 40000 40000


REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

BINTAN ISLAND PURWANTA,ST


NIP. 19660921 199203 1 010

40000 40000 40000 Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

DENAH PONDASI DAN TAMPAK ATAS

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-GA-02
APPR
30000 45000

DOMPAK ISLAND

ABT-1

9709
3144
500
4222

2566
26630
400

28100
25155
Catatan :

REVISI

No. Tanggal Catatan dan Revisi

DINAS PEKERJAAN UMUM


PROVINSI KEPULAUAN RIAU

200000

JL. PERALATAN NO.1, KM.7 TANJUNGPINANG


TELP. (0771) 443415

KUASA PENGGUNA ANGGARAN


BIDANG BINA MARGA
SELAKU PEJABAT PEMBUAT KOMITMEN

PURWANTA,ST
NIP. 19660921 199203 1 010

Nama Paket Pekerjaan

Pekerjaan lanjutan DED (Detail Engineering Design)


Jembatan P.Bintan - P. Dompak
dan Review Design

Konsultan Perencana

PT. MULTI PHI BETHA


CONSULTING ENGINEERS
TANGGAL :

DISETUJUI Ir. Muhammad Ridwan Msc

DIPERIKSA Altho Sagara,ST

DIGAMBAR Rohendy

Judul Gambar :

POTONGAN MEMANJANG

SKALA JUMLAH GAMBAR NOMOR LEMBAR

STR-GA-03
9709
3067

25000
4209
28615
3.136

APPROACH SPAN = 165000


45000

R13369500
3488
10774

4.150
25062 3.000
29100
5274
45000

5074
11565

23676
29800 6066
45000
END SPAN

7070
12357
7.080
6000
4000

19410
6857
15000

27530
35000

1500
70000

10500
HANGER @10000 = 40000

35000
OVERALL LENGTH

MAIN SPAN = 260000


120000 70000
15000 10000 HANGER @10000 = 100000 10000 15000 HANGER @10000 = 40000 15000

8000

18000

10500

14982
14772

9232
13561

9672
9238
8835

11922
6811

11488
11085

+4.000 HWL+3.070
LWL+0.700

7070
SEA BED

7070
40000 40000 40000 35000 35000

POTONGAN MEMANJANG ALT.4 1


SKALA 1 : 500 STR-GA-03
L LENGTH OF BRIDGE = 953350

6680 33920 40250 40250 40250 40250


40600

5440 1260
1200

430
700

800
14935

14637

14316

13995

13675
APPROACH SPAN = 483350

40250 40250 40250 40250 40250


13354

13033

12392
12712
172150

40250 40250 4100 168000

7@4000=28000 7@4000=28000 7@4000=28000 7@4000=28000


12071

11750

11430
BINTAN ISLAND
7@4000=28000 7@4000=28000 40000 40000 40000 40000

0.8 %
10059

9422
9741

9103
HWL+3.070
LWL+0.700
440000

40000 40000 40000 40000 40000 40000


8784

8466

8147

7828

7510
40000 40000 40000 200000
6872

6558
7191

Anda mungkin juga menyukai