INDEKS HARGA SATUAN TENAGA KERJA DAN MATERIAL

KABUPATEN WONOSOBO TAHUN 2022

NO URAIAN SATUAN HARGA SATUAN


1 2 3 4
A TENAGA KERJA
1 Mandor org/hr 100,000
2 Kepala Tukang org/hr 100,000
3 Tukang org/hr 87,500
6 Pekerja org/hr 80,000
7 Operator alat berat org/hr 150,000
8 Pembantu operator alat berat org/hr 100,000
9 Mekanik org/hr 100,000
10 Pembantu mekanik org/hr 85,000
11 Jaga malam org/hr 70,000
12 Tukang masak aspal org/hr 100,000
13 Pengemudi truck org/hr 140,000
14 Pembantu pengemudi truck org/hr 80,000
15 Sopir personil org/hr 100,000
16 Buruh tak terlatih org/hr 70,000
B SEWA ALAT
1 Cocrete Mixer Molen 0,3 - 0,6 hari / 8 jam 300,000
2 Molen hari / 8 jam 300,000
3 Excavator 80-140 HP hari / 8 jam 4,800,000
4 Dumptruck 10 Ton hari / 8 jam 2,000,000
5 3-Wheel Roller hari / 8 jam 2,000,000
6 Roller steel wheel hari / 8 jam 2,000,000
7 Sewa pompa beton /cocrete pump hari / 8 jam 2,400,000
8 Vibrator hari / 8 jam 400,000
9 Sewa creen on track 35 ton hari / 8 jam 3,200,000
10 Jack hammer hari / 8 jam 240,000
11 Sewa mesin las hari / 8 jam 320,000
C HARGA SATUAN MATERIAL
I BATA, BATU DAN PASIR
1 Bata Merah bh 1,300
2 Bata beton ringan ex Celcon m3 86,300
3 Bataco bh 3,200
4 Batu kali m3 275,000
5 Batu pecah 1-2 cm m3 271,000
6 Batu pecah 2-3 cm m3 357,000
7 Batu pecah 3-5 cm m3 330,000
8 Batu pecah 5-7 cm m3 302,000
9 Batu Kerikil m3 385,000
10 Pasir Beton m3 385,000
11 Pasir Pasang m3 385,000
12 Pasir Urug m3 275,000
13 Pasir batu ( sirtu ) m3 275,000
14 Abu batu m3 313,000
15 Tanah Urug m3 55,000
16 Kapur padam m3 88,000
17 Roster beton 10/20 bh 3,800
18 Roster beton 15/30 bh 8,200
19 Roster beton 20/20 bh 8,250
20 Roster beton 25/25 bh 9,700
II BAHAN PEREKAT
1 Asphal Drum kg 12,500
2 Semen (50 Kg) Tiga Roda kg 1,200
3 Mortal zak 93,543
4 Semen Warna kg 3,302
5 Dempul kg 44,020
6 Coumpun kg 71,533
7 Air ltr 110
8 Strorox – 100 kg 77,035
9 Bunker oil lt 4,402
10 Solar lt 12,106
11 Minyak pelumas/oli lt 49,523
12 Cuka bibit ltr 93,543
13 Lem Pipa kecil bh 16,508
14 Lem Pipa Besar bh 71,533
15 Lem Kayu bh 22,010
16 Lem vinyl rajawali kg 22,010
17 Lem kuning ( aica aibon ) kg 88,040
18 Aluminium foil m2 11,555
III BAHAN BAJA :
1 Besi beton polos kg 13,000
2 Besi beton ulir kg 13,500
3 Kawat beton kg 27,500
4 Kawat berduri m1 3,300
5 Kawat jaring/harmonika 20 m roll 522,700
6 Kawat las listrik kg 33,000
7 Wiremesh M10 (spasi 15 x 15 cm) kg 13,100
8 Wiremesh M12 (spasi 15 x 15 cm) kg 12,700
9 Besi hollow 40.40.2 mm kg 39,600
10 Besi L 30.30.3 kg 19,800
11 Besi L 40.40.4 kg 19,800
12 Besi L 50.50.5 kg 19,800
13 Besi propil < 600 mm kg 19,800
14 Besi propil > 600 mm kg 19,800
15 Besi siku kg 19,800
16 Besi strip/strip plat kg 19,800
17 Paku kg 27,500
18 Paku hak panjang 15 cm kg 48,300
19 Paku beton kg 93,500
20 Paku Skrup bh 17,600
21 Paku Skrup kg 71,500
22 Skrup Listplank bh 500
23 Kuda-kuda Baja Ringan Setara Gigasteel ( 7-10 m) m2 251,800
24 Kuda-kuda Baja Ringan Setara Gigasteel ( 10-12,5 m) m2 259,600
25 Kuda-kuda Baja Ringan Setara Gigasteel ( 12,5-15 m) m2 297,600
26 Kuda-kuda Baja Ringan Setara Gigasteel ( 15-18 m) m2 305,600
27 Reng Usuk Baja Ringan Setara Gigasteel m2 165,000
28 Baja Ringan C7575 BSI AKP / R101 BSI AKP <8,9 M m2 184,300
29 Baja Ringan C7575 BSI AKP / R101 BSI AKP 9M > B > 12 M m2 198,600
30 Baja Ringan C75100 BSI AKP / R101 BSI AKP 9M > B > 12 M m2 206,300
31 Baja Ringan C75.75 (taso) batang 130,000
32 Palu / godam bh 47,300
33 Gergaji besi bh 16,500
34 Pahat beton (baja keras) bh 27,500
35 Linggis (baja keras) bh 88,000
36 Rool door besi m2 660,300
37 Folding gate besi tbl 0,5 mm m2 797,800
38 Rool door almunium m2 792,300
IV BAHAN KAYU -
1 Kayu Klas I (Jati ) -
Papan 2/20 m3 25,115,300
Papan 3/20 m3 25,115,300
Usuk 5/7 m3 25,115,300
Balok 6/12 m3 25,115,300
Balok 8/12 m3 28,304,500
Reng 2/3 m3 25,115,300
2 Kayu Klas II (Bengkirai) -
Papan 2/20 m3 15,475,700
Papan 3/20 m3 14,902,600
Usuk 5/7 m3 14,542,300
Balok 6/12 m3 14,902,600
Balok 8/12 m3 14,859,600
Reng 2/3 m3 14,902,600
3 Kayu Klas II (Kamper) -
Papan 2/20 m3 14,444,000
Papan 3/20 m3 14,673,300
Usuk 5/7 m3 14,149,200
Balok 6/12 m3 14,329,400
Balok 8/12 m3 14,329,400
Reng 2/3 m3 14,329,400
4 Kayu Klas III (Kruing) -
Papan 2/20 m3 9,973,200
Papan 3/20 m3 9,858,600
Usuk 5/7 m3 9,432,800
Balok 6/12 m3 8,826,900
Balok 8/12 m3 8,884,200
Reng 2/3 m3 8,826,900
5 Kayu Klas IV (Suren/Mahoni) -
Papan 2/20 m3 2,751,200
Papan 3/20 m3 2,751,200
Usuk 5/7 m3 3,144,200
Balok 6/12 m3 3,056,900
Balok 8/12 m3 3,056,900
Reng 2/3 m3 2,751,200
6 Kayu Klas IV (Albasia) -
Papan 2/20 m3 2,751,200
Papan 3/20 m3 2,292,700
Usuk 5/5 m3 2,751,200
Usuk 5/7 kelas A Panjang 4 m m3 2,751,200
Balok 6/12 kelas A Panjang 4 m m3 2,865,800
Balok 8/12 kelas A Panjang 4 m m3 2,865,800
7 Bambu bh 17,600
8 kayu bakar m3 225,000
9 Ijuk kg 11,000
V BAHAN ALMUNIUM DAN KACA -
1 Kusen Almunium m1 137,500
2 Rangka Jendela Almunium m1 132,000
3 Rangka Pintu Almunium m1 132,000
4 Alumunium strip 8 cm m 132,000
5 Kusen & Pintu PVC toilet unit 214,500
6 Pintu WC allumunium Fabrikasi unit 1,210,500
7 Engsel Pintu bh 38,500
8 Engsel jendela bh 22,000
9 Handle pintu bh 169,100
10 Selinder bh 49,500
11 Door Stoper bh 45,100
12 Door closer bh 220,100
13 Door Holder bh 110,000
14 Kunci tanam lokal bh 125,000
15 Kait Angin bh 19,200
16 Grendel Pintu bh 27,500
17 Grendel Jendela bh 13,700
18 Kunci Lemari bh 22,000
19 Profil kaca m 11,500
20 Kaca uk. 5 mm (Kaca Polos) m2 121,000
21 Kaca uk. 5 mm (Kaca Rayben) m2 269,600
22 Kaca uk. 6 mm (Kaca Polos) m2 272,900
23 Kaca uk. 6 mm (Kaca Rayben) m2 501,800
24 Kaca uk. 8 mm (Kaca Polos) m2 521,600
25 Kaca uk. 8 mm (Kaca Rayben) m2 824,200
26 Kaca tempered uk. 10 mm m2 1,017,900
27 Kaca tempered uk. 12 mm m2 1,078,400
28 Kaca tempered uk. 8 mm m2 825,300
29 Akrilik 3 mm m2 265,200
30 Akrilik 5 mm m2 432,400
31 Sealant Kaca m1 38,500
32 Kaca Es 3 mm m2 121,000
VI BAHAN SANITARI -
1 Bak fiber vol 1000 liter bh 1,650,700
2 Bak fiberglass bh 330,100
3 Floor drain bh 44,000
4 Kloset jongkok porselen setara KIA bh 258,600
5 Kloset duduk setara Toto bh 2,201,000
6 Kran air plastik bh 33,000
7 Kran air besi/logam bh 38,500
8 Kran air stainless bh 66,000
9 Urinoir Setara Toto bh 1,210,500
10 Washbaak stainless bh 275,100
11 Wastafel setara INA bh 715,300
12 Wastafel setara TOTO bh 935,400
13 Water drain bh 55,000
14 Seltip bh 4,400
VII BAHAN PIPA
1 Pipa 1/2" AW setara Rucika Btg 28,613
2 Pipa 1" AW setara Rucika Btg 46,221
3 Pipa 1 1/2" AW setara Rucika Btg 82,538
4 Pipa 2" AW setara Rucika Btg 104,548
5 Pipa 2 1/2" AW setara Rucika Btg 154,070
6 Pipa 3" AW setara Rucika Btg 220,100
7 Pipa 4" AW setara Rucika Btg 363,165
8 Pipa 5" AW setara Rucika Btg 577,763
9 Pipa 6" AW setara Rucika Btg 781,355
10 Pipa galvanis 1/2" type medium A Btg 731,833
11 Pipa galvanis 3/4" type medium A Btg 286,130
12 Pipa galvanis 1" type medium A Btg 440,200
13 Pipa galvanis 1.5" type medium A Btg 660,300
14 Pipa galvanis 2" type medium A Btg 880,400
15 Pipa galvanis 2.5" medium A Btg 1,100,500
16 Pipa galvanis 3" meidum A Btg 1,133,515
17 Pipa galvanis 4" medium A Btg 2,090,950
18 Pipa galvanis 1" type medium B Btg 138,663
19 Pipa galvanis 1.5" type medium B Btg 165,075
20 Pipa galvanis 1/2" type medium B Btg 88,040
21 Pipa galvanis 2" type medium B Btg 198,090
22 Pipa galvanis 2.5" medium B Btg 297,135
23 Pipa galvanis 3" meidum B Btg 247,613
24 Pipa galvanis 3/4" type medium B Btg 112,251
25 Pipa galvanis 4" medium B Btg 264,120
26 Pipa stainless 1/2" Btg 93,543
27 Pipa stainless 1" Btg 187,085
28 Pipa stainless 2" Btg 385,175
29 Pipa stainless 3" Btg 550,250
30 Pipa stainless 4" Btg 1,094,998
VII BAHAN FABRIKAN
1 GRC board 0.45x120x240 lbr 65,000
2 Gypsum board (120x240) cm x 9 mm lbr 71,000
3 Sunda Plafond (25x100) lembar 38,500
4 Multiplek 9 mm lbr 115,000
5 Multiplek 12 mm lbr 203,000
6 Multiplek 18 mm lbr 275,000
7 Tripleks 3 mm 2,40 x 1,20 lbr 71,000
8 Tripleks 6 mm 2,40 x 1,20 lbr 95,000
9 Tripleks 9 mm 2,40 x 1,20 lbr 120,000
10 Lisplank GRC m1 55,025
11 Lisplank Kalsiboard m1 60,528
12 Asbes semen plat 3 mm ( 100 x 200 ) lembar 55,025
13 Eternit 4 mm ( 100 x 100 ) lembar 19,809
14 Kayu lis profil m 15,407
15 List Propil gipsum 10 cm x 2 m bt 15,407
16 List Propil gipsum 12,5 cm x 2 m bt 19,809
17 Tepung Kalsium kg 6,603
VIII BAHAN CAT
1 Soda api kg 38,000
2 Cat tembok dalam setara catylac kg 33,000
3 Cat tembok dalam setara Decolith kg 44,000
4 Cat tembok dalam setara Movilex kg 66,000
5 Cat tembok luar setara catylac kg 49,000
6 Cat tembok luar setara Decolith kg 55,000
7 Cat tembok luar setara Movilex kg 82,000
8 Cat BESI setara Emco kg 77,000
9 Cat Kayu avian kg 71,000
10 Cat kayu cukup setara Emco kg 77,000
11 Kuas bh 23,000
12 Amplas lbr 5,500
13 Plamur kg 55,000
14 Meni besi ltr 38,500
15 Minyak cat kayu ( terpentin ) lt 27,500
16 Minyak cat besi ( thiner ) lt 33,000
17 Cat Baja Glvanis kg 99,000
18 Cat coating (pengencer thiner) kg 30,800
19 Cat coating waterbased (pengencer air) kg 63,800
20 Sabun detergen kg 4,400
IX BAHAN LANTAI
1 Tegel difabel m2 330,100
2 Keramik 30x30 ( KW I ) putih m2 60,500
3 Keramik 30x30 ( KW I ) warna m2 66,000
4 Keramik 40x40 ( KW I ) putih m2 66,000
5 Keramik 40x40 ( KW I ) warna m2 71,500
6 Step Nosing Keramik 10x30 KW 1 bh 19,800
7 Step Nosing keramik 10x40 KW 1 bh 14,300
8 Granit 60x60 polished m2 209,000
9 Granit 60x60 unpolished m2 214,500
10 Step Nosing Granit 10x40 bh 22,000
11 Keramik dinding 25 x 40 polos m2 77,000
12 Keramik dinding 25 x 40 warna m2 82,500
13 Keramik dinding artistik 10x20 m2 55,000
14 Keramik lantai kamar mandi 20x20 m2 60,500
15 Keramik lantai kamar mandi 25x25 m2 71,500
16 Marmer m2 319,100
17 Batu candi lurus 10/20 m2 115,500
18 Batu candi lurus 15/30 m2 137,500
19 Batu candi lurus 20/40 m2 137,500
20 Batu candi polos 10/20, 15/15, 20/20 m2 115,500
21 Batu candi susun sirih 10/20 m2 99,000
22 Batu candi susun sirih 15/30 m2 88,000
23 Batu candi susun sirih 20/40 m2 99,000
24 Batu tempel hitam 10x20 m2 99,000
25 Vynil m2 176,000
26 HPL m2 181,500
27 ACP 3mm m2 242,100
28 ACP 4mm m2 330,100
29 Wallpaper m2 44,000
X BAHAN ATAP
1 Genteng beton bh 8,800
2 Genteng metal polos m2 55,000
3 Genteng metal lapis pasir m2 61,900
4 Genteng metal lapis pasir (sakura roof) m2 118,100
4 Genteng plentong bh 3,500
5 Genteng kodok bh 3,800
6 Seng gelombang BJLS 20 ( 80 x 180 ) m2 60,500
7 Seng gelombang BJLS 30 ( 80 x 180 ) m2 88,000
8 Galvalum Polos m2 49,500
9 Galvalum Lapis Pasir m2 79,400
10 Bubungan Seng BJLS 30 m1 16,500
11 Bubungan genteng beton m1 32,400
12 Bubungan genteng metal polos m1 44,000
13 Bubungan genteng metal lapis pasir m1 49,500
14 Bubungan plentong bh 3,300
15 Bubungan genteng Galvalum polos bh 44,000
16 Bubungan genteng Galvalum lapis pasir bh 49,500
17 Genteng Bitumen Bergelombang Memanjang H : 38 mm Lbr 170,000
18 Atap Bitumen Bergelombang H : 38 mm Lbr 176,000
19 Atap Bitumen Bergelombang H : 40 mm Lbr 57,000
20 Atap Bitumen Bergelombang H : 40 mm (ex Onduvilla Hijau Polos) Lbr 66,000
21 Nok / Ridge Onduline Lbr 93,500
22 Seng plat BJLS 30 ( 90 x 240 ) Lbr 149,500
23 Floordeck 0.75 mm m2 140,800
24 Seng gelombang fiber 80x180 lembar 77,000
XI BAHAN PAVING, PRECAST DAN BETON -
1 Paving blok natural 6 cm K.175 Lokal m2 60,500
2 Paving blok warna 6 cm K.175 Lokal m2 71,500
3 Paving blok natural 8 cm K.175 Lokal m2 77,000
4 Paving blok warna 8 cm K.175 Lokal m2 88,000
5 Paving blok natural 6 cm K.225 Lokal m2 66,000
6 Paving blok warna 6 cm K.225 Lokal m2 77,000
7 Paving blok natural 8 cm K.225 Lokal m2 77,000
8 Paving blok warna 8 cm K.225 Lokal m2 88,000
9 Paving type Holand (10,5x21) k-200 tbl. 6cm m2 92,400
10 Paving type Holand (10,5x21) k-300 tbl. 6cm m2 110,000
11 Paving type Holand (10,5x21) k-200 tbl. 8cm m2 148,700
12 Paving type Holand (10,5x21) k-300 tbl. 8cm m2 170,500
13 Paving type kubus (21x21) k-200 tbl. 6cm m2 92,400
14 Paving type kubus (21x21) k-300 tbl. 6cm m2 110,000
15 Paving type kubus (21x21) k-200 tbl. 8cm m2 148,700
16 Paving type kubus (21x21) k-300 tbl. 8cm m2 170,500
17 Con blok 24x24x6 K-250 m2 107,800
18 Con blok 24x24x6 K-300 m2 143,000
19 Con blok 24x24x8 K-300 m2 165,000
20 Kanstin S bh 38,500
21 Kanstin L bh 49,500
22 Kantin K-175 Lokal bh 20,900
23 Kantin K-225 Lokal bh 24,200
24 Buis Beton U-20 K-175 bh 27,500
25 Buis Beton Dia 20 K-175 bh 55,000
26 Buis Beton U-30 K-175 bh 35,700
27 Buis Beton Dia 30 K-175 bh 71,500
28 Buis Beton Dia 40 K-175 bh 44,000
29 Buis Beton U-20 K-225 bh 33,000
30 Buis Beton Dia 20 K-225 bh 77,000
31 Buis Beton U-30 K-225 bh 41,200
32 Buis Beton Dia 30 K-225 bh 82,500
33 Buis Beton Dia 40 K-225 bh 99,000
34 Buis Beton Dia 50 K-225 bh 132,000
35 Buis Beton Dia 60 K-225 Tinggi 1/2 m bh 99,000
36 Buis Beton Dia 80 K-225 Tinggi 1/2 m bh 143,000
37 Buis Beton Dia 100 K-225 Tinggi 1/2 m bh 220,100
38 Box Culvert 400 x 400 x1000 mm, HD Pcs 1,151,900
39 Box Culvert 500 x 500 x1000 mm, HD Pcs 1,473,100
40 Box Culvert 600 x 600 x1000 mm, HD Pcs 1,839,400
41 Box Culvert 800 x 800 x1000 mm, HD Pcs 2,585,700
42 U-Ditch 300x300x1200 mm Pcs 357,500
43 U-Ditch 300x400x1200 mm Pcs 406,700
44 U-Ditch 300x500x1200 mm Pcs 470,100
45 U-Ditch 400x400x1200 mm Pcs 522,700
46 U-Ditch 400x500x1200 mm Pcs 540,600
47 U-Ditch 400x600x1200 mm Pcs 608,600
48 U-Ditch 500x500x1200 mm Pcs 660,800
49 U-Ditch 500x600x1200 mm Pcs 712,500
50 U-Ditch 500x700x1200 mm Pcs 784,500
51 U-Ditch 600x500x1200 mm Pcs 840,600
52 U-Ditch 600x600x1200 mm Pcs 938,300
53 U-Ditch 600x700x1200 mm Pcs 1,052,300
54 U-Ditch 600x800x1200 mm Pcs 1,103,700
55 U-Ditch 800x600x1200 mm Pcs 1,179,400
56 U-Ditch 800x800x1200 mm Pcs 1,403,100
57 U-Ditch 800x900x1200 mm Pcs 1,591,500
58 U-Ditch 800x1000x1200 mm Pcs 1,721,500
59 Cover U-Ditch 300-65/600 mm LD Lubang Pcs 80,500
60 Cover U-Ditch 400-80/600 mm LD Lubang Pcs 120,300
61 Cover U-Ditch 500-100/600 mm LD Lubang Pcs 176,400
62 Cover U-Ditch 600-110/600 mm LD Lubang Pcs 232,900
63 Cover U-Ditch 800-110/600 mm LD Lubang Pcs 300,900
64 Beton ready mixed K-125 m3 704,320
65 Beton ready mixed K-175 m3 803,365
66 Beton ready mixed K-225 m3 935,425
67 Beton ready mixed K-250 m3 1,078,490
68 Beton ready mixed K-275 m3 1,012,460
69 Beton ready mixed K-300 m3 1,133,515
70 Beton ready mixed K-350 m3 1,188,540
71 FS' 45 m3 1,282,083
XII BAHAN LISTRIK m3 1,282,083
1 Pipa listrik 5/8" brg 8,400.00
2 Kabel m 2,300.00
3 T Dus bh 4,200.00
4 L Bow bh 600.00
5 Las Dop bh 350.00
6 Klem bh 125.00
7 Mongkok bh 32,200.00
8 Saklar bh 20,000.00
9 Fitting bh 11,500.00
10 Philips LED 14 watt bh 85,000.00
11 Strop kontak bh 20,000.00
12 Saklar tunggal bh 20,000.00
13 Saklar ganda bh 20,000.00
Wonosobo, 2022
KONSULTAN PERENCANA
CV. HARAPAN KARYA KONSULTAN

HARDHIK, ST
Direktur
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
BIDANG CIPTA KARYA TA. 2021 KABUPATEN WONOSOBO
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Semen portland Kg 5.0000 1,200.00 6,000.00
Pasir beton m3 0.0050 385,000.00 1,925.00
Koral beton m3 0.0090 357,000.00 3,213.00
Kayu 5/7 kelas III m3 0.0720 2,751,200.00 198,086.40
Paku biasa 2” – 5” Kg 0.0600 27,500.00 1,650.00
JUMLAH HARGA BAHAN 210,874.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 264,374.40
E Overhead & Profit 10% 26,437.44
F Harga Satuan Pekerjaan (D+E) 290,811.84

A. 2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.4000 87,500.00 35,000.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 55,000.00
B BAHAN
Semen portland Kg 2.5000 1,200.00 3,000.00
Seng gelombang BJLS 20 (80x180) Lbr 1.2000 60,500.00 72,600.00
Pasir beton m3 0.0050 385,000.00 1,925.00
Koral beton 2/3 pecah tangan m3 0.0090 357,000.00 3,213.00
Kayu lanan 5/7 m3 0.0720 2,751,200.00 198,086.40
Paku biasa 2” – 5” Kg 0.0600 27,500.00 1,650.00
Meni besi Liter 0.4500 38,500.00 17,325.00
JUMLAH HARGA BAHAN 297,799.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 352,799.40
E Overhead & Profit 10% 35,279.94
F Harga Satuan Pekerjaan (D+E) 388,079.34

A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.3000 87,500.00 26,250.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 46,250.00
B BAHAN
Semen portland Kg 2.0000 1,200.00 2,400.00
Kawat duri M’ 25.0000 3,300.00 82,500.00
Pasir beton m3 0.0050 385,000.00 1,925.00
Koral beton m3 0.0090 357,000.00 3,213.00
Paku biasa 2” – 5” Kg 0.0600 27,500.00 1,650.00
JUMLAH HARGA BAHAN 91,688.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 137,938.00
E Overhead & Profit 10% 13,793.80
F Harga Satuan Pekerjaan (D+E) 151,731.80

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kayu lanan balok 5/7 m3 0.0120 2,751,200.00 33,014.40
Paku 2”-3” Kg 0.0200 27,500.00 550.00
Kayu lanan papan 3/20 m3 0.0070 2,292,700.00 16,048.90
JUMLAH HARGA BAHAN 49,613.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,863.30
E Overhead & Profit 10% 6,786.33
F Harga Satuan Pekerjaan (D+E) 74,649.63

A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 80,000.00 160,000.00
Tukang Kayu L.02 OH 2.0000 87,500.00 175,000.00
Tukang batu L.02 OH 1.0000 87,500.00 87,500.00
Kepala Tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 457,500.00
B BAHAN
Kayu lanan m3 0.1800 2,751,200.00 495,216.00
Paku biasa Kg 0.0800 27,500.00 2,200.00
Besi strip Kg 1.1000 19,800.00 21,780.00
Semen Portland Kg 35.0000 1,200.00 42,000.00
Pasir pasang m3 0.1500 385,000.00 57,750.00
Pasir beton m3 0.1000 385,000.00 38,500.00
Koral beton m3 0.1500 357,000.00 53,550.00
Bata merah Bh 30.0000 1,300.00 39,000.00
Seng plat BJLS 30 Lbr 0.2500 149,500.00 37,375.00
Kaca polos 5mm m2 0.0800 121,000.00 9,680.00
Kunci tanam Bh 0.1500 125,000.00 18,750.00
Triplek 3mm Lbr 0.0600 71,000.00 4,260.00
JUMLAH HARGA BAHAN 820,061.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,277,561.00
E Overhead & Profit 10% 127,756.10
F Harga Satuan Pekerjaan (D+E) 1,405,317.10

A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 1.5000 87,500.00 131,250.00
Kepala tukang L.03 0.1500 100,000.00 15,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 231,250.00
B BAHAN
Kayu lanan m3 0.2760 2,751,200.00 759,331.20
Paku biasa Kg 0.7000 27,500.00 19,250.00
Seng gelombang BJLS 20 Kg 1.5000 60,500.00 90,750.00
JUMLAH HARGA BAHAN 869,331.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,100,581.20
E Overhead & Profit 10% 110,058.12
F Harga Satuan Pekerjaan (D+E) 1,210,639.32

A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 2.0000 87,500.00 175,000.00
Kepala Tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 280,000.00
B BAHAN
Kayu lanan m3 0.2100 2,751,200.00 577,752.00
Paku biasa Kg 0.3000 27,500.00 8,250.00
Semen Portland Kg 10.5000 1,200.00 12,600.00
Pasir beton m3 0.0300 385,000.00 11,550.00
Koral beton m3 0.0500 357,000.00 17,850.00
Seng gelombang BJLS 20 Lbr 1.5000 60,500.00 90,750.00
Seng plat Lbr 0.2500 149,500.00 37,375.00
JUMLAH HARGA BAHAN 756,127.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,036,127.00
E Overhead & Profit 10% 103,612.70
F Harga Satuan Pekerjaan (D+E) 1,139,739.70

A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 2.0000 87,500.00 175,000.00
Kepala Tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 280,000.00
B BAHAN
Kayu lanan m3 0.1860 2,751,200.00 511,723.20
Paku biasa Kg 0.3000 27,500.00 8,250.00
Semen Portland Kg 18.0000 1,200.00 21,600.00
Pasir beton m3 0.0300 385,000.00 11,550.00
Koral beton m3 0.0500 357,000.00 17,850.00
Seng gelombang BJLS 20 Lbr 1.5000 60,500.00 90,750.00
Plywood 3mm Lbr 1.3500 71,000.00 95,850.00
JUMLAH HARGA BAHAN 757,573.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,037,573.20
E Overhead & Profit 10% 103,757.32
F Harga Satuan Pekerjaan (D+E) 1,141,330.52

A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 13,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,000.00
E Overhead & Profit 10% 1,300.00
F Harga Satuan Pekerjaan (D+E) 14,300.00

A. 2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 2.0000 87,500.00 175,000.00
Kepala Tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 280,000.00
B BAHAN
Bambu diameter 6- 8/600 cm Batang 1.2500 17,600.00 22,000.00
Tali ijuk m3 0.1860 110,000.00 20,460.00
JUMLAH HARGA BAHAN 42,460.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 322,460.00
E Overhead & Profit 10% 32,246.00
F Harga Satuan Pekerjaan (D+E) 354,706.00

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang Kayu L.02 OH 0.3000 87,500.00 26,250.00
Kepala Tukang L.03 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 29,250.00
B BAHAN
Kayu lanan papan 2/30 m3 0.0360 2,292,700.00 82,537.20
Kayu balok 5/7 kelas III m3 0.0140 2,751,200.00 38,516.80
Paku biasa kg 0.0800 27,500.00 2,200.00
JUMLAH HARGA BAHAN 123,254.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 152,504.00
E Overhead & Profit 10% 15,250.40
F Harga Satuan Pekerjaan (D+E) 167,754.40

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 1.0000 80,000.00 80,000.00
Mandor L.04 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 80,500.00
B BAHAN
Batu belah m3 0.1500 275,000.00 41,250.00
Batu pecah 3/5 tangan m3 0.0900 330,000.00 29,700.00
Pasir pasang m3 0.0100 385,000.00 3,850.00
JUMLAH HARGA BAHAN 74,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,300.00
E Overhead & Profit 10% 15,530.00
F Harga Satuan Pekerjaan (D+E) 170,830.00

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 13.3340 80,000.00 1,066,720.00
Mandor L.04 0.6600 100,000.00 66,000.00
JUMLAH TENAGA KERJA 1,132,720.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,132,720.00
E Overhead & Profit 10% 113,272.00
F Harga Satuan Pekerjaan (D+E) 1,245,992.00

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 6.6670 80,000.00 533,360.00
Mandor L.04 0.3330 100,000.00 33,300.00
JUMLAH TENAGA KERJA 566,660.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 566,660.00
E Overhead & Profit 10% 56,666.00
F Harga Satuan Pekerjaan (D+E) 623,326.00

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 0.0420 80,000.00 3,360.00
Tukang L.02 OH 0.0040 87,500.00 350.00
Kepala Tukang L.03 OH 0.0020 100,000.00 200.00
Mandor L.04 0.0420 100,000.00 4,200.00
JUMLAH TENAGA KERJA 8,110.00
B BAHAN
Kawat jaring rol 0.1434 522,700.00 74,955.18
JUMLAH HARGA BAHAN 74,955.18
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 83,065.18
E Overhead & Profit 10% 8,306.52
F Harga Satuan Pekerjaan (D+E) 91,371.70

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 m3 Tanah Biasa Sedalam s.d. 1 m Untuk
1.7.1.a
Volume s.d. 200 m3 Dalam Satu Lokasi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 80,000.00 60,000.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 62,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 62,500.00
E Overhead & Profit 10% 6,250.00
F Harga Satuan Pekerjaan (D+E) 68,750.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 76,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 76,500.00
E Overhead & Profit 10% 7,650.00
F Harga Satuan Pekerjaan (D+E) 84,150.00

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 80,000.00 84,000.00
Mandor L.04 OH 0.0670 100,000.00 6,700.00
JUMLAH TENAGA KERJA 90,700.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,700.00
E Overhead & Profit 10% 9,070.00
F Harga Satuan Pekerjaan (D+E) 99,770.00

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Mandor L.04 OH 0.0320 100,000.00 3,200.00
JUMLAH TENAGA KERJA 83,200.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 83,200.00
E Overhead & Profit 10% 8,320.00
F Harga Satuan Pekerjaan (D+E) 91,520.00

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 126,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 126,000.00
E Overhead & Profit 10% 12,600.00
F Harga Satuan Pekerjaan (D+E) 138,600.00
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 100,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,500.00
E Overhead & Profit 10% 10,050.00
F Harga Satuan Pekerjaan (D+E) 110,550.00

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 4,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,500.00
E Overhead & Profit 10% 450.00
F Harga Satuan Pekerjaan (D+E) 4,950.00

A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3300 80,000.00 26,400.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 27,400.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,400.00
E Overhead & Profit 10% 2,740.00
F Harga Satuan Pekerjaan (D+E) 30,140.00

1.7.2.a Pengurugan Kembali 1 m3 Galian Tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,000.00
E Overhead & Profit 10% 4,500.00
F Harga Satuan Pekerjaan (D+E) 49,500.00

A.2.3.1.9.2 Pengurugan kembali 1 m3 galian tanah keras


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3333 80,000.00 26,664.00
Mandor L.04 OH 0.0107 100,000.00 1,070.00
JUMLAH TENAGA KERJA 27,734.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,734.00
E Overhead & Profit 10% 2,773.40
F Harga Satuan Pekerjaan (D+E) 30,507.40
A.2.3.1.9.3 Pengurugan kembali 1 m3 galian tanah cadas
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 42,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,000.00
E Overhead & Profit 10% 4,200.00
F Harga Satuan Pekerjaan (D+E) 46,200.00

A.2.3.1.9.4 Pengurugan kembali 1 m3 galian tanah lumpur


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 33,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,500.00
E Overhead & Profit 10% 3,350.00
F Harga Satuan Pekerjaan (D+E) 36,850.00

A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,000.00
E Overhead & Profit 10% 4,500.00
F Harga Satuan Pekerjaan (D+E) 49,500.00

1.7.2.d Pengurugan 1 m3 dengan Pasir Urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 25,000.00
B BAHAN
Pasir urug 1.2000 275,000.00 330,000.00
JUMLAH HARGA BAHAN 330,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 355,000.00
E Overhead & Profit 10% 35,500.00
F Harga Satuan Pekerjaan (D+E) 390,500.00

A.2.3.1.11.1 Pengurugan 1 m3 dengan tanah urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 25,000.00
B BAHAN
Tanah urug 1.2000 55,000.00 66,000.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,000.00
E Overhead & Profit 10% 9,100.00
F Harga Satuan Pekerjaan (D+E) 100,100.00
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang L.02 OH 0.4000 87,500.00 35,000.00
Kepala Tukang L.03 OH 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0800 100,000.00 8,000.00
JUMLAH TENAGA KERJA 111,000.00
B BAHAN
Kapur Padam m3 0.1350 88,000.00 11,880.00
Pasir Pasang m3 0.4000 385,000.00 154,000.00
Tanah Liat m3 0.9480 55,000.00 52,140.00
JUMLAH HARGA BAHAN 218,020.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 329,020.00
E Overhead & Profit 10% 32,902.00
F Harga Satuan Pekerjaan (D+E) 361,922.00

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 17,000.00
B BAHAN
Ijuk m3 6.0000 11,000.00 66,000.00
JUMLAH HARGA BAHAN 66,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 83,000.00
E Overhead & Profit 10% 8,300.00
F Harga Satuan Pekerjaan (D+E) 91,300.00

A.2.3.1.14. Pengurugan 1 m3 sirtu padat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 22,500.00
B BAHAN
Sirtu m3 1.2000 275,000.00 330,000.00
JUMLAH HARGA BAHAN 330,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 352,500.00
E Overhead & Profit 10% 35,250.00
F Harga Satuan Pekerjaan (D+E) 387,750.00

A.2.3.1.15. Galian tanah 1m3 menggunakan alat berat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2260 80,000.00 18,080.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 18,780.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
Excavator E.11.c Jam 0.0760 4,800,000.00 364,800.00
Dumptruck Jam 0.0760 2,000,000.00 152,000.00
JUMLAH HARGA ALAT 516,800.00
D Jumlah (A+B+C) 535,580.00
E Overhead & Profit 10% 53,558.00
F Harga Satuan Pekerjaan (D+E) 589,138.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 202.0000 1,200.00 242,400.00
Pasir Pasang m3 0.4850 385,000.00 186,725.00
JUMLAH HARGA BAHAN 759,125.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 959,750.00
E Overhead & Profit 10% 95,975.00
F Harga Satuan Pekerjaan (D+E) 1,055,725.00

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 163.0000 1,200.00 195,600.00
Pasir Pasang m3 0.5200 385,000.00 200,200.00
JUMLAH HARGA BAHAN 725,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 926,425.00
E Overhead & Profit 10% 92,642.50
F Harga Satuan Pekerjaan (D+E) 1,019,067.50

A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 136.0000 1,200.00 163,200.00
Pasir Pasang m3 0.5440 385,000.00 209,440.00
JUMLAH HARGA BAHAN 702,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 903,265.00
E Overhead & Profit 10% 90,326.50
F Harga Satuan Pekerjaan (D+E) 993,591.50

2.1.1.d.(a) Pemasangan 1 m3 Pondasi Batu Belah


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 117.0000 1,200.00 140,400.00
Pasir Pasang m3 0.5610 385,000.00 215,985.00
JUMLAH HARGA BAHAN 686,385.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 887,010.00
E Overhead & Profit 10% 88,701.00
F Harga Satuan Pekerjaan (D+E) 975,711.00

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 91.0000 1,200.00 109,200.00
Pasir Pasang m3 0.5840 385,000.00 224,840.00
JUMLAH HARGA BAHAN 664,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 864,665.00
E Overhead & Profit 10% 86,466.50
F Harga Satuan Pekerjaan (D+E) 951,131.50

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Kapur m3 0.1700 88,000.00 14,960.00
Semen Portland Kg 0.1700 1,200.00 204.00
Pasir Pasang m3 0.3400 385,000.00 130,900.00
JUMLAH HARGA BAHAN 476,064.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 676,689.00
E Overhead & Profit 10% 67,668.90
F Harga Satuan Pekerjaan (D+E) 744,357.90

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 61.0000 1,200.00 73,200.00
Kapur m3 0.1470 88,000.00 12,936.00
Pasir Pasang m3 0.4920 385,000.00 189,420.00
JUMLAH HARGA BAHAN 605,556.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 806,181.00
E Overhead & Profit 10% 80,618.10
F Harga Satuan Pekerjaan (D+E) 886,799.10

A.3.2.1.8.Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala Tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 200,625.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 41.0000 1,200.00 49,200.00
Kapur m3 0.1310 88,000.00 11,528.00
Pasir Pasang m3 0.5230 385,000.00 201,355.00
JUMLAH HARGA BAHAN 592,083.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 792,708.00
E Overhead & Profit 10% 79,270.80
F Harga Satuan Pekerjaan (D+E) 871,978.80

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 80,000.00 62,400.00
Tukang Batu L.02 OH 0.3900 87,500.00 34,125.00
Kepala Tukang L.03 OH 0.0390 100,000.00 3,900.00
Mandor L.04 OH 0.0390 100,000.00 3,900.00
JUMLAH TENAGA KERJA 104,325.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Pasir urug m3 0.4320 275,000.00 118,800.00
JUMLAH HARGA BAHAN 448,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 553,125.00
E Overhead & Profit 10% 55,312.50
F Harga Satuan Pekerjaan (D+E) 608,437.50

A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.4000 80,000.00 272,000.00
Tukang Batu L.02 OH 0.8500 87,500.00 74,375.00
Kepala Tukang L.03 OH 0.0850 100,000.00 8,500.00
Mandor L.04 OH 0.1700 100,000.00 17,000.00
JUMLAH TENAGA KERJA 371,875.00
B BAHAN
Batu belah m3 0.4800 275,000.00 132,000.00
Semen Portland Kg 194.0000 1,200.00 232,800.00
Pasir Beton m3 0.3120 385,000.00 120,120.00
Batu pecah 2/3 m3 0.4680 357,000.00 167,076.00
Besi beton polos Kg 126.0000 13,000.00 1,638,000.00
Kawat beton Kg 1.8000 27,500.00 49,500.00
JUMLAH HARGA BAHAN 2,339,496.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,711,371.00
E Overhead & Profit 10% 271,137.10
F Harga Satuan Pekerjaan (D+E) 2,982,508.10

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.4000 80,000.00 192,000.00
Tukang Batu L.02 OH 0.8000 87,500.00 70,000.00
Kepala Tukang L.03 OH 0.0800 100,000.00 8,000.00
Mandor L.04 OH 0.1190 100,000.00 11,900.00
JUMLAH TENAGA KERJA 281,900.00
B BAHAN
Batu belah m3 0.4500 275,000.00 123,750.00
Semen Portland Kg 194.0000 1,200.00 232,800.00
Pasir Beton m3 0.3120 385,000.00 120,120.00
Batu pecah 2/3 m3 0.4680 357,000.00 167,076.00
JUMLAH HARGA BAHAN 643,746.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 925,646.00
E Overhead & Profit 10% 92,564.60
F Harga Satuan Pekerjaan (D+E) 1,018,210.60

A.3.2.1.12.. Pas. batu kali 1PC : 4 PP menggunakan molen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.7000 80,000.00 216,000.00
Tukang Batu L.02 OH 0.9000 87,500.00 78,750.00
Kepala Tukang L.03 OH 0.0900 100,000.00 9,000.00
Mandor L.04 OH 0.2700 100,000.00 27,000.00
JUMLAH TENAGA KERJA 330,750.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 163.0000 1,200.00 195,600.00
Pasir Pasang m3 0.5200 385,000.00 200,200.00
JUMLAH HARGA BAHAN 725,800.00
C PERALATAN
Molen Sewa-hari 0.1670 300,000.00 50,100.00
JUMLAH HARGA ALAT 50,100.00
D Jumlah (A+B+C) 1,106,650.00
E Overhead & Profit 10% 110,665.00
F Harga Satuan Pekerjaan (D+E) 1,217,315.00

A.3.2.1.13.. Pas. batu kali 1PC : 6 PP menggunakan molen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.7000 80,000.00 216,000.00
Tukang Batu L.02 OH 0.9000 87,500.00 78,750.00
Kepala Tukang L.03 OH 0.0900 100,000.00 9,000.00
Mandor L.04 OH 0.2700 100,000.00 27,000.00
JUMLAH TENAGA KERJA 330,750.00
B BAHAN
Batu belah m3 1.2000 275,000.00 330,000.00
Semen Portland Kg 117.0000 1,200.00 140,400.00
Pasir Pasang m3 0.5610 385,000.00 215,985.00
JUMLAH HARGA BAHAN 686,385.00
C PERALATAN
Molen Sewa-hari 0.1670 300,000.00 50,100.00
JUMLAH HARGA ALAT 50,100.00
D Jumlah (A+B+C) 1,067,235.00
E Overhead & Profit 10% 106,723.50
F Harga Satuan Pekerjaan (D+E) 1,173,958.50

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 m3 beton mutu f’ = 7,4 MPa (K 100), slump (12  2) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 247.0000 1,200.00 296,400.00
Pasir Beton kg 869.0000 275.00 238,975.00
Batu pecah mesin 2/3 kg 999.0000 264.44 264,180.00
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 823,205.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 990,367.50
E Overhead & Profit 10% 99,036.75
F Harga Satuan Pekerjaan (D+E) 1,089,404.25

A.4.1.1.2. Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125), slump (12  2) cm, w/c = 0,78
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 276.0000 1,200.00 331,200.00
Pasir Beton kg 828.0000 275.00 227,700.00
Batu pecah mesin 2/3 kg 1,012.0000 264.44 267,617.78
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 850,167.78
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,017,330.28
E Overhead & Profit 10% 101,733.03
F Harga Satuan Pekerjaan (D+E) 1,119,063.31

A.4.1.1.2.2 Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125), slump (12  2) cm, w/c = 0,78 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 276.0000 1,200.00 331,200.00
Pasir Beton kg 828.0000 275.00 227,700.00
Batu pecah mesin 2/3 kg 1,012.0000 264.44 267,617.78
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 850,167.78
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,062,645.28
E Overhead & Profit 10% 106,264.53
F Harga Satuan Pekerjaan (D+E) 1,168,909.81

A.4.1.1.3. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12  2) cm, w/c = 0,72
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 299.0000 1,200.00 358,800.00
Pasir Beton kg 799.0000 275.00 219,725.00
Batu pecah mesin 2/3 kg 1,017.0000 264.44 268,940.00
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 871,115.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,038,277.50
E Overhead & Profit 10% 103,827.75
F Harga Satuan Pekerjaan (D+E) 1,142,105.25

A.4.1.1.3.2 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12  2) cm, w/c = 0,72 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 299.0000 1,200.00 358,800.00
Pasir Beton kg 799.0000 275.00 219,725.00
Batu pecah mesin 2/3 kg 1,017.0000 264.44 268,940.00
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 871,115.00
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,083,592.50
E Overhead & Profit 10% 108,359.25
F Harga Satuan Pekerjaan (D+E) 1,191,951.75
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

A.A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 121,500.00
B BAHAN
Semen Portland kg 230.0000 1,200.00 276,000.00
Pasir Beton kg 893.0000 275.00 245,575.00
Batu pecah mesin 2/3 kg 1,027.0000 264.44 271,584.44
Air Liter 200.0000 110.00 22,000.00
JUMLAH HARGA BAHAN 815,159.44
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 936,659.44
E Overhead & Profit 10% 93,665.94
F Harga Satuan Pekerjaan (D+E) 1,030,325.38

A. A.4.1.1.5. Membuat 1 m3 beton mutu f’= 14,5 MPa (K 175), slump (12  2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 326.0000 1,200.00 391,200.00
Pasir Beton kg 760.0000 275.00 209,000.00
Batu pecah mesin 2/3 kg 1,029.0000 264.44 272,113.33
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 895,963.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,063,125.83
E Overhead & Profit 10% 106,312.58
F Harga Satuan Pekerjaan (D+E) 1,169,438.41

A. A.4.1.1.5.2 Membuat 1 m3 beton mutu f’= 14,5 MPa (K 175), slump (12  2) cm, w/c = 0,66 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 326.0000 1,200.00 391,200.00
Pasir Beton kg 760.0000 275.00 209,000.00
Batu pecah mesin 2/3 kg 1,029.0000 264.44 272,113.33
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 895,963.33
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,108,440.83
E Overhead & Profit 10% 110,844.08
F Harga Satuan Pekerjaan (D+E) 1,219,284.91

A. A.4.1.1.6. Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12  2) cm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 352.0000 1,200.00 422,400.00
Pasir Beton kg 731.0000 275.00 201,025.00
Batu pecah mesin 2/3 kg 1,031.0000 264.44 272,642.22
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 919,717.22
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,086,879.72
E Overhead & Profit 10% 108,687.97
F Harga Satuan Pekerjaan (D+E) 1,195,567.69

A. A.4.1.1.6.2 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12  2) cm, w/c = 0,61 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 352.0000 1,200.00 422,400.00
Pasir Beton kg 731.0000 275.00 201,025.00
Batu pecah mesin 2/3 kg 1,031.0000 264.44 272,642.22
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 919,717.22
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,132,194.72
E Overhead & Profit 10% 113,219.47
F Harga Satuan Pekerjaan (D+E) 1,245,414.19

A.4.1.1.7. Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (12  2) cm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 371.0000 1,200.00 445,200.00
Pasir Beton kg 698.0000 275.00 191,950.00
Batu pecah mesin 2/3 kg 1,047.0000 264.44 276,873.33
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 937,673.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,104,835.83
E Overhead & Profit 10% 110,483.58
F Harga Satuan Pekerjaan (D+E) 1,215,319.41

A.4.1.1.7.2. Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (12  2) cm, w/c = 0,58 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 371.0000 1,200.00 445,200.00
Pasir Beton kg 698.0000 275.00 191,950.00
Batu pecah mesin 2/3 kg 1,047.0000 264.44 276,873.33
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 937,673.33
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,150,150.83
E Overhead & Profit 10% 115,015.08
F Harga Satuan Pekerjaan (D+E) 1,265,165.91

A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (12  2) cm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 384.0000 1,200.00 460,800.00
Pasir Beton kg 692.0000 275.00 190,300.00
Batu pecah mesin 2/3 kg 1,039.0000 264.44 274,757.78
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 949,507.78
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,116,670.28
E Overhead & Profit 10% 111,667.03
F Harga Satuan Pekerjaan (D+E) 1,228,337.31

A.4.1.1.8.2. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (12  2) cm, w/c = 0,56 menggunakan alat
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3230 80,000.00 105,840.00
Tukang Batu L.02 OH 0.1890 87,500.00 16,537.50
Kepala Tukang L.03 OH 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.1320 100,000.00 13,200.00
JUMLAH TENAGA KERJA 137,477.50
B BAHAN
Semen Portland kg 384.0000 1,200.00 460,800.00
Pasir Beton kg 692.0000 275.00 190,300.00
Batu pecah mesin 2/3 kg 1,039.0000 264.44 274,757.78
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 949,507.78
C PERALATAN
Molen Sewa-hari 0.2500 300,000.00 75,000.00
JUMLAH HARGA ALAT 75,000.00
D Jumlah (A+B+C) 1,161,985.28
E Overhead & Profit 10% 116,198.53
F Harga Satuan Pekerjaan (D+E) 1,278,183.81

A.4.1.1.9. Membuat 1 m3 beton mutu f’= 24,0 MPa (K 275), slump (12  2) cm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 406.0000 1,200.00 487,200.00
Pasir Beton kg 684.0000 275.00 188,100.00
Batu pecah mesin 2/3 kg 1,026.0000 264.44 271,320.00
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 970,270.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,137,432.50
E Overhead & Profit 10% 113,743.25
F Harga Satuan Pekerjaan (D+E) 1,251,175.75

A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12  2) cm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 87,500.00 24,062.50
Kepala Tukang L.03 OH 0.0280 100,000.00 2,800.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 167,162.50
B BAHAN
Semen Portland kg 413.0000 1,200.00 495,600.00
Pasir Beton kg 681.0000 275.00 187,275.00
Batu pecah mesin 2/3 m3 1,021.0000 264.44 269,997.78
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 976,522.78
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,143,685.28
E Overhead & Profit 10% 114,368.53
F Harga Satuan Pekerjaan (D+E) 1,258,053.81

A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12  2) cm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 80,000.00 168,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
JUMLAH TENAGA KERJA 212,625.00
B BAHAN
Semen Portland kg 439.0000 1,200.00 526,800.00
Pasir Beton kg 670.0000 275.00 184,250.00
Batu pecah mesin 2/3 kg 1,006.0000 264.44 266,031.11
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 1,000,731.11
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,213,356.11
E Overhead & Profit 10% 121,335.61
F Harga Satuan Pekerjaan (D+E) 1,334,691.72

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12  2) cm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 80,000.00 168,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
JUMLAH TENAGA KERJA 212,625.00
B BAHAN
Semen Portland kg 448.0000 1,200.00 537,600.00
Pasir Beton kg 667.0000 275.00 183,425.00
Batu pecah mesin 2/3 kg 1,000.0000 264.44 264,444.44
Air Liter 215.0000 110.00 23,650.00
JUMLAH HARGA BAHAN 1,009,119.44
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,221,744.44
E Overhead & Profit 10% 122,174.44
F Harga Satuan Pekerjaan (D+E) 1,343,918.88

A.4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 80,000.00 168,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.1050 100,000.00 10,500.00
JUMLAH TENAGA KERJA 212,625.00
B BAHAN
Semen Portland kg 400.0000 1,200.00 480,000.00
Pasir Beton m3 0.4800 385,000.00 184,800.00
Batu pecah mesin 2/3 m3 0.8000 357,000.00 285,600.00
Strorox – 100 kg 1.2000 77,035 92,442.00
Air Liter 210.0000 110.00 23,100.00
JUMLAH HARGA BAHAN 1,065,942.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,278,567.00
E Overhead & Profit 10% 127,856.70
F Harga Satuan Pekerjaan (D+E) 1,406,423.70

A.4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.1000 87,500.00 183,750.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.1050 - -
JUMLAH TENAGA KERJA 222,250.00
B BAHAN
Semen Portland kg 400.0000 385,000.00 154,000,000.00
Pasir Beton m3 0.4800 - -
Batu pecah mesin 2/3 m3 0.8000 - -
Strorox – 100 kg 1.2000 19,800 23,760.00
Air Liter 210.0000 110.00 23,100.00
JUMLAH HARGA BAHAN 154,046,860.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 154,269,110.00
E Overhead & Profit 10% 15,426,911.00
F Harga Satuan Pekerjaan (D+E) 169,696,021.00

A.4.1.1.17.1 Pemasangan 1 kg Jaring Ayaman Tulangan Tunggal (wiremesh) M6 - M8


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0025 80,000.00 200.00
Tukang Besi L.02 OH 0.0025 87,500.00 218.75
Kepala Tukang L.03 OH 0.0025 100,000.00 250.00
Mandor L.04 OH 0.0001 100,000.00 10.00
JUMLAH TENAGA KERJA 678.75
B BAHAN
Jaring Ayaman Tulangan M6 - M8 kg 1.0200 13,000.00 13,260.00
Kawat beton kg 0.0050 27,500.00 137.50
JUMLAH HARGA BAHAN 13,397.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,076.25
E Overhead & Profit 10% 1,407.63
F Harga Satuan Pekerjaan (D+E) 15,483.88

A.4.1.1.17.a Pembesian 10 kg dengan besi polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1600 80,000.00 12,800.00
Tukang Besi L.02 OH 0.1600 87,500.00 14,000.00
Kepala Tukang L.03 OH 0.0160 100,000.00 1,600.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 30,000.00
B BAHAN
Besi beton polos kg 10.5000 13,000.00 136,500.00
Kawat beton kg 0.2800 27,500.00 7,700.00
JUMLAH HARGA BAHAN 144,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 174,200.00
E Overhead & Profit 10% 17,420.00
F Harga Satuan Pekerjaan (D+E) 191,620.00

A.4.1.1.17.2 Pembesian 10 kg dengan besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1600 80,000.00 12,800.00
Tukang Besi L.02 OH 0.1600 87,500.00 14,000.00
Kepala Tukang L.03 OH 0.0160 100,000.00 1,600.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 30,000.00
B BAHAN
Besi beton ulir kg 10.5000 13,500.00 141,750.00
Kawat beton kg 0.2800 27,500.00 7,700.00
JUMLAH HARGA BAHAN 149,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 179,450.00
E Overhead & Profit 10% 17,945.00
F Harga Satuan Pekerjaan (D+E) 197,395.00

A.4.1.1.17.1a Pembesian 1 kg dengan besi polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0160 80,000.00 1,280.00
Tukang Besi L.02 OH 0.0160 87,500.00 1,400.00
Kepala Tukang L.03 OH 0.0016 100,000.00 160.00
Mandor L.04 OH 0.0016 100,000.00 160.00
JUMLAH TENAGA KERJA 3,000.00
B BAHAN
Besi beton polos kg 1.0500 13,000.00 13,650.00
Kawat beton kg 0.0280 27,500.00 770.00
JUMLAH HARGA BAHAN 14,420.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,420.00
E Overhead & Profit 10% 1,742.00
F Harga Satuan Pekerjaan (D+E) 19,162.00

A.4.1.1.17.2a Pembesian 1 kg dengan besi ulir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0160 80,000.00 1,280.00
Tukang Besi L.02 OH 0.0160 87,500.00 1,400.00
Kepala Tukang L.03 OH 0.0016 100,000.00 160.00
Mandor L.04 OH 0.0016 100,000.00 160.00
JUMLAH TENAGA KERJA 3,000.00
B BAHAN
Besi beton ulir kg 1.0500 13,500.00 14,175.00
Kawat beton kg 0.0280 27,500.00 770.00
JUMLAH HARGA BAHAN 14,945.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,945.00
E Overhead & Profit 10% 1,794.50
F Harga Satuan Pekerjaan (D+E) 19,739.50

A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala Tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,175.00
B BAHAN
Besi beton polos kg 10.5000 13,000.00 136,500.00
Kawat beton kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 139,250.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 148,425.00
E Overhead & Profit 10% 14,842.50
F Harga Satuan Pekerjaan (D+E) 163,267.50

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 80,000.00 2,000.00
Tukang Besi L.02 OH 0.0250 87,500.00 2,187.50
Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
Mandor L.04 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 6,787.50
B BAHAN
Jaring kawat baja dilas kg 10.2000 13,100.00 133,620.00
Kawat beton kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 134,995.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 141,782.50
E Overhead & Profit 10% 14,178.25
F Harga Satuan Pekerjaan (D+E) 155,960.75

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 87,500.00 22,750.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 69,550.00
B BAHAN
Kayu kelas lanan papan m3 0.0400 2,292,700.00 91,708.00
Paku 5 – 10 cm kg 0.3000 27,500.00 8,250.00
Minyak bekisting Liter 0.1000 4,402.00 440.20
JUMLAH HARGA BAHAN 100,398.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 169,948.20
E Overhead & Profit 10% 16,994.82
F Harga Satuan Pekerjaan (D+E) 186,943.02

A.4.1.1.20.1 Pemasangan 1 m2 bekisting untuk pondasi ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 87,500.00 22,750.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 69,550.00
B BAHAN
Kayu kelas lanan papan m3 0.0264 2,292,700.00 60,527.28
Paku 5 – 10 cm kg 0.6000 27,500.00 16,500.00
Minyak bekisting Liter - 4,402.00 -
JUMLAH HARGA BAHAN 77,027.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 146,577.28
E Overhead & Profit 10% 14,657.73
F Harga Satuan Pekerjaan (D+E) 161,235.01

A.4.1.1.20.2 Pemasangan 1 m2 bekisting untuk pondasi ( papan kayu tb. 18 mm ) 2 x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang Kayu L.02 OH 0.5200 87,500.00 45,500.00
Kepala Tukang L.03 OH 0.0520 100,000.00 5,200.00
Mandor L.04 OH 0.0520 100,000.00 5,200.00
JUMLAH TENAGA KERJA 139,100.00
B BAHAN
Kayu kelas lanan papan m3 0.0264 2,292,700.00 60,527.28
Paku 5 – 10 cm kg 0.6000 27,500.00 16,500.00
Minyak bekisting Liter - 4,402.00 -
JUMLAH HARGA BAHAN 77,027.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 216,127.28
E Overhead & Profit 10% 21,612.73
F Harga Satuan Pekerjaan (D+E) 237,740.01

A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 87,500.00 22,750.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 69,550.00
B BAHAN
Kayu kelas III papan m3 0.0450 2,292,700.00 103,171.50
Paku 5 cm – 10 cm kg 0.3000 27,500.00 8,250.00
Minyak bekisting Liter 0.1000 4,402.00 440.20
JUMLAH HARGA BAHAN 111,861.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 181,411.70
E Overhead & Profit 10% 18,141.17
F Harga Satuan Pekerjaan (D+E) 199,552.87

A.4.1.1.21(1) Pemasangan 1 m2 bekisting untuk sloof 2x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 87,500.00 22,750.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 69,550.00
B BAHAN
Kayu kelas III papan m3 0.0270 2,292,700.00 61,902.90
Paku 5 cm – 10 cm kg 0.3000 27,500.00 8,250.00
Minyak bekisting Liter 0.1000 4,402.00 440.20
JUMLAH HARGA BAHAN 70,593.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 140,143.10
E Overhead & Profit 10% 14,014.31
F Harga Satuan Pekerjaan (D+E) 154,157.41

A.4.1.1.21.1 Pemasangan 1 m2 bekisting untuk sloof ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.2600 87,500.00 22,750.00
Kepala Tukang L.03 OH 0.0260 100,000.00 2,600.00
Mandor L.04 OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 69,550.00
B BAHAN
Kayu kelas III papan m3 0.0270 2,292,700.00 61,902.90
Paku 5 cm – 10 cm kg 0.3000 27,500.00 8,250.00
Minyak bekisting Liter - 4,402.00 -
JUMLAH HARGA BAHAN 70,152.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 139,702.90
E Overhead & Profit 10% 13,970.29
F Harga Satuan Pekerjaan (D+E) 153,673.19

A.4.1.1.21.2 Pemasangan 1 m2 bekisting untuk sloof ( papan kayu tb. 18 mm ) 2 x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang Kayu L.02 OH 0.5200 87,500.00 45,500.00
Kepala Tukang L.03 OH 0.0520 100,000.00 5,200.00
Mandor L.04 OH 0.0520 100,000.00 5,200.00
JUMLAH TENAGA KERJA 139,100.00
B BAHAN
Kayu kelas III papan m3 0.0297 2,292,700.00 68,093.19
Paku 5 cm – 10 cm kg 0.6000 27,500.00 16,500.00
Minyak bekisting Liter - 4,402.00 -
JUMLAH HARGA BAHAN 84,593.19
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 223,693.19
E Overhead & Profit 10% 22,369.32
F Harga Satuan Pekerjaan (D+E) 246,062.51

A.4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0400 2,292,700.00 91,708.00
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Plywood 9mm Lbr 0.3500 120,000.00 42,000.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 222,056.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 310,331.40
E Overhead & Profit 10% 31,033.14
F Harga Satuan Pekerjaan (D+E) 341,364.54

A.4.1.1.22.(1) Pemasangan 1 m2 bekisting untuk kolom 2x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.0000 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.0000 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.0000 3,300.00
Mandor L.04 OH 0.0330 100,000.0000 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.0000 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.0000 11,000.00
Minyak bekisting Liter 0.2000 4,402.0000 880.40
Balok kayu kelas II m3 0.0081 2,751,200.0000 22,284.72
Plywood 9mm Lbr 0.2013 120,000.0000 24,150.00
Bambu apus 4 m Batang 1.3500 17,600.0000 23,760.00
JUMLAH HARGA BAHAN 137,099.92
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 225,374.92
E Overhead & Profit 10% 22,537.49
F Harga Satuan Pekerjaan (D+E) 247,912.41

A.4.1.1.22.1. Pemasangan 1 m2 bekisting untuk kolom ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.00 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 143,373.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 231,648.20
E Overhead & Profit 10% 23,164.82
F Harga Satuan Pekerjaan (D+E) 254,813.02

A.4.1.1.22.2. Pemasangan 1 m2 bekisting untuk kolom ( Triplek tb. 6 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Triplek 6mm Lbr 0.3500 95,000.00 33,250.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 121,598.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 209,873.40
E Overhead & Profit 10% 20,987.34
F Harga Satuan Pekerjaan (D+E) 230,860.74

A.4.1.1.22.3. Pemasangan 1 m2 bekisting untuk kolom ( papan kayu tb. 18 mm ) 2 x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3200 80,000.00 105,600.00
Tukang Kayu L.02 OH 0.6600 87,500.00 57,750.00
Kepala Tukang L.03 OH 0.0660 100,000.00 6,600.00
Mandor L.04 OH 0.0660 100,000.00 6,600.00
JUMLAH TENAGA KERJA 176,550.00
B BAHAN
Kayu kelas III papan m3 0.0264 2,292,700.00 60,527.28
Paku 5 cm – 12 cm kg 0.8000 27,500.00 22,000.00
Minyak bekisting Liter - 4,402.00 -
Balok kayu kelas II m3 0.0165 2,751,200.00 45,394.80
Plywood 9mm Lbr - 95,000.00 -
Bambu apus 4 m Batang 2.2000 17,600.00 38,720.00
JUMLAH HARGA BAHAN 166,642.08
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 343,192.08
E Overhead & Profit 10% 34,319.21
F Harga Satuan Pekerjaan (D+E) 377,511.29

A.4.1.1.23. Pemasangan 1 m2 bekisting untuk balok


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0400 2,292,700.00 91,708.00
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0180 2,751,200.00 49,521.60
Plywood 9mm Lbr 0.3500 120,000.00 42,000.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 230,310.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 318,585.00
E Overhead & Profit 10% 31,858.50
F Harga Satuan Pekerjaan (D+E) 350,443.50

A.4.1.1.23.(1) Pemasangan 1 m2 bekisting untuk balok 2x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.0000 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.0000 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.0000 3,300.00
Mandor L.04 OH 0.0330 100,000.0000 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.0000 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.0000 11,000.00
Minyak bekisting Liter 0.2000 4,402.0000 880.40
Balok kayu kelas II m3 0.0097 2,751,200.0000 26,741.66
Plywood 9mm Lbr 0.2013 120,000.0000 24,150.00
Bambu apus 4 m Batang 1.3500 17,600.0000 23,760.00
JUMLAH HARGA BAHAN 141,556.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 229,831.86
E Overhead & Profit 10% 22,983.19
F Harga Satuan Pekerjaan (D+E) 252,815.05

A.4.1.1.23.1 Pemasangan 1 m2 bekisting untuk balok ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.00 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0180 2,751,200.00 49,521.60
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 151,626.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,901.80
E Overhead & Profit 10% 23,990.18
F Harga Satuan Pekerjaan (D+E) 263,891.98

A.4.1.1.23.2 Pemasangan 1 m2 bekisting untuk balok ( plywood tb. 6 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0180 2,751,200.00 49,521.60
Plywood 6mm Lbr 0.3500 95,000.00 33,250.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 129,852.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,127.00
E Overhead & Profit 10% 21,812.70
F Harga Satuan Pekerjaan (D+E) 239,939.70

A.4.1.1.23.3 Pemasangan 1 m2 bekisting untuk balok ( papan kayu tb. 18 mm ) 2 x pakai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.00 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0180 2,751,200.00 49,521.60
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 151,626.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,901.80
E Overhead & Profit 10% 23,990.18
F Harga Satuan Pekerjaan (D+E) 263,891.98

A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0400 2,292,700.00 91,708.00
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Plywood 9mm Lbr 0.3500 120,000.00 42,000.00
Bambu apus 4 m Batang 6.0000 17,600.00 105,600.00
JUMLAH HARGA BAHAN 292,456.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 380,731.40
E Overhead & Profit 10% 38,073.14
F Harga Satuan Pekerjaan (D+E) 418,804.54

A.4.1.1.24.1 Pemasangan 1 m2 bekisting untuk lantai ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.00 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Bambu apus 4 m Batang 6.0000 17,600.00 105,600.00
JUMLAH HARGA BAHAN 212,892.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 301,167.80
E Overhead & Profit 10% 30,116.78
F Harga Satuan Pekerjaan (D+E) 331,284.58

A.4.1.1.24.2 Pemasangan 1 m2 bekisting untuk lantai ( plywood tb. 6 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Plywood 6mm Lbr 0.3500 95,000.00 33,250.00
Bambu apus 4 m Batang 6.0000 17,600.00 105,600.00
JUMLAH HARGA BAHAN 191,118.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 279,393.00
E Overhead & Profit 10% 27,939.30
F Harga Satuan Pekerjaan (D+E) 307,332.30

A.4.1.1.24.3 Pemasangan 1 m2 bekisting untuk lantai bak air bersih ( papan kayu tb. 18 mm )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0240 2,292,700.00 55,024.80
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Bambu apus 4 m Batang 3.0000 17,600.00 52,800.00
JUMLAH HARGA BAHAN 160,092.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 248,367.80
E Overhead & Profit 10% 24,836.78
F Harga Satuan Pekerjaan (D+E) 273,204.58

A.4.1.1.25. Pemasangan 1 m2 bekisting untuk dinding


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0300 2,292,700.00 68,781.00
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0200 2,751,200.00 55,024.00
Bambu apus 4 m Batang 3.0000 17,600.00 52,800.00
JUMLAH HARGA BAHAN 188,485.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 276,760.40
E Overhead & Profit 10% 27,676.04
F Harga Satuan Pekerjaan (D+E) 304,436.44

A.4.1.1.25.1 Pemasangan 1 m2 bekisting untuk dinding ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0180 2,292,700.00 41,268.60
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0200 2,751,200.00 55,024.00
Bambu apus 4 m Batang 3.0000 17,600.00 52,800.00
JUMLAH HARGA BAHAN 160,973.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 249,248.00
E Overhead & Profit 10% 24,924.80
F Harga Satuan Pekerjaan (D+E) 274,172.80

A.4.1.1.25.2 Pemasangan 1 m2 bekisting untuk dinding ( plywood tb. 6 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.2000 4,402.00 880.40
Balok kayu kelas II m3 0.0200 2,751,200.00 55,024.00
Plywood 6mm Lbr 0.3500 95,000.00 33,250.00
Bambu apus 4 m Batang 3.0000 17,600.00 52,800.00
JUMLAH HARGA BAHAN 152,954.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 241,229.40
E Overhead & Profit 10% 24,122.94
F Harga Satuan Pekerjaan (D+E) 265,352.34

A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0300 2,292,700.00 68,781.00
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.1500 4,402.00 660.30
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Plywood 9mm Lbr 0.3500 120,000.00 42,000.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 198,909.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 287,184.30
E Overhead & Profit 10% 28,718.43
F Harga Satuan Pekerjaan (D+E) 315,902.73

A.4.1.1.26.1 Pemasangan 1 m2 bekisting untuk tangga ( papan kayu tb. 18 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Kayu kelas III papan m3 0.0180 2,292,700.00 41,268.60
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.1500 4,402.00 660.30
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 129,396.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 217,671.90
E Overhead & Profit 10% 21,767.19
F Harga Satuan Pekerjaan (D+E) 239,439.09

A.4.1.1.26.2 Pemasangan 1 m2 bekisting untuk tangga ( plywood tb. 6 mm )


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6600 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.3300 87,500.00 28,875.00
Kepala Tukang L.03 OH 0.0330 100,000.00 3,300.00
Mandor L.04 OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 88,275.00
B BAHAN
Paku 5 cm – 12 cm kg 0.4000 27,500.00 11,000.00
Minyak bekisting Liter 0.1500 4,402.00 660.30
Balok kayu kelas II m3 0.0150 2,751,200.00 41,268.00
Plywood 6mm Lbr 0.3500 95,000.00 33,250.00
Bambu apus 4 m Batang 2.0000 17,600.00 35,200.00
JUMLAH HARGA BAHAN 121,378.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 209,653.30
E Overhead & Profit 10% 20,965.33
F Harga Satuan Pekerjaan (D+E) 230,618.63

A.4.1.1.28 Pemasangan 1 m2 jembatan untuk pengecoran beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0500 87,500.00 4,375.00
Kepala Tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 17,675.00
B BAHAN
Kayu kelas III (papan) m3 0.0264 2,292,700.00 60,527.28
Paku 5 cm – 12 cm kg 0.6000 27,500.00 16,500.00
Bambu apus 4 m Batang 0.5000 17,600.00 8,800.00
JUMLAH HARGA BAHAN 85,827.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 103,502.28
E Overhead & Profit 10% 10,350.23
F Harga Satuan Pekerjaan (D+E) 113,852.51

A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 80,000.00 424,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.3000 87,500.00 113,750.00
Tukang besi L.02 OH 1.0500 87,500.00 91,875.00
Kepala tukang L.03 OH 0.2620 100,000.00 26,200.00
Mandor L.04 OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 706,387.50
B BAHAN
Kayu kelas III papan m3 0.2000 2,292,700.00 458,540.00
Paku 5 cm – 12 cm kg 1.5000 27,500.00 41,250.00
Minyak bekisting Liter 0.4000 4,402.00 1,760.80
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat beton kg 2.2500 27,500.00 61,875.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
JUMLAH HARGA BAHAN 3,511,195.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,217,583.30
E Overhead & Profit 10% 421,758.33
F Harga Satuan Pekerjaan (D+E) 4,639,341.63
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 80,000.00 452,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.5600 87,500.00 136,500.00
Tukang besi L.02 OH 1.4000 87,500.00 122,500.00
Kepala tukang L.03 OH 0.3230 100,000.00 32,300.00
Mandor L.04 OH 0.2830 100,000.00 28,300.00
JUMLAH TENAGA KERJA 795,662.50
B BAHAN
Kayu kelas III papan m3 0.2700 2,292,700.00 619,029.00
Paku 5 cm – 12 cm kg 2.0000 27,500.00 55,000.00
Minyak bekisting Liter 0.6000 4,402.00 2,641.20
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.0000 27,500.00 82,500.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
JUMLAH HARGA BAHAN 4,389,440.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,185,102.70
E Overhead & Profit 10% 518,510.27
F Harga Satuan Pekerjaan (D+E) 5,703,612.97

A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0500 80,000.00 564,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.6500 87,500.00 144,375.00
Tukang besi L.02 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.4030 100,000.00 40,300.00
Mandor L.04 OH 0.3530 100,000.00 35,300.00
JUMLAH TENAGA KERJA 991,787.50
B BAHAN
Kayu kelas III papan m3 0.4000 2,292,700.00 917,080.00
Paku 5 cm – 12cm kg 4.0000 27,500.00 110,000.00
Minyak bekisting Liter 2.0000 4,402.00 8,804.00
Besi beton polos kg 315.0000 13,000.00 4,095,000.00
Kawat beton kg 4.5000 27,500.00 123,750.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
Kayu kelas II balok M3 0.1500 2,751,200.00 412,680.00
Plywood 6mm Lbr 3.5000 95,000.00 332,500.00
Bambu apus 4 m Batang 20.0000 17,600.00 352,000.00
JUMLAH HARGA BAHAN 7,252,084.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 8,243,871.50
E Overhead & Profit 10% 824,387.15
F Harga Satuan Pekerjaan (D+E) 9,068,258.65

A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.3500 80,000.00 508,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.6500 87,500.00 144,375.00
Tukang besi L.02 OH 1.4000 87,500.00 122,500.00
Kepala tukang L.03 OH 0.3330 100,000.00 33,300.00
Mandor L.04 OH 0.3180 100,000.00 31,800.00
JUMLAH TENAGA KERJA 864,037.50
B BAHAN
Kayu kelas III papan m3 0.3200 2,292,700.00 733,664.00
Paku 5 cm – 12 cm kg 3.2000 27,500.00 88,000.00
Minyak bekisting Liter 1.6000 4,402.00 7,043.20
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.0000 27,500.00 82,500.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
Kayu kelas II balok m3 0.1400 2,751,200.00 385,168.00
Plywood 6mm Lembar 2.8000 95,000.00 266,000.00
Bambu apus 4 m Batang 16.0000 17,600.00 281,600.00
JUMLAH HARGA BAHAN 5,474,245.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 6,338,282.70
E Overhead & Profit 10% 633,828.27
F Harga Satuan Pekerjaan (D+E) 6,972,110.97

A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 80,000.00 424,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.3000 87,500.00 113,750.00
Tukang besi L.02 OH 1.0500 87,500.00 91,875.00
Kepala tukang L.03 OH 0.2650 100,000.00 26,500.00
Mandor L.04 OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 706,687.50
B BAHAN
Kayu kelas III papan m3 0.3200 2,292,700.00 733,664.00
Paku 5 cm – 12 cm kg 3.2000 27,500.00 88,000.00
Minyak bekisting Liter 1.6000 4,402.00 7,043.20
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat beton kg 2.2500 27,500.00 61,875.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
Kayu kelas II balok m3 0.1200 2,751,200.00 330,144.00
Plywood 6mm Lembar 2.8000 95,000.00 266,000.00
Bambu apus 4 m Batang 32.0000 17,600.00 563,200.00
JUMLAH HARGA BAHAN 4,997,696.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,704,383.70
E Overhead & Profit 10% 570,438.37
F Harga Satuan Pekerjaan (D+E) 6,274,822.07

A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.3000 80,000.00 424,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.3000 87,500.00 113,750.00
Tukang besi L.02 OH 1.0500 87,500.00 91,875.00
Kepala tukang L.03 OH 0.2620 100,000.00 26,200.00
Mandor L.04 OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 706,387.50
B BAHAN
Kayu kelas III papan m3 0.2400 2,292,700.00 550,248.00
Paku 5 cm – 12 cm kg 3.2000 27,500.00 88,000.00
Minyak bekisting Liter 1.6000 4,402.00 7,043.20
Besi beton polos kg 157.5000 13,000.00 2,047,500.00
Kawat beton kg 2.2500 27,500.00 61,875.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
Kayu kelas II balok m3 0.1600 2,751,200.00 440,192.00
Plywood 6mm Lembar 2.8000 95,000.00 266,000.00
Bambu apus 4 m Batang 24.0000 17,600.00 422,400.00
JUMLAH HARGA BAHAN 4,783,528.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,489,915.70
E Overhead & Profit 10% 548,991.57
F Harga Satuan Pekerjaan (D+E) 6,038,907.27

A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 5.6500 80,000.00 452,000.00
Tukang batu L.02 OH 0.2750 87,500.00 24,062.50
Tukang kayu L.02 OH 1.5600 87,500.00 136,500.00
Tukang besi L.02 OH 1.4000 87,500.00 122,500.00
Kepala tukang L.03 OH 0.3230 100,000.00 32,300.00
Mandor L.04 OH 0.2830 100,000.00 28,300.00
JUMLAH TENAGA KERJA 795,662.50
B BAHAN
Kayu kelas III papan m3 0.2500 2,292,700.00 573,175.00
Paku 5 cm – 12 cm kg 3.0000 27,500.00 82,500.00
Minyak bekisting Liter 1.2000 4,402.00 5,282.40
Besi beton polos kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.0000 27,500.00 82,500.00
Semen Portland kg 336.0000 1,200.00 403,200.00
Pasir Beton m3 0.5400 385,000.00 207,900.00
Batu pecah mesin 2/3 m3 0.8100 357,000.00 289,170.00
Kayu kelas II balok m3 0.1050 2,751,200.00 288,876.00
Plywood 6mm Lembar 2.5000 95,000.00 237,500.00
Bambu apus 4 m Batang 14.0000 17,600.00 246,400.00
JUMLAH HARGA BAHAN 5,146,503.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,942,165.90
E Overhead & Profit 10% 594,216.59
F Harga Satuan Pekerjaan (D+E) 6,536,382.49

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1800 80,000.00 14,400.00
Tukang batu L.02 OH 0.0200 87,500.00 1,750.00
Tukang kayu L.02 OH 0.0200 87,500.00 1,750.00
Tukang besi L.02 OH 0.0200 87,500.00 1,750.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 21,150.00
B BAHAN
Kayu kelas III papan m3 0.0020 2,292,700.00 4,585.40
Paku 5 cm – 12 cm kg 0.0100 27,500.00 275.00
Minyak bekisting Liter - 4,402.00 -
Besi beton polos kg 3.0000 13,000.00 39,000.00
Kawat beton kg 0.4500 27,500.00 12,375.00
Semen Portland kg 4.0000 1,200.00 4,800.00
Pasir Beton m3 0.0060 385,000.00 2,310.00
Batu pecah mesin 2/3 m3 0.0090 357,000.00 3,213.00
JUMLAH HARGA BAHAN 66,558.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,708.40
E Overhead & Profit 10% 8,770.84
F Harga Satuan Pekerjaan (D+E) 96,479.24

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2970 80,000.00 23,760.00
Tukang batu L.02 OH 0.0330 87,500.00 2,887.50
Tukang kayu L.02 OH 0.0330 87,500.00 2,887.50
Tukang besi L.02 OH 0.0330 87,500.00 2,887.50
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 34,922.50
B BAHAN
Kayu kelas III papan m3 0.0030 2,292,700.00 6,878.10
Paku 5 cm – 12 cm kg 0.0200 27,500.00 550.00
Minyak bekisting Liter - 4,402.00 -
Besi beton polos kg 3.6000 13,000.00 46,800.00
Kawat beton kg 0.0500 27,500.00 1,375.00
Semen Portland kg 5.5000 1,200.00 6,600.00
Pasir Beton m3 0.0090 385,000.00 3,465.00
Batu pecah mesin 2/3 m3 0.0150 357,000.00 5,355.00
JUMLAH HARGA BAHAN 71,023.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 105,945.60
E Overhead & Profit 10% 10,594.56
F Harga Satuan Pekerjaan (D+E) 116,540.16

B.02 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87
B.02.a 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80000.000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87500.000.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100000.000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100000.000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 247.0000 1200.000.00 296400.000.00
2 PB / Pasir Beton M.14.a m3 0.6210 385000.000.00 239085.000.00
3 Kr / Krikil M.12 m3 0.7400 357000.000.00 264180.000.00
4 Air M.02 Liter 215.0000 110.000.00 23650.000.00
Jumlah Harga Bahan 823315.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 998677.500.00
E Overhead + Profit 10% 99867.750.00
F Harga Satuan Pekerjaan per-m3(D+E) 1098545.250.00

B.02.b 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87 Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80000.000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87500.000.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100000.000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100000.000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137,477.50
B Bahan
1 PC / Portland cement M.15 Kg 247.0000 1,200.00 296400.000.00
2 PB / Pasir Beton M.14.a m3 0.6210 385,000.00 239085.000.00
3 Kr / Krikil M.12 m3 0.7400 357,000.00 264180.000.00
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 823315.000.00
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa -hari 0.2500 300000.000.00 75000.000.00
Jumlah Harga Peralatan 75,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,035,792.50
E Overhead + Profit 10% 103,579.25
F Harga Satuan Pekerjaan per-m3(D+E) 1139371.750.00

B.03 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78
B.03.a 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80000.000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87500.000.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100000.000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100000.000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 276.0000 1,200.00 331200.000.00
2 PB / Pasir Beton M.14.a Kg 828.0000 275.00 227700.000.00
3 Kr / Krikil M.12 Kg 1,012.0000 264.44 267617.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 850167.777.78
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,025,530.28
E Overhead + Profit 10% 102,553.03
F Harga Satuan Pekerjaan per-m3(D+E) 1128083.310.00

B.03.b 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78 Menggunakan Molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80000.000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87500.000.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100000.000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100000.000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 276.0000 1200.000.00 331200.000.00
2 PB / Pasir Beton M.14.a Kg 828.0000 275.000.00 227700.000.00
3 Kr / Krikil M.12 Kg 1,012.0000 264.444.44 267617.777.78
4 Air M.02 Liter 215.0000 110.000.00 23650.000.00
Jumlah Harga Bahan 850167.777.78
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa -hari 0.2500 300000.000.00 75000.000.00
Jumlah Harga Peralatan 75,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,062,645.28
E Overhead + Profit 10% 106,264.53
F Harga Satuan Pekerjaan per-m3(D+E) 1168909.810.00

B.04 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72
B.04.a 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80000.000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87500.000.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100000.000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100000.000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 299.0000 1200.000.00 358800.000.00
2 PB / Pasir Beton M.14.a Kg 799.0000 275.000.00 219725.000.00
3 Kr / Krikil M.12 Kg 1,017.0000 264.444.44 268940.000.00
4 Air M.02 Liter 215.0000 110.000.00 23650.000.00
Jumlah Harga Bahan 871115.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,046,477.50
E Overhead + Profit 10% 104,647.75
F Harga Satuan Pekerjaan per-m3(D+E) 1151125.250.00

B.04.b 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72 Menggunakan Molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 299.0000 1,200.00 358800.000.00
2 PB / Pasir Beton M.14.a Kg 799.0000 275.00 219725.000.00
3 Kr / Krikil M.12 Kg 1,017.0000 264.44 268940.000.00
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 871115.000.00
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1083592.500.00
E Overhead + Profit 10% 108359.250.00
F Harga Satuan Pekerjaan per-m3(D+E) 1191951.750.00

B.05 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66
B.05.a 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80,000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87,500.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100,000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100,000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 326.0000 1,200.00 391200.000.00
2 PB / Pasir Beton M.14.a Kg 760.0000 275.00 209000.000.00
3 Kr / Krikil M.12 Kg 1,029.0000 264.44 272113.333.33
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 895963.333.33
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1071325.833.33
E Overhead + Profit 10% 107132.583.33
F Harga Satuan Pekerjaan per-m3(D+E) 1178458.420.00

B.05.b 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 Menggunakan Molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 326.0000 1,200.00 391200.000.00
2 PB / Pasir Beton M.14.a Kg 760.0000 275.00 209000.000.00
3 Kr / Krikil M.12 Kg 1,029.0000 264.44 272113.333.33
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 895963.333.33
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1108440.833.33
E Overhead + Profit 10% 110844.083.33
F Harga Satuan Pekerjaan per-m3(D+E) 1219284.920.00

B.06 1m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61
B.06.a 1m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80,000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87,500.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100,000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100,000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 352.0000 1,200.00 422400.000.00
2 PB / Pasir Beton M.14.a Kg 731.0000 275.00 201025.000.00
3 Kr / Krikil M.12 Kg 1,031.0000 264.44 272642.222.22
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 919717.222.22
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1095079.722.22
E Overhead + Profit 10% 109507.972.22
F Harga Satuan Pekerjaan per-m3(D+E) 1204587.690.00

B.06.b 1m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61 Menggunakan Molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 352.0000 1,200.00 422400.000.00
2 PB / Pasir Beton M.14.a Kg 731.0000 275.00 201025.000.00
3 Kr / Krikil M.12 Kg 1,031.0000 264.44 272642.222.22
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 919717.222.22
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1132194.722.22
E Overhead + Profit 10% 113219.472.22
F Harga Satuan Pekerjaan per-m3(D+E) 1245414.190.00

B.07 1m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58
B.07.a 1m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80,000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87,500.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100,000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100,000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 371.0000 1,200.00 445200.000.00
2 PB / Pasir Beton M.14.a Kg 689.0000 275.00 189475.000.00
3 Kr / Krikil M.12 Kg 1,047.0000 264.44 276873.333.33
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 935198.333.33
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1110560.833.33
E Overhead + Profit 10% 111056.083.33
F Harga Satuan Pekerjaan per-m3(D+E) 1221616.920.00

B.07.b 1m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58 Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 371.0000 1,200.00 445200.000.00
2 PB / Pasir Beton M.14.a Kg 689.0000 275.00 189475.000.00
3 Kr / Krikil M.12 Kg 1,047.0000 264.44 276873.333.33
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 935198.333.33
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1147675.833.33
E Overhead + Profit 10% 114767.583.33
F Harga Satuan Pekerjaan per-m3(D+E) 1262443.420.00

B.08 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56
B.08.a 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80,000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87,500.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100,000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100,000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 384.0000 1,200.00 460800.000.00
2 PB / Pasir Beton M.14.a Kg 692.0000 275.00 190300.000.00
3 Kr / Krikil M.12 Kg 1,039.0000 264.44 274757.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 949507.777.78
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1124870.277.78
E Overhead + Profit 10% 112487.027.78
F Harga Satuan Pekerjaan per-m3(D+E) 1237357.310.00
B.08.b 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56 Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 384.0000 1,200.00 460800.000.00
2 PB / Pasir Beton M.14.a Kg 692.0000 275.00 190300.000.00
3 Kr / Krikil M.12 Kg 1,039.0000 264.44 274757.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 949507.777.78
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1161985.277.78
E Overhead + Profit 10% 116198.527.78
F Harga Satuan Pekerjaan per-m3(D+E) 1278183.810.00

B.09 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53
B.09.a 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53 Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 384.0000 1,200.00 460800.000.00
2 PB / Pasir Beton M.14.a Kg 692.0000 275.00 190300.000.00
3 Kr / Krikil M.12 Kg 1,039.0000 264.44 274757.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 949507.777.78
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1086985.277.78
E Overhead + Profit 10% 108698.527.78
F Harga Satuan Pekerjaan per-m3(D+E) 1195683.810.00

B.09.b 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53 Menggunakan Molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 406.0000 1,200.00 487200.000.00
2 PB / Pasir Beton M.14.a Kg 684.0000 275.00 188100.000.00
3 Kr / Krikil M.12 Kg 1,026.0000 264.44 271320.000.00
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 970270.000.00
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1182747.500.00
E Overhead + Profit 10% 118274.750.00
F Harga Satuan Pekerjaan per-m3(D+E) 1301022.250.00

B.10 1m Beton mutu, f’c =26,4 MPa (K300) kedap air,slump (12+2) cm, w/c =0,52 (kedap air )
3

B.10.a Beton mutu, f’c =26,4 MPa (K300) kedap air,slump (12+2) cm, w/c =0,52 (kedap air ) Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 80,000.00 132000.000.00
2 Tukang Batu L.02 OH 0.2750 87,500.00 24062.500.00
3 Kepala Tukang L.03 OH 0.0280 100,000.00 2800.000.00
4 Mandor L.04 OH 0.1650 100,000.00 16500.000.00
Jumlah Harga Tenaga Kerja 175362.500.00
B Bahan
1 PC / Portland cement M.15 Kg 413.0000 1,200.00 495600.000.00
2 PB / Pasir Beton M.14.a Kg 681.0000 275.00 187275.000.00
3 Kr / Krikil M.12 Kg 1,021.0000 264.44 269997.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 976522.777.78
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1151885.277.78
E Overhead + Profit 10% 115188.527.78
F Harga Satuan Pekerjaan per-m3(D+E) 1267073.810.00

B.10.b Beton mutu, f’c =26,4 MPa (K300) kedap air,slump (12+2) cm, w/c =0,52 (kedap air ) Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 105840.000.00
2 Tukang Batu L.02 OH 0.1890 87,500.00 16537.500.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.1320 100,000.00 13200.000.00
Jumlah Harga Tenaga Kerja 137477.500.00
B Bahan
1 PC / Portland cement M.15 Kg 413.0000 1,200.00 495600.000.00
2 PB / Pasir Beton M.14.a Kg 681.0000 275.00 187275.000.00
3 Kr / Krikil M.12 Kg 1,021.0000 264.44 269997.777.78
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 976522.777.78
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1189000.277.78
E Overhead + Profit 10% 118900.027.78
F Harga Satuan Pekerjaan per-m3(D+E) 1307900.310.00

B.11 1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air, slump (12+2) cm, w/c = 0,49 (kedap air)
B.11.a 1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air, slump (12+2) cm, w/c = 0,49 (kedap air) Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 2.1000 80,000.00 168000.000.00
2 Tukang Batu L.02 OH 0.3500 87,500.00 30625.000.00
3 Kepala Tukang L.03 OH 0.0350 100,000.00 3500.000.00
4 Mandor L.04 OH 0.2100 100,000.00 21000.000.00
Jumlah Harga Tenaga Kerja 223125.000.00
B Bahan
1 PC / Portland cement M.15 Kg 439.0000 1,200.00 526800.000.00
2 PB / Pasir Beton M.14.a Kg 670.0000 275.00 184250.000.00
3 Kr / Krikil M.12 Kg 1,006.0000 264.44 266031.111.11
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 1000731.111.11
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1223856.111.11
E Overhead + Profit 10% 122385.611.11
F Harga Satuan Pekerjaan per-m3(D+E) 1346241.720.00

B.11.b 1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air, slump (12+2) cm, w/c = 0,49 (kedap air) Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6800 80,000.00 134400.000.00
2 Tukang Batu L.02 OH 0.2400 87,500.00 21000.000.00
3 Kepala Tukang L.03 OH 0.0240 100,000.00 2400.000.00
4 Mandor L.04 OH 0.1680 100,000.00 16800.000.00
Jumlah Harga Tenaga Kerja 174600.000.00
B Bahan
1 PC / Portland cement M.15 Kg 439.0000 1,200.00 526800.000.00
2 PB / Pasir Beton M.14.a Kg 670.0000 275.00 184250.000.00
3 Kr / Krikil M.12 Kg 1,006.0000 264.44 266031.111.11
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 1000731.111.11
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1250331.111.11
E Overhead + Profit 10% 125033.111.11
F Harga Satuan Pekerjaan per-m3(D+E) 1375364.220.00

B.12 1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12+2) cm, w/c = 0,48 (kedap air)
B.12.a 1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12+2) cm, w/c = 0,48 (kedap air) Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 2.1000 80,000.00 168000.000.00
2 Tukang Batu L.02 OH 0.3500 87,500.00 30625.000.00
3 Kepala Tukang L.03 OH 0.0350 100,000.00 3500.000.00
4 Mandor L.04 OH 0.2100 100,000.00 21000.000.00
Jumlah Harga Tenaga Kerja 223125.000.00
B Bahan
1 PC / Portland cement M.15 Kg 448.0000 1,200.00 537600.000.00
2 PB / Pasir Beton M.14.a Kg 667.0000 275.00 183425.000.00
3 Kr / Krikil M.12 Kg 1,000.0000 264.44 264444.444.44
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 1009119.444.44
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1232244.444.44
E Overhead + Profit 10% 123224.444.44
F Harga Satuan Pekerjaan per-m3(D+E) 1355468.890.00

B.12.b 1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12+2) cm, w/c = 0,48 (kedap air) Menggunakan molen
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6800 80,000.00 134400.000.00
2 Tukang Batu L.02 OH 0.2400 87,500.00 21000.000.00
3 Kepala Tukang L.03 OH 0.0240 100,000.00 2400.000.00
4 Mandor L.04 OH 0.1680 100,000.00 16800.000.00
Jumlah Harga Tenaga Kerja 174600.000.00
B Bahan
1 PC / Portland cement M.15 Kg 448.0000 1,200.00 537600.000.00
2 PB / Pasir Beton M.14.a Kg 667.0000 275.00 183425.000.00
3 Kr / Krikil M.12 Kg 1,000.0000 264.44 264444.444.44
4 Air M.02 Liter 215.0000 110.00 23650.000.00
Jumlah Harga Bahan 1009119.444.44
C Peralatan
1 Molen Kapasitas 0.3 m3 E.29.b Sewa-hari 0.2500 300,000.00 75000.000.00
Jumlah Harga Peralatan 75000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1258719.444.44
E Overhead + Profit 10% 125871.944.44
F Harga Satuan Pekerjaan per-m3(D+E) 1384591.390.00

B.13 1 m3 Beton Menggunakan Ready Mixed dan pompa beton


B.13.a 1 m3 Beton menggunakan Ready Mixed K-225 dan pompa beton
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 114,375.00
B Bahan
1 Campuran Beton Ready Mixed K-225 M.09.x m3 1.0200 935,425.00 954,133.50
Jumlah Harga Bahan 954,133.50
C Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,356,508.50
E Overhead + Profit 10% 135,650.85
F Harga Satuan Pekerjaan per-m3(D+E) 1492159.350.00

B.13.b 1 m3 Beton menggunakan Ready Mixed K-250 dan pompa beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 114,375.00
B Bahan
1 Campuran Beton Ready Mixed K-250 M.09.x m3 1.0200 1,078,490.00 1,100,059.80
Jumlah Harga Bahan 1,100,059.80
C Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,502,434.80
E Overhead + Profit 10% 150,243.48
F Harga Satuan Pekerjaan per-m3(D+E) 1652678.280.00

B.13.c 1 m3 Beton menggunakan Ready Mixed K-275 dan pompa beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 114,375.00
B Bahan
1 Campuran Beton Ready Mixed K-275 M.09.x m3 1.0200 1,012,460.00 1,032,709.20
Jumlah Harga Bahan 1,032,709.20
C Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,435,084.20
E Overhead + Profit 10% 143,508.42
F Harga Satuan Pekerjaan per-m3(D+E) 1578592.620.00

B.13.d 1 m3 Beton menggunakan Ready Mixed K300 dan pompa beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 114,375.00
B Bahan
1 Campuran Beton Ready Mixed K-300 M.09.x m3 1.0200 1,133,515.00 1,156,185.30
Jumlah Harga Bahan 1,156,185.30
C Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,558,560.30
E Overhead + Profit 10% 155,856.03
F Harga Satuan Pekerjaan per-m3(D+E) 1714416.330.00

B.13.e 1 m3 Beton menggunakan Ready Mixed K-350 dan pompa beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 114,375.00
B Bahan
1 Campuran Beton Ready Mixed K-350 M.09.x m3 1.0200 1,188,540.00 1,212,310.80
Jumlah Harga Bahan 1,212,310.80
C Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,614,685.80
E Overhead + Profit 10% 161,468.58
F Harga Satuan Pekerjaan per-m3(D+E) 1776154.380.00

B.13.b 1m3 beton menggunkan bahan aditif


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Jmlah Harga Tenaga Kerja
B Bahan
1 Bahan aditif M.03 Liter 1.2000 -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) -
E Overhead + Profit 10% -
F Harga Satuan Pekerjaan per-m3(D+E) -

A.3.2 Penambahan koefisien tenaga kerja dan atau peralatan


B.14 Mengangkut / menaikan campuran beton dengan jarak ≥ 5m
B.14.a 1 m3 beton dicorkan pada tapak berjalan < 25 m dengan beda tinggi < 1m
B.14.a.1 1 m3 beton dicorkan pada tapak berjalan < 25 m dengan beda tinggi < 1m Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4100 80,000.00 32,800.00
2 Mandor L.04 OH 0.0410 100,000.00 4,100.00
Jumlah Harga Tenaga Kerja 36,900.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 36,900.00
E Overhead + Profit 10% 3,690.00
F Harga Satuan Pekerjaan per-m3(D+E) 40590.000.00

B.14.b 1m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m
B.14.b.1 1m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.5000 80,000.00 40,000.00
2 Mandor L.04 OH 0.0500 100,000.00 5,000.00
Jumlah Harga Tenaga Kerja 45,000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 45,000.00
E Overhead + Profit 10% 4,500.00
F Harga Satuan Pekerjaan per-m3(D+E) 49500.000.00

B.14.b.2 1m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m Menggunakan pompa beton
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16,000.00
2 Mandor L.04 OH 0.0200 100,000.00 2,000.00
Jumlah Harga Tenaga Kerja 18,000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pompa dan Conveyor beton E.35 Sewa-hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 306,000.00
E Overhead + Profit 10% 30,600.00
F Harga Satuan Pekerjaan per-m3(D+E) 336600.000.00

B.15 1m Pemadatan beton pada saat mengecor


3

B.15.a 1m3 Pemadatan beton pada saat mengecor menggunakan Vibrator


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2500 80,000.00 20,000.00
2 Mandor L.04 OH 0.0250 100,000.00 2,500.00
Jumlah Harga Tenaga Kerja 22,500.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Vibrator E.48 Sewa-hari 0.1000 400000.000.00 40,000.00
Jumlah Harga Peralatan 40,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 62,500.00
E Overhead + Profit 10% 6,250.00
F Harga Satuan Pekerjaan per-m3(D+E) 68750.000.00

B.15.b 1m3 Pemadatan beton pada saat mengecor Manual ( Menggunakan penusuk besi beton )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.5000 80,000.00 40,000.00
2 Mandor L.04 OH 0.0500 100,000.00 5,000.00
Jumlah Harga Tenaga Kerja 45,000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 45,000.00
E Overhead + Profit 10% 4,500.00
F Harga Satuan Pekerjaan per-m3(D+E) 49500.000.00

B.16 1m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal)


B.16.a 1m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal) Manual
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2500 80,000.00 20,000.00
2 Mandor L.04 OH 0.0250 100,000.00 2,500.00
Jumlah Harga Tenaga Kerja 22,500.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 22,500.00
E Overhead + Profit 10% 2,250.00
F Harga Satuan Pekerjaan per-m3(D+E) 24750.000.00

B.16.b 1m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal) Menggunakan pompa beton
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16,000.00
2 Mandor L.04 OH 0.0200 100,000.00 2,000.00
Jumlah Harga Tenaga Kerja 18,000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Pompa dan Conveyor beton E.35 Sewa hari 0.1200 2,400,000.00 288,000.00
Jumlah Harga Peralatan 288,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 306000.000.00
E Overhead + Profit 10% 30600.000.00
F Harga Satuan Pekerjaan per-m3(D+E) 336600.000.00

A.3.3 Koefisien untuk analisa harga satuan pekerjaan pembesian beton


B.17 Pembesian 100 kg dengan besi polos
2.2.6.1.a.(a) Untuk pembesian plat menggunakan besi beton polos / 100 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.7000 80,000.00 56,000.00
2 Tukang Besi L.02 OH 0.7000 87,500.00 61,250.00
3 Kepala Tukang L.03 OH 0.0700 100,000.00 7,000.00
4 Mandor L.04 OH 0.0700 100,000.00 7,000.00
Jumlah Harga Tenaga Kerja 131,250.00
B Bahan
1 Besi beton polos M.55.d Kg 105.0000 13000.000.00 1,365,000.00
2 Kawat ikat M.67 kg 1.5000 27500.000.00 41,250.00
Jumlah Harga Bahan 1,406,250.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1537500.000.00
E Overhead + Profit 10% 153750.000.00
F Harga Satuan Pekerjaan per-100kg (D+E) 1691250.000.00

2.2.6.1.a.(a) .1 Untuk pembesian plat menggunakan besi beton polos / 1 kg


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.00700 80,000.00 560.00
2 Tukang Besi L.02 OH 0.00700 87,500.00 612.50
3 Kepala Tukang L.03 OH 0.00070 100,000.00 70.00
4 Mandor L.04 OH 0.00070 100,000.00 70.00
Jumlah Harga Tenaga Kerja 1,312.50
B Bahan
1 Besi beton polos M.55.d Kg 1.05000 13,000.00 13,650.00
2 Kawat ikat M.67 kg 0.01500 27,500.00 412.50
Jumlah Harga Bahan 14,062.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 15375.000.00
E Overhead + Profit 10% 1537.500.00
F Harga Satuan Pekerjaan per-100kg (D+E) 16912.500.00

B.17 Pembesian 100 kg dengan besi ulir


B.17.a.2 Untuk pembesian plat menggunakan besi beton ulir / 100 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.7000 80,000.00 56,000.00
2 Tukang Besi L.02 OH 0.7000 87,500.00 61,250.00
3 Kepala Tukang L.03 OH 0.0700 100,000.00 7,000.00
4 Mandor L.04 OH 0.0700 100,000.00 7,000.00
Jumlah Harga Tenaga Kerja 131,250.00
B Bahan
1 Besi beton ulir M.55.d Kg 105.0000 13500.000.00 1,417,500.00
2 Kawat ikat M.67 kg 1.5000 27500.000.00 41,250.00
Jumlah Harga Bahan 1,458,750.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1590000.000.00
E Overhead + Profit 10% 159000.000.00
F Harga Satuan Pekerjaan per-100kg (D+E) 1749000.000.00

B.17.a.2.1 Untuk pembesian plat menggunakan besi beton ulir / 1 kg


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.00700 80,000.00 560.00
2 Tukang Besi L.02 OH 0.00700 87,500.00 612.50
3 Kepala Tukang L.03 OH 0.00070 100,000.00 70.00
4 Mandor L.04 OH 0.00070 100,000.00 70.00
Jumlah Harga Tenaga Kerja 1,312.50
B Bahan
1 Besi beton ulir M.55.d Kg 1.05000 13500.000.00 14,175.00
2 Kawat ikat M.67 kg 0.01500 27500.000.00 412.50
Jumlah Harga Bahan 14,587.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 15900.000.00
E Overhead + Profit 10% 1590.000.00
F Harga Satuan Pekerjaan per-100kg (D+E) 17490.000.00

2.2.6.1.d.(a) Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton polos / 100 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6000 80,000.00 128,000.00
2 Tukang Besi L.02 OH 1.6000 87,500.00 140,000.00
3 Kepala Tukang L.03 OH 0.1600 100,000.00 16,000.00
4 Mandor L.04 OH 0.1600 100,000.00 16,000.00
Jumlah Harga Tenaga Kerja 300,000.00
B Bahan
1 Besi beton polos M.94.a Kg 105.0000 13,000.00 1,365,000.00
2 Kawat Ikat M.60 kg 2.8000 27,500.00 77,000.00
Jumlah Harga Bahan 1,442,000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1742000.000.00
E Overhead + Profit 10% 174200.000.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 1916200.000.00

2.2.6.1.d.(a).1 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton polos / 1 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.01600 80,000.00 1,280.00
2 Tukang Besi L.02 OH 0.01600 87,500.00 1,400.00
3 Kepala Tukang L.03 OH 0.00160 100,000.00 160.00
4 Mandor L.04 OH 0.00160 100,000.00 160.00
Jumlah Harga Tenaga Kerja 3,000.00
B Bahan
1 Besi beton polos M.94.a Kg 1.05000 13,000.00 13,650.00
2 Kawat Ikat M.60 kg 0.02800 27,500.00 770.00
Jumlah Harga Bahan 14,420.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 17,420.00
E Overhead + Profit 10% 1,742.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 19,162.00

B.17.b.2 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton ulir / 100 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.6000 80,000.00 128,000.00
2 Tukang Besi L.02 OH 1.6000 87,500.00 140,000.00
3 Kepala Tukang L.03 OH 0.1600 100,000.00 16,000.00
4 Mandor L.04 OH 0.1600 100,000.00 16,000.00
Jumlah Harga Tenaga Kerja 300,000.00
B Bahan
1 Besi beton ulir M.94.a Kg 105.0000 13,500.00 1,417,500.00
2 Kawat Ikat M.60 kg 2.8000 27,500.00 77,000.00
Jumlah Harga Bahan 1,494,500.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,794,500.00
E Overhead + Profit 10% 179,450.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 1,973,950.00

B.17.b.2.1 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton ulir / 1 kg
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.01600 80,000.00 1,280.00
2 Tukang Besi L.02 OH 0.01600 87,500.00 1,400.00
3 Kepala Tukang L.03 OH 0.00160 100,000.00 160.00
4 Mandor L.04 OH 0.00160 100,000.00 160.00
Jumlah Harga Tenaga Kerja 3,000.00
B Bahan
1 Besi beton ulir M.94.a Kg 1.05000 13,500.00 14,175.00
2 Kawat Ikat M.60 kg 0.02800 27,500.00 770.00
Jumlah Harga Bahan 14,945.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 17,945.00
E Overhead + Profit 10% 1,794.50
F Harga Satuan Pekerjaan per-100 kg (D+E) 19,739.50

A.4.1.1.17. Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- M8


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.0025 80,000.00 200.00
2 Tukang Besi L.02 OH 0.0025 87,500.00 218.75
3 Kepala Tukang L.03 OH 0.0025 100,000.00 250.00
4 Mandor L.04 OH 0.0001 100,000.00 10.00
Jumlah Harga Tenaga Kerja 678.75
B Bahan
1 Jaring Anyaman Tulangan Tunggal M6-M8 M.94.a Kg 1.0200 13,100.00 13,362.00
2 Kawat benrad M.60 kg 0.0050 27,500.00 137.50
Jumlah Harga Bahan 13,499.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 14,178.25
E Overhead + Profit 10% 1,417.83
F Harga Satuan Pekerjaan per-100 kg (D+E) 15,596.08

B.18.1 Pembesian 100 kg jaring kawat (Wiremesh) untuk plat atau dinding
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2500 80,000.00 20,000.00
2 Tukang Besi L.02 OH 0.2500 87,500.00 21,875.00
3 Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
4 Mandor L.04 OH 0.0250 100,000.00 2,500.00
Jumlah Harga Tenaga Kerja 46,875.00
B Bahan
1 Wire Mesh M.94.a Kg 102.0000 13,100.00 1,336,200.00
2 Kawat Ikat M.60 kg 0.5000 27,500.00 13,750.00
Jumlah Harga Bahan 1,349,950.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 1,396,825.00
E Overhead + Profit 10% 139,682.50
F Harga Satuan Pekerjaan per-100 kg (D+E) 1,536,507.50

B.18.2 Pembesian 1 kg jaring kawat (Wiremesh) untuk plat atau dinding


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.0025 80,000.00 200.00
2 Tukang Besi L.02 OH 0.0025 87,500.00 218.75
3 Kepala Tukang L.03 OH 0.0003 100,000.00 25.00
4 Mandor L.04 OH 0.0003 100,000.00 25.00
Jumlah Harga Tenaga Kerja 468.75
B Bahan
1 Wire Mesh M.94.a Kg 1.0200 13,100.00 13,362.00
2 Kawat Ikat M.60 kg 0.0050 27,500.00 137.50
Jumlah Harga Bahan 13,499.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 13,968.25
E Overhead + Profit 10% 1,396.83
F Harga Satuan Pekerjaan per-100 kg (D+E) 15,365.08

B.19 Pembesian 100kg Kabel prestressed polos / strand


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.5 80,000.00 40,000.00
2 Tukang Besi L.02 OH 0.5 87,500.00 43,750.00
3 Kepala Tukang Besi L.03 OH 0.05 100,000.00 5,000.00
4 Mandor L.04 OH 0.05 100,000.00 5,000.00
Jumlah Harga Tenaga Kerja 93,750.00
B Bahan
1 Kabel Prestres M.59 Kg 105 -
2 Besi beton M.55.d Kg 12.5 -
3 Kawat beton M.67 Kg 1 -
4 BBM non Subsidi M.137.bLiter 7.5 -
Jumlah Harga Bahan -
C Peralatan
1 Jack Tension /stressing E.15 Sewa-hari 0.15 -

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 93,750.00
E Overhead + Profit (Contoh 15 %) 10% 9,375.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 103,125.00

B.20 Mengangkut /menaikan 100kg tulangan setiap kenaikan vertikal 4m atau jarak horizontal setiap 25m ke tapak pemasangan
B.20.a Manual ( kenaikan 4m )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.1 87,500.00 8,750.00
3 Mandor L.04 OH 0.03 100,000.00 3,000.00
Jumlah Harga Tenaga Kerja 35,750.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 35,750.00
E Overhead + Profit 10% 3,575.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 39325.000.00

B.20.b Mekanis ( penambahan jarak horizontal 10m s.d 25 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16,000.00
2 Tukang Besi L.02 OH 0.04 87,500.00 3,500.00
3 Mandor L.04 OH 0.02 100,000.00 2,000.00
Jumlah Harga Tenaga Kerja 21,500.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Crane * E.07.a Sewa-hari 0.025 3,200,000.00 80,000.00
Jumlah Harga Peralatan 80,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 101,500.00
E Overhead + Profit 10% 10,150.00
F Harga Satuan Pekerjaan per-100 kg (D+E) 111,650.00
* termasuk operator dan bahan bakar

B.20.c Mekanis ( setiap penambahan jarak horizontal 25m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.1 87,500.00 8,750.00
3 Mandor L.04 OH 0.03 100,000.00 3,000.00
Jumlah Harga Tenaga Kerja 35,750.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Crane * E.07.a Sewa-hari 0.025 3,200,000.00 80,000.00
Jumlah Harga Peralatan 80,000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 115,750.00
E Overhead + Profit 10% 11,575.00
F Harga Satuan Pekerjaan per- 100 kg (D+E) 127325.000.00
* termasuk operator dan bahan bakar

B.20.d Mekanis (setiap kenaikan 4m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.1 87,500.00 8,750.00
3 Mandor L.04 OH 0.03 100,000.00 3,000.00
Jumlah Harga Tenaga Kerja 35,750.00
B Bahan
Jumlah Harga Bahan
C Peralatan
1 Lift* E.23 Sewa-hari 0.025 0
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 35,750.00
E Overhead + Profit 10% 3,575.00
F Harga Satuan Pekerjaan per-m3(D+E) 39325.000.00

B.21 Bekisting lantai


B.21.a. 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP)
B.21.a.1.a 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 18 mm * M.39.d Lembar 0.3530 275000.000.00 97075.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0180 2751200.000.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27500.000.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4402.000.00 1100.500.00
Jumlah Harga Bahan 155,397.10
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 211647.100.00
E Overhead + Profit 10% 21164.710.00
F Harga Satuan Pekerjaan per-m3(D+E) 232811.810.00

B.21.a.1.b 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 18 mm * M.39.d Lembar 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0100 2,751,200.00 27512.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 92,137.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 148387.500.00
E Overhead + Profit 10% 14838.750.00
F Harga Satuan Pekerjaan per-m3(D+E) 163226.250.00

B.21.a.1.c 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 18 mm * M.39.d Lembar 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 60,507.70
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 116757.700.00
E Overhead + Profit 10% 11675.770.00
F Harga Satuan Pekerjaan per-m3(D+E) 128433.470.00

B.21.a.1.d 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 18 mm * M.39.d Lembar 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 44,830.30
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 101080.300.00
E Overhead + Profit 10% 10108.030.00
F Harga Satuan Pekerjaan per-m3(D+E) 111188.330.00

B.21.a.2.a 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 12 mm * M.39.d Lembar 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0180 2,751,200.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 129,981.10
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 186231.100.00
E Overhead + Profit 10% 18623.110.00
F Harga Satuan Pekerjaan per-m3(D+E) 204854.210.00

B.21.a.2.b 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 12 mm * M.39.d Lembar 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0100 2,751,200.00 27512.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 77,521.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 133771.500.00
E Overhead + Profit 10% 13377.150.00
F Harga Satuan Pekerjaan per-m3(D+E) 147148.650.00

B.21.a.2.c 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 12 mm * M.39.d Lembar 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 51,291.70
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 107541.700.00
E Overhead + Profit 10% 10754.170.00
F Harga Satuan Pekerjaan per-m3(D+E) 118295.870.00

B.21.a.2.d 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 12 mm * M.39.d Lembar 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 38,278.30
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 94528.300.00
E Overhead + Profit 10% 9452.830.00
F Harga Satuan Pekerjaan per-m3(D+E) 103981.130.00

B.21.a.3.a 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 9 mm * M.39.d Lembar 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0180 2,751,200.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 98,917.10
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 155167.100.00
E Overhead + Profit 10% 15516.710.00
F Harga Satuan Pekerjaan per-m3(D+E) 170683.810.00

B.21.a.3.b 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 9 mm * M.39.d Lembar 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0100 2,751,200.00 27512.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 59,657.50
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 115907.500.00
E Overhead + Profit 10% 11590.750.00
F Harga Satuan Pekerjaan per-m3(D+E) 127498.250.00
B.21.a.3.c 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 9 mm * M.39.d Lembar 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 40,027.70
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 96277.700.00
E Overhead + Profit 10% 9627.770.00
F Harga Satuan Pekerjaan per-m3(D+E) 105905.470.00

B.21.a.3.d 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.3000 87,500.00 26250.000.00
3 Kepala Tukang L.03 OH 0.0300 100,000.00 3000.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 56250.000.00
B Bahan
1 Multiflex 9 mm * M.39.d Lembar 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
4 Minyak bekesting M.129 Liter 0.2500 4,402.00 1100.500.00
Jumlah Harga Bahan 30,270.30
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86520.300.00
E Overhead + Profit 10% 8652.030.00
F Harga Satuan Pekerjaan per-m3(D+E) 95172.330.00

B.21.b. 1 m bekisting lantai beton biasa dengan multiflex 12 mm atau 18 mm (TP)


2

B.21.b.1.a 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.3530 275000.000.00 97075.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0140 2751200.000.00 38516.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27500.000.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4402.000.00 880.400.00
Jumlah Harga Bahan 142,522.20
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 170272.200.00
E Overhead + Profit 10% 17027.220.00
F Harga Satuan Pekerjaan per-m3(D+E) 187299.420.00

B.21.b.1.b 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0080 2,751,200.00 22009.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 84,765.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 112515.000.00
E Overhead + Profit 10% 11251.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 123766.500.00

B.21.b.1.c 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 55,886.40
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 83636.400.00
E Overhead + Profit 10% 8363.640.00
F Harga Satuan Pekerjaan per-m3(D+E) 92000.040.00

B.21.b.1.d 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 40,209.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 67959.000.00
E Overhead + Profit 10% 6795.900.00
F Harga Satuan Pekerjaan per-m3(D+E) 74754.900.00
B.21.b.2.a 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 12 mm M.39.c Lembar 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0140 2,751,200.00 38516.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 117,106.20
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 144856.200.00
E Overhead + Profit 10% 14485.620.00
F Harga Satuan Pekerjaan per-m3(D+E) 159341.820.00

B.21.b.2.b 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 12 mm M.39.c Lembar 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0080 2,751,200.00 22009.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 70,149.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 97899.000.00
E Overhead + Profit 10% 9789.900.00
F Harga Satuan Pekerjaan per-m3(D+E) 107688.900.00

B.21.b.2.c 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 12 mm M.39.c Lembar 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 46,670.40
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 74420.400.00
E Overhead + Profit 10% 7442.040.00
F Harga Satuan Pekerjaan per-m3(D+E) 81862.440.00

B.21.b.2.d 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 12 mm M.39.c Lembar 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 33,657.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 61407.000.00
E Overhead + Profit 10% 6140.700.00
F Harga Satuan Pekerjaan per-m3(D+E) 67547.700.00

B.21.b.3.a 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0140 2,751,200.00 38516.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 86,042.20
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 113792.200.00
E Overhead + Profit 10% 11379.220.00
F Harga Satuan Pekerjaan per-m3(D+E) 125171.420.00

B.21.b.3.b 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0080 2,751,200.00 22009.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 52,285.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 80035.000.00
E Overhead + Profit 10% 8003.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 88038.500.00
B.21.b.3.c 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 35,406.40
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 63156.400.00
E Overhead + Profit 10% 6315.640.00
F Harga Satuan Pekerjaan per-m3(D+E) 69472.040.00

B.21.b.3.d 1 m bekisting lantai beton biasa dengan multiflex 9 mm (TP) 4 kali pakai
2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1000 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.0100 100,000.00 1000.000.00
4 Mandor L.04 OH 0.0200 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27,750.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm * M.33.d m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2200 27,500.00 6050.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 25,649.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 53399.000.00
E Overhead + Profit 10% 5339.900.00
F Harga Satuan Pekerjaan per-m3(D+E) 58738.900.00

B.21.c. 1 m bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
2

B.21.c.1 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II * M.35.e m3 0.0360 2292700.000.00 82537.200.00
2 Kaso 5/7 cm * M.37.a m3 0.0080 2,751,200.00 22009.600.00
3 Paku 5 Cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 113677.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 155302.200.00
E Overhead + Profit 10% 15530.220.00
F Harga Satuan Pekerjaan per-m3(D+E) 170832.420.00

B.21.c.2 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II * M.35.e m3 0.0220 2292700.000.00 50439.400.00
2 Kaso 5/7 cm * M.37.a m3 0.0040 2751200.000.00 11004.800.00
3 Paku 5 Cm dan 7 cm M.71.b kg 0.3000 27500.000.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4402.000.00 880.400.00
Jumlah Harga Bahan 70574.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 112199.600.00
E Overhead + Profit 10% 11219.960.00
F Harga Satuan Pekerjaan per-m3(D+E) 123419.560.00

B.21.c.3 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II * M.35.e m3 0.0140 2292700.000.00 32097.800.00
2 Kaso 5/7 cm * M.37.a m3 0.0030 2751200.000.00 8253.600.00
3 Paku 5 Cm dan 7 cm M.71.b kg 0.3000 27500.000.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4402.000.00 880.400.00
Jumlah Harga Bahan 49481.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 91106.800.00
E Overhead + Profit 10% 9110.680.00
F Harga Satuan Pekerjaan per-m3(D+E) 100217.480.00

B.21.c.4 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II * M.35.e m3 0.0110 2292700.000.00 25219.700.00
2 Kaso 5/7 cm * M.37.a m3 0.0020 2751200.000.00 5502.400.00
3 Paku 5 Cm dan 7 cm M.71.b kg 0.3000 27500.000.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4402.000.00 880.400.00
Jumlah Harga Bahan 39852.500.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 81477.500.00
E Overhead + Profit 10% 8147.750.00
F Harga Satuan Pekerjaan per-m3(D+E) 89625.250.00

B.21.d. 1m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm
B.21.d.1 1m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0630 2,751,200.00 173325.600.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
Jumlah Harga Bahan 180200.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 221825.600.00
E Overhead + Profit 10% 22182.560.00
F Harga Satuan Pekerjaan per-m2 (D+E) 244008.160.00

B.21.d.2 1m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0350 2,751,200.00 96292.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
Jumlah Harga Bahan 103167.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 144792.000.00
E Overhead + Profit 10% 14479.200.00
F Harga Satuan Pekerjaan per-m2 (D+E) 159271.200.00

B.21.d.3 1m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0200 2,751,200.00 55024.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
Jumlah Harga Bahan 61899.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 103524.000.00
E Overhead + Profit 10% 10352.400.00
F Harga Satuan Pekerjaan per-m2 (D+E) 113876.400.00

B.21.d.4 1m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 80,000.00 24000.000.00
2 Tukang Batu L.02 OH 0.1500 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.0150 100,000.00 1500.000.00
4 Mandor L.04 OH 0.0300 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0130 2,751,200.00 35765.600.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
Jumlah Harga Bahan 42640.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 84265.600.00
E Overhead + Profit 10% 8426.560.00
F Harga Satuan Pekerjaan per-m2 (D+E) 92692.160.00

B.21.e. 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm
B.21.e.1 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Dolken kayu Ø 8 cm-10 cm, panjang 4 m* M.29.d Batang 4.5000 -
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
Jumlah Harga Bahan 8250.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 55425.000.00
E Overhead + Profit 10% 5542.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 60967.500.00

B.21.e.2 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Dolken kayu Ø 8 cm-10 cm, panjang 4 m* M.29.d Batang 2.4750 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
Jumlah Harga Bahan 8250.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 55425.000.00
E Overhead + Profit 10% 5542.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 60967.500.00

B.21.e.3 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Dolken kayu Ø 8 cm-10 cm, panjang 4 m* M.29.d Batang 1.4630 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
Jumlah Harga Bahan 8250.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 55425.000.00
E Overhead + Profit 10% 5542.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 60967.500.00

B.21.e.4 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Dolken kayu Ø 8 cm-10 cm, panjang 4 m* M.29.d Batang 0.9590 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
Jumlah Harga Bahan 8250.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 55425.000.00
E Overhead + Profit 10% 5542.500.00
F Harga Satuan Pekerjaan per-m3(D+E) 60967.500.00

B.21.f 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm
B.21.f.1 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3200 80,000.00 25600.000.00
2 Tukang Batu L.02 OH 0.1600 87,500.00 14000.000.00
3 Kepala Tukang L.03 OH 0.0160 100,000.00 1600.000.00
4 Mandor L.04 OH 0.0320 100,000.00 3200.000.00
Jumlah Harga Tenaga Kerja 44400.000.00
B Bahan
1 Bambu Ø 8 cm-10 cm, panjang 4 m* M.29.b btg 4.5000 17,600.00 79200.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Bahan 102850.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 147250.000.00
E Overhead + Profit 10% 14725.000.00
F Harga Satuan Pekerjaan per-m3(D+E) 161975.000.00

B.21.f.2 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3200 80,000.00 25600.000.00
2 Tukang Batu L.02 OH 0.1600 87,500.00 14000.000.00
3 Kepala Tukang L.03 OH 0.0160 100,000.00 1600.000.00
4 Mandor L.04 OH 0.0320 100,000.00 3200.000.00
Jumlah Harga Tenaga Kerja 44400.000.00
B Bahan
1 Bambu Ø 8 cm-10 cm, panjang 4 m* M.29.b btg 2.7000 17,600.00 47520.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Bahan 71170.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 115570.000.00
E Overhead + Profit 10% 11557.000.00
F Harga Satuan Pekerjaan per-m3(D+E) 127127.000.00

B.21.f.3 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3200 80,000.00 25600.000.00
2 Tukang Batu L.02 OH 0.1600 87,500.00 14000.000.00
3 Kepala Tukang L.03 OH 0.0160 100,000.00 1600.000.00
4 Mandor L.04 OH 0.0320 100,000.00 3200.000.00
Jumlah Harga Tenaga Kerja 44400.000.00
B Bahan
1 Bambu Ø 8 cm-10 cm, panjang 4 m* M.29.b btg 1.8000 17,600.00 31680.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Bahan 55330.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 99730.000.00
E Overhead + Profit 10% 9973.000.00
F Harga Satuan Pekerjaan per-m3(D+E) 109703.000.00

B.21.f.4 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3200 80,000.00 25600.000.00
2 Tukang Batu L.02 OH 0.1600 87,500.00 14000.000.00
3 Kepala Tukang L.03 OH 0.0160 100,000.00 1600.000.00
4 Mandor L.04 OH 0.0320 100,000.00 3200.000.00
Jumlah Harga Tenaga Kerja 44400.000.00
B Bahan
1 Bambu Ø 8 cm-10 cm, panjang 4 m* M.29.b btg 1.3500 17,600.00 23760.000.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Bahan 47410.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 91810.000.00
E Overhead + Profit 10% 9181.000.00
F Harga Satuan Pekerjaan per-m3(D+E) 100991.000.00

B.22.a 1m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,6 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.1 80,000.00 8,000.00
2 Tukang Batu L.02 OH 0.05 87,500.00 4,375.00
3 Kepala Tukang L.03 OH 0.005 100,000.00 500.00
4 Mandor L.04 OH 0.01 100,000.00 1,000.00
Jumlah Harga Tenaga Kerja 13,875.00
B Bahan
1 Kaso 5/7 cm M.37.a m3 0.003 2,751,200.00 8,253.60
2 Balok 8/12 cm M.37.a m3 0.0068 2,865,800.00 19,487.44
3 Paku 7 cm-12 cm M.71.c kg 0.27 27,500.00 7,425.00
4 Floordeck 0.75 mm M.60.a m2 1.08 140,800.00 152,064.00
Jumlah Harga Bahan 187,230.04

C Peralatan
Jumlah Harga peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 201,105.04
E Overhead + Profit 10% 20,110.50
F Harga Satuan Pekerjaan per-m3(D+E) 221215.540.00

B.22.b 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,8m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.08 80,000.00 6,400.00
2 Tukang Batu L.02 OH 0.04 87,500.00 3,500.00
3 Kepala Tukang L.03 OH 0.004 100,000.00 400.00
4 Mandor L.04 OH 0.008 100,000.00 800.00
Jumlah Harga Tenaga Kerja 11,100.00
B Bahan
1 Kaso 5/7 cm M.37.a m3 0.0014 2,751,200.00 3,851.68
2 Balok 8/12 cm M.37.a m3 0.0089 2,865,800.00 25,505.62
3 Paku 7 cm-12 cm M.84.c kg 0.23 27,500.00 6,325.00
4 Floordeck 0.75 mm M.60.b m2 1.08 140,800.00 152,064.00
Jumlah Harga Peralatan 187,746.30
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 198,846.30
E Overhead + Profit 10% 19,884.63
F Harga Satuan Pekerjaan per-m3(D+E) 218730.930.00

B.22.c 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 1,2 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.054 80,000.00 4,320.00
2 Tukang Batu L.02 OH 0.027 87,500.00 2,362.50
3 Kepala Tukang L.03 OH 0.0027 100,000.00 270.00
4 Mandor L.04 OH 0.0054 100,000.00 540.00
Jumlah Harga Tenaga Kerja 7,492.50
B Bahan
1 Kaso 5/7 cm M.37.a m3 0.0014 2,751,200.00 3,851.68
2 Balok 8/12 cm M.37.a m3 0.0078 2,865,800.00 22,353.24
3 Paku 7 cm-12 cm M.71.c kg 0.21 27,500.00 5,775.00
4 Floordeck 0.75 mm M.60.d m2 1.08 140,800.00 152,064.00
Jumlah Harga Peralatan 184,043.92
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 191,536.42
E Overhead + Profit 10% 19,153.64
F Harga Satuan Pekerjaan per – m2 (D+E) 210690.060.00

B.22.d 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 2,0 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.042 80,000.00 3,360.00
2 Tukang Batu L.02 OH 0.021 87,500.00 1,837.50
3 Kepala Tukang L.03 OH 0.0021 100,000.00 210.00
4 Mandor L.04 OH 0.0042 100,000.00 420.00
Jumlah Harga Tenaga Kerja 5,827.50
B Bahan
1 Kaso 5/7 cm M.37.a m3 0.001 2,751,200.00 2,751.20
2 Balok 8/12 cm M.37.a m3 0.0078 2,865,800.00 22,353.24
3 Paku 7 cm-12 cm M.71.c kg 0.2 27,500.00 5,500.00
4 Floordeck 0.75 mm M.60.d m2 1.08 140,800.00 152,064.00
Jumlah Harga Peralatan 182,668.44
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 188,495.94
E Overhead + Profit 10% 18,849.59
F Harga Satuan Pekerjaan per – m2 (D+E) 207345.530.00

B.23. Bekisting balok


B.23.a 1m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0
B.23.a.1.a 1m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0410 2,751,200.00 112799.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 219774.700.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 287274.700.00
E Overhead + Profit 10% 28727.470.00
F Harga Satuan Pekerjaan per – m2 (D+E) 316002.170.00

B.23.a.1.b 1m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0230 2,751,200.00 63277.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 129003.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 196503.100.00
E Overhead + Profit 10% 19650.310.00
F Harga Satuan Pekerjaan per – m2 (D+E) 216153.410.00

B.23.a.1.c 1m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0130 2,751,200.00 35765.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 80866.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 148366.100.00
E Overhead + Profit 10% 14836.610.00
F Harga Satuan Pekerjaan per – m2 (D+E) 163202.710.00

B.23.a.1.d 1m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 59686.300.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 127186.300.00
E Overhead + Profit 10% 12718.630.00
F Harga Satuan Pekerjaan per – m2 (D+E) 139904.930.00

B.23.a.2.a 1m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0410 2,751,200.00 112799.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 194358.700.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 261858.700.00
E Overhead + Profit 10% 26185.870.00
F Harga Satuan Pekerjaan per – m2 (D+E) 288044.570.00

B.23.a.2.b 1m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0230 2,751,200.00 63277.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 114387.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 181887.100.00
E Overhead + Profit 10% 18188.710.00
F Harga Satuan Pekerjaan per – m2 (D+E) 200075.810.00

B.23.a.2.c 1m Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0


2
3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0130 2,751,200.00 35765.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 71650.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 139150.100.00
E Overhead + Profit 10% 13915.010.00
F Harga Satuan Pekerjaan per – m2 (D+E) 153065.110.00

B.23.a.2.d 1m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 53134.300.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 120634.300.00
E Overhead + Profit 10% 12063.430.00
F Harga Satuan Pekerjaan per – m2 (D+E) 132697.730.00

B.23.a.3.a 1m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0410 2,751,200.00 112799.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 163294.700.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 230794.700.00
E Overhead + Profit 10% 23079.470.00
F Harga Satuan Pekerjaan per – m2 (D+E) 253874.170.00

B.23.a.3.b 1m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0230 2,751,200.00 63277.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 96523.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 164023.100.00
E Overhead + Profit 10% 16402.310.00
F Harga Satuan Pekerjaan per – m2 (D+E) 180425.410.00
B.23.a.3.c 1m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0130 2,751,200.00 35765.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 60386.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 127886.100.00
E Overhead + Profit 10% 12788.610.00
F Harga Satuan Pekerjaan per – m2 (D+E) 140674.710.00

B.23.a.3.d 1m Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0


2
4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3200 27,500.00 8800.000.00
4 Minyak bekisting M.129 L 0.2500 4,402.00 1100.500.00
Jumlah Harga Peralatan 45126.300.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 112626.300.00
E Overhead + Profit 10% 11262.630.00
F Harga Satuan Pekerjaan per – m2 (D+E) 123888.930.00

B.23.b 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT ≤ 1,0
B.23.b.1.a 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0330 2,751,200.00 90789.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 195620.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 228920.000.00
E Overhead + Profit 10% 22892.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 251812.000.00

B.23.b.1.b 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0180 2,751,200.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 113102.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 146402.000.00
E Overhead + Profit 10% 14640.200.00
F Harga Satuan Pekerjaan per – m2 (D+E) 161042.200.00

B.23.b.1.c 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 73218.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 106518.600.00
E Overhead + Profit 10% 10651.860.00
F Harga Satuan Pekerjaan per – m2 (D+E) 117170.460.00

B.23.b.1.d 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 52038.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 85338.800.00
E Overhead + Profit 10% 8533.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 93872.680.00

B.23.b.2.a 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 12 mm M.39.c Lbr 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0330 2,751,200.00 90789.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 170204.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 203504.000.00
E Overhead + Profit 10% 20350.400.00
F Harga Satuan Pekerjaan per – m2 (D+E) 223854.400.00

B.23.b.2.b 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0180 2,751,200.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 98486.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 131786.000.00
E Overhead + Profit 10% 13178.600.00
F Harga Satuan Pekerjaan per – m2 (D+E) 144964.600.00

B.23.b.2.c 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 64002.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 97302.600.00
E Overhead + Profit 10% 9730.260.00
F Harga Satuan Pekerjaan per – m2 (D+E) 107032.860.00
B.23.b.2.d 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lbr 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 45486.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 78786.800.00
E Overhead + Profit 10% 7878.680.00
F Harga Satuan Pekerjaan per – m2 (D+E) 86665.480.00

B.23.c.3.a 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lbr 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0330 2,751,200.00 90789.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 139140.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 172440.000.00
E Overhead + Profit 10% 17244.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 189684.000.00

B.23.b.3.b 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lbr 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0180 2,751,200.00 49521.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 80622.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 113922.000.00
E Overhead + Profit 10% 11392.200.00
F Harga Satuan Pekerjaan per – m2 (D+E) 125314.200.00

B.23.b.3.c 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lbr 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 52738.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86038.600.00
E Overhead + Profit 10% 8603.860.00
F Harga Satuan Pekerjaan per – m2 (D+E) 94642.460.00

B.23.b.3.d 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lbr 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 37478.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 70778.800.00
E Overhead + Profit 10% 7077.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 77856.680.00

B.23.c 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP)
B.23.c.1 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0360 2,292,700.00 82537.200.00
2 Kaso 5/7 cm M.37.a m3 0.0240 2,751,200.00 66028.800.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 157696.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 207646.400.00
E Overhead + Profit 10% 20764.640.00
F Harga Satuan Pekerjaan per – m2 (D+E) 228411.040.00
B.23.c.2 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0220 2,292,700.00 50439.400.00
2 Kaso 5/7 cm M.37.a m3 0.0130 2,751,200.00 35765.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 95335.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 145285.400.00
E Overhead + Profit 10% 14528.540.00
F Harga Satuan Pekerjaan per – m2 (D+E) 159813.940.00

B.23.c.3 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0140 2,292,700.00 32097.800.00
2 Kaso 5/7 cm M.37.a m3 0.0080 2,751,200.00 22009.600.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 63237.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 113187.800.00
E Overhead + Profit 10% 11318.780.00
F Harga Satuan Pekerjaan per – m2 (D+E) 124506.580.00

B.23.c.4 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0110 2,292,700.00 25219.700.00
2 Kaso 5/7 cm M.37.a m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 48106.100.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 98056.100.00
E Overhead + Profit 10% 9805.610.00
F Harga Satuan Pekerjaan per – m2 (D+E) 107861.710.00

B.23.d.1 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0350 2,751,200.00 96292.000.00
2 Paku 5cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 102892.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 152842.000.00
E Overhead + Profit 10% 15284.200.00
F Harga Satuan Pekerjaan per – m2 (D+E) 168126.200.00

B.23.d.2 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0190 2,751,200.00 52272.800.00
2 Paku 5cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 58872.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 108822.800.00
E Overhead + Profit 10% 10882.280.00
F Harga Satuan Pekerjaan per – m2 (D+E) 119705.080.00

B.23.d.3 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0110 2,751,200.00 30263.200.00
2 Paku 5cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 36863.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86813.200.00
E Overhead + Profit 10% 8681.320.00
F Harga Satuan Pekerjaan per – m2 (D+E) 95494.520.00

B.23.d.4 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0070 2,751,200.00 19258.400.00
2 Paku 5cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 25858.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 75808.400.00
E Overhead + Profit 10% 7580.840.00
F Harga Satuan Pekerjaan per – m2 (D+E) 83389.240.00

B.23.e.1 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Dolken kayu kelas III Ø 8-10 cm, panjang 4m M.29.d Batang 2.7 - -
2 Paku 5cm dan 7 cm M.71.b kg 0.28 27,500.00 7700.000.00
Jumlah Harga Peralatan 7700.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 63200.000.00
E Overhead + Profit 10% 6320.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 69520.000.00

B.23.e.2 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Dolken kayu kelas III Ø 8-10 cm, panjang 4m M.29.d Batang 1.375 - -
2 Paku 5cm dan 7 cm M.71.b kg 0.28 27,500.00 7700.000.00
Jumlah Harga Peralatan 7700.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 63200.000.00
E Overhead + Profit 10% 6320.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 69520.000.00

B.23.e.3 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Dolken kayu kelas III Ø 8-10 cm, panjang 4m M.29.d Batang 0.813 - -
2 Paku 5cm dan 7 cm M.71.b kg 0.28 27,500.00 7700.000.00
Jumlah Harga Peralatan 7700.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 63200.000.00
E Overhead + Profit 10% 6320.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 69520.000.00

B.23.e.4 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Dolken kayu kelas III Ø 8-10 cm, panjang 4m M.29.d Batang 0.533 - -
2 Paku 5cm dan 7 cm M.71.b kg 0.28 27,500.00 7700.000.00
Jumlah Harga Peralatan 7700.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 63200.000.00
E Overhead + Profit 10% 6320.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 69520.000.00

B.23.f.1 1m2 perancah Bekisting balok beton menggunakan bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3800 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.1900 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.0380 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Bambu Ø 8-10 cm, panjang 4m M.29.b Batang 2.7000 17,600.00 47520.000.00
2 Paku 5cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 70620.000.00
C Peralatan -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 123345.000.00
E Overhead + Profit 10% 12334.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 135679.500.00

B.23.f.2 1m2 perancah Bekisting balok beton menggunakan bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3800 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.1900 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.0380 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Bambu Ø 8-10 cm, panjang 4m M.29.b Batang 1.5000 17,600.00 26400.000.00
2 Paku 5cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 49500.000.00
C Peralatan -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 102225.000.00
E Overhead + Profit 10% 10222.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 112447.500.00
B.23.f.3 1m2 perancah Bekisting balok beton menggunakan bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3800 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.1900 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.0380 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Bambu Ø 8-10 cm, panjang 4m M.29.b Batang 1.0000 17,600.00 17600.000.00
2 Paku 5cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 40700.000.00
C Peralatan -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 93425.000.00
E Overhead + Profit 10% 9342.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 102767.500.00

B.23.f.4 1m2 perancah Bekisting balok beton menggunakan bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3800 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.1900 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.0190 100,000.00 1900.000.00
4 Mandor L.04 OH 0.0380 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Bambu Ø 8-10 cm, panjang 4m M.29.b Batang 0.7500 17,600.00 13200.000.00
2 Paku 5cm dan 7 cm M.71.b Kg 0.2800 27,500.00 7700.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 36300.000.00
C Peralatan -
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 89025.000.00
E Overhead + Profit 10% 8902.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 97927.500.00

B.24. Bekisting kolom


B.24.a 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP)
B.24.a.1.a 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lembar 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0210 2,751,200.00 57775.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 162605.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 224480.600.00
E Overhead + Profit 10% 22448.060.00
F Harga Satuan Pekerjaan per – m2 (D+E) 246928.660.00

B.24.a.1.b 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lembar 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0120 2,751,200.00 33014.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 96594.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 158469.800.00
E Overhead + Profit 10% 15846.980.00
F Harga Satuan Pekerjaan per – m2 (D+E) 174316.780.00

B.24.a.1.c 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lembar 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 62213.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 124088.800.00
E Overhead + Profit 10% 12408.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 136497.680.00

B.24.a.1.d 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lembar 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 43785.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 105660.200.00
E Overhead + Profit 10% 10566.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 116226.220.00

B.24.a.2.a 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lembar 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0210 2,751,200.00 57775.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 137189.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 199064.600.00
E Overhead + Profit 10% 19906.460.00
F Harga Satuan Pekerjaan per – m2 (D+E) 218971.060.00
B.24.a.2.b 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lembar 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0120 2,751,200.00 33014.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 81978.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 143853.800.00
E Overhead + Profit 10% 14385.380.00
F Harga Satuan Pekerjaan per – m2 (D+E) 158239.180.00

B.24.a.2.c 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lembar 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 52997.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 114872.800.00
E Overhead + Profit 10% 11487.280.00
F Harga Satuan Pekerjaan per – m2 (D+E) 126360.080.00

B.24.a.2.d 1m Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 4 kali pakai
2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lembar 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 37233.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 99108.200.00
E Overhead + Profit 10% 9910.820.00
F Harga Satuan Pekerjaan per – m2 (D+E) 109019.020.00

B.24.a.3.a 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lembar 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0210 2,751,200.00 57775.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 106125.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 168000.600.00
E Overhead + Profit 10% 16800.060.00
F Harga Satuan Pekerjaan per – m2 (D+E) 184800.660.00

B.24.a.3.b 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lembar 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0120 2,751,200.00 33014.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 64114.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 125989.800.00
E Overhead + Profit 10% 12598.980.00
F Harga Satuan Pekerjaan per – m2 (D+E) 138588.780.00

B.24.a.3.c 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lembar 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 41733.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 103608.800.00
E Overhead + Profit 10% 10360.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 113969.680.00

B.24.a.3.d 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3300 80,000.00 26400.000.00
2 Tukang Batu L.02 OH 0.3300 87,500.00 28875.000.00
3 Kepala Tukang L.03 OH 0.0330 100,000.00 3300.000.00
4 Mandor L.04 OH 0.0330 100,000.00 3300.000.00
Jumlah Harga Tenaga Kerja 61875.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lembar 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 29225.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 91100.200.00
E Overhead + Profit 10% 9110.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 100210.220.00
B.24.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm atau 18 mm(TP)
B.24.b.1.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0170 2,751,200.00 46770.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 151600.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 182125.800.00
E Overhead + Profit 10% 18212.580.00
F Harga Satuan Pekerjaan per – m2 (D+E) 200338.380.00

B.24.b.1.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 88341.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 118866.200.00
E Overhead + Profit 10% 11886.620.00
F Harga Satuan Pekerjaan per – m2 (D+E) 130752.820.00

B.24.b.1.c 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 59462.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 89987.600.00
E Overhead + Profit 10% 8998.760.00
F Harga Satuan Pekerjaan per – m2 (D+E) 98986.360.00

B.24.b.1.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 43785.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 74310.200.00
E Overhead + Profit 10% 7431.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 81741.220.00

B.24.b.2.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 12 mm M.39.c Lembar 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0170 2,751,200.00 46770.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 126184.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 156709.800.00
E Overhead + Profit 10% 15670.980.00
F Harga Satuan Pekerjaan per – m2 (D+E) 172380.780.00

B.24.b.2.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 73725.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 104250.200.00
E Overhead + Profit 10% 10425.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 114675.220.00

B.24.b.2.c 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 50246.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 80771.600.00
E Overhead + Profit 10% 8077.160.00
F Harga Satuan Pekerjaan per – m2 (D+E) 88848.760.00

B.24.b.2.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 18 mm M.39.c Lembar 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 37233.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 67758.200.00
E Overhead + Profit 10% 6775.820.00
F Harga Satuan Pekerjaan per – m2 (D+E) 74534.020.00

B.24.b.3.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0170 2,751,200.00 46770.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 95120.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 125645.800.00
E Overhead + Profit 10% 12564.580.00
F Harga Satuan Pekerjaan per – m2 (D+E) 138210.380.00

B.24.b.3.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 55861.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86386.200.00
E Overhead + Profit 10% 8638.620.00
F Harga Satuan Pekerjaan per – m2 (D+E) 95024.820.00

B.24.b.3.c 1m Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 3 kali pakai
2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 38982.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 69507.600.00
E Overhead + Profit 10% 6950.760.00
F Harga Satuan Pekerjaan per – m2 (D+E) 76458.360.00

B.24.b.3.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2200 80,000.00 17600.000.00
2 Tukang Batu L.02 OH 0.1100 87,500.00 9625.000.00
3 Kepala Tukang L.03 OH 0.0110 100,000.00 1100.000.00
4 Mandor L.04 OH 0.0220 100,000.00 2200.000.00
Jumlah Harga Tenaga Kerja 30525.000.00
B Bahan
1 Multiflex 9 mm M.39.c Lembar 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.2500 27,500.00 6875.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 29225.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59750.200.00
E Overhead + Profit 10% 5975.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65725.220.00

B.24.c 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP)
B.24.c.1 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0360 2,292,700.00 82537.200.00
2 Kaso 5/7 cm M.37.a m3 0.0170 2,751,200.00 46770.400.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 138438.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 185613.000.00
E Overhead + Profit 10% 18561.300.00
F Harga Satuan Pekerjaan per – m2 (D+E) 204174.300.00

B.24.c.2 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0220 2,292,700.00 50439.400.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 84330.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 131505.600.00
E Overhead + Profit 10% 13150.560.00
F Harga Satuan Pekerjaan per – m2 (D+E) 144656.160.00

B.24.c.3 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0140 2,292,700.00 32097.800.00
2 Kaso 5/7 cm M.37.a m3 0.0060 2,751,200.00 16507.200.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 57735.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 104910.400.00
E Overhead + Profit 10% 10491.040.00
F Harga Satuan Pekerjaan per – m2 (D+E) 115401.440.00

B.24.c.4 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Papan 3/20 cm kayu kelas II M.35.e m3 0.0110 2,292,700.00 25219.700.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 45354.900.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 92529.900.00
E Overhead + Profit 10% 9252.990.00
F Harga Satuan Pekerjaan per – m2 (D+E) 101782.890.00

B.24.d.1 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0330 2,751,200.00 90789.600.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 97389.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 144564.600.00
E Overhead + Profit 10% 14456.460.00
F Harga Satuan Pekerjaan per – m2 (D+E) 159021.060.00

B.24.d.2 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0180 2,751,200.00 49521.600.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 56121.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 103296.600.00
E Overhead + Profit 10% 10329.660.00
F Harga Satuan Pekerjaan per – m2 (D+E) 113626.260.00

B.24.d.3 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0110 2,751,200.00 30263.200.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 36863.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 84038.200.00
E Overhead + Profit 10% 8403.820.00
F Harga Satuan Pekerjaan per – m2 (D+E) 92442.020.00

B.24.d.4 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3400 80,000.00 27200.000.00
2 Tukang Batu L.02 OH 0.1700 87,500.00 14875.000.00
3 Kepala Tukang L.03 OH 0.0170 100,000.00 1700.000.00
4 Mandor L.04 OH 0.0340 100,000.00 3400.000.00
Jumlah Harga Tenaga Kerja 47175.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0070 2,751,200.00 19258.400.00
2 Paku 5 cm dan 7 cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Peralatan 25858.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 73033.400.00
E Overhead + Profit 10% 7303.340.00
F Harga Satuan Pekerjaan per – m2 (D+E) 80336.740.00

B.24.e.1 1m2 Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.38 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.19 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.019 100,000.00 1900.000.00
4 Mandor L.04 OH 0.038 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Dolken kayu kelas III Ø 8 – 10 cm, panjang 4m M.29.d batang 2.3 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.24 27,500.00 6600.000.00
Jumlah Harga Peralatan 6,600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59,325.00
E Overhead + Profit 10% 10% 5932.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65257.500.00

B.24.e.2 1m2 Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.38 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.19 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.019 100,000.00 1900.000.00
4 Mandor L.04 OH 0.038 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Dolken kayu kelas III Ø 8 – 10 cm, panjang 4m M.29.d batang 1.265 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.24 27,500.00 6600.000.00
Jumlah Harga Peralatan 6,600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59,325.00
E Overhead + Profit 10% 5932.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65257.500.00

B.24.e.3 1m2 Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.38 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.19 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.019 100,000.00 1900.000.00
4 Mandor L.04 OH 0.038 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Dolken kayu kelas III Ø 8 – 10 cm, panjang 4m M.29.d batang 0.748 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.24 27,500.00 6600.000.00
Jumlah Harga Peralatan 6,600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59,325.00
E Overhead + Profit 10% 5932.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65257.500.00

B.24.e.4 1m2 Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.38 80,000.00 30400.000.00
2 Tukang Batu L.02 OH 0.19 87,500.00 16625.000.00
3 Kepala Tukang L.03 OH 0.019 100,000.00 1900.000.00
4 Mandor L.04 OH 0.038 100,000.00 3800.000.00
Jumlah Harga Tenaga Kerja 52725.000.00
B Bahan
1 Dolken kayu kelas III Ø 8 – 10 cm, panjang 4m M.29.d batang 0.49 - -
2 Paku 5 cm dan 7 cm M.71.b kg 0.24 27,500.00 6600.000.00
Jumlah Harga Peralatan 6,600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59,325.00
E Overhead + Profit 10% 5932.500.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65257.500.00

B.24.f.1 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Bambu Ø 8 cm-10cm, panjang 4 m* M.29.b Batang 2.3000 17,600.00 40480.000.00
2 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 62480.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 112430.000.00
E Overhead + Profit 10% 11243.000.00
F Harga Satuan Pekerjaan per – m2 (D+E) 123673.000.00

B.24.f.2 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Bambu Ø 8 cm-10cm, panjang 4 m* M.29.b Batang 1.3800 17,600.00 24288.000.00
2 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 46288.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 96238.000.00
E Overhead + Profit 10% 9623.800.00
F Harga Satuan Pekerjaan per – m2 (D+E) 105861.800.00

B.24.f.3 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Bambu Ø 8 cm-10cm, panjang 4 m* M.29.b Batang 0.9200 17,600.00 16192.000.00
2 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 38192.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 88142.000.00
E Overhead + Profit 10% 8814.200.00
F Harga Satuan Pekerjaan per – m2 (D+E) 96956.200.00

B.24.f.4 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Bambu Ø 8 cm-10cm, panjang 4 m* M.29.b Batang 0.6900 17,600.00 12144.000.00
2 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
3 Tambang ijuk atau plastik M.141 m 3.5000 4,400.00 15400.000.00
Jumlah Harga Peralatan 34144.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 84094.000.00
E Overhead + Profit 10% 8409.400.00
F Harga Satuan Pekerjaan per – m2 (D+E) 92503.400.00

B.25. Bekisting Dinding


B.25.a 1m2 Bekisting dinding beton expose dengan multiflex 18 mm
B.25.a.1.a 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0200 2,751,200.00 55024.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 161229.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 228729.400.00
E Overhead + Profit 10% 22872.940.00
F Harga Satuan Pekerjaan per – m2 (D+E) 251602.340.00

B.25.a.1.b 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 95218.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 162718.600.00
E Overhead + Profit 10% 16271.860.00
F Harga Satuan Pekerjaan per – m2 (D+E) 178990.460.00

B.25.a.1.c 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 63588.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 131088.800.00
E Overhead + Profit 10% 13108.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 144197.680.00

B.25.a.1.d 1m Bekisting dinding beton expose dengan multiflex 18 mm 4 kali pakai


2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 45160.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 112660.200.00
E Overhead + Profit 10% 11266.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 123926.220.00

B.25.a.2.a 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0200 2,751,200.00 55024.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 135813.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 203313.400.00
E Overhead + Profit 10% 20331.340.00
F Harga Satuan Pekerjaan per – m2 (D+E) 223644.740.00

B.25.a.2.b 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 80602.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 148102.600.00
E Overhead + Profit 10% 14810.260.00
F Harga Satuan Pekerjaan per – m2 (D+E) 162912.860.00

B.25.a.2.c 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 54372.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 121872.800.00
E Overhead + Profit 10% 12187.280.00
F Harga Satuan Pekerjaan per – m2 (D+E) 134060.080.00

B.25.a.2.d 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 38608.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 106108.200.00
E Overhead + Profit 10% 10610.820.00
F Harga Satuan Pekerjaan per – m2 (D+E) 116719.020.00

B.25.a.3.a 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0200 2,751,200.00 55024.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 104749.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 172249.400.00
E Overhead + Profit 10% 17224.940.00
F Harga Satuan Pekerjaan per – m2 (D+E) 189474.340.00

B.25.a.3.b 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0110 2,751,200.00 30263.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 62738.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 130238.600.00
E Overhead + Profit 10% 13023.860.00
F Harga Satuan Pekerjaan per – m2 (D+E) 143262.460.00

B.25.a.3.c 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0070 2,751,200.00 19258.400.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 43108.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 110608.800.00
E Overhead + Profit 10% 11060.880.00
F Harga Satuan Pekerjaan per – m2 (D+E) 121669.680.00

B.25.a.3.d 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.3600 87,500.00 31500.000.00
3 Kepala Tukang L.03 OH 0.0360 100,000.00 3600.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 67500.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0040 2,751,200.00 11004.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 30600.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 98100.200.00
E Overhead + Profit 10% 9810.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 107910.220.00

B.25.b 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP)
B.25.b.1.a 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.3530 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.0160 2,751,200.00 44019.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 148574.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 181874.600.00
E Overhead + Profit 10% 18187.460.00
F Harga Satuan Pekerjaan per – m2 (D+E) 200062.060.00

B.25.b.1.b 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.2030 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 88066.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 121366.200.00
E Overhead + Profit 10% 12136.620.00
F Harga Satuan Pekerjaan per – m2 (D+E) 133502.820.00

B.25.b.1.c 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.1280 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 56436.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 89736.400.00
E Overhead + Profit 10% 8973.640.00
F Harga Satuan Pekerjaan per – m2 (D+E) 98710.040.00

B.25.b.1.d 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 18 mm M.39.d Lbr 0.0910 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 40759.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 74059.000.00
E Overhead + Profit 10% 7405.900.00
F Harga Satuan Pekerjaan per – m2 (D+E) 81464.900.00

B.25.b.2.a 1m Bekisting dinding beton biasa dengan multiflex 12 mm (TP)


2
1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.3530 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.0160 2,751,200.00 44019.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 123158.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 156458.600.00
E Overhead + Profit 10% 15645.860.00
F Harga Satuan Pekerjaan per – m2 (D+E) 172104.460.00

B.25.b.2.b 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.2030 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 73450.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 106750.200.00
E Overhead + Profit 10% 10675.020.00
F Harga Satuan Pekerjaan per – m2 (D+E) 117425.220.00

B.25.b.2.c 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.1280 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 47220.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 80520.400.00
E Overhead + Profit 10% 8052.040.00
F Harga Satuan Pekerjaan per – m2 (D+E) 88572.440.00

B.25.b.2.d 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 12 mm M.39.d Lbr 0.0910 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 34207.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 67507.000.00
E Overhead + Profit 10% 6750.700.00
F Harga Satuan Pekerjaan per – m2 (D+E) 74257.700.00

B.25.b.3.a 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.3530 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.0160 2,751,200.00 44019.200.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 92094.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 125394.600.00
E Overhead + Profit 10% 12539.460.00
F Harga Satuan Pekerjaan per – m2 (D+E) 137934.060.00

B.25.b.3.b 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.2030 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 55586.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 88886.200.00
E Overhead + Profit 10% 8888.620.00
F Harga Satuan Pekerjaan per – m2 (D+E) 97774.820.00

B.25.3.2.c 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.1280 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 35956.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 69256.400.00
E Overhead + Profit 10% 6925.640.00
F Harga Satuan Pekerjaan per – m2 (D+E) 76182.040.00

B.25.b.3.d 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2400 80,000.00 19200.000.00
2 Tukang Batu L.02 OH 0.1200 87,500.00 10500.000.00
3 Kepala Tukang L.03 OH 0.0120 100,000.00 1200.000.00
4 Mandor L.04 OH 0.0240 100,000.00 2400.000.00
Jumlah Harga Tenaga Kerja 33300.000.00
B Bahan
1 Multiflex 9 mm M.39.d Lbr 0.0910 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5 cm dan 7 cm M.71.b Kg 0.2400 27,500.00 6600.000.00
4 Minyak bekisting M.129 Liter 0.2000 4,402.00 880.400.00
Jumlah Harga Peralatan 26199.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 59499.000.00
E Overhead + Profit 10% 5949.900.00
F Harga Satuan Pekerjaan per – m2 (D+E) 65448.900.00

B.25.c 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm
B.25.c.1 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm Kayu kelas II M.35.e m3 0.0360 2,292,700.00 82537.200.00
2 Kaso 5/7 cm M.37.a m3 0.0160 2,751,200.00 44019.200.00
3 Paku 5cm dan 7cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 135686.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 185636.800.00
E Overhead + Profit 10% 18563.680.00
F Harga Satuan Pekerjaan per-m2(D+E) 204200.480.00

B.25.c.2 1m Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 2 kali pakai
2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm Kayu kelas II M.35.e m3 0.0220 2,292,700.00 50439.400.00
2 Kaso 5/7 cm M.37.a m3 0.0090 2,751,200.00 24760.800.00
3 Paku 5cm dan 7cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 84330.600.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 134280.600.00
E Overhead + Profit 10% 13428.060.00
F Harga Satuan Pekerjaan per-m2(D+E) 147708.660.00

B.25.c.3 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm Kayu kelas II M.35.e m3 0.0140 2,292,700.00 32097.800.00
2 Kaso 5/7 cm M.37.a m3 0.0050 2,751,200.00 13756.000.00
3 Paku 5cm dan 7cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 54984.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 104934.200.00
E Overhead + Profit 10% 10493.420.00
F Harga Satuan Pekerjaan per-m2(D+E) 115427.620.00

B.25.c.4 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Papan 3/20 cm Kayu kelas II M.35.e m3 0.0110 2,292,700.00 25219.700.00
2 Kaso 5/7 cm M.37.a m3 0.0030 2,751,200.00 8253.600.00
3 Paku 5cm dan 7cm M.71.b kg 0.3000 27,500.00 8250.000.00
4 Minyak bekisting M129 L 0.2000 4,402.00 880.400.00
Jumlah Harga Bahan 42603.700.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 92553.700.00
E Overhead + Profit 10% 9255.370.00
F Harga Satuan Pekerjaan per-m2(D+E) 101809.070.00

B.25.d.1 1 m2 Perancah /penyokong bekisting dinding beton menggunakan 5/7 ,tinggi maksimum 2,5m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0300 2,751,200.00 82536.000.00
2 Paku 5cm dan 7cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Bahan 89136.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 139086.000.00
E Overhead + Profit 10% 13908.600.00
F Harga Satuan Pekerjaan per-m2(D+E) 152994.600.00

B.25.d.2 1 m2 Perancah /penyokong bekisting dinding beton menggunakan 5/7 ,tinggi maksimum 2,5m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0170 2,751,200.00 46770.400.00
2 Paku 5cm dan 7cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Bahan 53370.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 103320.400.00
E Overhead + Profit 10% 10332.040.00
F Harga Satuan Pekerjaan per-m2(D+E) 113652.440.00

B.25.d.3 1 m2 Perancah /penyokong bekisting dinding beton menggunakan 5/7 ,tinggi maksimum 2,5m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0100 2,751,200.00 27512.000.00
2 Paku 5cm dan 7cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Bahan 34112.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 84062.000.00
E Overhead + Profit 10% 8406.200.00
F Harga Satuan Pekerjaan per-m2(D+E) 92468.200.00

B.25.d.4 1 m2 Perancah /penyokong bekisting dinding beton menggunakan 5/7 ,tinggi maksimum 2,5m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3600 80,000.00 28800.000.00
2 Tukang Batu L.02 OH 0.1800 87,500.00 15750.000.00
3 Kepala Tukang L.03 OH 0.0180 100,000.00 1800.000.00
4 Mandor L.04 OH 0.0360 100,000.00 3600.000.00
Jumlah Harga Tenaga Kerja 49950.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.0060 2,751,200.00 16507.200.00
2 Paku 5cm dan 7cm M.71.b kg 0.2400 27,500.00 6600.000.00
Jumlah Harga Bahan 23107.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 73057.200.00
E Overhead + Profit 10% 7305.720.00
F Harga Satuan Pekerjaan per-m2(D+E) 80362.920.00

B.25.e.1 1 m2 Perancah / penyokong bekisting dinding beton menggunakan Balok 8/12 , tinggi maksimum 4,5 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Balok Kayu 8/12 cm * M.37.a m3 0.066 2,865,800.00 189142.800.00
2 Paku 7cm -12 cm M.71.c kg 0.24 27,500.00 6600.000.00
Jumlah Harga Bahan 195742.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 251242.800.00
E Overhead + Profit 10% 25124.280.00
F Harga Satuan Pekerjaan per-m2(D+E) 276367.080.00

B.25.e.2 1 m2 Perancah / penyokong bekisting dinding beton menggunakan Balok 8/12 , tinggi maksimum 4,5 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Balok Kayu 8/12 cm * M.37.a m3 0.036 2,865,800.00 103168.800.00
2 Paku 7cm -12 cm M.71.c kg 0.24 27,500.00 6600.000.00
Jumlah Harga Bahan 109768.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 165268.800.00
E Overhead + Profit 10% 16526.880.00
F Harga Satuan Pekerjaan per-m2(D+E) 181795.680.00

B.25.e.3 1 m2 Perancah / penyokong bekisting dinding beton menggunakan Balok 8/12 , tinggi maksimum 4,5 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Balok Kayu 8/12 cm * M.37.a m3 0.02 2,865,800.00 57316.000.00
2 Paku 7cm -12 cm M.71.c kg 0.24 27,500.00 6600.000.00
Jumlah Harga Bahan 63916.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 119416.000.00
E Overhead + Profit 10% 11941.600.00
F Harga Satuan Pekerjaan per-m2(D+E) 131357.600.00

B.25.e.4 1 m2 Perancah / penyokong bekisting dinding beton menggunakan Balok 8/12 , tinggi maksimum 4,5 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.4 80,000.00 32000.000.00
2 Tukang Batu L.02 OH 0.2 87,500.00 17500.000.00
3 Kepala Tukang L.03 OH 0.02 100,000.00 2000.000.00
4 Mandor L.04 OH 0.04 100,000.00 4000.000.00
Jumlah Harga Tenaga Kerja 55500.000.00
B Bahan
1 Balok Kayu 8/12 cm * M.37.a m3 0.013 2,865,800.00 37255.400.00
2 Paku 7cm -12 cm M.71.c kg 0.24 27,500.00 6600.000.00
Jumlah Harga Bahan 43855.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 99355.400.00
E Overhead + Profit 10% 9935.540.00
F Harga Satuan Pekerjaan per-m2(D+E) 109290.940.00

B.26 Bekisting fondasi dan sloof


B.26.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm atau 18 mm (TP)
B.26.a.1.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 18 mm M.39.a Lbr 0.353 275,000.00 97075.000.00
2 Kaso 5/7 cm M.37.a m3 0.029 2,751,200.00 79784.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 184615.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 212,365.20
E Overhead + Profit 10% 21,236.52
F Harga Satuan Pekerjaan per-m2(D+E) 233601.720.00

B.26.a.1.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 18 mm M.39.a Lbr 0.203 275,000.00 55825.000.00
2 Kaso 5/7 cm M.37.a m3 0.016 2,751,200.00 44019.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 107599.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 135,349.60
E Overhead + Profit 10% 13,534.96
F Harga Satuan Pekerjaan per-m2(D+E) 148884.560.00

B.26.a.1.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 18 mm M.39.a Lbr 0.128 275,000.00 35200.000.00
2 Kaso 5/7 cm M.37.a m3 0.009 2,751,200.00 24760.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 67716.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 95,466.20
E Overhead + Profit 10% 9,546.62
F Harga Satuan Pekerjaan per-m2(D+E) 105012.820.00

B.26.a.1.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 18 mm M.39.a Lbr 0.091 275,000.00 25025.000.00
2 Kaso 5/7 cm M.37.a m3 0.006 2,751,200.00 16507.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 49287.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 77,037.60
E Overhead + Profit 10% 7,703.76
F Harga Satuan Pekerjaan per-m2(D+E) 84741.360.00

B.26.a.2.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 12 mm M.39.a Lbr 0.353 203,000.00 71659.000.00
2 Kaso 5/7 cm M.37.a m3 0.029 2,751,200.00 79784.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 159199.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 186,949.20
E Overhead + Profit 10% 18,694.92
F Harga Satuan Pekerjaan per-m2(D+E) 205644.120.00

B.26.a.2.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 12 mm M.39.a Lbr 0.203 203,000.00 41209.000.00
2 Kaso 5/7 cm M.37.a m3 0.016 2,751,200.00 44019.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 92983.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 120,733.60
E Overhead + Profit 10% 12,073.36
F Harga Satuan Pekerjaan per-m2(D+E) 132806.960.00

B.26.a.2.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 12 mm M.39.a Lbr 0.128 203,000.00 25984.000.00
2 Kaso 5/7 cm M.37.a m3 0.009 2,751,200.00 24760.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 58500.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86,250.20
E Overhead + Profit 10% 8,625.02
F Harga Satuan Pekerjaan per-m2(D+E) 94875.220.00

B.26.a.2.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 12 mm M.39.a Lbr 0.091 203,000.00 18473.000.00
2 Kaso 5/7 cm M.37.a m3 0.006 2,751,200.00 16507.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 42735.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 70,485.60
E Overhead + Profit 10% 7,048.56
F Harga Satuan Pekerjaan per-m2(D+E) 77534.160.00

B.26.a.3.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 9 mm M.39.a Lbr 0.353 115,000.00 40595.000.00
2 Kaso 5/7 cm M.37.a m3 0.029 2,751,200.00 79784.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 128135.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 155,885.20
E Overhead + Profit 10% 15,588.52
F Harga Satuan Pekerjaan per-m2(D+E) 171473.720.00

B.26.a.3.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 9 mm M.39.a Lbr 0.203 115,000.00 23345.000.00
2 Kaso 5/7 cm M.37.a m3 0.016 2,751,200.00 44019.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 75119.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 102,869.60
E Overhead + Profit 10% 10,286.96
F Harga Satuan Pekerjaan per-m2(D+E) 113156.560.00
B.26.a.3.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 9 mm M.39.a Lbr 0.128 115,000.00 14720.000.00
2 Kaso 5/7 cm M.37.a m3 0.009 2,751,200.00 24760.800.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 47236.200.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 74,986.20
E Overhead + Profit 10% 7,498.62
F Harga Satuan Pekerjaan per-m2(D+E) 82484.820.00

B.26.a.3.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Batu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Multiflex 9 mm M.39.a Lbr 0.091 115,000.00 10465.000.00
2 Kaso 5/7 cm M.37.a m3 0.006 2,751,200.00 16507.200.00
3 Paku 5cm 7cm M.71.b kg 0.25 27,500.00 6875.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 34727.600.00
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 62,477.60
E Overhead + Profit 10% 6,247.76
F Harga Satuan Pekerjaan per-m2(D+E) 68725.360.00

B.26.b 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm
B.26.b.1 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24000.000.00
2 Tukang Kayu L.02 OH 0.15 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1500.000.00
4 Mandor L.04 OH 0.03 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu Kelas II M.39.a m3 0.036 2,292,700.00 82537.200.00
2 Kaso 5/7 cm M.37.a m3 0.029 2,751,200.00 79784.800.00
3 Paku 5cm 7cm M.71.b kg 0.3 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 171452.400.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 213,077.40
E Overhead + Profit 10% 21,307.74
F Harga Satuan Pekerjaan per-m2(D+E) 234385.140.00
B.26.b.2 1m Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 2 kali pakai
2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24000.000.00
2 Tukang Kayu L.02 OH 0.15 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1500.000.00
4 Mandor L.04 OH 0.03 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu Kelas II M.39.a m3 0.022 2,292,700.00 50439.400.00
2 Kaso 5/7 cm M.37.a m3 0.016 2,751,200.00 44019.200.00
3 Paku 5cm 7cm M.71.b kg 0.3 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 103589.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 145,214.00
E Overhead + Profit 10% 14,521.40
F Harga Satuan Pekerjaan per-m2(D+E) 159735.400.00

B.26.b.3 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24000.000.00
2 Tukang Kayu L.02 OH 0.15 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1500.000.00
4 Mandor L.04 OH 0.03 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu Kelas II M.39.a m3 0.014 2,292,700.00 32097.800.00
2 Kaso 5/7 cm M.37.a m3 0.009 2,751,200.00 24760.800.00
3 Paku 5cm 7cm M.71.b kg 0.3 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 65989.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 107,614.00
E Overhead + Profit 10% 10,761.40
F Harga Satuan Pekerjaan per-m2(D+E) 118375.400.00

B.26.b.4 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.3 80,000.00 24000.000.00
2 Tukang Kayu L.02 OH 0.15 87,500.00 13125.000.00
3 Kepala Tukang L.03 OH 0.015 100,000.00 1500.000.00
4 Mandor L.04 OH 0.03 100,000.00 3000.000.00
Jumlah Harga Tenaga Kerja 41625.000.00
B Bahan
1 Papan 3/20 cm kayu Kelas II M.39.a m3 0.011 2,292,700.00 25219.700.00
2 Kaso 5/7 cm M.37.a m3 0.006 2,751,200.00 16507.200.00
3 Paku 5cm 7cm M.71.b kg 0.3 27,500.00 8250.000.00
4 Minyak bekisting M.129 L 0.2 4,402.00 880.400.00
Jumlah Harga Bahan 50857.300.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 92,482.30
E Overhead + Profit 10% 9,248.23
F Harga Satuan Pekerjaan per-m2(D+E) 101730.530.00

B.26.c 1m2 Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m
B.26.c.1 1m2 Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 1 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Kayu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.035 2,751,200.00 96292.000.00
2 Paku 5cm dan 7cm M.71.b kg 0.25 27,500.00 6875.000.00
Jumlah Harga Bahan 103167.000.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 130,917.00
E Overhead + Profit 10% 13,091.70
F Harga Satuan Pekerjaan per-m2(D+E) 144008.700.00

B.26.c.2 1m2 Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 2 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Kayu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.019 2,751,200.00 52272.800.00
2 Paku 5cm dan 7cm M.71.b kg 0.25 27,500.00 6875.000.00
Jumlah Harga Bahan 59147.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 86,897.80
E Overhead + Profit 10% 8,689.78
F Harga Satuan Pekerjaan per-m2(D+E) 95587.580.00

B.26.c.3 1m2 Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 3 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Kayu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.014 2,751,200.00 38516.800.00
2 Paku 5cm dan 7cm M.71.b kg 0.25 27,500.00 6875.000.00
Jumlah Harga Bahan 45391.800.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 73,141.80
E Overhead + Profit 10% 7,314.18
F Harga Satuan Pekerjaan per-m2(D+E) 80455.980.00

B.26.c.4 1m2 Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 4 kali pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.2 80,000.00 16000.000.00
2 Tukang Kayu L.02 OH 0.1 87,500.00 8750.000.00
3 Kepala Tukang L.03 OH 0.01 100,000.00 1000.000.00
4 Mandor L.04 OH 0.02 100,000.00 2000.000.00
Jumlah Harga Tenaga Kerja 27750.000.00
B Bahan
1 Kaso 5/7 cm * M.37.a m3 0.011 2,751,200.00 30263.200.00
2 Paku 5cm dan 7cm M.71.b kg 0.25 27,500.00 6875.000.00
Jumlah Harga Bahan 37138.200.00
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 64,888.20
E Overhead + Profit 10% 6,488.82
F Harga Satuan Pekerjaan per-m2(D+E) 71377.020.00

B.27 Bongkar Bekisting


B.27.a Bongkar 1m2 bekisting secara biasa ( membersihkan dan membereskan puing-puing )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.04 80,000.00 3200.000.00
2 Mandor L.04 OH 0.004 100,000.00 400.000.00
Jumlah Harga Tenaga Kerja 3600.000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 3,600.00
E Overhead + Profit 10% 360.00
F Harga Satuan Pekerjaan per-m2(D+E) 3960.000.00

B.27.b Bongkar 1 m2 bekisting secara hati-hati (dan membereskan puing) *)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 0.06 80,000.00 4800.000.00
2 Mandor L.04 OH 0.006 100,000.00 600.000.00
Jumlah Harga Tenaga Kerja 5400.000.00
B Bahan
Jumlah Harga Bahan
C Peralatan
Jumlah Harga Peralatan
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 5,400.00
E Overhead + Profit 10% 540.00
F Harga Satuan Pekerjaan per-m2(D+E) 5940.000.00
B.29.a Bongkar 1 m3 beton secara konvensional
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 3.6 80,000.00 288000.000.00
2 Mandor L.04 OH 0.36 100,000.00 36000.000.00
Jumlah Harga Tenaga Kerja 324000.000.00
B Bahan
1 Cuka Bibit M.118 Liter 1.2 93,543.00 112251.600.00
Jumlah Harga Bahan 112251.600.00
C Peralatan
1 Palu / godam To.16 Buah 0.02 47,300.00 946.000.00
2 Gergaji besi To.04 Buah 0.1 16,500.00 1650.000.00
3 Pahat beton (baja keras) To.15 Buah 0.03 27,500.00 825.000.00
5 Linggis (baja keras) To.15 buah 0.05 88,000.00 4400.000.00
Jumlah Harga Peralatan 7821.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 444,072.60
E Overhead + Profit 10% 44,407.26
F Harga Satuan Pekerjaan per-m2(D+E) 488479.860.00

B.29.b Bongkar 1m3 beton dengan jack hammer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
1 Pekerja L.01 OH 1.2 80,000.00 96000.000.00
2 Mandor L.02 OH 0.12 100,000.00 12000.000.00
Jumlah Harga Tenaga Kerja 108000.000.00
B Bahan
1 BBM non subsidi M.136b Liter 2.5 12,106.00 30265.000.00
Jumlah Harga Bahan 30265.000.00
C Peralatan
1 Jack hammer E.14.a sewa-hari 0.25 240,000.00 60000.000.00
Jumlah Harga Peralatan 60000.000.00
D Jumlah Harga Tenaga Kerja Bahan dan Peralatan (A+B+C) 198,265.00
E Overhead + Profit 10% 19,826.50
F Harga Satuan Pekerjaan per-m2(D+E) 218091.500.00

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1320 80,000.00 10,560.00
Tukang batu L.02 OH 0.0220 87,500.00 1,925.00
Kepala tukang L.03 OH 0.0020 100,000.00 200.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 13,385.00
B BAHAN
Semen PC Kg 26.0800 1,200.00 31,296.00
Pasir beton Kg 60.8000 275.00 16,720.00
Kerikil (maks 30mm) Kg 82.3200 264.44 21,769.07
Air Liter 17.2000 110.00 1,892.00
JUMLAH HARGA BAHAN 71,677.07
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 85,062.07
E Overhead & Profit 10% 8,506.21
F Harga Satuan Pekerjaan (D+E) 93,568.28

A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1650 80,000.00 13,200.00
Tukang batu L.02 OH 0.0280 87,500.00 2,450.00
Kepala tukang L.03 OH 0.0030 100,000.00 300.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 16,750.00
B BAHAN
Semen PC Kg 32.6000 1,200.00 39,120.00
Pasir beton Kg 76.0000 275.00 20,900.00
Kerikil (maks 30mm) Kg 102.9000 264.44 27,211.33
Air Liter 21.5000 110.00 2,365.00
JUMLAH HARGA BAHAN 89,596.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,346.33
E Overhead & Profit 10% 10,634.63
F Harga Satuan Pekerjaan (D+E) 116,980.96

A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1980 80,000.00 15,840.00
Tukang batu L.02 OH 0.0330 87,500.00 2,887.50
Kepala tukang L.03 OH 0.0030 100,000.00 300.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 20,027.50
B BAHAN
Semen PC Kg 32.1200 1,200.00 38,544.00
Pasir beton Kg 91.2000 275.00 25,080.00
Kerikil (maks 30mm) Kg 123.4800 264.44 32,653.60
Air Liter 25.8000 110.00 2,838.00
JUMLAH HARGA BAHAN 99,115.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 119,143.10
E Overhead & Profit 10% 11,914.31
F Harga Satuan Pekerjaan (D+E) 131,057.41

A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2480 80,000.00 19,840.00
Tukang batu L.02 OH 0.0410 87,500.00 3,587.50
Kepala tukang L.03 OH 0.0040 100,000.00 400.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 25,127.50
B BAHAN
Semen PC Kg 48.9000 1,200.00 58,680.00
Pasir beton Kg 114.0000 275.00 31,350.00
Kerikil (maks 30mm) Kg 154.3500 264.44 40,817.00
Air Liter 32.2500 110.00 3,547.50
JUMLAH HARGA BAHAN 134,394.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 159,522.00
E Overhead & Profit 10% 15,952.20
F Harga Satuan Pekerjaan (D+E) 175,474.20

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1. Pembuatan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Las Konstruksi L.03 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
Besi Profil Kg 1.1500 19,800.00 22,770.00
JUMLAH HARGA BAHAN 22,770.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,720.00
E Overhead & Profit 10% 3,372.00
F Harga Satuan Pekerjaan (D+E) 37,092.00

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Las Konstruksi L.03 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
Besi Baja IWF Kg 1.1500 19,800.00 22,770.00
JUMLAH HARGA BAHAN 22,770.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,720.00
E Overhead & Profit 10% 3,372.00
F Harga Satuan Pekerjaan (D+E) 37,092.00

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi Konstruksi L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0010 100,000.00 100.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,350.00
B BAHAN
Solar Liter 1.0000 12,106.00 12,106.00
Minyak pelumas Liter 0.1000 49,523.00 4,952.30
JUMLAH HARGA BAHAN 17,058.30
C PERALATAN
Sewa alat Jam 0.8000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 34,408.30
E Overhead & Profit 10% 3,440.83
F Harga Satuan Pekerjaan (D+E) 37,849.13

A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 80,000.00 84,000.00
Tukang Las Biasa L.03 OH 1.0500 87,500.00 91,875.00
Kepala tukang L.03 OH 0.1050 100,000.00 10,500.00
Mandor L.04 OH 0.0520 100,000.00 5,200.00
JUMLAH TENAGA KERJA 191,575.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 19,800.00 297,000.00
Besi plat baja Kg 32.8000 19,800.00 649,440.00
Kawat las Kg 0.0500 33,000.00 1,650.00
JUMLAH HARGA BAHAN 948,090.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,139,665.00
E Overhead & Profit 10% 113,966.50
F Harga Satuan Pekerjaan (D+E) 1,253,631.50

A.4.2.1.5.1 Pengerjaan 10 cm pengelasan dengan las listrik


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0400 80,000.00 3,200.00
Tukang Besi Konstruksi L.03 OH 0.0200 87,500.00 1,750.00
Kepala tukang L.03 OH 0.0020 100,000.00 200.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 5,350.00
B BAHAN
Kawat las listrik Kg 0.4000 33,000.00 13,200.00
Solar Liter 0.3000 12,106.00 3,631.80
Minyak pelumas Liter 0.0400 49,523.00 1,980.92
JUMLAH HARGA BAHAN 18,812.72
C PERALATAN
Sewa alat Jam 0.1700 40,000.00 6,800.00
JUMLAH HARGA ALAT 6,800.00
D Jumlah (A+B+C) 30,962.72
E Overhead & Profit 10% 3,096.27
F Harga Satuan Pekerjaan (D+E) 34,058.99

A.4.2.1.5.2 Pengerjaan 1 cm pengelasan dengan las listrik


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0040 80,000.00 320.00
Tukang Besi Konstruksi L.03 OH 0.0020 87,500.00 175.00
Kepala tukang L.03 OH 0.0002 100,000.00 20.00
Mandor L.04 OH 0.0002 100,000.00 20.00
JUMLAH TENAGA KERJA 535.00
B BAHAN
Kawat las listrik Kg 0.0400 49,523.00 1,980.92
Solar Liter 0.0300 19,800.00 594.00
Minyak pelumas Liter 0.0040 33,000.00 132.00
JUMLAH HARGA BAHAN 2,706.92
C PERALATAN
Sewa alat Jam 0.0170 40,000.00 680.00
JUMLAH HARGA ALAT 680.00
D Jumlah (A+B+C) 3,921.92
E Overhead & Profit 10% 392.19
F Harga Satuan Pekerjaan (D+E) 4,314.11

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang Las Biasa L.03 OH 1.2000 87,500.00 105,000.00
Kepala tukang L.03 OH 0.1200 100,000.00 12,000.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 213,600.00
B BAHAN
Pintu gulung besi m2 1.0000 660,300.00 660,300.00
JUMLAH HARGA BAHAN 660,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 873,900.00
E Overhead & Profit 10% 87,390.00
F Harga Satuan Pekerjaan (D+E) 961,290.00

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan besi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4400 80,000.00 35,200.00
Tukang L.03 OH 0.4400 87,500.00 38,500.00
Kepala tukang L.03 OH 0.0440 100,000.00 4,400.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 80,300.00
B BAHAN
Pintu lipat m2 1.0000 797,800.00 797,800.00
JUMLAH HARGA BAHAN 797,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 878,100.00
E Overhead & Profit 10% 87,810.00
F Harga Satuan Pekerjaan (D+E) 965,910.00

A.4.2.1.9. Pemasangan 1 m2 rolling door alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Khusus Alumunium L.03 OH 1.0000 87,500.00 87,500.00
Kepala tukang L.03 OH 0.1000 100,000.00 10,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 182,500.00
B BAHAN
Rolling dor alluminium m2 1.0000 792,300.00 792,300.00
JUMLAH HARGA BAHAN 792,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 974,800.00
E Overhead & Profit 10% 97,480.00
F Harga Satuan Pekerjaan (D+E) 1,072,280.00

A.4.2.1.8. Pemasangan 1 m2 Pintu Lipat (Folding door) Bahan Plastik/ PVC


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4400 80,000.00 35,200.00
Tukang Khusus Alumunium L.03 OH 0.4400 87,500.00 38,500.00
Kepala tukang L.03 OH 0.0440 100,000.00 4,400.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 80,300.00
B BAHAN
Pintu Lipat m2 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,300.00
E Overhead & Profit 10% 8,030.00
F Harga Satuan Pekerjaan (D+E) 88,330.00

A.4.2.1.24. Pemasangan 1 m kusen pintu alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 80,000.00 3,440.00
Tukang Khusus Alumunium L.03 OH 0.0430 87,500.00 3,762.50
Kepala tukang L.03 OH 0.0043 100,000.00 430.00
Mandor L.04 OH 0.0021 100,000.00 210.00
JUMLAH TENAGA KERJA 7,842.50
B BAHAN
Profil alluminium 4 inch m 1.1000 137,500.00 151,250.00
Skrup fixer buah 2.0000 17,600.00 35,200.00
Sealant Tube 0.0600 38,500.00 2,310.00
JUMLAH HARGA BAHAN 188,760.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 196,602.50
E Overhead & Profit 10% 19,660.25
F Harga Satuan Pekerjaan (D+E) 216,262.75

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 80,000.00 6,800.00
Tukang Khusus Allumunium L.03 OH 0.0850 87,500.00 7,437.50
Kepala tukang L.03 OH 0.0085 100,000.00 850.00
Mandor L.04 OH 0.0042 100,000.00 420.00
JUMLAH TENAGA KERJA 15,507.50
B BAHAN
Profil alluminium m 4.4000 132,000.00 580,800.00
Alluminium strip m 14.6000 132,000.00 1,927,200.00
JUMLAH HARGA BAHAN 2,508,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,523,507.50
E Overhead & Profit 10% 252,350.75
F Harga Satuan Pekerjaan (D+E) 2,775,858.25

A.4.2.1.26. Pemasangan 1 m2 pintu kaca rangka alluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 80,000.00 6,800.00
Tukang Allumunium/Kaca L.03 OH 0.0850 87,500.00 7,437.50
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,637.50
B BAHAN
Pintu alluminium m 4.4000 132,000.00 580,800.00
Profil kaca m 4.5000 11,500.00 51,750.00
Sealant Tube 0.2700 38,500.00 10,395.00
JUMLAH HARGA BAHAN 642,945.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 658,582.50
E Overhead & Profit 10% 65,858.25
F Harga Satuan Pekerjaan (D+E) 724,440.75

A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (2 x 3) mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.6700 80,000.00 133,600.00
Tukang Las L.03 OH 1.6700 87,500.00 146,125.00
Kepala tukang L.03 OH 0.1670 100,000.00 16,700.00
Mandor L.04 OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 304,725.00
B BAHAN
Besi strip kg 6.1770 19,800.00 122,304.60
Pengelasan cm 27.0800 3,921.92 106,205.59
JUMLAH HARGA BAHAN 228,510.19
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 533,235.19
E Overhead & Profit 10% 53,323.52
F Harga Satuan Pekerjaan (D+E) 586,558.71

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 35,600.00
B BAHAN
Seng plat bjls 30 m 1.0500 62,291.67 65,406.25
Paku 1 cm - 2,5 cm kg 0.0150 27,500.00 412.50
Papan kayu kelas II atau III m3 0.0190 2,292,700.00 43,561.30
JUMLAH HARGA BAHAN 109,380.05
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 144,980.05
E Overhead & Profit 10% 14,498.01
F Harga Satuan Pekerjaan (D+E) 159,478.06

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 42,050.00
B BAHAN
Seng plat m 1.0500 62,291.67 65,406.25
Paku 1 cm – 2,5 cm kg 0.0100 27,500.00 275.00
Besi strip kg 0.5000 19,800.00 9,900.00
JUMLAH HARGA BAHAN 75,581.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,631.25
E Overhead & Profit 10% 11,763.13
F Harga Satuan Pekerjaan (D+E) 129,394.38

A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Besi L.02 OH 0.2500 87,500.00 21,875.00
Kepala Tukang L.03 OH 0.0250 100,000.00 2,500.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 45,675.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 9,900.00 34,650.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 9,900.00 9,900.00
JUMLAH HARGA BAHAN 44,550.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,225.00
E Overhead & Profit 10% 9,022.50
F Harga Satuan Pekerjaan (D+E) 99,247.50

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Besi L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 63,925.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 9,900.00 39,600.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 9,900.00 9,900.00
JUMLAH HARGA BAHAN 49,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 113,425.00
E Overhead & Profit 10% 11,342.50
F Harga Satuan Pekerjaan (D+E) 124,767.50

A.4.2.1.22. Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin ) Profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 80,000.00 58,720.00
Tukang Besi L.02 OH 0.7340 87,500.00 64,225.00
Kepala Tukang L.03 OH 0.0730 100,000.00 7,300.00
Mandor L.04 OH 0.0370 100,000.00 3,700.00
JUMLAH TENAGA KERJA 133,945.00
B BAHAN
Baja Ringan Canai Dingin Batang 0.8730 130,000.00 113,490.00
JUMLAH HARGA BAHAN 113,490.00
C PERALATAN
Assesoris % Bahan 0.1000 130,000.00 13,000.00
JUMLAH HARGA ALAT 13,000.00
D Jumlah (A+B+C) 260,435.00
E Overhead & Profit 10% 26,043.50
F Harga Satuan Pekerjaan (D+E) 286,478.50

A.4.2.1.22.a Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin ) Profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A Harga pemasangan aplikator m2 1.0000 210,000.00 210,000.00
PPh % 2.0000 210,000.00 4,200.00
Astek % 6.2400 210,000.00 13,104.00
D Jumlah (A+B+C) 227,304.00
E Overhead & Profit 10% 22,730.40
F Harga Satuan Pekerjaan (D+E) 250,034.40

A.4.2.1.23. Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai Dingin ) Profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7604 80,000.00 60,832.00
Tukang Besi L.02 OH 0.7604 87,500.00 66,535.00
Kepala Tukang L.03 OH 0.0760 100,000.00 7,600.00
Mandor L.04 OH 0.3800 100,000.00 38,000.00
JUMLAH TENAGA KERJA 172,967.00
B BAHAN
Baja Ringan Canai Dingin Batang 0.8730 130,000.00 113,490.00
JUMLAH HARGA BAHAN 113,490.00
C PERALATAN
Assesoris % Bahan 0.1000 130,000.00 13,000.00
JUMLAH HARGA ALAT 13,000.00
D Jumlah (A+B+C) 299,457.00
E Overhead & Profit 10% 29,945.70
F Harga Satuan Pekerjaan (D+E) 329,402.70

A.4.2.1.22. Pemasangan 1 m’ Grill penutup saluran


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8230 80,000.00 65,840.00
Tukang Besi L.02 0.0550 87,500.00 4,812.50
Kepala tukang L.03 0.0140 100,000.00 1,400.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 72,352.50
B BAHAN
Siku 5 x 5 kg 8.3160 19,800.00 164,656.80
Plat strip 3 cm kg 7.7000 19,800.00 152,460.00
Besi 10 mm kg 1.3565 13,000.00 17,633.90
JUMLAH HARGA BAHAN 334,750.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 407,103.20
E Overhead & Profit 10% 40,710.32
F Harga Satuan Pekerjaan (D+E) 447,813.52

A.4.2.1.23. a, Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 7-10 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Kuda-kuda Baja Ringan Setara Gigasteel ( 7-10 m) m2 1.0000 251,800.00 251,800.00
JUMLAH HARGA BAHAN 251,800.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 265,175.00
E Overhead & Profit 10% 26,517.50
F Harga Satuan Pekerjaan (D+E) 291,692.50

A.4.2.1.23. b, Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 10-12,5 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Kuda-kuda Baja Ringan Setara Gigasteel ( 10-12,5 m) m2 1.0000 259,600.00 259,600.00
JUMLAH HARGA BAHAN 259,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,975.00
E Overhead & Profit 10% 27,297.50
F Harga Satuan Pekerjaan (D+E) 300,272.50

A.4.2.1.23. c, Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 12,5-15 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Kuda-kuda Baja Ringan Setara Gigasteel ( 12,5-15 m) m2 1.0000 297,600.00 297,600.00
JUMLAH HARGA BAHAN 297,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 310,975.00
E Overhead & Profit 10% 31,097.50
F Harga Satuan Pekerjaan (D+E) 342,072.50

A.4.2.1.23. d, Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 15-18 m)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Kuda-kuda Baja Ringan Setara Gigasteel ( 15-18 m) m2 1.0000 305,600.00 305,600.00
JUMLAH HARGA BAHAN 305,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 318,975.00
E Overhead & Profit 10% 31,897.50
F Harga Satuan Pekerjaan (D+E) 350,872.50

A.4.2.1.24. a, Pemasangan 1 m2 rangka Baja Ringan C7575 BSI AKP / R101 BSI AKP <8,9 M
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Baja Ringan C7575 BSI AKP / R101 BSI AKP <8,9 M m2 1.0000 184,300.00 184,300.00
JUMLAH HARGA BAHAN 184,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,675.00
E Overhead & Profit 10% 19,767.50
F Harga Satuan Pekerjaan (D+E) 217,442.50

A.4.2.1.24. b, Pemasangan 1 m2 rangka Baja Ringan C7575 BSI AKP / R101 BSI AKP 9M > B > 12 M
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Baja Ringan C7575 BSI AKP / R101 BSI AKP 9M > B > 12 M m2 1.0000 198,600.00 198,600.00
JUMLAH HARGA BAHAN 198,600.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 211,975.00
E Overhead & Profit 10% 21,197.50
F Harga Satuan Pekerjaan (D+E) 233,172.50

A.4.2.1.24. c, Pemasangan 1 m2 rangka Baja Ringan C75100 BSI AKP / R101 BSI AKP 9M > B > 12 M
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Besi L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Baja Ringan C75100 BSI AKP / R101 BSI AKP 9M > B > 12 M m2 1.0000 206,300.00 206,300.00
JUMLAH HARGA BAHAN 206,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 219,675.00
E Overhead & Profit 10% 21,967.50
F Harga Satuan Pekerjaan (D+E) 241,642.50

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu dengan Mortar Tipe M,Fc' 17,2 Mpa ( Setara campuran 1SP : 2PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 43.5000 1,200.00 52,200.00
Pasir Pasang m3 0.0800 385,000.00 30,800.00
JUMLAH HARGA BAHAN 265,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 335,500.00
E Overhead & Profit 10% 33,550.00
F Harga Satuan Pekerjaan (D+E) 369,050.00

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu dengan Mortar Tipe S,Fc' 12,5 Mpa ( Setara campuran 1SP : 3PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 32.9500 1,200.00 39,540.00
Pasir Pasang m3 0.0910 385,000.00 35,035.00
JUMLAH HARGA BAHAN 256,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 327,075.00
E Overhead & Profit 10% 32,707.50
F Harga Satuan Pekerjaan (D+E) 359,782.50

A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu dengan Mortar Tipe N,Fc' 5,2 Mpa ( Setara campuran 1SP : 4PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 26.5500 1,200.00 31,860.00
Pasir Pasang m3 0.0930 385,000.00 35,805.00
JUMLAH HARGA BAHAN 249,665.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 320,165.00
E Overhead & Profit 10% 32,016.50
F Harga Satuan Pekerjaan (D+E) 352,181.50

A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu dengan Mortar Tipe O,Fc' 2,4 Mpa ( Setara campuran 1SP : 5PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 22.2000 1,200.00 26,640.00
Pasir Pasang m3 0.1020 385,000.00 39,270.00
JUMLAH HARGA BAHAN 247,910.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 318,410.00
E Overhead & Profit 10% 31,841.00
F Harga Satuan Pekerjaan (D+E) 350,251.00

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 18.5000 1,200.00 22,200.00
Pasir Pasang m3 0.1220 385,000.00 46,970.00
JUMLAH HARGA BAHAN 251,170.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 321,670.00
E Overhead & Profit 10% 32,167.00
F Harga Satuan Pekerjaan (D+E) 353,837.00

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
Bata merah Bh 140.0000 1,300.00 182,000.00
Semen Portland Kg 10.0800 1,200.00 12,096.00
Kapur Padam m3 0.0275 88,000.00 2,420.00
Pasir Pasang m3 0.0925 385,000.00 35,612.50
JUMLAH HARGA BAHAN 232,128.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 302,628.50
E Overhead & Profit 10% 30,262.85
F Harga Satuan Pekerjaan (D+E) 332,891.35

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan Mortar Tipe S,Fc' 17,7 Mpa ( Setara campuran 1SP : 2PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portland Kg 18.9500 1,200.00 22,740.00
Pasir Pasang m3 0.0380 385,000.00 14,630.00
JUMLAH HARGA BAHAN 128,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 163,620.00
E Overhead & Profit 10% 16,362.00
F Harga Satuan Pekerjaan (D+E) 179,982.00

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan Mortar Tipe S,Fc' 12,5 Mpa ( Setara campuran 1SP : 3PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portlan Kg 14.3700 1,200.00 17,244.00
Pasir Pasang m3 0.0400 385,000.00 15,400.00
JUMLAH HARGA BAHAN 123,644.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,894.00
E Overhead & Profit 10% 15,889.40
F Harga Satuan Pekerjaan (D+E) 174,783.40

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu dengan Mortar Tipe N,Fc' 5,2 Mpa ( Setara campuran 1SP : 4PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portlan Kg 11.5000 1,200.00 13,800.00
Pasir Pasang m3 0.0430 385,000.00 16,555.00
JUMLAH HARGA BAHAN 121,355.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 156,605.00
E Overhead & Profit 10% 15,660.50
F Harga Satuan Pekerjaan (D+E) 172,265.50

A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu dengan Mortar Tipe O,Fc' 2,4 Mpa ( Setara campuran 1SP : 5PP )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portlan Kg 9.6800 1,200.00 11,616.00
Pasir Pasang m3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 119,941.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,191.00
E Overhead & Profit 10% 15,519.10
F Harga Satuan Pekerjaan (D+E) 170,710.10

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portland Kg 8.3200 1,200.00 9,984.00
Pasir Pasang m3 0.0490 385,000.00 18,865.00
JUMLAH HARGA BAHAN 119,849.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,099.00
E Overhead & Profit 10% 15,509.90
F Harga Satuan Pekerjaan (D+E) 170,608.90

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP:8PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portland Kg 6.5000 1,200.00 7,800.00
Pasir Pasang m3 0.0500 385,000.00 19,250.00
JUMLAH HARGA BAHAN 118,050.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 153,300.00
E Overhead & Profit 10% 15,330.00
F Harga Satuan Pekerjaan (D+E) 168,630.00

A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata merah Bh 70.0000 1,300.00 91,000.00
Semen Portland Kg 4.5000 1,200.00 5,400.00
Kapur Padam m3 0.0150 88,000.00 1,320.00
Pasir Pasang m3 0.0500 385,000.00 19,250.00
JUMLAH HARGA BAHAN 116,970.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 152,220.00
E Overhead & Profit 10% 15,222.00
F Harga Satuan Pekerjaan (D+E) 167,442.00

A. 4.4.1.16 Pemasangan 1m2 dinding Conblok HB-20 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 44,425.00
B BAHAN
HB-20 Bh 12.5000 -
Semen Portland Kg 30.3200 1,200.00 36,384.00
Pasir Pasang m3 0.7280 385,000.00 280,280.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 316,664.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 361,089.00
E Overhead & Profit 10% 36,108.90
F Harga Satuan Pekerjaan (D+E) 397,197.90

A. 4.4.1.17 Pemasangan 1m2 dinding Conblok HB-20 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 44,425.00
B BAHAN
HB-20 Bh 12.5000 -
Semen Portland Kg 24.2600 1,200.00 29,112.00
Pasir Pasang m3 0.7720 385,000.00 297,220.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 326,332.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 370,757.00
E Overhead & Profit 10% 37,075.70
F Harga Satuan Pekerjaan (D+E) 407,832.70

A. 4.4.1.18 Pemasangan 1m2 dinding Conblok HB-15 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 80,000.00 25,600.00
Tukang Batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 38,900.00
B BAHAN
HB-15 Bh 12.5000 -
Semen Portland Kg 22.7400 1,200.00 27,288.00
Pasir Pasang m3 0.5500 385,000.00 211,750.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 239,038.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 277,938.00
E Overhead & Profit 10% 27,793.80
F Harga Satuan Pekerjaan (D+E) 305,731.80

A. 4.4.1.19 Pemasangan 1m2 dinding Conblok HB-15 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3200 80,000.00 25,600.00
Tukang Batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 38,900.00
B BAHAN
HB-15 Bh 12.5000 -
Semen Portland Kg 18.2000 1,200.00 21,840.00
Pasir Pasang m3 0.5820 385,000.00 224,070.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 245,910.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 284,810.00
E Overhead & Profit 10% 28,481.00
F Harga Satuan Pekerjaan (D+E) 313,291.00

A. 4.4.1.20 Pemasangan 1m2 dinding Conblok HB-10 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
HB-10 Bh 12.5000 -
Semen Portland Kg 15.1600 1,200.00 18,192.00
Pasir Pasang m3 0.3640 385,000.00 140,140.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 158,332.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 193,582.00
E Overhead & Profit 10% 19,358.20
F Harga Satuan Pekerjaan (D+E) 212,940.20

A. 4.4.1.21 Pemasangan 1m2 dinding Conblok HB-10 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
HB-10 Bh 12.5000 -
Semen Portland Kg 12.1300 1,200.00 14,556.00
Pasir Pasang m3 0.3880 385,000.00 149,380.00
Besi Angker Diameter 8 Kg 0.2800 -
JUMLAH HARGA BAHAN 163,936.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 199,186.00
E Overhead & Profit 10% 19,918.60
F Harga Satuan Pekerjaan (D+E) 219,104.60

A. 4.4.1.22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 30.0000 3,800.00 114,000.00
Semen Portland Kg 11.0000 1,300.00 14,300.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 141,775.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,025.00
E Overhead & Profit 10% 17,702.50
F Harga Satuan Pekerjaan (D+E) 194,727.50

A. 4.4.1.23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 30.0000 3,800.00 114,000.00
Semen Portland Kg 11.0000 1,300.00 14,300.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 141,775.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,025.00
E Overhead & Profit 10% 17,702.50
F Harga Satuan Pekerjaan (D+E) 194,727.50

A. 4.4.1.24. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
Bata rooster bh 70.0000 3,800.00 266,000.00
Semen Portland Kg 14.0000 1,300.00 18,200.00
Pasir Pasang m3 0.0320 385,000.00 12,320.00
JUMLAH HARGA BAHAN 296,520.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 336,645.00
E Overhead & Profit 10% 33,664.50
F Harga Satuan Pekerjaan (D+E) 370,309.50

A. 4.4.1.25. Pemasangan 1m2 Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala Tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 66,575.00
B BAHAN
Bata Ringan Tebal 7,5 cm bh 8.4000 -
Mortar Siap Pakai Kg 0.4730 -
(Semen Instan)
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan % (Bahan) 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,575.00
E Overhead & Profit 10% 6,657.50
F Harga Satuan Pekerjaan (D+E) 73,232.50

A. 4.4.1.26. Pemasangan 1m2 Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6710 80,000.00 53,680.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala Tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 66,655.00
B BAHAN
Bata Ringan Tebal 7,5 cm bh 8.4000 -
Mortar Siap Pakai Kg 0.0630 -
(Semen Instan)
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan % (Bahan) 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 66,655.00
E Overhead & Profit 10% 6,665.50
F Harga Satuan Pekerjaan (D+E) 73,320.50

A. 4.4.1.22.1 Pemasangan 1 cm2 dinding terawang (rooster) 10x11x20 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 50.0000 3,800.00 190,000.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 216,675.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 251,925.00
E Overhead & Profit 10% 25,192.50
F Harga Satuan Pekerjaan (D+E) 277,117.50

A. 4.4.1.22.2 Pemasangan 1 cm2 dinding terawang (rooster) 15x11x30 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 22.0000 8,200.00 180,400.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 207,075.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 242,325.00
E Overhead & Profit 10% 24,232.50
F Harga Satuan Pekerjaan (D+E) 266,557.50

A. 4.4.1.22.3 Pemasangan 1 cm2 dinding terawang (rooster) 20x11x20 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 25.0000 8,250.00 206,250.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 232,925.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 268,175.00
E Overhead & Profit 10% 26,817.50
F Harga Satuan Pekerjaan (D+E) 294,992.50

A. 4.4.1.22.4 Pemasangan 1 cm2 dinding terawang (rooster) 25x11x25 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata rooster bh 16.0000 9,700.00 155,200.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 181,875.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 217,125.00
E Overhead & Profit 10% 21,712.50
F Harga Satuan Pekerjaan (D+E) 238,837.50

A. 4.4.1.23.1 Pemasangan 1 cm2 dinding terawang (rooster) 10x11x20 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata berongga bh 50.0000 3,800.00 190,000.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 216,675.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 251,925.00
E Overhead & Profit 10% 25,192.50
F Harga Satuan Pekerjaan (D+E) 277,117.50

A. 4.4.1.23.2 Pemasangan 1 cm2 dinding terawang (rooster) 15x11x30 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata berongga bh 22.0000 8,200.00 180,400.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 207,075.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 242,325.00
E Overhead & Profit 10% 24,232.50
F Harga Satuan Pekerjaan (D+E) 266,557.50

A. 4.4.1.23.3 Pemasangan 1 cm2 dinding terawang (rooster) 20x11x20 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata berongga bh 25.0000 8,250.00 206,250.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 232,925.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 268,175.00
E Overhead & Profit 10% 26,817.50
F Harga Satuan Pekerjaan (D+E) 294,992.50

A. 4.4.1.23.4 Pemasangan 1 cm2 dinding terawang (rooster) 25x11x25 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Bata berongga bh 16.0000 9,700.00 155,200.00
Semen Portland Kg 11.0000 1,200.00 13,200.00
Pasir Pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 181,875.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 217,125.00
E Overhead & Profit 10% 21,712.50
F Harga Satuan Pekerjaan (D+E) 238,837.50

A. 4.4.1.24 Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
Bata rooster bh 70.0000 3,800.00 266,000.00
Semen Portland Kg 14.0000 1,200.00 16,800.00
Pasir Pasang m3 0.0320 385,000.00 12,320.00
JUMLAH HARGA BAHAN 295,120.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 335,245.00
E Overhead & Profit 10% 33,524.50
F Harga Satuan Pekerjaan (D+E) 368,769.50

A. 4.4.1.25 Pemasangan Bata Ringan Tb. 10cm dengan mortal semen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Batu L.02 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,250.00
B BAHAN
Bata Ringan bh 8.3333 1,035.60 8,630.00
Mortal zak 0.0800 93,543.00 7,483.44
JUMLAH HARGA BAHAN 16,113.44
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,363.44
E Overhead & Profit 10% 4,336.34
F Harga Satuan Pekerjaan (D+E) 47,699.78

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
No .Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 15.5040 1,200.00 18,604.80
Pasir pasang m3 0.0160 385,000.00 6,160.00
JUMLAH HARGA BAHAN 24,764.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 64,889.80
E Overhead & Profit 10% 6,488.98
F Harga Satuan Pekerjaan (D+E) 71,378.78

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 10.2240 1,200.00 12,268.80
Pasir pasang m3 0.0200 385,000.00 7,700.00
JUMLAH HARGA BAHAN 19,968.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,093.80
E Overhead & Profit 10% 6,009.38
F Harga Satuan Pekerjaan (D+E) 66,103.18

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 7.7760 1,200.00 9,331.20
Pasir pasang m3 0.0230 385,000.00 8,855.00
JUMLAH HARGA BAHAN 18,186.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 58,311.20
E Overhead & Profit 10% 5,831.12
F Harga Satuan Pekerjaan (D+E) 64,142.32

3.2.2.2.14.(c) Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 6.2400 1,200.00 7,488.00
Pasir pasang m3 0.0240 385,000.00 9,240.00
JUMLAH HARGA BAHAN 16,728.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,853.00
E Overhead & Profit 10% 5,685.30
F Harga Satuan Pekerjaan (D+E) 62,538.30

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 5.1840 1,200.00 6,220.80
Pasir pasang m3 0.0260 385,000.00 10,010.00
JUMLAH HARGA BAHAN 16,230.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,355.80
E Overhead & Profit 10% 5,635.58
F Harga Satuan Pekerjaan (D+E) 61,991.38

3.2.2.2.18.(c) Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 4.4160 1,200.00 5,299.20
Pasir pasang m3 0.0270 385,000.00 10,395.00
JUMLAH HARGA BAHAN 15,694.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,819.20
E Overhead & Profit 10% 5,581.92
F Harga Satuan Pekerjaan (D+E) 61,401.12

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 3.9360 1,200.00 4,723.20
Pasir pasang m3 0.0280 385,000.00 10,780.00
JUMLAH HARGA BAHAN 15,503.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,628.20
E Overhead & Profit 10% 5,562.82
F Harga Satuan Pekerjaan (D+E) 61,191.02

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
PC Kg 3.4560 1,200.00 4,147.20
Pasir pasang m3 0.0290 385,000.00 11,165.00
JUMLAH HARGA BAHAN 15,312.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,437.20
E Overhead & Profit 10% 5,543.72
F Harga Satuan Pekerjaan (D+E) 60,980.92

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 80,000.00 28,800.00
Tukang Batu L.03 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 42,300.00
B BAHAN
PC Kg 5.7600 1,200.00 6,912.00
Kapur padam m3 0.0030 88,000.00 264.00
Pasir pasang m3 0.0130 385,000.00 5,005.00
JUMLAH HARGA BAHAN 12,181.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,481.00
E Overhead & Profit 10% 5,448.10
F Harga Satuan Pekerjaan (D+E) 59,929.10

A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 80,000.00 28,800.00
Tukang Batu L.03 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 42,300.00
B BAHAN
PC Kg 3.0000 1,200.00 3,600.00
Kapur padam m3 0.0050 88,000.00 440.00
Pasir pasang m3 0.0200 385,000.00 7,700.00
JUMLAH HARGA BAHAN 11,740.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,040.00
E Overhead & Profit 10% 5,404.00
F Harga Satuan Pekerjaan (D+E) 59,444.00

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 80,000.00 28,800.00
Tukang Batu L.03 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 42,300.00
B BAHAN
SM m3 0.0090 -
Kapur padam m3 0.0090 88,000.00 792.00
Pasir pasang m3 0.0090 385,000.00 3,465.00
JUMLAH HARGA BAHAN 4,257.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,557.00
E Overhead & Profit 10% 4,655.70
F Harga Satuan Pekerjaan (D+E) 51,212.70

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 80,000.00 28,800.00
Tukang Batu L.03 OH 0.1200 87,500.00 10,500.00
Kepala Tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 42,300.00
B BAHAN
SM m3 0.0070 -
Kapur padam m3 0.0070 88,000.00 616.00
Pasir pasang m3 0.0150 385,000.00 5,775.00
JUMLAH HARGA BAHAN 6,391.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,691.00
E Overhead & Profit 10% 4,869.10
F Harga Satuan Pekerjaan (D+E) 53,560.10

A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.03 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 53,700.00
B BAHAN
PC Kg 13.6320 1,200.00 16,358.40
Pasir pasang m3 0.0270 385,000.00 10,395.00
JUMLAH HARGA BAHAN 26,753.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,453.40
E Overhead & Profit 10% 8,045.34
F Harga Satuan Pekerjaan (D+E) 88,498.74

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.03 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 41,600.00
B BAHAN
PC Kg 10.3680 1,200.00 12,441.60
Pasir pasang m3 0.0310 385,000.00 11,935.00
JUMLAH HARGA BAHAN 24,376.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,976.60
E Overhead & Profit 10% 6,597.66
F Harga Satuan Pekerjaan (D+E) 72,574.26

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.03 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 53,700.00
B BAHAN
PC Kg 8.3200 1,200.00 9,984.00
Pasir pasang m3 0.0320 385,000.00 12,320.00
JUMLAH HARGA BAHAN 22,304.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 76,004.00
E Overhead & Profit 10% 7,600.40
F Harga Satuan Pekerjaan (D+E) 83,604.40

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.03 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 53,700.00
B BAHAN
PC Kg 6.9120 1,200.00 8,294.40
Pasir pasang m3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 21,769.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 75,469.40
E Overhead & Profit 10% 7,546.94
F Harga Satuan Pekerjaan (D+E) 83,016.34

A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.03 OH 0.2000 87,500.00 17,500.00
Kepala Tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 53,700.00
B BAHAN
PC Kg 5.8880 1,200.00 7,065.60
Pasir pasang m3 0.0360 385,000.00 13,860.00
JUMLAH HARGA BAHAN 20,925.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 74,625.60
E Overhead & Profit 10% 7,462.56
F Harga Satuan Pekerjaan (D+E) 82,088.16

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4400 80,000.00 35,200.00
Tukang Batu L.03 OH 0.2200 87,500.00 19,250.00
Kepala Tukang L.03 OH 0.0220 100,000.00 2,200.00
Mandor L.04 OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 58,850.00
B BAHAN
SM m3 0.0090 - -
Kapur padam m3 0.0090 88,000.00 792.00
Pasir pasang m3 0.0180 385,000.00 6,930.00
JUMLAH HARGA BAHAN 7,722.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 66,572.00
E Overhead & Profit 10% 6,657.20
F Harga Satuan Pekerjaan (D+E) 73,229.20

A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Batu L.03 OH 0.0750 87,500.00 6,562.50
Kepala Tukang L.03 OH 0.0080 100,000.00 800.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 20,162.50
B BAHAN
PC Kg 5.1840 1,200.00 6,220.80
Pasir pasang m3 0.0260 385,000.00 10,010.00
JUMLAH HARGA BAHAN 16,230.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 36,393.30
E Overhead & Profit 10% 3,639.33
F Harga Satuan Pekerjaan (D+E) 40,032.63

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang Batu L.03 OH 0.4000 87,500.00 35,000.00
Kepala Tukang L.03 OH 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 45,800.00
B BAHAN
Semen PC Kg 0.5000 1,200.00 600.00
Pasir pasang m3 0.0130 385,000.00 5,005.00
JUMLAH HARGA BAHAN 5,605.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,405.00
E Overhead & Profit 10% 5,140.50
F Harga Satuan Pekerjaan (D+E) 56,545.50

A.4.4.2.21. Pemasangan 1 m2 plesteran Granit 1SP : 2PP Granit Tebal 10mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 80,000.00 36,000.00
Tukang Batu L.03 OH 0.2250 87,500.00 19,687.50
Kepala Tukang L.03 OH 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0230 100,000.00 2,300.00
JUMLAH TENAGA KERJA 60,287.50
B BAHAN
Semen PC Kg 10.0000 1,200.00 12,000.00
Serbuk Batu Granit Kg 15.0000 -
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 72,287.50
E Overhead & Profit 10% 7,228.75
F Harga Satuan Pekerjaan (D+E) 79,516.25

A.4.4.2.22. Pemasangan 1 m2 plesteran Traso 1SP : 2PP Traso Tebal 10mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4500 80,000.00 36,000.00
Tukang Batu L.03 OH 0.2250 87,500.00 19,687.50
Kepala Tukang L.03 OH 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0230 100,000.00 2,300.00
JUMLAH TENAGA KERJA 60,287.50
B BAHAN
Semen PC Kg 10.0000 1,200.00 12,000.00
Serbuk Batu Traso Kg 15.0000 -
JUMLAH HARGA BAHAN 12,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 72,287.50
E Overhead & Profit 10% 7,228.75
F Harga Satuan Pekerjaan (D+E) 79,516.25

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Semen PC Kg 4.3200 1,200.00 5,184.00
Pasir pasang M3 0.0060 385,000.00 2,310.00
JUMLAH HARGA BAHAN 7,494.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,744.00
E Overhead & Profit 10% 4,274.40
F Harga Satuan Pekerjaan (D+E) 47,018.40

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Batu L.03 OH 0.0750 87,500.00 6,562.50
Kepala Tukang L.03 OH 0.0080 100,000.00 800.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 20,162.50
B BAHAN
Semen PC Kg 3.1080 1,200.00 3,729.60
JUMLAH HARGA BAHAN 3,729.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,892.10
E Overhead & Profit 10% 2,389.21
F Harga Satuan Pekerjaan (D+E) 26,281.31

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang Batu L.03 OH 0.0350 87,500.00 3,062.50
Kepala Tukang L.03 OH 0.0040 100,000.00 400.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 9,462.50
B BAHAN
Semen PC Kg 1.6000 1,200.00 1,920.00
JUMLAH HARGA BAHAN 1,920.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,382.50
E Overhead & Profit 10% 1,138.25
F Harga Satuan Pekerjaan (D+E) 12,520.75

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Batu L.03 OH 0.1500 87,500.00 13,125.00
Kepala Tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 40,125.00
B BAHAN
Semen PC Kg 6.3400 1,200.00 7,608.00
Pasir pasang m3 0.0120 385,000.00 4,620.00
JUMLAH HARGA BAHAN 12,228.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,353.00
E Overhead & Profit 10% 5,235.30
F Harga Satuan Pekerjaan (D+E) 57,588.30

3.2.2.2.36.(c) Pemasangan 1 m2 acian.


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Batu L.03 OH 0.1000 87,500.00 8,750.00
Kepala Tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 26,750.00
B BAHAN
Semen PC Kg 3.2500 1,200.00 3,900.00
JUMLAH HARGA BAHAN 3,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,650.00
E Overhead & Profit 10% 3,065.00
F Harga Satuan Pekerjaan (D+E) 33,715.00

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.1. Pemasangan 1m2 Tegel PC Abu-abu ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
Ubin Abu-abu Bh 6.6300 52,816.00 350,170.08
Semen Portlan kg 9.8000 1,200.00 11,760.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 379,255.08
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 412,792.58
E Overhead & Profit 10% 41,279.26
F Harga Satuan Pekerjaan (D+E) 454,071.84

A.4.4.3.2. Pemasangan 1m2 Tegel PC Abu-abu ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
Ubin Abu-abu Bh 11.8700 29,709.00 352,645.83
Semen Portlan kg 10.0000 1,200.00 12,000.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 381,970.83
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 415,508.33
E Overhead & Profit 10% 41,550.83
F Harga Satuan Pekerjaan (D+E) 457,059.16

A.4.4.3.3. Pemasangan 1m2 Tegel PC Abu-abu ukuran 20cm x20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 80,000.00 21,600.00
Tukang Batu L.02 OH 0.1350 87,500.00 11,812.50
Kepala tukang L.03 OH 0.0140 100,000.00 1,400.00
Mandor L.04 OH 0.0140 100,000.00 1,400.00
JUMLAH TENAGA KERJA 36,212.50
B BAHAN
Ubin Abu-abu Bh 26.5000 13,204.00 349,906.00
Semen Portlan kg 10.4000 1,200.00 12,480.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 379,711.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 415,923.50
E Overhead & Profit 10% 41,592.35
F Harga Satuan Pekerjaan (D+E) 457,515.85

A.4.4.3.5. Pemasangan 1m2 Tegel Warna ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
34,775.00
B BAHAN
Ubin Warna Bh 11.8700 29,709.00 352,645.83
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 0.6000 3,302.00 1,981.20
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 383,952.03
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 418,727.03
E Overhead & Profit 10% 41,872.70
F Harga Satuan Pekerjaan (D+E) 460,599.73

A.4.4.3.6. Pemasangan 1m2 Tegel Warna ukuran 20cm x20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2700 80,000.00 21,600.00
Tukang Batu L.02 OH 0.1350 87,500.00 11,812.50
Kepala tukang L.03 OH 0.0140 100,000.00 1,400.00
Mandor L.04 OH 0.0140 100,000.00 1,400.00
36,212.50
B BAHAN
Ubin Warna Bh 26.5000 13,204.00 349,906.00
Semen Portlan kg 10.4000 1,200.00 12,480.00
Semen warna Kg 1.0000 3,302.00 3,302.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 383,013.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 419,225.50
E Overhead & Profit 10% 41,922.55
F Harga Satuan Pekerjaan (D+E) 461,148.05

A.4.4.3.8.a Pemasangan 1m2 Tegel Difabel ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,775.00
B BAHAN
Ubin warna Bh 11.8700 29,709.00 352,645.83
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 386,923.83
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 421,698.83
E Overhead & Profit 10% 42,169.88
F Harga Satuan Pekerjaan (D+E) 463,868.71

A.4.4.3.7.Pemasangan 1m2 lantai Ubin Traso ukuran 40cm x40cm KW1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
Keramik Teraco Bh 6.6300 10,560.00 70,012.80
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.3000 3,302.00 4,292.60
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 103,390.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 136,927.90
E Overhead & Profit 10% 13,692.79
F Harga Satuan Pekerjaan (D+E) 150,620.69

A.4.4.3.8.Pemasangan 1m2 lantai Ubin Traso ukuran 30cm x30cm KW1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,775.00
B BAHAN
Keramik Teraco Bh 11.8700 5,940.00 70,507.80
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 104,785.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 139,560.80
E Overhead & Profit 10% 13,956.08
F Harga Satuan Pekerjaan (D+E) 153,516.88

A.4.4.3.7.1.Pemasangan 1m2 lantai keramik polos ukuran 40cm x40cm KW1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Keramik polos 40x40 KW1 Bh 6.6300 10,560.00 70,012.80
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.3000 3,302.00 4,292.60
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 103,390.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,015.40
E Overhead & Profit 10% 19,701.54
F Harga Satuan Pekerjaan (D+E) 216,716.94

A.4.4.3.7.3.Pemasangan 1m2 lantai keramik warna ukuran 40cm x40cm KW1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Keramik Warna 40x40 KW1 Bh 6.6300 11,440.00 75,847.20
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.3000 3,302.00 4,292.60
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 109,224.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 202,849.80
E Overhead & Profit 10% 20,284.98
F Harga Satuan Pekerjaan (D+E) 223,134.78

A.4.4.3.9. Pemasangan 1m2 lantai Ubin granit 40Cm x 40 Cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
Ubin granit Bh 6.6300 - -
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.3000 3,302.00 4,292.60
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 33,377.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 66,915.10
E Overhead & Profit 10% 6,691.51
F Harga Satuan Pekerjaan (D+E) 73,606.61

A.4.4.3.10. Pemasangan 1m2 lantai Ubin granit 30Cm x 30 Cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,775.00
B BAHAN
Ubin granit Bh 11.8700 - -
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 34,278.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,053.00
E Overhead & Profit 10% 6,905.30
F Harga Satuan Pekerjaan (D+E) 75,958.30

A.4.4.3.12. Pemasangan 1m2 Lantai Ubin Teralux Ukuran 30cm x30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,775.00
B BAHAN
Ubin teralux Bh 11.8700 - -
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 34,278.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,053.00
E Overhead & Profit 10% 6,905.30
F Harga Satuan Pekerjaan (D+E) 75,958.30

A.4.4.3.13. Pemasangan 1m2 Lantai Ubin Teralux marmer Ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0120 100,000.00 1,200.00
JUMLAH TENAGA KERJA 32,100.00
B BAHAN
Ubin teralux marmer Bh 3.1000 - -
Semen Portlan kg 9.6000 1,200.00 11,520.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 33,798.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,898.00
E Overhead & Profit 10% 6,589.80
F Harga Satuan Pekerjaan (D+E) 72,487.80

A.4.4.3.13.2 Pemasangan 1m2 lantai granit polished 60cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 - -
Tukang Batu L.02 OH 0.1250 - -
Kepala tukang L.03 OH 0.0130 - -
Mandor L.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
granit kasar unpolished 60x60 Bh 3.0100 11,000.00 33,110.00
Semen Portlan kg 9.6000 80,000.00 768,000.00
Semen warna Kg 1.5000 87,500.00 131,250.00
Pasir pasang M3 0.0450 100,000.00 4,500.00
JUMLAH HARGA BAHAN 936,860.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.13.2 Pemasangan 1m2 lantai granit polished 60cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2400 80,000.00 19,200.00
Tukang Batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0120 100,000.00 1,200.00
JUMLAH TENAGA KERJA 32,100.00
B BAHAN
granit kasar unpolished 60x60 Bh 3.0100 69,666.67 209,696.67
Semen Portlan kg 9.6000 1,200.00 11,520.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 243,494.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 275,594.67
E Overhead & Profit 10% 27,559.47
F Harga Satuan Pekerjaan (D+E) 303,154.14

A.4.4.3.13.3 Pemasangan 1m2 lantai granit kasar (unpolished) 60cm x 60cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
granit kasar unpolished 60x60 Bh 3.0100 71,500.00 215,215.00
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 249,253.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 282,790.50
E Overhead & Profit 10% 28,279.05
F Harga Satuan Pekerjaan (D+E) 311,069.55

A.4.4.3.14. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,537.50
B BAHAN
Ubin teralux marmer Bh 6.6300 - -
Semen Portlan kg 9.8000 1,200.00 11,760.00
Semen warna Kg 1.3000 3,302.00 4,292.60
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 33,377.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 66,915.10
E Overhead & Profit 10% 6,691.51
F Harga Satuan Pekerjaan (D+E) 73,606.61

A.4.4.3.15. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 87,500.00 11,375.00
Kepala tukang L.03 OH 0.0130 100,000.00 1,300.00
Mandor L.04 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 34,775.00
B BAHAN
Ubin teralux marmer Bh 11.8700 - -
Semen Portlan kg 10.0000 1,200.00 12,000.00
Semen warna Kg 1.5000 3,302.00 4,953.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
JUMLAH HARGA BAHAN 34,278.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,053.00
E Overhead & Profit 10% 6,905.30
F Harga Satuan Pekerjaan (D+E) 75,958.30

A.4.4.3.16. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 20 s.d. <30 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin PC Bh 5.3000 - -
Semen Portlan kg 1.6500 1,200.00 1,980.00
Pasir pasang M3 0.0040 385,000.00 1,540.00
JUMLAH HARGA BAHAN 3,520.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,995.00
E Overhead & Profit 10% 1,999.50
F Harga Satuan Pekerjaan (D+E) 21,994.50

A.4.4.3.17. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 30 s.d. <40 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin PC Bh 3.5300 - -
Semen Portlan kg 1.2400 1,200.00 1,488.00
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,643.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,118.00
E Overhead & Profit 10% 1,911.80
F Harga Satuan Pekerjaan (D+E) 21,029.80
A.4.4.3.18. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 40 s.d. <50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin PC Bh 2.6500 - -
Semen Portlan kg 1.2400 1,200.00 1,488.00
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,643.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,118.00
E Overhead & Profit 10% 1,911.80
F Harga Satuan Pekerjaan (D+E) 21,029.80

A.4.4.3.19. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 20 s.d. <30 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin warna Bh 5.3000 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.20. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 30 s.d. <40 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin warna Bh 3.5300 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.21. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 40 s.d. <50 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin warna Bh 2.6500 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.22. Pemasangan 1 m’ Plint Ubin Teraso Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin teraso Bh 3.5300 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.23. Pemasangan 1 m’ Plint Ubin Teraso Ukuran 40 s.d. <50cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin teraso Bh 2.6500 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.24. Pemasangan 1 m’ Plint Ubin Granit Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin granit Bh 3.5300 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.25. Pemasangan 1 m’ Plint Ubin Granit Ukuran 40 s.d. <50cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint ubin granit Bh 2.6500 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.26. Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint Teralux Kerang Bh 3.5300 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.27. Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 40 s.d. <50cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint Teralux Kerang Bh 2.6500 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.28. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint Teralux marmer Bh 3.5300 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02
A.4.4.3.29. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 40 s.d. <50cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint Teralux marmer Bh 2.6500 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.30. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 16,475.00
B BAHAN
Plint Teralux marmer Bh 1.7000 - -
Semen Portlan kg 1.1400 1,200.00 1,368.00
Semen warna kg 0.1000 3,302.00 330.20
Pasir pasang M3 0.0030 385,000.00 1,155.00
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,328.20
E Overhead & Profit 10% 1,932.82
F Harga Satuan Pekerjaan (D+E) 21,261.02

A.4.4.3.31. Pemasangan 1m2 Lantai Teraso Cor di Tempat, Tebal 3cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3600 80,000.00 28,800.00
Tukang Batu L.02 OH 0.1800 87,500.00 15,750.00
Kepala tukang L.03 OH 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 48,150.00
B BAHAN
Teraso cor M3 0.0360 - -
Semen warna Kg 0.1000 3,302.00 330.20
JUMLAH HARGA BAHAN 330.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,480.20
E Overhead & Profit 10% 4,848.02
F Harga Satuan Pekerjaan (D+E) 53,328.22

A.4.4.3.32.Pemasangan 1m2 Lantai Keramik Artistik 10 s.d. <20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 106.0000 - -
Semen Portlan Kg 8.1900 1,200.00 9,828.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 3.2000 3,302.00 10,566.40
JUMLAH HARGA BAHAN 37,719.40
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 131,344.40


E Overhead & Profit 10% 13,134.44
F Harga Satuan Pekerjaan (D+E) 144,478.84

A.4.4.3.33.Pemasangan 1m2 Lantai Keramik Artistik 20 s.d. <30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 53.0000 - -
Semen Portlan Kg 8.1900 1,200.00 9,828.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 36,233.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,858.50


E Overhead & Profit 10% 12,985.85
F Harga Satuan Pekerjaan (D+E) 142,844.35

A.4.4.3.35.Pemasangan 1m2 Lantai Keramik 20 s.d. <30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Dus 1.0500 60,500.00 63,525.00
Semen Portlan Kg 10.4000 1,200.00 12,480.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 0.5000 3,302.00 1,651.00
JUMLAH HARGA BAHAN 94,981.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 188,606.00


E Overhead & Profit 10% 18,860.60
F Harga Satuan Pekerjaan (D+E) 207,466.60

A.4.4.3.32.Pemasangan 1m2 lantai Step Nosing Keramik 10x30 KW 1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Step Nosing Keramik 10x30 KW 1 Bh 18.0000 19,800.00 356,400.00
Semen Portlan Kg 8.1900 1,200.00 9,828.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 392,633.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 486,258.50


E Overhead & Profit 10% 48,625.85
F Harga Satuan Pekerjaan (D+E) 534,884.35
A.4.4.3.32.1 Pemasangan 1m2 lantai Step Nosing Keramik 10x40 KW 1
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Step Nosing keramik 10x40 KW 1 Bh 16.0000 14,300.00 228,800.00
Semen Portlan Kg 8.1900 1,200.00 9,828.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 265,033.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 358,658.50


E Overhead & Profit 10% 35,865.85
F Harga Satuan Pekerjaan (D+E) 394,524.35

A.4.4.3.35.2.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm polos KW 1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 11.8700 5,445.00 64,632.15
Semen Portland Kg 10.0000 1,200.00 12,000.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 1.5000 3,302.00 4,953.00
JUMLAH HARGA BAHAN 98,910.15
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 192,535.15
E Overhead & Profit 10% 19,253.52
F Harga Satuan Pekerjaan (D+E) 211,788.67

A.4.4.3.35.3.Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm warna KW 1


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 11.8700 5,940.00 70,507.80
Semen Portland Kg 10.0000 1,200.00 12,000.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 1.5000 3,302.00 4,953.00
JUMLAH HARGA BAHAN 104,785.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 198,410.80
E Overhead & Profit 10% 19,841.08
F Harga Satuan Pekerjaan (D+E) 218,251.88

A.4.4.3.36. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Dus 1.0500 60,500.00 63,525.00
Semen Portland Kg 10.0000 1,200.00 12,000.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 0.5000 3,302.00 1,651.00
JUMLAH HARGA BAHAN 94,501.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 188,126.00
E Overhead & Profit 10% 18,812.60
F Harga Satuan Pekerjaan (D+E) 206,938.60

A.4.4.3.36.a Pemasangan 1m2 Lantai Keramik Ukuran 40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Dus 1.0500 66,000.00 69,300.00
Semen Portland Kg 9.8000 1,200.00 11,760.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 0.5000 3,302.00 1,651.00
JUMLAH HARGA BAHAN 100,036.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 193,661.00
E Overhead & Profit 10% 19,366.10
F Harga Satuan Pekerjaan (D+E) 213,027.10

A.4.4.3.36.Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 26.5000 2,420.00 64,130.00
Semen Portlan Kg 10.4000 1,200.00 12,480.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 1.6200 3,302.00 5,349.24
JUMLAH HARGA BAHAN 99,284.24
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 192,909.24
E Overhead & Profit 10% 19,290.92
F Harga Satuan Pekerjaan (D+E) 212,200.16

A.4.4.3.36.1 Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Ubin keramik Bh 16.9600 4,468.75 75,790.00
Semen Portlan Kg 10.4000 1,200.00 12,480.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 1.6200 3,302.00 5,349.24
JUMLAH HARGA BAHAN 110,944.24
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 204,569.24
E Overhead & Profit 10% 20,456.92
F Harga Satuan Pekerjaan (D+E) 225,026.16

A.4.4.3.37. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm untuk variasi/border
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0500 80,000.00 84,000.00
Tukang Batu L.02 OH 0.5250 87,500.00 45,937.50
Kepala tukang L.03 OH 0.0053 100,000.00 530.00
Mandor L.04 OH 0.0053 100,000.00 530.00
JUMLAH TENAGA KERJA 130,997.50
B BAHAN
Ubin Keramik Bh 33.0000 - -
Semen Portlan Kg 9.8000 1,200.00 11,760.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 4.3780 3,302.00 14,456.16
JUMLAH HARGA BAHAN 43,541.16
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 174,538.66
E Overhead & Profit 10% 17,453.87
F Harga Satuan Pekerjaan (D+E) 191,992.53

A.4.4.3.39. Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 19,075.00
B BAHAN
Plint keramik Bh 10.6000 - -
Semen Portlan Kg 1.1400 1,200.00 1,368.00
Pasir pasang M3 0.0030 385,000.00 1,155.00
Semen warna Kg 0.0500 3,302.00 165.10
JUMLAH HARGA BAHAN 2,688.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,763.10
E Overhead & Profit 10% 2,176.31
F Harga Satuan Pekerjaan (D+E) 23,939.41

A.4.4.3.40. Pemasangan 1 m’ Plint Keramik Ukuran 20 s.d. <30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0900 80,000.00 7,200.00
Tukang Batu L.02 OH 0.0900 87,500.00 7,875.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 19,075.00
B BAHAN
Plint keramik Bh 5.3000 - -
Semen Portlan Kg 1.1400 1,200.00 1,368.00
Pasir pasang M3 0.0030 385,000.00 1,155.00
Semen warna Kg 0.0250 3,302.00 82.55
JUMLAH HARGA BAHAN 2,605.55
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,680.55
E Overhead & Profit 10% 2,168.06
F Harga Satuan Pekerjaan (D+E) 23,848.61

A.4.4.3.41. Pemasangan 1 m’ Plint Internal Cove Artistik 5cm x 5cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 80,000.00 60,000.00
Tukang Batu L.02 OH 0.7500 87,500.00 65,625.00
Kepala tukang L.03 OH 0.0750 100,000.00 7,500.00
Mandor L.04 OH 0.0038 100,000.00 380.00
JUMLAH TENAGA KERJA 133,505.00
B BAHAN
Internal cove Bh 5.3000 - -
Semen Portlan Kg 1.1400 1,200.00 1,368.00
Pasir pasang M3 0.0030 385,000.00 1,155.00
Semen warna Kg 0.1000 3,302.00 330.20
JUMLAH HARGA BAHAN 2,853.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 136,358.20
E Overhead & Profit 10% 13,635.82
F Harga Satuan Pekerjaan (D+E) 149,994.02

A.4.4.3.42. Pemasangan 1m2 lantai marmer ukuran 100cm x 100cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Marmer Bh 1.0600 319,100.00 338,246.00
Semen Portlan Kg 8.1900 1,200.00 9,828.00
Pasir pasang M3 0.0450 385,000.00 17,325.00
Semen warna Kg 0.1340 3,302.00 442.47
JUMLAH HARGA BAHAN 365,841.47
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 459,466.47
E Overhead & Profit 10% 45,946.65
F Harga Satuan Pekerjaan (D+E) 505,413.12

A.4.4.3.43. Pemasangan 1m2 lantai karpet


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Karpet M2 1.0500 - -
Lem karet Kg 0.3500 22,010.00 7,703.50
JUMLAH HARGA BAHAN 7,703.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 101,328.50
E Overhead & Profit 10% 10,132.85
F Harga Satuan Pekerjaan (D+E) 111,461.35

A.4.4.3.44. Pemasangan 1m2 Underlayer (Pelapis Bawah Karpet)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang kayu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Underlayer M2 1.0500 - -
Lem karet Kg 0.3500 22,010.00 7,703.50
JUMLAH HARGA BAHAN 7,703.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,603.50
E Overhead & Profit 10% 2,960.35
F Harga Satuan Pekerjaan (D+E) 32,563.85

A.4.4.3.45. Pemasangan 1 m2 Lantai Parquet Kayu Solid


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Parquet kayu M2 1.0500 - -
Lem kayu Kg 0.6000 22,010.00 13,206.00
JUMLAH HARGA BAHAN 13,206.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,831.00
E Overhead & Profit 10% 10,683.10
F Harga Satuan Pekerjaan (D+E) 117,514.10

A.4.4.3.46. Pemasangan 1 m2 Lantai Kayu Gymfloor


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Parquet Gymfloor M2 1.0500 - -
Lem kayu Kg 0.6000 22,010.00 13,206.00
JUMLAH HARGA BAHAN 13,206.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,831.00
E Overhead & Profit 10% 10,683.10
F Harga Satuan Pekerjaan (D+E) 117,514.10

A.4.4.3.47. Pemasangan 1 m2 Dinding Porselen 11cm x 11cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 133,750.00
B BAHAN
Porselen Doos 1.0500 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 0.5000 3,302.00 1,651.00
JUMLAH HARGA BAHAN 19,741.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 153,491.00
E Overhead & Profit 10% 15,349.10
F Harga Satuan Pekerjaan (D+E) 168,840.10

A.4.4.3.48. Pemasangan 1 m2 Dinding Porselen 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Porselen buah 53.0000 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 27,170.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,545.50
E Overhead & Profit 10% 14,754.55
F Harga Satuan Pekerjaan (D+E) 162,300.05

A.4.4.3.49. Pemasangan 1 m2 Dinding Porselen 20cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Porselen buah 26.0000 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 1.9400 3,302.00 6,405.88
JUMLAH HARGA BAHAN 24,495.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 144,870.88
E Overhead & Profit 10% 14,487.09
F Harga Satuan Pekerjaan (D+E) 159,357.97

A.4.4.3.50.Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik artistik Bh 52.0000 2,200.00 114,400.00
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 141,570.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 261,945.50
E Overhead & Profit 10% 26,194.55
F Harga Satuan Pekerjaan (D+E) 288,140.05

A.4.4.3.51.Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik artistik Bh 104.0000 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 2.9000 3,302.00 9,575.80
JUMLAH HARGA BAHAN 27,665.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 148,040.80
E Overhead & Profit 10% 14,804.08
F Harga Satuan Pekerjaan (D+E) 162,844.88

A.4.4.3.52.Pemasangan 1 m2 dinding keramik 10cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik Bh 52.0000 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 27,170.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,545.50
E Overhead & Profit 10% 14,754.55
F Harga Satuan Pekerjaan (D+E) 162,300.05

A.4.4.3.53.Pemasangan 1 m2 dinding keramik 20cm x 20cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik Bh 26.0000 - -
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 1.9400 3,302.00 6,405.88
JUMLAH HARGA BAHAN 24,495.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 144,870.88
E Overhead & Profit 10% 14,487.09
F Harga Satuan Pekerjaan (D+E) 159,357.97

A.4.4.3.54.Pemasangan 1 m2 Dinding Marmer 100cm x 100cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.3000 80,000.00 104,000.00
Tukang Batu L.02 OH 0.6500 87,500.00 56,875.00
Kepala tukang L.03 OH 0.0650 100,000.00 6,500.00
Mandor L.04 OH 0.0650 100,000.00 6,500.00
JUMLAH TENAGA KERJA 173,875.00
B BAHAN
Marmer Bh 1.0600 319,100.00 338,246.00
Semen Portlan Kg 12.4400 1,200.00 14,928.00
Pasir Pasang M3 0.0250 385,000.00 9,625.00
Semen warna Kg 0.6500 3,302.00 2,146.30
Paku 12 Bh 3.0300 1,335.71 4,047.21
JUMLAH HARGA BAHAN 368,992.51
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 542,867.51
E Overhead & Profit 10% 54,286.75
F Harga Satuan Pekerjaan (D+E) 597,154.26

A.4.4.3.53,a Pemasangan 1 m2 dinding keramik polos 25cm x 40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik artistik Bh 10.6000 7,700.00 81,620.00
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 1.9400 3,302.00 6,405.88
JUMLAH HARGA BAHAN 106,115.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 226,490.88
E Overhead & Profit 10% 22,649.09
F Harga Satuan Pekerjaan (D+E) 249,139.97

A.4.4.3.54.2 Pemasangan 1 m2 dinding keramik warna 25cm x 40cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 120,375.00
B BAHAN
Keramik artistik Bh 10.6000 8,250.00 87,450.00
Semen Portlan Kg 9.3000 1,200.00 11,160.00
Pasir Pasang M3 0.0180 385,000.00 6,930.00
Semen warna Kg 1.9400 3,302.00 6,405.88
JUMLAH HARGA BAHAN 111,945.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 232,320.88
E Overhead & Profit 10% 23,232.09
F Harga Satuan Pekerjaan (D+E) 255,552.97

A.4.4.3.55. Pemasangan 1 m2 Dinding Bata Pelapis (Super) 3cm x 7cm x 24cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 133,750.00
B BAHAN
Bata pelapis Bh 63.0000 1,300.00 81,900.00
Semen Portlan Kg 12.4400 1,200.00 14,928.00
Pasir Pasang M3 0.0250 385,000.00 9,625.00
Semen warna Kg 2.7500 3,302.00 9,080.50
JUMLAH HARGA BAHAN 115,533.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 249,283.50
E Overhead & Profit 10% 24,928.35
F Harga Satuan Pekerjaan (D+E) 274,211.85

A.4.4.3.56. Pemasangan 1 m2 Dinding Batu Paras


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Bata paras Bh 1.1000 - -
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 27,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 121,200.00
E Overhead & Profit 10% 12,120.00
F Harga Satuan Pekerjaan (D+E) 133,320.00

A.4.4.3.57.Pemasangan 1 m2 dinding batu tempel hitam


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu temple hitam bh 1.1000 1,980.00 2,178.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 29,753.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 123,378.00
E Overhead & Profit 10% 12,337.80
F Harga Satuan Pekerjaan (D+E) 135,715.80

A.4.4.3.58.1 Pemasangan 1 m2 dinding batu candi garis lurus 10x20


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi garis lurus 10x20 M2 1.1000 115,500.00 127,050.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 154,625.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 248,250.00
E Overhead & Profit 10% 24,825.00
F Harga Satuan Pekerjaan (D+E) 273,075.00

A.4.4.3.58.2 Pemasangan 1 m2 dinding batu candi garis lurus 15x30


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi garis lurus 15x30 M2 1.1000 137,500.00 151,250.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 178,825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,450.00
E Overhead & Profit 10% 27,245.00
F Harga Satuan Pekerjaan (D+E) 299,695.00

A.4.4.3.58.3 Pemasangan 1 m2 dinding batu candi garis lurus 20x40


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi garis lurus 20x40 M2 1.1000 137,500.00 151,250.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 178,825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,450.00
E Overhead & Profit 10% 27,245.00
F Harga Satuan Pekerjaan (D+E) 299,695.00

A.4.4.3.58.4 Pemasangan 1 m2 dinding batu candi polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi polos M2 1.1000 115,500.00 127,050.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 154,625.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 248,250.00
E Overhead & Profit 10% 24,825.00
F Harga Satuan Pekerjaan (D+E) 273,075.00

A.4.4.3.58.5 Pemasangan 1 m2 dinding batu candi susun sirih 10x20


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi susun sirih 10x20 M2 1.1000 99,000.00 108,900.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 136,475.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 230,100.00
E Overhead & Profit 10% 23,010.00
F Harga Satuan Pekerjaan (D+E) 253,110.00

A.4.4.3.58.6 Pemasangan 1 m2 dinding batu candi susun sirih 15x30


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi susun sirih 15x30 M2 1.1000 88,000.00 96,800.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 124,375.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,000.00
E Overhead & Profit 10% 21,800.00
F Harga Satuan Pekerjaan (D+E) 239,800.00

A.4.4.3.58.7 Pemasangan 1 m2 dinding batu candi susun sirih 20x40


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 87,500.00 30,625.00
Kepala tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 93,625.00
B BAHAN
Batu candi susun sirih 20x40 M2 1.1000 99,000.00 108,900.00
Semen Portlan Kg 11.7500 1,200.00 14,100.00
Pasir Pasang M3 0.0350 385,000.00 13,475.00
JUMLAH HARGA BAHAN 136,475.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 230,100.00
E Overhead & Profit 10% 23,010.00
F Harga Satuan Pekerjaan (D+E) 253,110.00

A.4.4.3.58.Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 27,425.00
B BAHAN
Vynil Bh 11.8700 15,840.00 188,020.80
Lem karet Kg 0.3500 22,010.00 7,703.50
JUMLAH HARGA BAHAN 195,724.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 223,149.30
E Overhead & Profit 10% 22,314.93
F Harga Satuan Pekerjaan (D+E) 245,464.23

A.4.4.3.59. Pemasangan 1 m2 Wallpaper lebar 50 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Batu L.02 OH 0.1750 87,500.00 15,312.50
Kepala tukang L.03 OH 0.0170 100,000.00 1,700.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 45,212.50
B BAHAN
Wallpaper m1 2.2000 44,000.00 96,800.00
Lem karet Kg 0.3500 22,010.00 7,703.50
JUMLAH HARGA BAHAN 104,503.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,716.00
E Overhead & Profit 10% 14,971.60
F Harga Satuan Pekerjaan (D+E) 164,687.60

A.4.4.3.60. Pemasangan 1 m2 Floor hardener


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Floor hardener kg 5.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,900.00
E Overhead & Profit 10% 2,190.00
F Harga Satuan Pekerjaan (D+E) 24,090.00

A.4.4.3.60.a Pemasangan 1 m2 ACP ukuran 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 27,425.00
B BAHAN
Vynil m2 1.2000 242,100.00 290,520.00
Lem Kg 0.3500 19,800.00 6,930.00
JUMLAH HARGA BAHAN 297,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 324,875.00
E Overhead & Profit 10% 32,487.50
F Harga Satuan Pekerjaan (D+E) 357,362.50

A.4.4.3.60.b Pemasangan 1 m2 ACP ukuran 4 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Batu L.02 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 27,425.00
B BAHAN
Vynil m2 1.2000 330,100.00 396,120.00
Lem Kg 0.3500 88,000.00 30,800.00
JUMLAH HARGA BAHAN 426,920.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 454,345.00
E Overhead & Profit 10% 45,434.50
F Harga Satuan Pekerjaan (D+E) 499,779.50

A.4.4.3.61. Pemasangan 1 m’ Plint Vynil 15cm x 30cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang L.02 OH 0.0800 87,500.00 7,000.00
Kepala tukang L.03 OH 0.0080 100,000.00 800.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 14,600.00
B BAHAN
Vynil bh 3.1000 24,640.00 76,384.00
Lem karet kg 0.0800 22,010.00 1,760.80
JUMLAH HARGA BAHAN 78,144.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 92,744.80
E Overhead & Profit 10% 9,274.48
F Harga Satuan Pekerjaan (D+E) 102,019.28

A.4.4.3.62. Pemasangan 1 m’ Plint Kayu Tebal 2 cm Lebar 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang batu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Papan kayu kelas 1 m3 0.0030 12,557,650.00 37,672.95
Paku/skrup 5cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 39,047.95
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,947.95
E Overhead & Profit 10% 6,094.80
F Harga Satuan Pekerjaan (D+E) 67,042.75

A.4.4.3.63. Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 68,880.00
B BAHAN
Paving blok 6 cm M2 1.0100 - -
Pasir beton M3 0.0500 385,000.00 19,250.00
JUMLAH HARGA BAHAN 19,250.00
C PERALATAN % bahan 10.0000 19,250.00 1,925.00

JUMLAH HARGA ALAT 1,925.00


D Jumlah (A+B+C) 90,055.00
E Overhead & Profit 10% 9,005.50
F Harga Satuan Pekerjaan (D+E) 99,060.50

A.4.4.3.64. Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 8cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 88,880.00
B BAHAN
Paving blok 8 cm natural M2 1.0100 - -
Pasir beton M3 0.0800 385,000.00 30,800.00
JUMLAH HARGA BAHAN 30,800.00
C PERALATAN % bahan 10.0000 30,800.00 3,080.00

JUMLAH HARGA ALAT 3,080.00


D Jumlah (A+B+C) 122,760.00
E Overhead & Profit 10% 12,276.00
F Harga Satuan Pekerjaan (D+E) 135,036.00

A.4.4.3.64.a Pasang paving blok natural tb. 6 cm K.175 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok natural tb. 6 cm K. 175 M2 1.0000 60,500.00 60,500.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 88,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 141,500.00
E Overhead & Profit 10% 14,150.00
F Harga Satuan Pekerjaan (D+E) 155,650.00

A.4.4.3.64.b Pasang paving blok warna tb. 6 cm K.175 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok warna tb. 6 cm K. 175 M2 1.0000 71,500.00 71,500.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 99,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 152,500.00
E Overhead & Profit 10% 15,250.00
F Harga Satuan Pekerjaan (D+E) 167,750.00

A.4.4.3.64.c Pasang paving blok natural tb. 8 cm K.175 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok natural tb. 8 cm K. 175 M2 1.0000 77,000.00 77,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 104,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,000.00
E Overhead & Profit 10% 15,800.00
F Harga Satuan Pekerjaan (D+E) 173,800.00

A.4.4.3.64.d. Pasang paving blok warna tb. 8 cm K.175 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok warna tb. 8 cm K. 175 M2 1.0000 88,000.00 88,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 115,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 169,000.00
E Overhead & Profit 10% 16,900.00
F Harga Satuan Pekerjaan (D+E) 185,900.00

A.4.4.3.68.a. Rolak Telasah Tanpa Pasir Urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Batu pecah 10/15 M2 0.1834 302,000.00 55,386.80
Pasir urug M3 - 275,000.00 -
JUMLAH HARGA BAHAN 55,386.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 108,886.80
E Overhead & Profit 10% 10,888.68
F Harga Satuan Pekerjaan (D+E) 119,775.48

A.4.4.3.68.a Rolak Telasah dengan Pasir Urug


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Batu pecah 10/15 M2 0.1834 302,000.00 55,386.80
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 82,886.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 136,386.80
E Overhead & Profit 10% 13,638.68
F Harga Satuan Pekerjaan (D+E) 150,025.48

A.4.4.3.65. Pemasangan 1 m2 Paving Block (Blok Beton) Berwarna tebal 6cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 68,880.00
B BAHAN
Paving blok 6cm berwarna M2 1.0100 - -
Pasir beton M3 0.0500 385,000.00 19,250.00
JUMLAH HARGA BAHAN 19,250.00
C PERALATAN % bahan 10.0000 19,250.00 1,925.00

JUMLAH HARGA ALAT 1,925.00


D Jumlah (A+B+C) 90,055.00
E Overhead & Profit 10% 9,005.50
F Harga Satuan Pekerjaan (D+E) 99,060.50

A.4.4.3.65.a Pasang paving blok natural tb. 6 cm K.225 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok natural tb. 6 cm K. 225 M2 1.0000 66,000.00 66,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 93,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,000.00
E Overhead & Profit 10% 14,700.00
F Harga Satuan Pekerjaan (D+E) 161,700.00

A.4.4.3.65.b Pasang paving blok natural tb. 8 cm K.225 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok natural tb. 8 cm K. 225 M2 1.0000 77,000.00 77,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 104,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,000.00
E Overhead & Profit 10% 15,800.00
F Harga Satuan Pekerjaan (D+E) 173,800.00

A.4.4.3.65.c. Pasang paving blok warna tb. 6 cm K.225 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok warna tb. 6 cm K. 225 M2 1.0000 77,000.00 77,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 104,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,000.00
E Overhead & Profit 10% 15,800.00
F Harga Satuan Pekerjaan (D+E) 173,800.00

A.4.4.3.65.d Pasang paving blok warna tb. 8 cm K.225 /m2 Lokal


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving blok warna tb. 8 cm K. 225 M2 1.0000 88,000.00 88,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 115,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 169,000.00
E Overhead & Profit 10% 16,900.00
F Harga Satuan Pekerjaan (D+E) 185,900.00

A.4.4.3.66. Pemasangan 1 m2 Paving Block (Blok Beton) Berwarna tebal 8cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 88,880.00
B BAHAN
Paving blok 8cm berwarna M2 1.0100 - -
Pasir beton M3 0.0800 385,000.00 30,800.00
JUMLAH HARGA BAHAN 30,800.00
C PERALATAN % bahan 10.0000 30,800.00 3,080.00

JUMLAH HARGA ALAT 3,080.00


D Jumlah (A+B+C) 122,760.00
E Overhead & Profit 10% 12,276.00
F Harga Satuan Pekerjaan (D+E) 135,036.00

A.4.4.3.66.a Pasang 1 m2 Paving type Holand (10,5x21) k-200 tbl. 6cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type Holand (10,5x21) k-200 tbl. 6cm M2 1.0000 92,400.00 92,400.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 119,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 173,400.00
E Overhead & Profit 10% 17,340.00
F Harga Satuan Pekerjaan (D+E) 190,740.00

A.4.4.3.66.b Pasang 1 m2 Paving type Holand (10,5x21) k-300 tbl. 6cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type Holand (10,5x21) k-300 tbl. 6cm M2 1.0000 110,000.00 110,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 191,000.00
E Overhead & Profit 10% 19,100.00
F Harga Satuan Pekerjaan (D+E) 210,100.00

A.4.4.3.66.c Pasang 1 m2 Paving type Holand (10,5x21) k-200 tbl. 8cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type Holand (10,5x21) k-200 tbl. 6cm M2 1.0000 148,700.00 148,700.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 176,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 229,700.00
E Overhead & Profit 10% 22,970.00
F Harga Satuan Pekerjaan (D+E) 252,670.00

A.4.4.3.66.d Pasang 1 m2 Paving type Holand (10,5x21) k-300 tbl. 8cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type Holand (10,5x21) k-300 tbl. 6cm M2 1.0000 170,500.00 170,500.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 251,500.00
E Overhead & Profit 10% 25,150.00
F Harga Satuan Pekerjaan (D+E) 276,650.00

A.4.4.3.66.e Pasang 1 m2 Paving type kubus (21x21) k-200 tbl. 6cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type kubus (21x21) k-200 tbl. 6cm M2 1.0000 92,400.00 92,400.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 119,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 173,400.00
E Overhead & Profit 10% 17,340.00
F Harga Satuan Pekerjaan (D+E) 190,740.00

A.4.4.3.66.f Pasang 1 m2 Paving type kubus (21x21) k-300 tbl. 6cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type kubus (21x21) k-300 tbl. 6cm M2 1.0000 110,000.00 110,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 137,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 191,000.00
E Overhead & Profit 10% 19,100.00
F Harga Satuan Pekerjaan (D+E) 210,100.00

A.4.4.3.66.g Pasang 1 m2 Paving type kubus (21x21) k-200 tbl. 8cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type kubus (21x21) k-200 tbl. 8cm M2 1.0000 148,700.00 148,700.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 176,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 229,700.00
E Overhead & Profit 10% 22,970.00
F Harga Satuan Pekerjaan (D+E) 252,670.00

A.4.4.3.66.h Pasang 1 m2 Paving type kubus (21x21) k-300 tbl. 8cm Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Paving type kubus (21x21) k-300 tbl. 8cm M2 1.0000 170,500.00 170,500.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 251,500.00
E Overhead & Profit 10% 25,150.00
F Harga Satuan Pekerjaan (D+E) 276,650.00

A.4.4.3.69.a. Pemasangan 1 m’ kanstin beton kerb 10/12.5x30x50


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
Semen portland kg 0.0278 1,200.00 33.36
Pasir pasang m3 0.0001 385,000.00 38.50
Kanstin beton kerb 10/12.5x30x50 bh 2.0000 49,500.00 99,000.00
JUMLAH HARGA BAHAN 99,071.86
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,021.86
E Overhead & Profit 10% 11,002.19
F Harga Satuan Pekerjaan (D+E) 121,024.05

A.4.4.3.69.b Pemasangan 1 m’ kanstin beton kerb 10/12.5x25x50


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
Semen portland kg 0.0278 1,200.00 33.36
Pasir pasang m3 0.0001 385,000.00 38.50
Kanstin beton kerb 10/12.5x30x50 bh 2.0000 38,500.00 77,000.00
JUMLAH HAR 77,071.86
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 88,021.86
E Overhead & Profit 10% 8,802.19
F Harga Satuan Pekerjaan (D+E) 96,824.05

A.4.4.3.67.a Pemasangan con blok 24x24x6 K-250 / m2 Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Con blok 24x24x6 K-250 M2 1.0000 107,800.00 107,800.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 135,300.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 188,800.00
E Overhead & Profit 10% 18,880.00
F Harga Satuan Pekerjaan (D+E) 207,680.00

A.4.4.3.67.b Pemasangan con blok 24x24x6 K-300 / m2 Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Con blok 24x24x6 K-250 M2 1.0000 143,000.00 143,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 170,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 224,000.00
E Overhead & Profit 10% 22,400.00
F Harga Satuan Pekerjaan (D+E) 246,400.00

A.4.4.3.67.c Pemasangan con blok 24x24x6 K-300 / m2 Setara (Merapi, Aldas dan ABC)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Batu L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Con blok 24x24x6 K-250 M2 1.0000 165,000.00 165,000.00
Pasir urug M3 0.1000 275,000.00 27,500.00
JUMLAH HARGA BAHAN 192,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 246,000.00
E Overhead & Profit 10% 24,600.00
F Harga Satuan Pekerjaan (D+E) 270,600.00

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 3 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang kayu L.02 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 9,625.00
B BAHAN
Serat semen m2 1.1000 - -
Paku tripleks kg 0.0100 27,500.00 275.00
JUMLAH HARGA BAHAN 275.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,900.00
E Overhead & Profit 10% 990.00
F Harga Satuan Pekerjaan (D+E) 10,890.00

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang kayu L.02 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 9,625.00
B BAHAN
Asbes semen 3mm m2 1.1000 55,025.00 60,527.50
Paku tripleks kg 0.0100 27,500.00 275.00
JUMLAH HARGA BAHAN 60,802.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 70,427.50
E Overhead & Profit 10% 7,042.75
F Harga Satuan Pekerjaan (D+E) 77,470.25

A.4.5.1.1.1 Pemasangan 1 m2 langit-langit eternit 4 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang kayu L.02 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.03 OH 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 9,625.00
B BAHAN
Eternit 4 mm m2 1.1000 19,809.00 21,789.90
Paku tripleks kg 0.0100 27,500.00 275.00
JUMLAH HARGA BAHAN 22,064.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 31,689.90
E Overhead & Profit 10% 3,168.99
F Harga Satuan Pekerjaan (D+E) 34,858.89

A.4.5.1.2. Pemasangan1 m2 Langit-Langit Akustik Ukuran 30 x 30 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang kayu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Akustik lbr 12.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,900.00
E Overhead & Profit 10% 2,190.00
F Harga Satuan Pekerjaan (D+E) 24,090.00

A.4.5.1.3. Pemasangan1 m2 Langit-Langit Akustik Ukuran 30 x 60 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang kayu L.02 OH 0.1200 87,500.00 10,500.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Akustik lbr 5.8000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,900.00
E Overhead & Profit 10% 2,190.00
F Harga Satuan Pekerjaan (D+E) 24,090.00

A.4.5.1.4. Pemasangan1 m2 Langit-Langit Akustik Ukuran 60 x 120 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Akustik lbr 1.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,250.00
E Overhead & Profit 10% 1,825.00
F Harga Satuan Pekerjaan (D+E) 20,075.00

A.4.5.1.5. Pemasangan 1 m2 Langit-Langit Kayu Lapis, Tebal 3 mm, 4 mm dan 6mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kayu lapis Lembar 0.3750 - -
Paku tripleks kg 0.0300 27,500.00 825.00
JUMLAH HARGA BAHAN 825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,075.00
E Overhead & Profit 10% 1,907.50
F Harga Satuan Pekerjaan (D+E) 20,982.50

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Tripleks Lembar 0.3750 71,000.00 26,625.00
Paku tripleks kg 0.0300 27,500.00 825.00
JUMLAH HARGA BAHAN 27,450.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,700.00
E Overhead & Profit 10% 4,570.00
F Harga Satuan Pekerjaan (D+E) 50,270.00

A.4.5.1.6. Pemasangan 1 m2 Langit-Langit Lambrisering Kayu, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.02 OH 0.8000 87,500.00 70,000.00
Kepala tukang L.03 OH 0.0800 100,000.00 8,000.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 142,400.00
B BAHAN
Kayu papan m3 0.0150 - -
Paku tripleks kg 0.0100 27,500.00 275.00
JUMLAH HARGA BAHAN 275.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 142,675.00
E Overhead & Profit 10% 14,267.50
F Harga Satuan Pekerjaan (D+E) 156,942.50

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
Gypsum board Lembar 0.3640 71,000.00 25,844.00
Paku skrup kg 0.1100 71,500.00 7,865.00
JUMLAH HARGA BAHAN 33,709.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 47,084.00
E Overhead & Profit 10% 4,708.40
F Harga Satuan Pekerjaan (D+E) 51,792.40

A.4.5.1.7.a Pemasangan 1 m2 langit-langit GRC 0.45x120x240


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
GRC 0.45x120x240 Lembar 0.3640 65,000.00 23,660.00
Paku skrup kg 0.1100 71,500.00 7,865.00
JUMLAH HARGA BAHAN 31,525.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,900.00
E Overhead & Profit 10% 4,490.00
F Harga Satuan Pekerjaan (D+E) 49,390.00

A.4.5.1.7.b Pemasangan 1 m2 langit-langit Setara Sunda Plafond


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 13,375.00
B BAHAN
setara sunda palfond Lembar 0.3640 38,500.00 14,014.00
Paku skrup kg 0.1100 71,500.00 7,865.00
JUMLAH HARGA BAHAN 21,879.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,254.00
E Overhead & Profit 10% 3,525.40
F Harga Satuan Pekerjaan (D+E) 38,779.40

A.4.5.1.10. Pemasangan 1 m’ list langit-langit kayu profil


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang Kayu L.02 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,175.00
B BAHAN
List kayu profil m 1.0500 15,407.00 16,177.35
Paku kg 0.0100 27,500.00 275.00
JUMLAH HARGA BAHAN 16,452.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,627.35
E Overhead & Profit 10% 2,562.74
F Harga Satuan Pekerjaan (D+E) 28,190.09

A.4.5.1.10.a Pemasangan 1 m’ list langit-langit gypsum profil 10 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
List gypsum profil 10 cm m 1.0000 15,407.00 15,407.0000
Tepung gypsum kg 1.0000 6,603.00 6,603.0000
JUMLAH HARGA BAHAN 22,010.0000
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,960.00
E Overhead & Profit 10% 3,296.00
F Harga Satuan Pekerjaan (D+E) 36,256.00

A.4.5.1.10.b Pemasangan 1 m’ list langit-langit gypsum profil 12,5 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,950.00
B BAHAN
List gypsum profil 12,5 cm m 1.0000 19,809.00 19,809.0000
Tepung gypsum kg 1.0000 6,603.00 6,603.0000
JUMLAH HARGA BAHAN 26,412.0000
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 37,362.00
E Overhead & Profit 10% 3,736.20
F Harga Satuan Pekerjaan (D+E) 41,098.20

A.4.5.1.11.a Pemasangan 1 m2 langit langit gipsum rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Besi L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 63,925.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 9,900.00 39,600.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 9,900.00 9,900.00
Gipsum 9 mm 120x240 lb 0.3640 71,000.00 25,844.00
Paku skrup kg 0.1100 27,500.00 3,025.00
JUMLAH HARGA BAHAN 78,369.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 142,294.00
E Overhead & Profit 10% 14,229.40
F Harga Satuan Pekerjaan (D+E) 156,523.40

A.4.5.1.11.b Pemasangan 1 m2 langit langit GRC rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Besi L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 63,925.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 9,900.00 39,600.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 9,900.00 9,900.00
GRC 0.45x120x240 lb 0.3640 65,000.00 23,660.00
Paku skrup kg 0.1100 27,500.00 3,025.00
JUMLAH HARGA BAHAN 76,185.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 140,110.00
E Overhead & Profit 10% 14,011.00
F Harga Satuan Pekerjaan (D+E) 154,121.00

A.4.5.1.11.c Pemasangan 1 m2 langit langit setara sunda palfond rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 80,000.00 28,000.00
Tukang Besi L.02 OH 0.3500 87,500.00 30,625.00
Kepala Tukang L.03 OH 0.0350 100,000.00 3,500.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 63,925.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 4.0000 9,900.00 39,600.00
Assesoris (perkuatan, las dll) Ls 100%xrangka 9,900.00 9,900.00
setara sunda palfond lb 0.3640 38,500.00 14,014.00
Paku skrup kg 0.1100 27,500.00 3,025.00
JUMLAH HARGA BAHAN 66,539.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 130,464.00
E Overhead & Profit 10% 13,046.40
F Harga Satuan Pekerjaan (D+E) 143,510.40

A.4.5.1.12. Pemasangan 1 m2 Langit-langit Akustik Ukuran 60 cm x 120 cm Berikut Rangka Aluminium


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Besi L.02 OH 0.5000 87,500.00 43,750.00
Kepala Tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 91,250.00
B BAHAN
Profil alumunium "T" M 3.6000 - -
Kawat Ø 4 mm Kg 0.1500 - -
Ramset Bh 1.0500 - -
Akustik 60 x 120 Lbr 1.5000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,250.00
E Overhead & Profit 10% 9,125.00
F Harga Satuan Pekerjaan (D+E) 100,375.00

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.0750 87,500.00 6,562.50
Kepala tukang L.11 OH 0.0075 100,000.00 750.00
Mandor L.15 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 20,112.50
B BAHAN
Genteng palentong Bh 25.0000 3,500.00 87,500.00
JUMLAH HARGA BAHAN 87,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,612.50
E Overhead & Profit 10% 10,761.25
F Harga Satuan Pekerjaan (D+E) 118,373.75

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.0750 87,500.00 6,562.50
Kepala tukang L.11 OH 0.0080 100,000.00 800.00
Mandor L.15 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 20,162.50
B BAHAN
Genteng kodok Bh 25.0000 3,800.00 95,000.00
JUMLAH HARGA BAHAN 95,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 115,162.50
E Overhead & Profit 10% 11,516.25
F Harga Satuan Pekerjaan (D+E) 126,678.75

A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.11 OH 0.0200 100,000.00 2,000.00
Mandor L.15 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 51,700.00
B BAHAN
Genteng bubung Bh 5.0000 3,300.00 16,500.00
Semen Portlan Kg 8.0000 1,200.00 9,600.00
Pasir pasang M3 0.0320 385,000.00 12,320.00
JUMLAH HARGA BAHAN 38,420.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,120.00
E Overhead & Profit 10% 9,012.00
F Harga Satuan Pekerjaan (D+E) 99,132.00

A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Kayu L.03 OH 0.0670 87,500.00 5,862.50
Kepala tukang L.11 OH 0.0070 100,000.00 700.00
Mandor L.15 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 18,462.50
B BAHAN
Rooflight 90x180 Lbr 0.6000 77,000.00 46,200.00
Paku biasa ½”-1” Kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 47,575.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 66,037.50
E Overhead & Profit 10% 6,603.75
F Harga Satuan Pekerjaan (D+E) 72,641.25

A.4.5.2.30. Pemasangan 1 m2 genteng beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.11 OH 0.0100 100,000.00 1,000.00
Mandor L.15 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 26,750.00
B BAHAN
Genteng beton Bh 11.0000 8,800.00 96,800.00
Paku biasa 2”-5” Kg 0.0300 27,500.00 825.00
JUMLAH HARGA BAHAN 97,625.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 124,375.00
E Overhead & Profit 10% 12,437.50
F Harga Satuan Pekerjaan (D+E) 136,812.50

A.4.5.2.31.a Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°)


uk. 200x95x0.30 cm, jarak rangka gording atau reng max. 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Kayu L.03 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.11 OH 0.0070 100,000.00 700.00
Mandor L.15 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 18,725.00
B BAHAN
Atap bitumen bergelombang H : 38 mm lbr 0.7470 176,000.00 131,472.00
Paku / skrup bh 9.0970 1,430.00 13,008.71
JUMLAH HARGA BAHAN 144,480.71
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 163,205.71
E Overhead & Profit 10% 16,320.57
F Harga Satuan Pekerjaan (D+E) 179,526.28

A.4.5.2.31.b Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°)


uk. 106x40x0.30 cm, jarak rangka gording atau reng max. 32 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.11 OH 0.0100 100,000.00 1,000.00
Mandor L.15 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 26,750.00
B BAHAN
Atap bitumen bergelombang H : 40 mm lbr 3.7100 57,000.00 211,470.00
Paku / skrup bh 16.1290 1,430.00 23,064.47
JUMLAH HARGA BAHAN 234,534.47
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 261,284.47
E Overhead & Profit 10% 26,128.45
F Harga Satuan Pekerjaan (D+E) 287,412.92

A.4.5.2.31.c Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°)


uk. 200x95x0.30 cm, jarak rangka gording atau reng max. 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Kayu L.03 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.11 OH 0.0070 100,000.00 700.00
Mandor L.15 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 18,725.00
B BAHAN
Genteng bitumen bergelombang memanjang H : 38 mm lbr 0.7320 170,000.00 124,440.00
Paku / skrup bh 11.4650 1,430.00 16,394.95
JUMLAH HARGA BAHAN 140,834.95
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 159,559.95
E Overhead & Profit 10% 15,956.00
F Harga Satuan Pekerjaan (D+E) 175,515.95

A.4.5.2.35.a Pemasangan 1 m' Nok bitumen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0840 80,000.00 6,720.00
Tukang Kayu L.03 OH 0.1250 87,500.00 10,937.50
Kepala tukang L.11 OH 0.0130 100,000.00 1,300.00
Mandor L.15 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 19,357.50
B BAHAN
Nok / Ridge lbr 1.2500 93,500.00 116,875.00
Paku / skrup bh 10.0000 1,430.00 14,300.00
JUMLAH HARGA BAHAN 131,175.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 150,532.50
E Overhead & Profit 10% 15,053.25
F Harga Satuan Pekerjaan (D+E) 165,585.75

A.4.5.2.32..1 Pemasangan 1 m2 genteng metal polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.11 OH 0.0100 100,000.00 1,000.00
Mandor L.15 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 25,850.00
B BAHAN
Genteng metal polos m2 1.0200 44,000.00 44,880.00
Paku biasa ½”-1” Kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 50,380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 76,230.00
E Overhead & Profit 10% 7,623.00
F Harga Satuan Pekerjaan (D+E) 83,853.00

A.4.5.2.32.2 Pemasangan 1 m2 genteng metal lapis pasir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.11 OH 0.0100 100,000.00 1,000.00
Mandor L.15 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 25,850.00
B BAHAN
Genteng metal lapis pasir m2 1.0200 118,100.00 120,462.00
Paku biasa ½”-1” Kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 125,962.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 151,812.00
E Overhead & Profit 10% 15,181.20
F Harga Satuan Pekerjaan (D+E) 166,993.20

A.4.5.2.34. Pemasangan 1 m’ nok genteng beton


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.11 OH 0.0200 100,000.00 2,000.00
Mandor L.15 OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 53,500.00
B BAHAN
Nok genteng beton Bh 3.5000 32,400.00 113,400.00
Paku biasa ½”-1” Kg 0.0500 27,500.00 1,375.00
Semen PC Kg 10.8000 1,200.00 12,960.00
Pasir pasang M3 0.0320 385,000.00 12,320.00
Semen warna Kg 1.0000 3,302.00 3,302.00
JUMLAH HARGA BAHAN 143,357.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 196,857.00
E Overhead & Profit 10% 19,685.70
F Harga Satuan Pekerjaan (D+E) 216,542.70

A.4.5.2.36.1 Pemasangan 1 m’ nok genteng metal polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Kayu L.03 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.11 OH 0.0150 100,000.00 1,500.00
Mandor L.15 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 35,925.00
B BAHAN
Nok genteng metal mpolos Bh 1.1000 44,000.00 48,400.00
Paku biasa ½”-1” Kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 49,775.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 85,700.00
E Overhead & Profit 10% 8,570.00
F Harga Satuan Pekerjaan (D+E) 94,270.00

A.4.5.2.36.2 Pemasangan 1 m’ nok genteng metal lapis pasir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Kayu L.03 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.11 OH 0.0150 100,000.00 1,500.00
Mandor L.15 OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 35,925.00
B BAHAN
Nok genteng metal lapis pasir Bh 1.1000 49,500.00 54,450.00
Paku biasa ½”-1” Kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 55,825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,750.00
E Overhead & Profit 10% 9,175.00
F Harga Satuan Pekerjaan (D+E) 100,925.00

A.4.5.2.38.1 Pemasangan 1 m2 atap seng gelombang BJLS 30


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Kayu L.03 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.11 OH 0.0060 100,000.00 600.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 16,050.00
B BAHAN
Seng gel 3”x6” bjls 30 Lbr 0.7000 88,000.00 61,600.00
Paku biasa ½”-1”/seng Kg 0.0200 27,500.00 550.00
JUMLAH HARGA BAHAN 62,150.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,200.00
E Overhead & Profit 10% 7,820.00
F Harga Satuan Pekerjaan (D+E) 86,020.00

A.4.5.2.38.3 Pemasangan 1 m2 atap seng gelombang BJLS 20


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Kayu L.03 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.11 OH 0.0060 100,000.00 600.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 16,050.00
B BAHAN
Seng gel 3”x6” bjls 20 Lbr 0.7000 60,500.00 42,350.00
Paku biasa ½”-1”/seng Kg 0.0200 27,500.00 550.00
JUMLAH HARGA BAHAN 42,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 58,950.00
E Overhead & Profit 10% 5,895.00
F Harga Satuan Pekerjaan (D+E) 64,845.00

A.4.5.2.38.4 Pemasangan 1 m2 atap seng gelombang BJLS 30 + Kaso albasia reng suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2200 80,000.00 17,600.00
Tukang Kayu L.03 OH 0.1600 87,500.00 14,000.00
Kepala tukang L.11 OH 0.0160 100,000.00 1,600.00
Mandor L.15 OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 34,300.00
B BAHAN
Seng gel 3”x6” bjls 30 Lbr 0.7000 88,000.00 61,600.00
Paku biasa ½”-1”/seng Kg 0.0200 27,500.00 550.00
Kaso albasia m3 0.0105 2,751,200.00 28,887.60
Reng suren m3 0.0014 2,751,200.00 3,851.68
Paku usuk/reng Kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 99,014.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 133,314.28
E Overhead & Profit 10% 13,331.43
F Harga Satuan Pekerjaan (D+E) 146,645.71

A.4.5.2.38.6 Pemasangan 1 m2 atap seng gelombang BJLS 20 + Kaso albasia reng suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2200 80,000.00 17,600.00
Tukang Kayu L.03 OH 0.1600 87,500.00 14,000.00
Kepala tukang L.11 OH 0.0160 100,000.00 1,600.00
Mandor L.15 OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 34,300.00
B BAHAN
Seng gel 3”x6” bjls 20 Lbr 0.7000 60,500.00 42,350.00
Paku biasa ½”-1”/seng Kg 0.0200 27,500.00 550.00
Kaso albasia m3 0.0105 2,751,200.00 28,887.60
Reng suren m3 0.0014 2,751,200.00 3,851.68
Paku usuk/reng Kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 79,764.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 114,064.28
E Overhead & Profit 10% 11,406.43
F Harga Satuan Pekerjaan (D+E) 125,470.71

A.4.5.2.39. Pemasangan 1 m’nok atap seng BJLS 30


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.11 OH 0.0070 100,000.00 700.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 19,425.00
B BAHAN
Seng plat 3”x6”bjls30 Lbr 0.3000 149,500.00 44,850.00
Paku biasa ½”-1”/seng Kg 0.0400 27,500.00 1,100.00
JUMLAH HARGA BAHAN 45,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,375.00
E Overhead & Profit 10% 6,537.50
F Harga Satuan Pekerjaan (D+E) 71,912.50

A.4.5.2.40. Pemasangan 1 m2 atap alumunium/galvalum polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.7500 87,500.00 65,625.00
Kepala tukang L.11 OH 0.0800 100,000.00 8,000.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 86,225.00
B BAHAN
Almn gel tbl0,55 m2 1.0500 49,500.00 51,975.00
Paku hak panj 15cm Kg 0.0200 27,500.00 550.00
JUMLAH HARGA BAHAN 52,525.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 138,750.00
E Overhead & Profit 10% 13,875.00
F Harga Satuan Pekerjaan (D+E) 152,625.00
A.4.5.2.40.1 Pemasangan 1 m2 atap alumunium/galvalum lapis pasir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Kayu L.03 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.11 OH 0.0060 100,000.00 600.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 16,050.00
B BAHAN
Almn gel tbl0,55 m2 1.0500 79,400.00 83,370.00
Paku hak panj 15cm Kg 0.0200 48,300.00 966.00
JUMLAH HARGA BAHAN 84,336.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,386.00
E Overhead & Profit 10% 10,038.60
F Harga Satuan Pekerjaan (D+E) 110,424.60

A.4.5.2.41. Pemasangan 1 m’ nok alumunium polos


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.03 OH 1.0000 87,500.00 87,500.00
Kepala tukang L.11 OH 0.1000 100,000.00 10,000.00
Mandor L.15 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 110,500.00
B BAHAN
Nok standar 40x18 Bh 1.2000 44,000.00 52,800.00
Paku hak panj 15cm Kg 0.0400 27,500.00 1,100.00
JUMLAH HARGA BAHAN 53,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 164,400.00
E Overhead & Profit 10% 16,440.00
F Harga Satuan Pekerjaan (D+E) 180,840.00

A.4.5.2.41.1 Pemasangan 1 m’ nok alumunium lapis pasir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.0700 87,500.00 6,125.00
Kepala tukang L.11 OH 0.0070 100,000.00 700.00
Mandor L.15 OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 19,425.00
B BAHAN
Nok standar 40x18 Bh 1.2000 49,500.00 59,400.00
Paku hak panj 15cm Kg 0.0400 48,300.00 1,932.00
JUMLAH HARGA BAHAN 61,332.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,757.00
E Overhead & Profit 10% 8,075.70
F Harga Satuan Pekerjaan (D+E) 88,832.70

A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.03 OH 0.0500 87,500.00 4,375.00
Kepala tukang L.11 OH 0.0050 100,000.00 500.00
Mandor L.15 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 17,675.00
B BAHAN
Alumunium foil M2 1.0500 11,555.00 12,132.75
JUMLAH HARGA BAHAN 12,132.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,807.75
E Overhead & Profit 10% 2,980.78
F Harga Satuan Pekerjaan (D+E) 32,788.53

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu jati
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.0000 87,500.00 1,837,500.00
Kepala tukang L.03 OH 2.1000 100,000.00 210,000.00
Mandor L.04 OH 0.3500 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,642,500.00
B BAHAN
Balok kayu jati m3 1.1000 25,115,300.00 27,626,830.00
Paku 10 cm Kg 1.2500 27,500.00 34,375.00
Lem kayu Kg 1.0000 22,010.00 22,010.00
JUMLAH HARGA BAHAN 27,683,215.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,325,715.00
E Overhead & Profit 10% 3,032,571.50
F Harga Satuan Pekerjaan (D+E) 33,358,286.50

A.4.6.1.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu bengkirai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.0000 87,500.00 1,837,500.00
Kepala tukang L.03 OH 2.1000 100,000.00 210,000.00
Mandor L.04 OH 0.3500 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,642,500.00
B BAHAN
Balok kayu bengkirai m3 1.1000 14,902,600.00 16,392,860.00
Paku 10 cm Kg 1.2500 27,500.00 34,375.00
Lem kayu Kg 1.0000 22,010.00 22,010.00
JUMLAH HARGA BAHAN 16,449,245.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 19,091,745.00
E Overhead & Profit 10% 1,909,174.50
F Harga Satuan Pekerjaan (D+E) 21,000,919.50

A.4.6.1.1.3 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kamfer
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.0000 87,500.00 1,837,500.00
Kepala tukang L.03 OH 2.1000 100,000.00 210,000.00
Mandor L.04 OH 0.3500 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,642,500.00
B BAHAN
Balok kayu kamfer m3 1.1000 14,329,400.00 15,762,340.00
Paku 10 cm Kg 1.2500 27,500.00 34,375.00
Lem kayu Kg 1.0000 22,010.00 22,010.00
JUMLAH HARGA BAHAN 15,818,725.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,461,225.00
E Overhead & Profit 10% 1,846,122.50
F Harga Satuan Pekerjaan (D+E) 20,307,347.50

A.4.6.1.2 (3) Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kruing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.0000 87,500.00 1,575,000.00
Kepala tukang L.03 OH 1.8000 100,000.00 180,000.00
Mandor L.04 OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,265,000.00
B BAHAN
Balok kayu kruing m3 1.2000 8,826,900.00 10,592,280.00
Paku 10 cm Kg 1.2500 27,500.00 34,375.00
Lem kayu Kg 1.0000 22,010.00 22,010.00
JUMLAH HARGA BAHAN 10,648,665.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,913,665.00
E Overhead & Profit 10% 1,291,366.50
F Harga Satuan Pekerjaan (D+E) 14,205,031.50
A.4.6.1.1.5 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu suren/mahoni
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.0000 87,500.00 1,575,000.00
Kepala tukang L.03 OH 1.8000 100,000.00 180,000.00
Mandor L.04 OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,265,000.00
B BAHAN
Balok kayu m3 1.2000 3,056,900.00 3,668,280.00
Paku 10 cm Kg 1.2500 27,500.00 34,375.00
Lem kayu Kg 1.0000 22,010.00 22,010.00
JUMLAH HARGA BAHAN 3,724,665.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,989,665.00
E Overhead & Profit 10% 598,966.50
F Harga Satuan Pekerjaan (D+E) 6,588,631.50

A.4.6.1.5.1 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0400 25,115,300.00 1,004,612.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 1,015,617.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,393,117.00
E Overhead & Profit 10% 139,311.70
F Harga Satuan Pekerjaan (D+E) 1,532,428.70

A.4.6.1.5.2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0400 14,902,600.00 596,104.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 607,109.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 984,609.00
E Overhead & Profit 10% 98,460.90
F Harga Satuan Pekerjaan (D+E) 1,083,069.90

A.4.6.1.5.3 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0400 14,673,300.00 586,932.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 597,937.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 975,437.00
E Overhead & Profit 10% 97,543.70
F Harga Satuan Pekerjaan (D+E) 1,072,980.70
A.4.6.1.5.4 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kruing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0400 9,858,600.00 394,344.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 405,349.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 782,849.00
E Overhead & Profit 10% 78,284.90
F Harga Satuan Pekerjaan (D+E) 861,133.90

A.4.6.1.5.5 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0400 2,751,200.00 110,048.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 121,053.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 498,553.00
E Overhead & Profit 10% 49,855.30
F Harga Satuan Pekerjaan (D+E) 548,408.30

A.4.6.1.6.1 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu jati
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.03 OH 2.4000 87,500.00 210,000.00
Kepala tukang L.03 OH 0.2400 100,000.00 24,000.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 302,000.00
B BAHAN
Papan kayu m3 0.0240 25,115,300.00 602,767.20
Lem kayu Kg 0.3000 22,010.00 6,603.00
JUMLAH HARGA BAHAN 609,370.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 911,370.20
E Overhead & Profit 10% 91,137.02
F Harga Satuan Pekerjaan (D+E) 1,002,507.22

A.4.6.1.6.2 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu bengkirai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.03 OH 2.4000 87,500.00 210,000.00
Kepala tukang L.03 OH 0.2400 100,000.00 24,000.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 302,000.00
B BAHAN
Papan kayu m3 0.0240 15,475,700.00 371,416.80
Lem kayu Kg 0.3000 22,010.00 6,603.00
JUMLAH HARGA BAHAN 378,019.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 680,019.80
E Overhead & Profit 10% 68,001.98
F Harga Satuan Pekerjaan (D+E) 748,021.78
A.4.6.1.6.3 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kamfer
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.03 OH 2.4000 87,500.00 210,000.00
Kepala tukang L.03 OH 0.2400 100,000.00 24,000.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 302,000.00
B BAHAN
Papan kayu m3 0.0240 14,444,000.00 346,656.00
Lem kayu Kg 0.3000 22,010.00 6,603.00
JUMLAH HARGA BAHAN 353,259.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 655,259.00
E Overhead & Profit 10% 65,525.90
F Harga Satuan Pekerjaan (D+E) 720,784.90

A.4.6.1.6.4 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kruing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.03 OH 2.4000 87,500.00 210,000.00
Kepala tukang L.03 OH 0.2400 100,000.00 24,000.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 302,000.00
B BAHAN
Papan kayu m3 0.0240 9,973,200.00 239,356.80
Lem kayu Kg 0.3000 22,010.00 6,603.00
JUMLAH HARGA BAHAN 245,959.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 547,959.80
E Overhead & Profit 10% 54,795.98
F Harga Satuan Pekerjaan (D+E) 602,755.78

A.4.6.1.6.5 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu mahoni/suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang kayu L.03 OH 2.4000 87,500.00 210,000.00
Kepala tukang L.03 OH 0.2400 100,000.00 24,000.00
Mandor L.04 OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 302,000.00
B BAHAN
Papan kayu m3 0.0240 2,751,200.00 66,028.80
Lem kayu Kg 0.3000 22,010.00 6,603.00
JUMLAH HARGA BAHAN 72,631.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 374,631.80
E Overhead & Profit 10% 37,463.18
F Harga Satuan Pekerjaan (D+E) 412,094.98

A.4.6.1.7.1 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu jati
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0640 25,115,300.00 1,607,379.20
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 1,618,384.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,995,884.20
E Overhead & Profit 10% 199,588.42
F Harga Satuan Pekerjaan (D+E) 2,195,472.62

A.4.6.1.7.2 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu bengkirai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0640 15,475,700.00 990,444.80
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 1,001,449.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,378,949.80
E Overhead & Profit 10% 137,894.98
F Harga Satuan Pekerjaan (D+E) 1,516,844.78

A.4.6.1.7.3 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kamfer
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.0000 87,500.00 262,500.00
Kepala tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 377,500.00
B BAHAN
Papan kayu m3 0.0640 14,444,000.00 924,416.00
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 935,421.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,312,921.00
E Overhead & Profit 10% 131,292.10
F Harga Satuan Pekerjaan (D+E) 1,444,213.10

A.4.6.1.7.4 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kruing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3333 80,000.00 26,666.67
Tukang kayu L.03 OH 1.0000 87,500.00 87,500.00
Kepala tukang L.03 OH 0.1000 100,000.00 10,000.00
Mandor L.04 OH 0.0167 100,000.00 1,666.67
JUMLAH TENAGA KERJA 125,833.33
B BAHAN
Papan kayu m3 0.0640 9,973,200.00 638,284.80
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 649,289.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 775,123.13
E Overhead & Profit 10% 77,512.31
F Harga Satuan Pekerjaan (D+E) 852,635.44

A.4.6.1.7.5 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu mahoni/suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3333 80,000.00 26,666.67
Tukang kayu L.03 OH 1.0000 87,500.00 87,500.00
Kepala tukang L.03 OH 0.1000 100,000.00 10,000.00
Mandor L.04 OH 0.0167 100,000.00 1,666.67
JUMLAH TENAGA KERJA 125,833.33
B BAHAN
Papan kayu m3 0.0640 2,751,200.00 176,076.80
Lem kayu Kg 0.5000 22,010.00 11,005.00
JUMLAH HARGA BAHAN 187,081.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 312,915.13
E Overhead & Profit 10% 31,291.51
F Harga Satuan Pekerjaan (D+E) 344,206.64

A.4.6.1.8.1 Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu jati (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.03 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.2100 100,000.00 21,000.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 264,250.00
B BAHAN
Papan kayu m3 0.0250 25,115,300.00 627,882.50
Paku 1 cm – 2,5 cm kg 0.0300 27,500.00 825.00
Lem kayu kg 0.5000 22,010.00 11,005.00
Plywood 6mm Lembar 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 734,712.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 998,962.50
E Overhead & Profit 10% 99,896.25
F Harga Satuan Pekerjaan (D+E) 1,098,858.75

A.4.6.1.8.2 Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu bengkirai (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.03 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.2100 100,000.00 21,000.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 264,250.00
B BAHAN
Papan kayu m3 0.0250 15,475,700.00 386,892.50
Paku 1 cm – 2,5 cm kg 0.0300 27,500.00 825.00
Lem kayu kg 0.5000 22,010.00 11,005.00
Plywood 6mm Lembar 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 493,722.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 757,972.50
E Overhead & Profit 10% 75,797.25
F Harga Satuan Pekerjaan (D+E) 833,769.75

A.4.6.1.8.3 Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu kamfer (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.03 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.2100 100,000.00 21,000.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 264,250.00
B BAHAN
Papan kayu m3 0.0250 14,444,000.00 361,100.00
Paku 1 cm – 2,5 cm kg 0.0300 27,500.00 825.00
Lem kayu kg 0.5000 22,010.00 11,005.00
Plywood 6mm Lembar 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 467,930.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 732,180.00
E Overhead & Profit 10% 73,218.00
F Harga Satuan Pekerjaan (D+E) 805,398.00

A.4.6.1.8.4 Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu kruing (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.03 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.2100 100,000.00 21,000.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 264,250.00
B BAHAN
Papan kayu m3 0.0250 9,973,200.00 249,330.00
Paku 1 cm – 2,5 cm kg 0.0300 27,500.00 825.00
Lem kayu kg 0.5000 22,010.00 11,005.00
Plywood 6mm Lembar 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 356,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 620,410.00
E Overhead & Profit 10% 62,041.00
F Harga Satuan Pekerjaan (D+E) 682,451.00

A.4.6.1.8.5 Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu mahoni/suren (lebar sampai 90 cm)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang kayu L.03 OH 2.1000 87,500.00 183,750.00
Kepala tukang L.03 OH 0.2100 100,000.00 21,000.00
Mandor L.04 OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 264,250.00
B BAHAN
Papan kayu m3 0.0250 2,751,200.00 68,780.00
Paku 1 cm – 2,5 cm kg 0.0300 27,500.00 825.00
Lem kayu kg 0.5000 22,010.00 11,005.00
Plywood 6mm Lembar 1.0000 95,000.00 95,000.00
JUMLAH HARGA BAHAN 175,610.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 439,860.00
E Overhead & Profit 10% 43,986.00
F Harga Satuan Pekerjaan (D+E) 483,846.00

A.4.6.1.10.1 Pemasangan 1 m2 jalusi kusen, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang kayu L.03 OH 2.0000 87,500.00 175,000.00
Kepala tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 282,100.00
B BAHAN
Papan kayu m3 0.0600 25,115,300.00 1,506,918.00
Paku 1 – 2,5 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 1,511,043.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,793,143.00
E Overhead & Profit 10% 179,314.30
F Harga Satuan Pekerjaan (D+E) 1,972,457.30

A.4.6.1.10.2 Pemasangan 1 m2 jalusi kusen, kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang kayu L.03 OH 2.0000 87,500.00 175,000.00
Kepala tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 282,100.00
B BAHAN
Papan kayu m3 0.0600 15,475,700.00 928,542.00
Paku 1 – 2,5 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 932,667.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,214,767.00
E Overhead & Profit 10% 121,476.70
F Harga Satuan Pekerjaan (D+E) 1,336,243.70

A.4.6.1.10.3 Pemasangan 1 m2 jalusi kusen, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang kayu L.03 OH 2.0000 87,500.00 175,000.00
Kepala tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 282,100.00
B BAHAN
Papan kayu m3 0.0600 14,444,000.00 866,640.00
Paku 1 – 2,5 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 870,765.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,152,865.00
E Overhead & Profit 10% 115,286.50
F Harga Satuan Pekerjaan (D+E) 1,268,151.50

A.4.6.1.10.4 Pemasangan 1 m2 jalusi kusen, kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang kayu L.03 OH 2.0000 87,500.00 175,000.00
Kepala tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 282,100.00
B BAHAN
Papan kayu m3 0.0600 9,973,200.00 598,392.00
Paku 1 – 2,5 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 602,517.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884,617.00
E Overhead & Profit 10% 88,461.70
F Harga Satuan Pekerjaan (D+E) 973,078.70

A.4.6.1.10.5 Pemasangan 1 m2 jalusi kusen, kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang kayu L.03 OH 2.0000 87,500.00 175,000.00
Kepala tukang L.03 OH 0.2000 100,000.00 20,000.00
Mandor L.04 OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 282,100.00
B BAHAN
Papan kayu m3 0.0600 2,751,200.00 165,072.00
Paku 1 – 2,5 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 169,197.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 451,297.00
E Overhead & Profit 10% 45,129.70
F Harga Satuan Pekerjaan (D+E) 496,426.70

A.4.6.1.13.1 Pemasangan 1 m3 konstruksi kuda-kuda kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 28,304,500.00 31,134,950.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 31,585,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,095,950.00
E Overhead & Profit 10% 3,309,595.00
F Harga Satuan Pekerjaan (D+E) 36,405,545.00

A.4.6.1.13.2 Pemasangan 1 m3 konstruksi kuda-kuda kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 14,859,600.00 16,345,560.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 16,796,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,306,560.00
E Overhead & Profit 10% 1,830,656.00
F Harga Satuan Pekerjaan (D+E) 20,137,216.00

A.4.6.1.13.3 Pemasangan 1 m3 konstruksi kuda-kuda kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 14,329,400.00 15,762,340.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 16,213,340.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,723,340.00
E Overhead & Profit 10% 1,772,334.00
F Harga Satuan Pekerjaan (D+E) 19,495,674.00

A.4.6.1.13.4 Pemasangan 1 m3 konstruksi kuda-kuda kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 8,884,200.00 9,772,620.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 10,223,620.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,733,620.00
E Overhead & Profit 10% 1,173,362.00
F Harga Satuan Pekerjaan (D+E) 12,906,982.00

A.4.6.1.13.5 Pemasangan 1 m3 konstruksi kuda-kuda kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 3,056,900.00 3,362,590.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 3,813,590.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,323,590.00
E Overhead & Profit 10% 532,359.00
F Harga Satuan Pekerjaan (D+E) 5,855,949.00

A.4.6.1.13.6 Pemasangan 1 m3 konstruksi kuda-kuda kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.0000 87,500.00 1,050,000.00
Kepala tukang L.03 OH 1.2000 100,000.00 120,000.00
Mandor L.04 OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,510,000.00
B BAHAN
Balok kayu m3 1.1000 2,865,800.00 3,152,380.00
Besi strip tebal 5mm kg 15.0000 19,800.00 297,000.00
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 3,603,380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,113,380.00
E Overhead & Profit 10% 511,338.00
F Harga Satuan Pekerjaan (D+E) 5,624,718.00

A.4.6.1.13.7 Pemasangan 1 m3 konstruksi gording kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 28,304,500.00 31,134,950.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 31,288,950.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,421,450.00
E Overhead & Profit 10% 3,242,145.00
F Harga Satuan Pekerjaan (D+E) 35,663,595.00

A.4.6.1.13.8 Pemasangan 1 m3 konstruksi gording kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 14,859,600.00 16,345,560.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 16,499,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,632,060.00
E Overhead & Profit 10% 1,763,206.00
F Harga Satuan Pekerjaan (D+E) 19,395,266.00

A.4.6.1.13.9 Pemasangan 1 m3 konstruksi gording kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 14,329,400.00 15,762,340.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 15,916,340.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,048,840.00
E Overhead & Profit 10% 1,704,884.00
F Harga Satuan Pekerjaan (D+E) 18,753,724.00

A.4.6.1.13.10 Pemasangan 1 m3 konstruksi gording kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 8,884,200.00 9,772,620.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 9,926,620.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 11,059,120.00
E Overhead & Profit 10% 1,105,912.00
F Harga Satuan Pekerjaan (D+E) 12,165,032.00

A.4.6.1.13.11 Pemasangan 1 m3 konstruksi gording kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 3,056,900.00 3,362,590.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 3,516,590.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,649,090.00
E Overhead & Profit 10% 464,909.00
F Harga Satuan Pekerjaan (D+E) 5,113,999.00

A.4.6.1.13.12 Pemasangan 1 m3 konstruksi gording kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang kayu L.03 OH 9.0000 87,500.00 787,500.00
Kepala tukang L.03 OH 0.9000 100,000.00 90,000.00
Mandor L.04 OH 0.1500 100,000.00 15,000.00
JUMLAH TENAGA KERJA 1,132,500.00
B BAHAN
Balok kayu m3 1.1000 2,865,800.00 3,152,380.00
Besi strip tebal 5mm kg - 19,800.00 -
Paku 12 cm kg 5.6000 27,500.00 154,000.00
JUMLAH HARGA BAHAN 3,306,380.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,438,880.00
E Overhead & Profit 10% 443,888.00
F Harga Satuan Pekerjaan (D+E) 4,882,768.00

A.4.6.1.16.1 Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu jati
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 25,115,300.00 351,614.20
Reng 2 x 3 cm m3 0.0036 25,115,300.00 90,415.08
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 448,904.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 467,154.28
E Overhead & Profit 10% 46,715.43
F Harga Satuan Pekerjaan (D+E) 513,869.71

A.4.6.1.16.2 Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu bengkirai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 14,542,300.00 203,592.20
Reng 2 x 3 cm m3 0.0036 14,902,600.00 53,649.36
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 264,116.56
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 282,366.56
E Overhead & Profit 10% 28,236.66
F Harga Satuan Pekerjaan (D+E) 310,603.22

A.4.6.1.16.3 Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu kamfer
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 14,149,200.00 198,088.80
Reng 2 x 3 cm m3 0.0036 14,329,400.00 51,585.84
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 256,549.64
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 274,799.64
E Overhead & Profit 10% 27,479.96
F Harga Satuan Pekerjaan (D+E) 302,279.60

A.4.6.1.16.4 Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu kruing
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 9,432,800.00 132,059.20
Reng 2 x 3 cm m3 0.0036 8,826,900.00 31,776.84
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 170,711.04
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 188,961.04
E Overhead & Profit 10% 18,896.10
F Harga Satuan Pekerjaan (D+E) 207,857.14

A.4.6.1.16.5 Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kaso lanan/tahun reng suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 3,144,200.00 44,018.80
Reng 2 x 3 cm m3 0.0036 2,751,200.00 9,904.32
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 60,798.12
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 79,048.12
E Overhead & Profit 10% 7,904.81
F Harga Satuan Pekerjaan (D+E) 86,952.93

A.4.6.1.17.1 Pemasangan 1 m2 rangka atap genteng beton, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 25,115,300.00 351,614.20
Reng (3 x 4) cm m3 0.0057 25,115,300.00 143,157.21
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 501,646.41
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 519,896.41
E Overhead & Profit 10% 51,989.64
F Harga Satuan Pekerjaan (D+E) 571,886.05

A.4.6.1.17.2 Pemasangan 1 m2 rangka atap genteng beton, kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 14,542,300.00 203,592.20
Reng (3 x 4) cm m3 0.0057 14,902,600.00 84,944.82
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 295,412.02
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 313,662.02
E Overhead & Profit 10% 31,366.20
F Harga Satuan Pekerjaan (D+E) 345,028.22

A.4.6.1.17.3 Pemasangan 1 m2 rangka atap genteng beton, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 14,149,200.00 198,088.80
Reng (3 x 4) cm m3 0.0057 14,329,400.00 81,677.58
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 286,641.38
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 304,891.38
E Overhead & Profit 10% 30,489.14
F Harga Satuan Pekerjaan (D+E) 335,380.52

A.4.6.1.17.4 Pemasangan 1 m2 rangka atap genteng beton, kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 9,432,800.00 132,059.20
Reng (3 x 4) cm m3 0.0057 8,826,900.00 50,313.33
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 189,247.53
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 207,497.53
E Overhead & Profit 10% 20,749.75
F Harga Satuan Pekerjaan (D+E) 228,247.28

A.4.6.1.17.5 Pemasangan 1 m2 rangka atap genteng beton, kaso kayu lanan/tahun reng suren
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0140 3,144,200.00 44,018.80
Reng (3 x 4) cm m3 0.0057 2,751,200.00 15,681.84
Paku 5 dan 10 cm kg 0.2500 27,500.00 6,875.00
JUMLAH HARGA BAHAN 66,575.64
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 84,825.64
E Overhead & Profit 10% 8,482.56
F Harga Satuan Pekerjaan (D+E) 93,308.20

A.4.6.1.19.1 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 25,115,300.00 386,775.62
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 392,275.62
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 441,025.62
E Overhead & Profit 10% 44,102.56
F Harga Satuan Pekerjaan (D+E) 485,128.18

A.4.6.1.19.2 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 14,542,300.00 223,951.42
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 229,451.42
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 278,201.42
E Overhead & Profit 10% 27,820.14
F Harga Satuan Pekerjaan (D+E) 306,021.56

A.4.6.1.19.3 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 14,149,200.00 217,897.68
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 223,397.68
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 272,147.68
E Overhead & Profit 10% 27,214.77
F Harga Satuan Pekerjaan (D+E) 299,362.45

A.4.6.1.19.4 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 9,432,800.00 145,265.12
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 150,765.12
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 199,515.12
E Overhead & Profit 10% 19,951.51
F Harga Satuan Pekerjaan (D+E) 219,466.63

A.4.6.1.19.5 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 3,144,200.00 48,420.68
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 53,920.68
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 102,670.68
E Overhead & Profit 10% 10,267.07
F Harga Satuan Pekerjaan (D+E) 112,937.75

A.4.6.1.19.6 Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.3000 87,500.00 26,250.00
Kepala tukang L.03 OH 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 48,750.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.0154 3,144,200.00 48,420.68
Paku 7 cm – 10 cm kg 0.2000 27,500.00 5,500.00
JUMLAH HARGA BAHAN 53,920.68
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 102,670.68
E Overhead & Profit 10% 10,267.07
F Harga Satuan Pekerjaan (D+E) 112,937.75

A.4.6.1.21.1 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0108 25,115,300.00 271,245.24
Paku 5 dan 7 cm kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 273,995.24
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 301,995.24
E Overhead & Profit 10% 30,199.52
F Harga Satuan Pekerjaan (D+E) 332,194.76
A.4.6.1.21.2 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu bengkirai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0108 14,902,600.00 160,948.08
Paku 5 dan 7 cm kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 163,698.08
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 191,698.08
E Overhead & Profit 10% 19,169.81
F Harga Satuan Pekerjaan (D+E) 210,867.89

A.4.6.1.21.3 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0108 14,673,300.00 158,471.64
Paku 5 dan 7 cm kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 161,221.64
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 189,221.64
E Overhead & Profit 10% 18,922.16
F Harga Satuan Pekerjaan (D+E) 208,143.80

A.4.6.1.21.4 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0108 9,858,600.00 106,472.88
Paku 5 dan 7 cm kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 109,222.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 137,222.88
E Overhead & Profit 10% 13,722.29
F Harga Satuan Pekerjaan (D+E) 150,945.17

A.4.6.1.21.5 Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0108 2,751,200.00 29,712.96
Paku 5 dan 7 cm kg 0.1000 27,500.00 2,750.00
JUMLAH HARGA BAHAN 32,462.96
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,462.96
E Overhead & Profit 10% 6,046.30
F Harga Satuan Pekerjaan (D+E) 66,509.26

A.4.6.1.22.1 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0110 25,115,300.00 276,268.30
Paku 5 dan 7 cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 277,643.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 305,643.30
E Overhead & Profit 10% 30,564.33
F Harga Satuan Pekerjaan (D+E) 336,207.63

A.4.6.1.22.2 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0110 14,902,600.00 163,928.60
Paku 5 dan 7 cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 165,303.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 193,303.60
E Overhead & Profit 10% 19,330.36
F Harga Satuan Pekerjaan (D+E) 212,633.96

A.4.6.1.22.3 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0110 14,673,300.00 161,406.30
Paku 5 dan 7 cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 162,781.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 190,781.30
E Overhead & Profit 10% 19,078.13
F Harga Satuan Pekerjaan (D+E) 209,859.43

A.4.6.1.22.4 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0110 9,858,600.00 108,444.60
Paku 5 dan 7 cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 109,819.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 137,819.60
E Overhead & Profit 10% 13,781.96
F Harga Satuan Pekerjaan (D+E) 151,601.56

A.4.6.1.22.5 Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Papan kayu m3 0.0110 2,751,200.00 30,263.20
Paku 5 dan 7 cm kg 0.0500 27,500.00 1,375.00
JUMLAH HARGA BAHAN 31,638.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 59,638.20
E Overhead & Profit 10% 5,963.82
F Harga Satuan Pekerjaan (D+E) 65,602.02

A.4.6.1.22.5 Pemasangan 1 m’ lisplank ukuran 30 cm, woodplank


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang kayu L.03 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 28,000.00
B BAHAN
Woodplank m' 1.0000 13,756.25 13,756.25
Skrup bh 4.0000 500.00 2,000.00
JUMLAH HARGA BAHAN 15,756.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,756.25
E Overhead & Profit 10% 4,375.63
F Harga Satuan Pekerjaan (D+E) 48,131.88

A.4.6.1.23.1 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 28,304,500.00 792,526.00
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 796,651.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 853,326.00
E Overhead & Profit 10% 85,332.60
F Harga Satuan Pekerjaan (D+E) 938,658.60

A.4.6.1.23.3 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 14,859,600.00 416,068.80
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 420,193.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 476,868.80
E Overhead & Profit 10% 47,686.88
F Harga Satuan Pekerjaan (D+E) 524,555.68

A.4.6.1.23.4 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 14,329,400.00 401,223.20
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 405,348.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 462,023.20
E Overhead & Profit 10% 46,202.32
F Harga Satuan Pekerjaan (D+E) 508,225.52

A.4.6.1.23.5 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 8,884,200.00 248,757.60
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 252,882.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 309,557.60
E Overhead & Profit 10% 30,955.76
F Harga Satuan Pekerjaan (D+E) 340,513.36

A.4.6.1.23.5 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 3,056,900.00 85,593.20
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 89,718.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 146,393.20
E Overhead & Profit 10% 14,639.32
F Harga Satuan Pekerjaan (D+E) 161,032.52

A.4.6.1.23.6 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu m3 0.0280 2,865,800.00 80,242.40
Paku 5 dan 7 cm kg 0.1500 27,500.00 4,125.00
JUMLAH HARGA BAHAN 84,367.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 141,042.40
E Overhead & Profit 10% 14,104.24
F Harga Satuan Pekerjaan (D+E) 155,146.64

A.4.6.1.24.1 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 28,304,500.00 792,526.00
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,120 x 240 Lembar 0.0860 95,000.00 8,170.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 817,146.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 873,821.60
E Overhead & Profit 10% 87,382.16
F Harga Satuan Pekerjaan (D+E) 961,203.76

A.4.6.1.24.2 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 14,859,600.00 416,068.80
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,
Lembar 0.0860 95,000.00 8,170.00
120 x 240
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 440,689.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 497,364.40
E Overhead & Profit 10% 49,736.44
F Harga Satuan Pekerjaan (D+E) 547,100.84

A.4.6.1.24.3 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 14,329,400.00 401,223.20
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,
Lembar 0.0860 95,000.00 8,170.00
120 x 240
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 425,843.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 482,518.80
E Overhead & Profit 10% 48,251.88
F Harga Satuan Pekerjaan (D+E) 530,770.68

A.4.6.1.24.4 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 8,884,200.00 248,757.60
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,
Lembar 0.0860 95,000.00 8,170.00
120 x 240
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 273,378.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 330,053.20
E Overhead & Profit 10% 33,005.32
F Harga Satuan Pekerjaan (D+E) 363,058.52

A.4.6.1.24.5 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 3,056,900.00 85,593.20
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,
Lembar 0.0860 95,000.00 8,170.00
120 x 240
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 110,213.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 166,888.80
E Overhead & Profit 10% 16,688.88
F Harga Satuan Pekerjaan (D+E) 183,577.68

A.4.6.1.24.6 Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang kayu L.03 OH 0.4500 87,500.00 39,375.00
Kepala tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,675.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 2,865,800.00 80,242.40
Paku 5 dan 10 kg 0.1500 27,500.00 4,125.00
Teakwood 4 mm,
Lembar 0.0860 95,000.00 8,170.00
120 x 240
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 104,863.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 161,538.00
E Overhead & Profit 10% 16,153.80
F Harga Satuan Pekerjaan (D+E) 177,691.80

A.4.6.1.25.1 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu jati


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 28,304,500.00 792,526.00
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 890,676.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 966,176.60
E Overhead & Profit 10% 96,617.66
F Harga Satuan Pekerjaan (D+E) 1,062,794.26

A.4.6.1.25.2 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu bengkirai


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 14,859,600.00 416,068.80
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 514,219.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 589,719.40
E Overhead & Profit 10% 58,971.94
F Harga Satuan Pekerjaan (D+E) 648,691.34

A.4.6.1.25.3 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu kamfer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 14,329,400.00 401,223.20
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 499,373.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 574,873.80
E Overhead & Profit 10% 57,487.38
F Harga Satuan Pekerjaan (D+E) 632,361.18

A.4.6.1.25.4 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu kruing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 8,884,200.00 248,757.60
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 346,908.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 422,408.20
E Overhead & Profit 10% 42,240.82
F Harga Satuan Pekerjaan (D+E) 464,649.02

A.4.6.1.25.5 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu mahoni/suren


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 3,056,900.00 85,593.20
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 183,743.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 259,243.80
E Overhead & Profit 10% 25,924.38
F Harga Satuan Pekerjaan (D+E) 285,168.18

A.4.6.1.25.6 Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu lanan/tahun


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang kayu L.03 OH 0.6000 87,500.00 52,500.00
Kepala tukang L.03 OH 0.0600 100,000.00 6,000.00
Mandor L.04 OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 75,500.00
B BAHAN
Balok kayu, 6 x 12 m3 0.0280 2,865,800.00 80,242.40
Paku
kg 0.1500 27,500.00 4,125.00
5 dan 10
Plywood 6 mm,120 x 240 Lembar 0.8600 95,000.00 81,700.00
Lem kayu kg 0.5600 22,010.00 12,325.60
JUMLAH HARGA BAHAN 178,393.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 253,893.00
E Overhead & Profit 10% 25,389.30
F Harga Satuan Pekerjaan (D+E) 279,282.30

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang kayu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 50,050.00
B BAHAN
Kunci tanam biasa Bh 1.0000 125,000.00 125,000.00
JUMLAH HARGA BAHAN 125,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 175,050.00
E Overhead & Profit 10% 17,505.00
F Harga Satuan Pekerjaan (D+E) 192,555.00

A.4.6.2.4. Pemasangan 1 buah kunci silinder


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0050 80,000.00 400.00
Tukang kayu L.02 OH 0.5000 87,500.00 43,750.00
Kepala tukang L.03 OH 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 52,150.00
B BAHAN
Kunci silinder Bh 1.0000 49,500.00 49,500.00
JUMLAH HARGA BAHAN 49,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 101,650.00
E Overhead & Profit 10% 10,165.00
F Harga Satuan Pekerjaan (D+E) 111,815.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 OH 0.1500 87,500.00 13,125.00
Kepala tukang L.03 OH 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Engsel pintu Bh 1.0000 38,500.00 38,500.00
JUMLAH HARGA BAHAN 38,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 54,405.00
E Overhead & Profit 10% 5,440.50
F Harga Satuan Pekerjaan (D+E) 59,845.50

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang kayu L.02 OH 0.1000 87,500.00 8,750.00
Kepala tukang L.03 OH 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0005 100,000.00 50.00
JUMLAH TENAGA KERJA 10,600.00
B BAHAN
Engsel kupu-kupu Bh 1.0000 22,000.00 22,000.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,600.00
E Overhead & Profit 10% 3,260.00
F Harga Satuan Pekerjaan (D+E) 35,860.00

A.4.6.2.8. Pemasangan 1 buah spring knip


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 16,625.00
B BAHAN
Spring knip Bh 1.0000 13,700.00 13,700.00
JUMLAH HARGA BAHAN 13,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,325.00
E Overhead & Profit 10% 3,032.50
F Harga Satuan Pekerjaan (D+E) 33,357.50

A.4.6.2.9. Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 16,625.00
B BAHAN
Kait angin Bh 1.0000 19,200.00 19,200.00
JUMLAH HARGA BAHAN 19,200.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,825.00
E Overhead & Profit 10% 3,582.50
F Harga Satuan Pekerjaan (D+E) 39,407.50

A.4.6.2.10. Pemasangan 1 buah door closer


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang kayu L.02 0.5000 87,500.00 43,750.00
Kepala tukang L.03 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 53,050.00
B BAHAN
Door closer set 1.0000 220,100.00 220,100.00
JUMLAH HARGA BAHAN 220,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 273,150.00
E Overhead & Profit 10% 27,315.00
F Harga Satuan Pekerjaan (D+E) 300,465.00

A.4.6.2.11.1 Pemasangan 1 buah kunci slot/grendel pintu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang kayu L.02 0.2000 87,500.00 17,500.00
Kepala tukang L.03 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 21,200.00
B BAHAN
Kunci slot Bh 1.0000 27,500.00 27,500.00
JUMLAH HARGA BAHAN 27,500.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,700.00
E Overhead & Profit 10% 4,870.00
F Harga Satuan Pekerjaan (D+E) 53,570.00

A.4.6.2.11 Pemasangan 1 buah kunci slot/grendel jendela


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang kayu L.02 0.2000 87,500.00 17,500.00
Kepala tukang L.03 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 21,200.00
B BAHAN
Kunci slot Bh 1.0000 13,700.00 13,700.00
JUMLAH HARGA BAHAN 13,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 34,900.00
E Overhead & Profit 10% 3,490.00
F Harga Satuan Pekerjaan (D+E) 38,390.00

A.4.6.2.12. Pemasangan 1 buah Door holder


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Tukang kayu L.02 0.5000 87,500.00 43,750.00
Kepala tukang L.03 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 53,050.00
B BAHAN
Door holder Bh 1.0000 110,000.00 110,000.00
JUMLAH HARGA BAHAN 110,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 163,050.00
E Overhead & Profit 10% 16,305.00
F Harga Satuan Pekerjaan (D+E) 179,355.00

A.4.6.2.15. Pemasangan 1 buah kunci lemari


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0250 80,000.00 2,000.00
Tukang kayu L.02 0.2500 87,500.00 21,875.00
Kepala tukang L.03 0.0250 100,000.00 2,500.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 26,505.00
B BAHAN
Kunci lemari Set 1.0000 22,000.00 22,000.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 48,505.00
E Overhead & Profit 10% 4,850.50
F Harga Satuan Pekerjaan (D+E) 53,355.50

A.4.6.2.16.a Pemasangan 1 m2 Kaca tempered uk. 10 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca tempered uk. 10 mm m2 1.1000 1,017,900.00 1,119,690.00
Sealant Kg 0.0500 38,500.00 1,925.00
JUMLAH HARGA BAHAN 1,121,615.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,137,520.00
E Overhead & Profit 10% 113,752.00
F Harga Satuan Pekerjaan (D+E) 1,251,272.00

A.4.6.2.16.b Pemasangan 1 m2 Kaca tempered uk. 12 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca tempered uk. 12 mm m2 1.1000 1,078,400.00 1,186,240.00
Sealant Kg 0.0500 38,500.00 1,925.00
JUMLAH HARGA BAHAN 1,188,165.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,204,070.00
E Overhead & Profit 10% 120,407.00
F Harga Satuan Pekerjaan (D+E) 1,324,477.00

A.4.6.2.16.c Pemasangan 1 m2 Kaca tempered uk. 8 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca tempered uk. 8 mm m2 1.1000 825,300.00 907,830.00
Sealant Kg 0.0500 38,500.00 1,925.00
JUMLAH HARGA BAHAN 909,755.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 925,660.00
E Overhead & Profit 10% 92,566.00
F Harga Satuan Pekerjaan (D+E) 1,018,226.00

A.4.6.2.17. Pemasangan 1 m2 Kaca uk. 5 mm (Kaca Polos)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 5 mm (Kaca Polos) m2 1.1000 121,000.00 133,100.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 133,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,005.00
E Overhead & Profit 10% 14,900.50
F Harga Satuan Pekerjaan (D+E) 163,905.50

A.4.6.2.16.j Pemasangan 1 m2 Kaca uk. 5 mm (Kaca Rayben)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 5 mm (Kaca Rayben) m2 1.1000 269,600.00 296,560.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 296,560.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 312,465.00
E Overhead & Profit 10% 31,246.50
F Harga Satuan Pekerjaan (D+E) 343,711.50

A.4.6.2.16.l Pemasangan 1 m2 Kaca uk. 6 mm (Kaca Polos)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 6 mm (Kaca Polos) m2 1.1000 272,900.00 300,190.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 300,190.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 316,095.00
E Overhead & Profit 10% 31,609.50
F Harga Satuan Pekerjaan (D+E) 347,704.50

A.4.6.2.16.m Pemasangan 1 m2 Kaca uk. 6 mm (Kaca Rayben)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 6 mm (Kaca Rayben) m2 1.1000 501,800.00 551,980.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 551,980.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 567,885.00
E Overhead & Profit 10% 56,788.50
F Harga Satuan Pekerjaan (D+E) 624,673.50

A.4.6.2.16.o Pemasangan 1 m2 Kaca uk. 8 mm (Kaca Polos)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 8 mm (Kaca Polos) m2 1.1000 521,600.00 573,760.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 573,760.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 589,665.00
E Overhead & Profit 10% 58,966.50
F Harga Satuan Pekerjaan (D+E) 648,631.50

A.4.6.2.16.p Pemasangan 1 m2 Kaca uk. 8 mm (Kaca Rayben)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Kaca uk. 8 mm (Kaca Rayben) m2 1.1000 824,200.00 906,620.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 906,620.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 922,525.00
E Overhead & Profit 10% 92,252.50
F Harga Satuan Pekerjaan (D+E) 1,014,777.50

A.4.6.2.16.q Pemasangan 1 m2 akrilik uk. 3 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Akrilik 3 mm m2 1.1000 265,200.00 291,720.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 291,720.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 307,625.00
E Overhead & Profit 10% 30,762.50
F Harga Satuan Pekerjaan (D+E) 338,387.50

A.4.6.2.16.r Pemasangan 1 m2 akrilik uk. 5 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0150 80,000.00 1,200.00
Tukang kayu L.02 0.1500 87,500.00 13,125.00
Kepala tukang L.03 0.0150 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 15,905.00
B BAHAN
Akrilik 5 mm m2 1.1000 432,400.00 475,640.00
Sealant Kg 0.0500 -
JUMLAH HARGA BAHAN 475,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 491,545.00
E Overhead & Profit 10% 49,154.50
F Harga Satuan Pekerjaan (D+E) 540,699.50

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Soda api Kg 0.0500 38,000.00 1,900.00
JUMLAH HARGA BAHAN 1,900.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,200.00
E Overhead & Profit 10% 1,420.00
F Harga Satuan Pekerjaan (D+E) 15,620.00

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Sabun Kg 0.0500 4,400.00 220.00
JUMLAH HARGA BAHAN 220.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,520.00
E Overhead & Profit 10% 1,252.00
F Harga Satuan Pekerjaan (D+E) 13,772.00

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Mandor L.04 OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 12,800.00
B BAHAN
Sabun Kg 0.0500 4,400.00 220.00
JUMLAH HARGA BAHAN 220.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,020.00
E Overhead & Profit 10% 1,302.00
F Harga Satuan Pekerjaan (D+E) 14,322.00

3.3.4.(c) 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang cat L.02 OH 0.0090 87,500.00 787.50
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 7,287.50
B BAHAN
Cat menie Kg 0.2000 38,500.00 7,700.00
Plamuur Kg 0.1500 55,000.00 8,250.00
Cat dasar Kg 0.1700 77,000.00 13,090.00
Cat penutup Kg 0.2600 71,000.00 18,460.00
Kuas Bh 0.0100 23,000.00 230.00
Pengencer/minyak cat Kg 0.0300 27,500.00 825.00
Ampelas Lbr 0.2000 5,500.00 1,100.00
JUMLAH HARGA BAHAN 49,655.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,942.50
E Overhead & Profit 10% 5,694.25
F Harga Satuan Pekerjaan (D+E) 62,636.75

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang cat L.02 OH 0.1050 87,500.00 9,187.50
Kepala tukang L.03 OH 0.0040 100,000.00 400.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 15,487.50
B BAHAN
Cat menie Kg 0.2000 38,500.00 7,700.00
Plamuur Kg 0.1500 55,000.00 8,250.00
Cat dasar Kg 0.1700 77,000.00 13,090.00
Cat penutup Kg 0.3500 71,000.00 24,850.00
Kuas Bh 0.0100 23,000.00 230.00
Pengencer Kg 0.0300 27,500.00 825.00
Ampelas Lbr 0.2000 5,500.00 1,100.00
JUMLAH HARGA BAHAN 56,045.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,532.50
E Overhead & Profit 10% 7,153.25
F Harga Satuan Pekerjaan (D+E) 78,685.75

A.4.7.1.5.1 1 m2 Pengecatan bidang kayu lama (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 80,000.00 5,600.00
Tukang cat L.02 OH 0.0090 87,500.00 787.50
Kepala tukang L.03 OH 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 7,287.50
B BAHAN
Plamuur Kg 0.1500 55,000.00 8,250.00
Cat dasar Kg 0.1700 77,000.00 13,090.00
Cat penutup Kg 0.1700 71,000.00 12,070.00
Kuas Bh 0.0100 23,000.00 230.00
Pengencer/minyak cat Kg 0.0300 27,500.00 825.00
Ampelas Lbr 0.2000 5,500.00 1,100.00
JUMLAH HARGA BAHAN 35,565.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,852.50
E Overhead & Profit 10% 4,285.25
F Harga Satuan Pekerjaan (D+E) 47,137.75

3.3.10.(c) Pengecatan 1 m2 tembok dalam baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex catylac
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.0630 87,500.00 5,512.50
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,042.50
B BAHAN
Plamuur Kg 0.1000 55,000.00 5,500.00
Cat dasar Kg 0.1000 44,000.00 4,400.00
Cat penutup Kg 0.2600 33,000.00 8,580.00
JUMLAH HARGA BAHAN 18,480.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,522.50
E Overhead & Profit 10% 2,652.25
F Harga Satuan Pekerjaan (D+E) 29,174.75

A.4.7.1.10.2 Pengecatan 1 m2 tembok luar baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex catylac
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.0630 87,500.00 5,512.50
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,042.50
B BAHAN
Plamuur Kg 0.1000 55,000.00 5,500.00
Cat dasar Kg 0.1000 44,000.00 4,400.00
Cat penutup Kg 0.2600 49,000.00 12,740.00
JUMLAH HARGA BAHAN 22,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,682.50
E Overhead & Profit 10% 3,068.25
F Harga Satuan Pekerjaan (D+E) 33,750.75

A.4.7.1.10.3 Pengecatan 1 m2 tembok dalam baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.0630 87,500.00 5,512.50
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,042.50
B BAHAN
Plamuur Kg 0.1000 55,000.00 5,500.00
Cat dasar Kg 0.1000 44,000.00 4,400.00
Cat penutup Kg 0.2600 66,000.00 17,160.00
JUMLAH HARGA BAHAN 27,060.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,102.50
E Overhead & Profit 10% 3,510.25
F Harga Satuan Pekerjaan (D+E) 38,612.75

A.4.7.1.10.4 Pengecatan 1 m2 tembok luar baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.0630 87,500.00 5,512.50
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,042.50
B BAHAN
Plamuur Kg 0.1000 55,000.00 5,500.00
Cat dasar Kg 0.1000 44,000.00 4,400.00
Cat penutup Kg 0.2600 82,000.00 21,320.00
JUMLAH HARGA BAHAN 31,220.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,262.50
E Overhead & Profit 10% 3,926.25
F Harga Satuan Pekerjaan (D+E) 43,188.75

A.4.7.1.11.1 Pengecatan 1 m2 tembok dalam lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex catylac
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat dasar Kg 0.1200 44,000.00 5,280.00
Cat penutup Kg 0.1800 33,000.00 5,940.00
JUMLAH HARGA BAHAN 11,220.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,855.00
E Overhead & Profit 10% 1,785.50
F Harga Satuan Pekerjaan (D+E) 19,640.50

A.4.7.1.11.2 Pengecatan 1 m2 tembok luar lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex catylac
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat dasar Kg 0.1200 44,000.00 5,280.00
Cat penutup Kg 0.1800 49,000.00 8,820.00
JUMLAH HARGA BAHAN 14,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,735.00
E Overhead & Profit 10% 2,073.50
F Harga Satuan Pekerjaan (D+E) 22,808.50

A.4.7.1.11.3 Pengecatan 1 m2 tembok dalam lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat dasar Kg 0.1200 44,000.00 5,280.00
Cat penutup Kg 0.1800 66,000.00 11,880.00
JUMLAH HARGA BAHAN 17,160.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,795.00
E Overhead & Profit 10% 2,379.50
F Harga Satuan Pekerjaan (D+E) 26,174.50

A.4.7.1.11.4 Pengecatan 1 m2 tembok luar lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat dasar Kg 0.1200 44,000.00 5,280.00
Cat penutup Kg 0.1800 82,000.00 14,760.00
JUMLAH HARGA BAHAN 20,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,675.00
E Overhead & Profit 10% 2,667.50
F Harga Satuan Pekerjaan (D+E) 29,342.50

A.4.7.1.15. Pemasangan 1 m2 wallpaper


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0025 100,000.00 250.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Wall paper m2 1.2000 44,000.00 52,800.00
Lem Kg 0.2000 88,040.00 17,608.00
JUMLAH HARGA BAHAN 70,408.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,758.00
E Overhead & Profit 10% 9,175.80
F Harga Satuan Pekerjaan (D+E) 100,933.80

A.4.7.1.15.A Pemasangan 1 m2 HPL


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0025 100,000.00 250.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Wall paper m2 1.2000 181,500.00 217,800.00
Lem Kg 0.2000 19,800.00 3,960.00
JUMLAH HARGA BAHAN 221,760.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 243,110.00
E Overhead & Profit 10% 24,311.00
F Harga Satuan Pekerjaan (D+E) 267,421.00

A.4.7.1.11.5 Pengecatan 1 m2 permukaan dinding ekspose dengan coating (3 lapis coating)


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat coating Kg 0.3000 30,800.00 9,240.00
Pengencer/minyak cat Kg 0.0300 27,500.00 825.00
JUMLAH HARGA BAHAN 10,065.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,700.00
E Overhead & Profit 10% 1,670.00
F Harga Satuan Pekerjaan (D+E) 18,370.00

A.4.7.1.11.6 Pengecatan 1 m2 permukaan dinding ekspose dengan coating waterbased (3 lapis coating)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 80,000.00 2,240.00
Tukang cat L.02 OH 0.0420 87,500.00 3,675.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,635.00
B BAHAN
Cat coating waterbased Kg 0.3000 63,800.00 19,140.00
Pengencer air Kg 0.0300 110.00 3.30
JUMLAH HARGA BAHAN 19,143.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,778.30
E Overhead & Profit 10% 2,577.83
F Harga Satuan Pekerjaan (D+E) 28,356.13

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang cat L.02 OH 0.2000 87,500.00 17,500.00
Kepala tukang L.03 OH 0.0200 100,000.00 2,000.00
Mandor L.04 OH 0.0025 100,000.00 250.00
JUMLAH TENAGA KERJA 21,350.00
B BAHAN
Menie besi Kg 0.1000 38,500.00 3,850.00
Kwas Bh 0.0100 23,000.00 230.00
JUMLAH HARGA BAHAN 4,080.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,430.00
E Overhead & Profit 10% 2,543.00
F Harga Satuan Pekerjaan (D+E) 27,973.00

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang cat L.02 OH 0.2250 87,500.00 19,687.50
Kepala tukang L.02 OH 0.0225 100,000.00 2,250.00
Mandor L.04 OH 0.0075 100,000.00 750.00
JUMLAH TENAGA KERJA 42,687.50
B BAHAN
Menie besi Kg 0.1000 38,500.00 3,850.00
Pengencer L 0.0100 33,000.00 330.00
Kwas Bh 0.0100 23,000.00 230.00
Perancah kayu m3 0.0020 2,751,200.00 5,502.40
JUMLAH HARGA BAHAN 9,912.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,599.90
E Overhead & Profit 10% 5,259.99
F Harga Satuan Pekerjaan (D+E) 57,859.89

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang cat L.02 OH 0.0600 87,500.00 5,250.00
Kepala tukang L.03 OH 0.0120 100,000.00 1,200.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 11,550.00
B BAHAN
Cat Kg 0.3000 99,000.00 29,700.00
Kwas Bh 0.0100 23,000.00 230.00
Pengencer L 0.0100 33,000.00 330.00
JUMLAH HARGA BAHAN 30,260.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 41,810.00


E Overhead & Profit 10% 4,181.00
F Harga Satuan Pekerjaan (D+E) 45,991.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.3000 80,000.00 264,000.00
Tukang batu L.02 1.1000 87,500.00 96,250.00
Kepala tukang L.03 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 377,250.00
B BAHAN
Closet duduk Unit 1.0000 2,201,000.00 2,201,000.00
Perlengkapan Ls 6% x closet 132,060.00 132,060.00
JUMLAH HARGA BAHAN 2,333,060.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,710,310.00
E Overhead & Profit 10% 271,031.00
F Harga Satuan Pekerjaan (D+E) 2,981,341.00

A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang batu L.02 1.5000 87,500.00 131,250.00
Kepala tukang L.03 0.1500 100,000.00 15,000.00
Mandor L.04 OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 242,250.00
B BAHAN
Closet jongkok Unit 1.0000 258,600.00 258,600.00
Semen Portland Kg 6.0000 1,200.00 7,200.00
Pasir pasang M3 0.0100 385,000.00 3,850.00
JUMLAH HARGA BAHAN 269,650.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 511,900.00
E Overhead & Profit 10% 51,190.00
F Harga Satuan Pekerjaan (D+E) 563,090.00

A.5.1.1 4. Pemasangan 1 buah urinoir


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang batu L.02 1.0000 87,500.00 87,500.00
Kepala tukang L.03 0.1000 100,000.00 10,000.00
Mandor L.04 OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 182,500.00
B BAHAN
Urinoir Unit 1.0000 1,210,500.00 1,210,500.00
Semen Portland Kg 6.0000 1,200.00 7,200.00
Pasir pasang M3 0.0100 385,000.00 3,850.00
Perlengkapan % 30.0000 363,150.00 363,150.00
JUMLAH HARGA BAHAN 1,584,700.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,767,200.00
E Overhead & Profit 10% 176,720.00
F Harga Satuan Pekerjaan (D+E) 1,943,920.00

A.5.1.1 5. Pemasangan 1 buah wastafel


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang batu L.02 1.4500 87,500.00 126,875.00
Kepala tukang L.03 0.1500 100,000.00 15,000.00
Mandor L.04 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 243,875.00
B BAHAN
Wastafel Unit 1.2000 715,300.00 858,360.00
Semen Portland Kg 6.0000 1,200.00 7,200.00
Pasir pasang M3 0.0100 385,000.00 3,850.00
Perlengkapan % - - -
JUMLAH HARGA BAHAN 869,410.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,113,285.00
E Overhead & Profit 10% 111,328.50
F Harga Satuan Pekerjaan (D+E) 1,224,613.50

A.5.1.1 7. Pemasangan 1 buah bak fibreglass


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 0.4500 87,500.00 39,375.00
Kepala tukang L.03 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 69,375.00
B BAHAN
Bak fibreglass Unit 1.0000 330,100.00 330,100.00
Perlengkapan Ls 12%xbak 39,612.00 39,612.00
JUMLAH HARGA BAHAN 369,712.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 439,087.00
E Overhead & Profit 10% 43,908.70
F Harga Satuan Pekerjaan (D+E) 482,995.70

A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 6.0000 80,000.00 480,000.00
Tukang batu L.02 3.0000 87,500.00 262,500.00
Kepala tukang L.03 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 775,500.00
B BAHAN
Bata merah bh 150.0000 1,300.00 195,000.00
Semen portlan Kg 120.0000 1,200.00 144,000.00
Pasir pasang M3 0.3000 385,000.00 115,500.00
Porselen 11x11 bh 3.6000 -
Semen warna Kg 6.0000 3,302.00 19,812.00
JUMLAH HARGA BAHAN 474,312.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,249,812.00
E Overhead & Profit 10% 124,981.20
F Harga Satuan Pekerjaan (D+E) 1,374,793.20

A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.5000 80,000.00 280,000.00
Tukang batu L.02 4.5000 87,500.00 393,750.00
Kepala tukang L.03 0.0500 100,000.00 5,000.00
Mandor L.04 OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 680,550.00
B BAHAN
Beton K 150 M3 0.9000 1,142,105.25 1,027,894.73
Baja tulangan Kg 1.8000 13,000.00 23,400.00
Kayu bekisting M2 8.0000 4,402.00 35,216.00
Perlengkapan % 10.0000 1,086,510.73 108,651.07
JUMLAH HARGA BAHAN 1,195,161.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,875,711.80
E Overhead & Profit 10% 187,571.18
F Harga Satuan Pekerjaan (D+E) 2,063,282.98

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang batu L.02 0.3000 87,500.00 26,250.00
Kepala tukang L.03 0.0300 100,000.00 3,000.00
Mandor L.04 OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 33,150.00
B BAHAN
Bak cuci piring Unit 1.0000 275,100.00 275,100.00
Waterdrain Bh 1.0000 55,000.00 55,000.00
JUMLAH HARGA BAHAN 330,100.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 363,250.00
E Overhead & Profit 10% 36,325.00
F Harga Satuan Pekerjaan (D+E) 399,575.00

A.5.1.1 14. Pemasangan 1 buah floor drain


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 0.1000 87,500.00 8,750.00
Kepala tukang L.03 0.0100 100,000.00 1,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 11,050.00
B BAHAN
Floor drain Unit 1.0000 44,000.00 44,000.00
JUMLAH HARGA BAHAN 44,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 55,050.00
E Overhead & Profit 10% 5,505.00
F Harga Satuan Pekerjaan (D+E) 60,555.00

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.1600 80,000.00 172,800.00
Tukang batu L.02 0.7200 87,500.00 63,000.00
Kepala tukang L.03 0.0720 100,000.00 7,200.00
Mandor L.04 OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 244,100.00
B BAHAN
Bata merah bh 40.0000 1,300.00 52,000.00
Semen portland Kg 44.0000 1,200.00 52,800.00
Pasir pasang M3 0.0700 385,000.00 26,950.00
Pasir beton M3 0.0600 385,000.00 23,100.00
Batu pecah mesin 2x3 M3 0.0700 357,000.00 24,990.00
Baja tulangan Kg 1.6000 13,000.00 20,800.00
JUMLAH HARGA BAHAN 200,640.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 444,740.00
E Overhead & Profit 10% 44,474.00
F Harga Satuan Pekerjaan (D+E) 489,214.00

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 80,000.00 256,000.00
Tukang batu L.02 1.1500 87,500.00 100,625.00
Kepala tukang L.03 0.0110 100,000.00 1,100.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 359,325.00
B BAHAN
Bata merah bh 70.0000 1,300.00 91,000.00
Semen portland Kg 77.0000 1,200.00 92,400.00
Pasir pasang M3 0.1300 385,000.00 50,050.00
Pasir beton M3 0.0900 385,000.00 34,650.00
Batu pecah 2x3 M3 0.0200 357,000.00 7,140.00
Baja tulangan Kg 2.6000 13,000.00 33,800.00
JUMLAH HARGA BAHAN 309,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 668,365.00
E Overhead & Profit 10% 66,836.50
F Harga Satuan Pekerjaan (D+E) 735,201.50

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 3.2000 80,000.00 256,000.00
Tukang batu L.02 1.1500 87,500.00 100,625.00
Kepala tukang L.03 0.1100 100,000.00 11,000.00
Mandor L.04 OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 369,225.00
B BAHAN
Bata merah bh 123.0000 1,300.00 159,900.00
Semen portland Kg 114.0000 1,200.00 136,800.00
Pasir pasang M3 0.1840 385,000.00 70,840.00
Pasir beton M3 0.1200 385,000.00 46,200.00
Kerikil M3 0.0330 357,000.00 11,781.00
Baja tulangan Kg 4.8500 13,000.00 63,050.00
JUMLAH HARGA BAHAN 488,571.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 857,796.00
E Overhead & Profit 10% 85,779.60
F Harga Satuan Pekerjaan (D+E) 943,575.60

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis ½” M 1.2000 121,972.17 146,366.60
Perlengkapan Ls 35%xpipa 42,690.26 42,690.26
JUMLAH HARGA BAHAN 189,056.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 204,851.86
E Overhead & Profit 10% 20,485.19
F Harga Satuan Pekerjaan (D+E) 225,337.05

A.5.1.1 18.A Pemasangan 1 m’ pipa galvanis diameter ½” medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis ½” M 1.2000 14,673.33 17,608.00
Perlengkapan Ls 35%xpipa 5,135.67 5,135.67
JUMLAH HARGA BAHAN 22,743.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,538.67
E Overhead & Profit 10% 3,853.87
F Harga Satuan Pekerjaan (D+E) 42,392.54

A.5.1.1. 35 Pemasangan 1 buah kran plastik diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 0.4000 87,500.00 35,000.00
Kepala tukang L.03 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Kran air bh 1.0000 5,500.00 5,500.00
Sealtape Buah 0.0250 4,400.00 110.00
JUMLAH HARGA BAHAN 5,610.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,910.00
E Overhead & Profit 10% 4,591.00
F Harga Satuan Pekerjaan (D+E) 50,501.00

A.5.1.1 19.2 Pemasangan 1 buah kran besi/logam diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 0.4000 87,500.00 35,000.00
Kepala tukang L.03 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Kran air bh 1.0000 6,416.67 6,416.67
Sealtape Buah 0.0250 4,400.00 110.00
JUMLAH HARGA BAHAN 6,526.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,826.67
E Overhead & Profit 10% 4,682.67
F Harga Satuan Pekerjaan (D+E) 51,509.34

A.5.1.1 19.3 Pemasangan 1 buah kran stainliss diameter ½” atau 3/4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang batu L.02 0.4000 87,500.00 35,000.00
Kepala tukang L.03 0.0400 100,000.00 4,000.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 40,300.00
B BAHAN
Kran air bh 1.0000 11,000.00 11,000.00
Sealtape Buah 0.0250 4,400.00 110.00
JUMLAH HARGA BAHAN 11,110.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,410.00
E Overhead & Profit 10% 5,141.00
F Harga Satuan Pekerjaan (D+E) 56,551.00

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4” medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis 3/4” M 1.2000 47,688.33 57,226.00
Perlengkapan % 35.0000 16,690.92 16,690.92
JUMLAH HARGA BAHAN 73,916.92
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 89,711.92
E Overhead & Profit 10% 8,971.19
F Harga Satuan Pekerjaan (D+E) 98,683.11

A.5.1.1 20. A Pemasangan 1 m’ pipa galvanis diameter 3/4” medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis 3/4” M 1.2000 18,708.50 22,450.20
Perlengkapan % 35.0000 6,547.98 6,547.98
JUMLAH HARGA BAHAN 28,998.18
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,793.18
E Overhead & Profit 10% 4,479.32
F Harga Satuan Pekerjaan (D+E) 49,272.50

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis 1” M 1.2000 73,366.67 88,040.00
Perlengkapan % 35.0000 25,678.33 25,678.33
JUMLAH HARGA BAHAN 113,718.33
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 129,513.33
E Overhead & Profit 10% 12,951.33
F Harga Satuan Pekerjaan (D+E) 142,464.66

A.5.1.1 21. A Pemasangan 1 m’ pipa galvanis diameter 1” Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa galvanis 1” M 1.2000 23,110.50 27,732.60
Perlengkapan % 35.0000 8,088.68 8,088.68
JUMLAH HARGA BAHAN 35,821.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,616.28
E Overhead & Profit 10% 5,161.63
F Harga Satuan Pekerjaan (D+E) 56,777.91

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang batu L.02 0.1800 87,500.00 15,750.00
Kepala tukang L.03 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 26,690.00
B BAHAN
Pipa galvanis 11/2” M 1.2000 110,050.00 132,060.00
Perlengkapan % 35.0000 38,517.50 38,517.50
JUMLAH HARGA BAHAN 170,577.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,267.50
E Overhead & Profit 10% 19,726.75
F Harga Satuan Pekerjaan (D+E) 216,994.25

A.5.1.1 22. A Pemasangan 1 m’ pipa galvanis diameter 1 ½” Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang batu L.02 0.1800 87,500.00 15,750.00
Kepala tukang L.03 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 26,690.00
B BAHAN
Pipa galvanis 11/2” M 1.2000 27,512.50 33,015.00
Perlengkapan % 35.0000 9,629.38 9,629.38
JUMLAH HARGA BAHAN 42,644.38
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 69,334.38
E Overhead & Profit 10% 6,933.44
F Harga Satuan Pekerjaan (D+E) 76,267.82

A.5.1.1 22.1 Pemasangan 1 m’ pipa galvanis diameter 2 Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang batu L.02 0.1800 87,500.00 15,750.00
Kepala tukang L.03 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 26,690.00
B BAHAN
Pipa galvanis 2” M 1.2000 146,733.33 176,080.00
Perlengkapan % 35.0000 51,356.67 51,356.67
JUMLAH HARGA BAHAN 227,436.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 254,126.67
E Overhead & Profit 10% 25,412.67
F Harga Satuan Pekerjaan (D+E) 279,539.34

A.5.1.1 22.1, Pemasangan 1 m’ pipa galvanis diameter 2 Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang batu L.02 0.1800 87,500.00 15,750.00
Kepala tukang L.03 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 26,690.00
B BAHAN
Pipa galvanis 2” M 1.2000 33,015.00 39,618.00
Perlengkapan % 35.0000 11,555.25 11,555.25
JUMLAH HARGA BAHAN 51,173.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 77,863.25
E Overhead & Profit 10% 7,786.33
F Harga Satuan Pekerjaan (D+E) 85,649.58

A.5.1.1 22.2 Pemasangan 1 m’ pipa galvanis diameter 2 ½” Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 2 1/2” M 1.2000 183,416.67 220,100.00
Perlengkapan % 35.0000 64,195.83 64,195.83
JUMLAH HARGA BAHAN 284,295.83
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 317,783.33
E Overhead & Profit 10% 31,778.33
F Harga Satuan Pekerjaan (D+E) 349,561.66

A.5.1.1 22.2, Pemasangan 1 m’ pipa galvanis diameter 2 ½” Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 2 1/2” M 1.2000 49,522.50 59,427.00
Perlengkapan % 35.0000 17,332.88 17,332.88
JUMLAH HARGA BAHAN 76,759.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,247.38
E Overhead & Profit 10% 11,024.74
F Harga Satuan Pekerjaan (D+E) 121,272.12

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 3” M 1.2000 188,919.17 226,703.00
Perlengkapan % 35.0000 66,121.71 66,121.71
JUMLAH HARGA BAHAN 292,824.71
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 326,312.21
E Overhead & Profit 10% 32,631.22
F Harga Satuan Pekerjaan (D+E) 358,943.43

A.5.1.1 23. A Pemasangan 1 m’ pipa galvanis diameter 3” Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 3” M 1.2000 41,268.83 49,522.60
Perlengkapan % 35.0000 14,444.09 14,444.09
JUMLAH HARGA BAHAN 63,966.69
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 97,454.19
E Overhead & Profit 10% 9,745.42
F Harga Satuan Pekerjaan (D+E) 107,199.61

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” Medium A


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 4” M 1.2000 348,491.67 418,190.00
Perlengkapan % 35.0000 121,972.08 121,972.08
JUMLAH HARGA BAHAN 540,162.08
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 573,649.58
E Overhead & Profit 10% 57,364.96
F Harga Satuan Pekerjaan (D+E) 631,014.54

A.5.1.1 24.A Pemasangan 1 m’ pipa galvanis diameter 4” Medium B


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa galvanis 4” M 1.2000 44,020.00 52,824.00
Perlengkapan % 35.0000 15,407.00 15,407.00
JUMLAH HARGA BAHAN 68,231.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 101,718.50
E Overhead & Profit 10% 10,171.85
F Harga Satuan Pekerjaan (D+E) 111,890.35

A.5.1.1 23. a Pemasangan 1 m’ pipa stailess diameter ½”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa stailnles ½” M 1.2000 15,590.50 18,708.60
Perlengkapan Ls 35%xpipa 5,456.68 5,456.68
JUMLAH HARGA BAHAN 24,165.28
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 39,960.28
E Overhead & Profit 10% 3,996.03
F Harga Satuan Pekerjaan (D+E) 43,956.31

A.5.1.1 23. b Pemasangan 1 m’ pipa stailess diameter 1"


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0270 100,000.00 2,700.00
JUMLAH TENAGA KERJA 15,795.00
B BAHAN
Pipa stailnles 1" M 1.2000 31,180.83 37,417.00
Perlengkapan Ls 35%xpipa 10,913.29 10,913.29
JUMLAH HARGA BAHAN 48,330.29
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 64,125.29
E Overhead & Profit 10% 6,412.53
F Harga Satuan Pekerjaan (D+E) 70,537.82

A.5.1.1 23. c Pemasangan 1 m’ pipa stailess diameter 2"


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang batu L.02 0.1800 87,500.00 15,750.00
Kepala tukang L.03 0.0180 100,000.00 1,800.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 26,690.00
B BAHAN
Pipa stailnles 2" M 1.2000 64,195.83 77,035.00
Perlengkapan Ls 35%xpipa 22,468.54 22,468.54
JUMLAH HARGA BAHAN 99,503.54
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 126,193.54
E Overhead & Profit 10% 12,619.35
F Harga Satuan Pekerjaan (D+E) 138,812.89

A.5.1.1 23. d Pemasangan 1 m’ pipa stailess diameter 3"


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa stailnles 3" M 1.2000 91,708.33 110,050.00
Perlengkapan Ls 35%xpipa 32,097.92 32,097.92
JUMLAH HARGA BAHAN 142,147.92
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 175,635.42
E Overhead & Profit 10% 17,563.54
F Harga Satuan Pekerjaan (D+E) 193,198.96

A.5.1.1 23. e Pemasangan 1 m’ pipa stailess diameter 4"


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang batu L.02 0.2250 87,500.00 19,687.50
Kepala tukang L.03 0.0230 100,000.00 2,300.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 33,487.50
B BAHAN
Pipa stailnles 4" M 1.2000 182,499.67 218,999.60
Perlengkapan Ls 35%xpipa 63,874.88 63,874.88
JUMLAH HARGA BAHAN 282,874.48
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 316,361.98
E Overhead & Profit 10% 31,636.20
F Harga Satuan Pekerjaan (D+E) 347,998.18

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 0.0600 87,500.00 5,250.00
Kepala tukang L.03 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 8,930.00
B BAHAN
Pipa PVC 1/2” M 1.2000 7,153.25 8,583.90
Perlengkapan % 35.0000 2,503.64 2,503.64
JUMLAH HARGA BAHAN 11,087.54
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,017.54
E Overhead & Profit 10% 2,001.75
F Harga Satuan Pekerjaan (D+E) 22,019.29

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang batu L.02 0.0600 87,500.00 5,250.00
Kepala tukang L.03 0.0060 100,000.00 600.00
Mandor L.04 OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 8,930.00
B BAHAN
Pipa PVC 1” M 1.2000 46,221.00 55,465.20
Perlengkapan % 35.0000 16,177.35 16,177.35
JUMLAH HARGA BAHAN 71,642.55
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 80,572.55
E Overhead & Profit 10% 8,057.26
F Harga Satuan Pekerjaan (D+E) 88,629.81

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 13,395.00
B BAHAN
Pipa PVC 11/2” M 1.2000 82,538.00 99,045.60
Perlengkapan % 35.0000 28,888.30 28,888.30
JUMLAH HARGA BAHAN 127,933.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 141,328.90
E Overhead & Profit 10% 14,132.89
F Harga Satuan Pekerjaan (D+E) 155,461.79

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang batu L.02 0.0900 87,500.00 7,875.00
Kepala tukang L.03 0.0090 100,000.00 900.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 13,395.00
B BAHAN
Pipa PVC 2” M 1.2000 26,137.00 31,364.40
Perlengkapan % 35.0000 9,147.95 9,147.95
JUMLAH HARGA BAHAN 40,512.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 53,907.35
E Overhead & Profit 10% 5,390.74
F Harga Satuan Pekerjaan (D+E) 59,298.09

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 0.1350 87,500.00 11,812.50
Kepala tukang L.03 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Pipa PVC 21/2” M 1.2000 154,070.00 184,884.00
Perlengkapan % 35.0000 53,924.50 53,924.50
JUMLAH HARGA BAHAN 238,808.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,851.00
E Overhead & Profit 10% 25,885.10
F Harga Satuan Pekerjaan (D+E) 284,736.10

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 0.1350 87,500.00 11,812.50
Kepala tukang L.03 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Pipa PVC 3” M 1.2000 220,100.00 264,120.00
Perlengkapan % 35.0000 77,035.00 77,035.00
JUMLAH HARGA BAHAN 341,155.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 361,197.50
E Overhead & Profit 10% 36,119.75
F Harga Satuan Pekerjaan (D+E) 397,317.25

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 0.1350 87,500.00 11,812.50
Kepala tukang L.03 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Pipa PVC 4” M 1.2000 363,165.00 435,798.00
Perlengkapan % 35.0000 127,107.75 127,107.75
JUMLAH HARGA BAHAN 562,905.75
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 582,948.25
E Overhead & Profit 10% 58,294.83
F Harga Satuan Pekerjaan (D+E) 641,243.08

A.5.1.1 33. Pemasangan 1 m’ pipa PVC tipe AW diameter 5”


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 0.1350 87,500.00 11,812.50
Kepala tukang L.03 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Pipa PVC 5” M 1.2000 577,763.00 693,315.60
Perlengkapan % 35.0000 202,217.05 202,217.05
JUMLAH HARGA BAHAN 895,532.65
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 915,575.15
E Overhead & Profit 10% 91,557.52
F Harga Satuan Pekerjaan (D+E) 1,007,132.67
A.5.1.1 34. Pemasangan 1 m’ pipa PVC tipe AW diameter 6”
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang batu L.02 0.1350 87,500.00 11,812.50
Kepala tukang L.03 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,042.50
B BAHAN
Pipa PVC 6” M 1.2000 781,355.00 937,626.00
Perlengkapan % 35.0000 273,474.25 273,474.25
JUMLAH HARGA BAHAN 1,211,100.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,231,142.75
E Overhead & Profit 10% 123,114.28
F Harga Satuan Pekerjaan (D+E) 1,354,257.03

A.5.1.1 35.2 Pemasangan 1 m’ pipa beton diameter 20 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang batu L.02 0.0700 87,500.00 6,125.00
Kepala tukang L.03 0.0070 100,000.00 700.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 18,725.00
B BAHAN
Pipa tanah dia 15 Bh 1.1000 55,000.00 60,500.00
Bata merah M3 0.0270 1,300.00 35.10
Semen portlan Kg 3.9200 1,200.00 4,704.00
Pasir pasang M3 0.0560 385,000.00 21,560.00
Pasir urug M3 0.0240 275,000.00 6,600.00
JUMLAH HARGA BAHAN 93,399.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 112,124.10
E Overhead & Profit 10% 11,212.41
F Harga Satuan Pekerjaan (D+E) 123,336.51

A.5.1.1.36.1 Pemasangan 1 m’ pipa beton diameter 30 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 41,200.00 45,320.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 100,211.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 151,036.50
E Overhead & Profit 10% 15,103.65
F Harga Satuan Pekerjaan (D+E) 166,140.15

A.5.1.1.36.2 Pemasangan 1 m’ pipa beton diameter 40 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 99,000.00 108,900.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 163,791.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 214,616.50
E Overhead & Profit 10% 21,461.65
F Harga Satuan Pekerjaan (D+E) 236,078.15

A.5.1.1.36.3 Pemasangan 1 m’ pipa beton diameter 50 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 132,000.00 145,200.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 200,091.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 250,916.50
E Overhead & Profit 10% 25,091.65
F Harga Satuan Pekerjaan (D+E) 276,008.15

A.5.1.1.36.4 Pemasangan 1 m’ pipa beton diameter 60 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 198,000.00 217,800.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 272,691.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 323,516.50
E Overhead & Profit 10% 32,351.65
F Harga Satuan Pekerjaan (D+E) 355,868.15

A.5.1.1.36.5 Pemasangan 1 m’ pipa beton diameter 80 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 286,000.00 314,600.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 369,491.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 420,316.50
E Overhead & Profit 10% 42,031.65
F Harga Satuan Pekerjaan (D+E) 462,348.15

A.5.1.1.36.6 Pemasangan 1 m’ pipa beton diameter 100 cm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 440,200.00 484,220.00
Bata merah M3 0.0550 1,300.00 71.50
Semen portlan Kg 10.3000 1,200.00 12,360.00
Pasir pasang M3 0.0610 385,000.00 23,485.00
Pasir urug M3 0.0690 275,000.00 18,975.00
JUMLAH HARGA BAHAN 539,111.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 589,936.50
E Overhead & Profit 10% 58,993.65
F Harga Satuan Pekerjaan (D+E) 648,930.15

A.5.1.1.37.1 Pemasangan 1 m’ U-Ditch 300x300x1200 mm


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang batu L.02 0.1900 87,500.00 16,625.00
Kepala tukang L.03 0.0190 100,000.00 1,900.00
Mandor L.04 OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 50,825.00
B BAHAN
Pipa beton Bh 1.1000 3,443,000.00 3,787,300.00
JUMLAH HARGA BAHAN 3,787,300.00
C PERALATAN
Crene
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,838,125.00
E Overhead & Profit 10% 383,812.50
F Harga Satuan Pekerjaan (D+E) 4,221,937.50

A.6.2.1.1. Pemasangan 1 Buah Titik Lampu


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang OH 1.0000 87,500.00 87,500.00
% bahan JUMLAH TENAGA KERJA 87,500.00
B BAHAN
Pipa listrik 5/8" brg 3.00 8,400.00 25,200.00
Kabel m 10.00 2,300.00 23,000.00
T Dus buah 3.00 4,200.00 12,600.00
L Bow buah 4.00 600.00 2,400.00
Las Dop buah 3.00 350.00 1,050.00
Klem buah 15.00 125.00 1,875.00
Mongkok buah 1.00 32,200.00 32,200.00
Saklar buah 1.00 - -
Fitting buah 1.00 11,500.00 11,500.00
JUMLAH HARGA BAHAN 109,825.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,325.00
E Overhead & Profit 10% 19,732.50
F Harga Satuan Pekerjaan (D+E) 217,057.50

Wonosobo, 2022
KONSULTAN PERENCANA
CV. HARAPAN KARYA KONSULTAN

HARDHIK, ST
Direktur
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

A. TENAGA

1. Pekerja Jam 0.0315 10,000.00


2. Mandor Jam 0.0031 12,500.00

JUMLAH HARGA TENAGA

B. BAHAN

1. Agregat Kasar M3 1.5690 330,000.00


2. Agregat Halus M3 0.1690 385,000.00
3 Aspal Kg 104.0000 12,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Dump Truck Jam 0.5784 250,000.00


2 3-Wheel Roller Jam 0.1606 250,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 10 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukura
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaa
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecua
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lela
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
JUMLAH
HARGA
(Rp.)

314.99
39.37

354.36

517,758.62
65,051.72
1,300,000.00

1,882,810.34

144,600.88
40,160.64

184,761.52

2,067,926.23
206,792.62
2,274,718.85
tan, volume dan/atau ukuran

saikan satu satuan pekerjaan


a tidak dapat diubah kecuali
truksi Kepada Peserta Lelang
kai dan operator.
n (tetapi tidak termasuk PPN
DAFTAR ANALISA

ANALISA BIAYA PEKERJAAN


LAPIS SAND SHEET
TEBAL 2 cm Jadi
( MENGGUNAKAN BURUH )

PROPINSI KODE KABUPATEN KODE

JAWA TENGAH 33 WONOSOBO 07


JUMLAH JUMLAH UPAH
PEKERJA HARI KODE
ORANG ( Hr-Org ) ( Rp./Hr/Org )

P Mandor 9.00 1.00 L.061 9.00 100,000.00


E Operator terlatih 3.00 1.00 L.081 3.00 150,000.00
K Pembantu operator 3.00 1.00 L.083 3.00 100,000.00
E Buruh tak terlatih 237.00 1.00 L.101 237.00 70,000.00
R Buruh terlatih 10.00 1.00 L.106 9.00 80,000.00
J
A

VOLUME SATUAN KODE HARGA


MATERIAL
M SAT.( Rp. )
A
T Abu batu 6.00 m3 M.022 313,000.00
E Batu pecah mesin 1/1 12.00 m3 M.025 271,000.00
R Pasir beton 24.00 m3 M.041 385,000.00
I Alat Bantu 10.77 set M.170 -
A Aspal 5,800.00 kg M.061 12,500.00
L Kayu bakar 42.00 m3 M.065 225,000.00

JUMLAH HARI KODE JAM BIAYA


PERALATAN
P ALAT KERJA KERJA ( Rp./JAM )
E
R Roller steell wheel 1.00 2.00 E.080 10.00 250,000.00
A
L
A
T
A
N
Overhead +Profit
VOLUME 1,400.00 SATUAN : M2 HARGA SATUAN ( Rp ) :
QUANTITY
PEKERJAAN KODE

TB I.a

DISUSUN OLEH :

BIAYA SUB TOTAL


( Rp. ) ( Rp. )

900,000.00
450,000.00
300,000.00
16,590,000.00
720,000.00

18,960,000.00
BIAYA SUB JUMLAH
( Rp. ) ( Rp. )

1,878,000.00 1400 8,400.00


3,252,000.00 1350 16,200.00
9,240,000.00 1400 33,600.00
-
72,500,000.00 5,000.00 5,000.00
9,450,000.00 5,980.00 63,200.00 0.079114
96,320,000.00
BIAYA SUB JUMLAH
( Rp. / JAM ) ( Rp. ) Prime Coat 0.7 1400 980

2,500,000.00

4.28571429

2,500,000.00
JUMLAH (Rp) 117,780,000.00
10% 11,778,000.00
92,541.43 perM2
DAFTAR HARGA KESATUAN
ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NOMOR : 28/PRT/M/2016
BIDANG CIPTA KARYA TA. 2021 KABUPATEN WONOSOBO

HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

DEVISI. I
I 1. 1. 1. PEKERJAAN PERSIAPAN
1 A. 2.2.1.1. Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 290,811.84
2 A. 2.2.1.2. Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 388,079.34
3 A. 2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 151,731.80
4 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank 74,649.63
5 A. 2.2.1.5. Pembuatan 1 m2 kantor sementara lantai plesteran 1,405,317.10
6 A. 2.2.1.6. Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1,210,639.32
7 A. 2.2.1.7. Pembuatan 1 m2 gudang semen dan peralatan 1,139,739.70
8 A. 2.2.1.8. Pembuatan 1 m2 bedeng pekerja 1,141,330.52
9 A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan 14,300.00
10 A. 2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu 354,706.00
11 A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm 167,754.40
12 A. 2.2.1.12. Pembuatan 1 m2 jalan sementara 170,830.00
13 A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang 1,245,992.00
14 A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 623,326.00
15 A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 91,371.70
BONGKARAN
1 ANB.3 1 m2 BONGKARAN PLESTERAN 9,504.00
2 ANB.4 1 m2 BONGKARAN ATAP (RANGKA + PENUTUP) 87,120.00
3 ANB.4a 1 m2 BONGKARAN ATAP (PENUTUP ATAP GENTENG) 2,860.00
4 ANB.5 1 m2 BONGKARAN PLAFOND 11,880.00
5 ANB.6 1 m2 BONGKARAN LANTAI 4,675.00

DEVISI. II
I A.2.3.1. HARGA SATUAN PEKERJAAN TANAH
Penggalian 1 m3 Tanah Biasa Sedalam s.d. 1 m Untuk
1 1.7.1.a 68,750.00
Volume s.d. 200 m3 Dalam Satu Lokasi
2 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 84,150.00
3 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m 99,770.00
4 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m 91,520.00
5 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m 138,600.00
6 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m 110,550.00
7 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 4,950.00
8 A.2.3.1.8. Pembuangan 1 m3 tanah sejauh 30 meter 30,140.00
9 1.7.2.a Pengurugan Kembali 1 m3 Galian Tanah 49,500.00
10 A.2.3.1.9.b Pengurugan kembali 1 m3 galian tanah keras 30,507.40
11 A.2.3.1.9.c Pengurugan kembali 1 m3 galian tanah cadas 46,200.00
12 A.2.3.1.9.d Pengurugan kembali 1 m3 galian tanah lumpur 36,850.00
13 A.2.3.1.10. Pemadatan tanah 1 m3 tanah ( per 20 cm) 49,500.00
14 A.2.3.1.11. Pengurugan 1 m3 dengan Pasir Urug 390,500.00
15 A.2.3.1.11.a Pengurugan 1 m3 dengan tanah urug 100,100.00
16 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL 361,922.00
17 A.1.5.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 91,300.00
18 A.2.3.1.14. Pengurugan 1 m3 sirtu padat 387,750.00
19 A.2.3.1.15. Galian tanah 1m3 menggunakan alat berat 589,138.00

DEVISI. III
II A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 1,055,725.00
2 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 1,019,067.50
3 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 993,591.50
4 2.1.1.d.(a) Pemasangan 1 m3 Pondasi Batu Belah 975,711.00
5 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 951,131.50
6 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP 744,357.90
7 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP 886,799.10
8 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP 871,978.80
9 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) 608,437.50
10 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 2,982,508.10
11 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm 1,018,210.60
12 A.3.2.1.12. Pas. batu kali 1PC : 4 PP menggunakan molen 1,217,315.00
13 A.3.2.1.13. Pas. batu kali 1PC : 6 PP menggunakan molen 1,173,958.50

DEVISI. IV
III A.4.1.1. A.4.1.1 HARGA SATUAN PEKERJAAN BETON
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

1 A.4.1.1.1. Membuat 1 m3 beton mutu f’= 7,4 MPa (K 100), slump (12  2) cm, w/c = 0,87 1,089,404.25
2 A.4.1.1.2. Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125), slump (12  2) cm, w/c = 0,78 1,119,063.31
3 A.4.1.1.2.a Membuat 1 m3 beton mutu f’= 9,8 MPa (K 125), slump (12  2) cm, w/c = 0,78 menggunakan alat 1,168,909.81
4 A.4.1.1.3. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12  2) cm, w/c = 0,72 1,142,105.25
5 A.4.1.1.3.a Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12  2) cm, w/c = 0,72 menggunakan alat 1,191,951.75
6 A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 1,030,325.38
7 A.4.1.1.5. Membuat 1 m3 beton mutu f’= 14,5 MPa (K 175), slump (12  2) cm, w/c = 0,66 1,169,438.41
8 A.4.1.1.5.a Membuat 1 m3 beton mutu f’= 14,5 MPa (K 175), slump (12  2) cm, w/c = 0,66 menggunakan alat 1,219,284.91
9 A.4.1.1.6. Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12  2) cm, w/c = 0,61 1,195,567.69
10 A.4.1.1.6.a Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12  2) cm, w/c = 0,61 menggunakan alat 1,245,414.19
11 A.4.1.1.7. Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (12  2) cm, w/c = 0,58 1,215,319.41
12 A.4.1.1.7.1 Membuat 1 m3 beton mutu f’= 19,3 MPa (K 225), slump (12  2) cm, w/c = 0,58 menggunakan alat 1,265,165.91
13 A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (12  2) cm, w/c = 0,56 1,228,337.31
14 A.4.1.1.8.a Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (12  2) cm, w/c = 0,56 menggunakan alat 1,278,183.81
15 A.4.1.1.9. Membuat 1 m3 beton mutu f’= 24,0 MPa (K 275), slump (12  2) cm, w/c = 0,53 1,251,175.75
16 A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12  2) cm, w/c = 0,52 1,258,053.81
17 A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12  2) cm, w/c = 0,49 1,334,691.72
18 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12  2) cm, w/c = 0,48 1,343,918.88
19 A.4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100 1,406,423.70
A.4.1.1.17. Pemasangan 1 kg jaring Ayaman Tulangan Tunggal (wiremesh) M6 - M8 15,483.88
20 A.4.1.1.17.a Pembesian 10 kg dengan besi polos 191,620.00
21 A.4.1.1.17.b Pembesian 10 kg dengan besi ulir 197,395.00
22 A.4.1.1.17.c Pembesian 1 kg dengan besi polos 19,162.00
23 A.4.1.1.17.d Pembesian 1 kg dengan besi ulir 19,739.50
24 A.4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands 163,267.50
25 A.4.1.1.19. Pemasangan 10 kg jaring kawat baja (wiremesh) 155,960.75
26 A.4.1.1.18. Pemasangan 1 m2 bekisting untuk telapak pondasi 186,943.02
27 A.4.1.1.20.a Pemasangan 1 m2 bekisting untuk pondasi ( papan kayu tb. 18 mm ) 161,235.01
28 A.4.1.1.20.b Pemasangan 1 m2 bekisting untuk pondasi ( papan kayu tb. 18 mm ) 2 x pakai 237,740.01
29 A.4.1.1.19. Pemasangan 1 m2 bekisting untuk sloof 199,552.87
30 A.4.1.1.19.(1) Pemasangan 1 m2 bekisting untuk sloof 2x pakai 154,157.41
30 A.4.1.1.21.a Pemasangan 1 m2 bekisting untuk sloof ( papan kayu tb. 18 mm ) 153,673.19
31 A.4.1.1.21.b Pemasangan 1 m2 bekisting untuk sloof ( papan kayu tb. 18 mm ) 2 x pakai 246,062.51
32 A.4.1.1.20. Pemasangan 1 m2 bekisting untuk kolom 341,364.54
33 A.4.1.1.20.(1) Pemasangan 1 m2 bekisting untuk kolom 2x pakai 247,912.41
33 A.4.1.1.22.a. Pemasangan 1 m2 bekisting untuk kolom ( papan kayu tb. 18 mm ) 254,813.02
34 A.4.1.1.22.b Pemasangan 1 m2 bekisting untuk kolom ( Plywood tb. 6 mm ) 230,860.74
35 A.4.1.1.22.c. Pemasangan 1 m2 bekisting untuk kolom ( papan kayu tb. 18 mm ) 2 x pakai 377,511.29
36 A.4.1.1.21. Pemasangan 1 m2 bekisting untuk balok 350,443.50
37 A.4.1.1.21.(1) Pemasangan 1 m2 bekisting untuk balok 2x pakai 252,815.05
37 A.4.1.1.23.a Pemasangan 1 m2 bekisting untuk balok ( papan kayu tb. 18 mm ) 263,891.98
38 A.4.1.1.23.b Pemasangan 1 m2 bekisting untuk balok ( plywood tb. 6 mm ) 239,939.70
39 A.4.1.1.22. Pemasangan 1 m2 bekisting untuk lantai 418,804.54
40 A.4.1.1.24.a Pemasangan 1 m2 bekisting untuk lantai ( papan kayu tb. 18 mm ) 331,284.58
41 A.4.1.1.24.b Pemasangan 1 m2 bekisting untuk lantai ( plywood tb. 6 mm ) 307,332.30
42 A.4.1.1.24.c Pemasangan 1 m2 bekisting untuk lantai bak air bersih ( papan kayu tb. 18 mm ) 273,204.58
43 A.4.1.1.23. Pemasangan 1 m2 bekisting untuk dinding 304,436.44
44 A.4.1.1.25.a Pemasangan 1 m2 bekisting untuk dinding ( papan kayu tb. 18 mm ) 274,172.80
45 A.4.1.1.25.b Pemasangan 1 m2 bekisting untuk dinding ( plywood tb. 6 mm ) 265,352.34
46 A.4.1.1.25. Pemasangan 1 m2 bekisting untuk tangga 315,902.73
47 A.4.1.1.26.a Pemasangan 1 m2 bekisting untuk tangga ( papan kayu tb. 18 mm ) 239,439.09
48 A.4.1.1.26.b Pemasangan 1 m2 bekisting untuk tangga ( plywood tb. 6 mm ) 230,618.63
49 A.4.1.1.28. Pemasangan 1 m2 jembatan untuk pengecoran beton 113,852.51
50 A.4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) 4,639,341.63
51 A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) 5,703,612.97
52 A.4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) 9,068,258.65
53 A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) 6,972,110.97
54 A.4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) 6,274,822.07
55 A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) 6,038,907.27
56 A.4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) 6,536,382.49
57 A.4.1.1.35. Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 96,479.24
58 A.4.1.1.36. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 116,540.16

B.02 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87
59 B.02.a 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87 Manual 1,098,545.25
60 B.02.b 1 m3 Beton mutu, f’c = 7,4 Mpa (K100), slump (12±2) cm, w/c = 0,87 Menggunakan molen 1,139,371.75

B.03 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78
60 B.03.a 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78 Manual 1,128,083.31
61 B.03.b 1 m3 Beton mutu, f’c = 9,8 Mpa (K125), slump (12±2) cm, w/c = 0,78 Menggunakan Molen 1,168,909.81

B.04 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72
62 B.04.a 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72 Manual 1,151,125.25
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

63 B.04.b 1 m3 Beton mutu, f’c = 12,2 MPa (K150), slump (12+2) cm, w/c = 0,72 Menggunakan Molen 1,191,951.75

B.05 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66
64 B.05.a 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 Manual 1,178,458.42
65 B.05.b 1 m3 Beton Mutu f’c = 14,5 Mpa (K175), slump (12+2) cm, w/c = 0,66 Menggunakan Molen 1,219,284.92

66 B.06 1 m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61
67 B.06.a 1 m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61 Manual 1,204,587.69
68 B.06.b 1 m3 Beton mutu, f’c = 16,9 Mpa (K200), slump (12+2) cm , w/c = 0,61 Menggunakan Molen 1,245,414.19

69 B.07 1 m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58
70 B.07.a 1 m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58 Manual 1,221,616.92
71 B.07.b 1 m3 Beton mutu , f’c = 19,3 MPa (K225), slump (12+2) cm, w/c = 0,58 Menggunakan molen 1,262,443.42

72 B.08 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56
73 B.08.a 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56 Manual 1,237,357.31
74 B.08.b 1 m3 Beton mutu,f’c = 21,7 MPa (K250) kedap air , slump (12+2) cm, w/c = 0,56 Menggunakan molen 1,278,183.81

75 B.09 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53
76 B.09.a 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53 Manual 1,195,683.81
77 B.09.b 1 m3 Beton mutu, f’c =24,0 MPa (K275) kedap air, slump (12+2) cm , w/c =0,53 Menggunakan Molen 1,301,022.25

78 B.10 1 m3 Beton mutu, f’c =26,4 MPa (K300) kedap air,slump (12+2) cm, w/c =0,52 (kedap air )
79 B.10.a 1 m3 Beton mutu, f’c =26,4 MPa (K300) kedap air,slump (12+2) cm, w/c =0,52 (kedap air ) Manual 1,267,073.81

1 m3 Beton mutu, f’c =26,4 MPa (K300) kedap air,slump


80 B.10.b 1,307,900.31
(12+2) cm, w/c =0,52 (kedap air ) Menggunakan molen

81 B.11 1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air, slump (12+2) cm, w/c = 0,49 (kedap air)
82 B.11.a 1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air, slump (12+2) cm, w/c = 0,49 (kedap air) Manual 1,346,241.72
1 m3 Beton mutu, f’c = 28,8 MPa , (K325) kedap air,
83 B.11.b slump (12+2) cm, w/c = 0,49 (kedap air) Menggunakan 1,375,364.22
molen

84 B.12 1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12+2) cm, w/c = 0,48 (kedap air)
85 B.12.a 1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12+2) cm, w/c = 0,48 (kedap air) Manual 1,355,468.89
1 m3 Beton mutu, f’c = 31,2 MPa, (K350) kedap air ,
86 B.12.b slump (12+2) cm, w/c = 0,48 (kedap air) Menggunakan 1,384,591.39
molen

87 B.13 1 m3 Beton Menggunakan Ready Mixed K300


88 B.13.a 1 m3 Beton menggunakan Ready Mixed K-225 dan pompa beton 1,492,159.35
89 B.13.b 1 m3 Beton menggunakan Ready Mixed K-250 dan pompa beton 1,652,678.28
90 B.13.c 1 m3 Beton menggunakan Ready Mixed K-275 dan pompa beton 1,578,592.62
91 B.13.d 1 m3 Beton menggunakan Ready Mixed K-300 dan pompa beton 1,714,416.33
92 B.13.e 1 m3 Beton menggunakan Ready Mixed K-350 dan pompa beton 1,776,154.38
93 B.13.b 1 m3 beton menggunkan bahan aditif

A.3.2 Penambahan koefisien tenaga kerja dan atau peralatan


B.14 Mengangkut / menaikan campuran beton dengan jarak ≥ 5m
B.14.a 1 m3 beton dicorkan pada tapak berjalan < 25 m dengan beda tinggi < 1m
94 B.14.a.1 1 m3 beton dicorkan pada tapak berjalan < 25 m dengan beda tinggi < 1m Manual 40,590.00

B.14.b 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m
95 B.14.b.1 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m Manual 49,500.00
96 B.14.b.2 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25m Menggunakan pompa beton 336,600.00

B.15 1 m3 Pemadatan beton pada saat mengecor


97 B.15.a 1 m3 Pemadatan beton pada saat mengecor menggunakan Vibrator 68,750.00
98 B.15.b 1 m3 Pemadatan beton pada saat mengecor Manual ( Menggunakan penusuk besi beton ) 49,500.00

B.16 1 m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal)


99 B.16.a 1 m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal) Manual 24,750.00
100 B.16.b 1 m3 beton dicorkan pada tapak setiap kenaikan 4m (Vertikal) Menggunakan pompa beton 336,600.00

A.3.3 Koefisien untuk analisa harga satuan pekerjaan pembesian beton


B.17 Pembesian 100 kg dengan besi polos dan ulir
101 2.2.6.1.a.(a) Untuk pembesian plat menggunakan besi beton polos / 100 kg 1,691,250.00
102 2.2.6.1.a.(a).1 Untuk pembesian plat menggunakan besi beton polos / 1 kg 16,912.50
103 B.17.a.2 Untuk pembesian plat menggunakan besi beton ulir / 100 kg 1,749,000.00
104 B.17.a.2.1 Untuk pembesian plat menggunakan besi beton ulir / 1 kg 17,490.00
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

105 2.2.6.1.d.(a) Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton polos / 100 kg 1,916,200.00
106 2.2.6.1.d.(a).1 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton polos / 1 kg 19,162.00
107 B.17.b.2 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton ulir / 100 kg 1,973,950.00
108 B.17.b.2.1 Untuk pembesian kolom , balok, ring balk dan sloof menggunakan besi beton ulir / 1 kg 19,739.50

B.18 Pembesian jaring kawat (Wiremesh) untuk plat atau dinding


A.4.1.1.17. Pemasangan 1 kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6- M8 15,596.08
109 B.18.1 Pembesian 100 kg jaring kawat (Wiremesh) untuk plat atau dinding 1,536,507.50
110 B.18.2 Pembesian 1 kg jaring kawat (Wiremesh) untuk plat atau dinding 15,365.08
111 B.19 Pembesian
Pembesian 100kg Kabel prestressed polos / strand

Mengangkut /menaikan 100kg tulangan setiap kenaikan vertikal 4m atau jarak horizontal setiap
B.20
25m ke tapak pemasangan
112 B.20.a Manual ( kenaikan 4m ) 39,325.00
113 B.20.b Mekanis ( penambahan jarak horizontal 10m s.d 25 m) 111,650.00
114 B.20.c Mekanis ( setiap penambahan jarak horizontal 25m) 127,325.00
115 B.20.d MekanisMekanis (setiap kenaikan 4m)

B.21 Bekisting lantai


B.21.a 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP)
116 B.21.a.1.a 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 1 kali pakai 232,811.81
117 B.21.a.1.b 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 2 kali pakai 163,226.25
118 B.21.a.1.c 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 3 kali pakai 128,433.47
119 B.21.a.1.d 1 m2 Bekisting lantai beton expose dengan Multiflex 18 mm (TP) 4 kali pakai 111,188.33
120 B.21.a.2.a 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 1 kali pakai 204,854.21
121 B.21.a.2.b 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 2 kali pakai 147,148.65
122 B.21.a.2.c 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 3 kali pakai 118,295.87
123 B.21.a.2.d 1 m2 Bekisting lantai beton expose dengan Multiflex 12 mm (TP) 4 kali pakai 103,981.13
124 B.21.a.3.a 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 1 kali pakai 170,683.81
125 B.21.a.3.b 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 2 kali pakai 127,498.25
126 B.21.a.3.c 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 3 kali pakai 105,905.47
127 B.21.a.3.d 1 m2 Bekisting lantai beton expose dengan Multiflex 9 mm (TP) 4 kali pakai 95,172.33

B.21.b. 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm atau 18 mm (TP)


128 B.21.b.1.a 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 1 kali pakai 187,299.42
129 B.21.b.1.b 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 2 kali pakai 123,766.50
130 B.21.b.1.c 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 3 kali pakai 92,000.04
131 B.21.b.1.d 1 m2 bekisting lantai beton biasa dengan multiflex 18 mm (TP) 4 kali pakai 74,754.90
132 B.21.b.2.a 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 1 kali pakai 159,341.82
133 B.21.b.2.b 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 2 kali pakai 107,688.90
134 B.21.b.2.c 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 3 kali pakai 81,862.44
135 B.21.b.2.d 1 m2 bekisting lantai beton biasa dengan multiflex 12 mm (TP) 4 kali pakai 67,547.70
136 B.21.b.3.a 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 1 kali pakai 125,171.42
137 B.21.b.3.b 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 2 kali pakai 88,038.50
138 B.21.b.3.c 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 3 kali pakai 69,472.04
139 B.21.b.3.d 1 m2 bekisting lantai beton biasa dengan multiflex 9 mm (TP) 4 kali pakai 58,738.90

B.21.c. 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
140 B.21.c.1 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 1 kali pakai 170,832.42
141 B.21.c.2 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 2 kali pakai 123,419.56
142 B.21.c.3 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 3 kali pakai 100,217.48
143 B.21.c.4 1 m2 bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) 4 kali pakai 89,625.25

B.21.d. 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm
144 B.21.d.1 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 1 kali pakai 244,008.16
145 B.21.d.2 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 2 kali pakai 159,271.20
146 B.21.d.3 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 3 kali pakai 113,876.40
147 B.21.d.4 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT ≤ 60 cm 4 kali pakai 92,692.16

B.21.e. 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm
148 B.21.e.1 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 1 kali pakai 60,967.50
149 B.21.e.2 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 2 kali pakai 60,967.50
150 B.21.e.3 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 3 kali pakai 60,967.50
151 B.21.e.4 1 m2 perancah bekisting lantai menggunakan dolken 8-10 cm, tinggi 4m,JAT ≤ 80 cm 4 kali pakai 60,967.50

152 B.21.f 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm
153 B.21.f.1 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 1 kali pakai 161,975.00
126 B.21.f.2 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 2 kali pakai 127,127.00
127 B.21.f.3 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 3 kali pakai 109,703.00
128 B.21.f.4 1 m2 perancah bekisting lantai menggunakan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 80 cm 4 kali pakai 100,991.00

B.22 1 m2 Bekisting lantai Floordeck tipe pelat


129 B.22.a 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,6 m) 221,215.54
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

130 B.22.b 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,8m) 218,730.93
131 B.22.c 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 1,2 m) 210,690.06
132 B.22.d 1 m2 Bekisting lantai Floordeck tipe pelat (JAP ≤ 2,0 m) 182,668.44

B.23. Bekisting balok


B.23.a 1 m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0
133 B.23.a.1.a 1 m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 1 kali pakai 316,002.17
134 B.23.a.1.b 1 m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 2 kali pakai 216,153.41
135 B.23.a.1.c 1 m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 3 kali pakai 163,202.71
136 B.23.a.1.d 1 m2 Bekisting balok expose menggunakan multiflex 18 mm, JAT ≤ 1,0 4 kali pakai 139,904.93
137 B.23.a.2.a 1 m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 1 kali pakai 288,044.57
138 B.23.a.2.b 1 m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 2 kali pakai 200,075.81
139 B.23.a.2.c 1 m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 3 kali pakai 153,065.11
140 B.23.a.2.d 1 m2 Bekisting balok expose menggunakan multiflex 12 mm, JAT ≤ 1,0 4 kali pakai 132,697.73
141 B.23.a.3.a 1 m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 1 kali pakai 253,874.17
142 B.23.a.3.b 1 m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 2 kali pakai 180,425.41
143 B.23.a.3.c 1 m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 3 kali pakai 140,674.71
144 B.23.a.3.d 1 m2 Bekisting balok expose menggunakan multiflex 9 mm, JAT ≤ 1,0 4 kali pakai 123,888.93

B.23.b 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT ≤ 1,0
145 B.23.b.1.a 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 1 kali pakai 251,812.00
146 B.23.b.1.b 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 2 kali pakai 161,042.20
147 B.23.b.1.c 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 3 kali pakai 117,170.46
148 B.23.b.1.d 1m2 Bekisting balok beton biasa menggunakan multiflex 18 mm , JAT ≤ 1,0 4 kali pakai 93,872.68
149 B.23.b.2.a 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 1 kali pakai 223,854.40
150 B.23.b.2.b 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 2 kali pakai 144,964.60
151 B.23.b.2.c 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 3 kali pakai 107,032.86
152 B.23.b.2.d 1m2 Bekisting balok beton biasa menggunakan multiflex 12 mm , JAT ≤ 1,0 4 kali pakai 86,665.48
153 B.23.c.3.a 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 1 kali pakai 189,684.00
154 B.23.b.3.b 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 2 kali pakai 125,314.20
155 B.23.b.3.c 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 3 kali pakai 94,642.46
156 B.23.b.3.d 1m2 Bekisting balok beton biasa menggunakan multiflex 9 mm , JAT ≤ 1,0 4 kali pakai 77,856.68

B.23.c 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP)
157 B.23.c.1 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 1 kali pakai 228,411.04
158 B.23.c.2 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 2 kali pakai 159,813.94
159 B.23.c.3 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 3 kali pakai 124,506.58
160 B.23.c.4 1m2 Bekisting balok beton bisa menggunakan kayu papan 3/20 cm (TP) 4 kali pakai 107,861.71

B.23.d 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m
161 B.23.d.1 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 1 kali pakai 168,126.20
162 B.23.d.2 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 2 kali pakai 119,705.08
163 B.23.d.3 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 3 kali pakai 95,494.52
164 B.23.d.4 1m2 perancah Bekisting balok menggunakan Kaso 5/7,tinggi 4 m dan JAT ≤ 1,0 m 4 kali pakai 83,389.24

B.23.e. 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m
165 B.23.e.1 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 1 kali pakai 69,520.00
166 B.23.e.2 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 2 kali pakai 69,520.00
167 B.23.e.3 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 3 kali pakai 69,520.00
168 B.23.e.4 1m2 perancah Bekisting balok menggunakan Dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m 4 kali pakai 69,520.00

B.23.f 1m2 perancah Bekisting balok beton menggunakan bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m
1m2 perancah Bekisting balok beton menggunakan
169 B.23.f.1 bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 1 kali 135,679.50
pakai

1m2 perancah Bekisting balok beton menggunakan


170 B.23.f.2 bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 2 kali 112,447.50
pakai

1m2 perancah Bekisting balok beton menggunakan


171 B.23.f.3 bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 3 kali 102,767.50
pakai

1m2 perancah Bekisting balok beton menggunakan


172 B.23.f.4 bambu Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,0 m 4 kali 97,927.50
pakai

B.24. Bekisting kolom


B.24.a 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP)
173 B.24.a.1.a 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 1 kali pakai 246,928.66
174 B.24.a.1.b 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 2 kali pakai 174,316.78
175 B.24.a.1.c 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 3 kali pakai 136,497.68
176 B.24.a.1.d 1m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) 4 kali pakai 116,226.22
177 B.24.a.2.a 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 1 kali pakai 218,971.06
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

178 B.24.a.2.b 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 2 kali pakai 158,239.18
179 B.24.a.2.c 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 3 kali pakai 126,360.08
180 B.24.a.2.d 1m2 Bekisting kolom beton expose menggunakan multiflex 12 mm (TP) 4 kali pakai 109,019.02
181 B.24.a.3.a 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 1 kali pakai 184,800.66
182 B.24.a.3.b 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 2 kali pakai 138,588.78
183 B.24.a.3.c 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 3 kali pakai 113,969.68
184 B.24.a.3.d 1m2 Bekisting kolom beton expose menggunakan multiflex 9 mm (TP) 4 kali pakai 100,210.22

B.24.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm atau 18 mm(TP)
185 B.24.b.1.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 1 kali pakai 200,338.38
186 B.24.b.1.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 2 kali pakai 130,752.82
187 B.24.b.1.c 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 3 kali pakai 98,986.36
188 B.24.b.1.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 18 mm (TP) 4 kali pakaiB.24.b.1.d 81,741.22
189 B.24.b.2.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 1 kali pakai 172,380.78
190 B.24.b.2.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 2 kali pakai 114,675.22
191 B.24.b.2.c 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 3 kali pakai 88,848.76
192 B.24.b.2.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 12 mm (TP) 4 kali pakai 74,534.02
193 B.24.b.3.a 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 1 kali pakai 138,210.38
194 B.24.b.3.b 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 2 kali pakai 95,024.82
195 B.24.b.3.c 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 3 kali pakai 76,458.36
196 B.24.b.3.d 1m2 Bekisting kolom beton biasa menggunakan multiflex 9 mm (TP) 4 kali pakai 65,725.22

B.24.c 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP)
197 B.24.c.1 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 1 kali pakai 204,174.30
198 B.24.c.2 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 2 kali pakai 144,656.16
199 B.24.c.3 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 3 kali pakai 115,401.44
200 B.24.c.4 1m2 Bekisting kolom beton biasa menggunakan kayu papan3/20 cm (TP) 4 kali pakai 101,782.89

B.24.d. 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m
201 B.24.d.1 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 1 kali pakai 159,021.06
202 B.24.d.2 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 2 kali pakai 113,626.26
203 B.24.d.3 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 3 kali pakai 92,442.02
204 B.24.d.4 1m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm tinggi 4 m JAT < 1,0 m 4 kali pakai 80,336.74

B.24.e. 1m2 Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m
1m2 Perancah bekisting kolom beton dengan kayu
205 B.24.e.1 65,257.50
dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 1 kali pakai

1m2 Perancah bekisting kolom beton dengan kayu


206 B.24.e.2 65,257.50
dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 2 kali pakai

1m2 Perancah bekisting kolom beton dengan kayu


207 B.24.e.3 65,257.50
dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 3 kali pakai

1m2 Perancah bekisting kolom beton dengan kayu


208 B.24.e.4 65,257.50
dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m 4 kali pakai

B.24.f. 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m
209 B.24.f.1 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 1 kali pakai 123,673.00
210 B.24.f.2 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 2 kali pakai 105,861.80
211 B.24.f.3 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 3 kali pakai 96,956.20
212 B.24.f.4 1m2 Perancah bekisting kolom beton dengan bambu Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,0 m 4 kali pakai 92,503.40

B.25. Bekisting Dinding


B.25.a 1m2 Bekisting dinding beton expose dengan multiflex 18 mm
213 B.25.a.1.a 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 1 kali pakai 251,602.34
214 B.25.a.1.b 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 2 kali pakai 178,990.46
215 B.25.a.1.c 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 3 kali pakai 144,197.68
216 B.25.a.1.d 1m2 Bekisting dinding beton expose dengan multiflex 18 mm 4 kali pakai 123,926.22
217 B.25.a.2.a 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 1 kali pakai 223,644.74
218 B.25.a.2.b 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 2 kali pakai 162,912.86
219 B.25.a.2.c 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 3 kali pakai 134,060.08
220 B.25.a.2.d 1m2 Bekisting dinding beton expose dengan multiflex 12 mm 4 kali pakai 116,719.02
221 B.25.a.3.a 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 1 kali pakai 189,474.34
222 B.25.a.3.b 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 2 kali pakai 143,262.46
223 B.25.a.3.c 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 3 kali pakai 121,669.68
224 B.25.a.3.d 1m2 Bekisting dinding beton expose dengan multiflex 9 mm 4 kali pakai 107,910.22

B.25.b 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP)
225 B.25.b.1.a 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 1 kali pakai 200,062.06
226 B.25.b.1.b 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 2 kali pakai 133,502.82
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

227 B.25.b.1.c 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 3 kali pakai 98,710.04
228 B.25.b.1.d 1m2 Bekisting dinding beton biasa dengan multiflex 18 mm (TP) 4 kali pakai 81,464.90
229 B.25.b.2.a 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 1 kali pakai 172,104.46
230 B.25.b.2.b 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 2 kali pakai 117,425.22
231 B.25.b.2.c 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 3 kali pakai 88,572.44
232 B.25.b.2.d 1m2 Bekisting dinding beton biasa dengan multiflex 12 mm (TP) 4 kali pakai 74,257.70
233 B.25.b.3.a 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 1 kali pakai 137,934.06
234 B.25.b.3.b 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 2 kali pakai 97,774.82
235 B.25.3.2.c 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 3 kali pakai 76,182.04
236 B.25.b.3.d 1m2 Bekisting dinding beton biasa dengan multiflex 9 mm (TP) 4 kali pakai 65,448.90

B.25.c 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm
237 B.25.c.1 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 1 kali pakai 204,200.48
238 B.25.c.2 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 2 kali pakai 147,708.66
239 B.25.c.3 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 3 kali pakai 115,427.62
240 B.25.c.4 1m2 Bekisting dinding beton biasa dengan menggunakan kayu papan 3/20 cm 4 kali pakai 101,809.07

1 m2 Perancah /penyokong bekisting dinding beton


241 B.25.d.1 152,994.60
menggunakan 5/7 ,tinggi maksimum 2,5m 1 kali pakai

1 m2 Perancah /penyokong bekisting dinding beton


242 B.25.d.2 113,652.44
menggunakan 5/7 ,tinggi maksimum 2,5m 2 kali pakai

1 m2 Perancah /penyokong bekisting dinding beton


243 B.25.d.3 92,468.20
menggunakan 5/7 ,tinggi maksimum 2,5m 3 kali pakai

1 m2 Perancah /penyokong bekisting dinding beton


244 B.25.d.4 80,362.92
menggunakan 5/7 ,tinggi maksimum 2,5m 4 kali pakai

1 m2 Perancah / penyokong bekisting dinding beton


245 B.25.e.1 menggunakan Balok 8/12 , tinggi maksimum 4,5 m 1 276,367.08
kali pakai

1 m2 Perancah / penyokong bekisting dinding beton


246 B.25.e.2 menggunakan Balok 8/12 , tinggi maksimum 4,5 m 2 181,795.68
kali pakai

1 m2 Perancah / penyokong bekisting dinding beton


247 B.25.e.3 menggunakan Balok 8/12 , tinggi maksimum 4,5 m 3 131,357.60
kali pakai

1 m2 Perancah / penyokong bekisting dinding beton


248 B.25.e.4 menggunakan Balok 8/12 , tinggi maksimum 4,5 m 4 109,290.94
kali pakai

B.26 Bekisting fondasi dan sloof


B.26.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm atau 18 mm (TP)
249 B.26.a.1.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 1 kali pakai 233,601.72
250 B.26.a.1.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 2 kali pakai 148,884.56
251 B.26.a.1.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 3 kali pakai 105,012.82
252 B.26.a.1.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 18 mm (TP) 4 kali pakai 84,741.36
253 B.26.a.2.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 1 kali pakai 205,644.12
254 B.26.a.2.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 2 kali pakai 132,806.96
255 B.26.a.2.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 3 kali pakai 94,875.22
256 B.26.a.2.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm (TP) 4 kali pakai 77,534.16
257 B.26.a.3.a 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 1 kali pakai 171,473.72
258 B.26.a.3.b 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 2 kali pakai 113,156.56
259 B.26.a.3.c 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 3 kali pakai 82,484.82
260 B.26.a.3.d 1m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 9 mm (TP) 4 kali pakai 68,725.36

B.26.b 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm
261 B.26.b.1 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 1 kali pakai 234,385.14
262 B.26.b.2 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 2 kali pakai 159,735.40
263 B.26.b.3 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 3 kali pakai 118,375.40
264 B.26.b.4 1m2 Bekesting fondasi dan sloof beton biasa menggunakan papan 3/20 cm 4 kali pakai 101,730.53

1m2 Perancah /penyokong bekisting sloof


B.26.c dan fondasi beton menggunakan Kaso
5/7 ,tinggi maksimum 2,0 m
1m2 Perancah /penyokong bekisting sloof dan fondasi
265 B.26.c.1 beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 144,008.70
1 kali pakai

1m2 Perancah /penyokong bekisting sloof dan fondasi


266 B.26.c.2 beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 95,587.58
2 kali pakai
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

1m2 Perancah /penyokong bekisting sloof dan fondasi


267 B.26.c.3 beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 80,455.98
3 kali pakai

1m2 Perancah /penyokong bekisting sloof dan fondasi


268 B.26.c.4 beton menggunakan Kaso 5/7 ,tinggi maksimum 2,0 m 71,377.02
4 kali pakai

B.27 Bongkar Bekisting


269 B.27.a Bongkar 1m2 bekisting secara biasa ( membersihkan dan membereskan puing-puing ) 3,960.00
270 B.27.b Bongkar 1 m2 bekisting secara hati-hati (dan membereskan puing) *) 5,940.00

B.29 Bongkar 1 m3 beton


271 B.29.a Bongkar 1 m3 beton secara konvensional 488,479.86
272 B.29.b Bongkar 1m3 beton dengan jack hammer 218,091.50

V A.4.1.2. A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


1 A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (12 ± 2) cm 93,568.28
2 A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2) cm 116,980.96
3 A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2) cm 131,057.41
4 A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (12 ±2) cm 175,474.20
A.4.1.2.5. Pembuatan 1 m2 Begisting Untuk Plat Beton Pracetak Komponen Modular Bangunan Gedung (5 x kali pakai) -

VI A.4.2.1. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 A.4.2.1.1. Pembuatan 1 kg besi profil 37,092.00
2 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 37,092.00
3 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 37,849.13
4 A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 1,253,631.50
5 A.4.2.1.5.1. Pengerjaan 10 cm pengelasan dengan las listrik 34,058.99
6 A.4.2.1.5.2. Pengerjaan 1 cm pengelasan dengan las listrik 4,314.11
7 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 961,290.00
8 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan besi 965,910.00
9 A.4.2.1.9. Pemasangan 1 m2 rolling door alluminium 1,072,280.00
A.4.2.1.8. Pemasangan 1 m2 Pintu Lipat (Folding door) Bahan Plastik/ PVC 88,330.00
1 A.4.2.1.9. Pemasangan 1 m2 Sunscreen alluminium
10 A.4.2.1.24. Pemasangan 1 m kusen pintu alluminium 216,262.75
11 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,775,858.25
12 A.4.2.1.26. Pemasangan 1 m2 pintu kaca rangka alluminium 724,440.75
A.4.2.1.26. Pemasangan 1 m2 Venetions Blinds dan Vertical Blinds
13 A.4.2.1.15. Pemasangan 1 m2 teralis besi strip (2 x 3) mm 586,558.71
14 A.4.2.1.16. Pemasangan 1 m2 Kawat Nyamuk
15 A.4.2.1.17. Pemasangan 1 m2 Jendela Nako Dan Tralis
14 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 159,478.06
15 A.4.2.1.19. Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm 129,394.38
16 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi 99,247.50
17 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon 124,767.50
18 A.4.2.1.21.a Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon -
A.4.2.1.22. Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin ) Profil C75 286,478.50
A.4.2.1.22.a Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin ) Profil C75 250,034.40
A.4.2.1.23. Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai Dingin ) Profil C75 329,402.70
18 A.4.2.1.22. Pemasangan 1 m’ Grill penutup saluran 447,813.52
19 A.4.2.1.23. a Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 7-10 m) 291,692.50
20 A.4.2.1.23. b Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 10-12,5 m) 300,272.50
21 A.4.2.1.23. c Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 12,5-15 m) 342,072.50
22 A.4.2.1.23. d Pemasangan 1 m2 rangka Kuda-kuda Baja Ringan Setara Gigasteel ( 15-18 m) 350,872.50
23 A.4.2.1.24.a Pemasangan 1 m2 rangka Baja Ringan C7575 BSI AKP / R101 BSI AKP <8,9 M 217,442.50
24 A.4.2.1.24.b Pemasangan 1 m2 rangka Baja Ringan C7575 BSI AKP / R101 BSI AKP 9M > B > 12 M 233,172.50
25 A.4.2.1.24.c Pemasangan 1 m2 rangka Baja Ringan C75100 BSI AKP / R101 BSI AKP 9M > B > 12 M 241,642.50

IV A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 369,050.00
2 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 359,782.50
3 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 352,181.50
4 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 350,251.00
5 A. 4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 353,837.00
6 A. 4.4.1.6. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 332,891.35
7 A. 4.4.1.7. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 179,982.00
8 A. 4.4.1.8. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 174,783.40
9 A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 172,265.50
10 A. 4.4.1.10. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP:5PP 170,710.10
11 A. 4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 6PP 170,608.90
12 A. 4.4.1.12. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP:8PP 168,630.00
13 A. 4.4.1.13. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 167,442.00
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

A.4.4.1.16. Pemasangan 1m2 dinding Conblok HB-20 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP) 397,197.90
A.4.4.1.17. Pemasangan 1m2 dinding Conblok HB-20 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP) 407,832.70
A.4.4.1.18. Pemasangan 1m2 dinding Conblok HB-15 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP) 305,731.80
A.4.4.1.19. Pemasangan 1m2 dinding Conblok HB-15 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP) 313,291.00
A.4.4.1.20. Pemasangan 1m2 dinding Conblok HB-10 dengan Mortar Type S,Fc' 12,5 MPa ( Setara campuran 1SP :3PP) 212,940.20
A.4.4.1.21. Pemasangan 1m2 dinding Conblok HB-10 dengan Mortar Type N,Fc' 5,2 MPa ( Setara campuran 1SP :4PP) 219,104.60
A. 4.4.1.22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 194,727.50
A. 4.4.1.23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 194,727.50
A. 4.4.1.24. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 370,309.50
A. 4.4.1.25. Pemasangan 1m2 Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai 73,232.50
A. 4.4.1.26. Pemasangan 1m2 Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai 73,320.50
14 A. 4.4.1.22.a Pemasangan 1 cm2 dinding terawang (rooster) 10x11x20 campuran 1SP :3PP 277,117.50
15 A. 4.4.1.22.b Pemasangan 1 cm2 dinding terawang (rooster) 15x11x30 campuran 1SP :3PP 266,557.50
16 A. 4.4.1.22.c Pemasangan 1 cm2 dinding terawang (rooster) 20x11x20 campuran 1SP :3PP 294,992.50
17 A. 4.4.1.22.d Pemasangan 1 cm2 dinding terawang (rooster) 25x11x25 campuran 1SP :3PP 238,837.50
18 A. 4.4.1.23.e Pemasangan 1 cm2 dinding terawang (rooster) 10x11x20 campuran 1SP :4PP 277,117.50
19 A. 4.4.1.23.f Pemasangan 1 cm2 dinding terawang (rooster) 15x11x30 campuran 1SP :4PP 266,557.50
20 A. 4.4.1.23.g Pemasangan 1 cm2 dinding terawang (rooster) 20x11x20 campuran 1SP :4PP 294,992.50
21 A. 4.4.1.23.h Pemasangan 1 cm2 dinding terawang (rooster) 25x11x25 campuran 1SP :4PP 238,837.50
22 A. 4.4.1.24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP 368,769.50
23 A. 4.4.1.25. Pemasangan Bata Ringan Tb. 10cm dengan mortal semen 47,699.78

V A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm. 71,378.78
2 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm. 66,103.18
3 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. 64,142.32
4 3.2.2.2.14.(c) Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 62,538.30
5 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 61,991.38
6 3.2.2.2.18.(c) Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm. 61,401.12
7 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 61,191.02
8 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 60,980.92
9 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 59,929.10
10 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 59,444.00
11 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 51,212.70
12 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 53,560.10
13 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 88,498.74
14 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 72,574.26
15 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm. 83,604.40
16 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 83,016.34
17 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 82,088.16
18 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 20 mm 73,229.20
19 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 40,032.63
20 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 56,545.50
A.4.4.2.21. Pemasangan 1 m2 plesteran Granit 1SP : 2PP Granit Tebal 10mm 79,516.25
A.4.4.2.22. Pemasangan 1 m2 plesteran Traso 1SP : 2PP Traso Tebal 10mm 79,516.25
21 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 47,018.40
22 A.4.4.2.24. Pemasangan 1 m2 finishing siar pasangan bata merah 26,281.31
23 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock/batako ekspose 12,520.75
24 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP. 57,588.30
25 3.2.2.2.36.(c) Pemasangan 1 m2 acian. 33,715.00

VI A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.1. Pemasangan 1m2 lantai ubin PC Abu-abu warna ukuran 40cm x40cm 454,071.84
A.4.4.3.2. Pemasangan 1m2 lantai ubin PC Abu-abu warna ukuran 30cm x30cm 457,059.16
A.4.4.3.3. Pemasangan 1m2 lantai ubin PC Abu-abu warna ukuran 20cm x20cm 457,515.85
A.4.4.3.5. Pemasangan 1m2 lantai ubin warna ukuran 30cm x30cm 460,599.73
A.4.4.3.6. Pemasangan 1m2 lantai ubin warna ukuran 20cm x20cm 461,148.05
A.4.4.3.7. Pemasangan 1m2 lantai Ubin Traso ukuran 40cm x40cm KW1 150,620.69
A.4.4.3.8. Pemasangan 1m2 lantai Ubin Traso ukuran 30cm x30cm KW1 153,516.88
1 A.4.4.3.8.a Pemasangan 1m2 lantai ubin/tegel difabel warna ukuran 30cm x30cm 463,868.71
2 A.4.4.3.7.1. Pemasangan 1m2 lantai keramik polos ukuran 40cm x40cm KW1 216,716.94
3 A.4.4.3.7.3. Pemasangan 1m2 lantai keramik warna ukuran 40cm x40cm KW1 223,134.78
A.4.4.3.9. Pemasangan 1m2 lantai Ubin granit 40Cm x 40 Cm 73,606.61
A.4.4.3.10. Pemasangan 1m2 lantai Ubin granit 30Cm x 30 Cm 75,958.30
A.4.4.3.12. Pemasangan 1m2 Lantai Ubin Teralux Ukuran 30cm x30cm 75,958.30
A.4.4.3.13. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 60cm x60cm 72,487.80
4 A.4.4.3.13.a Pemasangan 1m2 lantai granit polished 60Cm x 60 Cm 303,154.14
5 A.4.4.3.13.b Pemasangan 1m2 lantai granit kasar (unpolished) 60Cm x 60 Cm 311,069.55
A.4.4.3.14. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 40cm x40cm 73,606.61
A.4.4.3.15. Pemasangan 1m2 Lantai Ubin Teralux Marmer Ukuran 30cm x30cm 75,958.30
A.4.4.3.16. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 20 s.d. <30 cm 21,994.50
A.4.4.3.17. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 30 s.d. <40 cm 21,029.80
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

A.4.4.3.18. Pemasangan 1 m’ Plint Ubin PC Abu-abu Ukuran 40 s.d. <50 cm 21,029.80


A.4.4.3.19. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 20 s.d. <30 cm 21,261.02
A.4.4.3.20. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 30 s.d. <40 cm 21,261.02
A.4.4.3.21. Pemasangan 1 m’ Plint Ubin PC Warna Ukuran 40 s.d. <50 cm 21,261.02
A.4.4.3.22. Pemasangan 1 m’ Plint Ubin Teraso Ukuran 30 s.d. <40cm 21,261.02
A.4.4.3.23. Pemasangan 1 m’ Plint Ubin Teraso Ukuran 40 s.d. <50cm 21,261.02
A.4.4.3.24. Pemasangan 1 m’ Plint Ubin Granit Ukuran 30 s.d. <40cm 21,261.02
A.4.4.3.25. Pemasangan 1 m’ Plint Ubin Granit Ukuran 40 s.d. <50cm 21,261.02
A.4.4.3.26. Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 30 s.d. <40cm 21,261.02
A.4.4.3.27. Pemasangan 1 m’ Plint Ubin Teralux Kerang Ukuran 40 s.d. <50cm 21,261.02
A.4.4.3.28. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 30 s.d. <40cm 21,261.02
A.4.4.3.29. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 40 s.d. <50cm 21,261.02
A.4.4.3.30. Pemasangan 1 m’ Plint Ubin Teralux Marmer Ukuran 60 s.d. <70cm 21,261.02
A.4.4.3.31. Pemasangan 1m2 Lantai Teraso Cor di Tempat, Tebal 3cm 53,328.22
A.4.4.3.32. Pemasangan 1m2 Lantai Keramik Artistik 10 s.d. <20cm 144,478.84
6 A.4.4.3.32. Pemasangan 1m2 lantai Step Nosing Keramik 10x30 KW 1 534,884.35
7 A.4.4.3.32.1 Pemasangan 1m2 lantai Step Nosing Keramik 10x40 KW 1 394,524.35
A.4.4.3.33. Pemasangan 1m2 Lantai Keramik Artistik 20 s.d. <30cm 142,844.35
A.4.4.3.35. Pemasangan 1m2 Lantai Keramik 20 s.d. <30cm 207,466.60
8 A.4.4.3.35.a. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm polos KW 1 211,788.67
9 A.4.4.3.35.b. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm polos KW 2 211,788.67
10 A.4.4.3.35.c. Pemasangan 1m2 lantai keramik ukuran 30cm x 30cm warna KW 1 218,251.88
A.4.4.3.36. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm 206,938.60
A.4.4.3.36.a Pemasangan 1m2 Lantai Keramik Ukuran 40 cm 213,027.10
11 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm 212,200.16
12 A.4.4.3.36.a Pemasangan 1m2 lantai keramik ukuran 25cm x 25cm 225,026.16
A.4.4.3.37. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm untuk variasi/border 191,992.53
A.4.4.3.39. Pemasangan 1 m’ Plint Keramik Ukuran 10 s.d. <20cm 23,939.41
A.4.4.3.40. Pemasangan 1 m’ Plint Keramik Ukuran 20 s.d. <30cm 23,848.61
A.4.4.3.41. Pemasangan 1 m’ Plint Internal Cove Artistik 5cm x 5cm x 20cm 149,994.02
13 A.4.4.3.42. Pemasangan 1m2 lantai marmer ukuran 100cm x 100cm 505,413.12
A.4.4.3.43. Pemasangan 1m2 lantai karpet 111,461.35
A.4.4.3.44. Pemasangan 1m2 Underlayer (Pelapis Bawah Karpet) 32,563.85
A.4.4.3.45. Pemasangan 1 m2 Lantai Parquet Kayu Solid 117,514.10
A.4.4.3.46. Pemasangan 1 m2 Lantai Kayu Gymfloor 117,514.10
A.4.4.3.47. Pemasangan 1 m2 Dinding Porselen 11cm x 11cm 168,840.10
A.4.4.3.48. Pemasangan 1 m2 Dinding Porselen 10cm x 20cm 162,300.05
A.4.4.3.49. Pemasangan 1 m2 Dinding Porselen 20cm x 20cm 159,357.97
14 A.4.4.3.50. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm 288,140.05
A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 5cm x 20cm 162,844.88
A.4.4.3.52. Pemasangan 1 m2 dinding keramik 10cm x 20cm 162,300.05
A.4.4.3.53. Pemasangan 1 m2 dinding keramik 20cm x 20cm 159,357.97
15 A.4.4.3.53.a Pemasangan 1 m2 dinding keramik 25cm x 40cm 249,139.97
A.4.4.3.54. Pemasangan 1 m2 Dinding Marmer 100cm x 100cm 597,154.26
A.4.4.3.55. Pemasangan 1 m2 Dinding Bata Pelapis (Super) 3cm x 7cm x 24cm 274,211.85
A.4.4.3.56. Pemasangan 1 m2 Dinding Batu Paras 133,320.00
16 A.4.4.3.57. Pemasangan 1 m2 dinding batu tempel hitam 135,715.80
24 A.4.4.3.58. Pemasangan 1 m2 lantai vynil ukuran 30cm x 30cm 245,464.23
17 A.4.4.3.58.a Pemasangan 1 m2 dinding batu candi garis lurus 10x20 273,075.00
18 A.4.4.3.58.b Pemasangan 1 m2 dinding batu candi garis lurus 15x30 299,695.00
19 A.4.4.3.58.c Pemasangan 1 m2 dinding batu candi garis lurus 20x40 299,695.00
20 A.4.4.3.58.d Pemasangan 1 m2 dinding batu candi polos 273,075.00
21 A.4.4.3.58.e Pemasangan 1 m2 dinding batu candi susun sirih 10x20 253,110.00
22 A.4.4.3.58.f Pemasangan 1 m2 dinding batu candi susun sirih 15x30 239,800.00
23 A.4.4.3.58.g Pemasangan 1 m2 dinding batu candi susun sirih 20x40 253,110.00
A.4.4.3.59. Pemasangan 1 m2 Wallpaper lebar 50 cm 164,687.60
A.4.4.3.60. Pemasangan 1 m2 Floor Hardener 24,090.00
25 A.4.4.3.60.a Pemasangan 1 m2 ACP ukuran 3 mm 357,362.50
26 A.4.4.3.60.b Pemasangan 1 m2 ACP ukuran 4 mm 499,779.50
A.4.4.3.61. Pemasangan 1 m’ Plint Vynil 15cm x 30cm 102,019.28
A.4.4.3.62. Pemasangan 1 m’ Plint Kayu Tebal 2 cm Lebar 10 cm 67,042.75
A.4.4.3.63. Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 6cm 99,060.50
A.4.4.3.64. Pemasangan 1 m2 Paving Block (Blok Beton) Natural tebal 8cm 135,036.00
27 A.4.4.3.64.a Pasang 1 m2 paving blok natural tb. 6 cm K.175 /m2 Lokal 155,650.00
28 A.4.4.3.64.b Pasang 1 m2 paving blok warna tb. 6 cm K.175 /m2 Lokal 167,750.00
29 A.4.4.3.64.c Pasang 1 m2 paving blok natural tb. 8 cm K.175 /m2 Lokal 173,800.00
30 A.4.4.3.64.d Pasang 1 m2 paving blok warna tb. 8 cm K.175 /m2 Lokal 185,900.00
A.4.4.3.65. Pemasangan 1 m2 Paving Block (Blok Beton) Berwarna tebal 6cm 99,060.50
31 A.4.4.3.65.a Pasang 1 m2 paving blok natural tb. 6 cm K.225 /m2 Lokal 161,700.00
32 A.4.4.3.65.b Pasang 1 m2 paving blok natural tb. 8 cm K.225 /m2 Lokal 173,800.00
33 A.4.4.3.65.c Pasang 1 m2 paving blok warna tb. 6 cm K.225 /m2 Lokal 173,800.00
34 A.4.4.3.65.d Pasang 1 m2 paving blok warna tb. 8 cm K.225 /m2 Lokal 185,900.00
A.4.4.3.66. Pemasangan 1 m2 Paving Block (Blok Beton) Berwarna tebal 8cm 135,036.00
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

35 A.4.4.3.66.a Pasang 1 m2 Paving type Holand (10,5x21) k-200 tbl. 6cmSetara (Merapi, Aldas dan ABC) 190,740.00
36 A.4.4.3.66.b Pasang 1 m2 Paving type Holand (10,5x21) k-300 tbl. 6cm Setara (Merapi, Aldas dan ABC) 210,100.00
37 A.4.4.3.66.c Pasang 1 m2 Paving type Holand (10,5x21) k-200 tbl. 6cmSetara (Merapi, Aldas dan ABC) 252,670.00
38 A.4.4.3.66.d Pasang 1 m2 Paving type Holand (10,5x21) k-300 tbl. 6cm Setara (Merapi, Aldas dan ABC) 276,650.00
39 A.4.4.3.66.e Pasang 1 m2 Paving type kubus (21x21) k-200 tbl. 6cm Setara (Merapi, Aldas dan ABC) 190,740.00
40 A.4.4.3.66.f Pasang 1 m2 Paving type kubus (21x21) k-300 tbl. 6cm Setara (Merapi, Aldas dan ABC) 210,100.00
41 A.4.4.3.66.g Pasang 1 m2 Paving type kubus (21x21) k-200 tbl. 8cm Setara (Merapi, Aldas dan ABC) 252,670.00
42 A.4.4.3.66.h Pasang 1 m2 Paving type kubus (21x21) k-300 tbl. 8cm Setara (Merapi, Aldas dan ABC) 276,650.00
43 A.4.4.3.67.a Pemasangan con blok 24x24x6 K-250 / m2 Setara (Merapi, Aldas dan ABC) 207,680.00
44 A.4.4.3.67.b Pemasangan con blok 24x24x6 K-300 / m2 Setara (Merapi, Aldas dan ABC) 246,400.00
45 A.4.4.3.67.c Pemasangan con blok 24x24x8 K-300 / m2 Setara (Merapi, Aldas dan ABC) 270,600.00
46 A.4.4.3.68.a Rolak Telasah Tanpa Pasir Urug 119,775.48
47 A.4.4.3.68.b Rolak Telasah dengan Pasir Urug 150,025.48
48 A.4.4.3.69.a Pemasangan 1 m' kanstin beton kerb 10/12,5x30x50 K-200 121,024.05
49 A.4.4.3.69.b Pemasangan 1 m' kanstin beton kerb 10/12,5x20x50 K-200 96,824.05

VII A.4.5.1. SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 A.4.5.1.1. Pemasangan1 m2 Langit-Langit Serat Semen, Tebal 4 mm, 5 mm, dan 6 mm 10,890.00
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 3 mm 77,470.25
1 A.4.5.1.1.a 34,858.89
A.4.5.1.2. Pemasangan1 m2 Langit-Langit Akustik Ukuran 30 x 30 cm 24,090.00
A.4.5.1.3. Pemasangan1 m2 Langit-Langit Akustik Ukuran 30 x 60 cm 24,090.00
A.4.5.1.4. Pemasangan1 m2 Langit-Langit Akustik Ukuran 60 x 120 cm 20,075.00
A.4.5.1.5. Pemasangan 1 m2 Langit-Langit Kayu Lapis, Tebal 3 mm, 4 mm dan 6mm 20,982.50
3 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm 50,270.00
A.4.5.1.6. Pemasangan 1 m2 Langit-Langit Lambrisering Kayu, tebal 9 mm 156,942.50
4 A.4.5.1.7. Pemasangan 1 m2 Langit-Langit Papan Gipsum, Tebal 9 mm 51,792.40
5 A.4.5.1.7.a Pemasangan 1 m2 langit-langit GRC 0.45x120x240 49,390.00
5 A.4.5.1.7.b Pemasangan 1 m2 langit-langit Setara Sunda Plafond 38,779.40
5 A.4.5.1.10. Pemasangan 1 m’ list langit-langit kayu profil 28,190.09
6 A.4.5.1.10.a Pemasangan 1 m’ list langit-langit gypsum profil 10 cm 36,256.00
7 A.4.5.1.10.b Pemasangan 1 m’ list langit-langit gypsum profil 12,5 cm 41,098.20
A.4.5.1.11. Pemasangan 1 m2 Rangka Langit-langit Besi hollow 40.40 -
Lihat pada kelompok Pekerjaan Besi dan Aluminium (A.4.2.1.21)
8 A.4.5.1.11.a. Pemasangan 1 m2 langit langit gipsum rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm 156,523.40
9 A.4.5.1.11.b. Pemasangan 1 m2 langit langit GRC rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm 154,121.00
10 A.4.5.1.11.c Pemasangan 1 m2 langit langit setara sunda palfond rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm 143,510.40
A.4.5.1.12. Pemasangan 1 m2 Langit-langit Akustik Ukuran 60 cm x 120 cm Berikut Rangka Aluminium 100,375.00

XI A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 118,373.75
2 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 126,678.75
3 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 99,132.00
4 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90x180 72,641.25
5 A.4.5.2.30. Pemasangan 1 m2 genteng beton 136,812.50
6 A.4.5.2.31.a Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°) 179,526.28
7 uk. 200x95x0.30 cm, jarak rangka gording atau reng max. 60 cm
8 A.4.5.2.31.b Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°) 287,412.92
9 uk. 106x40x0.30 cm, jarak rangka gording atau reng max. 32 cm
10 A.4.5.2.31.c Pemasangan 1 m2 Genteng bitumen bergelombang (kemiringanatap > 15°) 175,515.95
11 uk. 200x95x0.30 cm, jarak rangka gording atau reng max. 60 cm
12 A.4.5.2.32.a Pemasangan 1 m2 genteng metal polos 80x80 83,853.00
13 A.4.5.2.32.b Pemasangan 1 m2 genteng metal lapis pasir 80x80 166,993.20
14 A.4.5.2.34. Pemasangan 1 m’ nok genteng beton 216,542.70
15 A.4.5.2.35.a Pemasangan 1 m' Nok bitumen 165,585.75
16 A.4.5.2.36.a Pemasangan 1 m’ nok genteng metal polos 94,270.00
17 A.4.5.2.36.b Pemasangan 1 m’ nok genteng metal lapis pasir 100,925.00
18 A.4.5.2.38.a. Pemasangan 1 m2 atap seng gelombang BJLS 30 86,020.00
19 A.4.5.2.38.c. Pemasangan 1 m2 atap seng gelombang BJLS 20 64,845.00
20 A.4.5.2.38.d. Pemasangan 1 m2 atap seng gelombang BJLS 30 + Kaso albasia reng suren 146,645.71
21 A.4.5.2.38.f. Pemasangan 1 m2 atap seng gelombang BJLS 20 + Kaso albasia reng suren 125,470.71
22 A.4.5.2.39. Pemasangan 1 m’nok atap seng BJLS 30 71,912.50
23 A.4.5.2.40. Pemasangan 1 m2 atap alumunium/galvalum polos 152,625.00
A.4.5.2.40.1 Pemasangan 1 m2 atap alumunium/galvalum lapis pasir 110,424.60
24 A.4.5.2.41. Pemasangan 1 m’ nok alumunium 180,840.00
1 A.4.5.2.41.1 Pemasangan 1 m’ nok alumunium/galvalum lapis pasir 88,832.70
25 A.4.5.2.42. Pemasangan 1 m2 alumunium foil/sisalation 32,788.53

XII A.4.6.1. HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu jati 33,358,286.50
Pembuatan dan Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela,
1 A.4.6.1.2 -
Kayu Kelas II atau III
2 A.4.6.1.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu bengkirai 21,000,919.50
3 A.4.6.1.1.3. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kamfer 20,307,347.50
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

4 A.4.6.1.2 (3) Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kruing 14,205,031.50
5 A.4.6.1.1.5. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu suren/mahoni 6,588,631.50
6 A.4.6.1.5.1. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu jati 1,532,428.70
7 A.4.6.1.5.2. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu bengkirai 1,083,069.90
8 A.4.6.1.5.3. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kamfer 1,072,980.70
9 A.4.6.1.5.4. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kruing 861,133.90
10 A.4.6.1.5.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu mahoni/suren 548,408.30
11 A.4.6.1.6.1. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu jati 1,002,507.22
12 A.4.6.1.6.2. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu bengkirai 748,021.78
13 A.4.6.1.6.3. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kamfer 720,784.90
14 A.4.6.1.6.4. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kruing 602,755.78
15 A.4.6.1.6.5. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu mahoni/suren 412,094.98
16 A.4.6.1.7.1. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu jati 2,195,472.62
17 A.4.6.1.7.2. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu bengkirai 1,516,844.78
18 A.4.6.1.7.3. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kamfer 1,444,213.10
19 A.4.6.1.7.4. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kruing 852,635.44
20 A.4.6.1.7.5. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu mahoni/suren 344,206.64
21 A.4.6.1.8.1. Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu jati (lebar sampai 90 cm) 1,098,858.75
22 A.4.6.1.8.2. Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu bengkirai (lebar sampai 90 cm) 833,769.75
23 A.4.6.1.8.3. Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu kamfer (lebar sampai 90 cm) 805,398.00
24 A.4.6.1.8.4. Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu kruing (lebar sampai 90 cm) 682,451.00
25 A.4.6.1.8.5. Pembuatan 1 m2 daun pintu plywood 6 mm rangkap, rangka kayu mahoni/suren (lebar sampai 90 cm) 483,846.00
26 A.4.6.1.10.1. Pemasangan 1 m2 jalusi kusen, kayu jati 1,972,457.30
27 A.4.6.1.10.2. Pemasangan 1 m2 jalusi kusen, kayu bengkirai 1,336,243.70
28 A.4.6.1.10.3. Pemasangan 1 m2 jalusi kusen, kayu kamfer 1,268,151.50
29 A.4.6.1.10.4. Pemasangan 1 m2 jalusi kusen, kayu kruing 973,078.70
30 A.4.6.1.10.5. Pemasangan 1 m2 jalusi kusen, kayu mahoni/suren 496,426.70
31 A.4.6.1.13.1. Pemasangan 1 m3 konstruksi kuda-kuda kayu jati 36,405,545.00
32 A.4.6.1.13.2. Pemasangan 1 m3 konstruksi kuda-kuda kayu bengkirai 20,137,216.00
33 A.4.6.1.13.3. Pemasangan 1 m3 konstruksi kuda-kuda kayu kamfer 19,495,674.00
34 A.4.6.1.13.4. Pemasangan 1 m3 konstruksi kuda-kuda kayu kruing 12,906,982.00
35 A.4.6.1.13.5. Pemasangan 1 m3 konstruksi kuda-kuda kayu mahoni/suren 5,855,949.00
36 A.4.6.1.13.6. Pemasangan 1 m3 konstruksi kuda-kuda kayu lanan/tahun 5,624,718.00
37 A.4.6.1.13.7. Pemasangan 1 m3 konstruksi gording kayu jati 35,663,595.00
38 A.4.6.1.13.8. Pemasangan 1 m3 konstruksi gording kayu bengkirai 19,395,266.00
39 A.4.6.1.13.9. Pemasangan 1 m3 konstruksi gording kayu kamfer 18,753,724.00
40 A.4.6.1.13.10. Pemasangan 1 m3 konstruksi gording kayu kruing 12,165,032.00
41 A.4.6.1.13.11. Pemasangan 1 m3 konstruksi gording mahoni/suren 5,113,999.00
42 A.4.6.1.13.12. Pemasangan 1 m3 konstruksi gording lanan/tahun 4,882,768.00
43 A.4.6.1.16.1. Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu jati 513,869.71
44 A.4.6.1.16.2. Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu bengkirai 310,603.22
45 A.4.6.1.16.3. Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu kamfer 302,279.60
46 A.4.6.1.16.4. Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kayu kruing 207,857.14
47 A.4.6.1.16.5. Pemasangan 1 m2 rangka atap genteng keramik, tanah liat kaso lanan/tahun reng suren 86,952.93
48 A.4.6.1.17.1. Pemasangan 1 m2 rangka atap genteng beton, kayu jati 571,886.05
49 A.4.6.1.17.2. Pemasangan 1 m2 rangka atap genteng beton, kayu bengkirai 345,028.22
50 A.4.6.1.17.3. Pemasangan 1 m2 rangka atap genteng beton, kayu kamfer 335,380.52
51 A.4.6.1.17.4. Pemasangan 1 m2 rangka atap genteng beton, kayu kruing 228,247.28
52 A.4.6.1.17.5. Pemasangan 1 m2 rangka atap genteng beton, kaso kayu lanan/tahun reng suren 93,308.20
53 A.4.6.1.19.1. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu jati 485,128.18
54 A.4.6.1.19.2. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu bengkirai 306,021.56
55 A.4.6.1.19.3. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kamfer 299,362.45
56 A.4.6.1.19.4. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kruing 219,466.63
57 A.4.6.1.19.5. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu mahoni/suren 112,937.75
58 A.4.6.1.19.6. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu lanan/tahun 112,937.75
59 A.4.6.1.21.1. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu jati 332,194.76
60 A.4.6.1.21.2. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu bengkirai 210,867.89
61 A.4.6.1.21.3. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kamfer 208,143.80
62 A.4.6.1.21.4. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kruing 150,945.17
63 A.4.6.1.21.5. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu mahoni/suren 66,509.26
64 A.4.6.1.22.1. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu jati 336,207.63
65 A.4.6.1.22.2. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu bengkirai 212,633.96
66 A.4.6.1.22.3. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kamfer 209,859.43
67 A.4.6.1.22.4. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kruing 151,601.56
68 A.4.6.1.22.5. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu mahoni/suren 65,602.02
69 A.4.6.1.22.5 (a)Pemasangan 1 m’ lisplank ukuran 30 cm, woodplank 48,131.88
69 A.4.6.1.23.1. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu jati 938,658.60
70 A.4.6.1.23.2. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu bengkirai 524,555.68
71 A.4.6.1.23.3. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kamfer 508,225.52
72 A.4.6.1.23.4. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kruing 340,513.36
73 A.4.6.1.23.5. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu mahoni/suren 161,032.52
74 A.4.6.1.23.6. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu lanan/tahun 155,146.64
75 A.4.6.1.24.1. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu jati 961,203.76
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

76 A.4.6.1.24.2. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu bengkirai 547,100.84
77 A.4.6.1.24.3. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kamfer 530,770.68
78 A.4.6.1.24.4. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kruing 363,058.52
79 A.4.6.1.24.5. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu mahoni/suren 183,577.68
80 A.4.6.1.24.6. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu lanan/tahun 177,691.80
81 A.4.6.1.25.1. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu jati 1,062,794.26
82 A.4.6.1.25.2. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu bengkirai 648,691.34
83 A.4.6.1.25.3. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu kamfer 632,361.18
84 A.4.6.1.25.4. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu kruing 464,649.02
85 A.4.6.1.25.5. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu mahoni/suren 285,168.18
86 A.4.6.1.25.6. Pemasangan 1 m2 dinding pemisah plywood 6 mm rangkap, rangka kayu lanan/tahun 279,282.30

XIII A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 192,555.00
2 A.4.6.2.4. Pemasangan 1 buah kunci silinder 111,815.00
3 A.4.6.2.5. Pemasangan 1 buah engsel pintu 59,845.50
4 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 35,860.00
5 A.4.6.2.8. Pemasangan 1 buah spring knip 33,357.50
6 A.4.6.2.9. Pemasangan 1 buah kait angin 39,407.50
7 A.4.6.2.10. Pemasangan 1 buah door closer 300,465.00
8 A.4.6.2.11.a Pemasangan 1 buah kunci slot/grendel pintu 53,570.00
9 A.4.6.2.11 Pemasangan 1 buah kunci slot/grendel jendela 38,390.00
10 A.4.6.2.12. Pemasangan 1 buah Door holder 179,355.00
11 A.4.6.2.15. Pemasangan 1 buah kunci lemari 53,355.50
12 A.4.6.2.16.a. Pemasangan 1 m2 Kaca tempered uk. 10 mm 1,251,272.00
13 A.4.6.2.16.b. Pemasangan 1 m2 Kaca tempered uk. 12 mm 1,324,477.00
14 A.4.6.2.16.c. Pemasangan 1 m2 Kaca tempered uk. 8 mm 1,018,226.00
15 A.4.6.2.17. Pemasangan 1 m2 Kaca uk. 5 mm (Kaca Polos) 163,905.50
16 A.4.6.2.16.j. Pemasangan 1 m2 Kaca uk. 5 mm (Kaca Rayben) 343,711.50
17 A.4.6.2.16.l. Pemasangan 1 m2 Kaca uk. 6 mm (Kaca Polos) 347,704.50
18 A.4.6.2.16.m. Pemasangan 1 m2 Kaca uk. 6 mm (Kaca Rayben) 624,673.50
19 A.4.6.2.16.o. Pemasangan 1 m2 Kaca uk. 8 mm (Kaca Polos) 648,631.50
20 A.4.6.2.16.p. Pemasangan 1 m2 Kaca uk. 8 mm (Kaca Rayben) 1,014,777.50
21 A.4.6.2.16.q Pemasangan 1 m2 akrilik uk. 3 mm 338,387.50
22 A.4.6.2.16.r Pemasangan 1 m2 akrilik uk. 5 mm 540,699.50

VIII A.4.7.1. A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,620.00
2 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 13,772.00
3 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 14,322.00
4 3.3.4.(c) 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 62,636.75
5 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 78,685.75
6 A.4.7.1.5.1 1 m2 Pengecatan bidang kayu lama (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 47,137.75
7 3.3.10.(c) Pengecatan 1 m2 tembok dalam baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex catylac 29,174.75
8 A.4.7.1.10.2 Pengecatan 1 m2 tembok luar baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex catylac 33,750.75
9 A.4.7.1.10.3 Pengecatan 1 m2 tembok dalam baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex 38,612.75
10 A.4.7.1.10.4 Pengecatan 1 m2 tembok luar baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex 43,188.75
11 A.4.7.1.11.1 Pengecatan 1 m2 tembok dalam lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex catylac 19,640.50
12 A.4.7.1.11.2 Pengecatan 1 m2 tembok luar lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex catylac 22,808.50
13 A.4.7.1.11.3 Pengecatan 1 m2 tembok dalam lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex 26,174.50
14 A.4.7.1.11.4 Pengecatan 1 m2 tembok luar lama ( 1 lapis cat dasar, 2 lapis cat penutup) ex mowilex 29,342.50
15 A.4.7.1.11.5 Pengecatan 1 m2 permukaan dinding ekspose dengan coating (3 lapis coating) 18,370.00
16 A.4.7.1.11.6 Pengecatan 1 m2 permukaan dinding ekspose dengan coating waterbased (3 lapis coating) 28,356.13
17 A.4.7.1.15. Pemasangan 1 m2 wallpaper 100,933.80
18 A.4.7.1.15.A Pemasangan 1 m2 HPL 267,421.00
19 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 27,973.00
20 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 57,859.89
21 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 45,991.00

IX A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1. Pemasangan 1 buah closet duduk/monoblock ex Toto 2,981,341.00
2 A.5.1.1 2. Pemasangan 1 buah closet jongkok porslen 563,090.00
3 A.5.1.1 4. Pemasangan 1 buah urinoir ex Toto 1,943,920.00
4 A.5.1.1 5. Pemasangan 1 buah wastafel 1,224,613.50
5 A.5.1.1 7. Pemasangan 1 buah bak fibreglass 0,3 m3 482,995.70
6 A.5.1.1 8. Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 1,374,793.20
7 A.5.1.1 11. Pemasangan 1 buah bak beton volume 1 m3 2,063,282.98
5 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 399,575.00
6 A.5.1.1 14. Pemasangan 1 buah floor drain 60,555.00
7 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 489,214.00
8 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm 735,201.50
9 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm 943,575.60
10 A.5.1.1 .35 Pemasangan 1 buah kran plastik diameter ½” atau 3/4” 50,501.00
HARGA
NO ANALIS URAIAN
SATUAN
1 2 3 4

11 A.5.1.1 19.2 Pemasangan 1 buah kran besi/logam diameter ½” atau 3/4” 51,509.34
12 A.5.1.1 19.3 Pemasangan 1 buah kran stainliss diameter ½” atau 3/4” 56,551.00
13 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” medium A 225,337.05
14 A.5.1.1 18.A Pemasangan 1 m’ pipa galvanis diameter ½” medium B 42,392.54
15 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4” medium A 98,683.11
16 A.5.1.1 20. A Pemasangan 1 m’ pipa galvanis diameter 3/4” medium B 49,272.50
17 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” Medium A 142,464.66
18 A.5.1.1 21. A Pemasangan 1 m’ pipa galvanis diameter 1” Medium B 56,777.91
19 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis medium B diameter 1 ½”medium A 216,994.25
20 A.5.1.1 22. A Pemasangan 1 m’ pipa galvanis diameter 1 ½” Medium B 76,267.82
21 A.5.1.1 22.1. Pemasangan 1 m’ pipa galvanis diameter 2 Medium A 279,539.34
22 A.5.1.1 22.1,A Pemasangan 1 m’ pipa galvanis diameter 2 Medium B 85,649.58
23 A.5.1.1 22.2. Pemasangan 1 m’ pipa galvanis diameter 2 ½” Medium A 349,561.66
24 A.5.1.1 22.2,A Pemasangan 1 m’ pipa galvanis diameter 2 ½” Medium B 121,272.12
25 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” Medium A 358,943.43
26 A.5.1.1 23. A Pemasangan 1 m’ pipa galvanis diameter 3” Medium B 107,199.61
27 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” Medium A 631,014.54
28 A.5.1.1 24.A Pemasangan 1 m’ pipa galvanis diameter 4” Medium B 111,890.35
29 A.5.1.1 23. a Pemasangan 1 m’ pipa stailess diameter ½” 43,956.31
30 A.5.1.1 23. b Pemasangan 1 m’ pipa stailess diameter 1" 70,537.82
31 A.5.1.1 23. c Pemasangan 1 m’ pipa stailess diameter 2" 138,812.89
32 A.5.1.1 23. d Pemasangan 1 m’ pipa stailess diameter 3" 193,198.96
33 A.5.1.1 23. e Pemasangan 1 m’ pipa stailess diameter 4" 347,998.18
29 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” 22,019.29
30 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 88,629.81
31 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 11/2” 155,461.79
32 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 59,298.09
33 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 21/2” 284,736.10
34 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 397,317.25
35 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 641,243.08
36 A.5.1.1 33. Pemasangan 1 m’ pipa PVC tipe AW diameter 5” 1,007,132.67
37 A.5.1.1 34. Pemasangan 1 m’ pipa PVC tipe AW diameter 6” 1,354,257.03
38 A.5.1.1 35.2. Pemasangan 1 m’ pipa beton diameter 20 cm 123,336.51
39 A.5.1.1.36.1. Pemasangan 1 m’ pipa beton diameter 30 cm 166,140.15
40 A.5.1.1.36.2. Pemasangan 1 m’ pipa beton diameter 40 cm 236,078.15
41 A.5.1.1.36.3. Pemasangan 1 m’ pipa beton diameter 50 cm 276,008.15
42 A.5.1.1.36.4. Pemasangan 1 m’ pipa beton diameter 60 cm 355,868.15
43 A.5.1.1.36.5. Pemasangan 1 m’ pipa beton diameter 80 cm 462,348.15
44 A.5.1.1.36.6. Pemasangan 1 m’ pipa beton diameter 100 cm 648,930.15

X A.6.2.1 HARGA SATUAN PEKERJAAN SISTEM PENCAHAYAAN


1 A.6.2.1.1. Pemasangan 1 Buah Titik Lampu 217,057.50

Wonosobo, 2021
KONSULTAN PERENCANA
CV. HARAPAN KARYA KONSULTAN

HARDHIK, ST
Direktur
Update Analisa
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Alamat ; Jl. Soepardjo Rustam, Andongsili Telp. (0286) 321113 Fax. (0286) 321113
WONOSOBO Kode Pos 56351

RENCANA ANGGARAN BIAYA


( ENGINEER ESTIMATE )

KEGIATAN :
PENATAAN LINGKUNGAN

PEKERJAAN :
BETONISASI JALAN TEMBUS JENTREK-TEMBELANG KELURAHAN ROJOIMO

LOKASI :
KECAMATAN WONOSOBO
KABUPATEN WONOSOBO

SUMBER DANA :
APBD
PEMERINTAH KABUPATEN WONOSOBO
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA
Jalan S. Parman No. 8B Telepon/Fax (0286) 321078
WONOSOBO - 56311

RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PEMBANGUNAN PERPUSTAKAAN SEKOLAH


PEKERJAAN : PEMBANGUNAN RUANG PERPUSTAKAAN SD N 1 LENGKONG
LOKASI : KECAMATAN GARUNG KABUPATEN WONOSOBO
SUMBER DANA : APBD 2022

H.SATUAN H. KESATUAN PAJAK 11% JUMLAH


NO URAIAN PEKERJAAN ANALISA VOL/SAT.
[Rp.] [Rp.] [Rp.] [Rp.]
1 2 3 4 5 6 7 8
A PEKERJAAN PERSIAPAN
1 Uitzet & Bouwplank - #REF! ls 500,000.00 #REF! #REF! #REF!
2 Pembesihan lahan - 1.00 ls 500,000.00 500,000.00 55,000.00 555,000.00
3 Administrasi dan dokumentasi - #REF! ls 500,000.00 #REF! #REF! #REF!
4 Papan nama proyek - #REF! ls 150,000.00 #REF! #REF! #REF!
JUMLAH PEK. A #REF!
B SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
1 Sosialisasi, Promosi dan Pelatihan
- Papan Informasi Keselamatan Konstruksi - 1.00 Bh 250,000.00 250,000.00 27,500.00 277,500.00
2 Alat Pelindung Diri (APD) antara lain
- Topi Pelindung (safety helmet) - 3.00 bh 50,000.00 150,000.00 16,500.00 166,500.00
- Sarung Tangan (safety gloves) - 3.00 bh 20,000.00 60,000.00 6,600.00 66,600.00
- Sepatu Keselamatan (safety shoes) - 3.00 bh 120,000.00 360,000.00 39,600.00 399,600.00
- Rompi Keselamatan (safety vest) - 3.00 bh 45,000.00 135,000.00 14,850.00 149,850.00
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan
- Peralatan P3K - 1.00 Set 300,000.00 300,000.00 33,000.00 333,000.00
- Tempat cuci tangan - 1.00 Ls 200,000.00 200,000.00 22,000.00 222,000.00
JUMLAH PEK. B 1,615,050.00
C PEMBANGUNAN RUANG PERPUSTAKAAN SD N 1 LENGKONG
I PEKERJAAN TANAH
1 Galian tanah biasa 1.7.1.a #REF! m3 68,750.00 #REF! #REF! #REF!
2 Urugan tanah kembali 1.7.2.a #REF! m3 49,500.00 #REF! #REF! #REF!
3 Urugan tanah Dipadatkan A.2.3.1.11.a #REF! m3 100,100.00 #REF! #REF! #REF!
4 Urugan pasir t. 5cm A.2.3.1.11. #REF! m3 390,500.00 #REF! #REF! #REF!
- - -
II PEKERJAAN PONDASI - - -
1 Rolag bata 1:2 A. 4.4.1.7. #REF! m2 179,982.00 #REF! #REF! #REF!
2 Pas. Batu kali 1:6 2.1.1.d.(a) #REF! m3 975,711.00 #REF! #REF! #REF!

III PEKERJAAN PENUTUP DINDING & LANTAI - - -


1 Pas. Lantai keramik 40x40 A.4.4.3.36.a #REF! m2 213,027.10 #REF! #REF! #REF!
2 Pas. Lantai pemandu guiding block 30x30 A.4.4.3.8.a #REF! m2 463,868.71 #REF! #REF! #REF!
3 Pas. Keramik dinding 25x40 A.4.4.3.53.a #REF! m2 249,139.97 #REF! #REF! #REF!

IV PEKERJAAN BETON - - -
1 Rabat beton K-100 t. 5 cm A.4.1.1.1. #REF! m2 1,089,404.25 #REF! #REF! #REF!
2 Beton sloof 15/20 (S1) - - -
- Beton K-175 A.4.1.1.5. m3 1,169,438.41 - - -
- Pembesian 2.2.6.1.d.(a).1 kg 19,162.00 - - -
- Bekisting A.4.1.1.19.(1) m2 154,157.41 - - -
2 Beton sloof 15/15 (S2) - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.19.(1) #REF! m2 154,157.41 #REF! #REF! #REF!
3 Beton kolom 15/15 (K1) - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.20.(1) #REF! m2 247,912.41 #REF! #REF! #REF!
4 Beton kolom 15/15 K2 (selasar) - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.19.(1) #REF! m2 247,912.41 #REF! #REF! #REF!
5 Beton balok latei 12/15 - - -
1 2 3 4 5 6 7 8
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.21.(1) #REF! m2 252,815.05 #REF! #REF! #REF!
6 Beton ring balk 15/20 - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.21.(1) #REF! m2 252,815.05 #REF! #REF! #REF!
7 Beton balok konsul 15/15 - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.21.(1) #REF! m2 252,815.05 #REF! #REF! #REF!
6 Beton balok Sunduk 8/20 - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.21.(1) #REF! m2 252,815.05 #REF! #REF! #REF!
7 Beton balok Gunungan 12/15 - - -
- Beton K-175 A.4.1.1.5. #REF! m3 1,169,438.41 #REF! #REF! #REF!
- Pembesian 2.2.6.1.d.(a).1 #REF! kg 19,162.00 #REF! #REF! #REF!
- Bekisting A.4.1.1.21.(1) #REF! m2 252,815.05 #REF! #REF! #REF!

V PEKERJAAN DINDING - - -
1 Pas. Batu bata 1:6 A. 4.4.1.11. #REF! m2 170,608.90 #REF! #REF! #REF!
2 Plesteran dinding 1:6 3.2.2.2.18.(c) #REF! m2 61,401.12 #REF! #REF! #REF!
3 Acian 3.2.2.2.36.(c) #REF! m2 33,715.00 #REF! #REF! #REF!
4 Cat dinding ex Catilax 3.3.10.(c) #REF! m2 29,174.75 #REF! #REF! #REF!

VI PEKERJAAN KUSEN, PINTU, JENDELA - - -


1 Kusen pintu/jendela ky bangkirai A.4.6.1.1.2. #REF! m3 21,000,919.50 #REF! #REF! #REF!
2 Daun pintu panil ky bangkirai A.4.6.1.5.2. #REF! m2 1,083,069.90 #REF! #REF! #REF!
3 Daun jendela kaca ky bangkirai A.4.6.1.6.2. #REF! m2 748,021.78 #REF! #REF! #REF!
4 Cat kayu 3.3.4.(c) #REF! m2 62,636.75 #REF! #REF! #REF!
5 Slot tanam pintu A.4.6.2.2. #REF! bh 192,555.00 #REF! #REF! #REF!
6 Engsel pintu A.4.6.2.5. #REF! bh 59,845.50 #REF! #REF! #REF!
7 Gerendel Pintu A.4.6.2.11.a #REF! bh 53,570.00 #REF! #REF! #REF!
8 Engsel jendela A.4.6.2.6. #REF! bh 35,860.00 #REF! #REF! #REF!
9 Kait angin A.4.6.2.9. #REF! set 39,407.50 #REF! #REF! #REF!
10 Grendel Jendela A.4.6.2.11 #REF! bh 38,390.00 #REF! #REF! #REF!
11 Kaca bening 5 mm A.4.6.2.17. #REF! m2 163,905.50 #REF! #REF! #REF!

VII PEKERJAAN PLAFOND - - -


1 Pas. Rangka plafond hollow 1x35.35.0,3 mm, A.4.2.1.21. #REF! m2 99,247.50 #REF! #REF! #REF!
modul 60x60 cm - - -
2 Pas. Plafond langit-langit Gypsum A.4.5.1.7. #REF! m2 51,792.40 #REF! #REF! #REF!
3 List gypsum A.4.5.1.10.a #REF! m' 36,256.00 #REF! #REF! #REF!
4 Cat plafond 3.3.10.(c) #REF! m2 29,174.75 #REF! #REF! #REF!

VIII PEKERJAAN ATAP - - -


1 Pek. Kuda-kuda ky Kruing A.4.6.1.13.4. #REF! m3 12,906,982.00 #REF! #REF! #REF!
2 Pek. konstruksi gording, nok dan murplat kayu A.4.6.1.13.10. #REF! m3 12,165,032.00 #REF! #REF! #REF!
Kruing - - -
3 Pek Rangka atap Usuk 5/7 ky albasia reng 2/3 A.4.6.1.16.5. #REF! m2 86,952.93 #REF! #REF! #REF!
suren - - -
4 Pas. Papan Reuter ky kruing 2/20 A.4.6.1.21.4. #REF! m1 150,945.17 #REF! #REF! #REF!
5 Pas. Atap Galvalum lapis pasir A.4.5.2.40.1 #REF! m2 110,424.60 #REF! #REF! #REF!
6 Pas. Nok Galvalum lapis pasir A.4.5.2.41.1 #REF! m' 88,832.70 #REF! #REF! #REF!
7 Lisplang (30) cm, tbl 8mm kalsiplank A.4.6.1.22.5 (a) #REF! m2 48,131.88 #REF! #REF! #REF!
8 Cat listplank 3.3.4.(c) #REF! m2 62,636.75 #REF! #REF! #REF!

IX PEKERJAAN LISTRIK - - -
1 Pas. Instalasi listrik A.6.2.1.1. 5.00 ttk 217,057.50 1,085,287.50 119,381.63 1,204,669.13
2 Pas. Lampu Philips LED BULB 14.5W - 5.00 unit 85,000.00 425,000.00 46,750.00 471,750.00
3 Stop Kontak - 1.00 bh 20,000.00 20,000.00 2,200.00 22,200.00
4 Saklar Tunggal - 1.00 bh 20,000.00 20,000.00 2,200.00 22,200.00
5 Saklar Dauble - 1.00 bh 20,000.00 20,000.00 2,200.00 22,200.00
JUMLAH PEK. C #REF!
1 2 3 4 5 6 7 8
D PEKERJAAN LAIN-LAIN - - -
1 Pas. Hand rail stainless dia 2" - 7.40 m' 75,000.00 555,000.00 61,050.00 616,050.00
2 Pas. Wastafel Merk TOTO type LW 246 A.5.1.1 5. 1.00 unit 1,224,613.50 1,224,613.50 134,707.49 1,359,320.99
3 Pasang kran air A.5.1.1 .35 1.00 bh 50,501.00 50,501.00 5,555.11 56,056.11
4 Pas. Pipa PVC AW dia 1/2" A.5.1.1 25. 10.00 m' 22,019.29 220,192.90 24,221.22 244,414.12
5 Pas. Pipa PVC AW dia 2" A.5.1.1 29. 8.00 m' 59,298.09 474,384.72 52,182.32 526,567.04
6 Pas. Prasasti marmer ukuran 20x30 cm2 - 1.00 Bh 250,000.00 250,000.00 27,500.00 277,500.00
7 Pas. Rambu jalur evakuasi acrylic 10x 30 cm2 - 1.00 Bh 100,000.00 100,000.00 11,000.00 111,000.00
8 Pas. Rambu titik kumpul assembly acrylic 40x 60 - 1.00 Bh 800,000.00 800,000.00 88,000.00 888,000.00
cm2 + tiang 2" x3 mtr
JUMLAH PEK. D 4,078,908.25
JUMLAH TOTAL #REF!
Terbilang : Seratus sembilan …............ juta rupiah
DIBULATKAN #REF!

Wonosobo, 2022
Menyetujui : Dibuat oleh :
PEJABAT PEMBUAT KOMITMEN KONSULTAN PERENCANA
CV. HARAPAN KARYA KONSULTAN

ENDANG SUSILA, ST HARDHIK, ST


NIP : 19791009 200312 1 007 Direktur
Mengetahui :
KEPALA DINAS
PENDIDIKAN PEMUDA DAN OLAHRAGA
KABUPATEN WONOSOBO

Drs. TONO PRIHATONO


Pembina Tingkat I
NIP. 19740211 199303 1 001
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Alamat ; Jl. Soepardjo Rustam, Andongsili Telp. (0286) 321113 Fax. (0286) 321113
WONOSOBO Kode Pos 56351

RENCANA ANGGARAN BIAYA


KEGIATAN : URUSAN PENYELENGGARAAN PSU PERUMAHAN
PEKERJAAN : PEMBANGUNAN JALAN LINGKUNGAN JALAN DAN SENDERAN RT.06 RW.05 LIMAS GARDEN
KELURAHAN JLAMPRANG
LOKASI : KECAMATAN WONOSOBO KABUPATEN WONOSOBO
TAHUN ANGGARAN : 2022

JUMLAH HARGA +
HARGA SATUAN JUMLAH HARGA PPN 10%
NO URAIAN PEKERJAAN ANALIS VOLUME/SAT. PPN
[Rp.] [Rp.] [Rp.] [Rp.]
1 2 3 4 5 6 = ( 4X5 ) 7 = ( 6x11% ) 7 = ( 6+7 )

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan - 1.00 ls 500,000.00 500,000.00 55,000.00 555,000.00
2 Uitzet Bouwplank - 1.00 ls 317,000.00 317,000.00 34,870.00 351,870.00
3 Papan Nama Kegiatan - 1.00 bh 150,000.00 150,000.00 16,500.00 166,500.00
4 Administrasi dan Dokumentasi - 1.00 ls 1,000,000.00 1,000,000.00 110,000.00 1,110,000.00
6 JMF dan Uji Lab Beton - 1.00 ls 1,000,000.00 1,000,000.00 110,000.00 1,110,000.00
JUMLAH I 3,293,370.00

II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


1 Sosialisasi, Promosi dan Pelatihan
- Papan Informasi Keselamatan Konstruksi - 1.00 Bh 250,000.00 250,000.00 27,500.00 277,500.00
2 Alat Pelindung Diri (APD) antara lain
- Topi Pelindung (safety helmet) - 3.00 bh 50,000.00 150,000.00 16,500.00 166,500.00
- Sarung Tangan (safety gloves) - 3.00 bh 20,000.00 60,000.00 6,600.00 66,600.00
- Sepatu Keselamatan (safety shoes) - 3.00 bh 120,000.00 360,000.00 39,600.00 399,600.00
- Rompi Keselamatan (safety vest) - 3.00 bh 45,000.00 135,000.00 14,850.00 149,850.00
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan
- Peralatan P3K - 1.00 Set 300,000.00 300,000.00 33,000.00 333,000.00
JUMLAH II 1,393,050.00

III BETONISASI LINGKUNGAN


1 Pas beton mutu K-225 A.4.1.1.7.1 64.34 m3 1,219,284.91 78,447,571.82 8,629,232.90 87,076,804.73
2 Pasir urug A.2.3.1.11. 12.90 m3 390,500.00 5,037,450.00 554,119.50 5,591,569.50
3 Platik cor ls 421.00 m2 3,500.00 1,473,500.00 162,085.00 1,635,585.00
4 Pas. Begesting beton cor (3 kali pakai) B.26.b.3 44.50 m2 159,735.40 7,108,804.74 781,968.52 7,890,773.26
5 galian 24.67 m3 68,750.00 1,696,062.50 186,566.88 1,882,629.38
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP A.3.2.1.2. 23.51 m3 1,019,067.50 23,958,276.93 2,635,410.46 26,593,687.39
7 besi penutup saluran dia.10-200 - 44.40 19,800.00 879,120.00 96,703.20 975,823.20
8 Pengurugan 1 m3 sirtu padat A.2.3.1.14. 11.01 m3 387,750.00 4,269,127.50 469,604.03 4,738,731.53
9 Gril jumlah 2
- Besi Siku 50.50.5 - 60.90 kg 19,800.00 1,205,820.00 132,640.20 1,338,460.20
- Besi dia. 13 mm - 65.63 kg 13,500.00 885,937.50 97,453.13 983,390.63
- Pengelasan - 168.00 titik 4,314.11 724,770.48 79,724.75 804,495.23
- Pengecatan Grill A.4.7.1.16. 25.83 m2 27,973.00 722,542.59 79,479.68 802,022.27

JUMLAH III 140,313,972.31

JUMLAH TOTAL ( I +II +III ) 145,000,392.31


DIBULATKAN 145,000,000.00
Terbilang : Seratus empat puluh lima juta luma ratus ribu rupiah

Wonosobo, …… Juni 2022

Menyetujui ; Dibuat oleh :


KEPALA BIDANG PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN KONSULTAN PERENCANA
SELAKU
PEJABAT PEMBUAT KOMITMEN (PPK)

INDRI WIDIASTUTI,
NIP . 19670128 SH,2M.Si
199503 002 ANDI HIDAYAT S.T
Tenaga Teknis
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Alamat ; Jl. Soepardjo Rustam, Andongsili Telp. (0286) 321113 Fax. (0286) 321113
WONOSOBO Kode Pos 56351

HARGA PERKIRAAN SENDIRI (HPS)


KEGIATAN : URUSAN PENYELENGGARAAN PSU PERUMAHAN
PEKERJAAN : PEMBANGUNAN JALAN LINGKUNGAN JALAN DAN SENDERAN RT.06 RW.05 LIMAS GARDEN
KELURAHAN JLAMPRANG
LOKASI : KECAMATAN WONOSOBO KABUPATEN WONOSOBO
TAHUN ANGGARAN : 2022

HARGA SATUAN JUMLAH HARGA PPN 10% JUMLAH HARGA + PPN


NO URAIAN PEKERJAAN ANALIS VOLUME/SAT.
[Rp.] [Rp.] [Rp.] [Rp.]
1 2 3 4 5 6 = ( 4X5 ) 7 = ( 6x11% ) 7 = ( 6+7 )

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan - 1.00 ls 500,000.00 500,000.00 55,000.00 555,000.00
2 Uitzet Bouwplank - 1.00 ls 150,000.00 150,000.00 16,500.00 166,500.00
3 Papan Nama Kegiatan - 1.00 bh 150,000.00 150,000.00 16,500.00 166,500.00
4 Administrasi dan Dokumentasi - 1.00 ls 1,000,000.00 1,000,000.00 110,000.00 1,110,000.00
6 JMF dan Uji Lab Beton - 1.00 ls 1,000,000.00 1,000,000.00 110,000.00 1,110,000.00
JUMLAH I 3,108,000.00

II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


1 Sosialisasi, Promosi dan Pelatihan
- Papan Informasi Keselamatan Konstruksi - 1.00 Bh 250,000.00 250,000.00 27,500.00 277,500.00
2 Alat Pelindung Diri (APD) antara lain
- Topi Pelindung (safety helmet) - 3.00 bh 50,000.00 150,000.00 16,500.00 166,500.00
- Sarung Tangan (safety gloves) - 3.00 bh 20,000.00 60,000.00 6,600.00 66,600.00
- Sepatu Keselamatan (safety shoes) - 3.00 bh 120,000.00 360,000.00 39,600.00 399,600.00
- Rompi Keselamatan (safety vest) - 3.00 bh 45,000.00 135,000.00 14,850.00 149,850.00
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan
- Peralatan P3K - 1.00 Set 300,000.00 300,000.00 33,000.00 333,000.00
JUMLAH II 1,393,050.00

III BETONISASI LINGKUNGAN


1 Pas beton mutu K-225 A.4.1.1.7.1 64.34 m3 1,219,284.91 78,447,571.82 8,629,232.90 87,076,804.73
2 Pasir urug A.2.3.1.11. 12.90 m3 390,500.00 5,037,450.00 554,119.50 5,591,569.50
3 Platik cor ls 421.00 m2 3,500.00 1,473,500.00 162,085.00 1,635,585.00
4 Pas. Begesting beton cor (3 kali pakai) B.26.b.3 44.50 m2 159,735.40 7,108,804.74 781,968.52 7,890,773.26
5 galian 24.67 m3 68,750.00 1,696,062.50 186,566.88 1,882,629.38
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP A.3.2.1.2. 23.51 m3 1,019,067.50 23,958,276.93 2,635,410.46 26,593,687.39
7 besi penutup saluran dia.10-200 - 44.40 19,800.00 879,120.00 96,703.20 975,823.20
8 Pengurugan 1 m3 sirtu padat A.2.3.1.14. 11.01 m3 387,750.00 4,269,127.50 469,604.03 4,738,731.53
9 Gril jumlah 2
- Besi Siku 50.50.5 - 60.90 kg 19,800.00 1,205,820.00 132,640.20 1,338,460.20
- Besi dia. 13 mm - 65.63 kg 13,500.00 885,937.50 97,453.13 983,390.63
- Pengelasan - 168.00 titik 4,314.11 724,770.48 79,724.75 804,495.23
- Pengecatan Grill A.4.7.1.16. 25.83 m2 27,973.00 722,542.59 79,479.68 802,022.27

JUMLAH III 140,313,972.31

JUMLAH TOTAL ( I +II +III ) 144,815,022.31


DIBULATKAN 144,815,000.00

Wonosobo, …… ….... 2022

Dibuat oleh :
KEPALA BIDANG PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
SELAKU
PEJABAT PEMBUAT KOMITMEN (PPK)

INDRI WIDIASTUTI, SH, M.Si


NIP . 19670128 199503 2 002
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Alamat ; Jl. Soepardjo Rustam, Andongsili Telp. (0286) 321113 Fax. (0286) 321113
WONOSOBO Kode Pos 56351

Bill of Quantity (BoQ)


KEGIATAN : URUSAN PENYELENGGARAAN PSU PERUMAHAN
PEKERJAAN : PEMBANGUNAN JALAN LINGKUNGAN JALAN DAN SENDERAN RT.06 RW.05 LIMAS GARDEN
KELURAHAN JLAMPRANG
LOKASI : KECAMATAN WONOSOBO KABUPATEN WONOSOBO
TAHUN ANGGARAN : 2022

HARGA SATUAN JUMLAH HARGA PPN 10% JUMLAH HARGA + PPN


NO URAIAN PEKERJAAN ANALIS VOLUME/SAT.
[Rp.] [Rp.] [Rp.] [Rp.]
1 2 3 4 5 6 = ( 4X5 ) 7 = ( 6x11% ) 7 = ( 6+7 )

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan - 1.00 ls - - -
2 Uitzet Bouwplank - 1.00 ls - - -
3 Papan Nama Kegiatan - 1.00 bh - - -
4 Administrasi dan Dokumentasi - 1.00 ls - - -
6 JMF dan Uji Lab Beton - 1.00 ls - - -
JUMLAH I -

II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


1 Sosialisasi, Promosi dan Pelatihan
- Papan Informasi Keselamatan Konstruksi - 1.00 Bh -
2 Alat Pelindung Diri (APD) antara lain
- Topi Pelindung (safety helmet) - 3.00 bh -
- Sarung Tangan (safety gloves) - 3.00 bh -
- Sepatu Keselamatan (safety shoes) - 3.00 bh -
- Rompi Keselamatan (safety vest) - 3.00 bh -
3 Fasilitas Sarana, Prasarana dan Alat Kesehatan
- Peralatan P3K - 1.00 Set -
JUMLAH II

III BETONISASI LINGKUNGAN


1 Pas beton mutu K-225 A.4.1.1.7.1 64.34 m3 - - -
2 Pasir urug A.2.3.1.11. 12.90 m3 - - -
3 Platik cor ls 421.00 m2 - - -
4 Pas. Begesting beton cor (3 kali pakai) B.26.b.3 44.50 m2 - - -
5 galian 24.67 m3 - - -
6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP A.3.2.1.2. 23.51 m3 - - -
7 besi penutup saluran dia.10-200 - 44.40 - - -
8 Pengurugan 1 m3 sirtu padat A.2.3.1.14. 11.01 m3 - - -
9 Gril jumlah 2
- Besi Siku 50.50.5 - 60.90 kg - - -
- Besi dia. 13 mm - 65.63 kg - - -
- Pengelasan - 168.00 titik - - -
- Pengecatan Grill A.4.7.1.16. 25.83 m2 - - -

JUMLAH III -

JUMLAH TOTAL ( I +II +III ) -


DIBULATKAN -

Tempat,hari/tanggal-tahun

Penawar :
CV/PT…...............

PIMPINAN PERUSAHAAN
JABATAN
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Alamat ; Jl. Soepardjo Rustam, Andongsili Telp. (0286) 321113 Fax. (0286) 321113
WONOSOBO Kode Pos 56351

REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : URUSAN PENYELENGGARAAN PSU PERUMAHAN


PEKERJAAN : PEMBANGUNAN JALAN LINGKUNGAN JALAN DAN SENDERAN RT.06 RW.05 LIMAS GARDEN
LOKASI : KECAMATAN WONOSOBO KABUPATEN WONOSOBO
TAHUN ANGGARAN : 2022

JUMLAH + PPN
NO URAIAN PEKERJAAN KETERANGAN
[Rp.]
1 2 3 4

I PEKERJAAN PERSIAPAN Rp. 3,293,370.00

II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp. 1,393,050.00

III BETONISASI LINGKUNGAN Rp. 140,313,972.31

JUMLAH TOTAL Rp. 145,000,392.31


DIBULATKAN Rp. 145,000,000.00

Terbilang : Seratus empat puluh lima juta luma ratus ribu rupiah

Wonosobo, …… Juni 2022

Menyetujui ; Dibuat oleh :


KEPALA BIDANG PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN KONSULTAN PERENCANA
SELAKU 0
PEJABAT PEMBUAT KOMITMEN (PPK) -

INDRI WIDIASTUTI, SH, M.Si ANDI HIDAYAT S.T


NIP . 19670128 199503 2 002
- Tenaga Teknis
PEMERINTAH KABUPATEN WONOSOBO
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERHUBUNGAN
Jln. Soepardjo Rustam, Andongsili Telp (0286) 321113 Fax.:(0286) 321113

Wonosobo Kode Pos 56351

KEGIATAN : URUSAN PENYELENGGARAN PSU PERUMAHAN


PEKERJAAN : PENATAAN JALAN LINGKUNGAN RT 01 RW 02 KAMPUNG SUMBERAN BARAT KELURAHAN WONOSOBO BARAT, KECAMATAN WONOSOBO
LOKASI : KECAMATAN WONOSOBO KABUPATEN WONOSOBO
TAHUN ANGGARAN : 2022

Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10

II PEKERJAAN TANAH
1 Galian Tanah 24.67 m3
2 Urug Sirtu 11.01 m3

III PEKERJAAN BETONISASI


1 Plastik Alas Beton Cor 421.00 m2
2 Pasir Urug 12.90 m3
3 Beton Jalan 16cm K -225 64.41 m3
4 Begisting 3 Kali Pakai 43.42 m2

IV PEKERJAAN SALURAN
1 Pasangan batu 23.51 m3
2 Pembesian besi Polos 44.40 kg
3 Begisting 3 Kali Pakai 1.08 m2

V PEKERJAAN GRILL BESI


- Besi Siku 50.50.5 60.90 kg
- Besi dia. 13 mm 65.63 kg
- Pengelasan 168.00 titik
- Pengecatan Grill 25.83 m2

Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10
Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10
II PEKERJAAN TANAH

1. Galian Tanah

3.00 x 0.40 x 0.40 x 1.00 x 1.00 = 0.48 m3


4.50 x 0.40 x 0.40 x 1.00 x 1.00 = 0.72 m3
4.00 x 0.50 x 0.40 x 1.00 x 1.00 = 0.80 m3
5.00 x 0.40 x 0.40 x 1.00 x 1.00 = 0.80 m3
30.00 x 0.30 x 0.30 x 1.00 x 1.00 = 2.70 m3
28.40 x 0.90 x 0.75 = 19.17 m3
2. Urug Tanah 24.67 m3

#REF! Urug dengan Sirtu


5.00 x 3.00 x 0.70 x 1.00 x 1.00 = 5.25 m3
24.00 x 2.00 x 0.12 x 1.00 x 1.00 = 5.76 m3
11.01 m3
Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN BETONISASI

1.

#REF! Plastik Alas Beton Cor


20.00 x 5.00 x 0.12 x 1.00 x 1.00 = 100.00 m2
24.00 x 2.00 x 0.12 x 1.00 x 1.00 = 48.00 m2
35.00 x 3.00 x 0.12 x 1.00 x 1.00 = 105.00 m2
10.00 x 3.00 x 0.12 x 1.00 x 1.00 = 30.00 m2
7.00 x 3.00 x 0.12 x 1.00 x 1.00 = 21.00 m2
39.00 x 3.00 x 0.12 x 1.00 x 1.00 = 117.00 m2
421.00 m2
Beton Jalan 16cm K -225
20.00 x 5.00 x 0.15 x 1.00 x 1.00 = 15.00 m3
24.00 x 2.00 x 0.15 x 1.00 x 1.00 = 7.20 m3
35.00 x 3.00 x 0.15 x 1.00 x 1.00 = 15.75 m3
10.00 x 3.00 x 0.15 x 1.00 x 1.00 = 4.50 m3
7.00 x 3.00 x 0.15 x 1.00 x 1.00 = 3.15 m3
39.00 x 3.00 x 0.15 x 1.00 x 1.00 = 17.55 m3
2.40 3.50 x 0.15 x - x = 1.26

64.41 m3

Pasir Urug 30.00 x 3.00 x 0.05 x x = 4.50 m3


10.00 x 3.00 x 0.05 x x = 1.50 m3
7.00 x 3.00 x 0.05 x x = 1.05 m3
39.00 x 3.00 x 0.05 x x = 5.85 m3
12.90 m3

Begisting Rabat Beton


135.00 x 0.15 x 2.00 x 1.00 = 41.42 m2
43.42 m2

Plastik Alas Beton Cor = 421.00 m2


Pasir Urug = 12.90 m3
Beton Jalan 15cm K -175 = 64.41 m3
Begisting = 43.42 m2
Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10
IV PEKERJAAN SALURAN

1. Saluran dan senderan


Pasangan batu
3.00 x 0.30 0.40 0.70 x x = 0.63 m3
4.00 x 0.30 0.40 1.00 = 1.20 m3
4.00 x 0.30 0.40 0.70 0.10 2.00 = 0.96 m3
30.00 x 0.30 0.30 0.50 = 4.50 m3
5.00 x 0.30 0.30 0.60 = 0.90 m3
19.00 x 0.30 0.30 0.60 2.00 = 6.84 m3
koperan 3.00 x 0.40 0.40 = 0.48 m3
4.00 x 0.40 0.40 = 0.64 m3
4.00 x 0.40 0.40 = 0.64 m3
30.00 x 0.40 0.40 = 4.80 m3
5.00 x 0.40 0.20 = 0.40 m3
19.00 x 0.40 0.20 = 1.52 m3
23.51 m3

2. Pembesian besi Polos


P 0+000 - P 0+080 BJ
10 - besi 10 mm 3.00 x 2.40 0.62 x 10.00 x 1.00 = 44.40 kg
besi 10 mm - 200 x 0.62 x 15.00 x 1.00 = - kg
44.40 kg

3. Bekisting
P 0+000 - P 0+080 3.00 x 2.40 x 0.15 1.00 x - = 1.08 m2
penutup deainase
1.08 m2

Lebar
Nomor Uraian Pekerjaan Panjang Tinggi Banyak Jumlah Volume Satuan Sket Gambar
Atas Bawah
1 2 3 4 5 6 7 8 9 10
V PEKERJAAN GRILL BESI

1. Pas. Grill Besi


- Besi Siku 50.50.5
4.50 x 1.00 x 1.00 x 2.00 = 9.00 kg
0.60 x 1.00 x 1.00 x 6.00 = 3.60 kg
12.60 kg
Berat jenis 2.42
30.45 kg
- Besi dia. 13 mm Ulir
4.50 x 1.00 x 1.00 x 7.00 = 31.50 kg
31.50 kg
Berat jenis 1.04
32.81 kg
- Pengelasan
6.00 x x 7.00 x 1.00 = 42.00 titik
7.00 6.00 1.00 = 42.00
84.00 titik

- Pengecatan Grill Luas Panjang Jumlah


Besi Siku 6.00 x 0.20 x 4.50 x 2.00 = 10.80 m2
0.50 x 0.20 x 6.00 x 3.00 = 1.80 m2
Besi Bulat 0.50 x 0.02 x 4.50 x 7.00 = 0.32 m2
0.02 12.92 m2

JUMLAH TOTAL *2
- Besi Siku 50.50.5 60.90 kg
- Besi dia. 13 mm 65.63 kg
- Pengelasan 168.00 titik
- Pengecatan Grill 25.83 m2