PERHITUNGAN VOLUME

Babat Rumput
P L
Area A 137.55 6
B
Area B 72.98 0
C Area C 34.61 0
Rencana
penambahan talud
Area D
Area E
kanan

Area F
Rencana
penambahan
talud kiri

1:
0.5
2.5
1:

I
Ta ng ga

Pas. Batu Kali

1 : 0.5
d
Talu

Paving
Ta ngga

Area Tampungan

Area B 72.98 1
1 : 2.5

Area C 34.61 1
Tan
gga
I

0.5
1:
Ta
Ar

lu
e

Ta
a

ng
Ba

ga
ba

I
tR
um
pu

a II
t

1: Tang g
2 .5 ga I ng 1:
2.5
Ta

1 : 2.5 5
1 : 2.
Sarana Talud
MCK

Area Babat Rumput

A
Pembersihan Sedimen
Luas Tinggi
Area A 2,444.87 0.2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL SUMBER DAYA AIR
PEKERJAAN :
PENILAIAN KINERJA DAN PENYUSUNAN
O PE R A SI D AN PE M EL I H A R A AN S U M B ER D AY A A IR AKNOP EMBUNG AIR BAKU WILAYAH
B AL AI B ESA R WI LA Y A H SU N GA I B EN G AW A N S O LO

2,444.87
Panjang Tampungan
Lokasi B 0.25 Km
UME

825.27 m2
- m2
- m2
- m2
- m2
- m2

825.27 M2

14.60 m2
6.92 m2
21.52 m2

488.97 m3

488.97 m3