ABSEN PEKERJA HARIAN TUKANG

Proyek. : Bapak Marcel


Kuli. : Isman (Ambas belakang)
Periode. : 27 juni - 3 juli 2021 minggu (1)
No NAMA Minggu senin selasa rabu Kamis Jumat Sabtu JMLH UPAH/ JMLH UPAH TOTAL
Tanggal 27-juni-2021 28-juni-2021 29-juni-2021 30-juni-2021 1-juli-2021 2-juli-2021 3-juli-2021 HARI HARI Lmbr Lmbr/jam

1 Isman 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 6hari 175.000 12 jam 20,000 1,290,000
Tukang jam kerja Libur 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
2 Topa 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 6hari 160,000 12 jam 20,000 1,200,000
Tukang jam kerja Libur 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
3 Asep 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 6hari 150,000 12 jam 20,000 1,140,000
Tukang jam kerja Libur 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
4 Umam 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 6hari 150,000 12 jam 20,000 1,140,000
Tukang jam kerja Libur 8.00 - 18.00 Libur 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
5 Fiki 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 5hari 120,000 10 jam 15,000 900,000
Kenek jam kerja Libur 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
Total keseluruhan pembayaran 5,640,000

KETERANGAN PEKERJAAN TUKANG


1 minggu
27-juni-2021
2 senin 2 orang bongkar pagar seng area balancing tank+1 orang besisting bak kontrl+2 orang bowplank balancing tank
28-juni-2021
3 Selasa 1 orang cor grouting pipa vacum inlet + 2 orang pasang bata celah badugan trap untuk persiapan cot+2 orang pasang
29-juni-2021 pipa air hujan +ngatur level kemiringan
4 Rabu 1 orang Cor grouting pipa vacum+2 orang bongkar rangka pagar area balancing tank+2 orang cor +pembesian trap+cor bak kontrol
30-juni-2021
5 Kamis 2 orang marking titik kolom patio+lanjut bowpapnk+ 2 orang pasang bata dudukan pipa penyangga air hujan+1 orang mulai
1-juli-2021 mulai geser kolom
6 Jumat 2 orang lanjut di pengurungan pipa+bongkar begisting bak kontrol+1 orang lanjut geser stek kolom+2 orang mulai fabrikasi begisting
2-juli-2021
7 Sabtu 2 orang fabrikasi begisting+3 orang mulai pembesian kolom
3-juli-2021
ABSEN PEKERJA HARIAN TUKANG
Proyek. : Bapak Marcel
Kuli. : Isman (Ambas belakang)
Periode : 4 Juli - 10 juli 2021. (Minggu 2)
No NAMA Minggu senin selasa rabu Kamis Jumat Sabtu JMLH UPAH/ JMLH UPAH TOTAL
Tanggal 4-juli-2021 5-juli-2021 6-juli-2021 7-juli-2021 8-juli-2021 9-juli-2021 10-juli-2021 HARI HARI Lmbr Lmbr/jam

1 Isman 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 7hari 175.000 14 jam 20,000 1,505,000
Tukang jam kerja 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 13.00 - 18.00 8.00 - 18.00 8.00 - 18.00
2 Topa 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 7hari 160,000 14 jam 20,000 1,400,000
Tukang jam kerja 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
3 Asep 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 7hari 150,000 14 jam 20,000 1,330,000
Tukang jam kerja 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
4 Umam 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 7hari 150,000 14 jam 20,000 1,330,000
Tukang jam kerja 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
5 Fiki 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 1hr 2jm 7hari 120,000 14 jam 15,000 1,050,000
Kenek jam kerja 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00 8.00 - 18.00
Total keseluruhan pembayaran 6,585,000

KETERANGAN PEKERJAAN TUKANG


1 minggu 2 orang pembesian kolom+2 orang fabrikasi begisting kolom+1 orang bantu pembesian + fabrikasi+ukur titik kolom
4-Juli-2021
2 senin 2 orang pasang begisting kolom+2 orang pembesian tambahan jalur slof+bobok + 1 orang gatot bantu ukuran titik kolom
5-Juli-2021
3 Selasa 2 orang pasang begisting kolom+2 orang pembesian kolom+1 orang gatot bobok dinding untuk masukan kolom
6-Juli-2021
4 Rabu 5 orang mengerjakan area patio bobok dinding untuk kolom+begisting kolom+pembesian+cor sloof tambahan patio
7-Juli-2021
5 Kamis 5 orang perkuatan begisting+ngecor
8-Juli-2021
6 Jumat 2 orang bongkar begisting kolom +1 orang fabrikasi balok B6+2 orang susun kapolding
9-Juli-2021
7 Sabtu 1 orang fabrikasi pembesian balok.4 orang rangka penahan balok dak+potong genteng.rangka.plafon
10-Juli-2021

PEMBELIAN MATERIAL TAMBAHAN

1 tywae 3 in x 3 biji Tgl 30 - Juni - 2021. Rp103,500


keni 2 in x 1 biji Tgl 30 - Juni - 2021. Rp11,500
vsok 1in x 4 biji Tgl 30 - Juni - 2021. Rp24,000
keni 3 in x 4 biji Tgl 30 - Juni - 2021. Rp72,000

2 keni 3 in x 2 biji Tgl 30 - Juni - 2021. Rp36.000


3 Benang besar x 2 Tgl 1 - Juli - 2021. Rp12.000
Total Rp259,000

TAGIHAN ABSEN TUKANG


1 Absen minggu pertama 13 juni-19 juni 2021 Rp5,640,000
2 Absen minggu Ke dua. 20 juni-26 juni 2021 Rp6,585,000

Total Rp12,225,000

Total Tagihan keseluruhan Rp12.484.000

Jakarta 10 juli 2021

Isman