PO NO. :s p K 1 68/5 p K/ M B/W K-A M K/ B D/G K- U GM I 1.122023 I 2023
r
PEKERJAAN PEMASANGAN EXPANSION JOINT RUBBER
PROYEK PEMBANGUNAN GEDUNG GELANGGANG INOVASI& KREATIVITAS (GIK) UGM MATERIAL EXPANSION JOINT RUBBER TANGGAL 2O Februari2O24
No. PEKERJAAN VOLUME (m)
Pekerjaan Pemasangan Expansion Joint Rubber Lantai 1 1.. Zona A-B 5,10 2. Zona C-D 47,38 3. Zona D-E L7,58 4. Zona E 4,85 TOTAL LANTAI 1 75,01 Pekerjaan Pemasangan Expansion Joint Rubber Lantai 2 1. Zona A-B 44,03 2. Zona B-C 18,38 3. Zona C-D 69,83 4. Zona D-E 10,10 5. Zona E-F L2,10 6. Zona F 10,60 TOTAL LANTAI 2 1.65,04 Pekerjaan Pemasangan Expansion Joint Rubber Lantai 3 1. Zona A-B 28,68 2. Zona B-C 23,28 4. Zona C-D 51,27 5. Zona D-E 24,10 6. Zona F-D 66,00 TOTAL LANTAI 3 193,33 Pekerjaan Pemasangan Expansion Joint Rubber Lantai 4 L. Zona D-E 9,50 2. Zona F-D 60,50 TOTAL LANTAI 4 70,00 Pekerjaan Pemasangan Expansion Joint Rubber Basement 1. Basement 35,58 TOTAL BASEMENT 35,58 TOTAL PEMASANGAN (Lt1+Lt2+lt3+Lt4+Basement) 538,96