Anda di halaman 1dari 8

A B C D

15800

4400 11400

9' 9'
9 K2 K2 K2 9
3600

3600
K2 K2 K2

8 8
6000

6000
K2 K2 K2

7 7
8000

8000
K2 K2 K2

6 6
8000

8000
K2 K2 K2

5 5
57650

57650
8000

8000
K2 K2 K2

4 4
8000

8000
K2 K1 K1

3 3
7300

7300
K4 K2 K1 K1

2 2
8750

8750

K4 K2 K1 K1

1 1

K4

1' 1'

KODE KETERANGAN

K1 KOLOM 80X70

K2 KOLOM 70X70

K3 KOLOM 50X50
4400 11400
K4 KOLOM Ø60

15800

RENCANA KOLOM BASEMENT


1
A B C D 1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
A B C D
15800
4400 11400

9' 9'

9 K3 K2 K2 9
3600

3600
K3 K2 K2

8 8
6000

6000
K3 K2 K2

7 7
8000

8000
K3 K2 K2

6 6
8000

8000
K3 K2 K2

5 5
57650

57650
8000

8000
K3 K2 K2

4 4
8000

8000
K3 K1 K1

3 3
7300

7300
K4 K3 K1 K1

2 2
8750

8750
K4 K3 K1 K1

K4

1' 1'

KODE KETERANGAN

K1 KOLOM 80X70

K2 KOLOM 70X70

K3 KOLOM 50X50

K4 KOLOM Ø60

4400 11400
15800

RENCANA KOLOM LANTAI 1


A B C D 1
1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
A B C D
15800
4400 11400

9' 9'

9 K3 K2 K2 9
3600

3600
K3 K2 K2

8 8
6000

6000
K3 K2 K2

7 7
8000

8000
K3 K2 K2

6 6
8000

8000
K3 K2 K2

5 5
57650

57650
8000

8000
K3 K2 K2

4 4
8000

8000
K3 K1 K1

3 3
7300

7300
K4 K3 K1 K1

2 2
8750

8750

K4 K3 K1 K1

1 1

K4

1' 1'

KODE KETERANGAN

K1 KOLOM 80X70

K2 KOLOM 70X70

K3 KOLOM 50X50
4400 11400
K4 KOLOM Ø60
15800

RENCANA KOLOM LANTAI 2


1
A B C D 1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
A B C D
15800
4400 11400

9' 9'

9 K3 K2 K2 9
3600

3600
K3 K2 K2

8 8
6000

6000
K3 K2 K2

7 7
8000

8000
K3 K2 K2

6 6
8000

8000
K3 K2 K2

5 5
57650

57650
8000

8000
K3 K2 K2

4 4
8000

8000
K3 K1 K1

3 3
7300

7300
K4 K3 K1 K1

2 2
8750

8750

K4 K3 K1 K1

1 1

K4

1' 1'

KODE KETERANGAN

K1 KOLOM 80X70
4400 11400 K2 KOLOM 70X70

K3 KOLOM 50X50
15800
K4 KOLOM Ø60

RENCANA KOLOM LANTAI 3


1
1 : 300
A B C D

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
A B C D

15800

9' 4400 11400


9'

9 K3 K2 K2 9
3600

3600
K3 K2 K2

8 8
6000

6000
K3 K2 K2

7 7
8000

8000
K3 K2 K2

6 6
8000

8000
K3 K2 K2

5 5
57650

57650
8000

8000
K3 K2 K2

4 4
8000

8000
K3 K1 K1

3 3
7300

7300
K4 K3 K1 K1

2 2
8750

8750

K4 K3 K1 K1

1 1

K4

1' 1'

KODE KETERANGAN

K1 KOLOM 80X70
4400 11400
K2 KOLOM 70X70

15800 K3 KOLOM 50X50

K4 KOLOM Ø60

RENCANA KOLOM LANTAI 4


1
1 : 300
A B C D

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
B1 B1 B1 B1 B1 B1 B1 B2 +16.00

K1 K1 K1 K2
K2 K2 K2 K2 K2
B1 B1 B1 B1 B1 B1 B1 B2 +11.00

K1 K2 K2
K1 K1 K2 K2 K2 K2
B1 B1 B1 B1 B1 B1 B1 B2 +7.50

K1 K2
K1 K1 K2 K2 K2 K2 K2
B1 B1 B1 B1 B1 B1 B1 B2 +4.00

K1 K2
K2 K2 K2 K2 K2
K1 K1
B1 B1 B1 B1 B1 B1 B1 B2 ±0.00

K1
-3.200

K1 70X80

8750 7300 8000 8000 8000 8000 6000 3600 2898 K2 70X70
B1 95X50
60548
B2 55X30

1 2 3 4 5 6 7 8 9 9'
BARIS D LAJUR 9'-1
1
1 : 300

B3 B1 +16.00 B3 B1 +16.00

K4 K3 K1 K3 K2 K2
K1

B3 B1 +11.00 B3 B1 +11.00

K4
K3 K1 K3 K2 K2
K1
B3 B1 +7.50 B3 B1 +7.50

K4 K3 K3 K2 K2
K1 K1
B3 B1 +4.00 B3 B1 +4.00

K4
K3 K1 K1 K3 K2 K2

B3 B1 ±0.00 B3 B1 ±0.00

K2 K1 K2 K2
B3 -3.200 B3 B1 -3.200

K1 80X70 K2 70X70
5160 4400 11400 K3 50X50 4400 11400 K3 50X50
B1 95X50
20960 K4 Ø60 15800
B3 50X25
B1 95X50
B3 50X25

A B C D B C D
LAJUR 2 BARIS A-D LAJUR 4 BARIS B-D
2 3
1 : 300 1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
B3 B1 +16.00 B3 B1 +16.00

K3 K2 K2 K3 K2 K2

B3 B1 +11.00 B3 B1 +11.00

K3 K2 K2 K3 K2 K2

B3 B1 +7.50 B3 B1 +7.50

K3 K2 K2 K3 K2 K2

B3 B1 +4.00 B3 B1 +4.00

K3 K2 K2 K3 K2 K2

B3 B1 ±0.00 B3 B1 ±0.00

K2
K2 K2 K2 K2
B3 B1 -3.200 B3 B1 -3.200

K2 70X70 K2 70X70
4400 11400
4400 11400 K3 50X50 K3 50X50
B1 95X50 15800 B1 95X50
15800
B3 50X25 B3 50X25

B C D B C D
LAJUR 6 BARIS B-D LAJUR 9 BARIS B-D
1 2
1 : 300 1 : 300

B4 B4 +16.00

K4 K4 K4

B4 B4 +11.00

K4 K4 K4

B4 B4 +7.50

K4 K4 K4
B4 B4 +4.00

K4 K4 K4
B4 B4 ±0.00

-3.200

K4 Ø60
B4 15X15

8750 6701

15451

2 1 1'
BARIS A LAJUR 1'-3
3
1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143
B3 B3 B3 B3 B3 B3 B3 +16.00

K3 K3 K3 K3 K3 K3 K3 K3
K3
+11.00
B3 B3 B3 B3 B3 B3 B3

K3 K3
K3 K3 K3 K3 K3 K3 K3
B3 B3 B3 B3 B3 B3 B3 +7.50

K3 K3 K3 K3 K3 K3 K3 K3 K3
+4.00
B3 B3 B3 B3 B3 B3 B3

K3 K3 K3 K3 K3 K3 K3 K3 K3
B3 B3 B3 B3 B3 B3 B1 ±0.00

-3.200

K3 50X50
3600 6000 8000 8000 8000 8000 7300 8750 B1 95X50
B3 50X25

57650

9 8 7 6 5 4 3 2 1
BARIS B LAJUR 1-9
1
1 : 300

B2 B1 B1 B1 B1 B1 B1 B1 +16.00

K2 K1 K1 K1
K2 K2 K2 K2 K2
B2 B1 B1 B1 B1 B1 B1 B1 +11.00

K2 K2 K1
K2 K2 K2 K2 K1 K1
B2 B1 B1 B1 B1 B1 B1 B1 +7.50

K2 K1
K2 K2 K2 K2 K2 K1 K1
B2 B1 B1 B1 B1 B1 B1 B1 +4.00

K2 K1
K2 K2 K2 K2 K2
K1 K1
B2 B1 B1 B1 B1 B1 B1 B1 ±0.00

K1
-3.200

K1 70X80
3600 6000 8000 8000 8000 8000 7300 8750
K2 70X70
B1 95X50
57650
B2 55X30

9 8 7 6 5 4 3 2 1
BARIS C LAJUR 1-9
2
1 : 300

PEKERJAAN : PEMBIMBING : TANGGAL : PARAF :


4 NOVEMBER 2021
1. ZAHMI AFRIZAL, ST.M.Sc.
2. ROWI SUTARYO, ST.
STRUKTUR BANGUNAN 5

DIGAMBAR : SKALA : NO LEMBAR :


CRISTIAN ADI WIBOWO 1:300

05143