E
S Uraian Total Unit Satuan Harga Satuan Jumlah Keterangan
T
I
1 Material 1 Unit - -
M
A
2 Upah 1 Unit - -
S
I
3 Sub Total - -
4 Mobilization 2.5% - -
A
N
5 Overhead 10% - -
G
G
6 Total -
A
R
A 7 Dibulatkan -
N
A. PEKERJAAN PERSIAPAN
a.1 Bouwplank 25.50 m' - - -
Sub Total a - - -
B. PEKERJAAN TANAH & PONDASI
b.1 Pek. Galian pondasi 39.00 M3 - - -
b.2 Pancang kayu gelam,@ 4 Mtr, dia Ø 5" - Ø 6 " 78.00 Btg - - -
b.3 Urug pasir bawah pondasi t = 5 Cm 32.10 M3 - - -
b.4 Pek. Pondasi batu gunung 1 : 5 19.95 M 3
- - -
b.5 Urugan kembali bekas galian 14.40 M 3
- - -
b.6 Pengecoran Sloof beton bertulang 20/30 K 225 2.34 M 3
- - -
b.7 Tulangan Pokok dia 12 mm 138.53 kg - - -
b.8 Tulangan Begel Ø 8 - 200 103.10 kg - - -
b.9 Bekisting balok Kayu 5/7 + Papan 2/20 23.40 M2 - - -
Sub Total b - - -
C. PEKERJAAN LANTAI & DINDING & PLAFOND
c.1 Pek. Pasir urug,t = 5 cm 2.53 M3 - - -
c.2 Pek. Lantai kerja ,t = 7 cm 50.54 M 2
- - -
c.3 Pek. Cor lantai tebal 10 cm K 225 3.60 M 3
- - -
c.4 Pasang Wiremesh M10-150 ( 1 Layer ) 36.00 M 2
- - -
c.5 Pek. Rabatan t = 7 cm , Lebar = 70 cm, ( Depan Bangunan ) 10.99 M 2
- - -
c.6 Pasang dinding batu bata 1 : 5 125.49 M 2
- - -
c.7 Pek.Plester dinding 1 : 3 + acian dinding 250.98 M2 - - -
c.8 Pek. Pengecoran Kolom 20/20. K - 225 1.36 M3 - - -
c.9 Tulangan pokok dia 12 124.32 kg - - -
c.10 Tulangan begel Ø 8 - 150 110.60 kg - - -
Title : Rencana Anggaran Biaya
Project : Pembangunan SMF & Partner Office
Location : Jl. Ring road 3 - Sempaja Utara , Samarinda Utara, Kal - Tim
Area : 2 ( Dua Lantai )
Time Schedule :
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT JUMLAH KET.
MATERIAL UPAH MATERIAL UPAH
c.11 Bekisting balok Kayu 5/7 + Papan 2/20 27.20 M2 - - -
c.12 Pek. Pengecoran Balok 20/30 K - 225 2.34 M 3
- - -
c.13 Tulangan pokok dia 12 138.53 kg - - -
c.14 Tulangan begel Ø 8 - 150 103.10 kg - - -
c.15 Bekisting balok Kayu 5/7 + Papan 2/20 9.60 M2 - - -
c.16 Kusen pintu dan jendela, Kayu Bengkirai 37.50 M 1
- - -
c.17 Kawat Harmonika + wiremesh M-10 2.43 M 2
- - -
c.18 Pintu Besi Uk 2 x 0,65 x 2,4 ( Komplit ) 3.00 Unit - - -
c.19 Pengecoran Atap beton, t = 8 cm K - 225 4.04 M3 - - -
c.20 Pek. Besi wiremesh M10-150 50.54 M 2
- - -
c.21 Bekisting Atap Beton, Triplek t = 9 mm 50.54 M 2
- - -
c.22 Pengecoran Lisplank Beton ,t = 8 cm 0.73 M 3
- - -
c.23 Besi wiremesh M10 -150 9.10 M 2
- - -
c.24 Bekisting Lisplank Beton, Triplek t = 9 mm 16.73 M2 - - -
c.25 Water Proofing dak beton ( ex.Sika ) 50.54 M2 - - -
c.26 Psg. Plafond Baja Ringan ( Rangka Metal Furing 4/4,2/4 + Plafond Calsiboard 6 mm ) 50.54 M2 - - -
c.27 Pipa PVC + Elbow AW Ex.Wavin Ø 2,5 " Saluran Air hujan Atap ke Bawah 2.00 Btg - - -
c.28 Saringan Pipa PVC Ø 2,5 " Saluran Air hujan Atap ke Bawah 2.00 Set - - -
Sub Total c - - -
D. PEKERJAAN ELEKTRIKAL
d.1 Psg. Lampu Downlight 23 Watt Philips + Komplit 10.00 bh - - -
d.2 Psg. Lampu Downlight 18 Watt , Philips + komplit 3.00 bh - - -
d.3 Psg. Saklar Tunggal (type inbow), Broco 2.00 ttk - - -
d.4 Psg. Saklar Doubel (type inbow), Broco 2.00 ttk - - -
d.5 Psg. Inst. jaringan listrik dr MCB box ke ttk lampu, saklar & stop kontak 1.00 ls - - -
Sub Total d - - -
Jumlah Total Pekerjaan Ware House 36 M 2 - - -
Title : Rencana Anggaran Biaya
Project : Pembangunan SMF & Partner Office
Location : Jl. Ring road 3 - Sempaja Utara , Samarinda Utara, Kal - Tim
Area : 2 ( Dua Lantai )
Time Schedule :
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT JUMLAH KET.
MATERIAL UPAH MATERIAL UPAH
XII PEKERJAAN POS SECURITY SMF OFFICE
A. PEKERJAAN PERSIAPAN
a.1 Bouwplank 18.00 m' - - -
Sub Total a - - -
B. PEKERJAAN TANAH & PONDASI
b.1 Pek. Galian pondasi 9.37 M3 - - -
b.2 Pancang kayu gelam,@ 4 Mtr, dia Ø 5" - Ø 6 " 20.00 Btg - - -
b.3 Urug pasir bawah pondasi t = 5 Cm 0.48 M3 - - -
b.4 Pek. Pondasi batu gunung 1 : 5 5.57 M 3
- - -
b.5 Urugan kembali bekas galian 3.33 M 3
- - -
b.6 Pengecoran Sloof beton bertulang 20/20 K 225 0.50 M 3
- - -
b.7 Tulangan Pokok dia 12 mm 44.04 kg - - -
b.8 Tulangan Begel Ø 8 - 200 33.05 kg - - -
b.9 Bekisting balok Kayu 5/7 + Papan 2/20 4.96 M2 - - -
Sub Total b - - -
C. PEKERJAAN LANTAI & DINDING & PLAFOND
c.1 Pek. Pasir urug,t = 5 cm 0.39 M3 - - -
c.2 Pek. Lantai kerja ,t = 7 cm 7.83 M2 - - -
c.3 Pek. Pasang keramik Lantai 30/30.ex Roman 5.13 M 2
- - -
c.4 Pek. Pasang keramik Lantai Km/wc 20/20,ex. Roman 2.70 M 2
- - -
c.5 Pek. Pasang keramik Dinding Km/wc 20/25,ex Roman 8.85 M 2
- - -
c.6 Pasang dinding batu bata 1 : 5, t = 2,6 mtr 28.15 M 2
- - -
c.7 Pek.Plester dinding 1 : 3 + acian dinding 56.30 M 2
- - -
c.8 Pek. Pengecoran Kolom 30/30. K - 225 1.57 M 3
- - -
c.9 Tulangan pokok dia 12 61.80 kg - - -
c.10 Tulangan begel Ø 8 - 150 54.98 kg - - -
c.11 Bekisting balok Kayu 5/7 + Papan 2/20 13.92 M 2
- - -
c.12 Pek. Pengecoran Balok 20/20 K - 225 0.50 M 3
- - -
c.13 Tulangan pokok dia 12 44.04 kg - - -
c.14 Tulangan begel Ø 8 - 150 26.44 kg - - -
c.15 Pasang Bekisting balok 7.44 M2 - - -
c.16 Kusen pintu dan jendela, Kayu Bengkirai 24.98 M 1
- - -
c.17 Psg. Daun Pintu Panel Kayu Bengkirai + Komplit ,Kunci ,Hendel dll. 1.00 Unit - - -
c.18 Psg. Daun jendela Kaca , ( komplit ) 1.00 Unit - - -
c.19 Psg. Boven Kaca 5 mm ( Warna Buram ) 1.00 Unit - - -
c.20 Pengecoran Atap beton, t = 8 cm K - 225 1.17 M3 - - -
c.21 Pek. Besi wiremesh M10-150 14.57 M 2
- - -
c.22 Bekisting Atap Beton, Triplek t = 9 mm 14.57 M 2
- - -
c.23 Pengecoran Listplank Beton ,t = 8 cm K - 225 0.62 M 3
- - -
c.24 Besi wiremesh M10 -150 7.80 M 2
- - -
c.25 Bekisting Lisplank Beton, Triplek t = 9 mm 12.17 M2 - - -
Title : Rencana Anggaran Biaya
Project : Pembangunan SMF & Partner Office
Location : Jl. Ring road 3 - Sempaja Utara , Samarinda Utara, Kal - Tim
Area : 2 ( Dua Lantai )
Time Schedule :
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT JUMLAH KET.
MATERIAL UPAH MATERIAL UPAH
c.26 Water Proofing dak beton ( ex. Sika ) 14.57 M2 - - -
c.27 Psg. Plafond ( Rangka Metal Furing 4/4,2/4 + Plafond Calsiboard 6 mm ) 14.57 M 2
- - -
c.28 Psg. Lis Plafond 23.00 M 1
- - -
c.29 Pipa PVC + Elbow AW Ex.Wavin Ø 2,5 " Saluran Air hujan Atap ke Bawah 5.00 Btg - - -
c.30 Saringan Pipa PVC Ø 2,5 " Saluran Air hujan Atap ke Bawah 2.00 Set - - -
Sub Total c - - -
D. PEKERJAAN ELEKTRIKAL
d.1 Psg. Lampu Downlight 23 Watt Philips + Komplit 1.00 bh - - -
d.2 Psg. Lampu Downlight 18 Watt , Philips + komplit 4.00 bh - - -
d.3 Psg. Saklar Tunggal (type inbow), Broco 1.00 ttk - - -
d.4 Psg. Saklar Doubel (type inbow), Broco 1.00 ttk - - -
d.5 Psg. Inst. jaringan listrik dr MCB box ke ttk lampu, saklar & stop kontak 1.00 ls - - -
Sub Total d - - -
E. PEKERJAAN SANITAIR & SANITASI
e.1 Floor drain dia. 3 ", Stainless + Saringan 1.00 bh. - - -
e.2 Psg. Daun Pintu Km/WC ( Alumunium & Kusen Bengkirai ) 1.00 Unit - - -
e.3 Kran air Ex. Toto 1.00 bh. - - -
e.4 Closet Duduk ex. Toto 1.00 bh. - - -
e.5 Septic tank uk. 1,2 x 3 x 1,62 1.00 Unit - - -
e.6 Resapan 1, 2 x 2 x 1,6 1.00 Unit - - -
Sub Total e - - -
Jumlah Total Pekerjaan Pos Security - - -
XIII PEKERJAAN POMPA & RUMAH POMPA . Uk. 3 x 3
A. a.1 Pompa Sanyo PH 258 JP 2.00 Set - - -
a.2 Pek. Rumah pompa uk. 3 x 3 1.00 Unit - - -
Jumlah Total Pekerjaan Pompa Hydrant & Rumah Pompa - - -
JUMLAH TOTAL KESELURUHAN - - -