MUNDJIDAH WAHAB
LAMPIRAN : KEPUTUSAN BUPATI JOMBANG
NOMOR : 188.4.45/278/415.10.1.3/2019
TANGGAL: 22 Juli 2020
I. BIDANG PENGAIRAN
HARGA
NO MACAM PEKERJAAN SATUAN
( Rp. )
1 2 3
MACAM HARGA
NO PEKERJAA SATUAN
N ( Rp. )
1 2 3
HARGA
NO MACAM PEKERJAAN SATUAN
( Rp. )
1 2 3
307,357.34
Pemasangan 1 m2 lantai keramik ukuran 60 cm x 60
1 A.4.4.3.34.
cm (Polos)
350,827.34
Pemasangan 1 m2 lantai keramik ukuran 60 cm x 60
2 A.4.4.3.34.
cm (Motif)
ONGKOS
JENIS
NO SATUAN HARGA LANGSIR/
BAHAN
100 M
1 2 3 4 5
I BAHAN PASIR
II BAHAN BATU
20 Filler Kg Rp 1,200
3 Batako bh Rp 4,500
V BAHAN BESI
VI TEGEL/KERAMIK
21 Glangsing bh Rp 3,500
3 Tiner A Lt Rp 32,000
4 Tiner B Lt Rp 23,500
13 Cerlak Kg Rp 150,000
14 Politur Lt Rp 75,000
15 Vernis Lt Rp 81,500
16 Teer Kg Rp 50,000
23 Spiritus Lt Rp 20,000
- 46 -
XIII KACA
3 Kaca es 5 mm m2 Rp 150,000
3 Grendel Bh Rp 15,000
L SHAPE
JUT
RIGIT PAVEMENT
3 AC - WC Ton Rp 1,150,000
4 AC - BC Ton Rp 1,150,000
2 Palu/bodem 1 Bh Rp 210,000
4 Keranjang 1 Bh Rp 20,000
6 Cetok 1 Bh Rp 25,000
7 Kuas 1 Bh Rp 18,000
- 57 -
11 Gergaji 1 Bh Rp 100,000
14 Linggis 1 Bh Rp 65,000
16 Ember 1 Bh Rp 10,000
2 Ijuk Kg Rp 8,000
- 58 -
17 Walpaper m2 Rp 70,000
Sewa /
2 Pesawat ukur Digital Theodolite ( All Type ) Rp 200,000
hr
Sewa /
3 Pesawat ukur Waterpass ( All Type ) Rp 150,000
hr
Sewa /
4 GPS Statik Rp 100,000
hr
Sewa /
5 Pompa air Rp 150,000
hr
Sewa /
6 Tustel Rp 75,000
hr
Sewa /
7 Timbris Rp 125,000
hr
- 62 -
Sewa /
8 Kereta dorong Rp 30,000
hr
Sewa /
9 Gerobak Rp 50,000
hr
Sewa /
10 Chainsaw Rp 160,000
hr
Sewa /
11 Molen Rp 150,000
hr
Sewa /
12 Asphalt Mixing Plant Rp 5,000,000
jam
Sewa /
13 Asphalt Finisher Rp 400,000
jam
Sewa /
14 Asphalt Sprayer Rp 225,000
jam
Sewa /
15 Bulldoser 100 - 150 Hp Rp 400,000
jam
Sewa /
16 Compressor 4000 - 6500 L/M Rp 250,000
jam
Sewa /
17 Conrete Mixer 0.3-0.6 m3 Rp 200,000
jam
Sewa /
18 Crane 10 - 15 ton Rp 400,000
jam
Sewa /
19 Dump Truck 3.5 ton Rp 300,000
jam
Sewa /
20 Dump Truck 10 ton Rp 350,000
jam
Sewa /
21 Excavator 80 - 140 Hp Rp 500,000
jam
Sewa /
22 Flat bed Truck 3-4 m3 Rp 300,000
jam
Sewa /
23 Generator Set Rp 500,000
jam
- 63 -
Sewa /
24 Motor Grader >100Hp Rp 500,000
jam
Sewa /
25 Track Loader 75- 100hp Rp 400,000
jam
Sewa /
26 Wheed Loader 1.0-1.6 m3 Rp 400,000
jam
Sewa /
27 Tree Wheed Roller 6 - 8 T Rp 400,000
jam
Sewa /
28 Tandem Roller 6-8 T Rp 500,000
jam
Sewa /
29 Tire Roller 8 - 10 T Rp 400,000
jam
Sewa /
30 Vibratoy Roller 5-8 T Rp 400,000
jam
Sewa /
31 Concrete Vibrator Rp 100,000
jam
Sewa /
32 Stone Cruisher Rp 700,000
jam
Sewa /
33 Water Pump 70-100 Mm Rp 50,000
jam
Sewa /
34 Water Tanker 3000-4500 L Rp 300,000
jam
Sewa /
35 Pedestrian Roller Rp 300,000
jam
Sewa /
36 Tamper Rp 400,000
jam
Sewa /
37 Jack Hammer Rp 300,000
jam
Sewa /
38 Vulvi Mixxer Rp 400,000
jam
Sewa /
39 Concete Pump Rp 500,000
jam
- 64 -
Sewa /
40 Trailer 20 Ton Rp 450,000
jam
Sewa /
41 Pile Draiver+ Hammer Rp 250,000
jam
Sewa /
42 Crane on Track 35 Ton Rp 450,000
jam
Sewa /
43 welding set Rp 100,000
jam
Sewa /
44 Bore pile Machine Rp 300,000
jam
Sewa /
45 Asapalt Liquid Mixer Rp 600,000
jam
Sewa /
46 Tronton Rp 500,000
jam
Sewa /
47 Cold Milling Rp 500,000
jam
Sewa /
48 Rock Drill Breaker Rp 300,000
jam
Sewa /
38 Aggregat ( chip ) Spreader Rp 275,000
jam
Sewa /
39 Aspalt Distributor Rp 300,000
jam
Sewa /
40 Concete Pan mixer Rp 400,000
jam
Sewa /
41 Concete breaker Rp 650,000
jam
Sewa /
42 Aspalt Tanker Rp 500,000
jam
Sewa /
43 Cement tanker Rp 500,000
jam
Sewa /
44 Vibrating Rammer Rp 350,000
jam
- 65 -
Sewa /
45 Truck Mixer ( Agitator ) Rp 500,000
jam
Sewa /
46 Bore pile Machine Rp 500,000
jam
Sewa /
47 condrete mixer (350) Rp 200,000
jam
- 66 -
I.A PERSONIL
1 AHLI MUDA
9 - 12 12,000,000 15,000,000 19,000,000
a b c d
1-4 6,500,000
5-8 8,500,000
1 S1
9 - 12 11,000,000
1-4 8,500,000
5-8 11,000,000
2 S2
9 - 12 14,000,000
1-4 11,000,000
3 S3 5-8 14,500,000
9 - 12 18,000,000
- 68 -
TENAGA PENDUKUNG
a b c d
0-2 th 3,000,000
3-4 th 3,500,000
9-12 th 5,000,000
1-4 th 5,000,000
5-8 th 6,000,000
2 D3
9-12 th 7,000,000
Operator
4 3,000,000
Komputer
a b c
5 Mandor 190,000.00
7 Operator 135,000.00
9 Supir 150,000.00
II.A.1
BUPATI JOMBANG,
MUNDJIDAH WAHAB