168 Lb.Blimbing I-Lb.Blimbing II 1 Air Buyuk 0+600 S 12.00 4.00 1.00 S K I 100
2 Air Beliti 5+950 S 40.00 1.20 1.00 T B I 100.00
170 Kota Padang-Lb. Belimbing II 3 Air Besung 0+450 S 11.00 4.00 1.00 L T I 100.00
4 Air Tuang 1+780 S 11.00 4.00 1.00 L T I 100.00
5 Air Lung 2+980 S 9.00 4.00 1.00 L T I 100.00
Ukuran Type / Kondisi
Jembatan
No. Bangunan Atas Kondisi
No. Ruas Nama Ruas Penyebrangan Panjang Lebar Jumlah
Urut Rusak Rusak
Nama Jembatan/Sungai Pal (Km) (M) (M) Bentang Type Bahan Asal Baik Sedang
Ringan Berat
6 Air Sebak 3+375 S 7.00 4.00 1.00 L T I 100.00
7 Air Tebat 4+830 S 6.50 4.00 1.00 L T I 100.00
8 Air Tengah 5+630 S 30.00 4.50 1.00 R B T 100.00
9 Air Petai 5+880 S 7.00 4.00 1.00 L T I 100.00
10 Air Tebat 6+920 S 6.00 4.00 1.00 L T I 100.00
11 Air Les 7+015 S 6.00 4.00 1.00 L T I 100.00
12 Air Bujuk 7+125 S 6.00 4.00 1.00 L T I 100.00
13 Air Kau 8+060 S 6.00 4.00 1.00 L T I 100.00
14 Air Tengah 10+750 S 30.00 4.50 1.00 R B T 100.00
166 Periang - Lb.Tunjung 15 Air Beliti 0+025 S 60.00 4.50 1.00 R B T 100.00
16 Air Bujuk 0+900 S 8.00 4.00 1.00 L T I 100.00
17 Air Mandi 2+960 S 8.00 4.00 1.00 L T I 100.00
18 Air Lung 3+750 S 8.00 4.00 1.00 L T I 100.00
163 Sp.Krg Baru - Lb. Tunjung II 19 Air Kati 1+500 S 6.00 4.00 1.00 G B I 100.00
20 Air Buang 4+020 S 6.00 4.00 1.00 G B I 100.00
164 Trans A.Kati-Lb. Tunjung II 21 Air Bang 2+040 S 2.00 7.00 1.00 B B I 100.00
Durian Mas-Air Latan 22 Air Latan 0+350 S 6.00 4.50 1.00 G B I 100.00
Desa Derati 23 Air Beliti - S 60.00 1.20 1.00 T B I 100.00
Lubuk Mumpo - Trans. Lubuk Mumpo 24 Air Beliti 0+300 S 25.00 4.00 1.00 M B I 100.00
Jalan Desa Tanjung Heran Kec. SBU 25 Air Musi 2+500 S 24.34 4.50 1.00 L B I 100.00
Jalan Desa Pengambang - Guru Agung Kec. SBU 26 Air Napal - S 45.00 6.00 1.00 R B I 100.00
SUB. JUMLAH 400.84
JUMLAH 2,215.24
Keterangan :
* JENIS/TYPE JEMBATAN Rejang Lebong, Februari 2020
1. BOX CULVERT (B) Mengetahui,
2. GELAGAR (G) KEPALA DINAS PUPRPKP KEPALA BIDANG BINA MARGA
3. BALOK T (L) KABUPATEN REJANG LEBONG DPUPRPKP KABUPATEN REJANG LEBONG
4. GELAGAR KOMPOSIT (M)
5. PLAT (P)
6. RANGKA (R)
7. JMBT. SEMENTARA (S)
8. JMBT. GANTUNG (T) YUSRAN FAUZI, ST RONI SAPUTRA, ST
Ukuran Type / Kondisi
Jembatan
No. Bangunan Atas Kondisi
No. Ruas Nama Ruas Penyebrangan Panjang Lebar Jumlah
Urut Rusak Rusak
Nama Jembatan/Sungai Pal (Km) (M) (M) Bentang Type Bahan Asal Baik Sedang
Ringan Berat
NIP. 19660220 199303 1 003 NIP. 19760605 201001 1 012
17.00
25.00
56.00
31.00
13.00
11.00
6.00
1.00
160.00