Anda di halaman 1dari 1

OPNAME PEMASANGAN

PO NO. :s p K 1 68/5 p K/ M B/W K-A M K/ B D/G K- U GM I 1.122023 I 2023


r

PEKERJAAN PEMASANGAN EXPANSION JOINT RUBBER


PROYEK PEMBANGUNAN GEDUNG GELANGGANG INOVASI& KREATIVITAS (GIK) UGM
MATERIAL EXPANSION JOINT RUBBER
TANGGAL 2O Februari2O24

No. PEKERJAAN VOLUME (m)


Pekerjaan Pemasangan Expansion Joint Rubber Lantai 1
1.. Zona A-B 5,10
2. Zona C-D 47,38
3. Zona D-E L7,58
4. Zona E 4,85
TOTAL LANTAI 1 75,01
Pekerjaan Pemasangan Expansion Joint Rubber Lantai 2
1. Zona A-B 44,03
2. Zona B-C 18,38
3. Zona C-D 69,83
4. Zona D-E 10,10
5. Zona E-F L2,10
6. Zona F 10,60
TOTAL LANTAI 2 1.65,04
Pekerjaan Pemasangan Expansion Joint Rubber Lantai 3
1. Zona A-B 28,68
2. Zona B-C 23,28
4. Zona C-D 51,27
5. Zona D-E 24,10
6. Zona F-D 66,00
TOTAL LANTAI 3 193,33
Pekerjaan Pemasangan Expansion Joint Rubber Lantai 4
L. Zona D-E 9,50
2. Zona F-D 60,50
TOTAL LANTAI 4 70,00
Pekerjaan Pemasangan Expansion Joint Rubber Basement
1. Basement 35,58
TOTAL BASEMENT 35,58
TOTAL PEMASANGAN (Lt1+Lt2+lt3+Lt4+Basement) 538,96

PIHAK PERTAMA PrHAK Gpua