04.08.03 PROGRAM REHABILITASI & REKONSTRUKSI NAD & NIAS - - - - - - 30,790,310 - 30,790,310 30,790,310
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, Termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Tapak Tuan-Subulussalam 20,000 M 30 600,000 600,000 600,000
- Blang Kejeren-Kuta Cane 25,000 M 30 750,000 750,000 750,000
- Banda Aceh 30,000 M 30 900,000 900,000 900,000
11 Pembangunan Terminal :
-di Kab.Aceh Timur Tahap IV (selesai) 1 PKT 1,643,200 1,643,200 1,643,200 1,643,200
-di Nagan Raya Tahap II 1 PKT 10,000,000 - - - - - 10,000,000 10,000,000 10,000,000
-di Aceh Barat (Meulaboh) Tahap II 1 PKT 10,000,000 - - - - - 10,000,000 10,000,000 10,000,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,905,602 1,905,602 - - - 1,905,602
1 Belanja Barang Operasional Lainnya
Subsidi Operasi Bus Perintis (10 lintasan) 1 TH 1,872,002 1,872,002 1,872,002 1,872,002
Terminal Keudah-Darusalam
Terminal Keudah-Batoh
Terminal Keudah-Lampeuneurut
Terminal Keudah-Surin
Terminal Keudah-Syiah kuala
Meulaboh-Tapak Tuan-Singkil
Meulaboh-Alue Peunyaring
2 Belanja Uang Honor Tidak Tetap
- Pengawasan Subsidi Operasi Bus Perintis 1 TH 33,600 33,600 33,600 33,600
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 554,500 554,500 - - - 554,500
Page 1
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 Belanja Uang Honor Tidak Tetap
- Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
- Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pekan Nasional Keselamatan Transportasi Darat 1 PKT 450,000 450,000 450,000 450,000
4 Pengembangan Data Kinerja Perhubungan Darat Prop.NAD -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 304,160 304,160 25,000 - 25,000 329,160
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Banda Aceh-Jakarta (PP) : 20 OT 3,772 75,440 75,440 75,440
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP NANGGOE ACEH DARRUSALAM 42,152,790 - - - - 259,500 259,500 41,893,290 - 41,893,290 42,152,790
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 41,893,290 - - - - - - 41,893,290 - 41,893,290 41,893,290
2 Pemb. Bus Air pd Sungai Mas Kab. Aceh Barat (Termasuk Supervisi) 2 Unit - - - -
Page 2
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
4 Belanja Perjalanan Lainnya 1 Th 123,000 123,000 123,000 123,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 4,839,075 - 4,839,075 4,839,075
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Tarutung-Sipirok-P.Sidempuan 15,000 M 30 450,000 450,000 450,000
- Tarutung-Sibolga-P.Sidempuan 15,000 M 30 450,000 450,000 450,000
- Medan-Binjai-Langkat 10,000 M 30 300,000 300,000 300,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
- Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Sumut -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 274,000 274,000 40,000 - 40,000 314,000
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
Page 3
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Laptop 1 UNIT 25,000 25,000 25,000 25,000
- Pengadaan Filling Cabinet dan Brankas Besi 1 PKT 15,000 15,000 15,000 15,000
5 Belanja Perjalanan Lainnya
- Tiket Medan-Jakarta (PP) : 20 OT 2,909 58,180 58,180 58,180
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP SUMATERA UTARA 4,379,930 - - - - 234,220 234,220 4,145,710 - 4,145,710 4,379,930
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 4,145,710 - - - - - - 4,145,710 - 4,145,710 4,145,710
4 Pemb. Dermaga Sungai di Paluh Subur Hamparan Perak Kab. Deli Serdang 1 pkt - - - -
Pengad. & Pemas Rambu - Rambu Perairan Pedalaman Sungai Lts. Belawan
1 20 Unit - - - -
Lama-Paluh Makna-Karang Gading
Pengad. & Pemas Rambu - Rambu Perairan Pedalaman Sungai Lts. Belawan
2 20 Unit - - - -
Lama - Sei Dua
Page 4
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 6,261,330 - 6,261,330 6,261,330
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Padang-Solok 10,000 M 30 300,000 300,000 300,000
- Kiliranjao-Batas Jambi 10,000 M 30 300,000 300,000 300,000
- Kiliranjao-Batas Riau 10,000 M 30 300,000 300,000 300,000
- Bukittinggi-Batas Sumut 20,000 M 30 600,000 600,000 600,000
-
6 Pengadaan dan Pemasangan APILL Tenaga Surya -
- Simpang 3 Solok 1 UNIT 300,000 300,000 300,000 300,000
- Simpang 3 Lubuk Sikaping 1 UNIT 300,000 300,000 300,000 300,000
- Simpang 3 Lubuk Basung 1 UNIT 300,000 300,000 300,000 300,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Sumbar -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 268,300 268,300 25,000 - 25,000 293,300
1 Belanja Uang Honor Tidak Tetap
Page 5
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaanATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Laptop 1 BH 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Padang-Jakarta (PP) : 20 OT 2,624 52,480 52,480 52,480
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP SUMATERA BARAT 9,308,512 - - - - 234,220 234,220 9,074,292 - 9,074,292 9,308,512
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 9,074,292 - - - - - - 9,074,292 - 9,074,292 9,074,292
Page 6
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 9,984,976 - 9,984,976 9,984,976
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Sp. Kandis-Duri-Sp.Kulim-Sp.Batang-Bts.Sumut 20,000 M 30 600,000 600,000 600,000
- Pekanbaru-Pkl.Kerinci-Pematang Reba-Batas Jambi 20,000 M 30 600,000 600,000 600,000
- Jalan Nasional Kota Dumai 10,000 M 30 300,000 300,000 300,000
11 Pengadaan Paket Penghargaan Kota Pemenang WTN 1 PKT 100,000 100,000 100,000 100,000
(Fasilitas Keselamatan LLAJ)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Page 7
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Riau -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 285,380 285,380 25,000 - 25,000 310,380
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Pekanbaru-Jakarta (PP) : 20 OT 2,833 56,660 56,660 56,660
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP R I A U 7,284,220 - - - - 284,220 284,220 7,000,000 - 7,000,000 7,284,220
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 7,000,000 - - - - - - 7,000,000 - 7,000,000 7,000,000
Page 8
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Belanja Bahan ATK 1 Th 25,000 25,000 25,000 25,000
4 Belanja Perjalanan Lainnya 1 Th 150,000 150,000 150,000 150,000
A SATKER PENGEMBANGAN LLAJ KEPULAUAN RIAU - - - - 837,780 837,780 6,475,350 - 6,475,350 7,313,130
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 6,450,350 - 6,450,350 6,450,350
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Keselamatan LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Tanjung Pinang-Bintan 15,000 M 30 450,000 450,000 450,000
- Batam 30,000 M 30 900,000 900,000 900,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 528,800 528,800 - - - 528,800
Belanja Barang Non Operasional Lainnya
1 Subsidi Operasi Bus Perintis (trayek baru)
- Trayek Baru 1 TH 500,000 500,000 500,000 500,000
Page 9
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
2 - Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 50,000 50,000 - - - 50,000
1 Pengembangan Data Kinerja Perhubungan Darat Prop.Kep.Riau -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 258,980 258,980 25,000 - 25,000 283,980
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 72 OB 375 27,000 27,000 27,000
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 28,280 28,280 28,280 28,280
- Biaya pengadaan ATK 1 TH 28,620 28,620 28,620 28,620
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Perjalanan Lainnya
- Tiket Tanjung Pinang-Jakarta (PP) : 20 OT 1,932 38,640 38,640 38,640
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
5 Belanja Modal Peralatan dan Mesin
- Pengadaan Note Book dan Printer 1 SET 25,000 25,000 25,000 25,000
B SATKER PENGEMBANGAN LLASDP KEPRI 66,020,539 - - - - 533,420 533,420 65,487,119 - 65,487,119 66,020,539
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 65,462,119 - - - - - - 65,462,119 - 65,462,119 65,462,119
1 Pemb. Derm. Penyeb Dabo Thp V (Termasuk Supervisi) Selesai 1 pkt 16,992,566 16,992,566 16,992,566 16,992,566
2 Pemb. Derm. Penyeb Tj. Pinang (P. Bintan) Thp IV 1 pkt 19,455,305 19,455,305 19,455,305 19,455,305
3 Pemb. Derm. Penyeb Selat Belia (P. Kundur) Thp III 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
4 Pemb. Derm. Penyeb Selat Lampa (Kep.Natuna) Thp I (Termasuk Supervisi) 1 pkt - - - -
5 Pemb. Derm. Penyeb Matak (Kep. Anambas) Thp I (Termasuk Supervisi) 1 pkt - - - -
6 Pemb. Derm. Penyeb Penarik (P. Lingga) Thp I (Termasuk Supervisi) 1 pkt - - - -
Page 10
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 Pembayaran Gaji, Lembur, Honorarium dan Vakasi
Honor KPA 12 OB 9,600 - 9,600 9,600 9,600
Honor SPM 12 OB 7,200 - 7,200 7,200 7,200
Honor Bendahara Kegiatan 12 OB 6,720 - 6,720 6,720 6,720
Honor Staff 60 OB 24,000 - 24,000 24,000 24,000
Honor SAI 36 OB 14,400 - 14,400 14,400 14,400
Honor Panitia Pengadaan Barang/Jasa Fisik 40 OP 24,000 - 24,000 24,000 24,000
Honor Panitia Pengadaan Barang/Jasa Supervisi 25 OP 7,500 - 7,500 7,500 7,500
2 Belanja Barang Operasional
Biaya Lelang, Penerbitan, Pencetakan, Penggandaan 1 Th 45,000 45,000 45,000 45,000
3 Biaya Ops. Kend. R. 4 & R. 2 1 Th 15,000 15,000 15,000 15,000
4 Belanja Bahan ATK 1 Th 40,000 40,000 40,000 40,000
5 Belanja Perjalanan Lainnya 1 Th 200,000 200,000 200,000 200,000
7 Belanja Modal Peralatan dan Mesin -
Pengadaan Notebook 1 unit 25,000 - - 25,000 25,000 25,000
8 Belanja Jasa Lainnya :
Langganan Telepon, Listrik, PAM 1 Th 50,000 50,000 50,000 50,000
Sewa Kantor/Rumah 1 Th 30,000 30,000 30,000 30,000
Sewa Kend. R 4 1 Th 60,000 60,000 60,000 60,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 2,741,020 - 2,741,020 2,741,020
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Simpang Tuan-Batas Riau 12,000 M 30 360,000 360,000 360,000
- Muara Tembesi - Bungo 10,000 M 30 300,000 300,000 300,000
6 Manajemen & Rekayasa Lalu Lintas 1 PKT 369,350 369,350 369,350 369,350
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,407,600 1,407,600 - - - 1,407,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis 1 TH 1,378,800 1,378,800 1,378,800 1,378,800
- Terminal Alam Barajo-Sungai Bahar (Tanjung Lebar)
- Bangko-Pamenang-Jelatan-TTKDA
- Jambi-Petaling
- Bangko-Tanah Garau
- Bangko-Air Jernih
- Jambi Ma. Tebo-Kuamang Kuning
- Jambi-Sungai B ahar-Johor (PT.ASIATIC)
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
Page 11
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Jambi -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 249,580 249,580 25,000 - 25,000 274,580
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Jambi-Jakarta (PP) : 20 OT 1,688 33,760 33,760 33,760
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP JAMBI 5,084,775 - - - - 237,775 237,775 4,847,000 - 4,847,000 5,084,775
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 4,847,000 - - - - - - 4,847,000 - 4,847,000 4,847,000
1 Pembangunan Dermaga Penyeb. Kuala Tungkal Thp IX (selesai) 1 Pkt 4,847,000 4,847,000 4,847,000 4,847,000
2 Pembangunan Dermaga Penyeb. Di Muara Sabak Ilir (Selesai 100%) 1 Pkt - - - -
Page 12
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,671,900 - 5,671,900 5,671,900
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan - - - -
- Bengkulu - Bts Sumbar (Bengkulu - Mukomuko) 15,000 M 30 450,000 450,000 450,000
- Bengkulu - Bts Lampung (Bengkulu - Kaur) 15,000 M 30 450,000 450,000 450,000
- Bengkulu - Bts Sumsel (Bengkulu - Curup) 15,000 M 30 450,000 450,000 450,000
- Jalan Nasional Dalam Kota Bengkulu 15,000 M 30 450,000 450,000 450,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,660,800 1,660,800 - - - 1,660,800
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (5 Trayek Usulan Baru) 1 TH 1,632,000 1,632,000 1,632,000 1,632,000
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Bengkulu -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 267,720 267,720 25,000 - 25,000 292,720
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
Page 13
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 36,500 36,500 36,500 36,500
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 PKT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Bengkulu-Jakarta (PP) : 20 OT 1,950 39,000 39,000 39,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP BENGKULU 3,696,645 - - - - 275,260 275,260 3,421,385 - 3,421,385 3,696,645
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 3,421,385 - - - - - - 3,421,385 - 3,421,385 3,421,385
1 Lanjutan Pemb. Der. Penyeb. Pulau Baai 1 pkt 3,421,385 - 3,421,385 3,421,385 3,421,385
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 2,202,566 - 2,202,566 2,202,566
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
- Pangkalpinang - Kelapa - Muntok 5,000 M 30 150,000 150,000 150,000
- Pangkalpinang - Koba - Toboali 5,000 M 30 150,000 150,000 150,000
- Pangkalpinang - Sungailiat - Belinyu 5,000 M 30 150,000 150,000 150,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
- Pangkalpinang - Koba - Toboali 750 M 950 712,500 712,500 712,500
- - -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas - - -
- Kelapa - Muntok 100 BH 707 70,700 70,700 70,700
- Manggar - Badau - Renggiang 200 BH 707 141,400 141,400 141,400
- -
Page 14
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
4 Pengadaan dan Pemasangan RPPJ - -
- Pangkalpinang - Koba - Toboali 5 BH 7,750 38,750 38,750 38,750
- Pangkalpinang - Kelapa - Muntok 5 BH 7,750 38,750 38,750 38,750
- Pangkalpinang - Sungailiat - Belinyu 5 BH 7,750 38,750 38,750 38,750
- -
5 Pengadaan dan Pemasangan Warning Light - -
- Pangkalpinang-Kelapa-Muntok 2 UNIT 40,858 81,716 81,716 81,716
- -
6 Pengadaan dan Pemasangan Paku Jalan - -
- Pangkal Pinang-Sungailiat-Belinyu 500 BH 250 125,000 125,000 125,000
- Pangkal Pinang-Kelapa-Muntok 500 BH 250 125,000 125,000 125,000
- Pangkal Pinang-Koba-Toboali 500 BH 250 125,000 125,000 125,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,047,600 1,047,600 - - - 1,047,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (7 Trayek) 1 TH 1,018,800 1,018,800 1,018,800 1,018,800
Pangkal Pinang-Sadai
Pangkal Pinang-Belinyu
Pangkal Pinang-Batu Betumpang
Pangkal Pinang-Tanjung Rias
Pangkal Pinang-Tepus
Tj.Pandan-Tj.Ru
Tj.Ru-Manggar
Pangkal Pinang-Baki
Pangkal Pinang-Puding Besar
Tj.Pandan-Manggar(Via Sijuk,Buding,Kampit)
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 101,875 101,875 - - - 101,875
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 47,375 47,375 47,375 47,375
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Babel -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 240,440 240,440 25,000 - 25,000 265,440
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 630 7,560 7,560 7,560
- Honor PPK 12 OB 575 6,900 6,900 6,900
- Honor Penguji SPM 12 OB 490 5,880 5,880 5,880
- Honor Bendahara 12 OB 460 5,520 5,520 5,520
- Honor Staf 60 OB 320 19,200 19,200 19,200
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 28,160 28,160 28,160 28,160
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadan Laptop 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Pangkal Pinang-Jakarta (PP) : 20 OT 1,231 24,620 24,620 24,620
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
Page 15
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 9,353,800 - 9,353,800 9,353,800
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Batas Palembang-Betung-Bayung Lincir-Batas Jambi 20,000 M 30 600,000 600,000 600,000
Bayung Lincir-Batas Jambi 15,000 M 30 450,000 450,000 450,000
7 Manajemen & Rekayasa Lalu Lintas 1 PKT 350,000 350,000 350,000 350,000
8 Pembangunan terminal :
- Tipe B di Kab. Ogan Ilir (Tahap V) 1 PKT 6,000,000 6,000,000 6,000,000 6,000,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya -
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Sumsel -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 270,600 270,600 25,000 - 25,000 295,600
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 32,900 32,900 32,900 32,900
- Biaya pengadaanATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Peralatan dan Mesin
- Pengadaan Laptop 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Palembang-Jakarta (PP) : 20 OT 1,644 32,880 32,880 32,880
- Penginapan 40 HR 450 18,000 18,000 18,000
Page 16
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 80 OH 300 24,000 24,000 24,000
B SATKER PENGEMBANGAN LLASDP SUMSEL 7,381,500 - - - - 381,500 381,500 7,000,000 - 7,000,000 7,381,500
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 7,000,000 - - - - - - 7,000,000 - 7,000,000 7,000,000
1 Pemb. Dermaga Sungai Bayung Lencir Kab. Muba Thp. III (Termasuk Supervisi) 1 pkt 3,500,000 3,500,000 3,500,000 3,500,000
Pemb. Dermaga Sungai Penuguan Kab. Banyuasin Thp II Selesai (Termasuk
2 1 pkt 3,500,000 3,500,000 3,500,000 3,500,000
Supervisi)
3 Pemb. Dermaga Sungai Makarti Jaya Kab. Banyuasin (Termasuk Supervisi) 1 pkt - - - -
4 Pemb. Dermaga Sungai Muara Telang Kab. Banyuasin (Termasuk Supervisi) 1 pkt - - - -
5 Peningk. Dermaga Danau Kota Batu Kab. OKU Selatan (Termasuk Supervisi) 1 pkt - - - -
6 Peningk. Dermaga Banding Agung Kab. OKU Selatan (Termasuk Supervisi) 1 pkt - - - -
Pemb. Dermaga Sungai Sebalik (Multi Moda) Kab. Banyuasin Thp I (Termasuk
7 1 pkt - - - -
Supervisi)
8 Pemb. Dermaga Sungai Pegayut Kab. Ogan Ilir (Termasuk Supervisi) 1 pkt - - - -
9 Pemb. Dermaga Sungai Muara Kuang Kab. Ogan Ilir (Termasuk Supervisi) 1 pkt - - - -
Pemb. Dermaga Sungai Muara Lematang Kab. Muara Enim (Termasuk
10 1 pkt - - - -
Supervisi)
Pemb. Dermaga Sungai Kampung Rambutan (KTM) Kab. OI (Termasuk
11 1 pkt - - - -
Supervisi)
12 Pemb. Dermaga Sungai Mesuji Thp I (Termasuk Supervisi) 1 pkt - - - -
Pemb. Dermaga Sungai Harapan Mulia Kab. Muara Enim Thp I (Termasuk
13 1 pkt - - - -
Supervisi)
14 Pemb. Dermaga Sungai Sekanak Palembang Thp I (Termasuk Supervisi) 1 pkt - - - -
15 Pemb. Dermaga Sungai Lebong Kab. OI Thp I (Termasuk Supervisi) 1 pkt - - - -
16 Pemb. Dermaga Sungai Pelabuhan Dalam Kab. OI (Termasuk Supervisi) 1 pkt - - - -
17 Pemb. Dermaga Sungai Kertapati Palembang Thp I (Termasuk Supervisi) 1 pkt - - - -
Pengerukan Alur Pelayaran Jalur-Jalur Transmigrasi Kab. OKI dan Banyuasin
18 1 pkt - - - -
(Termasuk Supervisi)
19 Subsidi Angkutan Sungai di Sumatera Selatan 1 pkt - - - -
- - -
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 6,887,091 - 6,887,091 6,887,091
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
Page 17
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1 Pengadaan dan Pemasangan Marka Jalan
Bandarlampung-Bakauheni 10,000 M 30 300,000 - 300,000 300,000
Bukit Kemuning-Baradatu-Blambangan Umpu-Batas Sumsel 10,000 M 30 300,000 300,000 300,000
Terbanggi Besar-Menggala-Unit II-Batas Sumsel 10,000 M 30 300,000 300,000 300,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
Bandar lampung-Terbanggi Besar-Menggala 500 M 950 475,000 475,000 475,000
Bandar Lampung-Piringsewu-Kota Agung 500 M 950 475,000 475,000 475,000
Kota Agung-Sanggi-Krui 500 M 950 475,000 475,000 475,000
- -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas (75x75) - -
Bandar Lampung-Gedung Tataan-Gading Rejo-Piringsewu 100 BH 951 95,110 95,110 95,110
Bukit Kemuning-Blambangan Umpu 100 BH 951 95,110 95,110 95,110
Bandar Lampung-Bakauheni 250 BH 951 237,775 237,775 237,775
- -
4 Pengadaan dan Pemasangan RPPJ - -
Bandar Lampung-Piringsewu-Kota Agung 12 BH 7,750 93,000 93,000 93,000
Bandar Lampung-Terbanggi Besar-Bukit Kemuning 12 BH 7,750 93,000 93,000 93,000
Kota Agung-Krui-Batas Bengkulu 12 BH 7,750 93,000 93,000 93,000
- -
5 Pengadaan dan Pemasangan Paku Marka - -
Sp. Tanjing Karang-Tegineneng 500 BH 250 125,000 125,000 125,000
Sp. Kalianda-Bakauheni 500 BH 250 125,000 125,000 125,000
Terbanggi Besar-Kotabumi-Bukit Kemuning 500 BH 250 125,000 125,000 125,000
- -
6 Pengadaan dan Pemasangan Delineator - -
Krui-Batas Bengkulu 200 BH 425 85,000 85,000 85,000
Kotabumi-Bukit Kemuning-Sp. Empat-Bts. Sumsel 200 BH 425 85,000 85,000 85,000
Bandarlampung-Kalianda-Bakauheni 100 BH 425 42,500 42,500 42,500
- -
7 Pengadaan & pemasangan Cermin Tikungan
Krui-Batas Bengkulu 5 BH 5,039 25,195 25,195 25,195
- -
8 Pengadaan dan Pemasangan Warning Light Tenaga Surya - -
Simpang Jalan Teluk Ambon/Panjang 1 UNIT 56,042 56,042 56,042 56,042
Fly Over Natar, Kab. Lampung Selatan 1 UNIT 56,042 56,042 56,042 56,042
Hargomulyo (Lampung Timur) 1 UNIT 56,042 56,042 56,042 56,042
- - -
9 Pengadaan dan Pemasangan APILL Tenaga Surya - - -
Sp.Kotabumu, Lampung Utara 1 UNIT 300,000 300,000 300,000 300,000
Kota Bandar Lampung 1 UNIT 300,000 300,000 300,000 300,000
Kota Metro 1 UNIT 300,000 300,000 300,000 300,000
- -
10 Pengadaan dan Pemasangan LPJU Tenaga Surya - -
Ruas Jalan sp. Tanjung Karang-Tegineneng 25 UNIT 35,000 875,000 875,000 875,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,929,600 1,929,600 - - - 1,929,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (6 trayek) 1 TH 1,900,800 1,900,800 1,900,800 1,900,800
Rajabasa - Kemiling - Sukadanaham - Lempasing - Hanura
Rajabasa - Karang Anyar - Jatimulyo - Metro
Rajabasa - Branti - Gedong Tataan
Metro-Mojopahit-Gunung Sugih-Bakri-Kalirejo
Metro-Labuhan Meringggai-Sidomulyo-Bakauheni
Metro-Sekampung-Batanghari-Sukadana-Way Jepara-Terml Matara Baru
04.08.05 PROGRAM REHABILITASI & PEMELIHARAAN PRASARANA DAN FASILITAS LLAJ - - - - - - 250,000 - 250,000 250,000
Page 18
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Belanja Pemeliharaan yang dikapitalisasi
1 Pemeliharaan Fasilitas LLAJ (Rambu, Guard rail, Warning Light, APILL) 1 PKT 250,000 250,000 250,000 250,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 554,500 554,500 - - - 554,500
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 243,960 243,960 25,000 - 25,000 268,960
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 32,900 32,900 32,900 32,900
- Biaya pengadaan ATK 1 TH 28,600 28,600 28,600 28,600
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Laptop+Printer 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Bandar Lampung-Jakarta (PP) : 20 OT 762 15,240 15,240 15,240
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP LAMPUNG 2,656,470 - - - - 246,170 246,170 2,410,300 - 2,410,300 2,656,470
2 Peningkatan Dermaga Danau Ranau (Termasuk Supervisi) 1 pkt 410,300 410,300 410,300 410,300
3 Replacement Dermaga Kuala Teladas (Termasuk Desain dan Supervisi) 1 pkt 2,000,000 2,000,000 2,000,000 2,000,000
Page 19
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor Bendahara Kegiatan 12 OB 5,280 - 5,280 5,280 5,280
Honor Staff 60 OB 18,300 - 18,300 18,300 18,300
Honor SAI 24 OB 6,000 - 6,000 6,000 6,000
Honor Panitia 1 TH 23,100 - 23,100 23,100 23,100
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 1,827,767 - 1,827,767 1,827,767
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Cilegon - Anyer - Labuan 20,000 M 29 580,000 580,000 580,000
Serang - Tangerang - Batas DKI 10,000 M 29 290,000 290,000 290,000
5 Manajemen dan Rekayasa Lalu Lintas pada Jalan Nasional 1 PKT 247,925 247,925 247,925 247,925
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,695,600 1,695,600 - - - 1,695,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (3 Trayek) 1 TH 1,666,800 1,666,800 1,666,800 1,666,800
Labuan - Panimbang - Angsana - Munjul
Cikesik-Cibareno
Serang - Malimping
Merak-Sumur
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Banten -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 209,660 209,660 25,000 - 25,000 234,660
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 630 7,560 7,560 7,560
- Honor PPK 12 OB 575 6,900 6,900 6,900
- Honor Penguji SPM 12 OB 490 5,880 5,880 5,880
- Honor Bendahara 12 OB 460 5,520 5,520 5,520
- Honor Staf 60 OB 320 19,200 19,200 19,200
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan -
Page 20
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya -
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Serang-Jakarta (PP) : 20 OT 100 2,000 2,000 2,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 15,800,089 - 15,800,089 15,800,089
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Sukabumi-Pel.Ratu 20,000 M 29 580,000 580,000 580,000
Ciawi-Cianjur-Padalarang 20,000 M 29 580,000 580,000 580,000
Depok-Cibinong-Bogor 20,000 M 29 580,000 580,000 580,000
Banjar-Pangandaran 20,000 M 29 580,000 580,000 580,000
Bandung-Nagrek-Tasikmalaya 10,000 M 29 290,000 290,000 290,000
Tasikmalaya-Banjar 10,000 M 29 290,000 290,000 290,000
Page 21
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Cibiru-Cileunyi-Sumedang 25 UNIT 33,000 825,000 825,000 825,000
- - -
11 Pengadaan Paket Penghargaan Kota Pemenang WTN 2 PKT 100,000 200,000 200,000 200,000
(Fasilitas Keselamatan LLAJ) -
12 Pembangunan Terminal
- Penunjang Terminal di Tasikmalaya 1 PKT 3,518,989 3,518,989 3,518,989 3,518,989
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 604,500 604,500 - - - 604,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pekan Nasional Keselamatan Transportasi Darat 1 PKT 450,000 450,000 450,000 450,000
4 Pengembangan Data Kinerja Perhubungan Darat Prop.Jabar -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 235,220 235,220 25,000 - 25,000 260,220
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 29,600 29,600 29,600 29,600
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Bandung-Jakarta (PP) : 20 OT 200 4,000 4,000 4,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 350 17,500 17,500 17,500
B SATKER PENGEMBANGAN LLASDP JABAR 4,541,236 - - - - 234,220 234,220 4,307,016 - 4,307,016 4,541,236
Page 22
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pengerukan Alur Pelayaran Sungai Muara Bendera (Termasuk Desain &
10 1 pkt - - - -
Supervisi)
- - -
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 10,161,558 - 10,161,558 10,161,558
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Wangon-Buntu-Kebumen 10,000 M 29 290,000 290,000 290,000
Kebumen-Purworejo-Batas DIY 10,000 M 29 290,000 290,000 290,000
Kertosuro-Klaten-Batas DIY 10,000 M 29 290,000 290,000 290,000
Page 23
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Kab.Wonogiri 1 UNIT 300,000 300,000 300,000 300,000
Kab.Karanganyar 1 UNIT 300,000 300,000 300,000 300,000
10 Penerapan ATCS
- Kota Solo 1 PKT 5,500,000 5,500,000 5,500,000 5,500,000
11 Pengadaan Paket Penghargaan Kota Pemenang WTN 2 PKT 100,000 200,000 200,000 200,000
(Fasilitas Keselamatan LLAJ)
12 Pembangunan Lajur Khusus Sepeda di Sragen 1 PKT 800,000 800,000 800,000 800,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Jateng -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 235,520 235,520 25,000 - 25,000 260,520
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Semarang-Jakarta (PP) : 20 OT 340 6,800 6,800 6,800
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP JATENG 19,303,676 - - - - 343,570 343,570 18,960,106 - 18,960,106 19,303,676
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 16,463,000 - - - - - - 16,463,000 - 16,463,000 16,463,000
Page 24
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
0995 PEMBANGUNAN DERMAGA DANAU
1 Pemb. Dermaga Waduk Wadas Lintang (Tritis & Mijing) Kab. Wonosobo 1 pkt - - - -
2 Pemb. Dermaga Waduk Kedung Ombo Kab. Sragen 1 pkt - - - -
A SATKER PENGEMBANGAN LLAJ D.I YOGYAKARTA - - - - 393,720 393,720 9,035,680 - 9,035,680 9,429,400
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 8,976,680 - 8,976,680 8,976,680
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Ring road 10,000 M 29 290,000 290,000 290,000
Yogyakarta-Wonosari-Pracimantoro 10,000 M 29 290,000 290,000 290,000
Yogyakarta - Bantul - Purworejo 10,000 M 29 290,000 290,000 290,000
Yogyakarta - Klangon - Tempel 10,000 M 29 290,000 290,000 290,000
Page 25
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Yogyakarta-Wates-Purworejo Dan Yogya-Tempel 450 BH 415 186,750 186,750 186,750
Yogyakarta-Klangon-Tempel 450 BH 415 186,750 186,750 186,750
Ring Road 250 BH 415 103,750 103,750 103,750
7 Pengadaan dan Pemasangan LED High-Flux (253 set) 1 PKT 1,500,000 1,500,000 1,500,000 1,500,000
14 Manajemen dan Rekayasa Lalu Lintas Simpang Druwo 1 PKT 750,000 750,000 750,000 750,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Sosialisasi KeselamatanLLAJ
Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.DIY -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 239,220 239,220 59,000 - 59,000 298,220
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 26,900 26,900 26,900 26,900
- Biaya pengadaan ATK 1 TH 31,000 31,000 31,000 31,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
Page 26
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Pengadaan Sepeda Motor Operasional 2 UNIT 17,000 34,000 34,000 34,000
5 Belanja Perjalanan Lainnya
- Tiket Yogyakarta-Jakarta (PP) : 20 OT 400 8,000 8,000 8,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 350 17,500 17,500 17,500
B SATKER PENGEMBANGAN LLASDP D.I YOGJAKARTA 1,283,796 - - - - 155,585 155,585 1,128,211 - 1,128,211 1,283,796
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 8,198,900 - 8,198,900 8,198,900
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Kamal-Bangkalan-Sampang-Pemekasan-Sumenep 30,000 M 29 870,000 870,000 870,000
Probolinggo-Situbundo-Banyuwangi 15,000 M 29 435,000 435,000 435,000
Madiun-Ponorogo-Batas Jateng 15,000 M 29 435,000 435,000 435,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
Trenggalek-Ponorogo 600 M 950 570,000 570,000 570,000
Malang-Lumajang 600 M 950 570,000 570,000 570,000
Pandaan-Malang 600 M 950 570,000 570,000 570,000
Probolinggo-Situbundo-Banyuwangi 500 M 950 475,000 475,000 475,000
- -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas (75x75 cm) - -
Malang-Dampit-Lumajang 200 BH 932 186,400 186,400 186,400
Probolinggo-Lumajang-Jember 100 BH 932 93,200 93,200 93,200
Malang-Pare-Kediri 200 BH 932 186,400 186,400 186,400
Page 27
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- -
4 Pengadaan dan Pemasangan Traffic Light High-Flux - -
Sp.4 Sumur Sumbing,Kab.Tuban 1 UNIT 200,000 200,000 200,000 200,000
Sp.4 Gondang, Kab.Tulungagung 1 UNIT 200,000 200,000 200,000 200,000
Sp.4 Gragalan, Kab.Tulungagung 1 UNIT 200,000 200,000 200,000 200,000
Sp.4 Dolog, Kab.Kediri 1 UNIT 200,000 200,000 200,000 200,000
-
5 Pengadaan dan Pemasangan Lampu Peringatan (Warning Light) -
Sp.3 Keras,Kec.Geneng,Kab.Ngawi 1 UNIT 31,900 31,900 31,900 31,900
Sp.3 Kedung Glagah,Kec.Geneng,Kab.Ngawi 1 UNIT 31,900 31,900 31,900 31,900
Jembatan Timbang Watudodol Kab.Banyuwangi 1 UNIT 31,900 31,900 31,900 31,900
Jembatan Timbang Mojoagung Kab.Jombang 1 UNIT 31,900 31,900 31,900 31,900
Jembatan Timbang Kalibaru Manis Kab.Banyuwangi 1 UNIT 31,900 31,900 31,900 31,900
8 Pengadaan Paket Penghargaan Kota Pemenang WTN 6 PKT 100,000 600,000 600,000 600,000
(Fasilitas Keselamatan LLAJ)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Jatim -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 240,220 240,220 25,000 - 25,000 265,220
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 200 7,200 7,200 7,200
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 32,000 32,000 32,000 32,000
- Biaya pengadaan ATK 1 TH 39,580 39,580 39,580 39,580
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Surabaya-Jakarta (PP) : 20 OT 450 9,000 9,000 9,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 350 17,500 17,500 17,500
B SATKER PENGEMBANGAN LLASDP JATIM 29,334,220 - - - - 334,220 334,220 29,000,000 - 29,000,000 29,334,220
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 29,000,000 - - - - - - 29,000,000 - 29,000,000 29,000,000
Page 28
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
0992 PEMBANGUNAN DERMAGA PENYEBERANGAN 29,000,000
1 Pembangunan Break Water di Der. Penyeb. Lamongan Thp II 1 Pkt 15,000,000 15,000,000 15,000,000 15,000,000
- Pemb. Breakwater sisi barat 125 m 106 Meter
- Pemb. Breakwater sisi timur 305 m 305 Meter
2 Pembangunan Derm. Penyeb. P. Sapeken Kab. Sumenep Thp I 1 Pkt 4,000,000 4,000,000 4,000,000 4,000,000
3 Pembangunan Derm. Penyeb. Jangkar Kab. Situbondo (Termasuk Supervisi) 1 Pkt - - - -
4 Pembangunan Derm. Penyeb. Di Pulau Pagerungan Kab. Sumenep Tahap I 1 Pkt - - - -
5 Pembangunan Derm Penyeb. Di Pulau Giligenteng Kab. Purbolinggo Tahap I 1 Pkt - - - -
6 Pembangunan Derm Penyeb. Kota Purbolinggo Tahap I 1 Pkt - - - -
3 Pemb. Derm. Penyeb. Pulau Raas Kab. Sumenep 1 Pkt 10,000,000 10,000,000 10,000,000 10,000,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,385,810 - 5,385,810 5,385,810
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Prov.Bali 40,000 M 30 1,200,000 1,200,000 1,200,000
- - -
2 Pengadaan dan Pemasangan Guard Rail - -
Denpasar-Gilimanuk, Denpasar-Singaraja, Angantelu-Amlapura-Singaraja 1,500 M 950 1,425,000 1,425,000 1,425,000
- - -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas (75 x 75) - - -
Angantelu-Amlapura-Singaraja 250 BH 956 239,000 239,000 239,000
- - -
4 Pengadaan dan Pemasangan RPPJ - - -
Denpasar-Padangbai, Angantelu-Amlapura-Singaraja 15 BH 7,750 116,250 116,250 116,250
- - -
5 Pengadaan dan Pemasangan Delineator - - -
Gilimanuk-Singaraja,Denpasar-Panca Sari-Singaraja,Denpasar-Padang Bai, 42,500 42,500 42,500
100 BH 425
Angantelu-Amlapura-Singaraja
- - -
6 Pengadaan dan Pemasangan Cermin Tikungan - - -
Prov.Bali 5 BH 4,770 23,850 23,850 23,850
- - -
7 Pengadaan dan Pemasangan Paku Marka - - -
Denpasar-Gilimanuk;Gilimanuk-Singaraja;Denpasar-Pancasari- 506,000 506,000 506,000
2,000 BH 253
Singaraja;Denpasar-Padangbai;Angantelu-Amlapura-Singaraja
- -
8 Pengadaan dan Pemasangan Warning Light - -
Prov.Bali 5 UNIT 46,642 233,210 233,210 233,210
- -
9 Pengadaan dan Pemasangan APILL Tenaga Surya - -
Tersebar di Kab/Kota Prov.Bali 2 UNIT 300,000 600,000 600,000 600,000
Page 29
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- - -
11 Pengadaan Paket Penghargaan Kota Pemenang WTN 4 PKT 100,000 400,000 400,000 400,000
(Fasilitas Keselamatan LLAJ)
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 19,500,000 - - - - - - 19,500,000 - 19,500,000 19,500,000
1 Pembangunan Derm. Penyeb. Padangbai II Thp. V (Termasuk Supervisi) 1 Pkt 3,500,000 3,500,000 3,500,000 3,500,000
2 Pembangunan Derm. Penyeb. Gunaksa Thp III (Termasuk Supervisi) 1 Pkt 16,000,000 16,000,000 16,000,000 16,000,000
- - - -
Page 30
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Belanja Bahan ATK 1 Th 54,200 54,200 54,200 54,200
4 Belanja Perjalanan Lainnya 1 Th 125,000 125,000 125,000 125,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 6,083,100 - 6,083,100 6,083,100
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Lembar - Cakra 10,000 M 30 300,000 300,000 300,000
Cakra - Kopang 15,000 M 30 450,000 450,000 450,000
Ring Road Mataram 20,000 M 30 600,000 600,000 600,000
KSB 10,000 M 30 300,000 300,000 300,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
Lembar-Cakra 700 M 1,050 735,000 735,000 735,000
Ringroad-Mataram 500 M 1,050 525,000 525,000 525,000
Dompu-Bima 300 M 1,050 315,000 315,000 315,000
- -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas - -
Cakra - Kopang 100 BH 712 71,200 71,200 71,200
Ringroad-Mataram 100 BH 712 71,200 71,200 71,200
Pototano-Benete 100 BH 712 71,200 71,200 71,200
- -
4 Pengadaan dan Pemasangan RPPJ - -
Ring Road-Mataram 10 BH 7,800 78,000 78,000 78,000
Kopang-Kayangan 10 BH 7,800 78,000 78,000 78,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,669,400 2,669,400 - - - 2,669,400
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (7 trayek) 1 TH 2,631,600 2,631,600 2,631,600 2,631,600
Mataram
Lobar
Loteng
Lotim
Sumbawa
Dompu
Bima
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 37,800 37,800 37,800 37,800
04.08.05 PROGRAM REHABILITASI & PEMELIHARAAN PRASARANA LLAJ - - - - - - 2,000,000 - 2,000,000 2,000,000
Belanja Pemeliharaan yang Dikapitalisasi
Rehabilitasi Terminal Mandalika (Mataram) 1 PKT 2,000,000 2,000,000 2,000,000 2,000,000
Page 31
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.NTB -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 270,600 270,600 25,000 - 25,000 295,600
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 29,600 29,600 29,600 29,600
- Biaya pengadaan ATK 1 TH 28,600 28,600 28,600 28,600
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Laptop 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Mataram-Jakarta (PP) : 20 OT 2,094 41,880 41,880 41,880
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP NTB 3,179,084 - - - - 308,720 308,720 2,870,364 - 2,870,364 3,179,084
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 2,870,364 - - - - - - 2,870,364 - 2,870,364 2,870,364
Page 32
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,573,544 - 5,573,544 5,573,544
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, termasuk supervisi
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 4,506,000 4,506,000 - - - 4,506,000
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis 1 TH 4,477,200 4,477,200 4,477,200 4,477,200
Stasiun Kupang
Stasiun Kefamenanu (Kab.TTU)
Stasiun Ende (Kab.Ende)
Stasiun Waingapu (Kab.Sumba Timur)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 154,500 154,500 - - - 154,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.NTT -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 284,440 284,440 25,000 - 25,000 309,440
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
Page 33
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 23,600 23,600 23,600 23,600
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 12,000 12,000 12,000 12,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja pengiriman surat dinas pos pusat
-. Pengiriman surat dinas 1 TH 8,000 8,000 8,000 8,000
5 Belanja Perjalanan Lainnya
- Tiket Kupang - Jakarta (PP) : 20 OT 2,786 55,720 55,720 55,720
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP NTT 29,270,098 - - - - 514,020 514,020 28,756,078 - 28,756,078 29,270,098
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 28,756,078 - - - - - - 28,756,078 - 28,756,078 28,756,078
1 Pemb. Derm. Penyeb. Marapokot-Mbay Tahap VIII Selesai 1 pkt 2,000,000 2,000,000 2,000,000 2,000,000
2 Pemb. Derm. Lewoleba Tahap III Selesai 1 pkt 15,756,078 15,756,078 15,756,078 15,756,078
3 Pemb. Derm. Penyeb. Sabu Tahap II 1 pkt 8,000,000 8,000,000 8,000,000 8,000,000
4 Pemb. Derm. Penyeb. Hansisi P. Semau Kab. Kupang 1 pkt - - - -
5 Pemb. Derm. Penyeb. Sulamu Kab. Kupang Thp I 1 pkt - - - -
6 Pemb. Derm. Penyeb. Baranusa (P. Pantar) Kab. Alor Thp I - pkt - - - -
7 Pemb. Derm. Penyeb. Waiwerang (P. Adonara) NTT Thp I 1 pkt 3,000,000 3,000,000 3,000,000 3,000,000
8 Pemb. Derm. II Penyeb. Labuhan Bajo NTT 1 pkt - - - -
9 Pemb. Derm. Penyeb. Waikelo Tahap VII 1 pkt - - - -
10 Pemb. Derm. Penyeb. Waingapu Tahap (Lanjutan) 1 pkt - - - -
#VALUE! #VALUE!
PENGADAAN KAPAL PENYEBERANGAN - - - -
- - -
Pemb. Kapal Motor Penyeberangan Lintas Kupang-Weiwerang, (P. Adonara)
1 1 unit - - - -
600 GT
2 Pemb. Kapal Motor Penyeberangan Lintas Kupang-Ende 600 GT - unit - - - -
3 Pemb. Kapal Motor Penyeberangan Lintas Kupang-Hansisi 600 GT 1 unit - - - -
- - -
0995 PEMBANGUNAN SBNP - - - -
- - -
1 Pemb. Lampu Pelabuhan Labuhan Bajo 12,50 Meter Darat 1 Unit - - - -
2 Pemb. Lampu Pelabuhan Aimere 12,50 Meter Darat 1 Unit - - - -
3 Pemb. Lampu Pelabuhan Waikelo 12,50 Meter Darat 1 Unit - - - -
4 Pemb. Lampu Pelabuhan Waingapu 12,50 Meter Darat 1 Unit - - - -
- - -
SUBSIDI OPERASI LINTAS PENYEBERANGAN PERINTIS - - - -
- - -
1 Subsidi Angkutan Penyeberangan Perintis di Propinsi NTT - pkt - - - -
- - -
PROGRAM PENYELENGGARAAN PIMPINAN KENEGARAAN DAN
04.90.19 514,020 - - - - 514,020 514,020 - - - 514,020
KEPEMERINTAHAN
Page 34
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
2 Belanja Barang Operasional
Biaya Lelang, Penerbitan, Pencetakan, Penggandaan 1 Th 50,000 50,000 50,000 50,000
3 Belanja Bahan ATK 1 Th 50,000 50,000 50,000 50,000
4 Belanja Perjalanan Lainnya 1 Th 200,000 200,000 200,000 200,000
Catatan : Pemb. Derm. Penyeb. Lewoleba; Pelepasan Tanah thn 2008 400jt, Pengurusan Tanah tahun 2009 409 juta, Surat terlampir ada,sertifikat akan disampaikan bln april 09
Pemb. Derm. Penyeb. Sabu Thp I; Term, Cek pek Pengerukan, SID 2006, cek dan bawa perbaikan SID
Pemb. Lampu Pelabuhan ; Surat rekom Distrik Navigasi, Lokasi,Koordinat,Jenis lampu
Pemb. Breakwater; sesuaikan harga tiang pancangdan besi, di CEK/disinkronkan RAB, buat matriks tahapan
Pemb. Derm. Penyeb. Hansisi P Semau; SID belum ada, pra desain pusat 2009,
Pemb. Derm. Penyeb. Sulamu; SID belum ada, pra desain pusat 2009,
Pemb. Derm. Penyeb. Weiwerang; SID belum ada, pra desain pusat 2009,
Pemb. Derm. Penyeb. Baranusa; SID belum ada, pra desain pusat 2009,
Pemb. Derm. II Penyeb. Labuhan Bajo; Siapkan Masterplan (Pusat), Menunggu Masterplan
Subsidi terhadap 18 lintas
C SATKER PENGEMBANGAN LLASDP WAIKELO 12,247,020 - - - - 247,020 247,020 12,000,000 - 12,000,000 12,247,020
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 12,000,000 - - - - - - 12,000,000 - 12,000,000 12,000,000
1 Pemb. Break Water di Pel. Penyeb. Waikelo 1 pkt 12,000,000 12,000,000 12,000,000 12,000,000
D UPT PELABUHAN PENYEBERANGAN KALABAHI 1,450,964 272,474 - 272,474 777,400 49,890 827,290 351,200 - 351,200 1,450,964
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 300,000 - - - - - - 300,000 - 300,000 300,000
01.01.09 PROGRAM PENERAPAN KEPERINTAHAN YANG BAIK 1,150,964 272,474 - 272,474 777,400 49,890 827,290 51,200 - 51,200 1,150,964
Page 35
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Belanja Pembulatan Gaji PNS 12 Bln 2 2 2 2
- Belanja Pembulatan Gaji PNS (gaji ke 13) 1 Bln 1 1 1 1
512121 Belanja Tunjangan Suami/Istri PNS -
- Belanja Tunjangan Suami/Istri PNS 12 Bln 6,083 6,083 6,083 6,083
- Belanja Tunjangan Suami/Istri PNS 1 Bln 507 507 507 507
- Kenaikan Gaji 5% 1 THN 330 330 330 330
512122 Belanja Tunjangan Anak PNS -
- Belanja Tunjangan Anak PNS 12 Bln 2,050 2,050 2,050 2,050
- Belanja Tunjangan Anak PNS (gaji ke 13) 1 Bln 171 171 171 171
- Kenaikan Gaji 5% 1 THN 111 111 111 111
512123 Belanja Tunjangan Struktural PNS -
- Belanja Tunjangan Struktural PNS 12 Bln 4,320 4,320 4,320 4,320
- Belanja Tunjangan Struktural PNS (gaji ke 13) 1 Bln 360 360 360 360
512125 Belanja Tunjangan PPh. PNS -
- Belanja Tunjangan PPh. PNS 12 Bln 1,506 1,506 1,506 1,506
- Belanja Tunjangan PPh. PNS (gaji ke 13) 1 Bln 126 126 126 126
512126 Belanja Tunjangan Beras PNS -
- Belanja Tunjangan Beras PNS 12 Bln 5,595 5,595 5,595 5,595
512129 Belanja Uang Makan PNS -
- Belanja Tunjangan Beras PNS 2,304 OH 46,080 46,080 46,080 46,080
512151 Belanja Tunjangan Umum PNS -
- Belanja Tunjangan Umum PNS 12 Bln 4,320 4,320 4,320 4,320
- Belanja Tunjangan Umum PNS (gaji ke 13) 1 Bln 360 360 360 360
512211 Belanja Uang Lembur
- Uang Lembur dan Uang Makan Lembur Gol II 1 Th 24,300 24,300 24,300 24,300
- Uang Lembur dan Uang Makan Lembur Gol III 1 Th 17,820 17,820 17,820 17,820
- Uang Makan Lembur 1 Th 28,800 28,800 28,800 28,800
512212 Belanja Pegawai Transito
- Gaji Transito 1 Th 60,437 60,437 60,437 60,437
Page 36
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Pemeliharaan Alat Komunikasi SSB 1 Th 10,000 10,000 10,000 10,000
- Lampu Mercury 1 Th 5,500 5,500 5,500 5,500
- Instalasi Lampu 1 Th 5,400 5,400 5,400 5,400
- Kendaraan Bermotor R2 2 unit 9,000 9,000 9,000 9,000
- Peralatan Komputer 4 unit 2,800 2,800 2,800 2,800
- Peralatan Printer 4 Unit 1,400 1,400 1,400 1,400
-Speed Boat 1 Bh 12,600 12,600 12,600 12,600
-BBM Speed Boat 1 Th 16,470 16,470 16,470 16,470
- Docking Tahunan Speed Boat 1 Th 25,000 25,000 25,000 25,000
Page 37
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
A SATKER PENGEMBANGAN LLAJ KALIMANTAN BARAT - - - - 1,257,598 1,257,598 18,760,516 - 18,760,516 20,018,114
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 18,730,516 - 18,730,516 18,730,516
Page 38
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Sp.Tanjung-Sintang 32,812 M 32 1,049,984 - 1,049,984 1,049,984
Sintang-Putussibau 32,812 M 32 1,049,984 1,049,984 1,049,984
-
2 Pengadaan dan Pemasangan Guard Rail -
Sintang-Putussibau 1,000 M 1,000 1,000,000 1,000,000 1,000,000
Sp.Tebelian-Nanga Pinoh 1,000 M 1,000 1,000,000 1,000,000 1,000,000
-
3 Pengadaan dan Pemasangan Rambu Lalu Lintas (75x75) -
Sintang-Putussibau 500 BH 984 492,000 492,000 492,000
-
4 Pengadaan dan Pemasangan RPPJ -
Sintang-Putussibau 50 BH 8,000 400,000 400,000 400,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 493,918 493,918 - - - 493,918
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (1 trayek)
Pontianak - Tayan - Ketapang 1 TH 465,118 465,118 465,118 465,118
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 500,000 500,000 - - - 500,000
Belanja Modal Fisik Lainnya
1 Pekan Nasional Keselamatan Transportasi Darat 1 PKT 450,000 450,000 450,000 450,000
2 Pengembangan Data Kinerja Perhubungan Darat Prop.Kalbar -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 263,680 263,680 30,000 - 30,000 293,680
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaanATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
- Pengadaan Printer 1 UNIT 5,000 5,000 5,000 5,000
5 Belanja Perjalanan Lainnya
- Tiket Pontianak - Jakarta (PP) : 20 OT 1,748 34,960 34,960 34,960
Page 39
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP KALBAR 16,799,635 - - - - 380,635 380,635 16,419,000 - 16,419,000 16,799,635
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 16,419,000 - - - - - - 16,419,000 - 16,419,000 16,419,000
1 Pengadaan & Pemasangan Rambu Sungai Pawan & Sungai Kapuas 300 bh - - - -
A SATKER PENGEMBANGAN LLAJ KALIMANTAN TENGAH - - - - 1,048,260 1,048,260 21,758,600 - 21,758,600 22,806,860
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 20,233,600 - 20,233,600 20,233,600
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
P. Raya - Kapuas - Bts Kalsel 30,000 M 32 960,000 960,000 960,000
P. Raya - Sampit - P. Bun 30,000 M 32 960,000 960,000 960,000
Pasar Panas - Ampah - Muara Teweh 15,000 M 32 480,000 480,000 480,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
P. Raya - Kapuas - Bts Kalsel 600 M 1,050 630,000 630,000 630,000
P. Raya - Sampit - P. Bun 1,000 M 1,050 1,050,000 1,050,000 1,050,000
Pasar Panas - Ampah - Muara Teweh 500 M 1,050 525,000 525,000 525,000
P. Bun - Sp. Buntu - Kujan - Bts Kalbar 400 M 1,050 420,000 420,000 420,000
Page 40
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
P. Raya - Sampit - P. Bun 500 BH 265 132,500 132,500 132,500
Pasar Panas - Ampah - Muara Teweh 500 BH 265 132,500 132,500 132,500
- - -
6 Pengadaan dan Pemasangan Rambu Lalu Lintas (75x75 cm) - - -
P.Raya-Kapuas-Batas Kalsel 100 BH 984 98,400 98,400 98,400
P. Raya - Sampit - P. Bun 100 BH 984 98,400 98,400 98,400
Pasar Panas - Ampah - Muara Teweh 100 BH 984 98,400 98,400 98,400
P. Bun - Sp. Runtu - Kujan - Bts Kalbar 70 BH 984 68,880 68,880 68,880
-
7 Pengadaan dan Pemasangan Delineator -
P.Raya-Kapuas-Batas Kalsel 500 BH 450 225,000 225,000 225,000
P. Raya - Sampit - P. Bun 500 BH 450 225,000 225,000 225,000
Pasar Panas - Ampah - Muara Teweh 500 BH 450 225,000 225,000 225,000
P. Bun - Sp. Runtu - Kujan - Bts Kalbar 500 BH 450 225,000 225,000 225,000
12 Pembangunan Terminal
- Terminal Tipe A di Palangkaraya, Tahap 4 1 PKT 10,000,000 10,000,000 10,000,000 10,000,000
04.08.05 PROGRAM REHABILITASI & PEMELIHARAAN PRASARANA & SARANA LLAJ - - - - - - 1,500,000 - 1,500,000 1,500,000
Belanja Pemeliharaan Yang Dikapitalisasi
1 Rehabilitasi Fasilitas Unit Penimbangan Kendaraan Bermotor
Jembatan Timbang Kapuas (Anjir Serapat Km 13), Thp II 1 PKT 1,500,000 1,500,000 1,500,000 1,500,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 424,800 424,800 - - - 424,800
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (1 Trayek)
Propinsi Kalteng 1 TH 396,000 396,000 396,000 396,000
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 354,500 354,500 - - - 354,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Penyelenggaraan Rakornis LLAJ P.Kalimantan 1 PKT 250,000 250,000 250,000 250,000
4 Pengembangan Data Kinerja Perhubungan Darat Prop.Kalteng -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 268,960 268,960 25,000 - 25,000 293,960
Page 41
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaanATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 PKT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Palangkaraya - Jakarta (PP) : 20 OT 2,012 40,240 40,240 40,240
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP KALTENG 46,759,807 - - - - 439,220 439,220 46,320,587 - 46,320,587 46,759,807
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 35,514,693 - - - - - - 35,514,693 - 35,514,693 35,514,693
1 Pemb. Der. Penyeb Bahaur di Kab. Pulang Pisau Thp. IV (Termasuk Supervisi) 1 Pkt 24,611,906 24,611,906 24,611,906 24,611,906
2 Pengerukan Anjir Kelampan 200,000 M3 - - - -
3 Pengerukan Anjir Serapat 200,000 M3 - - - -
7 Pengerukan Terusan Hantipan 1 Pkt - - - -
1 Pemb. Dermaga Sungai Napu di Telang Baru Thp IV (Selesai) 1 pkt 2,859,127 2,859,127 2,859,127 2,859,127
2 Pemb. Dermaga Sungai di Danau Sembuluh 1 pkt 3,057,740 3,057,740 3,057,740 3,057,740
3 Pemb. Dermaga Bongkar Muat Barang di Puruk Cahu Kab. Murung Raya THP III 1 pkt 4,985,920 4,985,920 4,985,920 4,985,920
4 Pemb. Dermaga Sungai di Danau Sembuluh 1 pkt - - - -
5 Pemb. Dermaga Sungai di Sepang Semin 1 pkt - - - -
6 Pemb. Derm. Sei. Rungan Manuhing di Desa Takaras 1 pkt - - - -
7 Pemb. Derm. Di Wilayah Eks. PLG 1 pkt - - - -
1 Pengadaan Bus Air Untuk Angkutan Sungai di Kawasan Eks. PLG 5 unit - - - -
Pengadaan Kapal Kerja 120 PK untuk Kab. Pulang Pisau, Barito Utara dan
2 3 unit - - - -
Murung Raya
3 Pengadaan Speed Boat 60 PK 1 unit - - - -
1 Peningk. & Rehab. Dermaga Sungai di Rambang Kota Palangkaraya Thp. IV 1 pkt 3,881,500 3,881,500 3,881,500 3,881,500
2 Peningk. & Rehab. Dermaga Sungai di Pasar Lama Buntok Thp. III 1 pkt 4,015,294 4,015,294 4,015,294 4,015,294
3 Peningk. & Rehab. Dermaga Danau Mare di Kuala Kapuas 1 pkt - - - -
4 Peningkatan & Rehab. Derm. Sei kahayan di Kuala Kurun Kab. Gunung Mas 1 pkt - - - -
5 Peningkatan & Rehab. Derm. Sei di Pulang Pisau 1 pkt - - - -
6 Peningkatan & Rehab. Derm. Maliku 1 pkt - - - -
7 Peningkatan & Rehab. Derm. Pegatan di Kab. Katingan 1 pkt - - - -
- - -
Peningk. & Rehab Dermaga Sei Kahayan di Kuala Kurun Kabupaten Gunung
3 1 pkt 2,909,100 2,909,100 2,909,100 2,909,100
Mas
Page 42
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor KPA 12 OB 9,600 - 9,600 9,600 9,600
Honor SPM 12 OB 7,200 - 7,200 7,200 7,200
Honor Bendahara Kegiatan 12 OB 6,720 - 6,720 6,720 6,720
Honor Staff 60 OB 24,000 - 24,000 24,000 24,000
Honor SAI 36 OB 14,400 - 14,400 14,400 14,400
Honor Panitia 4 Pkt 27,300 - 27,300 27,300 27,300
A SATKER PENGEMBANGAN LLAJ KALIMANTAN SELATAN - - - - 1,806,620 1,806,620 10,815,008 - 10,815,008 12,621,628
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 10,690,008 - 10,690,008 10,690,008
Belanja Modal Jalan, Irigasi dan Jaringan
Pembangunan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Banjarmasin-Tanjung-Batas Kaltim 30,469 M 32 975,008 975,008 975,008
Banjarmasin-Batulicin-Batas Kaltim 25,000 M 32 800,000 800,000 800,000
10 Pembangunan Terminal :
- Tipe A, Km.17 Kab. Banjar Tahap 2 1 PKT 4,000,000 4,000,000 4,000,000 4,000,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,406,400 1,406,400 - - - 1,406,400
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (3 trayek) 1 TH 1,377,600 1,377,600 1,377,600 1,377,600
Batulicin -Tanah Grogot
Banjarmasin-Banjarbaru (via lingkar selatan)/Cempaka-Trisakti
Paringun - Halong
04.08.05 PROGRAM REHABILITASI & PEMELIHARAAN PRASARA & SARANA LLAJ - - - - - - 100,000 - 100,000 100,000
Belanja Pemeliharaan Yang Dikapitalisasi
Pemeliharaan Fasilitas Keselamatan LLAJ
Lintas Banjarmasin-Kandangan 1 PKT 100,000 100,000 100,000 100,000
Page 43
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 129,500 129,500 - - - 129,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 75,000 75,000 75,000 75,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Kalsel -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 270,720 270,720 25,000 - 25,000 295,720
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook dan Printer 1 PKT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Banjarmasin-Jakarta (PP) : 20 OT 2,100 42,000 42,000 42,000
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP KALSEL 23,240,906 - - - - 287,170 287,170 22,953,736 - 22,953,736 23,240,906
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 19,153,736 - - - - - - 19,153,736 - 19,153,736 19,153,736
1 Pemb. Der. II Penyeb Batulicin Thp. VI (Termasuk Supervisi) 1 Pkt 2,773,601 2,773,601 2,773,601 2,773,601
2 Pemb. Der. Penyeb P. Laut Timur Kab. Kotabaru Thp. I (Termasuk Supervisi) 1 Pkt - - - -
3 Pemb. Der. Penyeb P. Sebuku Kab. Kotabaru Thp. I (Termasuk Supervisi) 1 Pkt - - - -
4 Pemb. / Peningk. Dermaga Sungai di Alalak Kota Banjarmasin Tahap III 1 pkt 11,717,058 11,717,058 11,717,058 11,717,058
1 Pemb. Dermaga Sungai di Jelapat Tahap V Kab. Barito Kuala 1 pkt 831,458 831,458 831,458 831,458
2 Pemb. Dermaga Sungai di Danau Panggang Kab. Hulu Sungai Utara Tahap II 1 pkt 3,831,619 3,831,619 3,831,619 3,831,619
1 Peningk. Dermaga Sungai Pasar Baru Kota Banjarmasin Tahap II 1 pkt 3,800,000 3,800,000 3,800,000 3,800,000
2 Pemb. / Peningk. Dermaga Sungai di Alalak Kota Banjarmasin Tahap III 1 pkt - - - -
3 Peningk. Dermaga sungai Di Paminggir Kab. Hulu Sungai Utara Tahap I 1 pkt - - - -
Page 44
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor SPM 12 OB 7,200 - 7,200 7,200 7,200
Honor Bendahara Kegiatan 12 OB 6,720 - 6,720 6,720 6,720
Honor Staff 60 OB 24,000 - 24,000 24,000 24,000
Honor SAI 36 OB 14,400 - 14,400 14,400 14,400
Honor Panitia 6 Pkt 29,250 - 29,250 29,250 29,250
22 KALIMANTAN TIMUR 497,510 - 497,510 1,012,920 3,163,901 4,176,821 57,871,792 - 57,871,792 62,546,123
A SATKER PENGEMBANGAN LLAJ KALIMANTAN TIMUR - - - - 2,656,960 2,656,960 9,391,392 - 9,391,392 12,048,352
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 9,366,392 - 9,366,392 9,366,392
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Ruas Jalan Samarinda - Balikpapan 36,406 M 32 1,164,992 1,164,992 1,164,992
Ruas Jalan Samarinda-Bontang 20,000 M 32 640,000 640,000 640,000
Ruas Jalan Penajam-Kuaro 20,000 M 32 640,000 640,000 640,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 1,767,600 1,767,600 - - - 1,767,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (3 trayek) 1 TH 1,738,800 1,738,800 1,738,800 1,738,800
Samarinda - Bongan
Samarinda - Bentian Besar
Samarinda - Muara Muntai
Samarinda - Long Mesangat
Samarinda - Muara Aloh
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 604,500 604,500 - - - 604,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
Page 45
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 100,000 100,000 100,000 100,000
3 Pekan Nasional Keselamatan Transportasi Darat 1 PKT 450,000 450,000 450,000 450,000
4 Pengembangan Data Kinerja Perhubungan Darat Prop.Kaltim -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 284,860 284,860 25,000 - 25,000 309,860
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Samarinda-Jakarta (PP) : 20 OT 2,682 53,640 53,640 53,640
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 350 17,500 17,500 17,500
B SATKER PENGEMBANGAN LLASDP KALTIM 42,355,520 - - - - 355,520 355,520 42,000,000 - 42,000,000 42,355,520
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 42,000,000 - - - - - - 42,000,000 - 42,000,000 42,000,000
1 Pemb. Derm. Penyeb. Ancam Tahap IV Termasuk Supervisi 1 pkt 4,000,000 4,000,000 4,000,000 4,000,000
2 Pemb. Derm. Penyeb. Sebatik Tahap III, Termasuk Supervisi 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
3 Pemb. Derm. II Penyeb. Penajam Tahap I Termasuk Supervisi 1 pkt - - - -
1 Pemb. Kapal Penyeb 500 GT Lts. Tarakan - Nunukan Thp II 1 unit 24,000,000 24,000,000 24,000,000 24,000,000
2 Pemb. Kapal Penyeb 500 GT Lts. Nunukan - Sebatik Thp I 1 unit - - - -
Page 46
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor SAI 36 OB 14,400 - 14,400 14,400 14,400
Honor Panitia Pengadaan Barang/Jasa Fisik 56 OP 54,600 - 54,600 54,600 54,600
Honor Panitia Pengadaan Barang/Jasa Supervisi 40 OP 39,000 - 39,000 39,000 39,000
Catatan : Pemb. Dermaga Penyeb Ancam selesai 100 % (Cek RAB, Cek Harga satuan, Cek Harga satuan pancang, Sesuakian RAB dengan yg lainnya)
Pemb. Dermaga Sungai Kayan desain agar segera di Ekspose
Pemb. Der. Sei Tering belum ada desain
Pemb. Der. Sei Sebuku Desain APBD I 2008
Pemb. Der. Sei Kunjang ; Desain APBD II 2009, Cek DIPA 2009, lokasi kota
samarinda
C UPT PELABUHAN PENYEBERANGAN KARIANGU 8,142,251 497,510 - 497,510 1,012,920 151,421 1,164,341 6,480,400 - 6,480,400 8,142,251
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 4,000,000 - - - - - - 4,000,000 - 4,000,000 4,000,000
-
0992 PEMBANGUNAN DERMAGA PENYEBERANGAN 4,000,000 - - - - - - 4,000,000 - 4,000,000 4,000,000
0001 Pembayaran Gaji, Lembur, Honorarium dan Vakasi 1 Th 497,510 497,510 - 497,510 - - - - - - 497,510
Page 47
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Belanja Tunjangan Suami/Istri PNS untuk 7 pegawai (Gaji ke 13) 1 bln 1,260 1,260 1,260 1,260
Kenaikan Gaji 5% 1 THN 820 820 820 820
Page 48
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
PENDIDIKAN DAN LATIHAN
542111 Belanja Perjalanan Biasa
- Latihan Prajabatan Gol. II 5 ot 9,500 9,500 9,500 9,500
- Pengembangan (Sosialisasi dan Seminar) 20 oh 12,000 12,000 12,000 12,000
0474 PENCETAKA/PENERBITAN/PENGGANDAAN/LAMINASI
Page 49
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
0024 PEMBANGUNAN/PENGADAAN/PENINGKATAN SARANA DAN PRASARANA 256,821 - - - - 151,421 151,421 105,400 - 105,400 256,821
A SATKER PENGEMBANGAN LLAJ SULAWESI UTARA - - - - 4,618,460 4,618,460 13,526,835 - 13,526,835 18,145,295
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 13,501,835 - 13,501,835 13,501,835
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Tomohon-Kawangkoan-Tumpaan 30,000 M 35 1,050,000 1,050,000 1,050,000
Kotamobagu-Modayag-Tutuyan (Kab.Boltim) 25,000 M 35 875,000 875,000 875,000
Tondano-Tomohon 20,000 M 35 700,000 700,000 700,000
Page 50
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Pengadaan dan Pemasangan Rambu Lalu Lintas -
Kaiya-Lolak-Boroko-Atinggola 75 BH 790 59,250 59,250 59,250
Modayag-Molobog-Tutuyan (Kab.BolSel) 75 BH 790 59,250 59,250 59,250
Siau-Ulu-Ondong (Kab.Sitaro) 50 BH 790 39,500 39,500 39,500
Tomohon-Kawangkoan-Tumpaan 75 BH 790 59,250 59,250 59,250
Kawangkoan-Ratahan-Belang 50 BH 790 39,500 39,500 39,500
-
4 Pengadaan dan Pemasangan RPPJ -
Manado-Wori-Mapanget 12 BH 8,710 104,520 104,520 104,520
Modayag-Molobog-Kotabunan (Kab.BolSel) 12 BH 8,710 104,520 104,520 104,520
Airmadidi-Kema-Bitung 12 BH 8,710 104,520 104,520 104,520
Dalam Kotamobagu 12 BH 8,710 104,520 104,520 104,520
Molibagu-Momalia 8 BH 8,710 69,680 69,680 69,680
-
5 Pengadaan dan Pemasangan RPPJ Portal -
Worotijan-Poigar-Kaiya 6 BH 132,000 792,000 792,000 792,000
-
6 Pengadaan dan Pemasangan Cermin Tikungan -
Manado - Tanawangko - Tumpaan 5 BH 5,293 26,465 26,465 26,465
Tondano-Tomohon-Kawangkoan 5 BH 5,293 26,465 26,465 26,465
Dalam Kota Bitung 5 BH 5,293 26,465 26,465 26,465
Dalam Kotamobagu 5 BH 5,293 26,465 26,465 26,465
Dalam Kota Manado 5 BH 5,293 26,465 26,465 26,465
-
7 Pengadaan dan Pemasangan Delineator -
Kaiya-Lolak-Boroko-Atinggola 600 BH 460 276,000 276,000 276,000
Kawangkoan-Ratahan-Belang 200 BH 460 92,000 92,000 92,000
Kaiya-Ktamobagu-Doloduo-Molibagu 400 BH 460 184,000 184,000 184,000
Tahuna-Naha 100 BH 460 46,000 46,000 46,000
-
8 Pengadaan dan Pemasangan APILL Solar Cell -
Simpang 3 Tumpaan, Kab.Minahasa Selatan 1 UNIT 300,000 300,000 300,000 300,000
Simpang 3 Paniki, Kota Manado 1 UNIT 300,000 300,000 300,000 300,000
Simpang 3 Kairagi, Kota Manado 1 UNIT 300,000 300,000 300,000 300,000
-
9 Pengadaan dan Pemasangan Warning Light Solar Cell -
Paal II-Kairagi (Jembatan Kairagi) 1 UNIT 60,000 60,000 60,000 60,000
Jalan Piere Tendean (Boulevard) Manado 1 UNIT 60,000 60,000 60,000 60,000
Simpang 3 Jembatan Kalya, Bolmong 1 UNIT 60,000 60,000 60,000 60,000
-
10 Pengadaan dan Pemasangan Paku Marka Jalan
Ruas Jalan Manado-Bitung 500 BH 277 138,500 138,500 138,500
Ruas Jalan Manado-Tomohon-Kawangkoan 500 BH 277 138,500 138,500 138,500
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 3,740,400 3,740,400 - - - 3,740,400
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (6 trayek) 1 TH 3,711,600 3,711,600 3,711,600 3,711,600
Manado - Ratatotok - Molobok
Manado - Molibagu - Pinolusian
Tahuna - Tamako - Pananaru - Laine - Peta - Kendage - Tahuna
Tuminting - Palaes - Maliambaong - Munte - Likupang - Pinenek - Tangkoko
Manado - Tondano - Kema - Bitung
Manado - Tungoi - Matalibaru
Manado-Lolak-Labuan Uki
Manado-Tombatu-Kalait-Ranoyapo
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 554,500 554,500 - - - 554,500
Page 51
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 323,560 323,560 25,000 - 25,000 348,560
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Manado - Jakarta (PP) : 20 OT 4,742 94,840 94,840 94,840
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP SULUT 37,399,654 - - - - 440,170 440,170 36,959,484 - 36,959,484 37,399,654
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 36,731,300 - - - - - - 36,731,300 - 36,731,300 36,731,300
- - - -
Page 52
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pembangunan dan Pengadaan Bis Air untuk Lintas Danau Tondano di Kab. - -
3 3 pkt - -
Minahasa (Termasuk Desain & Supervisi)
A SATKER PENGEMBANGAN LLAJ SULAWESI TENGAH - - - - 2,711,020 2,711,020 5,387,992 - 5,387,992 8,099,012
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,362,992 - 5,362,992 5,362,992
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Tompe-Tambu-Sabang 15,000 M 35 525,000 525,000 525,000
Sabang-Ogotua 15,000 M 35 525,000 525,000 525,000
Ogoamas-Tolitoli 15,000 M 35 525,000 525,000 525,000
2 Pengadaan dan Pemasangan Guard Rail
Tawaeli-Toboli 300 M 1,050 315,000 315,000 315,000
Mepanga-Moutong-Molosifat 300 M 1,050 315,000 315,000 315,000
Biromaru-Palolo 300 M 1,050 315,000 315,000 315,000
Napu-Kasiguncu 300 M 1,050 315,000 315,000 315,000
Pakuli-Kulawi 300 M 1,050 315,000 315,000 315,000
3 Pengadaan dan Pemasangan Rambu Lalu Lintas
Donggala-Sarumana-Batas Mamuju 50 BH 783 39,150 39,150 39,150
Palu-Biromaru-Palolo 50 BH 783 39,150 39,150 39,150
Napu-Kasiguncu 50 BH 783 39,150 39,150 39,150
Palu-Pakuli-Kulawi 50 BH 783 39,150 39,150 39,150
Luwuk-Toili-Pandauke 50 BH 783 39,150 39,150 39,150
Tompira-Bungku 50 BH 783 39,150 39,150 39,150
6 Pengadaan dan Pemasangan LPJU (Solar Cell) 25 UNIT 30,000 750,000 750,000 750,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,307,600 2,307,600 - - - 2,307,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (4 trayek) 1 TH 2,278,800 2,278,800 2,278,800 2,278,800
Poso-Napu
Tentena-Gintu
Page 53
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Palu-Buol
Kolonedale-Matano
Ampana-Dataran Bulan
Toili-Baturube
Kolonedale-Nuha
Buol-Paleleh
Sausu-Piore
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 298,920 298,920 25,000 - 25,000 323,920
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 250 9,000 9,000 9,000
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 36,500 36,500 36,500 36,500
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Palu-Jakarta (PP) : 20 OT 3,510 70,200 70,200 70,200
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP SULTENG 32,343,820 - - - - 343,820 343,820 32,000,000 - 32,000,000 32,343,820
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 31,350,000 - - - - - - 31,350,000 - 31,350,000 31,350,000
1 Pemb. Derm. Penyeb. Oebone - Ampana Tahap II (Termasuk Supervisi) 1 pkt 17,350,000 17,350,000 17,350,000 17,350,000
2 Pemb. Derm. Penyeb. Salakan (Termasuk Supervisi) 1 pkt - - - -
3 Pemb. Derm. Penyeb. Kolonedale Thp II (Termasuk Supervisi) 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
4 Pemb. Derm. Penyeb. Baturube Thp II (Termasuk Supervisi) 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
1 Pemb. Dermaga Danau Poso di Tantena (Termasuk Desain & Supervisi) 1 pkt - - - -
Pemb. Rambu Suar Darat Pel. Penyeb. Tolitoli, Bangai & Wakai (Termasuk
1 3 unit - - - -
Supervisi)
Page 54
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pemb. Rambu Suar Laut Pel. Penyeb. Tolitoli, Bangai & Wakai (Termasuk
2 3 unit - - - -
Supervisi)
A SATKER PENGEMBANGAN LLAJ SULAWESI SELATAN - - - - 856,920 856,920 8,762,836 - 8,762,836 9,619,756
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 8,737,836 - 8,737,836 8,737,836
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Makasssar-Maros-Pangkep 20,000 M 32 640,000 640,000 640,000
Parepare - Sidrap - Wajo - Palopo 20,000 M 32 640,000 640,000 640,000
Lutra - Bts Sulteng - Lutim - Bts Sultra - Bts Sulteng 20,000 M 32 640,000 640,000 640,000
- -
2 Pengadaan dan Pemasangan Guard Rail - -
Palopo - Luwu Utara - Bts Sulteng 600 M 1,050 630,000 630,000 630,000
Enrekang - Tator - Palopo 600 M 1,050 630,000 630,000 630,000
Maros-Bone 600 M 1,050 630,000 630,000 630,000
- -
3 Pengadaan dan Pemasangan Rambu Lalu Lintas - -
Bulukumba-Sinjai-Bone 100 BH 731 73,100 73,100 73,100
Enrekang - Tator - Palopo 100 BH 731 73,100 73,100 73,100
Makasar-Maros-Pangkep 100 BH 731 73,100 73,100 73,100
Barru-Parepare-Pinrang 100 BH 731 73,100 73,100 73,100
- -
4 Pengadaan dan Pemasangan RPPJ - -
Lintas Jalan Negara 20 BH 8,596 171,920 171,920 171,920
- -
5 Pengadaan dan Pemasangan Delineator - -
Lintas Jalan Negara 1,000 BH 460 460,000 460,000 460,000
- -
6 Pengadaan dan Pemasangan Cermin Tikungan 3 BH - -
Lintas Jalan Negara 3 BH 5,224 15,672 15,672 15,672
- -
7 Pengadaan dan Pemasangan Paku Jalan - -
Page 55
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Lintas Jalan Negara 1,000 BH 277 277,000 277,000 277,000
-
8 Pengadaan dan Pemasangan APILL Solar Cell -
Simp 3 Prov.Sulsel 1 UNIT 300,000 300,000 300,000 300,000
Simp 4 Prov.Sulsel 1 UNIT 300,000 300,000 300,000 300,000
-
9 Pengadaan dan Pemasangan Warning Light - -
Lintas Jalan Negara 5 UNIT 51,000 255,000 255,000 255,000
- -
10 Pengadaan dan Pemasangan LPJU Solar Cell - -
Lintas Jalan Negara 20 UNIT 33,000 660,000 660,000 660,000
- -
11 Pengadaan dan Pemasangan LED High-Flux serta modul responsif 1 PKT 1,195,844 1,195,844 1,195,844 1,195,844
- - -
12 Pengadaan Paket Penghargaan Kota Pemenang WTN 2 PKT 100,000 200,000 200,000 200,000
(Fasilitas Keselamatan LLAJ)
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 554,500 554,500 - - - 554,500
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pekan Nasional Keselamatan Transportasi Darat 1 PKT 450,000 450,000 450,000 450,000
4 Pengembangan Data Kinerja Perhubungan Darat Prop.Sulsel -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 302,420 302,420 25,000 - 25,000 327,420
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Makasar-Jakarta (PP) : 25 OT 2,848 71,200 71,200 71,200
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 350 17,500 17,500 17,500
B SATKER PENGEMBANGAN LLASDP SULSEL 27,086,224 - - - - 341,075 341,075 26,745,149 - 26,745,149 27,086,224
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 16,700,149 - - - - - - 16,700,149 - 16,700,149 16,700,149
1 Pemb. Der. Penyeb Garonggong Thp. VI (Termasuk Supervisi) Selesai 100% 1 Pkt 16,700,149 16,700,149 16,700,149 16,700,149
- - -
Page 56
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pemb. Rambu Suar di Pel. Penyeb. Garonggong, 3 unit (termasuk desain dan
1 3 Unit - - - -
supervisi)
Pemb. Rambu Suar Type Single Pipe di Pel. Penyeb. Bira Kab. Bulukumba 1
2 1 Unit - - - -
unit (termasuk desain dan supervisi)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,230,989 - 5,230,989 5,230,989
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Jl.Marisa-Molosifat 25,000 M 35 875,000 875,000 875,000
Jl.Kwandang-Atinggola 15,000 M 35 525,000 525,000 525,000
-
2 Pengadaan dan Pemasangan Guard Rail -
Jl.Isimu-Kwandang 500 M 1,050 525,000 525,000 525,000
Jl.Kwandang-Atinggola 500 M 1,050 525,000 525,000 525,000
Jl.Marisa-Molosifat 400 M 1,050 420,000 420,000 420,000
Jl.Gorontalo-Taludaa 400 M 1,050 420,000 420,000 420,000
-
3 Pengadaan dan Pemasangan LPJU -
Jl.Gorontalo-Telaga 25 UNIT 30,000 750,000 750,000 750,000
-
4 Pengadaan dan Pemasangan RPPJ -
Jl.Isimu-Paguyaman 8 BH 8,672 69,376 69,376 69,376
Jl.Paguyaman-Marisa 8 BH 8,672 69,376 69,376 69,376
-
Page 57
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
5 Pengadaan dan Pemasangan Rambu Lalu Lintas -
Jl.Telaga-Limboto 30 BH 786 23,580 23,580 23,580
Jl.Limboto-Isimu 80 BH 786 62,880 62,880 62,880
Jl.Kwandang-Atinggola 200 BH 786 157,200 157,200 157,200
-
6 Pengadaan dan Pemasangan Cermin Tikungan -
Rs.Jl.Kwandang-Atinggola 2 BH 5,270 10,540 10,540 10,540
Jl.Paguyaman-Marisa 2 BH 5,270 10,540 10,540 10,540
Jl.Marisa-Molosifat 2 BH 5,270 10,540 10,540 10,540
-
7 Pengadaan dan Pemasangan Warning Light -
Depan SMU Negeri Telaga, Kab.Gorontalo 1 UNIT 50,000 50,000 50,000 50,000
Sp.3 Pitohayanga Komp.RIDO Supermarket Telaga, Kab.Gorontalo 1 UNIT 50,000 50,000 50,000 50,000
Sp.3 Moluo Kec.Kwandang, Kab.Gorontalo Utara 1 UNIT 50,000 50,000 50,000 50,000
-
-
8 Manajemen dan Rekayasa Lalu Lintas -
Kab. Pohuwato (termasuk desain dan supervisi) 1 PKT 626,957 626,957 626,957 626,957
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,002,800 2,002,800 - - - 2,002,800
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (6 trayek) 1 TH 1,974,000 1,974,000 1,974,000 1,974,000
Terminal 42-Bubaa
Terminal 42-Wonosari (Daerah Kota Terpadu Mandiri/KTM)
Terminal Moodu-Wongkaditi-Terminal 42-Donggala-Tamalate
Terminal 42-Bonedaa
Terminal 42-Parungi-Lakeya-Bululi-Sukoharjo-Mohiyolo
Terminal 42-Paguat-Marisa 1,2,3,4
Terminal 42-Barakati-Wonggokiki
Terminal 42-Hulubala-Bongo
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Sosialisasi Keselamatan LLAJ
Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Gorontalo -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 305,600 305,600 25,000 - 25,000 330,600
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
Page 58
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
5 Belanja Perjalanan Lainnya
- Tiket Gorontalo-Jakarta (PP) : 20 OT 3,844 76,880 76,880 76,880
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B UPT PELABUHAN PENYEBERANGAN GORONTALO 24,905,933 436,281 - 436,281 495,386 200,995 696,381 23,773,271 - 23,773,271 24,905,933
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 22,404,382 - - - - - - 22,404,382 - 22,404,382 22,404,382
1 Pemb. Der. Penyeb di Marisa Thp IV (Termasuk Supervisi) 1 Pkt 22,404,382 22,404,382 22,404,382 22,404,382
2 Pemb. Der. II Pel Penyeb Gorontalo 1 Pkt - - - -
0001 Pembayaran Gaji, Lembur, Honorarium dan Vakasi 1 Th 436,281 436,281 - 436,281 - - - - - - 436,281
Page 59
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Uang Lembur dan Uang Makan Lembur Gol III 1,008 jam 17,820 17,820 17,820 17,820
- Uang Makan Lembur 504 oh 57,600 57,600 57,600 57,600
Page 60
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Pengadaan ATK 1 th 3,500 3,500 3,500 3,500
- Konsumsi 1 th 1,000 1,000 1,000 1,000
- Bahan/ATK 1 th 300 300 300 300
0474 PENCETAKA/PENERBITAN/PENGGANDAAN/LAMINASI
Belanja Keperluan Sehari-hari Perkantoran
- Pencetakan, Penerbitan, Pengandaan, Laminasi 1 th 19,350 19,350 19,350 19,350
0024 PEMBANGUNAN/PENGEDAAN/PENINGK. SARANA DAN PRASARANA 302,995 - - - - 200,995 200,995 102,000 - 102,000 302,995
Page 61
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 14,301,125 - 14,301,125 14,301,125
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ,termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Jl.R.Soeprapto Kota Kendari-Puwatu-Konawe-Bts Kolaka 100,000 M 34 3,400,000 3,400,000 3,400,000
9 Pengadaan dan Pemasangan LPJU Tenaga Surya 100 UNIT 35,000 3,500,000 3,500,000 3,500,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,328,000 2,328,000 - - - 2,328,000
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (6 Trayek) 1 TH 2,284,800 2,284,800 2,284,800 2,284,800
Kendari-Benua
Kendari-Lamonae
Kendari-Sumber Sari
Kendari-Mawasangka
Kendari-Tondasi
Kendari-Bungku
Kendari - Buah Pinang
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Sosialisasi Keselamatan LLAJ
Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Sultra -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 365,720 365,720 65,000 - 65,000 430,720
1 Pembayaran Gaji, Lembur, Honorarium dan Vakasi 1 TH
Honor KPA 12 OB 920 11,040 11,040 11,040
Honor PPK 12 OB 800 9,600 9,600 9,600
Honor SPM 12 OB 800 9,600 9,600 9,600
Honor Bendahara 12 OB 690 8,280 8,280 8,280
Honor Staff 60 OB 460 27,600 27,600 27,600
Honor SAI 36 OB 350 12,600 12,600 12,600
Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
Page 62
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Belanja Barang Non Operasional Lainnya
Belanja Bahan ATK 1 TH 44,000 44,000 44,000 44,000
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 26,405,940 - - - - - - 26,405,940 - 26,405,940 26,405,940
1 Pembangunan Dermaga Penyeberangan Kamaru Thp. VII (selesai) 1 Pkt 11,202,970 11,202,970 11,202,970 11,202,970
2 Pembangunan Dermaga Penyeberangan Wanci Thp. VI (selesai) 1 Pkt 11,202,970 11,202,970 11,202,970 11,202,970
3 Pembangunan Dermaga Penyeberangan Amolengu Thp I 1 Pkt - - - -
4 Pembangunan Dermaga Penyeberangan LabuanThp I 1 Pkt 4,000,000 4,000,000 4,000,000 4,000,000
- - - -
A SATKER PENGEMBANGAN LLAJ SULAWESI BARAT - - - - 1,360,980 1,360,980 13,340,010 - 13,340,010 14,700,990
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 13,315,010 - 13,315,010 13,315,010
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ,termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Mamuju-Batas Sulsel 50,000 M 32 1,600,000 1,600,000 1,600,000
Page 63
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Kab.Mamuju 1 UNIT 300,000 300,000 300,000 300,000
Kab.Majene 1 UNIT 300,000 300,000 300,000 300,000
Kab.Polman 1 UNIT 300,000 300,000 300,000 300,000
11 Pembangunan Terminal
- Terminal Regional Simbuang Kab Mamuju Tahap II 1 PKT 6,000,000 6,000,000 6,000,000 6,000,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 964,800 964,800 - - - 964,800
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (2 Trayek+ 4 Trayek) 1 TH 936,000 936,000 936,000 936,000
Mamuju - Pasang Kayu
Mamuju - Mamasa
Mamuju - Kalumpang
Mamuju - Tomo
Mamuju - Tobadak
Mamuju - ATM
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Sosialisasi Keselamatan LLAJ
Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Sulbar -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 291,680 291,680 25,000 - 25,000 316,680
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
Page 64
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Mamuju-Jakarta (PP) : 20 OT 3,148 62,960 62,960 62,960
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP SULBAR 2,284,145 - - - - 234,145 234,145 2,050,000 - 2,050,000 2,284,145
2 Peningkatan/Rehabilitasi Derm. Sungai Tarailu (Termasuk desain & Supervisi) 1 pkt 2,000,000 2,000,000 2,000,000 2,000,000
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 6,503,542 - 6,503,542 6,503,542
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan & Pemasangan Fasilitas Kes. LLAJ
1 Pengadaan dan Pemasangan Marka Jalan
Kota Ambon-Latuhalat 10,000 M 37 370,000 370,000 370,000
Kota Ambon-Passo 10,000 M 37 370,000 370,000 370,000
Passo-Liang 10,000 M 37 370,000 370,000 370,000
Kota Ambon 10,000 M 37 370,000 370,000 370,000
Page 65
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Pengadaan dan Pemasangan Guard Rail
Benteng-Gunung Nona 500 M 1,100 550,000 550,000 550,000
Berebere-Toisapu 500 M 1,100 550,000 550,000 550,000
IPST-Toisapu Ambon 500 M 1,100 550,000 550,000 550,000
Kairatu-Piru 500 M 1,100 550,000 550,000 550,000
-
4 Pengadaan dan Pemasangan Rambu Lalu Lintas
Saumlaki-Tanah Putih 100 BH 731 73,100 73,100 73,100
Saumlaki-Bandara Baru 100 BH 731 73,100 73,100 73,100
Namlea-Air Buaya 250 BH 731 182,750 182,750 182,750
8 Pengad.& pemas Alat PKB di Passo (3 alat utama & 2 alat pendukung) 1 PKT 900,000 900,000 900,000 900,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,728,800 2,728,800 - - - 2,728,800
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (5 trayek) 1 TH 2,700,000 2,700,000 2,700,000 2,700,000
Ambon-Waisala
Ambon-Kawa/Masika
Ambon-Tehoru
Namlea-T.Bara
Namlea-Unit 18
Ambon-Pasanea
Piru-Luhu
Namlea-Wamlana
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 28,800 28,800 28,800 28,800
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 50,000 50,000 - - - 50,000
1 Pengembangan Data Kinerja Perhubungan Darat Prop.Maluku -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 321,280 321,280 25,000 - 25,000 346,280
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Ambon-Jakarta (PP) : 20 OT 4,628 92,560 92,560 92,560
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
Page 66
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
B SATKER PENGEMBANGAN LLASDP MALUKU 75,503,437 - - - - 440,170 440,170 75,063,267 - 75,063,267 75,503,437
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 75,013,267 - - - - - - 75,013,267 - 75,013,267 75,013,267
1 Pemb. Derm. Penyeb Larat Thp VII Selesai (Termasuk Supervisi) 1 pkt 6,107,410 6,107,410 6,107,410 6,107,410
2 Pemb. Derm. Penyeb Tepa Thp IV Selesai (Termasuk Supervisi) 1 pkt 7,805,857 7,805,857 7,805,857 7,805,857
3 Pemb. Derm. Penyeb Benjina Thp IV (Termasuk Supervisi) 1 pkt 8,000,000 8,000,000 8,000,000 8,000,000
4 Pemb. Derm. Penyeb Teluk Bara (P. Buru) Thp III (Termasuk Supervisi) 1 pkt 8,000,000 8,000,000 8,000,000 8,000,000
5 Pemb. Derm. Penyeb Nusalaut Thp. II (Termasuk Supervisi) 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
6 Pemb. Derm. Penyeb Lakor Thp. II (Termasuk Supervisi) 1 pkt 7,000,000 7,000,000 7,000,000 7,000,000
7 Pemb. Derm. Penyeb Kisar Thp. II (Termasuk Supervisi) 1 pkt 11,600,000 11,600,000 11,600,000 11,600,000
8 Pemb. Derm. Penyeb Geser Thp. I (Termasuk Supervisi) 1 pkt - - - -
9 Pemb. Derm. Penyeb Meror Thp. I (Termasuk Supervisi) 1 pkt - - - -
10 Pemb. Derm. Penyeb Lamerang Thp. I (Termasuk Supervisi) 1 pkt - - - -
11 Pemb. Derm. Penyeb Wailey Thp. I (Termasuk Supervisi) 1 pkt 4,000,000 4,000,000 4,000,000 4,000,000
12 Pemb. Derm. Penyeb Toyando Thp. I (Termasuk Supervisi) 1 pkt - - - -
13 Pemb. Derm. Penyeb Airmanang Thp. I (Termasuk Supervisi) 1 pkt 4,000,000 4,000,000 4,000,000 4,000,000
14 Pemb. Derm. Penyeb Kei Besar Thp. I (Termasuk Supervisi) 1 pkt - - - -
15 Pemb. Derm. Penyeb Adaut Thp. I (Termasuk Supervisi) 1 pkt - - - -
16 Peningk/Rehab. Pel. Penyeb. Waipirit Selesai (Termasuk Supervisi) 1 pkt 11,500,000 11,500,000 11,500,000 11,500,000
- - - -
0995 PEMBANGUNAN SBNP -
1 - - - -
Catatan : Waipirit pasangan pelabuhan hunimoa, Geser pasangan Aimanang, Meror pasangan Dobo-Benjina-Meror (KMP Lobster), Lamerang pasangan Dobo-Lamerang
Pemb. Dermaga Penyeberangan : Nusalaut, Lakor, Kisar, Geser, Kei Besar Utara, Aru Selatan Desain APBD 2007 yang baru diexpose Kisar dan Lakor
Pemb. Der. Penyeb. Lanjutan : Larat, Dobo, Tepa, Benjina & Teluk Bara Desain APBN 2008
Pemb. Der. Penyeb. Wailey Thp I; DED 2009. Pradesain 08
Pemb. Der. Penyeb. Toyondo Thp I; DED 2009. Pradesain APBD 08
Pemb. Der. Penyeb. Kei Besar Thp I; Pradesain 2007. desain 07
Page 67
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pemb. Der. Penyeb. Adaut Thp I; DED dan Pradesain 2009.
Pemb. Der. Penyeb. Aimerang dan Toyando Thp I; DED dan Pradesain 2009.
Pemb. Der. Penyeb. Lakor Thp II dan Geser Thp I; Sudah Ekspose dan menunggu perbaikan.
Pemb. Der. Penyeb. Meror Thp I, Lamerang Thp I dan Kei Besar Thp I; Sudah SID tinggal Ekspose
C SATKER PENGEMBANGAN SARANA LLASDP MALUKU 10,036,700 - - - - 299,200 299,200 9,737,500 - 9,737,500 10,036,700
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 9,700,000 - - - - - - 9,700,000 - 9,700,000 9,700,000
A SATKER PENGEMBANGAN LLAJ MALUKU UTARA - - - - 2,183,680 2,183,680 5,653,618 - 5,653,618 7,837,298
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 5,628,618 - 5,628,618 5,628,618
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ Termasuk Supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Kao-Tobelo 10,000 M 36 360,000 - 360,000 360,000
Kota Sanana dan sekitarnya 10,000 M 36 360,000 360,000 360,000
Sondo-Sondo-Ekor-Subaim 10,000 M 36 360,000 360,000 360,000
Page 68
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Buli-Maba 10,000 M 36 360,000 360,000 360,000
2 Pengadaan dan Pemasangan Rambu - -
Kao-Tobelo-Galela 150 BH 731 109,650 109,650 109,650
Payahe-Weda-Wiroro 150 BH 731 109,650 109,650 109,650
Pogi-Manaf-Kantor Bupati 150 BH 731 109,650 109,650 109,650
Sondo-Sondo-Ekor 100 BH 731 73,100 73,100 73,100
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 159,000 159,000 - - - 159,000
1 Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi Keselamatan LLAJ di Kota Ternate 15 OB 300 4,500 4,500 4,500
Honorarium Tim Sosialisasi Keselamatan LLAJ Kab. Halmahera Utara 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengad Paket Penunjang Sosialisasi Keselamatan LLAJ di Kota Ternate 1 PKT 50,000 50,000 50,000 50,000
Pengad. Pkt Penunjang Sos. Keselamatan LLAJ Kab.Halmahera Utara 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Malut -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 331,480 331,480 25,000 - 25,000 356,480
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
Page 69
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Biaya pengadaanATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Ternate-Jakarta (PP) : 20 OT 5,138 102,760 102,760 102,760
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP MALUT 36,699,795 - - - - 390,170 390,170 36,309,625 - 36,309,625 36,699,795
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 36,259,625 - - - - - - 36,259,625 - 36,259,625 36,259,625
1 Pemb. Derm. Penyeb. Patani Tahap V (Termasuk Supervisi) 1 pkt 3,759,625 3,759,625 3,759,625 3,759,625
2 Pemb. Derm. Penyeb. Mangole Tahap IV (Termasuk Supervisi) 1 pkt - - - -
2 Pemb. Derm. Penyeb. Obi Tahap II (Termasuk Supervisi) 1 pkt 5,000,000 5,000,000 5,000,000 5,000,000
Pemb. Derm. Penyeb. Makian Tahap I Lintas Makian - Bastiong (Termasuk
3 1 pkt - - - -
Supervisi)
3 Pemb. Derm. II Penyeb. Bastiong Tahap I Lintas (Termasuk Supervisi) 1 pkt - - - -
Pemb. Derm. Penyeb Makian Thp I Lintas Makian -Bastiong (Termasuk
4 1 pkt - - - -
Supervisi)
- - - - -
8 Pemb. Derm. Penyeb Kayoa Thp I Lintas Kayoa - Bastiong (Termasuk Supervisi) 1 pkt - - - -
Pemb. Derm. Penyeb Gebe Thp I Lintas Patani-Gebe-Sorong (Termasuk
9 1 pkt - - - -
Supervisi)
Pemb. Derm. Penyeb Sanana Selatan Thp I Lintas Sanana Selatan- Teluk Bara
10 1 pkt - - - -
(P. Buru) (Termasuk Supervisi)
Page 70
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
3 Belanja Bahan ATK 1 Th 30,000 30,000 30,000 30,000
4 Belanja Perjalanan Lainnya 1 Th 200,000 200,000 200,000 200,000
5 Belanja Modal Peralatan dan Mesin 2 unit 50,000 - - 50,000 50,000 50,000
A SATKER PENGEMBANGAN LLAJ PAPUA BARAT - - - - 3,229,928 3,229,928 4,782,000 - 4,782,000 8,011,928
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 4,757,000 - 4,757,000 4,757,000
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ, termasuk supervisi
1 Pengadaan dan Pemasangan Marka Jalan
Fak-fak-Kokas 20,000 M 37 740,000 740,000 740,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 2,796,600 2,796,600 - - - 2,796,600
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (8 trayek) 1 TH 2,763,600 2,763,600 2,763,600 2,763,600
Sorong-Aimas II Sp.IV
Sorong-Ketapop
Sorong-Arar
Manokwari-Warmare
Manokwari-SP.IX
Manokwari-Sp.II-Sp.IV
Manokwari-Masni
Manokwari-Momiwaren
2 Belanja Uang Honor Tidak Tetap
Pengawasan Subsidi Operasi Bus Perintis 1 TH 33,000 33,000 33,000 33,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 104,500 104,500 - - - 104,500
1 Sosialisasi Keselamatan LLAJ
Belanja Uang Honor Tidak Tetap
Honorarium Tim Sosialisasi 15 OB 300 4,500 4,500 4,500
2 Belanja Barang Operasional Lainnya
Pengadaan Paket Penunjang Sosialisasi Keselamatan LLAJ 1 PKT 50,000 50,000 50,000 50,000
3 Pengembangan Data Kinerja Perhubungan Darat Prop.Papua Barat -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 328,828 328,828 25,000 - 25,000 353,828
1 Belanja Uang Honor Tidak Tetap 1 TH
- Honor Kuasa Pengguna Anggaran 12 OB 745 8,940 8,940 8,940
- Honor PPK 12 OB 690 8,280 8,280 8,280
- Honor Penguji SPM 12 OB 575 6,900 6,900 6,900
- Honor Bendahara 12 OB 550 6,600 6,600 6,600
- Honor Staf 60 OB 375 22,500 22,500 22,500
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
Page 71
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Manokwari-Jakarta (PP) : 20 OT 5,176 103,520 103,520 103,520
- Penginapan 40 HR 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Tiket Manokwari-Sorong 4 OH 872 3,488 3,488 3,488
- Penginapan 8 OH 300 2,400 2,400 2,400
- Uang Harian 12 OH 300 3,600 3,600 3,600
- Perjalanan ke lokasi 50 OH 300 15,000 15,000 15,000
B SATKER PENGEMBANGAN LLASDP PAPUA BARAT 27,255,372 - - - - 397,395 397,395 26,857,977 - 26,857,977 27,255,372
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 26,857,977 - - - - - - 26,857,977 - 26,857,977 26,857,977
1 Pemb. Der. Penyeb Sorong Tahap VI (Termasuk Supervisi) 1 Pkt 12,857,977 12,857,977 12,857,977 12,857,977
2 Pemb. Der. Penyeb Fak-Fak Thp. IV (Termasuk Supervisi) 1 Pkt 7,000,000 7,000,000 7,000,000 7,000,000
3 Pemb. Der. Penyeb Bintuni Thp. I (Termasuk Supervisi) 1 Pkt - - - -
4 Pemb. Der. Penyeb Waigeo (Raja Ampat) Thp. II (Termasuk Supervisi) 1 Pkt 7,000,000 7,000,000 7,000,000 7,000,000
Pemb. Der. Penyeb Aranday Tahap I Lintas Lintas Aranday-Babo (Termasuk
5 1 Pkt - - - -
Supervisi)
Pemb. Der. Penyeb Inanwatan Tahap I Lintas Inanwatan-Teminabuan dan
6 1 Pkt - - - -
Lintas Inanwatan-Kokas (Termasuk Supervisi)
7 Pemb. Der. Penyeb Missol Tahap I Lintas Missol-Saget (Termasuk Supervisi) 1 Pkt - - - -
Pemb. Dermaga Kayu di Klamono, Beraur, Teluk Arguni & Teluk Etna (Termasuk
1 4 pkt - - - -
desain & supervisi)
2 Pemb. Dermaga Sungai di Konda Tahap I (Sungai Kaibus) 1 pkt - - - -
3 Pemb. Dermaga Sungai di Kais Tahap I (Sungai Kais) 1 pkt - - - -
4 Pemb. Dermaga Sungai di Arranday Tahap I (Sungai Sebyar) 1 pkt - - - -
5 Pemb. Dermaga Sungai di Tembuni Tahap I (Sungai Tembuni) 1 pkt - - - -
Page 72
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 17,525,000 - 17,525,000 17,525,000
Belanja Modal Jalan, Irigasi dan Jaringan
Pengadaan dan Pemasangan Fasilitas Kes. LLAJ Termasuk Supervisi
1 Pengadaan dan Pemasangan Guard Rail
Distrik Sentani Barat - Kemtuk Gresi Kab Jayapura 1,000 M 1,250 1,250,000 1,250,000 1,250,000
Distrik Merauke Kab. Merauke 1,000 M 1,250 1,250,000 1,250,000 1,250,000
Arso-Senggi Kab. Keerom 1,000 M 1,250 1,250,000 1,250,000 1,250,000
Distrik Jayapura Selatan - Distrik Herem Kota Jayapura 1,000 M 1,250 1,250,000 1,250,000 1,250,000
-
2 Pengadaan dan Pemasangan Marka Jalan -
Jayapura-Sentani Kota/Kab. Jayapura 30,000 M 36 1,080,000 1,080,000 1,080,000
Distrik Merauke Kab. Merauke 20,000 M 36 720,000 720,000 720,000
-
2 Pengadaan dan Pemasangan RPPJ -
Jayapura-Sentani 30 BH 9,500 285,000 285,000 285,000
Distrik Merauke Kab. Merauke 20 BH 9,500 190,000 190,000 190,000
3 Pembangunan Terminal :
- Terminal ALBN di Enrope, Papua Tahap I 1 PKT 10,250,000 10,250,000 10,250,000 10,250,000
-
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 8,233,080 8,233,080 - - - 8,233,080
Belanja Barang Operasional Lainnya
1 Subsidi Operasi Bus Perintis (21 trayek) 1 TH 8,197,080 8,197,080 8,197,080 8,197,080
Lokasi Jayapura
Lokasi Merauke
Lokasi Biak
Lokasi Nabire
Lokasi Serui
Lokasi Timika
2 Belanja Uang Honor Tidak Tetap
-Pengawasan Subsidi Operasi Bus Perintis 1 TH 36,000 36,000 36,000 36,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 50,000 50,000 - - - 50,000
1 Pengembangan Data Kinerja Perhubungan Darat Prop.Papua -
-. Honorarium (4 orang x 4 bulan) 16 OB 400 6,400 6,400 - - - 6,400
Belanja Bahan
-. Pengadaan ATK 4 Trwl 2,000 8,000 8,000 8,000
Belanja Barang Operasional Lainnya
-. Biaya Rapat, Buku Laporan, dll 4 Trwl 8,900 35,600 35,600 35,600
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 427,424 427,424 25,000 - 25,000 452,424
1 Belanja Uang Honor Tidak Tetap
- Honor Kuasa Pengguna Anggaran 12 OB 920 11,040 11,040 11,040
- Honor PPK 12 OB 800 9,600 9,600 9,600
- Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf 60 OB 460 27,600 27,600 27,600
- Honor SAI 36 OB 350 12,600 12,600 12,600
- Honor Panitia Lelang 1 TH 20,000 20,000 20,000 20,000
2 Belanja Bahan
- Biaya lelang, pencetakan, penggandaan, operasional, dll 1 TH 20,000 20,000 20,000 20,000
- Biaya pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
3 Belanja Barang Non Operasional Lainnya - -
- Sewa kendaraan roda 4 5 BLN 5,000 25,000 25,000 25,000
4 Belanja Modal Peralatan dan Mesin
- Pengadaan Notebook 1 UNIT 25,000 25,000 25,000 25,000
5 Belanja Perjalanan Lainnya
- Tiket Jayapura-Jakarta (PP) : 20 OT 8,266 165,320 165,320 165,320
- Penginapan 40 OH 450 18,000 18,000 18,000
- Uang Harian 60 OH 450 27,000 27,000 27,000
- Perjalanan ke lokasi 50 OH 240 12,000 12,000 12,000
- Tiket Jayapura-Merauke (PP) : 3 OT 1,578 4,734 4,734 4,734
- Penginapan 8 OH 300 2,400 2,400 2,400
- Uang Harian 9 OH 300 2,700 2,700 2,700
Page 73
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Tiket Jayapura-Biak-Serui (PP) : 3 OT 2,200 6,600 6,600 6,600
- Penginapan 8 OH 450 3,600 3,600 3,600
- Uang Harian 9 OH 450 4,050 4,050 4,050
- Tiket Jayapura-Biak-Nabire (PP) : 3 OT 2,400 7,200 7,200 7,200
- Penginapan 8 OH 300 2,400 2,400 2,400
- Uang Harian 9 OH 300 2,700 2,700 2,700
B SATKER PENGEMBANGAN LLASDP PAPUA 21,723,173 - - - - 340,195 340,195 21,382,978 - 21,382,978 21,723,173
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 19,356,378 - - - - - - 19,356,378 - 19,356,378 19,356,378
1 Pemb. Der. Penyeb Pamako Kab. Timika Thp. III (Termasuk Supervisi 2,5 %) 1 Pkt 4,000,000 4,000,000 4,000,000 4,000,000
Pemb. Kapal Penyeb Perintis 500 GT Lintas Nabire-Manokwari Thp III Selesai
1 1 unit 15,356,378 15,356,378 15,356,378 15,356,378
(Termasuk Supervisi)
Pemb, Bus Air Kapasitas 50 Penumpang untuk Kab. Mapi & Bovendigul
2 2 unit - - - -
(Termasuk Supervisi)
SEKRETARIAT DITJEN PERHUBUNGAN DARAT 31,735,789 - 31,735,789 16,108,331 13,413,805 29,522,136 1,953,680 - 1,953,680 63,211,605
Page 74
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK 31,735,789 - 31,735,789 16,108,331 1,236,157 17,344,488 1,953,680 - 1,953,680 51,033,957
0001 PEMBAYARAN GAJI, LEMBUR, HONORARIUM DAN VAKASI
Belanja Gaji Pokok PNS 1 TH 12,202,962 12,202,962 12,202,962 12,202,962
Belanja Gaji Pokok PNS (Gaji ke 13) 1 BLN 1,022,019 1,022,019 1,022,019 1,022,019
Kenaikan Gaji PNS 1 TH 661,250 661,250 661,250 661,250
Belanja Pembulatan Gaji PNS 1 TH 308 308 308 308
Belanja Pembulatan Gaji PNS (Gaji ke 13) 1 TH 26 26 26 26
Belanja Tunjangan Suami/Isteri PNS 1 TH 853,324 853,324 853,324 853,324
Belanja Tunjangan Suami/Isteri PNS (Gaji ke 13) 1 TH 71,535 71,535 71,535 71,535
Kenaikan Gaji PNS 1 TH 46,243 46,243 46,243 46,243
Belanja Tunjangan Anak PNS 1 TH 246,581 246,581 246,581 246,581
Belanja Tunjangan Anak PNS (Gaji ke 13) 1 TH 20,666 20,666 20,666 20,666
Kenaikan Gaji PNS 1 TH 13,363 13,363 13,363 13,363
Belanja Tunjangan Struktural PNS 1 TH 895,400 895,400 895,400 895,400
Belanja Tunjangan Struktural PNS (Gaji ke 13) 1 TH 74,120 74,120 74,120 74,120
Belanja Tunjangan Fungsional PNS 1 TH 219,035 219,035 219,035 219,035
Belanja Tunjangan Fungsional PNS (Gaji ke 13) 1 TH 18,430 18,430 18,430 18,430
Belanja Tunjangan PPh PNS 1 TH 408,766 408,766 408,766 408,766
Belanja Tunjangan PPh PNS (Gaji ke 13) 1 TH 34,204 34,204 34,204 34,204
Belanja Beras PNS 1 TH 674,182 674,182 674,182 674,182
Belanja Uang Makan PNS 1 TH 2,880,000 2,880,000 2,880,000 2,880,000
Tunjangan Umum PNS 1 TH 861,520 861,520 861,520 861,520
Tunjangan Umum PNS (Gaji ke 13) 1 TH 72,000 72,000 72,000 72,000
Belanja Lembur Golongan I 1 TH 2,520 2,520 2,520 2,520
Belanja Lembur Golongan II 1 TH 379,080 379,080 379,080 379,080
Belanja Lembur Golongan III 1 TH 1,500,840 1,500,840 1,500,840 1,500,840
Belanja Lembur Golongan IV 1 TH 229,320 229,320 229,320 229,320
Uang Makan Lembur 1 TH 2,160,000 2,160,000 2,160,000 2,160,000
Belanja Transito 1 TH 6,188,095 6,188,095 6,188,095 6,188,095
0026 POLIKLINIK/OBAT-2AN (TERMASUK HONOR DOKTER DAN PERAWAT)
Belanja Barang Operasional Lainya
Poliklinik/ Obat-obatan/ Honorarium Dokter dan Perawat 1 TH 255,834 255,834 255,834 255,834
Belanja Modal dan Peralatan Mesin
Pengadaan Panoramik Dental (Alat Rontgen) 1 UNIT 450,000 450,000 450,000 450,000
Pengadaan Alat Pisus Mata 1 UNIT 5,500 5,500 5,500 5,500
Pengadaan Alat Centrifuge 1 UNIT 5,200 5,200 5,200 5,200
Pengadaan Shaker Rotator 1 UNIT 3,500 3,500 3,500 3,500
Pengadaan Alat Penghancur Jarum 1 UNIT 2,500 2,500 2,500 2,500
Pengadaan Alat Tensimeter (standing type) 1 UNIT 7,500 7,500 7,500 7,500
Pengadaan Alat Timbang Badan dan Tinggi Badan 1 SET 1,500 1,500 1,500 1,500
Pengadaan Alat Otoskap 1 UNIT 1,100 1,100 1,100 1,100
Page 75
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pengadaan Software (Aplikasi Perkantoran) 5 PKT 7,500 37,500 37,500 37,500
0926 PENGADAAN PERALATAN KANTOR (INVENTARIS KANTOR)
Belanja Modal Peralatan dan Mesin
Pengadaan Handy Cam 1 UNIT 40,000 40,000 40,000 40,000
Pengadaan Kamera Digital 1 UNIT 20,000 20,000 20,000 20,000
Pengadaan Sound System dan TOA untuk SKJ 1 PKT 20,000 20,000 20,000 20,000
Pengadaan Alat Penyimpan Arsip 1 PKT 100,000 100,000 100,000 100,000
Pengadaan AC 1,5 PK/1,5 PK/2 PK/2,5 PK 5 UNIT 19,500 97,500 97,500 97,500
Pengadaan Alat Penghancur Kertas 5 UNIT 5,000 25,000 25,000 25,000
Pengadaan Mesin Tik Elektronik 4 UNIT 11,000 44,000 44,000 44,000
Pengadaan Exhaust Fan 5 UNIT 500 2,500 2,500 2,500
Pengadaan Mesin Penghitung Uang 1 UNIT 40,755 40,755 40,755 40,755
Pengadaan Camera Saku 3 UNIT 4,500 13,500 13,500 13,500
Pengadaan Alat Perekam Suara 5 UNIT 3,000 15,000 15,000 15,000
Pengadaan alat komunikasi 1 PKT 50,000 50,000 50,000 50,000
Pengadaan LCD Projector 1 UNIT 20,000 20,000 20,000 20,000
Pengadaan Kursi Rapat Dirjen 1 SET 45,000 45,000 45,000 45,000
Pengadaan Kursi Hadap/Rapat 10 UNIT 500 5,000 5,000 5,000
Pengadaan Meja Rapat 1 SET 20,000 20,000 20,000 20,000
1138 PERAWATAN KENDARAAN BERMOTOR RODA 4/6/10
Belanja Biaya Pemeliharaan Peralatan dan Mesin
Perawatan Kendaraan Operasional R-4 8 UNIT 16,350 130,800 130,800 130,800
Perawatan Kendaraan Operasional R-6 5 UNIT 18,000 90,000 90,000 90,000
2007 LANGGANAN DAYA DAN JASA
Belanja Langganan Daya dan Jasa
- Langganan Daya dan Jasa 1 TH 1,836,000 1,836,000 1,836,000 1,836,000
4863 OPERASIONAL PERKANTORAN DAN PIMPINAN
Honor yang terkait dengan operasional satuan kerja
- KPA 12 OB 1,145 13,740 13,740 13,740
- Pejabat Pembuat Komitmen 12 OB 975 11,700 11,700 11,700
- Pejabat Penguji SPM 12 OB 860 10,320 10,320 10,320
- Bendahara 12 OB 800 9,600 9,600 9,600
- Staff Pengelola 60 OB 575 34,500 34,500 34,500
- SAI 36 OB 500 18,000 18,000 18,000
- Pejabat Pengadaan 12 OB 500 6,000 6,000 6,000
- Panitia Pengadaan 19 OP 500 9,500 9,500 9,500
- Panitia Serah Terima 1 TH 10,405 10,405 10,405 10,405
- Honorarium Pengemudi (8 orang) 96 OB 850 81,600 81,600 81,600
Belanja Barang Operasional Lainnya
Operasional kendaraan antar jemput karyawan (R6) 5 UNIT 28,200 141,000 141,000 141,000
Oerasional kendaraan Roda 4 (R4) 10 UNIT 10,800 108,000 108,000 108,000
0011 PENDIDIKAN DAN PELATIHAN STRUKTURAL
Belanja Barang Operasional Lainya
Pendidikan dan Pelatihan Struktural 1 TH 34,370 34,370 34,370 34,370
0012 PENDIDIKAN DAN PELATIHAN TEKNIS
Belanja Barang Operasional Lainya 1 TH 93,000 93,000 93,000 93,000
Honor yang terkait dengan output kegiatan 1 TH - - -
Belanja Perjalanan Peserta 1 TH 89,482 89,482 89,482 89,482
0029 PEMBINAAN ADMINISTRASI PENGELOLAAN KEPEGAWAIAN
Penataan Nomenklatur Jabatan Teknis dan Penyempurnaan Uraian
a 1 KGT
Jabatan/Pekerjaan Direktorat Jenderal Perhubungan Darat
Belanja Barang Operasional Lainya 1 TH 5,500 5,500 5,500 5,500
Perjalanan Dinas 1 TH 96,900 96,900 96,900 96,900
b Monitoring UPT dan Eks UPT Direktorat Jenderal Phbd. 1 KGT
Belanja Barang Operasional Lainya 1 TH 5,500 5,500 5,500 5,500
Perjalanan Dinas 1 TH 96,678 96,678 96,678 96,678
Peningkatan Kualitas Mental dan Spiritual Pegawai Direktorat Jenderal
c 1 KGT
Perhubungan Darat (Metode ESQ)
Belanja Barang Operasional Lainya 1 TH 249,000 249,000 249,000 249,000
d Peningkatan Disiplin dan Jiwa Korsa Pegawai Ditjen Perhubungan Darat 1 KGT
Belanja Barang Operasional Lainya 1 TH 410,965 410,965 410,965 410,965
e Monitoring dan Evaluasi Pelaksanaan Jabatan Fungsional PKB 1 KGT
Belanja Barang Operasional Lainya 1 TH 3,000 3,000 3,000 3,000
Perjalanan Dinas 1 TH 82,106 82,106 82,106 82,106
f Penyelenggaraan Pengadaan CPNS Formasi Tahun 2010 1 KGT
Belanja Barang Operasional Lainya 1 TH 120,325 120,325 120,325 120,325
Honor 1 TH 9,000 9,000 9,000 9,000
Page 76
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Perjalanan Dinas 1 TH 11,400 11,400 11,400 11,400
g Penyus Standar Kompet Jab Aparatur Perhubungan Bid Lalu Lintas 1 KGT
Belanja Barang Operasional Lainya 1 TH 6,000 6,000 6,000 6,000
Perjalanan Dinas 1 TH 132,964 132,964 132,964 132,964
h Penyusunan Jabatan Fungsional Bidang Lalu Lintas Jalan 1 KGT
Belanja Barang Operasional Lainya 1 TH 51,925 51,925 51,925 51,925
Honor 1 TH 6,000 6,000 6,000 6,000
Perjalanan Dinas 1 TH 28,850 28,850 28,850 28,850
i Pembekalan Pegawai Yang Akan Memasuki Masa Purna Bakti 1 KGT
Honor 1 TH 20,000 20,000 20,000 20,000
Belanja Barang Operasional Lainya 1 TH 112,400 112,400 112,400 112,400
Perjalanan Dinas 1 TH 20,195 20,195 20,195 20,195
j Peningk. Kualitas dan Kinerja SDM Phbd di Bid. Perenc. Angk. Umum 1 KGT
Belanja Barang Operasional Lainya 1 TH 64,812 64,812 64,812 64,812
Honor yang terkait output kegiatan 1 TH 14,725 14,725 14,725 14,725
Honor narasumber/pembicara 1 TH 20,850 20,850 20,850 20,850
Perjalanan Dinas 1 TH 87,000 87,000 87,000 87,000
k Peningk. Kualitas dan Kinerja SDM Phbd di Bid. Manajemen RLL 1 KGT
Belanja Barang Operasional Lainya 1 TH 64,812 64,812 64,812 64,812
Honor yang terkait output kegiatan 1 TH 14,725 14,725 14,725 14,725
Honor narasumber/pembicara 1 TH 20,850 20,850 20,850 20,850
Perjalanan Dinas 1 TH 87,000 87,000 87,000 87,000
l Peningk. Kualitas dan Kinerja SDM Phbd di Bidang PKB 1 KGT
Belanja Barang Operasional Lainya 1 TH 64,812 64,812 64,812 64,812
Honor yang terkait output kegiatan 1 TH 14,725 14,725 14,725 14,725
Honor narasumber/pembicara 1 TH 20,850 20,850 20,850 20,850
Perjalanan Dinas 1 TH 87,000 87,000 87,000 87,000
m Pembekalan dan Ujian Sertifikasi Pengadaan Barang dan Jasa 1 KGT
Belanja Barang Operasional Lainya 1 TH 36,730 36,730 36,730 36,730
Honor yang terkait output kegiatan 1 TH 6,000 6,000 6,000 6,000
Honor narasumber/pembicara 1 TH 16,250 16,250 16,250 16,250
0050 PENYUS/PENGUMP/PENGOLAH/UPDATING/ANAL DATA DAN STATIST
Penyus/Pengump/Pengolah/Updating/ Analisa Data/ dan Statistik
Belanja Barang Operasional Lainya 1 TH 17,400 17,400 17,400 17,400
Perjalanan Dinas 1 TH 60,585 60,585 60,585 60,585
a Penataan Kearsipan 1 KGT
Belanja Barang Operasional Lainya 1 TH 24,450 24,450 24,450 24,450
Perjalanan Dinas 1 TH 35,760 35,760 35,760 35,760
0061 PENYELENGGARAAN HUMAS/ PROTOKOL/PEMBERITAAN
b Dokumentasi
Belanja Barang Operasional Lainya 1 TH 7,590 7,590 7,590 7,590
Belanja Perjalanan 1 TH 7,000 7,000 7,000 7,000
c Jumpa Pers/Siaran Pers
Belanja Barang Operasional Lainya 1 TH 20,000 20,000 20,000 20,000
Belanja Perjalanan 1 TH 20,000 20,000 20,000 20,000
d Liputan Pers
Belanja Perjalanan Dinas 1 TH 20,000 20,000 20,000 20,000
e Pameran/Visualisasi
Belanja Barang Operasional Lainya 1 TH 20,000 20,000 20,000 20,000
Belanja Perjalanan 1 TH 20,000 20,000 20,000 20,000
f Langganan Koran
Belanja Barang Operasional Lainya 1 TH 30,000 30,000 30,000 30,000
g Penerbitan News Letter Info Hubdat
Belanja Barang Operasional Lainya 1 TH 180,000 180,000 180,000 180,000
Belanja Perjalanan Dinas 1 TH 113,760 113,760 113,760 113,760
Belanja Honor 1 TH 100,000 100,000 100,000 100,000
RAPAT-RAPAT KOORDINASI/ KERJA/ DINAS/ PIMPINAN KELOMPOK
0088
KERJA/KONSULTASI
Rakornis Ditjen Hubdat dan Rapat Kerja Lainnya 1 KGT 400,000 400,000 400,000 400,000
Belanja Perjalanan Dinas 1 KGT 500,000 500,000 500,000 500,000
0099 SEWA JARINGAN TELEKOMUNIKASI (LEASED CHANNEL) SATELITE
Jasa Sewa Jaringan Internet untuk Website Ditjen Hubdat 12 BLN 50,000 600,000 600,000 600,000
0101 PEMBERIAN TANDA JASA/ PENGHARGAAN/ KEHORMATAN
Wahana Tata Nugraha 1 KGT
Belanja Barang Operasional Lainya 1 TH
Acara di Istana Negara 1 HR 7,000 7,000 7,000 7,000
Konsumsi 1 HR 11,250 11,250 11,250 11,250
Page 77
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Publikasi 1 TH 8,000 8,000 8,000 8,000
Rapat 1 TH 3,625 3,625 3,625 3,625
Perlengkapan dan ATK 1 TH 90,125 90,125 90,125 90,125
Honor 1 TH 60,000 60,000 60,000 60,000
Perjalanan Dinas 1 TH 800,000 800,000 800,000 800,000
0113 PEMBERANTASAN KORUPSI
Rencana Aksi Nasional Pemberantasan korupsi (RAN-PK) 1 KGT
Honor 1 TH 63,000 63,000 63,000 63,000
Belanja Barang Operasional Lainya 1 TH 6,750 6,750 6,750 6,750
Perjalanan Dinas 1 TH 99,000 99,000 99,000 99,000
0114 KOORD PENYUS PERAT PER UU-AN DAN BANTUAN HUKUM
Penyuluhan Peraturan Perundang-undangan
Belanja Barang Operasional Lainya 1 TH 250,000 250,000 250,000 250,000
Pembuatan Bahan Penyuluhan
Belanja Barang Operasional Lainya 1 TH 150,000 150,000 150,000 150,000
Pertimbangan Bantuan Hukum
Belanja Barang Operasional Lainya 1 TH 2,460 2,460 2,460 2,460
Koordinasi Penyus Per-UUan dan Verifikasi Perda dan Raperda
Belanja Barang Operasional Lainya 1 TH 100,000 100,000 100,000 100,000
Pembuatan Buku UU
Belanja Barang Operasional Lainya 1 TH 211,479 211,479 211,479 211,479
Terjemahan Buku UU kedalam Bahasa Inggris
Belanja Barang Operasional Lainya 1 TH 100,000 100,000 100,000 100,000
Penyusunan RPP Bidang LLAJ dan LLASDP
Belanja Barang Operasional Lainya 1 TH 200,000 200,000 200,000 200,000
Honorarium Tim Verifikasi Perda dan Raperda 1 TH 100,000 100,000 100,000 100,000
Honorarium Tim Penyusun RPP Bidang LLAJ dan Bidang LLASDP 1 TH 200,000 200,000 200,000 200,000
Perjalanan Dinas
Penyuluhan Peraturan Perundang-undangan 1 TH 130,000 130,000 130,000 130,000
Pertimbangan Bantuan Hukum 1 TH 22,400 22,400 22,400 22,400
Koordinasi Penyus Per-UUan dan Verifikasi Perda dan Raperda 1 TH 473,424 473,424 473,424 473,424
Penyusunan RPP Bidang LLAJ dan LLASDP 1 TH 200,000 200,000 200,000 200,000
00116 Pembinaan Administrasi dan Pengelolaan Keuangan 1 KGT
Belanja Barang Operasional Lainya 1 TH 42,600 42,600 42,600 42,600
Perjalanan Dinas 1 TH 392,243 392,243 392,243 392,243
Penataan Administrasi BMKN dan Serah Terima Proyek 1 KGT
Belanja Barang Operasional Lainya 1 TH 85,750 85,750 85,750 85,750
Honor 1 TH 80,250 80,250 80,250 80,250
Perjalanan Dinas 1 TH 561,000 561,000 561,000 561,000
0018 Pembinaan Penerimaan Bukan Pajak (PNBP) 1 KGT
Belanja Barang Operasional Lainya 1 TH 35,000 35,000 35,000 35,000
Perjalanan Dinas 1 TH 65,000 65,000 65,000 65,000
0116 PEMBINAAN ADMINISTRASI DAN PENGELOLAAN PERLENGKAPAN
Penataan Administrasi BMN Kantor Pusat Ditjen Hubdat 1 KGT
Belanja Barang Operasional Lainya 1 TH 10,000 10,000 10,000 10,000
Perjalanan Dinas 1 TH 23,080 23,080 23,080 23,080
Penataan Administrasi Untuk Pengusulan Penghapusan Barang Milik Kekayaan
B 1 KGT
Negara Kantor Pusat Ditjen Hubdat
Belanja Barang Operasional Lainya 1 TH 10,000 10,000 10,000 10,000
Perjalanan Dinas 1 TH 46,160 46,160 46,160 46,160
0474 PENCETAKAN/ PENERBITAN/ PENGGANDAAN/ LAMINASI
Belanja Barang Operasional Lainya
Pencetakan/ Penerbitan/ Penggandaan/ Laminasi/ Pelelangan 1 TH 742,450 742,450 742,450 742,450
Pencetakan Plakat Kantor Ditjen Hubdat 20 BH 1,500 30,000 30,000 30,000
Page 78
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
0040 PENGEMBANGAN SISTEM INFORMASI MANAJEMEN
Belanja Barang Operasional Lainnya
Pembangunan Sistem Informasi 1 PKT 50,000 50,000 50,000 50,000
Pemeliharaan Jaringan Sistem Informasi 1 PKT 50,000 50,000 50,000 50,000
Pengembangan Sistem Informasi 1 PKT 50,000 50,000 50,000 50,000
Pengendalian Operasional Sistem Informasi 1 PKT 50,000 50,000 50,000 50,000
Bantuan Teknis 1 PKT 50,000 50,000 50,000 50,000
Pengembangan Data Perhubungan Darat 1 PKT
Belanja Barang Operasional Lainnya 1 PKT 45,550 45,550 45,550 45,550
Honor 1 TH 24,600 24,600 24,600 24,600
Perjalanan 1 TH 179,850 179,850 179,850 179,850
00054 Penyusunan Detail Desain
Belanja Modal Fisik Lainnya 1 KGT
Penyusunan Desain Penataan Ruang Kantor Pusat Ditjen Hubdat 1 TH 50,000 50,000 50,000 50,000
PEMBINAAN PROGRAM
Penyusunan Program dan RKAKL 1 KGT
Belanja Barang Operasional Lainya 1 TH 90,000 90,000 90,000 90,000
Perjalanan Dinas 1 TH 175,000 175,000 175,000 175,000
Pengadaan Notebook 2 UNIT 20,000 - 40,000 40,000 40,000
Integritas Perencanaan, Pelaksanaan dan Evaluasi 1 KGT -
Belanja Barang Operasional Lainya 1 TH 71,157 71,157 71,157 71,157
Perjalanan Dinas 1 TH 200,000 200,000 200,000 200,000
Pembinaan Program dan Rencana Kerja 1 KGT -
Perjalanan Dinas 1 TH 200,000 200,000 200,000 200,000
0926 PENGADAAN KENDARAAN OPERASIONAL
Belanja Modal Peralatan dan Mesin
Pengadaan Kendaraan Operasional Khusus Model Pick Up 1 UNIT 175,000 175,000 175,000 175,000
Pengadaan Kendaraan Operasional Khusus Pengangkut Arsip Inaktive 1 UNIT 200,000 200,000 200,000 200,000
Pengadaan Kendaraan Operasional Roda-2 untuk Juru Surat 2 UNIT 20,000 40,000 40,000 40,000
Page 79
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor 1 TH 13,150 13,150 13,150 13,150
Belanja Barang Operasional Lainya 1 TH 4,075 4,075 4,075 4,075
Perjalanan Dinas 1 TH 62,775 62,775 62,775 62,775
Evaluasi Jaringan Trayek dan Kebutuhan AKAP 1 KGT
Belanja Barang Operasional Lainya 1 TH 1,875 1,875 1,875 1,875
Perjalanan Dinas 1 TH 68,871 68,871 68,871 68,871
Monitoring Tarif Angk Penump dan Barang Per-Kuartal Tahap I dan II 1 KGT
Belanja Barang Operasional Lainya 1 TH 25,350 25,350 25,350 25,350
Perjalanan Dinas 1 TH 74,650 74,650 74,650 74,650
Pembinaan dan Sosialisasi Jemb Timbang 1 KGT
Honor 1 TH 5,200 5,200 5,200 5,200
Belanja Barang Operasional Lainya 1 TH 8,500 8,500 8,500 8,500
Perjalanan Dinas 1 TH 36,300 36,300 36,300 36,300
Pembin Pelak Prod K B dlm Penerap Sertifikat Regristrasi Uji Tipe 1 KGT
Belanja Barang Operasional Lainya 1 TH 8,500 8,500 8,500 8,500
Perjalanan Dinas 1 TH 36,250 36,250 36,250 36,250
Penetapan Perintah atau Larangan pd Ruas Jalan Tol Thp I 1 KGT
Honor 1 TH 3,200 3,200 3,200 3,200
Belanja Barang Operasional Lainya 1 TH 8,500 8,500 8,500 8,500
Perjalanan Dinas 1 TH 28,300 28,300 28,300 28,300
Survey Jarak Trayek (AKAP) di P Bali dan Lombok 1 KGT
Belanja Barang Operasional Lainya 1 TH 1,575 1,575 1,575 1,575
Perjalanan Dinas 1 TH 41,650 41,650 41,650 41,650
Semiloka Peningkatan Pelayanan Angkutan Jalan Antar Kota T.A 2010 1 KGT
Honor 1 TH 17,400 17,400 17,400 17,400
Belanja Barang Operasional Lainya 1 TH 15,600 15,600 15,600 15,600
Perjalanan Dinas 1 TH 67,000 67,000 67,000 67,000
Pelaksanaan Pemilihan Pengusaha Angkutan (AKAP) T.A 2010 1 KGT
Belanja Barang Operasional Lainya 1 TH 1,915 1,915 1,915 1,915
Perjalanan Dinas 1 TH 94,198 94,198 94,198 94,198
Sosialiasai/Lokakarya Pengujian Kend Bermotor T.A 2010 1 KGT
Honor 1 TH 20,000 20,000 20,000 20,000
Belanja Barang Operasional Lainya 1 TH 10,800 10,800 10,800 10,800
Perjalanan Dinas 1 TH 64,700 64,700 64,700 64,700
Pemilihan Penguji Kendaraan Bermotor Teladan (PKBT) Nasional T.A 2010 1 KGT
Honor 1 TH 32,500 32,500 32,500 32,500
Belanja Barang Operasional Lainya 1 TH 117,129 117,129 117,129 117,129
Pembinaan dan Monitoring Pelaksanaan Penelitian Rancang Bangun dan
Rekayasa Kendaraan Bermotor serta SRUT di Dishub Prop T.A 2010 1 KGT
Page 80
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
2 Evaluasi Kinerja Pelayanan Jaringan jalan di Wilayah Perkotaan 1 KGT
Honor 1 TH 9,500 9,500 9,500 9,500
Belanja Barang Operasional Lainya 1 TH 17,860 17,860 17,860 17,860
Perjalanan Dinas 1 TH 152,640 152,640 152,640 152,640
3 Analisis Kinerja Pelayanan Angkutan Umum di Kawasan Perkotaan 1 KGT
Honor 1 TH 6,000 6,000 6,000 6,000
Belanja Barang Operasional Lainya 1 TH 12,000 12,000 12,000 12,000
Perjalanan Dinas 1 TH 101,900 101,900 101,900 101,900
Survei Monitoring Pelayanan Angkutan Umum di Wilayah Perkotaan pada masa
4 1 KGT
Angkutan Lebaran 2009
Honor 1 TH 18,000 18,000 18,000 18,000
Belanja Barang Operasional Lainya 1 TH 36,000 36,000 36,000 36,000
Perjalanan Dinas 1 TH 306,000 306,000 306,000 306,000
5 Pembinaan Kota-Kota Percontohan di Bidang Transportasi Perkotaan 1 KGT
Honor 1 TH 10,800 10,800 10,800 10,800
Belanja Barang Operasional Lainya 1 TH 18,700 18,700 18,700 18,700
Perjalanan Dinas 1 TH 170,500 170,500 170,500 170,500
6 Konsolidasi Penanganan Masalah Transportasi di Wilayah Perkot 1 KGT
Honor 1 TH 12,000 12,000 12,000 12,000
Belanja Barang Operasional Lainya 1 TH 23,950 23,950 23,950 23,950
Perjalanan Dinas 1 TH 204,050 204,050 204,050 204,050
7 Monitoring Pelayanan SAUM (Sistem Angkutan Umum Massal) 1 KGT
Honor 1 TH 6,600 6,600 6,600 6,600
Belanja Barang Operasional Lainya 1 TH 13,469 13,469 13,469 13,469
Perjalanan Dinas 1 TH 113,475 113,475 113,475 113,475
8 Penilaian Kinerja Pelayanan Angkutan Umum di Kawasan Perkot 1 KGT
Honor 1 TH 6,000 6,000 6,000 6,000
Belanja Barang Operasional Lainya 1 TH 12,000 12,000 12,000 12,000
Perjalanan Dinas 1 TH 102,000 102,000 102,000 102,000
9 Monit Kinerja Pelayanan Angk Pemadu Moda Transp. Perkotaan 1 KGT
Honor 1 TH 6,000 6,000 6,000 6,000
Belanja Barang Operasional Lainya 1 TH 12,000 12,000 12,000 12,000
Perjalanan Dinas 1 TH 102,000 102,000 102,000 102,000
10 Sosialisasi Kebijakan Pemadu Moda Transportasi Perkotaan 1 KGT
Honor 1 TH 9,000 9,000 9,000 9,000
Belanja Barang Operasional Lainya 1 TH 18,000 18,000 18,000 18,000
Perjalanan Dinas 1 TH 153,000 153,000 153,000 153,000
11 Pemantauan Kinerja & Identifikasi Fasilitas Angkutan Taksi 1 KGT
Honor 1 TH 6,480 6,480 6,480 6,480
Belanja Barang Operasional Lainya 1 TH 13,000 13,000 13,000 13,000
Perjalanan Dinas 1 TH 110,520 110,520 110,520 110,520
Analisis Pemanfaatn BBG dikaitkan jaringan trayek angkutan umum di wilayah
12 1 KGT
Kota Banten
Honor 1 TH 8,500 8,500 8,500 8,500
Belanja Barang Operasional Lainya 1 TH 9,730 9,730 9,730 9,730
Perjalanan Dinas 1 TH 81,770 81,770 81,770 81,770
13 Analisis Pemanf BBG yg dikaitkan dg Jar Tray Angk Um di Batam 1 KGT
Honor 1 TH 8,500 8,500 8,500 8,500
Belanja Barang Operasional Lainya 1 TH 9,614 9,614 9,614 9,614
Perjalanan Dinas 1 TH 121,886 121,886 121,886 121,886
14 Sos. Penanganan Dampak Transp di 2 Kota (Kota Kupang & Padang) 1 KGT
Honor 1 TH 28,800 28,800 28,800 28,800
Belanja Barang Operasional Lainya 1 TH 90,726 90,726 90,726 90,726
Perjalanan Dinas 1 TH 60,474 60,474 60,474 60,474
Monitoring & Evaluasi Penggunaan Converter Kit Pada Angkutan Umum di Kota
15 1 KGT
Pelembang, DKI Jakarta dan Bogor
Honor 1 TH 12,150 12,150 12,150 12,150
Belanja Barang Operasional Lainya 1 TH 20,154 20,154 20,154 20,154
Perjalanan Dinas 1 TH 217,696 217,696 217,696 217,696
16 Penyusunan Laporan Kinerja& Program Transportasi Perkotaan 1 KGT
Honor 1 TH 66,000 66,000 66,000 66,000
Belanja Barang Operasional Lainya 1 TH 4,600 4,600 4,600 4,600
Perjalanan Dinas 1 TH 129,500 129,500 129,500 129,500
Page 81
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Page 82
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Penyusunan Data Jaringan Transp Sungai dan Danau Tahun 2010 1 KGT 18,800 18,800 18,800 18,800
Belanja Perjalanan Biasa
Analisis dan Evaluasi Kinerja Lintas Penyeberangan Tahun 2010 1 KGT 136,200 136,200 136,200 136,200
Bimbingan Teknis Penetapan Lintas Penyeb (Permulaan) Tahun 2010 1 KGT 110,700 110,700 110,700 110,700
Lakip, penetapan kinerja,laporan tahunan dan PDDA Dit.LLASDP 2010 1 KGT 31,400 31,400 31,400 31,400
Penyusunan Data Jaringan Transp Sungai dan Danau Tahun 2010 1 KGT 131,200 131,200 131,200 131,200
2 Sarana Angkutan SDP
Belanja Barang operasional Lainnya
Evaluasi Kinerja Ops Sarana Angkutan Penyeb Tahun 2010 1 KGT 2,100 2,100 2,100 2,100
Penyusunan Pedoman Regristasi Sarana ASD Tahun 2010 1 KGT 900 900 900 900
Pemantauan Pelaks Docking Kapal Penyeb di Lintas Komersiil Th 2010 1 KGT 900 900 900 900
Belanja Perjalanan Biasa
Evaluasi Kinerja Operasional Sarana Angkutan Penyeb Tahun 2009 1 KGT 149,932 149,932 149,932 149,932
Penyusunan Pedoman Regristasi Sarana ASD Tahun 2010 1 KGT 35,694 35,694 35,694 35,694
Pemantauan Pelaks Docking Kapal Penyeb di Lintas Komersiil Th 2010 1 KGT 49,960 49,960 49,960 49,960
3 Pelabuhan SDP
Belanja Barang operasional Lainnya
Pemantauan Kinerja Pelabuhan SDP Tahun 2010 1 KGT 14,160 14,160 14,160 14,160
Pemantauan Pemeliharaan Pel Penyeb Yang Diusahakan Tahun 2010 1 KGT 18,704 18,704 18,704 18,704
Sosialisasi Pedoman Teknis Pengoperasian Pel Penyeb Tahun 2010 1 KGT 14,210 14,210 14,210 14,210
Peningkatan SDM Kepelabuhan di Bidang GIS 1 KGT 50,000 50,000 50,000 50,000
Evaluasi Management UPT LLASDP Tahun 2010 1 KGT 2,750 2,750 2,750 2,750
Belanja Perjalanan Biasa
Pemantauan Kinerja Pelabuhan SDP Tahun 2010 1 KGT 107,228 107,228 107,228 107,228
Pemantauan Pemeliharaan Pel Penyeb Yang Diusahakan Tahun 2010 1 KGT 157,800 157,800 157,800 157,800
Sosialisasi Pedoman Teknis Pengoperasian Pel Penyeb Tahun 2010 1 KGT 153,070 153,070 153,070 153,070
Evaluasi Management UPT LLASDP Tahun 2010 1 KGT 122,250 122,250 122,250 122,250
4 Lalu Lintas SDP
Belanja Barang operasional Lainnya
Survey Evaluasi Kinerja Manajemen LL Penyeberangan 1 KGT 11,050 11,050 11,050 11,050
Sosialisasi Pedoman Teknis Bidang LLASDP 1 KGT 11,265 11,265 11,265 11,265
Survey Evaluasi Kinerja Manajemen LL Sungai Danau Tahun 2010 1 KGT 11,150 11,150 11,150 11,150
Belanja Perjalanan Biasa
Evaluasi Kinerja Manajemen Lalu Lintas Penyeberangan 1 KGT 139,213 139,213 139,213 139,213
Sosialisasi Pedoman Teknis Bidang LLASDP 1 KGT 109,267 109,267 109,267 109,267
Evaluasi Kinerja Lalu Lintas Angkutan Sungai dan Danau 1 KGT 138,206 138,206 138,206 138,206
5 Angkutan SDP
Belanja Barang operasional Lainnya
Evaluasi Kinerja Pelayanan Penyel Angk Penyeb pada Lintas Komersial 1 KGT 2,000 2,000 2,000 2,000
Pemantauan Pelaksanaan Tarif Angkutan Penyeberangan 1 KGT 8,600 8,600 8,600 8,600
Penyelenggaraan Penghargaan Insan ASDP 1 KGT 11,600 11,600 11,600 11,600
Peningkatan SDM Bidang LLASDP 1 KGT 10,000 10,000 10,000 10,000
Pemeriks Perangkat Ops Sarana dan Pras Penyeb dan Pengawas/Pemantau 3,957
1 KGT 3,957 3,957 3,957
Angk Penyeb Dalam Rangka Penyel Angk Lebaran
Belanja Perjalanan Biasa
Evaluasi Kinerja Pelayanan Penyel Angk Penyeb pada Lintas Komersial 1 KGT 83,000 83,000 83,000 83,000
Pemeriksaan Kapal Dalam Rangka Penerbitan Persetujuan Pengoperasian 120,000
1 KGT 120,000 120,000 120,000
Kapal Penyeberangan
Pemantauan Pelaksanaan Tarif Angkutan Penyeberangan 1 KGT 125,391 125,391 125,391 125,391
Pemeriksaan Kapal Angk Penyeb Setelah Melakukan Docking Tahunan 1 KGT 230,410 230,410 230,410 230,410
Penyelenggaraan Penghargaan Insan ASDP 1 KGT 28,274 28,274 28,274 28,274
Pemeriks Perangkat Ops Sarana dan Pras Penyeb dan Pengawas/Pemantau 252,050
1 KGT 252,050 252,050 252,050
Angk Penyeb Dalam Rangka Penyel Angk Lebaran
Honor yang terkait kegiatan
Pemantauan Pelaksanaan Tarif Angkutan Penyeberangan 1 TH 6,000 6,000 6,000 6,000
Penyelenggaraan Penghargaan Insan ASDP 1 TH 10,100 10,100 10,100 10,100
34 SATKER PENINGKATAN PEMBINAAN TRANSPORTASI DARAT - - - - 1,265,000 1,265,000 10,945,080 - 10,945,080 12,210,080
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 1,005,000 1,005,000 10,945,080 - 10,945,080 11,950,080
0546 MONITORING/ PENGAWASAN PELAKSANAAN PROGRAM/ KEGIATAN
Monitoring Penyel Penegakan Hukum Muatan Lebih Jt. Timbang
Belanja Uang Honor Tidak Tetap
- Honor Koordinator (1 orang x 12 bln) 12 OB 500 6,000 6,000 6,000
- Honor Anggota Tim (5 orang x 12 bln) 60 OB 250 15,000 15,000 15,000
Belanja Bahan
Page 83
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
- Pencetakan,Penggandaan dan Operasional Lainnya 1 TH 7,295 7,295 7,295 7,295
- Pengadaan ATK 1 TH 15,000 15,000 15,000 15,000
Belanja Perjalanan Lainnya
- Perjalanan Dinas 1 TH 111,705 111,705 111,705 111,705
Monitoring Pelaksanaan Kegiatan di Lingkungan Sub Sektor Perhubungan Darat
Belanja Uang Honor Tidak Tetap
- Honor Pengarah (1 orgx12 bln) 12 OB 750 9,000 9,000 9,000
- Honor Ketua (1 orgx12 bln) 12 OB 650 7,800 7,800 7,800
- Honor Wakil Ketua (3 org x 12 bln) 36 OB 600 21,600 21,600 21,600
- Honor Anggota Tim (33 org x 12 bln) 396 OB 500 198,000 198,000 198,000
Belanja Bahan
- Biaya Penggandaan, Dokumentasi dan Operasional Lainnya 1 TH 34,000 34,000 34,000 34,000
- Belanja Bahan ATK 1 TH 40,000 40,000 40,000 40,000
Belanja Perjalanan Lainnya
- Perjalanan Dinas 1 TH 539,600 539,600 539,600 539,600
Studi Kebijakan Transportasi Darat
Belanja Modal Fisik Lainnnya
1 Perumusan Jabatan Fungsional Inspektur Teknis Bidang LLAJ 1 LAP 514,700 514,700 514,700 514,700
2 Evaluasi Tatralok dan Tatrawil Bidang Transportasi Darat Wilayah Sumatera 1 LAP 567,000 567,000 567,000 567,000
3 Perencanaan Terminal dan Jaringan Angkutan Penumpang di Sumatera 1 LAP 574,800 574,800 574,800 574,800
4 Penyusunan Tatanan Terminal Barang Kawasan Pulau Jawa dan Bali 1 LAP 556,200 556,200 556,200 556,200
5 Penyusunan Agenda 21 Sub Sektor Transportasi Darat 1 LAP 506,200 506,200 506,200 506,200
6 Penyusunan Tatanan Terminal Barang P. Kalimantan 1 LAP 521,300 521,300 521,300 521,300
Kajian Perumusan Penyiapan Akreditasi dan Sertifikasi Unit Pengujian Berkala 539,200 539,200 539,200
7 1 LAP 539,200
Kendaraan Bermotor
8 Penyusunan Rencana Umum Lalu Lintas dan Angkutan Jalan 1 LAP 570,900 570,900 570,900 570,900
9 Perencanaan Pengembangan Bus Rapid Transit (BRT) di Indonesia 1 LAP 447,080 447,080 447,080 447,080
Kajian Pengembangan Sitem Telekomunikasi Berbasis Gelombang Radio Sektor 483,400 483,400 483,400
10 1 LAP 483,400
Perhubungan Darat
11 Analisis Kelayakan Pengembangan Terminal Barang di Pulau Sumatera 1 LAP 553,700 553,700 553,700 553,700
Penyusunan Pedoman Rencana Induk Jaringan Lalu Lintas dan Angkutan Jalan 563,300 563,300 563,300
12 1 LAP 563,300
Propinsi, Kabupaten/Kota
Penyusunan Simpul-Simpul Strategis Unit Jembatan Timbang di Wilayah Pulau 542,000 542,000 542,000
13 1 LAP 542,000
Jawa dan Bali
Kajian Pengembangan Sistem Informasi dan Komunikasi Sarana dan Prasarana 508,000 508,000 508,000
14 1 LAP 508,000
LLAJ
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 488,300 488,300 488,300
15 1 LAP 488,300
LLAJ Bidang Pembinaan dan Penyelenggaraan
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 480,000 480,000 480,000
16 1 LAP 480,000
LLAJ Bidang Lalu Lintas
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 488,300 488,300 488,300
17 488,300
LLAJ Bidang Pengemudi 1 LAP
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 497,600 497,600 497,600
18 1 LAP 497,600
LLAJ Bidang Manajemen Keamanan dan Keselamatan
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 497,600 497,600 497,600
19 1 LAP 497,600
LLAJ Bidang Sistem Informasi dan Komunikasi LLAJ
Penyusunan Naskah Akademis Tindak Lanjut UU No.22 Tahun 2009 Tentang 497,300 497,300 497,300
20 1 LAP 497,300
LLAJ Bidang Sumber Daya Manusia
21 Detail Engineering Desain (DED) Gedung Arsip Ditjen Hubdat 1 LAP 548,200 548,200 548,200 548,200
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 260,000 260,000 - - - 260,000
Belanja Uang Honor Tidak Tetap
- Honor KPA 12 OB 920 11,040 11,040 11,040
- Honor SPM 12 OB 800 9,600 9,600 9,600
- Honor Bendahara 12 OB 690 8,280 8,280 8,280
- Honor Staf Pengelola 60 OB 460 27,600 27,600 27,600
- Honor SAI 24 OB 280 6,720 6,720 6,720
- Nilai Pagu Pengadaan 250 jt s/d 500 jt (8 paket x 3 orang) 24 OP 475 11,400 11,400 11,400
-. Nilai Pagu Pengadaan 500 jt s/d 1 M (13 paket x 5 orang) 65 OP 545 35,425 35,425 35,425
Belanja Barang Non Operasional Lainnya
- Biaya Lelang dan Penerbitan Iklan Pelelangan 1 TH 14,085 14,085 14,085 14,085
Belanja Bahan
- Belanja Bahan ATK 1 TH 30,000 30,000 30,000 30,000
- Penerbitan/ Pencetakan/ Penggandaan & Operasional Lainnya 1 TH 55,850 55,850 55,850 55,850
Belanja Perjalanan Lainnya
- Perjalanan Dinas 1 TH 50,000 50,000 50,000 50,000
Page 84
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
2 DIREKTORAT LALU LINTAS DAN ANGKUTAN JALAN - - - - 12,532,688 12,532,688 142,572,824 - 142,572,824 155,105,512
Page 85
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor Bendahara 12 OB 800 9,600 9,600 - - - 9,600
Honor Staff (5 Org x 12 Bln) 60 OB 575 34,500 34,500 - - - 34,500
Honor SAI (3 Org x 12 Bln) 36 OB 350 12,600 12,600 - - - 12,600
Honor Panitia Lelang Pengadaan Barang (24 pkt x 7 org) 168 OB 400 67,200 67,200 67,200
Honor Panitia Lelang Pengadaan Jasa (30 pkt x 7 org) 210 OB 400 84,000 84,000 84,000
Belanja Bahan
Biaya Lelang, Penerbitan, Pencetakan, Penggandaan 1 TH 50,000 50,000 50,000 - - - 50,000
Pengadaan ATK 1 TH 100,000 100,000 100,000 - - - 100,000
Belanja Perjalanan Lainnya
Perjalanan dinas 1 TH 100,000 100,000 100,000 - - - 100,000
Page 86
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor Bendahara 12 OB 800 9,600 9,600 9,600
Honor Staff (10 Org x 12 Bln) 60 OB 575 34,500 34,500 34,500
Honor SAI (3 Org x 12 Bln) 36 OB 350 12,600 12,600 12,600
Honor Panitia Lelang Pengadaan Barang (44 pkt x 7 org) 1 TH 123,200 123,200 123,200 123,200
Honor Panitia Lelang Pengadaan Jasa Konsultasi 1 TH 104,700 104,700 104,700 104,700
Belanja Bahan
Biaya Lelang, Penerbitan, Pencetakan, Penggandaan 1 TH 30,000 - - - 30,000 30,000 30,000
Pengadaan ATK 1 TH 35,000 - - - 35,000 35,000 35,000
Belanja Perjalanan Lainnya
Perjalanan dinas 1 TH 100,000 - - - 100,000 100,000 100,000
37 SATKER PENGAWASAN OPERASIONAL & KEPERINTISAN ANGK. LLAJ - - - - 3,575,868 3,575,868 16,210,000 - 16,210,000 19,785,868
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - 750,000 750,000 2,250,000 - 2,250,000 3,000,000
1 Pengadaan System Informasi Angkutan Jalan 1 PKT 500,000 500,000 500,000 500,000
2 Pengad. & Pemas. Penggunaan Tracking System Pengops. AKAP 1 PKT 750,000 750,000 750,000 750,000
3 Pengembangan Jaringan Alat Komunikasi 1 PKT 500,000 500,000 500,000 500,000
Percontohan Aplikasi Teknologi Informasi untuk Pengawasan dan Pengendalian 1 PKT 500,000 500,000 500,000 500,000
4 Kecepatan Kendaraan Bermotor di Jalan
5 Pengadaan Kartu PPNS 1 PKT 50,000 50,000 50,000 50,000
6 Pemeliharaan dan Pengoperasian Kendaraan Operasional 1 PKT 200,000 200,000 200,000 200,000
7 Pemeliharaan dan Pengoperasian Alat Komunikasi 1 PKT 500,000 500,000 500,000 500,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - - - 11,600,000 - 11,600,000 11,600,000
Pengad. Kend. Khusus Penangan Gangguan LLAJ Akibat Bencana Alam 1 PKT 500,000 500,000 500,000 600,000
Pengadaan Bus Perintis 37 UNIT 300,000 11,100,000 11,100,000 11,100,000
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 2,495,588 2,495,588 2,360,000 - 2,360,000 4,855,588
1 Tata Cara Teknis Monit. Pelay. Pemberian Izin Trayek/Ops. (Standar ISO) 1 PKT 500,000 500,000 500,000 500,000
2 Blue Print Angkutan Jalan 1 PKT 500,000 500,000 500,000 500,000
3 Perencanaan Teknis Standar Pelayanan Angkutan Penumpang Umum 1 PKT 500,000 500,000 500,000 500,000
4 Survey Load Faktor Angkutan Umum Penumpang 1 PKT 500,000 500,000 500,000 500,000
5 Pedoman Teknis Surat Ijin Trayek/Ops. Dalam Bentuk Kartu Elektronik 1 PKT 300,000 300,000 300,000 300,000
6 Peningkatan Ketrampilan (Refresing) PPNS LLAJ (2 Angkatan) 1 PKT 200,000 200,000 200,000 - 200,000
7 Peningkatan Kualitas PPNS LLAJ Pola 100 Jam 1 PKT 250,000 250,000 250,000 - 250,000
8 Peningkatan Kualitas PPNS LLAJ Pola 400 Jam 1 PKT 400,000 400,000 400,000 - 400,000
9 Monitoring Pelaksanaan Penimbangan Kendaraan Bermotor 250,000
- Honorarium Tim 1 TH 70,000 70,000 70,000 70,000
- Penggadaan, Pencetakan, Formulir, Biaya Rapat, dll 1 PKT 30,000 30,000 30,000 30,000
- Pengadaan ATK 1 TH 20,000 20,000 20,000 20,000
- Perjalanan Dinas 1 TH 130,000 130,000 130,000 130,000
10 Penegakan Hukum Dimensi Kendaraan Bermotor 220,000
- Honorarium Tim 1 TH 70,000 70,000 70,000 70,000
- Penggadaan, Pencetakan, Formulir, Biaya Rapat, dll 1 PKT 30,000 30,000 30,000 30,000
- Pengadaan ATK 1 TH 20,000 20,000 20,000 20,000
- Perjalanan Dinas 1 TH 100,000 100,000 100,000 100,000
11 Penegakan Hukum Perijinan Angkutan Secara Nasional 300,000
- Honorarium Tim 1 TH 70,000 70,000 70,000 70,000
- Penggadaan, Pencetakan, Formulir, Biaya Rapat, dll 1 PKT 35,000 35,000 35,000 35,000
- Pengadaan ATK 1 TH 25,000 25,000 25,000 25,000
- Perjalanan Dinas 1 TH 170,000 170,000 170,000 170,000
12 Monitoring Angkutan Perintis 465,588
- Honorarium Tim 1 TH 100,000 100,000 100,000 100,000
- Penggadaan, Pencetakan, Formulir, Biaya Rapat, dll 1 PKT 15,000 15,000 15,000 15,000
- Pengadaan ATK 1 TH 10,588 10,588 10,588 10,588
- Perjalanan Dinas 1 TH 340,000 340,000 340,000 340,000
13 Rakernis Angkutan Perintis 270,000
- Honorarium Tim 1 TH 70,000 70,000 70,000 70,000
- Penggadaan, Pencetakan, Formulir, Biaya Rapat, dll 1 PKT 30,000 30,000 30,000 30,000
- Pengadaan ATK 1 TH 20,000 20,000 20,000 20,000
- Perjalanan Dinas 1 TH 150,000 150,000 150,000 150,000
14 Kontengensi Penanganan Bencana Alam 200,000
- Honorarium Tim 1 TH 40,000 40,000 40,000 40,000
- Pengadaan Peralatan Penanganan 1 PKT 60,000 - 60,000 60,000 60,000
- Perjalanan Dinas 1 TH 100,000 100,000 100,000 100,000
04.90.19 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 330,280 330,280 - - - 330,280
Pembayaran Gaji, Lembur, Honorarium dan Vakasi 1 TH
Honor KPA 12 OB 920 11,040 11,040 11,040
Page 87
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor Pejabat Pembuat Komitmen 12 OB 800 9,600 9,600 9,600
Honor SPM 12 OB 800 9,600 9,600 9,600
Honor Bendahara 12 OB 690 8,280 8,280 8,280
Honor Staff (8 Org x 12 Bln) 96 OB 460 44,160 44,160 44,160
Honor SAI (3 Org x 12 Bln) 36 OB 350 12,600 12,600 12,600
Honor Panitia Lelang Pengadaan Barang (12 pkt x 7 org) 84 TH 400 33,600 33,600 33,600
Honor Panitia Lelang Jasa Konsultasi (13 pkt x 7 org) 91 TH 400 36,400 36,400 36,400
Belanja Bahan
Biaya Lelang, Penerbitan, Pencetakan, Penggandaan 1 TH 30,000 30,000 30,000 30,000
Pengadaan ATK 1 TH 35,000 35,000 35,000 35,000
Belanja Perjalanan Lainnya
Perjalanan dinas 1 TH 100,000 100,000 100,000 100,000
DIREKTORAT BINA SISTEM TRANSPORTASI PERKOTAAN - - - - 7,120,240 7,120,240 67,950,000 - 67,950,000 75,070,240
38 SATKER PENGADAAN SARANA ANGKUTAN PERKOTAAN - - - - 365,760 365,760 56,850,000 - 56,850,000 57,215,760
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - - - 56,850,000 - 56,850,000 56,850,000
Belanja Modal Peralatan & Mesin
1 Pengadaan Bus Ukuran Sedang Non AC Euro II Engine PS>= 120 PS ( Bus 38 UNIT 300,000 11,400,000 11,400,000 11,400,000
Bantuan Angkutan Kota/Pelajar/Mahasiswa)
2 Pengadaan Bus Ukuran Sedang AC Euro II Engine PS>= 120 PS (Bantuan 10 UNIT 425,000 4,250,000 4,250,000 4,250,000
untuk Pengembangan Angkutan Umum Massal)
3 Pengadaan Bus Ukuran Besar AC Euro II Engine (Bantuan untuk 18 UNIT 900,000 16,200,000 16,200,000 16,200,000
Pengembangan Angkutan Umum Massal) Model 1 Pintu
4 Pengadaan Bus Ukuran Besar AC Euro II Engine (Bantuan untuk 25 UNIT 1,000,000 25,000,000 25,000,000 25,000,000
Pengembangan Angkutan Umum Massal) Model 2 Pintu
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 200,000 200,000 - - - 200,000
Monitoring persiapan dan evaluasi implementasi angkutan umum massal 1 PKT 200,000
berbasis jalan
Honorarium Tim Sekretariat Monitoring 1 TH 30,000 30,000 30,000 30,000
Penggandaan, Pencetakan, dll 1 TH 15,000 15,000 15,000 15,000
Pengadaan ATK 1 TH 20,000 20,000 20,000 20,000
Perjalanan Dinas 1 TH 135,000 135,000 135,000 135,000
39 SATKER PENGEMBANGAN LALU LINTAS DAN ANGKUTAN PERKOTAAN - - - - 1,746,660 1,746,660 4,800,000 - 4,800,000 6,546,660
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 1,604,120 1,604,120 4,800,000 - 4,800,000 6,404,120
Penyusunan Rencana Induk Transportasi Perkotaan pada Kawasan Kota 1 LAP 600,000
1 600,000 600,000 600,000
Samarinda dan sekitarnya
2 Perencanaan Teknis Penerapan ITS 1 LAP 600,000 600,000 600,000 600,000
Perencanaan Teknis Penyusunan Pelayanan Angkutan Orang di Kawasan 1 LAP 600,000
3 600,000 600,000 600,000
tertentu (Lingkungan)
Studi Pedoman Sistem Perijinan Angkutan Umum Perkotaan dengan Sistem 1 LAP 600,000
4 600,000 600,000 600,000
Lelang (Quality Licensing)
Studi Pedoman Perencanaan Trayek Pengumpan (feeder) untuk Angkutan 1 LAP 600,000 - - 600,000
5 600,000 600,000
Massal Berbasis Jalan
6 Pedoman Pelaksanaan Manajemen Lalu Lintas Lokal 1 LAP 600,000 600,000 600,000 600,000
Penyusunan Rencana Induk Transportasi Perkotaan pada Kawasan Kota 1 LAP 600,000 600,000
7 600,000 600,000
Banjarmasin dan sekitarnya
Perencanaan Teknis Penetapan Kebutuhan Armada dan Wilayah Operasi 1 LAP 600,000 600,000 600,000 600,000
8
Angkutan Taksi untuk Wilayah D.I Yogyakarta dan sekitarnya
Page 88
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Belanja Modal Fisik Lainnya
- Koordinasi & kelembagaan Peningkatan Transp Perkotaan (Perjalanan Dinas LN) 1 PKT 450,000 450,000 450,000 - - 450,000
- Publikasi Transportasi Perkotaan 1 PKT 438,220 438,220 438,220 - - 438,220
- Sosialisasi Kebijakan Transportasi Perkotaan 1 PKT 500,000 500,000 500,000 - - 500,000
40 SATKER PENGEMBANGAN SISTEM TRANSPORTASI RAMAH LINGKUNGAN - - - - 5,007,820 5,007,820 6,300,000 - 6,300,000 11,307,820
04.08.03 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - - - 4,500,000 - 4,500,000 4,500,000
Penerapan ATCS di Kota Bogor 1 PKT 2,500,000 - 2,500,000 2,500,000 2,500,000
Penataan Fasilitas Pejalan Kaki di Kota Bukittinggi 1 PKT 2,000,000 - 2,000,000 2,000,000 2,000,000
04.08.04 PROGRAM PENINGKATAN AKSESIBILITAS PELAYANAN ANGKUTAN LLAJ - - - - 4,750,000 4,750,000 - - - 4,750,000
Belanja Bantuan Kompensasi Sosial
Pengadaan dan Pemasangan Converter Kit pada Kendaraan Umum Termasuk 1 Pkt 4,750,000 4,750,000 4,750,000 4,750,000
Instalasi Dan Supervisi Tahap IV
04.08.10 PROGRAM RESTRUKTURISASI KELEMBAGAAN DAN PRASARANA LLAJ - - - - 118,700 118,700 1,800,000 - 1,800,000 1,918,700
Kegiatan Pendukung Terhadap Integrated Publik Transportation Masterplan For 1 LAP 600,000 600,000 600,000 600,000
1
Bandung
Kegiatan Pendukung Terhadap Program For Improvement Of Transportation in 1 LAP 600,000 600,000 600,000 600,000
2
Medium Sized City
Perencanaan Teknis Gasifikasi Angkutan Umum Berbasi Jalan di Kota Surabaya 1 LAP 600,000 600,000 600,000 600,000
3
118,700
4 Program Kerja Pelaksanaan Monitoring dan Evaluasi Penggunaan Converter Kit 1 KGT
Honorarium Tim Sekretariat Monitoring 1 TH 33,700 33,700 33,700 33,700
Penggadaan, Pencetakan, Pengadaan Formulir, Biaya Rapat, dll 1 TH 15,000 15,000 15,000 15,000
Pengadaan ATK 1 TH 20,000 20,000 20,000 20,000
Perjalanan Dinas 1 TH 50,000 50,000 50,000 50,000
DIREKTORAT KESELAMATAN TRANSPORTASI DARAT - - - - 16,438,757 16,438,757 11,620,000 5,000,000 16,620,000 33,058,757
41 SATKER PENINGKATAN KESELAMATAN TRANSPORTASI DARAT - - - - 16,438,757 16,438,757 11,620,000 5,000,000 16,620,000 33,058,757
A.1 PROGRAM PEMBANGUNAN PRASARANA & FASILITAS LLAJ - - - - 800,000 800,000 2,250,000 5,000,000 7,250,000 8,050,000
Page 89
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pengadaan & Pemasangan Fasilitas Keselamatan LLAJ
1 Pengadaan Peralatan Inspeksi Keselamatan LLAJ 1 PKT 1,500,000 1,500,000 1,500,000 1,500,000
2 Perbaikan LRK di Prov.Bali dan NTB 1 PKT 750,000 750,000 750,000 750,000
3 Pengadaan Helm Anak 1 PKT 800,000 800,000 800,000 800,000
4 Loan Bank Dunia - SRIP 4834 IND 1 PKT 5,000,000 5,000,000 5,000,000 5,000,000
A.2 PROGRAM RESTRUKTURISASI KELEMBAGAAN PRASARANA LLAJ - - - - 15,310,037 15,310,037 9,350,000 - 9,350,000 24,660,037
Penyusunan/PerumusanSistem & Prosedur Teknis
Monitoring dan Evaluasi Kinerja Keselamatan 1 PKT 450,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
Perjalanan Dinas 1 TH 320,000 320,000 320,000 320,000
Penggandaan, Percetakan, Biaya Rapat, dll 1 TH 30,000 30,000 30,000 30,000
ATK 1 TH 20,000 20,000 20,000 20,000
Monitoring dan Evaluasi Pekan Keselamatan di daerah 1 TH 500,000 500,000 500,000 500,000
1 Penyusunan Pedoman Teknis Database Awak Kapal Sungai dan Danau 1 LAP 650,000 650,000 650,000 650,000
Penyusunan Konsep Pedoman Teknis Penyelenggaraan Lembaga Pendidikan
2 1 LAP 500,000 500,000 500,000 500,000
dan Pelatihan Awak Kapal Sungai dan Danau
Penyus Pedoman Teknis Sertifikasi Infrastruk Lemb Pend Mengemudi dan
3
Instruktur Lembaga pendidikan Pengemudi Angkutan Umum 1 LAP 650,000 650,000 650,000 650,000
4 Penyusunan Pedoman Pengemudi yang Berkeselamatan 1 LAP 550,000 550,000 550,000 550,000
5 Pedoman Pemasangan Bill Board Keselamatan 1 LAP 500,000 500,000 500,000 500,000
6 Penyusunan Modul Pendidikan Keselamatan Untuk Tingkat TK dan SD 1 LAP 500,000 500,000 500,000 500,000
Pedoman Penyusunan Rencana Umum Keselamatan Transportasi Jalan Bagi
7 1 LAP 500,000 500,000 500,000 500,000
Daerah
8 Evaluasi Implementasi Lajur Sepeda Motor 1 LAP 500,000 500,000 500,000 500,000
9 Kajian Teknis Penetapan Batas Kecepatan Maksimum dan Minimum 1 LAP 500,000 500,000 500,000 500,000
Kajian Teknis Penerapan Dampak Keselamatan Lalu Lintas (Studi kasus Pusat
10
Perbelanjaan) 1 LAP 500,000 500,000 500,000 500,000
11 Kajian Teknis Inspeksi Keselamatan Jalan (Road Safety Inspection) 1 LAP 500,000 500,000 500,000 500,000
Page 90
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
9 Pemberdayaan Audit Keselamatan ASDP 1 PKT 300,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
Belanja Bahan 1 TH 70,000 70,000 70,000 70,000
Belanja Perjalanan 1 TH 150,000 150,000 150,000 150,000
10 Survey Investigasi DED DRK Alur Pelayaran ASDP 1 PKT 300,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
Belanja Bahan 1 TH 70,000 70,000 70,000 70,000
Belanja Perjalanan 1 TH 150,000 150,000 150,000 150,000
Pelatihan Audit Keselamatan Alur Pelayaran Angkutan Sungai, Danau, dan
11
Penyeberangan 1 PKT 550,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
Belanja Bahan 1 TH 70,000 70,000 70,000 70,000
Belanja Perjalanan 1 TH 400,000 400,000 400,000 400,000
12 Pemberdayaan Audit Keselamatan Jalan di 5 Provinsi 500,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
Belanja Bahan 1 TH 70,000 70,000 70,000 70,000
Belanja Perjalanan 1 TH 350,000 350,000 350,000 350,000
13 Peningkatan kualitas analisa data kecelakaan anggota UPK
Belanja Barang 1 TH 230,000 230,000 230,000 230,000
Belanja Bahan 1 TH 20,000 20,000 20,000 20,000
Belanja Perjalanan 1 TH 170,000 170,000 170,000 170,000
Honorarium 1 TH 80,000 80,000 80,000 80,000
14 Peningkatan kualitas mental dan disiplin pengemudi
Honorarium 1 TH 77,165 77,165 77,165 77,165
Belanja Bahan 1 TH 8,800 8,800 8,800 8,800
Belanja Perjalanan 1 TH 270,540 270,540 270,540 270,540
Belanja Barang 1 TH 143,495 143,495 143,495 143,495
A.3 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK - - - - 328,720 328,720 20,000 - 20,000 348,720
1 Belanja Uang Honor Tidak Tetap
Honor KPA 12 OB 920 11,040 11,040 11,040
Honor PPK 12 OB 800 9,600 9,600 9,600
Honor Penguji SPM 12 OB 800 9,600 9,600 9,600
Honor Bendahara 12 OB 690 8,280 8,280 8,280
Honor Staf 60 OB 460 27,600 27,600 27,600
Honor SAI 36 OB 350 12,600 12,600 12,600
Honor Panitia Lelang 1 TH 30,000 30,000 30,000 30,000
2 Belanja Bahan
Pengadaan ATK 1 TH 30,000 30,000 30,000 30,000
Biaya lelang, penerbitan, pencetakan, penggandaan 1 TH 40,000 40,000 40,000 40,000
Belanja Peralatan Modal dan Mesin
Pengadaan Laptop 1 UNIT 20,000 20,000 20,000 20,000
3 Belanja Perjalanan Lainnya
Perjalanan dinas 1 TH 150,000 150,000 150,000 150,000
6 DIREKTORAT LALU LINTAS ANGKUTAN SUNGAI DANAU & PENYEBERANGAN - - - - 144,808,813 144,808,813 249,342,376 - 249,342,376 394,151,189
33.E1 SATKER PENGEMBANGAN TRANSPORTASI SDP 96,940,198 - - - - 1,034,071 1,034,071 95,906,127 - 95,906,127 96,940,198
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 89,106,127 - - - - 216,900 216,900 89,106,127 - 89,106,127 89,323,027
Pemb. Der. Penyeb. Merak V Thp. II (Termasuk Supervisi) 1 Pkt 17,770,000 17,770,000 17,770,000 17,770,000
Pemb. Der. Penyeb. Bakauheni V Thp. II (Termasuk Supervisi) 1 Pkt 39,373,000 39,373,000 39,373,000 39,373,000
Pembangunan Break Water Tahap II 1 Pkt 31,963,127 31,963,127 31,963,127 31,963,127
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 6,750,000 - - - - - - 6,750,000 - 6,750,000 6,750,000
- -
Pra Studi Kelayakan Jaringan Transportasi Sungai di Wilayah Sungai Rungan &
1 1 lap 600,000 600,000 600,000 600,000
Sungai Sebangau Prop. Kalteng.
- - - - -
Pra Studi Kelayakan Jaringan Transportasi Sungai di Wilayah Sungai Kapuas
2 1 lap 600,000 600,000 600,000 600,000
Hilir Prop. Kalbar.
Pra Studi Kelayakan Jaringan Transportasi Sungai di Wilayah Sungai
3 1 lap 800,000 800,000 800,000 800,000
Memberamo Bagian Hilir Prop. Papua
Page 91
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pra Studi Kelayakan Jaringan Transportasi Sungai di Wilayah Sungai Digul
4 1 lap 800,000 800,000 800,000 800,000
Bagian Hilir Prop.Papua
Pra Studi Kelayakan Jaringan Transportasi Sungai di Wilayah Sungai Kais
5 1 lap 700,000 700,000 700,000 700,000
Bagian Hilir Prop.Irian Jaya Barat
6 Penyusunan Cetak Biru Pelayanan Jaringan Lalu Lintas Angkutan Sungai 1 lap 950,000 950,000 950,000 950,000
7 Survey Potensi Transportasi Sungai dan Danau di Propinsi Lampung 1 lap 800,000 800,000 800,000 800,000
DED Gangway dan Elevated Side Ramp Dermaga V Merak dan Bakauheni 1 lap 700,000 700,000 700,000 700,000
Survey dan Analisa Gelombang di Pelabuhan Penyeberangan Bakauheni 1 lap 800,000 800,000 800,000 800,000
Belanja Sewa :
Sewa Kendaraan R4 (1 unit)(Ops. Pemb.Der.Merak Bakauheni) 1 Th 60,000 60,000 60,000 60,000
Sewa Gedung Kantor 2 lokasi 1 Th 50,000 50,000 50,000 50,000
33.E2 SATKER PENINGK. KESELAMATAN DAN PELAYANAN TRANSPORTASI SDP 5,280,344 - - - - 639,500 639,500 5,014,594 - 5,014,594 5,654,094
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 4,750,000 - - - - - - 4,750,000 - 4,750,000 4,750,000
Page 92
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Penyusunan Pedoman Teknis Manajemen Lalu Lintas Angkutan Sungai dan
1 Lap 700,000 700,000 700,000 700,000
Danau
Penyusunan Pedoman Teknis Pengaturan Alur Pelayaran Sungai 1 Lap 700,000 700,000 700,000 700,000
DED pengerukan air sugihan kiri di Kab. Oki (Sumsel) 1 lap 700,000 700,000 700,000 700,000
Page 93
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
33.E3 SATKER PERENCANAAN TEKNIS DAN PENGAWASAN TRANSPORTASI SDP 8,493,340 - - - - 1,223,340 1,223,340 7,270,000 - 7,270,000 8,493,340
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 7,230,000 - - - - - - 7,230,000 - 7,230,000 7,230,000
Page 94
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
521219
2175
33.E5 SATKER PENGEMBANGAN KEPERINTISAN 143,384,597 - - - - 141,133,997 141,133,997 2,250,600 - 2,250,600 143,384,597
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 140,228,027 - - - - 140,228,027 140,228,027 - - - 140,228,027
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 2,225,600 - - - - - - 2,225,600 - 2,225,600 2,225,600
1 Kunjungan Pemantauan Angkutan Penyeberangan Perintis 1 Lap 531,550 - 531,550 531,550 531,550
2 Kunjungan Pemantauan Docking Kapal Perintis 1 Lap 344,050 344,050 344,050 344,050
1 Studi Evaluasi Perhitungan Tarif Jasa Pelabuhan Penyeberangan 1 Lap 850,000 850,000 850,000 850,000
4 Evaluasi Kelayakan Operasional Kapal LCT di Lintas Ketapang - Gilimanuk 1 Lap 250,000 250,000 250,000 250,000
5 Kajian Pengoperasian Kapal Ferry RoRo Cepat di Lintas Merak - Bakauheni 1 Lap 250,000 250,000 250,000 250,000
Page 95
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
512112 Belanja Uang Honor Tidak Tetap : 1 Th
Tim Pemantau Angkutan Penyeberangan Perintis
* Koordinator 12 OB 6,000 - 6,000 6,000 6,000
* Ketua 12 OB 5,400 - 5,400 5,400 5,400
* Wakil Ketua 12 OB 4,800 - 4,800 4,800 4,800
* Sekretaris 12 OB 3,600 - 3,600 3,600 3,600
* Anggota 960 OB 240,000 - 240,000 240,000 240,000
- -
512111 Belanja Bahan : - -
Biaya Pelelangan, Pencetakan, Penerbitan, Penggandaan 1 th 10,000 - 10,000 10,000 10,000
Biaya ATK 1 th 18,000 - 18,000 18,000 18,000
33.E6 SATKER PENGEMBANGAN SARANA SDP 120,928,560 - - - - 457,505 457,505 120,471,055 - 120,471,055 120,928,560
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 119,163,135 - - - - 192,080 192,080 118,971,055 - 118,971,055 119,163,135
0294 PENGADAAN ALAT ANGKUTAN AIR 119,163,135 - - - - 192,080 192,080 118,971,055 - 118,971,055 119,163,135
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 1,500,000 - - - - - - 1,500,000 - 1,500,000 1,500,000
Studi Desain Prototype Kapal Penyeberangan Penumpang type 150 GT, 200 GT
1 1 PKT 900,000 900,000 900,000 900,000
dan 300 GT jenis Double Ended
- - - - -
Studi Desain Prototype Kapal Penyeberangan Penumpang type 2000 GT dan
2 1 PKT 600,000 600,000 600,000 600,000
3000 GT
Page 96
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Honor Panitia Pengadaan Desain/Jasa Supervisi 17 OP 33,150 - - 33,150 33,150 33,150
Honor Panitia Studi 3 OP 6,750 - - 6,750 6,750 6,750
33.E6 SATKER PENUNJANG SARANA TRANSPORTASI SDP 18,750,400 - - - - 320,400 320,400 18,430,000 - 18,430,000 18,750,400
04.08.08 PROGRAM PEMBANGUNAN PRASARANA DAN SARANA ASDP 16,000,000 - - - - - - 16,000,000 - 16,000,000 16,000,000
2258 PENGADAAN KAPAL PERINTIS DAN BUS AIR 16,000,000 - - - - - - 16,000,000 - 16,000,000 16,000,000
04.08.08 PROGRAM RESTRUKTURISASI & KELEMBAGAAN ASDP 2,300,000 - - - - - - 2,300,000 - 2,300,000 2,300,000
-
0054 SURVEY/STUDY KELAYAKAN/PENYUSUNAN MASTER PLAN/DED/SID
1 Studi Penggunaan Kapal Sungai Sesuai Karakteristik Daerah 1 PKT 900,000 900,000 900,000 900,000
2 Desain Kapal Kerja Multiguna untuk sungai dan danau 1 PKT 600,000 600,000 600,000 600,000
- - - - -
1 Internal Auditor ISM Code Kapal Penyeberangan 1 KGT 200,000 200,000 200,000 200,000
2 Surveyor Bangunan Kapal Penyeberangan Baru 1 KGT 200,000 200,000 200,000 200,000
3 Surveyor Mempertahankan Klas Kapal Penyeberangan 1 KGT 200,000 200,000 200,000 200,000
4 Ship Appraisal Kapal Penyeberangan 1 KGT 200,000 200,000 200,000 200,000
42 UPT BPLJSKB DI BEKASI 1,986,500 - 1,986,500 5,763,883 - 5,763,883 176,500 - 176,500 7,926,883
01.01.09 PROGRAM PENERAPAN KEPEMERINTAHAN YANG BAIK 1,986,500 - 1,986,500 5,763,883 - 5,763,883 176,500 - 176,500 7,926,883
00001 Pembayaran Gaji, Lembur, Honorarium dan Vakasi
Belanja Gaji Pokok PNS 1 TH 596,690 596,690 596,690 596,690
Belanja Gaji Pokok PNS (Gaji ke 13) 1 TH 50,553 50,553 50,553 50,553
Kenaikan gaji 5 % 1 TH 32,363 32,363 32,363 32,363
Belanja Pembulatan Gaji PNS 1 TH 12 12 12 12
Belanja Pembulatan Gaji PNS (Gaji ke 13) 1 TH 2 2 2 2
Belanja Tunjangan Suami/Istri PNS 1 TH 50,467 50,467 50,467 50,467
Belanja Tunjangan Suami/Istri PNS (Gaji ke 13) 1 TH 4,288 4,288 4,288 4,288
Page 97
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Kenaikan gaji 5 % 1 TH 2,738 2,738 2,738 2,738
Belanja Tunjangan Anak PNS 1 TH 13,003 13,003 13,003 13,003
Belanja Tunjangan Anak PNS (Gaji ke 13) 1 TH 1,100 1,100 1,100 1,100
Kenaikan gaji 5 % 1 TH 706 706 706 706
Belanja Tunjangan Struktural PNS 1 TH 47,520 47,520 47,520 47,520
Belanja Tunjangan Struktural PNS (Gaji ke 13) 1 TH 3,960 3,960 3,960 3,960
Belanja Tunjangan Fungsional PNS 1 TH - - - -
Belanja Tunjangan PPh PNS 1 TH 18,750 18,750 18,750 18,750
Belanja Tunjangan PPh PNS (Gaji ke 13) 1 TH 1,591 1,591 1,591 1,591
Belanja Tunjangan Beras PNS 1 TH 36,617 36,617 36,617 36,617
Belanja Uang Makan PNS 1 TH 196,800 196,800 196,800 196,800
Belanja Tunjangan Umum PNS 1 TH 43,180 43,180 43,180 43,180
Belanja Tunjangan Umum PNS (Gaji ke 13) 1 TH 3,660 3,660 3,660 3,660
Belanja Lembur -
Uang Lembur 1 TH 382,500 382,500 382,500 382,500
Belanja Transito 1 TH 500,000 500,000 500,000 500,000
0002 Penyelenggaraan Operasional dan Pemeliharaan Perkantoran
00026 Poliklinik/Obat-obatan (Termasuk Honorarium Dokter dan Perawat)
Obat-obatan, Honor Dokter dan Perawat 51 OT 1,091 55,641 55,641 55,641
00032 Pengadaan pakaian dinas pegawai
Pengadaan pakaian dinas pegawai 102 OT 225 22,950 22,950 22,950
00034 Pengad Toga/Pak. Kerja Sopir/Psr/Prwt/Dokt/Satpam/Tng. Tek. Lainnya
Pakaian Satpam 32 OT 250 8,000 8,000 8,000
Pakaian Penguji 46 OT 225 10,350 10,350 10,350
Pakaian Teknis dan lainnya 22 OT 225 4,950 4,950 4,950
00205 Perawatan Gedung Kantor
Belanja Biaya Pemeliharaan Gedung dan Bangunan
Perbaikan Gedung Kantin 1 PKT 50,000 50,000 50,000 - 50,000
Perbaikan Gedung Genset 1 PKT 50,000 50,000 50,000 - 50,000
Perbaikan Gedung Komponen 1 PKT 100,000 100,000 100,000 - 100,000
Perbaikan Gedung Workshop 1 PKT 50,000 50,000 50,000 - 50,000
Perbaikan Gedung Utama 1 PKT 200,000 200,000 200,000 - 200,000
Perbaikan Mushola 1 PKT 20,000 20,000 20,000 - 20,000
Perbaikan Gedung Pemadam 1 PKT 20,000 20,000 20,000 - 20,000
Perbaikan Gedung Klinik 1 PKT 20,000 20,000 20,000 - 20,000
Pemeliharaan Rumah Jaga 1 PKT 10,000 10,000 10,000 - 10,000
Pemeliharaan Gedung Chasis (Emisi PC) 1 PKT 100,000 100,000 100,000 - 100,000
Pemeliharaan Gedung Emisi Sepeda Motor 1 PKT 75,000 75,000 75,000 - 75,000
Pemeliharaan Gedung Emisi Heavy Duty 1 PKT 50,000 50,000 50,000 - 50,000
Pemeliharaan Halaman Gedung 1 PKT 60,000 60,000 60,000 60,000
Pemeliharaan Kebersihan Gedung Daerah (cleaning service) 1 PKT 60,000 60,000 60,000 60,000
Pemeliharaan Gedung Uji Emisi Heavy Duty 1 PKT 10,000 10,000 10,000 10,000
Pemeliharaan Gedung Uji Sepeda Motor 1 PKT 15,000 15,000 15,000 15,000
Pemeliharaan Jalan Masuk (700 m) 1 PKT 25,000 25,000 25,000 25,000
Pemeliharaan Jalan Lingkungan 1 PKT 25,000 25,000 25,000 25,000
Belanja Biaya Pemeliharaan Peralatan dan Mesin
Pemeliharaan CCTV 1 PKT 30,000 30,000 30,000 30,000
Pemeliharaan Mesin Fotocopy 1 PKT 3,500 3,500 3,500 3,500
Pemeliharaan AC Window/Split 40 BH 350 14,000 14,000 14,000
Pemeliharaan peralatan komputer 17 UNIT 850 14,450 14,450 14,450
Pemeliharaan Website 1 PKT 30,000 30,000 30,000 30,000
Pemeliharaan Mic Conference 1 PKT 5,000 5,000 5,000 5,000
Pemeliharaan Infocus 1 PKT 750 750 750 750
Pemeliharaan Mesin Ketik Manual 7 UNIT 500 3,500 3,500 3,500
Pemeliharaan alat pemadam kebakaran 1 PKT 15,000 15,000 15,000 15,000
Pemeliharaan Trafo 1 PKT 10,000 10,000 10,000 10,000
Pemeliharaan Fire Hydrant 1 PKT 50,000 50,000 50,000 50,000
Pemeliharaan Laptop 7 UNIT 680 4,760 4,760 4,760
Pemeliharaan HT 10 UNIT 5,000 50,000 50,000 50,000
Pemeliharaan Lampu 1 PKT 30,000 30,000 30,000 30,000
00250 Perawatan Alat Besar/Alat Bantu
Pemeliharaan alat uji emisi (EURO) passenger car 1 PKT 250,000 250,000 250,000 - 250,000
Pemeliharaan alat uji emisi (EURO) sepeda motor 1 PKT 250,000 250,000 250,000 - 250,000
Pemeliharaan alat uji emisi (EURO) GVW >3,5 ton 1 PKT 400,000 400,000 400,000 - 400,000
Pemeliharaan genset listrik 450 KVA (5.640 Liter) 1 PKT 24,252 24,252 24,252 - 24,252
Pemeliharaan genset listrik 250 KVA (4.000 Liter) 1 PKT 17,200 17,200 17,200 - 17,200
Pemeliharaan alat uji passenger car 1 PKT 75,000 75,000 75,000 - 75,000
Page 98
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Pemeliharaan alat uji sepeda motor 1 PKT 50,000 50,000 50,000 - 50,000
Pemeliharaan alat uji heavy duty 1 PKT 50,000 50,000 50,000 - 50,000
Pemeliharaan alat uji dimensi sepeda motor 1 PKT 25,000 25,000 25,000 - 25,000
Pemeliharaan alat uji noise 1 PKT 50,000 50,000 50,000 - 50,000
00926 Pengadaan Peralatan/Perlengkapan Kantor
Pengadaan AC Split 7 UNIT 5,000 35,000 35,000 35,000
Pengadaan laptop 2 UNIT 20,000 40,000 40,000 40,000
Pengadaan Komputer 5 UNIT 12,500 62,500 62,500 62,500
Pengadaan Printer 3 UNIT 3,000 9,000 9,000 9,000
Pengadaan Bell Alarm 1 UNIT 30,000 30,000 30,000 30,000
01138 Perawatan Kendaraan Bermotor Roda 4/6/10
Pemeliharaan Kendaraan Bermotor Roda-4 6 UNIT 13,000 78,000 78,000 78,000
Pemeliharaan Kendaraan Bermotor Roda-6 6 UNIT 18,000 108,000 108,000 108,000
02005 Perawatan Kendaraan Bermotor Roda 2
Pemeliharaan Kendaraan Bermotor Roda-2 8 UNIT 2,800 22,400 22,400 22,400
02007 Langganan Daya dan Jasa
Listrik 12 BLN 60,000 720,000 720,000 720,000
Telepon 12 BLN 7,000 84,000 84,000 84,000
04863 Operasional Perkantoran dan Pimpinan
Honor KPA 12 OB 920 11,040 11,040 11,040
Honor PPK 12 OB 800 9,600 9,600 9,600
Honor SPM 12 OB 800 9,600 9,600 9,600
Honor Bendahara 12 OB 690 8,280 8,280 8,280
Honor Staf 60 OB 460 27,600 27,600 27,600
Honor SAI 24 OB 350 8,400 8,400 8,400
Honor Panitia Lelang 84 OB 825 69,300 69,300 69,300
Honor Pengawas 24 OB 300 7,200 7,200 7,200
Honor Pramubakti 60 OB 1,000 60,000 60,000 60,000
Honor Pengemudi 36 OB 850 30,600 30,600 30,600
Belanja Modal Fisik Lainnya
Pencetakan/Bahan lain-lain 410 RIM 200 82,000 82,000 82,000
Pencetakan Sertifikat Uji Tipe/Registrasi (100.000 lbr) 1 PKT 330,000 330,000 330,000 330,000
Pencetakan Brosur Balai 5,000 SET 20 100,000 100,000 100,000
Honor Tim Konsinyering dan Penyusunan Laporan-laporan 1 TH 33,344 33,344 33,344 33,344
00012 Pendidikan dan Pelatihan Teknis
Pendidikan dan Pelatihan Teknis 10 OT 8,000 80,000 80,000 80,000
Perjalanan Dinas LN untuk Training Out Door Testing 2 KGT 75,000 150,000 150,000 150,000
00061 Penyelenggaraan Humas, Protokol dan Pemberitaan
Penyelengaraan Humas/Protokol/Publikasi 12 BLN 2,000 24,000 24,000 24,000
00099 Sewa Jaringan Telekomunikasi (leased canel satelit)
Sewa Jaringan Telekomunikasi (leased canel satelit) 12 BLN 5,350 64,200 64,200 64,200
00967 Monitoring dan Evaluasi
Rapat Diskusi Rutin 12 BLN 1,850 22,200 22,200 22,200
Penyusunan Pembahasan DIPA 2011 1 PKT 20,000 20,000 20,000 20,000
Rapat Sosialisasi PKB 1 PKT 21,656 21,656 21,656 21,656
01360 Koordinasi Institusional -
Biaya Satpam 360 OB 800 288,000 288,000 288,000
Keperluan sehari-hari Perkantoran 1 TH 150,000 150,000 150,000 150,000
Pengiriman Surat Dinas 1 TH 36,000 36,000 36,000 36,000
Perjalanan Dinas Dalam Negeri 10 KGT 11,076 110,760 110,760 110,760
Perjalanan Dinas Luar Negeri 3 KGT 60,000 180,000 180,000 180,000
00578 Peningkatan Kemampuan SDM
Tunjangan Operasional/Pembinaan 12,936 OT 25 323,400 323,400 323,400
04.90.19 KD11 33,722,289 - 33,722,289 21,872,214 12,604,409 34,476,623 3,044,180 - 3,044,180 71,243,092
1a
04.90.19 KD11 - - - - - - 30,790,310 - 30,790,310 30,790,310
3a
04.08.03 KD11 - - - - 16,701,457 16,701,457 370,001,843 5,000,000 375,001,843 391,703,300
1b
04.08.04 KD11 - - - - 52,989,000 52,989,000 68,450,000 - 68,450,000 121,439,000
1c
04.08.05 KD11 - - - - 750,000 750,000 31,645,000 - 31,645,000 32,395,000
Page 99
BELANJA PEGAWAI BELANJA BARANG BELANJA MODAL
NO KEGIATAN/SUB KEGIATAN/JENIS BELANJA / RINCIAN BELANJA VOLUME HARGA TIDAK TIDAK JUMLAH RAYA
MENGIKAT JUMLAH MENGIKAT JUMLAH Rp. MURNI PHLN JUMLAH
SATUAN MENGIKAT MENGIKAT
(1) (3) (4) (5) (7) (8) (9) (10) (11) (12) (13) (14) (15)
1e
04.08.10 KD11 - - - - 29,369,620 29,369,620 37,105,080 - 37,105,080 66,474,700
1d
714,045,402
1,838,663,309
5880000 34,928,554 - 34,928,554 24,157,920 270,562,061 294,719,981 1,504,014,774 5,000,000 1,509,014,774 1,838,442,619
3959000 24,157,920 276,271,971 1503084174 220,690
- 5,709,910 930,600
10,492,718
3,294,654
5,000,000
18,787,372 996980400
220,690
145,146,823 851833577
220,690 -
Page 100
KD11
33,579,572
3a
1c
1d
Page 101
1a
3b
2d
2a
Page 102
5,307,575 5,257,575
1b
1d
1a
Page 103
2b
2a
Page 104
6,709,130 6,659,130
1b
1d
1a
Page 105
47,198,750
2b
2c
2a
Page 106
10,449,856 10,399,856
8,160,856
1b
1d
Page 107
1a
2b
2d
2a
Page 108
7,313,130 7,263,130
1b
1c
Page 109
1d
1a
2b
2c
2a
Page 110
4,577,700
1b
1c
1d
Page 111
1a
65,820 Semula
65,820 Menjadi
- Sisa
2b
2d
2a
Page 112
7,779,920 7479920
1b
1c
1d
1a
78,720 Semula
62,220 Menjadi
16,500 Sisa
Page 113
2b 36
2d
2c
2a
3,617,481
1b
Page 114
1c
1d
1a
65,820 Semula
54,060 Menjadi
11,760 Sisa
Page 115
9,753,900
1b
1d
1a
78,720 Semula
62,220 Menjadi
16,500 Sisa
Page 116
2b
2d
2a
9,890,151
1b
Page 117
1c
1e
Page 118
1d
1a
78,720 Semula
62,220 Menjadi
16,500 Sisa
2b
2d
2c
2a
Page 119
3,862,527
1b
1c
1d
1a
Page 120
16,664,809
1b
Page 121
1d
1a
2b
2d
Page 122
2d
2a
10,526,578
1b
Page 123
1d
1a
2b
Page 124
2d
2a
9,429,400
1b
Page 125
1d
1a
78,720 Semula
62,220 Menjadi
16,500 Sisa
Page 126
2b
2d
2a
8,568,620
1b
Page 127
1d
1a
78,720 Semula
#REF! Sisa
2b
Page 128
2a
5,720,490
1b
Page 129
1d
1a
2b
CELENGAN DIHAPUS
2d
2a
Page 130
11,202,600 11,152,600
1b
1c
1e
Page 131
1d
1a
2b
2d
2a
Page 132
10,543,484 10,493,484
1b
1c
1d
1a
Page 133
2b 28,756,078
2a
Page 134
2b 12,000,000
2a
800
600
560
400
400
975
975
25,000
25,000
100,000
1363956
87,008
2b 31000
118,008
2a
Page 135
Page 136
Page 137
2b
#REF!
2a 44,925,800
- -
#REF!
2a 22,462,900
- -
20,018,114
1b 18,730,516
Page 138
-
2,099,968
65,624
32,812
32,812
1c
1d
1a
Page 139
2b
2d
2a
22,806,860
22,806,860
1b
2,400,000 22,462,900
2,625,000
732,020
397,500
Page 140
364,080
900,000
750,000
390,000
800,000
875,000
10,000,000
1e
1,500,000
1c
424,800
1d 304,500
1a 293,960
Page 141
2b 32,649,982
2d
2a
Page 142
12,621,628
1b
1c
1e
Page 143
1d
1a
2b
2d
2a
Page 144
12,048,352
1b
1c
1d
Page 145
1a
2b
2c
2a
Page 146
- 3999441
4,142,810
2b 60000
2d
2c
2a 1,687,936 (79,315)
Page 147
Page 148
Page 149
18,145,295
1b
Page 150
1c
1d
Page 151
1a
2b
Page 152
2d
2a
8,099,012
1b
1c
Page 153
1d
1a
78,720 Semula
62,220 Menjadi
16,500 Sisa
2b
Page 154
2d
2c
2a
9,619,756
1b
Page 155
1d
1a
78,720 Semula
78,720 Menjadi
- Sisa
2b
Page 156
2d
2a
7,668,889
1b
Page 157
1c
1e
1d
1a
78,720 Semula
78,720 Menjadi
- Sisa
Page 158
- 24,733,520 40943695
(172,413) 40,001,965 (16,037,762)
2b (15,096,032) 42000
(15,995,762)
2d
2c
2a 1,062,249
(172,413)
Page 159
(10,629)
147,746
94,746
53,000
75,240
Page 160
41,000
74,000 -
102,000
17,164,345
17,164,345 17,114,345
Page 161
1b
1c
1d
1a
98,720
Page 162
65,000
178,000
2b
Calon drop
Calon drop
2d
2a
14,700,990
1b
Page 163
1c
1d
1a
Page 164
2b
2d
2d
2a
9,628,622
1b
Page 165
1c
1d
1a
78,720 Semula
78,720 Menjadi
- Sisa
152,560
Page 166
2b
2b
2a
800
600
560
400
1,200
683
1,138
Page 167
19,400,000
2a 19,400,000
800
700
600
400
400
150
2b
7,000,000
450,000
7,837,298
1b
Page 168
1c
1d
1a
78,720 Semula
78,720 Menjadi
- Sisa
Page 169
2b
2a
800
600
560
400
1,200
683
1,138
Page 170
8,011,928
1b
1c
1d
1a
Page 171
#REF!
2b
2a
800
600
600
560
400
400
9,528
6,278
Page 172
26,260,504
1b
1c
1d
1a
Page 173
2b
2d
2a
800
600
600
560
400
600
6,825
5,750,314
Page 174
51,033,957 63,186,291 (12,152,334)
1a 16,108,331 3,757,666,112
1a 16,108,331 63,186,291
1a
1a -
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
Page 175
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a 1800000
1a
1a 28200000
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
Page 176
1a 29,099
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a 187,387
1a
1a
1a
1a
1a 187,387
1a
1a
1a
1a
1a 187,387
1a
1a
1a
1a
1a 58,980
1a
1a
1a
1a
1a 77,985
1a
1a
1a 60,210
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
Page 177
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a 1600000
Page 178
1a
1a #VALUE!
1a #VALUE!
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
1a
9,511,457
2,666,191
12,177,648
12,229,182
51,534
1b 48
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b 1,841,312,983
1b 1,838,442,619
1b 2,870,364
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
Page 179
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b 29099
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b 180,000
1b
1b
Page 180
1b
1b 180,000
1b
1b
1b
1b 119,900
1b
1b
1b
1b 360,000
1b
1b
1b
1b 200,000
1b
1b
1b
1b 240,000
1b
1b
1b
1b 133,544
1b
1b
1b
1b 120,000
1b
1b
1b
1b 120,000
1b
1b
1b
1b 180,000
1b
1b
1b
1b 130,000
1b
1b
1b
1b 100,000
1b
1b
1b
1b 140,000
1b
1b
1b
1b 180,000
1b
1b
1b
1b 250,000
1b
1b
1b
1b 200,100
1b
1b
1,931,864
Page 181
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
329,295
1b 329,295
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
1b
2,666,191
2b
2b
2b
Page 182
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
2b
12,210,080
1d
155,000
Page 183
850,000
1a
Page 184
66,237,692
1b
1e
1d
1a
Page 185
69,081,952
1e
1b
37,261,667
1d
1a
Page 186
1b
1c
1d
1a
Page 187
57,215,760
1c
1d
1a
6,546,660
1d
Page 188
1a
11,307,820
1b
1c
1d
1a
33,058,757
1b 33,208,757
Page 189
1d
17,860,037
Page 190
1a
2b 89,323,027
216,900
89,539,927
2c
Page 191
2a
2b
2c
Page 192
530,344
-
2a 1,277,844
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a 214,594
2a 214,594
2a
2a
2a
23,750
2b
2b
2b 350,000 72,000
2b
2b
2b
2b
2b
Page 193
2c
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2b 938,685
2b
2b
2b
Page 194
2b
2b
2b
2b
2b
2b
2b
2b
140,809,217
581,190
2c 140,809,217
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
2a
Page 195
2b
2b
2b
2b
2b
2b
2b
2b
120,928,560 -
2b 119,163,135
#REF!
#REF!
2c
2a
2a
2a
2a
2a
2a
Page 196
2a
2a
2a
2a
2b
2c
2a
1,000
700
750
500
500
30,000
25,000
20,000
180,000
65,000
7,926,883
1a #REF! LLAJ #REF!
#REF! LLASDP
1,850,171,000 Total Darat
Page 197
Page 198
88,555,819
88,555,819
-
88,555,819
(88,555,819)
88,555,819
-
30,790,310 -
360,912,990
(30,790,310)
Page 199
66,474,700
-
721,016,710 723,742,423
(6,971,308)
-
(9,697,021)
220,690
1,126,429,427 (1,811,520)
(6,605,507) 996980400
(2,308,011) 220,690
(8,913,518)
Page 200