Anda di halaman 1dari 4

JUNI 2022

PEMASUKAN PENGELUARAN SALDO


11/6/22 10/6/22 SALDO 46.496.850
EDI SETOR PAM Ongkos pengeboran PEMASUKAN 1.480.000 +
Rp. 1.480.000 Rp. 5.000.000 47.976.850
Beli kabel PENGELUARAN 10.545.000 -
Rp. 412.000 37.431.850
13/6/22
Beli pulsa listrik
Rp. 1.000.000
Sumbangan apitan
Rp. 1.000.000
Bisaroh pengurus
Rp. 1.000.000
Bisaroh 6 musholla
Rp. 150.000
24/6/22
Fotocopy undangan dan fotocopy laporan
Rp. 200.000
26/6/22
Pembelian automatis + ongkos
Rp. 700.000
25/6/22
Beli pulsa listrik
Rp. 1.000.000
26/6/22
Beli aqua 2 dus
Rp. 63.000
Print laporan
Rp. 20.000
TOTAL 10.545.000
JULI 2022
PEMASUKAN PENGELUARAN SALDO
5/7/22 8/7/22 SALDO 37.431.850
EDI SETOR PAM Beli pulsa listrik PEMASUKAN 8.065.500 +
Rp. 3.590.000 Rp. 1.000.000 45.497.350
21/7/22 PENGELUARAN 9.261.000 -
11/7/22 Beli pulsa listrik 36.236.350
EDI SETOR PAM Rp. 1.000.000
Rp. 4.200.000 + Bisaroh 6 musholla
Rp. 250.000 + Rp. 150.000
Rp. 25.000 Bisaroh pengurus
Rp. 900.000
Total Rp. 8.065.500
28/7/22
Beli pipa AW 1¼ 50 pt sok 1¼ 50 pcs
Rp. 4.150.000
Untuk pemindahan PAM sumur 35 kk ke
jaringan masjid
Beli lem hitali 2 kaleng
Rp. 80.000
30/7/22
Beli keni 1¼ 20 pcs, sok 15 pcs, nopi ¼ 1
dop 2 ins = 2, ganco, T 1¼ = 1, sok 2 x ¼ = 1,
T 2 x 1¼ = 1, T 1¼ x ¾ =1
Rp. 310.000
Beli rokok + minuman
Rp. 44.000
31/7/22
Sok ¼ = 4, T 1¼ x ½ = 1, keni 2 ins = 2, sok 1¼ =
1,
klem 2 ins = 4, paku beton 8 pcs
Rp. 113.000
Beli rokok + minuman
Rp . 54.000
Bisaroh pemindahan jaringan Pipa 35 kk
Rp. 700.000
Beli peralon 1 ¼ 19 pcs
Rp. 760.000
TOTAL 9.261.000
AGUSTUS 2022
PEMASUKAN PENGELUARAN SALDO
1/8/22 1/8/22 SALDO 36.236.350
EDI SETOR PAM Perbaikan 2 titik PEMASUKAN 6.926.000 +
Rp. 2.286.000 Rp. 40.000 43.162.350
3/8/22 PENGELUARAN 4.040.500 -
7/8/22 Beli pipa 1¼, L 1¼, lem asahi, klem, sok ¼ 39.121.850
EDI SETOR PAM Rp. 138.000 4.000.000 -
Rp. 3.037.000 2/8/22 35.121.850
Perbaikan pipa bocor 2 titik
10/8/22 Rp. 40.000
EDI SETOR PAM 4/8/22
Rp. 1.603.000 Beli timer + ongkos
Total Rp. 6.926.000 Rp. 477.500
Beli pulsa listrik
Rp. 1.000.000
Beli peralon 1 ins = 1 pcs
Rp. 35.000
Perbaikan 9 titik
Rp. 200.000
Bisaroh 6 musholla
Rp. 150.000
Bisaroh pengurus
Rp. 900.000
17/8/22
Beli pulsa listrik
Rp. 1.000.000
Beli peralon 2 ins = 1 pcs
Rp. 60.000
Bisaroh 4 RT untuk acara 17 agustus
Rp. 4.000.000

Anda mungkin juga menyukai