Kegiatan :-
Pekerjaan :-
Lokasi : Sumber - Kabupaten Cirebon
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek - 1.00 bh 364,012.00 364,012.00
2 Kesehatan Dan Keselamatan Kerja ( K3 ) - 1.00 ls 1,265,000.00 1,265,000.00
3 Alat Bantu ( Scaffolding ) - 20.00 set 341,550.00 6,831,000.00
Sub Jumlah Total Pekerjaan Persiapan 8,460,012.00
II PEKERJAAN AULA BAPENDA
A PEKERJAAN INTERIOR
1 Pek. Pemasangan Backdrop Panggung Taksiran 29.70 m2 1,002,540.00 29,775,438.00
2 Pek. Pemasangan Lantai Vinil A.4.4.3.59. 193.06 m2 208,644.70 40,280,945.78
3 Pek. Pemasangan Backdrop Plafond Taksiran 92.39 m2 1,002,540.00 92,623,668.06
4 Pek. Pengecatan Plafond Taksiran 137.13 m2 34,529.00 4,734,892.71
Sub Jumlah Total Pekerjaan Interior 167,414,944.55
B PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Lampu Indirex - 47.34 m' 50,000.00 2,367,000.00
2 Pek. Pemasangan Saklar Ganda - 2.00 bh 65,560.00 131,120.00
3 Pek. Pemasangan Titik Instalasi Penerangan A.8.4.6.1 3.00 titik 447,480.00 1,342,440.00
4 Pek. Pemasangan Lampu Downlight - 3.00 bh 124,000.00 372,000.00
5 Pek. Pemasangan Stop Kontak - 2.00 bh 39,050.00 78,100.00
Sub Jumlah Total Pekerjaan Listrik 4,290,660.00
Jumlah Real Coast 180,165,616.55
PPN 11% 19,818,217.82
Jumlah Total 199,983,834.37
Terbilang : "Seratus Sembilan Puluh Sembilan Juta Sembilan Ratus Delapan Puluh Tiga Ribu Delapan Ratus Tiga Puluh
Empat Koma Tiga Tujuh"
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pembuatan Papan Nama Proyek
NO. : I.1
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T
LUAS
DIMENSI VOLU
KET.
Q1 Q2 Q3 (P x L x ME
T)
1.00 bh
1.00 1.00
JUMLAH TOTAL 1.00 bh
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Kesehatan Dan Keselamatan Kerja ( K3 )
NO. : I.2
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLU
KET.
Q3 (P x L x ME
T)
1.00 ls
1.00
JUMLAH TOTAL 1.00 ls
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Alat Bantu ( Scaffolding )
NO. : I.3
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLUME KET.
Q3 (P x L x
T)
27.00 set
27.00
JUMLAH TOTAL 27.00 set
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pemasangan 1 m² Backdrop Panggung
NO. : II.A.1
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T
LUAS
DIMENSI
VOLUME KET.
Q1 Q2 Q3 (P x L x
T)
29.70 m2
29.70
JUMLAH TOTAL 29.70 m2
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pemasangan 1 m² Vinil t. 3mm Lantai
NO. : II.A.2
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1
ENSI LUAS
(P x L x VOLUME KET.
Q2 Q3 T)
193.06 m2
161.66
29.40
2.00
JUMLAH TOTAL 193.06 m2
RIAN PURNAMA
Direktur
DATA PENDUKUNG K
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAAN : Pemasangan 1 m2 Backdrop Plafond
NO. : II.A.3
SKET GAMBAR
DIMENSI LUAS
(P x L x
L T Q1 Q2 Q3 T)
RIAN PURNAMA
Direktur
VOLUME KET.
92.39 m2
92.39 m2
V. ARS GUMILANG
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pengecatan Plafond
NO. : II.A.4
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLU
KET.
Q3 (P x L x ME
T)
137.13 m2
104.92
32.21
JUMLAH TOTAL 137.13 m2
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Lampu Indirex
NO. : II.B.1
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1
LUAS
ENSI
VOLUME KET.
Q2 Q3 (P x L x
T)
47.34 m'
11.60
18.28
6.62
5.80
5.04
JUMLAH TOTAL 47.34 m'
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Saklar Ganda
NO. : II.B.2
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLUME KET.
Q3 (P x L x
T)
2.00 Buah
2.00
JUMLAH TOTAL 2.00 Buah
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Titik Instalasi Penerangan
NO. : II.B.3
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLUME KET.
Q3 (P x L x
T)
3.00 Titik
3.00
JUMLAH TOTAL 3.00 Titik
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Lampu Downlight
NO. : II.B.4
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLUME KET.
Q3 (P x L x
T)
3.00 Buah
3.00
JUMLAH TOTAL 3.00 Buah
RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS
PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Stop Kontak
NO. : II.B.5
SKET GAMBAR
DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2
LUAS
VOLUME KET.
Q3 (P x L x
T)
2.00 Buah
2.00
JUMLAH TOTAL 2.00 Buah
RIAN PURNAMA
Direktur
Taksiran Pemasangan 1 m² Panel Dinding/Backdrop HPL (tebal max. 10cm)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Tukang Kayu m2 1.00 110,000.00
Tukang Finishing Tlusiran m 4.00 25,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiplek 9mm lbr 0.80 118,000.00
Multiplek 12mm lbr 1.00 215,000.00
HPL ex TACO lbr 0.80 200,000.00
Lem Kuning kg 1.70 45,000.00
Lem Putih bh 1.20 18,000.00
Paku Tembak dus 0.68 30,000.00
Scrup 4 cm bh 15.00 500.00
Ampelas lbr 1.00 6,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu ls 1.000 100,000.00
110,000.00
100,000.00
210,000.00
94,400.00
215,000.00
160,000.00
76,500.00
21,600.00
20,400.00
7,500.00
6,000.00
601,400.00
100,000.00
100,000.00
911,400.00
91,140.00
1,002,540.00
110,000.00
200,000.00
310,000.00
94,400.00
275,000.00
140,000.00
123,750.00
41,400.00
30,000.00
10,000.00
9,000.00
723,550.00
180,887.50
180,887.50
1,214,437.50
121,443.75
1,335,881.25
Jumlah
Harga
(Rp)
110,000.00
200,000.00
310,000.00
94,400.00
215,000.00
140,000.00
36,000.00
76,500.00
21,600.00
30,000.00
15,000.00
9,000.00
637,500.00
159,375.00
159,375.00
1,106,875.00
110,687.50
1,217,562.50
Jumlah
Harga
(Rp)
110,000.00
110,000.00
200,000.00
420,000.00
172,000.00
220,000.00
325,000.00
200,000.00
177,750.00
67,860.00
45,000.00
20,000.00
24,000.00
7,500.00
140,000.00
232,000.00
1,631,110.00
407,777.50
407,777.50
2,458,887.50
245,888.75
2,704,776.25
Jumlah
Harga
(Rp)
36,000.00 0.45
24,750.00 0.225
2,645.00 0.023
63,395.00 0.023
23333.33
240,000.00 2.88 560000 168000 728000
45,000.00 0.35 3.2 30333.33
41,300.00 1.008 175000
326,300.00
13,052.00
13,052.00
402,747.00 475000 142500 617500
40,274.70 25729.17
443,021.70
Jumlah
Harga
(Rp)
36,000.00
24,750.00
2,645.00
63,395.00
240,000.00
45,000.00
285,000.00
11,400.00
11,400.00
359,795.00
35,979.50
395,774.50
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :
A TENAGA
Obat-obatan L.01 Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Rompi bh 10.000
Helm bh 10.000
Sepatu bh 10.000
Lain-lain ls 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.330
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250
Semen portland Kg 5.000
Pasir beton m3 0.005
Koral beton (kerikil) m3 0.009
Kayu 5/7 (kayu kelas III) m3 0.072
Paku biasa 2” – 5” Kg 0.060
Residu (ter kayu) Liter 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.02 OH 0.400
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.250
f 8-10/400 cm
Semen portland Kg 2.500
Seng gelombang lbr 1.200
Pasir Beton m3 0.005
Koral Beton m3 0.009
Kayu 5/7 (kayu kelas III) m3 0.072
Paku biasa 2''-5'' Kg 0.060
Meni Besi ltr 0.450
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.02 OH 0.300
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu f Batang 1.000
8-10/400 cm
Semen portland Kg 2.000
Kawat duri M’ 25.000
Pasir beton m3 0.005
Koral beton m3 0.009
Paku biasa 2” – 5” Kg 0.060
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Tukang kayu L.02 OH 0.300
Kepala tukang L.03 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan kelas m3 0.036
III
Kayu balok 5/7 m3 0.014
kelas III
Paku biasa kg 0.080
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Batu belah 10/15 cm m3 0.150
Batu pecah mesin 2-3 cm m3 0.090
Pasir pasang m3 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.667
Mandor L.04 OH 0.333
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.010
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.088
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 0.042
Tukang L.02 0.004
Kepala Tukang L.03 0.002
Mandor L.04 0.042
JUMLAH TENAGA KERJA
B BAHAN
Kawat jaring Lbr 0.143
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.375
Tukang L.02 OH 0.125
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.019
JUMLAH TENAGA KERJA
B BAHAN
Panel beton Lbr 0.986
pracetak
Kolom beton Batang 0.525
pracetak
Semen PC Kg 45.000
Pasir beton m3 0.074
Koral m3 0.146
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.050
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug 1.200
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.800
Tukang L.02 OH 0.400
Kepala Tukang L.03 OH 0.040
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
Kapur Padam/bakar m3 0.135
Pasir Pasang m3 0.400
Tanah Liat m3 0.948
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Ijuk m3 6.000
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 202.000
Pasir pasang m3 0.485
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 163.000
Pasir pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 136.000
Pasir pasang m3 0.544
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 117.000
Pasir pasang m3 0.561
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 41.000
Kapur m3 0.131
Pasir pasang m3 0.523
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara de
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 247.000
Pasir beton kg 869.000
Kerikil (Maks 30 kg 999.000
mm)/menggunakan bt.pecah
mesin 2-3
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
1. Semen kg 276.000
Portland
2. Pasir beton kg 828.000
3. Kerikil kg 1,012.000
kg 1,012.000
(Maks 30mm)
4. Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 299.000
Pasir beton kg 799.000
Kerikil (Maks 30 mm) kg 1,017.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
CATATAN
400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama d
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 326.000
Pasir beton kg 760.000
Kerikil (Maks kg 1,029.000
30mm)/menggunakan bt.pecah 2-
3
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 352.000
Pasir beton kg 731.000
Kerikil (Maks kg 1,031.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000
Pasir beton kg 698.000
Kerikil (Maks kg 1,047.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 384.000
Pasir beton kg 692.000
Kerikil kg 1,039.000
(Maksimum
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 413.000
Pasir beton kg 681.000
Kerikil (Maks kg 1,021.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama d
A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000
Pasir beton kg 667.000
Kerikil (maksimum kg 1,000.000
30 mm)
Bahan tambahan Liter 4.500
kimia (efoksi)
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
sir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 400.000
Pasir beton m3 0.480
Kerikil (2cm/3cm) m3 0.800
Strorox – 100 kg 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060
Tukang Batu/Pipa L.02 OH 0.030
Kepala Tukang L.03 OH 0.003
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
150 mm
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070
Tukang Batu/Pipa L.02 OH 0.035
Kepala Tukang L.03 OH 0.004
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
200 mm
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080
Tukang Batu L.02 OH 0.040
Kepala Tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
230 mm - 320 mm
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070
Tukang besi L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 10.500
(polos/ulir)
Kawat beton kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang besi L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 10.500
(polos/ulir)
Kawat beton kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025
Tukang besi L.02 OH 0.025
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat kg 10.200
baja dilas
Kawat beton kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.520
Tukang kayu L.02 OH 0.260
Kepala tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 – 10 cm kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof
A TENAGA
Pekerja L.01 OH 0.520
Tukang kayu L.02 OH 0.260
Kepala tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.045
Paku 5 cm – 10 cm kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 Lbr 0.350
mm
Dolken kayu f 8- Batang 2.000
Batang 2.000
10cm –panj 4 m
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slu
A TENAGA
Pekerja L.01 OH 0.132
Tukang batu L.02 OH 0.022
Kepala tukang L.03 OH 0.002
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 26.080
Pasir beton Kg 60.800
Kerikil (menggunakan bt. Pecah 2- Kg 82.320
3)
Air L 17.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slu
A TENAGA
Pekerja L.01 OH 0.165
Tukang batu L.02 OH 0.028
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 32.600
Pasir beton Kg 76.000
Kerikil (maks 30mm) Kg 102.900
Air L 21.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, sl
A TENAGA
Pekerja L.01 OH 0.198
Tukang batu L.02 OH 0.033
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 39.120
Pasir beton Kg 91.200
Kerikil (maks 30mm) Kg 123.480
Air L 25.800
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slu
A TENAGA
Pekerja L.01 OH 0.248
Tukang batu L.02 OH 0.041
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 48.900
Pasir beton Kg 114.000
Kerikil (maks 30 mm) Kg 154.350
Air L 32.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.007
Tukang kayu L.02 OH 0.076
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Lantai kerja t=10cm m3 0.008
Besi hollow (50 x 50
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi
7 m3 0.005
cm)
Phenol film 12 mm Lbr 0.080
Minyak cetakan
L 0.200
(bekisting)
Dinabolt Ø 12mm
buah 3.882
(10 s.d.15 cm)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali paka
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pak
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton prac
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton prac
A TENAGA
Pekerja L.01 OH 0.069
Tukang batu L.02 OH 0.242
Tukang vibrator L.02 OH 0.138
Kepala tukang L.03 OH 0.037
Mandor L.04 OH 0.073
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak
A TENAGA
Pekerja L.01 OH 0.061
Tukang batu L.02 OH 0.213
Tukang vibrator L.02 OH 0.122
Kepala tukang L.03 OH 0.033
Mandor/Supervisor/ L.04 OH 0.073
Penyelia
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.08 OH 0.067
Pembantu operator
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067
Tukang batu L.02 OH 0.067
Tukang ereksi L.02 OH 0.134
Kepala tukang L.03 OH 0.067
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.676
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.067
Sewa pipe support buah 1.100
hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.0 OH 0.061
8
Pembantu operator crane L.0 OH 0.061
9
Pekerja L.0 OH 0.061
1
Tukang batu L.0 OH 0.061
2
Tukang ereksi L.0 OH 0.122
2
Kepala tukang L.0 OH 0.061
3
Mandor L.0 OH 0.061
4
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.110
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit 0.061
hari
Sewa scaffolding unit 1.100
hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.08 OH 0.083
Pembantu operator L.09 OH 0.083
crane
Pekerja L.01 OH 0.083
Tukang batu L.02 OH 0.083
Tukang ereksi L.02 OH 0.166
Kepala tukang L.03 OH 0.083
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Solar L 8.277
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.083
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator
L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.000
Screening Kg 650.000
Air L 350.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.000
Air L 400.00
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Tukang batu L.02 OH 0.367
Kepala tukang L.03 OH 0.074
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.147
Tukang kayu L.02 OH 0.147
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004
Paku (5 s.d.7) cm Kg 0.264
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.220
Tukang kayu L.02 OH 0.022
Tukang besi L.02 OH 0.220
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060
Tukang las L.03 OH 0.060
konstruksi
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.060
Tukang las L.03 OH 0.060
konstruksi
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang besi L.03 OH 0.100
konstruksi
Kepala tukang L.03 OH 0.001
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000
Minyak pelumas Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.800
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040
Tukang las (bersertifikat) L.03 OH 0.020
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200
Tukang las biasa L.03 OH 1.200
Kepala tukang L.03 OH 0.120
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pintu gulung besi m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.440
Tukang L.03 OH 0.440
Kepala tukang L.03 OH 0.044
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080
Tukang L.03 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Sunscreen alluminium m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.043
Tukang khusus alumunium L.03 OH 0.043
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m1 1.100
Skrup fixer buah 2.000
Sealant Tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.043
Tukang khusus alumunium L.03 OH 0.043
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Kaca rayband m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.085
Tukang khusus L.03 OH 0.085
alumunium
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.400
Profil kaca m 4.500
Sealant Tube 0.270
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds
A TENAGA
Pekerja L.01 OH 0.350
Tukang L.03 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Venetions blinds dan m2 1.000
vertical blinds (tirai)
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.670
Tukang las L.03 OH 1.670
Kepala tukang L.03 OH 0.167
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Besi strip kg 6.177
Pengelasan cm 27.080
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako 1.100
m2
(rangka + kaca 5 mm)
Paku skrup 10.000
buah
1 cm – 2,5 cm
Besi strip m 7.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050
Paku 1 cm - 2,5 cm kg 0.015
Papan kayu kelas II
m3 0.019
atau III
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 4
A TENAGA
Pekerja L.01 OH 0.150
Tukang L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050
Paku 1 cm – 2,5 cm kg 0.010
Besi strip kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang besi L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal M1 3.500
hollow 40.40.2 mm
Assesoris Ls 1.000
(perkuatan, las dll)
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil
A TENAGA
Pekerja L.01 OH 0.734
Tukang besi L.02 OH 0.734
Kepala tukang L.03 OH 0.073
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg 3.065
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.760
Tukang besi L.02 OH 0.760
Kepala tukang L.03 OH 0.076
Mandor L.04 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai
kg 4.050
dingin C75
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.390
Tukang besi L.02 OH 0.700
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Alumunium Composit m2 1.100
Hollow Galvanis 4x4 mm btg 0.800
Braket Siku/Spigot btg 0.267
Paku Skrup Beton kg 0.080
Paku Skrup kg 0.110
Sealent tube 0.250
JUMLAH HARGA BAHAN
C PERALATAN
Stager set 0.020
Listrik Kerja ls 1.000
Alat Bantu Lain ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campur
A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 43.500
Pasir pasang m3 0.080
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campur
A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 32.950
Pasir pasang m3 0.091
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu
A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala bukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 26.550
Pasir Pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campur
A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 18.500
Pasir pasang m3 0.122
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 10.080
Kapur padam m3 0.028
Pasir pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 18.950
Pasir pasang m3 0.038
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 14.370
Pasir pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 11.500
Pasir pasang m3 0.043
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 9.680
Pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campur
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 6.500
Pasir pasang m3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campur
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 4.500
Kapur padam m3 0.015
Pasir pasang m3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen merah Kg 0.018
Kapur padam m3 0.018
Pasir pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
HB20 : Hollow Block tebal 20cm
A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP
A TENAGA
Pekerja L.01 OH 0.350
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
HB-20 buah 12.500
Semen Portland Kg 2.426
Pasir pasang m3 0.077
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.320
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
HB-15 buah 12.500
Semen Portland Kg 2.274
Pasir pasang m3 0.055
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
HB15: Hollow Block tebal 15cm
A TENAGA
Pekerja L.01 OH 0.320
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
HB-15 buah 12.500
Semen Portland Kg 1.820
Pasir pasang m3 0.058
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
HB-10 buah 12.500
Semen Portland Kg 1.516
Pasir pasang m3 0.036
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
Hb10 : Hollow Block tebal 10 cm
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
HB-10 buah 12.500
Semen Portland Kg 1.213
Pasir pasang m3 0.039
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Berongga buah 70.000
Semen Portland Kg 1.400
Pasir pasang m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap p
A TENAGA
Pekerja L.01 OH 0.670
Tukang batu L.02 OH 1.300
Kepala tukang L.03 OH 0.130
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5cm buah 8.400
Mortar siap pakai Kg 0.473
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pa
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 15.504
PP m3 0.016
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.224
PP m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 7.776
PP m3 0.023
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 6.240
PP m3 0.024
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184
PP m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 4.416
PP m3 0.027
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.936
PP m3 0.028
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.456
PP m3 0.029
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.760
KP m3 0.003
PP m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.000
KP m3 0.005
PP m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.009
KP m3 0.009
PP m3 0.009
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.007
KP m3 0.007
PP m3 0.015
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 13.632
PP m3 0.027
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.368
PP m3 0.031
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 8.320
PP m3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 6.912
PP m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm
A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.888
PP m3 0.036
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.440
Tukang batu L.03 OH 0.220
Kepala tukang L.03 OH 0.022
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.009
KP m3 0.009
PP m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.03 OH 0.075
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184
PP m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.03 OH 0.400
Kepala tukang L.03 OH 0.040
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 0.500
Pasir pasang m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.03 OH 0.225
Kepala tukang L.03 OH 0.023
Mandor L.04 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.000
Batu granit Kg 15.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.03 OH 0.225
Kepala tukang L.03 OH 0.023
Mandor L.04 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.000
Batu traso Kg 15.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 4.320
Pasir pasang m3 0.006
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.03 OH 0.075
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.108
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070
Tukang batu L.03 OH 0.035
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 1.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 6.340
Pasir pasang m3 0.012
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH
Tukang batu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
MSP Kg
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH
Tukang batu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
MSP Kg
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 11.870
Semen Portland kg 10.000
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.270
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu buah 26.500
Semen Portland kg 10.400
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang datu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.270
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 26.500
Semen Portland kg 10.400
Semen warna Kg 1.000
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit bh 3.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.11.
Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.240
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.100
Semen Portland kg 9.600
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.300
Semen Portland kg 1.650
Pasir pasang M3 0.004
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.530
Semen Portland kg 1.240
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 2.650
Semen Portland kg 1.240
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.150
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 3.530
Semen Portlan kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 2.630
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 1.700
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3 cm
A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.02 OH 0.180
Kepala tukang L.03 OH 0.018
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Teraso cor M3 0.036
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 53.000
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 106.000
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 3.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik doos 1.050
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Doos 1.050
Semen Portland Kg 10.000
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Doos 1.050
Semen Portland Kg 10.400
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.050
Tukang batu L.02 OH 0.525
Kepala tukang L.03 OH 0.053
Mandor L.04 OH 0.053
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.000
Semen Portland Kg 9.800
Pasir pasang M3 0.045
Semen warna Kg 4.370
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.870
Semen Portland Kg 14.150
Pasir pasang M3 0.039
Semen warna Kg 2.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.025
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.600
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen Portland Kg 0.570
Pasir pasang M3 0.002
Semen warna Kg 0.013
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.750
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Internal cove Bh 5.300
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.060
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 0.134
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.170
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.050
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Underlayer m2 1.050
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.050
Lem Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor
A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.050
Lem Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Porslen Doos 1.050
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Porslen buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Porslen buah 26.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 106.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.900
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 26.500
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.54. rub b Pemasangan 1 m2 dinding keramik 30 cm x 60 cm
A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 13.500
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.300
Tukang batu L.02 OH 0.650
Kepala tukang L.03 OH 0.065
Mandor L.04 OH 0.065
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060
Semen Portland Kg 12.440
Pasir pasang M3 0.025
Semen warna Kg 0.650
Paku 12 cm buah 3.030
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis buah 63.000
Semen Portland Kg 12.440
Pasir pasang M3 0.025
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu paras buah 1.100
Semen Portland Kg 11.750
Pasir pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel hitam Buah 1.100
Semen Portland Kg 11.750
Pasir pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 10x10 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 10x20 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 15x30 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 20x40 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.58. rub e Pemasangan 1 m2 Batu Alam Andesit Bakar 30 x 30 cm
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 30x30 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 30x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 40x40 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 40x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 50x50 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 60x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Vynil buah 11.870
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350
Tukang batu L.02 OH 0.175
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.200
Lem Kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner Kg 5.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.02 OH 0.080
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Vynil buah 1.760
Lem Kg 0.080
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 M3 0.003
Paku/skrup 5 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 6 cm M2 1.010
Pasir beton M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.500
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 8 cm natural M2 1.010
Pasir beton M3 2.070
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 6cm berwarna M2 1.010
Pasir beton M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 12.000
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.800
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.500
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Tripleks Lembar 0.375
Paku tripleks kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.02 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan m3 0.015
Paku tripleks kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.500
Tukang besi L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum "T" m 3.600
Kawat Ø 4 mm kg 0.150
Ramset Buah 1.050
Akustik 60 x 120 Lembar 1.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.05
Paku kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List profil gypsum m' 1.10
Semen PC (50 kg) kg 0.005
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 25.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok buah 25.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 12.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Buah 5.000
Semen Portland Kg 8.000
Pasir pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung buah 4.000
Semen Portland Kg 8.000
Pasir pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.067
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 90 x 180 Lbr 0.600
Paku biasa ½”-1” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.500
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.600
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.600
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.750
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.350
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.440
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.510
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.800
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.370
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.380
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.460
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.490
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.570
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.050
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.150
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton buah 11.000
Paku biasa 2”-5” Kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.300
Kepala tukang L.11 OH 0.003
Mandor L.15 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Genteng aspal Buah 6.900
Plywood 6 mm Lbr 0.350
Paku biasa ½”-1” Kg 0.030
Plastic aerator buah 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal buah 1.300
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal buah 2.000
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang Las L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Polycarbonet m2 1.000
Paku Skrup bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang Las L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Galvalume m2 1.000
Paku Skrup bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.166
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu buah 30.000
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.125
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng aspal buah 2.000
Paku biasa ½”-1” Kg 0.050
Kayu balok borneo M3 0.004
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal
A TENAGA
Pekerja L.01 OH 0.250
Tukang kayu L.03 OH 0.150
Kepala tukang L.11 OH 0.015
Mandor L.15 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal buah 1.100
Paku biasa ½”-1” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.125
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3" x 6” Lbr 0.400
Paku biasa ½”-1” Kg 0.050
Paku biasa 2”-5” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.03 OH 0.060
Kepala tukang L.11 OH 0.006
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng gel 3”x6” Lbr 0.700
Paku biasa ½”-1” Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300
Paku biasa ½”-1” Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.750
Kepala tukang L.11 OH 0.080
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050
Paku hak panjang 15 cm Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 1.000
Kepala tukang L.11 OH 0.100
Mandor L.15 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40 x 18 buah 1.200
Paku hak panjang 15 cm Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.050
Kepala tukang L.11 OH 0.005
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Aluminium foil M2 1.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.050
Kepala tukang L.11 OH 0.005
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Woodplank m1 1.050
Skrup bh 4.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu
A TENAGA
Pekerja L.01 OH 7.000
Tukang kayu L.03 OH 21.000
Kepala tukang L.03 OH 2.100
Mandor L.04 OH 0.350
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Paku 10 cm Kg 1.250
Lem kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu
A TENAGA
Pekerja L.01 OH 6.000
Tukang kayu L.03 OH 18.000
Kepala tukang L.03 OH 1.800
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200
Paku 10 cm Kg 1.250
Lem kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350
Tukang kayu L.03 OH 1.050
Kepala tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Paku 5 – 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350
Tukang kayu L.03 OH 1.050
Kepala tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Paku 5 – 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau I
A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.03 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Lem kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas
A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.03 OH 2.400
Kepala tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.024
Lem kayu Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I
A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.03 OH 2.100
Kepala tukang L.03 OH 0.210
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 cm – 2,5 cm kg 0.030
Lem kayu kg 0.500
Plywood tebal 4 mm Lembar 1.000
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I ata
A TENAGA
Pekerja L.01 OH 0.80
Tukang kayu L.03 OH 2.40
Kepala tukang L.03 OH 0.24
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.026
Paku 1 cm – 2,5 cm kg 0.030
Lem kayu kg 0.500
Plywood 4 mm Lembar 1.000
(90 x 220) cm
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.670
Tukang kayu L.03 OH 2.000
Kepala tukang L.03 OH 0.200
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.060
Paku 1 – 2,5 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.03 OH 2.400
Kepala tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 – 2,5 cm kg 0.030
Lem kayu kg 0.300
Teakwood 4 mm Lembar 1.000
90 x 220 cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.850
Tukang kayu L.03 OH 2.550
Kepala tukang L.03 OH 0.255
Mandor L.04 OH 0.043
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 – 2,5 cm kg 0.030
Lem kayu kg 0.800
Teakwood 4 mm Lembar 1.000
90 x 220 cm
Formika Lembar 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 6.700
Tukang kayu L.03 OH 20.100
Kepala tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.700
Tukang kayu L.03 OH 20.100
Kepala tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 3.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014
Reng 2 x 3 cm m3 0.036
Paku 5 dan 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014
Reng (3 x 4) cm m3 0.057
Paku 5 dan 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.014
Paku 5 - 10 cm m3 0.057
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II ata
A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015
Paku 7 cm – 10 cm kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016
Paku 7 – 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011
Paku 5 dan 7 cm kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas I
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011
Paku 5 dan 7 cm kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 m3 0.028
Paku 5 dan 10 kg 0.150
Plywood 4 mm, Lembar 0.860
120 x 240
Lem kayu kg 0.560
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600
Tukang kayu L.03 OH 1.800
Kepala tukang L.03 OH 0.180
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.007
Paku 5 dan 10 kg 0.100
Paku skrup 10 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.500
Kaso-kaso 5 x 7 m3 0.014
Paku kg 0.012
List kayu 2/4 m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA KERJA
Pekerja L.01 OH 0.060
Tukang kayu L.02 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi
A TENAGA KERJA
Pekerja L.01 OH 0.005
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.5. Pemasangan 1 buah engsel pintu
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Spring knip buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Door holder buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.010
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Door stop buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060
Tukang kayu L.02 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.025
Tukang kayu L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 3 mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.017
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100
Sealant Kg 0.070
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm
A TENAGA
Pekerja L.01 OH 0.025
Tukang kayu L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1.100
Sealant Kg 0.070
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm
A TENAGA
Pekerja L.01 OH 0.017
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 8 mm m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kaca wireglassed 5 mm m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm
A TENAGA
Pekerja L.01 OH 0.075
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.0 OH 0.070
1
Tukang cat L.0 OH 0.009
2
Kepala tukang L.0 OH 0.006
3
Mandor L.0 OH 0.003
4
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup (setara avian) Kg 0.260
Kuas buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3
A TENAGA
Pekerja L.0 OH 0.070
1
Tukang cat L.0 OH 0.105
2
Kepala tukang L.0 OH 0.004
3
Mandor L.0 OH 0.003
4
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup (setara avian) Kg 0.350
Kuas buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.360
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.060
Kepala tukang L.03 OH 0.016
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Politur L 0.150
Politur jadi L 0.372
Ampelas Lbr 2.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.160
Tukang cat L.02 OH 0.160
Kepala tukang L.03 OH 0.016
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Vernis L 0.150
Dempul Kg 0.050
Ampelas Lbr 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100
Cat dasar Kg 0.100
Cat penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.028
Tukang cat L.02 OH 0.042
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120
Cat penutup Kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.028
Tukang cat L.02 OH 0.042
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kalkarium Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang cat L.02 OH 0.001
Kepala tukang L.03 OH 0.000
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.150
Ampelas Lbr 0.100
Alang-alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.005
Kepala tukang L.03 OH 0.001
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.300
Ampelas Lbr 0.200
Alang-alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100
Kwas buah 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang cat L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.100
Menie B Kg 0.100
Cat Kg 0.080
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060
Tukang cat L.02 OH 0.060
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.300
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang cat L.02 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.110
Cat antara Kg 0.170
Cat penutup Kg 0.080
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang cat L.02 OH 0.700
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.200
Cat penutup 2 x Watershield Kg 0.260
Ampelas lbr 0.100
Roll Cat bh 0.025
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.000
Tukang cat L.02 OH 12.000
Kepala tukang L.03 OH 1.200
Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
Wood filler kg 1.500
Woodstain kg 1.500
Sanding kg 1.500
Melamic kg 2.400
Thinner L 2.000
Ampelas Lbr 6.000
Lbr JUMLAH HARGA BAHAN
C PERALATAN
Compressor jam
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Bata merah buah 7.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.000
Kepala tukang L.03 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 0.300
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200
Tukang batu L.02 OH 1.450
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.075
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bathcuip Unit 1.000
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.000
Tukang batu L.02 OH 4.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.900
JUMLAH TENAGA KERJA
B BAHAN
Bak fiberglass Unit 1.000
Perlengkapan Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
A TENAGA
Pekerja L.01 OH 6.000
Tukang batu L.02 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 150.000
Semen portlan Kg 120.000
Pasir pasang M3 0.300
Porselen 11x11 bh 360.000
Semen warna Kg 6.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.000
Tukang batu L.02 OH 4.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.900
JUMLAH TENAGA KERJA
B BAHAN
Bak fiberglass Unit 1.000
Perlengkapan Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bak air fiberglass Unit 1.000
Perlengkapan % 0.120
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.030
Tukang batu L.02 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000
Waterdrain buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000
Waterdrain buah 1.000
Semen portland Kg 20.000
Pasir pasang M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.010
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
A TENAGA
Pekerja L.01 OH 2.160
Tukang batu L.02 OH 0.720
Kepala tukang L.03 OH 0.072
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 40.000
Semen portland Kg 44.000
Pasir pasang M3 0.070
Pasir beton M3 0.060
Kerikil M3 0.070
Baja tulangan Kg 1.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 c
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.200
Tukang cat L.02 OH 1.500
Kepala tukang L.03 OH 0.011
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen portland Kg 77.000
Pasir pasang M3 0.130
Pasir beton M3 0.090
Kerikil M3 0.020
Baja tulangan Kg 2.600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.200
Tukang batu L.02 OH 1.150
Kepala tukang L.03 OH 0.011
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 123.000
Semen portland Kg 114.000
Pasir pasang M3 0.184
Pasir beton M3 0.120
Kerikil M3 0.033
Baja tulangan Kg 4.850
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.000
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.108
Tukang las L.02 OH 0.180
Mandor L.03 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.036
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.030
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.036
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 11/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 21/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.02 OH 0.040
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah buah 1.600
Semen portlan Kg 35.000
Pasir pasang M3 0.014
Pasir urug M3 0.014
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
A TENAGA
Pekerja L.01 OH 0.060
Tukang batu L.02 OH 0.030
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 buah 1.600
Semen portlan Kg 0.680
Pasir pasang M3 0.013
Pasir urug M3 0.011
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.140
Tukang batu L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 7.000
JUMLAH TENAGA KERJA
B BAHAN
Pipa beton dia. 15-20 buah 1.100
Bata merah M3 0.027
Semen portlan Kg 3.920
Pasir pasang M3 0.056
Pasir urug M3 0.024
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.380
Tukang batu L.02 OH 0.190
Kepala tukang L.03 OH 0.019
Mandor L.04 OH 0.019
JUMLAH TENAGA KERJA
B BAHAN
Pipa beton dia. 30-100 buah 1.100
Bata merah M3 0.550
Semen portlan Kg 10.300
Pasir pasang M3 0.061
Pasir urug M3 0.069
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.105
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 114 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.294
Tukang pipa L.02 OH 0.147
Mandor L.04 OH 0.029
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.040
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.809
Tukang pipa L.02 OH 0.405
Mandor L.04 OH 0.081
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.122
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.957
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.145
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.618
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.250
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.691
Tukang pipa L.02 OH 0.846
Mandor L.04 OH 0.169
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.262
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.895
Tukang pipa L.02 OH 0.948
Mandor L.04 OH 0.190
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.294
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.099
Tukang pipa L.02 OH 1.050
Mandor L.04 OH 0.210
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.327
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.303
Tukang pipa L.02 OH 1.152
Mandor L.04 OH 0.230
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
hari 0.359
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.045
Tukang pipa L.02 OH 0.023
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.062
Tukang pipa L.02 OH 0.031
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.102
Tukang pipa L.02 OH 0.051
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.067
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.042
hari 0.042
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.170
Tukang pipa L.02 OH 0.085
Mandor L.04 OH 0.017
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.065
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.290
Tukang pipa L.02 OH 0.145
Mandor L.04 OH 0.029
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.152
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.359
Tukang pipa L.02 OH 0.180
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.200
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.433
Tukang pipa L.02 OH 0.216
Mandor L.04 OH 0.043
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.251
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.256
Mandor L.04 OH 0.051
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.307
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.893
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.089
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.573
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.677
Mandor L.04 OH 0.135
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.883
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.659
Tukang pipa L.02 OH 0.830
Mandor L.04 OH 0.166
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.093
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.818
Tukang pipa L.02 OH 0.909
Mandor L.04 OH 0.182
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.205
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.370
Tukang pipa L.02 OH 1.185
Mandor L.04 OH 0.237
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.584
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.345
Tukang pipa L.02 OH 0.172
Mandor L.04 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang pipa L.02 OH 0.200
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm
A TENAGA
Pekerja L.01 OH 0.448
Tukang pipa L.02 OH 0.224
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.506
Tukang pipa L.02 OH 0.253
Mandor L.04 OH 0.051
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm
A TENAGA
Pekerja L.01 OH 0.796
Tukang pipa L.02 OH 0.398
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.949
Tukang pipa L.02 OH 0.475
Mandor L.04 OH 0.095
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.958
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.212
Tukang pipa L.02 OH 0.606
Mandor L.04 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.676
Mandor L.04 OH 0.135
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.469
Tukang pipa L.02 OH 0.735
Mandor L.04 OH 0.140
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.327
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.133
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.327
Tukang pipa L.02 OH 1.163
Mandor L.04 OH 0.233
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F
A TENAGA
Pekerja L.01 OH 2.911
Tukang pipa L.02 OH 1.456
Mandor L.04 OH 0.291
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.488
Tukang pipa L.02 OH 1.744
Mandor L.04 OH 0.349
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.547
Tukang pipa L.02 OH 0.109
Mandor L.04 OH 0.055
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.613
Tukang pipa L.02 OH 0.123
Mandor L.04 OH 0.061
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.855
Tukang pipa L.02 OH 0.171
Mandor L.04 OH 0.085
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.951
Tukang pipa L.02 OH 0.190
Mandor L.04 OH 0.095
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.050
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.973
Tukang pipa L.02 OH 0.195
Mandor L.04 OH 0.097
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.071
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.545
Tukang pipa L.02 OH 0.309
Operator alat berat L.08 OH 0.093
Mandor L.04 OH 0.154
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.023
225 kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel hari 0.031
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.813
Tukang pipa L.02 OH 0.363
Operator alat berat L.08 OH 0.143
Mandor L.04 OH 0.181
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.029
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.011
Tukang pipa L.02 OH 0.402
Operator alat berat L.08 OH 0.293
Mandor L.04 OH 0.201
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel
hari 0.077
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.859
Tukang pipa L.02 OH 0.772
Operator alat berat L.08 OH 0.493
Mandor L.04 OH 0.386
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.084
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.225
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.995
Tukang pipa L.02 OH 0.999
Operator alat berat L.08 OH 0.593
Mandor L.04 OH 0.499
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.093
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.248
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.931
Tukang pipa L.02 OH 1.186
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.693
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.112
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.298
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 6.949
Tukang pipa L.02 OH 1.390
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.695
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.152
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.304
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.499
Tukang pipa L.02 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.579
Tukang pipa L.02 OH 0.116
Mandor L.04 OH 0.058
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.648
Tukang pipa L.02 OH 0.130
Mandor L.04 OH 0.065
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm
A TENAGA
Pekerja L.01 OH 0.708
Tukang pipa L.02 OH 0.142
Mandor L.04 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.113
Tukang pipa L.02 OH 0.223
Mandor L.04 OH 0.111
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.325
Tukang pipa L.02 OH 0.265
Mandor L.04 OH 0.133
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.415
Tukang pipa L.02 OH 0.283
Mandor L.04 OH 0.141
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.231
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.223
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.026
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.037
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.208
Tukang pipa L.02 OH 0.442
Mandor L.04 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.027
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.897
Tukang pipa L.02 OH 0.779
Mandor L.04 OH 0.390
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.046
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.098
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.895
Tukang pipa L.02 OH 0.979
Mandor L.04 OH 0.489
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.058
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.133
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.387
Tukang pipa L.02 OH 1.077
Mandor L.04 OH 0.539
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.064
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.150
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.897
Tukang pipa L.02 OH 1.176
Mandor L.04 OH 0.588
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.070
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.167
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003
(gergaji) /saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA
B BAHAN KERJA
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.040
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.017
(gergaji) /saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.037
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.420
Tukang pipa L.02 OH 0.210
Mandor L.04 OH 0.042
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 54.000
/ cilinder saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.069
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.086
/ cilinder saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.160
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.168
/ cilinder saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.213
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.236
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.000
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.004
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.005
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.006
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.009
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.017
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.023
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.030
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.055
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.070
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.085
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.101
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.060
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.179
/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.270
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.332
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.619
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
Operator L.08 OH 1.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.477
/ cilinder saw
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.010
Mandor L.04 OH 0.002
A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013
A TENAGA
Pekerja L.01 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.050
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.730
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.420
Mandor L.04 OH 0.085
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.52 (K3) Pemotongan 1 buah pipa DCI Ø 200 mm
A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.54 (K3) Pemotongan 1 buah pipa DCI Ø 300 mm
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.598
Tukang pipa L.02 OH 0.520
Mandor L.04 OH 0.260
A TENAGA
Pekerja L.01 OH 3.370
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402
A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.100
Mandor L.04 OH 0.550
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.440
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.620
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.000
Tukang pipa L.02 OH 1.000
Mandor L.04 OH 0.200
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.000
Tukang pipa L.02 OH 2.000
Mandor L.04 OH 0.400
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.12 (K3) Pemasangan 1 buah Valve Ø 1000 mm
A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022
A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.110
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.220
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.450
& handle crane 2 T
Mobile crane £ 3 ton hari 0.225
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 80 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.606
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.075
watt
Sewa Pompa hari 0.968
Submersible 3m3/h
Sewa Tripot/Tackel hari 0.865
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.430
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 1.310
/ cilinder saw
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.530
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 1.839
watt
Sewa Pompa hari 3.278
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.831
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.750
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.259
watt
Sewa Pompa hari 3.828
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.061
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.970
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.679
watt
Sewa Pompa hari 4.378
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.291
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 2.190
hari 2.190
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 3.099
watt
Sewa Pompa hari 4.928
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.521
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja 0.254
Tukang Listrik 0.365
Kepala Tukang 0.090
Mandor 0.070
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3 x 2,5 mm² M1 14.000
Pipa Konduit, uPVC High Impact M1 14.000
20 mm
Klem pipa 20 mm2, lengkap BH 14.000
dengan skrup
Tee Doos / Terminal Boxes BH 2.000
Isolasi LOT 0.100
Flexible pipe dia. 20 mm² M1 0.200
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pekerja 0.254
Tukang Listrik 0.365
Kepala Tukang 0.090
Mandor 0.070
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3 x 2,5 mm² M1 16.000
Pipa Konduit, uPVC High Impact M1 16.000
20 mm
Klem pipa 20 mm2, lengkap BH 16.000
dengan skrup
Tee Doos / Terminal Boxes BH 1.300
Isolasi LOT 0.265
Flexible pipe dia. 20 mm² M1 0.155
JUMLAH HARGA BAHAN
C PERALATAN
A TENAGA
Pembantu tukang oh 0.200
Tukang kayu oh 0.600
Kepala tukang oh 0.060
Mandor oh 0.020
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020
Paku Biasa 2-5 kg 0.250
Kayu Dolken dia.8 8-10/4 m' btg 1.500
Triplek 6 mm lbr 0.350
Cetak papan nama dg bhn flexi cetak digital m' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
PERSIAPAN
Harga Jumlah
Satuan Harga
(Rp) (Rp)
150,000.00 150,000.00
TENAGA KERJA 150,000.00
15,000.00 150,000.00
25,000.00 250,000.00
55,000.00 550,000.00
100,000.00 50,000.00
HARGA BAHAN 1,000,000.00
HARGA ALAT -
1,150,000.00
10.00% 115,000.00
1,265,000.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 26,400.00
120,000.00 1,200.00
TENAGA KERJA 27,600.00
-
-
-
-
HARGA BAHAN -
HARGA ALAT -
27,600.00
10.00% 2,760.00
30,360.00
80,000.00 32,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 2,400.00
TENAGA KERJA 58,800.00
71,000.00 88,750.00
1,420.00 7,100.00
223,000.00 1,115.00
225,000.00 2,025.00
4,025,000.00 289,800.00
21,000.00 1,260.00
31,600.00 12,640.00
HARGA BAHAN 402,690.00
HARGA ALAT -
461,490.00
10.00% 46,149.00
507,639.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
110,000.00 44,000.00
120,000.00 2,400.00
120,000.00 2,400.00
MLAH TENAGA KERJA 64,800.00
71,000.00 88,750.00
1,420.00 3,550.00
84,000.00 100,800.00
223,000.00 1,115.00
225,000.00 2,025.00
4,025,000.00 289,800.00
21,000.00 1,260.00
28,750.00 12,937.50
HARGA BAHAN 500,237.50
HARGA ALAT -
565,037.50
10.00% 56,503.75
621,541.25 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
110,000.00 33,000.00
120,000.00 2,400.00
120,000.00 2,400.00
TENAGA KERJA 53,800.00
71,000.00 71,000.00
1,420.00 2,840.00
16,900.00 422,500.00
223,000.00 1,115.00
225,000.00 2,025.00
21,000.00 1,260.00
HARGA BAHAN 429,740.00
HARGA ALAT -
483,540.00
10.00% 48,354.00
531,894.00 ok
1 m’ Bouwplank
4,025,000.00 48,300.00
21,000.00 420.00
38,640.00 270.48
HARGA BAHAN 48,990.48
0.01
HARGA ALAT -
69,790.48
10.00% 6,979.05
76,769.53 ok
80,000.00 160,000.00
110,000.00 220,000.00
110,000.00 110,000.00
120,000.00 36,000.00
120,000.00 6,000.00
TENAGA KERJA 532,000.00
71,000.00 88,750.00
4,025,000.00 724,500.00
21,000.00 1,680.00
15,812.50 17,393.75
1,420.00 4,260.00
203,000.00 30,450.00
223,000.00 22,300.00
225,000.00 33,750.00
900.00 27,000.00
43,700.00 10,925.00
3,400.00 680.00
92,000.00 7,360.00
51,700.00 7,755.00
106,000.00 6,360.00
HARGA BAHAN 983,163.75
HARGA ALAT -
1,515,163.75
10.00% 151,516.38
1,666,680.13 ok
80,000.00 80,000.00
110,000.00 165,000.00
120,000.00 18,000.00
120,000.00 6,000.00
H TENAGA KERJA 269,000.00
71,000.00 213,000.00
4,025,000.00 1,110,900.00
21,000.00 14,700.00
84,000.00 126,000.00
HARGA BAHAN 1,464,600.00
HARGA ALAT -
1,733,600.00
10.00% 173,360.00
1,906,960.00 ditangguhkan
80,000.00 80,000.00
110,000.00 220,000.00
120,000.00 24,000.00
120,000.00 6,000.00
TENAGA KERJA 330,000.00
71,000.00 120,700.00
4,025,000.00 845,250.00
21,000.00 6,300.00
1,420.00 14,910.00
223,000.00 6,690.00
225,000.00 11,250.00
84,000.00 126,000.00
50,485.00 12,621.25
HARGA BAHAN 1,143,721.25
HARGA ALAT -
1,473,721.25
10.00% 147,372.13
1,621,093.38 ok
80,000.00 80,000.00
110,000.00 220,000.00
120,000.00 24,000.00
120,000.00 6,000.00
TENAGA KERJA 330,000.00
71,000.00 88,750.00
4,025,000.00 748,650.00
21,000.00 6,300.00
1,420.00 25,560.00
223,000.00 6,690.00
225,000.00 11,250.00
84,000.00 126,000.00
106,000.00 143,100.00
HARGA BAHAN 1,156,300.00
HARGA ALAT -
1,486,300.00
10.00% 148,630.00
1,634,930.00 ok
an dan perataan
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
120,000.00 6,000.00
TENAGA KERJA 14,000.00
HARGA BAHAN -
HARGA ALAT -
14,000.00
10.00% 1,400.00
15,400.00 ok
18,000.00 22,500.00
80,068.80
10.00% 8,006.88
88,075.68 ok
kan ukuran 40 cm x 50 cm x 25 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
110,000.00 33,000.00
120,000.00 3,600.00
TENAGA KERJA 36,600.00
4,025,000.00 144,900.00
4,025,000.00 56,350.00
21,000.00 1,680.00
HARGA BAHAN 202,930.00
HARGA ALAT -
239,530.00
10.00% 23,953.00
263,483.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
120,000.00 600.00
AH TENAGA KERJA 80,600.00
315,000.00 47,250.00
315,000.00 28,350.00
203,000.00 2,030.00
HARGA BAHAN 77,630.00
HARGA ALAT -
158,230.00
10.00% 15,823.00
174,053.00 ok
80,000.00 1,066,720.00
120,000.00 79,920.00
TENAGA KERJA 1,146,640.00
HARGA BAHAN -
HARGA ALAT -
1,146,640.00
10.00% 114,664.00
1,261,304.00 ok
embok bata
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 53,360.00
120,000.00 39,960.00
AH TENAGA KERJA 93,320.00
AH HARGA BAHAN -
HARGA ALAT -
93,320.00
10.00% 9,332.00
102,652.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
120,000.00 1,200.00
AH TENAGA KERJA 9,200.00
AH HARGA BAHAN -
HARGA ALAT -
9,200.00
10.00% 920.00
10,120.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 800.00
120,000.00 6,000.00
AH TENAGA KERJA 6,800.00
AH HARGA BAHAN -
HARGA ALAT -
6,800.00
10.00% 680.00
7,480.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
120,000.00 10,560.00
AH TENAGA KERJA 30,560.00
AH HARGA BAHAN -
HARGA ALAT -
30,560.00
10.00% 3,056.00
33,616.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,360.00
110,000.00 440.00
120,000.00 240.00
120,000.00 5,040.00
AH TENAGA KERJA 9,080.00
652,050.00 93,503.97
HARGA BAHAN 93,503.97
HARGA ALAT -
102,583.97
10.00% 10,258.40
112,842.37 belum di survey harga kawat jaring
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 30,000.00
110,000.00 13,750.00
120,000.00 1,440.00
120,000.00 2,280.00
TENAGA KERJA 47,470.00
1,420.00 63,900.00
223,000.00 16,502.00
225,000.00 32,850.00
HARGA BAHAN 335,624.40
HARGA ALAT -
383,094.40
10.00% 38,309.44
421,403.84 harga bahan belum di survey
edalam 1 m
HARGA BAHAN -
HARGA ALAT -
63,000.00
10.00% 6,300.00
69,300.00 ok
edalam 2 m
80,000.00 72,000.00
120,000.00 5,400.00
TENAGA KERJA 77,400.00
HARGA BAHAN -
HARGA ALAT -
77,400.00
10.00% 7,740.00
85,140.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 84,000.00
120,000.00 8,040.00
TENAGA KERJA 92,040.00
HARGA BAHAN -
HARGA ALAT -
92,040.00
10.00% 9,204.00
101,244.00 ok
80,000.00 80,000.00
120,000.00 3,840.00
TENAGA KERJA 83,840.00
HARGA BAHAN -
HARGA ALAT -
83,840.00
10.00% 8,384.00
92,224.00 ok
80,000.00 120,000.00
120,000.00 7,200.00
TENAGA KERJA 127,200.00
HARGA BAHAN -
HARGA ALAT -
127,200.00
10.00% 12,720.00
139,920.00 ok
sedalam 1 m
80,000.00 96,000.00
120,000.00 5,400.00
TENAGA KERJA 101,400.00
HARGA BAHAN -
HARGA ALAT -
101,400.00
10.00% 10,140.00
111,540.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
120,000.00 600.00
TENAGA KERJA 4,600.00
HARGA BAHAN -
HARGA ALAT -
4,600.00
10.00% 460.00
5,060.00 ok
h sejauh 30 meter
HARGA BAHAN -
HARGA ALAT -
27,600.00
10.00% 2,760.00
30,360.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,000.00
120,000.00 6,000.00
TENAGA KERJA 46,000.00
HARGA BAHAN -
HARGA ALAT -
46,000.00
10.00% 4,600.00
50,600.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,000.00
120,000.00 6,000.00
TENAGA KERJA 46,000.00
HARGA BAHAN -
HARGA ALAT -
46,000.00
10.00% 4,600.00
50,600.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
120,000.00 1,200.00
TENAGA KERJA 25,200.00
199,295.00 239,154.00
HARGA BAHAN 239,154.00
HARGA ALAT -
264,354.00
10.00% 26,435.40
290,789.40 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,000.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 9,600.00
TENAGA KERJA 122,400.00
80,500.00 10,867.50
239,085.00 95,634.00
115,000.00 109,020.00
HARGA BAHAN 215,521.50
HARGA ALAT -
337,921.50
10.00% 33,792.15
371,713.65 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
120,000.00 1,800.00
TENAGA KERJA 13,800.00
18,500.00 111,000.00
HARGA BAHAN 111,000.00
HARGA ALAT -
124,800.00
10.00% 12,480.00
137,280.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
120,000.00 3,000.00
AH TENAGA KERJA 23,000.00
184,000.00 220,800.00
AH HARGA BAHAN 220,800.00
HARGA ALAT -
243,800.00
10.00% 24,380.00
268,180.00 ok
tu belah campuran 1SP : 3PP
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 286,840.00
203,000.00 98,455.00
HARGA BAHAN 695,795.00
HARGA ALAT -
916,295.00
10.00% 91,629.50
1,007,924.50 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 231,460.00
203,000.00 105,560.00
HARGA BAHAN 647,520.00
HARGA ALAT -
868,020.00
10.00% 86,802.00
954,822.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
indeks asli indeks rubahan
80,000.00 120,000.00 1.500 1.500
110,000.00 82,500.00 0.750 0.750
120,000.00 9,000.00 0.075 0.075
120,000.00 9,000.00 0.075 0.010 disesuaikan dengan perhitungan teori teknis
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 193,120.00
203,000.00 110,432.00
HARGA BAHAN 614,052.00
HARGA ALAT -
834,552.00
10.00% 83,455.20
918,007.20 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 166,140.00
203,000.00 113,883.00
AH HARGA BAHAN 590,523.00
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 129,220.00
203,000.00 118,552.00
HARGA BAHAN 558,272.00
HARGA ALAT -
778,772.00
10.00% 77,877.20
856,649.20 ok
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
253,000.00 43,010.00
1,420.00 241.40
203,000.00 69,020.00
AH HARGA BAHAN 422,771.40
HARGA ALAT -
643,271.40
10.00% 64,327.14
707,598.54 ok
tu belah campuran 1 SP : 3 KP : 10 PP
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 86,620.00
253,000.00 37,191.00
203,000.00 99,876.00
AH HARGA BAHAN 534,187.00
HARGA ALAT -
754,687.00
10.00% 75,468.70
830,155.70 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00
258,750.00 310,500.00
1,420.00 58,220.00
253,000.00 33,143.00
203,000.00 106,169.00
HARGA BAHAN 508,032.00
HARGA ALAT -
728,532.00
10.00% 72,853.20
801,385.20 ok
osong (anstamping)
80,000.00 62,400.00
110,000.00 42,900.00
120,000.00 4,680.00
120,000.00 4,680.00
AH TENAGA KERJA 114,660.00
258,750.00 310,500.00
199,295.00 86,095.44
HARGA BAHAN 396,595.44
HARGA ALAT -
511,255.44
10.00% 51,125.54
562,380.98 ok
80,000.00 272,000.00
110,000.00 93,500.00
120,000.00 10,200.00
120,000.00 20,400.00
AH TENAGA KERJA 396,100.00
258,750.00 124,200.00
1,420.00 275,480.00
223,000.00 69,576.00
225,000.00 105,300.00
14,000.00 1,764,000.00
20,000.00 36,000.00
AH HARGA BAHAN 2,374,556.00
HARGA ALAT -
2,770,656.00
10.00% 277,065.60
3,047,721.60 ok
80,000.00 192,000.00
110,000.00 88,000.00
120,000.00 9,600.00
120,000.00 14,280.00
AH TENAGA KERJA 303,880.00
258,750.00 116,437.50
1,420.00 275,480.00
223,000.00 69,576.00
225,000.00 105,300.00
AH HARGA BAHAN 566,793.50
HARGA ALAT -
870,673.50
10.00% 87,067.35
957,740.85 ok
= 7,4 Mpa (sama dengan K 100), setara dengan beton rabat
Harga Jumlah
Satuan Harga
(Rp) (Rp)
1,420.00 350,740.00
159.29 138,419.29
212.96 212,750.00
14.65 3,149.75
AH HARGA BAHAN 705,059.04
HARGA ALAT -
880,629.04
10.00% 88,062.90
968,691.94 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp) 99.90
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 391,920.00
159.29 131,888.57
212.96 215,518.52
212.96 215,518.52
14.65 3,149.75
HARGA BAHAN 742,476.84
HARGA ALAT -
918,046.84
10.00% 91,804.68
1,009,851.52 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 424,580.00
159.29 127,269.29
212.96 216,583.33
14.65 3,149.75
HARGA BAHAN 771,582.37
HARGA ALAT -
947,152.37
10.00% 94,715.24
1,041,867.61 ok
ton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 96,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 7,200.00
AH TENAGA KERJA 127,600.00
1,420.00 326,600.00
159.29 142,242.14
170.37 174,970.37
14.65 2,930.00
HARGA BAHAN 646,742.51
HARGA ALAT -
774,342.51
10.00% 77,434.25
851,776.76 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 462,920.00
159.29 121,057.14
212.96 219,138.89
14.65 3,149.75
HARGA BAHAN 806,265.78
HARGA ALAT -
981,835.78
10.00% 98,183.58
1,080,019.36 pk
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 499,840.00
159.29 116,437.86
212.96 219,564.81
14.65 3,149.75
HARGA BAHAN 838,992.42
HARGA ALAT -
1,014,562.42
10.00% 101,456.24
1,116,018.66 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 526,820.00
159.29 111,181.43
212.96 222,972.22
14.65 3,149.75
HARGA BAHAN 864,123.40
HARGA ALAT -
1,039,693.40
10.00% 103,969.34
1,143,662.74 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 545,280.00
159.29 110,225.71
212.96 221,268.52
14.65 3,149.75
HARGA BAHAN 879,923.98
HARGA ALAT -
1,055,493.98
10.00% 105,549.40
1,161,043.38 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 576,520.00
159.29 108,951.43
212.96 218,500.00
14.65 3,149.75
AH HARGA BAHAN 907,121.18
1,082,691.18
10.00% 108,269.12
1,190,960.30 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00
1,420.00 586,460.00
159.29 108,473.57
212.96 217,435.19
14.65 3,149.75
AH HARGA BAHAN 915,518.51
1,091,088.51
10.00% 109,108.85
1,200,197.36 ok
= 28,8 Mpa (sama dengan K 375)
80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00
1,420.00 623,380.00
159.29 106,721.43
212.96 214,240.74
14.65 3,149.75
HARGA BAHAN 947,491.92
HARGA ALAT -
1,170,791.92
10.00% 117,079.19
1,287,871.11 ok
80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00
1,420.00 636,160.00
159.29 106,243.57
212.96 212,962.96
14.65 3,149.75
HARGA BAHAN 958,516.28
HARGA ALAT -
1,181,816.28
10.00% 118,181.63
1,299,997.91 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00
1,420.00 636,160.00
159.29 106,243.57
212.96 212,962.96
14.65 2,930.00
HARGA BAHAN 1,656,921.53
HARGA ALAT -
1,880,221.53
10.00% 188,022.15
2,068,243.69 bahan belum di survey
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00
1,420.00 568,000.00
223,000.00 107,040.00
225,000.00 180,000.00 sumber harga
87,975.00 105,570.00 https://www.scribd.com/doc/226685552/AHS-Bahan-Upah-Perhubungan
AH HARGA BAHAN 960,610.00 69,550.00 harga 2014
76,505.00 estimasi 2017 dikali 1,1 (10%)
HARGA ALAT -
1,183,910.00
10.00% 118,391.00
1,302,301.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
110,000.00 3,300.00
120,000.00 360.00
120,000.00 360.00
AH TENAGA KERJA 8,820.00
sumber harga
57,500.00 60,375.00 http://waterstop-pvc.blogspot.co.id/2016/11/harga-waterstop-lebar-150-mm.html
50,000.00
AH HARGA BAHAN 60,375.00
HARGA ALAT -
69,195.00
10.00% 6,919.50
76,114.50 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,600.00
110,000.00 3,850.00
120,000.00 480.00
120,000.00 840.00
AH TENAGA KERJA 10,770.00
sumber harga
143,700.00 150,885.00 http://ahsp.sipil.net/pekerjaan/pemasangan-water-stop-rubber-lebar-150-mm-200-mm
125,000.00
HARGA BAHAN 150,885.00
HARGA ALAT -
161,655.00
10.00% 16,165.50
177,820.50 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,400.00
110,000.00 4,400.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 11,760.00
sumber harga
132,200.00 138,810.00 http://ahsp.sipil.net/pekerjaan/memasang-water-stop-pvc-lebar-230-mm-320-mm
115,000.00
HARGA BAHAN 138,810.00
HARGA ALAT -
150,570.00
10.00% 15,057.00
165,627.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,600.00
110,000.00 7,700.00
120,000.00 840.00
120,000.00 480.00
AH TENAGA KERJA 14,620.00
14,000.00 147,000.00
20,000.00 3,000.00
HARGA BAHAN 150,000.00
HARGA ALAT -
164,620.00
10.00% 16,462.00
181,082.00 ok 18,108.20
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
110,000.00 5,500.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 10,460.00
14,000.00 147,000.00
20,000.00 2,000.00
HARGA BAHAN 149,000.00
HARGA ALAT -
159,460.00
10.00% 15,946.00
175,406.00 ok
at baja (wiremesh)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,000.00
110,000.00 2,750.00
120,000.00 3,000.00
120,000.00 120.00
AH TENAGA KERJA 7,870.00
9,700.00 98,940.00
20,000.00 1,000.00
HARGA BAHAN 99,940.00
HARGA ALAT -
107,810.00
10.00% 10,781.00
118,591.00 confirm ulang
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 41,600.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
AH TENAGA KERJA 76,440.00
4,025,000.00 161,000.00
21,000.00 6,300.00
10,600.00 1,060.00
HARGA BAHAN 168,360.00
HARGA ALAT -
244,800.00
10.00% 24,480.00
269,280.00 ok
ting untuk sloof
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 41,600.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
AH TENAGA KERJA 76,440.00
4,025,000.00 181,125.00
21,000.00 6,300.00
10,600.00 1,060.00
HARGA BAHAN 188,485.00
HARGA ALAT -
264,925.00
10.00% 26,492.50
291,417.50 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00
4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 86,250.00
106,000.00 37,100.00
71,000.00 142,000.00
71,000.00 142,000.00
HARGA ALAT -
533,890.00
10.00% 53,389.00
587,279.00 ok
80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00
4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 103,500.00
106,000.00 37,100.00
71,000.00 142,000.00
HARGA ALAT -
551,140.00
10.00% 55,114.00
606,254.00 ok
80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00
4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 86,250.00
106,000.00 37,100.00
71,000.00 426,000.00
HARGA ALAT -
817,890.00
10.00% 81,789.00
899,679.00 ok
80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
4,025,000.00 120,750.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 115,000.00
106,000.00 37,100.00
71,000.00 213,000.00
20,700.00 82,800.00
80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00
4,025,000.00 120,750.00
21,000.00 8,400.00
10,600.00 1,590.00
5,750,000.00 86,250.00
106,000.00 37,100.00
71,000.00 142,000.00
HARGA ALAT -
493,110.00
10.00% 49,311.00
542,421.00 ok
80,000.00 12,000.00
110,000.00 5,500.00
120,000.00 600.00
120,000.00 960.00
MLAH TENAGA KERJA 19,060.00
4,025,000.00 106,260.00
21,000.00 12,600.00
71,000.00 35,500.00
HARGA ALAT -
173,420.00
10.00% 17,342.00
190,762.00 ok
80,000.00 14,400.00
110,000.00 2,200.00
110,000.00 2,200.00
110,000.00 2,200.00
120,000.00 720.00
120,000.00 1,080.00
MLAH TENAGA KERJA 22,800.00
4,025,000.00 8,050.00
21,000.00 210.00
- - kolom praktis biasanya tidak menggunakan minyak pelumas
14,000.00 42,000.00
20,000.00 9,000.00
1,420.00 5,680.00
223,000.00 1,338.00
225,000.00 2,025.00
HARGA BAHAN 68,303.00
HARGA ALAT -
91,103.00
10.00% 9,110.30
100,213.30 ok
80,000.00 23,760.00
110,000.00 3,630.00
110,000.00 3,630.00
110,000.00 3,630.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,650.00
4,025,000.00 12,075.00
21,000.00 420.00
- -
14,000.00 50,400.00
20,000.00 1,000.00
1,420.00 7,810.00
223,000.00 2,007.00
225,000.00 3,375.00
MLAH HARGA BAHAN 77,087.00
HARGA ALAT -
114,737.00
10.00% 11,473.70
126,210.70 ok
BETON PRACETAK
apangan (cast in place). Indeks yang ada dalam
angan, terutama untuk analisa cetakan (bekisting)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,560.00
110,000.00 2,420.00
120,000.00 240.00
120,000.00 840.00
AH TENAGA KERJA 14,060.00
1,420.00 37,033.60
159.29 9,684.57
212.96 17,531.11
14.65 251.98
HARGA BAHAN 64,501.26
HARGA ALAT -
78,561.26
10.00% 7,856.13
86,417.39 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 13,200.00
110,000.00 3,080.00
120,000.00 360.00
120,000.00 960.00
AH TENAGA KERJA 17,600.00
1,420.00 46,292.00
159.29 12,105.71
212.96 21,913.89
14.65 314.98
HARGA BAHAN 80,626.58
HARGA ALAT -
98,226.58
10.00% 9,822.66
108,049.24 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 15,840.00
110,000.00 3,630.00
120,000.00 360.00
120,000.00 1,200.00
AH TENAGA KERJA 21,030.00
1,420.00 55,550.40
159.29 14,526.86
212.96 26,296.67
14.65 377.97
HARGA BAHAN 96,751.89
HARGA ALAT -
117,781.89
10.00% 11,778.19
129,560.08 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 19,840.00
110,000.00 4,510.00
120,000.00 480.00
120,000.00 1,560.00
AH TENAGA KERJA 26,390.00
1,420.00 69,438.00
159.29 18,158.57
212.96 32,870.83
14.65 472.46
HARGA BAHAN 120,939.87
HARGA ALAT -
147,329.87
10.00% 14,732.99
162,062.85 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 560.00
110,000.00 8,360.00
120,000.00 960.00
120,000.00 120.00
AH TENAGA KERJA 10,000.00
sumber harga
3,000.00 11,646.00
http://anekamurbaut.blogspot.co.id/2014/05/dyna-bolt.html
HARGA BAHAN 158,404.61 2,545.00
HARGA ALAT -
168,404.61
10.00% 16,840.46
185,245.08 ok
80,000.00 320.00
110,000.00 4,180.00
120,000.00 480.00
120,000.00 120.00
MLAH TENAGA KERJA 5,100.00
6,900,000.00 34,500.00
281,700.00 12,113.10
10,600.00 2,120.00
21,000.00 966.00
3,000.00 2,079.00
HARGA BAHAN 51,778.10
HARGA ALAT -
56,878.10
10.00% 5,687.81
62,565.91 ok
80,000.00 320.00
110,000.00 4,180.00
120,000.00 480.00
120,000.00 120.00
MLAH TENAGA KERJA 5,100.00
6,900,000.00 27,600.00
281,700.00 13,521.60
10,600.00 2,120.00
21,000.00 966.00
3,000.00 2,079.00
HARGA ALAT -
51,386.60
10.00% 5,138.66
56,525.26 ok
80,000.00 4,240.00
110,000.00 1,980.00
120,000.00 600.00
TENAGA KERJA 6,820.00
HARGA BAHAN -
HARGA ALAT -
6,820.00
10.00% 682.00
7,502.00 ok
80,000.00 7,120.00
110,000.00 3,300.00
120,000.00 600.00
TENAGA KERJA 11,020.00
HARGA BAHAN -
HARGA ALAT -
11,020.00
10.00% 1,102.00
12,122.00 ok
80,000.00 5,680.00
110,000.00 2,640.00
120,000.00 600.00
TENAGA KERJA 8,920.00
HARGA BAHAN -
HARGA ALAT -
8,920.00
10.00% 892.00
9,812.00 ok
m3 komponen untuk pelat pracetak
80,000.00 5,120.00
110,000.00 26,840.00
110,000.00 14,080.00
120,000.00 4,080.00
120,000.00 8,760.00
TENAGA KERJA 58,880.00
HARGA BAHAN -
HARGA ALAT -
58,880.00
10.00% 5,888.00
64,768.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,520.00
110,000.00 26,620.00
110,000.00 15,180.00
120,000.00 4,440.00
120,000.00 8,760.00
TENAGA KERJA 60,520.00
HARGA BAHAN -
HARGA ALAT -
60,520.00
10.00% 6,052.00
66,572.00 ok
m3 komponen kolom pracetak
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,880.00
110,000.00 23,430.00
110,000.00 13,420.00
120,000.00 3,960.00
120,000.00 8,760.00
HARGA BAHAN -
HARGA ALAT -
54,450.00
10.00% 5,445.00
59,895.00 ok
k pelat pracetak
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 9,380.00
80,000.00 5,360.00
80,000.00 5,360.00
110,000.00 7,370.00
110,000.00 14,740.00
120,000.00 8,040.00
120,000.00 8,040.00
AH TENAGA KERJA 58,290.00
10,900.00 72,768.40
AH HARGA BAHAN 72,768.40
807,258.40
10.00% 80,725.84
887,984.24 ok
k balok pracetak
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 8,540.00
80,000.00 4,880.00
80,000.00 4,880.00
110,000.00 6,710.00
110,000.00 13,420.00
120,000.00 7,320.00
120,000.00 7,320.00
10,900.00 66,599.00
MLAH HARGA BAHAN 66,599.00
4,485,000.00 273,585.00
341,550.00 375,705.00
768,959.00
10.00% 76,895.90
845,854.90 ok
k kolom pracetak
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 11,620.00
80,000.00 6,640.00
80,000.00 6,640.00
110,000.00 9,130.00
110,000.00 18,260.00
120,000.00 9,960.00
120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00
10,900.00 90,219.30
HARGA BAHAN 90,219.30
4,485,000.00 372,255.00
341,550.00 751,410.00
HARGA ALAT 1,123,665.00
1,286,094.30
10.00% 128,609.43
1,414,703.73 ok
uk pelat pracetak ( ± 20 m)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 2,660.00
80,000.00 1,520.00
80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00
10,900.00 20,677.30
AH HARGA BAHAN 20,677.30
4,485,000.00 85,215.00
MLAH HARGA ALAT 85,215.00
115,772.30
10.00% 11,577.23
127,349.53 ok
uk balok pracetak ( ± 20 m)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 2,660.00
80,000.00 1,520.00
80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00
10,900.00 20,677.30
AH HARGA BAHAN 20,677.30
4,485,000.00 85,215.00
MLAH HARGA ALAT 85,215.00
115,772.30
10.00% 11,577.23
127,349.53 ok
uk kolom pracetak ( ± 20 m)
Harga Jumlah
Satuan Harga
(Rp) (Rp)
140,000.00 2,660.00
80,000.00 1,520.00
80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00
10,900.00 20,677.30
AH HARGA BAHAN 20,677.30
4,485,000.00 85,215.00
HARGA ALAT 85,215.00
115,772.30
10.00% 11,577.23
127,349.53 ok
2,800.00 3,360,000.00
200.00 130,000.00
14.65 5,127.50
HARGA BAHAN 3,495,127.50
HARGA ALAT -
3,495,127.50
10.00% 349,512.75
3,844,640.25 ok
2,800.00 5,180,000.00
14.65 5,860.00
HARGA BAHAN 5,185,860.00
HARGA ALAT -
5,185,860.00
10.00% 518,586.00
5,704,446.00 ok
110,000.00 40,370.00
120,000.00 8,880.00
120,000.00 4,440.00
UMLAH TENAGA KERJA 53,690.00
HARGA BAHAN -
HARGA ALAT -
53,690.00
10.00% 5,369.00
59,059.00 ok
oint pracetak
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,760.00
110,000.00 16,170.00
120,000.00 1,800.00
120,000.00 600.00
TENAGA KERJA 30,330.00
6,900,000.00 82,800.00
5,750,000.00 23,000.00
21,000.00 5,544.00
HARGA BAHAN 111,344.00
HARGA ALAT -
141,674.00
10.00% 14,167.40
155,841.40 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 17,600.00
110,000.00 2,420.00
110,000.00 24,200.00
120,000.00 1,320.00
TENAGA KERJA 45,540.00
HARGA BAHAN -
HARGA ALAT -
45,540.00
10.00% 4,554.00
50,094.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 360.00
AH TENAGA KERJA 12,480.00
16,200.00 18,630.00
AH HARGA BAHAN 18,630.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 360.00
AH TENAGA KERJA 12,480.00
16,200.00 18,630.00
AH HARGA BAHAN 18,630.00
31,110.00
10.00% 3,111.00
34,221.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
110,000.00 11,000.00
120,000.00 120.00
120,000.00 600.00
AH TENAGA KERJA 19,720.00
10,900.00 10,900.00
10,600.00 1,060.00
AH HARGA BAHAN 11,960.00
132,250.00 105,800.00 sumber harga http://sewacrane-murahjakarta.blogspot.co.id/p/price-list-sewa-crane.html
MLAH HARGA ALAT 105,800.00 Rp. 23.000.000 / 200 jam ###
137,480.00
10.00% 13,748.00
151,228.00 ok
80,000.00 84,000.00
110,000.00 115,500.00
120,000.00 12,600.00
120,000.00 6,240.00
AH TENAGA KERJA 218,340.00
647,395.00
10.00% 64,739.50
712,134.50 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,200.00
110,000.00 2,200.00
120,000.00 240.00
120,000.00 240.00
AH TENAGA KERJA 5,880.00
31,100.00 12,440.00
10,900.00 3,270.00
10,600.00 424.00
AH HARGA BAHAN 16,134.00
132,250.00 22,482.50
MLAH HARGA ALAT 22,482.50
4,894.62
44,496.50
10.00% 4,449.65
48,946.15 ok banget 4,894.62
80,000.00 52,000.00
100,000.00 65,000.00
120,000.00 7,800.00
120,000.00 3,840.00
AH TENAGA KERJA 128,640.00
408,785.83
15.00% 61,317.87
470,103.70 belum survey bahan material
ng door besi
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 96,000.00
100,000.00 120,000.00
120,000.00 14,400.00
120,000.00 720.00
AH TENAGA KERJA 231,120.00
1,496,120.00
15.00% 224,418.00
1,720,538.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 35,200.00
100,000.00 44,000.00
120,000.00 5,280.00
120,000.00 2,640.00
AH TENAGA KERJA 87,120.00
3,537,120.00
15.00% 530,568.00
4,067,688.00 ok
alluminium
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,400.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 480.00
AH TENAGA KERJA 96,480.00
442,750.00 442,750.00
AH HARGA BAHAN 442,750.00
539,230.00
15.00% 80,884.50
620,114.50 belum survey bahan
r alluminium
80,000.00 80,000.00
100,000.00 100,000.00
120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 198,000.00
658,000.00
15.00% 98,700.00
756,700.00 ok
alluminium
pakan harga terpasang yang telah di tambahkan Overhead & Profit
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,440.00
100,000.00 4,300.00
120,000.00 516.00
120,000.00 252.00
AH TENAGA KERJA 8,508.00
150,188.00
15.00% 22,528.20
172,716.20 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,440.00
100,000.00 4,300.00
120,000.00 516.00
120,000.00 252.00
AH TENAGA KERJA 8,508.00
109,250.00 120,175.00
AH HARGA BAHAN 120,175.00
128,683.00
15.00% 19,302.45
147,985.45
80,000.00 6,800.00
100,000.00 8,500.00
120,000.00 1,020.00
120,000.00 504.00
AH TENAGA KERJA 16,824.00
126,500.00 556,600.00
115,000.00 1,679,000.00
AH HARGA BAHAN 2,235,600.00
2,252,424.00
15.00% 337,863.60
2,590,287.60 ok
a rangka alluminium
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,800.00
100,000.00 8,500.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 16,980.00
126,500.00 556,600.00
14,231.25 64,040.63
23,000.00 6,210.00
AH HARGA BAHAN 626,850.63
643,830.63
15.00% 96,574.59
740,405.22 harga belum di survey
blinds dan vertical blinds
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 2,160.00
AH TENAGA KERJA 69,360.00
191,490.00
15.00% 28,723.50
220,213.50 ok
strip (2 x 3) mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 133,600.00
100,000.00 167,000.00
120,000.00 20,040.00
120,000.00 9,960.00
AH TENAGA KERJA 330,600.00
15,812.50 97,673.81
5,081.71 137,612.61
AH HARGA BAHAN 235,286.42
565,886.42
15.00% 84,882.96
650,769.38 harga belum di survey
80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00
428,324.97
15.00% 64,248.74
492,573.71 haha
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 38,520.00
193,430.00 212,773.00
575.00 5,750.00
15,812.50 110,687.50
AH HARGA BAHAN 329,210.50
MLAH HARGA ALAT -
367,730.50
15.00% 55,159.58
422,890.08 harga belum di survey
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 38,520.00
50,485.00 53,009.25
20,700.00 310.50
4,025,000.00 76,475.00
168,314.75
15.00% 25,247.21
193,561.96 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 960.00
AH TENAGA KERJA 46,560.00
50,485.00 53,009.25
20,700.00 207.00
15,812.50 7,906.25
AH HARGA BAHAN 61,122.50
107,682.50
15.00% 16,152.38
123,834.88 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 1,560.00
AH TENAGA KERJA 49,560.00
76,578.98 76,578.98
HARGA ALAT -
202,717.96
15.00% 30,407.69
233,125.65 harga belum di survey
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 2,160.00
AH TENAGA KERJA 69,360.00
12,000.00 48,000.00
200.00 800.00
500.00 4,000.00
HARGA BAHAN 52,800.00
HARGA ALAT -
122,160.00
15.00% 18,324.00
140,484.00 harga belum di survey
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 58,720.00
100,000.00 73,400.00
120,000.00 8,760.00
120,000.00 4,440.00
AH TENAGA KERJA 145,320.00
16,065.50 49,240.76 sumber harga standar biaya umum kab. Subang thn 2013, Rp. 12.700 (di kali 1,1)
HARGA BAHAN 49,240.76
49,240.76 4,924.08
HARGA ALAT 4,924.08
199,484.83
15.00% 29,922.72
229,407.56 harga belum di survey
80,000.00 60,832.00
100,000.00 76,040.00
120,000.00 9,120.00
120,000.00 4,560.00
AH TENAGA KERJA 150,552.00
16,065.50 65,065.28
-
HARGA ALAT -
215,617.28
15.00% 32,342.59
247,959.87
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 31,200.00
100,000.00 70,000.00
120,000.00 8,400.00
120,000.00 840.00
AH TENAGA KERJA 110,440.00
684,000.00 752,400.00
153,000.00 122,400.00
70,000.00 18,690.00
21,000.00 1,680.00
21,000.00 2,310.00
65,000.00 16,250.00
HARGA BAHAN 913,730.00
150,000.00 3,000.00
15,000.00 15,000.00
50,000.00 50,000.00
HARGA ALAT 68,000.00
1,092,170.00
15.00% 163,825.50
1,255,995.50
PASANGAN DINDING
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 70,035.00
239,085.00 19,126.80
HARGA BAHAN 217,961.80
HARGA ALAT -
291,961.80
15.00% 43,794.27
335,756.07 ok
1,678,780.35
a merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 53,049.50
239,085.00 21,756.74
HARGA BAHAN 203,606.24
HARGA ALAT -
277,606.24
15.00% 41,640.94
319,247.17 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 42,745.50
239,085.00 22,234.91
HARGA BAHAN 193,780.41
HARGA ALAT -
267,780.41
15.00% 40,167.06
307,947.47 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 35,742.00
239,085.00 24,386.67
HARGA BAHAN 188,928.67
HARGA ALAT -
262,928.67
15.00% 39,439.30
302,367.97 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 29,785.00
239,085.00 29,168.37
HARGA BAHAN 187,753.37
HARGA ALAT -
261,753.37
15.00% 39,263.01
301,016.38 ok
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00
920.00 128,800.00
1,610.00 16,228.80
80,500.00 2,213.75
239,085.00 22,115.36
HARGA BAHAN 169,357.91
HARGA ALAT -
243,357.91
15.00% 36,503.69
279,861.60 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 30,509.50
239,085.00 9,085.23
HARGA BAHAN 103,994.73
HARGA ALAT -
140,994.73
15.00% 21,149.21
162,143.94 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 23,135.70
239,085.00 9,563.40
HARGA BAHAN 97,099.10
HARGA ALAT -
134,099.10
15.00% 20,114.87
154,213.97 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 18,515.00
239,085.00 10,280.66
HARGA BAHAN 93,195.66
HARGA ALAT -
130,195.66
15.00% 19,529.35
149,725.00 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 15,584.80
239,085.00 10,758.83
HARGA BAHAN 90,743.63
HARGA ALAT -
127,743.63
15.00% 19,161.54
146,905.17 ok
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 13,395.20
239,085.00 11,715.17
HARGA BAHAN 89,510.37
HARGA ALAT -
126,510.37
15.00% 18,976.55
145,486.92 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 10,465.00
239,085.00 11,954.25
HARGA BAHAN 86,819.25
HARGA ALAT -
123,819.25
15.00% 18,572.89
142,392.14 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 7,245.00
80,500.00 1,207.50
239,085.00 11,954.25
HARGA BAHAN 84,806.75
HARGA ALAT -
121,806.75
15.00% 18,271.01
140,077.76 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 28.98
80,500.00 1,449.00
239,085.00 4,303.53
HARGA BAHAN 70,181.51
HARGA ALAT -
107,181.51
15.00% 16,077.23
123,258.74 ok
920.00 64,400.00
1,610.00 22.54
80,500.00 1,127.00
239,085.00 6,694.38
HARGA BAHAN 72,243.92
HARGA ALAT -
109,243.92
15.00% 16,386.59
125,630.51 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 2,160.00
JUMLAH TENAGA KERJA 46,960.00
HARGA ALAT -
94,821.76
15.00% 14,223.26
109,045.02 harga bahan belum di survey
block HB20 campuran 1SP : 4PP
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 2,160.00
AH TENAGA KERJA 46,960.00
2,012.50 25,156.25
1,610.00 3,905.86
239,085.00 18,457.36
14,950.00 4,186.00
HARGA BAHAN 51,705.47
HARGA ALAT -
98,665.47
15.00% 14,799.82
113,465.29
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 25,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,920.00
AH TENAGA KERJA 40,960.00
1,725.00 21,562.50
1,610.00 3,661.14
239,085.00 13,149.68
14,950.00 4,186.00
HARGA BAHAN 42,559.32
HARGA ALAT -
83,519.32
15.00% 12,527.90
96,047.21
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 25,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,920.00
AH TENAGA KERJA 40,960.00
1,725.00 21,562.50
1,610.00 2,930.20
239,085.00 13,914.75
14,950.00 4,186.00
HARGA BAHAN 42,593.45
HARGA ALAT -
83,553.45
15.00% 12,533.02
96,086.46
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
1,552.50 19,406.25
1,610.00 2,440.76
239,085.00 8,702.69
14,950.00 4,186.00
HARGA BAHAN 34,735.70
HARGA ALAT -
71,735.70
15.00% 10,760.36
82,496.06
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
1,552.50 19,406.25
1,610.00 1,952.93
239,085.00 9,276.50
14,950.00 4,186.00
HARGA BAHAN 34,821.68
HARGA ALAT -
71,821.68
15.00% 10,773.25
82,594.93
15,000.00 450,000.00
1,610.00 17,710.00
239,085.00 8,367.98
HARGA BAHAN 476,077.98
HARGA ALAT -
513,077.98
15.00% 76,961.70
590,039.67
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,000.00
15,000.00 450,000.00
1,610.00 17,710.00
239,085.00 8,367.98
HARGA BAHAN 476,077.98
HARGA ALAT -
513,077.98
15.00% 76,961.70
590,039.67
Harga Jumlah
Satuan Harga
(Rp) (Rp)
75.76
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,095,619.07
15.00% 164,342.86
1,259,961.93
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 53,600.00
100,000.00 130,000.00
120,000.00 15,600.00
120,000.00 360.00
AH TENAGA KERJA 199,560.00 0.75
-
HARGA ALAT -
245,279.81
15.00% 36,791.97
282,071.78
a ringan tebal 10 cm dengan mortar siap pakai
80,000.00 53,680.00
100,000.00 130,000.00
120,000.00 15,600.00
120,000.00 360.00
AH TENAGA KERJA 199,640.00
-
HARGA ALAT -
250,311.69
15.00% 37,546.75
287,858.44
PLESTERAN
SP : 1PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 24,961.44
239,085.00 3,825.36
HARGA BAHAN 28,786.80
HARGA ALAT -
71,386.80
15.00% 10,708.02
82,094.82 ok
SP : 2PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 16,460.64
239,085.00 4,781.70
HARGA BAHAN 21,242.34
HARGA ALAT -
63,842.34
15.00% 9,576.35
73,418.69 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 12,519.36
239,085.00 5,498.96
HARGA BAHAN 18,018.32
HARGA ALAT -
60,618.32
15.00% 9,092.75
69,711.06 ok
SP : 4PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 10,046.40
239,085.00 5,738.04
HARGA BAHAN 15,784.44
HARGA ALAT -
58,384.44
15.00% 8,757.67
67,142.11 ok
SP : 5PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 8,346.24
239,085.00 6,216.21
HARGA BAHAN 14,562.45
HARGA ALAT -
57,162.45
15.00% 8,574.37
65,736.82 ok
SP : 6PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 7,109.76
239,085.00 6,455.30
HARGA BAHAN 13,565.06
HARGA ALAT -
56,165.06
15.00% 8,424.76
64,589.81 ok
SP : 7PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 6,336.96
239,085.00 6,694.38
HARGA BAHAN 13,031.34
HARGA ALAT -
55,631.34
15.00% 8,344.70
63,976.04 ok
SP : 8PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 5,564.16
239,085.00 6,933.47
HARGA BAHAN 12,497.63
HARGA ALAT -
55,097.63
15.00% 8,264.64
63,362.27 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00
1,610.00 9,273.60
80,500.00 241.50
239,085.00 3,108.11
HARGA BAHAN 12,623.21
HARGA ALAT -
57,023.21
15.00% 8,553.48
65,576.69 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00
1,610.00 4,830.00
80,500.00 402.50
239,085.00 4,781.70
HARGA BAHAN 10,014.20
HARGA ALAT -
54,414.20
15.00% 8,162.13
62,576.33 ok
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00
HARGA ALAT -
47,285.94
15.00% 7,092.89
54,378.83
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00
1,074.53 7.52
80,500.00 563.50
239,085.00 3,586.28
HARGA BAHAN 4,157.30
HARGA ALAT -
48,557.30
15.00% 7,283.59
55,840.89
SP : 1PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00
1,610.00 21,947.52
239,085.00 6,455.30
HARGA BAHAN 28,402.82
HARGA ALAT -
85,442.82
15.00% 12,816.42
98,259.24
SP : 3PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 1,560.00
AH TENAGA KERJA 44,760.00
1,610.00 16,692.48
239,085.00 7,411.64
HARGA BAHAN 24,104.12
HARGA ALAT -
68,864.12
15.00% 10,329.62
79,193.73
SP : 4PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00
1,610.00 13,395.20
239,085.00 7,650.72
AH HARGA BAHAN 21,045.92
HARGA ALAT -
78,085.92
15.00% 11,712.89
89,798.81
SP : 5PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00
1,610.00 11,128.32
239,085.00 8,367.98
HARGA BAHAN 19,496.30
HARGA ALAT -
76,536.30
15.00% 11,480.44
88,016.74
SP : 6PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00
1,610.00 9,479.68
239,085.00 8,607.06
HARGA BAHAN 18,086.74
HARGA ALAT -
75,126.74
15.00% 11,269.01
86,395.75
SM : 1 KP : 2PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 35,200.00
100,000.00 22,000.00
120,000.00 2,640.00
120,000.00 2,640.00
AH TENAGA KERJA 62,480.00
1,074.53 9.67
80,500.00 724.50
239,085.00 4,303.53
AH HARGA BAHAN 5,037.70
67,517.70
15.00% 10,127.66
77,645.36
P : 5PP tebal 15 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00
1,610.00 8,346.24
239,085.00 6,216.21
AH HARGA BAHAN 14,562.45
35,982.45
15.00% 5,397.37
41,379.82
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,400.00
100,000.00 40,000.00
120,000.00 4,800.00
120,000.00 480.00
AH TENAGA KERJA 51,680.00
1,610.00 805.00
239,085.00 3,108.11
AH HARGA BAHAN 3,913.11
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
100,000.00 22,500.00
120,000.00 2,760.00
120,000.00 2,760.00
AH TENAGA KERJA 64,020.00
1,610.00 16,100.00
5,750.00 86,250.00 sumber harga http://blogharga.xyz/harga-batu-alam-terbaru.html, pasir granit
AH HARGA BAHAN 102,350.00
166,370.00
15.00% 24,955.50
191,325.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
100,000.00 22,500.00
120,000.00 2,760.00
120,000.00 2,760.00
AH TENAGA KERJA 64,020.00
1,610.00 16,100.00
5,750.00 86,250.00 sumber harga http://jualbatualam.net/harga-batu-alam-per-meter-untuk-dinding/, sama denganb
HARGA BAHAN 102,350.00
HARGA ALAT -
166,370.00
15.00% 24,955.50
191,325.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
1,610.00 6,955.20
239,085.00 1,434.51
HARGA BAHAN 8,389.71
HARGA ALAT -
45,389.71
15.00% 6,808.46
52,198.17
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00
1,610.00 5,003.88
HARGA BAHAN 5,003.88
HARGA ALAT -
26,423.88
15.00% 3,963.58
30,387.46
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,600.00
100,000.00 3,500.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 10,060.00
1,610.00 2,576.00
HARGA BAHAN 2,576.00
HARGA ALAT -
12,636.00
15.00% 1,895.40
14,531.40
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00
1,610.00 10,207.40
239,085.00 2,869.02
HARGA BAHAN 13,076.42
HARGA ALAT -
55,676.42
15.00% 8,351.46
64,027.88
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,200.00
AH TENAGA KERJA 28,400.00
1,610.00 5,232.50
HARGA BAHAN 5,232.50
HARGA ALAT -
33,632.50
15.00% 5,044.88
38,677.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 -
100,000.00 -
120,000.00 -
120,000.00 -
AH TENAGA KERJA -
4,312.50 -
HARGA BAHAN -
HARGA ALAT -
-
15.00% -
-
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 -
100,000.00 -
120,000.00 -
120,000.00 -
AH TENAGA KERJA -
4,312.50 -
HARGA BAHAN -
HARGA ALAT -
-
15.00% -
-
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
- -
1,610.00 15,778.00
239,085.00 10,758.83
AH HARGA BAHAN 26,536.83
62,156.83
15.00% 9,323.52
71,480.35
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
3,335.00 39,586.45
1,610.00 16,100.00
239,085.00 10,758.83
AH HARGA BAHAN 66,445.28
102,065.28
15.00% 15,309.79
117,375.07
PC abu-abu ukuran 20 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 21,600.00
100,000.00 13,500.00
120,000.00 1,680.00
120,000.00 1,680.00
AH TENAGA KERJA 38,460.00
2,645.00 70,092.50
1,610.00 16,744.00
239,085.00 10,758.83
AH HARGA BAHAN 97,595.33
136,055.33
15.00% 20,408.30
156,463.62
warna ukuran 40 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
- -
1,610.00 15,778.00
6,900.00 4,140.00
239,085.00 10,758.83
AH HARGA BAHAN 30,676.83
66,296.83
15.00% 9,944.52
76,241.35
warna ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
3,795.00 45,046.65
1,610.00 16,100.00
6,900.00 4,140.00
239,085.00 10,758.83
AH HARGA BAHAN 76,045.48
112,965.48
15.00% 16,944.82
129,910.30
warna ukuran 20 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 21,600.00
100,000.00 13,500.00
120,000.00 1,680.00
120,000.00 1,680.00
AH TENAGA KERJA 38,460.00
3,105.00 82,282.50
1,610.00 16,744.00
6,900.00 6,900.00
239,085.00 10,758.83
AH HARGA BAHAN 116,685.33
MLAH HARGA ALAT -
155,145.33
15.00% 23,271.80
178,417.12
teraso ukuran 40 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83
71,126.83
15.00% 10,669.02
81,795.85
teraso ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83
74,128.83
15.00% 11,119.32
85,248.15
granit ukuran 40 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
48,300.00 320,229.00
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 355,735.83
391,355.83
15.00% 58,703.37
450,059.20
granit ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
2,500.00 29,675.00
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 66,883.83
103,803.83
15.00% 15,570.57
119,374.40
granit ukuran 60 cm x 60 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
283,108.83
15.00% 42,466.32
325,575.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83
71,126.83
15.00% 10,669.02
81,795.85
teralux ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83
74,128.83
15.00% 11,119.32
85,248.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 19,200.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,440.00
AH TENAGA KERJA 34,080.00
- -
1,610.00 15,456.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 36,564.83
70,644.83
15.00% 10,596.72
81,241.55
80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00
- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83
MLAH HARGA ALAT -
71,126.83
15.00% 10,669.02
81,795.85
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00
- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83
74,128.83
15.00% 11,119.32
85,248.15
C abu-abu ukuran 15 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 2,656.50
239,085.00 956.34
AH HARGA BAHAN 3,612.84
21,492.84
15.00% 3,223.93
24,716.77
c abu-abu ukuran 10 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,996.40
239,085.00 717.26
AH HARGA BAHAN 2,713.66
20,593.66
15.00% 3,089.05
23,682.70
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,996.40
239,085.00 717.26
AH HARGA BAHAN 2,713.66
20,593.66
15.00% 3,089.05
23,682.70
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 1,035.00
239,085.00 717.26
AH HARGA BAHAN 3,587.66
21,467.66
15.00% 3,220.15
24,687.80
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
arna ukuran 10 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
raso ukuran 10 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
anit ukuran 10 cm x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
anit ukuran 10 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66
21,122.66
15.00% 3,168.40
24,291.05
o cor di tempat, tebal 3 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,800.00
100,000.00 18,000.00
120,000.00 2,160.00
120,000.00 2,160.00
AH TENAGA KERJA 51,120.00
- -
6,900.00 690.00
AH HARGA BAHAN 690.00
51,810.00
15.00% 7,771.50
59,581.50
mik artistik 10 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
1,380.00 73,140.00
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 18,975.00
AH HARGA BAHAN 116,059.73
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
- -
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 22,080.00
AH HARGA BAHAN 46,024.73
145,424.73
15.00% 21,813.71
167,238.43
mik ukuran 33 cm x 33 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
- -
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 27,394.73
126,794.73
15.00% 19,019.21
145,813.93
mik ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
31,625.00 33,206.25
1,610.00 16,100.00
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 63,515.08
162,915.08
15.00% 24,437.26
187,352.34
mik ukuran 20 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
57,500.00 60,375.00
1,610.00 16,744.00
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 91,327.83
190,727.83
15.00% 28,609.17
219,337.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 84,000.00
100,000.00 52,500.00
120,000.00 6,360.00
120,000.00 6,360.00
AH TENAGA KERJA 149,220.00
- -
1,610.00 15,778.00
239,085.00 10,758.83
6,900.00 30,153.00
AH HARGA BAHAN 56,689.83
205,909.83
15.00% 30,886.47
236,796.30
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
198,666.86
15.00% 29,800.03
228,466.89
k ukuran 10 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00
13,800.00 73,140.00 sumber harga standar biaya umum kab subang thn 2013 Rp. 5000
1,610.00 1,835.40
239,085.00 717.26
6,900.00 172.50
AH HARGA BAHAN 75,865.16
k ukuran 10 cm x 10 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00
10,350.00 109,710.00
1,610.00 1,835.40
239,085.00 717.26
6,900.00 345.00
AH HARGA BAHAN 112,607.66
133,607.66
15.00% 20,041.15
153,648.80
k ukuran 5 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00
10,350.00 54,855.00
1,610.00 917.70
239,085.00 358.63
6,900.00 89.70
AH HARGA BAHAN 56,221.03
77,221.03
15.00% 11,583.15
88,804.18
l cove artistik 5 cm x 5 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 60,000.00
100,000.00 75,000.00
120,000.00 9,000.00
120,000.00 4,560.00
AH TENAGA KERJA 148,560.00
17,250.00 91,425.00
1,610.00 1,835.40
239,085.00 717.26
6,900.00 690.00
AH HARGA BAHAN 94,667.66
243,227.66
15.00% 36,484.15
279,711.80
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
920,000.00 975,200.00
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 924.60
AH HARGA BAHAN 1,000,069.33
1,099,469.33
15.00% 164,920.40
1,264,389.72
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 13,600.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 1,080.00
AH TENAGA KERJA 33,720.00
182,041.25
15.00% 27,306.19
209,347.44
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
111,706.25
15.00% 16,755.94
128,462.19
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
327,790.00
15.00% 49,168.50
376,958.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
172,500.00 181,125.00
78,775.00 47,265.00
AH HARGA BAHAN 228,390.00
327,790.00
15.00% 49,168.50
376,958.50
selen 11 cm x 11 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 6,000.00
AH TENAGA KERJA 142,000.00
- -
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 3,450.00
AH HARGA BAHAN 22,726.53
MLAH HARGA ALAT -
164,726.53
15.00% 24,708.98
189,435.51
selen 10 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
1,380.00 73,140.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 111,391.53
239,191.53
15.00% 35,878.73
275,070.26
selen 20 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
2,645.00 68,770.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 101,432.53
229,232.53
15.00% 34,384.88
263,617.41
amik artistik 10 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
3,833.33 203,166.67
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 241,418.20
369,218.20
15.00% 55,382.73
424,600.93
amik artistik 5 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
1,916.67 203,166.67
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 20,010.00
AH HARGA BAHAN 242,453.20
370,253.20
15.00% 55,537.98
425,791.18
amik 10 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
1,380.00 73,140.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 111,391.53
239,191.53
15.00% 35,878.73
275,070.26
amik 20 cm x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
2,645.00 70,092.50
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 102,755.03
230,555.03
15.00% 34,583.25
265,138.28
amik 20 cm x 25 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00
2,400.00 63,600.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 96,262.53
224,062.53
15.00% 33,609.38
257,671.91
amik 30 cm x 60 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
100,000.00 90,000.00
120,000.00 54,000.00
120,000.00 5,400.00
- -
AH TENAGA KERJA 149,400.00
317,062.53
15.00% 47,559.38
364,621.91
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 104,000.00
100,000.00 65,000.00
120,000.00 7,800.00
120,000.00 7,800.00
AH TENAGA KERJA 184,600.00
920,000.00 975,200.00
1,610.00 20,028.40
239,085.00 5,977.13
6,900.00 4,485.00
575.00 1,742.25
AH HARGA BAHAN 1,007,432.78
1,192,032.78
15.00% 178,804.92
1,370,837.69
a pelapis 3 cm x 7 cm x 24 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 6,000.00
AH TENAGA KERJA 142,000.00
482,818.03
15.00% 72,422.70
555,240.73
Harga Jumlah
Satuan Harga
(Rp) (Rp)
indeks asli indeks modifikasi
80,000.00 56,000.00 0.700 0.7000
100,000.00 35,000.00 0.350 0.3500
120,000.00 4,200.00 0.035 0.0350
120,000.00 4,200.00 0.035 0.0035
AH TENAGA KERJA 99,400.00
131,979.50
15.00% 19,796.93
151,776.43
u tempel hitam
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00
1,782.50 1,960.75
1,610.00 18,917.50
239,085.00 8,367.98
AH HARGA BAHAN 29,246.23
128,646.23
15.00% 19,296.93
147,943.16
Andesit Bakar 10 x 10 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
70,000.00 74,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 80,491.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
180,091.00
15.00% 27,013.65
207,104.65
Andesit Bakar 10 x 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
70,000.00 74,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 80,491.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
180,091.00
15.00% 27,013.65
207,104.65
Andesit Bakar 15 x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
90,000.00 95,400.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 101,691.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
201,291.00
15.00% 30,193.65
231,484.65
Andesit Bakar 20 x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
100,000.00 106,000.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 112,291.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
211,891.00
15.00% 31,783.65
243,674.65
Andesit Bakar 30 x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
105,000.00 111,300.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 117,591.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
217,191.00
15.00% 32,578.65
249,769.65
Andesit Bakar 30 x 60 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
110,000.00 116,600.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 122,891.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
222,491.00
15.00% 33,373.65
255,864.65
Andesit Bakar 40 x 40 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
115,000.00 121,900.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 128,191.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
227,791.00
15.00% 34,168.65
261,959.65
Andesit Bakar 40 x 60 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
130,000.00 137,800.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 144,091.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
243,691.00
15.00% 36,553.65
280,244.65
Andesit Bakar 50 x 50 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
170,000.00 180,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 186,491.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
286,091.00
15.00% 42,913.65
329,004.65
Andesit Bakar 60 x 60 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00
180,000.00 190,800.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 197,091.00
5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00
296,691.00
15.00% 44,503.65
341,194.65
ukuran 30 cm x 30 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 29,760.00
12,545.45 148,914.55
25,300.00 8,855.00
AH HARGA BAHAN 157,769.55
187,529.55
15.00% 28,129.43
215,658.98
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 17,500.00
120,000.00 2,040.00
120,000.00 240.00
AH TENAGA KERJA 47,780.00
231,205.00
15.00% 34,680.75
265,885.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
79,343.33
15.00% 11,901.50
91,244.83
5cm x 30cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,400.00
100,000.00 8,000.00
120,000.00 960.00
120,000.00 480.00
AH TENAGA KERJA 15,840.00
12,545.45 22,080.00
25,300.00 2,024.00
AH HARGA BAHAN 24,104.00
39,944.00
15.00% 5,991.60
45,935.60
ebal 2 cm lebar 10 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
10,925,000.00 32,775.00
20,700.00 1,035.00
AH HARGA BAHAN 33,810.00
57,570.00
15.00% 8,635.50
66,205.50
k natural tebal 6 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 76,156.00
57,500.00 58,075.00
265,650.00 13,282.50
AH HARGA BAHAN 71,357.50
71,357.50 7,135.75
MLAH HARGA ALAT 7,135.75
154,649.25
15.00% 23,197.39
177,846.64
k natural tebal 8 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 96,156.00
71,300.00 72,013.00
265,650.00 549,895.50
AH HARGA BAHAN 621,908.50
621,908.50 62,190.85
MLAH HARGA ALAT 62,190.85
780,255.35
15.00% 117,038.30
897,293.65
k berwarna tebal 6 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 76,156.00
65,550.00 66,205.50
265,650.00 13,282.50
AH HARGA BAHAN 79,488.00
79,488.00 7,948.80
MLAH HARGA ALAT 7,948.80
163,592.80
15.00% 24,538.92
188,131.72
k berwarna tebal 8 cm
80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
MLAH TENAGA KERJA 96,156.00
79,350.00 80,143.50
265,650.00 549,895.50
MLAH HARGA BAHAN 630,039.00
630,039.00 63,003.90
UMLAH HARGA ALAT 63,003.90
789,198.90
15.00% 118,379.84
907,578.74
80,000.00 4,000.00
100,000.00 10,000.00
120,000.00 6,000.00
120,000.00 3,000.00
MLAH TENAGA KERJA 23,000.00
45,000.00 112,500.00
265,650.00 265.65
MLAH HARGA BAHAN 112,765.65
-
UMLAH HARGA ALAT -
135,765.65
15.00% 20,364.85
156,130.50
-LANGIT (PLAFOND)
80,000.00 2,400.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 480.00
MLAH TENAGA KERJA 10,720.00
-
UMLAH HARGA ALAT -
57,755.00
15.00% 8,663.25
66,418.25
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
-
MLAH HARGA ALAT -
728,710.00
15.00% 109,306.50
838,016.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
58,650.00 340,170.00
23,000.00 1,150.00
AH HARGA BAHAN 341,320.00
-
MLAH HARGA ALAT -
365,080.00
15.00% 54,762.00
419,842.00
t akustik ukuran (60 x 120) cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00
58,650.00 87,975.00
23,000.00 1,150.00
AH HARGA BAHAN 89,125.00
-
MLAH HARGA ALAT -
108,925.00
15.00% 16,338.75
125,263.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00
69,000.00 25,875.00
23,000.00 690.00
AH HARGA BAHAN 26,565.00
-
MLAH HARGA ALAT -
46,365.00
15.00% 6,954.75
53,319.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,000.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 4,800.00
AH TENAGA KERJA 158,400.00
4,025,000.00 60,375.00
23,000.00 230.00
AH HARGA BAHAN 60,605.00
-
MLAH HARGA ALAT -
219,005.00
15.00% 32,850.75
251,855.75
80,000.00 8,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 600.00
AH TENAGA KERJA 14,200.00
60,375.00 21,976.50
20,700.00 2,277.00
AH HARGA BAHAN 24,253.50
-
MLAH HARGA ALAT -
38,453.50
15.00% 5,768.03
44,221.53
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 3,000.00
AH TENAGA KERJA 99,000.00
113,850.00 409,860.00
23,000.00 3,450.00
230.00 241.50
58,650.00 87,975.00
AH HARGA BAHAN 501,526.50
600,526.50
15.00% 90,078.98
690,605.48
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 9,960.00
6,325.00 6,641.25
20,700.00 207.00
AH HARGA BAHAN 6,848.25
-
MLAH HARGA ALAT -
16,808.25
15.00% 2,521.24
19,329.49
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 9,960.00
15,000.00 16,500.00
78,200.00 391.00
AH HARGA BAHAN 16,891.00
-
MLAH HARGA ALAT -
26,851.00
15.00% 4,027.65
30,878.65
PENUTUP ATAP
ng palentong kecil
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 900.00
120,000.00 960.00
TENAGA KERJA 21,360.00
1,035.00 25,875.00
HARGA BAHAN 25,875.00
47,235.00
15.00% 7,085.25
54,320.25
ng kodok glazuur
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00
1,610.00 40,250.00
AH HARGA BAHAN 40,250.00
61,670.00
15.00% 9,250.50
70,920.50
ng palentong besar/super
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00
1,725.00 20,700.00
AH HARGA BAHAN 20,700.00
HARGA ALAT -
42,120.00
15.00% 6,318.00
48,438.00
teng palentong
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00
2,300.00 11,500.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 32,030.72
86,670.72
15.00% 13,000.61
99,671.33
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00
4,600.00 23,000.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 43,530.72
98,170.72
15.00% 14,725.61
112,896.33
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00
6,900.00 27,600.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 48,130.72
102,770.72
15.00% 15,415.61
118,186.33
ibreglass 90 x 180
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 6,700.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,580.00
63,510.00
15.00% 9,526.50
73,036.50
s gelombang 0,92 m x 2 ,5 m x 5 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 20,620.00
36,800.00 18,400.00
20,700.00 2,484.00
AH HARGA BAHAN 20,884.00
41,504.00
15.00% 6,225.60
47,729.60
s gelombang 0,92 m x 2,25 m x 5 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 20,620.00
36,800.00 22,080.00
20,700.00 2,484.00
AH HARGA BAHAN 24,564.00
45,184.00
15.00% 6,777.60
51,961.60
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 22,080.00
20,700.00 2,484.00
AH HARGA BAHAN 24,564.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 27,600.00
20,700.00 2,484.00
AH HARGA BAHAN 30,084.00
49,964.00
15.00% 7,494.60
57,458.60
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 12,880.00
20,700.00 2,484.00
AH HARGA BAHAN 15,364.00
MLAH HARGA ALAT -
35,244.00
15.00% 5,286.60
40,530.60
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
MLAH TENAGA KERJA 19,880.00
36,800.00 15,456.00
20,700.00 2,484.00
MLAH HARGA BAHAN 17,940.00
37,820.00
15.00% 5,673.00
43,493.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 16,192.00
20,700.00 2,484.00
AH HARGA BAHAN 18,676.00
MLAH HARGA ALAT -
38,556.00
15.00% 5,783.40
44,339.40
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 18,768.00
20,700.00 2,484.00
AH HARGA BAHAN 21,252.00
41,132.00
15.00% 6,169.80
47,301.80
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 29,440.00
20,700.00 2,484.00
AH HARGA BAHAN 31,924.00
51,804.00
15.00% 7,770.60
59,574.60
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 13,616.00
20,700.00 2,484.00
AH HARGA BAHAN 16,100.00
35,980.00
15.00% 5,397.00
41,377.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 13,984.00
20,700.00 2,484.00
AH HARGA BAHAN 16,468.00
36,348.00
15.00% 5,452.20
41,800.20
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 16,928.00
20,700.00 2,484.00
AH HARGA BAHAN 19,412.00
39,292.00
15.00% 5,893.80
45,185.80
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 18,032.00
20,700.00 2,484.00
AH HARGA BAHAN 20,516.00
40,396.00
15.00% 6,059.40
46,455.40
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 20,976.00
20,700.00 2,484.00
AH HARGA BAHAN 23,460.00
43,340.00
15.00% 6,501.00
49,841.00
l gelombang 0,92 m
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
195,830.00
15.00% 29,374.50
225,204.50
l gelombang 1,05 m
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 149,730.00
575.00 3,450.00
AH HARGA BAHAN 153,180.00
174,440.00
15.00% 26,166.00
200,606.00
l gelombang 1,08 m
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 146,165.00
575.00 3,450.00
AH HARGA BAHAN 149,615.00
170,875.00
15.00% 25,631.25
196,506.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00
110,270.00
15.00% 16,540.50
126,810.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00
110,270.00
15.00% 16,540.50
126,810.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00
110,270.00
15.00% 16,540.50
126,810.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 15,000.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 25,040.00
71,300.00 78,430.00
575.00 3,450.00
AH HARGA BAHAN 81,880.00
106,920.00
15.00% 16,038.00
122,958.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00
71,300.00 78,430.00
575.00 3,450.00
AH HARGA BAHAN 81,880.00
MLAH HARGA ALAT -
103,140.00
15.00% 15,471.00
118,611.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,200.00
AH TENAGA KERJA 28,400.00
5,750.00 63,250.00
20,700.00 621.00
AH HARGA BAHAN 63,871.00
92,271.00
15.00% 13,840.65
106,111.65
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 30,000.00
120,000.00 360.00
120,000.00 1,200.00
AH TENAGA KERJA 47,560.00
-
122,475.00 42,866.25
23,000.00 690.00
- -
AH HARGA BAHAN 43,556.25
91,116.25
15.00% 13,667.44
104,783.69
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 27,320.00
55,200.00 71,760.00
23,000.00 4,600.00
AH HARGA BAHAN 76,360.00
103,680.00
15.00% 15,552.00
119,232.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 27,320.00
55,200.00 110,400.00
23,000.00 4,600.00
AH HARGA BAHAN 115,000.00
142,320.00
15.00% 21,348.00
163,668.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
120,000.00 12,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 29,320.00
132,200.00 132,200.00
500.00 5,000.00
AH HARGA BAHAN 137,200.00
166,520.00
15.00% 24,978.00
191,498.00
ume 0,25mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
120,000.00 12,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 29,320.00
82,000.00 82,000.00
500.00 5,000.00
AH HARGA BAHAN 87,000.00
116,320.00
15.00% 17,448.00
133,768.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 13,280.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 960.00
AH TENAGA KERJA 42,240.00
102,902.50
15.00% 15,435.38
118,337.88
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,400.00
AH TENAGA KERJA 56,800.00
4,600.00 16,100.00
23,000.00 1,150.00
1,610.00 17,388.00
239,085.00 7,650.72
6,900.00 6,900.00
AH HARGA BAHAN 49,188.72
105,988.72
15.00% 15,898.31
121,887.03
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 720.00
AH TENAGA KERJA 38,720.00
-
23,000.00 1,150.00
5,750,000.00 20,125.00
AH HARGA BAHAN 21,275.00
59,995.00
15.00% 8,999.25
68,994.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,560.00
AH TENAGA KERJA 38,360.00
50,983.33 56,081.67
23,000.00 1,150.00
AH HARGA BAHAN 57,231.67
95,591.67
15.00% 14,338.75
109,930.42
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 720.00
AH TENAGA KERJA 38,720.00
67,735.00 27,094.00
23,000.00 1,150.00
20,700.00 1,035.00
AH HARGA BAHAN 29,279.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 9,600.00
100,000.00 6,000.00
120,000.00 720.00
120,000.00 720.00
AH TENAGA KERJA 17,040.00
67,735.00 47,414.50
23,000.00 460.00
AH HARGA BAHAN 47,874.50
64,914.50
15.00% 9,737.18
74,651.68
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 720.00
AH TENAGA KERJA 20,560.00
67,735.00 20,320.50
23,000.00 920.00
AH HARGA BAHAN 21,240.50
MLAH HARGA ALAT -
41,800.50
15.00% 6,270.08
48,070.58
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 75,000.00
120,000.00 9,600.00
120,000.00 720.00
AH TENAGA KERJA 97,320.00
262,000.00
15.00% 39,300.00
301,300.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 100,000.00
120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 126,000.00
- -
23,000.00 920.00
AH HARGA BAHAN 920.00
126,920.00
15.00% 19,038.00
145,958.00
m foil/sisalation
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 960.00
AH TENAGA KERJA 18,560.00
10,350.00 10,867.50
AH HARGA BAHAN 10,867.50
29,427.50
15.00% 4,414.13
33,841.63
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 960.00
AH TENAGA KERJA 18,560.00 16,000.00
18,000.00 18,900.00
860.00 3,440.00
AH HARGA BAHAN 22,340.00
40,900.00
15.00% 6,135.00
47,035.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 560,000.00
100,000.00 2,100,000.00
120,000.00 252,000.00
120,000.00 42,000.00
AH TENAGA KERJA 2,954,000.00
10,925,000.00 12,017,500.00
23,000.00 28,750.00
34,500.00 34,500.00
AH HARGA BAHAN 12,080,750.00
15,034,750.00
15.00% 2,255,212.50
17,289,962.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 480,000.00
100,000.00 1,800,000.00
120,000.00 216,000.00
120,000.00 36,000.00
AH TENAGA KERJA 2,532,000.00
4,025,000.00 4,830,000.00
23,000.00 28,750.00
34,500.00 34,500.00
AH HARGA BAHAN 4,893,250.00
7,425,250.00
15.00% 1,113,787.50
8,539,037.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 105,000.00
120,000.00 12,600.00
120,000.00 2,160.00
AH TENAGA KERJA 147,760.00
5,750,000.00 230,000.00
20,700.00 1,035.00
AH HARGA BAHAN 231,035.00
378,795.00
15.00% 56,819.25
435,614.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 105,000.00
120,000.00 12,600.00
120,000.00 2,160.00
AH TENAGA KERJA 147,760.00
4,025,000.00 161,000.00
20,700.00 1,035.00
AH HARGA BAHAN 162,035.00
309,795.00
15.00% 46,469.25
356,264.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 6,000.00
AH TENAGA KERJA 422,000.00
5,750,000.00 230,000.00
34,500.00 17,250.00
AH HARGA BAHAN 247,250.00
669,250.00
15.00% 100,387.50
769,637.50
1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
AH TENAGA KERJA 337,600.00
5,750,000.00 138,000.00
34,500.00 10,350.00
AH HARGA BAHAN 148,350.00
485,950.00
15.00% 72,892.50
558,842.50
80,000.00 80,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 6,000.00
AH TENAGA KERJA 422,000.00
5,750,000.00 368,000.00
34,500.00 17,250.00
AH HARGA BAHAN 385,250.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 210,000.00
120,000.00 25,200.00
120,000.00 4,200.00
MLAH TENAGA KERJA 295,400.00
5,750,000.00 143,750.00
20,700.00 621.00
34,500.00 17,250.00
122,475.00 122,475.00
579,496.00
15.00% 86,924.40
666,420.40
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
TENAGA KERJA 337,600.00
5,750,000.00 147,200.00
20,700.00 621.00
34,500.00 17,250.00
122,475.00 122,475.00
625,146.00
15.00% 93,771.90
718,917.90
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 53,600.00
100,000.00 200,000.00
120,000.00 24,000.00
120,000.00 40,200.00
AH TENAGA KERJA 317,800.00
5,750,000.00 345,000.00
20,700.00 3,105.00
AH HARGA BAHAN 348,105.00
665,905.00
15.00% 99,885.75
765,790.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
AH TENAGA KERJA 337,600.00
10,925,000.00 273,125.00
20,700.00 621.00
34,500.00 10,350.00
86,365.00 86,365.00
708,061.00
15.00% 106,209.15
814,270.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 68,000.00
100,000.00 255,000.00
120,000.00 30,600.00
120,000.00 5,160.00
AH TENAGA KERJA 358,760.00
5,750,000.00 143,750.00
20,700.00 621.00
34,500.00 27,600.00
86,365.00 86,365.00
258,336.00
AH HARGA BAHAN
-
MLAH HARGA ALAT
617,096.00
15.00% 92,564.40
709,660.40
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 320,000.00
100,000.00 1,200,000.00
120,000.00 144,000.00
120,000.00 24,000.00
AH TENAGA KERJA 1,688,000.00
4,025,000.00 4,427,500.00
15,812.50 237,187.50
20,700.00 115,920.00
AH HARGA BAHAN 4,780,607.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 536,000.00
100,000.00 2,010,000.00
120,000.00 241,200.00
120,000.00 40,200.00
AH TENAGA KERJA 2,827,400.00
10,925,000.00 13,110,000.00
15,812.50 237,187.50
20,700.00 115,920.00
AH HARGA BAHAN 13,463,107.50
80,000.00 536,000.00
100,000.00 2,010,000.00
120,000.00 241,200.00
120,000.00 40,200.00
AH TENAGA KERJA 2,827,400.00
5,750,000.00 6,325,000.00
15,812.50 237,187.50
20,700.00 62,100.00
AH HARGA BAHAN 6,624,287.50
9,451,687.50
15.00% 1,417,753.13
10,869,440.63
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00
6,900,000.00 96,600.00
8,145,833.33 293,250.00
20,700.00 5,175.00
AH HARGA BAHAN 395,025.00
414,825.00
15.00% 62,223.75
477,048.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00
6,900,000.00 96,600.00
8,145,833.33 464,312.50
20,700.00 5,175.00
AH HARGA BAHAN 566,087.50
585,887.50
15.00% 87,883.13
673,770.63
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00
5,750,000.00 80,500.00
20,700.00 1,179.90
AH HARGA BAHAN 81,679.90
MLAH HARGA ALAT -
105,439.90
15.00% 15,815.99
121,255.89
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 9,000.00
AH TENAGA KERJA 54,600.00
6,900,000.00 106,260.00
20,700.00 4,140.00
AH HARGA BAHAN 110,400.00
165,000.00
15.00% 24,750.00
189,750.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 1,200.00
AH TENAGA KERJA 50,800.00
6,900,000.00 112,470.00
20,700.00 5,175.00
AH HARGA BAHAN 117,645.00
168,445.00
15.00% 25,266.75
193,711.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 600.00
AH TENAGA KERJA 31,000.00
5,750,000.00 62,100.00
20,700.00 2,070.00
AH HARGA BAHAN 64,170.00
95,170.00
15.00% 14,275.50
109,445.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 600.00
AH TENAGA KERJA 31,000.00
5,750,000.00 63,250.00
20,700.00 1,035.00
AH HARGA BAHAN 64,285.00
95,285.00
15.00% 14,292.75
109,577.75
80,000.00 12,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 960.00
AH TENAGA KERJA 63,360.00
4,025,000.00 112,700.00
20,700.00 3,105.00
AH HARGA BAHAN 115,805.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 16,000.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 1,200.00
AH TENAGA KERJA 84,400.00
5,750,000.00 161,000.00
20,700.00 3,105.00
122,475.00 105,328.50
34,500.00 19,320.00
AH HARGA BAHAN 288,753.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 180,000.00
120,000.00 21,600.00
120,000.00 3,600.00
AH TENAGA KERJA 253,200.00
10,925,000.00 76,475.00
20,700.00 2,070.00
20,700.00 3,105.00
AH HARGA BAHAN 81,650.00
334,850.00
15.00% 50,227.50
385,077.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 120.00
AH TENAGA KERJA 10,580.00
122,475.00 48,990.00
20,700.00 1,035.00
AH HARGA BAHAN 50,025.00
60,605.00
15.00% 9,090.75
69,695.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 600.00
TENAGA KERJA 14,200.00
- -
6,900,000.00 96,600.00
20,700.00 248.40
6,325.00 18.98
HARGA BAHAN 96,867.38
HARGA ALAT -
111,067.38
15.00% 16,660.11
127,727.48
80,000.00 4,800.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 360.00
AH TENAGA KERJA 72,360.00
327,660.00
15.00% 49,149.00
376,809.00
80,000.00 800.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 600.00
AH TENAGA KERJA 57,400.00
149,500.00 149,500.00
AH HARGA BAHAN 149,500.00
206,900.00
15.00% 31,035.00
237,935.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 400.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 56,760.00
108,510.00
15.00% 16,276.50
124,786.50
80,000.00 400.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 56,760.00
137,260.00
15.00% 20,589.00
157,849.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00
21,850.00 21,850.00
AH HARGA BAHAN 21,850.00
39,946.00
15.00% 5,991.90
45,937.90
ndela kupu-kupu
80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 60.00
AH TENAGA KERJA 12,060.00
40,810.00
15.00% 6,121.50
46,931.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 60.00
AH TENAGA KERJA 30,460.00
53,460.00
15.00% 8,019.00
61,479.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00
44,260.00
15.00% 6,639.00
50,899.00
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00
8,625.00 8,625.00
AH HARGA BAHAN 8,625.00
27,585.00
15.00% 4,137.75
31,722.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 60,360.00
382,360.00
15.00% 57,354.00
439,714.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 24,120.00
37,920.00
15.00% 5,688.00
43,608.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 60,360.00
86,810.00
15.00% 13,021.50
99,831.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 12,600.00
58,600.00
15.00% 8,790.00
67,390.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 360.00
AH TENAGA KERJA 72,360.00
474,860.00
15.00% 71,229.00
546,089.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 120.00
AH TENAGA KERJA 30,120.00
193,420.00
15.00% 29,013.00
222,433.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00
80,500.00 88,550.00
48,300.00 2,415.00
AH HARGA BAHAN 90,965.00
109,061.00
15.00% 16,359.15
125,420.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00
92,000.00 101,200.00
48,300.00 2,415.00
AH HARGA BAHAN 103,615.00
121,711.00
15.00% 18,256.65
139,967.65
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,360.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 108.00
AH TENAGA KERJA 20,508.00
213,639.00
15.00% 32,045.85
245,684.85
m tebal 12 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 156.00
AH TENAGA KERJA 30,156.00
489,569.50
15.00% 73,435.43
563,004.93
n tebal 5 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00
189,735.00
15.00% 28,460.25
218,195.25
n tebal 8 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,360.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 1,080.00
AH TENAGA KERJA 21,480.00
347,470.50
15.00% 52,120.58
399,591.08
assed tebal 5 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00
284,610.00
15.00% 42,691.50
327,301.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 480.00
AH TENAGA KERJA 23,280.00
2,555,695.00
15.00% 383,354.25
2,939,049.25
PENGECATAN
permukaan cat lama
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
120,000.00 360.00
AH TENAGA KERJA 12,360.00
13,797.50
15.00% 2,069.63
15,867.13
kaan tembok yang pernah dicat
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
120,000.00 360.00
AH TENAGA KERJA 12,360.00
12,992.50
15.00% 1,948.88
14,941.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
120,000.00 960.00
AH TENAGA KERJA 12,960.00
12,650.00 632.50
AH HARGA BAHAN 632.50
13,592.50
15.00% 2,038.88
15,631.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,600.00
100,000.00 900.00
120,000.00 720.00
120,000.00 360.00
28,750.00 5,750.00
26,450.00 3,967.50
28,750.00 4,887.50
57,500.00 14,950.00
13,800.00 138.00 sumber harga http://hargaupdate.com/harga-kuas-dan-roller-cat-terbaru-maret-2016/
27,600.00 828.00 sumber harga http://www.anekamaju.com/18-pengencer-cat
3,450.00 690.00
AH HARGA BAHAN 31,211.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,600.00
100,000.00 10,500.00
120,000.00 480.00
120,000.00 360.00
28,750.00 5,750.00
26,450.00 3,967.50
28,750.00 4,887.50
57,500.00 20,125.00
13,800.00 138.00
27,600.00 828.00
3,450.00 690.00
AH HARGA BAHAN 36,386.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,200.00
100,000.00 6,300.00
120,000.00 7,560.00
120,000.00 360.00
AH TENAGA KERJA 17,420.00
34,787.50 12,523.50 sumber harga harga satuan bahan dan upah semarang 2015
AH HARGA BAHAN 12,523.50
29,943.50
15.00% 4,491.53
34,435.03
dengan politur
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,200.00
100,000.00 6,000.00
120,000.00 1,920.00
120,000.00 360.00
AH TENAGA KERJA 11,480.00
43,642.50 sumber harga harga satuan bahan dan upah semarang 2015
6,546.38
49,524.75 18,423.21 sumber harga harga satuan bahan dan upah semarang 2015
3,450.00 6,900.00
AH HARGA BAHAN 31,869.58
43,349.58
15.00% 6,502.44
49,852.02
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,000.00
120,000.00 720.00
AH TENAGA KERJA 8,720.00
31,625.00 11,068.75 sumber harga harga satuan bahan dan upah semarang 2015
AH HARGA BAHAN 11,068.75
19,788.75
15.00% 2,968.31
22,757.06
dengan vernis
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,800.00
100,000.00 16,000.00
120,000.00 1,920.00
120,000.00 360.00
AH TENAGA KERJA 31,080.00
39,847.50 5,977.13 sumber harga harga satuan bahan dan upah semarang 2015
21,275.00 1,063.75
3,450.00 345.00
AH HARGA BAHAN 7,385.88
38,465.88
15.00% 5,769.88
44,235.76
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 756.00
120,000.00 360.00
AH TENAGA KERJA 9,016.00
31,050.00 3,105.00
28,750.00 2,875.00
31,625.00 8,222.50
AH HARGA BAHAN 14,202.50
23,218.50
15.00% 3,482.78
26,701.28
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,240.00
100,000.00 4,200.00
120,000.00 504.00
120,000.00 360.00
AH TENAGA KERJA 7,304.00
28,750.00 3,450.00
31,625.00 5,692.50
AH HARGA BAHAN 9,142.50
16,446.50
15.00% 2,466.98
18,913.48
n kalkarium
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,240.00
100,000.00 4,200.00
120,000.00 504.00
120,000.00 360.00
AH TENAGA KERJA 7,304.00
21,275.00 2,127.50
AH HARGA BAHAN 2,127.50
9,431.50
15.00% 1,414.73
10,846.23
n kapur sirih
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,000.00
100,000.00 100.00
120,000.00 12.00
120,000.00 300.00
AH TENAGA KERJA 12,412.00
2,300.00 345.00
3,450.00 345.00
11,500.00 2,875.00 sumber harga http://atapalangalang.blogspot.co.id/2012/10/harga-atap-alang-alang-rumbia-kira
AH HARGA BAHAN 3,565.00
15,977.00
15.00% 2,396.55
18,373.55
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,200.00
100,000.00 500.00
120,000.00 60.00
120,000.00 300.00
AH TENAGA KERJA 4,060.00
2,300.00 690.00
3,450.00 690.00
11,500.00 2,875.00
AH HARGA BAHAN 4,255.00
8,315.00
15.00% 1,247.25
9,562.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 300.00
AH TENAGA KERJA 24,300.00
80,500.00 96,600.00
25,300.00 5,060.00
AH HARGA BAHAN 101,660.00
125,960.00
15.00% 18,894.00
144,854.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 300.00
AH TENAGA KERJA 24,300.00
28,750.00 2,875.00
13,800.00 138.00
AH HARGA BAHAN 3,013.00
27,313.00
15.00% 4,096.95
31,409.95
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 22,500.00
120,000.00 2,700.00
120,000.00 900.00
AH TENAGA KERJA 46,100.00
28,750.00 2,875.00
27,600.00 276.00
13,800.00 138.00
4,025,000.00 8,050.00
AH HARGA BAHAN 11,339.00
57,439.00
15.00% 8,615.85
66,054.85
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 156.00
AH TENAGA KERJA 48,156.00
28,750.00 2,875.00
28,750.00 2,875.00
63,250.00 5,060.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 11,224.00
59,380.00
15.00% 8,907.00
68,287.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
100,000.00 6,000.00
120,000.00 1,440.00
120,000.00 360.00
AH TENAGA KERJA 12,600.00
63,250.00 18,975.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 19,389.00
31,989.00
15.00% 4,798.35
36,787.35
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 2,400.00
AH TENAGA KERJA 124,000.00
28,750.00 3,162.50
40,250.00 6,842.50 sumber harga http://www.hargamaterial.xyz/harga-cat-tembok-dinding-terbaru/
63,250.00 5,060.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 15,479.00
139,479.00
15.00% 20,921.85
160,400.85
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 70,000.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 112,800.00
28,750.00 8,625.00
27,600.00 276.00
AH HARGA BAHAN 8,901.00
121,701.00
15.00% 18,255.15
139,956.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 18,700.00
31,625.00 9,487.50
AH HARGA BAHAN 9,487.50
28,187.50
15.00% 4,228.13
32,415.63
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 18,700.00
25,000.00 5,000.00
55,000.00 14,300.00
8,000.00 800.00
32,000.00 800.00
AH HARGA BAHAN 20,900.00
39,600.00
15.00% 5,940.00
45,540.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
110,000.00 6,930.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 19,330.00
40,200.00 12,060.00
AH HARGA BAHAN 12,060.00
31,390.00
10.00% 3,139.00
34,529.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 160,000.00
100,000.00 1,200,000.00
120,000.00 144,000.00
120,000.00 12,000.00
AH TENAGA KERJA 1,516,000.00
78,556.50 -
MLAH HARGA ALAT -
1,925,400.00
15.00% 288,810.00
2,214,210.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 264,000.00
100,000.00 110,000.00
120,000.00 1,200.00
120,000.00 19,200.00
AH TENAGA KERJA 394,400.00
1,422,550.00 1,422,550.00
213,382.50 213,382.50
AH HARGA BAHAN 1,635,932.50
2,030,332.50
15.00% 304,549.88
2,334,882.38
gkok porselen
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 150,000.00
120,000.00 18,000.00
120,000.00 19,200.00
AH TENAGA KERJA 267,200.00
161,000.00 161,000.00
1,610.00 9,660.00
239,085.00 2,390.85
AH HARGA BAHAN 173,050.85
440,250.85
15.00% 66,037.63
506,288.48
gkok teraso
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 150,000.00
120,000.00 18,000.00
120,000.00 6,000.00
AH TENAGA KERJA 254,000.00
115,000.00 115,000.00
1,610.00 9,660.00
239,085.00 2,390.85
920.00 6,440.00
AH HARGA BAHAN 133,490.85
387,490.85
15.00% 58,123.63
445,614.48
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
100,000.00 100,000.00
120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 198,000.00
746,350.00 746,350.00 sumber harga harga satuan bahan dan upah semarang 2015
1,610.00 9,660.00
239,085.00 2,390.85
223,905.00 223,905.00
AH HARGA BAHAN 982,305.85
1,180,305.85
15.00% 177,045.88
1,357,351.73
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 96,000.00
100,000.00 145,000.00
120,000.00 18,000.00
120,000.00 7,200.00
AH TENAGA KERJA 266,200.00
788,900.00 946,680.00
1,610.00 9,660.00
239,085.00 2,390.85
113,601.60 113,601.60
AH HARGA BAHAN 1,072,332.45
1,338,532.45
15.00% 200,779.87
1,539,312.32
cuip porselen
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,000.00
100,000.00 75,000.00
120,000.00 9,000.00
120,000.00 360.00
AH TENAGA KERJA 90,360.00
- -
- -
AH HARGA BAHAN -
MLAH HARGA ALAT -
90,360.00
15.00% 13,554.00
103,914.00
iberglass vol 1 m3
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 240,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 108,000.00
AH TENAGA KERJA 804,000.00
253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00
1,087,360.00
15.00% 163,104.00
1,250,464.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 480,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 3,600.00
AH TENAGA KERJA 819,600.00
920.00 138,000.00
1,610.00 193,200.00
239,085.00 71,725.50
- -
6,900.00 41,400.00
AH HARGA BAHAN 444,325.50
1,263,925.50
15.00% 189,588.83
1,453,514.33
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 240,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 108,000.00
AH TENAGA KERJA 804,000.00
253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00
1,087,360.00
15.00% 163,104.00
1,250,464.00
berglass vol 1 m3
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 24,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 1,800.00
AH TENAGA KERJA 76,200.00
253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00
359,560.00
15.00% 53,934.00
413,494.00
beton volume 1 m3
80,000.00 280,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 2,160.00
AH TENAGA KERJA 738,160.00
978,554.69 880,699.22
20,872.50 3,757,050.00
40,250.00 322,000.00
- -
1,039,677.19 103,967.72
AH HARGA BAHAN 5,063,716.94
5,801,876.94
15.00% 870,281.54
6,672,158.48
piring stainlessteel
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,400.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 1,800.00
AH TENAGA KERJA 37,800.00
460,000.00 460,000.00
442,750.00 442,750.00
AH HARGA BAHAN 902,750.00
940,550.00
15.00% 141,082.50
1,081,632.50
piring teraso
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 3,000.00
AH TENAGA KERJA 63,000.00
201,250.00 201,250.00
442,750.00 442,750.00
1,610.00 32,200.00
239,085.00 11,954.25
AH HARGA BAHAN 688,154.25
751,154.25
15.00% 112,673.14
863,827.39
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 12,600.00
94,875.00 94,875.00
AH HARGA BAHAN 94,875.00
107,475.00
15.00% 16,121.25
123,596.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 172,800.00
100,000.00 72,000.00
120,000.00 8,640.00
120,000.00 1,320.00
AH TENAGA KERJA 254,760.00
920.00 36,800.00
1,610.00 70,840.00
239,085.00 16,735.95
265,650.00 15,939.00
230,000.00 16,100.00
20,872.50 33,396.00
AH HARGA BAHAN 189,810.95
444,570.95
15.00% 66,685.64
511,256.59
80,000.00 256,000.00
100,000.00 150,000.00
120,000.00 1,320.00
120,000.00 1,920.00
AH TENAGA KERJA 409,240.00
920.00 64,400.00
1,610.00 123,970.00
239,085.00 31,081.05
265,650.00 23,908.50
230,000.00 4,600.00
20,872.50 54,268.50
AH HARGA BAHAN 302,228.05
711,468.05
15.00% 106,720.21
818,188.26
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 256,000.00
100,000.00 115,000.00
120,000.00 1,320.00
120,000.00 1,920.00
AH TENAGA KERJA 374,240.00
920.00 113,160.00
1,610.00 183,540.00
239,085.00 43,991.64
265,650.00 31,878.00
230,000.00 7,590.00
20,872.50 101,231.63
AH HARGA BAHAN 481,391.27
MLAH HARGA ALAT -
855,631.27
15.00% 128,344.69
983,975.95
s diameter ½”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00
29,900.00 29,900.00
29,900.00 10,465.00
AH HARGA BAHAN 40,365.00
56,565.00
15.00% 8,484.75
65,049.75
meter ½” atau ¾ ”
80,000.00 800.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 600.00
AH TENAGA KERJA 50,200.00
13,800.00 13,800.00
4,600.00 115.00
AH HARGA BAHAN 13,915.00
s diameter ¾ ”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00
38,600.00 38,600.00
13,510.00 13,510.00
AH HARGA BAHAN 52,110.00
68,310.00
15.00% 10,246.50
78,556.50
s diameter 1”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00
57,800.00 57,800.00
20,230.00 20,230.00
AH HARGA BAHAN 78,030.00
s diameter 1 ½”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,640.00
120,000.00 21,600.00
120,000.00 2,160.00
AH TENAGA KERJA 32,400.00
87,800.00 87,800.00
30,730.00 30,730.00
AH HARGA BAHAN 118,530.00
150,930.00
15.00% 22,639.50
173,569.50
s diameter 3”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00
181,833.00 181,833.00
63,641.55 63,641.55
AH HARGA BAHAN 245,474.55
286,034.55
15.00% 42,905.18
328,939.73
s diameter 2 1/2”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00
116,900.00 116,900.00
40,915.00 40,915.00
AH HARGA BAHAN 157,815.00
198,375.00
15.00% 29,756.25
228,131.25
s diameter 2”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00
71,233.00 71,233.00
24,931.55 24,931.55
AH HARGA BAHAN 96,164.55
136,724.55
15.00% 20,508.68
157,233.23
s diameter 4”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00
283,000.00 283,000.00
99,050.00 99,050.00
AH HARGA BAHAN 382,050.00
422,610.00
15.00% 63,391.50
486,001.50
s diameter 6”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00
434,900.00 434,900.00
152,215.00 152,215.00
AH HARGA BAHAN 587,115.00
e AW diameter ½ ”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,880.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 10,440.00
7,072.50 8,487.00
2,970.45 2,970.45
AH HARGA BAHAN 11,457.45
21,897.45
15.00% 3,284.62
25,182.07
e AW diameter ¾ ”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,400.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 9,960.00
10,810.00 12,972.00
4,540.20 4,540.20
AH HARGA BAHAN 17,512.20
27,472.20
15.00% 4,120.83
31,593.03
e AW diameter 1”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,880.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 10,440.00
12,190.00 14,628.00
5,119.80 5,119.80
AH HARGA BAHAN 19,747.80
30,187.80
15.00% 4,528.17
34,715.97
e AW diameter 1 ½ ”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,320.00
110,000.00 9,900.00
120,000.00 1,080.00
120,000.00 360.00
AH TENAGA KERJA 15,660.00
27,600.00 33,120.00
11,592.00 11,592.00
AH HARGA BAHAN 44,712.00
60,372.00
15.00% 9,055.80
69,427.80
e AW diameter 2”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,320.00
110,000.00 9,900.00
120,000.00 1,080.00
120,000.00 360.00
AH TENAGA KERJA 15,660.00
35,592.50 42,711.00
14,948.85 14,948.85
AH HARGA BAHAN 57,659.85
73,319.85
15.00% 10,997.98
84,317.83
e AW diameter 2 ½ ”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00
74,290.00 89,148.00
31,201.80 31,201.80
AH HARGA BAHAN 120,349.80
143,779.80
15.00% 21,566.97
165,346.77
e AW diameter 3”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00
74,290.00 89,148.00
31,201.80 31,201.80
AH HARGA BAHAN 120,349.80
143,779.80
15.00% 21,566.97
165,346.77
e AW diameter 4”
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00
107,812.50 129,375.00
45,281.25 45,281.25
AH HARGA BAHAN 174,656.25
198,086.25
15.00% 29,712.94
227,799.19
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,400.00
110,000.00 4,400.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 11,760.00
199,180.00 318,688.00
1,610.00 56,350.00
239,085.00 3,347.19
199,295.00 2,790.13
AH HARGA BAHAN 381,175.32
392,935.32
15.00% 58,940.30
451,875.62
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,800.00
110,000.00 3,300.00
120,000.00 360.00
120,000.00 360.00
AH TENAGA KERJA 8,820.00
130,180.00 208,288.00
1,610.00 1,094.80
239,085.00 3,108.11
199,295.00 2,192.25
AH HARGA BAHAN 214,683.15
223,503.15
15.00% 33,525.47
257,028.62
iameter 15 – 20 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 11,200.00
110,000.00 7,700.00
120,000.00 840.00
120,000.00 840,000.00
AH TENAGA KERJA 859,740.00
50,916.25 56,007.88
920.00 24.84
1,610.00 6,311.20
239,085.00 13,388.76
199,295.00 4,783.08
AH HARGA BAHAN 80,515.76
940,255.76
15.00% 141,038.36
1,081,294.12
iameter 30 – 100 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 30,400.00
110,000.00 20,900.00
120,000.00 2,280.00
120,000.00 2,280.00
AH TENAGA KERJA 55,860.00
75,900.00 83,490.00
920.00 506.00
1,610.00 16,583.00
239,085.00 14,584.19
199,295.00 13,751.36
AH HARGA BAHAN 128,914.54
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
27,000.00 27,000.00
AH HARGA BAHAN 27,000.00
1,350.00 67.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
35,000.00 35,000.00
AH HARGA BAHAN 35,000.00
1,750.00 87.50
C Ø 32 mm, 1 inch
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
45,000.00 45,000.00
AH HARGA BAHAN 45,000.00
2,250.00 112.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
65,000.00 65,000.00
AH HARGA BAHAN 65,000.00
3,250.00 162.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
75,000.00 75,000.00
AH HARGA BAHAN 75,000.00
3,750.00 187.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
95,000.00 95,000.00
AH HARGA BAHAN 95,000.00
4,750.00 237.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA
135,000.00 135,000.00
AH HARGA BAHAN 135,000.00
6,750.00 337.50
80,000.00 7,520.00
110,000.00 5,170.00
120,000.00 1,080.00
AH TENAGA KERJA 13,770.00
185,000.00 185,000.00
AH HARGA BAHAN 185,000.00
9,250.00 462.50
199,232.50
15.00% 29,884.88
229,117.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,400.00
110,000.00 5,830.00
120,000.00 1,320.00
AH TENAGA KERJA 15,550.00
300,000.00 300,000.00
AH HARGA BAHAN 300,000.00
15,000.00 750.00
316,300.00
15.00% 47,445.00
363,745.00
C Ø 150 mm
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 9,440.00
110,000.00 6,490.00
120,000.00 1,440.00
JUMLAH TENAGA 17,370.00
KERJA
- -
JUMLAH HARGA BAHAN -
15,000.00 180.00
17,550.00
15.00% 2,632.50
20,182.50
80,000.00 15,120.00
110,000.00 10,450.00
120,000.00 2,280.00
AH TENAGA KERJA 27,850.00
355,005.00 355,005.00
AH HARGA BAHAN 355,005.00
15,000.00 360.00
383,215.00
15.00% 57,482.25
440,697.25
C Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,480.00
110,000.00 14,080.00
120,000.00 3,120.00
AH TENAGA KERJA 37,680.00
556,312.50 556,312.50
AH HARGA BAHAN 556,312.50
15,000.00 510.00
594,502.50
15.00% 89,175.38
683,677.88
C Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 23,520.00
110,000.00 16,170.00
120,000.00 3,480.00
AH TENAGA KERJA 43,170.00
- -
AH HARGA BAHAN -
15,000.00 600.00
43,770.00
15.00% 6,565.50
50,335.50
C Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 43,520.00
110,000.00 29,920.00
120,000.00 6,480.00
AH TENAGA KERJA 79,920.00
- -
AH HARGA BAHAN -
15,000.00 1,200.00
81,120.00
15.00% 12,168.00
93,288.00
C Ø 450 mm
80,000.00 53,520.00
110,000.00 36,850.00
120,000.00 8,040.00
AH TENAGA KERJA 98,410.00
- -
AH HARGA BAHAN -
15,000.00 1,500.00
99,910.00
15.00% 14,986.50
114,896.50
C Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 64,720.00
110,000.00 44,550.00
120,000.00 9,720.00
AH TENAGA KERJA 118,990.00
- -
AH HARGA BAHAN -
15,000.00 1,830.00
120,820.00
15.00% 18,123.00
138,943.00
C Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 76,560.00
110,000.00 52,690.00
120,000.00 11,520.00
AH TENAGA KERJA 140,770.00
- -
AH HARGA BAHAN -
15,000.00 2,175.00
142,945.00
15.00% 21,441.75
164,386.75
C Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 129,440.00
110,000.00 88,990.00
120,000.00 19,440.00
AH TENAGA KERJA 237,870.00
- -
AH HARGA BAHAN -
15,000.00 3,750.00
241,620.00
15.00% 36,243.00
277,863.00
C Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 135,280.00
110,000.00 93,060.00
120,000.00 20,280.00
AH TENAGA KERJA 248,620.00
- -
AH HARGA BAHAN -
15,000.00 3,930.00
252,550.00
15.00% 37,882.50
290,432.50
C Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 151,600.00
110,000.00 104,280.00
120,000.00 22,800.00
AH TENAGA KERJA 278,680.00
- -
AH HARGA BAHAN -
15,000.00 4,410.00
283,090.00
15.00% 42,463.50
325,553.50
C Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 167,920.00
110,000.00 115,500.00
120,000.00 25,200.00
AH TENAGA KERJA 308,620.00
- -
AH HARGA BAHAN -
15,000.00 4,905.00
313,525.00
15.00% 47,028.75
360,553.75
C Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 184,240.00
110,000.00 126,720.00
120,000.00 27,600.00
AH TENAGA KERJA 338,560.00
- -
AH HARGA BAHAN -
5,385.00
15,000.00
343,945.00
15.00% 51,591.75
395,536.75
PE Ø 63 mm
80,000.00 2,800.00
110,000.00 1,870.00
120,000.00 360.00
AH TENAGA KERJA 5,030.00
29,785.00 29,785.00
AH HARGA BAHAN 29,785.00
15,000.00 285.00
35,100.00
15.00% 5,265.00
40,365.00
PE Ø 100 mm
80,000.00 3,200.00
110,000.00 2,200.00
120,000.00 480.00
AH TENAGA KERJA 5,880.00
- -
AH HARGA BAHAN -
15,000.00 285.00
6,165.00
15.00% 924.75
7,089.75
PE Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,600.00
110,000.00 2,530.00
120,000.00 600.00
AH TENAGA KERJA 6,730.00
117,070.00 117,070.00
AH HARGA BAHAN 117,070.00
15,000.00 285.00
124,085.00
15.00% 18,612.75
142,697.75
PE Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,960.00
110,000.00 3,410.00
120,000.00 720.00
AH TENAGA KERJA 9,090.00
- -
AH HARGA BAHAN -
15,000.00 285.00
9,375.00
15.00% 1,406.25
10,781.25
PE Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,160.00
110,000.00 5,610.00
120,000.00 1,200.00
AH TENAGA KERJA 14,970.00
298,540.00 298,540.00
AH HARGA BAHAN 298,540.00
15,000.00 285.00
313,795.00
15.00% 47,069.25
360,864.25
PE Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,640.00
110,000.00 7,370.00
120,000.00 1,560.00
AH TENAGA KERJA 19,570.00
464,945.00 464,945.00
AH HARGA BAHAN 464,945.00
15,000.00 630.00
15,000.00 630.00
485,145.00
15.00% 72,771.75
557,916.75
PE Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 13,600.00
110,000.00 9,350.00
120,000.00 2,040.00
AH TENAGA KERJA 24,990.00
- -
AH HARGA BAHAN -
15,000.00 975.00
25,965.00
15.00% 3,894.75
29,859.75
PE Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 23,200.00
110,000.00 15,950.00
120,000.00 3,480.00
AH TENAGA KERJA 42,630.00
- -
AH HARGA BAHAN -
15,000.00 2,280.00
MLAH HARGA ALAT 2,280.00
44,910.00
15.00% 6,736.50
51,646.50
PE Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,720.00
110,000.00 19,800.00
120,000.00 3,600.00
AH TENAGA KERJA 52,120.00
- -
AH HARGA BAHAN -
15,000.00 3,000.00
55,120.00
15.00% 8,268.00
63,388.00
PE Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 34,640.00
110,000.00 23,760.00
120,000.00 5,160.00
AH TENAGA KERJA 63,560.00
- -
AH HARGA BAHAN -
15,000.00 3,765.00
PE Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,960.00
110,000.00 28,160.00
120,000.00 6,120.00
AH TENAGA KERJA 75,240.00
- -
AH HARGA BAHAN -
15,000.00 4,605.00
79,845.00
15.00% 11,976.75
91,821.75
PE Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 71,440.00
110,000.00 49,060.00
120,000.00 10,680.00
AH TENAGA KERJA 131,180.00
- -
AH HARGA BAHAN -
15,000.00 8,595.00
PE Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 108,240.00
110,000.00 74,470.00
120,000.00 16,200.00
AH TENAGA KERJA 198,910.00
- -
AH HARGA BAHAN -
15,000.00 13,245.00
212,155.00
15.00% 31,823.25
243,978.25
PE Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 132,720.00
110,000.00 91,300.00
120,000.00 19,920.00
AH TENAGA KERJA 243,940.00
- -
AH HARGA BAHAN -
15,000.00 16,395.00
260,335.00
15.00% 39,050.25
299,385.25
PE Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 145,440.00
110,000.00 99,990.00
120,000.00 21,840.00
AH TENAGA KERJA 267,270.00
- -
AH HARGA BAHAN -
15,000.00 18,075.00
285,345.00
15.00% 42,801.75
328,146.75
PE Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 189,600.00
110,000.00 130,350.00
120,000.00 28,440.00
AH TENAGA KERJA 348,390.00
- -
AH HARGA BAHAN -
15,000.00 23,760.00
372,150.00
15.00% 55,822.50
427,972.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 27,600.00
110,000.00 18,920.00
120,000.00 4,080.00
AH TENAGA KERJA 50,600.00
97,750.00 97,750.00
AH HARGA BAHAN 97,750.00
15,000.00 -
148,350.00
15.00% 22,252.50
170,602.50
P Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
110,000.00 22,000.00
120,000.00 4,800.00
AH TENAGA KERJA 58,800.00
281,750.00 281,750.00
AH HARGA BAHAN 281,750.00
15,000.00 -
340,550.00
15.00% 51,082.50
391,632.50
P Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 35,840.00
110,000.00 24,640.00
120,000.00 5,400.00
AH TENAGA KERJA 65,880.00
- -
AH HARGA BAHAN -
15,000.00 -
65,880.00
15.00% 9,882.00
75,762.00
P Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,480.00
110,000.00 27,830.00
120,000.00 6,120.00
AH TENAGA KERJA 74,430.00
408,250.00 408,250.00
AH HARGA BAHAN 408,250.00
15,000.00 -
482,680.00
15.00% 72,402.00
555,082.00
P Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 63,680.00
110,000.00 43,780.00
120,000.00 9,600.00
AH TENAGA KERJA 117,060.00
782,000.00 782,000.00
AH HARGA BAHAN 782,000.00
15,000.00 -
899,060.00
15.00% 134,859.00
1,033,919.00
P Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 75,920.00
110,000.00 52,250.00
120,000.00 11,400.00
AH TENAGA KERJA 139,570.00
1,006,250.00 1,006,250.00
AH HARGA BAHAN 1,006,250.00
15,000.00 -
1,145,820.00
15.00% 171,873.00
1,317,693.00
P Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 76,640.00
110,000.00 52,690.00
120,000.00 11,520.00
AH TENAGA KERJA 140,850.00
- -
AH HARGA BAHAN -
15,000.00 -
140,850.00
15.00% 21,127.50
161,977.50
P Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 96,960.00
110,000.00 66,660.00
120,000.00 14,520.00
AH TENAGA KERJA 178,140.00
- -
AH HARGA BAHAN -
15,000.00 -
178,140.00
15.00% 26,721.00
204,861.00
P Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 108,240.00
110,000.00 74,360.00
120,000.00 16,200.00
AH TENAGA KERJA 198,800.00
- -
AH HARGA BAHAN -
15,000.00 -
198,800.00
15.00% 29,820.00
228,620.00
P Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 117,520.00
110,000.00 80,850.00
120,000.00 16,800.00
AH TENAGA KERJA 215,170.00
- -
AH HARGA BAHAN -
15,000.00 -
215,170.00
15.00% 32,275.50
247,445.50
P Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 106,160.00
110,000.00 73,040.00
120,000.00 15,960.00
AH TENAGA KERJA 195,160.00
- -
AH HARGA BAHAN -
15,000.00 -
195,160.00
15.00% 29,274.00
224,434.00
P Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 186,160.00
110,000.00 127,930.00
120,000.00 27,960.00
AH TENAGA KERJA 342,050.00
- -
AH HARGA BAHAN -
15,000.00 -
342,050.00
15.00% 51,307.50
393,357.50
P Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 209,840.00
110,000.00 144,320.00
120,000.00 31,440.00
AH TENAGA KERJA 385,600.00
- -
AH HARGA BAHAN -
15,000.00 -
385,600.00
15.00% 57,840.00
443,440.00
P Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 232,880.00
110,000.00 160,160.00
120,000.00 34,920.00
AH TENAGA KERJA 427,960.00
- -
AH HARGA BAHAN -
15,000.00 -
427,960.00
15.00% 64,194.00
492,154.00
P Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 256,000.00
110,000.00 176,000.00
120,000.00 38,400.00
AH TENAGA KERJA 470,400.00
- -
AH HARGA BAHAN -
15,000.00 -
470,400.00
15.00% 70,560.00
540,960.00
P Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 279,040.00
110,000.00 191,840.00
120,000.00 41,880.00
AH TENAGA KERJA 512,760.00
- -
AH HARGA BAHAN -
15,000.00 -
512,760.00
15.00% 76,914.00
589,674.00
I Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 39,120.00
110,000.00 10,780.00
120,000.00 4,800.00
AH TENAGA KERJA 54,700.00
710,700.00 710,700.00
AH HARGA BAHAN 710,700.00
15,000.00 5,700.00
771,100.00
15.00% 115,665.00
886,765.00
I Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 43,760.00
110,000.00 11,990.00
120,000.00 6,600.00
AH TENAGA KERJA 62,350.00
1,076,400.00 1,076,400.00
AH HARGA BAHAN 1,076,400.00
15,000.00 5,700.00
1,144,450.00
15.00% 171,667.50
1,316,117.50
I Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 49,040.00
110,000.00 13,530.00
120,000.00 7,320.00
AH TENAGA KERJA 69,890.00
1,573,200.00 1,573,200.00
AH HARGA BAHAN 1,573,200.00
15,000.00 5,700.00
1,648,790.00
15.00% 247,318.50
1,896,108.50
I Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 68,400.00
110,000.00 18,810.00
120,000.00 10,200.00
AH TENAGA KERJA 97,410.00
2,415,000.00 2,415,000.00
AH HARGA BAHAN 2,415,000.00
15,000.00 5,700.00
2,518,110.00
15.00% 377,716.50
2,895,826.50
I Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 76,080.00
110,000.00 20,900.00
120,000.00 11,400.00
AH TENAGA KERJA 108,380.00
3,220,000.00 3,220,000.00
AH HARGA BAHAN 3,220,000.00
15,000.00 750.00
3,329,130.00
15.00% 499,369.50
3,828,499.50
I Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 77,840.00
110,000.00 21,450.00
120,000.00 11,640.00
AH TENAGA KERJA 110,930.00
- -
AH HARGA BAHAN -
15,000.00 1,065.00
111,995.00
15.00% 16,799.25
128,794.25
I Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 123,600.00
110,000.00 33,990.00
130,000.00 12,090.00
120,000.00 18,480.00
188,160.00
- -
AH HARGA BAHAN -
1,835,400.00 42,214.20
15,000.00 465.00
I Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 145,040.00
110,000.00 39,930.00
130,000.00 18,590.00
120,000.00 21,720.00
225,280.00
- -
AH HARGA BAHAN -
1,835,400.00 53,226.60
15,000.00 585.00
I Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 163,760.00
110,000.00 44,990.00
130,000.00 25,090.00
120,000.00 24,600.00
258,440.00
- -
AH HARGA BAHAN -
1,835,400.00 62,403.60
15,000.00 675.00
321,518.60
15.00% 48,227.79
369,746.39
I Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 160,880.00
110,000.00 44,220.00
130,000.00 38,090.00
120,000.00 24,120.00
267,310.00
- -
AH HARGA BAHAN -
106,453.20
1,835,400.00
1,155.00
15,000.00
I Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 308,720.00
110,000.00 84,920.00
130,000.00 64,090.00
120,000.00 46,320.00
504,050.00
- -
-
1,835,400.00 154,173.60
15,000.00 3,375.00
I Ø900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 399,600.00
110,000.00 109,890.00
130,000.00 77,090.00
120,000.00 59,880.00
646,460.00
- -
-
1,835,400.00 170,692.20
15,000.00 3,720.00
I Ø1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 474,480.00
110,000.00 130,460.00
130,000.00 103,090.00
120,000.00 83,160.00
791,190.00
- -
-
1,835,400.00 205,564.80
15,000.00 4,470.00
I Ø1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 555,920.00
110,000.00 152,900.00
130,000.00 103,090.00
120,000.00 83,400.00
895,310.00
- -
-
1,835,400.00 278,980.80
15,000.00 4,560.00
JUMLAH HARGA ALAT 283,540.80
1,178,850.80
15.00% 176,827.62
1,355,678.42
I Ø1200 mm
80,000.00 644,480.00
110,000.00 177,210.00
130,000.00 116,090.00
120,000.00 96,720.00
1,034,500.00
- -
-
1,835,400.00 330,372.00
15,000.00 4,500.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 39,920.00
110,000.00 11,000.00
120,000.00 6,000.00
56,920.00
192,625.00 192,625.00
192,625.00
15,000.00 60.00
a Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 46,320.00
110,000.00 12,760.00
120,000.00 6,960.00
66,040.00
263,925.00 263,925.00
263,925.00
15,000.00 60.00
a Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 51,840.00
110,000.00 14,300.00
120,000.00 7,800.00
73,940.00
322,575.00 322,575.00
322,575.00
15,000.00 60.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,640.00
110,000.00 15,620.00
120,000.00 8,520.00
80,780.00
397,037.50 397,037.50
397,037.50
15,000.00 60.00
a Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 89,040.00
110,000.00 24,530.00
120,000.00 13,320.00
126,890.00
674,475.00 674,475.00
674,475.00
15,000.00 60.00
80,000.00 106,000.00
110,000.00 29,150.00
120,000.00 15,960.00
151,110.00
859,625.00 859,625.00
859,625.00
15,000.00 60.00
a Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 113,200.00
110,000.00 31,130.00
120,000.00 16,920.00
161,250.00
- -
-
15,000.00 60.00
a Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 189,280.00
110,000.00 52,030.00
120,000.00 28,440.00
269,750.00
- -
-
1,835,400.00 49,555.80
15,000.00 585.00
a Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 178,480.00
110,000.00 49,060.00
120,000.00 26,760.00
254,300.00
- -
-
1,835,400.00 47,720.40
15,000.00 555.00
a Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 194,560.00
110,000.00 53,460.00
120,000.00 29,160.00
277,180.00
- -
-
1,835,400.00 53,226.60
15,000.00 675.00
a Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 176,640.00
110,000.00 48,620.00
120,000.00 26,520.00
251,780.00
- -
-
1,835,400.00 49,555.80
15,000.00 585.00
a Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 311,760.00
110,000.00 85,690.00
120,000.00 46,800.00
444,250.00
- -
-
1,835,400.00 84,428.40
15,000.00 1,470.00
a Ø 900 mm
80,000.00 352,240.00
110,000.00 8,910.00
120,000.00 52,800.00
413,950.00
- -
-
1,835,400.00 95,440.80
15,000.00 1,725.00
a Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 391,600.00
110,000.00 107,690.00
120,000.00 58,680.00
557,970.00
- -
-
1,835,400.00 106,453.20
15,000.00 1,995.00
a Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 430,960.00
110,000.00 118,470.00
120,000.00 64,680.00
614,110.00
- -
-
1,835,400.00 117,465.60
15,000.00 2,250.00
a Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 471,760.00
110,000.00 129,360.00
120,000.00 70,560.00
671,680.00
- -
-
1,835,400.00 128,478.00
15,000.00 2,505.00
PEMOTONGAN PIPA
PVC Ø 63 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 400.00
110,000.00 220.00
120,000.00 60.00
AH TENAGA KERJA 680.00
35,190.00 35,190.00
AH HARGA BAHAN 35,190.00
57,500.00 172.50
36,042.50
15.00% 5,406.38
41,448.88
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 1,120.00
110,000.00 770.00
120,000.00 120.00
JUMLAH TENAGA 2,010.00
KERJA
73,600.00 73,600.00
JUMLAH HARGA BAHAN 73,600.00
57,500.00 172.50
75,782.50
15.00% 11,367.38
87,149.88
PVC Ø 110 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,760.00
110,000.00 1,210.00
120,000.00 240.00
JUMLAH TENAGA 3,210.00
KERJA
106,927.00 106,927.00
JUMLAH HARGA BAHAN 106,927.00
57,500.00 172.50
PVC Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,480.00
110,000.00 1,650.00
120,000.00 360.00
AH TENAGA KERJA 4,490.00
- -
AH HARGA BAHAN -
57,500.00 172.50
4,662.50
15.00% 699.38
5,361.88
PVC Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,480.00
110,000.00 4,400.00
120,000.00 960.00
AH TENAGA KERJA 11,840.00
355,005.00 355,005.00
AH HARGA BAHAN 355,005.00
57,500.00 977.50
367,822.50
15.00% 55,173.38
422,995.88
PVC Ø 250 mm
556,312.50 556,312.50
AH HARGA BAHAN 556,312.50
57,500.00 1,725.00
576,877.50
15.00% 86,531.63
663,409.13
PVC Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,400.00
110,000.00 8,470.00
120,000.00 1,800.00
AH TENAGA KERJA 22,670.00
- -
AH HARGA BAHAN -
57,500.00 2,127.50
24,797.50
15.00% 3,719.63
28,517.13
PVC Ø 400 mm
80,000.00 26,480.00
110,000.00 18,260.00
120,000.00 3,960.00
AH TENAGA KERJA 48,700.00
- -
AH HARGA BAHAN -
57,500.00 4,945.00
53,645.00
15.00% 8,046.75
61,691.75
PVC Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 33,600.00
110,000.00 23,100.00
120,000.00 5,040.00
AH TENAGA KERJA 61,740.00
- -
AH HARGA BAHAN -
57,500.00 3,105,000.00
3,166,740.00
15.00% 475,011.00
3,641,751.00
PVC Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 41,440.00
110,000.00 28,490.00
120,000.00 6,240.00
AH TENAGA KERJA 76,170.00
- -
AH HARGA BAHAN -
57,500.00 3,967.50
80,137.50
15.00% 12,020.63
92,158.13
PVC Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 49,840.00
110,000.00 34,210.00
120,000.00 7,440.00
AH TENAGA KERJA 91,490.00
- -
AH HARGA BAHAN -
57,500.00 4,945.00
96,435.00
15.00% 14,465.25
110,900.25
PVC Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 87,120.00
110,000.00 59,950.00
120,000.00 13,080.00
AH TENAGA KERJA 160,150.00
- -
AH HARGA BAHAN -
57,500.00 9,200.00
169,350.00
15.00% 25,402.50
194,752.50
PVC Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 91,280.00
110,000.00 62,810.00
120,000.00 13,680.00
AH TENAGA KERJA 167,770.00
- -
AH HARGA BAHAN -
57,500.00 9,660.00
177,430.00
15.00% 26,614.50
204,044.50
PVC Ø 1000 mm
80,000.00 102,800.00
110,000.00 70,730.00
120,000.00 15,480.00
AH TENAGA KERJA 189,010.00
- -
AH HARGA BAHAN -
57,500.00 10,982.50
199,992.50
15.00% 29,998.88
229,991.38
PVC Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
AH TENAGA KERJA 210,130.00
- -
AH HARGA BAHAN -
57,500.00 12,247.50
222,377.50
15.00% 33,356.63
255,734.13
PVC Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 125,840.00
110,000.00 86,570.00
120,000.00 18,840.00
AH TENAGA KERJA 231,250.00
- -
AH HARGA BAHAN -
57,500.00 13,570.00
244,820.00
15.00% 36,723.00
281,543.00
HDPE Ø 63 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 160.00
110,000.00 110.00
120,000.00 24.00
130,000.00 4,420.00
AH TENAGA KERJA 4,714.00
29,785.00 29,785.00
AH HARGA BAHAN 29,785.00
57,500.00 230.00
34,729.00
15.00% 5,209.35
39,938.35
HDPE Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 480.00
110,000.00 330.00
120,000.00 120.00
130,000.00 9,230.00
AH TENAGA KERJA 10,160.00
- -
AH HARGA BAHAN -
57,500.00 287.50
10,447.50
15.00% 1,567.13
12,014.63
HDPE Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 720.00
110,000.00 550.00
120,000.00 120.00
130,000.00 12,480.00
AH TENAGA KERJA 13,870.00
117,070.00 117,070.00
AH HARGA BAHAN 117,070.00
57,500.00 345.00
131,285.00
15.00% 19,692.75
150,977.75
HDPE Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,280.00
110,000.00 880.00
120,000.00 240.00
130,000.00 15,730.00
AH TENAGA KERJA 18,130.00
- -
AH HARGA BAHAN -
57,500.00 517.50
18,647.50
15.00% 2,797.13
21,444.63
HDPE Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 3,520.00
110,000.00 2,420.00
120,000.00 480.00
130,000.00 22,230.00
28,650.00
298,540.00 298,540.00
AH HARGA BAHAN 298,540.00
57,500.00 977.50
328,167.50
15.00% 49,225.13
377,392.63
HDPE Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,360.00
110,000.00 3,630.00
120,000.00 840.00
130,000.00 28,730.00
38,560.00
464,945.00 464,945.00
AH HARGA BAHAN 464,945.00
57,500.00 1,322.50
504,827.50
15.00% 75,724.13
580,551.63
HDPE Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
110,000.00 4,950.00
120,000.00 1,080.00
130,000.00 35,230.00
48,460.00
- -
AH HARGA BAHAN -
57,500.00 1,725.00
50,185.00
15.00% 7,527.75
57,712.75
HDPE Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 14,160.00
110,000.00 9,680.00
120,000.00 2,160.00
130,000.00 48,230.00
74,230.00
- -
AH HARGA BAHAN -
57,500.00 3,162.50
77,392.50
15.00% 11,608.88
89,001.38
HDPE Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 18,000.00
110,000.00 12,430.00
120,000.00 2,760.00
130,000.00 54,730.00
87,920.00
- -
AH HARGA BAHAN -
57,500.00 4,025.00
91,945.00
15.00% 13,791.75
105,736.75
HDPE Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 22,160.00
110,000.00 15,290.00
120,000.00 3,360.00
130,000.00 61,230.00
102,040.00
- -
AH HARGA BAHAN -
57,500.00 4,887.50
106,927.50
15.00% 16,039.13
122,966.63
HDPE Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 26,640.00
110,000.00 18,370.00
120,000.00 3,960.00
130,000.00 74,230.00
123,200.00
- -
AH HARGA BAHAN -
57,500.00 5,807.50
129,007.50
15.00% 19,351.13
148,358.63
HDPE Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,080.00
110,000.00 33,110.00
120,000.00 7,200.00
130,000.00 100,230.00
188,620.00
- -
AH HARGA BAHAN -
57,500.00 10,292.50
198,912.50
15.00% 29,836.88
228,749.38
HDPE Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 73,040.00
110,000.00 50,160.00
120,000.00 10,920.00
130,000.00 113,230.00
247,350.00
- -
AH HARGA BAHAN -
57,500.00 15,525.00
HDPE Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 90,000.00
110,000.00 61,820.00
120,000.00 13,440.00
130,000.00 126,230.00
291,490.00
- -
AH HARGA BAHAN -
57,500.00 19,090.00
310,580.00
15.00% 46,587.00
357,167.00
HDPE Ø 1100 mm
80,000.00 98,400.00
110,000.00 68,090.00
120,000.00 14,880.00
130,000.00 139,230.00
JUMLAH TENAGA KERJA 320,600.00
- -
MLAH HARGA BAHAN -
57,500.00 20,125.00
340,725.00
15.00% 51,108.75
391,833.75
HDPE Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 129,520.00
110,000.00 88,990.00
120,000.00 19,440.00
130,000.00 152,230.00
390,180.00
- -
AH HARGA BAHAN -
57,500.00 27,427.50
417,607.50
15.00% 62,641.13
480,248.63
GIP Ø 63 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,520.00
110,000.00 1,100.00
120,000.00 240.00
2,860.00
97,750.00 97,750.00
AH HARGA BAHAN 97,750.00
57,500.00 -
GIP Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 4,640.00
110,000.00 3,190.00
120,000.00 720.00
8,550.00
281,750.00 281,750.00
AH HARGA BAHAN 281,750.00
57,500.00 -
290,300.00
15.00% 43,545.00
333,845.00
GIP Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,360.00
110,000.00 5,060.00
120,000.00 1,080.00
13,500.00
- -
AH HARGA BAHAN -
57,500.00 -
13,500.00
15.00% 2,025.00
15,525.00
GIP Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,480.00
110,000.00 7,260.00
120,000.00 1,560.00
19,300.00
408,250.00 408,250.00
AH HARGA BAHAN 408,250.00
57,500.00 -
GIP Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 27,200.00
110,000.00 18,700.00
120,000.00 4,080.00
49,980.00
782,000.00 782,000.00
AH HARGA BAHAN 782,000.00
57,500.00 -
831,980.00
15.00% 124,797.00
956,777.00
GIP Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 38,000.00
110,000.00 26,070.00
120,000.00 5,640.00
69,710.00
1,006,250.00 1,006,250.00
AH HARGA BAHAN 1,006,250.00
57,500.00 -
1,075,960.00
15.00% 161,394.00
1,237,354.00
GIP Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,320.00
110,000.00 27,720.00
120,000.00 6,000.00
74,040.00
- -
AH HARGA BAHAN -
57,500.00 -
74,040.00
15.00% 11,106.00
85,146.00
GIP Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 58,400.00
110,000.00 40,590.00
120,000.00 8,880.00
107,870.00
- -
AH HARGA BAHAN -
57,500.00 -
107,870.00
15.00% 16,180.50
124,050.50
GIP Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 67,840.00
110,000.00 46,200.00
120,000.00 10,200.00
124,240.00
- -
AH HARGA BAHAN -
57,500.00 -
124,240.00
15.00% 18,636.00
142,876.00
GIP Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 75,280.00
110,000.00 51,810.00
120,000.00 11,280.00
138,370.00
- -
AH HARGA BAHAN -
57,500.00 -
138,370.00
15.00% 20,755.50
159,125.50
GIP Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 69,120.00
110,000.00 47,520.00
120,000.00 10,320.00
126,960.00
-
-
AH HARGA BAHAN -
57,500.00 -
126,960.00
15.00% 19,044.00
146,004.00
GIP Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 125,360.00
110,000.00 86,130.00
120,000.00 18,840.00
230,330.00
- -
AH HARGA BAHAN -
57,500.00 -
230,330.00
15.00% 34,549.50
264,879.50
GIP Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 141,600.00
110,000.00 97,350.00
120,000.00 21,240.00
260,190.00
- -
AH HARGA BAHAN -
57,500.00 -
260,190.00
15.00% 39,028.50
299,218.50
GIP Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 157,920.00
110,000.00 108,570.00
120,000.00 23,640.00
290,130.00
- -
AH HARGA BAHAN -
57,500.00 -
290,130.00
15.00% 43,519.50
333,649.50
GIP Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 174,240.00
110,000.00 119,790.00
120,000.00 26,160.00
320,190.00
- -
AH HARGA BAHAN -
57,500.00 -
320,190.00
15.00% 48,028.50
368,218.50
GIP Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 190,560.00
110,000.00 131,010.00
120,000.00 28,560.00
350,130.00
- -
AH HARGA BAHAN -
57,500.00 -
350,130.00
15.00% 52,519.50
402,649.50
DCI Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 5,680.00
110,000.00 1,540.00
120,000.00 840.00
8,060.00
710,700.00 710,700.00
AH HARGA BAHAN 710,700.00
57,500.00 172.50
718,932.50
15.00% 107,839.88
826,772.38
DCI Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,960.00
110,000.00 2,420.00
120,000.00 1,320.00
12,700.00
1,076,400.00 1,076,400.00
AH HARGA BAHAN 1,076,400.00
57,500.00 575.00
1,089,675.00
15.00% 163,451.25
1,253,126.25
DCI Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 12,720.00
110,000.00 3,520.00
120,000.00 1,920.00
18,160.00
1,573,200.00 1,573,200.00
AH HARGA BAHAN 1,573,200.00
57,500.00 1,035.00
1,592,395.00
15.00% 238,859.25
1,831,254.25
DCI Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 29,280.00
110,000.00 8,030.00
120,000.00 4,440.00
41,750.00
2,415,000.00 2,415,000.00
AH HARGA BAHAN 2,415,000.00
57,500.00 3,105.00
2,459,855.00
15.00% 368,978.25
2,828,833.25
DCI Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 38,080.00
110,000.00 10,450.00
120,000.00 5,760.00
54,290.00
3,220,000.00 3,220,000.00
AH HARGA BAHAN 3,220,000.00
57,500.00 4,197.50
3,278,487.50
15.00% 491,773.13
3,770,260.63
DCI Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 40,960.00
110,000.00 11,220.00
120,000.00 6,120.00
58,300.00
- -
AH HARGA BAHAN -
57,500.00 4,542.50
62,842.50
15.00% 9,426.38
72,268.88
DCI Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 75,280.00
110,000.00 20,680.00
120,000.00 11,280.00
107,240.00
- -
AH HARGA BAHAN -
57,500.00 9,085.00
116,325.00
15.00% 17,448.75
133,773.75
DCI Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 90,960.00
110,000.00 24,970.00
120,000.00 13,680.00
129,610.00
- -
AH HARGA BAHAN -
57,500.00 10,120.00
139,730.00
15.00% 20,959.50
160,689.50
DCI Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 104,960.00
110,000.00 28,820.00
120,000.00 15,720.00
149,500.00
- -
AH HARGA BAHAN -
57,500.00 11,040.00
160,540.00
15.00% 24,081.00
184,621.00
DCI Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 104,720.00
110,000.00 28,820.00
120,000.00 15,720.00
149,260.00
- -
AH HARGA BAHAN -
57,500.00 11,040.00
160,300.00
15.00% 24,045.00
184,345.00
DCI Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 207,840.00
110,000.00 57,200.00
120,000.00 31,200.00
296,240.00
- -
AH HARGA BAHAN -
57,500.00 17,825.00
DCI Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 269,600.00
110,000.00 74,140.00
120,000.00 40,440.00
384,180.00
- -
AH HARGA BAHAN -
57,500.00 21,907.50
406,087.50
15.00% 60,913.13
467,000.63
DCI Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 321,680.00
110,000.00 88,440.00
120,000.00 48,240.00
458,360.00
- -
AH HARGA BAHAN -
57,500.00 25,357.50
DCI Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 378,480.00
110,000.00 104,060.00
120,000.00 56,760.00
539,300.00
- -
AH HARGA BAHAN -
57,500.00 29,095.00
568,395.00
15.00% 85,259.25
653,654.25
DCI Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 440,160.00
110,000.00 121,000.00
120,000.00 66,000.00
627,160.00
- -
AH HARGA BAHAN -
57,500.00 33,120.00
MLAH HARGA ALAT 33,120.00
660,280.00
15.00% 99,042.00
759,322.00
baja Ø 63 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,240.00
110,000.00 660.00
120,000.00 360.00
3,260.00
192,625.00 192,625.00
AH HARGA BAHAN 192,625.00
57,500.00 2,127.50
198,012.50
15.00% 29,701.88
227,714.38
baja Ø 100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 6,800.00
110,000.00 1,870.00
120,000.00 960.00
9,630.00
263,925.00 263,925.00
AH HARGA BAHAN 263,925.00
57,500.00 2,300.00
57,500.00 2,300.00
275,855.00
15.00% 41,378.25
317,233.25
baja Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 10,640.00
110,000.00 2,970.00
120,000.00 1,560.00
15,170.00
322,575.00 322,575.00
AH HARGA BAHAN 322,575.00
57,500.00 2,415.00
340,160.00
15.00% 51,024.00
391,184.00
baja Ø 150 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 14,720.00
110,000.00 4,070.00
120,000.00 2,160.00
20,950.00
397,037.50 397,037.50
AH HARGA BAHAN 397,037.50
57,500.00 2,587.50
420,575.00
15.00% 63,086.25
483,661.25
baja Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 38,080.00
110,000.00 10,450.00
120,000.00 5,760.00
54,290.00
674,475.00 674,475.00
AH HARGA BAHAN 674,475.00
57,500.00 3,450.00
732,215.00
15.00% 109,832.25
842,047.25
baja Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 53,040.00
110,000.00 14,630.00
120,000.00 7,920.00
75,590.00
859,625.00 859,625.00
AH HARGA BAHAN 859,625.00
57,500.00 3,910.00
939,125.00
15.00% 140,868.75
1,079,993.75
baja Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 59,600.00
110,000.00 16,390.00
120,000.00 8,880.00
84,870.00
- -
AH HARGA BAHAN -
57,500.00 4,140.00
89,010.00
15.00% 13,351.50
102,361.50
baja Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 115,200.00
110,000.00 31,680.00
120,000.00 17,280.00
164,160.00
- -
AH HARGA BAHAN -
57,500.00 6,037.50
170,197.50
15.00% 25,529.63
195,727.13
baja Ø 450 mm
80,000.00 111,920.00
110,000.00 30,800.00
120,000.00 16,800.00
159,520.00
- -
AH HARGA BAHAN -
57,500.00 6,152.50
165,672.50
15.00% 24,850.88
190,523.38
baja Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 124,640.00
110,000.00 34,320.00
120,000.00 18,720.00
177,680.00
- -
AH HARGA BAHAN -
57,500.00 6,152.50
183,832.50
15.00% 27,574.88
211,407.38
baja Ø 600 mm
80,000.00 114,960.00
110,000.00 31,570.00
120,000.00 17,280.00
163,810.00
- -
AH HARGA BAHAN -
57,500.00 6,497.50
170,307.50
15.00% 25,546.13
195,853.63
baja Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 209,600.00
110,000.00 57,750.00
120,000.00 31,440.00
298,790.00
- -
AH HARGA BAHAN -
57,500.00 9,545.00
308,335.00
15.00% 46,250.25
354,585.25
baja Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 237,680.00
110,000.00 65,340.00
120,000.00 35,640.00
338,660.00
- -
AH HARGA BAHAN -
57,500.00 10,522.50
349,182.50
15.00% 52,377.38
401,559.88
baja Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 265,520.00
110,000.00 73,040.00
120,000.00 39,840.00
378,400.00
- -
AH HARGA BAHAN -
57,500.00 11,557.50
389,957.50
15.00% 58,493.63
448,451.13
baja Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 293,360.00
110,000.00 80,630.00
120,000.00 44,040.00
418,030.00
- -
AH HARGA BAHAN -
57,500.00 12,535.00
430,565.00
15.00% 64,584.75
495,149.75
baja Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 321,200.00
110,000.00 88,330.00
120,000.00 48,240.00
457,770.00
- -
AH HARGA BAHAN -
57,500.00 13,570.00
471,340.00
15.00% 70,701.00
542,041.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
210,130.00
3,737,500.00 3,737,500.00
AH HARGA BAHAN 3,737,500.00
4,025,000.00 402,500.00
4,350,130.00
15.00% 652,519.50
5,002,649.50
e Ø 200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00
6,210,000.00 6,210,000.00
AH HARGA BAHAN 6,210,000.00
4,025,000.00 1,207,500.00
7,669,410.00
15.00% 1,150,411.50
8,819,821.50
e Ø 250 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00
10,637,500.00 10,637,500.00
AH HARGA BAHAN 10,637,500.00
4,025,000.00 1,610,000.00
12,499,410.00
15.00% 1,874,911.50
14,374,321.50
e Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 160,000.00
110,000.00 110,000.00
120,000.00 24,000.00
294,000.00
- -
AH HARGA BAHAN -
4,025,000.00 2,012,500.00
2,306,500.00
15.00% 345,975.00
2,652,475.00
e Ø 400 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 274,320.00
110,000.00 188,650.00
120,000.00 41,160.00
504,130.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
4,529,130.00
15.00% 679,369.50
5,208,499.50
e Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 274,320.00
110,000.00 188,650.00
120,000.00 41,160.00
504,130.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
4,529,130.00
15.00% 679,369.50
5,208,499.50
e Ø 500 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 320,000.00
110,000.00 220,000.00
120,000.00 48,000.00
588,000.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
4,613,000.00
15.00% 691,950.00
5,304,950.00
e Ø 600 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 113,680.00
110,000.00 78,210.00
120,000.00 17,040.00
208,930.00
- -
AH HARGA BAHAN -
4,025,000.00 2,415,000.00
1,667,500.00 500,250.00
MLAH HARGA ALAT 2,915,250.00
3,124,180.00
15.00% 468,627.00
3,592,807.00
e Ø 700 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
210,130.00
- -
HARGA BAHAN -
4,025,000.00 2,012,500.00
1,667,500.00 833,750.00
AH HARGA ALAT 2,846,250.00
3,056,380.00
15.00% 458,457.00
3,514,837.00
e Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 142,880.00
110,000.00 98,230.00
120,000.00 21,480.00
262,590.00
- -
AH HARGA BAHAN -
4,025,000.00 2,012,500.00
1,667,500.00 833,750.00
MLAH HARGA ALAT 2,846,250.00
3,108,840.00
15.00% 466,326.00
3,575,166.00
e Ø 900 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00
- -
AH HARGA BAHAN -
4,025,000.00 3,018,750.00
1,667,500.00 1,250,625.00
MLAH HARGA ALAT 4,269,375.00
4,521,285.00
15.00% 678,192.75
5,199,477.75
e Ø 1000 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 205,680.00
110,000.00 141,460.00
120,000.00 30,840.00
377,980.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00
6,070,480.00
15.00% 910,572.00
6,981,052.00
e Ø 1100 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 240,000.00
110,000.00 165,000.00
120,000.00 36,000.00
441,000.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00
6,133,500.00
15.00% 920,025.00
7,053,525.00
e Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 240,000.00
110,000.00 165,000.00
120,000.00 36,000.00
441,000.00
- -
AH HARGA BAHAN -
4,025,000.00 4,025,000.00
1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00
6,133,500.00
15.00% 920,025.00
7,053,525.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 8,480.00
110,000.00 5,830.00
120,000.00 1,320.00
15,630.00
- -
AH HARGA BAHAN -
4,025,000.00 112,700.00
MLAH HARGA ALAT 112,700.00
128,330.00
15.00% 19,249.50
147,579.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 17,280.00
110,000.00 11,880.00
120,000.00 2,640.00
31,800.00
- -
AH HARGA BAHAN -
4,025,000.00 116,725.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 26,080.00
110,000.00 17,930.00
120,000.00 3,960.00
47,970.00
- -
AH HARGA BAHAN -
4,025,000.00 156,975.00
MLAH HARGA ALAT 156,975.00
204,945.00
15.00% 30,741.75
235,686.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 34,880.00
110,000.00 23,980.00
120,000.00 5,280.00
64,140.00
- -
AH HARGA BAHAN -
4,025,000.00 2,012,500.00
2,076,640.00
15.00% 311,496.00
2,388,136.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 52,480.00
110,000.00 36,080.00
120,000.00 7,920.00
96,480.00
- -
AH HARGA BAHAN -
4,025,000.00 2,012,500.00
4,025,000.00 2,012,500.00
2,108,980.00
15.00% 316,347.00
2,425,327.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 61,280.00
110,000.00 42,130.00
120,000.00 9,240.00
112,650.00
- -
AH HARGA BAHAN -
4,025,000.00 2,012,500.00
2,125,150.00
15.00% 318,772.50
2,443,922.50
80,000.00 70,080.00
110,000.00 48,180.00
120,000.00 10,560.00
128,820.00
- -
AH HARGA BAHAN -
4,025,000.00 2,415,000.00
4,025,000.00 2,415,000.00
2,543,820.00
15.00% 381,573.00
2,925,393.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 87,680.00
110,000.00 60,280.00
120,000.00 13,200.00
161,160.00
- -
AH HARGA BAHAN -
4,025,000.00 776,825.00
1,667,500.00 160,080.00
MLAH HARGA ALAT 936,905.00
1,098,065.00
15.00% 164,709.75
1,262,774.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 105,280.00
110,000.00 72,380.00
120,000.00 15,840.00
193,500.00
- -
AH HARGA BAHAN -
4,025,000.00 905,625.00
1,667,500.00 188,427.50
MLAH HARGA ALAT 1,094,052.50
1,287,552.50
15.00% 193,132.88
1,480,685.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 122,880.00
110,000.00 84,480.00
120,000.00 18,480.00
225,840.00
- -
AH HARGA BAHAN -
4,025,000.00 1,034,425.00
1,667,500.00 215,107.50
MLAH HARGA ALAT 1,249,532.50
1,475,372.50
15.00% 221,305.88
1,696,678.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 140,480.00
110,000.00 96,580.00
120,000.00 21,120.00
258,180.00
- -
AH HARGA BAHAN -
4,025,000.00 1,292,025.00
1,667,500.00 268,467.50
MLAH HARGA ALAT 1,560,492.50
1,818,672.50
15.00% 272,800.88
2,091,473.38
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 158,080.00
110,000.00 108,680.00
120,000.00 23,760.00
290,520.00
- -
AH HARGA BAHAN -
4,025,000.00 1,473,150.00
1,667,500.00 305,152.50
MLAH HARGA ALAT 1,778,302.50
2,068,822.50
15.00% 310,323.38
2,379,145.88
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 175,680.00
110,000.00 120,780.00
120,000.00 26,400.00
322,860.00
- -
AH HARGA BAHAN -
4,025,000.00 1,553,650.00
1,667,500.00 321,827.50
MLAH HARGA ALAT 1,875,477.50
2,198,337.50
15.00% 329,750.63
2,528,088.13
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 193,280.00
110,000.00 132,880.00
120,000.00 29,040.00
355,200.00
- -
AH HARGA BAHAN -
4,025,000.00 1,811,250.00
1,667,500.00 375,187.50
MLAH HARGA ALAT 2,186,437.50
2,541,637.50
15.00% 381,245.63
2,922,883.13
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 117,280.00
110,000.00 80,630.00
120,000.00 17,640.00
215,550.00
-
AH HARGA BAHAN -
57,500.00 34,845.00
1,420,020.00 106,501.50
379,500.00 367,356.00
4,025,000.00 3,481,625.00
4,205,877.50
15.00% 630,881.63
4,836,759.13
80,000.00 131,680.00
110,000.00 90,530.00
120,000.00 19,800.00
242,010.00
-
AH HARGA BAHAN -
57,500.00 37,375.00
1,420,020.00 225,783.18
379,500.00 409,101.00
4,025,000.00 3,666,775.00
MLAH HARGA ALAT 4,339,034.18
4,581,044.18
15.00% 687,156.63
5,268,200.81
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 167,680.00
110,000.00 115,280.00
120,000.00 25,200.00
308,160.00
-
-
AH HARGA BAHAN
57,500.00 43,700.00
1,420,020.00 523,987.38
379,500.00 513,463.50
4,025,000.00 4,129,650.00
80,000.00 203,680.00
110,000.00 140,030.00
120,000.00 30,600.00
374,310.00
-
AH HARGA BAHAN -
57,500.00 50,025.00
1,420,020.00 822,191.58
379,500.00 617,826.00
4,025,000.00 4,592,525.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 239,680.00
110,000.00 164,780.00
120,000.00 36,000.00
440,460.00
-
AH HARGA BAHAN -
57,500.00 56,350.00
1,420,020.00 1,120,395.78
379,500.00 722,188.50
4,025,000.00 5,055,400.00
80,000.00 275,680.00
110,000.00 189,530.00
120,000.00 41,400.00
506,610.00
-
AH HARGA BAHAN -
57,500.00 62,675.00
1,420,020.00 1,418,599.98
379,500.00 826,551.00
4,025,000.00 5,518,275.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 347,680.00
110,000.00 239,030.00
120,000.00 51,600.00
638,310.00
-
AH HARGA BAHAN -
57,500.00 75,325.00
1,420,020.00 2,015,008.38
379,500.00 1,035,276.00
4,025,000.00 6,444,025.00
80,000.00 383,680.00
110,000.00 263,780.00
120,000.00 57,600.00
705,060.00
-
AH HARGA BAHAN -
57,500.00 81,650.00
1,420,020.00 2,313,212.58
379,500.00 1,139,638.50
4,025,000.00 6,906,900.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 419,680.00
110,000.00 288,530.00
120,000.00 63,000.00
771,210.00
-
AH HARGA BAHAN -
57,500.00 87,975.00
1,420,020.00 2,611,416.78
379,500.00 1,244,001.00
4,025,000.00 7,369,775.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 491,680.00
110,000.00 338,030.00
120,000.00 73,800.00
903,510.00
-
AH HARGA BAHAN -
57,500.00 100,625.00
1,420,020.00 3,207,825.18
379,500.00 1,452,726.00
4,025,000.00 8,295,525.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 563,680.00
110,000.00 387,530.00
120,000.00 84,600.00
1,035,810.00
-
AH HARGA BAHAN -
57,500.00 113,275.00
1,420,020.00 3,804,233.58
379,500.00 1,661,451.00
4,025,000.00 9,221,275.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 635,680.00
110,000.00 437,030.00
120,000.00 95,400.00
1,168,110.00
-
AH HARGA BAHAN -
57,500.00 125,925.00
57,500.00 125,925.00
1,420,020.00 4,400,641.98
379,500.00 1,870,176.00
4,025,000.00 10,147,025.00
PENGETESAN PIPA
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 11.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 560.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 23.00
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 571.55
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 46.00
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 594.55
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 103.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 652.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 178.25
7,532.50 451.95 128.44 12,6 mpa
48,300.00 96.60
AH HARGA BAHAN 726.80
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 281.75
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 830.30
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 408.25
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 956.80
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 724.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 1,273.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
AH TENAGA KERJA 736.00
5,750.00 908.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 1,457.05
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 640.00
120,000.00 96.00
AH TENAGA KERJA 736.00
5,750.00 1,627.25
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 2,175.80
ELEKTRIKAL
lampu dan Saklar
80,000.00 80,000.00
120,000.00 6,000.00
120,000.00 60.00
86,060.00
5,750.00 17,250.00
7,475.00 179,400.00
17,200.00 412,800.00
2,300.00 6,900.00
2,300.00 9,200.00
2,500.00 60,000.00
1,150.00 1,150.00
14,375.00 14,375.00
5,175.00 5,175.00
AH HARGA BAHAN 706,250.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
120,000.00 6,000.00
120,000.00 60.00
86,060.00
5,750.00 17,250.00
7,475.00 112,125.00
2,300.00 2,300.00
2,300.00 4,600.00
2,500.00 60,000.00
40,250.00 40,250.00
AH HARGA BAHAN 236,525.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,320.00
120,000.00 43,800.00
120,000.00 10,800.00
120,000.00 8,400.00
83,320.00
7,500.00 105,000.00
5,700.00 79,800.00
700.00 9,800.00
2,300.00 4,600.00
8,000.00 800.00
3,000.00 600.00
AH HARGA BAHAN 200,600.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 20,320.00
120,000.00 43,800.00
120,000.00 10,800.00
120,000.00 8,400.00
83,320.00
7,500.00 120,000.00
5,700.00 91,200.00
700.00 11,200.00
2,300.00 2,990.00
8,000.00 2,120.00
3,000.00 465.00
AH HARGA BAHAN 227,975.00
80,000.00 16,000.00
100,000.00 60,000.00
105,000.00 6,300.00
110,000.00 2,200.00
JUMLAH TENAGA KERJA 84,500.00
4,025,000.00 80,500.00
20,700.00 5,175.00
71,875.00 107,812.50
95,450.00 33,407.50 28,800.00
28,750.00 28,750.00 0.96
AH HARGA BAHAN 255,645.00 30,000.00
-
MLAH HARGA ALAT -
340,145.00
15.00% 51,021.75
391,166.75
rhitungan teknis menurut teori
m/2016/04/pagarpanelbeton-precast-harga-jual.html, tinggi 250, 5 lebar panel
gar-panel-beton-precast
aikan dengan perhitungan teori teknis
a-epoxy-lantai-kualitas-terbaik-di-indonesia/, Rp. 135.000 /kg
ahan-Upah-Perhubungan
ga-waterstop-lebar-150-mm.html
er-stop-rubber-lebar-150-mm-200-mm
-stop-pvc-lebar-230-mm-320-mm
7,500.00
?q=harga+phenol+film+12mm&tbm=isch&imgil=NZhJVzXFw0mLQM%253A%253BiCFXds6D7jT-4M%253Bhttps%25253A%25252F%25252Fjualtriplek1.wordpress.com%
m/harga-sewa-crane/ = 3.900.000
ducts.html?page=shop.product_details&flypage=flypage.tpl&product_id=26&category_id=7&vmcchk=1
ogspot.co.id/p/price-list-sewa-crane.html
.../12/.../standar_biaya_umum.pdf
category/besi-hollow/, menggunakan Besi Hollow 40 x 40 x 2 mm x 6 Meter Rp. 114.155
g thn 2013, Rp. 12.700 (di kali 1,1)
lama di bagi 10
.1=0.022 isi lubang v2*0.1*0.1*0.1*0.2*12.5=0.05 jumlah=0.022+0.05=0.072
jumlah bahan + bahan
pajak
harga satuan
kayu/katalog-harga-lantai-kayu-2014.html
a-tempel/. Rp. 245.000 / 60 pcs
m/2016/09/daftar-harga-batu-paras-jogja-dan-jenis.html
ga-wallpaper-dinding/, diambil harga tengah2nya
floor-hardener-sika/
p-asbes-dan-seng/
pblog.com/kami-adalah-tukang-plafon-gypsum-dan-tukang-plafon-akustik-jawa-tengah.html, menggunakan ketebalan 9 mm
-atap-asbes-terbaru/
-atap-asbes-terbaru/
0d4a2f58027cfb434000003/jual-atap-sirap-kayu-ulin-kalimantan/
om/plat-tembaga/harga-plat-aluminium/
dle-pintu-dan-kunci-pintu-terbaru/
Kunci-Pintu-Kamar-Mandi-Bulat
dle-pintu-dan-kunci-pintu-terbaru/
Engsel-Kupu-Kupu
ga-engsel-pintu-jendela/#
d/spring-knip-379-solid
Door-Closer-Penutup-Pintu-Otomatis
mah-tangga/gembok-kunci-pengaman/htum9-jual-slot-pintu-kunci-stainless-bolt
663a955642eb653708b4570/door-holder-feet--penahan-pintu-unik-bentuk-kaki-warna-merah/
mah-tangga/furniture-interior/lain-lain-1669/18pj3x-jual-door-stop-stainless-setengah-lingkaran-door-stopper-penahan-pintu-doorstop-setengah-bulat-model-tanam-pengam
id/p/daftar-harga.html
mah-tangga/gembok-kunci-pengaman/745oy-jual-kunci-lemari-merk-shanghai-lock-factory-size-16-mm-1-set-12-pcs
arga-kaca-terbaru.html
m/harga-kaca-per-meter-terbaru-2016/
arga-kaca-terbaru.html
m/harga-kaca-per-meter-terbaru-2016/
arga-kaca-terbaru.html
arga-kaca-terbaru.html
wc/index.php?productID=156
om/sabun_cream_ekonomi_5_kg#.WMY0i2gxXIU
as-dan-roller-cat-terbaru-maret-2016/
emarang 2015
emarang 2015
emarang 2015
emarang 2015
emarang 2015
o.id/2012/10/harga-atap-alang-alang-rumbia-kirai.html
ga-cat-tembok-dinding-terbaru/
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
2013/04/daftar-harga-impra-wood-finish.html
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
emarang 2015
252F%25252Fjualtriplek1.wordpress.com%25252Fharga%25252F&source=iu&pf=m&fir=NZhJVzXFw0mLQM%253A%252CiCFXds6D7jT-4M%252C_&usg=__OT98FVs
rstop-setengah-bulat-model-tanam-pengaman-pintu-dan-dinding-tembok
4M%252C_&usg=__OT98FVsnzZp-4AFrSAupfGnWhQI%3D&biw=1024&bih=657&ved=0ahUKEwid6Z-SusPSAhVCQ48KHUqcCbkQyjcISQ&ei=Vim-WJ3mLcKGvQTKu
SQ&ei=Vim-WJ3mLcKGvQTKuKbICw#imgrc=NZhJVzXFw0mLQM:
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2022
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan 2,090,403.60
54 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 1,302,334.00
55 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm 76,114.50
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 177,820.50
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 165,627.00
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 181,082.00
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 175,406.00
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 118,591.00
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 252,164.00
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 272,162.00
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 557,788.00
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 574,288.00
II - 811
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 870,188.00
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 714,472.00
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 517,209.00
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 179,465.44
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 99,357.50
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 124,927.00
II - 812
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 88,261.97
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 110,354.96
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 132,326.95
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 165,521.44
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 174,758.26
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 52,115.91
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 48,165.26
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 7,502.00
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 12,122.00
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 9,812.00
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 64,768.00
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 66,572.00
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 59,895.00
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 887,984.24
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 845,854.90
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,414,703.73
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 127,349.53
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 127,349.53
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 127,349.53
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,844,640.25
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,704,446.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 59,059.00
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 127,461.40
94 A.4.1.2.24. Upah 1 titik joint dengan sling 50,094.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 34,221.00
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 34,221.00
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 151,228.00
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 712,134.50
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 49,166.15
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 456,575.68
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,502,072.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,528,822.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 601,898.00
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 734,800.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 165,514.80
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,478,601.40
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 708,994.00
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 214,456.00
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 641,305.06
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 472,532.94
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 398,849.00
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 171,384.40
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 113,910.50
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 225,126.00
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 271,986.00
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 227,635.27
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 245,697.10
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 308,011.00
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 293,988.20
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 284,438.00
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 279,653.00
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 278,339.60
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 266,253.46
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 149,185.30
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 142,477.94
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 138,664.90
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 136,268.66
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 135,037.54
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 132,418.00
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 133,468.50
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 120,156.92
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 121,270.47
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 102,427.64
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 106,593.87
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 98,423.69
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 98,429.10
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 99,576.31
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 99,638.95
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 159,197.50
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 159,197.50
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 267,011.36
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 284,101.29
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 289,641.99
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 76,300.05
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 68,945.89
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 65,792.01
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 63,616.08
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 62,413.21
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 61,436.89
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 60,910.43
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 60,383.97
II - 813
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 62,894.92
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 60,703.50
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 54,685.29
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 55,466.07
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 92,266.28
II - 814
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 74,553.12
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 85,085.44
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 83,556.04
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 82,179.86
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 77,682.99
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 38,290.21
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 64,931.90
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 182,567.00
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 182,567.00
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 49,887.64
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 29,241.70
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 13,950.20
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 61,092.68
170 A.4.4.2.27. Pemasangan 1 m2 acian 37,416.50
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 104,090.80
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 137,129.30
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 115,352.60
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 153,464.30
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 429,490.60
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 223,948.78
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 174,416.00
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm 209,690.80
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 219,243.20
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 107,184.33
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 147,018.08
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 85,462.96
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 275,151.58
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,209,768.34
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 202,086.50
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 124,168.00
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 364,369.50
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 364,369.50
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 251,993.50
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 244,580.60
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 412,318.50
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm 419,287.00
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 251,993.50
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm 245,845.60
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,314,543.78
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 533,296.28
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 145,167.00
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 141,537.00
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 208,644.70
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 256,250.50
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 89,056.00
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 44,924.00
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 64,663.50
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 173,033.85
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 756,955.43
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 182,810.65
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 766,732.23
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 64,218.00
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 802,131.00
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 402,479.00
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 120,725.00
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 59,048.00
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 243,265.00
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 42,895.16
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 665,326.75
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 18,089.50
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 51,821.00
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 68,387.00
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 46,827.00
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 94,595.60
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 107,245.60
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 112,305.60
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 70,488.00
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 46,519.00
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 50,567.00
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 49,698.00
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 55,770.00
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 39,578.00
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 42,411.60
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 43,221.20
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 46,054.80
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 57,794.00
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 40,387.60
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 40,792.40
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 44,030.80
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 45,245.20
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 48,483.60
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 216,293.00
II - 815
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 192,764.00
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 188,842.50
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 122,177.00
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 122,177.00
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 122,177.00
II - 816
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 118,767.00
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 114,334.00
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 102,003.00
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 114,708.00
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 157,212.00
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 116,534.00
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 115,150.20
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 106,832.00
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 84,612.00
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 84,546.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 52,030.00
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 296,406.00
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 32,862.50
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 16,766,365.00
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 7,849,435.00
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 395,241.00
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 335,225.00
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 736,120.00
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 541,112.00
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 868,120.00
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) 621,753.00
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 674,773.00
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 705,045.00
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 792,412.50
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 673,321.00
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 6,778,420.00
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 18,142,300.00
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 9,711,240.00
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 107,246.92
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 108,175.54
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 105,772.70
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 152,680.00
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 154,605.00
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 98,010.00
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 97,955.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 190,099.80
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 378,371.40
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 388,217.50
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 60,258.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 367,026.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 226,765.00
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 124,806.00
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 156,486.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 97,455.60
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 45,936.00
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 61,006.00
290 A.4.6.2.8. Pemasangan 1 buah spring knip 50,336.00
291 A.4.6.2.9. Pemasangan 1 buah kait angin 32,021.00
292 A.4.6.2.10. Pemasangan 1 buah door closer 426,096.00
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 43,912.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 100,936.00
295 A.4.6.2.13. Pemasangan 1 buah door stop 65,560.00
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 528,946.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 215,512.00
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 112,003.10
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 128,338.10
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 236,541.80
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 540,975.60
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 210,298.00
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 384,142.00
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 314,721.00
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,812,678.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,174.50
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 14,289.00
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 14,949.00
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 45,317.80
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 62,134.60
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 33,635.80
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 48,478.32
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 21,758.00
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 44,070.13
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 31,868.10
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 19,204.90
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 10,839.40
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 17,591.20
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 9,212.50
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 140,756.00
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 33,261.80
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 65,819.60
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 70,103.00
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 35,847.90
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 163,336.80
II - 817
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 144,623.60
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 2,213,255.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 2,104,633.30
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 499,125.00
II - 818
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 440,935.00
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,307,614.00
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,486,684.76
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,245,596.00
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,245,596.00
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 400,466.00
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 1,037,850.00
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 825,495.00
338 A.5.1.1 14. Pemasangan 1 buah floor drain 119,350.00
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 468,798.00
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 752,334.00
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 877,532.70
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 71,373.50
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 70,547.13
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 89,179.20
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 172,986.00
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 266,112.00
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 367,091.41
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 547,371.00
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 23,958.00
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 29,132.40
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 35,184.60
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 66,409.20
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 56,964.60
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 148,196.40
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 185,529.30
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 443,830.20
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 378,028.20
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 214,835.06
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1,022,195.57
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 183,704.40
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
361 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 447,480.00
362 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 535,260.00
- TAMBAHAN / LAIN-LAIN
363 - 1 Buah Pembuatan Papan Nama Proyek 364,012.00
364 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 379,621.00
365 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 112,966.70
366 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 290,764.65
367 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 41,146.88
368 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 56,430.00
369 ABK.990.07 Menurunkan 1 m2 atap genteng 2,053.33
370 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,306.67
371 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 78,906.67
372 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 6,746.67
373 SNI 2012 1 m³ Bongkaran Beton Bertulang 630,652.00
374 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 591,052.00
375 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 949,520.00
376 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 111,741.30
377 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 186,384.00
378 - 1 Bh Pekerjaan Stop Kontak 39,050.00
379 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 68,200.00
380 - 1 Unit Pekerjaan Sekring Kast 60,610.00
381 - 1 Bh Pekerjaan MCB Box 60,610.00
382 - 1 m' Pekerjaan Over Spaneng 38,522.00
383 - 1 Bh Pekerjaan Saklar Ganda 65,560.00
384 - 1 Bh Pekerjaan Saklar Tunggal 61,710.00
385 A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 1,029,072.00
JALAN LINGKUNGAN
386 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 92,222.76
387 Analisa EI-321.rob : Timbunan Biasa 330,605.42
388 Analisa EI-322.rob : Timbunan Pilihan 394,489.22
389 Analisa EI-331.rob : Penyiapan Badan Jalan 166.46
390 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 14,664.65
391 Analisa EI-612a : Lapis Perekat - Aspal Cair 14,952.88
392 Analisa EI-621 : Agregat Penutup BURTU 17,137.92
393 Analisa EI-631.rob : Latasir Kelas A (SS-A) 60,773.82
394 Analisa EI-632.rob : Latasir Kelas B (SS-B) 68,247.70
395 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,148,410.32
396 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,281,609.49
397 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 428,722.27
398 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,118,589.13
399 Analisa EI-412 : Lapis Pondasi Agregat Kelas A (Buruh) 507,178.02
400 Analisa EI-422 : Lapis Pondasi Agregat Kelas B (Buruh) 407,772.75
401 Analisa EI-192a rob : Udit Type U 300 X 300 636,254.01
402 Analisa EI-192b rob : Udit Type U 400 X 400 760,933.51
403 Analisa EI-181 : Bok Culvert BC 400 X 400 1,411,913.60
404 Analisa EI-182 : Box Culvert BC 500 x 500 HD 1,835,973.50
405 - 1 m2 Memasang Paving Block t = 8 cm (K - 250) 192,227.75
406 - 1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm 385,193.60
407 Analisa EI-714 : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan) 1,683,946.78
408 Analisa EI-619 : Beton Struktur Site Mix K-125 919,627.89
II - 819
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
409 AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras) 519,207.15
410 AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang) 399,553.96
411 AT.02.rob.1 1 m' Pengeboran sederhana 259,603.58
412 AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras) 480,108.20
413 AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang) 369,420.70
II - 820
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
414 AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6'' 482,104.15
415 AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8'' 708,741.83
416 AT.12 1 m3 Pengadaan dan pemasangan gravel pack 1,841,807.00
417 AT.13 1 jam pencucian sumur 185,850.50
418 AT.14 1 jam Uji Pemompaan 185,850.50
437 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 206,945.20
438 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 193,958.00
439 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 168,483.60
440 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 133,601.20
441 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 102,946.00
442 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 82,886.80
443 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 75,322.80
444 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 46,433.60
445 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 45,933.60
446 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 23,538.40
447 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 177,222.32
448 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 166,092.80
449 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 144,333.76
450 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 113,335.60
451 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 87,746.80
452 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 70,727.44
453 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 64,514.48
454 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 40,353.92
455 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 39,853.92
456 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 19,485.28
457 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa 157,049.20
458 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa 147,180.50
459 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa 127,943.10
460 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa 99,581.20
461 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa 77,431.00
462 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa 62,474.80
463 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa 57,178.80
464 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa 36,227.60
465 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa 35,727.60
466 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa 16,734.40
467 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 363,995.20
468 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 310,048.48
469 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 261,424.08
470 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 219,801.20
471 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 163,996.00
472 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 133,286.80
473 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 115,122.80
474 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 71,583.60
475 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 66,333.60
476 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 40,488.40
477 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 334,272.32
478 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 282,031.48
479 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 237,274.24
480 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 199,535.60
481 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 148,796.80
482 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 121,127.44
483 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 104,314.48
484 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 65,503.92
485 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 60,253.92
486 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 36,435.28
487 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa 314,099.20
488 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa 263,270.98
489 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa 220,883.58
490 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa 185,781.20
491 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa 138,481.00
492 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa 112,874.80
493 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa 96,978.80
494 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa 61,377.60
495 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa 56,127.60
496 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa 33,684.40
497 - 400 m' Pengetesan pipa PVC dia. 350 mm 3,636,500.00
498 - 400 m' Pengetesan pipa PVC dia. 300 mm 3,037,500.00
499 - 400 m' Pengetesan pipa PVC dia. 250 mm 2,470,000.00
500 - 400 m' Pengetesan pipa PVC dia. 200 mm 1,934,000.00
501 - 400 m' Pengetesan pipa PVC dia. 160 mm 1,238,250.00
502 - 400 m' Pengetesan pipa PVC dia. 110 mm 1,198,500.00
503 - 400 m' Pengetesan pipa PVC dia. 90 mm 1,119,750.00
504 - 400 m' Pengetesan pipa PVC dia. 63 mm 1,072,500.00
505 - 400 m' Pengetesan pipa PVC dia. 50 mm 1,035,750.00
506 - 1 unit perbaikan gate valve dia. 350mm 791,320.00
507 - 1 unit perbaikan gate valve dia. 300mm 775,570.00
508 - 1 unit perbaikan gate valve dia. 250mm 765,070.00
509 - 1 unit perbaikan gate valve dia. 200mm 749,320.00
510 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 487,066.28
511 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 400,491.68
512 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan 350,317.68
513 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan 272,588.08
514 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan 252,088.08
515 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan 184,304.48
516 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu 478,816.28
II - 821
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
517 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu 394,741.68
518 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu 350,317.68
519 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu 272,588.08
520 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu 252,088.08
521 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu 184,304.48
II - 822
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
522 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa 427,786.28
523 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa 353,917.68
524 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa 314,029.68
525 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa 252,176.08
526 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa 231,676.08
527 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa 170,696.48
528 - 1 unit pemasangan gate valve dia. 200 mm 726,080.28
529 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan 654,999.76
530 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 446,706.28
531 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 361,131.68
532 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan 320,707.68
533 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan 238,228.08
534 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan 217,728.08
535 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu 494,432.00
536 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu 446,706.28
537 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu 361,131.68
538 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu 320,707.68
539 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu 238,228.08
540 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu 217,728.08
541 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu 154,944.48
542 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa 395,536.28
543 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa 320,167.68
544 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa 284,279.68
545 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa 217,676.08
546 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa 197,176.08
547 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa 141,196.48
548 - 1 unit Pemasangan Box Street dia. 8" 217,867.76
549 - 1 unit Pemasangan Box Street dia. 6" 96,224.28
550 - 1 unit Pemasangan Box Street dia. 4" 81,268.08
551 - 1 unit Pemasangan Box Street dia. 3" 75,972.08
552 - 1 unit Pemasangan Box Street dia. 2" 55,020.88
553 - 1 unit Pemasangan Box Street dia. 1 1/2" 54,520.88
554 - 1 unit Pemasangan Box Street dia. 1" 35,527.68
555 - 1 unit Peninggian Box Street 132,788.48
556 - 1 unit Pemasangan wash out dia. 160 mm 597,901.48
557 - 1 unit Pemasangan wash out dia. 110 mm 483,367.84
558 - 1 unit Pemasangan wash out dia. 90 mm 432,220.00
559 - 1 unit Pemasangan wash out dia. 63 mm 309,876.56
560 - 1 unit Pemasangan wash out dia. 50 mm 287,376.56
561 - 18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal 4,199,982.88
562 - 18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal 6,524,765.92
563 - 18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal 7,596,076.96
564 - 18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal 9,474,071.20
565 - 18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal 13,291,132.00
566 - 18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal 13,924,573.84
567 - 18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal 15,736,385.20
568 - 18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal 16,473,990.88
569 - 1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR 126,287.28
570 - 1 unit Tiang Penyangga 491,833.04
571 - 1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia < 15 cm 7,710.00
572 - 1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m 56,760.00
Cirebon, 2022
II - 823
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2022
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Dolken kayu Batang 1.250 71,000.00 88,750.00
f 8-10/400 cm
Semen portland Kg 2.500 1,420.00 3,550.00
Seng gelombang lbr 1.200 84,000.00 100,800.00
Pasir Beton m3 0.005 223,000.00 1,115.00
Koral Beton m3 0.009 225,000.00 2,025.00
Kayu 5/7 (kayu kelas III) m3 0.072 3,636,000.00 261,792.00
Paku biasa 2''-5'' Kg 0.060 21,000.00 1,260.00
Meni Besi ltr 0.450 38,000.00 17,100.00
JUMLAH HARGA BAHAN 476,392.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 541,192.00
E Overhead & Profit 10.00% 54,119.20
F Harga Satuan Pekerjaan (D+E) 595,311.20
A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 824
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 53,800.00
III - 825
B BAHAN
Dolken kayu f Batang 1.000 71,000.00 71,000.00
8-10/400 cm
Semen portland Kg 2.000 1,420.00 2,840.00
Kawat duri M’ 25.000 16,900.00 422,500.00
Pasir beton m3 0.005 223,000.00 1,115.00
Koral beton m3 0.009 225,000.00 2,025.00
Paku biasa 2” – 5” Kg 0.060 21,000.00 1,260.00
JUMLAH HARGA BAHAN 429,740.00
C PERALATAN
III - 826
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )
III - 827
D Jumlah (A+B+C) 1,413,946.00
E Overhead & Profit 10.00% 141,394.60
F Harga Satuan Pekerjaan (D+E) 1,555,340.60
III - 828
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 36,600.00
B BAHAN
Kayu papan kelas m3 0.036 3,636,000.00 130,896.00
III
Kayu balok 5/7 m3 0.014 3,636,000.00 50,904.00
kelas III
Paku biasa kg 0.080 21,000.00 1,680.00
JUMLAH HARGA BAHAN 183,480.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
III - 829
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 80,600.00
III - 830
B BAHAN
Batu belah 10/15 cm m3 0.150 315,000.00 47,250.00
Batu pecah mesin 2-3 cm m3 0.090 315,000.00 28,350.00
Pasir pasang m3 0.010 203,000.00 2,030.00
JUMLAH HARGA BAHAN 77,630.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 110,000.00 440.00
Kepala Tukang L.03 0.002 120,000.00 240.00
Mandor L.04 0.042 120,000.00 5,040.00
JUMLAH TENAGA KERJA 9,080.00
B BAHAN
Kawat jaring Lbr 0.143 653,700.00 93,740.58
JUMLAH HARGA BAHAN 93,740.58
C PERALATAN
III - 831
D Jumlah (A+B+C) 102,820.58
E Overhead & Profit 10.00% 10,282.06
F Harga Satuan Pekerjaan (D+E) 113,102.64
III - 832
A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.375 80,000.00 30,000.00
Tukang L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 47,470.00
B BAHAN
Panel beton Lbr 0.986 118,400.00 116,742.40
pracetak
Kolom beton Batang 0.525 201,200.00 105,630.00
pracetak
Semen PC Kg 45.000 1,420.00 63,900.00
Pasir beton m3 0.074 223,000.00 16,502.00
Koral m3 0.146 225,000.00 32,850.00
JUMLAH HARGA BAHAN 335,624.40
C PERALATAN
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,000.00
E Overhead & Profit 10.00% 6,300.00
F Harga Satuan Pekerjaan (D+E) 69,300.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 92,040.00
B BAHAN
III - 833
D Jumlah (A+B+C) 92,040.00
E Overhead & Profit 10.00% 9,204.00
F Harga Satuan Pekerjaan (D+E) 101,244.00
III - 834
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 4,600.00
B BAHAN
III - 835
F Harga Satuan Pekerjaan (D+E) 5,060.00
III - 836
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug 1.200 160,000.00 192,000.00
JUMLAH HARGA BAHAN 192,000.00
C PERALATAN
III - 837
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 122,400.00
B BAHAN
Kapur Padam/bakar m3 0.135 253,000.00 34,155.00
Pasir Pasang m3 0.400 203,000.00 81,200.00
Tanah Liat m3 0.948 172,500.00 163,530.00
JUMLAH HARGA BAHAN 278,885.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 202.000 1,420.00 286,840.00
Pasir pasang m3 0.485 203,000.00 98,455.00
JUMLAH HARGA BAHAN 763,295.00
C PERALATAN
III - 838
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 983,795.00
E Overhead & Profit 10.00% 98,379.50
F Harga Satuan Pekerjaan (D+E) 1,082,174.50
III - 839
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 203,000.00 105,560.00
JUMLAH HARGA BAHAN 715,020.00
C PERALATAN
III - 840
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
III - 841
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 91.000 1,420.00 129,220.00
Pasir pasang m3 0.584 203,000.00 118,552.00
JUMLAH HARGA BAHAN 625,772.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 846,272.00
E Overhead & Profit 10.00% 84,627.20
F Harga Satuan Pekerjaan (D+E) 930,899.20
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 41.000 1,420.00 58,220.00
Kapur m3 0.131 253,000.00 33,143.00
Pasir pasang m3 0.523 203,000.00 106,169.00
JUMLAH HARGA BAHAN 575,532.00
C PERALATAN
III - 842
D Jumlah (A+B+C) 796,032.00
E Overhead & Profit 10.00% 79,603.20
F Harga Satuan Pekerjaan (D+E) 875,635.20
III - 843
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
III - 844
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 247.000 1,420.00 350,740.00
Pasir beton kg 869.000 159.29 138,419.29
Kerikil (Maks 30 kg 999.000 233.33 233,100.00
mm)/menggunakan bt.pecah mesin 2-
3
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 725,409.04
C PERALATAN
A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
1. Semen kg 276.000 1,420.00 391,920.00
Portland
2. Pasir beton kg 828.000 159.29 131,888.57
3. Kerikil kg 1,012.000 233.33 236,133.33
(Maks 30mm)
4. Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 763,091.65
C PERALATAN
A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen portland kg 299.000 1,420.00 424,580.00
Pasir beton kg 799.000 159.29 127,269.29
Kerikil (Maks 30 mm) kg 1,017.000 233.33 237,300.00
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 792,299.04
C PERALATAN
III - 845
E Overhead & Profit 10.00% 96,786.90
F Harga Satuan Pekerjaan (D+E) 1,064,655.94
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2
III - 846
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,600.00
B BAHAN
Semen Portland kg 230.000 1,420.00 326,600.00
Pasir beton kg 893.000 159.29 142,242.14
Kerikil kg 1,027.000 166.67 171,166.67
(Maks 30 mm)/bukan bt.pecah 2-3
Air Liter 200.000 14.65 2,930.00
JUMLAH HARGA BAHAN 642,938.81
C PERALATAN
A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 326.000 1,420.00 462,920.00
Pasir beton kg 760.000 159.29 121,057.14
Kerikil (Maks kg 1,029.000 233.33 240,100.00
30mm)/menggunakan bt.pecah 2-3
A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 352.000 1,420.00 499,840.00
Pasir beton kg 731.000 159.29 116,437.86
Kerikil (Maks kg 1,031.000 233.33 240,566.67
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 859,994.27
C PERALATAN
III - 847
E Overhead & Profit 10.00% 103,556.43
F Harga Satuan Pekerjaan (D+E) 1,139,120.70
III - 848
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 371.000 1,420.00 526,820.00
Pasir beton kg 698.000 159.29 111,181.43
Kerikil (Maks kg 1,047.000 233.33 244,300.00
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 885,451.18
C PERALATAN
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 384.000 1,420.00 545,280.00
Pasir beton kg 692.000 159.29 110,225.71
Kerikil kg 1,039.000 233.33 242,433.33
(Maksimum
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 901,088.80
C PERALATAN
A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)
Harga Jumlah
Uraian Kode Satuan Koefisien Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 406.000 1,420.00 576,520.00
Pasir beton kg 684.000 159.29 108,951.43
Kerikil (Maks kg 1,026.000 233.33 239,400.00
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 928,021.18
C PERALATAN
III - 849
E Overhead & Profit 10.00% 110,359.12
F Harga Satuan Pekerjaan (D+E) 1,213,950.30
III - 850
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 413.000 1,420.00 586,460.00
Pasir beton kg 681.000 159.29 108,473.57
Kerikil (Maks kg 1,021.000 233.33 238,233.33
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 936,316.65
C PERALATAN
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)
III - 851
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan
sesuai Tabel berikut:
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,420.00 636,160.00
Pasir beton kg 667.000 159.29 106,243.57
Kerikil (maksimum kg 1,000.000 233.33 233,333.33
30 mm)
Bahan tambahan Liter 4.500 155,200.00 698,400.00
kimia (efoksi)
Air Liter 200.000 14.65 2,930.00
JUMLAH HARGA BAHAN 1,677,066.90
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 400.000 1,420.00 568,000.00
Pasir beton m3 0.480 223,000.00 107,040.00
Kerikil (2cm/3cm) m3 0.800 225,000.00 180,000.00
Strorox – 100 kg 1.200 88,000.00 105,600.00
JUMLAH HARGA BAHAN 960,640.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu/Pipa L.02 OH 0.030 110,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Waterstop lebar m 1.050 57,500.00 60,375.00
150 mm
JUMLAH HARGA BAHAN 60,375.00
C PERALATAN
III - 852
F Harga Satuan Pekerjaan (D+E) 76,114.50
III - 853
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Batu/Pipa L.02 OH 0.035 110,000.00 3,850.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 10,770.00
B BAHAN
Waterstop lebar m 1.050 143,700.00 150,885.00
200 mm
JUMLAH HARGA BAHAN 150,885.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang Batu L.02 OH 0.040 110,000.00 4,400.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Waterstop lebar m 1.050 132,200.00 138,810.00
230 mm - 320 mm
JUMLAH HARGA BAHAN 138,810.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang besi L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 14,620.00
B BAHAN
Besi beton kg 10.500 14,000.00 147,000.00
(polos/ulir)
Kawat beton kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 854
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang besi L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
III - 855
B BAHAN
Besi beton kg 10.500 14,000.00 147,000.00
(polos/ulir)
Kawat beton kg 0.100 20,000.00 2,000.00
JUMLAH HARGA BAHAN 149,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 7,870.00
B BAHAN
Jaring kawat kg 10.200 9,700.00 98,940.00
baja dilas
Kawat beton kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 99,940.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 – 10 cm kg 0.300 21,000.00 6,300.00
Minyak bekisting Liter 0.100 10,600.00 1,060.00
JUMLAH HARGA BAHAN 152,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,240.00
E Overhead & Profit 10.00% 22,924.00
F Harga Satuan Pekerjaan (D+E) 252,164.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.045 3,636,000.00 163,620.00
Paku 5 cm – 10 cm kg 0.300 21,000.00 6,300.00
Minyak bekisting Liter 0.100 10,600.00 1,060.00
JUMLAH HARGA BAHAN 170,980.00
C PERALATAN
III - 856
JUMLAH HARGA ALAT -
III - 857
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.200 10,600.00 2,120.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 Lbr 0.350 106,000.00 37,100.00
mm
Dolken kayu f 8- Batang 2.000 71,000.00 142,000.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 410,060.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 858
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 791,080.00
E Overhead & Profit 10.00% 79,108.00
F Harga Satuan Pekerjaan (D+E) 870,188.00
III - 859
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding
III - 860
D Jumlah (A+B+C) 163,150.40
E Overhead & Profit 10.00% 16,315.04
F Harga Satuan Pekerjaan (D+E) 179,465.44
III - 861
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 110,000.00 2,200.00
Tukang kayu L.02 OH 0.020 110,000.00 2,200.00
Tukang besi L.02 OH 0.020 110,000.00 2,200.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Kayu kelas III m3 0.002 3,636,000.00 7,272.00
Paku 5 cm – 12 cm kg 0.010 21,000.00 210.00
Besi beton polos kg 3.000 14,000.00 42,000.00
Kawat beton kg 0.450 20,000.00 9,000.00
Semen Portland kg 4.000 1,420.00 5,680.00
Pasir Beton m3 0.006 223,000.00 1,338.00
Kerikil m3 0.009 225,000.00 2,025.00
JUMLAH HARGA BAHAN 67,525.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 80,000.00 10,560.00
Tukang batu L.02 OH 0.022 110,000.00 2,420.00
Kepala tukang L.03 OH 0.002 120,000.00 240.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Semen PC Kg 26.080 1,420.00 37,033.60
Pasir beton Kg 60.800 159.29 9,684.57
Kerikil (menggunakan bt. Pecah 2-3) Kg 82.320 233.33 19,208.00
III - 862
JUMLAH HARGA ALAT -
III - 863
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 80,000.00 13,200.00
Tukang batu L.02 OH 0.028 110,000.00 3,080.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 17,600.00
B BAHAN
Semen PC Kg 32.600 1,420.00 46,292.00
Pasir beton Kg 76.000 159.29 12,105.71
Kerikil (maks 30mm) Kg 102.900 233.33 24,010.00
Air L 21.500 14.65 314.98
JUMLAH HARGA BAHAN 82,722.69
C PERALATAN
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 80,000.00 15,840.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 21,030.00
B BAHAN
Semen PC Kg 39.120 1,420.00 55,550.40
Pasir beton Kg 91.200 159.29 14,526.86
Kerikil (maks 30mm) Kg 123.480 233.33 28,812.00
Air L 25.800 14.65 377.97
JUMLAH HARGA BAHAN 99,267.23
C PERALATAN
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 80,000.00 19,840.00
Tukang batu L.02 OH 0.041 110,000.00 4,510.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 26,390.00
B BAHAN
Semen PC Kg 48.900 1,420.00 69,438.00
Pasir beton Kg 114.000 159.29 18,158.57
Kerikil (maks 30 mm) Kg 154.350 233.33 36,015.00
Air L 32.250 14.65 472.46
JUMLAH HARGA BAHAN 124,084.03
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 150,474.03
E Overhead & Profit 10.00% 15,047.40
F Harga Satuan Pekerjaan (D+E) 165,521.44
III - 864
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 80,000.00 560.00
Tukang kayu L.02 OH 0.076 110,000.00 8,360.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Lantai kerja t=10cm m3 0.008 847,592.69 6,780.74
Besi hollow (50 x 50 8,600.00 80,788.40
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 5,000,000.00 25,000.00
m3 0.005
cm)
Phenol film 12 mm Lbr 0.080 281,700.00 22,536.00
Minyak cetakan
L 0.200 10,600.00 2,120.00
(bekisting)
Dinabolt Ø 12mm
buah 3.882 3,000.00 11,646.00
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 148,871.14
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 158,871.14
E Overhead & Profit 10.00% 15,887.11
F Harga Satuan Pekerjaan (D+E) 174,758.26
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
III - 865
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,786.60
E Overhead & Profit 10.00% 4,378.66
F Harga Satuan Pekerjaan (D+E) 48,165.26
III - 866
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
III - 867
F Harga Satuan Pekerjaan (D+E) 64,768.00
III - 868
A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.069 80,000.00 5,520.00
Tukang batu L.02 OH 0.242 110,000.00 26,620.00
Tukang vibrator L.02 OH 0.138 110,000.00 15,180.00
Kepala tukang L.03 OH 0.037 120,000.00 4,440.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 60,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.213 110,000.00 23,430.00
Tukang vibrator L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor/Supervisor/ L.04 OH 0.073 120,000.00 8,760.00
Penyelia
JUMLAH TENAGA KERJA 54,450.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.067 140,000.00 9,380.00
Pembantu operator 80,000.00 5,360.00
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang batu L.02 OH 0.067 110,000.00 7,370.00
Tukang ereksi L.02 OH 0.134 110,000.00 14,740.00
Kepala tukang L.03 OH 0.067 120,000.00 8,040.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 58,290.00
B BAHAN
Solar L 6.676 10,900.00 72,768.40
JUMLAH HARGA BAHAN 72,768.40
C PERALATAN
Sewa crane unit hari 0.067 4,485,000.00 300,495.00
Sewa pipe support buah 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 676,200.00
III - 869
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lantai Indeks
La ereksi pelat Lantai kenaikan
nta lantai
i ereksi
pelat
1 1 13 1.114
2 1 14 1.134
3 1 15 1.155
4 1 16 1.176
5 1 17 1.197
6 1 18 1.219
7 1 19 1.241
8 1.018 20 1.264
9 1.037 21 1.287
10 1.055 22 1.310
11 1.075 23 1.334
12 1.094 24 1.358
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.061 140,000.00 8,540.00
Pembantu operator crane L.09 OH 0.061 80,000.00 4,880.00
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.061 110,000.00 6,710.00
Tukang ereksi L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.061 120,000.00 7,320.00
Mandor L.04 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 53,070.00
B BAHAN
Solar L 6.110 10,900.00 66,599.00
JUMLAH HARGA BAHAN 66,599.00
C PERALATAN
Sewa crane unit 0.061 4,485,000.00 273,585.00
hari
Sewa scaffolding unit 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 649,290.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.083 140,000.00 11,620.00
Pembantu operator L.09 OH 0.083 80,000.00 6,640.00
crane
Pekerja L.01 OH 0.083 80,000.00 6,640.00
III - 870
Tukang batu L.02 OH 0.083 110,000.00 9,130.00
Tukang ereksi L.02 OH 0.166 110,000.00 18,260.00
Kepala tukang L.03 OH 0.083 120,000.00 9,960.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00
III - 871
B BAHAN
Solar L 8.277 10,900.00 90,219.30
JUMLAH HARGA BAHAN 90,219.30
C PERALATAN
Sewa crane unit hari 0.083 4,485,000.00 372,255.00
Sewa pipe support buah hari 2.200 341,550.00 751,410.00
JUMLAH HARGA ALAT 1,123,665.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator
L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
III - 872
A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00
III - 873
JUMLAH HARGA ALAT -
III - 874
A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.147 80,000.00 11,760.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,330.00
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012 5,000,000.00 60,000.00
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004 5,000,000.00 20,000.00
Paku (5 s.d.7) cm Kg 0.264 21,000.00 5,544.00
JUMLAH HARGA BAHAN 85,544.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.220 80,000.00 17,600.00
Tukang kayu L.02 OH 0.022 110,000.00 2,420.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 45,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi Profil Kg 1.150 16,200.00 18,630.00
JUMLAH HARGA BAHAN 18,630.00
C PERALATAN
III - 875
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi baja IWF Kg 1.150 16,200.00 18,630.00
JUMLAH HARGA BAHAN 18,630.00
C PERALATAN
A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.052 120,000.00 6,240.00
JUMLAH TENAGA KERJA 218,340.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 12,100.00 181,500.00
Besi pelat baja Kg 32.800 7,500.00 246,000.00
Kawat las Kg 0.050 31,100.00 1,555.00
JUMLAH HARGA BAHAN 429,055.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang las (bersertifikat) L.03 OH 0.020 120,000.00 2,400.00
III - 876
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 6,080.00
III - 877
B BAHAN
Kawat las listrik Kg 0.400 31,100.00 12,440.00
Solar Liter 0.300 10,900.00 3,270.00
Minyak pelumas Liter 0.040 10,600.00 424.00
JUMLAH HARGA BAHAN 16,134.00
C PERALATAN
Sewa alat Jam 0.170 132,250.00 22,482.50
JUMLAH HARGA ALAT 22,482.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang las biasa L.03 OH 1.200 110,000.00 132,000.00
Kepala tukang L.03 OH 0.120 120,000.00 14,400.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 243,120.00
B BAHAN
Pintu gulung besi m2 1.000 1,122,400.00 1,122,400.00
JUMLAH HARGA BAHAN 1,122,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.03 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 91,520.00
B BAHAN
Pintu lipat m2 1.000 3,116,500.00 3,116,500.00
JUMLAH HARGA BAHAN 3,116,500.00
C PERALATAN
III - 878
D Jumlah (A+B+C) 3,208,020.00
E Overhead & Profit 10.00% 320,802.00
F Harga Satuan Pekerjaan (D+E) 3,528,822.00
III - 879
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.03 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 104,480.00
B BAHAN
Sunscreen alluminium m2 1.000 442,700.00 442,700.00
JUMLAH HARGA BAHAN 442,700.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
III - 880
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 17,830.00
III - 881
B BAHAN
Pintu alluminium m 4.400 126,500.00 556,600.00
Profil kaca m 4.500 14,200.00 63,900.00
Sealant Tube 0.270 23,000.00 6,210.00
JUMLAH HARGA BAHAN 626,710.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.03 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Venetions blinds dan m2 1.000 122,100.00 122,100.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 122,100.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang las L.03 OH 1.670 110,000.00 183,700.00
Kepala tukang L.03 OH 0.167 120,000.00 20,040.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 347,300.00
B BAHAN
Besi strip kg 6.177 15,800.00 97,596.60
Pengelasan cm 27.080 5,100.00 138,108.00
JUMLAH HARGA BAHAN 235,704.60
C PERALATAN
III - 882
JUMLAH HARGA ALAT -
III - 883
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Jendela nako m2 1.100 187,700.00 206,470.00
(rangka + kaca 5 mm)
Paku skrup buah 10.000 500.00 5,000.00
1 cm – 2,5 cm
Besi strip m 7.000 15,800.00 110,600.00
JUMLAH HARGA BAHAN 322,070.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm - 2,5 cm kg 0.015 21,000.00 315.00
Papan kayu kelas II
m3 0.019 3,636,000.00 69,084.00
atau III
JUMLAH HARGA BAHAN 115,284.00
C PERALATAN
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 49,560.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm – 2,5 cm kg 0.010 21,000.00 210.00
Besi strip kg 0.500 15,800.00 7,900.00
JUMLAH HARGA BAHAN 53,995.00
C PERALATAN
III - 884
F Harga Satuan Pekerjaan (D+E) 113,910.50
III - 885
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
III - 886
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
III - 887
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala bukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 26.550 1,420.00 37,701.00
Pasir Pasang m3 0.093 203,000.00 18,879.00
JUMLAH HARGA BAHAN 182,580.00
C PERALATAN
JUMLAH HARGA ALAT -
A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 22.200 1,420.00 31,524.00
Pasir pasang m3 0.102 203,000.00 20,706.00
JUMLAH HARGA BAHAN 178,230.00
C PERALATAN
JUMLAH HARGA ALAT -
A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 18.500 1,420.00 26,270.00
Pasir pasang m3 0.122 203,000.00 24,766.00
JUMLAH HARGA BAHAN 177,036.00
C PERALATAN
A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
III - 888
JUMLAH TENAGA KERJA 76,000.00
III - 889
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 10.080 1,420.00 14,313.60
Kapur padam m3 0.028 253,000.00 6,957.50
Pasir pasang m3 0.093 203,000.00 18,777.50
JUMLAH HARGA BAHAN 166,048.60
C PERALATAN
A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,420.00 26,909.00
Pasir pasang m3 0.038 203,000.00 7,714.00
JUMLAH HARGA BAHAN 97,623.00
C PERALATAN
A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 14.370 1,420.00 20,405.40
Pasir pasang m3 0.040 203,000.00 8,120.00
JUMLAH HARGA BAHAN 91,525.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,525.40
E Overhead & Profit 10.00% 12,952.54
F Harga Satuan Pekerjaan (D+E) 142,477.94
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
III - 890
JUMLAH HARGA ALAT -
III - 891
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 9.680 1,420.00 13,745.60
Pasir pasang m3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 85,880.60
C PERALATAN
A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 8.320 1,420.00 11,814.40
Pasir pasang m3 0.049 203,000.00 9,947.00
JUMLAH HARGA BAHAN 84,761.40
C PERALATAN
A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP
III - 892
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP
A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.014 1,420.00 19.88
Kapur padam m3 0.014 253,000.00 3,542.00
Pasir pasang m3 0.028 203,000.00 5,684.00
JUMLAH HARGA BAHAN 72,245.88
C PERALATAN
III - 893
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP
A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP
A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP
III - 894
HB15: Hollow Block tebal 15cm
III - 895
A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP
III - 896
A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata rooster m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 106,725.00
C PERALATAN
A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata berongga m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 106,725.00
C PERALATAN
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai
III - 897
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.671 80,000.00 53,680.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,640.00
B BAHAN
Bata ringan tebal 10cm buah 8.400 6,000.00 50,400.00
Mortar siap pakai Kg 0.063 4,300.00 270.90
JUMLAH HARGA BAHAN 50,670.90
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -
III - 898
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm
III - 899
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
III - 900
B BAHAN
PC Kg 4.416 1,420.00 6,270.72
PP m3 0.027 203,000.00 5,481.00
JUMLAH HARGA BAHAN 11,751.72
C PERALATAN
III - 901
JUMLAH HARGA ALAT -
III - 902
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm
III - 903
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm
III - 904
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
III - 905
B BAHAN
PC Kg 6.912 1,420.00 9,815.04
PP m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 16,920.04
C PERALATAN
III - 906
JUMLAH HARGA ALAT -
III - 907
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm
III - 908
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
III - 909
B BAHAN
Semen PC Kg 4.320 1,420.00 6,134.40
Pasir pasang m3 0.006 203,000.00 1,218.00
JUMLAH HARGA BAHAN 7,352.40
C PERALATAN
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
III - 910
D Jumlah (A+B+C) 55,538.80
E Overhead & Profit 10.00% 5,553.88
F Harga Satuan Pekerjaan (D+E) 61,092.68
III - 911
A.4.4.2.27. Pemasangan 1 m2 acian
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin abu-abu Bh 11.870 2,900.00 34,423.00
Semen Portland kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 57,758.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin abu-abu buah 26.500 2,300.00 60,950.00
Semen Portland kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 84,853.00
C PERALATAN
III - 912
III - 913
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 38,220.00
B BAHAN
Ubin warna Bh 11.870 3,300.00 39,171.00
Semen Portland kg 10.000 1,420.00 14,200.00
Semen warna Kg 0.600 6,900.00 4,140.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 66,646.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin warna Bh 26.500 2,600.00 68,900.00
Semen Portland kg 10.400 1,420.00 14,768.00
Semen warna Kg 1.000 6,900.00 6,900.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 99,703.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin granit Bh 6.630 48,500.00 321,555.00
Semen Portland kg 9.800 1,420.00 13,916.00
Semen warna Kg 1.300 6,900.00 8,970.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 353,576.00
C PERALATAN
III - 914
III - 915
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 53.000 1,150.00 60,950.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 100,689.80
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 27,500.00 28,875.00
Semen Portland Kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 55,660.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 57,500.00 60,375.00
Semen Portland Kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 87,728.00
C PERALATAN
III - 916
III - 917
A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 11.870 4,600.00 54,602.00
Semen Portland Kg 14.150 1,420.00 20,093.00
Pasir pasang M3 0.039 203,000.00 7,917.00
Semen warna Kg 2.000 6,900.00 13,800.00
JUMLAH HARGA BAHAN 96,412.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 13,800.00 73,140.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.025 6,900.00 172.50
JUMLAH HARGA BAHAN 75,540.30
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 10.600 10,300.00 109,180.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.050 6,900.00 345.00
JUMLAH HARGA BAHAN 111,752.80
C PERALATAN
III - 918
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 10,300.00 54,590.00
Semen Portland Kg 0.570 1,420.00 809.40
Pasir pasang M3 0.002 203,000.00 304.50
Semen warna Kg 0.013 6,900.00 89.70
JUMLAH HARGA BAHAN 55,793.60
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 156,060.00
B BAHAN
Internal cove Bh 5.300 17,200.00 91,160.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.100 6,900.00 690.00
JUMLAH HARGA BAHAN 94,077.80
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Marmer Bh 1.060 920,000.00 975,200.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.134 6,900.00 924.60
JUMLAH HARGA BAHAN 996,889.40
C PERALATAN
III - 919
A.4.4.3.44. Pemasangan 1 m2 lantai karpet
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 35,420.00
B BAHAN
Karpet m2 1.050 115,000.00 120,750.00
Lem Kg 0.350 78,700.00 27,545.00
JUMLAH HARGA BAHAN 148,295.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Underlayer m2 1.050 57,500.00 60,375.00
Lem Kg 0.350 78,700.00 27,545.00
JUMLAH HARGA BAHAN 87,920.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,700.00 47,220.00
JUMLAH HARGA BAHAN 228,345.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
III - 920
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
III - 921
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,700.00 47,220.00
JUMLAH HARGA BAHAN 228,345.00
C PERALATAN
III - 922
C PERALATAN
III - 923
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 106.000 2,000.00 212,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.900 6,900.00 20,010.00
JUMLAH HARGA BAHAN 248,870.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 96,785.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 26.500 2,300.00 60,950.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 91,196.00
C PERALATAN
III - 924
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.300 80,000.00 104,000.00
Tukang batu L.02 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 191,100.00
B BAHAN
Marmer buah 1.060 920,000.00 975,200.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 203,000.00 5,075.00
Semen warna Kg 0.650 6,900.00 4,485.00
Paku 12 cm buah 3.030 500.00 1,515.00
JUMLAH HARGA BAHAN 1,003,939.80
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 147,000.00
B BAHAN
Bata pelapis buah 63.000 4,700.00 296,100.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 203,000.00 5,075.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 337,814.80
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu paras buah 1.100 4,800.00 5,280.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 29,070.00
C PERALATAN
III - 925
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu tempel hitam Buah 1.100 1,800.00 1,980.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 25,770.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 31,260.00
B BAHAN
Vynil buah 11.870 12,600.00 149,562.00
Lem Kg 0.350 25,300.00 8,855.00
JUMLAH HARGA BAHAN 158,417.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.175 110,000.00 19,250.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 49,530.00
B BAHAN
Wallpaper m 2.200 80,500.00 177,100.00
Lem Kg 0.250 25,300.00 6,325.00
JUMLAH HARGA BAHAN 183,425.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 926
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
III - 927
B BAHAN
Floor harderner Kg 5.000 11,200.00 56,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.080 110,000.00 8,800.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Vynil buah 1.760 12,600.00 22,176.00
Lem Kg 0.080 25,300.00 2,024.00
JUMLAH HARGA BAHAN 24,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Papan kayu kelas 1 M3 0.003 10,925,000.00 32,775.00
Paku/skrup 5 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 33,825.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6 cm M2 1.010 57,500.00 58,075.00
Pasir beton M3 0.050 223,000.00 11,150.00
JUMLAH HARGA BAHAN 69,225.00
C PERALATAN
III - 928
Peralatan % 0.100 69,225.00 6,922.50
JUMLAH HARGA ALAT 6,922.50
III - 929
A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm natural M2 1.010 71,300.00 72,013.00
Pasir beton M3 2.070 223,000.00 461,610.00
JUMLAH HARGA BAHAN 533,623.00
C PERALATAN
Peralatan % 0.100 533,623.00 53,362.30
JUMLAH HARGA ALAT 53,362.30
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6cm berwarna M2 1.010 65,500.00 66,155.00
Pasir beton M3 0.050 223,000.00 11,150.00
JUMLAH HARGA BAHAN 77,305.00
C PERALATAN
Peralatan % 0.100 77,305.00 7,730.50
JUMLAH HARGA ALAT 7,730.50
III - 930
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,420.00
III - 931
B BAHAN
Asbes semen m2 1.100 42,500.00 46,750.00
Paku tripleks kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 46,960.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 12.000 58,600.00 703,200.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 704,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 5.800 58,600.00 339,880.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 340,930.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Akustik Lembar 1.500 58,600.00 87,900.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 88,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -
III - 932
D Jumlah (A+B+C) 109,750.00
E Overhead & Profit 10.00% 10,975.00
F Harga Satuan Pekerjaan (D+E) 120,725.00
III - 933
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Tripleks Lembar 0.375 86,000.00 32,250.00
Paku tripleks kg 0.030 21,000.00 630.00
JUMLAH HARGA BAHAN 32,880.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 166,400.00
B BAHAN
Kayu papan m3 0.015 3,636,000.00 54,540.00
Paku tripleks kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 54,750.00
C PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
III - 934
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang besi L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 104,000.00
III - 935
B BAHAN
Profil Allum "T" m 3.600 113,800.00 409,680.00
Kawat Ø 4 mm kg 0.150 20,000.00 3,000.00
Ramset Buah 1.050 250.00 262.50
Akustik 60 x 120 Lembar 1.500 58,600.00 87,900.00
JUMLAH HARGA BAHAN 500,842.50
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
List kayu profil m 1.05 5,500.00 5,775.00
Paku kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 5,985.00
C PERALATAN
-
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 900.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,110.00
B BAHAN
Genteng palentong buah 25.000 1,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng kodok buah 25.000 1,600.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00
III - 936
C PERALATAN
III - 937
A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng palentong buah 12.000 1,700.00 20,400.00
JUMLAH HARGA BAHAN 20,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung Buah 5.000 2,300.00 11,500.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 29,356.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 5.000 4,600.00 23,000.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 40,856.00
C PERALATAN
III - 938
A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 4.000 6,900.00 27,600.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 45,456.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 110,000.00 7,370.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Rooflight 90 x 180 Lbr 0.600 71,300.00 42,780.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 43,830.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.500 36,800.00 18,400.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 20,920.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 939
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
III - 940
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 24,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 24,600.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.750 36,800.00 27,600.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 30,120.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.350 36,800.00 12,880.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 15,400.00
C PERALATAN
III - 941
JUMLAH HARGA ALAT -
III - 942
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.440 36,800.00 16,192.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 18,712.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.510 36,800.00 18,768.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 21,288.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
III - 943
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
III - 944
B BAHAN
Asbes gel 92 x 250 Lbr 0.800 36,800.00 29,440.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 31,960.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.370 36,800.00 13,616.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 16,136.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.380 36,800.00 13,984.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 16,504.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.460 36,800.00 16,928.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 19,448.00
C PERALATAN
III - 945
JUMLAH HARGA ALAT -
III - 946
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.490 36,800.00 18,032.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 20,552.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.570 36,800.00 20,976.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 23,496.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.400 71,300.00 171,120.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 174,120.00
C PERALATAN
III - 947
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.100 71,300.00 149,730.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 152,730.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.050 71,300.00 146,165.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 149,165.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
III - 948
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
III - 949
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 26,540.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 81,430.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 81,430.00
C PERALATAN
III - 950
D Jumlah (A+B+C) 103,940.00
E Overhead & Profit 10.00% 10,394.00
F Harga Satuan Pekerjaan (D+E) 114,334.00
III - 951
A.4.5.2.30. Pemasangan 1 m2 genteng beton
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Genteng beton buah 11.000 5,700.00 62,700.00
Paku biasa 2”-5” Kg 0.030 21,000.00 630.00
JUMLAH HARGA BAHAN 63,330.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 1.300 55,200.00 71,760.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 75,960.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 2.000 55,200.00 110,400.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 114,600.00
C PERALATAN
III - 952
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.166 80,000.00 13,280.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 44,740.00
B BAHAN
Sirap kayu buah 30.000 1,900.00 57,000.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 61,200.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Nok genteng beton buah 3.500 4,600.00 16,100.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
Semen PC Kg 10.800 1,420.00 15,336.00
Pasir pasang M3 0.032 203,000.00 6,496.00
Semen warna Kg 1.000 6,900.00 6,900.00
JUMLAH HARGA BAHAN 45,882.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.015 120,000.00 1,800.00
Mandor L.15 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 39,860.00
B BAHAN
Nok genteng metal buah 1.100 51,100.00 56,210.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 57,260.00
C PERALATAN
III - 953
A.4.5.2.38. Pemasangan 1 m’ nok sirap
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 41,220.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.400 84,000.00 33,600.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
Paku biasa 2”-5” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 35,700.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.060 110,000.00 6,600.00
Kepala tukang L.11 OH 0.006 120,000.00 720.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 17,640.00
B BAHAN
Seng gel 3”x6” Lbr 0.700 84,000.00 58,800.00
Paku biasa ½”-1” Kg 0.020 21,000.00 420.00
JUMLAH HARGA BAHAN 59,220.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 21,260.00
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300 84,000.00 25,200.00
Paku biasa ½”-1” Kg 0.040 21,000.00 840.00
JUMLAH HARGA BAHAN 26,040.00
C PERALATAN
III - 954
A.4.5.2.41. Pemasangan 1 m2 atap alumunium
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.750 110,000.00 82,500.00
Kepala tukang L.11 OH 0.080 120,000.00 9,600.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 104,820.00
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050 156,400.00 164,220.00
Paku hak panjang 15 cm Kg 0.020 21,000.00 420.00
JUMLAH HARGA BAHAN 164,640.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.050 110,000.00 5,500.00
Kepala tukang L.11 OH 0.005 120,000.00 600.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Aluminium foil M2 1.050 10,300.00 10,815.00
JUMLAH HARGA BAHAN 10,815.00
C PERALATAN
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.000 110,000.00 2,310,000.00
Kepala tukang L.03 OH 2.100 120,000.00 252,000.00
Mandor L.04 OH 0.350 120,000.00 42,000.00
JUMLAH TENAGA KERJA 3,164,000.00
B BAHAN
Balok kayu m3 1.100 10,925,000.00 12,017,500.00
Paku 10 cm Kg 1.250 21,000.00 26,250.00
Lem kayu Kg 1.000 34,400.00 34,400.00
JUMLAH HARGA BAHAN 12,078,150.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 955
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,712,000.00
B BAHAN
Balok kayu m3 1.200 3,636,000.00 4,363,200.00
Paku 10 cm Kg 1.250 21,000.00 26,250.00
Lem kayu Kg 1.000 34,400.00 34,400.00
JUMLAH HARGA BAHAN 4,423,850.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Paku 5 – 7 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 201,050.00
C PERALATAN
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 3,636,000.00 145,440.00
Paku 5 – 7 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 146,490.00
C PERALATAN
III - 956
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Lem kayu Kg 0.500 34,400.00 17,200.00
JUMLAH HARGA BAHAN 217,200.00
C PERALATAN
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.024 5,000,000.00 120,000.00
Lem kayu Kg 0.300 34,400.00 10,320.00
JUMLAH HARGA BAHAN 130,320.00
C PERALATAN
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 957
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.03 OH 2.100 110,000.00 231,000.00
Kepala tukang L.03 OH 0.210 120,000.00 25,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 316,400.00
III - 958
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 cm – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.500 34,400.00 17,200.00
Plywood tebal 4 mm Lembar 1.000 106,000.00 106,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 248,830.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.80 80,000.00 64,000.00
Tukang kayu L.03 OH 2.40 110,000.00 264,000.00
Kepala tukang L.03 OH 0.24 120,000.00 28,800.00
Mandor L.04 OH 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.026 5,000,000.00 128,000.00
Paku 1 cm – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.500 34,400.00 17,200.00
Plywood 4 mm Lembar 1.000 106,000.00 106,000.00
(90 x 220) cm
JUMLAH HARGA BAHAN 251,830.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang kayu L.03 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 337,800.00
B BAHAN
Papan kayu m3 0.060 5,000,000.00 300,000.00
Paku 1 – 2,5 cm kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 303,150.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
III - 959
B BAHAN
Papan kayu m3 0.025 10,925,000.00 273,125.00
Paku 1 – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.300 34,400.00 10,320.00
Teakwood 4 mm Lembar 1.000 74,700.00 74,700.00
90 x 220 cm
JUMLAH HARGA BAHAN 358,775.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 80,000.00 68,000.00
Tukang kayu L.03 OH 2.550 110,000.00 280,500.00
Kepala tukang L.03 OH 0.255 120,000.00 30,600.00
Mandor L.04 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 384,260.00
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.800 34,400.00 27,520.00
Teakwood 4 mm Lembar 1.000 74,700.00 74,700.00
90 x 220 cm
Formika Lembar 0.500 227,850.00
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 612,110.00
E Overhead & Profit 10.00% 61,211.00
F Harga Satuan Pekerjaan (D+E) 673,321.00
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.200 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,808,000.00
B BAHAN
Balok kayu m3 1.100 3,636,000.00 3,999,600.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 5.600 21,000.00 117,600.00
JUMLAH HARGA BAHAN 4,354,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,162,200.00
E Overhead & Profit 10.00% 616,220.00
F Harga Satuan Pekerjaan (D+E) 6,778,420.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.200 10,925,000.00 13,110,000.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 5.600 21,000.00 117,600.00
III - 960
JUMLAH HARGA BAHAN 13,464,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,493,000.00
E Overhead & Profit 10.00% 1,649,300.00
F Harga Satuan Pekerjaan (D+E) 18,142,300.00
III - 961
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.100 5,000,000.00 5,500,000.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 3.000 21,000.00 63,000.00
JUMLAH HARGA BAHAN 5,800,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng 2 x 3 cm m3 0.036 40,200.00 1,447.20
Paku 5 dan 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 76,697.20
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng (3 x 4) cm m3 0.057 40,200.00 2,291.40
Paku 5 dan 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 77,541.40
C PERALATAN
III - 962
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Kayu kelas II m3 0.014 5,000,000.00 70,000.00
Paku 5 - 10 cm m3 0.057 21,000.00 1,197.00
JUMLAH HARGA BAHAN 71,197.00
C PERALATAN
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 57,600.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015 5,000,000.00 77,000.00
Paku 7 cm – 10 cm kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 81,200.00
C PERALATAN
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 5,000,000.00 81,500.00
Paku 7 – 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 86,750.00
C PERALATAN
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
III - 963
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
III - 964
B BAHAN
Papan kayu m3 0.011 5,000,000.00 54,000.00
Paku 5 dan 7 cm kg 0.100 21,000.00 2,100.00
JUMLAH HARGA BAHAN 56,100.00
C PERALATAN
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,000,000.00 55,000.00
Paku 5 dan 7 cm kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 56,050.00
C PERALATAN
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 5,000,000.00 140,000.00
Paku 5 dan 10 kg 0.150 21,000.00 3,150.00
Plywood 4 mm, Lembar 0.860 106,000.00 91,160.00
120 x 240
Lem kayu kg 0.560 34,400.00 19,264.00
III - 965
JUMLAH HARGA BAHAN 253,574.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 343,974.00
E Overhead & Profit 10.00% 34,397.40
F Harga Satuan Pekerjaan (D+E) 378,371.40
III - 966
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang kayu L.03 OH 1.800 110,000.00 198,000.00
Kepala tukang L.03 OH 0.180 120,000.00 21,600.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 271,200.00
B BAHAN
Papan kayu m3 0.007 10,925,000.00 76,475.00
Paku 5 dan 10 kg 0.100 21,000.00 2,100.00
Paku skrup 10 cm kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 81,725.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 11,330.00
B BAHAN
Plywood 4 mm m3 0.400 106,000.00 42,400.00
Paku 1 dan 2,5 kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 43,450.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Kunci tanam antik buah 1.000 255,300.00 255,300.00
JUMLAH HARGA BAHAN 255,300.00
C PERALATAN
III - 967
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci tanam KM buah 1.000 51,700.00 51,700.00
JUMLAH HARGA BAHAN 51,700.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Engsel pintu buah 1.000 69,000.00 69,000.00
JUMLAH HARGA BAHAN 69,000.00
III - 968
C PERALATAN
JUMLAH HARGA ALAT -
III - 969
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 32,460.00
B BAHAN
Engsel angin buah 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Spring knip buah 1.000 25,300.00 25,300.00
JUMLAH HARGA BAHAN 25,300.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 970
C PERALATAN
JUMLAH HARGA ALAT -
III - 971
A.4.6.2.10. Pemasangan 1 buah door closer
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door closer set 1.000 322,000.00 322,000.00
JUMLAH HARGA BAHAN 322,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 26,120.00
B BAHAN
Kunci slot buah 1.000 13,800.00 13,800.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door holder buah 1.000 26,400.00 26,400.00
JUMLAH HARGA BAHAN 26,400.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
III - 972
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
III - 973
B BAHAN
Door stop buah 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Rel pintu sorong Set 1.000 402,500.00 402,500.00
JUMLAH HARGA BAHAN 402,500.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 32,620.00
B BAHAN
Kunci lemari Set 1.000 163,300.00 163,300.00
JUMLAH HARGA BAHAN 163,300.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 3 mm m2 1.100 72,750.00 80,025.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 82,225.00
C PERALATAN
III - 974
D Jumlah (A+B+C) 101,821.00
E Overhead & Profit 10.00% 10,182.10
F Harga Satuan Pekerjaan (D+E) 112,003.10
III - 975
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 5 mm m2 1.100 86,250.00 94,875.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 97,075.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.001 120,000.00 108.00
JUMLAH TENAGA KERJA 22,208.00
B BAHAN
Kaca tebal 8 mm m2 1.100 172,500.00 189,750.00
Sealant Kg 0.070 44,000.00 3,080.00
JUMLAH HARGA BAHAN 192,830.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 32,656.00
B BAHAN
Kaca buram 12 mm m2 1.100 414,600.00 456,060.00
Sealant Kg 0.070 44,000.00 3,080.00
JUMLAH HARGA BAHAN 459,140.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 976
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
III - 977
B BAHAN
Kaca cermin 5 mm m2 1.100 155,200.00 170,720.00
JUMLAH HARGA BAHAN 170,720.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 23,180.00
B BAHAN
Kaca cermin 8 mm m2 1.100 296,400.00 326,040.00
JUMLAH HARGA BAHAN 326,040.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca wireglassed 5 mm m2 1.100 241,500.00 265,650.00
JUMLAH HARGA BAHAN 265,650.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 80,000.00 6,000.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,780.00
B BAHAN
Kaca patri 5mm m2 1.100 2,300,000.00 2,530,000.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 2,532,200.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 978
E Overhead & Profit 10.00% 255,698.00
F Harga Satuan Pekerjaan (D+E) 2,812,678.00
III - 979
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Soda api Kg 0.050 28,700.00 1,435.00
JUMLAH HARGA BAHAN 1,435.00
C PERALATAN
JUMLAH HARGA ALAT -
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.009 110,000.00 990.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,670.00
B BAHAN
Cat menie Kg 0.200 38,000.00 7,600.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 38,000.00 6,460.00
Cat penutup (setara avian) Kg 0.260 55,200.00 14,352.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 33,528.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 980
D Jumlah (A+B+C) 41,198.00
E Overhead & Profit 10.00% 4,119.80
F Harga Satuan Pekerjaan (D+E) 45,317.80
III - 981
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.105 110,000.00 11,550.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 17,990.00
B BAHAN
Cat menie Kg 0.200 38,000.00 7,600.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 38,000.00 6,460.00
Cat penutup (setara avian) Kg 0.350 55,200.00 19,320.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 38,496.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.063 120,000.00 7,560.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 18,050.00
B BAHAN
Teak oil L 0.360 34,800.00 12,528.00
JUMLAH HARGA BAHAN 12,528.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,080.00
B BAHAN
Politur L 0.150 43,600.00 6,540.00
Politur jadi L 0.372 49,600.00 18,451.20
Ampelas Lbr 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 31,991.20
C PERALATAN
III - 982
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 8,720.00
B BAHAN
Residu atau ter L 0.350 31,600.00 11,060.00
JUMLAH HARGA BAHAN 11,060.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.160 80,000.00 12,800.00
Tukang cat L.02 OH 0.160 110,000.00 17,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 32,680.00
B BAHAN
Vernis L 0.150 39,800.00 5,970.00
Dempul Kg 0.050 21,275.00 1,063.75
Ampelas Lbr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 7,383.75
C PERALATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,646.00
B BAHAN
Plamuur Kg 0.100 80,500.00 8,050.00
Cat dasar Kg 0.100 38,000.00 3,800.00
Cat penutup Kg 0.260 28,750.00 7,475.00
JUMLAH HARGA BAHAN 19,325.00
C PERALATAN
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
III - 983
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
III - 984
B BAHAN
Cat dasar Kg 0.120 38,000.00 4,560.00
Cat penutup Kg 0.180 28,750.00 5,175.00
JUMLAH HARGA BAHAN 9,735.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Kalkarium Kg 0.100 21,300.00 2,130.00
JUMLAH HARGA BAHAN 2,130.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang cat L.02 OH 0.001 110,000.00 110.00
Kepala tukang L.03 OH 0.000 120,000.00 12.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 12,422.00
B BAHAN
Kapur sirih Kg 0.150 2,300.00 345.00
Ampelas Lbr 0.100 3,500.00 350.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 3,570.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.005 110,000.00 550.00
Kepala tukang L.03 OH 0.001 120,000.00 60.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 4,110.00
B BAHAN
Kapur sirih Kg 0.300 2,300.00 690.00
Ampelas Lbr 0.200 3,500.00 700.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 4,265.00
C PERALATAN
III - 985
JUMLAH HARGA ALAT -
III - 986
A.4.7.1.15. Pemasangan 1 m2 wallpaper
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Wall paper m2 1.200 80,500.00 96,600.00
Lem Kg 0.200 25,300.00 5,060.00
JUMLAH HARGA BAHAN 101,660.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Menie besi Kg 0.100 38,000.00 3,800.00
Kwas buah 0.010 13,800.00 138.00
JUMLAH HARGA BAHAN 3,938.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.02 OH 0.023 120,000.00 2,700.00
Mandor L.04 OH 0.008 120,000.00 900.00
JUMLAH TENAGA KERJA 48,350.00
B BAHAN
Menie besi Kg 0.100 38,000.00 3,800.00
Pengencer L 0.010 27,600.00 276.00
Kwas buah 0.010 13,800.00 138.00
Perancah kayu m3 0.002 3,636,000.00 7,272.00
JUMLAH HARGA BAHAN 11,486.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
III - 987
Tukang cat L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 50,656.00
III - 988
B BAHAN
Menie A Kg 0.100 38,000.00 3,800.00
Menie B Kg 0.100 38,000.00 3,800.00
Cat Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 13,074.00
C PERALATAN
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Cat Kg 0.300 63,250.00 18,975.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 19,389.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 132,000.00
B BAHAN
Cat dasar Kg 0.110 38,000.00 4,180.00
Cat antara Kg 0.170 40,200.00 6,834.00
Cat penutup Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 16,488.00
C PERALATAN
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.700 110,000.00 77,000.00
Kepala tukang L.03 OH 0.070 120,000.00 8,400.00
III - 989
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 119,800.00
B BAHAN
Cat dasar Kg 0.300 38,000.00 11,400.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 11,676.00
III - 990
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang cat L.02 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 1,636,000.00
B BAHAN
Wood filler kg 1.500 29,900.00 44,850.00
Woodstain kg 1.500 54,000.00 81,000.00
Sanding kg 1.500 55,200.00 82,800.00
Melamic kg 2.400 50,000.00 120,000.00
Thinner L 2.000 13,200.00 26,400.00
Ampelas Lbr 6.000 3,500.00 21,000.00
Lbr JUMLAH HARGA BAHAN 376,050.00
C PERALATAN
Compressor jam 78,556.50 -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 110,000.00 121,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 405,400.00
B BAHAN
Closet duduk Unit 1.000 1,422,550.00 1,422,550.00
Perlengkapan Ls 6% x closet 85,353.00 85,353.00
JUMLAH HARGA BAHAN 1,507,903.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 282,200.00
B BAHAN
Closet jongkok Unit 1.000 161,000.00 161,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
JUMLAH HARGA BAHAN 171,550.00
C PERALATAN
III - 991
JUMLAH HARGA ALAT -
III - 992
A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Closet jongkok Unit 1.000 115,000.00 115,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Bata merah buah 7.000 900.00 6,300.00
JUMLAH HARGA BAHAN 131,850.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Urinoir Unit 1.000 746,300.00 746,300.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Perlengkapan % 0.300 223,890.00 223,890.00
JUMLAH HARGA BAHAN 980,740.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 280,700.00
B BAHAN
Wastafel Unit 1.200 788,900.00 946,680.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Perlengkapan % 0.120 113,601.60 113,601.60
JUMLAH HARGA BAHAN 1,070,831.60
C PERALATAN
III - 993
A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 80,700.00
B BAHAN
Bak air fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan % 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 994
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 40,800.00
III - 995
B BAHAN
Bak cuci piring Unit 1.000 460,000.00 460,000.00
Waterdrain buah 1.000 442,700.00 442,700.00
JUMLAH HARGA BAHAN 902,700.00
C PERALATAN
JUMLAH HARGA ALAT -
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 80,000.00 172,800.00
Tukang batu L.02 OH 0.720 110,000.00 79,200.00
Kepala tukang L.03 OH 0.072 120,000.00 8,640.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 261,960.00
B BAHAN
Bata merah buah 40.000 900.00 36,000.00
Semen portland Kg 44.000 1,420.00 62,480.00
Pasir pasang M3 0.070 203,000.00 14,210.00
Pasir beton M3 0.060 223,000.00 13,380.00
Kerikil M3 0.070 225,000.00 15,750.00
Baja tulangan Kg 1.600 14,000.00 22,400.00
JUMLAH HARGA BAHAN 164,220.00
C PERALATAN
III - 996
D Jumlah (A+B+C) 426,180.00
E Overhead & Profit 10.00% 42,618.00
F Harga Satuan Pekerjaan (D+E) 468,798.00
III - 997
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang cat L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 424,240.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen portland Kg 77.000 1,420.00 109,340.00
Pasir pasang M3 0.130 203,000.00 26,390.00
Pasir beton M3 0.090 223,000.00 20,070.00
Kerikil M3 0.020 225,000.00 4,500.00
Baja tulangan Kg 2.600 14,000.00 36,400.00
JUMLAH HARGA BAHAN 259,700.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang batu L.02 OH 1.150 110,000.00 126,500.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 385,740.00
B BAHAN
Bata merah buah 123.000 900.00 110,700.00
Semen portland Kg 114.000 1,420.00 161,880.00
Pasir pasang M3 0.184 203,000.00 37,352.00
Pasir beton M3 0.120 223,000.00 26,760.00
Kerikil M3 0.033 225,000.00 7,425.00
Baja tulangan Kg 4.850 14,000.00 67,900.00
JUMLAH HARGA BAHAN 412,017.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis ½” M 1.200 29,900.00 35,880.00
Perlengkapan Ls 0.350 29,900.00 10,465.00
JUMLAH HARGA BAHAN 46,345.00
C PERALATAN
III - 998
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 3/4” M 1.200 38,600.00 46,320.00
Perlengkapan % 0.350 16,212.00 16,212.00
JUMLAH HARGA BAHAN 62,532.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 1” M 1.200 57,800.00 69,360.00
Perlengkapan % 0.350 69,360.00 69,360.00
JUMLAH HARGA BAHAN 138,720.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 80,000.00 8,640.00
Tukang batu L.02 OH 0.180 110,000.00 19,800.00
III - 999
Kepala tukang L.03 OH 0.018 120,000.00 2,160.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 31,200.00
III - 1000
B BAHAN
Pipa galvanis 11/2” M 1.200 87,800.00 105,360.00
Perlengkapan % 0.350 105,360.00 105,360.00
JUMLAH HARGA BAHAN 210,720.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 3” M 1.200 181,833.00 218,199.60
Perlengkapan % 0.350 76,369.86 76,369.86
JUMLAH HARGA BAHAN 294,569.46
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 4” M 1.200 283,000.00 339,600.00
Perlengkapan % 0.350 118,860.00 118,860.00
JUMLAH HARGA BAHAN 458,460.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1/2” M 1.200 7,000.00 8,400.00
Perlengkapan % 0.350 2,940.00 2,940.00
JUMLAH HARGA BAHAN 11,340.00
C PERALATAN
III - 1001
D Jumlah (A+B+C) 21,780.00
E Overhead & Profit 10.00% 2,178.00
F Harga Satuan Pekerjaan (D+E) 23,958.00
III - 1002
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,960.00
B BAHAN
Pipa PVC 3/4” M 1.200 10,200.00 12,240.00
Perlengkapan % 0.350 4,284.00 4,284.00
JUMLAH HARGA BAHAN 16,524.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1” M 1.200 13,300.00 15,960.00
Perlengkapan % 0.350 5,586.00 5,586.00
JUMLAH HARGA BAHAN 21,546.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 11/2” M 1.200 27,600.00 33,120.00
Perlengkapan % 0.350 11,592.00 11,592.00
JUMLAH HARGA BAHAN 44,712.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
III - 1003
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
III - 1004
B BAHAN
Pipa PVC 2” M 1.200 22,300.00 26,760.00
Perlengkapan % 0.350 9,366.00 9,366.00
JUMLAH HARGA BAHAN 36,126.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 21/2” M 1.200 68,700.00 82,440.00
Perlengkapan % 0.350 28,854.00 28,854.00
JUMLAH HARGA BAHAN 111,294.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 3” M 1.200 89,650.00 107,580.00
Perlengkapan % 0.350 37,653.00 37,653.00
JUMLAH HARGA BAHAN 145,233.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 4” M 1.200 234,600.00 281,520.00
Perlengkapan % 0.350 98,532.00 98,532.00
JUMLAH HARGA BAHAN 380,052.00
C PERALATAN
III - 1005
D Jumlah (A+B+C) 403,482.00
E Overhead & Profit 10.00% 40,348.20
F Harga Satuan Pekerjaan (D+E) 443,830.20
III - 1006
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.040 110,000.00 4,400.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,420.00 49,700.00
Pasir pasang M3 0.014 203,000.00 2,842.00
Pasir urug M3 0.014 160,000.00 2,240.00
JUMLAH HARGA BAHAN 331,902.00
C PERALATAN
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang batu L.02 OH 0.030 110,000.00 3,300.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,420.00 965.60
Pasir pasang M3 0.013 203,000.00 2,639.00
Pasir urug M3 0.011 160,000.00 1,760.00
JUMLAH HARGA BAHAN 186,484.60
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 7.000 120,000.00 840,000.00
JUMLAH TENAGA KERJA 859,740.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,300.00 48,730.00
Bata merah M3 0.027 900.00 24.30
Semen portlan Kg 3.920 1,420.00 5,566.40
Pasir pasang M3 0.056 203,000.00 11,368.00
Pasir urug M3 0.024 160,000.00 3,840.00
JUMLAH HARGA BAHAN 69,528.70
C PERALATAN
III - 1007
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 110,000.00 20,900.00
Kepala tukang L.03 OH 0.019 120,000.00 2,280.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 55,860.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 900.00 495.00
Semen portlan Kg 10.300 1,420.00 14,626.00
Pasir pasang M3 0.061 203,000.00 12,383.00
Pasir urug M3 0.069 160,000.00 11,040.00
JUMLAH HARGA BAHAN 111,144.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 243,300.00 243,300.00
JUMLAH TENAGA KERJA 243,300.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,700.00 17,100.00
Kabel m 15.000 9,200.00 138,000.00
T Dus buah 1.000 2,300.00 2,300.00
L Bow buah 2.000 2,300.00 4,600.00
Klem biasa buah 24.000 1,950.00 46,800.00
MCB buah 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 243,300.00
C PERALATAN
III - 1008
TAMBAHAN / LAIN-LAIN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 80,000.00 16,000.00
Tukang kayu oh 0.600 110,000.00 66,000.00
Kepala tukang oh 0.060 120,000.00 7,200.00
Mandor oh 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 91,600.00
B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 3,636,000.00 72,720.00
Paku Biasa 2-5 kg 0.250 21,000.00 5,250.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 71,000.00 106,500.00
Triplek 6 mm lbr 0.350 91,000.00 31,850.00
Cetak papan nama dg bhn flexi cetak digital print m' 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 239,320.00
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.125 110,000.00 13,750.00
Kepala tukang oh 0.013 120,000.00 1,560.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
ubin granit bh 0.020 48,500.00 970.00
portland cement kg 0.250 1,420.00 355.00
pasir pasang m3 1.500 203,000.00 304,500.00
semen warna kg 0.350 6,900.00 2,415.00
JUMLAH HARGA BAHAN 308,240.00
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.120 110,000.00 13,200.00
Kepala tukang oh 0.012 120,000.00 1,440.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,200.00
B BAHAN
keramik 40 x 40 bh 6.630 5,200.00 34,476.00
portland cement kg 9.800 1,420.00 13,916.00
pasir pasang m3 0.045 203,000.00 9,135.00
semen warna kg 1.300 6,900.00 8,970.00
JUMLAH HARGA BAHAN 66,497.00
C PERALATAN -
JUMLAH HARGA ALAT -
III - 1009
SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 80,000.00 30,000.00
Tukang batu oh 0.180 110,000.00 19,800.00
Kepala tukang oh 0.018 120,000.00 2,160.00
Mandor oh 0.020 120,000.00 2,340.00
JUMLAH TENAGA KERJA 54,300.00
B BAHAN
granito 60 x 60 bh 3.000 54,000.00 162,000.00
portland cement kg 14.700 1,420.00 20,874.00
pasir pasang m3 0.068 203,000.00 13,702.50
semen warna kg 1.950 6,900.00 13,455.00
JUMLAH HARGA BAHAN 210,031.50
C PERALATAN -
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 80,000.00 4,800.00
Tukang batu oh 0.060 110,000.00 6,600.00
Kepala tukang oh 0.006 120,000.00 720.00
Mandor oh 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
List gypsum profil m' 1.050 20,700.00 21,735.00
Tepung gypsum kg 0.150 21,275.00 3,191.25
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 80,000.00 8,000.00
Tukang batu oh 0.200 110,000.00 22,000.00
Kepala tukang oh 0.020 120,000.00 2,400.00
Mandor oh 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
woodplank bh 0.250 69,000.00 17,250.00
Paku biasa 2" - 5" kg 0.050 21,000.00 1,050.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
III - 1010
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Mandor L.15 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 28,000.00
III - 1011
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 86,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 80,000.00 320,000.00
Tukang kayu L.02 OH 6.00 110,000.00 660,000.00
Kepala tukang L.03 OH 0.60 120,000.00 72,000.00
Mandor L.04 OH 0.20 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,076,000.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 80,000.00 80,000.00
Mandor L.04 OH 0.10 120,000.00 12,000.00
JUMLAH TENAGA KERJA 92,000.00
B BAHAN
III - 1012
JUMLAH 101,200.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 10,120.00 6,746.67
III - 1013
SNI 2012 1 m³ Bongkaran Beton Bertulang
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 537,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,420.00 329,440.00
Pasir beton m3 0.52 223,000.00 115,960.00
Spleet 2/3 cm m3 0.78 315,000.00 245,700.00
JUMLAH HARGA BAHAN 691,100.00
B TENAGA
Pekerja Oh 1.65 80,000.00 132,000.00
Tukang batu Oh 0.25 110,000.00 27,500.00
Kepala tukang Oh 0.025 120,000.00 3,000.00
Mandor Oh 0.08 120,000.00 9,600.00
JUMLAH TENAGA KERJA 172,100.00
C PERALATAN
JUMLAH HARGA ALAT -
- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 60,000.00 21,000.00
Holo 4/4 meni btg 1.00 13,950.00 13,950.00
Holo 2/4 meni btg 0.34 12,600.00 4,284.00
Kawat Bwg 12 kg 0.10 11,500.00 1,150.00
Paku screw 2.5 cm bh 20.00 100.00 2,000.00
Adhesive kg 0.02 6,900.00 138.00
Kain kasa m' 2.00 500.00 1,000.00
Cat penutup 2 kali kg 0.03 28,700.00 861.00
Paku beton bh 4.00 200.00 800.00
JUMLAH HARGA BAHAN 45,183.00
III - 1014
B TENAGA
Pekerja oh 0.17 80,000.00 13,600.00
Tukang oh 0.28 110,000.00 30,800.00
Kep Tukang oh 0.03 120,000.00 3,600.00
Mandor oh 0.07 120,000.00 8,400.00
JUMLAH TENAGA KERJA 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 7,500.00 82,500.00
Instalasi lapu dan stop kontak ttk 1.00 37,500.00 37,500.00
JUMLAH HARGA BAHAN 120,000.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 80,000.00 38,400.00
Tukang Listrik Oh 0.048 110,000.00 5,280.00
Kepala tukang Listrik Oh 0.048 120,000.00 5,760.00
JUMLAH TENAGA KERJA 49,440.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 41,400.00 41,400.00
JUMLAH HARGA BAHAN 41,400.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik 0 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 1015
- 1 Unit Pekerjaan Sekring Kast
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 34,500.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 10,300.00 10,300.00
JUMLAH HARGA BAHAN 10,300.00
TENAGA
Pembantu tukang Listrik Oh 0.24 80,000.00 19,200.00
Tukang Listrik Oh 0.024 110,000.00 2,640.00
Kepala tukang Listrik Oh 0.024 120,000.00 2,880.00
JUMLAH TENAGA KERJA 24,720.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 18,400.00 18,400.00
JUMLAH HARGA BAHAN 18,400.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
III - 1016
D Jumlah (A+B+C) 59,600.00
E Overhead & Profit 10.00% 5,960.00
F Harga Satuan Pekerjaan (D+E) 65,560.00
III - 1017
- 1 Bh Pekerjaan Saklar Tunggal
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 203,000.00 105,560.00
JUMLAH HARGA BAHAN 715,020.00
C PERALATAN
Cirebon, 2022
III - 1018
Analisa EI-311a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1019
Analisa EI-321.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0101 383,917.43 3,868.41
2. Dump Truck (E08) Jam 0.6103 218,351.62 133,269.49
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 242,040.15 1,012.55
5. Water tank truck (E23) Jam 0.0070 313,608.03 2,204.07
6 Alat Bantu Ls 1.0000 0.00 0.00
IV - 1020
Analisa EI-322.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 435,196.50 3,701.18
2. Dump Truck (E08) Jam 0.6073 218,351.62 132,614.95
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 406,739.23 6,550.34
4. Water Tanker (E23) Jam 0.0070 313,608.03 2,204.07
5. Alat Bantu Ls 1.0000 0.00 0.00
IV - 1021
Analisa EI-331.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 242,040.15 113.91
3 Alat Bantu Ls 1.0000 0.00 0.00
IV - 1022
Analisa EI-611a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1023
Analisa EI-612a
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1024
Analisa EI-621
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1025
Analisa EI-631.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 435,196.50 4,165.43
2. AMP E01 Jam 0.0201 7,795,898.87 156,544.15
3. Genset E12 Jam 0.0201 297,098.16 5,965.83
4. Dump Truck (3,5 ton) E08 Jam 0.0122 218,351.62 2,664.57
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 406,739.23 12,904.80
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 1026
Analisa EI-632.rob
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 435,196.50 4,165.43
2. AMP E01 Jam 0.0201 7,795,898.87 156,544.15
3. Genset E12 Jam 0.0201 297,098.16 5,965.83
4. Dump Truck E08 Jam 0.0163 218,351.62 3,552.76
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 406,739.23 9,678.60
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00
IV - 1027
Analisa EI-661
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1028
Analisa EI-662
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1029
Analisa EI-814
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1030
Analisa EI-817
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1031
Analisa EI-412
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1032
Analisa EI-422
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1033
Analisa EI-192a rob
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1034
Analisa EI-192b rob
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1035
Analisa EI-181
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1036
Analisa EI-182
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1037
1 m2 Memasang Paving Block t = 8 cm (K - 250)
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1038
yang dibayar dari kontrak) dan biaya-biaya lainnya.
IV - 1039
Analisa EI-714
A. TENAGA
B. BAHAN
C. PERALATAN
IV - 1040
Analisa EI-619
A. TENAGA
B. BAHAN
C. PERALATAN
Cirebon, 2022
IV - 1041
AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 805,000.00 435,102.50
JUMLAH HARGA ALAT 435,102.50
D Jumlah (A+B+C) 472,006.50
E Overhead & Profit 10.00% 47,200.65
F Harga Satuan Pekerjaan (D+E) 519,207.15
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 603,750.00 326,326.88
JUMLAH HARGA ALAT 326,326.88
D Jumlah (A+B+C) 363,230.88
E Overhead & Profit 10.00% 36,323.09
F Harga Satuan Pekerjaan (D+E) 399,553.96
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1544 80,000.00 12,352.00
Tukang bor L.02 OH 0.0386 110,000.00 4,246.00
Mandor L.04 OH 0.0155 120,000.00 1,854.00
JUMLAH TENAGA KERJA 18,452.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.270 805,000.00 217,551.25
JUMLAH HARGA ALAT 217,551.25
D Jumlah (A+B+C) 236,003.25
E Overhead & Profit 10.00% 23,600.33
F Harga Satuan Pekerjaan (D+E) 259,603.58
V - 1042
AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN
AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6''
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0720 80,000.00 5,760.00
Tukang bor L.02 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0071 120,000.00 852.00
JUMLAH TENAGA KERJA 8,592.00
B BAHAN
Pipa PVC 6'' m 1.0500 284,900.00 299,145.00
Centralizer Ls 0.1000 299,145.00 29,914.50
JUMLAH HARGA BAHAN 329,059.50
C PERALATAN
Driling rig + perlengkapan jam 0.1250 805,000.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 438,276.50
E Overhead & Profit 10.00% 43,827.65
V - 1043
F Harga Satuan Pekerjaan (D+E) 482,104.15
V - 1044
AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8''
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang bor L.02 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0082 120,000.00 984.00
JUMLAH TENAGA KERJA 9,584.00
B BAHAN
Pipa PVC 8'' m 1.0500 449,950.00 472,447.50
Centralizer Ls 0.1000 472,447.50 47,244.75
JUMLAH HARGA BAHAN 519,692.25
C PERALATAN
Driling rig + perlengkapan m 0.1429 805,000.00 115,034.50
JUMLAH HARGA ALAT 115,034.50
D Jumlah (A+B+C) 644,310.75
E Overhead & Profit 10.00% 64,431.08
F Harga Satuan Pekerjaan (D+E) 708,741.83
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang bor L.02 OH 0.2600 110,000.00 28,600.00
Mandor L.04 OH 0.1040 120,000.00 12,480.00
JUMLAH TENAGA KERJA 124,280.00
B BAHAN
Gravel pack pelabuhan m3 1.0000 86,600.00 86,600.00
ratu/sukabumi
JUMLAH HARGA BAHAN 86,600.00
C PERALATAN
Driling rig + perlengkapan m 1.8180 805,000.00 1,463,490.00
JUMLAH HARGA ALAT 1,463,490.00
D Jumlah (A+B+C) 1,674,370.00
E Overhead & Profit 10.00% 167,437.00
F Harga Satuan Pekerjaan (D+E) 1,841,807.00
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 10.00% 16,895.50
F Harga Satuan Pekerjaan (D+E) 185,850.50
V - 1045
AT.14 1 jam Uji Pemompaan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 10.00% 16,895.50
F Harga Satuan Pekerjaan (D+E) 185,850.50
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
pekerja L.01 OH 1.500 80,000.00 120,000.00
mandor L.02 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 126,000.00
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1046
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 168,483.60
V - 1047
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1048
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1049
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1050
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1051
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1052
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1053
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1054
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1055
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1056
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1057
JUMLAH 220,883.58
V - 1058
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1059
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1060
400 m' Pengetesan pipa PVC dia. 250 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1061
400 m' Pengetesan pipa PVC dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1062
1 unit perbaikan gate valve dia. 300mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1063
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1064
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1065
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1066
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1067
1 unit pemasangan gate valve dia. 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1068
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1069
JUMLAH 361,131.68
V - 1070
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1071
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1072
1 unit Pemasangan Box Street dia. 8"
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1073
JUMLAH 35,527.68
V - 1074
1 unit Peninggian Box Street
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 ls Bongkar Box Street 22,000.00
1 ls Pemasangan / Perbaikan Accessories
Accessories dia. 3/4" 75,000.00
Accessories dia. 1" 75,000.00
Accessories dia. 1 1/2" 75,000.00
Accessories dia. 2" 95,000.00
Accessories dia. 3" 99,750.00
Accessories dia. 4" 120,750.00
Accessories dia. 6" 152,250.00
Accessories dia. 8" 183,750.00
Accessories dia. 10" 238,900.00
Accessories dia. 12" 310,500.00
Accessories dia. 14" 403,600.00
1 m³ Perbaikan Aspal Hotmix 1,260,000.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1075
1 unit Pemasangan wash out dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Crossing Jalan Sistim Boring
m' pekerjaan boring tanah pipa dia. 2" 1 165,700.00
m' pekerjaan boring tanah pipa dia. 3" 1 185,100.00
m' pekerjaan boring tanah pipa dia. 4" 1 283,800.00
m' pekerjaan boring tanah pipa dia. 6" 1 335,200.00
m' pekerjaan boring tanah pipa dia. 8" 1 418,600.00
m' pekerjaan boring tanah pipa dia. 10" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 12" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 14" 1 672,500.00
m' pekerjaan boring tanah pipa dia. 16" 1 700,000.00
V - 1076
Pemasangan Pipa Sistim Boring
18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1077
18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
V - 1078
1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
Cirebon, 2022
V - 1079
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
A. BAHAN :
I. BATU
1 Abu Batu m3 252,840.00
2 Atras ( tanah urug ) m3 143,750.00
3 Batu apung kg 4,950.00
4 Batu belah 10/15 cm m3 315,000.00
5 Batu belah 15/20 cm (Krakal) m3 258,750.00
6 Batu pecah mesin 0.5-1 cm m3 288,000.00
7 Batu pecah mesin 1-2 cm m3 315,000.00
8 Batu pecah mesin 2-3 cm m3 315,000.00
9 Batu pecah mesin 3-5 cm m3 315,000.00
10 Batu tempel Palimanan 10 X 20 bh 3,200.00
11 Batu tempel kapur tekstur tidak rata m2 299,000.00
12 Chipping m3 310,500.00
13 Filler m3 218,500.00
14 Kapur bakar (padam) m3 253,000.00
15 Kapur Sirih kg 2,300.00
16 Kerikil Ø 1-3 cm m3 225,000.00
17 Gravel Pack 60 cm bh 86,600.00
18 Gravel Pack 30 cm bh 46,200.00
19 Gravel Pack 20 cm bh 40,400.00
20 Batu andesit 30 x 30 cm bh 10,500.00
21 Kansteen 10 x 20 x 40 m1 94,900.00
22 Pasang Kansteen 15 x 25 x 40 m1 247,225.00
23 Pasang Kansteen 20 x 25 x 60 m1 171,109.00
II. PASIR
1 Pasir beton m3 223,000.00
2 Pasir aspal m3 203,000.00
3 Pasir pasang m3 203,000.00
4 Pasir urug m3 160,000.00
5 Sirtu m3 184,000.00
6 Sirtu tersaring m3 301,900.00
7 Tanah urug pilhan m3 172,500.00
8 Tanah urug biasa m3 172,500.00
9 Tanah merah m3 172,500.00
VI - 1080
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
22 Sling Ø 32 mm m 350,750.00
23 Sling Ø 16 mm m 258,750.00
24 Klem sling Ø 32 mm set 517,500.00
25 Warfel / jarum keras Ø 32 mm bh 230,000.00
26 Causen sling Ø 32 mm bh 224,250.00
27 Klem kokat sling Ø 32 mm bh 287,500.00
28 Segel sling Ø 32 mm bh 287,500.00
29 Warfel sling Ø 16 mm bh 189,750.00
30 Segel sling Ø 16 mm bh 161,000.00
31 Klem kokat sling Ø 16 mm bh 103,500.00
32 Causen sling Ø 16 mm bh 166,750.00
33 Jarum keras Ø 16 mm bh 189,750.00
34 Klem pipa pvc bh 1,950.00
VI - 1081
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1082
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
V. ASPAL
1 Aspal kemasan kg 13,000.00
2 Aspal curah kg 13,000.00
3 Aspal Emulsi ltr 12,000.00
VI. MINYAK
1 Pertalite liter 7,600.00
2 Premium (non subsidi) liter 7,600.00
3 Solar liter 5,900.00
4 Solar (non subsidi) liter 10,900.00
5 Minyak tanah liter 11,800.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 48,500.00
7 Pelumas bekisting liter 10,600.00
8 Stempet kg 28,700.00
VII.CETAKAN
1 Bata merah bh 900.00
2 Bata berongga bh 2,800.00
3 Batako bh 3,700.00
4 Genteng glazuur turbo ex Jatiwangi bh 4,000.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,600.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 3,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,300.00
8 Genteng nok/bubung morando diglazuur bh 5,200.00
9 Genteng morando bh 400.00
VI - 1083
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 18,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 18,400,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 13,800,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,175,000.00
5 Kayu dolken O 8 - 10 /4 m btg 71,000.00
6 Kayu dolken O 12 - 15 /4 m btg 86,200.00
7 Kayu dolken O 5 /3 m btg 15,100.00
8 Kayu hutan/kayu perancah acuan (kayu kelas III) m3 3,636,000.00
9 Kayu kamper m3 9,430,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 90,800.00
12 Kayu kruing m3 8,365,100.00
13 Kayu lanan m3 7,527,900.00
14 Kayu meranti m3 6,900,000.00
15 Kayu jati Jabar m3 9,430,000.00
VI - 1084
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
IX. LAIN-LAIN
1 Air L 14.65
2 Air bersih m3 5,700.00
3 Kayu kelas III (0,03 * 0,02 * 2 * 0,8)* harga bahan per m3 kg 38,600.00
4 Jendela naco (0,04 * harga kaca) bh 3,400.00
5 seng pelat (asumsi L.90 P.1 m) lbr 43,700.00
6 kawat jaring lbr 653,700.00
7 panel beton pracetak lbr 118,400.00
8 kolom beton pracetak batang 201,200.00
9 bahan tambahan kimia (efoksi) Liter 155,200.00
10 Strorox – 100 kg 88,000.00
11 Waterstop lebar 150 mm m' 57,500.00
12 Waterstop lebar 200 mm m' 143,700.00
13 Waterstop lebar 230 mm - 320 mm m' 132,200.00
14 Jaring kawat baja dilas (1 lembar = 61,79 kg)untuk wiremesh M8 kg 9,700.00
15 Penjaga jarak bekisting/spacer (dari besi/baut) bh 20,700.00
16 Besi scuare tube m' 21,800.00
17 Besi lis kaca (1 x 1) cm m' 16,400.00
18 Pengelasan cm 5,100.00
20 Besi hollow (50 x 50 x 3) mm kg 8,600.00
21 Dinabolt Ø 12mm bh 3,000.00
22 Phenol film 12 mm lbr 281,700.00
23 Semen grout kg 2,800.00
24 Screening kg 200.00
25 Besi siku L 30.30.3 kg 12,100.00
26 Besi pelat baja kg 7,500.00
27 Kawat las kg 31,100.00
28 Pintu gulung besi m2 1,122,400.00
29 Pintu lipat m2 3,116,500.00
30 Rolling door alluminium m2 460,000.00
31 Profil alluminium (silver) m' 126,500.00
32 Sealant tube 23,000.00
33 Venetions blinds dan vertical blinds (tirai) m2 122,100.00
34 Profil kaca (allumunium) m' 14,200.00
35 Sunscreen alluminium m2 442,700.00
36 Kawat nyamuk m2 287,500.00
37 Baja strip (0,2 x 2) cm kg 20,900.00
38 Jendela nako (rangka + kaca 5 mm) m2 187,700.00
39 Rangka metal hollow 40.40.2 mm m' 21,800.00
40 Baja ringan canai dingin C75 kg 16,100.00
41 HB (Batako Berlobang)-20 m3 503,100.00
42 HB (Batako Berlobang)-15 m3 575,000.00
43 HB (Batako Berlobang)-10 m3 776,200.00
44 Besi angker diameter 8 kg 14,900.00
45 Bata ringan tebal 7,5cm m3 747,500.00
46 Bata ringan tebal 10cm m3 862,500.00
47 Mortar siap pakai kg 4,300.00
48 Semen Mortar (SM) m3 1,100.00
49 Batu granit kg 5,700.00
50 Batu traso kg 5,700.00
80 ubin keramik mozaik ukuran 30 cm x 30 cm bh 4,600.00
81 plint keramik ukuran 10 cm x 20 cm bh 13,800.00
82 plint keramik ukuran 10 cm x 10 cm bh 10,300.00
83 plint keramik ukuran 5 cm x 20 cm bh 10,300.00
84 plint internal cove artistik 5 cm x 5 cm x 20 cm bh 17,200.00
85 lantai marmer ukuran 100cm x 100cm bh 920,000.00
86 Karpet m2 115,000.00
87 Lem untuk karpet kg 78,700.00
88 underlayer (pelapis bawah karpet) m2 57,500.00
89 parquet kayu m2 172,500.00
91 dinding keramik artistik 10 cm x 20 cm bh 3,900.00
92 dinding keramik artistik 5 cm x 20 cm bh 2,000.00
93 dinding marmer 100 cm x 100 cm bh 920,000.00
94 bata pelapis 3 cm x 7 cm x 24 cm bh 4,700.00
95 batu paras bh 4,800.00
96 batu tempel hitam bh 1,800.00
97 Vynil bh 12,600.00
98 Lem vynil kg 25,300.00
99 Wallpaper m' 80,500.00
100 Floor harderner kg 11,200.00
101 Asbes semen m2 42,500.00
102 Akustik lbr 58,600.00
103 Profil Allum "T" m' 113,800.00
VI - 1085
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1086
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1087
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1088
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1089
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1090
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1091
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
VI - 1092
NO
HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp
B. UPAH
1 Mandor /hari 120,000.00
2 Kepala tukang /hari 120,000.00
3 Tukang kayu / besi /hari 110,000.00
4 Tukang batu /hari 110,000.00
5 Tukang bor /hari 110,000.00
6 Tukang Las /hari 120,000.00
7 Pembantu tukang/Pekerja /hari 80,000.00
8 Operator terlatih /hari 140,000.00
9 Operator kurang terlatih /hari 85,000.00
10 Pembantu operator /hari 80,000.00
11 Supir truk /hari 90,000.00
12 Pembantu supir /hari 80,000.00
13 Mekanik /hari 90,000.00
14 Pembantu mekanik /hari 80,000.00
15 Buruh lapangan terlatih /hari 100,000.00
16 Buruh lapangan kurang terlatih /hari 80,000.00
17 Buruh lapangan tak terlatih / pekerja /hari 80,000.00
C. ALAT
1 Sewa crane (10 Ton) unit/hari 4,485,000.00
2 Sewa pipe support buah/hari 341,550.00
3 Sewa scaffolding unit/hari 341,550.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 4,025,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,835,400.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 57,500.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 57,500.00
8 Mobile crane £ 3 ton unit/hari 1,667,500.00
9 Sewa Genset 1500 watt unit/hari 1,420,020.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 379,500.00
11 Sewa crane (3 Ton) Jam 132,250.00
12 Compressor Jam 78,556.50
13 Driling rig + perlengkapan (daerah batuan keras) m 805,000.00
14 Driling rig + perlengkapan (daerah batuan sedang) m 603,750.00
15 Mesin Las Jam 230,000.00
16 Mesin Blower Jam 345,000.00
ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 383,917.43
2 DUMP TRUCK 3.5 TON E08 Jam 218,351.62
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 435,196.50
4 MOTOR GRADER >100 HP E13 Jam 394,059.68
5 VIBRATORY ROLLER 5-8 T. E19 Jam 242,040.15
6 WATER TANKER 3000-4500 L. E23 Jam 313,608.03
7 TANDEM ROLLER 6-8 T. E17 Jam 406,739.23
8 ASPHALT DISTRIBUTOR E41 Jam 342,947.33
9 COMPRESSOR 4000-6500 L\M E05 Jam 129,446.21
10 TIRE ROLLER 8-10 T. E18 Jam 440,375.31
11 ASPHALT MIXING PLANT E01 Jam 7,795,898.87
12 GENERATOR SET E12 Jam 297,098.16
13 ASPHALT FINISHER E02 Jam 280,799.72
14 DUMP TRUCK 5 TON E09 Jam 345,406.65
15 THREE WHEEL ROLLER 6-8 T E16 Jam 216,136.39
16 ASPHALT SPRAYER E03 Jam 57,689.63
17 Beton Mixer E06 Jam 75,186.43
18 Concrete Vibrator E20 Jam 42,267.10
19 Flat Bed Truck E11 Jam 274,692.64
Cirebon, 2022
VI - 1093
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2022
DESA :
KECAMATAN :
KABUPATEN : C I R E B O N
HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek SNI.100.03 bh -
-
II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-
IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-
V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100),
9 A.4.1.1.1 m3
setara dengan beton rabat -
10 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) A.4.1.1.2 m3 -
11 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) A.4.1.1.3 m3 -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)
12 A.4.1.1.4 m3
cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
13 A.4.1.1.5. m3
(sama dengan K 175) -
14 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) A.4.1.1.6 m3 -
15 Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) A.4.1.1.7. m3 -
16 Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) A.4.1.1.8. m3 -
17 Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) A.4.1.1.9. m3 -
VII - 1094
18 Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) A.4.1.1.10. m3 -
19 Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) A.4.1.1.11. m3 -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
20 A.4.1.1.12. m3
(sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-
VII - 1095
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
8 A.4.6.1.22. m'
kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu
9 A.4.6.1.23. m2
kelas II atau III -
10 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26. m2 -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
15 A.4.6.1.21. m'
kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
16 A.4.6.1.22. m'
kelas II -
IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
13 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh
-
14 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' -
15 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1 25. m' -
16 (K3) Pemasangan 1 buah titik lampu (Instalasi) A.8.4.6.1 bh -
17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh -
-
VII - 1096
XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat
1 A.4.7.1.4. m2
dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
2 A.4.7.1.10. m2
lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -
REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -
PPN 10 % Rp -
JUMLAH TOTAL Rp -
DIBULATKAN Rp -
TERBILANG : ( ………………………………………….. )
Cirebon, 2022
VII - 1097
RISALAH ANALISA
- Pemasangan 1 m2 dinding bata berongga ekspose 5 x 10,5 x 21 campuran
1SP :3PP (Pemasangan Tanpa Spasi)
dibuat 16 Mei 2017 pengganti analisa A. 4.4.1.24.rob
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
Bata Berongga ekspose buah 83.000 3,000.00 249,000.00
Semen Portland Kg 19.000 1,420.00 26,980.00
Pasir pasang m3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 282,476.00
C PERALATAN
VIII - 1098
A.4.5.2.1. rob1 ATAP BITUMEN SELULOSA MONOLAYER UK.195 X 96 CM
dibuat 13 Juni 2017
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Selulosa 0.650 172,500.00 112,125.00
Paku/Screw 12.000 1,400.00 16,800.00
JUMLAH HARGA BAHAN 128,925.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.042 94,900.00 98,885.80
Paku/Screw 8.330 1,400.00 11,662.00
JUMLAH HARGA BAHAN 110,547.80
C PERALATAN
VIII - 1099
A.4.5.2.1. rob3 ATAP BITUMEN SELULOSA MONOLAYER UK. 106 X 40 CM
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Atap Selulosa 3.230 58,100.00 187,663.00
Paku/Screw 16.150 1,400.00 22,610.00
JUMLAH HARGA BAHAN 210,273.00
C PERALATAN
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.300 101,200.00 131,560.00
Paku/Screw 10.000 1,400.00 14,000.00
JUMLAH HARGA BAHAN 145,560.00
C PERALATAN
VIII - 1100
A.4.5.2.1. rob5 1m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm
( kemiringan atap Minimum 10o - 15o ) Uk. 200 x 95 x 0.30 cm,
Jarak Rangka Gording atau Reng max. 45 cm
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 189,200.00 122,980.00
Paku atau Sekrup 9.100 1,400.00 12,740.00
JUMLAH HARGA BAHAN 135,720.00
C PERALATAN
Cirebon, 2022
VIII - 1101
1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m
1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia
< 15 cm
Kode Analisa T.02