Anda di halaman 1dari 1

Rekapitulasi Ritase DT EKY 4

Tanggal = 23 September 2022

Berat Kosong Berat muatan Konversi Berat


No No. Polisi Driver Lokasi Ritase
(kg) (kg) (1,65 ton/m3)
1 8.060 4,88
E 4020
1 KT 8699 OQ SUYUTI 2 8.000 4,85
F 4.020 3 6.580 3,99
Total Unit: 1 Total Ritase: 3 Total Kubik: 13,72
Rata-rata retase: 4,57
Total Retase Lokasi E: 2 ret
Total Retase Lokasi F: 1 ret

23 SEPTEMBER 2022 Page 1 of 1

Anda mungkin juga menyukai