Anda di halaman 1dari 1103

RENCANA ANGGARAN BIAYA (RAB)

Kegiatan :-
Pekerjaan :-
Lokasi : Sumber - Kabupaten Cirebon

KODE HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOL. SAT. (Rp) (Rp)
ANALISA
1 2 3 4 5 6 7

I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek - 1.00 bh 364,012.00 364,012.00
2 Kesehatan Dan Keselamatan Kerja ( K3 ) - 1.00 ls 1,265,000.00 1,265,000.00
3 Alat Bantu ( Scaffolding ) - 20.00 set 341,550.00 6,831,000.00
Sub Jumlah Total Pekerjaan Persiapan 8,460,012.00
II PEKERJAAN AULA BAPENDA
A PEKERJAAN INTERIOR
1 Pek. Pemasangan Backdrop Panggung Taksiran 29.70 m2 1,002,540.00 29,775,438.00
2 Pek. Pemasangan Lantai Vinil A.4.4.3.59. 193.06 m2 208,644.70 40,280,945.78
3 Pek. Pemasangan Backdrop Plafond Taksiran 92.39 m2 1,002,540.00 92,623,668.06
4 Pek. Pengecatan Plafond Taksiran 137.13 m2 34,529.00 4,734,892.71
Sub Jumlah Total Pekerjaan Interior 167,414,944.55
B PEKERJAAN INSTALASI LISTRIK
1 Pek. Pemasangan Lampu Indirex - 47.34 m' 50,000.00 2,367,000.00
2 Pek. Pemasangan Saklar Ganda - 2.00 bh 65,560.00 131,120.00
3 Pek. Pemasangan Titik Instalasi Penerangan A.8.4.6.1 3.00 titik 447,480.00 1,342,440.00
4 Pek. Pemasangan Lampu Downlight - 3.00 bh 124,000.00 372,000.00
5 Pek. Pemasangan Stop Kontak - 2.00 bh 39,050.00 78,100.00
Sub Jumlah Total Pekerjaan Listrik 4,290,660.00
Jumlah Real Coast 180,165,616.55
PPN 11% 19,818,217.82
Jumlah Total 199,983,834.37

Terbilang : "Seratus Sembilan Puluh Sembilan Juta Sembilan Ratus Delapan Puluh Tiga Ribu Delapan Ratus Tiga Puluh
Empat Koma Tiga Tujuh"
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pembuatan Papan Nama Proyek
NO. : I.1

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T

1. Pembuatan Papan Nama Proyek


KUANTITAS

LUAS
DIMENSI VOLU
KET.
Q1 Q2 Q3 (P x L x ME
T)
1.00 bh

1.00 1.00
JUMLAH TOTAL 1.00 bh

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Kesehatan Dan Keselamatan Kerja ( K3 )
NO. : I.2

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Kesehatan Dan Keselamatan Ke


1.00
JUMLAH
TAS

LUAS
VOLU
KET.
Q3 (P x L x ME
T)
1.00 ls

1.00
JUMLAH TOTAL 1.00 ls

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Alat Bantu ( Scaffolding )
NO. : I.3

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Alat Bantu ( Scaffolding )


27.00
JUMLAH
TITAS

LUAS
VOLUME KET.
Q3 (P x L x
T)
27.00 set

27.00
JUMLAH TOTAL 27.00 set

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pemasangan 1 m² Backdrop Panggung
NO. : II.A.1

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T

1. Pemasangan 1 m² Backdrop Panggung


8.80 3.38
G KUANTITAS

LUAS
DIMENSI
VOLUME KET.
Q1 Q2 Q3 (P x L x
T)
29.70 m2

29.70
JUMLAH TOTAL 29.70 m2

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pemasangan 1 m² Vinil t. 3mm Lantai
NO. : II.A.2

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1

1. Pemasangan 1 m² Vinil t. 3mm Lantai


13.70 11.80
9.80 3.00
10.00 0.20
UANTITAS

ENSI LUAS
(P x L x VOLUME KET.
Q2 Q3 T)

193.06 m2

161.66
29.40
2.00
JUMLAH TOTAL 193.06 m2

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG K

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAAN : Pemasangan 1 m2 Backdrop Plafond
NO. : II.A.3

SKET GAMBAR

NO URAIAN PEKERJAAN SAT


P

1. Pemasangan 1 m2 Backdrop Plafond


2.45
13.70
9.80
DATA PENDUKUNG KUANTITAS

DIMENSI LUAS
(P x L x
L T Q1 Q2 Q3 T)

0.74 19.00 34.45


0.74 5.00 50.69
0.74 7.25
JUMLAH TOTAL

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
VOLUME KET.

92.39 m2
92.39 m2

V. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pengecatan Plafond
NO. : II.A.4

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Pek. Pengecatan Plafond


4.30 2.44 10.00
3.30 2.44 4.00
JUMLAH
TAS

LUAS
VOLU
KET.
Q3 (P x L x ME
T)
137.13 m2

104.92
32.21
JUMLAH TOTAL 137.13 m2

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Lampu Indirex
NO. : II.B.1

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1

1. Pek. Pemasangan Lampu Indirex


11.60
9.14 2.00
3.31 2.00
2.90 2.00
0.42 12.00
JUML
UANTITAS

LUAS
ENSI
VOLUME KET.
Q2 Q3 (P x L x
T)
47.34 m'

11.60
18.28
6.62
5.80
5.04
JUMLAH TOTAL 47.34 m'

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Saklar Ganda
NO. : II.B.2

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Pek. Pemasangan Saklar Gand


2.00
JUMLAH
TITAS

LUAS
VOLUME KET.
Q3 (P x L x
T)
2.00 Buah

2.00
JUMLAH TOTAL 2.00 Buah

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Titik Instalasi Penerangan
NO. : II.B.3

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Pek. Pemasangan Titik Instala


3.00
JUMLAH
TITAS

LUAS
VOLUME KET.
Q3 (P x L x
T)
3.00 Titik

3.00
JUMLAH TOTAL 3.00 Titik

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Lampu Downlight
NO. : II.B.4

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Pek. Pemasangan Lampu Down


3.00
JUMLAH
TITAS

LUAS
VOLUME KET.
Q3 (P x L x
T)
3.00 Buah

3.00
JUMLAH TOTAL 3.00 Buah

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
DATA PENDUKUNG KUANTITAS

PEKERJAAN :
TAHUN : 2023
ITEM PEKERJAA: Pek. Pemasangan Stop Kontak
NO. : II.B.5

SKET GAMBAR

DIMENSI
NO URAIAN PEKERJAAN SAT
P L T Q1 Q2

1. Pek. Pemasangan Stop Kontak


2.00
JUMLAH
TITAS

LUAS
VOLUME KET.
Q3 (P x L x
T)
2.00 Buah

2.00
JUMLAH TOTAL 2.00 Buah

CV. ARS GUMILANG

RIAN PURNAMA
Direktur
Taksiran Pemasangan 1 m² Panel Dinding/Backdrop HPL (tebal max. 10cm)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Tukang Kayu m2 1.00 110,000.00
Tukang Finishing Tlusiran m 4.00 25,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiplek 9mm lbr 0.80 118,000.00
Multiplek 12mm lbr 1.00 215,000.00
HPL ex TACO lbr 0.80 200,000.00
Lem Kuning kg 1.70 45,000.00
Lem Putih bh 1.20 18,000.00
Paku Tembak dus 0.68 30,000.00
Scrup 4 cm bh 15.00 500.00
Ampelas lbr 1.00 6,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu ls 1.000 100,000.00

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

Taksiran Pemasangan 1 m² Penyekat Workstation (tebal max. 10cm)


Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Tukang Kayu 1.00 110,000.00
Tukang Finishing Tlusiran 8.00 25,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiplek 9 mm lbr 0.80 118,000.00
Multiplek 15 mm lbr 1.00 275,000.00
HPL ex TACO lbr 0.70 200,000.00
Lem Kuning kg 2.75 45,000.00
Lem Putih bh 2.30 18,000.00
Paku Tembak dus 1.00 30,000.00
Scrup 4 cm bh 20.00 500.00
Ampelas lbr 1.50 6,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu % 0.500 361,775.00

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
Taksiran Pemasangan 1 m' Drop Celling HPL (tebal max. 10cm)
Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Tukang Kayu 1.00 110,000.00
Tukang Finishing Tlusiran 8.00 25,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiplek 9 mm lbr 0.80 118,000.00
Multiplek 12 mm lbr 1.00 215,000.00
HPL ex TACO lbr 0.70 200,000.00
Hollow 40 x 40 mm m' 4.00 9,000.00
Lem Kuning kg 1.70 45,000.00
Lem Putih bh 1.20 18,000.00
Paku Tembak dus 1.00 30,000.00
Scrup 4 cm bh 30.00 500.00
Ampelas lbr 1.50 6,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu % 0.500 318,750.00

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

Taksiran Pembuatan 1 m' Meja (tinggi max. 1m)


Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja 1.00 110,000.00
Tukang Kayu 1.00 110,000.00
Tukang Finishing Tlusiran 8.00 25,000.00
JUMLAH TENAGA KERJA
B BAHAN
Multiplek 12mm lbr 0.80 215,000.00
Multiplek 15mm lbr 0.80 275,000.00
Multiplek 18mm lbr 1.00 325,000.00
HPL ex TACO lbr 1.00 200,000.00
Lem Kuning kg 3.95 45,000.00
Lem Putih bh 3.77 18,000.00
Paku Tembak dus 1.50 30,000.00
Scrup 4 cm bh 40.00 500.00
Ampelas lbr 4.00 6,000.00
Cat kg 0.25 30,000.00
Engsel bh 4.000 35,000.00
Relling bh 4.000 58,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu % 0.500 815,555.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

Taksiran Pemasangan 1 m2 Vynil t. 3mm + Bawah Triplek


Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja 0.45 80,000.00
Tukang Kayu 0.23 110,000.00
Mandor 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vinil lbr 8.00 30,000.00
Lem Kuning kg 1.00 45,000.00
Triplek 9mm lbr 0.35 118,000.00
JUMLAH HARGA BAHAN
C PERALATAN
Alat Bantu % 0.200 65,260.00

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

Taksiran Pemasangan 1 m2 Vinil t. 3mm


Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja 0.45 80,000.00
Tukang Kayu 0.23 110,000.00
Mandor 0.02 115,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vinil lbr 8.00 30,000.00
Lem Kuning kg 1.00 45,000.00

JUMLAH HARGA BAHAN


C PERALATAN
Alat Bantu % 0.200 57,000.00

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
HPL (tebal max. 10cm)
Jumlah
Harga
(Rp)

110,000.00
100,000.00
210,000.00

94,400.00
215,000.00
160,000.00
76,500.00
21,600.00
20,400.00
7,500.00
6,000.00
601,400.00

100,000.00

100,000.00
911,400.00
91,140.00
1,002,540.00

bal max. 10cm)


Jumlah
Harga
(Rp)

110,000.00
200,000.00
310,000.00

94,400.00
275,000.00
140,000.00
123,750.00
41,400.00
30,000.00
10,000.00
9,000.00
723,550.00

180,887.50

180,887.50
1,214,437.50
121,443.75
1,335,881.25
Jumlah
Harga
(Rp)

110,000.00
200,000.00
310,000.00

94,400.00
215,000.00
140,000.00
36,000.00
76,500.00
21,600.00
30,000.00
15,000.00
9,000.00
637,500.00

159,375.00

159,375.00
1,106,875.00
110,687.50
1,217,562.50

Jumlah
Harga
(Rp)

110,000.00
110,000.00
200,000.00
420,000.00

172,000.00
220,000.00
325,000.00
200,000.00
177,750.00
67,860.00
45,000.00
20,000.00
24,000.00
7,500.00
140,000.00
232,000.00
1,631,110.00

407,777.50
407,777.50
2,458,887.50
245,888.75
2,704,776.25

Jumlah
Harga
(Rp)

36,000.00 0.45
24,750.00 0.225
2,645.00 0.023
63,395.00 0.023
23333.33
240,000.00 2.88 560000 168000 728000
45,000.00 0.35 3.2 30333.33
41,300.00 1.008 175000
326,300.00

13,052.00

13,052.00
402,747.00 475000 142500 617500
40,274.70 25729.17
443,021.70

Jumlah
Harga
(Rp)

36,000.00
24,750.00
2,645.00
63,395.00

240,000.00
45,000.00

285,000.00

11,400.00

11,400.00
359,795.00
35,979.50
395,774.50
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

Asumsi Kesehatan Dan Keselamatan Kerja ( K3 )

No Uraian Kode Satuan Koefisien

A TENAGA
Obat-obatan L.01 Ls 1.000
JUMLAH TENAGA KERJA
B BAHAN
Rompi bh 10.000
Helm bh 10.000
Sepatu bh 10.000
Lain-lain ls 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

Asumsi Angkutan Bekas Bongkaran 15m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.330
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.250
Semen portland Kg 5.000
Pasir beton m3 0.005
Koral beton (kerikil) m3 0.009
Kayu 5/7 (kayu kelas III) m3 0.072
Paku biasa 2” – 5” Kg 0.060
Residu (ter kayu) Liter 0.400
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 me

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.02 OH 0.400
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.250
f 8-10/400 cm
Semen portland Kg 2.500
Seng gelombang lbr 1.200
Pasir Beton m3 0.005
Koral Beton m3 0.009
Kayu 5/7 (kayu kelas III) m3 0.072
Paku biasa 2''-5'' Kg 0.060
Meni Besi ltr 0.450
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.02 OH 0.300
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu f Batang 1.000
8-10/400 cm
Semen portland Kg 2.000
Kawat duri M’ 25.000
Pasir beton m3 0.005
Koral beton m3 0.009
Paku biasa 2” – 5” Kg 0.060
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012
Paku 2''-3'' Kg 0.020
Kayu papan 3/20 m3 0.007
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet)

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.000
Tukang kayu L.02 OH 2.000
Tukang batu L.02 OH 1.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø Batang 1.250
8-10/400 cm
Kayu (kelas III) m3 0.180
Paku biasa Kg 0.080
besi strip Kg 1.100
semen portland Kg 3.000
pasir pasang m3 0.150
pasir beton m3 0.100
koral beton m3 0.150
bata merah bh 30.000
seng pelat lbr 0.250
jendela naco bh 0.200
kaca polos m2 0.080
kunci tanam bh 0.150
plywood 4 mm lbr 0.060
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Ø Batang 3.000
8-10/400 cm
Kayu (kelas III) m3 0.276
Paku biasa Kg 0.700
Seng gelombang Kg 1.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.02 OH 2.000
Kepala tukang L.03 OH 0.200
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.700
diameter 8-10/400 cm
Kayu (kelas III) m3 0.210
Paku biasa Kg 0.300
Semen Portland Kg 10.500
Pasir beton m3 0.030
Koral beton m3 0.050
Seng gelombang Lbr 1.500
seng pelat Lbr 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.02 OH 2.000
Kepala tukang L.03 OH 0.200
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu Batang 1.250
diameter 8-10/400 cm
Kayu (kelas III) m3 0.186
Paku biasa Kg 0.300
Semen Portland Kg 18.000
Pasir beton m3 0.030
Koral beton m3 0.050
Seng gelombang Lbr 1.500
plywood 4 mm Lbr 1.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Bambu diameter Batang 1.250
6-8/600 cm
Tali ijuk m3 0.186
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Tukang kayu L.02 OH 0.300
Kepala tukang L.03 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan kelas m3 0.036
III
Kayu balok 5/7 m3 0.014
kelas III
Paku biasa kg 0.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Batu belah 10/15 cm m3 0.150
Batu pecah mesin 2-3 cm m3 0.090
Pasir pasang m3 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 13.334
Mandor L.04 OH 0.666
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.667
Mandor L.04 OH 0.333
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.14. rub a Pembongkaran 1 m2 plafond

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.14. rub b Pembongkaran 1 m2 dinding / lantai

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.010
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.14. rub c Pembongkaran 1 m2 Atap

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.088
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 0.042
Tukang L.02 0.004
Kepala Tukang L.03 0.002
Mandor L.04 0.042
JUMLAH TENAGA KERJA
B BAHAN
Kawat jaring Lbr 0.143
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.375
Tukang L.02 OH 0.125
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.019
JUMLAH TENAGA KERJA
B BAHAN
Panel beton Lbr 0.986
pracetak
Kolom beton Batang 0.525
pracetak
Semen PC Kg 45.000
Pasir beton m3 0.074
Koral m3 0.146
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.900
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.050
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Mandor L.04 OH 0.032
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.500
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.200
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.330
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.800
Tukang L.02 OH 0.400
Kepala Tukang L.03 OH 0.040
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
Kapur Padam/bakar m3 0.135
Pasir Pasang m3 0.400
Tanah Liat m3 0.948
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Ijuk m3 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.2.3.1.14. Pengurugan 1 m3 sirtu padat

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Sirtu m3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 202.000
Pasir pasang m3 0.485
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 163.000
Pasir pasang m3 0.520
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 136.000
Pasir pasang m3 0.544
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 117.000
Pasir pasang m3 0.561
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 91.000
Pasir pasang m3 0.584
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Kapur (bakar) m3 0.170
Semen Portland kg 0.170
Pasir pasang m3 0.340
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 61.000
Kapur m3 0.147
Pasir pasang m3 0.492
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.500
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Semen Portland Kg 41.000
Kapur m3 0.131
Pasir pasang m3 0.523
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.780
Tukang batu L.02 OH 0.390
Kepala tukang L.03 OH 0.039
Mandor L.04 OH 0.039
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 1.200
Pasir urug m3 0.432
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 K

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 3.400
Tukang batu L.02 OH 0.850
Kepala tukang L.03 OH 0.085
Mandor L.04 OH 0.170
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.480
Semen Portland Kg 194.000
Pasir beton m3 0.312
Kerikil m3 0.468
Besi beton Kg 126.000
Kawat beton Kg 1.800
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.400
Tukang batu L.02 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.119
JUMLAH TENAGA KERJA
B BAHAN
Batu belah m3 0.450
Semen Portland Kg 194.000
Pasir beton m3 0.312
Kerikil m3 0.468
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara de

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 247.000
Pasir beton kg 869.000
Kerikil (Maks 30 kg 999.000
mm)/menggunakan bt.pecah
mesin 2-3
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
1. Semen kg 276.000
Portland
2. Pasir beton kg 828.000
3. Kerikil kg 1,012.000
kg 1,012.000
(Maks 30mm)
4. Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 299.000
Pasir beton kg 799.000
Kerikil (Maks 30 mm) kg 1,017.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
CATATAN
400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.200
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230.000
Pasir beton kg 893.000
Kerikil kg 1,027.000
(Maks 30 mm)/bukan bt.pecah 2-
3
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama d

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 326.000
Pasir beton kg 760.000
Kerikil (Maks kg 1,029.000
30mm)/menggunakan bt.pecah 2-
3
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 352.000
Pasir beton kg 731.000
Kerikil (Maks kg 1,031.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 371.000
Pasir beton kg 698.000
Kerikil (Maks kg 1,047.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 384.000
Pasir beton kg 692.000
Kerikil kg 1,039.000
(Maksimum
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)

Uraian Kode Satuan Koefisien


No
A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 406.000
Pasir beton kg 684.000
Kerikil (Maks kg 1,026.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 413.000
Pasir beton kg 681.000
Kerikil (Maks kg 1,021.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 439.000
Pasir beton kg 670.000
Kerikil (Maks 30 kg 1,006.000
mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama d

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000
Pasir beton kg 667.000
Kerikil (Maks kg 1,000.000
30mm)
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

acetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan


sesuai Tabel berikut:

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 448.000
Pasir beton kg 667.000
Kerikil (maksimum kg 1,000.000
30 mm)
Bahan tambahan Liter 4.500
kimia (efoksi)
Air Liter 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
sir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.100
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.105
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 400.000
Pasir beton m3 0.480
Kerikil (2cm/3cm) m3 0.800
Strorox – 100 kg 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang Batu/Pipa L.02 OH 0.030
Kepala Tukang L.03 OH 0.003
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
150 mm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang Batu/Pipa L.02 OH 0.035
Kepala Tukang L.03 OH 0.004
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
200 mm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.080
Tukang Batu L.02 OH 0.040
Kepala Tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Waterstop lebar m 1.050
230 mm - 320 mm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang besi L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 10.500
(polos/ulir)
Kawat beton kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang besi L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi beton kg 10.500
(polos/ulir)
Kawat beton kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.025
Tukang besi L.02 OH 0.025
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat kg 10.200
baja dilas
Kawat beton kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.520
Tukang kayu L.02 OH 0.260
Kepala tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 – 10 cm kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.520
Tukang kayu L.02 OH 0.260
Kepala tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.045
Paku 5 cm – 10 cm kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 Lbr 0.350
mm
Dolken kayu f 8- Batang 2.000
Batang 2.000
10cm –panj 4 m
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.018
Plywood tebal 9 mm Lbr 0.350
Dolken kayu
f (8–10) cm Batang 2.000
panjang 4 m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken kayu galam,
(8–10) cm panjang Batang 6.000
4m
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.0 OH 0.660
1
Tukang kayu L.0 OH 0.330
2
Kepala tukang L.0 OH 0.033
3
Mandor L.0 OH 0.033
4
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.020
Plywood tebal 9 mm Lbr 0.350
Dolken kayu , f 8–
Batang 3.000
10 cm, panj4 m
Penjaga jarak bekisting/spacer
(dari besi/baut) Buah 4.000

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.030
Paku 5 cm – 12 cm kg 0.400
Minyak bekisting Liter 0.150
Balok kayu kelas II m3 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken kayu, Ø 8–
Batang 2.000
10 cm,panjang 4 m
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III (papan) m3 0.026
Paku 5 cm – 12 cm kg 0.600
Dolken kayu , f 8–10 panjang 4m
Batang 0.500

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.180
Tukang batu L.02 OH 0.020
Tukang kayu L.02 OH 0.020
Tukang besi L.02 OH 0.020
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.002
Paku 5 cm – 12 cm kg 0.010
Minyak bekisting Liter
Besi beton polos kg 3.000
Kawat beton kg 0.450
Semen Portland kg 4.000
Pasir Beton m3 0.006
Kerikil m3 0.009
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.297
Tukang batu L.02 OH 0.033
Tukang kayu L.02 OH 0.033
Tukang besi L.02 OH 0.033
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.003
Paku 5 cm – 12 cm kg 0.020
Minyak bekisting Liter
Besi beton polos kg 3.600
Kawat beton kg 0.050
Semen Portland kg 5.500
Pasir beton m3 0.009
Kerikil m3 0.015
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast in place
pedoman ini hanya untuk pekerjaan produksi yang dilakukan di lapangan, terutama untuk analisa cetakan (be

A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.132
Tukang batu L.02 OH 0.022
Kepala tukang L.03 OH 0.002
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 26.080
Pasir beton Kg 60.800
Kerikil (menggunakan bt. Pecah 2- Kg 82.320
3)
Air L 17.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.165
Tukang batu L.02 OH 0.028
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 32.600
Pasir beton Kg 76.000
Kerikil (maks 30mm) Kg 102.900
Air L 21.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, sl

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.198
Tukang batu L.02 OH 0.033
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 39.120
Pasir beton Kg 91.200
Kerikil (maks 30mm) Kg 123.480
Air L 25.800
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.248
Tukang batu L.02 OH 0.041
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 48.900
Pasir beton Kg 114.000
Kerikil (maks 30 mm) Kg 154.350
Air L 32.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai)


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.007
Tukang kayu L.02 OH 0.076
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Lantai kerja t=10cm m3 0.008
Besi hollow (50 x 50
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi
7 m3 0.005
cm)
Phenol film 12 mm Lbr 0.080
Minyak cetakan
L 0.200
(bekisting)
Dinabolt Ø 12mm
buah 3.882
(10 s.d.15 cm)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali paka

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.004
Tukang kayu L.02 OH 0.038
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi m3 0.005
7 cm)
Phenol film 12 mm Lbr 0.043
Minyak cetakan L 0.200
(bekisting)
Paku (5 s.d.7) cm kg 0.046
Dinabolt Ø 12 mm buah 0.693
(10 s.d.15 cm)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pak

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.004
Tukang kayu L.02 OH 0.038
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 (lebar 5 m3 0.004
cm, tinggi 7 cm)
Phenol film 12 mm Lbr 0.048
Minyak cetakan L 0.200
(bekisting)
Paku (5 s.d.7) cm Kg 0.046
Dinabolt Ø 12 mm buah 0.693
(10-15cm)
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton prac

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.053
Tukang kayu L.02 OH 0.018
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton prac

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.089
Tukang kayu L.02 OH 0.030
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pr

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.071
Tukang kayu L.02 OH 0.024
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.064
Tukang batu L.02 OH 0.244
Tukang vibrator L.02 OH 0.128
Kepala tukang L.03 OH 0.034
Mandor L.04 OH 0.073
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.069
Tukang batu L.02 OH 0.242
Tukang vibrator L.02 OH 0.138
Kepala tukang L.03 OH 0.037
Mandor L.04 OH 0.073
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.061
Tukang batu L.02 OH 0.213
Tukang vibrator L.02 OH 0.122
Kepala tukang L.03 OH 0.033
Mandor/Supervisor/ L.04 OH 0.073
Penyelia
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.08 OH 0.067
Pembantu operator
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067
Tukang batu L.02 OH 0.067
Tukang ereksi L.02 OH 0.134
Kepala tukang L.03 OH 0.067
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.676
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.067
Sewa pipe support buah 1.100
hari
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

ks kenaikan lantai ereksi komponen untuk pelat pracetak


Indeks kenaikan lantai Indeks
Lant ereksi pelat Lantai kenaika
ai n lantai
ereksi
1 1 13 1.114
2 1 14 1.134
3 1 15 1.155
4 1 16 1.176
5 1 17 1.197
6 1 18 1.219
7 1 19 1.241
8 1.018 20 1.264
9 1.037 21 1.287
10 1.055 22 1.310
11 1.075 23 1.334
12 1.094 24 1.358

A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.0 OH 0.061
8
Pembantu operator crane L.0 OH 0.061
9
Pekerja L.0 OH 0.061
1
Tukang batu L.0 OH 0.061
2
Tukang ereksi L.0 OH 0.122
2
Kepala tukang L.0 OH 0.061
3
Mandor L.0 OH 0.061
4
JUMLAH TENAGA KERJA
B BAHAN
Solar L 6.110
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit 0.061
hari
Sewa scaffolding unit 1.100
hari
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

ks kenaikan lantai ereksi komponen untuk balok pracetak


Indeks kenaikan lantai Indeks
Lant ereksi balok Lantai kenaika
ai n lantai
ereksi
1 1 13 1.068
2 1 14 1.080
3 1 15 1.092
4 1 16 1.104
5 1 17 1.116
6 1 18 1.129
7 1 19 1.141
8 1.011 20 1.154
9 1.022 21 1.166
10 1.034 22 1.179
11 1.045 23 1.192
12 1.057 24 1.206

A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.08 OH 0.083
Pembantu operator L.09 OH 0.083
crane
Pekerja L.01 OH 0.083
Tukang batu L.02 OH 0.083
Tukang ereksi L.02 OH 0.166
Kepala tukang L.03 OH 0.083
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Solar L 8.277
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.083

Sewa pipe support buah hari 2.200


JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

s kenaikan lantai ereksi komponen untuk kolom pracetak


Indeks kenaikan lantai Indeks
Lant ereksi kolom Lantai kenaikan
ai lantai
ereksi
1 1 13 1.162
2 1 14 1.191
3 1 15 1.221
4 1 16 1.252
5 1 17 1.284
6 1 18 1.317
7 1 19 1.350
8 1.025 20 1.384
9 1.051 21 1.419
10 1.078 22 1.455
11 1.105 23 1.492
12 1.133 24 1.530

A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator
L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)

No Uraian Kode Satuan Koefisien

A TENAGA
Operator crane L.08 OH 0.019
Pembantu operator L.09 OH 0.019
crane
Pekerja L.01 OH 0.019
Tukang batu L.02 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Solar L 1.897
JUMLAH HARGA BAHAN
C PERALATAN
Sewa crane unit hari 0.019
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.20. Bahan 1 m3 grout campuran

No Uraian Kode Satuan Koefisien

A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.000
Screening Kg 650.000
Air L 350.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.21. Bahan 1 m3 grout (tidak campuran)

No Uraian Kode Satuan Koefisien

A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.000
Air L 400.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Tukang batu L.02 OH 0.367
Kepala tukang L.03 OH 0.074
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.147
Tukang kayu L.02 OH 0.147
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004
Paku (5 s.d.7) cm Kg 0.264
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.1.2.24. Upah 1 titik joint dengan sling

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.220
Tukang kayu L.02 OH 0.022
Tukang besi L.02 OH 0.220
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1. Pemasangan 1 kg besi profil

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang las L.03 OH 0.060
konstruksi
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi Profil Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang las L.03 OH 0.060
konstruksi
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Besi baja IWF Kg 1.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang besi L.03 OH 0.100
konstruksi
Kepala tukang L.03 OH 0.001
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Solar Liter 1.000
Minyak pelumas Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN
1. Sewa alat Jam 0.800
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.050
Tukang las biasa L.03 OH 1.050
Kepala tukang L.03 OH 0.105
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Besi siku L 30.30.3 Kg 15.000
Besi pelat baja Kg 32.800
Kawat las Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.040
Tukang las (bersertifikat) L.03 OH 0.020

Kepala tukang L.03 OH 0.002


Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Kawat las listrik Kg 0.400
Solar Liter 0.300
Minyak pelumas Liter 0.040
JUMLAH HARGA BAHAN
C PERALATAN
Sewa alat Jam 0.170
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.650
Tukang las biasa L.03 OH 0.650
Kepala tukang L.03 OH 0.065
Mandor L.04 OH 0.032
JUMLAH TENAGA KERJA
B BAHAN
Besi scuare tube m 4.760
Besi lis kaca (1 x 1) cm m 4.522
Pengelasan cm 20.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.200
Tukang las biasa L.03 OH 1.200
Kepala tukang L.03 OH 0.120
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pintu gulung besi m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.440
Tukang L.03 OH 0.440
Kepala tukang L.03 OH 0.044
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Pintu lipat m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.080
Tukang L.03 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Sunscreen alluminium m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Tukang khusus L.03 OH 1.000
alumunium
Kepala tukang L.03 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Rolling door alluminium m2 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium


Catatan : untuk pekerjaan ini langsung nge link dari bahan, karena harga bahan merupakan harga terpasang yang telah di tambahkan Overhe

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.043
Tukang khusus alumunium L.03 OH 0.043
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m1 1.100
Skrup fixer buah 2.000
Sealant Tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.11. rub Pemasangan 1 m2 kaca rayband

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.043
Tukang khusus alumunium L.03 OH 0.043
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Kaca rayband m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.085
Tukang khusus L.03 OH 0.085
alumunium
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Profil alluminium m 4.400
Alluminium strip m 14.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.085
Tukang khusus L.03 OH 0.085
alumunium
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Pintu alluminium m 4.400
Profil kaca m 4.500
Sealant Tube 0.270
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.350
Tukang L.03 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Venetions blinds dan m2 1.000
vertical blinds (tirai)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.670
Tukang las L.03 OH 1.670
Kepala tukang L.03 OH 0.167
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Besi strip kg 6.177
Pengelasan cm 27.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.100
Tukang L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kawat nyamuk m2 1.100
Pengelasan cm 11.110
Baja strip (0,2 x 2) cm kg 1.716
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jendela nako 1.100
m2
(rangka + kaca 5 mm)
Paku skrup 10.000
buah
1 cm – 2,5 cm
Besi strip m 7.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050
Paku 1 cm - 2,5 cm kg 0.015
Papan kayu kelas II
m3 0.019
atau III
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 4

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat m 1.050
Paku 1 cm – 2,5 cm kg 0.010
Besi strip kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang besi L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal M1 3.500
hollow 40.40.2 mm
Assesoris Ls 1.000
(perkuatan, las dll)
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm,

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.350
Tukang besi L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Rangka hollow 40.40.2 mm M1 4.000

Paku Beton bh 4.000


Scrup bh 8.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.734
Tukang besi L.02 OH 0.734
Kepala tukang L.03 OH 0.073
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai dingin C75 kg 3.065
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.760
Tukang besi L.02 OH 0.760
Kepala tukang L.03 OH 0.076
Mandor L.04 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canai
kg 4.050
dingin C75
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.2.1.22. rub Covering ACP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.390
Tukang besi L.02 OH 0.700
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Alumunium Composit m2 1.100
Hollow Galvanis 4x4 mm btg 0.800
Braket Siku/Spigot btg 0.267
Paku Skrup Beton kg 0.080
Paku Skrup kg 0.110
Sealent tube 0.250
JUMLAH HARGA BAHAN
C PERALATAN
Stager set 0.020
Listrik Kerja ls 1.000
Alat Bantu Lain ls 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 43.500
Pasir pasang m3 0.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 32.950
Pasir pasang m3 0.091
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala bukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 26.550
Pasir Pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 22.200
Pasir pasang m3 0.102
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 18.500
Pasir pasang m3 0.122
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campu
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang batu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 140.000
Semen Portland Kg 10.080
Kapur padam m3 0.028
Pasir pasang m3 0.093
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 18.950
Pasir pasang m3 0.038
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 14.370
Pasir pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 11.500
Pasir pasang m3 0.043
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 9.680
Pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campu

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 8.320
Pasir pasang m3 0.049
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 6.500
Pasir pasang m3 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen Portland Kg 4.500
Kapur padam m3 0.015
Pasir pasang m3 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen merah Kg 0.018
Kapur padam m3 0.018
Pasir pasang m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campur

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen merah Kg 0.014
Kapur padam m3 0.014
Pasir pasang m3 0.028
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP

Uraian Kode Satuan


Koefisien Rubahan
No
A TENAGA
Pekerja L.01 OH 0.350
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
HB-20 bh 12.500
Semen Portland Kg 3.032
Pasir pasang m3 0.073
Besi angker diameter 8 Kg 0.028
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
HB20 : Hollow Block tebal 20cm
A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP

No Uraian Kode Satuan


Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.350
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
HB-20 buah 12.500
Semen Portland Kg 2.426
Pasir pasang m3 0.077
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP

No Uraian Kode Satuan


Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.320
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
HB-15 buah 12.500
Semen Portland Kg 2.274
Pasir pasang m3 0.055
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
HB15: Hollow Block tebal 15cm

A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP

No Uraian Kode Satuan


Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.320
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
HB-15 buah 12.500
Semen Portland Kg 1.820
Pasir pasang m3 0.058
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP

No Uraian Kode Satuan


Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
HB-10 buah 12.500
Semen Portland Kg 1.516
Pasir pasang m3 0.036
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
Hb10 : Hollow Block tebal 10 cm

A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP

No Uraian Kode Satuan


Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
HB-10 buah 12.500
Semen Portland Kg 1.213
Pasir pasang m3 0.039
Besi angker diameter 8 Kg 0.280
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster m3 30.000
Semen Portland Kg 11.000
Pasir pasang m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata berongga m3 30.000
Semen Portland Kg 11.000
Pasir pasang m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campura

No Uraian Kode Satuan


Koefisien Rubahan
No Uraian Kode Satuan
Koefisien Rubahan

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Berongga buah 70.000
Semen Portland Kg 1.400
Pasir pasang m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap p

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.670
Tukang batu L.02 OH 1.300
Kepala tukang L.03 OH 0.130
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 7,5cm buah 8.400
Mortar siap pakai Kg 0.473
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pa

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.671
Tukang batu L.02 OH 1.300
Kepala tukang L.03 OH 0.130
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bata ringan tebal 10cm buah 8.400
Mortar siap pakai Kg 0.063
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm

Uraian Kode Satuan Koefisien


No

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 15.504
PP m3 0.016
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.224
PP m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm

Uraian Kode Satuan Koefisien


No

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 7.776
PP m3 0.023
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 6.240
PP m3 0.024
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184
PP m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm

Uraian Kode Satuan Koefisien


No

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 4.416
PP m3 0.027
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.936
PP m3 0.028
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.456
PP m3 0.029
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.760
KP m3 0.003
PP m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 3.000
KP m3 0.005
PP m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.009
KP m3 0.009
PP m3 0.009
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.007
KP m3 0.007
PP m3 0.015
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm

No Uraian Kode Satuan Koefisien


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 13.632
PP m3 0.027
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 10.368
PP m3 0.031
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 8.320
PP m3 0.032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang batu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 6.912
PP m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.888
PP m3 0.036
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.440
Tukang batu L.03 OH 0.220
Kepala tukang L.03 OH 0.022
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
SM m3 0.009
KP m3 0.009
PP m3 0.018
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.03 OH 0.075
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
PC Kg 5.184
PP m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.03 OH 0.400
Kepala tukang L.03 OH 0.040
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 0.500
Pasir pasang m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.03 OH 0.225
Kepala tukang L.03 OH 0.023
Mandor L.04 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.000
Batu granit Kg 15.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.03 OH 0.225
Kepala tukang L.03 OH 0.023
Mandor L.04 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 10.000
Batu traso Kg 15.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 4.320
Pasir pasang m3 0.006
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.03 OH 0.075
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.108
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang batu L.03 OH 0.035
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 1.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.03 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 6.340
Pasir pasang m3 0.012
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.27. Pemasangan 1 m2 acian

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang batu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.28. Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH
Tukang batu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
MSP Kg
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.2.29. Pemasangan 1 m2 plesteran acian mortar siap pakai (MSP)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH
Tukang batu L.03 OH
Kepala tukang L.03 OH
Mandor L.04 OH
JUMLAH TENAGA KERJA
B BAHAN
MSP Kg
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DIND

A.4.4.3.1. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.250
Tukang atu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu buah 6.630
Semen Portland kg 9.800
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Bh 11.870
Semen Portland kg 10.000
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.270
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu buah 26.500
Semen Portland kg 10.400
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.4. Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang datu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.270
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Ubin warna Bh 26.500
Semen Portland kg 10.400
Semen warna Kg 1.000
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.7. Pemasangan 1 m2 lantai ubin teraso ukuran 40 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.8. Pemasangan 1 m2 lantai ubin teraso ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teraso Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.10. Pemasangan 1 m2 lantai ubin granit ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.10. rub Pemasangan 1 m2 lantai ubin granit ukuran 60 cm x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin granit bh 3.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.11.
Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.12. Pemasangan 1 m2 lantai ubin teralux ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.13. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60 cm x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.240
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 3.100
Semen Portland kg 9.600
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.14. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.125
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 6.630
Semen Portland kg 9.800
Semen warna Kg 1.300
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.15. Pemasangan 1 m2 lantai ubin teralux marmer ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.260
Tukang batu L.02 OH 0.130
Kepala tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin teralux marmer Bh 11.870
Semen Portland kg 10.000
Semen warna Kg 1.500
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.16. Pemasangan 1 m’ plint ubin PC abu-abu ukuran 15 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 5.300
Semen Portland kg 1.650
Pasir pasang M3 0.004
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.17. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 3.530
Semen Portland kg 1.240
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.18. Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin PC Bh 2.650
Semen Portland kg 1.240
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.19. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 20cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.150
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.20. Pemasangan 1 m’ plint ubin warna ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.21. Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin warna Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.22. Pemasangan 1 m’ plint ubin teraso ukuran 10cm x 30cm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 3.530
Semen Portlan kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.23. Pemasangan 1 m’ plint ubin teraso ukuran 10 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin teraso Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.24. Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.25. Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin granit Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.26. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10cm x 40cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 2.630
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.27. Pemasangan 1 m’ plint ubin teralux kerang ukuran 10 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux kerang Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.28. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10 cm x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 1.700
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.29. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10 cm x 40 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 2.650
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.30. Pemasangan 1 m’ plint ubin teralux marmer ukuran 10cm x 30cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint teralux marmer Bh 3.530
Semen Portland kg 1.140
Semen warna Kg 0.100
Pasir pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.31. Pemasangan 1m2 lantai teraso cor di tempat, tebal 3 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.360
Tukang batu L.02 OH 0.180
Kepala tukang L.03 OH 0.018
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Teraso cor M3 0.036
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 53.000
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 106.000
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 3.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.34. Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik doos 1.050
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Doos 1.050
Semen Portland Kg 10.000
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Doos 1.050
Semen Portland Kg 10.400
Pasir pasang M3 0.045
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.37. Pemasangan 1m2 lantai keramik ukuran 10 cm x 33 cm untuk variasi/b

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.050
Tukang batu L.02 OH 0.525
Kepala tukang L.03 OH 0.053
Mandor L.04 OH 0.053
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 33.000
Semen Portland Kg 9.800
Pasir pasang M3 0.045
Semen warna Kg 4.370
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 11.870
Semen Portland Kg 14.150
Pasir pasang M3 0.039
Semen warna Kg 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 10.600
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik Bh 5.300
Semen Portland Kg 0.570
Pasir pasang M3 0.002
Semen warna Kg 0.013
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.750
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.038
JUMLAH TENAGA KERJA
B BAHAN
Internal cove Bh 5.300
Semen Portland Kg 1.140
Pasir pasang M3 0.003
Semen warna Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Marmer Bh 1.060
Semen Portland Kg 8.190
Pasir pasang M3 0.045
Semen warna Kg 0.134
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.44. Pemasangan 1 m2 lantai karpet

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.170
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.050
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet)


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Underlayer m2 1.050
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.050
Lem Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Parquet m2 1.050
Lem Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.48. Pemasangan 1 m2 dinding porselen 11 cm x 11 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Porslen Doos 1.050
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Porslen buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Porslen buah 26.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 106.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.900
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 53.000
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 26.500
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.54. rub a Pemasangan 1 m2 dinding keramik 20 cm x 25 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 26.500
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.54. rub b Pemasangan 1 m2 dinding keramik 30 cm x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik buah 13.500
Semen Portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.300
Tukang batu L.02 OH 0.650
Kepala tukang L.03 OH 0.065
Mandor L.04 OH 0.065
JUMLAH TENAGA KERJA
B BAHAN
Marmer buah 1.060
Semen Portland Kg 12.440
Pasir pasang M3 0.025
Semen warna Kg 0.650
Paku 12 cm buah 3.030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Bata pelapis buah 63.000
Semen Portland Kg 12.440
Pasir pasang M3 0.025
Semen warna Kg 2.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.57. Pemasangan 1 m2 dinding batu paras

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu paras buah 1.100
Semen Portland Kg 11.750
Pasir pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel hitam Buah 1.100
Semen Portland Kg 11.750
Pasir pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub a Pemasangan 1 m2 Batu Alam Andesit Bakar 10 x 10 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 10x10 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub b Pemasangan 1 m2 Batu Alam Andesit Bakar 10 x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 10x20 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub c Pemasangan 1 m2 Batu Alam Andesit Bakar 15 x 30 cm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 15x30 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub d Pemasangan 1 m2 Batu Alam Andesit Bakar 20 x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 20x40 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.4.3.58. rub e Pemasangan 1 m2 Batu Alam Andesit Bakar 30 x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 30x30 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub f Pemasangan 1 m2 Batu Alam Andesit Bakar 30 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 30x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub g Pemasangan 1 m2 Batu Alam Andesit Bakar 40 x 40 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 40x40 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub h Pemasangan 1 m2 Batu Alam Andesit Bakar 40 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 40x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub i Pemasangan 1 m2 Batu Alam Andesit Bakar 50 x 50 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 50x50 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.58. rub j Pemasangan 1 m2 Batu Alam Andesit Bakar 60 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.450
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit 60x60 cm m2 1.060
Semen kg 2.000
Pasir m3 0.017
JUMLAH HARGA BAHAN
C PERALATAN
ls 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang batu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Vynil buah 11.870
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.350
Tukang batu L.02 OH 0.175
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.200
Lem Kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.61. Pemasangan 1m2 floor harderner

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner Kg 5.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.02 OH 0.080
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Vynil buah 1.760
Lem Kg 0.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang batu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas 1 M3 0.003
Paku/skrup 5 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 6 cm M2 1.010
Pasir beton M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 8 cm natural M2 1.010
Pasir beton M3 2.070
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 6cm berwarna M2 1.010
Pasir beton M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.500
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Paving block 8 cm berwarna M2 1.010
Pasir beton M3 2.070
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 0.100
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.4.3.67. rub a Pemasangan 1 m' Kansteen 40.20.10

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.050
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Kansteen 40.20.10 bh 2.500
Pasir Beton M3 0.001
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.030
Tukang kayu L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100
Paku tripleks kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 12.000
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.02 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 5.800
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Akustik Lembar 1.500
Paku tripleks kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Tripleks Lembar 0.375
Paku tripleks kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.02 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan m3 0.015
Paku tripleks kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm,

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364
Paku skrup kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut ran

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Tukang besi L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Profil Allum "T" m 3.600
Kawat Ø 4 mm kg 0.150
Ramset Buah 1.050
Akustik 60 x 120 Lembar 1.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.05
Paku kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.1.9. rub Pemasangan 1 m’ list langit-langit profil gypsum

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List profil gypsum m' 1.10
Semen PC (50 kg) kg 0.005
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

10 Pemasangan 1 m2 rangka langit-langit besi hollow 40.40


pada kelompok Pekerjaan Besi dan Alumunium (A.9.21)

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 25.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng kodok buah 25.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Genteng palentong buah 12.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung Buah 5.000
Semen Portland Kg 8.000
Pasir pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung buah 5.000
Semen Portland Kg 8.000
Pasir pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Genteng bubung buah 4.000
Semen Portland Kg 8.000
Pasir pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.067
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 90 x 180 Lbr 0.600
Paku biasa ½”-1” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.500
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.075
Kepala tukang L.11 OH 0.008
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.600
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.600
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.750
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.350
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.420
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.440
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.510
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.800
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.370
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.380
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.460
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.490
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.007
JUMLAH TENAGA KERJA
B BAHAN
Asbes gel 92 x 250 Lbr 0.570
Paku pancing 6 x 23 Kg 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.400
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Bubung stel gel. Lbr 2.050
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.200
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.150
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.084
Tukang kayu L.03 OH 0.125
Kepala tukang L.11 OH 0.013
Mandor L.15 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Nok paten 92 cm Lbr 1.100
Paku skrup 3,5” buah 6.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.30. Pemasangan 1 m2 genteng beton

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Genteng beton buah 11.000
Paku biasa 2”-5” Kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.31. Pemasangan 1 m2 genteng aspal

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.300
Kepala tukang L.11 OH 0.003
Mandor L.15 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Genteng aspal Buah 6.900
Plywood 6 mm Lbr 0.350
Paku biasa ½”-1” Kg 0.030
Plastic aerator buah 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal buah 1.300
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal buah 2.000
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.33. rub a Pemasangan 1 m2 Atap Polycarbonet

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang Las L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Polycarbonet m2 1.000
Paku Skrup bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.33. rub b Pemasangan 1 m2 Atap Galvalume 0,25mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang Las L.03 OH 0.100
Kepala tukang L.11 OH 0.010
Mandor L.15 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Galvalume m2 1.000
Paku Skrup bh 10.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.166
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Sirap kayu buah 30.000
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.35. Pemasangan 1 m’ nok genteng beton

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.400
Tukang kayu L.03 OH 0.200
Kepala tukang L.11 OH 0.020
Mandor L.15 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng beton buah 3.500
Paku biasa ½”-1” Kg 0.050
Semen PC Kg 10.800
Pasir pasang M3 0.032
Semen warna Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.36. Pemasangan 1 m’ nok genteng aspal

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.125
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng aspal buah 2.000
Paku biasa ½”-1” Kg 0.050
Kayu balok borneo M3 0.004
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.5.2.37. Pemasangan 1 m’ nok genteng metal

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang kayu L.03 OH 0.150
Kepala tukang L.11 OH 0.015
Mandor L.15 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal buah 1.100
Paku biasa ½”-1” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.38. Pemasangan 1 m’ nok sirap

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.125
Tukang kayu L.03 OH 0.250
Kepala tukang L.11 OH 0.025
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3" x 6” Lbr 0.400
Paku biasa ½”-1” Kg 0.050
Paku biasa 2”-5” Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.03 OH 0.060
Kepala tukang L.11 OH 0.006
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng gel 3”x6” Lbr 0.700
Paku biasa ½”-1” Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.40. Pemasangan 1 m’nok atap seng

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.070
Kepala tukang L.11 OH 0.007
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300
Paku biasa ½”-1” Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.41. Pemasangan 1 m2 atap alumunium

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.750
Kepala tukang L.11 OH 0.080
Mandor L.15 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050
Paku hak panjang 15 cm Kg 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.42. Pemasangan 1 m’ nok alumunium

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 1.000
Kepala tukang L.11 OH 0.100
Mandor L.15 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40 x 18 buah 1.200
Paku hak panjang 15 cm Kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.050
Kepala tukang L.11 OH 0.005
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Aluminium foil M2 1.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.5.2.44. Pemasangan 1 m1 Listpank Woodplank

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.050
Kepala tukang L.11 OH 0.005
Mandor L.15 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Woodplank m1 1.050
Skrup bh 4.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 7.000
Tukang kayu L.03 OH 21.000
Kepala tukang L.03 OH 2.100
Mandor L.04 OH 0.350
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Paku 10 cm Kg 1.250
Lem kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.000
Tukang kayu L.03 OH 18.000
Kepala tukang L.03 OH 1.800
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200
Paku 10 cm Kg 1.250
Lem kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.350
Tukang kayu L.03 OH 1.050
Kepala tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Paku 5 – 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas II


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.350
Tukang kayu L.03 OH 1.050
Kepala tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Paku 5 – 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.03 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.040
Lem kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.03 OH 2.400
Kepala tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.024
Lem kayu Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.000
Tukang kayu L.03 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.064
Lem kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tert

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang kayu L.03 OH 2.100
Kepala tukang L.03 OH 0.210
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 cm – 2,5 cm kg 0.030
Lem kayu kg 0.500
Plywood tebal 4 mm Lembar 1.000
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I ata

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.80
Tukang kayu L.03 OH 2.40
Kepala tukang L.03 OH 0.24
Mandor L.04 OH 0.04
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.026
Paku 1 cm – 2,5 cm kg 0.030
Lem kayu kg 0.500
Plywood 4 mm Lembar 1.000
(90 x 220) cm
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.670
Tukang kayu L.03 OH 2.000
Kepala tukang L.03 OH 0.200
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.060
Paku 1 – 2,5 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.800
Tukang kayu L.03 OH 2.400
Kepala tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 – 2,5 cm kg 0.030
Lem kayu kg 0.300
Teakwood 4 mm Lembar 1.000
90 x 220 cm
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu k

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.850
Tukang kayu L.03 OH 2.550
Kepala tukang L.03 OH 0.255
Mandor L.04 OH 0.043
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.025
Paku 1 – 2,5 cm kg 0.030
Lem kayu kg 0.800
Teakwood 4 mm Lembar 1.000
90 x 220 cm
Formika Lembar 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II d

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 4.000
Tukang kayu L.03 OH 12.000
Kepala tukang L.03 OH 1.200
Mandor L.04 OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.700
Tukang kayu L.03 OH 20.100
Kepala tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.200
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.700
Tukang kayu L.03 OH 20.100
Kepala tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 1.100
Besi strip tebal 5 mm kg 15.000
Paku 12 cm kg 3.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014
Reng 2 x 3 cm m3 0.036
Paku 5 dan 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014
Reng (3 x 4) cm m3 0.057
Paku 5 dan 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.120
Tukang kayu L.03 OH 0.120
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas II m3 0.014
Paku 5 - 10 cm m3 0.057
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II ata

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.075
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015
Paku 7 cm – 10 cm kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016
Paku 7 – 10 cm kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011
Paku 5 dan 7 cm kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.011
Paku 5 dan 7 cm kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.150
Tukang kayu L.03 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu m3 0.028
Paku 5 dan 7 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang kayu L.03 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu, 6 x 12 m3 0.028
Paku 5 dan 10 kg 0.150
Plywood 4 mm, Lembar 0.860
120 x 240
Lem kayu kg 0.560
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.600
Tukang kayu L.03 OH 1.800
Kepala tukang L.03 OH 0.180
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu m3 0.007
Paku 5 dan 10 kg 0.100
Paku skrup 10 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240)

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.025
Tukang kayu L.03 OH 0.075
Kepala tukang L.03 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4 mm m3 0.400
Paku 1 dan 2,5 kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.03 OH 0.050
Kepala tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Bilik bambu m2 1.500
Kaso-kaso 5 x 7 m3 0.014
Paku kg 0.012
List kayu 2/4 m3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1. Pemasangan 1 buah kunci tanam antik

No Uraian Kode Satuan Koefisien

A TENAGA KERJA
Pekerja L.01 OH 0.060
Tukang kayu L.02 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0.010
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam biasa buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

No Uraian Kode Satuan Koefisien

A TENAGA KERJA
Pekerja L.01 OH 0.005
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.4. Pemasangan 1 buah kunci silinder

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0.005
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci silinder buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.5. Pemasangan 1 buah engsel pintu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.010
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.7. Pemasangan 1 buah engsel angin


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Engsel angin buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.8. Pemasangan 1 buah spring knip

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Spring knip buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.9. Pemasangan 1 buah kait angin


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kait angin buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.10. Pemasangan 1 buah door closer

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Door closer set 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel)


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang kayu L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kunci slot buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.12. Pemasangan 1 buah door holder

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang kayu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Door holder buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.13. Pemasangan 1 buah door stop


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.010
Tukang kayu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Door stop buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.14. Pemasangan 1 buah rel pintu sorong

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang kayu L.02 OH 0.600
Kepala tukang L.03 OH 0.060
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Rel pintu sorong Set 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.15. Pemasangan 1 buah kunci lemari


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.025
Tukang kayu L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kunci lemari Set 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 3 mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.017
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100
Sealant Kg 0.070
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.025
Tukang kayu L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Kaca buram 12 mm m2 1.100
Sealant Kg 0.070
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.017
Tukang kayu L.02 OH 0.170
Kepala tukang L.03 OH 0.017
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 8 mm m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.015
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kaca wireglassed 5 mm m2 1.100
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.075
Tukang kayu L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Kaca patri 5mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN

C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.0 OH 0.070
1
Tukang cat L.0 OH 0.009
2
Kepala tukang L.0 OH 0.006
3
Mandor L.0 OH 0.003
4
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup (setara avian) Kg 0.260
Kuas buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.0 OH 0.070
1
Tukang cat L.0 OH 0.105
2
Kepala tukang L.0 OH 0.004
3
Mandor L.0 OH 0.003
4
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamuur Kg 0.150
Cat dasar Kg 0.170
Cat penutup (setara avian) Kg 0.350
Kuas buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Teak oil L 0.360
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.060
Kepala tukang L.03 OH 0.016
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Politur L 0.150
Politur jadi L 0.372
Ampelas Lbr 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Residu atau ter L 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.160
Tukang cat L.02 OH 0.160
Kepala tukang L.03 OH 0.016
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Vernis L 0.150
Dempul Kg 0.050
Ampelas Lbr 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.100
Cat dasar Kg 0.100
Cat penutup Kg 0.260
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.028
Tukang cat L.02 OH 0.042
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120
Cat penutup Kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.028
Tukang cat L.02 OH 0.042
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kalkarium Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.150
Tukang cat L.02 OH 0.001
Kepala tukang L.03 OH 0.000
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.150
Ampelas Lbr 0.100
Alang-alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.040
Tukang cat L.02 OH 0.005
Kepala tukang L.03 OH 0.001
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kapur sirih Kg 0.300
Ampelas Lbr 0.200
Alang-alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.15. Pemasangan 1 m2 wallpaper

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Wall paper m2 1.200
Lem Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.200
Kepala tukang L.03 OH 0.020
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100
Kwas buah 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.250
Tukang cat L.02 OH 0.225
Kepala tukang L.02 OH 0.023
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100
Pengencer L 0.010
Kwas buah 0.010
Perancah kayu m3 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Tukang cat L.02 OH 0.250
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Menie A Kg 0.100
Menie B Kg 0.100
Cat Kg 0.080
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang cat L.02 OH 0.060
Kepala tukang L.03 OH 0.012
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.300
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang cat L.02 OH 0.800
Kepala tukang L.03 OH 0.080
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.110
Cat antara Kg 0.170
Cat penutup Kg 0.080
Kwas buah 0.010
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang cat L.02 OH 0.700
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
Pengencer L 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.21. rob Pengecatan 1 m2 dinding Baru

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.21. rob Pengecatan 1 m2 dinding Lama

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.200
Cat penutup 2 x Watershield Kg 0.260
Ampelas lbr 0.100
Roll Cat bh 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.21. rob Pengecatan 1 m2 plafond

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.020
Tukang cat L.02 OH 0.063
Kepala tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.000
Tukang cat L.02 OH 12.000
Kepala tukang L.03 OH 1.200
Mandor L.04 OH 0.100
JUMLAH TENAGA KERJA
B BAHAN
Wood filler kg 1.500
Woodstain kg 1.500
Sanding kg 1.500
Melamic kg 2.400
Thinner L 2.000
Ampelas Lbr 6.000
Lbr JUMLAH HARGA BAHAN
C PERALATAN
Compressor jam
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 3.300
Tukang batu L.02 OH 1.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.000
Perlengkapan Ls 15% x closet
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen

No Uraian Kode Satuan Koefisien

TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Bata merah buah 7.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 4. (K3) Pemasangan 1 buah urinoir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang batu L.02 OH 1.000
Kepala tukang L.03 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.200
Tukang batu L.02 OH 1.450
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 6. (K3) Pemasangan 1 buah bathcuip porselen

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.075
Tukang batu L.02 OH 0.750
Kepala tukang L.03 OH 0.075
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Bathcuip Unit 1.000
Perlengkapan % 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.000
Tukang batu L.02 OH 4.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.900
JUMLAH TENAGA KERJA
B BAHAN
Bak fiberglass Unit 1.000
Perlengkapan Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.000
Tukang batu L.02 OH 3.000
Kepala tukang L.03 OH 0.300
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 150.000
Semen portlan Kg 120.000
Pasir pasang M3 0.300
Porselen 11x11 bh 360.000
Semen warna Kg 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.000
Tukang batu L.02 OH 4.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.900
JUMLAH TENAGA KERJA
B BAHAN
Bak fiberglass Unit 1.000
Perlengkapan Ls 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang batu L.02 OH 0.450
Kepala tukang L.03 OH 0.045
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bak air fiberglass Unit 1.000
Perlengkapan % 0.120
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 11. (K3) Pemasangan 1 buah bak beton volume 1 m3

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 3.500
Tukang batu L.02 OH 4.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Beton 1:2:3 M3 0.900
Baja tulangan Kg 180.000
Kayu bekisting M2 8.000
Ubin porselen buah 500.000
Perlengkapan % 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.030
Tukang batu L.02 OH 0.300
Kepala tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000
Waterdrain buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang batu L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Bak cuci piring Unit 1.000
Waterdrain buah 1.000
Semen portland Kg 20.000
Pasir pasang M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 14. Pemasangan 1 buah floor drain

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.010
Tukang batu L.02 OH 0.100
Kepala tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Floor drain Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.160
Tukang batu L.02 OH 0.720
Kepala tukang L.03 OH 0.072
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 40.000
Semen portland Kg 44.000
Pasir pasang M3 0.070
Pasir beton M3 0.060
Kerikil M3 0.070
Baja tulangan Kg 1.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 c
No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.200
Tukang cat L.02 OH 1.500
Kepala tukang L.03 OH 0.011
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.000
Semen portland Kg 77.000
Pasir pasang M3 0.130
Pasir beton M3 0.090
Kerikil M3 0.020
Baja tulangan Kg 2.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.200
Tukang batu L.02 OH 1.150
Kepala tukang L.03 OH 0.011
Mandor L.04 OH 0.016
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 123.000
Semen portland Kg 114.000
Pasir pasang M3 0.184
Pasir beton M3 0.120
Kerikil M3 0.033
Baja tulangan Kg 4.850
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis ½” M 1.000
Perlengkapan Ls 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”

No Uraian Kode Satuan Koefisien


A TENAGA KERJA
Pekerja L.01 OH 0.010
Tukang batu L.02 OH 0.400
Kepala tukang L.03 OH 0.040
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3/4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.054
Tukang las L.02 OH 0.090
Mandor L.03 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 1” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.108
Tukang las L.02 OH 0.180
Mandor L.03 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 11/2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 3” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 23. rub a Pemasangan 1 m’ pipa galvanis diameter 2 1/2”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 23. rub b Pemasangan 1 m’ pipa galvanis diameter 2”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 2” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 24. rub Pemasangan 1 m’ pipa galvanis diameter 6”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.135
Tukang las L.02 OH 0.225
Mandor L.03 OH 0.023
JUMLAH TENAGA KERJA
B BAHAN
Pipa galvanis 4” M 1.000
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.036
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.030
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.036
Tukang batu L.02 OH 0.060
Kepala tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.054
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 11/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.054
Tukang batu L.02 OH 0.090
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 21/2” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang batu L.02 OH 0.135
Kepala tukang L.03 OH 0.014
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4” M 1.200
Perlengkapan % 0.350
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.080
Tukang batu L.02 OH 0.040
Kepala tukang L.03 OH 0.004
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah buah 1.600
Semen portlan Kg 35.000
Pasir pasang M3 0.014
Pasir urug M3 0.014
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.060
Tukang batu L.02 OH 0.030
Kepala tukang L.03 OH 0.003
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa tanah dia 15 buah 1.600
Semen portlan Kg 0.680
Pasir pasang M3 0.013
Pasir urug M3 0.011
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.140
Tukang batu L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 7.000
JUMLAH TENAGA KERJA
B BAHAN
Pipa beton dia. 15-20 buah 1.100
Bata merah M3 0.027
Semen portlan Kg 3.920
Pasir pasang M3 0.056
Pasir urug M3 0.024
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.380
Tukang batu L.02 OH 0.190
Kepala tukang L.03 OH 0.019
Mandor L.04 OH 0.019
JUMLAH TENAGA KERJA
B BAHAN
Pipa beton dia. 30-100 buah 1.100
Bata merah M3 0.550
Semen portlan Kg 10.300
Pasir pasang M3 0.061
Pasir urug M3 0.069
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


A.8.4.1.1 rub a (K3) Pemasangan 1 m pipa PVC Ø 22 mm, 1/2 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 22 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.1 rub b (K3) Pemasangan 1 m pipa PVC Ø 26 mm, 3/4 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 26 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.1 rub c (K3) Pemasangan 1 m pipa PVC Ø 32 mm, 1 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 32 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.1 rub d (K3) Pemasangan 1 m pipa PVC Ø 42 mm, 1 3/4 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 42 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.1 rub e (K3) Pemasangan 1 m pipa PVC Ø 48 mm, 1 1/2 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 48 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.1 rub f (K3) Pemasangan 1 m pipa PVC Ø 60 mm, 2 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 60 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.1 (K3) Pemasangan 1 m pipa PVC Ø 76 mm, 2 1/2 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.041
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa PVC Ø 76 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
Catatan:
tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.
A.8.4.1.2 (K3) Pemasangan 1 m pipa PVC Ø 89 mm, 3 inch

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.094
Tukang pipa L.02 OH 0.047
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 89 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.3 (K3) Pemasangan 1 m pipa PVC Ø 114 mm, 4 inch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.105
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 114 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
alat bantu ls 0.050

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.4 (K3) Pemasangan 1 m pipa PVC Ø 150 mm


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.118
Tukang pipa L.02 OH 0.059
Mandor L.04 OH 0.012
JUMLAH TENAGA
B BAHAN KERJA

Pipa PVC Ø 150 mm m 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & hari 0.012
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.5 (K3) Pemasngan 1 m pipa PVC Ø 200 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.189
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.019
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.024
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.6 (K3) Pemasangan 1 m pipa PVC Ø 250 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.256
Tukang pipa L.02 OH 0.128
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.034
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.7 (K3) Pemasangan 1 m pipa PVC Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.294
Tukang pipa L.02 OH 0.147
Mandor L.04 OH 0.029
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.040
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.8 (K3) Pemasangan 1 m pipa PVC Ø 400 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.544
Tukang pipa L.02 OH 0.272
Mandor L.04 OH 0.054
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.080
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.9 (K3) Pemasangan 1 m pipa PVC Ø 450 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.669
Tukang pipa L.02 OH 0.335
Mandor L.04 OH 0.067
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.100
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.10 (K3) Pemasangan 1 m pipa PVC Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.809
Tukang pipa L.02 OH 0.405
Mandor L.04 OH 0.081
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.122
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.11 (K3) Pemasangan 1 m pipa PVC Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.957
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.145
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.12 (K3) Pemasangan 1 m pipa PVC Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.618
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.250
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.13 (K3) Pemasangan 1 m pipa PVC Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.691
Tukang pipa L.02 OH 0.846
Mandor L.04 OH 0.169
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.262
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.14 (K3) Pemasangan 1 m pipa PVC Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.895
Tukang pipa L.02 OH 0.948
Mandor L.04 OH 0.190
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.294
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.15 (K3) Pemasangan 1 m pipa PVC Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.099
Tukang pipa L.02 OH 1.050
Mandor L.04 OH 0.210
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.327
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.16 (K3) Pemasangan 1 m pipa PVC Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.303
Tukang pipa L.02 OH 1.152
Mandor L.04 OH 0.230
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
hari 0.359
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.035
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.18 (K3) Pemasangan 1 m pipa HDPE Ø 100 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.040
Tukang pipa L.02 OH 0.020
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.19 (K3) Pemasangan 1 m pipa HDPE Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.045
Tukang pipa L.02 OH 0.023
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.20 (K3) Pemasangan 1 m pipa HDPE Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.062
Tukang pipa L.02 OH 0.031
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.21 (K3) Pemasangan 1 m pipa HDPE Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.102
Tukang pipa L.02 OH 0.051
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.019
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.22 (K3) Pemasangan 1 m pipa HDPE Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.067
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.042
hari 0.042
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.23 (K3) Pemasangan 1 m pipa HDPE Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.170
Tukang pipa L.02 OH 0.085
Mandor L.04 OH 0.017
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.065
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.24 (K3) Pemasangan 1 m pipa HDPE Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.290
Tukang pipa L.02 OH 0.145
Mandor L.04 OH 0.029
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.152
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.25 (K3) Pemasangan 1 m pipa HDPE Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.359
Tukang pipa L.02 OH 0.180
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.200
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.26 (K3) Pemasangan 1 m pipa HDPE Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.433
Tukang pipa L.02 OH 0.216
Mandor L.04 OH 0.043
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.251
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.27 (K3) Pemasangan 1 m pipa HDPE Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.256
Mandor L.04 OH 0.051
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.307
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.28 (K3) Pemasangan 1 m pipa HDPE Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.893
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.089
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.573
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.29 (K3) Pemasangan 1 m pipa HDPE Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.677
Mandor L.04 OH 0.135
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.883
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.30 (K3) Pemasangan 1 m pipa HDPE Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.659
Tukang pipa L.02 OH 0.830
Mandor L.04 OH 0.166
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.093
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.31 (K3) Pemasangan 1 m pipa HDPE Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.818
Tukang pipa L.02 OH 0.909
Mandor L.04 OH 0.182
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.205
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.32 (K3) Pemasangan 1 m pipa HDPE Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.370
Tukang pipa L.02 OH 1.185
Mandor L.04 OH 0.237
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.584
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.33 (K3) Pemasangan 1 m pipa GIP Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.345
Tukang pipa L.02 OH 0.172
Mandor L.04 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.34 (K3) Pemasangan 1 m pipa GIP Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.400
Tukang pipa L.02 OH 0.200
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.35 (K3) Pemasangan 1 m pipa GIP Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.448
Tukang pipa L.02 OH 0.224
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.36 (K3) Pemasangan 1 m pipa GIP Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.506
Tukang pipa L.02 OH 0.253
Mandor L.04 OH 0.051
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.37 (K3) Pemasangan 1 m pipa GIP Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.796
Tukang pipa L.02 OH 0.398
Mandor L.04 OH 0.080
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.38 (K3) Pemasangan 1 m pipa GIP Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.949
Tukang pipa L.02 OH 0.475
Mandor L.04 OH 0.095
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari -
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.39 (K3) Pemasangan 1 m pipa GIP Ø 300 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.958
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.40 (K3) Pemasangan 1 m pipa GIP Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.212
Tukang pipa L.02 OH 0.606
Mandor L.04 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.41 (K3) Pemasangan 1 m pipa GIP Ø 450 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.676
Mandor L.04 OH 0.135
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.42 (K3) Pemasangan 1 m pipa GIP Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.469
Tukang pipa L.02 OH 0.735
Mandor L.04 OH 0.140
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.43 (K3) Pemasangan 1 m pipa GIP Ø 600 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.327
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.133
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.44 (K3) Pemasangan 1 m pipa GIP Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.327
Tukang pipa L.02 OH 1.163
Mandor L.04 OH 0.233
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.45 (K3) Pemasangan 1 m pipa GIP Ø 900 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.623
Tukang pipa L.02 OH 1.312
Mandor L.04 OH 0.262
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F

A.8.4.1.46 (K3) Pemasangan 1 m pipa GIP Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.911
Tukang pipa L.02 OH 1.456
Mandor L.04 OH 0.291
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.47 (K3) Pemasangan 1 m pipa GIP Ø 1100 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 3.200
Tukang pipa L.02 OH 1.600
Mandor L.04 OH 0.320
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.48 (K3) Pemasangan 1 m pipa GIP Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.488
Tukang pipa L.02 OH 1.744
Mandor L.04 OH 0.349
JUMLAH TENAGA KERJA
B BAHAN
Pipa GIP Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel
& handle crane 2 T hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.49 (K3) Pemasangan 1 m pipa DCI Ø 100 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.489
Tukang pipa L.02 OH 0.098
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.50 (K3) Pemasangan 1 m pipa DCI Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.547
Tukang pipa L.02 OH 0.109
Mandor L.04 OH 0.055
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.51 (K3) Pemasangan 1 m pipa DCI Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.613
Tukang pipa L.02 OH 0.123
Mandor L.04 OH 0.061
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.52 (K3) Pemasangan 1 m pipa DCI Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.855
Tukang pipa L.02 OH 0.171
Mandor L.04 OH 0.085
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.380
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.53 (K3) Pemasangan 1 m pipa DCI Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.951
Tukang pipa L.02 OH 0.190
Mandor L.04 OH 0.095
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 250 mm M 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.050
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.54 (K3) Pemasangan 1 m pipa DCI Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.973
Tukang pipa L.02 OH 0.195
Mandor L.04 OH 0.097
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.071
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.55 (K3) Pemasangan 1 m pipa DCI Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.545
Tukang pipa L.02 OH 0.309
Operator alat berat L.08 OH 0.093
Mandor L.04 OH 0.154
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.023
225 kapasitas 0,5 - 1,0 m3
Sewa Tripot/Tackel hari 0.031
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.56 (K3) Pemasangan 1 m pipa DCI Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.813
Tukang pipa L.02 OH 0.363
Operator alat berat L.08 OH 0.143
Mandor L.04 OH 0.181
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.029
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.57 (K3) Pemasangan 1 m pipa DCI Ø 500 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.047
Tukang pipa L.02 OH 0.409
Operator alat berat L.08 OH 0.193
Mandor L.04 OH 0.205
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.034
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.045
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.58 (K3) Pemasangan pipa 1 m DCI Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.011
Tukang pipa L.02 OH 0.402
Operator alat berat L.08 OH 0.293
Mandor L.04 OH 0.201
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel
hari 0.077
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.59 (K3) Pemasangan 1 m pipa DCI Ø 800 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.859
Tukang pipa L.02 OH 0.772
Operator alat berat L.08 OH 0.493
Mandor L.04 OH 0.386
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.084
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.225
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.60 (K3) Pemasangan 1 m pipa DCI Ø900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.995
Tukang pipa L.02 OH 0.999
Operator alat berat L.08 OH 0.593
Mandor L.04 OH 0.499
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.093
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.248
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.61 (K3) Pemasangan 1 m pipa DCI Ø1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.931
Tukang pipa L.02 OH 1.186
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.693
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.112
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.298
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.62 (K3) Pemasangan 1 m pipa DCI Ø1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.949
Tukang pipa L.02 OH 1.390
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.695
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.152
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.304
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.63 (K3) Pemasangan 1 m pipa DCI Ø1200 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 8.056
Tukang pipa L.02 OH 1.611
Operator alat berat L.08 OH 0.893
Mandor L.04 OH 0.806
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.180
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.300
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.64 (K3) Pemasangan 1 m Pipa baja Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.499
Tukang pipa L.02 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 63 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.65 (K3) Pemasangan 1 m pipa baja Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.579
Tukang pipa L.02 OH 0.116
Mandor L.04 OH 0.058
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.66 (K3) Pemasangan 1 m pipa baja Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.648
Tukang pipa L.02 OH 0.130
Mandor L.04 OH 0.065
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 125 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.67 (K3) Pemasangan 1 m pipa baja Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.708
Tukang pipa L.02 OH 0.142
Mandor L.04 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 150 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.68 (K3) Pemasangan 1 m pipa baja Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.113
Tukang pipa L.02 OH 0.223
Mandor L.04 OH 0.111
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.69 (K3) Pemasangan pipa baja Ø 250 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.325
Tukang pipa L.02 OH 0.265
Mandor L.04 OH 0.133
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 250 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.70 (K3) Pemasangan 1 m pipa baja Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.415
Tukang pipa L.02 OH 0.283
Mandor L.04 OH 0.141
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 300 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.004
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.71 (K3) Pemasangan 1 m pipa baja Ø 400 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.366
Tukang pipa L.02 OH 0.473
Mandor L.04 OH 0.237
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 400 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.027
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.72 (K3) Pemasangan 1 m pipa baja Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.231
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.223
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 450 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.026
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.037
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.73 (K3) Pemasangan 1 m pipa baja Ø 500 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.432
Tukang pipa L.02 OH 0.486
Mandor L.04 OH 0.243
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 500 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.029
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.045
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.74 (K3) Pemasangan 1 m pipa baja Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.208
Tukang pipa L.02 OH 0.442
Mandor L.04 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 600 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.027
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.75 (K3) Pemasangan 1 m pipa baja Ø 800 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.897
Tukang pipa L.02 OH 0.779
Mandor L.04 OH 0.390
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 800 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.046
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.098
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.76 (K3) Pemasangan 1 m pipa baja Ø 900 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 4.403
Tukang pipa L.02 OH 0.081
Mandor L.04 OH 0.440
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 900 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.052
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.115
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.77 (K3) Pemasangan 1 m pipa baja Ø 1000 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.895
Tukang pipa L.02 OH 0.979
Mandor L.04 OH 0.489
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1000 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.058
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.133
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.78 (K3) Pemasangan 1 m pipa baja Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.387
Tukang pipa L.02 OH 1.077
Mandor L.04 OH 0.539
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1100 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.064
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.150
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.79 (K3) Pemasangan 1 m pipa baja Ø 1200 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.897
Tukang pipa L.02 OH 1.176
Mandor L.04 OH 0.588
JUMLAH TENAGA KERJA
B BAHAN
Pipa baja Ø 1200 mm m 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type hari 0.070
225 kapasitas 0,5 -1,0 m3
Sewa Tripot/Tackel hari 0.167
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA


A.8.4.2.1 (K3) Pemotongan 1 buah pipa PVC Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003
(gergaji) /saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.2 (K3) Pemotongan 1 m pipa PVC Ø 90 mm


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.014
Tukang pipa L.02 OH 0.007
Mandor L.04 OH 0.001
JUMLAH TENAGA
B BAHAN KERJA

Pipa PVC Ø 90 mm buah 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003
(gergaji) /saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.3 (K3) Pemotongan 1 buah pipa PVC Ø 110 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA
B BAHAN KERJA

Pipa PVC Ø 110 mm buah 1.000


JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.003
(gergaji) /saw

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.4 (K3) Pemotongan 1 buah pipa PVC Ø 150 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.031
Tukang pipa L.02 OH 0.015
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.003
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.5 (K3) Pemotongan 1 buah pipa PVC Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.040
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.017
(gergaji) /saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.6 (K3) Pemotongan 1 buah pipa PVC Ø 250 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.128
Tukang pipa L.02 OH 0.064
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T1/manual hari 0.030
(gergaji) /saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.7 (K3) Pemotongan 1 buah pipa PVC Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.037
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.8 (K3) Pemotongan 1 buah pipa PVC Ø 400 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.331
Tukang pipa L.02 OH 0.166
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.086
pipa T1/manual (gergaji) /saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.9 (K3) Pemotongan 1 buah pipa PVC Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.420
Tukang pipa L.02 OH 0.210
Mandor L.04 OH 0.042
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 54.000
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.10 (K3) Pemotongan 1 buah pipa PVC Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.069
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.11 (K3) Pemotongan 1 buah pipa PVC Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.086
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.12 (K3) Pemotongan 1 buah pipa PVC Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.160
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.13 (K3) Pemotongan 1 buah pipa PVC Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.168
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.14 (K3) Pemotongan 1 buah pipa PVC Ø 1000 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.285
Tukang pipa L.02 OH 0.643
Mandor L.04 OH 0.129
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.191
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.15 (K3) Pemotongan 1 buah pipa PVC Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.213
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.16 (K3) Pemotongan 1 buah pipa PVC Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.236
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.17 (K3) Pemotongan 1 buah pipa HDPE Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.000
Operator L.08 OH 0.034
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.004
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.18 (K3) Pemotongan 1 buah pipa HDPE Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.005
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.19 (K3) Pemotongan 1 buah pipa HDPE Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.006
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.20 (K3) Pemotongan 1 buah pipa HDPE Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.009
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.017
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.22 (K3) Pemotongan 1 buah pipaHDPE Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.023
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.23 (K3) Pemotongan 1 buah pipa HDPE Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.090
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.030
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.24 (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.055
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.25 (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.070
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.26 (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.085
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.27 (K3) Pemotongan 1 buah pipa HDPE Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.101
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.28 (K3) Pemotongan 1 buah pipa HDPE Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.060
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.179
/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.29 (K3) Pemotongan 1 buah pipa HDPE Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.270
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.30 (K3) Pemotongan 1 buah pipa HDPE Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.332
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.31 (K3) Pemotongan 1 buah pipa HDPE Ø 1100 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.230
Tukang pipa L.02 OH 0.619
Mandor L.04 OH 0.124
Operator L.08 OH 1.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa hari 0.350
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.32 (K3) Pemotongan 1 buah pipa HDPE Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.619
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
Operator L.08 OH 1.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.477
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.33 (K3) Pemotongan 1 buah pipa GIP Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.010
Mandor L.04 OH 0.002

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari -
/ cilinder saw

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.34 (K3) Pemotongan 1 buah pipa GIP Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.35 (K3) Pemotongan 1 buah pipa GIP Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik
/ cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.36 (K3) Pemotongan 1 buah pipa GIP Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari -
pipa T2/mekanik/cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.37 (K3) Pemotongan 1 buah pipa GIP Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.340
Tukang pipa L.02 OH 0.170
Mandor L.04 OH 0.034

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari -
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.38 (K3) Pemotongan 1 buah pipa GIP Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari -
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.39 (K3) Pemotongan 1 buah pipa GIP Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.050

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik
/ cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.40 (K3) Pemotongan 1 buah pipa GIP Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.730
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.41 (K3) Pemotongan 1 buah pipa GIP Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.420
Mandor L.04 OH 0.085

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.42 (K3) Pemotongan 1 buah pipa GIP Ø 500 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.471
Mandor L.04 OH 0.094

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.43 (K3) Pemotongan1 buah pipa GIP Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik
/ cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.44 (K3) Pemotongan 1 buah pipa GIP Ø 800 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.567
Tukang pipa L.02 OH 0.783
Mandor L.04 OH 0.157

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik
/ cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.45 (K3) Pemotongan 1 buah pipa GIP Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.770
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik
/ cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.46 (K3) Pemotongan 1 buah pipa GIP Ø 1000 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.47 (K3) Pemotongan 1 buah pipa GIP Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.48 (K3) Pemotongan 1 buah pipa GIP Ø 1200 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong
pipa T2/mekanik /cilinder saw hari -
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.49 (K3) Pemotongan 1 buah pipa DCI Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.003
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.50 (K3) Pemotongan 1 buah pipa DCI Ø 125 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.010
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.51 (K3) Pemotongan 1 buah pipa DCI Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.018
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.52 (K3) Pemotongan 1 buah pipa DCI Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.054
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.53 (K3) Pemotongan 1 buah pipa DCI Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.073
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.54 (K3) Pemotongan 1 buah pipa DCI Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.079
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.55 (K3) Pemotongan 1 buah pipa DCI Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.158
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.56 (K3) Pemotongan 1 buah pipa DCI Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.176
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.57 (K3) Pemotongan 1 buah pipa DCI Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.192
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.58 (K3) Pemotongan 1 buah pipa DCI Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.192
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.59 (K3) Pemotongan 1 buah pipa DCI Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.598
Tukang pipa L.02 OH 0.520
Mandor L.04 OH 0.260

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.310
/ cilinder saw

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.60 (K3) Pemotongan 1 buah pipa DCI Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.370
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.381
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.61 (K3) Pemotongan 1 buah pipa DCI Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.441
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.62 (K3) Pemotongan 1 buah pipa DCI Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.506
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.63 (K3) Pemotongan 1 buah pipa DCI Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.100
Mandor L.04 OH 0.550

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.576
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.64 (K3) Pemotongan 1 buah pipa baja Ø 63 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 63 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.037
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.65 (K3) Pemotongan 1 buah pipa baja Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.040
/ cilinder saw
Peralatan potong pipa T2/mekanik hari 0.040
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.66 (K3) Pemotongan 1 buah pipa baja Ø 125 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 125 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.042
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.67 (K3) Pemotongan 1 buah pipa baja Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.045
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.68 (K3) Pemotongan 1 buah pipa baja Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.060
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.69 (K3) Pemotongan 1 buah pipa baja Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.068
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.70 (K3) Pemotongan 1 buah pipa baja Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.072
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.71 (K3) Pemotongan 1 buah pipa baja Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.440
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.105
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.72 (K3) Pemotongan 1 buah pipa baja Ø 450 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.399
Tukang pipa L.02 OH 0.280
Mandor L.04 OH 0.140

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.107
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.73 (K3) Pemotongan 1 buah pipa baja Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.107
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.74 (K3) Pemotongan 1 buah pipa baja Ø 600 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.437
Tukang pipa L.02 OH 0.287
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.113
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.75 (K3) Pemotongan 1 buah pipa baja Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.620
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.166
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.76 (K3) Pemotongan 1 buah pipa baja Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 0.183
/ cilinder saw

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.77 (K3) Pemotongan 1 buah pipa baja Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.201
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.78 (K3) Pemotongan 1 buah pipa baja Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.218
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.79 (K3) Pemotongan 1 buah pipa baja Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa baja Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.236
pipa T2/mekanik /cilinder saw
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


A.8.4.3.1 (K3) Pemasangan 1 buah Valve Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.100
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.2 (K3) Pemasangan 1 buah Valve Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.300
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.3 (K3) Pemasangan 1 buah Valve Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.400
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.4 (K3) Pemasangan 1 buah Valve Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.000
Tukang pipa L.02 OH 1.000
Mandor L.04 OH 0.200

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.500
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.5 (K3) Pemasangan 1 buah Valve Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.6 (K3) Pemasangan 1 buah Valve Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.7 (K3) Pemasangan 1 buah Valve Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.000
Tukang pipa L.02 OH 2.000
Mandor L.04 OH 0.400

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.8 (K3) Pemasangan 1 buah Valve Ø 600 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.421
Tukang pipa L.02 OH 0.711
Mandor L.04 OH 0.142

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.600
& handle crane 2 T
Mobile crane £ 3 ton hari 0.300
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.9 (K3) Pemasangan 1 buah Valve Ø 700 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & hari 0.500
handle crane 2 T
Mobile crane £ 3 ton hari 0.500
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.10 (K3) Pemasangan 1 buah Valve Ø 800 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.500
& handle crane 2 T
Mobile crane £ 3 ton hari 0.500
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.11 (K3) Pemasangan 1 buah Valve Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.750
& handle crane 2 T
Mobile crane £ 3 ton hari 0.750
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.12 (K3) Pemasangan 1 buah Valve Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.13 (K3) Pemasangan 1 buah Valve Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.14 (K3) Pemasangan 1 buah Valve Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 3.000
Tukang pipa L.02 OH 1.500
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 1.000
& handle crane 2 T
Mobile crane £ 3 ton hari 1.000
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.15 (K3) Pemasangan 1 buah Tee Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.028
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.16 (K3) Pemasangan 1 buah Tee Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.029
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.17 (K3) Pemasangan 1 buah Tee Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.039
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.18 (K3) Pemasangan 1 buah Tee Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.500
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.19 (K3) Pemasangan 1 buah Tee Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.500
hari 0.500
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.20 (K3) Pemasangan 1 buah Tee Ø 450 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.500
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.21 (K3) Pemasangan 1 buah Tee Ø 500 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.876
Tukang pipa L.02 OH 0.438
Mandor L.04 OH 0.088

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.600
hari 0.600
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.22 (K3) Pemasangan 1 buah Tee Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.110

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.193
& handle crane 2 T
Mobile crane £ 3 ton hari 0.096
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.23 (K3) Pemasangan 1 buah Tee Ø 700 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.225
& handle crane 2 T
Mobile crane £ 3 ton hari 0.113
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.24 (K3) Pemasangan 1 buah Tee Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.257
& handle crane 2 T
Mobile crane £ 3 ton hari 0.129
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.25 (K3) Pemasangan 1 buah Tee Ø 900 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 900 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.321
& handle crane 2 T
Mobile crane £ 3 ton hari 0.161
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.26 (K3) Pemasangan 1 buah Tee Ø 1000 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1000 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.366
& handle crane 2 T
Mobile crane £ 3 ton hari 0.183
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.27 (K3) Pemasangan 1 buah Tee Ø 1100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.220

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.386
& handle crane 2 T
Mobile crane £ 3 ton hari 0.193
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.28 (K3) Pemasangan 1 buah Tee Ø 1200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel hari 0.450
& handle crane 2 T
Mobile crane £ 3 ton hari 0.225
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAM


A.8.4.4.1 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 80 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.606
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.075
watt
Sewa Pompa hari 0.968
Submersible 3m3/h
Sewa Tripot/Tackel hari 0.865
& handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.650
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.159
watt
Sewa Pompa hari 1.078
Submersible 3m3/h
Sewa Tripot/Tackel hari 0.911
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.210

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 150 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.760
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.369
watt
Sewa Pompa hari 1.353
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.026
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.870
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.579
watt
Sewa Pompa hari 1.628
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.141
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.300

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 250 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 0.980
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.789
watt
Sewa Pompa hari 1.903
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.256
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.090
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 0.999
watt
Sewa Pompa hari 2.178
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.371
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.430
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 400 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong pipa T2/mekanik hari 1.310
/ cilinder saw

Sewa Genset 1500 hari 1.419


watt
Sewa Pompa hari 2.728
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.601
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.480
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 450 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.420
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 1.629
watt
Sewa Pompa hari 3.003
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.716
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.530
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 1.839
watt
Sewa Pompa hari 3.278
Submersible 3m3/h
Sewa Tripot/Tackel hari 1.831
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.750
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.259
watt
Sewa Pompa hari 3.828
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.061
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 1.970
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 2.679
watt
Sewa Pompa hari 4.378
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.291
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan potong hari 2.190
hari 2.190
pipa T2/mekanik /
cilinder saw
Sewa Genset 1500 hari 3.099
watt
Sewa Pompa hari 4.928
Submersible 3m3/h
Sewa Tripot/Tackel hari 2.521
& handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA


A.8.4.5.1 (K3) Pengetesan 1 m pipa Ø 50 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.2 (K3) Pengetesan 1 m pipa Ø 75 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.3 (K3) Pengetesan 1 m pipa Ø 100 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.4 (K3) Pengetesan 1 m pipa Ø 150 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.5 (K3) Pengetesan 1 m pipa Ø 200 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.6 (K3) Pengetesan 1 m pipa Ø 250 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.7 (K3) Pengetesan 1 m pipa Ø 300 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.8 (K3) Pengetesan 1 m pipa Ø 400 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.9 (K3) Pengetesan 1 m pipa Ø 500 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.10 (K3) Pengetesan 1 m pipa Ø 600 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.060
Oli liter 0.002
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu dan Saklar

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja 1.000
Tukang Listrik 0.050
Kepala Tukang 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8” btg 3.000
Kabel 1,5 x m 24.000
Kabel 2,5 x m 24.000
T Dus buah 3.000
L Bow buah 4.000
Klem buah 24.000
Mongkok buah 1.000
Saklar buah 1.000
Fitting buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

A.8.4.6.1. rub a (K3) Pemasangan MCB 2A s/d 6A

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja 1.000
Tukang Listrik 0.050
Kepala Tukang 0.001
JUMLAH TENAGA KERJA
B BAHAN
Pipa listrik 5/8” btg 3.000
Kabel m 15.000
T Dus buah 1.000
L Bow buah 2.000
Klem biasa buah 24.000
MCB buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)

ABK-VIII.35 Pemasangan Titik Instalasi Penerangan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja 0.254
Tukang Listrik 0.365
Kepala Tukang 0.090
Mandor 0.070
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3 x 2,5 mm² M1 14.000
Pipa Konduit, uPVC High Impact M1 14.000
20 mm
Klem pipa 20 mm2, lengkap BH 14.000
dengan skrup
Tee Doos / Terminal Boxes BH 2.000
Isolasi LOT 0.100
Flexible pipe dia. 20 mm² M1 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 10.00%
F Harga Satuan Pekerjaan (D+E)

ABK-VIII.37 Pemasangan Titik Stop Kontak

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja 0.254
Tukang Listrik 0.365
Kepala Tukang 0.090
Mandor 0.070
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA 3 x 2,5 mm² M1 16.000
Pipa Konduit, uPVC High Impact M1 16.000
20 mm
Klem pipa 20 mm2, lengkap BH 16.000
dengan skrup
Tee Doos / Terminal Boxes BH 1.300
Isolasi LOT 0.265
Flexible pipe dia. 20 mm² M1 0.155
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
REKAP ANALISA KOTA CIREBON

ABK-I.01 1 Buah Pembuatan Papan Nama Proyek

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang oh 0.200
Tukang kayu oh 0.600
Kepala tukang oh 0.060
Mandor oh 0.020
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020
Paku Biasa 2-5 kg 0.250
Kayu Dolken dia.8 8-10/4 m' btg 1.500
Triplek 6 mm lbr 0.350
Cetak papan nama dg bhn flexi cetak digital m' 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit 15.00%
F Harga Satuan Pekerjaan (D+E)
PERSIAPAN

Harga Jumlah
Satuan Harga
(Rp) (Rp)

150,000.00 150,000.00
TENAGA KERJA 150,000.00

15,000.00 150,000.00
25,000.00 250,000.00
55,000.00 550,000.00
100,000.00 50,000.00
HARGA BAHAN 1,000,000.00

HARGA ALAT -
1,150,000.00
10.00% 115,000.00
1,265,000.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 26,400.00
120,000.00 1,200.00
TENAGA KERJA 27,600.00

-
-
-
-
HARGA BAHAN -

HARGA ALAT -
27,600.00
10.00% 2,760.00
30,360.00

ementara dari kayu tinggi 2 meter


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 2,400.00
TENAGA KERJA 58,800.00

71,000.00 88,750.00
1,420.00 7,100.00
223,000.00 1,115.00
225,000.00 2,025.00
4,025,000.00 289,800.00
21,000.00 1,260.00
31,600.00 12,640.00
HARGA BAHAN 402,690.00

HARGA ALAT -
461,490.00
10.00% 46,149.00
507,639.00 ok

sementara dari seng gelombang tinggi 2 meter

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
110,000.00 44,000.00
120,000.00 2,400.00
120,000.00 2,400.00
MLAH TENAGA KERJA 64,800.00

71,000.00 88,750.00

1,420.00 3,550.00
84,000.00 100,800.00
223,000.00 1,115.00
225,000.00 2,025.00
4,025,000.00 289,800.00
21,000.00 1,260.00
28,750.00 12,937.50
HARGA BAHAN 500,237.50

HARGA ALAT -
565,037.50
10.00% 56,503.75
621,541.25 ok

sementara dari kawat duri tinggi 1,8 meter

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
110,000.00 33,000.00
120,000.00 2,400.00
120,000.00 2,400.00
TENAGA KERJA 53,800.00

71,000.00 71,000.00

1,420.00 2,840.00
16,900.00 422,500.00
223,000.00 1,115.00
225,000.00 2,025.00
21,000.00 1,260.00
HARGA BAHAN 429,740.00

HARGA ALAT -

483,540.00
10.00% 48,354.00
531,894.00 ok

1 m’ Bouwplank

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 8,000.00
110,000.00 11,000.00
120,000.00 1,200.00
120,000.00 600.00
TENAGA KERJA 20,800.00

4,025,000.00 48,300.00
21,000.00 420.00
38,640.00 270.48
HARGA BAHAN 48,990.48
0.01

HARGA ALAT -

69,790.48
10.00% 6,979.05
76,769.53 ok

ementara lantai plesteran (direksikeet)

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 160,000.00
110,000.00 220,000.00
110,000.00 110,000.00
120,000.00 36,000.00
120,000.00 6,000.00
TENAGA KERJA 532,000.00

71,000.00 88,750.00

4,025,000.00 724,500.00
21,000.00 1,680.00
15,812.50 17,393.75
1,420.00 4,260.00
203,000.00 30,450.00
223,000.00 22,300.00
225,000.00 33,750.00
900.00 27,000.00
43,700.00 10,925.00
3,400.00 680.00
92,000.00 7,360.00
51,700.00 7,755.00
106,000.00 6,360.00
HARGA BAHAN 983,163.75

HARGA ALAT -

1,515,163.75
10.00% 151,516.38
1,666,680.13 ok

aga (konstruksi kayu )

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
110,000.00 165,000.00
120,000.00 18,000.00
120,000.00 6,000.00
H TENAGA KERJA 269,000.00

71,000.00 213,000.00

4,025,000.00 1,110,900.00
21,000.00 14,700.00
84,000.00 126,000.00
HARGA BAHAN 1,464,600.00

HARGA ALAT -

1,733,600.00
10.00% 173,360.00
1,906,960.00 ditangguhkan

semen dan peralatan

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
110,000.00 220,000.00
120,000.00 24,000.00
120,000.00 6,000.00
TENAGA KERJA 330,000.00

71,000.00 120,700.00

4,025,000.00 845,250.00
21,000.00 6,300.00
1,420.00 14,910.00
223,000.00 6,690.00
225,000.00 11,250.00
84,000.00 126,000.00
50,485.00 12,621.25
HARGA BAHAN 1,143,721.25

HARGA ALAT -

1,473,721.25
10.00% 147,372.13
1,621,093.38 ok

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
110,000.00 220,000.00
120,000.00 24,000.00
120,000.00 6,000.00
TENAGA KERJA 330,000.00

71,000.00 88,750.00

4,025,000.00 748,650.00
21,000.00 6,300.00
1,420.00 25,560.00
223,000.00 6,690.00
225,000.00 11,250.00
84,000.00 126,000.00
106,000.00 143,100.00
HARGA BAHAN 1,156,300.00
HARGA ALAT -

1,486,300.00
10.00% 148,630.00
1,634,930.00 ok

an dan perataan

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
120,000.00 6,000.00
TENAGA KERJA 14,000.00

HARGA BAHAN -

HARGA ALAT -

14,000.00
10.00% 1,400.00
15,400.00 ok

perancah dari bambu

Harga Satuan (Rp) Jumlah Harga (Rp)

indeks asli indeks asli modif modifikasi/deal


80,000.00 8,000.00 1.00 2.00 ###
110,000.00 5,500.00 2.00 1.00 ###
120,000.00 2,400.00 0.20 0.20 ###
120,000.00 600.00 0.05 0.05 ###
TENAGA KERJA 16,500.00 ada perubahan indeks di sesuaikan dengan perhitungan teknis menurut teori

18,000.00 22,500.00

220,800.00 41,068.80 0.001136 kg/cm3 berat jenis


HARGA BAHAN 63,568.80 10,000.00
11.36 kg/m3
HARGA ALAT -

80,068.80
10.00% 8,006.88
88,075.68 ok

kan ukuran 40 cm x 50 cm x 25 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

110,000.00 33,000.00
120,000.00 3,600.00
TENAGA KERJA 36,600.00

4,025,000.00 144,900.00

4,025,000.00 56,350.00

21,000.00 1,680.00
HARGA BAHAN 202,930.00

HARGA ALAT -

239,530.00
10.00% 23,953.00
263,483.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
120,000.00 600.00
AH TENAGA KERJA 80,600.00

315,000.00 47,250.00
315,000.00 28,350.00
203,000.00 2,030.00
HARGA BAHAN 77,630.00

HARGA ALAT -

158,230.00
10.00% 15,823.00
174,053.00 ok

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 1,066,720.00
120,000.00 79,920.00
TENAGA KERJA 1,146,640.00

HARGA BAHAN -

HARGA ALAT -

1,146,640.00
10.00% 114,664.00
1,261,304.00 ok

embok bata

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 53,360.00
120,000.00 39,960.00
AH TENAGA KERJA 93,320.00
AH HARGA BAHAN -

HARGA ALAT -

93,320.00
10.00% 9,332.00
102,652.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
120,000.00 1,200.00
AH TENAGA KERJA 9,200.00

AH HARGA BAHAN -

HARGA ALAT -

9,200.00
10.00% 920.00
10,120.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 800.00
120,000.00 6,000.00
AH TENAGA KERJA 6,800.00
AH HARGA BAHAN -

HARGA ALAT -

6,800.00
10.00% 680.00
7,480.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
120,000.00 10,560.00
AH TENAGA KERJA 30,560.00

AH HARGA BAHAN -

HARGA ALAT -

30,560.00
10.00% 3,056.00
33,616.00

at jaring galvanis panjang 240 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,360.00
110,000.00 440.00
120,000.00 240.00
120,000.00 5,040.00
AH TENAGA KERJA 9,080.00
652,050.00 93,503.97
HARGA BAHAN 93,503.97

HARGA ALAT -

102,583.97
10.00% 10,258.40
112,842.37 belum di survey harga kawat jaring

pracetak 5x50x240 cm untuk pagar

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 30,000.00
110,000.00 13,750.00
120,000.00 1,440.00
120,000.00 2,280.00
TENAGA KERJA 47,470.00

118,400.00 116,742.40 sumber harga http://www.indonusa-conblock.com/2016/04/pagarpanelbeton-precast-harga-jual.

201,200.00 105,630.00 sumber harga http://asiacon.co.id/harga-jual-pagar-panel-beton-precast

1,420.00 63,900.00
223,000.00 16,502.00
225,000.00 32,850.00
HARGA BAHAN 335,624.40

HARGA ALAT -

383,094.40
10.00% 38,309.44
421,403.84 harga bahan belum di survey

edalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 60,000.00
120,000.00 3,000.00
TENAGA KERJA 63,000.00

HARGA BAHAN -

HARGA ALAT -
63,000.00
10.00% 6,300.00
69,300.00 ok

edalam 2 m

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 72,000.00
120,000.00 5,400.00
TENAGA KERJA 77,400.00

HARGA BAHAN -

HARGA ALAT -
77,400.00
10.00% 7,740.00
85,140.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 84,000.00
120,000.00 8,040.00
TENAGA KERJA 92,040.00

HARGA BAHAN -
HARGA ALAT -

92,040.00
10.00% 9,204.00
101,244.00 ok

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
120,000.00 3,840.00
TENAGA KERJA 83,840.00

HARGA BAHAN -

HARGA ALAT -

83,840.00
10.00% 8,384.00
92,224.00 ok

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 120,000.00
120,000.00 7,200.00
TENAGA KERJA 127,200.00

HARGA BAHAN -

HARGA ALAT -

127,200.00
10.00% 12,720.00
139,920.00 ok
sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 96,000.00
120,000.00 5,400.00
TENAGA KERJA 101,400.00

HARGA BAHAN -

HARGA ALAT -

101,400.00
10.00% 10,140.00
111,540.00 ok

nah tebing setinggi 1 meter

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
120,000.00 600.00
TENAGA KERJA 4,600.00

HARGA BAHAN -

HARGA ALAT -
4,600.00
10.00% 460.00
5,060.00 ok

h sejauh 30 meter

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 26,400.00
120,000.00 1,200.00
TENAGA KERJA 27,600.00

HARGA BAHAN -

HARGA ALAT -
27,600.00
10.00% 2,760.00
30,360.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,000.00
120,000.00 6,000.00
TENAGA KERJA 46,000.00

HARGA BAHAN -

HARGA ALAT -
46,000.00
10.00% 4,600.00
50,600.00 ok

nah ( per 20 cm)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,000.00
120,000.00 6,000.00
TENAGA KERJA 46,000.00

HARGA BAHAN -
HARGA ALAT -
46,000.00
10.00% 4,600.00
50,600.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
120,000.00 1,200.00
TENAGA KERJA 25,200.00

199,295.00 239,154.00
HARGA BAHAN 239,154.00

HARGA ALAT -
264,354.00
10.00% 26,435.40
290,789.40 ok

del campuran 1KP : 3PP : 7TL

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,000.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 9,600.00
TENAGA KERJA 122,400.00

80,500.00 10,867.50
239,085.00 95,634.00
115,000.00 109,020.00
HARGA BAHAN 215,521.50

HARGA ALAT -
337,921.50
10.00% 33,792.15
371,713.65 ok

k tebal 10 cm untuk bidang resapan

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
120,000.00 1,800.00
TENAGA KERJA 13,800.00

18,500.00 111,000.00
HARGA BAHAN 111,000.00

HARGA ALAT -
124,800.00
10.00% 12,480.00
137,280.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
120,000.00 3,000.00
AH TENAGA KERJA 23,000.00

184,000.00 220,800.00
AH HARGA BAHAN 220,800.00

HARGA ALAT -

243,800.00
10.00% 24,380.00
268,180.00 ok
tu belah campuran 1SP : 3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 286,840.00
203,000.00 98,455.00
HARGA BAHAN 695,795.00

HARGA ALAT -
916,295.00
10.00% 91,629.50
1,007,924.50 ok

tu belah campuran 1SP : 4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 231,460.00
203,000.00 105,560.00
HARGA BAHAN 647,520.00
HARGA ALAT -
868,020.00
10.00% 86,802.00
954,822.00 ok

tu belah campuran 1SP : 5PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)
indeks asli indeks rubahan
80,000.00 120,000.00 1.500 1.500
110,000.00 82,500.00 0.750 0.750
120,000.00 9,000.00 0.075 0.075
120,000.00 9,000.00 0.075 0.010 disesuaikan dengan perhitungan teori teknis
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 193,120.00
203,000.00 110,432.00
HARGA BAHAN 614,052.00

HARGA ALAT -
834,552.00
10.00% 83,455.20
918,007.20 ok

tu belah campuran 1SP : 6PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 166,140.00
203,000.00 113,883.00
AH HARGA BAHAN 590,523.00

MLAH HARGA ALAT -


811,023.00
10.00% 81,102.30
892,125.30 ok

tu belah campuran 1SP : 8PP

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 129,220.00
203,000.00 118,552.00
HARGA BAHAN 558,272.00

HARGA ALAT -

778,772.00
10.00% 77,877.20
856,649.20 ok

tu belah campuran 1SP : 1KP : 2PP

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
253,000.00 43,010.00
1,420.00 241.40
203,000.00 69,020.00
AH HARGA BAHAN 422,771.40

HARGA ALAT -

643,271.40
10.00% 64,327.14
707,598.54 ok

tu belah campuran 1 SP : 3 KP : 10 PP

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 86,620.00
253,000.00 37,191.00
203,000.00 99,876.00
AH HARGA BAHAN 534,187.00

HARGA ALAT -

754,687.00
10.00% 75,468.70
830,155.70 ok

tu belah campuran ¼ SP : 1 KP : 4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 120,000.00
110,000.00 82,500.00
120,000.00 9,000.00
120,000.00 9,000.00
AH TENAGA KERJA 220,500.00

258,750.00 310,500.00
1,420.00 58,220.00
253,000.00 33,143.00
203,000.00 106,169.00
HARGA BAHAN 508,032.00

HARGA ALAT -

728,532.00
10.00% 72,853.20
801,385.20 ok

osong (anstamping)

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 62,400.00
110,000.00 42,900.00
120,000.00 4,680.00
120,000.00 4,680.00
AH TENAGA KERJA 114,660.00

258,750.00 310,500.00
199,295.00 86,095.44
HARGA BAHAN 396,595.44

HARGA ALAT -

511,255.44
10.00% 51,125.54
562,380.98 ok

klop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 272,000.00
110,000.00 93,500.00
120,000.00 10,200.00
120,000.00 20,400.00
AH TENAGA KERJA 396,100.00

258,750.00 124,200.00
1,420.00 275,480.00
223,000.00 69,576.00
225,000.00 105,300.00
14,000.00 1,764,000.00
20,000.00 36,000.00
AH HARGA BAHAN 2,374,556.00

HARGA ALAT -

2,770,656.00
10.00% 277,065.60
3,047,721.60 ok

muran, diameter 100 cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 192,000.00
110,000.00 88,000.00
120,000.00 9,600.00
120,000.00 14,280.00
AH TENAGA KERJA 303,880.00

258,750.00 116,437.50
1,420.00 275,480.00
223,000.00 69,576.00
225,000.00 105,300.00
AH HARGA BAHAN 566,793.50

HARGA ALAT -

870,673.50
10.00% 87,067.35
957,740.85 ok
= 7,4 Mpa (sama dengan K 100), setara dengan beton rabat

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00 75.43


110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 350,740.00
159.29 138,419.29
212.96 212,750.00

14.65 3,149.75
AH HARGA BAHAN 705,059.04

HARGA ALAT -

880,629.04
10.00% 88,062.90
968,691.94 ok

= 9,8 Mpa (sama dengan K-125)

Harga Jumlah
Satuan Harga
(Rp) (Rp) 99.90

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 391,920.00

159.29 131,888.57
212.96 215,518.52
212.96 215,518.52

14.65 3,149.75
HARGA BAHAN 742,476.84

HARGA ALAT -

918,046.84
10.00% 91,804.68
1,009,851.52 ok

= 12,2 Mpa (sama denga K 150)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 424,580.00
159.29 127,269.29
212.96 216,583.33
14.65 3,149.75
HARGA BAHAN 771,582.37

HARGA ALAT -

947,152.37
10.00% 94,715.24
1,041,867.61 ok

ton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 96,000.00
110,000.00 22,000.00
120,000.00 2,400.00
120,000.00 7,200.00
AH TENAGA KERJA 127,600.00

1,420.00 326,600.00
159.29 142,242.14
170.37 174,970.37

14.65 2,930.00
HARGA BAHAN 646,742.51

HARGA ALAT -
774,342.51
10.00% 77,434.25
851,776.76 ok

= 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 462,920.00
159.29 121,057.14
212.96 219,138.89

14.65 3,149.75
HARGA BAHAN 806,265.78

HARGA ALAT -

981,835.78
10.00% 98,183.58
1,080,019.36 pk

= 16,9 Mpa (sama dengan K 220)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 499,840.00
159.29 116,437.86
212.96 219,564.81

14.65 3,149.75
HARGA BAHAN 838,992.42

HARGA ALAT -

1,014,562.42
10.00% 101,456.24
1,116,018.66 ok

= 19,3 Mpa (sama dengan K 225)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 526,820.00
159.29 111,181.43
212.96 222,972.22
14.65 3,149.75
HARGA BAHAN 864,123.40

HARGA ALAT -

1,039,693.40
10.00% 103,969.34
1,143,662.74 ok

= 21,7 Mpa (sama dengan K 250)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 545,280.00
159.29 110,225.71
212.96 221,268.52

14.65 3,149.75
HARGA BAHAN 879,923.98

HARGA ALAT -

1,055,493.98
10.00% 105,549.40
1,161,043.38 ok

= 24,0 Mpa (sama dengan K 325)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 576,520.00
159.29 108,951.43
212.96 218,500.00

14.65 3,149.75
AH HARGA BAHAN 907,121.18

MLAH HARGA ALAT -

1,082,691.18
10.00% 108,269.12
1,190,960.30 ok

= 26,4 Mpa (sama dengan K 350)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,000.00
110,000.00 30,250.00
120,000.00 3,360.00
120,000.00 9,960.00
AH TENAGA KERJA 175,570.00

1,420.00 586,460.00
159.29 108,473.57
212.96 217,435.19

14.65 3,149.75
AH HARGA BAHAN 915,518.51

MLAH HARGA ALAT -

1,091,088.51
10.00% 109,108.85
1,200,197.36 ok
= 28,8 Mpa (sama dengan K 375)

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00

1,420.00 623,380.00
159.29 106,721.43
212.96 214,240.74

14.65 3,149.75
HARGA BAHAN 947,491.92

HARGA ALAT -

1,170,791.92
10.00% 117,079.19
1,287,871.11 ok

= 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)


421.51
Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00

1,420.00 636,160.00
159.29 106,243.57
212.96 212,962.96

14.65 3,149.75
HARGA BAHAN 958,516.28

HARGA ALAT -
1,181,816.28
10.00% 118,181.63
1,299,997.91 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00

1,420.00 636,160.00
159.29 106,243.57
212.96 212,962.96

155,250.00 698,625.00 sumber harga http://pusatepoxylantai.com/harga-epoxy-lantai-kualitas-terbaik-di-indonesia/, Rp.

14.65 2,930.00
HARGA BAHAN 1,656,921.53

HARGA ALAT -

1,880,221.53
10.00% 188,022.15
2,068,243.69 bahan belum di survey

r dengan strorox – 100

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 168,000.00
110,000.00 38,500.00
120,000.00 4,200.00
120,000.00 12,600.00
AH TENAGA KERJA 223,300.00
1,420.00 568,000.00
223,000.00 107,040.00
225,000.00 180,000.00 sumber harga
87,975.00 105,570.00 https://www.scribd.com/doc/226685552/AHS-Bahan-Upah-Perhubungan
AH HARGA BAHAN 960,610.00 69,550.00 harga 2014
76,505.00 estimasi 2017 dikali 1,1 (10%)

HARGA ALAT -

1,183,910.00
10.00% 118,391.00
1,302,301.00 ok

top lebar 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
110,000.00 3,300.00
120,000.00 360.00
120,000.00 360.00
AH TENAGA KERJA 8,820.00
sumber harga
57,500.00 60,375.00 http://waterstop-pvc.blogspot.co.id/2016/11/harga-waterstop-lebar-150-mm.html
50,000.00
AH HARGA BAHAN 60,375.00

HARGA ALAT -

69,195.00
10.00% 6,919.50
76,114.50 ok

top lebar 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,600.00
110,000.00 3,850.00
120,000.00 480.00
120,000.00 840.00
AH TENAGA KERJA 10,770.00
sumber harga
143,700.00 150,885.00 http://ahsp.sipil.net/pekerjaan/pemasangan-water-stop-rubber-lebar-150-mm-200-mm
125,000.00
HARGA BAHAN 150,885.00

HARGA ALAT -

161,655.00
10.00% 16,165.50
177,820.50 ok

lebar 230 mm – 320 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,400.00
110,000.00 4,400.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 11,760.00
sumber harga
132,200.00 138,810.00 http://ahsp.sipil.net/pekerjaan/memasang-water-stop-pvc-lebar-230-mm-320-mm
115,000.00
HARGA BAHAN 138,810.00

HARGA ALAT -

150,570.00
10.00% 15,057.00
165,627.00 ok

polos atau besi ulir

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,600.00
110,000.00 7,700.00
120,000.00 840.00
120,000.00 480.00
AH TENAGA KERJA 14,620.00

14,000.00 147,000.00

20,000.00 3,000.00
HARGA BAHAN 150,000.00

HARGA ALAT -

164,620.00
10.00% 16,462.00
181,082.00 ok 18,108.20

gang (prestressed) polos/strands

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
110,000.00 5,500.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 10,460.00

14,000.00 147,000.00

20,000.00 2,000.00
HARGA BAHAN 149,000.00

HARGA ALAT -

159,460.00
10.00% 15,946.00
175,406.00 ok

at baja (wiremesh)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,000.00
110,000.00 2,750.00
120,000.00 3,000.00
120,000.00 120.00
AH TENAGA KERJA 7,870.00

9,700.00 98,940.00

20,000.00 1,000.00
HARGA BAHAN 99,940.00

HARGA ALAT -

107,810.00
10.00% 10,781.00
118,591.00 confirm ulang

ting untuk pondasi

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 41,600.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
AH TENAGA KERJA 76,440.00

4,025,000.00 161,000.00
21,000.00 6,300.00
10,600.00 1,060.00
HARGA BAHAN 168,360.00

HARGA ALAT -

244,800.00
10.00% 24,480.00
269,280.00 ok
ting untuk sloof

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 41,600.00
110,000.00 28,600.00
120,000.00 3,120.00
120,000.00 3,120.00
AH TENAGA KERJA 76,440.00

4,025,000.00 181,125.00
21,000.00 6,300.00
10,600.00 1,060.00
HARGA BAHAN 188,485.00

HARGA ALAT -

264,925.00
10.00% 26,492.50
291,417.50 ok

ting untuk kolom

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00

4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 86,250.00
106,000.00 37,100.00

71,000.00 142,000.00
71,000.00 142,000.00

HARGA BAHAN 436,870.00

HARGA ALAT -

533,890.00
10.00% 53,389.00
587,279.00 ok

ting untuk balok

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00

4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 103,500.00
106,000.00 37,100.00
71,000.00 142,000.00

HARGA BAHAN 454,120.00

HARGA ALAT -
551,140.00
10.00% 55,114.00
606,254.00 ok

ting untuk lantai

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00

4,025,000.00 161,000.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 86,250.00
106,000.00 37,100.00
71,000.00 426,000.00

HARGA BAHAN 720,870.00

HARGA ALAT -
817,890.00
10.00% 81,789.00
899,679.00 ok

ting untuk dinding

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 52,800.00

110,000.00 36,300.00

120,000.00 3,960.00

120,000.00 3,960.00

AH TENAGA KERJA 97,020.00

4,025,000.00 120,750.00
21,000.00 8,400.00
10,600.00 2,120.00
5,750,000.00 115,000.00
106,000.00 37,100.00
71,000.00 213,000.00

20,700.00 82,800.00

HARGA BAHAN 579,170.00


HARGA ALAT -
676,190.00
10.00% 67,619.00
743,809.00 ok

ting untuk tangga

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 52,800.00
110,000.00 36,300.00
120,000.00 3,960.00
120,000.00 3,960.00
AH TENAGA KERJA 97,020.00

4,025,000.00 120,750.00
21,000.00 8,400.00
10,600.00 1,590.00
5,750,000.00 86,250.00
106,000.00 37,100.00
71,000.00 142,000.00

HARGA BAHAN 396,090.00

HARGA ALAT -
493,110.00
10.00% 49,311.00
542,421.00 ok

untuk pengecoran beton

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 12,000.00
110,000.00 5,500.00
120,000.00 600.00
120,000.00 960.00
MLAH TENAGA KERJA 19,060.00
4,025,000.00 106,260.00
21,000.00 12,600.00
71,000.00 35,500.00

HARGA BAHAN 154,360.00

HARGA ALAT -

173,420.00
10.00% 17,342.00
190,762.00 ok

eton bertulang (11 x 11) cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 14,400.00
110,000.00 2,200.00
110,000.00 2,200.00
110,000.00 2,200.00
120,000.00 720.00
120,000.00 1,080.00
MLAH TENAGA KERJA 22,800.00

4,025,000.00 8,050.00
21,000.00 210.00
- - kolom praktis biasanya tidak menggunakan minyak pelumas
14,000.00 42,000.00
20,000.00 9,000.00
1,420.00 5,680.00
223,000.00 1,338.00
225,000.00 2,025.00
HARGA BAHAN 68,303.00

HARGA ALAT -

91,103.00
10.00% 9,110.30
100,213.30 ok

n bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 23,760.00
110,000.00 3,630.00
110,000.00 3,630.00
110,000.00 3,630.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,650.00

4,025,000.00 12,075.00
21,000.00 420.00
- -
14,000.00 50,400.00
20,000.00 1,000.00
1,420.00 7,810.00
223,000.00 2,007.00
225,000.00 3,375.00
MLAH HARGA BAHAN 77,087.00

HARGA ALAT -
114,737.00
10.00% 11,473.70
126,210.70 ok

BETON PRACETAK
apangan (cast in place). Indeks yang ada dalam
angan, terutama untuk analisa cetakan (bekisting)

produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,560.00
110,000.00 2,420.00
120,000.00 240.00
120,000.00 840.00
AH TENAGA KERJA 14,060.00

1,420.00 37,033.60
159.29 9,684.57
212.96 17,531.11

14.65 251.98
HARGA BAHAN 64,501.26

HARGA ALAT -

78,561.26
10.00% 7,856.13
86,417.39 ok

roduksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 13,200.00
110,000.00 3,080.00
120,000.00 360.00
120,000.00 960.00
AH TENAGA KERJA 17,600.00

1,420.00 46,292.00
159.29 12,105.71
212.96 21,913.89
14.65 314.98
HARGA BAHAN 80,626.58

HARGA ALAT -

98,226.58
10.00% 9,822.66
108,049.24 ok

produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 15,840.00
110,000.00 3,630.00
120,000.00 360.00
120,000.00 1,200.00
AH TENAGA KERJA 21,030.00

1,420.00 55,550.40
159.29 14,526.86
212.96 26,296.67
14.65 377.97
HARGA BAHAN 96,751.89

HARGA ALAT -

117,781.89
10.00% 11,778.19
129,560.08 ok

roduksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 19,840.00
110,000.00 4,510.00
120,000.00 480.00
120,000.00 1,560.00
AH TENAGA KERJA 26,390.00

1,420.00 69,438.00
159.29 18,158.57
212.96 32,870.83
14.65 472.46
HARGA BAHAN 120,939.87

HARGA ALAT -
147,329.87
10.00% 14,732.99
162,062.85 ok

ntuk pelat beton pracetak ( 5 kali pakai)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 560.00
110,000.00 8,360.00
120,000.00 960.00
120,000.00 120.00
AH TENAGA KERJA 10,000.00

851,776.76 sumber harga


6,814.21
8,600.00 80,788.40 http://www.sentrabesibaja.com/besi-hollow-hitam-galvaniz/
untuk 27,32 kg = Rp. 204.900 jadi untuk 1 kg =
6,900,000.00 34,500.00

281,700.00 22,536.00 sumber harga https://www.google.co.id/search?q=harga+phenol+film+12mm&tbm=isch&imgil=N


245,000.00
10,600.00 2,120.00

sumber harga
3,000.00 11,646.00
http://anekamurbaut.blogspot.co.id/2014/05/dyna-bolt.html
HARGA BAHAN 158,404.61 2,545.00

HARGA ALAT -
168,404.61
10.00% 16,840.46
185,245.08 ok

ntuk balok beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 320.00
110,000.00 4,180.00
120,000.00 480.00
120,000.00 120.00
MLAH TENAGA KERJA 5,100.00

6,900,000.00 34,500.00

281,700.00 12,113.10
10,600.00 2,120.00

21,000.00 966.00
3,000.00 2,079.00
HARGA BAHAN 51,778.10

HARGA ALAT -
56,878.10
10.00% 5,687.81
62,565.91 ok

ntuk kolom beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 320.00
110,000.00 4,180.00
120,000.00 480.00
120,000.00 120.00
MLAH TENAGA KERJA 5,100.00

6,900,000.00 27,600.00

281,700.00 13,521.60
10,600.00 2,120.00

21,000.00 966.00
3,000.00 2,079.00

HARGA BAHAN 46,286.60

HARGA ALAT -
51,386.60
10.00% 5,138.66
56,525.26 ok

kisting 1 buah komponen pelat beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 4,240.00
110,000.00 1,980.00
120,000.00 600.00
TENAGA KERJA 6,820.00

HARGA BAHAN -
HARGA ALAT -
6,820.00
10.00% 682.00
7,502.00 ok

kisting 1 buah komponen balok beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 7,120.00
110,000.00 3,300.00
120,000.00 600.00
TENAGA KERJA 11,020.00

HARGA BAHAN -

HARGA ALAT -
11,020.00
10.00% 1,102.00
12,122.00 ok

ekisting 1 buah komponen kolom beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 5,680.00
110,000.00 2,640.00
120,000.00 600.00
TENAGA KERJA 8,920.00

HARGA BAHAN -

HARGA ALAT -
8,920.00
10.00% 892.00
9,812.00 ok
m3 komponen untuk pelat pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 5,120.00
110,000.00 26,840.00
110,000.00 14,080.00
120,000.00 4,080.00
120,000.00 8,760.00
TENAGA KERJA 58,880.00

HARGA BAHAN -

HARGA ALAT -
58,880.00
10.00% 5,888.00
64,768.00 ok

m3 komponen untuk balok pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,520.00
110,000.00 26,620.00
110,000.00 15,180.00
120,000.00 4,440.00
120,000.00 8,760.00
TENAGA KERJA 60,520.00

HARGA BAHAN -

HARGA ALAT -

60,520.00
10.00% 6,052.00
66,572.00 ok
m3 komponen kolom pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,880.00
110,000.00 23,430.00
110,000.00 13,420.00
120,000.00 3,960.00
120,000.00 8,760.00

AH TENAGA KERJA 54,450.00

HARGA BAHAN -

HARGA ALAT -

54,450.00
10.00% 5,445.00
59,895.00 ok

k pelat pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 9,380.00
80,000.00 5,360.00

80,000.00 5,360.00
110,000.00 7,370.00
110,000.00 14,740.00
120,000.00 8,040.00
120,000.00 8,040.00
AH TENAGA KERJA 58,290.00

10,900.00 72,768.40
AH HARGA BAHAN 72,768.40

4,485,000.00 300,495.00 sumber harga https://www.hargamaterial123.com/harga-sewa-crane/ = 3.900.000


341,550.00 375,705.00 sumber harga http://pabrik-scaffolding.com/products.html?page=shop.product_details&flypage=
297,000.00
HARGA ALAT 676,200.00

807,258.40
10.00% 80,725.84
887,984.24 ok

k balok pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 8,540.00

80,000.00 4,880.00

80,000.00 4,880.00

110,000.00 6,710.00

110,000.00 13,420.00

120,000.00 7,320.00

120,000.00 7,320.00

MLAH TENAGA KERJA 53,070.00

10,900.00 66,599.00
MLAH HARGA BAHAN 66,599.00

4,485,000.00 273,585.00

341,550.00 375,705.00

HARGA ALAT 649,290.00

768,959.00
10.00% 76,895.90
845,854.90 ok

k kolom pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 11,620.00
80,000.00 6,640.00

80,000.00 6,640.00
110,000.00 9,130.00
110,000.00 18,260.00
120,000.00 9,960.00
120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00
10,900.00 90,219.30
HARGA BAHAN 90,219.30

4,485,000.00 372,255.00

341,550.00 751,410.00
HARGA ALAT 1,123,665.00

1,286,094.30
10.00% 128,609.43
1,414,703.73 ok

uk pelat pracetak ( ± 20 m)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 2,660.00
80,000.00 1,520.00

80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00

10,900.00 20,677.30
AH HARGA BAHAN 20,677.30
4,485,000.00 85,215.00
MLAH HARGA ALAT 85,215.00

115,772.30
10.00% 11,577.23
127,349.53 ok

uk balok pracetak ( ± 20 m)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 2,660.00

80,000.00 1,520.00

80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00

10,900.00 20,677.30
AH HARGA BAHAN 20,677.30

4,485,000.00 85,215.00
MLAH HARGA ALAT 85,215.00

115,772.30
10.00% 11,577.23
127,349.53 ok

uk kolom pracetak ( ± 20 m)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

140,000.00 2,660.00
80,000.00 1,520.00

80,000.00 1,520.00
110,000.00 4,180.00
AH TENAGA KERJA 9,880.00

10,900.00 20,677.30
AH HARGA BAHAN 20,677.30

4,485,000.00 85,215.00
HARGA ALAT 85,215.00

115,772.30
10.00% 11,577.23
127,349.53 ok

Jumlah Harga (Rp)


Harga Satuan
(Rp)

MLAH TENAGA KERJA -

2,800.00 3,360,000.00
200.00 130,000.00
14.65 5,127.50
HARGA BAHAN 3,495,127.50

HARGA ALAT -

3,495,127.50
10.00% 349,512.75
3,844,640.25 ok

Jumlah Harga (Rp)


Harga Satuan
(Rp)

MLAH TENAGA KERJA -

2,800.00 5,180,000.00
14.65 5,860.00
HARGA BAHAN 5,185,860.00

HARGA ALAT -
5,185,860.00
10.00% 518,586.00
5,704,446.00 ok

ada joint beton pracetak

Jumlah Harga (Rp)


Harga Satuan
(Rp)

110,000.00 40,370.00
120,000.00 8,880.00
120,000.00 4,440.00
UMLAH TENAGA KERJA 53,690.00

HARGA BAHAN -

HARGA ALAT -

53,690.00
10.00% 5,369.00
59,059.00 ok

oint pracetak

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,760.00
110,000.00 16,170.00
120,000.00 1,800.00
120,000.00 600.00
TENAGA KERJA 30,330.00

6,900,000.00 82,800.00

5,750,000.00 23,000.00
21,000.00 5,544.00
HARGA BAHAN 111,344.00

HARGA ALAT -
141,674.00
10.00% 14,167.40
155,841.40 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 17,600.00
110,000.00 2,420.00
110,000.00 24,200.00
120,000.00 1,320.00
TENAGA KERJA 45,540.00

HARGA BAHAN -

HARGA ALAT -

45,540.00
10.00% 4,554.00
50,094.00 ok

BESI DAN ALUMUNIUM

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
110,000.00 6,600.00

120,000.00 720.00
120,000.00 360.00
AH TENAGA KERJA 12,480.00

16,200.00 18,630.00
AH HARGA BAHAN 18,630.00

MLAH HARGA ALAT -


31,110.00
10.00% 3,111.00
34,221.00 ok

a-kuda baja IWF

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
110,000.00 6,600.00

120,000.00 720.00
120,000.00 360.00
AH TENAGA KERJA 12,480.00

16,200.00 18,630.00
AH HARGA BAHAN 18,630.00

MLAH HARGA ALAT -

31,110.00
10.00% 3,111.00
34,221.00 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
110,000.00 11,000.00

120,000.00 120.00
120,000.00 600.00
AH TENAGA KERJA 19,720.00

10,900.00 10,900.00
10,600.00 1,060.00
AH HARGA BAHAN 11,960.00
132,250.00 105,800.00 sumber harga http://sewacrane-murahjakarta.blogspot.co.id/p/price-list-sewa-crane.html
MLAH HARGA ALAT 105,800.00 Rp. 23.000.000 / 200 jam ###

137,480.00
10.00% 13,748.00
151,228.00 ok

elat baja tebal 2 mm rangkap, rangka baja siku

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 84,000.00
110,000.00 115,500.00
120,000.00 12,600.00
120,000.00 6,240.00
AH TENAGA KERJA 218,340.00

12,100.00 181,500.00 sumber harga http://www.rumahmaterial.com/2014/10/daftar-harga-besi-siku-2014.html Rp. 85.0


7,500.00 246,000.00 sumber harga http://www.sentrabesibaja.com/plat-besi-baja-hitam/ Rp. 182.000 /28
31,100.00 1,555.00 sumber harga http://www.anekamaju.com/126-kawat-las Rp.27.000
AH HARGA BAHAN 429,055.00

MLAH HARGA ALAT -

647,395.00
10.00% 64,739.50
712,134.50 ok

dengan las listrik

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,200.00
110,000.00 2,200.00

120,000.00 240.00
120,000.00 240.00
AH TENAGA KERJA 5,880.00
31,100.00 12,440.00
10,900.00 3,270.00
10,600.00 424.00
AH HARGA BAHAN 16,134.00

132,250.00 22,482.50
MLAH HARGA ALAT 22,482.50
4,894.62
44,496.50
10.00% 4,449.65
48,946.15 ok banget 4,894.62

dela besi scuare tube

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 52,000.00
100,000.00 65,000.00
120,000.00 7,800.00
120,000.00 3,840.00
AH TENAGA KERJA 128,640.00

21,879.71 104,147.41 sumber harga http://www.gudangbesibaja.com/category/besi-hollow/, disamakan dengan besi h


16,445.00 74,364.29 sumber harga standar biaya umum kab. Subang thn 2013 = besi hollow 3 cm Rp. 13.000
5,081.71 101,634.13
AH HARGA BAHAN 280,145.83

MLAH HARGA ALAT -

408,785.83
15.00% 61,317.87
470,103.70 belum survey bahan material

ng door besi

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 96,000.00
100,000.00 120,000.00
120,000.00 14,400.00
120,000.00 720.00
AH TENAGA KERJA 231,120.00

1,265,000.00 1,265,000.00 sumber harga http://www.seputarbangunan.com/2016/05/harga-rolling-door-folding-gate.html R


AH HARGA BAHAN 1,265,000.00

MLAH HARGA ALAT -

1,496,120.00
15.00% 224,418.00
1,720,538.00 ok

(folding door) bahan plastik/PVC

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 35,200.00
100,000.00 44,000.00
120,000.00 5,280.00
120,000.00 2,640.00
AH TENAGA KERJA 87,120.00

3,450,000.00 3,450,000.00 sumber harga http://www.seputarbangunan.com/2016/05/harga-rolling-door-folding-gate.html R


AH HARGA BAHAN 3,450,000.00

MLAH HARGA ALAT -

3,537,120.00
15.00% 530,568.00
4,067,688.00 ok

alluminium

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,400.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 480.00
AH TENAGA KERJA 96,480.00

442,750.00 442,750.00
AH HARGA BAHAN 442,750.00

MLAH HARGA ALAT -

539,230.00
15.00% 80,884.50
620,114.50 belum survey bahan

r alluminium

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
100,000.00 100,000.00

120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 198,000.00

460,000.00 460,000.00 sumber harga http://www.layindoaluminium.com/p/daftar-harga-aluminium.html untuk Ukuran 1


AH HARGA BAHAN 460,000.00

MLAH HARGA ALAT -

658,000.00
15.00% 98,700.00
756,700.00 ok

alluminium
pakan harga terpasang yang telah di tambahkan Overhead & Profit

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,440.00
100,000.00 4,300.00
120,000.00 516.00
120,000.00 252.00
AH TENAGA KERJA 8,508.00

126,500.00 139,150.00 sumber harga http://www.layindoaluminium.com/p/daftar-harga-aluminium.html 3 inch Rp 100.0


575.00 1,150.00
23,000.00 1,380.00 sumber harga https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/4zp7x-jual-l
AH HARGA BAHAN 141,680.00

MLAH HARGA ALAT -

150,188.00
15.00% 22,528.20
172,716.20 ok

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,440.00
100,000.00 4,300.00
120,000.00 516.00
120,000.00 252.00
AH TENAGA KERJA 8,508.00

109,250.00 120,175.00
AH HARGA BAHAN 120,175.00

MLAH HARGA ALAT -

128,683.00
15.00% 19,302.45
147,985.45

minium strip lebar 8 cm


Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 6,800.00
100,000.00 8,500.00

120,000.00 1,020.00
120,000.00 504.00
AH TENAGA KERJA 16,824.00

126,500.00 556,600.00
115,000.00 1,679,000.00
AH HARGA BAHAN 2,235,600.00

MLAH HARGA ALAT -

2,252,424.00
15.00% 337,863.60
2,590,287.60 ok

a rangka alluminium

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,800.00
100,000.00 8,500.00

120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 16,980.00

126,500.00 556,600.00
14,231.25 64,040.63
23,000.00 6,210.00
AH HARGA BAHAN 626,850.63

MLAH HARGA ALAT -

643,830.63
15.00% 96,574.59
740,405.22 harga belum di survey
blinds dan vertical blinds

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 2,160.00
AH TENAGA KERJA 69,360.00

122,130.00 122,130.00 sumber harga http://www.tukanggorden.com/products/88/0/VERTICAL-Blind-Rp-106-200-M2/

AH HARGA BAHAN 122,130.00

MLAH HARGA ALAT -

191,490.00
15.00% 28,723.50
220,213.50 ok

strip (2 x 3) mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 133,600.00
100,000.00 167,000.00
120,000.00 20,040.00
120,000.00 9,960.00
AH TENAGA KERJA 330,600.00

15,812.50 97,673.81
5,081.71 137,612.61
AH HARGA BAHAN 235,286.42

MLAH HARGA ALAT -

565,886.42
15.00% 84,882.96
650,769.38 harga belum di survey

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00

287,500.00 316,250.00 sumber harga http://www.womasindo.com/harga-kawat-nyamuk.html


5,081.71 56,457.76
20,872.50 35,817.21 sumber harga www.jasakonstruksi.net/static/file.../12/.../standar_biaya_umum.pdf
AH HARGA BAHAN 408,524.97

MLAH HARGA ALAT -

428,324.97
15.00% 64,248.74
492,573.71 haha

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 38,520.00

193,430.00 212,773.00

575.00 5,750.00

15,812.50 110,687.50
AH HARGA BAHAN 329,210.50
MLAH HARGA ALAT -

367,730.50
15.00% 55,159.58
422,890.08 harga belum di survey

/ jurai seng bjls 28 lebar 90 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 38,520.00

50,485.00 53,009.25
20,700.00 310.50

4,025,000.00 76,475.00

AH HARGA BAHAN 129,794.75

MLAH HARGA ALAT -

168,314.75
15.00% 25,247.21
193,561.96 ok

gkaran D-15 cm, seng pelat bjls 30 lebar 45 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 960.00
AH TENAGA KERJA 46,560.00
50,485.00 53,009.25
20,700.00 207.00
15,812.50 7,906.25
AH HARGA BAHAN 61,122.50

MLAH HARGA ALAT -

107,682.50
15.00% 16,152.38
123,834.88 ok

si hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 1,560.00
AH TENAGA KERJA 49,560.00

21,879.71 76,578.98 sumber harga http://www.gudangbesibaja.com/category/besi-hollow/, menggunakan Besi Hollow

76,578.98 76,578.98

HARGA BAHAN 153,157.96

HARGA ALAT -

202,717.96
15.00% 30,407.69
233,125.65 harga belum di survey

hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 28,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 2,160.00
AH TENAGA KERJA 69,360.00

12,000.00 48,000.00

200.00 800.00
500.00 4,000.00
HARGA BAHAN 52,800.00

HARGA ALAT -

122,160.00
15.00% 18,324.00
140,484.00 harga belum di survey

pelana rangka atap baja canai dingin profil C75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 58,720.00
100,000.00 73,400.00
120,000.00 8,760.00
120,000.00 4,440.00
AH TENAGA KERJA 145,320.00

16,065.50 49,240.76 sumber harga standar biaya umum kab. Subang thn 2013, Rp. 12.700 (di kali 1,1)
HARGA BAHAN 49,240.76

49,240.76 4,924.08
HARGA ALAT 4,924.08

199,484.83
15.00% 29,922.72
229,407.56 harga belum di survey

urai rangka atap baja canai dingin profil C75


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 60,832.00
100,000.00 76,040.00
120,000.00 9,120.00
120,000.00 4,560.00
AH TENAGA KERJA 150,552.00

16,065.50 65,065.28

HARGA BAHAN 65,065.28

-
HARGA ALAT -

215,617.28
15.00% 32,342.59
247,959.87

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 31,200.00
100,000.00 70,000.00
120,000.00 8,400.00
120,000.00 840.00
AH TENAGA KERJA 110,440.00

684,000.00 752,400.00
153,000.00 122,400.00
70,000.00 18,690.00
21,000.00 1,680.00
21,000.00 2,310.00
65,000.00 16,250.00
HARGA BAHAN 913,730.00

150,000.00 3,000.00
15,000.00 15,000.00
50,000.00 50,000.00
HARGA ALAT 68,000.00
1,092,170.00
15.00% 163,825.50
1,255,995.50

PASANGAN DINDING

a merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 70,035.00
239,085.00 19,126.80
HARGA BAHAN 217,961.80

HARGA ALAT -

291,961.80
15.00% 43,794.27
335,756.07 ok
1,678,780.35
a merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 53,049.50
239,085.00 21,756.74
HARGA BAHAN 203,606.24

HARGA ALAT -

277,606.24
15.00% 41,640.94
319,247.17 ok

a merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 42,745.50
239,085.00 22,234.91
HARGA BAHAN 193,780.41

HARGA ALAT -

267,780.41
15.00% 40,167.06
307,947.47 ok

a merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 35,742.00
239,085.00 24,386.67
HARGA BAHAN 188,928.67

HARGA ALAT -

262,928.67
15.00% 39,439.30
302,367.97 ok

a Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 29,785.00
239,085.00 29,168.37
HARGA BAHAN 187,753.37

HARGA ALAT -

261,753.37
15.00% 39,263.01
301,016.38 ok

a merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 3,600.00
AH TENAGA KERJA 74,000.00

920.00 128,800.00
1,610.00 16,228.80
80,500.00 2,213.75
239,085.00 22,115.36
HARGA BAHAN 169,357.91

HARGA ALAT -

243,357.91
15.00% 36,503.69
279,861.60 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 30,509.50
239,085.00 9,085.23
HARGA BAHAN 103,994.73

HARGA ALAT -

140,994.73
15.00% 21,149.21
162,143.94 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 23,135.70
239,085.00 9,563.40
HARGA BAHAN 97,099.10

HARGA ALAT -

134,099.10
15.00% 20,114.87
154,213.97 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 18,515.00
239,085.00 10,280.66
HARGA BAHAN 93,195.66
HARGA ALAT -

130,195.66
15.00% 19,529.35
149,725.00 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 15,584.80
239,085.00 10,758.83
HARGA BAHAN 90,743.63

HARGA ALAT -

127,743.63
15.00% 19,161.54
146,905.17 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 13,395.20
239,085.00 11,715.17
HARGA BAHAN 89,510.37

HARGA ALAT -

126,510.37
15.00% 18,976.55
145,486.92 ok

a merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 10,465.00
239,085.00 11,954.25
HARGA BAHAN 86,819.25

HARGA ALAT -

123,819.25
15.00% 18,572.89
142,392.14 ok

a merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
920.00 64,400.00
1,610.00 7,245.00
80,500.00 1,207.50
239,085.00 11,954.25
HARGA BAHAN 84,806.75

HARGA ALAT -

121,806.75
15.00% 18,271.01
140,077.76 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 28.98
80,500.00 1,449.00
239,085.00 4,303.53
HARGA BAHAN 70,181.51

HARGA ALAT -

107,181.51
15.00% 16,077.23
123,258.74 ok

a merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,000.00

920.00 64,400.00
1,610.00 22.54
80,500.00 1,127.00
239,085.00 6,694.38
HARGA BAHAN 72,243.92

HARGA ALAT -

109,243.92
15.00% 16,386.59
125,630.51 ok

block HB20 campuran 1SP : 3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 2,160.00
JUMLAH TENAGA KERJA 46,960.00

2,012.50 25,156.25 indeks di rubah 0.20


1,610.00 indeks salah di betulkan dengan asumsi indeks lama di bagi 10
4,881.52
239,085.00 17,405.39 keterangan im2 10m spasi [0.01*10*0.2=0.02*1.1=0.022 isi lubang v2*0.1*0.1*0.1*0.2*12.5=0.0
14,950.00 418.60
HARGA BAHAN 47,861.76

HARGA ALAT -

94,821.76
15.00% 14,223.26
109,045.02 harga bahan belum di survey
block HB20 campuran 1SP : 4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 2,160.00
AH TENAGA KERJA 46,960.00

2,012.50 25,156.25
1,610.00 3,905.86
239,085.00 18,457.36
14,950.00 4,186.00
HARGA BAHAN 51,705.47

HARGA ALAT -

98,665.47
15.00% 14,799.82
113,465.29

block HB15 campuran 1SP : 3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 25,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,920.00
AH TENAGA KERJA 40,960.00

1,725.00 21,562.50
1,610.00 3,661.14
239,085.00 13,149.68
14,950.00 4,186.00
HARGA BAHAN 42,559.32
HARGA ALAT -

83,519.32
15.00% 12,527.90
96,047.21

nblock HB15 campuran 1SP :4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 25,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,920.00
AH TENAGA KERJA 40,960.00

1,725.00 21,562.50
1,610.00 2,930.20
239,085.00 13,914.75
14,950.00 4,186.00
HARGA BAHAN 42,593.45

HARGA ALAT -

83,553.45
15.00% 12,533.02
96,086.46

nblock HB10 campuran 1SP :3PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00
1,552.50 19,406.25
1,610.00 2,440.76
239,085.00 8,702.69
14,950.00 4,186.00
HARGA BAHAN 34,735.70

HARGA ALAT -

71,735.70
15.00% 10,760.36
82,496.06

nblock HB10 campuran 1SP : 4PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

1,552.50 19,406.25
1,610.00 1,952.93
239,085.00 9,276.50
14,950.00 4,186.00
HARGA BAHAN 34,821.68

HARGA ALAT -

71,821.68
15.00% 10,773.25
82,594.93

awang (rooster) 12x11x24 campuran 1SP :3PP

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,000.00

15,000.00 450,000.00
1,610.00 17,710.00
239,085.00 8,367.98
HARGA BAHAN 476,077.98

HARGA ALAT -

513,077.98
15.00% 76,961.70
590,039.67

rawang (rooster) 12x11x24 campuran 1SP :4PP

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
MLAH TENAGA KERJA 37,000.00

15,000.00 450,000.00
1,610.00 17,710.00
239,085.00 8,367.98
HARGA BAHAN 476,077.98

HARGA ALAT -

513,077.98
15.00% 76,961.70
590,039.67

bata berongga ekspose 5x11x23 campuran 1SP :3PP 5x11x21

Harga Jumlah
Satuan Harga
(Rp) (Rp)
75.76
80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

15,000.00 1,050,000.00 #REF! 95.00 bh 1,425,000.00


1,610.00 2,254.00 #REF! 16.64 kg 26,790.40
239,085.00 765.07 #REF! 0.06 m3 14,345.10
HARGA BAHAN 1,053,019.07 #REF! 1,466,135.50
#REF! 1,508,735.50
#REF! 226,310.33
HARGA ALAT - #REF! 1,735,045.83

1,095,619.07
15.00% 164,342.86
1,259,961.93

a ringan tebal 7,5 cm dengan mortar siap pakai

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 53,600.00
100,000.00 130,000.00
120,000.00 15,600.00
120,000.00 360.00
AH TENAGA KERJA 199,560.00 0.75

5,200.00 43,680.00 sumber harga http://boshargabangunan.com/harga-bata-ringan/ Rp. 750.000 /m3


4,312.50 2,039.81 sumber harga http://www.rumahmaterial.com/2014/04/daftar-harga-mortar-utama-mu-2014.htm
HARGA BAHAN 45,719.81

-
HARGA ALAT -

245,279.81
15.00% 36,791.97
282,071.78
a ringan tebal 10 cm dengan mortar siap pakai

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 53,680.00
100,000.00 130,000.00
120,000.00 15,600.00
120,000.00 360.00
AH TENAGA KERJA 199,640.00

6,000.00 50,400.00 sumber harga http://boshargabangunan.com/harga-bata-ringan/


4,312.50 271.69 survay harga bahan yang benar
AH HARGA BAHAN 50,671.69

-
HARGA ALAT -

250,311.69
15.00% 37,546.75
287,858.44

PLESTERAN

SP : 1PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 24,961.44
239,085.00 3,825.36
HARGA BAHAN 28,786.80

HARGA ALAT -

71,386.80
15.00% 10,708.02
82,094.82 ok

SP : 2PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 16,460.64
239,085.00 4,781.70
HARGA BAHAN 21,242.34

HARGA ALAT -

63,842.34
15.00% 9,576.35
73,418.69 ok

SP : 3PP tebal 15mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 12,519.36
239,085.00 5,498.96
HARGA BAHAN 18,018.32

HARGA ALAT -
60,618.32
15.00% 9,092.75
69,711.06 ok

SP : 4PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 10,046.40
239,085.00 5,738.04
HARGA BAHAN 15,784.44

HARGA ALAT -

58,384.44
15.00% 8,757.67
67,142.11 ok

SP : 5PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 8,346.24
239,085.00 6,216.21
HARGA BAHAN 14,562.45
HARGA ALAT -

57,162.45
15.00% 8,574.37
65,736.82 ok

SP : 6PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 7,109.76
239,085.00 6,455.30
HARGA BAHAN 13,565.06

HARGA ALAT -

56,165.06
15.00% 8,424.76
64,589.81 ok

SP : 7PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 6,336.96
239,085.00 6,694.38
HARGA BAHAN 13,031.34
HARGA ALAT -

55,631.34
15.00% 8,344.70
63,976.04 ok

SP : 8PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 5,564.16
239,085.00 6,933.47
HARGA BAHAN 12,497.63

HARGA ALAT -

55,097.63
15.00% 8,264.64
63,362.27 ok

SP : 1/2KP : 3PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00
1,610.00 9,273.60
80,500.00 241.50
239,085.00 3,108.11
HARGA BAHAN 12,623.21

HARGA ALAT -

57,023.21
15.00% 8,553.48
65,576.69 ok

SP : 2KP : 8PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00

1,610.00 4,830.00
80,500.00 402.50
239,085.00 4,781.70
HARGA BAHAN 10,014.20

HARGA ALAT -

54,414.20
15.00% 8,162.13
62,576.33 ok

SM : 1KP : 1PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00

1,074.53 9.67 sumber harga http://www.signalreadymix.co/blog/harga-semen-perekat-hebel#popup mengguna


80,500.00 724.50
239,085.00 2,151.77
HARGA BAHAN 2,885.94

HARGA ALAT -

47,285.94
15.00% 7,092.89
54,378.83

SM : 1KP : 2PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,800.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 2,160.00
AH TENAGA KERJA 44,400.00

1,074.53 7.52
80,500.00 563.50
239,085.00 3,586.28
HARGA BAHAN 4,157.30

HARGA ALAT -

48,557.30
15.00% 7,283.59
55,840.89

SP : 1PP tebal 20 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00

1,610.00 21,947.52
239,085.00 6,455.30
HARGA BAHAN 28,402.82

HARGA ALAT -

85,442.82
15.00% 12,816.42
98,259.24

SP : 3PP tebal 20 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 1,560.00
AH TENAGA KERJA 44,760.00

1,610.00 16,692.48
239,085.00 7,411.64
HARGA BAHAN 24,104.12

HARGA ALAT -

68,864.12
15.00% 10,329.62
79,193.73

SP : 4PP tebal 20 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00

1,610.00 13,395.20
239,085.00 7,650.72
AH HARGA BAHAN 21,045.92

HARGA ALAT -

78,085.92
15.00% 11,712.89
89,798.81

SP : 5PP tebal 20 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00

1,610.00 11,128.32
239,085.00 8,367.98
HARGA BAHAN 19,496.30

HARGA ALAT -

76,536.30
15.00% 11,480.44
88,016.74
SP : 6PP tebal 20 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,640.00
AH TENAGA KERJA 57,040.00

1,610.00 9,479.68
239,085.00 8,607.06
HARGA BAHAN 18,086.74

HARGA ALAT -

75,126.74
15.00% 11,269.01
86,395.75

SM : 1 KP : 2PP tebal 20 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 35,200.00
100,000.00 22,000.00
120,000.00 2,640.00
120,000.00 2,640.00
AH TENAGA KERJA 62,480.00

1,074.53 9.67
80,500.00 724.50
239,085.00 4,303.53
AH HARGA BAHAN 5,037.70

MLAH HARGA ALAT -

67,517.70
15.00% 10,127.66
77,645.36

P : 5PP tebal 15 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00

1,610.00 8,346.24
239,085.00 6,216.21
AH HARGA BAHAN 14,562.45

MLAH HARGA ALAT -

35,982.45
15.00% 5,397.37
41,379.82

oning 1SP : 3PP lebar 10 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,400.00
100,000.00 40,000.00
120,000.00 4,800.00
120,000.00 480.00
AH TENAGA KERJA 51,680.00

1,610.00 805.00
239,085.00 3,108.11
AH HARGA BAHAN 3,913.11

MLAH HARGA ALAT -


55,593.11
15.00% 8,338.97
63,932.07

ranit 1SP : 2 granit tebal 1cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
100,000.00 22,500.00
120,000.00 2,760.00
120,000.00 2,760.00
AH TENAGA KERJA 64,020.00

1,610.00 16,100.00
5,750.00 86,250.00 sumber harga http://blogharga.xyz/harga-batu-alam-terbaru.html, pasir granit
AH HARGA BAHAN 102,350.00

MLAH HARGA ALAT -

166,370.00
15.00% 24,955.50
191,325.50

aso 1SP : 2 traso tebal 1 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
100,000.00 22,500.00
120,000.00 2,760.00
120,000.00 2,760.00
AH TENAGA KERJA 64,020.00

1,610.00 16,100.00
5,750.00 86,250.00 sumber harga http://jualbatualam.net/harga-batu-alam-per-meter-untuk-dinding/, sama denganb
HARGA BAHAN 102,350.00
HARGA ALAT -

166,370.00
15.00% 24,955.50
191,325.50

prat 1SP : 2PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,800.00
AH TENAGA KERJA 37,000.00

1,610.00 6,955.20
239,085.00 1,434.51
HARGA BAHAN 8,389.71

HARGA ALAT -

45,389.71
15.00% 6,808.46
52,198.17

ar pasangan bata merah

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00

1,610.00 5,003.88
HARGA BAHAN 5,003.88
HARGA ALAT -

26,423.88
15.00% 3,963.58
30,387.46

ar pasangan conblock ekspose

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,600.00
100,000.00 3,500.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 10,060.00

1,610.00 2,576.00
HARGA BAHAN 2,576.00

HARGA ALAT -

12,636.00
15.00% 1,895.40
14,531.40

ar pasangan batu kali, campuran 1SP : 2PP

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,800.00
AH TENAGA KERJA 42,600.00

1,610.00 10,207.40
239,085.00 2,869.02
HARGA BAHAN 13,076.42

HARGA ALAT -

55,676.42
15.00% 8,351.46
64,027.88

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,200.00
AH TENAGA KERJA 28,400.00

1,610.00 5,232.50
HARGA BAHAN 5,232.50

HARGA ALAT -

33,632.50
15.00% 5,044.88
38,677.38

engan mortar siap pakai (MSP)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 -
100,000.00 -
120,000.00 -
120,000.00 -
AH TENAGA KERJA -
4,312.50 -
HARGA BAHAN -

HARGA ALAT -

-
15.00% -
-

cian mortar siap pakai (MSP)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 -
100,000.00 -
120,000.00 -
120,000.00 -
AH TENAGA KERJA -

4,312.50 -
HARGA BAHAN -

HARGA ALAT -

-
15.00% -
-

N PENUTUP LANTAI DAN PENUTUP DINDING

PC abu-abu ukuran 40cm x 40 cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

- -
1,610.00 15,778.00
239,085.00 10,758.83
AH HARGA BAHAN 26,536.83

MLAH HARGA ALAT -

62,156.83
15.00% 9,323.52
71,480.35

PC abu-abu ukuran 30 cm x30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

3,335.00 39,586.45
1,610.00 16,100.00
239,085.00 10,758.83
AH HARGA BAHAN 66,445.28

MLAH HARGA ALAT -

102,065.28
15.00% 15,309.79
117,375.07

PC abu-abu ukuran 20 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 21,600.00
100,000.00 13,500.00
120,000.00 1,680.00
120,000.00 1,680.00
AH TENAGA KERJA 38,460.00

2,645.00 70,092.50
1,610.00 16,744.00
239,085.00 10,758.83
AH HARGA BAHAN 97,595.33

MLAH HARGA ALAT -

136,055.33
15.00% 20,408.30
156,463.62

warna ukuran 40 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

- -
1,610.00 15,778.00
6,900.00 4,140.00
239,085.00 10,758.83
AH HARGA BAHAN 30,676.83

MLAH HARGA ALAT -

66,296.83
15.00% 9,944.52
76,241.35
warna ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

3,795.00 45,046.65
1,610.00 16,100.00
6,900.00 4,140.00
239,085.00 10,758.83
AH HARGA BAHAN 76,045.48

MLAH HARGA ALAT -

112,965.48
15.00% 16,944.82
129,910.30

warna ukuran 20 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 21,600.00
100,000.00 13,500.00
120,000.00 1,680.00
120,000.00 1,680.00
AH TENAGA KERJA 38,460.00

3,105.00 82,282.50
1,610.00 16,744.00
6,900.00 6,900.00
239,085.00 10,758.83
AH HARGA BAHAN 116,685.33
MLAH HARGA ALAT -

155,145.33
15.00% 23,271.80
178,417.12

teraso ukuran 40 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83

MLAH HARGA ALAT -

71,126.83
15.00% 10,669.02
81,795.85

teraso ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83

MLAH HARGA ALAT -

74,128.83
15.00% 11,119.32
85,248.15

granit ukuran 40 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

48,300.00 320,229.00
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 355,735.83

MLAH HARGA ALAT -

391,355.83
15.00% 58,703.37
450,059.20

granit ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

2,500.00 29,675.00
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 66,883.83

MLAH HARGA ALAT -

103,803.83
15.00% 15,570.57
119,374.40

granit ukuran 60 cm x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

54,000.00 208,980.00 216,000.00 14,285.71


1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 246,188.83

MLAH HARGA ALAT -

283,108.83
15.00% 42,466.32
325,575.15

teralux marmer ukuran 40 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83

MLAH HARGA ALAT -

71,126.83
15.00% 10,669.02
81,795.85

teralux ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83

MLAH HARGA ALAT -

74,128.83
15.00% 11,119.32
85,248.15

teralux marmer ukuran 60 cm x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 19,200.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 1,440.00
AH TENAGA KERJA 34,080.00

- -
1,610.00 15,456.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 36,564.83

MLAH HARGA ALAT -

70,644.83
15.00% 10,596.72
81,241.55

teralux marmer ukuran 40 cm x 40 cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 20,000.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 35,620.00

- -
1,610.00 15,778.00
6,900.00 8,970.00
239,085.00 10,758.83
AH HARGA BAHAN 35,506.83
MLAH HARGA ALAT -

71,126.83
15.00% 10,669.02
81,795.85

teralux marmer ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,800.00
100,000.00 13,000.00
120,000.00 1,560.00
120,000.00 1,560.00
AH TENAGA KERJA 36,920.00

- -
1,610.00 16,100.00
6,900.00 10,350.00
239,085.00 10,758.83
AH HARGA BAHAN 37,208.83

MLAH HARGA ALAT -

74,128.83
15.00% 11,119.32
85,248.15

C abu-abu ukuran 15 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 2,656.50
239,085.00 956.34
AH HARGA BAHAN 3,612.84

MLAH HARGA ALAT -

21,492.84
15.00% 3,223.93
24,716.77

c abu-abu ukuran 10 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,996.40
239,085.00 717.26
AH HARGA BAHAN 2,713.66

MLAH HARGA ALAT -

20,593.66
15.00% 3,089.05
23,682.70

c abu-abu ukuran 10cm x 40cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,996.40
239,085.00 717.26
AH HARGA BAHAN 2,713.66

MLAH HARGA ALAT -

20,593.66
15.00% 3,089.05
23,682.70

arna ukuran 10cm x 20cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 1,035.00
239,085.00 717.26
AH HARGA BAHAN 3,587.66

MLAH HARGA ALAT -

21,467.66
15.00% 3,220.15
24,687.80

arna ukuran 10cm x 30cm

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

arna ukuran 10 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

raso ukuran 10cm x 30cm


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

raso ukuran 10 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -


21,122.66
15.00% 3,168.40
24,291.05

anit ukuran 10 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

anit ukuran 10 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

ralux kerang ukuran 10cm x 40cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

ralux kerang ukuran 10 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00
- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

ralux marmer ukuran 10 cm x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

ralux marmer ukuran 10 cm x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05

ralux marmer ukuran 10cm x 30cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 1,080.00
120,000.00 600.00
AH TENAGA KERJA 17,880.00

- -
1,610.00 1,835.40
6,900.00 690.00
239,085.00 717.26
AH HARGA BAHAN 3,242.66

MLAH HARGA ALAT -

21,122.66
15.00% 3,168.40
24,291.05
o cor di tempat, tebal 3 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,800.00
100,000.00 18,000.00
120,000.00 2,160.00
120,000.00 2,160.00
AH TENAGA KERJA 51,120.00

- -
6,900.00 690.00
AH HARGA BAHAN 690.00

MLAH HARGA ALAT -

51,810.00
15.00% 7,771.50
59,581.50

mik artistik 10 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

1,380.00 73,140.00
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 18,975.00
AH HARGA BAHAN 116,059.73

MLAH HARGA ALAT -


215,459.73
15.00% 32,318.96
247,778.68

mik artistik 10 cm x 10 cm atau 5 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

- -
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 22,080.00
AH HARGA BAHAN 46,024.73

MLAH HARGA ALAT -

145,424.73
15.00% 21,813.71
167,238.43

mik ukuran 33 cm x 33 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

- -
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 27,394.73

MLAH HARGA ALAT -

126,794.73
15.00% 19,019.21
145,813.93

mik ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

31,625.00 33,206.25
1,610.00 16,100.00
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 63,515.08

MLAH HARGA ALAT -

162,915.08
15.00% 24,437.26
187,352.34

mik ukuran 20 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

57,500.00 60,375.00
1,610.00 16,744.00
239,085.00 10,758.83
6,900.00 3,450.00
AH HARGA BAHAN 91,327.83

MLAH HARGA ALAT -

190,727.83
15.00% 28,609.17
219,337.00

mik ukuran 10 cm x 33 cm untuk variasi/border

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 84,000.00
100,000.00 52,500.00
120,000.00 6,360.00
120,000.00 6,360.00
AH TENAGA KERJA 149,220.00

- -
1,610.00 15,778.00
239,085.00 10,758.83
6,900.00 30,153.00
AH HARGA BAHAN 56,689.83

MLAH HARGA ALAT -

205,909.83
15.00% 30,886.47
236,796.30

mik mozaik ukuran 30 cm x 30 cm


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

4,495.45 53,361.05 sumber harga http://keramikterbaru.blogspot.com/2014/08/harga-keramik-arwana.html


1,610.00 22,781.50
239,085.00 9,324.32
6,900.00 13,800.00
AH HARGA BAHAN 99,266.86

MLAH HARGA ALAT -

198,666.86
15.00% 29,800.03
228,466.89

k ukuran 10 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00

13,800.00 73,140.00 sumber harga standar biaya umum kab subang thn 2013 Rp. 5000
1,610.00 1,835.40
239,085.00 717.26
6,900.00 172.50
AH HARGA BAHAN 75,865.16

MLAH HARGA ALAT -


96,865.16
15.00% 14,529.77
111,394.93

k ukuran 10 cm x 10 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00

10,350.00 109,710.00
1,610.00 1,835.40
239,085.00 717.26
6,900.00 345.00
AH HARGA BAHAN 112,607.66

MLAH HARGA ALAT -

133,607.66
15.00% 20,041.15
153,648.80

k ukuran 5 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
100,000.00 9,000.00
120,000.00 4,200.00
120,000.00 600.00
AH TENAGA KERJA 21,000.00

10,350.00 54,855.00
1,610.00 917.70
239,085.00 358.63
6,900.00 89.70
AH HARGA BAHAN 56,221.03

MLAH HARGA ALAT -

77,221.03
15.00% 11,583.15
88,804.18

l cove artistik 5 cm x 5 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 60,000.00
100,000.00 75,000.00
120,000.00 9,000.00
120,000.00 4,560.00
AH TENAGA KERJA 148,560.00

17,250.00 91,425.00
1,610.00 1,835.40
239,085.00 717.26
6,900.00 690.00
AH HARGA BAHAN 94,667.66

MLAH HARGA ALAT -

243,227.66
15.00% 36,484.15
279,711.80

mer ukuran 100cm x 100cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

920,000.00 975,200.00
1,610.00 13,185.90
239,085.00 10,758.83
6,900.00 924.60
AH HARGA BAHAN 1,000,069.33

MLAH HARGA ALAT -

1,099,469.33
15.00% 164,920.40
1,264,389.72

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 13,600.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 1,080.00
AH TENAGA KERJA 33,720.00

115,000.00 120,750.00 sumber harga http://www.ianinterior.co.id/kisaran-harga-karpet-polos-yang-tersedia-dipasaran/


78,775.00 27,571.25 sumber harga http://www.lantaikayuku.com/2015/10/macam-macam-lem.html, menggunakan le
AH HARGA BAHAN 148,321.25

MLAH HARGA ALAT -

182,041.25
15.00% 27,306.19
209,347.44

(pelapis bawah karpet)


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

57,500.00 60,375.00 sumber harga http://www.bataviakarpet.co.id/catalogue/accessories/carpets/underlayer_foam/in


78,775.00 27,571.25
AH HARGA BAHAN 87,946.25

MLAH HARGA ALAT -

111,706.25
15.00% 16,755.94
128,462.19

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

172,500.00 181,125.00 sumber harga gudangparquet.net/harga-lantai-kayu/katalog-harga-lantai-kayu-2014.html


78,775.00 47,265.00
AH HARGA BAHAN 228,390.00

MLAH HARGA ALAT -

327,790.00
15.00% 49,168.50
376,958.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

172,500.00 181,125.00
78,775.00 47,265.00
AH HARGA BAHAN 228,390.00

MLAH HARGA ALAT -

327,790.00
15.00% 49,168.50
376,958.50

selen 11 cm x 11 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 6,000.00
AH TENAGA KERJA 142,000.00

- -
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 3,450.00
AH HARGA BAHAN 22,726.53
MLAH HARGA ALAT -

164,726.53
15.00% 24,708.98
189,435.51

selen 10 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

1,380.00 73,140.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 111,391.53

MLAH HARGA ALAT -

239,191.53
15.00% 35,878.73
275,070.26

selen 20 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

2,645.00 68,770.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 101,432.53

MLAH HARGA ALAT -

229,232.53
15.00% 34,384.88
263,617.41

amik artistik 10 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

3,833.33 203,166.67
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 241,418.20

MLAH HARGA ALAT -

369,218.20
15.00% 55,382.73
424,600.93

amik artistik 5 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

1,916.67 203,166.67
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 20,010.00
AH HARGA BAHAN 242,453.20

MLAH HARGA ALAT -

370,253.20
15.00% 55,537.98
425,791.18

amik 10 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

1,380.00 73,140.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 18,975.00
AH HARGA BAHAN 111,391.53

MLAH HARGA ALAT -

239,191.53
15.00% 35,878.73
275,070.26

amik 20 cm x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

2,645.00 70,092.50
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 102,755.03

MLAH HARGA ALAT -

230,555.03
15.00% 34,583.25
265,138.28

amik 20 cm x 25 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 5,400.00
AH TENAGA KERJA 127,800.00

2,400.00 63,600.00
1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 96,262.53

MLAH HARGA ALAT -

224,062.53
15.00% 33,609.38
257,671.91
amik 30 cm x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

100,000.00 90,000.00
120,000.00 54,000.00
120,000.00 5,400.00
- -
AH TENAGA KERJA 149,400.00

10,000.00 135,000.00 31.25


1,610.00 14,973.00
239,085.00 4,303.53
6,900.00 13,386.00
AH HARGA BAHAN 167,662.53

MLAH HARGA ALAT -

317,062.53
15.00% 47,559.38
364,621.91

rmer 100 cm x 100 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 104,000.00
100,000.00 65,000.00
120,000.00 7,800.00
120,000.00 7,800.00
AH TENAGA KERJA 184,600.00

920,000.00 975,200.00
1,610.00 20,028.40
239,085.00 5,977.13
6,900.00 4,485.00
575.00 1,742.25
AH HARGA BAHAN 1,007,432.78

MLAH HARGA ALAT -

1,192,032.78
15.00% 178,804.92
1,370,837.69

a pelapis 3 cm x 7 cm x 24 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 6,000.00
AH TENAGA KERJA 142,000.00

4,695.83 295,837.50 sumber harga http://batatempel.com/harga-bata-tempel/. Rp. 245.000 / 60 pcs


1,610.00 20,028.40
239,085.00 5,977.13
6,900.00 18,975.00
AH HARGA BAHAN 340,818.03

MLAH HARGA ALAT -

482,818.03
15.00% 72,422.70
555,240.73

Harga Jumlah
Satuan Harga
(Rp) (Rp)
indeks asli indeks modifikasi
80,000.00 56,000.00 0.700 0.7000
100,000.00 35,000.00 0.350 0.3500
120,000.00 4,200.00 0.035 0.0350
120,000.00 4,200.00 0.035 0.0035
AH TENAGA KERJA 99,400.00

4,812.75 5,294.03 sumber harga http://www.cahayaalamstone.com/2016/09/daftar-harga-batu-paras-jogja-dan-jen


1,610.00 18,917.50
239,085.00 8,367.98
AH HARGA BAHAN 32,579.50

MLAH HARGA ALAT -

131,979.50
15.00% 19,796.93
151,776.43

u tempel hitam

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 35,000.00
120,000.00 4,200.00
120,000.00 4,200.00
AH TENAGA KERJA 99,400.00

1,782.50 1,960.75
1,610.00 18,917.50
239,085.00 8,367.98
AH HARGA BAHAN 29,246.23

MLAH HARGA ALAT -

128,646.23
15.00% 19,296.93
147,943.16

Andesit Bakar 10 x 10 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

70,000.00 74,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 80,491.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

180,091.00
15.00% 27,013.65
207,104.65

Andesit Bakar 10 x 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

70,000.00 74,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 80,491.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

180,091.00
15.00% 27,013.65
207,104.65

Andesit Bakar 15 x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

90,000.00 95,400.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 101,691.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

201,291.00
15.00% 30,193.65
231,484.65

Andesit Bakar 20 x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

100,000.00 106,000.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 112,291.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

211,891.00
15.00% 31,783.65
243,674.65
Andesit Bakar 30 x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

105,000.00 111,300.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 117,591.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

217,191.00
15.00% 32,578.65
249,769.65

Andesit Bakar 30 x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

110,000.00 116,600.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 122,891.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

222,491.00
15.00% 33,373.65
255,864.65

Andesit Bakar 40 x 40 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

115,000.00 121,900.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 128,191.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

227,791.00
15.00% 34,168.65
261,959.65

Andesit Bakar 40 x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

130,000.00 137,800.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 144,091.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

243,691.00
15.00% 36,553.65
280,244.65

Andesit Bakar 50 x 50 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

170,000.00 180,200.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 186,491.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

286,091.00
15.00% 42,913.65
329,004.65

Andesit Bakar 60 x 60 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 36,000.00
110,000.00 55,000.00
120,000.00 2,400.00
120,000.00 1,200.00
AH TENAGA KERJA 94,600.00

180,000.00 190,800.00
1,420.00 2,840.00
203,000.00 3,451.00
AH HARGA BAHAN 197,091.00

5,000.00 5,000.00
MLAH HARGA ALAT 5,000.00

296,691.00
15.00% 44,503.65
341,194.65

ukuran 30 cm x 30 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 29,760.00

12,545.45 148,914.55
25,300.00 8,855.00
AH HARGA BAHAN 157,769.55

MLAH HARGA ALAT -

187,529.55
15.00% 28,129.43
215,658.98

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 17,500.00
120,000.00 2,040.00
120,000.00 240.00
AH TENAGA KERJA 47,780.00

80,500.00 177,100.00 sumber harga http://www.hargamaterial.xyz/harga-wallpaper-dinding/, diambil harga tengah2nya


25,300.00 6,325.00
AH HARGA BAHAN 183,425.00

MLAH HARGA ALAT -

231,205.00
15.00% 34,680.75
265,885.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

11,116.67 55,583.33 sumber harga http://trowellantai.com/tag/harga-floor-hardener-sika/


AH HARGA BAHAN 55,583.33

MLAH HARGA ALAT -

79,343.33
15.00% 11,901.50
91,244.83

5cm x 30cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,400.00
100,000.00 8,000.00
120,000.00 960.00
120,000.00 480.00
AH TENAGA KERJA 15,840.00
12,545.45 22,080.00
25,300.00 2,024.00
AH HARGA BAHAN 24,104.00

MLAH HARGA ALAT -

39,944.00
15.00% 5,991.60
45,935.60

ebal 2 cm lebar 10 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

10,925,000.00 32,775.00
20,700.00 1,035.00
AH HARGA BAHAN 33,810.00

MLAH HARGA ALAT -

57,570.00
15.00% 8,635.50
66,205.50

k natural tebal 6 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 76,156.00

57,500.00 58,075.00
265,650.00 13,282.50
AH HARGA BAHAN 71,357.50

71,357.50 7,135.75
MLAH HARGA ALAT 7,135.75

154,649.25
15.00% 23,197.39
177,846.64

k natural tebal 8 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 96,156.00

71,300.00 72,013.00
265,650.00 549,895.50
AH HARGA BAHAN 621,908.50

621,908.50 62,190.85
MLAH HARGA ALAT 62,190.85

780,255.35
15.00% 117,038.30
897,293.65

k berwarna tebal 6 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
AH TENAGA KERJA 76,156.00

65,550.00 66,205.50
265,650.00 13,282.50
AH HARGA BAHAN 79,488.00

79,488.00 7,948.80
MLAH HARGA ALAT 7,948.80

163,592.80
15.00% 24,538.92
188,131.72

k berwarna tebal 8 cm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 156.00
MLAH TENAGA KERJA 96,156.00

79,350.00 80,143.50
265,650.00 549,895.50
MLAH HARGA BAHAN 630,039.00

630,039.00 63,003.90
UMLAH HARGA ALAT 63,003.90

789,198.90
15.00% 118,379.84
907,578.74

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 4,000.00
100,000.00 10,000.00
120,000.00 6,000.00
120,000.00 3,000.00
MLAH TENAGA KERJA 23,000.00

45,000.00 112,500.00
265,650.00 265.65
MLAH HARGA BAHAN 112,765.65

-
UMLAH HARGA ALAT -

135,765.65
15.00% 20,364.85
156,130.50

-LANGIT (PLAFOND)

it asbes semen, tebal 4 mm, 5 mm, dan 6 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 2,400.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 480.00
MLAH TENAGA KERJA 10,720.00

42,550.00 46,805.00 sumber harga https://daftarharga.biz/harga-atap-asbes-dan-seng/


23,000.00 230.00
MLAH HARGA BAHAN 47,035.00

-
UMLAH HARGA ALAT -

57,755.00
15.00% 8,663.25
66,418.25

t akustik ukuran (30 x 30) cm


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

58,650.00 703,800.00 sumber harga http://tukangplafongypsum.mwapblog.com/kami-adalah-tukang-plafon-gypsum-da


23,000.00 1,150.00
AH HARGA BAHAN 704,950.00

-
MLAH HARGA ALAT -

728,710.00
15.00% 109,306.50
838,016.50

t akustik ukuran (30 x 60) cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

58,650.00 340,170.00
23,000.00 1,150.00
AH HARGA BAHAN 341,320.00

-
MLAH HARGA ALAT -

365,080.00
15.00% 54,762.00
419,842.00
t akustik ukuran (60 x 120) cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00

58,650.00 87,975.00
23,000.00 1,150.00
AH HARGA BAHAN 89,125.00

-
MLAH HARGA ALAT -

108,925.00
15.00% 16,338.75
125,263.75

t tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00

69,000.00 25,875.00
23,000.00 690.00
AH HARGA BAHAN 26,565.00

-
MLAH HARGA ALAT -

46,365.00
15.00% 6,954.75
53,319.75

t lambrisering kayu, tebal 9 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,000.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 4,800.00
AH TENAGA KERJA 158,400.00

4,025,000.00 60,375.00
23,000.00 230.00
AH HARGA BAHAN 60,605.00

-
MLAH HARGA ALAT -

219,005.00
15.00% 32,850.75
251,855.75

it gypsum board ukuran (120x240x9) mm, tebal 9 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 8,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 600.00
AH TENAGA KERJA 14,200.00

60,375.00 21,976.50
20,700.00 2,277.00
AH HARGA BAHAN 24,253.50

-
MLAH HARGA ALAT -
38,453.50
15.00% 5,768.03
44,221.53

t akustik ukuran (60 x 120) cm berikut rangka alluminium

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 3,000.00
AH TENAGA KERJA 99,000.00

113,850.00 409,860.00
23,000.00 3,450.00
230.00 241.50
58,650.00 87,975.00
AH HARGA BAHAN 501,526.50

MLAH HARGA ALAT -

600,526.50
15.00% 90,078.98
690,605.48

ngit kayu profil

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 9,960.00

6,325.00 6,641.25
20,700.00 207.00
AH HARGA BAHAN 6,848.25

-
MLAH HARGA ALAT -

16,808.25
15.00% 2,521.24
19,329.49

ngit profil gypsum

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 360.00
AH TENAGA KERJA 9,960.00

15,000.00 16,500.00
78,200.00 391.00
AH HARGA BAHAN 16,891.00

-
MLAH HARGA ALAT -

26,851.00
15.00% 4,027.65
30,878.65

PENUTUP ATAP
ng palentong kecil

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 900.00
120,000.00 960.00
TENAGA KERJA 21,360.00

1,035.00 25,875.00
HARGA BAHAN 25,875.00

MLAH HARGA ALAT -

47,235.00
15.00% 7,085.25
54,320.25

ng kodok glazuur

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00

1,610.00 40,250.00
AH HARGA BAHAN 40,250.00

MLAH HARGA ALAT -

61,670.00
15.00% 9,250.50
70,920.50

ng palentong besar/super

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 21,420.00

1,725.00 20,700.00
AH HARGA BAHAN 20,700.00

HARGA ALAT -

42,120.00
15.00% 6,318.00
48,438.00

teng palentong

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00

2,300.00 11,500.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 32,030.72

MLAH HARGA ALAT -

86,670.72
15.00% 13,000.61
99,671.33

teng kodok glazuur

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00

4,600.00 23,000.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 43,530.72

MLAH HARGA ALAT -

98,170.72
15.00% 14,725.61
112,896.33

teng palentong besar

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 240.00
AH TENAGA KERJA 54,640.00

6,900.00 27,600.00
1,610.00 12,880.00
239,085.00 7,650.72
AH HARGA BAHAN 48,130.72

MLAH HARGA ALAT -

102,770.72
15.00% 15,415.61
118,186.33

ibreglass 90 x 180
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 6,700.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,580.00

71,300.00 42,780.00 sumber harga http://portalbangunan.com/harga-atap-asbes-terbaru/


23,000.00 1,150.00
AH HARGA BAHAN 43,930.00

MLAH HARGA ALAT -

63,510.00
15.00% 9,526.50
73,036.50

s gelombang 0,92 m x 2 ,5 m x 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 20,620.00

36,800.00 18,400.00
20,700.00 2,484.00
AH HARGA BAHAN 20,884.00

MLAH HARGA ALAT -

41,504.00
15.00% 6,225.60
47,729.60
s gelombang 0,92 m x 2,25 m x 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 960.00
AH TENAGA KERJA 20,620.00

36,800.00 22,080.00
20,700.00 2,484.00
AH HARGA BAHAN 24,564.00

MLAH HARGA ALAT -

45,184.00
15.00% 6,777.60
51,961.60

s gelombang 0,92 m x 2,00 m x 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 22,080.00
20,700.00 2,484.00
AH HARGA BAHAN 24,564.00

MLAH HARGA ALAT -


44,444.00
15.00% 6,666.60
51,110.60

s gelombang 0,92 m x 1,80 m x 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 27,600.00
20,700.00 2,484.00
AH HARGA BAHAN 30,084.00

MLAH HARGA ALAT -

49,964.00
15.00% 7,494.60
57,458.60

s gelombang 1,05 m x 3,00 m x 4 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 12,880.00
20,700.00 2,484.00
AH HARGA BAHAN 15,364.00
MLAH HARGA ALAT -

35,244.00
15.00% 5,286.60
40,530.60

s gelombang 1,05 m x 2,70 m x 4 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
MLAH TENAGA KERJA 19,880.00

36,800.00 15,456.00
20,700.00 2,484.00
MLAH HARGA BAHAN 17,940.00

UMLAH HARGA ALAT -

37,820.00
15.00% 5,673.00
43,493.00

s gelombang 1,05 m x 2,40 m x 4 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 16,192.00
20,700.00 2,484.00
AH HARGA BAHAN 18,676.00
MLAH HARGA ALAT -

38,556.00
15.00% 5,783.40
44,339.40

s gelombang 1,05 m x 2,10 m x 4 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 18,768.00
20,700.00 2,484.00
AH HARGA BAHAN 21,252.00

MLAH HARGA ALAT -

41,132.00
15.00% 6,169.80
47,301.80

s gelombang 1,05 m x 1,50 m x 4 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00
36,800.00 29,440.00
20,700.00 2,484.00
AH HARGA BAHAN 31,924.00

MLAH HARGA ALAT -

51,804.00
15.00% 7,770.60
59,574.60

s gelombang 1,08 m x 3,00 m x 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 13,616.00
20,700.00 2,484.00
AH HARGA BAHAN 16,100.00

MLAH HARGA ALAT -

35,980.00
15.00% 5,397.00
41,377.00

s gelombang 1,08 m x 2,70 m x 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 13,984.00
20,700.00 2,484.00
AH HARGA BAHAN 16,468.00

MLAH HARGA ALAT -

36,348.00
15.00% 5,452.20
41,800.20

s gelombang 1,08 m x 2,40 m x 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 16,928.00
20,700.00 2,484.00
AH HARGA BAHAN 19,412.00

MLAH HARGA ALAT -

39,292.00
15.00% 5,893.80
45,185.80

s gelombang 1,08 m x 2,10 m x 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 18,032.00
20,700.00 2,484.00
AH HARGA BAHAN 20,516.00

MLAH HARGA ALAT -

40,396.00
15.00% 6,059.40
46,455.40

s gelombang 1,08 m x 1,80 m x 6 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 840.00
AH TENAGA KERJA 19,880.00

36,800.00 20,976.00
20,700.00 2,484.00
AH HARGA BAHAN 23,460.00

MLAH HARGA ALAT -

43,340.00
15.00% 6,501.00
49,841.00

l gelombang 0,92 m

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 171,120.00 sumber harga http://portalbangunan.com/harga-atap-asbes-terbaru/


575.00 3,450.00
AH HARGA BAHAN 174,570.00

MLAH HARGA ALAT -

195,830.00
15.00% 29,374.50
225,204.50

l gelombang 1,05 m

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 149,730.00
575.00 3,450.00
AH HARGA BAHAN 153,180.00

MLAH HARGA ALAT -

174,440.00
15.00% 26,166.00
200,606.00

l gelombang 1,08 m
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 146,165.00
575.00 3,450.00
AH HARGA BAHAN 149,615.00

MLAH HARGA ALAT -

170,875.00
15.00% 25,631.25
196,506.25

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00

MLAH HARGA ALAT -

110,270.00
15.00% 16,540.50
126,810.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00

MLAH HARGA ALAT -

110,270.00
15.00% 16,540.50
126,810.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 85,560.00
575.00 3,450.00
AH HARGA BAHAN 89,010.00

MLAH HARGA ALAT -

110,270.00
15.00% 16,540.50
126,810.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 15,000.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 25,040.00

71,300.00 78,430.00
575.00 3,450.00
AH HARGA BAHAN 81,880.00

MLAH HARGA ALAT -

106,920.00
15.00% 16,038.00
122,958.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,720.00
100,000.00 12,500.00
120,000.00 1,560.00
120,000.00 480.00
AH TENAGA KERJA 21,260.00

71,300.00 78,430.00
575.00 3,450.00
AH HARGA BAHAN 81,880.00
MLAH HARGA ALAT -

103,140.00
15.00% 15,471.00
118,611.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 1,200.00
AH TENAGA KERJA 28,400.00

5,750.00 63,250.00
20,700.00 621.00
AH HARGA BAHAN 63,871.00

MLAH HARGA ALAT -

92,271.00
15.00% 13,840.65
106,111.65

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 30,000.00
120,000.00 360.00
120,000.00 1,200.00
AH TENAGA KERJA 47,560.00

-
122,475.00 42,866.25
23,000.00 690.00
- -
AH HARGA BAHAN 43,556.25

MLAH HARGA ALAT -

91,116.25
15.00% 13,667.44
104,783.69

tal ukuran 80 x 100 atap pelana

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 27,320.00

55,200.00 71,760.00
23,000.00 4,600.00
AH HARGA BAHAN 76,360.00

MLAH HARGA ALAT -

103,680.00
15.00% 15,552.00
119,232.00

tal ukuran 80 x 100 atap jurai

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 27,320.00

55,200.00 110,400.00
23,000.00 4,600.00
AH HARGA BAHAN 115,000.00

MLAH HARGA ALAT -

142,320.00
15.00% 21,348.00
163,668.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
120,000.00 12,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 29,320.00

132,200.00 132,200.00
500.00 5,000.00
AH HARGA BAHAN 137,200.00

MLAH HARGA ALAT -

166,520.00
15.00% 24,978.00
191,498.00

ume 0,25mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
120,000.00 12,000.00
120,000.00 1,200.00
120,000.00 120.00
AH TENAGA KERJA 29,320.00

82,000.00 82,000.00
500.00 5,000.00
AH HARGA BAHAN 87,000.00

MLAH HARGA ALAT -

116,320.00
15.00% 17,448.00
133,768.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 13,280.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 960.00
AH TENAGA KERJA 42,240.00

1,868.75 56,062.50 sumber harga https://fjb.kaskus.co.id/product/50d4a2f58027cfb434000003/jual-atap-sirap-kayu-


23,000.00 4,600.00
AH HARGA BAHAN 60,662.50

MLAH HARGA ALAT -

102,902.50
15.00% 15,435.38
118,337.88

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 32,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 2,400.00
AH TENAGA KERJA 56,800.00

4,600.00 16,100.00
23,000.00 1,150.00
1,610.00 17,388.00
239,085.00 7,650.72
6,900.00 6,900.00
AH HARGA BAHAN 49,188.72

MLAH HARGA ALAT -

105,988.72
15.00% 15,898.31
121,887.03

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 720.00
AH TENAGA KERJA 38,720.00

-
23,000.00 1,150.00
5,750,000.00 20,125.00
AH HARGA BAHAN 21,275.00

MLAH HARGA ALAT -

59,995.00
15.00% 8,999.25
68,994.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 1,560.00
AH TENAGA KERJA 38,360.00

50,983.33 56,081.67
23,000.00 1,150.00
AH HARGA BAHAN 57,231.67

MLAH HARGA ALAT -

95,591.67
15.00% 14,338.75
109,930.42

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 720.00
AH TENAGA KERJA 38,720.00

67,735.00 27,094.00
23,000.00 1,150.00
20,700.00 1,035.00
AH HARGA BAHAN 29,279.00

MLAH HARGA ALAT -


67,999.00
15.00% 10,199.85
78,198.85

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 6,000.00
120,000.00 720.00
120,000.00 720.00
AH TENAGA KERJA 17,040.00

67,735.00 47,414.50
23,000.00 460.00
AH HARGA BAHAN 47,874.50

MLAH HARGA ALAT -

64,914.50
15.00% 9,737.18
74,651.68

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 7,000.00
120,000.00 840.00
120,000.00 720.00
AH TENAGA KERJA 20,560.00

67,735.00 20,320.50
23,000.00 920.00
AH HARGA BAHAN 21,240.50
MLAH HARGA ALAT -

41,800.50
15.00% 6,270.08
48,070.58

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 75,000.00
120,000.00 9,600.00
120,000.00 720.00
AH TENAGA KERJA 97,320.00

156,400.00 164,220.00 sumber harga https://supplierplate.wordpress.com/plat-tembaga/harga-plat-aluminium/


23,000.00 460.00
AH HARGA BAHAN 164,680.00

MLAH HARGA ALAT -

262,000.00
15.00% 39,300.00
301,300.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 100,000.00
120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 126,000.00
- -
23,000.00 920.00
AH HARGA BAHAN 920.00

MLAH HARGA ALAT -

126,920.00
15.00% 19,038.00
145,958.00

m foil/sisalation

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 960.00
AH TENAGA KERJA 18,560.00

10,350.00 10,867.50
AH HARGA BAHAN 10,867.50

MLAH HARGA ALAT -

29,427.50
15.00% 4,414.13
33,841.63

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 960.00
AH TENAGA KERJA 18,560.00 16,000.00
18,000.00 18,900.00
860.00 3,440.00
AH HARGA BAHAN 22,340.00

MLAH HARGA ALAT -

40,900.00
15.00% 6,135.00
47,035.00

1 m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 560,000.00
100,000.00 2,100,000.00
120,000.00 252,000.00
120,000.00 42,000.00
AH TENAGA KERJA 2,954,000.00

10,925,000.00 12,017,500.00
23,000.00 28,750.00
34,500.00 34,500.00
AH HARGA BAHAN 12,080,750.00

MLAH HARGA ALAT -

15,034,750.00
15.00% 2,255,212.50
17,289,962.50

1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 480,000.00
100,000.00 1,800,000.00
120,000.00 216,000.00
120,000.00 36,000.00
AH TENAGA KERJA 2,532,000.00

4,025,000.00 4,830,000.00
23,000.00 28,750.00
34,500.00 34,500.00
AH HARGA BAHAN 4,893,250.00

MLAH HARGA ALAT -

7,425,250.00
15.00% 1,113,787.50
8,539,037.50

1 m2 pintu klamp standar, kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 105,000.00
120,000.00 12,600.00
120,000.00 2,160.00
AH TENAGA KERJA 147,760.00

5,750,000.00 230,000.00
20,700.00 1,035.00
AH HARGA BAHAN 231,035.00

MLAH HARGA ALAT -

378,795.00
15.00% 56,819.25
435,614.25

1 m2 pintu klamp sederhana, kayu kelas III

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,000.00
100,000.00 105,000.00
120,000.00 12,600.00
120,000.00 2,160.00
AH TENAGA KERJA 147,760.00

4,025,000.00 161,000.00
20,700.00 1,035.00
AH HARGA BAHAN 162,035.00

MLAH HARGA ALAT -

309,795.00
15.00% 46,469.25
356,264.25

1 m2 daun pintu panel, kayu kelas I atau II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 6,000.00
AH TENAGA KERJA 422,000.00

5,750,000.00 230,000.00
34,500.00 17,250.00
AH HARGA BAHAN 247,250.00

MLAH HARGA ALAT -

669,250.00
15.00% 100,387.50
769,637.50
1 m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
AH TENAGA KERJA 337,600.00

5,750,000.00 138,000.00
34,500.00 10,350.00
AH HARGA BAHAN 148,350.00

MLAH HARGA ALAT -

485,950.00
15.00% 72,892.50
558,842.50

1 m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 6,000.00
AH TENAGA KERJA 422,000.00

5,750,000.00 368,000.00
34,500.00 17,250.00
AH HARGA BAHAN 385,250.00

MLAH HARGA ALAT -


807,250.00
15.00% 121,087.50
928,337.50
plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,000.00
100,000.00 210,000.00
120,000.00 25,200.00
120,000.00 4,200.00
MLAH TENAGA KERJA 295,400.00

5,750,000.00 143,750.00
20,700.00 621.00
34,500.00 17,250.00
122,475.00 122,475.00

MLAH HARGA BAHAN 284,096.00

UMLAH HARGA ALAT -

579,496.00
15.00% 86,924.40
666,420.40

d rangkap, rangka expose kayu kelas I atau II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
TENAGA KERJA 337,600.00

5,750,000.00 147,200.00
20,700.00 621.00
34,500.00 17,250.00
122,475.00 122,475.00

HARGA BAHAN 287,546.00


HARGA ALAT -

625,146.00
15.00% 93,771.90
718,917.90

n, kayu kelas I atau II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 53,600.00
100,000.00 200,000.00
120,000.00 24,000.00
120,000.00 40,200.00
AH TENAGA KERJA 317,800.00

5,750,000.00 345,000.00
20,700.00 3,105.00
AH HARGA BAHAN 348,105.00

MLAH HARGA ALAT -

665,905.00
15.00% 99,885.75
765,790.75

angkap, rangka expose kayu kelas I

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,000.00
100,000.00 240,000.00
120,000.00 28,800.00
120,000.00 4,800.00
AH TENAGA KERJA 337,600.00
10,925,000.00 273,125.00
20,700.00 621.00
34,500.00 10,350.00
86,365.00 86,365.00

AH HARGA BAHAN 370,461.00

MLAH HARGA ALAT -

708,061.00
15.00% 106,209.15
814,270.15

angkap lapis formika, rangka expose kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 68,000.00
100,000.00 255,000.00
120,000.00 30,600.00
120,000.00 5,160.00
AH TENAGA KERJA 358,760.00

5,750,000.00 143,750.00
20,700.00 621.00
34,500.00 27,600.00
86,365.00 86,365.00

258,336.00
AH HARGA BAHAN
-
MLAH HARGA ALAT
617,096.00
15.00% 92,564.40
709,660.40

kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 320,000.00
100,000.00 1,200,000.00
120,000.00 144,000.00
120,000.00 24,000.00
AH TENAGA KERJA 1,688,000.00

4,025,000.00 4,427,500.00
15,812.50 237,187.50
20,700.00 115,920.00
AH HARGA BAHAN 4,780,607.50

MLAH HARGA ALAT -


6,468,607.50
15.00% 970,291.13
7,438,898.63

kuda-kuda expose, kayu kelas I

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 536,000.00
100,000.00 2,010,000.00
120,000.00 241,200.00
120,000.00 40,200.00
AH TENAGA KERJA 2,827,400.00

10,925,000.00 13,110,000.00
15,812.50 237,187.50
20,700.00 115,920.00
AH HARGA BAHAN 13,463,107.50

MLAH HARGA ALAT -


16,290,507.50
15.00% 2,443,576.13
18,734,083.63

gordeng, kayu kelas II


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 536,000.00
100,000.00 2,010,000.00
120,000.00 241,200.00
120,000.00 40,200.00
AH TENAGA KERJA 2,827,400.00

5,750,000.00 6,325,000.00
15,812.50 237,187.50
20,700.00 62,100.00
AH HARGA BAHAN 6,624,287.50

MLAH HARGA ALAT -

9,451,687.50
15.00% 1,417,753.13
10,869,440.63

p genteng keramik, kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00

6,900,000.00 96,600.00
8,145,833.33 293,250.00
20,700.00 5,175.00
AH HARGA BAHAN 395,025.00

MLAH HARGA ALAT -

414,825.00
15.00% 62,223.75
477,048.75

p genteng beton, kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 19,800.00

6,900,000.00 96,600.00
8,145,833.33 464,312.50
20,700.00 5,175.00
AH HARGA BAHAN 566,087.50

MLAH HARGA ALAT -

585,887.50
15.00% 87,883.13
673,770.63

p sirap, kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 9,600.00
100,000.00 12,000.00
120,000.00 1,440.00
120,000.00 720.00
AH TENAGA KERJA 23,760.00

5,750,000.00 80,500.00
20,700.00 1,179.90
AH HARGA BAHAN 81,679.90
MLAH HARGA ALAT -

105,439.90
15.00% 15,815.99
121,255.89

git-langit (50 x 100) cm, kayu kelas II atau III

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 9,000.00
AH TENAGA KERJA 54,600.00

6,900,000.00 106,260.00
20,700.00 4,140.00
AH HARGA BAHAN 110,400.00

MLAH HARGA ALAT -

165,000.00
15.00% 24,750.00
189,750.00

git-langit (60 x 60) cm, kayu kelas II atau III

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 1,200.00
AH TENAGA KERJA 50,800.00

6,900,000.00 112,470.00
20,700.00 5,175.00
AH HARGA BAHAN 117,645.00

MLAH HARGA ALAT -

168,445.00
15.00% 25,266.75
193,711.75

uran (3 x 20) cm, kayu kelas I atau kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 600.00
AH TENAGA KERJA 31,000.00

5,750,000.00 62,100.00
20,700.00 2,070.00
AH HARGA BAHAN 64,170.00

MLAH HARGA ALAT -

95,170.00
15.00% 14,275.50
109,445.50

kuran (3 x 30) cm, kayu kelas I atau kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 600.00
AH TENAGA KERJA 31,000.00
5,750,000.00 63,250.00
20,700.00 1,035.00
AH HARGA BAHAN 64,285.00

MLAH HARGA ALAT -

95,285.00
15.00% 14,292.75
109,577.75

ding pemisah (60 x 120) cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 12,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 960.00
AH TENAGA KERJA 63,360.00

4,025,000.00 112,700.00
20,700.00 3,105.00
AH HARGA BAHAN 115,805.00

MLAH HARGA ALAT -


179,165.00
15.00% 26,874.75
206,039.75

misah plywood rangkap, rangka kayu kelas II

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 1,200.00
AH TENAGA KERJA 84,400.00

5,750,000.00 161,000.00
20,700.00 3,105.00
122,475.00 105,328.50

34,500.00 19,320.00
AH HARGA BAHAN 288,753.50

MLAH HARGA ALAT -


373,153.50
15.00% 55,973.03
429,126.53

mbrisering dari papan kayu kelas I

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,000.00
100,000.00 180,000.00
120,000.00 21,600.00
120,000.00 3,600.00
AH TENAGA KERJA 253,200.00

10,925,000.00 76,475.00
20,700.00 2,070.00
20,700.00 3,105.00
AH HARGA BAHAN 81,650.00

MLAH HARGA ALAT -

334,850.00
15.00% 50,227.50
385,077.50

mbrisering dari plywood ukuran (120 x 240) cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 2,000.00
100,000.00 7,500.00
120,000.00 960.00
120,000.00 120.00
AH TENAGA KERJA 10,580.00

122,475.00 48,990.00
20,700.00 1,035.00
AH HARGA BAHAN 50,025.00

MLAH HARGA ALAT -

60,605.00
15.00% 9,090.75
69,695.75

k, rangka kayu kelas III atau IV

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 5,000.00
120,000.00 600.00
120,000.00 600.00
TENAGA KERJA 14,200.00

- -
6,900,000.00 96,600.00
20,700.00 248.40
6,325.00 18.98
HARGA BAHAN 96,867.38

HARGA ALAT -
111,067.38
15.00% 16,660.11
127,727.48

KUNCI DAN KACA


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 360.00
AH TENAGA KERJA 72,360.00

255,300.00 255,300.00 sumber harga https://daftarharga.biz/harga-handle-pintu-dan-kunci-pintu-terbaru/


AH HARGA BAHAN 255,300.00

MLAH HARGA ALAT -

327,660.00
15.00% 49,149.00
376,809.00

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 800.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 600.00
AH TENAGA KERJA 57,400.00

149,500.00 149,500.00
AH HARGA BAHAN 149,500.00

MLAH HARGA ALAT -

206,900.00
15.00% 31,035.00
237,935.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 400.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 56,760.00

51,750.00 51,750.00 sumber harga http://www.priceza.co.id/s/harga/Kunci-Pintu-Kamar-Mandi-Bulat


AH HARGA BAHAN 51,750.00

MLAH HARGA ALAT -

108,510.00
15.00% 16,276.50
124,786.50

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 400.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 56,760.00

80,500.00 80,500.00 sumber harga https://daftarharga.biz/harga-handle-pintu-dan-kunci-pintu-terbaru/


AH HARGA BAHAN 80,500.00

MLAH HARGA ALAT -

137,260.00
15.00% 20,589.00
157,849.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00

21,850.00 21,850.00
AH HARGA BAHAN 21,850.00

MLAH HARGA ALAT -

39,946.00
15.00% 5,991.90
45,937.90

ndela kupu-kupu

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 60.00
AH TENAGA KERJA 12,060.00

28,750.00 28,750.00 sumber harga http://www.priceza.co.id/s/harga/Engsel-Kupu-Kupu


AH HARGA BAHAN 28,750.00

MLAH HARGA ALAT -

40,810.00
15.00% 6,121.50
46,931.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 60.00
AH TENAGA KERJA 30,460.00

23,000.00 23,000.00 sumber harga http://www.hargamaterial.xyz/harga-engsel-pintu-jendela/#


AH HARGA BAHAN 23,000.00

MLAH HARGA ALAT -

53,460.00
15.00% 8,019.00
61,479.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00

25,300.00 25,300.00 sumber harga http://www.rajawali-sakti.com/solid/spring-knip-379-solid


AH HARGA BAHAN 25,300.00

MLAH HARGA ALAT -

44,260.00
15.00% 6,639.00
50,899.00
Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00

8,625.00 8,625.00
AH HARGA BAHAN 8,625.00

MLAH HARGA ALAT -

27,585.00
15.00% 4,137.75
31,722.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 60,360.00

322,000.00 322,000.00 sumber harga http://www.priceza.co.id/s/harga/Door-Closer-Penutup-Pintu-Otomatis


AH HARGA BAHAN 322,000.00

MLAH HARGA ALAT -

382,360.00
15.00% 57,354.00
439,714.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 120.00
AH TENAGA KERJA 24,120.00

13,800.00 13,800.00 sumber harga https://www.bukalapak.com/p/rumah-tangga/gembok-kunci-pengaman/htum9-jua


AH HARGA BAHAN 13,800.00

MLAH HARGA ALAT -

37,920.00
15.00% 5,688.00
43,608.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 360.00
AH TENAGA KERJA 60,360.00

26,450.00 26,450.00 sumber harga https://fjb.kaskus.co.id/product/5663a955642eb653708b4570/door-holder-feet--p


AH HARGA BAHAN 26,450.00

MLAH HARGA ALAT -

86,810.00
15.00% 13,021.50
99,831.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 12,600.00

46,000.00 46,000.00 sumber harga https://www.bukalapak.com/p/rumah-tangga/furniture-interior/lain-lain-1669/18pj3


AH HARGA BAHAN 46,000.00

MLAH HARGA ALAT -

58,600.00
15.00% 8,790.00
67,390.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
100,000.00 60,000.00
120,000.00 7,200.00
120,000.00 360.00
AH TENAGA KERJA 72,360.00

402,500.00 402,500.00 sumber harga http://relpintu-sliding.blogspot.co.id/p/daftar-harga.html


AH HARGA BAHAN 402,500.00

MLAH HARGA ALAT -

474,860.00
15.00% 71,229.00
546,089.00
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 120.00
AH TENAGA KERJA 30,120.00

163,300.00 163,300.00 sumber harga https://www.bukalapak.com/p/rumah-tangga/gembok-kunci-pengaman/745oy-jua


AH HARGA BAHAN 163,300.00

MLAH HARGA ALAT -

193,420.00
15.00% 29,013.00
222,433.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00

80,500.00 88,550.00
48,300.00 2,415.00
AH HARGA BAHAN 90,965.00

MLAH HARGA ALAT -

109,061.00
15.00% 16,359.15
125,420.15
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 96.00
AH TENAGA KERJA 18,096.00

92,000.00 101,200.00
48,300.00 2,415.00
AH HARGA BAHAN 103,615.00

MLAH HARGA ALAT -

121,711.00
15.00% 18,256.65
139,967.65

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,360.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 108.00
AH TENAGA KERJA 20,508.00

172,500.00 189,750.00 sumber harga http://hargabahanbangunan.co/harga-kaca-terbaru.html


48,300.00 3,381.00
AH HARGA BAHAN 193,131.00

MLAH HARGA ALAT -

213,639.00
15.00% 32,045.85
245,684.85
m tebal 12 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 156.00
AH TENAGA KERJA 30,156.00

414,575.00 456,032.50 sumber harga https://www.hargamaterial123.com/harga-kaca-per-meter-terbaru-2016/


48,300.00 3,381.00
AH HARGA BAHAN 459,413.50

MLAH HARGA ALAT -

489,569.50
15.00% 73,435.43
563,004.93

n tebal 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00

155,250.00 170,775.00 sumber harga http://hargabahanbangunan.co/harga-kaca-terbaru.html


AH HARGA BAHAN 170,775.00

MLAH HARGA ALAT -

189,735.00
15.00% 28,460.25
218,195.25
n tebal 8 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,360.00
100,000.00 17,000.00
120,000.00 2,040.00
120,000.00 1,080.00
AH TENAGA KERJA 21,480.00

296,355.00 325,990.50 sumber harga https://www.hargamaterial123.com/harga-kaca-per-meter-terbaru-2016/


AH HARGA BAHAN 325,990.50

MLAH HARGA ALAT -

347,470.50
15.00% 52,120.58
399,591.08

assed tebal 5 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,200.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 960.00
AH TENAGA KERJA 18,960.00

241,500.00 265,650.00 sumber harga http://hargabahanbangunan.co/harga-kaca-terbaru.html


AH HARGA BAHAN 265,650.00

MLAH HARGA ALAT -

284,610.00
15.00% 42,691.50
327,301.50
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,000.00
100,000.00 15,000.00
120,000.00 1,800.00
120,000.00 480.00
AH TENAGA KERJA 23,280.00

2,300,000.00 2,530,000.00 sumber harga http://hargabahanbangunan.co/harga-kaca-terbaru.html


48,300.00 2,415.00
AH HARGA BAHAN 2,532,415.00

MLAH HARGA ALAT -

2,555,695.00
15.00% 383,354.25
2,939,049.25

PENGECATAN
permukaan cat lama

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
120,000.00 360.00
AH TENAGA KERJA 12,360.00

28,750.00 1,437.50 sumber harga http://www.purewatercare.com/pwc/index.php?productID=156


AH HARGA BAHAN 1,437.50

MLAH HARGA ALAT -

13,797.50
15.00% 2,069.63
15,867.13
kaan tembok yang pernah dicat

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
120,000.00 360.00
AH TENAGA KERJA 12,360.00

12,650.00 632.50 sumber harga http://www.bhinnekanusantara.com/sabun_cream_ekonomi_5_kg#.WMY0i2gxXI


AH HARGA BAHAN 632.50 11,000.00

MLAH HARGA ALAT -

12,992.50
15.00% 1,948.88
14,941.38

permukaan baja cara manual

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
120,000.00 960.00
AH TENAGA KERJA 12,960.00

12,650.00 632.50
AH HARGA BAHAN 632.50

MLAH HARGA ALAT -

13,592.50
15.00% 2,038.88
15,631.38

u baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,600.00

100,000.00 900.00

120,000.00 720.00

120,000.00 360.00

AH TENAGA KERJA 7,580.00

28,750.00 5,750.00
26,450.00 3,967.50
28,750.00 4,887.50
57,500.00 14,950.00
13,800.00 138.00 sumber harga http://hargaupdate.com/harga-kuas-dan-roller-cat-terbaru-maret-2016/
27,600.00 828.00 sumber harga http://www.anekamaju.com/18-pengencer-cat
3,450.00 690.00
AH HARGA BAHAN 31,211.00

MLAH HARGA ALAT -


38,791.00
15.00% 5,818.65
44,609.65

u baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,600.00

100,000.00 10,500.00

120,000.00 480.00

120,000.00 360.00

AH TENAGA KERJA 16,940.00

28,750.00 5,750.00
26,450.00 3,967.50
28,750.00 4,887.50
57,500.00 20,125.00
13,800.00 138.00
27,600.00 828.00
3,450.00 690.00
AH HARGA BAHAN 36,386.00

MLAH HARGA ALAT -


53,326.00
15.00% 7,998.90
61,324.90

dengan teak oil

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,200.00
100,000.00 6,300.00
120,000.00 7,560.00
120,000.00 360.00
AH TENAGA KERJA 17,420.00

34,787.50 12,523.50 sumber harga harga satuan bahan dan upah semarang 2015
AH HARGA BAHAN 12,523.50

MLAH HARGA ALAT -

29,943.50
15.00% 4,491.53
34,435.03

dengan politur

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,200.00
100,000.00 6,000.00
120,000.00 1,920.00
120,000.00 360.00
AH TENAGA KERJA 11,480.00

43,642.50 sumber harga harga satuan bahan dan upah semarang 2015
6,546.38
49,524.75 18,423.21 sumber harga harga satuan bahan dan upah semarang 2015
3,450.00 6,900.00
AH HARGA BAHAN 31,869.58

MLAH HARGA ALAT -

43,349.58
15.00% 6,502.44
49,852.02

dengan cat residu dan ter

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,000.00
120,000.00 720.00
AH TENAGA KERJA 8,720.00

31,625.00 11,068.75 sumber harga harga satuan bahan dan upah semarang 2015
AH HARGA BAHAN 11,068.75

MLAH HARGA ALAT -

19,788.75
15.00% 2,968.31
22,757.06

dengan vernis

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,800.00
100,000.00 16,000.00
120,000.00 1,920.00
120,000.00 360.00
AH TENAGA KERJA 31,080.00
39,847.50 5,977.13 sumber harga harga satuan bahan dan upah semarang 2015
21,275.00 1,063.75
3,450.00 345.00
AH HARGA BAHAN 7,385.88

MLAH HARGA ALAT -

38,465.88
15.00% 5,769.88
44,235.76

(1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 756.00
120,000.00 360.00
AH TENAGA KERJA 9,016.00

31,050.00 3,105.00
28,750.00 2,875.00
31,625.00 8,222.50
AH HARGA BAHAN 14,202.50

MLAH HARGA ALAT -

23,218.50
15.00% 3,482.78
26,701.28

a (1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,240.00
100,000.00 4,200.00
120,000.00 504.00
120,000.00 360.00
AH TENAGA KERJA 7,304.00

28,750.00 3,450.00
31,625.00 5,692.50
AH HARGA BAHAN 9,142.50

MLAH HARGA ALAT -

16,446.50
15.00% 2,466.98
18,913.48

n kalkarium

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,240.00
100,000.00 4,200.00
120,000.00 504.00
120,000.00 360.00
AH TENAGA KERJA 7,304.00

21,275.00 2,127.50
AH HARGA BAHAN 2,127.50

MLAH HARGA ALAT -

9,431.50
15.00% 1,414.73
10,846.23

n kapur sirih

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,000.00
100,000.00 100.00
120,000.00 12.00
120,000.00 300.00
AH TENAGA KERJA 12,412.00

2,300.00 345.00
3,450.00 345.00
11,500.00 2,875.00 sumber harga http://atapalangalang.blogspot.co.id/2012/10/harga-atap-alang-alang-rumbia-kira
AH HARGA BAHAN 3,565.00

MLAH HARGA ALAT -

15,977.00
15.00% 2,396.55
18,373.55

dengan kapur sirih (pemeliharaan)

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,200.00
100,000.00 500.00
120,000.00 60.00
120,000.00 300.00
AH TENAGA KERJA 4,060.00

2,300.00 690.00
3,450.00 690.00
11,500.00 2,875.00
AH HARGA BAHAN 4,255.00

MLAH HARGA ALAT -

8,315.00
15.00% 1,247.25
9,562.25

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 300.00
AH TENAGA KERJA 24,300.00

80,500.00 96,600.00
25,300.00 5,060.00
AH HARGA BAHAN 101,660.00

MLAH HARGA ALAT -

125,960.00
15.00% 18,894.00
144,854.00

baja dengan menie besi

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
100,000.00 20,000.00
120,000.00 2,400.00
120,000.00 300.00
AH TENAGA KERJA 24,300.00

28,750.00 2,875.00
13,800.00 138.00
AH HARGA BAHAN 3,013.00

MLAH HARGA ALAT -

27,313.00
15.00% 4,096.95
31,409.95

baja dengan menie besi dengan perancah

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 22,500.00
120,000.00 2,700.00
120,000.00 900.00
AH TENAGA KERJA 46,100.00

28,750.00 2,875.00
27,600.00 276.00
13,800.00 138.00
4,025,000.00 8,050.00
AH HARGA BAHAN 11,339.00

MLAH HARGA ALAT -

57,439.00
15.00% 8,615.85
66,054.85

baja galvanis secara manual 4 lapis

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 25,000.00
120,000.00 3,000.00
120,000.00 156.00
AH TENAGA KERJA 48,156.00

28,750.00 2,875.00
28,750.00 2,875.00
63,250.00 5,060.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 11,224.00

MLAH HARGA ALAT -

59,380.00
15.00% 8,907.00
68,287.00

baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
100,000.00 6,000.00
120,000.00 1,440.00
120,000.00 360.00
AH TENAGA KERJA 12,600.00

63,250.00 18,975.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 19,389.00

MLAH HARGA ALAT -

31,989.00
15.00% 4,798.35
36,787.35

baja galvanis secara manual sistem 3 lapis

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 80,000.00
120,000.00 9,600.00
120,000.00 2,400.00
AH TENAGA KERJA 124,000.00

28,750.00 3,162.50
40,250.00 6,842.50 sumber harga http://www.hargamaterial.xyz/harga-cat-tembok-dinding-terbaru/
63,250.00 5,060.00
13,800.00 138.00
27,600.00 276.00
AH HARGA BAHAN 15,479.00

MLAH HARGA ALAT -

139,479.00
15.00% 20,921.85
160,400.85

baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
100,000.00 70,000.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 112,800.00

28,750.00 8,625.00
27,600.00 276.00
AH HARGA BAHAN 8,901.00

MLAH HARGA ALAT -

121,701.00
15.00% 18,255.15
139,956.15

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 18,700.00
31,625.00 9,487.50
AH HARGA BAHAN 9,487.50

MLAH HARGA ALAT -

28,187.50
15.00% 4,228.13
32,415.63

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
100,000.00 6,300.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 18,700.00

25,000.00 5,000.00
55,000.00 14,300.00
8,000.00 800.00
32,000.00 800.00
AH HARGA BAHAN 20,900.00

MLAH HARGA ALAT -

39,600.00
15.00% 5,940.00
45,540.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,600.00
110,000.00 6,930.00
120,000.00 8,400.00
120,000.00 2,400.00
AH TENAGA KERJA 19,330.00

40,200.00 12,060.00
AH HARGA BAHAN 12,060.00

MLAH HARGA ALAT -

31,390.00
10.00% 3,139.00
34,529.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 160,000.00
100,000.00 1,200,000.00
120,000.00 144,000.00
120,000.00 12,000.00
AH TENAGA KERJA 1,516,000.00

34,500.00 51,750.00 sumber harga http://www.rumahmaterial.com/2014/04/daftar-harga-finishing-kayu-impra-2014_2


57,500.00 86,250.00 sumber harga http://www.mediabangunan.com/2013/04/daftar-harga-impra-wood-finish.html
57,500.00 86,250.00sumber harga http://www.rumahmaterial.com/2014/04/daftar-harga-finishing-kayu-impra-2014_2
57,500.00 138,000.00 sumber harga http://www.rumahmaterial.com/2014/04/daftar-harga-finishing-kayu-impra-2014_2
13,225.00 26,450.00
3,450.00 20,700.00
AH HARGA BAHAN 409,400.00

78,556.50 -
MLAH HARGA ALAT -

1,925,400.00
15.00% 288,810.00
2,214,210.00

SANITASI DALAM GEDUNG


t duduk/monoblock

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 264,000.00
100,000.00 110,000.00
120,000.00 1,200.00
120,000.00 19,200.00
AH TENAGA KERJA 394,400.00

1,422,550.00 1,422,550.00
213,382.50 213,382.50
AH HARGA BAHAN 1,635,932.50

MLAH HARGA ALAT -

2,030,332.50
15.00% 304,549.88
2,334,882.38

gkok porselen

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 150,000.00
120,000.00 18,000.00
120,000.00 19,200.00
AH TENAGA KERJA 267,200.00

161,000.00 161,000.00
1,610.00 9,660.00
239,085.00 2,390.85
AH HARGA BAHAN 173,050.85

MLAH HARGA ALAT -

440,250.85
15.00% 66,037.63
506,288.48

gkok teraso
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 150,000.00
120,000.00 18,000.00
120,000.00 6,000.00
AH TENAGA KERJA 254,000.00

115,000.00 115,000.00
1,610.00 9,660.00
239,085.00 2,390.85
920.00 6,440.00
AH HARGA BAHAN 133,490.85

MLAH HARGA ALAT -

387,490.85
15.00% 58,123.63
445,614.48

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 80,000.00
100,000.00 100,000.00
120,000.00 12,000.00
120,000.00 6,000.00
AH TENAGA KERJA 198,000.00

746,350.00 746,350.00 sumber harga harga satuan bahan dan upah semarang 2015
1,610.00 9,660.00
239,085.00 2,390.85
223,905.00 223,905.00
AH HARGA BAHAN 982,305.85

MLAH HARGA ALAT -

1,180,305.85
15.00% 177,045.88
1,357,351.73

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 96,000.00
100,000.00 145,000.00
120,000.00 18,000.00
120,000.00 7,200.00
AH TENAGA KERJA 266,200.00

788,900.00 946,680.00
1,610.00 9,660.00
239,085.00 2,390.85
113,601.60 113,601.60
AH HARGA BAHAN 1,072,332.45

MLAH HARGA ALAT -

1,338,532.45
15.00% 200,779.87
1,539,312.32

cuip porselen

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,000.00
100,000.00 75,000.00
120,000.00 9,000.00
120,000.00 360.00
AH TENAGA KERJA 90,360.00

- -
- -
AH HARGA BAHAN -
MLAH HARGA ALAT -

90,360.00
15.00% 13,554.00
103,914.00

iberglass vol 1 m3

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 240,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 108,000.00
AH TENAGA KERJA 804,000.00

253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00

MLAH HARGA ALAT -

1,087,360.00
15.00% 163,104.00
1,250,464.00

mandi batu bata vol 0,30 m3

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 480,000.00
100,000.00 300,000.00
120,000.00 36,000.00
120,000.00 3,600.00
AH TENAGA KERJA 819,600.00

920.00 138,000.00
1,610.00 193,200.00
239,085.00 71,725.50
- -
6,900.00 41,400.00
AH HARGA BAHAN 444,325.50

MLAH HARGA ALAT -

1,263,925.50
15.00% 189,588.83
1,453,514.33

di teraso vol 0,30 m3

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 240,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 108,000.00
AH TENAGA KERJA 804,000.00

253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00

MLAH HARGA ALAT -

1,087,360.00
15.00% 163,104.00
1,250,464.00

berglass vol 1 m3

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 45,000.00
120,000.00 5,400.00
120,000.00 1,800.00
AH TENAGA KERJA 76,200.00
253,000.00 253,000.00
30,360.00 30,360.00
AH HARGA BAHAN 283,360.00

MLAH HARGA ALAT -

359,560.00
15.00% 53,934.00
413,494.00

beton volume 1 m3

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 280,000.00
100,000.00 450,000.00
120,000.00 6,000.00
120,000.00 2,160.00
AH TENAGA KERJA 738,160.00

978,554.69 880,699.22
20,872.50 3,757,050.00
40,250.00 322,000.00
- -
1,039,677.19 103,967.72
AH HARGA BAHAN 5,063,716.94

MLAH HARGA ALAT -

5,801,876.94
15.00% 870,281.54
6,672,158.48

piring stainlessteel

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,400.00
100,000.00 30,000.00
120,000.00 3,600.00
120,000.00 1,800.00
AH TENAGA KERJA 37,800.00

460,000.00 460,000.00
442,750.00 442,750.00
AH HARGA BAHAN 902,750.00

MLAH HARGA ALAT -

940,550.00
15.00% 141,082.50
1,081,632.50

piring teraso

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,000.00
100,000.00 50,000.00
120,000.00 6,000.00
120,000.00 3,000.00
AH TENAGA KERJA 63,000.00

201,250.00 201,250.00
442,750.00 442,750.00
1,610.00 32,200.00
239,085.00 11,954.25
AH HARGA BAHAN 688,154.25

MLAH HARGA ALAT -

751,154.25
15.00% 112,673.14
863,827.39

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 800.00
100,000.00 10,000.00
120,000.00 1,200.00
120,000.00 600.00
AH TENAGA KERJA 12,600.00

94,875.00 94,875.00
AH HARGA BAHAN 94,875.00

MLAH HARGA ALAT -

107,475.00
15.00% 16,121.25
123,596.25

rol pasangan bata 30x30 tinggi 35 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 172,800.00
100,000.00 72,000.00
120,000.00 8,640.00
120,000.00 1,320.00
AH TENAGA KERJA 254,760.00

920.00 36,800.00
1,610.00 70,840.00
239,085.00 16,735.95
265,650.00 15,939.00
230,000.00 16,100.00
20,872.50 33,396.00
AH HARGA BAHAN 189,810.95

MLAH HARGA ALAT -

444,570.95
15.00% 66,685.64
511,256.59

rol pasangan bata 45cm x 45cm tinggi 50 cm


Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 256,000.00
100,000.00 150,000.00
120,000.00 1,320.00
120,000.00 1,920.00
AH TENAGA KERJA 409,240.00

920.00 64,400.00
1,610.00 123,970.00
239,085.00 31,081.05
265,650.00 23,908.50
230,000.00 4,600.00
20,872.50 54,268.50
AH HARGA BAHAN 302,228.05

MLAH HARGA ALAT -

711,468.05
15.00% 106,720.21
818,188.26

rol pasangan bata 60 cm x 60 cm tinggi 65 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 256,000.00
100,000.00 115,000.00
120,000.00 1,320.00
120,000.00 1,920.00
AH TENAGA KERJA 374,240.00

920.00 113,160.00
1,610.00 183,540.00
239,085.00 43,991.64
265,650.00 31,878.00
230,000.00 7,590.00
20,872.50 101,231.63
AH HARGA BAHAN 481,391.27
MLAH HARGA ALAT -
855,631.27
15.00% 128,344.69
983,975.95

s diameter ½”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00

29,900.00 29,900.00
29,900.00 10,465.00
AH HARGA BAHAN 40,365.00

MLAH HARGA ALAT -

56,565.00
15.00% 8,484.75
65,049.75

meter ½” atau ¾ ”

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 800.00
110,000.00 44,000.00
120,000.00 4,800.00
120,000.00 600.00
AH TENAGA KERJA 50,200.00

13,800.00 13,800.00
4,600.00 115.00
AH HARGA BAHAN 13,915.00

MLAH HARGA ALAT -


64,115.00
15.00% 9,617.25
73,732.25

s diameter ¾ ”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00

38,600.00 38,600.00
13,510.00 13,510.00
AH HARGA BAHAN 52,110.00

MLAH HARGA ALAT -

68,310.00
15.00% 10,246.50
78,556.50

s diameter 1”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,320.00
120,000.00 10,800.00
120,000.00 1,080.00
AH TENAGA KERJA 16,200.00

57,800.00 57,800.00
20,230.00 20,230.00
AH HARGA BAHAN 78,030.00

MLAH HARGA ALAT -


94,230.00
15.00% 14,134.50
108,364.50

s diameter 1 ½”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,640.00
120,000.00 21,600.00
120,000.00 2,160.00
AH TENAGA KERJA 32,400.00

87,800.00 87,800.00
30,730.00 30,730.00
AH HARGA BAHAN 118,530.00

MLAH HARGA ALAT -

150,930.00
15.00% 22,639.50
173,569.50

s diameter 3”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00

181,833.00 181,833.00
63,641.55 63,641.55
AH HARGA BAHAN 245,474.55

MLAH HARGA ALAT -

286,034.55
15.00% 42,905.18
328,939.73

s diameter 2 1/2”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00

116,900.00 116,900.00
40,915.00 40,915.00
AH HARGA BAHAN 157,815.00

MLAH HARGA ALAT -

198,375.00
15.00% 29,756.25
228,131.25

s diameter 2”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00

71,233.00 71,233.00
24,931.55 24,931.55
AH HARGA BAHAN 96,164.55

MLAH HARGA ALAT -

136,724.55
15.00% 20,508.68
157,233.23

s diameter 4”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00

283,000.00 283,000.00
99,050.00 99,050.00
AH HARGA BAHAN 382,050.00

MLAH HARGA ALAT -

422,610.00
15.00% 63,391.50
486,001.50

s diameter 6”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,800.00
120,000.00 27,000.00
120,000.00 2,760.00
AH TENAGA KERJA 40,560.00

434,900.00 434,900.00
152,215.00 152,215.00
AH HARGA BAHAN 587,115.00

MLAH HARGA ALAT -


627,675.00
15.00% 94,151.25
721,826.25

e AW diameter ½ ”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,880.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 10,440.00

7,072.50 8,487.00
2,970.45 2,970.45
AH HARGA BAHAN 11,457.45

MLAH HARGA ALAT -

21,897.45
15.00% 3,284.62
25,182.07

e AW diameter ¾ ”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,400.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 9,960.00

10,810.00 12,972.00
4,540.20 4,540.20
AH HARGA BAHAN 17,512.20

MLAH HARGA ALAT -

27,472.20
15.00% 4,120.83
31,593.03

e AW diameter 1”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,880.00
110,000.00 6,600.00
120,000.00 720.00
120,000.00 240.00
AH TENAGA KERJA 10,440.00

12,190.00 14,628.00
5,119.80 5,119.80
AH HARGA BAHAN 19,747.80

MLAH HARGA ALAT -

30,187.80
15.00% 4,528.17
34,715.97

e AW diameter 1 ½ ”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,320.00
110,000.00 9,900.00
120,000.00 1,080.00
120,000.00 360.00
AH TENAGA KERJA 15,660.00

27,600.00 33,120.00
11,592.00 11,592.00
AH HARGA BAHAN 44,712.00

MLAH HARGA ALAT -

60,372.00
15.00% 9,055.80
69,427.80

e AW diameter 2”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,320.00
110,000.00 9,900.00
120,000.00 1,080.00
120,000.00 360.00
AH TENAGA KERJA 15,660.00

35,592.50 42,711.00
14,948.85 14,948.85
AH HARGA BAHAN 57,659.85

MLAH HARGA ALAT -

73,319.85
15.00% 10,997.98
84,317.83

e AW diameter 2 ½ ”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00
74,290.00 89,148.00
31,201.80 31,201.80
AH HARGA BAHAN 120,349.80

MLAH HARGA ALAT -

143,779.80
15.00% 21,566.97
165,346.77

e AW diameter 3”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00

74,290.00 89,148.00
31,201.80 31,201.80
AH HARGA BAHAN 120,349.80

MLAH HARGA ALAT -

143,779.80
15.00% 21,566.97
165,346.77

e AW diameter 4”

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 14,850.00
120,000.00 1,620.00
120,000.00 480.00
AH TENAGA KERJA 23,430.00
107,812.50 129,375.00
45,281.25 45,281.25
AH HARGA BAHAN 174,656.25

MLAH HARGA ALAT -

198,086.25
15.00% 29,712.94
227,799.19

bah jenis pipa tanah Ǿ 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,400.00
110,000.00 4,400.00
120,000.00 480.00
120,000.00 480.00
AH TENAGA KERJA 11,760.00

199,180.00 318,688.00
1,610.00 56,350.00
239,085.00 3,347.19
199,295.00 2,790.13
AH HARGA BAHAN 381,175.32

MLAH HARGA ALAT -

392,935.32
15.00% 58,940.30
451,875.62

bah jenis pipa tanah diameter 15 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,800.00
110,000.00 3,300.00
120,000.00 360.00
120,000.00 360.00
AH TENAGA KERJA 8,820.00

130,180.00 208,288.00
1,610.00 1,094.80
239,085.00 3,108.11
199,295.00 2,192.25
AH HARGA BAHAN 214,683.15

MLAH HARGA ALAT -

223,503.15
15.00% 33,525.47
257,028.62

iameter 15 – 20 cm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 11,200.00
110,000.00 7,700.00
120,000.00 840.00
120,000.00 840,000.00
AH TENAGA KERJA 859,740.00

50,916.25 56,007.88
920.00 24.84
1,610.00 6,311.20
239,085.00 13,388.76
199,295.00 4,783.08
AH HARGA BAHAN 80,515.76

MLAH HARGA ALAT -

940,255.76
15.00% 141,038.36
1,081,294.12

iameter 30 – 100 cm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 30,400.00
110,000.00 20,900.00
120,000.00 2,280.00
120,000.00 2,280.00
AH TENAGA KERJA 55,860.00

75,900.00 83,490.00
920.00 506.00
1,610.00 16,583.00
239,085.00 14,584.19
199,295.00 13,751.36
AH HARGA BAHAN 128,914.54

MLAH HARGA ALAT -


184,774.54
15.00% 27,716.18
212,490.72

PEMASANGAN PIPA DI LUAR GEDUNG


C Ø 22 mm, 1/2 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

27,000.00 27,000.00
AH HARGA BAHAN 27,000.00

1,350.00 67.50

MLAH HARGA ALAT 67.50


39,017.50
15.00% 5,852.63
44,870.13

C Ø 26 mm, 3/4 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

35,000.00 35,000.00
AH HARGA BAHAN 35,000.00

1,750.00 87.50

MLAH HARGA ALAT 87.50


47,037.50
15.00% 7,055.63
54,093.13

C Ø 32 mm, 1 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

45,000.00 45,000.00
AH HARGA BAHAN 45,000.00

2,250.00 112.50

MLAH HARGA ALAT 112.50


57,062.50
15.00% 8,559.38
65,621.88
C Ø 42 mm, 1 3/4 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

65,000.00 65,000.00
AH HARGA BAHAN 65,000.00

3,250.00 162.50

MLAH HARGA ALAT 162.50


77,112.50
15.00% 11,566.88
88,679.38

C Ø 48 mm, 1 1/2 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

75,000.00 75,000.00
AH HARGA BAHAN 75,000.00

3,750.00 187.50

MLAH HARGA ALAT 187.50


87,137.50
15.00% 13,070.63
100,208.13
C Ø 60 mm, 2 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

95,000.00 95,000.00
AH HARGA BAHAN 95,000.00

4,750.00 237.50

MLAH HARGA ALAT 237.50


107,187.50
15.00% 16,078.13
123,265.63

C Ø 76 mm, 2 1/2 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,510.00
120,000.00 960.00
11,950.00
AH TENAGA KERJA

135,000.00 135,000.00
AH HARGA BAHAN 135,000.00

6,750.00 337.50

MLAH HARGA ALAT 337.50


147,287.50
15.00% 22,093.13
169,380.63

ngan spesifikasi dan gambar kerja.


C Ø 89 mm, 3 inch

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 7,520.00
110,000.00 5,170.00
120,000.00 1,080.00
AH TENAGA KERJA 13,770.00

185,000.00 185,000.00
AH HARGA BAHAN 185,000.00

9,250.00 462.50

MLAH HARGA ALAT 462.50

199,232.50
15.00% 29,884.88
229,117.38

C Ø 114 mm, 4 inch

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,400.00
110,000.00 5,830.00
120,000.00 1,320.00
AH TENAGA KERJA 15,550.00

300,000.00 300,000.00
AH HARGA BAHAN 300,000.00

15,000.00 750.00

MLAH HARGA ALAT 750.00

316,300.00
15.00% 47,445.00
363,745.00

C Ø 150 mm
Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 9,440.00
110,000.00 6,490.00
120,000.00 1,440.00
JUMLAH TENAGA 17,370.00
KERJA

- -
JUMLAH HARGA BAHAN -

15,000.00 180.00

AH HARGA ALAT 180.00

17,550.00
15.00% 2,632.50
20,182.50

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 15,120.00
110,000.00 10,450.00
120,000.00 2,280.00
AH TENAGA KERJA 27,850.00

355,005.00 355,005.00
AH HARGA BAHAN 355,005.00

15,000.00 360.00

MLAH HARGA ALAT 360.00

383,215.00
15.00% 57,482.25
440,697.25

C Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,480.00
110,000.00 14,080.00
120,000.00 3,120.00
AH TENAGA KERJA 37,680.00

556,312.50 556,312.50
AH HARGA BAHAN 556,312.50

15,000.00 510.00

MLAH HARGA ALAT 510.00

594,502.50
15.00% 89,175.38
683,677.88

C Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 23,520.00
110,000.00 16,170.00
120,000.00 3,480.00
AH TENAGA KERJA 43,170.00

- -
AH HARGA BAHAN -

15,000.00 600.00

MLAH HARGA ALAT 600.00

43,770.00
15.00% 6,565.50
50,335.50

C Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 43,520.00
110,000.00 29,920.00
120,000.00 6,480.00
AH TENAGA KERJA 79,920.00

- -
AH HARGA BAHAN -

15,000.00 1,200.00

MLAH HARGA ALAT 1,200.00

81,120.00
15.00% 12,168.00
93,288.00

C Ø 450 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 53,520.00
110,000.00 36,850.00
120,000.00 8,040.00
AH TENAGA KERJA 98,410.00

- -
AH HARGA BAHAN -

15,000.00 1,500.00

MLAH HARGA ALAT 1,500.00

99,910.00
15.00% 14,986.50
114,896.50

C Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 64,720.00
110,000.00 44,550.00
120,000.00 9,720.00
AH TENAGA KERJA 118,990.00

- -
AH HARGA BAHAN -

15,000.00 1,830.00

MLAH HARGA ALAT 1,830.00

120,820.00
15.00% 18,123.00
138,943.00

C Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 76,560.00
110,000.00 52,690.00
120,000.00 11,520.00
AH TENAGA KERJA 140,770.00

- -
AH HARGA BAHAN -

15,000.00 2,175.00

MLAH HARGA ALAT 2,175.00

142,945.00
15.00% 21,441.75
164,386.75

C Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 129,440.00
110,000.00 88,990.00
120,000.00 19,440.00
AH TENAGA KERJA 237,870.00

- -
AH HARGA BAHAN -

15,000.00 3,750.00

MLAH HARGA ALAT 3,750.00

241,620.00
15.00% 36,243.00
277,863.00

C Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 135,280.00
110,000.00 93,060.00
120,000.00 20,280.00
AH TENAGA KERJA 248,620.00

- -
AH HARGA BAHAN -

15,000.00 3,930.00

MLAH HARGA ALAT 3,930.00

252,550.00
15.00% 37,882.50
290,432.50

C Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 151,600.00
110,000.00 104,280.00
120,000.00 22,800.00
AH TENAGA KERJA 278,680.00

- -
AH HARGA BAHAN -

15,000.00 4,410.00

MLAH HARGA ALAT 4,410.00

283,090.00
15.00% 42,463.50
325,553.50

C Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 167,920.00
110,000.00 115,500.00
120,000.00 25,200.00
AH TENAGA KERJA 308,620.00

- -
AH HARGA BAHAN -

15,000.00 4,905.00

MLAH HARGA ALAT 4,905.00

313,525.00
15.00% 47,028.75
360,553.75

C Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 184,240.00
110,000.00 126,720.00
120,000.00 27,600.00
AH TENAGA KERJA 338,560.00
- -
AH HARGA BAHAN -

5,385.00
15,000.00

MLAH HARGA ALAT 5,385.00

343,945.00
15.00% 51,591.75
395,536.75

PE Ø 63 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 2,800.00
110,000.00 1,870.00
120,000.00 360.00
AH TENAGA KERJA 5,030.00

29,785.00 29,785.00
AH HARGA BAHAN 29,785.00

15,000.00 285.00

MLAH HARGA ALAT 285.00

35,100.00
15.00% 5,265.00
40,365.00

PE Ø 100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 3,200.00
110,000.00 2,200.00
120,000.00 480.00
AH TENAGA KERJA 5,880.00

- -
AH HARGA BAHAN -
15,000.00 285.00

MLAH HARGA ALAT 285.00

6,165.00
15.00% 924.75
7,089.75

PE Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,600.00
110,000.00 2,530.00
120,000.00 600.00
AH TENAGA KERJA 6,730.00

117,070.00 117,070.00
AH HARGA BAHAN 117,070.00

15,000.00 285.00

MLAH HARGA ALAT 285.00

124,085.00
15.00% 18,612.75
142,697.75

PE Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,960.00
110,000.00 3,410.00
120,000.00 720.00
AH TENAGA KERJA 9,090.00

- -
AH HARGA BAHAN -
15,000.00 285.00

MLAH HARGA ALAT 285.00

9,375.00
15.00% 1,406.25
10,781.25

PE Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,160.00
110,000.00 5,610.00
120,000.00 1,200.00
AH TENAGA KERJA 14,970.00

298,540.00 298,540.00
AH HARGA BAHAN 298,540.00

15,000.00 285.00

MLAH HARGA ALAT 285.00

313,795.00
15.00% 47,069.25
360,864.25

PE Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,640.00
110,000.00 7,370.00
120,000.00 1,560.00
AH TENAGA KERJA 19,570.00

464,945.00 464,945.00
AH HARGA BAHAN 464,945.00

15,000.00 630.00
15,000.00 630.00

MLAH HARGA ALAT 630.00

485,145.00
15.00% 72,771.75
557,916.75

PE Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 13,600.00
110,000.00 9,350.00
120,000.00 2,040.00
AH TENAGA KERJA 24,990.00

- -
AH HARGA BAHAN -

15,000.00 975.00

MLAH HARGA ALAT 975.00

25,965.00
15.00% 3,894.75
29,859.75

PE Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 23,200.00
110,000.00 15,950.00
120,000.00 3,480.00
AH TENAGA KERJA 42,630.00

- -
AH HARGA BAHAN -

15,000.00 2,280.00
MLAH HARGA ALAT 2,280.00

44,910.00
15.00% 6,736.50
51,646.50

PE Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 28,720.00
110,000.00 19,800.00
120,000.00 3,600.00
AH TENAGA KERJA 52,120.00

- -
AH HARGA BAHAN -

15,000.00 3,000.00

MLAH HARGA ALAT 3,000.00

55,120.00
15.00% 8,268.00
63,388.00

PE Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 34,640.00
110,000.00 23,760.00
120,000.00 5,160.00
AH TENAGA KERJA 63,560.00

- -
AH HARGA BAHAN -

15,000.00 3,765.00

MLAH HARGA ALAT 3,765.00


67,325.00
15.00% 10,098.75
77,423.75

PE Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,960.00
110,000.00 28,160.00
120,000.00 6,120.00
AH TENAGA KERJA 75,240.00

- -
AH HARGA BAHAN -

15,000.00 4,605.00

MLAH HARGA ALAT 4,605.00

79,845.00
15.00% 11,976.75
91,821.75

PE Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 71,440.00
110,000.00 49,060.00
120,000.00 10,680.00
AH TENAGA KERJA 131,180.00

- -
AH HARGA BAHAN -

15,000.00 8,595.00

MLAH HARGA ALAT 8,595.00


139,775.00
15.00% 20,966.25
160,741.25

PE Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 108,240.00
110,000.00 74,470.00
120,000.00 16,200.00
AH TENAGA KERJA 198,910.00

- -
AH HARGA BAHAN -

15,000.00 13,245.00

MLAH HARGA ALAT 13,245.00

212,155.00
15.00% 31,823.25
243,978.25

PE Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 132,720.00
110,000.00 91,300.00
120,000.00 19,920.00
AH TENAGA KERJA 243,940.00

- -
AH HARGA BAHAN -

15,000.00 16,395.00

MLAH HARGA ALAT 16,395.00

260,335.00
15.00% 39,050.25
299,385.25

PE Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 145,440.00
110,000.00 99,990.00
120,000.00 21,840.00
AH TENAGA KERJA 267,270.00

- -
AH HARGA BAHAN -

15,000.00 18,075.00

MLAH HARGA ALAT 18,075.00

285,345.00
15.00% 42,801.75
328,146.75

PE Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 189,600.00
110,000.00 130,350.00
120,000.00 28,440.00
AH TENAGA KERJA 348,390.00

- -
AH HARGA BAHAN -

15,000.00 23,760.00

MLAH HARGA ALAT 23,760.00

372,150.00
15.00% 55,822.50
427,972.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 27,600.00
110,000.00 18,920.00
120,000.00 4,080.00
AH TENAGA KERJA 50,600.00

97,750.00 97,750.00
AH HARGA BAHAN 97,750.00

15,000.00 -

MLAH HARGA ALAT -

148,350.00
15.00% 22,252.50
170,602.50

P Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 32,000.00
110,000.00 22,000.00
120,000.00 4,800.00
AH TENAGA KERJA 58,800.00

281,750.00 281,750.00
AH HARGA BAHAN 281,750.00

15,000.00 -

MLAH HARGA ALAT -

340,550.00
15.00% 51,082.50
391,632.50
P Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 35,840.00
110,000.00 24,640.00
120,000.00 5,400.00
AH TENAGA KERJA 65,880.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

65,880.00
15.00% 9,882.00
75,762.00

P Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,480.00
110,000.00 27,830.00
120,000.00 6,120.00
AH TENAGA KERJA 74,430.00

408,250.00 408,250.00
AH HARGA BAHAN 408,250.00

15,000.00 -

MLAH HARGA ALAT -

482,680.00
15.00% 72,402.00
555,082.00
P Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 63,680.00
110,000.00 43,780.00
120,000.00 9,600.00
AH TENAGA KERJA 117,060.00

782,000.00 782,000.00
AH HARGA BAHAN 782,000.00

15,000.00 -

MLAH HARGA ALAT -

899,060.00
15.00% 134,859.00
1,033,919.00

P Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 75,920.00
110,000.00 52,250.00
120,000.00 11,400.00
AH TENAGA KERJA 139,570.00

1,006,250.00 1,006,250.00
AH HARGA BAHAN 1,006,250.00

15,000.00 -

MLAH HARGA ALAT -

1,145,820.00
15.00% 171,873.00
1,317,693.00

P Ø 300 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 76,640.00
110,000.00 52,690.00
120,000.00 11,520.00
AH TENAGA KERJA 140,850.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

140,850.00
15.00% 21,127.50
161,977.50

P Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 96,960.00
110,000.00 66,660.00
120,000.00 14,520.00
AH TENAGA KERJA 178,140.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

178,140.00
15.00% 26,721.00
204,861.00

P Ø 450 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 108,240.00
110,000.00 74,360.00
120,000.00 16,200.00
AH TENAGA KERJA 198,800.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

198,800.00
15.00% 29,820.00
228,620.00

P Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 117,520.00
110,000.00 80,850.00
120,000.00 16,800.00
AH TENAGA KERJA 215,170.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

215,170.00
15.00% 32,275.50
247,445.50

P Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 106,160.00
110,000.00 73,040.00
120,000.00 15,960.00
AH TENAGA KERJA 195,160.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

195,160.00
15.00% 29,274.00
224,434.00

P Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 186,160.00
110,000.00 127,930.00
120,000.00 27,960.00
AH TENAGA KERJA 342,050.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

342,050.00
15.00% 51,307.50
393,357.50

P Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 209,840.00
110,000.00 144,320.00
120,000.00 31,440.00
AH TENAGA KERJA 385,600.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

385,600.00
15.00% 57,840.00
443,440.00

P Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 232,880.00
110,000.00 160,160.00
120,000.00 34,920.00
AH TENAGA KERJA 427,960.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

427,960.00
15.00% 64,194.00
492,154.00

P Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 256,000.00
110,000.00 176,000.00
120,000.00 38,400.00
AH TENAGA KERJA 470,400.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

470,400.00
15.00% 70,560.00
540,960.00

P Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 279,040.00
110,000.00 191,840.00
120,000.00 41,880.00
AH TENAGA KERJA 512,760.00

- -
AH HARGA BAHAN -

15,000.00 -

MLAH HARGA ALAT -

512,760.00
15.00% 76,914.00
589,674.00

I Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 39,120.00
110,000.00 10,780.00
120,000.00 4,800.00
AH TENAGA KERJA 54,700.00

710,700.00 710,700.00
AH HARGA BAHAN 710,700.00

15,000.00 5,700.00

MLAH HARGA ALAT 5,700.00

771,100.00
15.00% 115,665.00
886,765.00

I Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 43,760.00
110,000.00 11,990.00
120,000.00 6,600.00
AH TENAGA KERJA 62,350.00

1,076,400.00 1,076,400.00
AH HARGA BAHAN 1,076,400.00

15,000.00 5,700.00

MLAH HARGA ALAT 5,700.00

1,144,450.00
15.00% 171,667.50
1,316,117.50

I Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 49,040.00
110,000.00 13,530.00
120,000.00 7,320.00
AH TENAGA KERJA 69,890.00

1,573,200.00 1,573,200.00
AH HARGA BAHAN 1,573,200.00

15,000.00 5,700.00

MLAH HARGA ALAT 5,700.00

1,648,790.00
15.00% 247,318.50
1,896,108.50

I Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 68,400.00
110,000.00 18,810.00
120,000.00 10,200.00
AH TENAGA KERJA 97,410.00

2,415,000.00 2,415,000.00
AH HARGA BAHAN 2,415,000.00

15,000.00 5,700.00

MLAH HARGA ALAT 5,700.00

2,518,110.00
15.00% 377,716.50
2,895,826.50

I Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 76,080.00
110,000.00 20,900.00
120,000.00 11,400.00
AH TENAGA KERJA 108,380.00

3,220,000.00 3,220,000.00
AH HARGA BAHAN 3,220,000.00

15,000.00 750.00

MLAH HARGA ALAT 750.00

3,329,130.00
15.00% 499,369.50
3,828,499.50

I Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 77,840.00
110,000.00 21,450.00
120,000.00 11,640.00
AH TENAGA KERJA 110,930.00

- -
AH HARGA BAHAN -

15,000.00 1,065.00

MLAH HARGA ALAT 1,065.00

111,995.00
15.00% 16,799.25
128,794.25

I Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 123,600.00
110,000.00 33,990.00
130,000.00 12,090.00
120,000.00 18,480.00
188,160.00

- -
AH HARGA BAHAN -

1,835,400.00 42,214.20

15,000.00 465.00

JUMLAH HARGA ALAT 42,679.20


230,839.20
15.00% 34,625.88
265,465.08

I Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 145,040.00
110,000.00 39,930.00
130,000.00 18,590.00
120,000.00 21,720.00
225,280.00

- -
AH HARGA BAHAN -

1,835,400.00 53,226.60

15,000.00 585.00

JUMLAH HARGA ALAT 53,811.60


279,091.60
15.00% 41,863.74
320,955.34

I Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 163,760.00
110,000.00 44,990.00
130,000.00 25,090.00
120,000.00 24,600.00
258,440.00

- -
AH HARGA BAHAN -

1,835,400.00 62,403.60

15,000.00 675.00

JUMLAH HARGA ALAT 63,078.60

321,518.60
15.00% 48,227.79
369,746.39

I Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 160,880.00
110,000.00 44,220.00
130,000.00 38,090.00
120,000.00 24,120.00
267,310.00

- -
AH HARGA BAHAN -

106,453.20
1,835,400.00

1,155.00
15,000.00

JUMLAH HARGA ALAT 107,608.20


374,918.20
15.00% 56,237.73
431,155.93

I Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 308,720.00
110,000.00 84,920.00
130,000.00 64,090.00
120,000.00 46,320.00
504,050.00

- -
-

1,835,400.00 154,173.60

15,000.00 3,375.00

JUMLAH HARGA ALAT 157,548.60


661,598.60
15.00% 99,239.79
760,838.39

I Ø900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 399,600.00
110,000.00 109,890.00
130,000.00 77,090.00
120,000.00 59,880.00
646,460.00

- -
-

1,835,400.00 170,692.20

15,000.00 3,720.00

JUMLAH HARGA ALAT 174,412.20


820,872.20
15.00% 123,130.83
944,003.03

I Ø1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 474,480.00
110,000.00 130,460.00
130,000.00 103,090.00
120,000.00 83,160.00
791,190.00

- -
-

1,835,400.00 205,564.80

15,000.00 4,470.00

JUMLAH HARGA ALAT 210,034.80


1,001,224.80
15.00% 150,183.72
1,151,408.52

I Ø1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 555,920.00
110,000.00 152,900.00
130,000.00 103,090.00
120,000.00 83,400.00
895,310.00

- -
-

1,835,400.00 278,980.80

15,000.00 4,560.00
JUMLAH HARGA ALAT 283,540.80
1,178,850.80
15.00% 176,827.62
1,355,678.42

I Ø1200 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 644,480.00
110,000.00 177,210.00
130,000.00 116,090.00
120,000.00 96,720.00
1,034,500.00

- -
-

1,835,400.00 330,372.00

15,000.00 4,500.00

JUMLAH HARGA ALAT 334,872.00


1,369,372.00
15.00% 205,405.80
1,574,777.80

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 39,920.00
110,000.00 11,000.00
120,000.00 6,000.00
56,920.00

192,625.00 192,625.00
192,625.00

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


249,605.00
15.00% 37,440.75
287,045.75

a Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 46,320.00
110,000.00 12,760.00
120,000.00 6,960.00
66,040.00

263,925.00 263,925.00
263,925.00

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


330,025.00
15.00% 49,503.75
379,528.75

a Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 51,840.00
110,000.00 14,300.00
120,000.00 7,800.00
73,940.00

322,575.00 322,575.00
322,575.00

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


396,575.00
15.00% 59,486.25
456,061.25
a Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 56,640.00
110,000.00 15,620.00
120,000.00 8,520.00
80,780.00

397,037.50 397,037.50
397,037.50

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


477,877.50
15.00% 71,681.63
549,559.13

a Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 89,040.00
110,000.00 24,530.00
120,000.00 13,320.00
126,890.00

674,475.00 674,475.00
674,475.00

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


801,425.00
15.00% 120,213.75
921,638.75
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 106,000.00
110,000.00 29,150.00
120,000.00 15,960.00
151,110.00

859,625.00 859,625.00
859,625.00

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


1,010,795.00
15.00% 151,619.25
1,162,414.25

a Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 113,200.00
110,000.00 31,130.00
120,000.00 16,920.00
161,250.00

- -
-

15,000.00 60.00

JUMLAH HARGA ALAT 60.00


161,310.00
15.00% 24,196.50
185,506.50

a Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 189,280.00
110,000.00 52,030.00
120,000.00 28,440.00
269,750.00

- -
-

1,835,400.00 49,555.80

15,000.00 585.00

JUMLAH HARGA ALAT 50,140.80


319,890.80
15.00% 47,983.62
367,874.42

a Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 178,480.00
110,000.00 49,060.00
120,000.00 26,760.00
254,300.00

- -
-

1,835,400.00 47,720.40

15,000.00 555.00

JUMLAH HARGA ALAT 48,275.40


302,575.40
15.00% 45,386.31
347,961.71

a Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 194,560.00
110,000.00 53,460.00
120,000.00 29,160.00
277,180.00

- -
-

1,835,400.00 53,226.60

15,000.00 675.00

JUMLAH HARGA ALAT 53,901.60


331,081.60
15.00% 49,662.24
380,743.84

a Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 176,640.00
110,000.00 48,620.00
120,000.00 26,520.00
251,780.00

- -
-

1,835,400.00 49,555.80

15,000.00 585.00

JUMLAH HARGA ALAT 50,140.80


301,920.80
15.00% 45,288.12
347,208.92

a Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 311,760.00
110,000.00 85,690.00
120,000.00 46,800.00
444,250.00

- -
-

1,835,400.00 84,428.40

15,000.00 1,470.00

JUMLAH HARGA ALAT 85,898.40


530,148.40
15.00% 79,522.26
609,670.66

a Ø 900 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 352,240.00
110,000.00 8,910.00
120,000.00 52,800.00
413,950.00

- -
-

1,835,400.00 95,440.80

15,000.00 1,725.00

JUMLAH HARGA ALAT 97,165.80


511,115.80
15.00% 76,667.37
587,783.17

a Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 391,600.00
110,000.00 107,690.00
120,000.00 58,680.00
557,970.00

- -
-

1,835,400.00 106,453.20

15,000.00 1,995.00

JUMLAH HARGA ALAT 108,448.20


666,418.20
15.00% 99,962.73
766,380.93

a Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 430,960.00
110,000.00 118,470.00
120,000.00 64,680.00
614,110.00

- -
-

1,835,400.00 117,465.60

15,000.00 2,250.00

JUMLAH HARGA ALAT 119,715.60


733,825.60
15.00% 110,073.84
843,899.44

a Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 471,760.00
110,000.00 129,360.00
120,000.00 70,560.00
671,680.00

- -
-

1,835,400.00 128,478.00

15,000.00 2,505.00

JUMLAH HARGA ALAT 130,983.00


802,663.00
15.00% 120,399.45
923,062.45

PEMOTONGAN PIPA
PVC Ø 63 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 400.00
110,000.00 220.00
120,000.00 60.00
AH TENAGA KERJA 680.00

35,190.00 35,190.00
AH HARGA BAHAN 35,190.00

57,500.00 172.50

MLAH HARGA ALAT 172.50

36,042.50
15.00% 5,406.38
41,448.88
Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 1,120.00
110,000.00 770.00
120,000.00 120.00
JUMLAH TENAGA 2,010.00
KERJA

73,600.00 73,600.00
JUMLAH HARGA BAHAN 73,600.00

57,500.00 172.50

AH HARGA ALAT 172.50

75,782.50
15.00% 11,367.38
87,149.88

PVC Ø 110 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,760.00
110,000.00 1,210.00
120,000.00 240.00
JUMLAH TENAGA 3,210.00
KERJA

106,927.00 106,927.00
JUMLAH HARGA BAHAN 106,927.00

57,500.00 172.50

AH HARGA ALAT 172.50


110,309.50
15.00% 16,546.43
126,855.93

PVC Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,480.00
110,000.00 1,650.00
120,000.00 360.00
AH TENAGA KERJA 4,490.00

- -
AH HARGA BAHAN -

57,500.00 172.50

MLAH HARGA ALAT 172.50

4,662.50
15.00% 699.38
5,361.88

PVC Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,480.00
110,000.00 4,400.00
120,000.00 960.00
AH TENAGA KERJA 11,840.00

355,005.00 355,005.00
AH HARGA BAHAN 355,005.00

57,500.00 977.50

MLAH HARGA ALAT 977.50

367,822.50
15.00% 55,173.38
422,995.88

PVC Ø 250 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


80,000.00 10,240.00
110,000.00 7,040.00
120,000.00 1,560.00
AH TENAGA KERJA 18,840.00

556,312.50 556,312.50
AH HARGA BAHAN 556,312.50

57,500.00 1,725.00

MLAH HARGA ALAT 1,725.00

576,877.50
15.00% 86,531.63
663,409.13

PVC Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,400.00
110,000.00 8,470.00
120,000.00 1,800.00
AH TENAGA KERJA 22,670.00

- -
AH HARGA BAHAN -

57,500.00 2,127.50

MLAH HARGA ALAT 2,127.50

24,797.50
15.00% 3,719.63
28,517.13

PVC Ø 400 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 26,480.00
110,000.00 18,260.00
120,000.00 3,960.00
AH TENAGA KERJA 48,700.00

- -
AH HARGA BAHAN -

57,500.00 4,945.00

MLAH HARGA ALAT 4,945.00

53,645.00
15.00% 8,046.75
61,691.75

PVC Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 33,600.00
110,000.00 23,100.00
120,000.00 5,040.00
AH TENAGA KERJA 61,740.00

- -
AH HARGA BAHAN -

57,500.00 3,105,000.00

MLAH HARGA ALAT 3,105,000.00

3,166,740.00
15.00% 475,011.00
3,641,751.00

PVC Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 41,440.00
110,000.00 28,490.00
120,000.00 6,240.00
AH TENAGA KERJA 76,170.00

- -
AH HARGA BAHAN -

57,500.00 3,967.50

MLAH HARGA ALAT 3,967.50

80,137.50
15.00% 12,020.63
92,158.13

PVC Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 49,840.00
110,000.00 34,210.00
120,000.00 7,440.00
AH TENAGA KERJA 91,490.00

- -
AH HARGA BAHAN -

57,500.00 4,945.00

MLAH HARGA ALAT 4,945.00

96,435.00
15.00% 14,465.25
110,900.25

PVC Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 87,120.00
110,000.00 59,950.00
120,000.00 13,080.00
AH TENAGA KERJA 160,150.00
- -
AH HARGA BAHAN -

57,500.00 9,200.00

MLAH HARGA ALAT 9,200.00

169,350.00
15.00% 25,402.50
194,752.50

PVC Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 91,280.00
110,000.00 62,810.00
120,000.00 13,680.00
AH TENAGA KERJA 167,770.00

- -
AH HARGA BAHAN -

57,500.00 9,660.00

MLAH HARGA ALAT 9,660.00

177,430.00
15.00% 26,614.50
204,044.50

PVC Ø 1000 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 102,800.00
110,000.00 70,730.00
120,000.00 15,480.00
AH TENAGA KERJA 189,010.00

- -
AH HARGA BAHAN -

57,500.00 10,982.50

MLAH HARGA ALAT 10,982.50

199,992.50
15.00% 29,998.88
229,991.38

PVC Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
AH TENAGA KERJA 210,130.00

- -
AH HARGA BAHAN -

57,500.00 12,247.50

MLAH HARGA ALAT 12,247.50

222,377.50
15.00% 33,356.63
255,734.13

PVC Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 125,840.00
110,000.00 86,570.00
120,000.00 18,840.00
AH TENAGA KERJA 231,250.00

- -
AH HARGA BAHAN -
57,500.00 13,570.00

MLAH HARGA ALAT 13,570.00

244,820.00
15.00% 36,723.00
281,543.00

HDPE Ø 63 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 160.00
110,000.00 110.00
120,000.00 24.00
130,000.00 4,420.00
AH TENAGA KERJA 4,714.00

29,785.00 29,785.00
AH HARGA BAHAN 29,785.00

57,500.00 230.00

MLAH HARGA ALAT 230.00

34,729.00
15.00% 5,209.35
39,938.35

HDPE Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 480.00
110,000.00 330.00
120,000.00 120.00
130,000.00 9,230.00
AH TENAGA KERJA 10,160.00

- -
AH HARGA BAHAN -

57,500.00 287.50

MLAH HARGA ALAT 287.50

10,447.50
15.00% 1,567.13
12,014.63

HDPE Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 720.00
110,000.00 550.00
120,000.00 120.00
130,000.00 12,480.00
AH TENAGA KERJA 13,870.00

117,070.00 117,070.00
AH HARGA BAHAN 117,070.00

57,500.00 345.00

MLAH HARGA ALAT 345.00

131,285.00
15.00% 19,692.75
150,977.75

HDPE Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,280.00
110,000.00 880.00
120,000.00 240.00
130,000.00 15,730.00
AH TENAGA KERJA 18,130.00
- -
AH HARGA BAHAN -

57,500.00 517.50

MLAH HARGA ALAT 517.50

18,647.50
15.00% 2,797.13
21,444.63

HDPE Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 3,520.00
110,000.00 2,420.00
120,000.00 480.00
130,000.00 22,230.00
28,650.00

298,540.00 298,540.00
AH HARGA BAHAN 298,540.00

57,500.00 977.50

MLAH HARGA ALAT 977.50

328,167.50
15.00% 49,225.13
377,392.63

HDPE Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,360.00
110,000.00 3,630.00
120,000.00 840.00
130,000.00 28,730.00
38,560.00
464,945.00 464,945.00
AH HARGA BAHAN 464,945.00

57,500.00 1,322.50

MLAH HARGA ALAT 1,322.50

504,827.50
15.00% 75,724.13
580,551.63

HDPE Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,200.00
110,000.00 4,950.00
120,000.00 1,080.00
130,000.00 35,230.00
48,460.00

- -
AH HARGA BAHAN -

57,500.00 1,725.00

MLAH HARGA ALAT 1,725.00

50,185.00
15.00% 7,527.75
57,712.75

HDPE Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 14,160.00
110,000.00 9,680.00
120,000.00 2,160.00
130,000.00 48,230.00
74,230.00

- -
AH HARGA BAHAN -

57,500.00 3,162.50

MLAH HARGA ALAT 3,162.50

77,392.50
15.00% 11,608.88
89,001.38

HDPE Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 18,000.00
110,000.00 12,430.00
120,000.00 2,760.00
130,000.00 54,730.00
87,920.00

- -
AH HARGA BAHAN -

57,500.00 4,025.00

MLAH HARGA ALAT 4,025.00

91,945.00
15.00% 13,791.75
105,736.75

HDPE Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 22,160.00
110,000.00 15,290.00
120,000.00 3,360.00
130,000.00 61,230.00
102,040.00

- -
AH HARGA BAHAN -

57,500.00 4,887.50

MLAH HARGA ALAT 4,887.50

106,927.50
15.00% 16,039.13
122,966.63

HDPE Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 26,640.00
110,000.00 18,370.00
120,000.00 3,960.00
130,000.00 74,230.00
123,200.00

- -
AH HARGA BAHAN -

57,500.00 5,807.50

MLAH HARGA ALAT 5,807.50

129,007.50
15.00% 19,351.13
148,358.63

HDPE Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 48,080.00
110,000.00 33,110.00
120,000.00 7,200.00
130,000.00 100,230.00
188,620.00

- -
AH HARGA BAHAN -

57,500.00 10,292.50

MLAH HARGA ALAT 10,292.50

198,912.50
15.00% 29,836.88
228,749.38

HDPE Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 73,040.00
110,000.00 50,160.00
120,000.00 10,920.00
130,000.00 113,230.00
247,350.00

- -
AH HARGA BAHAN -

57,500.00 15,525.00

MLAH HARGA ALAT 15,525.00


262,875.00
15.00% 39,431.25
302,306.25

HDPE Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 90,000.00
110,000.00 61,820.00
120,000.00 13,440.00
130,000.00 126,230.00
291,490.00

- -
AH HARGA BAHAN -

57,500.00 19,090.00

MLAH HARGA ALAT 19,090.00

310,580.00
15.00% 46,587.00
357,167.00

HDPE Ø 1100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 98,400.00
110,000.00 68,090.00
120,000.00 14,880.00
130,000.00 139,230.00
JUMLAH TENAGA KERJA 320,600.00

- -
MLAH HARGA BAHAN -

57,500.00 20,125.00

UMLAH HARGA ALAT 20,125.00

340,725.00
15.00% 51,108.75
391,833.75

HDPE Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 129,520.00
110,000.00 88,990.00
120,000.00 19,440.00
130,000.00 152,230.00
390,180.00

- -
AH HARGA BAHAN -

57,500.00 27,427.50

MLAH HARGA ALAT 27,427.50

417,607.50
15.00% 62,641.13
480,248.63

GIP Ø 63 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 1,520.00
110,000.00 1,100.00
120,000.00 240.00
2,860.00

97,750.00 97,750.00
AH HARGA BAHAN 97,750.00

57,500.00 -

MLAH HARGA ALAT -


100,610.00
15.00% 15,091.50
115,701.50

GIP Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 4,640.00
110,000.00 3,190.00
120,000.00 720.00
8,550.00

281,750.00 281,750.00
AH HARGA BAHAN 281,750.00

57,500.00 -

MLAH HARGA ALAT -

290,300.00
15.00% 43,545.00
333,845.00

GIP Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 7,360.00
110,000.00 5,060.00
120,000.00 1,080.00
13,500.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

13,500.00
15.00% 2,025.00
15,525.00

GIP Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,480.00
110,000.00 7,260.00
120,000.00 1,560.00
19,300.00

408,250.00 408,250.00
AH HARGA BAHAN 408,250.00

57,500.00 -

MLAH HARGA ALAT -


427,550.00
15.00% 64,132.50
491,682.50

GIP Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 27,200.00
110,000.00 18,700.00
120,000.00 4,080.00
49,980.00

782,000.00 782,000.00
AH HARGA BAHAN 782,000.00

57,500.00 -

MLAH HARGA ALAT -

831,980.00
15.00% 124,797.00
956,777.00

GIP Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 38,000.00
110,000.00 26,070.00
120,000.00 5,640.00
69,710.00

1,006,250.00 1,006,250.00
AH HARGA BAHAN 1,006,250.00

57,500.00 -

MLAH HARGA ALAT -

1,075,960.00
15.00% 161,394.00
1,237,354.00

GIP Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,320.00
110,000.00 27,720.00
120,000.00 6,000.00
74,040.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

74,040.00
15.00% 11,106.00
85,146.00

GIP Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 58,400.00
110,000.00 40,590.00
120,000.00 8,880.00
107,870.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

107,870.00
15.00% 16,180.50
124,050.50

GIP Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 67,840.00
110,000.00 46,200.00
120,000.00 10,200.00
124,240.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

124,240.00
15.00% 18,636.00
142,876.00

GIP Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 75,280.00
110,000.00 51,810.00
120,000.00 11,280.00
138,370.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

138,370.00
15.00% 20,755.50
159,125.50

GIP Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 69,120.00
110,000.00 47,520.00
120,000.00 10,320.00
126,960.00

-
-
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

126,960.00
15.00% 19,044.00
146,004.00

GIP Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 125,360.00
110,000.00 86,130.00
120,000.00 18,840.00
230,330.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

230,330.00
15.00% 34,549.50
264,879.50

GIP Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 141,600.00
110,000.00 97,350.00
120,000.00 21,240.00
260,190.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

260,190.00
15.00% 39,028.50
299,218.50

GIP Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 157,920.00
110,000.00 108,570.00
120,000.00 23,640.00
290,130.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

290,130.00
15.00% 43,519.50
333,649.50

GIP Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 174,240.00
110,000.00 119,790.00
120,000.00 26,160.00
320,190.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

320,190.00
15.00% 48,028.50
368,218.50

GIP Ø 1200 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 190,560.00
110,000.00 131,010.00
120,000.00 28,560.00
350,130.00

- -
AH HARGA BAHAN -

57,500.00 -

MLAH HARGA ALAT -

350,130.00
15.00% 52,519.50
402,649.50

DCI Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 5,680.00
110,000.00 1,540.00
120,000.00 840.00
8,060.00

710,700.00 710,700.00
AH HARGA BAHAN 710,700.00

57,500.00 172.50

MLAH HARGA ALAT 172.50

718,932.50
15.00% 107,839.88
826,772.38

DCI Ø 125 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,960.00
110,000.00 2,420.00
120,000.00 1,320.00
12,700.00

1,076,400.00 1,076,400.00
AH HARGA BAHAN 1,076,400.00

57,500.00 575.00

MLAH HARGA ALAT 575.00

1,089,675.00
15.00% 163,451.25
1,253,126.25

DCI Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 12,720.00
110,000.00 3,520.00
120,000.00 1,920.00
18,160.00

1,573,200.00 1,573,200.00
AH HARGA BAHAN 1,573,200.00

57,500.00 1,035.00

MLAH HARGA ALAT 1,035.00

1,592,395.00
15.00% 238,859.25
1,831,254.25
DCI Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 29,280.00
110,000.00 8,030.00
120,000.00 4,440.00
41,750.00

2,415,000.00 2,415,000.00
AH HARGA BAHAN 2,415,000.00

57,500.00 3,105.00

MLAH HARGA ALAT 3,105.00

2,459,855.00
15.00% 368,978.25
2,828,833.25

DCI Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 38,080.00
110,000.00 10,450.00
120,000.00 5,760.00
54,290.00

3,220,000.00 3,220,000.00
AH HARGA BAHAN 3,220,000.00

57,500.00 4,197.50

MLAH HARGA ALAT 4,197.50

3,278,487.50
15.00% 491,773.13
3,770,260.63
DCI Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 40,960.00
110,000.00 11,220.00
120,000.00 6,120.00
58,300.00

- -
AH HARGA BAHAN -

57,500.00 4,542.50

MLAH HARGA ALAT 4,542.50

62,842.50
15.00% 9,426.38
72,268.88

DCI Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 75,280.00
110,000.00 20,680.00
120,000.00 11,280.00
107,240.00

- -
AH HARGA BAHAN -

57,500.00 9,085.00

MLAH HARGA ALAT 9,085.00

116,325.00
15.00% 17,448.75
133,773.75

DCI Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 90,960.00
110,000.00 24,970.00
120,000.00 13,680.00
129,610.00

- -
AH HARGA BAHAN -

57,500.00 10,120.00

MLAH HARGA ALAT 10,120.00

139,730.00
15.00% 20,959.50
160,689.50

DCI Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 104,960.00
110,000.00 28,820.00
120,000.00 15,720.00
149,500.00

- -
AH HARGA BAHAN -

57,500.00 11,040.00

MLAH HARGA ALAT 11,040.00

160,540.00
15.00% 24,081.00
184,621.00

DCI Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 104,720.00
110,000.00 28,820.00
120,000.00 15,720.00
149,260.00

- -
AH HARGA BAHAN -

57,500.00 11,040.00

MLAH HARGA ALAT 11,040.00

160,300.00
15.00% 24,045.00
184,345.00

DCI Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 207,840.00
110,000.00 57,200.00
120,000.00 31,200.00
296,240.00

- -
AH HARGA BAHAN -

57,500.00 17,825.00

MLAH HARGA ALAT 17,825.00


314,065.00
15.00% 47,109.75
361,174.75

DCI Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 269,600.00
110,000.00 74,140.00
120,000.00 40,440.00
384,180.00

- -
AH HARGA BAHAN -

57,500.00 21,907.50

MLAH HARGA ALAT 21,907.50

406,087.50
15.00% 60,913.13
467,000.63

DCI Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 321,680.00
110,000.00 88,440.00
120,000.00 48,240.00
458,360.00

- -
AH HARGA BAHAN -

57,500.00 25,357.50

MLAH HARGA ALAT 25,357.50


483,717.50
15.00% 72,557.63
556,275.13

DCI Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 378,480.00
110,000.00 104,060.00
120,000.00 56,760.00
539,300.00

- -
AH HARGA BAHAN -

57,500.00 29,095.00

MLAH HARGA ALAT 29,095.00

568,395.00
15.00% 85,259.25
653,654.25

DCI Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 440,160.00
110,000.00 121,000.00
120,000.00 66,000.00
627,160.00

- -
AH HARGA BAHAN -

57,500.00 33,120.00
MLAH HARGA ALAT 33,120.00

660,280.00
15.00% 99,042.00
759,322.00

baja Ø 63 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 2,240.00
110,000.00 660.00
120,000.00 360.00
3,260.00

192,625.00 192,625.00
AH HARGA BAHAN 192,625.00

57,500.00 2,127.50

MLAH HARGA ALAT 2,127.50

198,012.50
15.00% 29,701.88
227,714.38

baja Ø 100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 6,800.00
110,000.00 1,870.00
120,000.00 960.00
9,630.00

263,925.00 263,925.00
AH HARGA BAHAN 263,925.00

57,500.00 2,300.00
57,500.00 2,300.00

MLAH HARGA ALAT 2,300.00

275,855.00
15.00% 41,378.25
317,233.25

baja Ø 125 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 10,640.00
110,000.00 2,970.00
120,000.00 1,560.00
15,170.00

322,575.00 322,575.00
AH HARGA BAHAN 322,575.00

57,500.00 2,415.00

MLAH HARGA ALAT 2,415.00

340,160.00
15.00% 51,024.00
391,184.00

baja Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 14,720.00
110,000.00 4,070.00
120,000.00 2,160.00
20,950.00

397,037.50 397,037.50
AH HARGA BAHAN 397,037.50
57,500.00 2,587.50

MLAH HARGA ALAT 2,587.50

420,575.00
15.00% 63,086.25
483,661.25

baja Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 38,080.00
110,000.00 10,450.00
120,000.00 5,760.00
54,290.00

674,475.00 674,475.00
AH HARGA BAHAN 674,475.00

57,500.00 3,450.00

MLAH HARGA ALAT 3,450.00

732,215.00
15.00% 109,832.25
842,047.25

baja Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 53,040.00
110,000.00 14,630.00
120,000.00 7,920.00
75,590.00

859,625.00 859,625.00
AH HARGA BAHAN 859,625.00
57,500.00 3,910.00

MLAH HARGA ALAT 3,910.00

939,125.00
15.00% 140,868.75
1,079,993.75

baja Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 59,600.00
110,000.00 16,390.00
120,000.00 8,880.00
84,870.00

- -
AH HARGA BAHAN -

57,500.00 4,140.00

MLAH HARGA ALAT 4,140.00

89,010.00
15.00% 13,351.50
102,361.50

baja Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 115,200.00
110,000.00 31,680.00
120,000.00 17,280.00
164,160.00

- -
AH HARGA BAHAN -

57,500.00 6,037.50

MLAH HARGA ALAT 6,037.50

170,197.50
15.00% 25,529.63
195,727.13

baja Ø 450 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 111,920.00
110,000.00 30,800.00
120,000.00 16,800.00
159,520.00

- -
AH HARGA BAHAN -

57,500.00 6,152.50

MLAH HARGA ALAT 6,152.50

165,672.50
15.00% 24,850.88
190,523.38

baja Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 124,640.00
110,000.00 34,320.00
120,000.00 18,720.00
177,680.00

- -
AH HARGA BAHAN -

57,500.00 6,152.50

MLAH HARGA ALAT 6,152.50

183,832.50
15.00% 27,574.88
211,407.38

baja Ø 600 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 114,960.00
110,000.00 31,570.00
120,000.00 17,280.00
163,810.00

- -
AH HARGA BAHAN -

57,500.00 6,497.50

MLAH HARGA ALAT 6,497.50

170,307.50
15.00% 25,546.13
195,853.63

baja Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 209,600.00
110,000.00 57,750.00
120,000.00 31,440.00
298,790.00

- -
AH HARGA BAHAN -

57,500.00 9,545.00

MLAH HARGA ALAT 9,545.00

308,335.00
15.00% 46,250.25
354,585.25

baja Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 237,680.00
110,000.00 65,340.00
120,000.00 35,640.00
338,660.00

- -
AH HARGA BAHAN -

57,500.00 10,522.50

MLAH HARGA ALAT 10,522.50

349,182.50
15.00% 52,377.38
401,559.88

baja Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 265,520.00
110,000.00 73,040.00
120,000.00 39,840.00
378,400.00
- -
AH HARGA BAHAN -

57,500.00 11,557.50

MLAH HARGA ALAT 11,557.50

389,957.50
15.00% 58,493.63
448,451.13

baja Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 293,360.00
110,000.00 80,630.00
120,000.00 44,040.00
418,030.00

- -
AH HARGA BAHAN -

57,500.00 12,535.00

MLAH HARGA ALAT 12,535.00

430,565.00
15.00% 64,584.75
495,149.75

baja Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 321,200.00
110,000.00 88,330.00
120,000.00 48,240.00
457,770.00
- -
AH HARGA BAHAN -

57,500.00 13,570.00

MLAH HARGA ALAT 13,570.00

471,340.00
15.00% 70,701.00
542,041.00

PEMASANGAN AKSESORIS PIPA


e Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
210,130.00

3,737,500.00 3,737,500.00
AH HARGA BAHAN 3,737,500.00

4,025,000.00 402,500.00

MLAH HARGA ALAT 402,500.00

4,350,130.00
15.00% 652,519.50
5,002,649.50

e Ø 200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00

6,210,000.00 6,210,000.00
AH HARGA BAHAN 6,210,000.00

4,025,000.00 1,207,500.00

MLAH HARGA ALAT 1,207,500.00

7,669,410.00
15.00% 1,150,411.50
8,819,821.50

e Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00

10,637,500.00 10,637,500.00
AH HARGA BAHAN 10,637,500.00

4,025,000.00 1,610,000.00

MLAH HARGA ALAT 1,610,000.00

12,499,410.00
15.00% 1,874,911.50
14,374,321.50

e Ø 300 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 160,000.00
110,000.00 110,000.00
120,000.00 24,000.00
294,000.00

- -
AH HARGA BAHAN -

4,025,000.00 2,012,500.00

MLAH HARGA ALAT 2,012,500.00

2,306,500.00
15.00% 345,975.00
2,652,475.00

e Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 274,320.00
110,000.00 188,650.00
120,000.00 41,160.00
504,130.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

MLAH HARGA ALAT 4,025,000.00

4,529,130.00
15.00% 679,369.50
5,208,499.50

e Ø 450 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 274,320.00
110,000.00 188,650.00
120,000.00 41,160.00
504,130.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

MLAH HARGA ALAT 4,025,000.00

4,529,130.00
15.00% 679,369.50
5,208,499.50

e Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 320,000.00
110,000.00 220,000.00
120,000.00 48,000.00
588,000.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

MLAH HARGA ALAT 4,025,000.00

4,613,000.00
15.00% 691,950.00
5,304,950.00

e Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 113,680.00
110,000.00 78,210.00
120,000.00 17,040.00
208,930.00

- -
AH HARGA BAHAN -

4,025,000.00 2,415,000.00

1,667,500.00 500,250.00
MLAH HARGA ALAT 2,915,250.00

3,124,180.00
15.00% 468,627.00
3,592,807.00

e Ø 700 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 114,320.00
110,000.00 78,650.00
120,000.00 17,160.00
210,130.00

- -
HARGA BAHAN -

4,025,000.00 2,012,500.00

1,667,500.00 833,750.00
AH HARGA ALAT 2,846,250.00

3,056,380.00
15.00% 458,457.00
3,514,837.00

e Ø 800 mm
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 142,880.00
110,000.00 98,230.00
120,000.00 21,480.00
262,590.00

- -
AH HARGA BAHAN -

4,025,000.00 2,012,500.00

1,667,500.00 833,750.00
MLAH HARGA ALAT 2,846,250.00

3,108,840.00
15.00% 466,326.00
3,575,166.00

e Ø 900 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 137,120.00
110,000.00 94,270.00
120,000.00 20,520.00
251,910.00

- -
AH HARGA BAHAN -

4,025,000.00 3,018,750.00

1,667,500.00 1,250,625.00
MLAH HARGA ALAT 4,269,375.00

4,521,285.00
15.00% 678,192.75
5,199,477.75
e Ø 1000 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 205,680.00
110,000.00 141,460.00
120,000.00 30,840.00
377,980.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00

6,070,480.00
15.00% 910,572.00
6,981,052.00

e Ø 1100 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 240,000.00
110,000.00 165,000.00
120,000.00 36,000.00
441,000.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00
6,133,500.00
15.00% 920,025.00
7,053,525.00

e Ø 1200 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 240,000.00
110,000.00 165,000.00
120,000.00 36,000.00
441,000.00

- -
AH HARGA BAHAN -

4,025,000.00 4,025,000.00

1,667,500.00 1,667,500.00
MLAH HARGA ALAT 5,692,500.00

6,133,500.00
15.00% 920,025.00
7,053,525.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 8,480.00
110,000.00 5,830.00
120,000.00 1,320.00
15,630.00

- -
AH HARGA BAHAN -

4,025,000.00 112,700.00
MLAH HARGA ALAT 112,700.00

128,330.00
15.00% 19,249.50
147,579.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 17,280.00
110,000.00 11,880.00
120,000.00 2,640.00
31,800.00

- -
AH HARGA BAHAN -

4,025,000.00 116,725.00

MLAH HARGA ALAT 116,725.00


148,525.00
15.00% 22,278.75
170,803.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 26,080.00
110,000.00 17,930.00
120,000.00 3,960.00
47,970.00

- -
AH HARGA BAHAN -

4,025,000.00 156,975.00
MLAH HARGA ALAT 156,975.00

204,945.00
15.00% 30,741.75
235,686.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 34,880.00
110,000.00 23,980.00
120,000.00 5,280.00
64,140.00

- -
AH HARGA BAHAN -

4,025,000.00 2,012,500.00

MLAH HARGA ALAT 2,012,500.00

2,076,640.00
15.00% 311,496.00
2,388,136.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 52,480.00
110,000.00 36,080.00
120,000.00 7,920.00
96,480.00

- -
AH HARGA BAHAN -

4,025,000.00 2,012,500.00
4,025,000.00 2,012,500.00

MLAH HARGA ALAT 2,012,500.00

2,108,980.00
15.00% 316,347.00
2,425,327.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 61,280.00
110,000.00 42,130.00
120,000.00 9,240.00
112,650.00

- -
AH HARGA BAHAN -

4,025,000.00 2,012,500.00

MLAH HARGA ALAT 2,012,500.00

2,125,150.00
15.00% 318,772.50
2,443,922.50

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 70,080.00
110,000.00 48,180.00
120,000.00 10,560.00
128,820.00

- -
AH HARGA BAHAN -

4,025,000.00 2,415,000.00
4,025,000.00 2,415,000.00

MLAH HARGA ALAT 2,415,000.00

2,543,820.00
15.00% 381,573.00
2,925,393.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 87,680.00
110,000.00 60,280.00
120,000.00 13,200.00
161,160.00

- -
AH HARGA BAHAN -

4,025,000.00 776,825.00

1,667,500.00 160,080.00
MLAH HARGA ALAT 936,905.00

1,098,065.00
15.00% 164,709.75
1,262,774.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 105,280.00
110,000.00 72,380.00
120,000.00 15,840.00
193,500.00

- -
AH HARGA BAHAN -
4,025,000.00 905,625.00

1,667,500.00 188,427.50
MLAH HARGA ALAT 1,094,052.50

1,287,552.50
15.00% 193,132.88
1,480,685.38

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 122,880.00
110,000.00 84,480.00
120,000.00 18,480.00
225,840.00

- -
AH HARGA BAHAN -

4,025,000.00 1,034,425.00

1,667,500.00 215,107.50
MLAH HARGA ALAT 1,249,532.50

1,475,372.50
15.00% 221,305.88
1,696,678.38

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 140,480.00
110,000.00 96,580.00
120,000.00 21,120.00
258,180.00
- -
AH HARGA BAHAN -

4,025,000.00 1,292,025.00

1,667,500.00 268,467.50
MLAH HARGA ALAT 1,560,492.50

1,818,672.50
15.00% 272,800.88
2,091,473.38

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 158,080.00
110,000.00 108,680.00
120,000.00 23,760.00
290,520.00

- -
AH HARGA BAHAN -

4,025,000.00 1,473,150.00

1,667,500.00 305,152.50
MLAH HARGA ALAT 1,778,302.50

2,068,822.50
15.00% 310,323.38
2,379,145.88

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 175,680.00
110,000.00 120,780.00
120,000.00 26,400.00
322,860.00

- -
AH HARGA BAHAN -

4,025,000.00 1,553,650.00

1,667,500.00 321,827.50
MLAH HARGA ALAT 1,875,477.50

2,198,337.50
15.00% 329,750.63
2,528,088.13

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 193,280.00
110,000.00 132,880.00
120,000.00 29,040.00
355,200.00

- -
AH HARGA BAHAN -

4,025,000.00 1,811,250.00

1,667,500.00 375,187.50
MLAH HARGA ALAT 2,186,437.50
2,541,637.50
15.00% 381,245.63
2,922,883.13

PENYAMBUNGAN PIPA BARU KE PIPA LAMA


pa baru ke pipa yang ada Ø 80 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 117,280.00
110,000.00 80,630.00
120,000.00 17,640.00
215,550.00

-
AH HARGA BAHAN -

57,500.00 34,845.00

1,420,020.00 106,501.50

379,500.00 367,356.00

4,025,000.00 3,481,625.00

MLAH HARGA ALAT 3,990,327.50

4,205,877.50
15.00% 630,881.63
4,836,759.13

pa baru ke pipa yang ada Ø 100 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 131,680.00
110,000.00 90,530.00
120,000.00 19,800.00
242,010.00

-
AH HARGA BAHAN -

57,500.00 37,375.00

1,420,020.00 225,783.18

379,500.00 409,101.00

4,025,000.00 3,666,775.00
MLAH HARGA ALAT 4,339,034.18
4,581,044.18
15.00% 687,156.63
5,268,200.81

pa baru ke pipa yang ada Ø 150 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 167,680.00
110,000.00 115,280.00
120,000.00 25,200.00
308,160.00

-
-
AH HARGA BAHAN

57,500.00 43,700.00

1,420,020.00 523,987.38

379,500.00 513,463.50

4,025,000.00 4,129,650.00

MLAH HARGA ALAT 5,210,800.88


5,518,960.88
15.00% 827,844.13
6,346,805.01

pa baru ke pipa yang ada Ø 200 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 203,680.00
110,000.00 140,030.00
120,000.00 30,600.00
374,310.00

-
AH HARGA BAHAN -

57,500.00 50,025.00

1,420,020.00 822,191.58

379,500.00 617,826.00

4,025,000.00 4,592,525.00

MLAH HARGA ALAT 6,082,567.58


6,456,877.58
15.00% 968,531.64
7,425,409.22

pa baru ke pipa yang ada Ø 250 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 239,680.00
110,000.00 164,780.00
120,000.00 36,000.00
440,460.00

-
AH HARGA BAHAN -

57,500.00 56,350.00

1,420,020.00 1,120,395.78

379,500.00 722,188.50

4,025,000.00 5,055,400.00

MLAH HARGA ALAT 6,954,334.28


7,394,794.28
15.00% 1,109,219.14
8,504,013.42
pa baru ke pipa yang ada Ø 300 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 275,680.00
110,000.00 189,530.00
120,000.00 41,400.00
506,610.00

-
AH HARGA BAHAN -

57,500.00 62,675.00

1,420,020.00 1,418,599.98

379,500.00 826,551.00

4,025,000.00 5,518,275.00

MLAH HARGA ALAT 7,826,100.98


8,332,710.98
15.00% 1,249,906.65
9,582,617.63

pa baru ke pipa yang ada Ø 400 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 347,680.00
110,000.00 239,030.00
120,000.00 51,600.00
638,310.00

-
AH HARGA BAHAN -

57,500.00 75,325.00

1,420,020.00 2,015,008.38
379,500.00 1,035,276.00

4,025,000.00 6,444,025.00

MLAH HARGA ALAT 9,569,634.38


10,207,944.38
15.00% 1,531,191.66
11,739,136.04

pa baru ke pipa yang ada Ø 450 mm

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 383,680.00
110,000.00 263,780.00
120,000.00 57,600.00
705,060.00

-
AH HARGA BAHAN -

57,500.00 81,650.00

1,420,020.00 2,313,212.58

379,500.00 1,139,638.50

4,025,000.00 6,906,900.00

MLAH HARGA ALAT 10,441,401.08


11,146,461.08
15.00% 1,671,969.16
12,818,430.24

pa baru ke pipa yang ada Ø 500 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 419,680.00
110,000.00 288,530.00
120,000.00 63,000.00
771,210.00

-
AH HARGA BAHAN -

57,500.00 87,975.00

1,420,020.00 2,611,416.78

379,500.00 1,244,001.00

4,025,000.00 7,369,775.00

MLAH HARGA ALAT 11,313,167.78


12,084,377.78
15.00% 1,812,656.67
13,897,034.45

pa baru ke pipa yang ada Ø 600 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 491,680.00
110,000.00 338,030.00
120,000.00 73,800.00
903,510.00

-
AH HARGA BAHAN -

57,500.00 100,625.00

1,420,020.00 3,207,825.18

379,500.00 1,452,726.00

4,025,000.00 8,295,525.00

MLAH HARGA ALAT 13,056,701.18


13,960,211.18
15.00% 2,094,031.68
16,054,242.86

pa baru ke pipa yang ada Ø 700 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 563,680.00
110,000.00 387,530.00
120,000.00 84,600.00
1,035,810.00

-
AH HARGA BAHAN -

57,500.00 113,275.00

1,420,020.00 3,804,233.58

379,500.00 1,661,451.00

4,025,000.00 9,221,275.00

MLAH HARGA ALAT 14,800,234.58


15,836,044.58
15.00% 2,375,406.69
18,211,451.27

buah pipa baru ke pipa yang ada Ø 800 mm

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 635,680.00
110,000.00 437,030.00
120,000.00 95,400.00
1,168,110.00

-
AH HARGA BAHAN -

57,500.00 125,925.00
57,500.00 125,925.00

1,420,020.00 4,400,641.98

379,500.00 1,870,176.00

4,025,000.00 10,147,025.00

MLAH HARGA ALAT 16,543,767.98


17,711,877.98
15.00% 2,656,781.70
20,368,659.68

PENGETESAN PIPA

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 11.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 560.05

MLAH HARGA ALAT -


1,296.05
15.00% 194.41
1,490.46

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 23.00
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 571.55

MLAH HARGA ALAT -


1,307.55
15.00% 196.13
1,503.68

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 46.00
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 594.55

MLAH HARGA ALAT -


1,330.55
15.00% 199.58
1,530.13

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 103.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 652.05

MLAH HARGA ALAT -


1,388.05
15.00% 208.21
1,596.26

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 178.25
7,532.50 451.95 128.44 12,6 mpa
48,300.00 96.60
AH HARGA BAHAN 726.80

MLAH HARGA ALAT -


1,462.80
15.00% 219.42
1,682.22

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00
5,750.00 281.75
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 830.30

MLAH HARGA ALAT -


1,566.30
15.00% 234.95
1,801.25

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 408.25
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 956.80

MLAH HARGA ALAT -


1,692.80
15.00% 253.92
1,946.72

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
736.00

5,750.00 724.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 1,273.05

MLAH HARGA ALAT -


2,009.05
15.00% 301.36
2,310.41

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
AH TENAGA KERJA 736.00

5,750.00 908.50
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 1,457.05

MLAH HARGA ALAT -


2,193.05
15.00% 328.96
2,522.01

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 640.00
120,000.00 96.00
AH TENAGA KERJA 736.00

5,750.00 1,627.25
7,532.50 451.95
48,300.00 96.60
AH HARGA BAHAN 2,175.80

MLAH HARGA ALAT -


2,911.80
15.00% 436.77
3,348.57

ELEKTRIKAL
lampu dan Saklar

Harga Satuan (Rp) Jumlah Harga (Rp)

80,000.00 80,000.00
120,000.00 6,000.00
120,000.00 60.00
86,060.00

5,750.00 17,250.00
7,475.00 179,400.00
17,200.00 412,800.00
2,300.00 6,900.00
2,300.00 9,200.00
2,500.00 60,000.00
1,150.00 1,150.00
14,375.00 14,375.00
5,175.00 5,175.00
AH HARGA BAHAN 706,250.00

MLAH HARGA ALAT -


792,310.00
15.00% 118,846.50
911,156.50

Harga Jumlah
Satuan Harga
(Rp) (Rp)
80,000.00 80,000.00
120,000.00 6,000.00
120,000.00 60.00
86,060.00

5,750.00 17,250.00
7,475.00 112,125.00
2,300.00 2,300.00
2,300.00 4,600.00
2,500.00 60,000.00
40,250.00 40,250.00
AH HARGA BAHAN 236,525.00

MLAH HARGA ALAT -


322,585.00
15.00% 48,387.75
370,972.75

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,320.00
120,000.00 43,800.00
120,000.00 10,800.00
120,000.00 8,400.00
83,320.00

7,500.00 105,000.00
5,700.00 79,800.00

700.00 9,800.00

2,300.00 4,600.00
8,000.00 800.00
3,000.00 600.00
AH HARGA BAHAN 200,600.00

MLAH HARGA ALAT -


283,920.00
10.00% 28,392.00
312,312.00

Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 20,320.00
120,000.00 43,800.00
120,000.00 10,800.00
120,000.00 8,400.00
83,320.00

7,500.00 120,000.00
5,700.00 91,200.00

700.00 11,200.00

2,300.00 2,990.00
8,000.00 2,120.00
3,000.00 465.00
AH HARGA BAHAN 227,975.00

MLAH HARGA ALAT -


311,295.00
15.00% 46,694.25
357,989.25
Harga Jumlah
Satuan Harga
(Rp) (Rp)

80,000.00 16,000.00
100,000.00 60,000.00
105,000.00 6,300.00
110,000.00 2,200.00
JUMLAH TENAGA KERJA 84,500.00

4,025,000.00 80,500.00
20,700.00 5,175.00
71,875.00 107,812.50
95,450.00 33,407.50 28,800.00
28,750.00 28,750.00 0.96
AH HARGA BAHAN 255,645.00 30,000.00
-
MLAH HARGA ALAT -

340,145.00
15.00% 51,021.75
391,166.75
rhitungan teknis menurut teori
m/2016/04/pagarpanelbeton-precast-harga-jual.html, tinggi 250, 5 lebar panel

gar-panel-beton-precast
aikan dengan perhitungan teori teknis
a-epoxy-lantai-kualitas-terbaik-di-indonesia/, Rp. 135.000 /kg
ahan-Upah-Perhubungan

ga-waterstop-lebar-150-mm.html
er-stop-rubber-lebar-150-mm-200-mm

-stop-pvc-lebar-230-mm-320-mm
7,500.00

?q=harga+phenol+film+12mm&tbm=isch&imgil=NZhJVzXFw0mLQM%253A%253BiCFXds6D7jT-4M%253Bhttps%25253A%25252F%25252Fjualtriplek1.wordpress.com%
m/harga-sewa-crane/ = 3.900.000
ducts.html?page=shop.product_details&flypage=flypage.tpl&product_id=26&category_id=7&vmcchk=1
ogspot.co.id/p/price-list-sewa-crane.html

014/10/daftar-harga-besi-siku-2014.html Rp. 85.000 / 8,16 kg


lat-besi-baja-hitam/ Rp. 182.000 /28
kawat-las Rp.27.000
category/besi-hollow/, disamakan dengan besi hollow 40 x 40 x 2 mm x 6 Meter = Rp. 114.155
g thn 2013 = besi hollow 3 cm Rp. 13.000
m/2016/05/harga-rolling-door-folding-gate.html Rp. 976.000

m/2016/05/harga-rolling-door-folding-gate.html Rp. 1.355.000/m'


m/p/daftar-harga-aluminium.html untuk Ukuran 1 mm (aluminium) Rp 400.000/m2
m/p/daftar-harga-aluminium.html 3 inch Rp 100.000/m" (silver), Rp 110.000/m" (hitam), Rp 110.000/m" (coklat)

mah-tangga/perkakas-rumah-tangga/4zp7x-jual-lem-sealant-tabung-lem-kaca-silicone-300-gr Rp. 20.000/300 gr


oducts/88/0/VERTICAL-Blind-Rp-106-200-M2/
a-kawat-nyamuk.html

.../12/.../standar_biaya_umum.pdf
category/besi-hollow/, menggunakan Besi Hollow 40 x 40 x 2 mm x 6 Meter Rp. 114.155
g thn 2013, Rp. 12.700 (di kali 1,1)
lama di bagi 10
.1=0.022 isi lubang v2*0.1*0.1*0.1*0.2*12.5=0.05 jumlah=0.022+0.05=0.072
jumlah bahan + bahan
pajak
harga satuan

arga-bata-ringan/ Rp. 750.000 /m3


014/04/daftar-harga-mortar-utama-mu-2014.html Rp.150.000 / zak (40 kg)
arga-bata-ringan/
g/harga-semen-perekat-hebel#popup menggunakan MU 301 Rp. 57.500 / 40 kg
alam-terbaru.html, pasir granit

u-alam-per-meter-untuk-dinding/, sama denganbatu koral


m/2014/08/harga-keramik-arwana.html

thn 2013 Rp. 5000


n-harga-karpet-polos-yang-tersedia-dipasaran/
5/10/macam-macam-lem.html, menggunakan lem aibon
atalogue/accessories/carpets/underlayer_foam/index.html

kayu/katalog-harga-lantai-kayu-2014.html
a-tempel/. Rp. 245.000 / 60 pcs
m/2016/09/daftar-harga-batu-paras-jogja-dan-jenis.html
ga-wallpaper-dinding/, diambil harga tengah2nya
floor-hardener-sika/
p-asbes-dan-seng/
pblog.com/kami-adalah-tukang-plafon-gypsum-dan-tukang-plafon-akustik-jawa-tengah.html, menggunakan ketebalan 9 mm
-atap-asbes-terbaru/
-atap-asbes-terbaru/
0d4a2f58027cfb434000003/jual-atap-sirap-kayu-ulin-kalimantan/
om/plat-tembaga/harga-plat-aluminium/
dle-pintu-dan-kunci-pintu-terbaru/
Kunci-Pintu-Kamar-Mandi-Bulat

dle-pintu-dan-kunci-pintu-terbaru/
Engsel-Kupu-Kupu
ga-engsel-pintu-jendela/#

d/spring-knip-379-solid
Door-Closer-Penutup-Pintu-Otomatis
mah-tangga/gembok-kunci-pengaman/htum9-jual-slot-pintu-kunci-stainless-bolt

663a955642eb653708b4570/door-holder-feet--penahan-pintu-unik-bentuk-kaki-warna-merah/
mah-tangga/furniture-interior/lain-lain-1669/18pj3x-jual-door-stop-stainless-setengah-lingkaran-door-stopper-penahan-pintu-doorstop-setengah-bulat-model-tanam-pengam

id/p/daftar-harga.html
mah-tangga/gembok-kunci-pengaman/745oy-jual-kunci-lemari-merk-shanghai-lock-factory-size-16-mm-1-set-12-pcs
arga-kaca-terbaru.html
m/harga-kaca-per-meter-terbaru-2016/

arga-kaca-terbaru.html
m/harga-kaca-per-meter-terbaru-2016/

arga-kaca-terbaru.html
arga-kaca-terbaru.html

wc/index.php?productID=156
om/sabun_cream_ekonomi_5_kg#.WMY0i2gxXIU
as-dan-roller-cat-terbaru-maret-2016/
emarang 2015
emarang 2015
emarang 2015

emarang 2015
emarang 2015
o.id/2012/10/harga-atap-alang-alang-rumbia-kirai.html
ga-cat-tembok-dinding-terbaru/
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
2013/04/daftar-harga-impra-wood-finish.html
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
014/04/daftar-harga-finishing-kayu-impra-2014_26.html
emarang 2015
252F%25252Fjualtriplek1.wordpress.com%25252Fharga%25252F&source=iu&pf=m&fir=NZhJVzXFw0mLQM%253A%252CiCFXds6D7jT-4M%252C_&usg=__OT98FVs
rstop-setengah-bulat-model-tanam-pengaman-pintu-dan-dinding-tembok
4M%252C_&usg=__OT98FVsnzZp-4AFrSAupfGnWhQI%3D&biw=1024&bih=657&ved=0ahUKEwid6Z-SusPSAhVCQ48KHUqcCbkQyjcISQ&ei=Vim-WJ3mLcKGvQTKu
SQ&ei=Vim-WJ3mLcKGvQTKuKbICw#imgrc=NZhJVzXFw0mLQM:
DAFTAR SATUAN ANALISA
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2022

HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter 470,274.20
2 A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter 595,311.20
3 A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter 531,894.00
4 A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank 71,605.97
5 A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet) 1,585,350.25
6 A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) 1,788,859.60
7 A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan 1,529,368.50
8 A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja 1,555,340.60
9 A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan 15,400.00
10 A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu 46,685.10
11 A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm 242,088.00
12 A. 2.2.1.12. Pembuatan 1 m2 jalan sementara 174,053.00
13 A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang 1,261,304.00
14 A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata 630,652.00
15 A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm 113,102.64
16 A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar 421,403.84
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
17 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m 69,300.00
18 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m 85,140.00
19 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m 101,244.00
20 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m 92,224.00
21 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m 139,920.00
22 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m 111,540.00
23 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter 5,060.00
24 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter 30,360.00
25 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah 50,600.00
26 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) 50,600.00
27 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug 238,920.00
28 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL 441,413.50
29 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan 137,280.00
30 A.2.3.1.14. Pengurugan 1 m3 sirtu padat 268,180.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
31 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP 1,082,174.50
32 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP 1,029,072.00
33 A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP 992,257.20
34 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP 966,375.30
35 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP 930,899.20
36 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP 781,848.54
37 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP 904,405.70
38 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP 875,635.20
39 A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping) 617,958.00
40 A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah 3,077,421.60
41 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm 985,584.60
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
42 A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat 991,076.94
43 A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) 1,032,527.82
44 A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) 1,064,655.94
45 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 847,592.69
46 A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175) 1,103,076.58
47 A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) 1,139,120.70
48 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) 1,167,123.30
49 A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) 1,184,324.68
50 A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) 1,213,950.30
51 A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) 1,223,075.32
52 A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) 1,310,412.96
53 A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425) 1,322,405.32

Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan 2,090,403.60
54 A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100 1,302,334.00
55 A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm 76,114.50
56 A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm 177,820.50
57 A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm 165,627.00
58 A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir 181,082.00
59 A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands 175,406.00
60 A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) 118,591.00
61 A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi 252,164.00
62 A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof 272,162.00
63 A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom 557,788.00
64 A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok 574,288.00

II - 811
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
65 A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai 870,188.00
66 A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding 714,472.00
67 A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga 517,209.00
68 A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton 179,465.44
69 A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm 99,357.50
70 A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm 124,927.00

II - 812
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
71 A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 88,261.97
72 A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 110,354.96
73 A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 132,326.95
74 A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm 165,521.44
75 A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) 174,758.26
76 A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) 52,115.91
77 A.4.1.2.7.
A.4.1.2.8. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) 48,165.26
78 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak 7,502.00
79 A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak 12,122.00
80 A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak 9,812.00
81 A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak 64,768.00
82 A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak 66,572.00
83 A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak 59,895.00
84 A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak 887,984.24
85 A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak 845,854.90
86 A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak 1,414,703.73
87 A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m) 127,349.53
88 A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m) 127,349.53
89 A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m) 127,349.53
90 A.4.1.2.20. Bahan 1 m3 grout campuran 3,844,640.25
91 A.4.1.2.21. Bahan 1 m3 grout (tidak campuran) 5,704,446.00
92 A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak 59,059.00
93 A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak 127,461.40
94 A.4.1.2.24. Upah 1 titik joint dengan sling 50,094.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
95 A.4.2.1.1. Pemasangan 1 kg besi profil 34,221.00
96 A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF 34,221.00
97 A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan 151,228.00
98 A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku 712,134.50
99 A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik 49,166.15
100 A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube 456,575.68
101 A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi 1,502,072.00
102 A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC 3,528,822.00
103 A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium 601,898.00
104 A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium 734,800.00
105 A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium 165,514.80
106 A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm 2,478,601.40
107 A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium 708,994.00
108 A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds 214,456.00
109 A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm 641,305.06
110 A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk 472,532.94
111 A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis 398,849.00
112 A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm 171,384.40
113 A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm 113,910.50
114 A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi 225,126.00
115 A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon 271,986.00
116 A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75 227,635.27
117 A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75 245,697.10
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
118 A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP 308,011.00
119 A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP 293,988.20
120 A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP 284,438.00
121 A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP 279,653.00
122 A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP 278,339.60
123 A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP 266,253.46
124 A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP 149,185.30
125 A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP 142,477.94
126 A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP 138,664.90
127 A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP 136,268.66
128 A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP 135,037.54
129 A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP 132,418.00
130 A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP 133,468.50
131 A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP 120,156.92
132 A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP 121,270.47
133 A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP 102,427.64
134 A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP 106,593.87
135 A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP 98,423.69
136 A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP 98,429.10
137 A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP 99,576.31
138 A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP 99,638.95
139 A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP 159,197.50
140 A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP 159,197.50
141 A. 4.4.1.24.rob Pemasangan 1 m2 dinding bata berongga ekspose 5x11x23 campuran 1SP :3PP 267,011.36
142 A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai 284,101.29
143 A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai 289,641.99
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
144 A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm 76,300.05
145 A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm 68,945.89
146 A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm 65,792.01
147 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm 63,616.08
148 A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm 62,413.21
149 A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm 61,436.89
150 A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm 60,910.43
151 A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm 60,383.97

II - 813
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
152 A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm 62,894.92
153 A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm 60,703.50
154 A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm 54,685.29
155 A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm 55,466.07
156 A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm 92,266.28

II - 814
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
157 A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm 74,553.12
158 A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm 85,085.44
159 A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm 83,556.04
160 A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm 82,179.86
161 A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm 77,682.99
162 A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm 38,290.21
163 A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm 64,931.90
164 A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm 182,567.00
165 A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm 182,567.00
166 A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP 49,887.64
167 A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah 29,241.70
168 A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose 13,950.20
169 A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP 61,092.68
170 A.4.4.2.27. Pemasangan 1 m2 acian 37,416.50
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
171 A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm 104,090.80
172 A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm 137,129.30
173 A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 115,352.60
174 A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm 153,464.30
175 A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 429,490.60
176 A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm 223,948.78
177 A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm 174,416.00
178 A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm 209,690.80
179 A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm 219,243.20
180 A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm 107,184.33
181 A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm 147,018.08
182 A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm 85,462.96
183 A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm 275,151.58
184 A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm 1,209,768.34
185 A.4.4.3.44. Pemasangan 1 m2 lantai karpet 202,086.50
186 A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet) 124,168.00
187 A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu 364,369.50
188 A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor 364,369.50
189 A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm 251,993.50
190 A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm 244,580.60
191 A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm 412,318.50
192 A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm 419,287.00
193 A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm 251,993.50
194 A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm 245,845.60
195 A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm 1,314,543.78
196 A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm 533,296.28
197 A.4.4.3.57. Pemasangan 1 m2 dinding batu paras 145,167.00
198 A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam 141,537.00
199 A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm 208,644.70
200 A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm 256,250.50
201 A.4.4.3.61. Pemasangan 1m2 floor harderner 89,056.00
202 A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm 44,924.00
203 A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm 64,663.50
204 A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm 173,033.85
205 A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm 756,955.43
206 A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm 182,810.65
207 A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm 766,732.23
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
208 A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm 64,218.00
209 A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm 802,131.00
210 A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm 402,479.00
211 A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm 120,725.00
212 A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm 59,048.00
213 A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm 243,265.00
214 A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm 42,895.16
215 A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium 665,326.75
216 A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil 18,089.50
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
217 A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil 51,821.00
218 A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur 68,387.00
219 A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super 46,827.00
220 A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong 94,595.60
221 A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur 107,245.60
222 A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar 112,305.60
223 A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180 70,488.00
224 A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm 46,519.00
225 A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm 50,567.00
226 A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm 49,698.00
227 A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm 55,770.00
228 A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 39,578.00
229 A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm 42,411.60
230 A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 43,221.20
231 A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 46,054.80
232 A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm 57,794.00
233 A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm 40,387.60
234 A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm 40,792.40
235 A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm 44,030.80
236 A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm 45,245.20
237 A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm 48,483.60
238 A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m 216,293.00

II - 815
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
239 A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m 192,764.00
240 A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m 188,842.50
241 A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m 122,177.00
242 A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m 122,177.00
243 A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m 122,177.00

II - 816
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
244 A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m 118,767.00
245 A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m 114,334.00
246 A.4.5.2.30. Pemasangan 1 m2 genteng beton 102,003.00
247 A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana 114,708.00
248 A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai 157,212.00
249 A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu 116,534.00
250 A.4.5.2.35. Pemasangan 1 m’ nok genteng beton 115,150.20
251 A.4.5.2.37. Pemasangan 1 m’ nok genteng metal 106,832.00
252 A.4.5.2.38. Pemasangan 1 m’ nok sirap 84,612.00
253 A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang 84,546.00
254 A.4.5.2.40. Pemasangan 1 m’nok atap seng 52,030.00
255 A.4.5.2.41. Pemasangan 1 m2 atap alumunium 296,406.00
256 A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation 32,862.50
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
257 A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I 16,766,365.00
258 A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III 7,849,435.00
259 A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II 395,241.00
260 A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III 335,225.00
261 A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II 736,120.00
262 A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II 541,112.00
263 A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II 868,120.00
264 A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) 621,753.00
265 A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II 674,773.00
266 A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II 705,045.00
267 A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I 792,412.50
268 A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II 673,321.00
269 A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter 6,778,420.00
270 A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I 18,142,300.00
271 A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II 9,711,240.00
272 A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II 107,246.92
273 A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II 108,175.54
274 A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II 105,772.70
275 A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III 152,680.00
276 A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III 154,605.00
277 A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II 98,010.00
278 A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II 97,955.00
279 A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III 190,099.80
280 A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II 378,371.40
281 A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I 388,217.50
282 A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm 60,258.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
283 A.4.6.2.1. Pemasangan 1 buah kunci tanam antik 367,026.00
284 A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa 226,765.00
285 A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi 124,806.00
286 A.4.6.2.4. Pemasangan 1 buah kunci silinder 156,486.00
287 A.4.6.2.5. Pemasangan 1 buah engsel pintu 97,455.60
288 A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu 45,936.00
289 A.4.6.2.7. Pemasangan 1 buah engsel angin 61,006.00
290 A.4.6.2.8. Pemasangan 1 buah spring knip 50,336.00
291 A.4.6.2.9. Pemasangan 1 buah kait angin 32,021.00
292 A.4.6.2.10. Pemasangan 1 buah door closer 426,096.00
293 A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel) 43,912.00
294 A.4.6.2.12. Pemasangan 1 buah door holder 100,936.00
295 A.4.6.2.13. Pemasangan 1 buah door stop 65,560.00
296 A.4.6.2.14. Pemasangan 1 buah rel pintu sorong 528,946.00
297 A.4.6.2.15. Pemasangan 1 buah kunci lemari 215,512.00
298 A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm 112,003.10
299 A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm 128,338.10
300 A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm 236,541.80
301 A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm 540,975.60
302 A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm 210,298.00
303 A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm 384,142.00
304 A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm 314,721.00
305 A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm 2,812,678.00
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
306 A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama 15,174.50
307 A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat 14,289.00
308 A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual 14,949.00
309 A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 45,317.80
310 A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 62,134.60
311 A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil 33,635.80
312 A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur 48,478.32
313 A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter 21,758.00
314 A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis 44,070.13
315 A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) 31,868.10
316 A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 19,204.90
317 A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium 10,839.40
318 A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih 17,591.20
319 A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) 9,212.50
320 A.4.7.1.15. Pemasangan 1 m2 wallpaper 140,756.00
321 A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi 33,261.80
322 A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah 65,819.60
323 A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis 70,103.00
324 A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir 35,847.90
325 A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis 163,336.80

II - 817
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
326 A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir 144,623.60
327 A.4.7.1.22. Plituran 10 m2 dengan plitur melamic 2,213,255.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
328 A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock 2,104,633.30
329 A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen 499,125.00

II - 818
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
330 A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso 440,935.00
331 A.5.1.1 4. (K3) Pemasangan 1 buah urinoir 1,307,614.00
332 A.5.1.1 5. (K3) Pemasangan 1 buah wastafel 1,486,684.76
333 A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3 1,245,596.00
334 A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 1,245,596.00
335 A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3 400,466.00
336 A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel 1,037,850.00
337 A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso 825,495.00
338 A.5.1.1 14. Pemasangan 1 buah floor drain 119,350.00
339 A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm 468,798.00
340 A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm 752,334.00
341 A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm 877,532.70
342 A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” 71,373.50
343 A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ” 70,547.13
344 A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” 89,179.20
345 A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1” 172,986.00
346 A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½” 266,112.00
347 A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” 367,091.41
348 A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4” 547,371.00
349 A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” 23,958.00
350 A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” 29,132.40
351 A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” 35,184.60
352 A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ” 66,409.20
353 A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” 56,964.60
354 A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ” 148,196.40
355 A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” 185,529.30
356 A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” 443,830.20
357 A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm 378,028.20
358 A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm 214,835.06
359 A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm 1,022,195.57
360 A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm 183,704.40
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
361 A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi) 447,480.00
362 A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) 535,260.00

- TAMBAHAN / LAIN-LAIN
363 - 1 Buah Pembuatan Papan Nama Proyek 364,012.00
364 SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40 379,621.00
365 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40 112,966.70
366 SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60 290,764.65
367 SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil 41,146.88
368 SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank 56,430.00
369 ABK.990.07 Menurunkan 1 m2 atap genteng 2,053.33
370 ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond 6,306.67
371 ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda 78,906.67
372 ABK.990.05 Membongkar 1 m2 lantai tegel/floor 6,746.67
373 SNI 2012 1 m³ Bongkaran Beton Bertulang 630,652.00
374 SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah 591,052.00
375 ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3 949,520.00
376 - 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan 111,741.30
377 - 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak 186,384.00
378 - 1 Bh Pekerjaan Stop Kontak 39,050.00
379 - 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting 68,200.00
380 - 1 Unit Pekerjaan Sekring Kast 60,610.00
381 - 1 Bh Pekerjaan MCB Box 60,610.00
382 - 1 m' Pekerjaan Over Spaneng 38,522.00
383 - 1 Bh Pekerjaan Saklar Ganda 65,560.00
384 - 1 Bh Pekerjaan Saklar Tunggal 61,710.00
385 A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP 1,029,072.00
JALAN LINGKUNGAN
386 Analisa EI-311a : Galian Biasa / Kupasan (menggunakan alat berat) 92,222.76
387 Analisa EI-321.rob : Timbunan Biasa 330,605.42
388 Analisa EI-322.rob : Timbunan Pilihan 394,489.22
389 Analisa EI-331.rob : Penyiapan Badan Jalan 166.46
390 Analisa EI-611a : Lapis Resap Pengikat - Aspal Cair 14,664.65
391 Analisa EI-612a : Lapis Perekat - Aspal Cair 14,952.88
392 Analisa EI-621 : Agregat Penutup BURTU 17,137.92
393 Analisa EI-631.rob : Latasir Kelas A (SS-A) 60,773.82
394 Analisa EI-632.rob : Latasir Kelas B (SS-B) 68,247.70
395 Analisa EI-661 : Lapis Permukaan Penetrasi Macadam 2,148,410.32
396 Analisa EI-662 : Lapis Pondasi/Perata Penetrasi Macadam 2,281,609.49
397 Analisa EI-814 : Waterbound Macadam Utk. Pek. Minor 428,722.27
398 Analisa EI-817 : Penetrasi Macadam Utk.Pek.Minor (Perata) 2,118,589.13
399 Analisa EI-412 : Lapis Pondasi Agregat Kelas A (Buruh) 507,178.02
400 Analisa EI-422 : Lapis Pondasi Agregat Kelas B (Buruh) 407,772.75
401 Analisa EI-192a rob : Udit Type U 300 X 300 636,254.01
402 Analisa EI-192b rob : Udit Type U 400 X 400 760,933.51
403 Analisa EI-181 : Bok Culvert BC 400 X 400 1,411,913.60
404 Analisa EI-182 : Box Culvert BC 500 x 500 HD 1,835,973.50
405 - 1 m2 Memasang Paving Block t = 8 cm (K - 250) 192,227.75
406 - 1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm 385,193.60
407 Analisa EI-714 : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan) 1,683,946.78
408 Analisa EI-619 : Beton Struktur Site Mix K-125 919,627.89

AIR TANAH DAN PERPIPAAN

II - 819
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
409 AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras) 519,207.15
410 AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang) 399,553.96
411 AT.02.rob.1 1 m' Pengeboran sederhana 259,603.58
412 AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras) 480,108.20
413 AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang) 369,420.70

II - 820
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
414 AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6'' 482,104.15
415 AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8'' 708,741.83
416 AT.12 1 m3 Pengadaan dan pemasangan gravel pack 1,841,807.00
417 AT.13 1 jam pencucian sumur 185,850.50
418 AT.14 1 jam Uji Pemompaan 185,850.50
437 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 206,945.20
438 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 193,958.00
439 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 168,483.60
440 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 133,601.20
441 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 102,946.00
442 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 82,886.80
443 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 75,322.80
444 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 46,433.60
445 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 45,933.60
446 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 23,538.40
447 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 177,222.32
448 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 166,092.80
449 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 144,333.76
450 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 113,335.60
451 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 87,746.80
452 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 70,727.44
453 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 64,514.48
454 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 40,353.92
455 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 39,853.92
456 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 19,485.28
457 - 1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa 157,049.20
458 - 1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa 147,180.50
459 - 1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa 127,943.10
460 - 1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa 99,581.20
461 - 1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa 77,431.00
462 - 1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa 62,474.80
463 - 1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa 57,178.80
464 - 1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa 36,227.60
465 - 1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa 35,727.60
466 - 1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa 16,734.40
467 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan 363,995.20
468 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan 310,048.48
469 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan 261,424.08
470 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan 219,801.20
471 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan 163,996.00
472 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan 133,286.80
473 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan 115,122.80
474 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan 71,583.60
475 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan 66,333.60
476 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan 40,488.40
477 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu 334,272.32
478 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu 282,031.48
479 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu 237,274.24
480 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu 199,535.60
481 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu 148,796.80
482 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu 121,127.44
483 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu 104,314.48
484 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu 65,503.92
485 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu 60,253.92
486 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu 36,435.28
487 - 1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa 314,099.20
488 - 1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa 263,270.98
489 - 1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa 220,883.58
490 - 1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa 185,781.20
491 - 1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa 138,481.00
492 - 1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa 112,874.80
493 - 1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa 96,978.80
494 - 1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa 61,377.60
495 - 1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa 56,127.60
496 - 1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa 33,684.40
497 - 400 m' Pengetesan pipa PVC dia. 350 mm 3,636,500.00
498 - 400 m' Pengetesan pipa PVC dia. 300 mm 3,037,500.00
499 - 400 m' Pengetesan pipa PVC dia. 250 mm 2,470,000.00
500 - 400 m' Pengetesan pipa PVC dia. 200 mm 1,934,000.00
501 - 400 m' Pengetesan pipa PVC dia. 160 mm 1,238,250.00
502 - 400 m' Pengetesan pipa PVC dia. 110 mm 1,198,500.00
503 - 400 m' Pengetesan pipa PVC dia. 90 mm 1,119,750.00
504 - 400 m' Pengetesan pipa PVC dia. 63 mm 1,072,500.00
505 - 400 m' Pengetesan pipa PVC dia. 50 mm 1,035,750.00
506 - 1 unit perbaikan gate valve dia. 350mm 791,320.00
507 - 1 unit perbaikan gate valve dia. 300mm 775,570.00
508 - 1 unit perbaikan gate valve dia. 250mm 765,070.00
509 - 1 unit perbaikan gate valve dia. 200mm 749,320.00
510 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 487,066.28
511 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 400,491.68
512 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan 350,317.68
513 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan 272,588.08
514 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan 252,088.08
515 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan 184,304.48
516 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu 478,816.28

II - 821
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
517 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu 394,741.68
518 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu 350,317.68
519 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu 272,588.08
520 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu 252,088.08
521 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu 184,304.48

II - 822
HARGA SATUAN
NO KODE ANALISA SATUAN PEKERJAAN
Rp
522 - 1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa 427,786.28
523 - 1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa 353,917.68
524 - 1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa 314,029.68
525 - 1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa 252,176.08
526 - 1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa 231,676.08
527 - 1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa 170,696.48
528 - 1 unit pemasangan gate valve dia. 200 mm 726,080.28
529 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan 654,999.76
530 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan 446,706.28
531 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan 361,131.68
532 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan 320,707.68
533 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan 238,228.08
534 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan 217,728.08
535 - 1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu 494,432.00
536 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu 446,706.28
537 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu 361,131.68
538 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu 320,707.68
539 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu 238,228.08
540 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu 217,728.08
541 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu 154,944.48
542 - 1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa 395,536.28
543 - 1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa 320,167.68
544 - 1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa 284,279.68
545 - 1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa 217,676.08
546 - 1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa 197,176.08
547 - 1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa 141,196.48
548 - 1 unit Pemasangan Box Street dia. 8" 217,867.76
549 - 1 unit Pemasangan Box Street dia. 6" 96,224.28
550 - 1 unit Pemasangan Box Street dia. 4" 81,268.08
551 - 1 unit Pemasangan Box Street dia. 3" 75,972.08
552 - 1 unit Pemasangan Box Street dia. 2" 55,020.88
553 - 1 unit Pemasangan Box Street dia. 1 1/2" 54,520.88
554 - 1 unit Pemasangan Box Street dia. 1" 35,527.68
555 - 1 unit Peninggian Box Street 132,788.48
556 - 1 unit Pemasangan wash out dia. 160 mm 597,901.48
557 - 1 unit Pemasangan wash out dia. 110 mm 483,367.84
558 - 1 unit Pemasangan wash out dia. 90 mm 432,220.00
559 - 1 unit Pemasangan wash out dia. 63 mm 309,876.56
560 - 1 unit Pemasangan wash out dia. 50 mm 287,376.56
561 - 18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal 4,199,982.88
562 - 18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal 6,524,765.92
563 - 18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal 7,596,076.96
564 - 18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal 9,474,071.20
565 - 18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal 13,291,132.00
566 - 18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal 13,924,573.84
567 - 18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal 15,736,385.20
568 - 18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal 16,473,990.88
569 - 1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR 126,287.28
570 - 1 unit Tiang Penyangga 491,833.04
571 - 1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia < 15 cm 7,710.00
572 - 1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m 56,760.00

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

II - 823
DAFTAR ANALISA HARGA SATUAN
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON
TAHUN ANGGARAN 2022

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.1 (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Dolken kayu Ø Batang 1.250 71,000.00 88,750.00
8-10/400 cm
Semen portland Kg 5.000 1,420.00 7,100.00
Pasir beton m3 0.005 223,000.00 1,115.00
Koral beton (kerikil) m3 0.009 225,000.00 2,025.00
Kayu 5/7 (kayu kelas III) m3 0.072 3,636,000.00 261,792.00
Paku biasa 2” – 5” Kg 0.060 21,000.00 1,260.00
Residu (ter kayu) Liter 0.400 16,700.00 6,680.00
JUMLAH HARGA BAHAN 368,722.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 427,522.00
E Overhead & Profit 10.00% 42,752.20
F Harga Satuan Pekerjaan (D+E) 470,274.20

A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Dolken kayu Batang 1.250 71,000.00 88,750.00
f 8-10/400 cm
Semen portland Kg 2.500 1,420.00 3,550.00
Seng gelombang lbr 1.200 84,000.00 100,800.00
Pasir Beton m3 0.005 223,000.00 1,115.00
Koral Beton m3 0.009 225,000.00 2,025.00
Kayu 5/7 (kayu kelas III) m3 0.072 3,636,000.00 261,792.00
Paku biasa 2''-5'' Kg 0.060 21,000.00 1,260.00
Meni Besi ltr 0.450 38,000.00 17,100.00
JUMLAH HARGA BAHAN 476,392.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 541,192.00
E Overhead & Profit 10.00% 54,119.20
F Harga Satuan Pekerjaan (D+E) 595,311.20

A. 2.2.1.3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 824
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 53,800.00

III - 825
B BAHAN
Dolken kayu f Batang 1.000 71,000.00 71,000.00
8-10/400 cm
Semen portland Kg 2.000 1,420.00 2,840.00
Kawat duri M’ 25.000 16,900.00 422,500.00
Pasir beton m3 0.005 223,000.00 1,115.00
Koral beton m3 0.009 225,000.00 2,025.00
Paku biasa 2” – 5” Kg 0.060 21,000.00 1,260.00
JUMLAH HARGA BAHAN 429,740.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 483,540.00


E Overhead & Profit 10.00% 48,354.00
F Harga Satuan Pekerjaan (D+E) 531,894.00

A. 2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kayu balok 5/7 m3 0.012 3,636,000.00 43,632.00
Paku 2''-3'' Kg 0.020 21,000.00 420.00
Kayu papan 3/20 m3 0.007 34,905.60 244.34
JUMLAH HARGA BAHAN 44,296.34
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 65,096.34


E Overhead & Profit 10.00% 6,509.63
F Harga Satuan Pekerjaan (D+E) 71,605.97

A. 2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran (direksikeet)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 532,000.00
B BAHAN
Dolken kayu Ø Batang 1.250 71,000.00 88,750.00
8-10/400 cm
Kayu (kelas III) m3 0.180 3,636,000.00 654,480.00
Paku biasa Kg 0.080 21,000.00 1,680.00
besi strip Kg 1.100 15,800.00 17,380.00
semen portland Kg 3.000 1,420.00 4,260.00
pasir pasang m3 0.150 203,000.00 30,450.00
pasir beton m3 0.100 223,000.00 22,300.00
koral beton m3 0.150 225,000.00 33,750.00
bata merah bh 30.000 900.00 27,000.00
seng pelat lbr 0.250 43,700.00 10,925.00
jendela naco bh 0.200 3,400.00 680.00
kaca polos m2 0.080 86,250.00 6,900.00
kunci tanam bh 0.150 28,750.00 4,312.50
plywood 4 mm lbr 0.060 106,000.00 6,360.00
JUMLAH HARGA BAHAN 909,227.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,441,227.50


E Overhead & Profit 10.00% 144,122.75
F Harga Satuan Pekerjaan (D+E) 1,585,350.25

III - 826
A. 2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu )

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Dolken kayu Ø Batang 3.000 71,000.00 213,000.00
8-10/400 cm
Kayu (kelas III) m3 0.276 3,636,000.00 1,003,536.00
Paku biasa Kg 0.700 21,000.00 14,700.00
Seng gelombang Kg 1.500 84,000.00 126,000.00
JUMLAH HARGA BAHAN 1,357,236.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,626,236.00


E Overhead & Profit 10.00% 162,623.60
F Harga Satuan Pekerjaan (D+E) 1,788,859.60

A. 2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Dolken kayu Batang 1.700 71,000.00 120,700.00
diameter 8-10/400 cm
Kayu (kelas III) m3 0.210 3,636,000.00 763,560.00
Paku biasa Kg 0.300 21,000.00 6,300.00
Semen Portland Kg 10.500 1,420.00 14,910.00
Pasir beton m3 0.030 223,000.00 6,690.00
Koral beton m3 0.050 225,000.00 11,250.00
Seng gelombang Lbr 1.500 84,000.00 126,000.00
seng pelat Lbr 0.250 43,700.00 10,925.00
JUMLAH HARGA BAHAN 1,060,335.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,390,335.00


E Overhead & Profit 10.00% 139,033.50
F Harga Satuan Pekerjaan (D+E) 1,529,368.50

A. 2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.02 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Dolken kayu Batang 1.250 71,000.00 88,750.00
diameter 8-10/400 cm
Kayu (kelas III) m3 0.186 3,636,000.00 676,296.00
Paku biasa Kg 0.300 21,000.00 6,300.00
Semen Portland Kg 18.000 1,420.00 25,560.00
Pasir beton m3 0.030 223,000.00 6,690.00
Koral beton m3 0.050 225,000.00 11,250.00
Seng gelombang Lbr 1.500 84,000.00 126,000.00
plywood 4 mm Lbr 1.350 106,000.00 143,100.00
JUMLAH HARGA BAHAN 1,083,946.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 827
D Jumlah (A+B+C) 1,413,946.00
E Overhead & Profit 10.00% 141,394.60
F Harga Satuan Pekerjaan (D+E) 1,555,340.60

III - 828
A. 2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 14,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 14,000.00


E Overhead & Profit 10.00% 1,400.00
F Harga Satuan Pekerjaan (D+E) 15,400.00

A. 2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 16,500.00
B BAHAN
Bambu diameter Batang 1.250 18,000.00 22,500.00
6-8/600 cm
Tali ijuk m3 0.186 18,500.00 3,441.00
JUMLAH HARGA BAHAN 25,941.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,441.00


E Overhead & Profit 10.00% 4,244.10
F Harga Satuan Pekerjaan (D+E) 46,685.10

A. 2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Tukang kayu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 36,600.00
B BAHAN
Kayu papan kelas m3 0.036 3,636,000.00 130,896.00
III
Kayu balok 5/7 m3 0.014 3,636,000.00 50,904.00
kelas III
Paku biasa kg 0.080 21,000.00 1,680.00
JUMLAH HARGA BAHAN 183,480.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 220,080.00


E Overhead & Profit 10.00% 22,008.00
F Harga Satuan Pekerjaan (D+E) 242,088.00

A. 2.2.1.12. Pembuatan 1 m2 jalan sementara

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00

III - 829
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 80,600.00

III - 830
B BAHAN
Batu belah 10/15 cm m3 0.150 315,000.00 47,250.00
Batu pecah mesin 2-3 cm m3 0.090 315,000.00 28,350.00
Pasir pasang m3 0.010 203,000.00 2,030.00
JUMLAH HARGA BAHAN 77,630.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 158,230.00


E Overhead & Profit 10.00% 15,823.00
F Harga Satuan Pekerjaan (D+E) 174,053.00

A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 13.334 80,000.00 1,066,720.00
Mandor L.04 OH 0.666 120,000.00 79,920.00
JUMLAH TENAGA KERJA 1,146,640.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,146,640.00


E Overhead & Profit 10.00% 114,664.00
F Harga Satuan Pekerjaan (D+E) 1,261,304.00

A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 573,320.00


E Overhead & Profit 10.00% 57,332.00
F Harga Satuan Pekerjaan (D+E) 630,652.00

A. 2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.042 80,000.00 3,360.00
Tukang L.02 0.004 110,000.00 440.00
Kepala Tukang L.03 0.002 120,000.00 240.00
Mandor L.04 0.042 120,000.00 5,040.00
JUMLAH TENAGA KERJA 9,080.00
B BAHAN
Kawat jaring Lbr 0.143 653,700.00 93,740.58
JUMLAH HARGA BAHAN 93,740.58
C PERALATAN

JUMLAH HARGA ALAT -

III - 831
D Jumlah (A+B+C) 102,820.58
E Overhead & Profit 10.00% 10,282.06
F Harga Satuan Pekerjaan (D+E) 113,102.64

III - 832
A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.375 80,000.00 30,000.00
Tukang L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 47,470.00
B BAHAN
Panel beton Lbr 0.986 118,400.00 116,742.40
pracetak
Kolom beton Batang 0.525 201,200.00 105,630.00
pracetak
Semen PC Kg 45.000 1,420.00 63,900.00
Pasir beton m3 0.074 223,000.00 16,502.00
Koral m3 0.146 225,000.00 32,850.00
JUMLAH HARGA BAHAN 335,624.40
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 383,094.40


E Overhead & Profit 10.00% 38,309.44
F Harga Satuan Pekerjaan (D+E) 421,403.84

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 63,000.00
E Overhead & Profit 10.00% 6,300.00
F Harga Satuan Pekerjaan (D+E) 69,300.00

A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 77,400.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 77,400.00
E Overhead & Profit 10.00% 7,740.00
F Harga Satuan Pekerjaan (D+E) 85,140.00

A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 92,040.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

III - 833
D Jumlah (A+B+C) 92,040.00
E Overhead & Profit 10.00% 9,204.00
F Harga Satuan Pekerjaan (D+E) 101,244.00

III - 834
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.032 120,000.00 3,840.00
JUMLAH TENAGA KERJA 83,840.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,840.00


E Overhead & Profit 10.00% 8,384.00
F Harga Satuan Pekerjaan (D+E) 92,224.00

A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,200.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,200.00


E Overhead & Profit 10.00% 12,720.00
F Harga Satuan Pekerjaan (D+E) 139,920.00

A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 101,400.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,400.00


E Overhead & Profit 10.00% 10,140.00
F Harga Satuan Pekerjaan (D+E) 111,540.00

A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 4,600.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 4,600.00
E Overhead & Profit 10.00% 460.00

III - 835
F Harga Satuan Pekerjaan (D+E) 5,060.00

III - 836
A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.330 80,000.00 26,400.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 27,600.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 27,600.00
E Overhead & Profit 10.00% 2,760.00
F Harga Satuan Pekerjaan (D+E) 30,360.00

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 46,000.00
E Overhead & Profit 10.00% 4,600.00
F Harga Satuan Pekerjaan (D+E) 50,600.00

A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 46,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 46,000.00
E Overhead & Profit 10.00% 4,600.00
F Harga Satuan Pekerjaan (D+E) 50,600.00

A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 25,200.00
B BAHAN
Pasir urug 1.200 160,000.00 192,000.00
JUMLAH HARGA BAHAN 192,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 217,200.00
E Overhead & Profit 10.00% 21,720.00
F Harga Satuan Pekerjaan (D+E) 238,920.00

III - 837
A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP : 3PP : 7TL
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang L.02 OH 0.400 110,000.00 44,000.00
Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.080 120,000.00 9,600.00
JUMLAH TENAGA KERJA 122,400.00
B BAHAN
Kapur Padam/bakar m3 0.135 253,000.00 34,155.00
Pasir Pasang m3 0.400 203,000.00 81,200.00
Tanah Liat m3 0.948 172,500.00 163,530.00
JUMLAH HARGA BAHAN 278,885.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 401,285.00


E Overhead & Profit 10.00% 40,128.50
F Harga Satuan Pekerjaan (D+E) 441,413.50

A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 13,800.00
B BAHAN
Ijuk m3 6.000 18,500.00 111,000.00
JUMLAH HARGA BAHAN 111,000.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 124,800.00
E Overhead & Profit 10.00% 12,480.00
F Harga Satuan Pekerjaan (D+E) 137,280.00

A.2.3.1.14. Pengurugan 1 m3 sirtu padat


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 23,000.00
B BAHAN
Sirtu m3 1.200 184,000.00 220,800.00
JUMLAH HARGA BAHAN 220,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 243,800.00


E Overhead & Profit 10.00% 24,380.00
F Harga Satuan Pekerjaan (D+E) 268,180.00

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 202.000 1,420.00 286,840.00
Pasir pasang m3 0.485 203,000.00 98,455.00
JUMLAH HARGA BAHAN 763,295.00
C PERALATAN

III - 838
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 983,795.00
E Overhead & Profit 10.00% 98,379.50
F Harga Satuan Pekerjaan (D+E) 1,082,174.50

III - 839
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 203,000.00 105,560.00
JUMLAH HARGA BAHAN 715,020.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 935,520.00
E Overhead & Profit 10.00% 93,552.00
F Harga Satuan Pekerjaan (D+E) 1,029,072.00

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 136.000 1,420.00 193,120.00
Pasir pasang m3 0.544 203,000.00 110,432.00
JUMLAH HARGA BAHAN 681,552.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 902,052.00
E Overhead & Profit 10.00% 90,205.20
F Harga Satuan Pekerjaan (D+E) 992,257.20

A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 117.000 1,420.00 166,140.00
Pasir pasang m3 0.561 203,000.00 113,883.00
JUMLAH HARGA BAHAN 658,023.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 878,523.00
E Overhead & Profit 10.00% 87,852.30
F Harga Satuan Pekerjaan (D+E) 966,375.30

A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00

III - 840
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00

III - 841
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 91.000 1,420.00 129,220.00
Pasir pasang m3 0.584 203,000.00 118,552.00
JUMLAH HARGA BAHAN 625,772.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 846,272.00
E Overhead & Profit 10.00% 84,627.20
F Harga Satuan Pekerjaan (D+E) 930,899.20

A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Kapur (bakar) m3 0.170 253,000.00 43,010.00
Semen Portland kg 0.170 1,420.00 241.40
Pasir pasang m3 0.340 203,000.00 69,020.00
JUMLAH HARGA BAHAN 490,271.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 710,771.40
E Overhead & Profit 10.00% 71,077.14
F Harga Satuan Pekerjaan (D+E) 781,848.54

A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 61.000 1,420.00 86,620.00
Kapur m3 0.147 253,000.00 37,191.00
Pasir pasang m3 0.492 203,000.00 99,876.00
JUMLAH HARGA BAHAN 601,687.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 822,187.00


E Overhead & Profit 10.00% 82,218.70
F Harga Satuan Pekerjaan (D+E) 904,405.70

A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 41.000 1,420.00 58,220.00
Kapur m3 0.131 253,000.00 33,143.00
Pasir pasang m3 0.523 203,000.00 106,169.00
JUMLAH HARGA BAHAN 575,532.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 842
D Jumlah (A+B+C) 796,032.00
E Overhead & Profit 10.00% 79,603.20
F Harga Satuan Pekerjaan (D+E) 875,635.20

III - 843
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.780 80,000.00 62,400.00
Tukang batu L.02 OH 0.390 110,000.00 42,900.00
Kepala tukang L.03 OH 0.039 120,000.00 4,680.00
Mandor L.04 OH 0.039 120,000.00 4,680.00
JUMLAH TENAGA KERJA 114,660.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Pasir urug m3 0.432 160,000.00 69,120.00
JUMLAH HARGA BAHAN 447,120.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 561,780.00


E Overhead & Profit 10.00% 56,178.00
F Harga Satuan Pekerjaan (D+E) 617,958.00

A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 3.400 80,000.00 272,000.00
Tukang batu L.02 OH 0.850 110,000.00 93,500.00
Kepala tukang L.03 OH 0.085 120,000.00 10,200.00
Mandor L.04 OH 0.170 120,000.00 20,400.00
JUMLAH TENAGA KERJA 396,100.00
B BAHAN
Batu belah m3 0.480 315,000.00 151,200.00
Semen Portland Kg 194.000 1,420.00 275,480.00
Pasir beton m3 0.312 223,000.00 69,576.00
Kerikil m3 0.468 225,000.00 105,300.00
Besi beton Kg 126.000 14,000.00 1,764,000.00
Kawat beton Kg 1.800 20,000.00 36,000.00
JUMLAH HARGA BAHAN 2,401,556.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,797,656.00


E Overhead & Profit 10.00% 279,765.60
F Harga Satuan Pekerjaan (D+E) 3,077,421.60

A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.400 80,000.00 192,000.00
Tukang batu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.119 120,000.00 14,280.00
JUMLAH TENAGA KERJA 303,880.00
B BAHAN
Batu belah m3 0.450 315,000.00 141,750.00
Semen Portland Kg 194.000 1,420.00 275,480.00
Pasir beton m3 0.312 223,000.00 69,576.00
Kerikil m3 0.468 225,000.00 105,300.00
JUMLAH HARGA BAHAN 592,106.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 895,986.00


E Overhead & Profit 10.00% 89,598.60
F Harga Satuan Pekerjaan (D+E) 985,584.60

III - 844
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100), setara dengan beton rabat

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 247.000 1,420.00 350,740.00
Pasir beton kg 869.000 159.29 138,419.29
Kerikil (Maks 30 kg 999.000 233.33 233,100.00
mm)/menggunakan bt.pecah mesin 2-
3
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 725,409.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 900,979.04


E Overhead & Profit 10.00% 90,097.90
F Harga Satuan Pekerjaan (D+E) 991,076.94

A.4.1.1.2 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
1. Semen kg 276.000 1,420.00 391,920.00
Portland
2. Pasir beton kg 828.000 159.29 131,888.57
3. Kerikil kg 1,012.000 233.33 236,133.33
(Maks 30mm)
4. Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 763,091.65
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 938,661.65


E Overhead & Profit 10.00% 93,866.17
F Harga Satuan Pekerjaan (D+E) 1,032,527.82

A.4.1.1.3 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen portland kg 299.000 1,420.00 424,580.00
Pasir beton kg 799.000 159.29 127,269.29
Kerikil (Maks 30 mm) kg 1,017.000 233.33 237,300.00
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 792,299.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 967,869.04

III - 845
E Overhead & Profit 10.00% 96,786.90
F Harga Satuan Pekerjaan (D+E) 1,064,655.94
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
1 MPA = 13.51kg/cm2

III - 846
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 127,600.00
B BAHAN
Semen Portland kg 230.000 1,420.00 326,600.00
Pasir beton kg 893.000 159.29 142,242.14
Kerikil kg 1,027.000 166.67 171,166.67
(Maks 30 mm)/bukan bt.pecah 2-3
Air Liter 200.000 14.65 2,930.00
JUMLAH HARGA BAHAN 642,938.81
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 770,538.81
E Overhead & Profit 10.00% 77,053.88
F Harga Satuan Pekerjaan (D+E) 847,592.69

A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (sama dengan K 175)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 326.000 1,420.00 462,920.00
Pasir beton kg 760.000 159.29 121,057.14
Kerikil (Maks kg 1,029.000 233.33 240,100.00
30mm)/menggunakan bt.pecah 2-3

Air Liter 215.000 14.65 3,149.75


JUMLAH HARGA BAHAN 827,226.89
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,002,796.89


E Overhead & Profit 10.00% 100,279.69
F Harga Satuan Pekerjaan (D+E) 1,103,076.58

A.4.1.1.6 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 352.000 1,420.00 499,840.00
Pasir beton kg 731.000 159.29 116,437.86
Kerikil (Maks kg 1,031.000 233.33 240,566.67
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 859,994.27
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,035,564.27

III - 847
E Overhead & Profit 10.00% 103,556.43
F Harga Satuan Pekerjaan (D+E) 1,139,120.70

III - 848
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 371.000 1,420.00 526,820.00
Pasir beton kg 698.000 159.29 111,181.43
Kerikil (Maks kg 1,047.000 233.33 244,300.00
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 885,451.18
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,061,021.18


E Overhead & Profit 10.00% 106,102.12
F Harga Satuan Pekerjaan (D+E) 1,167,123.30

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 384.000 1,420.00 545,280.00
Pasir beton kg 692.000 159.29 110,225.71
Kerikil kg 1,039.000 233.33 242,433.33
(Maksimum
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 901,088.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,076,658.80


E Overhead & Profit 10.00% 107,665.88
F Harga Satuan Pekerjaan (D+E) 1,184,324.68

A.4.1.1.9. Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325)

Harga Jumlah
Uraian Kode Satuan Koefisien Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 406.000 1,420.00 576,520.00
Pasir beton kg 684.000 159.29 108,951.43
Kerikil (Maks kg 1,026.000 233.33 239,400.00
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 928,021.18
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,103,591.18

III - 849
E Overhead & Profit 10.00% 110,359.12
F Harga Satuan Pekerjaan (D+E) 1,213,950.30

III - 850
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 175,570.00
B BAHAN
Semen Portland kg 413.000 1,420.00 586,460.00
Pasir beton kg 681.000 159.29 108,473.57
Kerikil (Maks kg 1,021.000 233.33 238,233.33
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 936,316.65
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,111,886.65


E Overhead & Profit 10.00% 111,188.67
F Harga Satuan Pekerjaan (D+E) 1,223,075.32

A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 439.000 1,420.00 623,380.00
Pasir beton kg 670.000 159.29 106,721.43
Kerikil (Maks 30 kg 1,006.000 233.33 234,733.33
mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 967,984.51
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,191,284.51


E Overhead & Profit 10.00% 119,128.45
F Harga Satuan Pekerjaan (D+E) 1,310,412.96

A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm (sama dengan K 425)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,420.00 636,160.00
Pasir beton kg 667.000 159.29 106,243.57
Kerikil (Maks kg 1,000.000 233.33 233,333.33
30mm)
Air Liter 215.000 14.65 3,149.75
JUMLAH HARGA BAHAN 978,886.65
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 1,202,186.65
E Overhead & Profit 10.00% 120,218.67
F Harga Satuan Pekerjaan (D+E) 1,322,405.32

III - 851
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan
sesuai Tabel berikut:
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 448.000 1,420.00 636,160.00
Pasir beton kg 667.000 159.29 106,243.57
Kerikil (maksimum kg 1,000.000 233.33 233,333.33
30 mm)
Bahan tambahan Liter 4.500 155,200.00 698,400.00
kimia (efoksi)
Air Liter 200.000 14.65 2,930.00
JUMLAH HARGA BAHAN 1,677,066.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,900,366.90


E Overhead & Profit 10.00% 190,036.69
F Harga Satuan Pekerjaan (D+E) 2,090,403.60
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox – 100

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.100 80,000.00 168,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.105 120,000.00 12,600.00
JUMLAH TENAGA KERJA 223,300.00
B BAHAN
Semen Portland kg 400.000 1,420.00 568,000.00
Pasir beton m3 0.480 223,000.00 107,040.00
Kerikil (2cm/3cm) m3 0.800 225,000.00 180,000.00
Strorox – 100 kg 1.200 88,000.00 105,600.00
JUMLAH HARGA BAHAN 960,640.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,183,940.00


E Overhead & Profit 10.00% 118,394.00
F Harga Satuan Pekerjaan (D+E) 1,302,334.00

A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu/Pipa L.02 OH 0.030 110,000.00 3,300.00
Kepala Tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Waterstop lebar m 1.050 57,500.00 60,375.00
150 mm
JUMLAH HARGA BAHAN 60,375.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,195.00


E Overhead & Profit 10.00% 6,919.50

III - 852
F Harga Satuan Pekerjaan (D+E) 76,114.50

III - 853
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Batu/Pipa L.02 OH 0.035 110,000.00 3,850.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 10,770.00
B BAHAN
Waterstop lebar m 1.050 143,700.00 150,885.00
200 mm
JUMLAH HARGA BAHAN 150,885.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 161,655.00


E Overhead & Profit 10.00% 16,165.50
F Harga Satuan Pekerjaan (D+E) 177,820.50

A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang Batu L.02 OH 0.040 110,000.00 4,400.00
Kepala Tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Waterstop lebar m 1.050 132,200.00 138,810.00
230 mm - 320 mm
JUMLAH HARGA BAHAN 138,810.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 150,570.00


E Overhead & Profit 10.00% 15,057.00
F Harga Satuan Pekerjaan (D+E) 165,627.00

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang besi L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 14,620.00
B BAHAN
Besi beton kg 10.500 14,000.00 147,000.00
(polos/ulir)
Kawat beton kg 0.150 20,000.00 3,000.00
JUMLAH HARGA BAHAN 150,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 164,620.00


E Overhead & Profit 10.00% 16,462.00
F Harga Satuan Pekerjaan (D+E) 181,082.00

A.4.1.1.18 Pemasangan 10 kg kabel prategang (prestressed) polos/strands

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 854
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang besi L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00

III - 855
B BAHAN
Besi beton kg 10.500 14,000.00 147,000.00
(polos/ulir)
Kawat beton kg 0.100 20,000.00 2,000.00
JUMLAH HARGA BAHAN 149,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 159,460.00


E Overhead & Profit 10.00% 15,946.00
F Harga Satuan Pekerjaan (D+E) 175,406.00

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang besi L.02 OH 0.025 110,000.00 2,750.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 7,870.00
B BAHAN
Jaring kawat kg 10.200 9,700.00 98,940.00
baja dilas
Kawat beton kg 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 99,940.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,810.00


E Overhead & Profit 10.00% 10,781.00
F Harga Satuan Pekerjaan (D+E) 118,591.00

A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 – 10 cm kg 0.300 21,000.00 6,300.00
Minyak bekisting Liter 0.100 10,600.00 1,060.00
JUMLAH HARGA BAHAN 152,800.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 229,240.00
E Overhead & Profit 10.00% 22,924.00
F Harga Satuan Pekerjaan (D+E) 252,164.00

A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang kayu L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 120,000.00 3,120.00
JUMLAH TENAGA KERJA 76,440.00
B BAHAN
Kayu kelas III m3 0.045 3,636,000.00 163,620.00
Paku 5 cm – 10 cm kg 0.300 21,000.00 6,300.00
Minyak bekisting Liter 0.100 10,600.00 1,060.00
JUMLAH HARGA BAHAN 170,980.00
C PERALATAN

III - 856
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 247,420.00


E Overhead & Profit 10.00% 24,742.00
F Harga Satuan Pekerjaan (D+E) 272,162.00

III - 857
A.4.1.1.22 (K3) Pemasangan 1 m2 bekisting untuk kolom

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.200 10,600.00 2,120.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 Lbr 0.350 106,000.00 37,100.00
mm
Dolken kayu f 8- Batang 2.000 71,000.00 142,000.00
10cm –panj 4 m
JUMLAH HARGA BAHAN 410,060.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 507,080.00


E Overhead & Profit 10.00% 50,708.00
F Harga Satuan Pekerjaan (D+E) 557,788.00

A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.200 10,600.00 2,120.00
Balok kayu kelas II m3 0.018 5,000,000.00 90,000.00
Plywood tebal 9 mm Lbr 0.350 106,000.00 37,100.00
Dolken kayu 71,000.00 142,000.00
f (8–10) cm Batang 2.000
panjang 4 m
JUMLAH HARGA BAHAN 425,060.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 522,080.00
E Overhead & Profit 10.00% 52,208.00
F Harga Satuan Pekerjaan (D+E) 574,288.00

A.4.1.1.24 (K3) Pemasangan 1 m2 bekisting untuk lantai

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.040 3,636,000.00 145,440.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.200 10,600.00 2,120.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 mm Lbr 0.350 106,000.00 37,100.00
Dolken kayu galam, 71,000.00 426,000.00
(8–10) cm panjang Batang 6.000
4m
JUMLAH HARGA BAHAN 694,060.00
C PERALATAN

III - 858
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 791,080.00
E Overhead & Profit 10.00% 79,108.00
F Harga Satuan Pekerjaan (D+E) 870,188.00

III - 859
A.4.1.1.25 (K3) Pemasangan 1 m2 bekisting untuk dinding

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.030 3,636,000.00 109,080.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.200 10,600.00 2,120.00
Balok kayu kelas II m3 0.020 5,000,000.00 100,000.00
Plywood tebal 9 mm Lbr 0.350 106,000.00 37,100.00
Dolken kayu , f 8– 71,000.00 213,000.00
Batang 3.000
10 cm, panj4 m
Penjaga jarak bekisting/spacer (dari 20,700.00 82,800.00
besi/baut) Buah 4.000

JUMLAH HARGA BAHAN 552,500.00


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 649,520.00
E Overhead & Profit 10.00% 64,952.00
F Harga Satuan Pekerjaan (D+E) 714,472.00

A.4.1.1.26 (K3) Pemasangan 1 m2 bekisting untuk tangga

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 97,020.00
B BAHAN
Kayu kelas III m3 0.030 3,636,000.00 109,080.00
Paku 5 cm – 12 cm kg 0.400 21,000.00 8,400.00
Minyak bekisting Liter 0.150 10,600.00 1,590.00
Balok kayu kelas II m3 0.015 5,000,000.00 75,000.00
Plywood tebal 9 mm Lbr 0.350 106,000.00 37,100.00
Dolken kayu, Ø 8– 71,000.00 142,000.00
Batang 2.000
10 cm,panjang 4 m
JUMLAH HARGA BAHAN 373,170.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 470,190.00
E Overhead & Profit 10.00% 47,019.00
F Harga Satuan Pekerjaan (D+E) 517,209.00

A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Kayu kelas III (papan) m3 0.026 3,636,000.00 95,990.40
Paku 5 cm – 12 cm kg 0.600 21,000.00 12,600.00
Dolken kayu , f 8–10 panjang 4m 71,000.00 35,500.00
Batang 0.500

JUMLAH HARGA BAHAN 144,090.40


C PERALATAN

JUMLAH HARGA ALAT -

III - 860
D Jumlah (A+B+C) 163,150.40
E Overhead & Profit 10.00% 16,315.04
F Harga Satuan Pekerjaan (D+E) 179,465.44

III - 861
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 110,000.00 2,200.00
Tukang kayu L.02 OH 0.020 110,000.00 2,200.00
Tukang besi L.02 OH 0.020 110,000.00 2,200.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 22,800.00
B BAHAN
Kayu kelas III m3 0.002 3,636,000.00 7,272.00
Paku 5 cm – 12 cm kg 0.010 21,000.00 210.00
Besi beton polos kg 3.000 14,000.00 42,000.00
Kawat beton kg 0.450 20,000.00 9,000.00
Semen Portland kg 4.000 1,420.00 5,680.00
Pasir Beton m3 0.006 223,000.00 1,338.00
Kerikil m3 0.009 225,000.00 2,025.00
JUMLAH HARGA BAHAN 67,525.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,325.00


E Overhead & Profit 10.00% 9,032.50
F Harga Satuan Pekerjaan (D+E) 99,357.50

A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm


Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.297 80,000.00 23,760.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Tukang kayu L.02 OH 0.033 110,000.00 3,630.00
Tukang besi L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 37,650.00
B BAHAN
Kayu kelas III m3 0.003 3,636,000.00 10,908.00
Paku 5 cm – 12 cm kg 0.020 21,000.00 420.00
Besi beton polos kg 3.600 14,000.00 50,400.00
Kawat beton kg 0.050 20,000.00 1,000.00
Semen Portland kg 5.500 1,420.00 7,810.00
Pasir beton m3 0.009 223,000.00 2,007.00
Kerikil m3 0.015 225,000.00 3,375.00
JUMLAH HARGA BAHAN 75,920.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 113,570.00
E Overhead & Profit 10.00% 11,357.00
F Harga Satuan Pekerjaan (D+E) 124,927.00

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast in place). Indeks yang ada dalam pedoman ini hanya untuk pekerjaan
produksi yang dilakukan di lapangan, terutama untuk analisa cetakan (bekisting) pracetak baik untuk komponen kolom, balok dan pelat.

A.4.1.2.1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.132 80,000.00 10,560.00
Tukang batu L.02 OH 0.022 110,000.00 2,420.00
Kepala tukang L.03 OH 0.002 120,000.00 240.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 14,060.00
B BAHAN
Semen PC Kg 26.080 1,420.00 37,033.60
Pasir beton Kg 60.800 159.29 9,684.57
Kerikil (menggunakan bt. Pecah 2-3) Kg 82.320 233.33 19,208.00

Air L 17.200 14.65 251.98


JUMLAH HARGA BAHAN 66,178.15
C PERALATAN

III - 862
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,238.15


E Overhead & Profit 10.00% 8,023.82
F Harga Satuan Pekerjaan (D+E) 88,261.97

III - 863
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.165 80,000.00 13,200.00
Tukang batu L.02 OH 0.028 110,000.00 3,080.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 17,600.00
B BAHAN
Semen PC Kg 32.600 1,420.00 46,292.00
Pasir beton Kg 76.000 159.29 12,105.71
Kerikil (maks 30mm) Kg 102.900 233.33 24,010.00
Air L 21.500 14.65 314.98
JUMLAH HARGA BAHAN 82,722.69
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 100,322.69


E Overhead & Profit 10.00% 10,032.27
F Harga Satuan Pekerjaan (D+E) 110,354.96

A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.198 80,000.00 15,840.00
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 21,030.00
B BAHAN
Semen PC Kg 39.120 1,420.00 55,550.40
Pasir beton Kg 91.200 159.29 14,526.86
Kerikil (maks 30mm) Kg 123.480 233.33 28,812.00
Air L 25.800 14.65 377.97
JUMLAH HARGA BAHAN 99,267.23
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 120,297.23


E Overhead & Profit 10.00% 12,029.72
F Harga Satuan Pekerjaan (D+E) 132,326.95

A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.248 80,000.00 19,840.00
Tukang batu L.02 OH 0.041 110,000.00 4,510.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 26,390.00
B BAHAN
Semen PC Kg 48.900 1,420.00 69,438.00
Pasir beton Kg 114.000 159.29 18,158.57
Kerikil (maks 30 mm) Kg 154.350 233.33 36,015.00
Air L 32.250 14.65 472.46
JUMLAH HARGA BAHAN 124,084.03
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 150,474.03
E Overhead & Profit 10.00% 15,047.40
F Harga Satuan Pekerjaan (D+E) 165,521.44

III - 864
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.007 80,000.00 560.00
Tukang kayu L.02 OH 0.076 110,000.00 8,360.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 10,000.00
B BAHAN
Lantai kerja t=10cm m3 0.008 847,592.69 6,780.74
Besi hollow (50 x 50 8,600.00 80,788.40
Kg 9.394
x 3) mm
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 5,000,000.00 25,000.00
m3 0.005
cm)
Phenol film 12 mm Lbr 0.080 281,700.00 22,536.00
Minyak cetakan
L 0.200 10,600.00 2,120.00
(bekisting)
Dinabolt Ø 12mm
buah 3.882 3,000.00 11,646.00
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 148,871.14
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 158,871.14
E Overhead & Profit 10.00% 15,887.11
F Harga Satuan Pekerjaan (D+E) 174,758.26

A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.004 80,000.00 320.00
Tukang kayu L.02 OH 0.038 110,000.00 4,180.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 5,100.00
B BAHAN
Kayu kaso 5/7 (lebar 5 cm, tinggi 7 m3 0.005 5,000,000.00 25,000.00
cm)
Phenol film 12 mm Lbr 0.043 281,700.00 12,113.10
Minyak cetakan L 0.200 10,600.00 2,120.00
(bekisting)
Paku (5 s.d.7) cm kg 0.046 21,000.00 966.00
Dinabolt Ø 12 mm buah 0.693 3,000.00 2,079.00
(10 s.d.15 cm)
JUMLAH HARGA BAHAN 42,278.10
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 47,378.10
E Overhead & Profit 10.00% 4,737.81
F Harga Satuan Pekerjaan (D+E) 52,115.91

A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.004 80,000.00 320.00
Tukang kayu L.02 OH 0.038 110,000.00 4,180.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 5,100.00
B BAHAN
Kayu kaso 5/7 (lebar 5 m3 0.004 5,000,000.00 20,000.00
cm, tinggi 7 cm)
Phenol film 12 mm Lbr 0.048 281,700.00 13,521.60
Minyak cetakan L 0.200 10,600.00 2,120.00
(bekisting)
Paku (5 s.d.7) cm Kg 0.046 21,000.00 966.00
Dinabolt Ø 12 mm buah 0.693 3,000.00 2,079.00
(10-15cm)
JUMLAH HARGA BAHAN 38,686.60
C PERALATAN

III - 865
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 43,786.60
E Overhead & Profit 10.00% 4,378.66
F Harga Satuan Pekerjaan (D+E) 48,165.26

III - 866
A.4.1.2.8.
Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.053 80,000.00 4,240.00
Tukang kayu L.02 OH 0.018 110,000.00 1,980.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 6,820.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 6,820.00
E Overhead & Profit 10.00% 682.00
F Harga Satuan Pekerjaan (D+E) 7,502.00

A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.089 80,000.00 7,120.00
Tukang kayu L.02 OH 0.030 110,000.00 3,300.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 11,020.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 11,020.00
E Overhead & Profit 10.00% 1,102.00
F Harga Satuan Pekerjaan (D+E) 12,122.00

A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.071 80,000.00 5,680.00
Tukang kayu L.02 OH 0.024 110,000.00 2,640.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 8,920.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 8,920.00
E Overhead & Profit 10.00% 892.00
F Harga Satuan Pekerjaan (D+E) 9,812.00

A.4.1.2.11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.064 80,000.00 5,120.00
Tukang batu L.02 OH 0.244 110,000.00 26,840.00
Tukang vibrator L.02 OH 0.128 110,000.00 14,080.00
Kepala tukang L.03 OH 0.034 120,000.00 4,080.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 58,880.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 58,880.00
E Overhead & Profit 10.00% 5,888.00

III - 867
F Harga Satuan Pekerjaan (D+E) 64,768.00

III - 868
A.4.1.2.12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.069 80,000.00 5,520.00
Tukang batu L.02 OH 0.242 110,000.00 26,620.00
Tukang vibrator L.02 OH 0.138 110,000.00 15,180.00
Kepala tukang L.03 OH 0.037 120,000.00 4,440.00
Mandor L.04 OH 0.073 120,000.00 8,760.00
JUMLAH TENAGA KERJA 60,520.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,520.00


E Overhead & Profit 10.00% 6,052.00
F Harga Satuan Pekerjaan (D+E) 66,572.00

A.4.1.2.13. Penuangan/menebar beton 1 m3 komponen kolom pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.213 110,000.00 23,430.00
Tukang vibrator L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor/Supervisor/ L.04 OH 0.073 120,000.00 8,760.00
Penyelia
JUMLAH TENAGA KERJA 54,450.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,450.00


E Overhead & Profit 10.00% 5,445.00
F Harga Satuan Pekerjaan (D+E) 59,895.00

A.4.1.2.14. Ereksi 1 buah komponen untuk pelat pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.067 140,000.00 9,380.00
Pembantu operator 80,000.00 5,360.00
L.09 OH 0.067
crane
Pekerja L.01 OH 0.067 80,000.00 5,360.00
Tukang batu L.02 OH 0.067 110,000.00 7,370.00
Tukang ereksi L.02 OH 0.134 110,000.00 14,740.00
Kepala tukang L.03 OH 0.067 120,000.00 8,040.00
Mandor L.04 OH 0.067 120,000.00 8,040.00
JUMLAH TENAGA KERJA 58,290.00
B BAHAN
Solar L 6.676 10,900.00 72,768.40
JUMLAH HARGA BAHAN 72,768.40
C PERALATAN
Sewa crane unit hari 0.067 4,485,000.00 300,495.00
Sewa pipe support buah 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 676,200.00

D Jumlah (A+B+C) 807,258.40


E Overhead & Profit 10.00% 80,725.84
F Harga Satuan Pekerjaan (D+E) 887,984.24

III - 869
Indeks kenaikan lantai ereksi komponen untuk pelat pracetak
Indeks kenaikan lantai Indeks
La ereksi pelat Lantai kenaikan
nta lantai
i ereksi
pelat
1 1 13 1.114
2 1 14 1.134
3 1 15 1.155
4 1 16 1.176
5 1 17 1.197
6 1 18 1.219
7 1 19 1.241
8 1.018 20 1.264
9 1.037 21 1.287
10 1.055 22 1.310
11 1.075 23 1.334
12 1.094 24 1.358

A.4.1.2.15. Ereksi 1 buah komponen untuk balok pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.061 140,000.00 8,540.00
Pembantu operator crane L.09 OH 0.061 80,000.00 4,880.00
Pekerja L.01 OH 0.061 80,000.00 4,880.00
Tukang batu L.02 OH 0.061 110,000.00 6,710.00
Tukang ereksi L.02 OH 0.122 110,000.00 13,420.00
Kepala tukang L.03 OH 0.061 120,000.00 7,320.00
Mandor L.04 OH 0.061 120,000.00 7,320.00
JUMLAH TENAGA KERJA 53,070.00
B BAHAN
Solar L 6.110 10,900.00 66,599.00
JUMLAH HARGA BAHAN 66,599.00
C PERALATAN
Sewa crane unit 0.061 4,485,000.00 273,585.00
hari
Sewa scaffolding unit 1.100 341,550.00 375,705.00
hari
JUMLAH HARGA ALAT 649,290.00

D Jumlah (A+B+C) 768,959.00


E Overhead & Profit 10.00% 76,895.90
F Harga Satuan Pekerjaan (D+E) 845,854.90

Indeks kenaikan lantai ereksi komponen untuk balok pracetak


Indeks kenaikan lantai Indeks
La ereksi balok Lantai kenaikan
nta lantai
i ereksi
balok
1 1 13 1.068
2 1 14 1.080
3 1 15 1.092
4 1 16 1.104
5 1 17 1.116
6 1 18 1.129
7 1 19 1.141
8 1.011 20 1.154
9 1.022 21 1.166
10 1.034 22 1.179
11 1.045 23 1.192
12 1.057 24 1.206

A.4.1.2.16. Ereksi 1 buah komponen untuk kolom pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.083 140,000.00 11,620.00
Pembantu operator L.09 OH 0.083 80,000.00 6,640.00
crane
Pekerja L.01 OH 0.083 80,000.00 6,640.00

III - 870
Tukang batu L.02 OH 0.083 110,000.00 9,130.00
Tukang ereksi L.02 OH 0.166 110,000.00 18,260.00
Kepala tukang L.03 OH 0.083 120,000.00 9,960.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 72,210.00

III - 871
B BAHAN
Solar L 8.277 10,900.00 90,219.30
JUMLAH HARGA BAHAN 90,219.30
C PERALATAN
Sewa crane unit hari 0.083 4,485,000.00 372,255.00
Sewa pipe support buah hari 2.200 341,550.00 751,410.00
JUMLAH HARGA ALAT 1,123,665.00

D Jumlah (A+B+C) 1,286,094.30


E Overhead & Profit 10.00% 128,609.43
F Harga Satuan Pekerjaan (D+E) 1,414,703.73

Indeks kenaikan lantai ereksi komponen untuk kolom pracetak


Indeks kenaikan lantai Indeks
Lanta ereksi kolom Lantai kenaikan
i lantai ereksi
kolom
1 1 13 1.162
2 1 14 1.191
3 1 15 1.221
4 1 16 1.252
5 1 17 1.284
6 1 18 1.317
7 1 19 1.350
8 1.025 20 1.384
9 1.051 21 1.419
10 1.078 22 1.455
11 1.105 23 1.492
12 1.133 24 1.530

A.4.1.2.17. Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 115,772.30


E Overhead & Profit 10.00% 11,577.23
F Harga Satuan Pekerjaan (D+E) 127,349.53

A.4.1.2.18. Langsir 1 buah komponen untuk balok pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator
L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 115,772.30


E Overhead & Profit 10.00% 11,577.23
F Harga Satuan Pekerjaan (D+E) 127,349.53

III - 872
A.4.1.2.19. Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Operator crane L.08 OH 0.019 140,000.00 2,660.00
Pembantu operator L.09 OH 0.019 80,000.00 1,520.00
crane
Pekerja L.01 OH 0.019 80,000.00 1,520.00
Tukang batu L.02 OH 0.038 110,000.00 4,180.00
JUMLAH TENAGA KERJA 9,880.00
B BAHAN
Solar L 1.897 10,900.00 20,677.30
JUMLAH HARGA BAHAN 20,677.30
C PERALATAN
Sewa crane unit hari 0.019 4,485,000.00 85,215.00
JUMLAH HARGA ALAT 85,215.00

D Jumlah (A+B+C) 115,772.30


E Overhead & Profit 10.00% 11,577.23
F Harga Satuan Pekerjaan (D+E) 127,349.53

A.4.1.2.20. Bahan 1 m3 grout campuran

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,200.000 2,800.00 3,360,000.00
Screening Kg 650.000 200.00 130,000.00
Air L 350.000 14.65 5,127.50
JUMLAH HARGA BAHAN 3,495,127.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 3,495,127.50


E Overhead & Profit 10.00% 349,512.75
F Harga Satuan Pekerjaan (D+E) 3,844,640.25

A.4.1.2.21. Bahan 1 m3 grout (tidak campuran)

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
JUMLAH TENAGA KERJA -
B BAHAN
Semen grout Kg 1,850.000 2,800.00 5,180,000.00
Air L 400.00 14.65 5,860.00
JUMLAH HARGA BAHAN 5,185,860.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 5,185,860.00
E Overhead & Profit 10.00% 518,586.00
F Harga Satuan Pekerjaan (D+E) 5,704,446.00

A.4.1.2.22. Upah 1 titik pekerjaan grout pada joint beton pracetak

Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien Harga Satuan
(Rp)
A TENAGA
Tukang batu L.02 OH 0.367 110,000.00 40,370.00
Kepala tukang L.03 OH 0.074 120,000.00 8,880.00
Mandor L.04 OH 0.037 120,000.00 4,440.00
JUMLAH TENAGA KERJA 53,690.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

III - 873
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,690.00


E Overhead & Profit 10.00% 5,369.00
F Harga Satuan Pekerjaan (D+E) 59,059.00

III - 874
A.4.1.2.23. Pemasangan 1 titik bekisting joint pracetak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.147 80,000.00 11,760.00
Tukang kayu L.02 OH 0.147 110,000.00 16,170.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 30,330.00
B BAHAN
Kayu kaso 5/7 (lebar m3 0.012 5,000,000.00 60,000.00
5 cm, tinggi 7 cm)
Papan cor (kayu kelas II) m3 0.004 5,000,000.00 20,000.00
Paku (5 s.d.7) cm Kg 0.264 21,000.00 5,544.00
JUMLAH HARGA BAHAN 85,544.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 115,874.00
E Overhead & Profit 10.00% 11,587.40
F Harga Satuan Pekerjaan (D+E) 127,461.40

A.4.1.2.24. Upah 1 titik joint dengan sling

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.220 80,000.00 17,600.00
Tukang kayu L.02 OH 0.022 110,000.00 2,420.00
Tukang besi L.02 OH 0.220 110,000.00 24,200.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 45,540.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,540.00


E Overhead & Profit 10.00% 4,554.00
F Harga Satuan Pekerjaan (D+E) 50,094.00

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1. Pemasangan 1 kg besi profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi Profil Kg 1.150 16,200.00 18,630.00
JUMLAH HARGA BAHAN 18,630.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,110.00


E Overhead & Profit 10.00% 3,111.00
F Harga Satuan Pekerjaan (D+E) 34,221.00

III - 875
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang las L.03 OH 0.060 110,000.00 6,600.00
konstruksi
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
Besi baja IWF Kg 1.150 16,200.00 18,630.00
JUMLAH HARGA BAHAN 18,630.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,110.00


E Overhead & Profit 10.00% 3,111.00
F Harga Satuan Pekerjaan (D+E) 34,221.00

A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang besi L.03 OH 0.100 110,000.00 11,000.00
konstruksi
Kepala tukang L.03 OH 0.001 120,000.00 120.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 19,720.00
B BAHAN
Solar Liter 1.000 10,900.00 10,900.00
Minyak pelumas Liter 0.100 10,600.00 1,060.00
JUMLAH HARGA BAHAN 11,960.00
C PERALATAN
1. Sewa alat Jam 0.800 132,250.00 105,800.00
JUMLAH HARGA ALAT 105,800.00

D Jumlah (A+B+C) 137,480.00


E Overhead & Profit 10.00% 13,748.00
F Harga Satuan Pekerjaan (D+E) 151,228.00

A.4.2.1.4. Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.050 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.052 120,000.00 6,240.00
JUMLAH TENAGA KERJA 218,340.00
B BAHAN
Besi siku L 30.30.3 Kg 15.000 12,100.00 181,500.00
Besi pelat baja Kg 32.800 7,500.00 246,000.00
Kawat las Kg 0.050 31,100.00 1,555.00
JUMLAH HARGA BAHAN 429,055.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 647,395.00


E Overhead & Profit 10.00% 64,739.50
F Harga Satuan Pekerjaan (D+E) 712,134.50

A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang las (bersertifikat) L.03 OH 0.020 120,000.00 2,400.00

Kepala tukang L.03 OH 0.002 120,000.00 240.00

III - 876
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 6,080.00

III - 877
B BAHAN
Kawat las listrik Kg 0.400 31,100.00 12,440.00
Solar Liter 0.300 10,900.00 3,270.00
Minyak pelumas Liter 0.040 10,600.00 424.00
JUMLAH HARGA BAHAN 16,134.00
C PERALATAN
Sewa alat Jam 0.170 132,250.00 22,482.50
JUMLAH HARGA ALAT 22,482.50

D Jumlah (A+B+C) 44,696.50


E Overhead & Profit 10.00% 4,469.65
F Harga Satuan Pekerjaan (D+E) 49,166.15

A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.650 80,000.00 52,000.00
Tukang las biasa L.03 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.032 120,000.00 3,840.00
JUMLAH TENAGA KERJA 135,140.00
B BAHAN
Besi scuare tube m 4.760 21,800.00 103,768.00
Besi lis kaca (1 x 1) cm m 4.522 16,400.00 74,160.80
Pengelasan cm 20.000 5,100.00 102,000.00
JUMLAH HARGA BAHAN 279,928.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 415,068.80


E Overhead & Profit 10.00% 41,506.88
F Harga Satuan Pekerjaan (D+E) 456,575.68

A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang las biasa L.03 OH 1.200 110,000.00 132,000.00
Kepala tukang L.03 OH 0.120 120,000.00 14,400.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 243,120.00
B BAHAN
Pintu gulung besi m2 1.000 1,122,400.00 1,122,400.00
JUMLAH HARGA BAHAN 1,122,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,365,520.00


E Overhead & Profit 10.00% 136,552.00
F Harga Satuan Pekerjaan (D+E) 1,502,072.00

A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang L.03 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 91,520.00
B BAHAN
Pintu lipat m2 1.000 3,116,500.00 3,116,500.00
JUMLAH HARGA BAHAN 3,116,500.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 878
D Jumlah (A+B+C) 3,208,020.00
E Overhead & Profit 10.00% 320,802.00
F Harga Satuan Pekerjaan (D+E) 3,528,822.00

III - 879
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang L.03 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 104,480.00
B BAHAN
Sunscreen alluminium m2 1.000 442,700.00 442,700.00
JUMLAH HARGA BAHAN 442,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 547,180.00


E Overhead & Profit 10.00% 54,718.00
F Harga Satuan Pekerjaan (D+E) 601,898.00

A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang khusus L.03 OH 1.000 110,000.00 110,000.00
alumunium
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Rolling door alluminium m2 1.000 460,000.00 460,000.00
JUMLAH HARGA BAHAN 460,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 668,000.00


E Overhead & Profit 10.00% 66,800.00
F Harga Satuan Pekerjaan (D+E) 734,800.00

A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,020.00
Mandor L.04 OH 0.004 120,000.00 504.00
JUMLAH TENAGA KERJA 17,674.00
B BAHAN
Profil alluminium m 4.400 126,500.00 556,600.00
Alluminium strip m 14.600 115,000.00 1,679,000.00
JUMLAH HARGA BAHAN 2,235,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,253,274.00


E Overhead & Profit 10.00% 225,327.40
F Harga Satuan Pekerjaan (D+E) 2,478,601.40

A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085 80,000.00 6,800.00

III - 880
Tukang khusus L.03 OH 0.085 110,000.00 9,350.00
alumunium
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 17,830.00

III - 881
B BAHAN
Pintu alluminium m 4.400 126,500.00 556,600.00
Profil kaca m 4.500 14,200.00 63,900.00
Sealant Tube 0.270 23,000.00 6,210.00
JUMLAH HARGA BAHAN 626,710.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 644,540.00


E Overhead & Profit 10.00% 64,454.00
F Harga Satuan Pekerjaan (D+E) 708,994.00

A.4.2.1.14. Pemasangan 1 m2 venetions blinds dan vertical blinds

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang L.03 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Venetions blinds dan m2 1.000 122,100.00 122,100.00
vertical blinds (tirai)
JUMLAH HARGA BAHAN 122,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 194,960.00


E Overhead & Profit 10.00% 19,496.00
F Harga Satuan Pekerjaan (D+E) 214,456.00

A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.670 80,000.00 133,600.00
Tukang las L.03 OH 1.670 110,000.00 183,700.00
Kepala tukang L.03 OH 0.167 120,000.00 20,040.00
Mandor L.04 OH 0.083 120,000.00 9,960.00
JUMLAH TENAGA KERJA 347,300.00
B BAHAN
Besi strip kg 6.177 15,800.00 97,596.60
Pengelasan cm 27.080 5,100.00 138,108.00
JUMLAH HARGA BAHAN 235,704.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 583,004.60


E Overhead & Profit 10.00% 58,300.46
F Harga Satuan Pekerjaan (D+E) 641,305.06

A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kawat nyamuk m2 1.100 287,500.00 316,250.00
Pengelasan cm 11.110 5,100.00 56,661.00
Baja strip (0,2 x 2) cm kg 1.716 20,900.00 35,864.40
JUMLAH HARGA BAHAN 408,775.40
C PERALATAN

III - 882
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 429,575.40


E Overhead & Profit 10.00% 42,957.54
F Harga Satuan Pekerjaan (D+E) 472,532.94

III - 883
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Jendela nako m2 1.100 187,700.00 206,470.00
(rangka + kaca 5 mm)
Paku skrup buah 10.000 500.00 5,000.00
1 cm – 2,5 cm
Besi strip m 7.000 15,800.00 110,600.00
JUMLAH HARGA BAHAN 322,070.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 362,590.00


E Overhead & Profit 10.00% 36,259.00
F Harga Satuan Pekerjaan (D+E) 398,849.00

A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 40,520.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm - 2,5 cm kg 0.015 21,000.00 315.00
Papan kayu kelas II
m3 0.019 3,636,000.00 69,084.00
atau III
JUMLAH HARGA BAHAN 115,284.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 155,804.00


E Overhead & Profit 10.00% 15,580.40
F Harga Satuan Pekerjaan (D+E) 171,384.40

A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng pelat bjls 30 lebar 45 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 49,560.00
B BAHAN
Seng pelat m 1.050 43,700.00 45,885.00
Paku 1 cm – 2,5 cm kg 0.010 21,000.00 210.00
Besi strip kg 0.500 15,800.00 7,900.00
JUMLAH HARGA BAHAN 53,995.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 103,555.00


E Overhead & Profit 10.00% 10,355.50

III - 884
F Harga Satuan Pekerjaan (D+E) 113,910.50

III - 885
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang besi L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 52,060.00
B BAHAN
Rangka metal M1 3.500 21,800.00 76,300.00
hollow 40.40.2 mm
Assesoris Ls 1.000 76,300.00 76,300.00
(perkuatan, las dll)
JUMLAH HARGA BAHAN 152,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 204,660.00


E Overhead & Profit 10.00% 20,466.00
F Harga Satuan Pekerjaan (D+E) 225,126.00

A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafon

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang besi L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 72,860.00
B BAHAN
Rangka metal M1 4.000 21,800.00 87,200.00
hollow 40.40.2 mm
Assesoris 87,200.00 87,200.00
(perkuatan, las Ls 100%xrangka
dll)
JUMLAH HARGA BAHAN 174,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 247,260.00


E Overhead & Profit 10.00% 24,726.00
F Harga Satuan Pekerjaan (D+E) 271,986.00

A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.734 80,000.00 58,720.00
Tukang besi L.02 OH 0.734 110,000.00 80,740.00
Kepala tukang L.03 OH 0.073 120,000.00 8,760.00
Mandor L.04 OH 0.037 120,000.00 4,440.00
JUMLAH TENAGA KERJA 152,660.00
B BAHAN
Baja ringan canai dingin C75 kg 3.065 16,100.00 49,346.50
JUMLAH HARGA BAHAN 49,346.50
C PERALATAN
Peralatan % 0.100 49,346.50 4,934.65
JUMLAH HARGA ALAT 4,934.65

D Jumlah (A+B+C) 206,941.15


E Overhead & Profit 10.00% 20,694.12
F Harga Satuan Pekerjaan (D+E) 227,635.27

III - 886
A.4.2.1.22. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.760 80,000.00 60,832.00
Tukang besi L.02 OH 0.760 110,000.00 83,644.00
Kepala tukang L.03 OH 0.076 120,000.00 9,120.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 158,156.00
B BAHAN
Baja ringan canai 16,100.00 65,205.00
kg 4.050
dingin C75
JUMLAH HARGA BAHAN 65,205.00
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 223,361.00


E Overhead & Profit 10.00% 22,336.10
F Harga Satuan Pekerjaan (D+E) 245,697.10

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.1. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 43.500 1,420.00 61,770.00
Pasir pasang m3 0.080 203,000.00 16,240.00
JUMLAH HARGA BAHAN 204,010.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 280,010.00


E Overhead & Profit 10.00% 28,001.00
F Harga Satuan Pekerjaan (D+E) 308,011.00

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 32.950 1,420.00 46,789.00
Pasir pasang m3 0.091 203,000.00 18,473.00
JUMLAH HARGA BAHAN 191,262.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 267,262.00


E Overhead & Profit 10.00% 26,726.20
F Harga Satuan Pekerjaan (D+E) 293,988.20

III - 887
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala bukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 26.550 1,420.00 37,701.00
Pasir Pasang m3 0.093 203,000.00 18,879.00
JUMLAH HARGA BAHAN 182,580.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 258,580.00


E Overhead & Profit 10.00% 25,858.00
F Harga Satuan Pekerjaan (D+E) 284,438.00

A. 4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 22.200 1,420.00 31,524.00
Pasir pasang m3 0.102 203,000.00 20,706.00
JUMLAH HARGA BAHAN 178,230.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 254,230.00


E Overhead & Profit 10.00% 25,423.00
F Harga Satuan Pekerjaan (D+E) 279,653.00

A. 4.4.1.5 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 76,000.00
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 18.500 1,420.00 26,270.00
Pasir pasang m3 0.122 203,000.00 24,766.00
JUMLAH HARGA BAHAN 177,036.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 253,036.00


E Overhead & Profit 10.00% 25,303.60
F Harga Satuan Pekerjaan (D+E) 278,339.60

A. 4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang batu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.030 120,000.00 3,600.00

III - 888
JUMLAH TENAGA KERJA 76,000.00

III - 889
B BAHAN
Bata merah buah 140.000 900.00 126,000.00
Semen Portland Kg 10.080 1,420.00 14,313.60
Kapur padam m3 0.028 253,000.00 6,957.50
Pasir pasang m3 0.093 203,000.00 18,777.50
JUMLAH HARGA BAHAN 166,048.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 242,048.60


E Overhead & Profit 10.00% 24,204.86
F Harga Satuan Pekerjaan (D+E) 266,253.46

A. 4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,420.00 26,909.00
Pasir pasang m3 0.038 203,000.00 7,714.00
JUMLAH HARGA BAHAN 97,623.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 135,623.00


E Overhead & Profit 10.00% 13,562.30
F Harga Satuan Pekerjaan (D+E) 149,185.30

A. 4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 14.370 1,420.00 20,405.40
Pasir pasang m3 0.040 203,000.00 8,120.00
JUMLAH HARGA BAHAN 91,525.40
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 129,525.40
E Overhead & Profit 10.00% 12,952.54
F Harga Satuan Pekerjaan (D+E) 142,477.94

A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 11.500 1,420.00 16,330.00
Pasir pasang m3 0.043 203,000.00 8,729.00
JUMLAH HARGA BAHAN 88,059.00
C PERALATAN

III - 890
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 126,059.00


E Overhead & Profit 10.00% 12,605.90
F Harga Satuan Pekerjaan (D+E) 138,664.90

III - 891
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga Jumlah
Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 9.680 1,420.00 13,745.60
Pasir pasang m3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 85,880.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 123,880.60


E Overhead & Profit 10.00% 12,388.06
F Harga Satuan Pekerjaan (D+E) 136,268.66

A. 4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 8.320 1,420.00 11,814.40
Pasir pasang m3 0.049 203,000.00 9,947.00
JUMLAH HARGA BAHAN 84,761.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 122,761.40


E Overhead & Profit 10.00% 12,276.14
F Harga Satuan Pekerjaan (D+E) 135,037.54

A. 4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP :8PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 6.500 1,420.00 9,230.00
Pasir pasang m3 0.050 203,000.00 10,150.00
JUMLAH HARGA BAHAN 82,380.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 120,380.00


E Overhead & Profit 10.00% 12,038.00
F Harga Satuan Pekerjaan (D+E) 132,418.00

III - 892
A. 4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen Portland Kg 4.500 1,420.00 6,390.00
Kapur padam m3 0.015 253,000.00 3,795.00
Pasir pasang m3 0.050 203,000.00 10,150.00
JUMLAH HARGA BAHAN 83,335.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 121,335.00


E Overhead & Profit 10.00% 12,133.50
F Harga Satuan Pekerjaan (D+E) 133,468.50

A. 4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :1PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.018 1,420.00 25.56
Kapur padam m3 0.018 253,000.00 4,554.00
Pasir pasang m3 0.018 203,000.00 3,654.00
JUMLAH HARGA BAHAN 71,233.56
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 109,233.56


E Overhead & Profit 10.00% 10,923.36
F Harga Satuan Pekerjaan (D+E) 120,156.92

A. 4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen merah Kg 0.014 1,420.00 19.88
Kapur padam m3 0.014 253,000.00 3,542.00
Pasir pasang m3 0.028 203,000.00 5,684.00
JUMLAH HARGA BAHAN 72,245.88
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 110,245.88


E Overhead & Profit 10.00% 11,024.59
F Harga Satuan Pekerjaan (D+E) 121,270.47

III - 893
A. 4.4.1.16 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 3PP

Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
No (Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 48,460.00
B BAHAN
HB-20 bh 12.500 12.500 2,012.40 25,155.00
Semen Portland Kg 30.320 3.032 1,420.00 4,305.44
Pasir pasang m3 0.728 0.073 203,000.00 14,778.40
Besi angker diameter 8 Kg 0.280 0.028 14,900.00 417.20
JUMLAH HARGA BAHAN 44,656.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 93,116.04


E Overhead & Profit 10.00% 9,311.60
F Harga Satuan Pekerjaan (D+E) 102,427.64
HB20 : Hollow Block tebal 20cm

A. 4.4.1.17 rob Pemasangan 1m2 dinding conblock HB20 campuran 1SP : 4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 48,460.00
B BAHAN
HB-20 buah 12.500 12.500 2,012.40 25,155.00
Semen Portland Kg 24.260 2.426 1,420.00 3,444.92
Pasir pasang m3 0.772 0.077 203,000.00 15,671.60
Besi angker diameter 8 Kg 0.280 0.280 14,900.00 4,172.00
JUMLAH HARGA BAHAN 48,443.52
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,903.52


E Overhead & Profit 10.00% 9,690.35
F Harga Satuan Pekerjaan (D+E) 106,593.87

A. 4.4.1.18 rob Pemasangan 1m2 dinding conblock HB15 campuran 1SP : 3PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 42,160.00
B BAHAN
HB-15 buah 12.500 12.500 2,300.00 28,750.00
Semen Portland Kg 22.740 2.274 1,420.00 3,229.08
Pasir pasang m3 0.550 0.055 203,000.00 11,165.00
Besi angker diameter 8 Kg 0.280 0.280 14,900.00 4,172.00
JUMLAH HARGA BAHAN 47,316.08
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,476.08


E Overhead & Profit 10.00% 8,947.61
F Harga Satuan Pekerjaan (D+E) 98,423.69

III - 894
HB15: Hollow Block tebal 15cm

III - 895
A. 4.4.1.19 rob Pemasangan 1 m2 dinding conblock HB15 campuran 1SP :4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.320 80,000.00 25,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 42,160.00
B BAHAN
HB-15 buah 12.500 12.500 2,300.00 28,750.00
Semen Portland Kg 18.200 1.820 1,420.00 2,584.40
Pasir pasang m3 0.582 0.058 203,000.00 11,814.60
Besi angker diameter 8 Kg 0.280 0.280 14,900.00 4,172.00
JUMLAH HARGA BAHAN 47,321.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,481.00


E Overhead & Profit 10.00% 8,948.10
F Harga Satuan Pekerjaan (D+E) 98,429.10

A. 4.4.1.20 rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP :3PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
HB-10 buah 12.500 12.500 3,104.80 38,810.00
Semen Portland Kg 15.160 1.516 1,420.00 2,152.72
Pasir pasang m3 0.364 0.036 203,000.00 7,389.20
Besi angker diameter 8 Kg 0.280 0.280 14,900.00 4,172.00
JUMLAH HARGA BAHAN 52,523.92
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,523.92


E Overhead & Profit 10.00% 9,052.39
F Harga Satuan Pekerjaan (D+E) 99,576.31
Hb10 : Hollow Block tebal 10 cm

A. 4.4.1.21.rob Pemasangan 1 m2 dinding conblock HB10 campuran 1SP : 4PP

No Uraian Kode Satuan Harga Jumlah


Koefisien Asli Koefisien Rubahan Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
HB-10 buah 12.500 12.500 3,104.80 38,810.00
Semen Portland Kg 12.130 1.213 1,420.00 1,722.46
Pasir pasang m3 0.388 0.039 203,000.00 7,876.40
Besi angker diameter 8 Kg 0.280 0.280 14,900.00 4,172.00
JUMLAH HARGA BAHAN 52,580.86
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 90,580.86


E Overhead & Profit 10.00% 9,058.09
F Harga Satuan Pekerjaan (D+E) 99,638.95

III - 896
A. 4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata rooster m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 106,725.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,725.00


E Overhead & Profit 10.00% 14,472.50
F Harga Satuan Pekerjaan (D+E) 159,197.50

A. 4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00
B BAHAN
Bata berongga m3 30.000 2,800.00 84,000.00
Semen Portland Kg 11.000 1,420.00 15,620.00
Pasir pasang m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 106,725.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 144,725.00


E Overhead & Profit 10.00% 14,472.50
F Harga Satuan Pekerjaan (D+E) 159,197.50

A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,560.00
B BAHAN
Bata ringan tebal 7,5cm buah 8.400 5,200.00 43,680.00
Mortar siap pakai Kg 0.473 4,300.00 2,033.90
JUMLAH HARGA BAHAN 45,713.90
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 258,273.90


E Overhead & Profit 10.00% 25,827.39
F Harga Satuan Pekerjaan (D+E) 284,101.29

III - 897
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.01 OH 0.671 80,000.00 53,680.00
Tukang batu L.02 OH 1.300 110,000.00 143,000.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 212,640.00
B BAHAN
Bata ringan tebal 10cm buah 8.400 6,000.00 50,400.00
Mortar siap pakai Kg 0.063 4,300.00 270.90
JUMLAH HARGA BAHAN 50,670.90
C PERALATAN
Peralatan % 0.100 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 263,310.90


E Overhead & Profit 10.00% 26,331.09
F Harga Satuan Pekerjaan (D+E) 289,641.99

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 15.504 1,420.00 22,015.68
PP m3 0.016 203,000.00 3,248.00
JUMLAH HARGA BAHAN 25,263.68
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 69,363.68


E Overhead & Profit 10.00% 6,936.37
F Harga Satuan Pekerjaan (D+E) 76,300.05

A.4.4.2.2. Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 10.224 1,420.00 14,518.08
PP m3 0.020 203,000.00 4,060.00
JUMLAH HARGA BAHAN 18,578.08
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,678.08


E Overhead & Profit 10.00% 6,267.81
F Harga Satuan Pekerjaan (D+E) 68,945.89

III - 898
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 7.776 1,420.00 11,041.92
PP m3 0.023 203,000.00 4,669.00
JUMLAH HARGA BAHAN 15,710.92
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,810.92


E Overhead & Profit 10.00% 5,981.09
F Harga Satuan Pekerjaan (D+E) 65,792.01

A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 6.240 1,420.00 8,860.80
PP m3 0.024 203,000.00 4,872.00
JUMLAH HARGA BAHAN 13,732.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,832.80


E Overhead & Profit 10.00% 5,783.28
F Harga Satuan Pekerjaan (D+E) 63,616.08

A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 5.184 1,420.00 7,361.28
PP m3 0.026 203,000.00 5,278.00
JUMLAH HARGA BAHAN 12,639.28
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,739.28


E Overhead & Profit 10.00% 5,673.93
F Harga Satuan Pekerjaan (D+E) 62,413.21

A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm

Uraian Kode Satuan Koefisien Harga Jumlah


No Satuan Harga
(Rp) (Rp)
A TENAGA

III - 899
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00

III - 900
B BAHAN
PC Kg 4.416 1,420.00 6,270.72
PP m3 0.027 203,000.00 5,481.00
JUMLAH HARGA BAHAN 11,751.72
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,851.72


E Overhead & Profit 10.00% 5,585.17
F Harga Satuan Pekerjaan (D+E) 61,436.89

A.4.4.2.7. Pemasangan 1 m2 plesteran 1SP : 7PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 3.936 1,420.00 5,589.12
PP m3 0.028 203,000.00 5,684.00
JUMLAH HARGA BAHAN 11,273.12
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,373.12


E Overhead & Profit 10.00% 5,537.31
F Harga Satuan Pekerjaan (D+E) 60,910.43

A.4.4.2.8. Pemasangan 1 m2 plesteran 1SP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
PC Kg 3.456 1,420.00 4,907.52
PP m3 0.029 203,000.00 5,887.00
JUMLAH HARGA BAHAN 10,794.52
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,894.52


E Overhead & Profit 10.00% 5,489.45
F Harga Satuan Pekerjaan (D+E) 60,383.97

A.4.4.2.9. Pemasangan 1 m2 plesteran 1SP : 1/2KP : 3PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
PC Kg 5.760 1,420.00 8,179.20
KP m3 0.003 253,000.00 759.00
PP m3 0.013 203,000.00 2,639.00
JUMLAH HARGA BAHAN 11,577.20
C PERALATAN

III - 901
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 57,177.20


E Overhead & Profit 10.00% 5,717.72
F Harga Satuan Pekerjaan (D+E) 62,894.92

III - 902
A.4.4.2.10. Pemasangan 1 m2 plesteran 1SP : 2KP : 8PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
PC Kg 3.000 1,420.00 4,260.00
KP m3 0.005 253,000.00 1,265.00
PP m3 0.020 203,000.00 4,060.00
JUMLAH HARGA BAHAN 9,585.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,185.00


E Overhead & Profit 10.00% 5,518.50
F Harga Satuan Pekerjaan (D+E) 60,703.50

A.4.4.2.11. Pemasangan 1 m2 plesteran 1SM : 1KP : 1PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
SM m3 0.009 1,100.00 9.90
KP m3 0.009 253,000.00 2,277.00
PP m3 0.009 203,000.00 1,827.00
JUMLAH HARGA BAHAN 4,113.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 49,713.90


E Overhead & Profit 10.00% 4,971.39
F Harga Satuan Pekerjaan (D+E) 54,685.29

A.4.4.2.12. Pemasangan 1 m2 plesteran 1SM : 1KP : 2PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.360 80,000.00 28,800.00
Tukang batu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 45,600.00
B BAHAN
SM m3 0.007 1,100.00 7.70
KP m3 0.007 253,000.00 1,771.00
PP m3 0.015 203,000.00 3,045.00
JUMLAH HARGA BAHAN 4,823.70
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,423.70


E Overhead & Profit 10.00% 5,042.37
F Harga Satuan Pekerjaan (D+E) 55,466.07

III - 903
A.4.4.2.13. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 13.632 1,420.00 19,357.44
PP m3 0.027 203,000.00 5,481.00
JUMLAH HARGA BAHAN 24,838.44
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 83,878.44


E Overhead & Profit 10.00% 8,387.84
F Harga Satuan Pekerjaan (D+E) 92,266.28

A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 46,760.00
B BAHAN
PC Kg 10.368 1,420.00 14,722.56
PP m3 0.031 203,000.00 6,293.00
JUMLAH HARGA BAHAN 21,015.56
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 67,775.56


E Overhead & Profit 10.00% 6,777.56
F Harga Satuan Pekerjaan (D+E) 74,553.12

A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 8.320 1,420.00 11,814.40
PP m3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 18,310.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,350.40


E Overhead & Profit 10.00% 7,735.04
F Harga Satuan Pekerjaan (D+E) 85,085.44

A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA

III - 904
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang batu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00

III - 905
B BAHAN
PC Kg 6.912 1,420.00 9,815.04
PP m3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 16,920.04
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 75,960.04


E Overhead & Profit 10.00% 7,596.00
F Harga Satuan Pekerjaan (D+E) 83,556.04

A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang Batu L.03 OH 0.200 110,000.00 22,000.00
Kepala Tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 59,040.00
B BAHAN
PC Kg 5.888 1,420.00 8,360.96
PP m3 0.036 203,000.00 7,308.00
JUMLAH HARGA BAHAN 15,668.96
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 74,708.96


E Overhead & Profit 10.00% 7,470.90
F Harga Satuan Pekerjaan (D+E) 82,179.86

A.4.4.2.18. Pemasangan 1 m2 plesteran 1SM : 1 KP : 2PP tebal 20 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.440 80,000.00 35,200.00
Tukang batu L.03 OH 0.220 110,000.00 24,200.00
Kepala tukang L.03 OH 0.022 120,000.00 2,640.00
Mandor L.04 OH 0.022 120,000.00 2,640.00
JUMLAH TENAGA KERJA 64,680.00
B BAHAN
SM m3 0.009 1,100.00 9.90
KP m3 0.009 253,000.00 2,277.00
PP m3 0.018 203,000.00 3,654.00
JUMLAH HARGA BAHAN 5,940.90
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 70,620.90


E Overhead & Profit 10.00% 7,062.09
F Harga Satuan Pekerjaan (D+E) 77,682.99

A.4.4.2.19. Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
PC Kg 5.184 1,420.00 7,361.28
PP m3 0.026 203,000.00 5,278.00
JUMLAH HARGA BAHAN 12,639.28
C PERALATAN

III - 906
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,809.28


E Overhead & Profit 10.00% 3,480.93
F Harga Satuan Pekerjaan (D+E) 38,290.21

III - 907
A.4.4.2.20. Pemasangan 1 m’ plesteran skoning 1SP : 3PP lebar 10 cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.03 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 55,680.00
B BAHAN
Semen PC Kg 0.500 1,420.00 710.00
Pasir pasang m3 0.013 203,000.00 2,639.00
JUMLAH HARGA BAHAN 3,349.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,029.00


E Overhead & Profit 10.00% 5,902.90
F Harga Satuan Pekerjaan (D+E) 64,931.90

A.4.4.2.21. Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.450 80,000.00 36,000.00
Tukang batu L.03 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.023 120,000.00 2,760.00
JUMLAH TENAGA KERJA 66,270.00
B BAHAN
Semen PC Kg 10.000 1,420.00 14,200.00
Batu granit Kg 15.000 5,700.00 85,500.00
JUMLAH HARGA BAHAN 99,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,970.00


E Overhead & Profit 10.00% 16,597.00
F Harga Satuan Pekerjaan (D+E) 182,567.00

A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.450 80,000.00 36,000.00
Tukang batu L.03 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.023 120,000.00 2,760.00
JUMLAH TENAGA KERJA 66,270.00
B BAHAN
Semen PC Kg 10.000 1,420.00 14,200.00
Batu traso Kg 15.000 5,700.00 85,500.00
JUMLAH HARGA BAHAN 99,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 165,970.00


E Overhead & Profit 10.00% 16,597.00
F Harga Satuan Pekerjaan (D+E) 182,567.00

A.4.4.2.23. Pemasangan 1 m2 plesteran ciprat 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)

III - 908
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 38,000.00

III - 909
B BAHAN
Semen PC Kg 4.320 1,420.00 6,134.40
Pasir pasang m3 0.006 203,000.00 1,218.00
JUMLAH HARGA BAHAN 7,352.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,352.40


E Overhead & Profit 10.00% 4,535.24
F Harga Satuan Pekerjaan (D+E) 49,887.64

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Semen PC Kg 3.108 1,420.00 4,413.36
JUMLAH HARGA BAHAN 4,413.36
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 26,583.36


E Overhead & Profit 10.00% 2,658.34
F Harga Satuan Pekerjaan (D+E) 29,241.70

A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang batu L.03 OH 0.035 110,000.00 3,850.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 10,410.00
B BAHAN
Semen PC Kg 1.600 1,420.00 2,272.00
JUMLAH HARGA BAHAN 2,272.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 12,682.00


E Overhead & Profit 10.00% 1,268.20
F Harga Satuan Pekerjaan (D+E) 13,950.20

A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
Semen PC Kg 6.340 1,420.00 9,002.80
Pasir pasang m3 0.012 203,000.00 2,436.00
JUMLAH HARGA BAHAN 11,438.80
C PERALATAN

JUMLAH HARGA ALAT -

III - 910
D Jumlah (A+B+C) 55,538.80
E Overhead & Profit 10.00% 5,553.88
F Harga Satuan Pekerjaan (D+E) 61,092.68

III - 911
A.4.4.2.27. Pemasangan 1 m2 acian

No Uraian Kode Satuan Koefisien Harga Jumlah


Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Semen PC Kg 3.250 1,420.00 4,615.00
JUMLAH HARGA BAHAN 4,615.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 34,015.00


E Overhead & Profit 10.00% 3,401.50
F Harga Satuan Pekerjaan (D+E) 37,416.50

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.2. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 30 cm x30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin abu-abu Bh 11.870 2,900.00 34,423.00
Semen Portland kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 57,758.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 94,628.00


E Overhead & Profit 10.00% 9,462.80
F Harga Satuan Pekerjaan (D+E) 104,090.80

A.4.4.3.3. Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin abu-abu buah 26.500 2,300.00 60,950.00
Semen Portland kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 84,853.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 124,663.00


E Overhead & Profit 10.00% 12,466.30
F Harga Satuan Pekerjaan (D+E) 137,129.30

III - 912
III - 913
A.4.4.3.5. Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.260 80,000.00 20,800.00
Tukang batu L.02 OH 0.130 110,000.00 14,300.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 38,220.00
B BAHAN
Ubin warna Bh 11.870 3,300.00 39,171.00
Semen Portland kg 10.000 1,420.00 14,200.00
Semen warna Kg 0.600 6,900.00 4,140.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 66,646.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,866.00


E Overhead & Profit 10.00% 10,486.60
F Harga Satuan Pekerjaan (D+E) 115,352.60

A.4.4.3.6. Pemasangan 1 m2 lantai ubin warna ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.270 80,000.00 21,600.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,680.00
Mandor L.04 OH 0.014 120,000.00 1,680.00
JUMLAH TENAGA KERJA 39,810.00
B BAHAN
Ubin warna Bh 26.500 2,600.00 68,900.00
Semen Portland kg 10.400 1,420.00 14,768.00
Semen warna Kg 1.000 6,900.00 6,900.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 99,703.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 139,513.00


E Overhead & Profit 10.00% 13,951.30
F Harga Satuan Pekerjaan (D+E) 153,464.30

A.4.4.3.9. Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
Ubin granit Bh 6.630 48,500.00 321,555.00
Semen Portland kg 9.800 1,420.00 13,916.00
Semen warna Kg 1.300 6,900.00 8,970.00
Pasir pasang M3 0.045 203,000.00 9,135.00
JUMLAH HARGA BAHAN 353,576.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 390,446.00


E Overhead & Profit 10.00% 39,044.60
F Harga Satuan Pekerjaan (D+E) 429,490.60

III - 914
III - 915
A.4.4.3.32. Pemasangan 1m2 lantai keramik artistik 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 53.000 1,150.00 60,950.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 100,689.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 203,589.80


E Overhead & Profit 10.00% 20,358.98
F Harga Satuan Pekerjaan (D+E) 223,948.78

A.4.4.3.35. Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 27,500.00 28,875.00
Semen Portland Kg 10.000 1,420.00 14,200.00
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 55,660.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 158,560.00


E Overhead & Profit 10.00% 15,856.00
F Harga Satuan Pekerjaan (D+E) 174,416.00

A.4.4.3.36. Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Doos 1.050 57,500.00 60,375.00
Semen Portland Kg 10.400 1,420.00 14,768.00
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.500 6,900.00 3,450.00
JUMLAH HARGA BAHAN 87,728.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 190,628.00


E Overhead & Profit 10.00% 19,062.80
F Harga Satuan Pekerjaan (D+E) 209,690.80

III - 916
III - 917
A.4.4.3.38. Pemasangan 1m2 lantai keramik mozaik ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Ubin keramik Bh 11.870 4,600.00 54,602.00
Semen Portland Kg 14.150 1,420.00 20,093.00
Pasir pasang M3 0.039 203,000.00 7,917.00
Semen warna Kg 2.000 6,900.00 13,800.00
JUMLAH HARGA BAHAN 96,412.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 199,312.00


E Overhead & Profit 10.00% 19,931.20
F Harga Satuan Pekerjaan (D+E) 219,243.20

A.4.4.3.39. Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 13,800.00 73,140.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.025 6,900.00 172.50
JUMLAH HARGA BAHAN 75,540.30
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,440.30


E Overhead & Profit 10.00% 9,744.03
F Harga Satuan Pekerjaan (D+E) 107,184.33

A.4.4.3.40. Pemasangan 1 m’ plint keramik ukuran 10 cm x 10 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 10.600 10,300.00 109,180.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.050 6,900.00 345.00
JUMLAH HARGA BAHAN 111,752.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 133,652.80


E Overhead & Profit 10.00% 13,365.28
F Harga Satuan Pekerjaan (D+E) 147,018.08

III - 918
A.4.4.3.41. Pemasangan 1 m’ plint keramik ukuran 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.090 80,000.00 7,200.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 21,900.00
B BAHAN
Plint keramik Bh 5.300 10,300.00 54,590.00
Semen Portland Kg 0.570 1,420.00 809.40
Pasir pasang M3 0.002 203,000.00 304.50
Semen warna Kg 0.013 6,900.00 89.70
JUMLAH HARGA BAHAN 55,793.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 77,693.60


E Overhead & Profit 10.00% 7,769.36
F Harga Satuan Pekerjaan (D+E) 85,462.96

A.4.4.3.42. Pemasangan 1 m’ plint internal cove artistik 5 cm x 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 80,000.00 60,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.038 120,000.00 4,560.00
JUMLAH TENAGA KERJA 156,060.00
B BAHAN
Internal cove Bh 5.300 17,200.00 91,160.00
Semen Portland Kg 1.140 1,420.00 1,618.80
Pasir pasang M3 0.003 203,000.00 609.00
Semen warna Kg 0.100 6,900.00 690.00
JUMLAH HARGA BAHAN 94,077.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 250,137.80


E Overhead & Profit 10.00% 25,013.78
F Harga Satuan Pekerjaan (D+E) 275,151.58

A.4.4.3.43. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Marmer Bh 1.060 920,000.00 975,200.00
Semen Portland Kg 8.190 1,420.00 11,629.80
Pasir pasang M3 0.045 203,000.00 9,135.00
Semen warna Kg 0.134 6,900.00 924.60
JUMLAH HARGA BAHAN 996,889.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,099,789.40


E Overhead & Profit 10.00% 109,978.94
F Harga Satuan Pekerjaan (D+E) 1,209,768.34

III - 919
A.4.4.3.44. Pemasangan 1 m2 lantai karpet

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 80,000.00 13,600.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 35,420.00
B BAHAN
Karpet m2 1.050 115,000.00 120,750.00
Lem Kg 0.350 78,700.00 27,545.00
JUMLAH HARGA BAHAN 148,295.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 183,715.00


E Overhead & Profit 10.00% 18,371.50
F Harga Satuan Pekerjaan (D+E) 202,086.50

A.4.4.3.45. Pemasangan 1 m2 underlayer (pelapis bawah karpet)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Underlayer m2 1.050 57,500.00 60,375.00
Lem Kg 0.350 78,700.00 27,545.00
JUMLAH HARGA BAHAN 87,920.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 112,880.00


E Overhead & Profit 10.00% 11,288.00
F Harga Satuan Pekerjaan (D+E) 124,168.00

A.4.4.3.46. Pemasangan 1 m2 lantai parquet kayu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,700.00 47,220.00
JUMLAH HARGA BAHAN 228,345.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,245.00


E Overhead & Profit 10.00% 33,124.50
F Harga Satuan Pekerjaan (D+E) 364,369.50

A.4.4.3.47. Pemasangan 1 m2 lantai kayu gymfloor

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00

III - 920
Tukang kayu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00

III - 921
B BAHAN
Parquet m2 1.050 172,500.00 181,125.00
Lem Kg 0.600 78,700.00 47,220.00
JUMLAH HARGA BAHAN 228,345.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 331,245.00


E Overhead & Profit 10.00% 33,124.50
F Harga Satuan Pekerjaan (D+E) 364,369.50

A.4.4.3.49. Pemasangan 1 m2 dinding porselen 10 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 96,785.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 229,085.00


E Overhead & Profit 10.00% 22,908.50
F Harga Satuan Pekerjaan (D+E) 251,993.50

A.4.4.3.50. Pemasangan 1 m2 dinding porselen 20 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Porslen buah 26.000 2,300.00 59,800.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 90,046.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 222,346.00


E Overhead & Profit 10.00% 22,234.60
F Harga Satuan Pekerjaan (D+E) 244,580.60

A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10 cm x 20 cm


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 3,900.00 206,700.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 242,535.00

III - 922
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 374,835.00
E Overhead & Profit 10.00% 37,483.50
F Harga Satuan Pekerjaan (D+E) 412,318.50

III - 923
A.4.4.3.52. Pemasangan 1 m2 dinding keramik artistik 5 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 106.000 2,000.00 212,000.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.900 6,900.00 20,010.00
JUMLAH HARGA BAHAN 248,870.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 381,170.00


E Overhead & Profit 10.00% 38,117.00
F Harga Satuan Pekerjaan (D+E) 419,287.00

A.4.4.3.53. Pemasangan 1 m2 dinding keramik 10 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 53.000 1,150.00 60,950.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 96,785.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 229,085.00


E Overhead & Profit 10.00% 22,908.50
F Harga Satuan Pekerjaan (D+E) 251,993.50

A.4.4.3.54. Pemasangan 1 m2 dinding keramik 20 cm x 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.900 80,000.00 72,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.045 120,000.00 5,400.00
JUMLAH TENAGA KERJA 132,300.00
B BAHAN
Keramik artistik buah 26.500 2,300.00 60,950.00
Semen Portland Kg 9.300 1,420.00 13,206.00
Pasir pasang M3 0.018 203,000.00 3,654.00
Semen warna Kg 1.940 6,900.00 13,386.00
JUMLAH HARGA BAHAN 91,196.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 223,496.00


E Overhead & Profit 10.00% 22,349.60
F Harga Satuan Pekerjaan (D+E) 245,845.60

III - 924
A.4.4.3.55. Pemasangan 1 m2 dinding marmer 100 cm x 100 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.300 80,000.00 104,000.00
Tukang batu L.02 OH 0.650 110,000.00 71,500.00
Kepala tukang L.03 OH 0.065 120,000.00 7,800.00
Mandor L.04 OH 0.065 120,000.00 7,800.00
JUMLAH TENAGA KERJA 191,100.00
B BAHAN
Marmer buah 1.060 920,000.00 975,200.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 203,000.00 5,075.00
Semen warna Kg 0.650 6,900.00 4,485.00
Paku 12 cm buah 3.030 500.00 1,515.00
JUMLAH HARGA BAHAN 1,003,939.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,195,039.80


E Overhead & Profit 10.00% 119,503.98
F Harga Satuan Pekerjaan (D+E) 1,314,543.78

A.4.4.3.56. Pemasangan 1 m2 dinding bata pelapis 3 cm x 7 cm x 24 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 147,000.00
B BAHAN
Bata pelapis buah 63.000 4,700.00 296,100.00
Semen Portland Kg 12.440 1,420.00 17,664.80
Pasir pasang M3 0.025 203,000.00 5,075.00
Semen warna Kg 2.750 6,900.00 18,975.00
JUMLAH HARGA BAHAN 337,814.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 484,814.80


E Overhead & Profit 10.00% 48,481.48
F Harga Satuan Pekerjaan (D+E) 533,296.28

A.4.4.3.57. Pemasangan 1 m2 dinding batu paras

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu paras buah 1.100 4,800.00 5,280.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 29,070.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,970.00


E Overhead & Profit 10.00% 13,197.00
F Harga Satuan Pekerjaan (D+E) 145,167.00

III - 925
A.4.4.3.58. Pemasangan 1 m2 dinding batu tempel hitam

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang batu L.02 OH 0.350 110,000.00 38,500.00
Kepala tukang L.03 OH 0.035 120,000.00 4,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 102,900.00
B BAHAN
Batu tempel hitam Buah 1.100 1,800.00 1,980.00
Semen Portland Kg 11.750 1,420.00 16,685.00
Pasir pasang M3 0.035 203,000.00 7,105.00
JUMLAH HARGA BAHAN 25,770.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 128,670.00


E Overhead & Profit 10.00% 12,867.00
F Harga Satuan Pekerjaan (D+E) 141,537.00

A.4.4.3.59. Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 31,260.00
B BAHAN
Vynil buah 11.870 12,600.00 149,562.00
Lem Kg 0.350 25,300.00 8,855.00
JUMLAH HARGA BAHAN 158,417.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 189,677.00


E Overhead & Profit 10.00% 18,967.70
F Harga Satuan Pekerjaan (D+E) 208,644.70

A.4.4.3.60. Pemasangan 1 m2 wallpaper lebar 50 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang batu L.02 OH 0.175 110,000.00 19,250.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 49,530.00
B BAHAN
Wallpaper m 2.200 80,500.00 177,100.00
Lem Kg 0.250 25,300.00 6,325.00
JUMLAH HARGA BAHAN 183,425.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 232,955.00


E Overhead & Profit 10.00% 23,295.50
F Harga Satuan Pekerjaan (D+E) 256,250.50

A.4.4.3.61. Pemasangan 1m2 floor harderner

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 926
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00

III - 927
B BAHAN
Floor harderner Kg 5.000 11,200.00 56,000.00
JUMLAH HARGA BAHAN 56,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 80,960.00


E Overhead & Profit 10.00% 8,096.00
F Harga Satuan Pekerjaan (D+E) 89,056.00

A.4.4.3.62. Pemasangan 1 m’ plint vynil 15cm x 30cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.080 110,000.00 8,800.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 16,640.00
B BAHAN
Vynil buah 1.760 12,600.00 22,176.00
Lem Kg 0.080 25,300.00 2,024.00
JUMLAH HARGA BAHAN 24,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,840.00


E Overhead & Profit 10.00% 4,084.00
F Harga Satuan Pekerjaan (D+E) 44,924.00

A.4.4.3.63. Pemasangan 1 m’ plint kayu tebal 2 cm lebar 10 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang batu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Papan kayu kelas 1 M3 0.003 10,925,000.00 32,775.00
Paku/skrup 5 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 33,825.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,785.00


E Overhead & Profit 10.00% 5,878.50
F Harga Satuan Pekerjaan (D+E) 64,663.50

A.4.4.3.64. Pemasangan 1 m2 paving block natural tebal 6 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6 cm M2 1.010 57,500.00 58,075.00
Pasir beton M3 0.050 223,000.00 11,150.00
JUMLAH HARGA BAHAN 69,225.00
C PERALATAN

III - 928
Peralatan % 0.100 69,225.00 6,922.50
JUMLAH HARGA ALAT 6,922.50

D Jumlah (A+B+C) 157,303.50


E Overhead & Profit 10.00% 15,730.35
F Harga Satuan Pekerjaan (D+E) 173,033.85

III - 929
A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm natural M2 1.010 71,300.00 72,013.00
Pasir beton M3 2.070 223,000.00 461,610.00
JUMLAH HARGA BAHAN 533,623.00
C PERALATAN
Peralatan % 0.100 533,623.00 53,362.30
JUMLAH HARGA ALAT 53,362.30

D Jumlah (A+B+C) 688,141.30


E Overhead & Profit 10.00% 68,814.13
F Harga Satuan Pekerjaan (D+E) 756,955.43

A.4.4.3.66. Pemasangan 1 m2 paving block berwarna tebal 6 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 81,156.00
B BAHAN
Paving block 6cm berwarna M2 1.010 65,500.00 66,155.00
Pasir beton M3 0.050 223,000.00 11,150.00
JUMLAH HARGA BAHAN 77,305.00
C PERALATAN
Peralatan % 0.100 77,305.00 7,730.50
JUMLAH HARGA ALAT 7,730.50

D Jumlah (A+B+C) 166,191.50


E Overhead & Profit 10.00% 16,619.15
F Harga Satuan Pekerjaan (D+E) 182,810.65

A.4.4.3.67. Pemasangan 1 m2 paving block berwarna tebal 8 cm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 101,156.00
B BAHAN
Paving block 8 cm berwarna M2 1.010 79,300.00 80,093.00
Pasir beton M3 2.070 223,000.00 461,610.00
JUMLAH HARGA BAHAN 541,703.00
C PERALATAN
Peralatan % 0.100 541,703.00 54,170.30
JUMLAH HARGA ALAT 54,170.30

D Jumlah (A+B+C) 697,029.30


E Overhead & Profit 10.00% 69,702.93
F Harga Satuan Pekerjaan (D+E) 766,732.23

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA

III - 930
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang kayu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,420.00

III - 931
B BAHAN
Asbes semen m2 1.100 42,500.00 46,750.00
Paku tripleks kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 46,960.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 58,380.00


E Overhead & Profit 10.00% 5,838.00
F Harga Satuan Pekerjaan (D+E) 64,218.00

A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 12.000 58,600.00 703,200.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 704,250.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 729,210.00


E Overhead & Profit 10.00% 72,921.00
F Harga Satuan Pekerjaan (D+E) 802,131.00

A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Akustik Lembar 5.800 58,600.00 339,880.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 340,930.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 365,890.00


E Overhead & Profit 10.00% 36,589.00
F Harga Satuan Pekerjaan (D+E) 402,479.00

A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Akustik Lembar 1.500 58,600.00 87,900.00
Paku tripleks kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 88,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

III - 932
D Jumlah (A+B+C) 109,750.00
E Overhead & Profit 10.00% 10,975.00
F Harga Satuan Pekerjaan (D+E) 120,725.00

III - 933
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Tripleks Lembar 0.375 86,000.00 32,250.00
Paku tripleks kg 0.030 21,000.00 630.00
JUMLAH HARGA BAHAN 32,880.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 53,680.00


E Overhead & Profit 10.00% 5,368.00
F Harga Satuan Pekerjaan (D+E) 59,048.00

A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 166,400.00
B BAHAN
Kayu papan m3 0.015 3,636,000.00 54,540.00
Paku tripleks kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 54,750.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 221,150.00


E Overhead & Profit 10.00% 22,115.00
F Harga Satuan Pekerjaan (D+E) 243,265.00

A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Gypsum board Lembar 0.364 60,400.00 21,985.60
Paku skrup kg 0.110 21,000.00 2,310.00
JUMLAH HARGA BAHAN 24,295.60
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,995.60


E Overhead & Profit 10.00% 3,899.56
F Harga Satuan Pekerjaan (D+E) 42,895.16

A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)

III - 934
A TENAGA
Pekerja L.01 OH 0.500 80,000.00 40,000.00
Tukang besi L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 104,000.00

III - 935
B BAHAN
Profil Allum "T" m 3.600 113,800.00 409,680.00
Kawat Ø 4 mm kg 0.150 20,000.00 3,000.00
Ramset Buah 1.050 250.00 262.50
Akustik 60 x 120 Lembar 1.500 58,600.00 87,900.00
JUMLAH HARGA BAHAN 500,842.50
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 604,842.50


E Overhead & Profit 10.00% 60,484.25
F Harga Satuan Pekerjaan (D+E) 665,326.75

A.4.5.1.9. Pemasangan 1 m’ list langit-langit kayu profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.050 110,000.00 5,500.00
Kepala tukang L.03 OH 0.005 120,000.00 600.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 10,460.00
B BAHAN
List kayu profil m 1.05 5,500.00 5,775.00
Paku kg 0.010 21,000.00 210.00
JUMLAH HARGA BAHAN 5,985.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 16,445.00


E Overhead & Profit 10.00% 1,644.50
F Harga Satuan Pekerjaan (D+E) 18,089.50
A.4.5.1.10 Pemasangan 1 m2 rangka langit-langit besi hollow 40.40
Lihat pada kelompok Pekerjaan Besi dan Alumunium (A.9.21)

A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1. Pemasangan 1 m2 atap genteng palentong kecil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 900.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,110.00
B BAHAN
Genteng palentong buah 25.000 1,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,110.00


E Overhead & Profit 10.00% 4,711.00
F Harga Satuan Pekerjaan (D+E) 51,821.00

A.4.5.2.2. Pemasangan 1 m2 atap genteng kodok glazuur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng kodok buah 25.000 1,600.00 40,000.00
JUMLAH HARGA BAHAN 40,000.00

III - 936
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 62,170.00
E Overhead & Profit 10.00% 6,217.00
F Harga Satuan Pekerjaan (D+E) 68,387.00

III - 937
A.4.5.2.3. Pemasangan 1 m2 atap genteng palentong besar/super

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 22,170.00
B BAHAN
Genteng palentong buah 12.000 1,700.00 20,400.00
JUMLAH HARGA BAHAN 20,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,570.00


E Overhead & Profit 10.00% 4,257.00
F Harga Satuan Pekerjaan (D+E) 46,827.00

A.4.5.2.4. Pemasangan 1 m’ bubung genteng palentong

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung Buah 5.000 2,300.00 11,500.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 29,356.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 85,996.00


E Overhead & Profit 10.00% 8,599.60
F Harga Satuan Pekerjaan (D+E) 94,595.60

A.4.5.2.5. Pemasangan 1 m’ bubung genteng kodok glazuur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 5.000 4,600.00 23,000.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 40,856.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,496.00


E Overhead & Profit 10.00% 9,749.60
F Harga Satuan Pekerjaan (D+E) 107,245.60

III - 938
A.4.5.2.6. Pemasangan 1 m’ bubung genteng palentong besar

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 56,640.00
B BAHAN
Genteng bubung buah 4.000 6,900.00 27,600.00
Semen Portland Kg 8.000 1,420.00 11,360.00
Pasir pasang M3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 45,456.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 102,096.00


E Overhead & Profit 10.00% 10,209.60
F Harga Satuan Pekerjaan (D+E) 112,305.60

A.4.5.2.7. Pemasangan 1 m2 roof light fibreglass 90 x 180

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 110,000.00 7,370.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,250.00
B BAHAN
Rooflight 90 x 180 Lbr 0.600 71,300.00 42,780.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 43,830.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,080.00


E Overhead & Profit 10.00% 6,408.00
F Harga Satuan Pekerjaan (D+E) 70,488.00

A.4.5.2.8. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.500 36,800.00 18,400.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 20,920.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 42,290.00


E Overhead & Profit 10.00% 4,229.00
F Harga Satuan Pekerjaan (D+E) 46,519.00

A.4.5.2.9. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,25 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 939
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.11 OH 0.008 120,000.00 960.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 21,370.00

III - 940
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 24,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,970.00


E Overhead & Profit 10.00% 4,597.00
F Harga Satuan Pekerjaan (D+E) 50,567.00

A.4.5.2.10. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2,00 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.600 36,800.00 22,080.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 24,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,180.00


E Overhead & Profit 10.00% 4,518.00
F Harga Satuan Pekerjaan (D+E) 49,698.00

A.4.5.2.11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.750 36,800.00 27,600.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 30,120.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 50,700.00


E Overhead & Profit 10.00% 5,070.00
F Harga Satuan Pekerjaan (D+E) 55,770.00

A.4.5.2.12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.350 36,800.00 12,880.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 15,400.00
C PERALATAN

III - 941
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,980.00


E Overhead & Profit 10.00% 3,598.00
F Harga Satuan Pekerjaan (D+E) 39,578.00

III - 942
A.4.5.2.13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.420 36,800.00 15,456.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 17,976.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,556.00


E Overhead & Profit 10.00% 3,855.60
F Harga Satuan Pekerjaan (D+E) 42,411.60

A.4.5.2.14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.440 36,800.00 16,192.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 18,712.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,292.00


E Overhead & Profit 10.00% 3,929.20
F Harga Satuan Pekerjaan (D+E) 43,221.20

A.4.5.2.15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.510 36,800.00 18,768.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 21,288.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,868.00


E Overhead & Profit 10.00% 4,186.80
F Harga Satuan Pekerjaan (D+E) 46,054.80

A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00

III - 943
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00

III - 944
B BAHAN
Asbes gel 92 x 250 Lbr 0.800 36,800.00 29,440.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 31,960.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 52,540.00


E Overhead & Profit 10.00% 5,254.00
F Harga Satuan Pekerjaan (D+E) 57,794.00

A.4.5.2.17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.370 36,800.00 13,616.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 16,136.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 36,716.00


E Overhead & Profit 10.00% 3,671.60
F Harga Satuan Pekerjaan (D+E) 40,387.60

A.4.5.2.18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.380 36,800.00 13,984.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 16,504.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,084.00


E Overhead & Profit 10.00% 3,708.40
F Harga Satuan Pekerjaan (D+E) 40,792.40

A.4.5.2.19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.460 36,800.00 16,928.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 19,448.00
C PERALATAN

III - 945
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,028.00


E Overhead & Profit 10.00% 4,002.80
F Harga Satuan Pekerjaan (D+E) 44,030.80

III - 946
A.4.5.2.20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.490 36,800.00 18,032.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 20,552.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,132.00


E Overhead & Profit 10.00% 4,113.20
F Harga Satuan Pekerjaan (D+E) 45,245.20

A.4.5.2.21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Asbes gel 92 x 250 Lbr 0.570 36,800.00 20,976.00
Paku pancing 6 x 23 Kg 0.120 21,000.00 2,520.00
JUMLAH HARGA BAHAN 23,496.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,076.00


E Overhead & Profit 10.00% 4,407.60
F Harga Satuan Pekerjaan (D+E) 48,483.60

A.4.5.2.22. Pemasangan 1 m’ bubung stel gelombang 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.400 71,300.00 171,120.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 174,120.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 196,630.00


E Overhead & Profit 10.00% 19,663.00
F Harga Satuan Pekerjaan (D+E) 216,293.00

III - 947
A.4.5.2.23. Pemasangan 1 m’ bubung stel gelombang 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.100 71,300.00 149,730.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 152,730.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 175,240.00


E Overhead & Profit 10.00% 17,524.00
F Harga Satuan Pekerjaan (D+E) 192,764.00

A.4.5.2.24. Pemasangan 1 m’ bubung stel gelombang 1,08 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Bubung stel gel. Lbr 2.050 71,300.00 146,165.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 149,165.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 171,675.00


E Overhead & Profit 10.00% 17,167.50
F Harga Satuan Pekerjaan (D+E) 188,842.50

A.4.5.2.25. Pemasangan 1 m’ nok paten 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,070.00


E Overhead & Profit 10.00% 11,107.00
F Harga Satuan Pekerjaan (D+E) 122,177.00

A.4.5.2.26. Pemasangan 1 m’ nok paten 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00

III - 948
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00

III - 949
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,070.00


E Overhead & Profit 10.00% 11,107.00
F Harga Satuan Pekerjaan (D+E) 122,177.00

A.4.5.2.27. Pemasangan 1 m’ nok paten 1,08 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.200 71,300.00 85,560.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 88,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 111,070.00


E Overhead & Profit 10.00% 11,107.00
F Harga Satuan Pekerjaan (D+E) 122,177.00

A.4.5.2.28. Pemasangan 1 m’ nok stel rata 0,92 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 26,540.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 81,430.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 107,970.00


E Overhead & Profit 10.00% 10,797.00
F Harga Satuan Pekerjaan (D+E) 118,767.00

A.4.5.2.29. Pemasangan 1 m’ nok stel rata 1,05 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang kayu L.03 OH 0.125 110,000.00 13,750.00
Kepala tukang L.11 OH 0.013 120,000.00 1,560.00
Mandor L.15 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 22,510.00
B BAHAN
Nok paten 92 cm Lbr 1.100 71,300.00 78,430.00
Paku skrup 3,5” buah 6.000 500.00 3,000.00
JUMLAH HARGA BAHAN 81,430.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 950
D Jumlah (A+B+C) 103,940.00
E Overhead & Profit 10.00% 10,394.00
F Harga Satuan Pekerjaan (D+E) 114,334.00

III - 951
A.4.5.2.30. Pemasangan 1 m2 genteng beton

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 29,400.00
B BAHAN
Genteng beton buah 11.000 5,700.00 62,700.00
Paku biasa 2”-5” Kg 0.030 21,000.00 630.00
JUMLAH HARGA BAHAN 63,330.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,730.00


E Overhead & Profit 10.00% 9,273.00
F Harga Satuan Pekerjaan (D+E) 102,003.00

A.4.5.2.32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 1.300 55,200.00 71,760.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 75,960.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,280.00


E Overhead & Profit 10.00% 10,428.00
F Harga Satuan Pekerjaan (D+E) 114,708.00

A.4.5.2.33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.11 OH 0.010 120,000.00 1,200.00
Mandor L.15 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Genteng metal buah 2.000 55,200.00 110,400.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 114,600.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 142,920.00


E Overhead & Profit 10.00% 14,292.00
F Harga Satuan Pekerjaan (D+E) 157,212.00

III - 952
A.4.5.2.34. Pemasangan 1 m2 atap sirap kayu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.166 80,000.00 13,280.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 44,740.00
B BAHAN
Sirap kayu buah 30.000 1,900.00 57,000.00
Paku biasa ½”-1” Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 61,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 105,940.00


E Overhead & Profit 10.00% 10,594.00
F Harga Satuan Pekerjaan (D+E) 116,534.00

A.4.5.2.35. Pemasangan 1 m’ nok genteng beton

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.11 OH 0.020 120,000.00 2,400.00
Mandor L.15 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
Nok genteng beton buah 3.500 4,600.00 16,100.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
Semen PC Kg 10.800 1,420.00 15,336.00
Pasir pasang M3 0.032 203,000.00 6,496.00
Semen warna Kg 1.000 6,900.00 6,900.00
JUMLAH HARGA BAHAN 45,882.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 104,682.00


E Overhead & Profit 10.00% 10,468.20
F Harga Satuan Pekerjaan (D+E) 115,150.20

A.4.5.2.37. Pemasangan 1 m’ nok genteng metal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang kayu L.03 OH 0.150 110,000.00 16,500.00
Kepala tukang L.11 OH 0.015 120,000.00 1,800.00
Mandor L.15 OH 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 39,860.00
B BAHAN
Nok genteng metal buah 1.100 51,100.00 56,210.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 57,260.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,120.00


E Overhead & Profit 10.00% 9,712.00
F Harga Satuan Pekerjaan (D+E) 106,832.00

III - 953
A.4.5.2.38. Pemasangan 1 m’ nok sirap

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.125 80,000.00 10,000.00
Tukang kayu L.03 OH 0.250 110,000.00 27,500.00
Kepala tukang L.11 OH 0.025 120,000.00 3,000.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 41,220.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.400 84,000.00 33,600.00
Paku biasa ½”-1” Kg 0.050 21,000.00 1,050.00
Paku biasa 2”-5” Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 35,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,920.00


E Overhead & Profit 10.00% 7,692.00
F Harga Satuan Pekerjaan (D+E) 84,612.00

A.4.5.2.39. Pemasangan 1 m2 atap seng gelombang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.060 110,000.00 6,600.00
Kepala tukang L.11 OH 0.006 120,000.00 720.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 17,640.00
B BAHAN
Seng gel 3”x6” Lbr 0.700 84,000.00 58,800.00
Paku biasa ½”-1” Kg 0.020 21,000.00 420.00
JUMLAH HARGA BAHAN 59,220.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 76,860.00


E Overhead & Profit 10.00% 7,686.00
F Harga Satuan Pekerjaan (D+E) 84,546.00

A.4.5.2.40. Pemasangan 1 m’nok atap seng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.070 110,000.00 7,700.00
Kepala tukang L.11 OH 0.007 120,000.00 840.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 21,260.00
B BAHAN
Seng pelat 3”x6” bjls 28 Lbr 0.300 84,000.00 25,200.00
Paku biasa ½”-1” Kg 0.040 21,000.00 840.00
JUMLAH HARGA BAHAN 26,040.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 47,300.00


E Overhead & Profit 10.00% 4,730.00
F Harga Satuan Pekerjaan (D+E) 52,030.00

III - 954
A.4.5.2.41. Pemasangan 1 m2 atap alumunium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.750 110,000.00 82,500.00
Kepala tukang L.11 OH 0.080 120,000.00 9,600.00
Mandor L.15 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 104,820.00
B BAHAN
Aluminium gel tebal 0,55 Lbr 1.050 156,400.00 164,220.00
Paku hak panjang 15 cm Kg 0.020 21,000.00 420.00
JUMLAH HARGA BAHAN 164,640.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 269,460.00


E Overhead & Profit 10.00% 26,946.00
F Harga Satuan Pekerjaan (D+E) 296,406.00

A.4.5.2.43. Pemasangan 1 m2 alumunium foil/sisalation

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.050 110,000.00 5,500.00
Kepala tukang L.11 OH 0.005 120,000.00 600.00
Mandor L.15 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 19,060.00
B BAHAN
Aluminium foil M2 1.050 10,300.00 10,815.00
JUMLAH HARGA BAHAN 10,815.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 29,875.00


E Overhead & Profit 10.00% 2,987.50
F Harga Satuan Pekerjaan (D+E) 32,862.50

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.000 80,000.00 560,000.00
Tukang kayu L.03 OH 21.000 110,000.00 2,310,000.00
Kepala tukang L.03 OH 2.100 120,000.00 252,000.00
Mandor L.04 OH 0.350 120,000.00 42,000.00
JUMLAH TENAGA KERJA 3,164,000.00
B BAHAN
Balok kayu m3 1.100 10,925,000.00 12,017,500.00
Paku 10 cm Kg 1.250 21,000.00 26,250.00
Lem kayu Kg 1.000 34,400.00 34,400.00
JUMLAH HARGA BAHAN 12,078,150.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,242,150.00


E Overhead & Profit 10.00% 1,524,215.00
F Harga Satuan Pekerjaan (D+E) 16,766,365.00

III - 955
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.000 80,000.00 480,000.00
Tukang kayu L.03 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 120,000.00 36,000.00
JUMLAH TENAGA KERJA 2,712,000.00
B BAHAN
Balok kayu m3 1.200 3,636,000.00 4,363,200.00
Paku 10 cm Kg 1.250 21,000.00 26,250.00
Lem kayu Kg 1.000 34,400.00 34,400.00
JUMLAH HARGA BAHAN 4,423,850.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 7,135,850.00


E Overhead & Profit 10.00% 713,585.00
F Harga Satuan Pekerjaan (D+E) 7,849,435.00

A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Paku 5 – 7 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 201,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 359,310.00


E Overhead & Profit 10.00% 35,931.00
F Harga Satuan Pekerjaan (D+E) 395,241.00

A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 80,000.00 28,000.00
Tukang kayu L.03 OH 1.050 110,000.00 115,500.00
Kepala tukang L.03 OH 0.105 120,000.00 12,600.00
Mandor L.04 OH 0.018 120,000.00 2,160.00
JUMLAH TENAGA KERJA 158,260.00
B BAHAN
Papan kayu m3 0.040 3,636,000.00 145,440.00
Paku 5 – 7 cm Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 146,490.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 304,750.00


E Overhead & Profit 10.00% 30,475.00
F Harga Satuan Pekerjaan (D+E) 335,225.00

III - 956
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.040 5,000,000.00 200,000.00
Lem kayu Kg 0.500 34,400.00 17,200.00
JUMLAH HARGA BAHAN 217,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 669,200.00


E Overhead & Profit 10.00% 66,920.00
F Harga Satuan Pekerjaan (D+E) 736,120.00

A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.024 5,000,000.00 120,000.00
Lem kayu Kg 0.300 34,400.00 10,320.00
JUMLAH HARGA BAHAN 130,320.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 491,920.00


E Overhead & Profit 10.00% 49,192.00
F Harga Satuan Pekerjaan (D+E) 541,112.00

A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang kayu L.03 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 452,000.00
B BAHAN
Papan kayu m3 0.064 5,000,000.00 320,000.00
Lem kayu Kg 0.500 34,400.00 17,200.00
JUMLAH HARGA BAHAN 337,200.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 789,200.00
E Overhead & Profit 10.00% 78,920.00
F Harga Satuan Pekerjaan (D+E) 868,120.00

A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 957
Pekerja L.01 OH 0.700 80,000.00 56,000.00
Tukang kayu L.03 OH 2.100 110,000.00 231,000.00
Kepala tukang L.03 OH 0.210 120,000.00 25,200.00
Mandor L.04 OH 0.035 120,000.00 4,200.00
JUMLAH TENAGA KERJA 316,400.00

III - 958
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 cm – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.500 34,400.00 17,200.00
Plywood tebal 4 mm Lembar 1.000 106,000.00 106,000.00
Ukuran (90 x 220) cm
JUMLAH HARGA BAHAN 248,830.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 565,230.00


E Overhead & Profit 10.00% 56,523.00
F Harga Satuan Pekerjaan (D+E) 621,753.00

A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.80 80,000.00 64,000.00
Tukang kayu L.03 OH 2.40 110,000.00 264,000.00
Kepala tukang L.03 OH 0.24 120,000.00 28,800.00
Mandor L.04 OH 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00
B BAHAN
Papan kayu m3 0.026 5,000,000.00 128,000.00
Paku 1 cm – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.500 34,400.00 17,200.00
Plywood 4 mm Lembar 1.000 106,000.00 106,000.00
(90 x 220) cm
JUMLAH HARGA BAHAN 251,830.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 613,430.00


E Overhead & Profit 10.00% 61,343.00
F Harga Satuan Pekerjaan (D+E) 674,773.00

A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.670 80,000.00 53,600.00
Tukang kayu L.03 OH 2.000 110,000.00 220,000.00
Kepala tukang L.03 OH 0.200 120,000.00 24,000.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 337,800.00
B BAHAN
Papan kayu m3 0.060 5,000,000.00 300,000.00
Paku 1 – 2,5 cm kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 303,150.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 640,950.00


E Overhead & Profit 10.00% 64,095.00
F Harga Satuan Pekerjaan (D+E) 705,045.00

A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang kayu L.03 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 120,000.00 4,800.00
JUMLAH TENAGA KERJA 361,600.00

III - 959
B BAHAN
Papan kayu m3 0.025 10,925,000.00 273,125.00
Paku 1 – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.300 34,400.00 10,320.00
Teakwood 4 mm Lembar 1.000 74,700.00 74,700.00
90 x 220 cm
JUMLAH HARGA BAHAN 358,775.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 720,375.00


E Overhead & Profit 10.00% 72,037.50
F Harga Satuan Pekerjaan (D+E) 792,412.50

A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.850 80,000.00 68,000.00
Tukang kayu L.03 OH 2.550 110,000.00 280,500.00
Kepala tukang L.03 OH 0.255 120,000.00 30,600.00
Mandor L.04 OH 0.043 120,000.00 5,160.00
JUMLAH TENAGA KERJA 384,260.00
B BAHAN
Papan kayu m3 0.025 5,000,000.00 125,000.00
Paku 1 – 2,5 cm kg 0.030 21,000.00 630.00
Lem kayu kg 0.800 34,400.00 27,520.00
Teakwood 4 mm Lembar 1.000 74,700.00 74,700.00
90 x 220 cm
Formika Lembar 0.500 227,850.00
JUMLAH HARGA BAHAN
C PERALATAN -
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 612,110.00
E Overhead & Profit 10.00% 61,211.00
F Harga Satuan Pekerjaan (D+E) 673,321.00

A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.000 80,000.00 320,000.00
Tukang kayu L.03 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.200 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,808,000.00
B BAHAN
Balok kayu m3 1.100 3,636,000.00 3,999,600.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 5.600 21,000.00 117,600.00
JUMLAH HARGA BAHAN 4,354,200.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 6,162,200.00
E Overhead & Profit 10.00% 616,220.00
F Harga Satuan Pekerjaan (D+E) 6,778,420.00

A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.200 10,925,000.00 13,110,000.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 5.600 21,000.00 117,600.00

III - 960
JUMLAH HARGA BAHAN 13,464,600.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 16,493,000.00
E Overhead & Profit 10.00% 1,649,300.00
F Harga Satuan Pekerjaan (D+E) 18,142,300.00

III - 961
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.700 80,000.00 536,000.00
Tukang kayu L.03 OH 20.100 110,000.00 2,211,000.00
Kepala tukang L.03 OH 2.010 120,000.00 241,200.00
Mandor L.04 OH 0.335 120,000.00 40,200.00
JUMLAH TENAGA KERJA 3,028,400.00
B BAHAN
Balok kayu m3 1.100 5,000,000.00 5,500,000.00
Besi strip tebal 5 mm kg 15.000 15,800.00 237,000.00
Paku 12 cm kg 3.000 21,000.00 63,000.00
JUMLAH HARGA BAHAN 5,800,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,828,400.00


E Overhead & Profit 10.00% 882,840.00
F Harga Satuan Pekerjaan (D+E) 9,711,240.00

A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng 2 x 3 cm m3 0.036 40,200.00 1,447.20
Paku 5 dan 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 76,697.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 97,497.20


E Overhead & Profit 10.00% 9,749.72
F Harga Satuan Pekerjaan (D+E) 107,246.92

A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 20,800.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.014 5,000,000.00 70,000.00
Reng (3 x 4) cm m3 0.057 40,200.00 2,291.40
Paku 5 dan 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 77,541.40
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 98,341.40


E Overhead & Profit 10.00% 9,834.14
F Harga Satuan Pekerjaan (D+E) 108,175.54

III - 962
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.120 80,000.00 9,600.00
Tukang kayu L.03 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 24,960.00
B BAHAN
Kayu kelas II m3 0.014 5,000,000.00 70,000.00
Paku 5 - 10 cm m3 0.057 21,000.00 1,197.00
JUMLAH HARGA BAHAN 71,197.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 96,157.00


E Overhead & Profit 10.00% 9,615.70
F Harga Satuan Pekerjaan (D+E) 105,772.70

A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 57,600.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.015 5,000,000.00 77,000.00
Paku 7 cm – 10 cm kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 81,200.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 138,800.00


E Overhead & Profit 10.00% 13,880.00
F Harga Satuan Pekerjaan (D+E) 152,680.00

A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 53,800.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 5,000,000.00 81,500.00
Paku 7 – 10 cm kg 0.250 21,000.00 5,250.00
JUMLAH HARGA BAHAN 86,750.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 140,550.00


E Overhead & Profit 10.00% 14,055.00
F Harga Satuan Pekerjaan (D+E) 154,605.00

A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00

III - 963
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00

III - 964
B BAHAN
Papan kayu m3 0.011 5,000,000.00 54,000.00
Paku 5 dan 7 cm kg 0.100 21,000.00 2,100.00
JUMLAH HARGA BAHAN 56,100.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,100.00


E Overhead & Profit 10.00% 8,910.00
F Harga Satuan Pekerjaan (D+E) 98,010.00

A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.03 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
Papan kayu m3 0.011 5,000,000.00 55,000.00
Paku 5 dan 7 cm kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 56,050.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 89,050.00


E Overhead & Profit 10.00% 8,905.00
F Harga Satuan Pekerjaan (D+E) 97,955.00

A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang kayu L.03 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 67,860.00
B BAHAN
Balok kayu m3 0.028 3,636,000.00 101,808.00
Paku 5 dan 7 cm kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 104,958.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 172,818.00
E Overhead & Profit 10.00% 17,281.80
F Harga Satuan Pekerjaan (D+E) 190,099.80

A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang kayu L.03 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.010 120,000.00 1,200.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Balok kayu, 6 x 12 m3 0.028 5,000,000.00 140,000.00
Paku 5 dan 10 kg 0.150 21,000.00 3,150.00
Plywood 4 mm, Lembar 0.860 106,000.00 91,160.00
120 x 240
Lem kayu kg 0.560 34,400.00 19,264.00

III - 965
JUMLAH HARGA BAHAN 253,574.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 343,974.00
E Overhead & Profit 10.00% 34,397.40
F Harga Satuan Pekerjaan (D+E) 378,371.40

III - 966
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 80,000.00 48,000.00
Tukang kayu L.03 OH 1.800 110,000.00 198,000.00
Kepala tukang L.03 OH 0.180 120,000.00 21,600.00
Mandor L.04 OH 0.030 120,000.00 3,600.00
JUMLAH TENAGA KERJA 271,200.00
B BAHAN
Papan kayu m3 0.007 10,925,000.00 76,475.00
Paku 5 dan 10 kg 0.100 21,000.00 2,100.00
Paku skrup 10 cm kg 0.150 21,000.00 3,150.00
JUMLAH HARGA BAHAN 81,725.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 352,925.00


E Overhead & Profit 10.00% 35,292.50
F Harga Satuan Pekerjaan (D+E) 388,217.50

A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.03 OH 0.075 110,000.00 8,250.00
Kepala tukang L.03 OH 0.008 120,000.00 960.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 11,330.00
B BAHAN
Plywood 4 mm m3 0.400 106,000.00 42,400.00
Paku 1 dan 2,5 kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 43,450.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 54,780.00


E Overhead & Profit 10.00% 5,478.00
F Harga Satuan Pekerjaan (D+E) 60,258.00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.1. Pemasangan 1 buah kunci tanam antik

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Kunci tanam antik buah 1.000 255,300.00 255,300.00
JUMLAH HARGA BAHAN 255,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 333,660.00


E Overhead & Profit 10.00% 33,366.00
F Harga Satuan Pekerjaan (D+E) 367,026.00

III - 967
A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 62,400.00
B BAHAN
Kunci tanam biasa buah 1.000 143,750.00 143,750.00
JUMLAH HARGA BAHAN 143,750.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 206,150.00
E Overhead & Profit 10.00% 20,615.00
F Harga Satuan Pekerjaan (D+E) 226,765.00

A.4.6.2.3. Pemasangan 1 buah kunci kamar mandi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci tanam KM buah 1.000 51,700.00 51,700.00
JUMLAH HARGA BAHAN 51,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 113,460.00


E Overhead & Profit 10.00% 11,346.00
F Harga Satuan Pekerjaan (D+E) 124,806.00

A.4.6.2.4. Pemasangan 1 buah kunci silinder

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.005 80,000.00 400.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 61,760.00
B BAHAN
Kunci silinder buah 1.000 80,500.00 80,500.00
JUMLAH HARGA BAHAN 80,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 142,260.00


E Overhead & Profit 10.00% 14,226.00
F Harga Satuan Pekerjaan (D+E) 156,486.00

A.4.6.2.5. Pemasangan 1 buah engsel pintu

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Engsel pintu buah 1.000 69,000.00 69,000.00
JUMLAH HARGA BAHAN 69,000.00

III - 968
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 88,596.00


E Overhead & Profit 10.00% 8,859.60
F Harga Satuan Pekerjaan (D+E) 97,455.60

III - 969
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 13,060.00
B BAHAN
Engsel kupu-kupu buah 1.000 28,700.00 28,700.00
JUMLAH HARGA BAHAN 28,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 41,760.00


E Overhead & Profit 10.00% 4,176.00
F Harga Satuan Pekerjaan (D+E) 45,936.00

A.4.6.2.7. Pemasangan 1 buah engsel angin

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 60.00
JUMLAH TENAGA KERJA 32,460.00
B BAHAN
Engsel angin buah 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 23,000.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,460.00


E Overhead & Profit 10.00% 5,546.00
F Harga Satuan Pekerjaan (D+E) 61,006.00

A.4.6.2.8. Pemasangan 1 buah spring knip

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Spring knip buah 1.000 25,300.00 25,300.00
JUMLAH HARGA BAHAN 25,300.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 45,760.00


E Overhead & Profit 10.00% 4,576.00
F Harga Satuan Pekerjaan (D+E) 50,336.00

A.4.6.2.9. Pemasangan 1 buah kait angin

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kait angin buah 1.000 8,650.00 8,650.00
JUMLAH HARGA BAHAN 8,650.00

III - 970
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 29,110.00


E Overhead & Profit 10.00% 2,911.00
F Harga Satuan Pekerjaan (D+E) 32,021.00

III - 971
A.4.6.2.10. Pemasangan 1 buah door closer

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door closer set 1.000 322,000.00 322,000.00
JUMLAH HARGA BAHAN 322,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 387,360.00


E Overhead & Profit 10.00% 38,736.00
F Harga Satuan Pekerjaan (D+E) 426,096.00

A.4.6.2.11. Pemasangan 1 buah kunci slot (grendel)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 26,120.00
B BAHAN
Kunci slot buah 1.000 13,800.00 13,800.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,920.00


E Overhead & Profit 10.00% 3,992.00
F Harga Satuan Pekerjaan (D+E) 43,912.00

A.4.6.2.12. Pemasangan 1 buah door holder

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang kayu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 65,360.00
B BAHAN
Door holder buah 1.000 26,400.00 26,400.00
JUMLAH HARGA BAHAN 26,400.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 91,760.00


E Overhead & Profit 10.00% 9,176.00
F Harga Satuan Pekerjaan (D+E) 100,936.00

A.4.6.2.13. Pemasangan 1 buah door stop

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00

III - 972
Tukang kayu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00

III - 973
B BAHAN
Door stop buah 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,600.00


E Overhead & Profit 10.00% 5,960.00
F Harga Satuan Pekerjaan (D+E) 65,560.00

A.4.6.2.14. Pemasangan 1 buah rel pintu sorong

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang kayu L.02 OH 0.600 110,000.00 66,000.00
Kepala tukang L.03 OH 0.060 120,000.00 7,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 78,360.00
B BAHAN
Rel pintu sorong Set 1.000 402,500.00 402,500.00
JUMLAH HARGA BAHAN 402,500.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 480,860.00


E Overhead & Profit 10.00% 48,086.00
F Harga Satuan Pekerjaan (D+E) 528,946.00

A.4.6.2.15. Pemasangan 1 buah kunci lemari

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 32,620.00
B BAHAN
Kunci lemari Set 1.000 163,300.00 163,300.00
JUMLAH HARGA BAHAN 163,300.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 195,920.00


E Overhead & Profit 10.00% 19,592.00
F Harga Satuan Pekerjaan (D+E) 215,512.00

A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 3 mm m2 1.100 72,750.00 80,025.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 82,225.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 974
D Jumlah (A+B+C) 101,821.00
E Overhead & Profit 10.00% 10,182.10
F Harga Satuan Pekerjaan (D+E) 112,003.10

III - 975
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.001 120,000.00 96.00
JUMLAH TENAGA KERJA 19,596.00
B BAHAN
Kaca tebal 5 mm m2 1.100 86,250.00 94,875.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 97,075.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 116,671.00


E Overhead & Profit 10.00% 11,667.10
F Harga Satuan Pekerjaan (D+E) 128,338.10

A.4.6.2.18. Pemasangan 1 m2 kaca tebal 8 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.001 120,000.00 108.00
JUMLAH TENAGA KERJA 22,208.00
B BAHAN
Kaca tebal 8 mm m2 1.100 172,500.00 189,750.00
Sealant Kg 0.070 44,000.00 3,080.00
JUMLAH HARGA BAHAN 192,830.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 215,038.00


E Overhead & Profit 10.00% 21,503.80
F Harga Satuan Pekerjaan (D+E) 236,541.80

A.4.6.2.19. Pemasangan 1 m2 kaca buram tebal 12 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang kayu L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 32,656.00
B BAHAN
Kaca buram 12 mm m2 1.100 414,600.00 456,060.00
Sealant Kg 0.070 44,000.00 3,080.00
JUMLAH HARGA BAHAN 459,140.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 491,796.00


E Overhead & Profit 10.00% 49,179.60
F Harga Satuan Pekerjaan (D+E) 540,975.60

A.4.6.2.20. Pemasangan 1 m2 kaca cermin tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 976
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00

III - 977
B BAHAN
Kaca cermin 5 mm m2 1.100 155,200.00 170,720.00
JUMLAH HARGA BAHAN 170,720.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 191,180.00


E Overhead & Profit 10.00% 19,118.00
F Harga Satuan Pekerjaan (D+E) 210,298.00

A.4.6.2.21. Pemasangan 1 m2 kaca cermin tebal 8 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.017 80,000.00 1,360.00
Tukang kayu L.02 OH 0.170 110,000.00 18,700.00
Kepala tukang L.03 OH 0.017 120,000.00 2,040.00
Mandor L.04 OH 0.009 120,000.00 1,080.00
JUMLAH TENAGA KERJA 23,180.00
B BAHAN
Kaca cermin 8 mm m2 1.100 296,400.00 326,040.00
JUMLAH HARGA BAHAN 326,040.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 349,220.00


E Overhead & Profit 10.00% 34,922.00
F Harga Satuan Pekerjaan (D+E) 384,142.00

A.4.6.2.22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015 80,000.00 1,200.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 20,460.00
B BAHAN
Kaca wireglassed 5 mm m2 1.100 241,500.00 265,650.00
JUMLAH HARGA BAHAN 265,650.00

C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 286,110.00


E Overhead & Profit 10.00% 28,611.00
F Harga Satuan Pekerjaan (D+E) 314,721.00

A.4.6.2.23. Pemasangan 1 m2 kaca patri tebal 5 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.075 80,000.00 6,000.00
Tukang kayu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 24,780.00
B BAHAN
Kaca patri 5mm m2 1.100 2,300,000.00 2,530,000.00
Sealant Kg 0.050 44,000.00 2,200.00
JUMLAH HARGA BAHAN 2,532,200.00

C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,556,980.00

III - 978
E Overhead & Profit 10.00% 255,698.00
F Harga Satuan Pekerjaan (D+E) 2,812,678.00

III - 979
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Soda api Kg 0.050 28,700.00 1,435.00
JUMLAH HARGA BAHAN 1,435.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,795.00


E Overhead & Profit 10.00% 1,379.50
F Harga Satuan Pekerjaan (D+E) 15,174.50

A.4.7.1.2. 1 m2 Pencucian bidang permukaan tembok yang pernah dicat


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,360.00
B BAHAN
Sabun Kg 0.050 12,600.00 630.00
JUMLAH HARGA BAHAN 630.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 12,990.00


E Overhead & Profit 10.00% 1,299.00
F Harga Satuan Pekerjaan (D+E) 14,289.00

A.4.7.1.3. 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Mandor L.04 OH 0.008 120,000.00 960.00
JUMLAH TENAGA KERJA 12,960.00
B BAHAN
Sabun Kg 0.050 12,600.00 630.00
JUMLAH HARGA BAHAN 630.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 13,590.00


E Overhead & Profit 10.00% 1,359.00
F Harga Satuan Pekerjaan (D+E) 14,949.00

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.009 110,000.00 990.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,670.00
B BAHAN
Cat menie Kg 0.200 38,000.00 7,600.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 38,000.00 6,460.00
Cat penutup (setara avian) Kg 0.260 55,200.00 14,352.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 33,528.00
C PERALATAN
JUMLAH HARGA ALAT -

III - 980
D Jumlah (A+B+C) 41,198.00
E Overhead & Profit 10.00% 4,119.80
F Harga Satuan Pekerjaan (D+E) 45,317.80

III - 981
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang cat L.02 OH 0.105 110,000.00 11,550.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 17,990.00
B BAHAN
Cat menie Kg 0.200 38,000.00 7,600.00
Plamuur Kg 0.150 23,000.00 3,450.00
Cat dasar Kg 0.170 38,000.00 6,460.00
Cat penutup (setara avian) Kg 0.350 55,200.00 19,320.00
Kuas buah 0.010 13,800.00 138.00
Pengencer Kg 0.030 27,600.00 828.00
Ampelas Lbr 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 38,496.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 56,486.00
E Overhead & Profit 10.00% 5,648.60
F Harga Satuan Pekerjaan (D+E) 62,134.60

A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.063 120,000.00 7,560.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 18,050.00
B BAHAN
Teak oil L 0.360 34,800.00 12,528.00
JUMLAH HARGA BAHAN 12,528.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,578.00


E Overhead & Profit 10.00% 3,057.80
F Harga Satuan Pekerjaan (D+E) 33,635.80

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,080.00
B BAHAN
Politur L 0.150 43,600.00 6,540.00
Politur jadi L 0.372 49,600.00 18,451.20
Ampelas Lbr 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 31,991.20
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 44,071.20


E Overhead & Profit 10.00% 4,407.12
F Harga Satuan Pekerjaan (D+E) 48,478.32

III - 982
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Mandor L.04 OH 0.006 120,000.00 720.00
JUMLAH TENAGA KERJA 8,720.00
B BAHAN
Residu atau ter L 0.350 31,600.00 11,060.00
JUMLAH HARGA BAHAN 11,060.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 19,780.00


E Overhead & Profit 10.00% 1,978.00
F Harga Satuan Pekerjaan (D+E) 21,758.00

A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.160 80,000.00 12,800.00
Tukang cat L.02 OH 0.160 110,000.00 17,600.00
Kepala tukang L.03 OH 0.016 120,000.00 1,920.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 32,680.00
B BAHAN
Vernis L 0.150 39,800.00 5,970.00
Dempul Kg 0.050 21,275.00 1,063.75
Ampelas Lbr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 7,383.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 40,063.75


E Overhead & Profit 10.00% 4,006.38
F Harga Satuan Pekerjaan (D+E) 44,070.13

A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.063 110,000.00 6,930.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,646.00
B BAHAN
Plamuur Kg 0.100 80,500.00 8,050.00
Cat dasar Kg 0.100 38,000.00 3,800.00
Cat penutup Kg 0.260 28,750.00 7,475.00
JUMLAH HARGA BAHAN 19,325.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,971.00


E Overhead & Profit 10.00% 2,897.10
F Harga Satuan Pekerjaan (D+E) 31,868.10

A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00

III - 983
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00

III - 984
B BAHAN
Cat dasar Kg 0.120 38,000.00 4,560.00
Cat penutup Kg 0.180 28,750.00 5,175.00
JUMLAH HARGA BAHAN 9,735.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 17,459.00


E Overhead & Profit 10.00% 1,745.90
F Harga Satuan Pekerjaan (D+E) 19,204.90

A.4.7.1.12. Pelaburan 1 m2 tembok dengan kalkarium

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028 80,000.00 2,240.00
Tukang cat L.02 OH 0.042 110,000.00 4,620.00
Kepala tukang L.03 OH 0.004 120,000.00 504.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 7,724.00
B BAHAN
Kalkarium Kg 0.100 21,300.00 2,130.00
JUMLAH HARGA BAHAN 2,130.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 9,854.00


E Overhead & Profit 10.00% 985.40
F Harga Satuan Pekerjaan (D+E) 10,839.40

A.4.7.1.13. Pelaburan 1 m2 tembok dengan kapur sirih

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.150 80,000.00 12,000.00
Tukang cat L.02 OH 0.001 110,000.00 110.00
Kepala tukang L.03 OH 0.000 120,000.00 12.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 12,422.00
B BAHAN
Kapur sirih Kg 0.150 2,300.00 345.00
Ampelas Lbr 0.100 3,500.00 350.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 3,570.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 15,992.00


E Overhead & Profit 10.00% 1,599.20
F Harga Satuan Pekerjaan (D+E) 17,591.20

A.4.7.1.14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.040 80,000.00 3,200.00
Tukang cat L.02 OH 0.005 110,000.00 550.00
Kepala tukang L.03 OH 0.001 120,000.00 60.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 4,110.00
B BAHAN
Kapur sirih Kg 0.300 2,300.00 690.00
Ampelas Lbr 0.200 3,500.00 700.00
Alang-alang Ikat 0.250 11,500.00 2,875.00
JUMLAH HARGA BAHAN 4,265.00
C PERALATAN

III - 985
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 8,375.00


E Overhead & Profit 10.00% 837.50
F Harga Satuan Pekerjaan (D+E) 9,212.50

III - 986
A.4.7.1.15. Pemasangan 1 m2 wallpaper

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Wall paper m2 1.200 80,500.00 96,600.00
Lem Kg 0.200 25,300.00 5,060.00
JUMLAH HARGA BAHAN 101,660.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 127,960.00


E Overhead & Profit 10.00% 12,796.00
F Harga Satuan Pekerjaan (D+E) 140,756.00

A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 80,000.00 1,600.00
Tukang cat L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.003 120,000.00 300.00
JUMLAH TENAGA KERJA 26,300.00
B BAHAN
Menie besi Kg 0.100 38,000.00 3,800.00
Kwas buah 0.010 13,800.00 138.00
JUMLAH HARGA BAHAN 3,938.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 30,238.00


E Overhead & Profit 10.00% 3,023.80
F Harga Satuan Pekerjaan (D+E) 33,261.80

A.4.7.1.17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang cat L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.02 OH 0.023 120,000.00 2,700.00
Mandor L.04 OH 0.008 120,000.00 900.00
JUMLAH TENAGA KERJA 48,350.00
B BAHAN
Menie besi Kg 0.100 38,000.00 3,800.00
Pengencer L 0.010 27,600.00 276.00
Kwas buah 0.010 13,800.00 138.00
Perancah kayu m3 0.002 3,636,000.00 7,272.00
JUMLAH HARGA BAHAN 11,486.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 59,836.00


E Overhead & Profit 10.00% 5,983.60
F Harga Satuan Pekerjaan (D+E) 65,819.60

A.4.7.1.18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 80,000.00 20,000.00

III - 987
Tukang cat L.02 OH 0.250 110,000.00 27,500.00
Kepala tukang L.03 OH 0.025 120,000.00 3,000.00
Mandor L.04 OH 0.001 120,000.00 156.00
JUMLAH TENAGA KERJA 50,656.00

III - 988
B BAHAN
Menie A Kg 0.100 38,000.00 3,800.00
Menie B Kg 0.100 38,000.00 3,800.00
Cat Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 13,074.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 63,730.00


E Overhead & Profit 10.00% 6,373.00
F Harga Satuan Pekerjaan (D+E) 70,103.00

A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang cat L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Cat Kg 0.300 63,250.00 18,975.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 19,389.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 32,589.00


E Overhead & Profit 10.00% 3,258.90
F Harga Satuan Pekerjaan (D+E) 35,847.90

A.4.7.1.20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.800 110,000.00 88,000.00
Kepala tukang L.03 OH 0.080 120,000.00 9,600.00
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 132,000.00
B BAHAN
Cat dasar Kg 0.110 38,000.00 4,180.00
Cat antara Kg 0.170 40,200.00 6,834.00
Cat penutup Kg 0.080 63,250.00 5,060.00
Kwas buah 0.010 13,800.00 138.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 16,488.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 148,488.00


E Overhead & Profit 10.00% 14,848.80
F Harga Satuan Pekerjaan (D+E) 163,336.80

A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.400 80,000.00 32,000.00
Tukang cat L.02 OH 0.700 110,000.00 77,000.00
Kepala tukang L.03 OH 0.070 120,000.00 8,400.00

III - 989
Mandor L.04 OH 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 119,800.00
B BAHAN
Cat dasar Kg 0.300 38,000.00 11,400.00
Pengencer L 0.010 27,600.00 276.00
JUMLAH HARGA BAHAN 11,676.00

III - 990
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 131,476.00


E Overhead & Profit 10.00% 13,147.60
F Harga Satuan Pekerjaan (D+E) 144,623.60

A.4.7.1.22. Plituran 10 m2 dengan plitur melamic

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 80,000.00 160,000.00
Tukang cat L.02 OH 12.000 110,000.00 1,320,000.00
Kepala tukang L.03 OH 1.200 120,000.00 144,000.00
Mandor L.04 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 1,636,000.00
B BAHAN
Wood filler kg 1.500 29,900.00 44,850.00
Woodstain kg 1.500 54,000.00 81,000.00
Sanding kg 1.500 55,200.00 82,800.00
Melamic kg 2.400 50,000.00 120,000.00
Thinner L 2.000 13,200.00 26,400.00
Ampelas Lbr 6.000 3,500.00 21,000.00
Lbr JUMLAH HARGA BAHAN 376,050.00
C PERALATAN
Compressor jam 78,556.50 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 2,012,050.00


E Overhead & Profit 10.00% 201,205.00
F Harga Satuan Pekerjaan (D+E) 2,213,255.00

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 80,000.00 264,000.00
Tukang batu L.02 OH 1.100 110,000.00 121,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 405,400.00
B BAHAN
Closet duduk Unit 1.000 1,422,550.00 1,422,550.00
Perlengkapan Ls 6% x closet 85,353.00 85,353.00
JUMLAH HARGA BAHAN 1,507,903.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,913,303.00


E Overhead & Profit 10.00% 191,330.30
F Harga Satuan Pekerjaan (D+E) 2,104,633.30

A.5.1.1 2. Pemasangan 1 buah closet jongkok porselen

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.160 120,000.00 19,200.00
JUMLAH TENAGA KERJA 282,200.00
B BAHAN
Closet jongkok Unit 1.000 161,000.00 161,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
JUMLAH HARGA BAHAN 171,550.00
C PERALATAN

III - 991
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 453,750.00


E Overhead & Profit 10.00% 45,375.00
F Harga Satuan Pekerjaan (D+E) 499,125.00

III - 992
A.5.1.1 3. Pemasangan 1 buah closet jongkok teraso

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 269,000.00
B BAHAN
Closet jongkok Unit 1.000 115,000.00 115,000.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Bata merah buah 7.000 900.00 6,300.00
JUMLAH HARGA BAHAN 131,850.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 400,850.00


E Overhead & Profit 10.00% 40,085.00
F Harga Satuan Pekerjaan (D+E) 440,935.00

A.5.1.1 4. (K3) Pemasangan 1 buah urinoir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Tukang batu L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 208,000.00
B BAHAN
Urinoir Unit 1.000 746,300.00 746,300.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Perlengkapan % 0.300 223,890.00 223,890.00
JUMLAH HARGA BAHAN 980,740.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,188,740.00


E Overhead & Profit 10.00% 118,874.00
F Harga Satuan Pekerjaan (D+E) 1,307,614.00

A.5.1.1 5. (K3) Pemasangan 1 buah wastafel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.200 80,000.00 96,000.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 120,000.00 7,200.00
JUMLAH TENAGA KERJA 280,700.00
B BAHAN
Wastafel Unit 1.200 788,900.00 946,680.00
Semen Portland Kg 6.000 1,420.00 8,520.00
Pasir pasang M3 0.010 203,000.00 2,030.00
Perlengkapan % 0.120 113,601.60 113,601.60
JUMLAH HARGA BAHAN 1,070,831.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,351,531.60


E Overhead & Profit 10.00% 135,153.16
F Harga Satuan Pekerjaan (D+E) 1,486,684.76

III - 993
A.5.1.1 7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,132,360.00


E Overhead & Profit 10.00% 113,236.00
F Harga Satuan Pekerjaan (D+E) 1,245,596.00

A.5.1.1 9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.000 80,000.00 240,000.00
Tukang batu L.02 OH 4.500 110,000.00 495,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.900 120,000.00 108,000.00
JUMLAH TENAGA KERJA 849,000.00
B BAHAN
Bak fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan Ls 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,132,360.00


E Overhead & Profit 10.00% 113,236.00
F Harga Satuan Pekerjaan (D+E) 1,245,596.00

A.5.1.1 10. Pemasangan 1 buah bak air fiberglass vol 1 m3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 80,700.00
B BAHAN
Bak air fiberglass Unit 1.000 253,000.00 253,000.00
Perlengkapan % 0.120 30,360.00 30,360.00
JUMLAH HARGA BAHAN 283,360.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 364,060.00


E Overhead & Profit 10.00% 36,406.00
F Harga Satuan Pekerjaan (D+E) 400,466.00

A.5.1.1 12. Pemasangan 1 buah bak cuci piring stainlessteel

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 994
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.300 110,000.00 33,000.00
Kepala tukang L.03 OH 0.030 120,000.00 3,600.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 40,800.00

III - 995
B BAHAN
Bak cuci piring Unit 1.000 460,000.00 460,000.00
Waterdrain buah 1.000 442,700.00 442,700.00
JUMLAH HARGA BAHAN 902,700.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 943,500.00


E Overhead & Profit 10.00% 94,350.00
F Harga Satuan Pekerjaan (D+E) 1,037,850.00

A.5.1.1 13. Pemasangan 1 buah bak cuci piring teraso


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang batu L.02 OH 0.500 110,000.00 55,000.00
Kepala tukang L.03 OH 0.050 120,000.00 6,000.00
Mandor L.04 OH 0.025 120,000.00 3,000.00
JUMLAH TENAGA KERJA 68,000.00
B BAHAN
Bak cuci piring Unit 1.000 201,200.00 201,200.00
Waterdrain buah 1.000 442,700.00 442,700.00
Semen portland Kg 20.000 1,420.00 28,400.00
Pasir pasang M3 0.050 203,000.00 10,150.00
JUMLAH HARGA BAHAN 682,450.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 750,450.00


E Overhead & Profit 10.00% 75,045.00
F Harga Satuan Pekerjaan (D+E) 825,495.00

A.5.1.1 14. Pemasangan 1 buah floor drain


Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 13,600.00
B BAHAN
Floor drain Unit 1.000 94,900.00 94,900.00
JUMLAH HARGA BAHAN 94,900.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 108,500.00


E Overhead & Profit 10.00% 10,850.00
F Harga Satuan Pekerjaan (D+E) 119,350.00

A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.160 80,000.00 172,800.00
Tukang batu L.02 OH 0.720 110,000.00 79,200.00
Kepala tukang L.03 OH 0.072 120,000.00 8,640.00
Mandor L.04 OH 0.011 120,000.00 1,320.00
JUMLAH TENAGA KERJA 261,960.00
B BAHAN
Bata merah buah 40.000 900.00 36,000.00
Semen portland Kg 44.000 1,420.00 62,480.00
Pasir pasang M3 0.070 203,000.00 14,210.00
Pasir beton M3 0.060 223,000.00 13,380.00
Kerikil M3 0.070 225,000.00 15,750.00
Baja tulangan Kg 1.600 14,000.00 22,400.00
JUMLAH HARGA BAHAN 164,220.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 996
D Jumlah (A+B+C) 426,180.00
E Overhead & Profit 10.00% 42,618.00
F Harga Satuan Pekerjaan (D+E) 468,798.00

III - 997
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang cat L.02 OH 1.500 110,000.00 165,000.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 424,240.00
B BAHAN
Bata merah buah 70.000 900.00 63,000.00
Semen portland Kg 77.000 1,420.00 109,340.00
Pasir pasang M3 0.130 203,000.00 26,390.00
Pasir beton M3 0.090 223,000.00 20,070.00
Kerikil M3 0.020 225,000.00 4,500.00
Baja tulangan Kg 2.600 14,000.00 36,400.00
JUMLAH HARGA BAHAN 259,700.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 683,940.00


E Overhead & Profit 10.00% 68,394.00
F Harga Satuan Pekerjaan (D+E) 752,334.00

A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.200 80,000.00 256,000.00
Tukang batu L.02 OH 1.150 110,000.00 126,500.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.016 120,000.00 1,920.00
JUMLAH TENAGA KERJA 385,740.00
B BAHAN
Bata merah buah 123.000 900.00 110,700.00
Semen portland Kg 114.000 1,420.00 161,880.00
Pasir pasang M3 0.184 203,000.00 37,352.00
Pasir beton M3 0.120 223,000.00 26,760.00
Kerikil M3 0.033 225,000.00 7,425.00
Baja tulangan Kg 4.850 14,000.00 67,900.00
JUMLAH HARGA BAHAN 412,017.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 797,757.00
E Overhead & Profit 10.00% 79,775.70
F Harga Satuan Pekerjaan (D+E) 877,532.70

A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis ½” M 1.200 29,900.00 35,880.00
Perlengkapan Ls 0.350 29,900.00 10,465.00
JUMLAH HARGA BAHAN 46,345.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,885.00


E Overhead & Profit 10.00% 6,488.50
F Harga Satuan Pekerjaan (D+E) 71,373.50

III - 998
A.5.1.1 19. Pemasangan 1 buah kran diameter ½” atau ¾ ”

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA KERJA
Pekerja L.01 OH 0.010 80,000.00 800.00
Tukang batu L.02 OH 0.400 110,000.00 44,000.00
Kepala tukang L.03 OH 0.040 120,000.00 4,800.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 50,200.00
B BAHAN
Kran air M 1.000 13,800.00 13,800.00
Sealtape Buah 0.025 5,350.00 133.75
JUMLAH HARGA BAHAN 13,933.75
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 64,133.75


E Overhead & Profit 10.00% 6,413.38
F Harga Satuan Pekerjaan (D+E) 70,547.13

A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 3/4” M 1.200 38,600.00 46,320.00
Perlengkapan % 0.350 16,212.00 16,212.00
JUMLAH HARGA BAHAN 62,532.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 81,072.00


E Overhead & Profit 10.00% 8,107.20
F Harga Satuan Pekerjaan (D+E) 89,179.20

A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.027 120,000.00 3,240.00
JUMLAH TENAGA KERJA 18,540.00
B BAHAN
Pipa galvanis 1” M 1.200 57,800.00 69,360.00
Perlengkapan % 0.350 69,360.00 69,360.00
JUMLAH HARGA BAHAN 138,720.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 157,260.00


E Overhead & Profit 10.00% 15,726.00
F Harga Satuan Pekerjaan (D+E) 172,986.00

A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.108 80,000.00 8,640.00
Tukang batu L.02 OH 0.180 110,000.00 19,800.00

III - 999
Kepala tukang L.03 OH 0.018 120,000.00 2,160.00
Mandor L.04 OH 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 31,200.00

III - 1000
B BAHAN
Pipa galvanis 11/2” M 1.200 87,800.00 105,360.00
Perlengkapan % 0.350 105,360.00 105,360.00
JUMLAH HARGA BAHAN 210,720.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 241,920.00


E Overhead & Profit 10.00% 24,192.00
F Harga Satuan Pekerjaan (D+E) 266,112.00

A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 3” M 1.200 181,833.00 218,199.60
Perlengkapan % 0.350 76,369.86 76,369.86
JUMLAH HARGA BAHAN 294,569.46
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 333,719.46


E Overhead & Profit 10.00% 33,371.95
F Harga Satuan Pekerjaan (D+E) 367,091.41

A.5.1.1 24. Pemasangan 1 m’ pipa galvanis diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 80,000.00 10,800.00
Tukang batu L.02 OH 0.225 110,000.00 24,750.00
Kepala tukang L.03 OH 0.023 120,000.00 2,760.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 39,150.00
B BAHAN
Pipa galvanis 4” M 1.200 283,000.00 339,600.00
Perlengkapan % 0.350 118,860.00 118,860.00
JUMLAH HARGA BAHAN 458,460.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 497,610.00


E Overhead & Profit 10.00% 49,761.00
F Harga Satuan Pekerjaan (D+E) 547,371.00

A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1/2” M 1.200 7,000.00 8,400.00
Perlengkapan % 0.350 2,940.00 2,940.00
JUMLAH HARGA BAHAN 11,340.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 1001
D Jumlah (A+B+C) 21,780.00
E Overhead & Profit 10.00% 2,178.00
F Harga Satuan Pekerjaan (D+E) 23,958.00

III - 1002
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 9,960.00
B BAHAN
Pipa PVC 3/4” M 1.200 10,200.00 12,240.00
Perlengkapan % 0.350 4,284.00 4,284.00
JUMLAH HARGA BAHAN 16,524.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 26,484.00


E Overhead & Profit 10.00% 2,648.40
F Harga Satuan Pekerjaan (D+E) 29,132.40

A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 80,000.00 2,880.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 120,000.00 240.00
JUMLAH TENAGA KERJA 10,440.00
B BAHAN
Pipa PVC 1” M 1.200 13,300.00 15,960.00
Perlengkapan % 0.350 5,586.00 5,586.00
JUMLAH HARGA BAHAN 21,546.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 31,986.00


E Overhead & Profit 10.00% 3,198.60
F Harga Satuan Pekerjaan (D+E) 35,184.60

A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00
B BAHAN
Pipa PVC 11/2” M 1.200 27,600.00 33,120.00
Perlengkapan % 0.350 11,592.00 11,592.00
JUMLAH HARGA BAHAN 44,712.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 60,372.00


E Overhead & Profit 10.00% 6,037.20
F Harga Satuan Pekerjaan (D+E) 66,409.20

A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA

III - 1003
Pekerja L.01 OH 0.054 80,000.00 4,320.00
Tukang batu L.02 OH 0.090 110,000.00 9,900.00
Kepala tukang L.03 OH 0.009 120,000.00 1,080.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 15,660.00

III - 1004
B BAHAN
Pipa PVC 2” M 1.200 22,300.00 26,760.00
Perlengkapan % 0.350 9,366.00 9,366.00
JUMLAH HARGA BAHAN 36,126.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,786.00


E Overhead & Profit 10.00% 5,178.60
F Harga Satuan Pekerjaan (D+E) 56,964.60

A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 ½ ”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 21/2” M 1.200 68,700.00 82,440.00
Perlengkapan % 0.350 28,854.00 28,854.00
JUMLAH HARGA BAHAN 111,294.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 134,724.00


E Overhead & Profit 10.00% 13,472.40
F Harga Satuan Pekerjaan (D+E) 148,196.40

A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 3” M 1.200 89,650.00 107,580.00
Perlengkapan % 0.350 37,653.00 37,653.00
JUMLAH HARGA BAHAN 145,233.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 168,663.00


E Overhead & Profit 10.00% 16,866.30
F Harga Satuan Pekerjaan (D+E) 185,529.30

A.5.1.1 32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 80,000.00 6,480.00
Tukang batu L.02 OH 0.135 110,000.00 14,850.00
Kepala tukang L.03 OH 0.014 120,000.00 1,620.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 23,430.00
B BAHAN
Pipa PVC 4” M 1.200 234,600.00 281,520.00
Perlengkapan % 0.350 98,532.00 98,532.00
JUMLAH HARGA BAHAN 380,052.00
C PERALATAN

JUMLAH HARGA ALAT -

III - 1005
D Jumlah (A+B+C) 403,482.00
E Overhead & Profit 10.00% 40,348.20
F Harga Satuan Pekerjaan (D+E) 443,830.20

III - 1006
A.5.1.1 33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.080 80,000.00 6,400.00
Tukang batu L.02 OH 0.040 110,000.00 4,400.00
Kepala tukang L.03 OH 0.004 120,000.00 480.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 11,760.00
B BAHAN
Pipa tanah buah 1.600 173,200.00 277,120.00
Semen portlan Kg 35.000 1,420.00 49,700.00
Pasir pasang M3 0.014 203,000.00 2,842.00
Pasir urug M3 0.014 160,000.00 2,240.00
JUMLAH HARGA BAHAN 331,902.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 343,662.00


E Overhead & Profit 10.00% 34,366.20
F Harga Satuan Pekerjaan (D+E) 378,028.20

A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang batu L.02 OH 0.030 110,000.00 3,300.00
Kepala tukang L.03 OH 0.003 120,000.00 360.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 8,820.00
B BAHAN
Pipa tanah dia 15 buah 1.600 113,200.00 181,120.00
Semen portlan Kg 0.680 1,420.00 965.60
Pasir pasang M3 0.013 203,000.00 2,639.00
Pasir urug M3 0.011 160,000.00 1,760.00
JUMLAH HARGA BAHAN 186,484.60
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 195,304.60


E Overhead & Profit 10.00% 19,530.46
F Harga Satuan Pekerjaan (D+E) 214,835.06

A.5.1.1 35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 7.000 120,000.00 840,000.00
JUMLAH TENAGA KERJA 859,740.00
B BAHAN
Pipa beton dia. 15-20 buah 1.100 44,300.00 48,730.00
Bata merah M3 0.027 900.00 24.30
Semen portlan Kg 3.920 1,420.00 5,566.40
Pasir pasang M3 0.056 203,000.00 11,368.00
Pasir urug M3 0.024 160,000.00 3,840.00
JUMLAH HARGA BAHAN 69,528.70
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 929,268.70


E Overhead & Profit 10.00% 92,926.87
F Harga Satuan Pekerjaan (D+E) 1,022,195.57

III - 1007
A.5.1.1.36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.380 80,000.00 30,400.00
Tukang batu L.02 OH 0.190 110,000.00 20,900.00
Kepala tukang L.03 OH 0.019 120,000.00 2,280.00
Mandor L.04 OH 0.019 120,000.00 2,280.00
JUMLAH TENAGA KERJA 55,860.00
B BAHAN
Pipa beton dia. 30-100 buah 1.100 66,000.00 72,600.00
Bata merah M3 0.550 900.00 495.00
Semen portlan Kg 10.300 1,420.00 14,626.00
Pasir pasang M3 0.061 203,000.00 12,383.00
Pasir urug M3 0.069 160,000.00 11,040.00
JUMLAH HARGA BAHAN 111,144.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 167,004.00
E Overhead & Profit 10.00% 16,700.40
F Harga Satuan Pekerjaan (D+E) 183,704.40

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL


A.8.4.6.1 (K3) Pemasangan 1 buah titik lampu (Instalasi)

Harga Satuan (Rp) Jumlah Harga (Rp)


No Uraian Kode Satuan Koefisien
A TENAGA
Upah % 1.000 203,400.00 203,400.00
JUMLAH TENAGA KERJA 203,400.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,700.00 17,100.00
Kabel m 10.000 9,200.00 92,000.00
T Dus buah 3.000 2,300.00 6,900.00
L Bow buah 4.000 2,300.00 9,200.00
Las Dop buah 3.000 3,400.00 10,200.00
Klem buah 24.000 1,950.00 46,800.00
Mongkok buah 1.000 1,100.00 1,100.00
Saklar buah 1.000 14,900.00 14,900.00
Fitting buah 1.000 5,200.00 5,200.00
JUMLAH HARGA BAHAN 203,400.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 406,800.00
E Overhead & Profit 10.00% 40,680.00
F Harga Satuan Pekerjaan (D+E) 447,480.00

A.8.4.6.1 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Upah % 1.000 243,300.00 243,300.00
JUMLAH TENAGA KERJA 243,300.00
B BAHAN
Pipa listrik 5/8” btg 3.000 5,700.00 17,100.00
Kabel m 15.000 9,200.00 138,000.00
T Dus buah 1.000 2,300.00 2,300.00
L Bow buah 2.000 2,300.00 4,600.00
Klem biasa buah 24.000 1,950.00 46,800.00
MCB buah 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 243,300.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 486,600.00
E Overhead & Profit 10.00% 48,660.00
F Harga Satuan Pekerjaan (D+E) 535,260.00

III - 1008
TAMBAHAN / LAIN-LAIN

- 1 Buah Pembuatan Papan Nama Proyek

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.200 80,000.00 16,000.00
Tukang kayu oh 0.600 110,000.00 66,000.00
Kepala tukang oh 0.060 120,000.00 7,200.00
Mandor oh 0.020 120,000.00 2,400.00
JUMLAH TENAGA KERJA 91,600.00

B BAHAN
Kayu Kaso 5/7 (kayu hutan) m3 0.020 3,636,000.00 72,720.00
Paku Biasa 2-5 kg 0.250 21,000.00 5,250.00
Kayu Dolken dia.8 8-10/4 m' btg 1.500 71,000.00 106,500.00
Triplek 6 mm lbr 0.350 91,000.00 31,850.00
Cetak papan nama dg bhn flexi cetak digital print m' 1.000 23,000.00 23,000.00
JUMLAH HARGA BAHAN 239,320.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 330,920.00


E Overhead & Profit 10.00% 33,092.00
F Harga Satuan Pekerjaan (D+E) 364,012.00

SNI 7395:2008 N0.6.9 Memasang 1 m2 lantai ubin granit ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.125 110,000.00 13,750.00
Kepala tukang oh 0.013 120,000.00 1,560.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,870.00
B BAHAN
ubin granit bh 0.020 48,500.00 970.00
portland cement kg 0.250 1,420.00 355.00
pasir pasang m3 1.500 203,000.00 304,500.00
semen warna kg 0.350 6,900.00 2,415.00
JUMLAH HARGA BAHAN 308,240.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 345,110.00


E Overhead & Profit 10.00% 34,511.00
F Harga Satuan Pekerjaan (D+E) 379,621.00

SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai keramik ukuran 40 x 40

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.250 80,000.00 20,000.00
Tukang batu oh 0.120 110,000.00 13,200.00
Kepala tukang oh 0.012 120,000.00 1,440.00
Mandor oh 0.013 120,000.00 1,560.00
JUMLAH TENAGA KERJA 36,200.00
B BAHAN
keramik 40 x 40 bh 6.630 5,200.00 34,476.00
portland cement kg 9.800 1,420.00 13,916.00
pasir pasang m3 0.045 203,000.00 9,135.00
semen warna kg 1.300 6,900.00 8,970.00
JUMLAH HARGA BAHAN 66,497.00
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 102,697.00


E Overhead & Profit 10.00% 10,269.70
F Harga Satuan Pekerjaan (D+E) 112,966.70

III - 1009
SNI 03-7395:2008 N0.6.9 Memasang 1 m2 lantai granit ukuran 60 x 60

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.375 80,000.00 30,000.00
Tukang batu oh 0.180 110,000.00 19,800.00
Kepala tukang oh 0.018 120,000.00 2,160.00
Mandor oh 0.020 120,000.00 2,340.00
JUMLAH TENAGA KERJA 54,300.00
B BAHAN
granito 60 x 60 bh 3.000 54,000.00 162,000.00
portland cement kg 14.700 1,420.00 20,874.00
pasir pasang m3 0.068 203,000.00 13,702.50
semen warna kg 1.950 6,900.00 13,455.00
JUMLAH HARGA BAHAN 210,031.50
C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 264,331.50


E Overhead & Profit 10.00% 26,433.15
F Harga Satuan Pekerjaan (D+E) 290,764.65

SNI 2839:2008 N0.6.8 Memasang 1 m' List Plafond Gypsum Profil

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.060 80,000.00 4,800.00
Tukang batu oh 0.060 110,000.00 6,600.00
Kepala tukang oh 0.006 120,000.00 720.00
Mandor oh 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 12,480.00
B BAHAN
List gypsum profil m' 1.050 20,700.00 21,735.00
Tepung gypsum kg 0.150 21,275.00 3,191.25

JUMLAH HARGA BAHAN 24,926.25


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 37,406.25


E Overhead & Profit 10.00% 3,740.63
F Harga Satuan Pekerjaan (D+E) 41,146.88

SNI 2839:2008 N0.6.8 1 m' Pasang Listplank Woodplank

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pembantu tukang oh 0.100 80,000.00 8,000.00
Tukang batu oh 0.200 110,000.00 22,000.00
Kepala tukang oh 0.020 120,000.00 2,400.00
Mandor oh 0.005 120,000.00 600.00
JUMLAH TENAGA KERJA 33,000.00
B BAHAN
woodplank bh 0.250 69,000.00 17,250.00
Paku biasa 2" - 5" kg 0.050 21,000.00 1,050.00

JUMLAH HARGA BAHAN 18,300.00


C PERALATAN -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 51,300.00


E Overhead & Profit 10.00% 5,130.00
F Harga Satuan Pekerjaan (D+E) 56,430.00

ABK.990.07 Menurunkan 1 m2 atap genteng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

III - 1010
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Mandor L.15 OH 0.100 120,000.00 12,000.00
JUMLAH TENAGA KERJA 28,000.00

III - 1011
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 28,000.00


E Overhead & Profit 10.00% 2,800.00
JUMLAH 30,800.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 3,080.00 2,053.33

ABK.990.09 Menurunkan 1 m2 rangka atap/Plafond

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000 80,000.00 80,000.00
Mandor L.04 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 86,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 86,000.00


E Overhead & Profit 10.00% 8,600.00
JUMLAH 94,600.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 9,460.00 6,306.67

ABK.990.12 Menurunkan 1 m3 kayu rangka kuda-kuda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.00 80,000.00 320,000.00
Tukang kayu L.02 OH 6.00 110,000.00 660,000.00
Kepala tukang L.03 OH 0.60 120,000.00 72,000.00
Mandor L.04 OH 0.20 120,000.00 24,000.00
JUMLAH TENAGA KERJA 1,076,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 1,076,000.00


E Overhead & Profit 10.00% 107,600.00
JUMLAH 1,183,600.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 118,360.00 78,906.67

ABK.990.05 Membongkar 1 m2 lantai tegel/floor

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.00 80,000.00 80,000.00
Mandor L.04 OH 0.10 120,000.00 12,000.00
JUMLAH TENAGA KERJA 92,000.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 92,000.00


E Overhead & Profit 10.00% 9,200.00

III - 1012
JUMLAH 101,200.00
F Harga Satuan Pekerjaan (D+E) Untuk 1 m2, maka : Upah diambil : 2/3 X Rp 10,120.00 6,746.67

III - 1013
SNI 2012 1 m³ Bongkaran Beton Bertulang

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 120,000.00 39,960.00
JUMLAH TENAGA KERJA 573,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 573,320.00


E Overhead & Profit 10.00% 57,332.00
F Harga Satuan Pekerjaan (D+E) 630,652.00

SNI 2012 1 m³ Bongkaran Dinding Tembok Bata Merah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.033 120,000.00 3,960.00
JUMLAH TENAGA KERJA 537,320.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 537,320.00


E Overhead & Profit 10.00% 53,732.00
F Harga Satuan Pekerjaan (D+E) 591,052.00

ABK.300.19 1 m3 Pekerjaan Beton AD. 1:2:3

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Semen portland kg 232 1,420.00 329,440.00
Pasir beton m3 0.52 223,000.00 115,960.00
Spleet 2/3 cm m3 0.78 315,000.00 245,700.00
JUMLAH HARGA BAHAN 691,100.00
B TENAGA
Pekerja Oh 1.65 80,000.00 132,000.00
Tukang batu Oh 0.25 110,000.00 27,500.00
Kepala tukang Oh 0.025 120,000.00 3,000.00
Mandor Oh 0.08 120,000.00 9,600.00
JUMLAH TENAGA KERJA 172,100.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 863,200.00


E Overhead & Profit 10.00% 86,320.00
F Harga Satuan Pekerjaan (D+E) 949,520.00

- 1m2 Pasang Plafond Rangka Holo dan Dengan Penutup GRC Berikut Pengecatan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
GRC 4 mm lbr 0.35 60,000.00 21,000.00
Holo 4/4 meni btg 1.00 13,950.00 13,950.00
Holo 2/4 meni btg 0.34 12,600.00 4,284.00
Kawat Bwg 12 kg 0.10 11,500.00 1,150.00
Paku screw 2.5 cm bh 20.00 100.00 2,000.00
Adhesive kg 0.02 6,900.00 138.00
Kain kasa m' 2.00 500.00 1,000.00
Cat penutup 2 kali kg 0.03 28,700.00 861.00
Paku beton bh 4.00 200.00 800.00
JUMLAH HARGA BAHAN 45,183.00

III - 1014
B TENAGA
Pekerja oh 0.17 80,000.00 13,600.00
Tukang oh 0.28 110,000.00 30,800.00
Kep Tukang oh 0.03 120,000.00 3,600.00
Mandor oh 0.07 120,000.00 8,400.00
JUMLAH TENAGA KERJA 56,400.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 101,583.00


E Overhead & Profit 10.00% 10,158.30
F Harga Satuan Pekerjaan (D+E) 111,741.30

- 1 Titik Pekerjaan Instalasi Lampu dan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A BAHAN
Kabel Listrik NYA 3 x 2,5 mm m' 11.00 7,500.00 82,500.00
Instalasi lapu dan stop kontak ttk 1.00 37,500.00 37,500.00
JUMLAH HARGA BAHAN 120,000.00
B TENAGA
Pembantu tukang Listrik Oh 0.48 80,000.00 38,400.00
Tukang Listrik Oh 0.048 110,000.00 5,280.00
Kepala tukang Listrik Oh 0.048 120,000.00 5,760.00
JUMLAH TENAGA KERJA 49,440.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 169,440.00


E Overhead & Profit 10.00% 16,944.00
F Harga Satuan Pekerjaan (D+E) 186,384.00

- 1 Bh Pekerjaan Stop Kontak

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Stop Kontak bh 1.000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,500.00


E Overhead & Profit 10.00% 3,550.00
F Harga Satuan Pekerjaan (D+E) 39,050.00

- 1 Bh Pekerjaan Lampu SL 18 Watt + Fitting

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Lampu SL 18 watt + fitting bh 1.000 41,400.00 41,400.00
JUMLAH HARGA BAHAN 41,400.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik 0 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 62,000.00


E Overhead & Profit 10.00% 6,200.00
F Harga Satuan Pekerjaan (D+E) 68,200.00

III - 1015
- 1 Unit Pekerjaan Sekring Kast

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Sekring Kast bh 1.000 46,000.00 46,000.00
JUMLAH HARGA BAHAN 46,000.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 66,600.00


E Overhead & Profit 10.00% 6,660.00
F Harga Satuan Pekerjaan (D+E) 73,260.00

- 1 Bh Pekerjaan MCB Box

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
MCB BOX bh 1.000 34,500.00 34,500.00
JUMLAH HARGA BAHAN 34,500.00
TENAGA
Pembantu tukang Listrik Oh 0.2 80,000.00 16,000.00
Tukang Listrik Oh 0.02 110,000.00 2,200.00
Kepala tukang Listrik Oh 0.02 120,000.00 2,400.00
JUMLAH TENAGA KERJA 20,600.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 55,100.00


E Overhead & Profit 10.00% 5,510.00
F Harga Satuan Pekerjaan (D+E) 60,610.00

- 1 m' Pekerjaan Over Spaneng

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Over Spaneng m' 1.000 10,300.00 10,300.00
JUMLAH HARGA BAHAN 10,300.00
TENAGA
Pembantu tukang Listrik Oh 0.24 80,000.00 19,200.00
Tukang Listrik Oh 0.024 110,000.00 2,640.00
Kepala tukang Listrik Oh 0.024 120,000.00 2,880.00
JUMLAH TENAGA KERJA 24,720.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 35,020.00


E Overhead & Profit 10.00% 3,502.00
F Harga Satuan Pekerjaan (D+E) 38,522.00

- 1 Bh Pekerjaan Saklar Ganda

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar Ganda bh 1.000 18,400.00 18,400.00
JUMLAH HARGA BAHAN 18,400.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -

III - 1016
D Jumlah (A+B+C) 59,600.00
E Overhead & Profit 10.00% 5,960.00
F Harga Satuan Pekerjaan (D+E) 65,560.00

III - 1017
- 1 Bh Pekerjaan Saklar Tunggal

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
BAHAN
Saklar tunggal bh 1.000 14,900.00 14,900.00
JUMLAH HARGA BAHAN 14,900.00
TENAGA
Pembantu tukang Listrik Oh 0.4 80,000.00 32,000.00
Tukang Listrik Oh 0.04 110,000.00 4,400.00
Kepala tukang Listrik Oh 0.04 120,000.00 4,800.00
JUMLAH TENAGA KERJA 41,200.00
C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 56,100.00


E Overhead & Profit 10.00% 5,610.00
F Harga Satuan Pekerjaan (D+E) 61,710.00

A.3.2.1.2.a Pemasangan pasangan 1 m3 batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang batu L.02 OH 0.750 110,000.00 82,500.00
Kepala tukang L.03 OH 0.075 120,000.00 9,000.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 220,500.00
B BAHAN
Batu belah m3 1.200 315,000.00 378,000.00
Semen Portland Kg 163.000 1,420.00 231,460.00
Pasir pasang m3 0.520 203,000.00 105,560.00
JUMLAH HARGA BAHAN 715,020.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 935,520.00
E Overhead & Profit 10.00% 93,552.00
F Harga Satuan Pekerjaan (D+E) 1,029,072.00

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

III - 1018
Analisa EI-311a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1.(1a)


JENIS PEKERJAAN : Galian Biasa / Kupasan (menggunakan alat berat)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0511 11,428.57 584.01


2. Mandor (L03) Jam 0.0256 17,142.86 438.00

JUMLAH HARGA TENAGA 1,022.01

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0256 383,917.43 9,809.18


2. Dump Truck (E08) Jam 0.3344 218,351.62 73,007.68
3. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 82,816.86

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 83,838.87


E. OVERHEAD & PROFIT 10.0 % x D 8,383.89
F. HARGA SATUAN PEKERJAAN ( D + E ) 92,222.76
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1019
Analisa EI-321.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(1).rob


JENIS PEKERJAAN : Timbunan Biasa
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0403 11,428.57 460.62


2. Mandor (L02) Jam 0.0101 17,142.86 172.73

JUMLAH HARGA TENAGA 633.36

B. BAHAN

1. Bahan timbunan (M08) M3 1.1100 143,750.00 159,562.50

JUMLAH HARGA BAHAN 159,562.50

C. PERALATAN
1. Excavator (E10) Jam 0.0101 383,917.43 3,868.41
2. Dump Truck (E08) Jam 0.6103 218,351.62 133,269.49
3. Motor Grader (E13) Jam 0.0037 0.00 0.00
4 Vibro Roller (E19) Jam 0.0042 242,040.15 1,012.55
5. Water tank truck (E23) Jam 0.0070 313,608.03 2,204.07
6 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 140,354.52

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 300,550.38


E. OVERHEAD & PROFIT 10.0 % x D 30,055.04
F. HARGA SATUAN PEKERJAAN ( D + E ) 330,605.42
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1020
Analisa EI-322.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.2.(2).rob


JENIS PEKERJAAN : Timbunan Pilihan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.4294 11,428.57 27,764.38


2. Mandor (L03) Jam 0.6073 17,142.86 10,411.64

JUMLAH HARGA TENAGA 38,176.03

B. BAHAN

1. Bahan pilihan (M09) (M09) M3 1.1100 158,000.00 175,380.00

JUMLAH HARGA BAHAN 175,380.00

C. PERALATAN
1. Wheel Loader (E15) Jam 0.0085 435,196.50 3,701.18
2. Dump Truck (E08) Jam 0.6073 218,351.62 132,614.95
3. Motor Grader (E13) Jam 0.0040 0.00 0.00
3. Tandem (E17) Jam 0.0161 406,739.23 6,550.34
4. Water Tanker (E23) Jam 0.0070 313,608.03 2,204.07
5. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 145,070.54

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 358,626.56


E. OVERHEAD & PROFIT 10.0 % x D 35,862.66
F. HARGA SATUAN PEKERJAAN ( D + E ) 394,489.22
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1021
Analisa EI-331.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.3.(1).rob


JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0024 11,428.57 27.21


2. Mandor (L02) jam 0.0006 17,142.86 10.20

JUMLAH HARGA TENAGA 37.41

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN
1. Motor Grader (E13) jam 0.0006 0.00 0.00
2. Vibro Roller (E19) jam 0.0005 242,040.15 113.91
3 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 113.91

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 151.33


E. OVERHEAD & PROFIT 10.0 % x D 15.13
F. HARGA SATUAN PEKERJAAN ( D + E ) 166.46
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1022
Analisa EI-611a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (1)(a)


JENIS PEKERJAAN : Lapis Resap Pengikat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 11,428.57 23.81


2. Mandor (L03) Jam 0.0004 17,142.86 7.14

JUMLAH HARGA TENAGA 30.95

B. BAHAN

1. Aspal (M10) Kg 0.6790 13,000.00 8,826.69


2. Kerosene (M11) liter 0.3708 11,800.00 4,375.44

JUMLAH HARGA BAHAN 13,202.13

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 342,947.33 71.45


2. Compressor E05 Jam 0.0002 129,446.21 26.97

JUMLAH HARGA PERALATAN 98.42

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,331.50


E. OVERHEAD & PROFIT 10.0 % x D 1,333.15
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,664.65
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1023
Analisa EI-612a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (2)(a)


JENIS PEKERJAAN : Lapis Perekat - Aspal Cair
SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 11,428.57 23.81


2. Mandor (L03) Jam 0.0004 17,142.86 7.14

JUMLAH HARGA TENAGA 30.95

B. BAHAN

1. Aspal (M10) Kg 0.8487 13,000.00 11,033.36


2. Kerosene (M11) liter 0.2060 11,800.00 2,430.80

JUMLAH HARGA BAHAN 13,464.16

C. PERALATAN

1. Asp. Distributor E41 Jam 0.0002 342,947.33 71.45


2. Compressor E05 Jam 0.0002 129,446.21 26.97

JUMLAH HARGA PERALATAN 98.42

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 13,593.53


E. OVERHEAD & PROFIT 10.0 % x D 1,359.35
F. HARGA SATUAN PEKERJAAN ( D + E ) 14,952.88
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1024
Analisa EI-621

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.2 (1)


JENIS PEKERJAAN : Agregat Penutup BURTU
SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2126 11,428.57 2,429.89


2. Mandor (L02) Jam 0.0106 17,142.86 182.24

JUMLAH HARGA TENAGA 2,612.13

B. BAHAN

1. Chipping (M41) Kg 23.0000 149.49 3,438.16

JUMLAH HARGA BAHAN 3,438.16

C. PERALATAN

1. Wheel Loader E15 Jam 0.0106 435,196.50 4,626.47


2. Dump Truck E08 Jam 0.0214 218,351.62 4,666.04
3. P. Tyre Roller E18 Jam 0.0005 440,375.31 237.13
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 9,529.64

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 15,579.93


E. OVERHEAD & PROFIT 10.0 % x D 1,557.99
F. HARGA SATUAN PEKERJAAN ( D + E ) 17,137.92
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1025
Analisa EI-631.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (1).rob


JENIS PEKERJAAN : Latasir Kelas A (SS-A)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 11,428.57 1,606.43


2. Mandor (L03) Jam 0.0201 17,142.86 344.23

JUMLAH HARGA TENAGA 1,950.66

B. BAHAN

1. Pasir Kasar M01a M3 0.2086 223,000.00 46,509.25


2. Pasir Halus M01c M3 0.4171 203,000.00 84,676.03
3 Semen/Filler (M05) Kg 31.5000 98.00 3,087.00
4 Aspal (M10) Kg 103.0000 13,000.00 1,339,000.00

JUMLAH HARGA BAHAN 1,473,272.27

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 435,196.50 4,165.43
2. AMP E01 Jam 0.0201 7,795,898.87 156,544.15
3. Genset E12 Jam 0.0201 297,098.16 5,965.83
4. Dump Truck (3,5 ton) E08 Jam 0.0122 218,351.62 2,664.57
5. Asphalt Finisher E02 Jam 0.0386 - 0.00
6. Tandem Roller E17 Jam 0.0317 406,739.23 12,904.80
7 P. Tyre Roller E18 Jam 0.0109 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 182,244.78

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,657,467.71


E. OVERHEAD & PROFIT 10.0 % x D 165,746.77
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,823,214.49
MAKA HARGA UNTUK 1 M2 60,773.82
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1026
Analisa EI-632.rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.3 (2).rob


JENIS PEKERJAAN : Latasir Kelas B (SS-B)
SATUAN PEMBAYARAN : Ton, m2

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1406 11,428.57 1,606.43


2. Mandor (L03) Jam 0.0201 17,142.86 344.23

JUMLAH HARGA TENAGA 1,950.66

B. BAHAN

1. Pasir Kasar (M01a) M3 0.0139 223,000.00 3,104.89


2. Pasir Halus (M01c) M3 0.0139 203,000.00 2,826.43
3 Semen (M05) 31.5000 98.00 3,087.00
4 Aspal (M10) 92.7000 13,000.00 1,205,100.00

JUMLAH HARGA BAHAN 1,214,118.32

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 435,196.50 4,165.43
2. AMP E01 Jam 0.0201 7,795,898.87 156,544.15
3. Genset E12 Jam 0.0201 297,098.16 5,965.83
4. Dump Truck E08 Jam 0.0163 218,351.62 3,552.76
5. Asphalt Finisher E02 Jam 0.0290 - 0.00
6. Tandem Roller E17 Jam 0.0238 406,739.23 9,678.60
7 P. Tyre Roller E18 Jam 0.0082 - 0.00
8 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 179,906.77

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,395,975.75


E. OVERHEAD & PROFIT 10.0 % x D 139,597.58
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,535,573.33
MAKA HARGA UNTUK 1 M2 68,247.70
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1027
Analisa EI-661

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(1)


JENIS PEKERJAAN : Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 11,428.57 1,619.93


2. Mandor (L03) Jam 0.0142 17,142.86 242.99

JUMLAH HARGA TENAGA 1,862.91

B. BAHAN

1. Agregat Kasar (M03) M3 1.6690 315,000.00 525,739.44


2. Agregat Halus (M04) M3 0.1479 315,000.00 46,584.51
3 Aspal (M10) Kg 98.5857 13,000.00 1,281,614.29

JUMLAH HARGA BAHAN 1,853,938.23

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 435,196.50 3,084.31


2. Dump Truck E09 Jam 0.1823 345,406.65 62,964.61
3. 3-Wheel Roller E16 Jam 0.0435 216,136.39 9,398.09
4. Asp. Sprayer E03 Jam 0.3788 57,689.63 21,852.13
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 97,299.14

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,953,100.29


E. OVERHEAD & PROFIT 10.0 % x D 195,310.03
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,148,410.32
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1028
Analisa EI-662

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.6.(2)


JENIS PEKERJAAN : Lapis Pondasi/Perata Penetrasi Macadam
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417 11,428.57 1,619.93


2. Mandor (L03) Jam 0.0142 17,142.86 242.99

JUMLAH HARGA TENAGA 1,862.91

B. BAHAN

1. Agregat Kasar (M03) M3 1.7746 315,000.00 559,014.08


2. Agregat Halus (M04) M3 0.2465 315,000.00 77,640.85
3 Aspal (M10) Kg 103.0000 13,000.00 1,339,000.00

JUMLAH HARGA BAHAN 1,975,654.93

C. PERALATAN

1. Wheel Loader E15 Jam 0.0071 435,196.50 3,084.31


2. Dump Truck E09 Jam 0.1823 345,406.65 62,964.61
3. 3-Wheel Roller E16 Jam 0.0406 216,136.39 8,771.55
4. Asp. Sprayer E03 Jam 0.3788 57,689.63 21,852.13
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 96,672.60

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,074,190.45


E. OVERHEAD & PROFIT 10.0 % x D 207,419.04
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,281,609.49
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1029
Analisa EI-814

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (4)


JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. Minor
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1631 11,428.57 1,864.09


2. Mandor (L03) Jam 0.0102 17,142.86 174.76

JUMLAH HARGA TENAGA 2,038.85

B. BAHAN

1. Agregat Kasar M3 0.9350 315,000.00 294,525.00


2. Agregat Halus M3 0.1650 315,000.00 51,975.00

JUMLAH HARGA BAHAN 346,500.00

C. PERALATAN

1. Wheel Loader E15 Jam 0.0102 435,196.50 4,436.51


2. Dump Truck E09 Jam 0.0897 345,406.65 30,985.38
3. 3-Wheel Roller E16 Jam 0.0268 216,136.39 5,786.78
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 41,208.67

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 389,747.52


E. OVERHEAD & PROFIT 10.0 % x D 38,974.75
F. HARGA SATUAN PEKERJAAN ( D + E ) 428,722.27
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1030
Analisa EI-817

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 8.1 (7)


JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor (Perata)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1701 11,428.57 1,943.91


2. Mandor (L03) Jam 0.0170 17,142.86 291.59

JUMLAH HARGA TENAGA 2,235.50

B. BAHAN

1. Agregat Kasar M3 1.7556 315,000.00 553,000.00


2. Agregat Halus M3 0.0000 315,000.00 0.00
3 Aspal (M10) Kg 99.2727 13,000.00 1,290,545.45

JUMLAH HARGA BAHAN 1,843,545.45

C. PERALATAN

1. Wheel Loader E15 Jam 0.0085 435,196.50 3,701.18


2. Dump Truck E09 Jam 0.2081 345,406.65 71,892.28
3. 3-Wheel Roller E16 Jam 0.0118 216,136.39 2,545.51
4. Asp. Sprayer E03 Jam 0.0359 57,689.63 2,070.21
5. Alat bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 80,209.17

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,925,990.12


E. OVERHEAD & PROFIT 10.0 % x D 192,599.01
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,118,589.13
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1031
Analisa EI-412

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 4.1 (2)


JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A (Buruh)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5000 11,428.57 5,714.29


2. Mandor (L03) Jam 0.0167 17,142.86 286.29

JUMLAH HARGA TENAGA 6,000.57

B. BAHAN

1. Bahan Agg. Kelas A M26 M3 1.1864 367,606.11 436,127.89

JUMLAH HARGA BAHAN 436,127.89

C. PERALATAN

1. Tandem Roller E17 Jam 0.0357 406,739.23 14,520.59


2. Water Tanker E23 Jam 0.0141 313,608.03 4,421.87

JUMLAH HARGA PERALATAN 18,942.46

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 461,070.92


E. OVERHEAD & PROFIT 10.0 % x D 46,107.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 507,178.02
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1032
Analisa EI-422

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 4.2 (2)


JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B (Buruh)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5000 11,428.57 5,714.29


2. Mandor (L03) Jam 0.0167 17,142.86 286.29

JUMLAH HARGA TENAGA 6,000.57

B. BAHAN

1. Bahan Agg. Kelas B M27 M3 1.1864 296,784.05 352,104.60

JUMLAH HARGA BAHAN 352,104.60

C. PERALATAN

1. Tandem Roller E17 Jam 0.0201 406,739.23 8,175.46


2. Water Tanker E23 Jam 0.0141 313,608.03 4,421.87

JUMLAH HARGA PERALATAN 12,597.33

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 370,702.50


E. OVERHEAD & PROFIT 10.0 % x D 37,070.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 407,772.75
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1033
Analisa EI-192a rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El-192a rob


JENIS PEKERJAAN : Udit Type U 300 X 300
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


KUANTITAS SATUAN HARGA
NO. KOMPONEN SATUAN
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.2000 11,428.57 128,000.00


2. Tukang (L02) jam 1.4000 15,714.29 22,000.00
3. Mandor (L03) jam 1.4000 17,142.86 24,000.00

JUMLAH HARGA TENAGA 174,000.00

B. BAHAN

1. U-Ditch Type U 300 / 300 1.0000 386,750.00 386,750.00


Panjang = 120 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 386,750.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0643 274,692.64 17,662.74

JUMLAH HARGA PERALATAN 17,662.74

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 578,412.74


E. OVERHEAD & PROFIT 10.0 % x D 57,841.27
F. HARGA SATUAN PEKERJAAN ( D + E ) 636,254.01
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1034
Analisa EI-192b rob

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El-192b rob


JENIS PEKERJAAN : Udit Type U 400 X 400
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.2000 11,428.57 128,000.00


2. Tukang (L02) jam 1.4000 15,714.29 22,000.00
3. Mandor (L03) jam 1.4000 17,142.86 24,000.00

JUMLAH HARGA TENAGA 174,000.00

B. BAHAN

1. U-Ditch Type U 400 / 400 1.0000 500,095.00 500,095.00


Panjang = 120 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 500,095.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0643 274,692.64 17,662.74

JUMLAH HARGA PERALATAN 17,662.74

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 691,757.74


E. OVERHEAD & PROFIT 10.0 % x D 69,175.77
F. HARGA SATUAN PEKERJAAN ( D + E ) 760,933.51
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1035
Analisa EI-181

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : El - 181


JENIS PEKERJAAN : Bok Culvert BC 400 X 400
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 14.0000 11,428.57 160,000.00


2. Tukang (L02) jam 1.7500 15,714.29 27,500.00
3. Mandor (L03) jam 1.7500 17,142.86 30,000.00

JUMLAH HARGA TENAGA 217,500.00

B. BAHAN

1. Box Culvert BC 400 x 400 HD 1.0000 1,044,000.00 1,044,000.00


Panjang = 100 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,044,000.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0803 274,692.64 22,057.82

JUMLAH HARGA PERALATAN 22,057.82

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,283,557.82


E. OVERHEAD & PROFIT 10.0 % x D 128,355.78
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,411,913.60
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1036
Analisa EI-182

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8 (2)


JENIS PEKERJAAN : Box Culvert BC 500 x 500 HD
SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 14.0000 11,428.57 160,000.00


2. Tukang (L02) jam 1.7500 15,714.29 27,500.00
3. Mandor (L03) jam 1.7500 17,142.86 30,000.00

JUMLAH HARGA TENAGA 217,500.00

B. BAHAN

1. Box Culvert BC 500 x 500 HD 1.0000 1,429,509.00 1,429,509.00


Panjang = 100 cm
2. Timbunan Porous (EI-161) M3 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,429,509.00

C. PERALATAN

1. Tamper (E25) jam 0.0000 0.00 0.00


2. Flat Bed Truck (E11) jam 0.0803 274,692.64 22,057.82

JUMLAH HARGA PERALATAN 22,057.82

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,669,066.82


E. OVERHEAD & PROFIT 10.0 % x D 166,906.68
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,835,973.50
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1037
1 m2 Memasang Paving Block t = 8 cm (K - 250)

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja OH 0.2500 80,000.00 20,000.00


2. Tukang OH 0.5000 110,000.00 55,000.00
3. Kepala Tukang OH 0.0500 120,000.00 6,000.00
4 Mandor OH 0.0013 120,000.00 156.00

JUMLAH HARGA TENAGA 81,156.00

B. BAHAN

1. Paving block tebal 8 cm K-250 m2 1.0100 70,500.00 71,205.00


2. Pasir Beton m3 0.0500 223,000.00 11,150.00

JUMLAH HARGA BAHAN 93,596.50

C. PERALATAN

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 174,752.50


E. OVERHEAD & PROFIT 10.0 % x D 17,475.25
F. HARGA SATUAN PEKERJAAN ( D + E ) 192,227.75
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

1 m' Memasang Kansteen, tebal 10 x 20 x 40 cm

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja OH 0.6400 80,000.00 51,200.00


2. Tukang OH 0.1600 110,000.00 17,600.00
4 Mandor OH 0.1600 120,000.00 19,200.00

JUMLAH HARGA TENAGA 88,000.00

B. BAHAN

1. Kansteen 10 x 20 x 40 bh 2.5000 94,900.00 237,250.00


2 Semen zak 0.2510 71,000.00 17,821.00
3 Pasir Pasang m3 0.0350 203,000.00 7,105.00

JUMLAH HARGA BAHAN 262,176.00

C. PERALATAN

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 350,176.00


E. OVERHEAD & PROFIT 10.0 % x D 35,017.60
F. HARGA SATUAN PEKERJAAN ( D + E ) 385,193.60
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN

IV - 1038
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1039
Analisa EI-714

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 7.1 (4)


JENIS PEKERJAAN : Perkerasan Jalan Beton Ready Mix K-225 (dengan angkutan)
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.1084 11,428.57 24,096.00


2. Tukang (L02) jam 1.0040 15,714.29 15,777.14
3. Mandor (L03) jam 0.1004 17,142.86 1,721.14

JUMLAH HARGA TENAGA 41,594.29

B. BAHAN

1. Beton Ready Mix K-225 M3 1.0800 1,270,400.00 1,372,032.00


2. Karung Buah 5.0000 5,650.00 28,250.00
3. Curing Compound Liter 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 1,400,282.00

C. PERALATAN

1. Concrete Vibrator (E20) jam 0.3333 52,746.13 17,580.29


2. Concrete Cutter (E54) jam 0.0000 0.00 0.00
3. Truck Pick Up (E53) jam 0.5972 119,564.87 71,404.14

JUMLAH HARGA PERALATAN 88,984.43

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,530,860.71


E. OVERHEAD & PROFIT 10.0 % x D 153,086.07
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,683,946.78
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

IV - 1040
Analisa EI-619

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 6.1 (9)


JENIS PEKERJAAN : Beton Struktur Site Mix K-125
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.0964 11,428.57 46,816.00


2. Tukang (L02) jam 2.7309 15,714.29 42,914.14
3. Mandor (L03) jam 0.6827 17,142.86 11,703.43

JUMLAH HARGA TENAGA 101,433.57

B. BAHAN

1. Semen (M12) Kg 260.3500 1,420.00 369,697.00


2. Pasir Beton (M01a) M3 0.4849 223,000.00 108,132.70
3. Agregat Kasar (M03) M3 0.5066 315,000.00 159,579.00

JUMLAH HARGA BAHAN 637,408.70

C. PERALATAN

1. Concrete Mixer (E06) jam 0.6827 75,186.43 51,329.77


2. Water Tanker (E23) jam 0.0542 313,608.03 16,997.56
3. Concrete Vibrator (E20) jam 0.6827 42,267.10 28,855.75

JUMLAH HARGA PERALATAN 97,183.08

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 836,025.35


E. OVERHEAD & PROFIT 10.0 % x D 83,602.54
F. HARGA SATUAN PEKERJAAN ( D + E ) 919,627.89
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan


Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

IV - 1041
AT.02.a 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan keras)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 805,000.00 435,102.50
JUMLAH HARGA ALAT 435,102.50
D Jumlah (A+B+C) 472,006.50
E Overhead & Profit 10.00% 47,200.65
F Harga Satuan Pekerjaan (D+E) 519,207.15

AT.02.b 1 m' Pengeboran Pilot hole Ø 6'' (daerah batuan sedang)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3088 80,000.00 24,704.00
Tukang bor L.02 OH 0.0772 110,000.00 8,492.00
Mandor L.04 OH 0.0309 120,000.00 3,708.00
JUMLAH TENAGA KERJA 36,904.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.541 603,750.00 326,326.88
JUMLAH HARGA ALAT 326,326.88
D Jumlah (A+B+C) 363,230.88
E Overhead & Profit 10.00% 36,323.09
F Harga Satuan Pekerjaan (D+E) 399,553.96

AT.02.rob.1 1 m' Pengeboran sederhana

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1544 80,000.00 12,352.00
Tukang bor L.02 OH 0.0386 110,000.00 4,246.00
Mandor L.04 OH 0.0155 120,000.00 1,854.00
JUMLAH TENAGA KERJA 18,452.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan m 0.270 805,000.00 217,551.25
JUMLAH HARGA ALAT 217,551.25
D Jumlah (A+B+C) 236,003.25
E Overhead & Profit 10.00% 23,600.33
F Harga Satuan Pekerjaan (D+E) 259,603.58

V - 1042
AT.03.a 1 m' Pengeboran Reaming Ø 10'' (daerah batuan keras)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Driling rig + perlengkapan m' 0.500 805,000.00 402,500.00
JUMLAH HARGA ALAT 402,500.00
D Jumlah (A+B+C) 436,462.00
E Overhead & Profit 10.00% 43,646.20
F Harga Satuan Pekerjaan (D+E) 480,108.20

AT.03.b 1 m' Pengeboran Reaming Ø 10'' (daerah batuan sedang)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2840 80,000.00 22,720.00
Tukang bor L.02 OH 0.0710 110,000.00 7,810.00
Mandor L.04 OH 0.0286 120,000.00 3,432.00
JUMLAH TENAGA KERJA 33,962.00
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN
Driling rig + perlengkapan m' 0.500 603,750.00 301,875.00
JUMLAH HARGA ALAT 301,875.00
D Jumlah (A+B+C) 335,837.00
E Overhead & Profit 10.00% 33,583.70
F Harga Satuan Pekerjaan (D+E) 369,420.70

AT.07 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 6''

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0720 80,000.00 5,760.00
Tukang bor L.02 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0071 120,000.00 852.00
JUMLAH TENAGA KERJA 8,592.00
B BAHAN
Pipa PVC 6'' m 1.0500 284,900.00 299,145.00
Centralizer Ls 0.1000 299,145.00 29,914.50
JUMLAH HARGA BAHAN 329,059.50
C PERALATAN
Driling rig + perlengkapan jam 0.1250 805,000.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 438,276.50
E Overhead & Profit 10.00% 43,827.65

V - 1043
F Harga Satuan Pekerjaan (D+E) 482,104.15

V - 1044
AT.09 1 m' Pengadaan dan pemasangan konstuksi pipa cassing PVC 8''

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang bor L.02 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0082 120,000.00 984.00
JUMLAH TENAGA KERJA 9,584.00
B BAHAN
Pipa PVC 8'' m 1.0500 449,950.00 472,447.50
Centralizer Ls 0.1000 472,447.50 47,244.75
JUMLAH HARGA BAHAN 519,692.25
C PERALATAN
Driling rig + perlengkapan m 0.1429 805,000.00 115,034.50
JUMLAH HARGA ALAT 115,034.50
D Jumlah (A+B+C) 644,310.75
E Overhead & Profit 10.00% 64,431.08
F Harga Satuan Pekerjaan (D+E) 708,741.83

AT.12 1 m3 Pengadaan dan pemasangan gravel pack

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.0400 80,000.00 83,200.00
Tukang bor L.02 OH 0.2600 110,000.00 28,600.00
Mandor L.04 OH 0.1040 120,000.00 12,480.00
JUMLAH TENAGA KERJA 124,280.00
B BAHAN
Gravel pack pelabuhan m3 1.0000 86,600.00 86,600.00
ratu/sukabumi
JUMLAH HARGA BAHAN 86,600.00
C PERALATAN
Driling rig + perlengkapan m 1.8180 805,000.00 1,463,490.00
JUMLAH HARGA ALAT 1,463,490.00
D Jumlah (A+B+C) 1,674,370.00
E Overhead & Profit 10.00% 167,437.00
F Harga Satuan Pekerjaan (D+E) 1,841,807.00

AT.13 1 jam pencucian sumur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 10.00% 16,895.50
F Harga Satuan Pekerjaan (D+E) 185,850.50

V - 1045
AT.14 1 jam Uji Pemompaan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5720 80,000.00 45,760.00
Tukang bor L.02 OH 0.1430 110,000.00 15,730.00
Mandor L.04 OH 0.0570 120,000.00 6,840.00
JUMLAH TENAGA KERJA 68,330.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Driling rig + perlengkapan jam 1.0000 100,625.00 100,625.00
JUMLAH HARGA ALAT 100,625.00
D Jumlah (A+B+C) 168,955.00
E Overhead & Profit 10.00% 16,895.50
F Harga Satuan Pekerjaan (D+E) 185,850.50

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
pekerja L.01 OH 1.500 80,000.00 120,000.00
mandor L.02 OH 0.050 120,000.00 6,000.00
JUMLAH TENAGA KERJA 126,000.00

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.880 126,000.00 110,880.00


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 206,945.20

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan

m³ Galian tanah berbatu / bongkar jalan 0.825 126,000.00 103,950.00


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,462.50
m³ Buang tanah sisa galian 0.038 30,360.00 1,138.50
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 193,958.00

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.715 126,000.00 90,090.00


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,667.50
m³ Buang tanah sisa galian 0.033 30,360.00 986.70

V - 1046
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 168,483.60

V - 1047
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.600 126,000.00 75,600.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 133,601.20

1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.450 126,000.00 56,700.00


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 102,946.00

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 82,886.80

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.320 126,000.00 40,320.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 75,322.80

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 46,433.60

V - 1048
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 45,933.60
1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.120 126,000.00 15,120.00


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 23,538.40

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.880 92,224.00 81,157.12


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 177,222.32

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.825 92,224.00 76,084.80


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,462.50
m³ Buang tanah sisa galian 0.038 30,360.00 1,138.50
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 166,092.80

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.715 92,224.00 65,940.16


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,667.50
m³ Buang tanah sisa galian 0.033 30,360.00 986.70
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 144,333.76

V - 1049
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.600 92,224.00 55,334.40


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 113,335.60

1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.450 92,224.00 41,500.80


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 87,746.80

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 92,224.00 33,200.64


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 70,727.44

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.320 92,224.00 29,511.68


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 64,514.48

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 92,224.00 16,600.32


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 40,353.92

V - 1050
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 92,224.00 16,600.32


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 39,853.92

1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.120 92,224.00 11,066.88


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 19,485.28

1 m' Pemasangan pipa PVC dia. 350 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.880 69,300.00 60,984.00


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
m' Pemasangan pipa PVC dia. 350 mm 1 5,500.00 5,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 157,049.20

1 m' Pemasangan pipa PVC dia. 300 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.825 69,300.00 57,172.50


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,462.50
m³ Buang tanah sisa galian 0.038 30,360.00 1,138.50
m' Pemasangan pipa PVC dia. 300 mm 1 5,000.00 5,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 147,180.50

1 m' Pemasangan pipa PVC dia. 250 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.715 69,300.00 49,549.50


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,667.50
m³ Buang tanah sisa galian 0.033 30,360.00 986.70
m' Pemasangan pipa PVC dia. 250 mm 1 4,500.00 4,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 127,943.10

V - 1051
1 m' Pemasangan pipa PVC dia. 200 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.600 69,300.00 41,580.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
m' Pemasangan pipa PVC dia. 200 mm 1 4,000.00 4,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 99,581.20
1 m' Pemasangan pipa PVC dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.450 69,300.00 31,185.00


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
m' Pemasangan pipa PVC dia. 160 mm 1 3,500.00 3,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 77,431.00

1 m' Pemasangan pipa PVC dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 110 mm 1 3,000.00 3,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 62,474.80

1 m' Pemasangan pipa PVC dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.320 69,300.00 22,176.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
m' Pemasangan pipa PVC dia. 90 mm 1 2,500.00 2,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 57,178.80

1 m' Pemasangan pipa PVC dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 69,300.00 12,474.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 63 mm 1 2,000.00 2,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 36,227.60

V - 1052
1 m' Pemasangan pipa PVC dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 69,300.00 12,474.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 50 mm 1 1,500.00 1,500.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 35,727.60

1 m' Pemasangan pipa PVC dia. 25 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.120 69,300.00 8,316.00


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
m' Pemasangan pipa PVC dia. 25 mm 1 1,000.00 1,000.00
ls Perapihan 1 1,650.00 1,650.00
JUMLAH 16,734.40

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.880 126,000.00 110,880.00


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 363,995.20

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.825 126,000.00 103,950.00


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,487.80
m³ Buang tanah sisa galian 0.038 30,360.00 1,153.68
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 310,048.48

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.715 126,000.00 90,090.00


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,692.80
m³ Buang tanah sisa galian 0.033 30,360.00 1,001.88
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 261,424.08

V - 1053
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah berbatu / bongkar jalan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.600 126,000.00 75,600.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 219,801.20

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.450 126,000.00 56,700.00


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 163,996.00

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 133,286.80

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.320 126,000.00 40,320.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 115,122.80

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 71,583.60

V - 1054
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.180 126,000.00 22,680.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 66,333.60

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.120 126,000.00 15,120.00


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 40,488.40

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.880 92,224.00 81,157.12


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 334,272.32

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.825 92,224.00 76,084.80


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,487.80
m³ Buang tanah sisa galian 0.033 30,360.00 1,001.88
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 282,031.48

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.715 92,224.00 65,940.16


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,692.80
m³ Buang tanah sisa galian 0.033 30,360.00 1,001.88
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 237,274.24

V - 1055
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.600 92,224.00 55,334.40


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 199,535.60

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.450 92,224.00 41,500.80


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 148,796.80

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 92,224.00 33,200.64


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 121,127.44

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.320 92,224.00 29,511.68


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 104,314.48

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 92,224.00 16,600.32


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 65,503.92

V - 1056
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.180 92,224.00 16,600.32


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 60,253.92

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.120 92,224.00 11,066.88


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 36,435.28

1 m' Perbaikan pipa PVC dia. 350 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.880 69,300.00 60,984.00


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.600 50,600.00 30,360.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan pipa PVC dia. 350 mm 1 144,500.00 144,500.00
ls Perapihan 1 19,700.00 19,700.00
JUMLAH 314,099.20

1 m' Perbaikan pipa PVC dia. 300 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.825 69,300.00 57,172.50


m³ Urugan pasir 0.225 238,920.00 53,757.00
m³ Urugan tanah kembali 0.563 50,600.00 28,487.80
m³ Buang tanah sisa galian 0.038 30,360.00 1,153.68
ls Perbaikan pipa PVC dia. 300 mm 1 105,000.00 105,000.00
ls Perapihan 1 17,700.00 17,700.00
JUMLAH 263,270.98

1 m' Perbaikan pipa PVC dia. 250 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.715 69,300.00 49,549.50


m³ Urugan pasir 0.195 238,920.00 46,589.40
m³ Urugan tanah kembali 0.488 50,600.00 24,692.80
m³ Buang tanah sisa galian 0.033 30,360.00 1,001.88
ls Perbaikan pipa PVC dia. 250 mm 1 83,350.00 83,350.00
ls Perapihan 1 15,700.00 15,700.00

V - 1057
JUMLAH 220,883.58

V - 1058
1 m' Perbaikan pipa PVC dia. 200 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.600 69,300.00 41,580.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.450 50,600.00 22,770.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan pipa PVC dia. 200 mm 1 76,150.00 76,150.00
ls Perapihan 1 15,700.00 15,700.00
JUMLAH 185,781.20

1 m' Perbaikan pipa PVC dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.450 69,300.00 31,185.00


m³ Urugan pasir 0.100 238,920.00 23,892.00
m³ Urugan tanah kembali 0.325 50,600.00 16,445.00
m³ Buang tanah sisa galian 0.025 30,360.00 759.00
ls Perbaikan pipa PVC dia. 160 mm 1 52,500.00 52,500.00
ls Perapihan 1 13,700.00 13,700.00
JUMLAH 138,481.00

1 m' Perbaikan pipa PVC dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.260 50,600.00 13,156.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 110 mm 1 43,350.00 43,350.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 112,874.80

1 m' Perbaikan pipa PVC dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.320 69,300.00 22,176.00


m³ Urugan pasir 0.080 238,920.00 19,113.60
m³ Urugan tanah kembali 0.220 50,600.00 11,132.00
m³ Buang tanah sisa galian 0.020 30,360.00 607.20
ls Perbaikan pipa PVC dia. 90 mm 1 32,250.00 32,250.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 96,978.80

1 m' Perbaikan pipa PVC dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 69,300.00 12,474.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 63 mm 1 17,100.00 17,100.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 61,377.60

V - 1059
1 m' Perbaikan pipa PVC dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.180 69,300.00 12,474.00


m³ Urugan pasir 0.060 238,920.00 14,335.20
m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 50 mm 1 11,850.00 11,850.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 56,127.60

1 m' Perbaikan pipa PVC dia. 25 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.120 69,300.00 8,316.00


m³ Urugan tanah kembali 0.105 50,600.00 5,313.00
m³ Buang tanah sisa galian 0.015 30,360.00 455.40
ls Perbaikan pipa PVC dia. 25 mm 1 7,900.00 7,900.00
ls Perapihan 1 11,700.00 11,700.00
JUMLAH 33,684.40

400 m' Pengetesan pipa PVC dia. 350 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 37.000 31,500.00 1,165,500.00
hr biaya mesin test, BBM, dan servis 7.000 52,500.00 367,500.00
mekanik 3.500 110,000.00 385,000.00
tukang pipa 7.000 110,000.00 770,000.00
kepala tukang 0.700 120,000.00 84,000.00
pekerja 7.000 80,000.00 560,000.00
mandor 0.350 120,000.00 42,000.00
JUMLAH 3,636,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 3,636,500.00 9,091.25

400 m' Pengetesan pipa PVC dia. 300 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 28.000 31,500.00 882,000.00
hr biaya mesin test, BBM, dan servis 6.000 52,500.00 315,000.00
mekanik 3.000 110,000.00 330,000.00
tukang pipa 6.000 110,000.00 660,000.00
kepala tukang 0.600 120,000.00 72,000.00
pekerja 6.000 80,000.00 480,000.00
mandor 0.300 120,000.00 36,000.00
JUMLAH 3,037,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 3,037,500.00 7,593.75

V - 1060
400 m' Pengetesan pipa PVC dia. 250 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 20.000 31,500.00 630,000.00
hr biaya mesin test, BBM, dan servis 5.000 52,500.00 262,500.00
mekanik 2.500 110,000.00 275,000.00
tukang pipa 5.000 110,000.00 550,000.00
kepala tukang 0.500 120,000.00 60,000.00
pekerja 5.000 80,000.00 400,000.00
mandor 0.250 120,000.00 30,000.00
JUMLAH 2,470,000.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 2,470,000.00 6,175.00

400 m' Pengetesan pipa PVC dia. 200 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 13.000 31,500.00 409,500.00
hr biaya mesin test, BBM, dan servis 4.000 52,500.00 210,000.00
mekanik 2.000 110,000.00 220,000.00
tukang pipa 4.000 110,000.00 440,000.00
kepala tukang 0.400 120,000.00 48,000.00
pekerja 4.000 80,000.00 320,000.00
mandor 0.200 120,000.00 24,000.00
JUMLAH 1,934,000.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,934,000.00 4,835.00

400 m' Pengetesan pipa PVC dia. 160 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 157,500.00 157,500.00


ls biaya perpompaan 1.000 105,000.00 105,000.00
m³ penyediaan air bersih 7.000 31,500.00 220,500.00
hr biaya mesin test, BBM, dan servis 2.500 52,500.00 131,250.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,238,250.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,238,250.00 3,095.63

400 m' Pengetesan pipa PVC dia. 110 mm


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 5.000 31,500.00 157,500.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,198,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,198,500.00 2,996.25

V - 1061
400 m' Pengetesan pipa PVC dia. 90 mm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 2.500 31,500.00 78,750.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,119,750.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,119,750.00 2,799.38

400 m' Pengetesan pipa PVC dia. 63 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 1.000 31,500.00 31,500.00
hr biaya mesin test, BBM, dan servis 2.000 52,500.00 105,000.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,072,500.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,072,500.00 2,681.25

400 m' Pengetesan pipa PVC dia. 50 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls penyediaan alat bantu dan pek. pengedopan 1.000 186,000.00 186,000.00


ls biaya perpompaan 1.000 126,000.00 126,000.00
m³ penyediaan air bersih 0.250 31,500.00 7,875.00
hr biaya mesin test, BBM, dan servis 1.750 52,500.00 91,875.00
tukang pipa 3.000 110,000.00 330,000.00
kepala tukang 0.300 120,000.00 36,000.00
pekerja 3.000 80,000.00 240,000.00
mandor 0.150 120,000.00 18,000.00
JUMLAH 1,035,750.00
Per m' Pengetesan Pipa PVC dia. 350 mm = 1/400 x Rp. 1,035,750.00 2,589.38

1 unit perbaikan gate valve dia. 350mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 92,224.00 311,256.00
ls perbaikan gate valve dia. 350mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 50,600.00 113,850.00
m³ pasang box street dia. 160 mm beton tumbuk 1 : 3 : 5 0.075 949,520.00 71,214.00
ls perapihan 1 63,000.00 63,000.00
JUMLAH 791,320.00

V - 1062
1 unit perbaikan gate valve dia. 300mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 92,224.00 311,256.00
ls perbaikan gate valve dia. 300mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 50,600.00 113,850.00
m³ pasang box street dia. 300mm beton tumbuk 1 : 3 : 5 0.075 949,520.00 71,214.00
ls perapihan 1 47,250.00 47,250.00
JUMLAH 775,570.00

1 unit perbaikan gate valve dia. 250mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 92,224.00 311,256.00
ls perbaikan gate valve dia. 250mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 50,600.00 113,850.00
m³ pasang box street dia. 250mm beton tumbuk 1 : 3 : 5 0.075 949,520.00 71,214.00
ls perapihan 1 36,750.00 36,750.00
JUMLAH 765,070.00

1 unit perbaikan gate valve dia. 200mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

ls bongkar box street (beton) 1 22,000.00 22,000.00


m³ galian tanah keras / berbatu 3.375 92,224.00 311,256.00
ls perbaikan gate valve dia. 200mm 1 210,000.00 210,000.00
m³ urugan tanah kembali 2.250 50,600.00 113,850.00
m³ pasang box street dia. 200mm beton tumbuk 1 : 3 : 5 0.075 949,520.00 71,214.00
ls perapihan 1 21,000.00 21,000.00
JUMLAH 749,320.00

1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Perbaikan gate valve dia. 160 mm 1 152,250.00 152,250.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 21,000.00 21,000.00
JUMLAH 487,066.28

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 110 mm 1 120,750.00 120,750.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 400,491.68

V - 1063
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 350,317.68

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 272,588.08

1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 252,088.08

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 35,527.68 35,527.68
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 184,304.48

V - 1064
1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Perbaikan gate valve dia. 160 mm 1 145,000.00 145,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 478,816.28

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 110 mm 1 115,000.00 115,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 394,741.68

1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 350,317.68

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 272,588.08

V - 1065
1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 252,088.08

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 35,527.68 35,527.68
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 184,304.48

1 unit Perbaikan gate valve dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.900 69,300.00 62,370.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Perbaikan gate valve dia. 160 mm 1 145,000.00 145,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 427,786.28

1 unit Perbaikan gate valve dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.720 69,300.00 49,896.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 110 mm 1 115,000.00 115,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 20,000.00 20,000.00
JUMLAH 353,917.68

V - 1066
1 unit Perbaikan gate valve dia. 90 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.640 69,300.00 44,352.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Perbaikan gate valve dia. 90 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 314,029.68

1 unit Perbaikan gate valve dia. 63 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 63 mm 1 95,000.00 95,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 252,176.08

1 unit Perbaikan gate valve dia. 50 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 50 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 15,000.00 15,000.00
JUMLAH 231,676.08

1 unit Perbaikan gate valve dia. 25 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.240 69,300.00 16,632.00


m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Perbaikan gate valve dia. 25 mm 1 75,000.00 75,000.00
ls Bongkar box street 1 22,000.00 22,000.00
unit Pemasangan box street dia. 25 mm 1 35,527.68 35,527.68
ls Perapihan 1 10,000.00 10,000.00
JUMLAH 170,696.48

V - 1067
1 unit pemasangan gate valve dia. 200 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ galian tanah keras / berbatu 3.375 92,224.00 311,256.00


ls pemasangan gate valve dia. 200mm 1 183,750.00 183,750.00
m³ urugan tanah kembali 2.250 50,600.00 113,850.00
unit pasang box street dia. 160 mm beton tumbuk 1 : 3 : 5 1 96,224.28 96,224.28
ls perapihan 1 21,000.00 21,000.00
JUMLAH 726,080.28

1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Pemasangan gate valve dia. 250 mm 1 238,900.00 238,900.00
unit Pemasangan box street dia. 250 mm 1 217,867.76 217,867.76
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 654,999.76

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 446,706.28

1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 361,131.68

1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 320,707.68

V - 1068
1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 238,228.08

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah berbatu / bongkar jalan

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah berbatu / bongkar jalan 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 217,728.08

1 unit Pemasangan gate valve dia. 250 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0 30,360.00 1,518.00
ls Pemasangan gate valve dia. 250 mm 1 238,900.00 238,900.00
unit Pemasangan box street dia. 110 mm 1 57,300.00 57,300.00
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 494,432.00

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.900 126,000.00 113,400.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 446,706.28

1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 126,000.00 90,720.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 2,640.00 2,640.00

V - 1069
JUMLAH 361,131.68

V - 1070
1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.640 126,000.00 80,640.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 320,707.68

1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 238,228.08

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.360 126,000.00 45,360.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 217,728.08

1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah keras / berbatu

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.240 126,000.00 30,240.00


m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 25 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 25 mm 1 35,527.68 35,527.68
ls Perapihan 1 2,640.00 2,640.00
JUMLAH 154,944.48

1 unit Pemasangan gate valve dia. 160 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.900 69,300.00 62,370.00


m³ Urugan pasir 0.200 238,920.00 47,784.00
m³ Urugan tanah kembali 0.650 50,600.00 32,890.00
m³ Buang tanah sisa galian 0.050 30,360.00 1,518.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 395,536.28

V - 1071
1 unit Pemasangan gate valve dia. 110 mm melalui galian tanah biasa

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.720 69,300.00 49,896.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.520 50,600.00 26,312.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 320,167.68

1 unit Pemasangan feet kran dia. 90 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.640 69,300.00 44,352.00


m³ Urugan pasir 0.160 238,920.00 38,227.20
m³ Urugan tanah kembali 0.440 50,600.00 22,264.00
m³ Buang tanah sisa galian 0.040 30,360.00 1,214.40
ls Pemasangan feet kran dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 284,279.68

1 unit Pemasangan feet kran dia. 63 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 217,676.08

1 unit Pemasangan feet kran dia. 50 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.360 69,300.00 24,948.00


m³ Urugan pasir 0.120 238,920.00 28,670.40
m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 50 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 197,176.08

1 unit Pemasangan feet kran dia. 25 mm melalui galian tanah biasa


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah biasa 0.240 69,300.00 16,632.00


m³ Urugan tanah kembali 0.210 50,600.00 10,626.00
m³ Buang tanah sisa galian 0.030 30,360.00 910.80
ls Pemasangan feet kran dia. 25 mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 25 mm 1 35,527.68 35,527.68
ls Perapihan 1 2,500.00 2,500.00
JUMLAH 141,196.48

V - 1072
1 unit Pemasangan Box Street dia. 8"
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 8" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 8" 1.000 185,781.20 185,781.20
m³ Beton tumbuk 1:3:5 0.028 949,520.00 26,586.56
JUMLAH 217,867.76

1 unit Pemasangan Box Street dia. 6"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 6" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 6" 1.000 77,431.00 77,431.00
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28
JUMLAH 96,224.28

1 unit Pemasangan Box Street dia. 4"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 4" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 4" 1.000 62,474.80 62,474.80
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28
JUMLAH 81,268.08

1 unit Pemasangan Box Street dia. 3"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 3" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 3" 1.000 57,178.80 57,178.80
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28
JUMLAH 75,972.08

1 unit Pemasangan Box Street dia. 2"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 2" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 2" 1.000 36,227.60 36,227.60
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28
JUMLAH 55,020.88

1 unit Pemasangan Box Street dia. 1 1/2"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 1 1/2" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 1 1/2" 1.000 35,727.60 35,727.60
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28
JUMLAH 54,520.88

1 unit Pemasangan Box Street dia. 1"

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

bh Pemasangan Box Street dia. 1" 1.000 5,500.00 5,500.00


m' Pemasangan pipa dia. 1" 1.000 16,734.40 16,734.40
m³ Beton tumbuk 1:3:5 0.014 949,520.00 13,293.28

V - 1073
JUMLAH 35,527.68

V - 1074
1 unit Peninggian Box Street

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ beton tumbuk 1 : 3 : 5 0.024 949,520.00 22,788.48


tukang 1.000 110,000.00 110,000.00
JUMLAH 132,788.48

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 ls Bongkar Box Street 22,000.00
1 ls Pemasangan / Perbaikan Accessories
Accessories dia. 3/4" 75,000.00
Accessories dia. 1" 75,000.00
Accessories dia. 1 1/2" 75,000.00
Accessories dia. 2" 95,000.00
Accessories dia. 3" 99,750.00
Accessories dia. 4" 120,750.00
Accessories dia. 6" 152,250.00
Accessories dia. 8" 183,750.00
Accessories dia. 10" 238,900.00
Accessories dia. 12" 310,500.00
Accessories dia. 14" 403,600.00
1 m³ Perbaikan Aspal Hotmix 1,260,000.00

1 unit Pemasangan wash out dia. 160 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.800 92,224.00 166,003.20


m³ Urugan pasir 0.400 238,920.00 95,568.00
m³ Urugan tanah kembali 1.300 50,600.00 65,780.00
m³ Buang tanah sisa galian 0.100 30,360.00 3,036.00
m' Pemasangan pipa PVC dia. 160 mm 4 3,500.00 14,000.00
ls Pemasangan gate valve dia. 160 mm 1 152,250.00 152,250.00
unit Pemasangan box street dia. 160 mm 1 96,224.28 96,224.28
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 597,901.48

1 unit Pemasangan wash out dia. 110 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.440 92,224.00 132,802.56


m³ Urugan pasir 0.320 238,920.00 76,454.40
m³ Urugan tanah kembali 1.040 50,600.00 52,624.00
m³ Buang tanah sisa galian 0.080 30,360.00 2,428.80
m' Pemasangan pipa PVC dia. 110 mm 4 3,000.00 12,000.00
ls Pemasangan gate valve dia. 110 mm 1 120,750.00 120,750.00
unit Pemasangan box street dia. 110 mm 1 81,268.08 81,268.08
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 483,367.84

V - 1075
1 unit Pemasangan wash out dia. 90 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.280 92,224.00 118,046.72


m³ Urugan pasir 0.320 238,920.00 76,454.40
m³ Urugan tanah kembali 0.880 50,600.00 44,528.00
m³ Buang tanah sisa galian 0.080 30,360.00 2,428.80
m' Pemasangan pipa PVC dia. 90 mm 4 2,500.00 10,000.00
ls Pemasangan gate valve dia. 90 mm 1 99,750.00 99,750.00
unit Pemasangan box street dia. 90 mm 1 75,972.08 75,972.08
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 432,220.00

1 unit Pemasangan wash out dia. 63 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 92,224.00 66,401.28


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.420 50,600.00 21,252.00
m³ Buang tanah sisa galian 0.060 30,360.00 1,821.60
m' Pemasangan pipa PVC dia. 63 mm 4 2,000.00 8,000.00
ls Pemasangan gate valve dia. 63 mm 1 95,000.00 95,000.00
unit Pemasangan box street dia. 63 mm 1 55,020.88 55,020.88
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 309,876.56

1 unit Pemasangan wash out dia. 50 mm

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.720 92,224.00 66,401.28


m³ Urugan pasir 0.240 238,920.00 57,340.80
m³ Urugan tanah kembali 0.420 50,600.00 21,252.00
m³ Buang tanah sisa galian 0.060 30,360.00 1,821.60
m' Pemasangan pipa PVC dia. 50 mm 4 1,500.00 6,000.00
ls Pemasangan gate valve dia. 50mm 1 75,000.00 75,000.00
unit Pemasangan box street dia. 50 mm 1 54,520.88 54,520.88
ls Perapihan 1 5,040.00 5,040.00
JUMLAH 287,376.56

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 unit Crossing Jalan Sistim Boring
m' pekerjaan boring tanah pipa dia. 2" 1 165,700.00
m' pekerjaan boring tanah pipa dia. 3" 1 185,100.00
m' pekerjaan boring tanah pipa dia. 4" 1 283,800.00
m' pekerjaan boring tanah pipa dia. 6" 1 335,200.00
m' pekerjaan boring tanah pipa dia. 8" 1 418,600.00
m' pekerjaan boring tanah pipa dia. 10" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 12" 1 598,300.00
m' pekerjaan boring tanah pipa dia. 14" 1 672,500.00
m' pekerjaan boring tanah pipa dia. 16" 1 700,000.00

V - 1076
Pemasangan Pipa Sistim Boring
18 m' Pemasangan Pipa PVC dia. 2" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.080 92,224.00 99,601.92


m³ Urugan tanah kembali 0.630 50,600.00 31,878.00
m³ Buang tanah sisa galian 0.090 30,360.00 2,732.40
m' Pengeboran tanah dia. 3" 18 185,100.00 3,331,800.00
ls Pemasangan pipa dia. 2" 18 40,353.92 726,370.56
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 4,199,982.88
Per m' Pemasangan Pipa PVC dia. 2" Sistem Boring = 1/18 x Rp. 233,332.38

18 m' Pemasangan Pipa PVC dia. 3" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 1.920 92,224.00 177,070.08


m³ Urugan tanah kembali 1.320 50,600.00 66,792.00
m³ Buang tanah sisa galian 0.120 30,360.00 3,643.20
m' Pengeboran tanah dia. 4" 18 283,800.00 5,108,400.00
ls Pemasangan pipa dia. 3" 18 64,514.48 1,161,260.64
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 6,524,765.92
Per m' Pemasangan Pipa PVC dia. 3" Sistem Boring = 1/18 x Rp. 362,487.00

18 m' Pemasangan Pipa PVC dia. 4" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 2.160 92,224.00 199,203.84


m³ Urugan tanah kembali 1.560 50,600.00 78,936.00
m³ Buang tanah sisa galian 0.120 30,360.00 3,643.20
m' Pengeboran tanah dia. 6" 18 335,200.00 6,033,600.00
ls Pemasangan pipa dia. 4" 18 70,727.44 1,273,093.92
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 7,596,076.96
Per m' Pemasangan Pipa PVC dia. 4" Sistem Boring = 1/18 x Rp. 422,004.28

18 m' Pemasangan Pipa PVC dia. 6" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 2.700 92,224.00 249,004.80


m³ Urugan tanah kembali 1.950 50,600.00 98,670.00
m³ Buang tanah sisa galian 0.150 30,360.00 4,554.00
m' Pengeboran tanah dia. 8" 18 418,600.00 7,534,800.00
ls Pemasangan pipa dia. 6" 18 87,746.80 1,579,442.40
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 9,474,071.20
Per m' Pemasangan Pipa PVC dia. 6" Sistem Boring = 1/18 x Rp. 526,337.29

V - 1077
18 m' Pemasangan Pipa PVC dia. 8" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 3.600 92,224.00 332,006.40


m³ Urugan tanah kembali 2.700 50,600.00 136,620.00
m³ Buang tanah sisa galian 0.180 30,360.00 5,464.80
m' Pengeboran tanah dia. 10" 18 598,300.00 10,769,400.00
ls Pemasangan pipa dia. 8" 18 113,335.60 2,040,040.80
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 13,291,132.00
Per m' Pemasangan Pipa PVC dia. 8" Sistem Boring = 1/18 x Rp. 738,396.22

18 m' Pemasangan Pipa PVC dia. 10" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 4.290 92,224.00 395,640.96


m³ Urugan tanah kembali 2.925 50,600.00 148,005.00
m³ Buang tanah sisa galian 0.195 30,360.00 5,920.20
m' Pengeboran tanah dia. 12" 18 598,300.00 10,769,400.00
ls Pemasangan pipa dia. 10" 18 144,333.76 2,598,007.68
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 13,924,573.84
Per m' Pemasangan Pipa PVC dia. 10" Sistem Boring = 1/18 x Rp. 773,587.44

18 m' Pemasangan Pipa PVC dia. 12" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 4.950 92,224.00 456,508.80


m³ Urugan tanah kembali 3.375 50,600.00 170,775.00
m³ Buang tanah sisa galian 0.225 30,360.00 6,831.00
m' Pengeboran tanah dia. 14" 18 672,500.00 12,105,000.00
ls Pemasangan pipa dia. 12" 18 166,092.80 2,989,670.40
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 15,736,385.20
Per m' Pemasangan Pipa PVC dia. 12" Sistem Boring = 1/18 x Rp. 874,243.62

18 m' Pemasangan Pipa PVC dia. 14" Sistim Boring Horizontal

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 5.280 92,224.00 486,942.72


m³ Urugan tanah kembali 3.600 50,600.00 182,160.00
m³ Buang tanah sisa galian 0.240 30,360.00 7,286.40
m' Pengeboran tanah dia. 16" 18 700,000.00 12,600,000.00
ls Pemasangan pipa dia. 14" 18 177,222.32 3,190,001.76
ls Pemadatan dan Perapihan kembali 1 7,600.00 7,600.00
JUMLAH 16,473,990.88
Per m' Pemasangan Pipa PVC dia. 14" Sistem Boring = 1/18 x Rp. 915,221.72

1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.495 92,224.00 45,650.88


m³ Urugan pasir 0.155 238,920.00 37,032.60
m³ Urugan tanah kembali 0.315 50,600.00 15,939.00
m³ Buang tanah sisa galian 0.180 30,360.00 5,464.80
m' Pemasangan pipa GI dia. 200 mm & Acc. 1 20,000.00 20,000.00
ls Perapihan 1 2,200.00 2,200.00
JUMLAH 126,287.28

V - 1078
1 m' Pemasangan pipa GI dia. 200 mm melalui galian type FR/CR

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m³ Galian tanah keras / berbatu 0.495 92,224.00 45,650.88


m³ Urugan pasir 0.155 238,920.00 37,032.60
m³ Urugan tanah kembali 0.315 50,600.00 15,939.00
m³ Buang tanah sisa galian 0.180 30,360.00 5,464.80
m' Pemasangan pipa GI dia. 200 mm & Acc. 1 18,200.00 18,200.00
ls Perapihan 1 2,200.00 2,200.00
JUMLAH 124,487.28

1 unit Tiang Penyangga

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

m' Pipa GI dia. 90 mm 2 129,350.00 258,700.00


m' Pengelasan 0.560 49,166.15 27,533.04
bh mur baud uk. 5/8" 2 1,600.00 3,200.00
bh cleam pipa 1 7,000.00 7,000.00
ls pemasangan 1 195,400.00 195,400.00
JUMLAH 491,833.04

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan


Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

V - 1079
DAFTAR HARGA SATUAN BAHAN, UPAH DAN ALAT
DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
KABUPATEN CIREBON

TAHUN ANGGARAN 2022

NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

A. BAHAN :

I. BATU
1 Abu Batu m3 252,840.00
2 Atras ( tanah urug ) m3 143,750.00
3 Batu apung kg 4,950.00
4 Batu belah 10/15 cm m3 315,000.00
5 Batu belah 15/20 cm (Krakal) m3 258,750.00
6 Batu pecah mesin 0.5-1 cm m3 288,000.00
7 Batu pecah mesin 1-2 cm m3 315,000.00
8 Batu pecah mesin 2-3 cm m3 315,000.00
9 Batu pecah mesin 3-5 cm m3 315,000.00
10 Batu tempel Palimanan 10 X 20 bh 3,200.00
11 Batu tempel kapur tekstur tidak rata m2 299,000.00
12 Chipping m3 310,500.00
13 Filler m3 218,500.00
14 Kapur bakar (padam) m3 253,000.00
15 Kapur Sirih kg 2,300.00
16 Kerikil Ø 1-3 cm m3 225,000.00
17 Gravel Pack 60 cm bh 86,600.00
18 Gravel Pack 30 cm bh 46,200.00
19 Gravel Pack 20 cm bh 40,400.00
20 Batu andesit 30 x 30 cm bh 10,500.00
21 Kansteen 10 x 20 x 40 m1 94,900.00
22 Pasang Kansteen 15 x 25 x 40 m1 247,225.00
23 Pasang Kansteen 20 x 25 x 60 m1 171,109.00

II. PASIR
1 Pasir beton m3 223,000.00
2 Pasir aspal m3 203,000.00
3 Pasir pasang m3 203,000.00
4 Pasir urug m3 160,000.00
5 Sirtu m3 184,000.00
6 Sirtu tersaring m3 301,900.00
7 Tanah urug pilhan m3 172,500.00
8 Tanah urug biasa m3 172,500.00
9 Tanah merah m3 172,500.00

III. BESI / PIPA / KAWAT


1 Besi WF/Besi Profil kg 16,200.00
2 Besi strip kg 15,800.00
3 Besi beton kg 14,000.00
4 Besi Wire Mesh M8 Lembar 652,050.00
5 Besi stainless dia. 0,5" m' 43,700.00
6 Besi stainless dia. 1" m' 69,000.00
7 Besi stainless dia. 1,5" m' 86,250.00
8 Besi stainless dia. 2" m' 92,200.00
9 Besi stainless dia. 2,5" m' 144,000.00
10 Besi stainless dia. 3" m' 174,800.00
11 Besi biasa dia. 2" btg 287,500.00
12 Besi biasa dia. 3" btg 356,500.00
13 Kawat beton / Kawat tali kg 20,000.00
14 Kawat bronjong pabrikan dia. 3 mm (uk 2x1x0.5) unit 510,500.00
15 Kawat bronjong dia. 4 mm kg 40,000.00
16 Kawat galvanis dia. 4 mm kg 23,000.00
17 Kawat galvanis dia. 6 mm kg 27,600.00
18 Kawat duri m' 16,900.00
19 Plat baja tebal 5 mm - 20 mm kg 14,000.00
20 Ram kawat harmonika m2 51,750.00
21 Socket besi O 3 " bh 47,000.00

VI - 1080
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

22 Sling Ø 32 mm m 350,750.00
23 Sling Ø 16 mm m 258,750.00
24 Klem sling Ø 32 mm set 517,500.00
25 Warfel / jarum keras Ø 32 mm bh 230,000.00
26 Causen sling Ø 32 mm bh 224,250.00
27 Klem kokat sling Ø 32 mm bh 287,500.00
28 Segel sling Ø 32 mm bh 287,500.00
29 Warfel sling Ø 16 mm bh 189,750.00
30 Segel sling Ø 16 mm bh 161,000.00
31 Klem kokat sling Ø 16 mm bh 103,500.00
32 Causen sling Ø 16 mm bh 166,750.00
33 Jarum keras Ø 16 mm bh 189,750.00
34 Klem pipa pvc bh 1,950.00

IV. PABRIKAN / TOKO


1 Alumunium foil m2 10,300.00
2 Alumunium pelapis pintu KM Tebal 0.2 lbr 40,200.00
3 Alumunium pelapis pintu KM Tebal 0.3 lbr 57,000.00
4 Alumunium pelapis pintu KM Tebal 0.4 lbr 80,800.00
5 Asbes gelombang 1500 x 1050 x 4 mm lbr 48,900.00
6 Asbes gelombang 1800 x 920 x 4 mm lbr 36,800.00
7 Asbes gelombang 2100 x 1050 x 4 mm lbr 65,600.00
8 Asbes gelombang 2400 x 1050 x 4 mm lbr 74,750.00
9 Asbes gelombang 2700 x 1050 x 4 mm lbr 86,250.00
10 Asbes gelombang 3000 x 1050 x 4 mm lbr 97,750.00
11 Ampelas lbr 3,500.00
12 Bak mandi keramik volume 0,3 m3 bh 212,750.00
13 Bak mandi fiber 120 L bh 253,000.00
14 Batu apung kg 5,000.00
15 Baut 3/4 " bh 7,700.00
16 Baut 5/8 " bh 7,700.00
17 Baut 1/2 " bh 6,900.00
18 Baut 1/2 " panjang 30 cm bh 23,000.00
19 Baut lawa-lawa 12 cm bh 17,250.00
20 Beading penurunan ( PC ) gypsum m' 11,500.00
21 Beading horison gypsum m' 11,500.00
22 Cat Menie kg 38,000.00
23 Cat genteng Matex kg 55,200.00
24 Cat genteng maxilite kg 57,500.00
25 Cat penutup kayu Bee brand kg 56,350.00
26 Cat penutup kayu Vim kg 28,900.00
27 Cat penutup kayu Ftalit kg 52,900.00
28 Cat penutup kayu Avian kg 55,200.00
29 Cat penutup tembok Vinilex kg 28,750.00
30 Cat penutup tembok Metrolit kg 26,450.00
31 Cat penutup tembok catylac kg 21,390.00
32 Cat penutup tembok Q Luc kg 11,500.00
33 Cat penutup tembok Property kg 10,925.00
34 Cat penutup besi kg 63,250.00
35 Cat Sinkromat kg 103,500.00
36 Closet duduk ( mono block ) porselen merk INA bh 1,422,550.00
37 Closet duduk ( siram ) porselen merk INA bh 626,750.00
38 Closet jongkok porselen merk INA/KIA bh 161,000.00
39 Closet jongkok porselen merk Avena bh 115,000.00
40 Dempul kayu kg 21,275.00
41 Dinding keramik uk. 10 x 20 cm bh 1,150.00
42 Dinding keramik uk. 20 x 20 cm bh 2,300.00
43 Dinding keramik uk. 20 x 25 cm bh 2,400.00
44 Dinding keramik uk. 30 x 30 cm bh 5,175.00
45 Door closer bh 190,095.00
46 Daun Jendela alumunium 4 '' m' 157,377.50
47 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna silver unit 822,250.00
48 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna Black/Brown unit 885,500.00
49 Jendela Alumunium + Kaca (uk.120 cm x 60 cm) warna White unit 948,750.00
50 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna silver unit 1,391,500.00
51 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna Black/Brown unit 1,518,000.00
52 Pintu Allumunium + Kaca (uk.210 cm x 90 cm) warna White unit 1,644,500.00
53 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna silver unit 1,138,500.00
54 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna Black/Brown unit 1,265,000.00
55 Pintu Kamar Mandi (Spandrel) uk. 200 cm x 70 cm warna White unit 1,391,500.00
56 Elastomer 30x30x5 bh 345,000.00
57 Elastomer 50x40x5 bh 3,450,000.00
58 Engsel jendela set 13,800.00
59 Engsel pintu set 69,000.00
60 Engsel meubeler bh 4,400.00
61 Eternit tebal 4 mm uk. 1 m x 1 m lbr 7,950.00
62 Eternit tebal 4 mm uk. 1 m x 0,5 m lbr 4,000.00
63 Flincote ltr 25,300.00
64 Loster Jati bh 28,750.00

VI - 1081
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

65 Glass beat kg 28,900.00


66 Glass Block bh 20,150.00
67 Gas elpiji kg 21,200.00
68 Grendel pintu / jendela bh 6,400.00
69 Gypsum board lbr 60,400.00
70 GRC tebal 4 mm lbr 60,000.00
71 Fiber Gelombang 180 x80 lbr 46,000.00
72 Kaca nako tebal 5 mm berikut teralis bh 13,150.00
73 Kaca polos tebal 3 mm m2 72,750.00
74 Kaca polos tebal 5 mm m2 86,250.00
75 Kaca polos tebal 5 mm ryben m2 92,000.00
76 Kait angin bh 8,650.00
77 Kran air Onda bh 13,800.00
78 Kunci gembok bh 28,750.00
79 Kunci pintu ukuran besar bh 143,750.00
80 Kunci pintu ukuran sedang bh 97,750.00
81 Kunci dan daun pintu dari fiber bh 402,500.00
82 Kusen Alumunium 3" warna natural/silver m' 75,900.00
83 Kusen Alumunium 3" warna coklat dop m' 82,800.00
84 Kusen Alumunium 3" warna coklat kilap m' 94,900.00
85 Kusen Alumunium 4" warna natural m' 94,900.00
86 Kusen Alumunium 4" warna coklat dop m' 101,200.00
87 Kusen Alumunium 4" warna coklat kilap m' 113,800.00
88 Kusen Alumunium 3" YKK m' 115,000.00
89 Kusen Alumunium 4" YKK m' 1,493,800.00
90 Langko - langko kuda - kuda bh 20,600.00
91 Lantai granit 60 x 60 cm ex. Granito corak bh 66,800.00
92 Lantai granit 60 x 60 cm ex. Granito polos bh 66,200.00
93 Lantai granit 40 x 40 cm ex. Essenza bh 50,000.00
94 Lantai granit 40 x 40 cm ex. Granito bh 48,500.00
95 Lantai granit 60 x 60 cm ex. Granito bh 54,000.00
96 Lantai keramik uk. 10 x 20 cm bh 1,200.00
97 Lantai keramik uk. 20 x 20 cm bh 2,300.00
98 Lantai keramik uk. 30 x 30 cm bh 2,500.00
99 Lantai keramik uk. 40 x 40 cm ( putih polos ) bh 5,200.00
100 Lantai terakota 20 x 5 cm bh 5,100.00
101 Lem kayu ltr 34,400.00
102 Lemkra/zat addictive kg 17,200.00
103 Lemkra Just Do It kg 5,200.00
104 Lemkra FS Nat kg 18,200.00
105 List kayu B.3 ( lebar sisi 3 cm ) m' 5,100.00
106 List kayu B.4 ( lebar sisi 4 cm ) m' 5,500.00
107 List keliling gypsum lebar 7 cm m' 16,100.00
108 List keliling gypsum lebar 10 cm m' 18,400.00
109 List keliling gypsum lebar 12 cm m' 20,700.00
110 List drop m' 10,200.00
111 Melamin / folywood lbr 101,800.00
112 Mozaik uk. 20 x 20 cm bh 2,200.00
113 Multiplex tebal 12 mm lbr 215,000.00
114 Multiplex tebal 15 mm lbr 300,000.00
115 Paku biasa 1/2" - 1" kg 21,000.00
116 Paku biasa 2" - 5" kg 21,000.00
117 Paku pancing 60 x 230 bh 1,000.00
118 Paku sekrup 3" - 5 " bh 500.00
119 Paku ulir bh 200.00
120 Plamir kayu / kualitas 1 kg 23,000.00
121 Plamir tembok kg 80,500.00
122 Plester Mutiara kg 9,200.00
123 Pintu kamer mandi fiber polos Daimaru bh 201,000.00
124 Pintu kamer mandi fiber Kaca Daimaru bh 281,700.00
125 Pintu kamer mandi Almunium Kettler bh 805,000.00
126 Polycarbonate m2 132,200.00
127 Plywood lbr 106,000.00
128 Portland Cement ( PC ) tiga roda zak 71,000.00
129 Portland Cement ( PC ) holcim zak 78,200.00
130 Portland Cement ( PC ) gresik zak 78,200.00
131 Rubber joint 25x10x5 bh 262,000.00
132 Joint Sealent kg 44,000.00
133 Expansion Cap m2 8,000.00
134 Polytene 125 mikron kg 29,000.00
135 Curing Compound Ltr 13,000.00
136 Roster / batu kerawang bh 4,600.00
137 Portland Semen kg 1,420.00
138 Semen warna kg 6,900.00
139 Seng BJLS 30 L. 90 cm m' 43,700.00
140 Seng gelombang 3' - 6 " BJLS 30 lbr 84,000.00
141 Sirlak kg 22,400.00
142 Spirtus ltr 10,300.00
143 Skim Coat kg 5,100.00

VI - 1082
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

144 Taekwood 4 mm 1200 x 2400 mm lbr 92,000.00


145 Taekwood 4 mm 900 x 2400 mm lbr 74,700.00
146 Ter kayu kg 16,700.00
147 Thermoplastic Glass beat kg 28,700.00
148 Tiner / minyak cat ltr 13,200.00
149 Triplek 3 mm lbr 58,000.00
150 Triplek 4 mm lbr 86,000.00
151 Triplek 6 mm lbr 91,000.00
152 Triplek 9 mm lbr 118,000.00
153 Triplek 12 mm lbr 215,000.00
154 Tempat cuci piring Beleza bh 460,000.00
155 Tempat cuci piring Benoti bh 201,200.00
156 Tempat cuci piring Royal bh 184,000.00
157 TG 302 kg 50,100.00
158 Washtafel bh 788,900.00
159 Woodplank corak 4 m lbr 69,000.00
160 Woodplank polos 2 m lbr 37,400.00
161 Ubin abu2 kepala basah 20 x 20 cm bh 2,300.00
162 Ubin abu2 kepala basah 30 x 30 cm bh 2,900.00
163 Ubin wafel ukuran 20 x 20 cm bh 2,300.00
164 Ubin warna 20 x 20 cm bh 2,600.00
165 Ubin warna 30 x 30 cm bh 3,300.00
166 Washtafel bh 788,900.00
167 Woodplank corak 4 m lbr 69,000.00
168 Woodplank polos 2 m lbr 37,400.00
169 Zincalume m2 86,200.00
170 Rangka plafon memakai Hollow dengan penutup GRC m2 101,400.00
tebal 4 mm + pengecatan
171 Tyfo Epoxy S Kg 747,700.00
172 Tyfo SHE51A m2 920,000.00
173 Karung plastik bh 2,500.00

174 Rangka atap baja ringan


a. Atap Baja Ringan memakai Genteng Keramik/Plentong
( jarak reng 22-28 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 189,750.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 201,250.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 212,750.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 201,250.00
m2 218,500.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 230,000.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 218,500.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 230,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 241,500.00
b. Atap Baja Ringan Genteng Metal/Spandek ( jarak reng 37,5-90 cm)
- Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 m2 178,250.00
- Atap Baja Ringan Perisai Bentang < 9 m Zinc-Alumunium G.550 m2 186,900.00
- Atap Baja Ringan Joglo Bentang < 9 m Zinc-Alumunium G.550 m2 195,500.00
- Atap Baja Ringan Pelana Bentang 10-12 m Zinc-Alumunium G.550 m2 184,000.00
- Atap Baja Ringan Perisai Bentang 10-12 m Zinc-Alumunium G.550 m2 201,250.00
- Atap Baja Ringan Joglo Bentang 10-12 m Zinc-Alumunium G.550 m2 212,750.00
- Atap Baja Ringan Pelana Bentang > 12 m Zinc-Alumunium G.550 m2 195,500.00
- Atap Baja Ringan Perisai Bentang > 12 m Zinc-Alumunium G.550 m2 207,000.00
- Atap Baja Ringan Joglo Bentang > 12 m Zinc-Alumunium G.550 m2 218,500.00

V. ASPAL
1 Aspal kemasan kg 13,000.00
2 Aspal curah kg 13,000.00
3 Aspal Emulsi ltr 12,000.00

VI. MINYAK
1 Pertalite liter 7,600.00
2 Premium (non subsidi) liter 7,600.00
3 Solar liter 5,900.00
4 Solar (non subsidi) liter 10,900.00
5 Minyak tanah liter 11,800.00
6 Olie SAE 20, 40, 60, 80 dan 120 liter 48,500.00
7 Pelumas bekisting liter 10,600.00
8 Stempet kg 28,700.00

VII.CETAKAN
1 Bata merah bh 900.00
2 Bata berongga bh 2,800.00
3 Batako bh 3,700.00
4 Genteng glazuur turbo ex Jatiwangi bh 4,000.00
5 Genteng nok/bubung diglazuur ex Jatiwangi bh 4,600.00
6 Genteng nok/bubung press mesin ex Jatiwangi bh 3,200.00
7 Genteng nok/bubung press tangan ex Jatiwangi bh 2,300.00
8 Genteng nok/bubung morando diglazuur bh 5,200.00
9 Genteng morando bh 400.00

VI - 1083
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

10 Genteng nok/bubung morando bh 4,600.00


11 Genteng press diglazuur ex Jatiwangi bh 2,700.00
12 Genteng press mesin ex Jatiwangi bh 2,200.00
13 Genteng press tangan ex Jatiwangi bh 1,600.00
14 Genteng Type Viktoria bh 10,300.00
15 Genteng nok/bubung Type Viktoria bh 14,400.00
16 Genteng nok/bubung ujung Type Viktoria bh 2,300.00
17 Genteng nok/bubung ujung pertigaan Type Viktoria bh 28,700.00
18 Genteng beton bh 5,700.00
19 Genteng metal 70 x 80 cm lbr 55,200.00
20 Gorong-gorong buis beton dia. 150 cm bh/0,5 m' 59,800.00
21 Gorong-gorong buis beton dia. 100 cm bh/0,5 m' 172,000.00
22 Gorong-gorong buis beton dia. 80 cm bh/0,5 m' 161,000.00
23 Gorong-gorong buis beton dia. 60 cm bh/m' 149,500.00
24 Gorong-gorong buis beton dia. 50 cm bh/m' 143,700.00
25 Gorong-gorong buis beton dia. 40 cm bh/m' 138,000.00
26 Gorong-gorong buis beton dia. 30 cm bh/m' 9,200.00
27 Gorong-gorong buis beton dia. 20 cm bh/m' 63,000.00
28 Kansten Cetak bh 94,900.00
29 Gravel dia. 60 cm bh 86,200.00
30 Gravel dia. 40 cm bh 51,700.00
31 Gravel dia. 20 cm bh 40,200.00
32 Nok steel gelombang 1050 x 5 mm m' 33,300.00
33 Nok steel gelombang 920 x 5 mm m' 25,800.00
34 Nok / bubung genteng beton bh 6,900.00
35 Paving Block K.175 Netural tebal 8 cm m2 71,300.00
36 Paving Block K.175 motif tebal 8 cm m2 73,600.00
37 Paving Block K.175 warna tebal 8 cm m2 79,300.00
38 Paving Block K.175 Netural tebal 6 cm m2 57,500.00
39 Paving Block K.175 motif tebal 6 cm m2 60,900.00
40 Paving Block K.175 warna tebal 6 cm m2 65,500.00
41 Paving Block K.250 m2 70,500.00
42 Box Culvert Ukuran 400 x 400 x1200 Buah 1,044,000.00
43 Box Culvert Ukuran 500 x 500 x1200 Buah 1,429,509.00
44 Box Culvert Ukuran 600 x 600 x1200 Buah 1,759,000.00
45 Box Culvert Ukuran 800 x 800 x1200 Buah 3,302,000.00
46 Box Culvert Ukuran 1200 x 1200 x1200 Buah 5,300,000.00
47 Box Culvert Ukuran 1500 x 1500 Buah 8,316,000.00
48 U- Ditch Ukuran 300 x 300 x 1200 Buah 386,750.00
49 U- Ditch Ukuran 300 x 400 x 1200 Buah 436,000.00
50 U- Ditch Ukuran 300 x 500 x 1200 Buah 513,000.00
51 U- Ditch Ukuran 400 x 400 x 1200 Buah 500,095.00
52 U- Ditch Ukuran 400 x 500 x 1200 Buah 603,750.00
53 U- Ditch Ukuran 400 x 600 x 1200 Buah 774,123.00
54 U- Ditch Ukuran 500 x 500 x 1200 Buah 737,000.00
55 U- Ditch Ukuran 500 x 600 x 1200 Buah 833,000.00
56 U- Ditch Ukuran 500 x 700 x 1200 Buah 902,000.00
57 U- Ditch Ukuran 600 x 600 x 1200 Buah 893,607.00
58 U- Ditch Ukuran 600 x 700 x 1200 Buah 1,005,000.00
59 U- Ditch Ukuran 600 x 800 x 1200 Buah 1,219,045.00
60 U- Ditch Ukuran 600 x 900 x 1200 Buah 1,524,497.00
61 U- Ditch Ukuran 800 x 900 x 1200 Buah 1,377,000.00
62 U- Ditch Ukuran 800 x 1000 x 1200 Buah 1,999,795.00
63 Cover U - Ditch 300, Heavy Duty Ukuran 300 x 600 Buah 138,000.00
64 Cover U - Ditch 400, Heavy Duty Ukuran 400 x 600 Buah 186,167.00
65 Cover U - Ditch 500, Heavy Duty Ukuran 500 x 600 Buah 268,447.00
66 Cover U - Ditch 600, Heavy Duty Ukuran 600 x 600 Buah 363,266.00
67 Cover U - Ditch 800, Heavy Duty Ukuran 800 x 600 Buah 517,938.00
68 Tiang pancang beton Pratekan m3 5,290,000.00
69 Beton Ready Mix K-225 m3 1,270,400.00
70 Karung Goni bh 5,650.00

VIII. KAYU
1 Bambu Ø6 - Ø8 / 6 m btg 18,000.00
2 Kayu deplank 8/20 - 4 m (Jati Jateng) m3 18,400,000.00
3 Kayu deplank 8/20 - 4 m (Balau) m3 13,800,000.00
4 Kayu deplank 8/20 - 4 m (Borneo) m3 5,175,000.00
5 Kayu dolken O 8 - 10 /4 m btg 71,000.00
6 Kayu dolken O 12 - 15 /4 m btg 86,200.00
7 Kayu dolken O 5 /3 m btg 15,100.00
8 Kayu hutan/kayu perancah acuan (kayu kelas III) m3 3,636,000.00
9 Kayu kamper m3 9,430,000.00
10 Kayu kaso 5/7 meranti m3 5,000,000.00
11 Kayu kaso 5/7 meranti btg 90,800.00
12 Kayu kruing m3 8,365,100.00
13 Kayu lanan m3 7,527,900.00
14 Kayu meranti m3 6,900,000.00
15 Kayu jati Jabar m3 9,430,000.00

VI - 1084
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

16 Kayu Balau (kayu kelas I) m3 10,925,000.00


17 Kayu Borneo (kayu kelas II) m3 5,000,000.00
18 Kayu bakar m3 172,500.00
19 Reng kayu borneo ukuran 2/3 cm btg 19,500.00
20 Reng 2 x 3 cm btg 40,200.00
21 Tali Ijuk kg 18,500.00

IX. LAIN-LAIN
1 Air L 14.65
2 Air bersih m3 5,700.00
3 Kayu kelas III (0,03 * 0,02 * 2 * 0,8)* harga bahan per m3 kg 38,600.00
4 Jendela naco (0,04 * harga kaca) bh 3,400.00
5 seng pelat (asumsi L.90 P.1 m) lbr 43,700.00
6 kawat jaring lbr 653,700.00
7 panel beton pracetak lbr 118,400.00
8 kolom beton pracetak batang 201,200.00
9 bahan tambahan kimia (efoksi) Liter 155,200.00
10 Strorox – 100 kg 88,000.00
11 Waterstop lebar 150 mm m' 57,500.00
12 Waterstop lebar 200 mm m' 143,700.00
13 Waterstop lebar 230 mm - 320 mm m' 132,200.00
14 Jaring kawat baja dilas (1 lembar = 61,79 kg)untuk wiremesh M8 kg 9,700.00
15 Penjaga jarak bekisting/spacer (dari besi/baut) bh 20,700.00
16 Besi scuare tube m' 21,800.00
17 Besi lis kaca (1 x 1) cm m' 16,400.00
18 Pengelasan cm 5,100.00
20 Besi hollow (50 x 50 x 3) mm kg 8,600.00
21 Dinabolt Ø 12mm bh 3,000.00
22 Phenol film 12 mm lbr 281,700.00
23 Semen grout kg 2,800.00
24 Screening kg 200.00
25 Besi siku L 30.30.3 kg 12,100.00
26 Besi pelat baja kg 7,500.00
27 Kawat las kg 31,100.00
28 Pintu gulung besi m2 1,122,400.00
29 Pintu lipat m2 3,116,500.00
30 Rolling door alluminium m2 460,000.00
31 Profil alluminium (silver) m' 126,500.00
32 Sealant tube 23,000.00
33 Venetions blinds dan vertical blinds (tirai) m2 122,100.00
34 Profil kaca (allumunium) m' 14,200.00
35 Sunscreen alluminium m2 442,700.00
36 Kawat nyamuk m2 287,500.00
37 Baja strip (0,2 x 2) cm kg 20,900.00
38 Jendela nako (rangka + kaca 5 mm) m2 187,700.00
39 Rangka metal hollow 40.40.2 mm m' 21,800.00
40 Baja ringan canai dingin C75 kg 16,100.00
41 HB (Batako Berlobang)-20 m3 503,100.00
42 HB (Batako Berlobang)-15 m3 575,000.00
43 HB (Batako Berlobang)-10 m3 776,200.00
44 Besi angker diameter 8 kg 14,900.00
45 Bata ringan tebal 7,5cm m3 747,500.00
46 Bata ringan tebal 10cm m3 862,500.00
47 Mortar siap pakai kg 4,300.00
48 Semen Mortar (SM) m3 1,100.00
49 Batu granit kg 5,700.00
50 Batu traso kg 5,700.00
80 ubin keramik mozaik ukuran 30 cm x 30 cm bh 4,600.00
81 plint keramik ukuran 10 cm x 20 cm bh 13,800.00
82 plint keramik ukuran 10 cm x 10 cm bh 10,300.00
83 plint keramik ukuran 5 cm x 20 cm bh 10,300.00
84 plint internal cove artistik 5 cm x 5 cm x 20 cm bh 17,200.00
85 lantai marmer ukuran 100cm x 100cm bh 920,000.00
86 Karpet m2 115,000.00
87 Lem untuk karpet kg 78,700.00
88 underlayer (pelapis bawah karpet) m2 57,500.00
89 parquet kayu m2 172,500.00
91 dinding keramik artistik 10 cm x 20 cm bh 3,900.00
92 dinding keramik artistik 5 cm x 20 cm bh 2,000.00
93 dinding marmer 100 cm x 100 cm bh 920,000.00
94 bata pelapis 3 cm x 7 cm x 24 cm bh 4,700.00
95 batu paras bh 4,800.00
96 batu tempel hitam bh 1,800.00
97 Vynil bh 12,600.00
98 Lem vynil kg 25,300.00
99 Wallpaper m' 80,500.00
100 Floor harderner kg 11,200.00
101 Asbes semen m2 42,500.00
102 Akustik lbr 58,600.00
103 Profil Allum "T" m' 113,800.00

VI - 1085
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

104 Ramset bh 250.00


105 Rooflight 90 x 180 lbr 71,300.00
106 Bubung stel gelombang lbr 71,300.00
107 Nok paten 92 cm lbr 71,300.00
109 Sirap kayu bh 1,900.00
110 Aluminium gel tebal 0,55 lbr 156,400.00
113 Kunci tanam antik (belluci) bh 255,300.00
114 Kunci tanam KM bh 51,700.00
115 Kunci silinder bh 80,500.00
116 Engsel kupu-kupu bh 28,700.00
117 Engsel angin bh 23,000.00
118 Spring knip bh 25,300.00
119 Door closer set 322,000.00
120 Kunci slot bh 13,800.00
121 Door holder bh 26,400.00
122 Door stop bh 46,000.00
123 Rel pintu sorong set 402,500.00
124 Kunci lemari set 163,300.00
125 Kaca tebal 8 mm m2 172,500.00
126 Kaca buram 12 mm m2 414,600.00
127 Kaca cermin 5 mm m2 155,200.00
128 Kaca cermin 8 mm m2 296,400.00
129 Kaca wireglassed 5 mm m2 241,500.00
130 Kaca patri 5mm m2 2,300,000.00
131 Soda api kg 28,700.00
132 Sabun kg 12,600.00
133 Kuas bh 13,800.00
134 Pengencer kg 27,600.00
135 Teak oil ltr 34,800.00
136 Politur ltr 43,600.00
137 Politur jadi ltr 49,600.00
138 Residu atau ter ltr 31,600.00
139 Vernis ltr 39,800.00
140 Kalkarium kg 21,300.00
141 Alang-alang ikat 11,500.00
142 Cat antara kg 40,200.00
143 Wood filler kg 29,900.00
144 Woodstain kg 54,000.00
145 Sanding kg 55,200.00
146 Melamic kg 50,000.00
147 Urinoir unit 746,300.00
150 Baja tulangan kg 14,000.00
151 Kayu bekisting m2 40,200.00
152 Waterdrain bh 442,700.00
153 Floor drain unit 94,900.00
154 genteng palentong kecil bh 1,000.00
155 genteng kodok glazuur bh 1,600.00
156 genteng palentong besar/super bh 1,700.00
157 genteng bubung palentong besar bh 6,900.00
158 Nok genteng beton bh 4,600.00
159 Nok genteng metal bh 51,100.00
160 Pipa listrik 5/8” btg 5,700.00
161 Kabel 1,5 x 2 m 9,200.00
162 Kabel 1,5 x 3 m 13,800.00
163 Kabel 2,5 x 2 m 14,900.00
164 Kabel 2,5 x 3 m 17,200.00
165 T Dus bh 2,300.00
166 L Bow bh 2,300.00
167 Las Dop bh 3,400.00
168 Mongkok bh 1,100.00
169 Saklar tunggal bh 14,900.00
170 Saklar ganda bh 18,400.00
171 Fitting tempel bh 5,200.00
172 Fitting gantung bh 4,000.00
173 M C B bh 34,500.00
174 digital print m' 23,000.00
175 Lampu pijar 25 s/d 100 watt (phlips) bh 13,800.00
176 Lampu Sl philip 18 watt bh 41,400.00
177 Lampu Sl philip 25 watt bh 54,000.00
178 Downlight + SL 25 watt philip bh 88,500.00
179 Lampu taman + tiang + lampu 1 buah bh 287,500.00
180 Stop kontak broco standard bh 14,900.00
181 kawat arde m 12,600.00
182 over spaneng m 10,300.00

VI - 1086
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

183 arde btg 12,600.00


184 box sikring bh 46,000.00
185 box MCB bh 5,700.00
186 Holo 4/4 meni btg 13,950.00
187 Holo 2/4 meni btg 12,600.00
188 Kawat Bwg 12 kg 11,500.00
189 Paku screw 2.5 cm bh 100.00
190 Adhesive kg 6,900.00
191 Kain kasa m' 500.00
192 Cat penutup 2 kali kg 28,700.00
193 Paku beton bh 200.00
194 Kabel Listrik NYA 3 x 2,5 mm m' 7,500.00
195 Bata berongga expose bh 3,000.00
196 Atap Selulosa uk. 195 x 96 cm bh 172,500.00
197 Paku/screw atap selulosa bh 1,400.00
198 Nok/bubung untuk atap selulosa untuk uk. 106 x 40 cm bh 94,900.00
199 Atap Selulosa uk. 106 x 40 cm bh 58,100.00
200 Nok/Bubung untuk Atap Selulosa 195 x 96 cm bh 101,200.00
201 Tabung Gas kg 21,800.00
202 Atap Bitumen Bergelombang Monolayer 3 mm LBR 189,200.00

X. BAHAN JALAN LINGKUNAN


1 Pasir Beton (Kasar) M01a M3 223,000.00
2 Pasir Halus (untuk HRS) M01c M3 203,000.00
3 Agregat Kasar (5-40 mm) M03 M3 315,000.00
4 Agregat Halus (0-5 mm) M04 M3 315,000.00
5 Agregat Kasar (tertahan pada ayakan 4,75 mm) M3 315,000.00
6 Agregat Halus (lolos saringan 4,75 mm) M3 315,000.00
7 Filler M05 Kg 98.00
8 Bahan Tanah Timbunan M08 M3 143,750.00
9 Bahan Pilihan M09 M3 158,000.00
10 Aspal M10 KG 13,000.00
11 Kerosen / Minyak Tanah M11 LITER 11,800.00
12 Chipping M41 M3 281,750.00
13 Chipping (kg) M41kg Kg 149.49
14 Bahan Agregat Kelas A M26 M3 367,606.11
15 Bahan Agregat Kelas B M27 M3 296,784.05
16 Formworks M2 45,000.00

X. PERPIPAAN, SANITASI DAN ACCESSORIES


1 Pipa Galv.Medium dia. 1/2" m' 29,900.00
2 Pipa Galv.Medium dia. 3/4" m' 38,600.00
3 Pipa Galv.Medium dia. 1" m' 57,800.00
4 Pipa Galv.Medium dia. 1 1/2" m' 87,800.00
5 Pipa Galv.Medium dia. 2" m' 71,233.00
6 Pipa Galv.Medium dia. 2 1/2" m' 116,900.00
7 Pipa Galv.Medium dia. 3" m' 181,833.00
8 Pipa Galv.Medium dia. 4" m' 283,000.00
9 Pipa Galv.Medium dia. 6" m' 434,900.00
10 Pipa PVC AW dia. 1/2" m' 7,000.00
11 Pipa PVC AW dia. 3/4" m' 10,200.00
12 Pipa PVC AW dia. 1" m' 13,300.00
13 Pipa PVC AW dia. 1 1/2" m' 27,600.00
14 Pipa PVC AW dia. 2" m' 22,300.00
15 Pipa PVC AW dia. 2 1/2" m' 68,700.00
16 Pipa PVC AW dia. 3" m' 89,650.00
17 Pipa PVC AW dia. 4" m' 234,600.00
18 Pipa PVC AW dia. 6" m' 284,900.00
19 Pipa PVC AW dia. 8" m' 449,950.00
20 Pipa PVC S.10 dia. 1/2" m' 6,600.00
21 Pipa PVC S.10 dia. 3/4" m' 9,400.00
22 Pipa PVC S.10 dia. 1" m' 12,450.00
23 Pipa PVC S.10 dia. 1 1/2" m' 27,650.00
24 Pipa PVC S.12,5 dia. 1 1/2" m' 27,650.00

VI - 1087
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

25 Pipa PVC S.12,5 dia. 2" m' 37,500.00


26 Pipa PVC S.12,5 dia. 3" m' 76,750.00
27 Pipa PVC S.12,5 dia. 4" m' 112,300.00
28 Pipa PVC S.12,5 dia. 6" m' 232,850.00
29 Pipa PVC S.12,5 dia. 8" m' 362,200.00
30 Pipa HDPE PN 16 dia. 1/2" m' 8,550.00
31 Pipa HDPE PN 16 dia. 3/4" m' 10,900.00
32 Pipa HDPE PN 16 dia. 1" m' 17,700.00
33 Pipa HDPE PN 12,5 dia. 1 1/2" m' 42,100.00
34 Pipa HDPE PN 12,5 dia. 2" m' 63,100.00
35 Pipa HDPE PN 12,5 dia. 2 1/2" m' 88,350.00
36 Pipa HDPE PN 12,5 dia. 3" m' 127,200.00
37 Pipa HDPE PN 12,5 dia. 4" m' 189,300.00
38 Pipa HDPE PN 12,5 dia. 5" m' 263,400.00
39 Pipa HDPE PN 12,5 dia. 6" m' 428,050.00
40 Pipa HDPE PN 12,5 dia. 8" m' 668,850.00
41 Pipa HDPE PN 12,5 dia. 10" m' 1,051,250.00
42 Pipa PVC Air limbah dia. 1 1/2" m' 39,400.00
43 Pipa PVC Air limbah dia. 2" m' 50,600.00
44 Pipa PVC Air limbah dia. 2 1/2" m' 60,900.00
45 Pipa PVC Air limbah dia. 3" m' 72,250.00
46 Pipa PVC Air limbah dia. 4" m' 86,000.00
47 Pipa PVC Air limbah dia. 6" m' 159,500.00
48 Pipa PVC Air limbah dia. 8" m' 244,600.00
49 Tangki Air kav.0,8 m3 bh 3,190,000.00
50 Tangki Air kav.1 m3 bh 3,850,000.00
51 Tangki Air kav.1,5 m3 bh 6,325,000.00
52 Tangki Air kav.2 m3 bh 7,920,000.00
53 Tangki Air kav.3 m3 bh 12,100,000.00
54 Tangki Air kav.5 m3 bh 19,800,000.00
55 Tangki Air kav.10 m3 bh 44,000,000.00
56 Tangki Air kav.15 m3 bh 68,200,000.00
57 Tangki Air Tanam kav.0,8 m3 bh 3,520,000.00
58 Tangki Air Tanam kav.1 m3 bh 4,565,000.00
59 Tangki Air Tanam kav.1,5 m3 bh 6,930,000.00
60 Tangki Air Tanam kav.2 m3 bh 9,405,000.00
61 Tangki Air Tanam kav.3 m3 bh 14,850,000.00
62 Tangki Air Tanam kav.5 m3 bh 23,100,000.00
63 Tangki Air Tanam kav.10 m3 bh 49,500,000.00
64 Pipa tanah Ǿ 20 cm bh 173,200.00
65 pipa tanah diameter 15 cm bh 113,200.00
66 pipa beton diameter 15 – 20 cm bh 44,300.00
67 pipa beton diameter 30 – 100 cm bh 66,000.00
68 Septic Tank kapasitas 0,8 m3 bh 3,767,500.00
69 Septic Tank kapasotas 1 m3 bh 4,743,750.00
70 Septic Tank kapasitas 1,5 m3 bh 7,411,250.00
71 Septic Tank kapasitas 2 m3 bh 10,312,500.00
72 Septic Tank kapasitas 10 m3 bh 53,625,000.00
73 Septic Tank kapasitas 15 m3 bh 80,437,500.00
74 Septic Tank kapasitas 20 m3 bh 107,250,000.00
75 Septic Tank kapasitas 25 m3 bh 134,062,500.00
76 Septic Tank kapasitas 30 m3 bh 160,875,000.00
77 Boch Gal.dia.1/2" bh 19,750.00
78 Boch Gal.dia.3/4" bh 28,900.00
79 Boch Gal.dia.1" bh 39,500.00
80 Boch Gal.dia.1 1/2" bh 91,650.00
81 Boch Gal.dia. 2" bh 239,600.00
82 Boch Gal.dia. 2 1/2" bh 352,350.00
83 Boch Gal.dia. 3" bh 465,100.00
84 Tee Gal.dia.1/2" bh 19,050.00
85 Tee Gal.dia.3/4" bh 25,400.00
86 Tee Gal.dia.1" bh 27,150.00
87 Tee Gal.dia.1 1/2" bh 50,750.00
88 Tee Gal.dia. 2" bh 60,650.00

VI - 1088
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

89 Tee Gal.dia. 2 1/2" bh 122,500.00


90 Tee Gal.dia. 3" bh 197,350.00
91 Double neplee Gal.dia.1/2" bh 9,200.00
92 Double neplee Gal.dia.3/4" bh 16,950.00
93 Double neplee Gal.dia.1" bh 31,050.00
94 Double neplee Gal.dia.1 1/2" bh 61,350.00
95 Double neplee Gal.dia. 2" bh 86,700.00
96 Double neplee Gal.dia. 2 1/2" bh 112,400.00
97 Double neplee Gal.dia. 3" bh 211,450.00
98 Water mur Gal.dia.1/2" bh 37,250.00
99 Water mur Gal.dia.3/4" bh 54,150.00
100 Water mur Gal.dia.1" bh 64,300.00
101 Water mur Gal.dia.1 1/2" bh 128,550.00
102 Water mur Gal.dia. 2" bh 162,400.00
103 Water mur Gal.dia. 2 1/2" bh 236,800.00
104 Water mur Gal.dia. 3" bh 338,250.00
105 Dop Gal.dia.1/2" bh 8,750.00
106 Dop Gal.dia.3/4" bh 12,900.00
107 Dop Gal.dia.1" bh 20,350.00
108 Dop Gal.dia.1 1/2" bh 32,300.00
109 Dop Gal.dia. 2" bh 56,650.00
110 Dop Gal.dia. 2 1/2" bh 67,400.00
111 Dop Gal.dia. 3" bh 130,350.00
112 Socket Gal.dia.1/2" bh 8,700.00
113 Socket Gal.dia.3/4" bh 9,750.00
114 Socket Gal.dia.1" bh 16,800.00
115 Socket Gal.dia.1 1/2" bh 37,450.00
116 Socket Gal.dia. 2" bh 54,550.00
117 Socket Gal.dia. 2 1/2" bh 60,600.00
118 Socket Gal.dia. 3" bh 102,500.00
119 Knee Gal.dia.1/2" x 90 bh 10,300.00
120 Knee Gal.dia.3/4" x 90 bh 17,000.00
121 Knee Gal.dia.1" x 90 bh 23,500.00
122 Knee Gal.dia.2" x 90 bh 48,150.00
123 Knee Gal.dia. 2" x 45 bh 58,700.00
124 Knee Gal.dia. 3" x 90 bh 148,800.00
125 Knee Gal.dia. 3" x 45 bh 161,500.00
126 Gate Valve dia.1/2" bh 162,250.00
127 Gate Valve dia.3/4" bh 180,950.00
128 Gate Valve dia.1" bh 206,800.00
129 Gate Valve dia.1 1/2" bh 395,450.00
130 Gate Valve dia.2" bh 636,900.00
131 Gate Valve dia.3" bh 1,395,900.00
132 Gate Valve dia.4" bh 1,901,350.00
133 Check Valve dia.1/2" bh 99,000.00
134 Check Valve dia.3/4" bh 114,950.00
135 Check Valve dia.1" bh 228,250.00
136 Check Valve dia.1 1/2" bh 444,950.00
137 Check Valve dia.2" bh 659,450.00
138 Check Valve dia.3" bh 2,119,700.00
139 Check Valve dia.4" bh 4,241,350.00
140 Ball Valve dia.1/2" bh 186,450.00
141 Ball Valve dia.3/4" bh 205,700.00
142 Ball Valve dia.1" bh 263,450.00
143 Ball Valve dia.2" bh 742,500.00
144 Ball Valve dia.3" bh 1,639,000.00
145 Plug krant dia.1/2" bh 94,500.00
146 Plug krant dia.3/4" bh 106,700.00
147 Plug krant dia.1" bh 156,200.00
148 Atap kran/Bibcok 1/2" bh 48,950.00
149 Atap kran/Bibcok 3/4" bh 57,200.00
150 Seal Tape bh 5,350.00
151 Water meter dia.1/2" bh 577,500.00
152 Water meter dia.3/4" bh 1,058,200.00

VI - 1089
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

153 Water meter dia.1" bh 2,990,350.00


154 Water meter dia.1 1/2" bh 4,687,650.00
155 Water meter dia.2" bh 9,046,950.00
156 Water meter dia.3" bh 11,070,400.00
157 Box meter bh 83,050.00
158 Clam sadel 2 x 1/2" bh 39,100.00
159 Clam sadel 2 x 3/4" bh 39,100.00
160 Clam sadel 2 x 1" bh 43,450.00
161 Clam sadel 3 x 1/2" bh 55,850.00
162 Clam sadel 3 x 3/4" bh 55,850.00
163 Clam sadel 3 x 1" bh 68,250.00
164 Tee all flang 2" x 2" bh 405,900.00
165 Tee all flang 3" x 2" bh 703,600.00
166 Tee all flang 3" x 3" bh 798,300.00
167 Tee all flang 4" x 2" bh 879,450.00
168 Tee all flang 4" x 3" bh 933,570.00
169 Tee all flang 4" x 4" bh 947,100.00
170 Bend all flang 2" x 90 bh 451,000.00
171 Bend all flang 2" x 45 bh 451,000.00
172 Bend all flang 3" x 90 bh 615,650.00
173 Bend all flang 3" x 45 bh 591,950.00
174 Bend all flang 4" x 90 bh 744,150.00
175 Bend all flang 4" x 45 bh 727,250.00
176 Gibol joint 2" bh 281,900.00
177 Gibol joint 2 1/2" bh 307,350.00
178 Gibol joint 3" bh 332,750.00
179 Gibol joint 4" bh 504,900.00
180 Flange Las 2" bh 91,300.00
181 Flange Las 3" bh 142,450.00
182 Flange Las 4" bh 329,450.00
183 Flange Las 6" bh 905,850.00
184 Baut & mur 5/8 x 3 bh 10,350.00
185 Baut & mur 5/8 x 4 bh 11,950.00
186 Baut & mur 5/8 x 5 bh 12,300.00
187 Baut & mur 5/8 x 6 bh 13,750.00
188 Manhole (Kotak/bulat) Uk.30 T.7mm bh 1,100,000.00
189 Manhole (Kotak/bulat) Uk.50 T.7mm bh 1,320,000.00
190 Manhole (Kotak/bulat) Uk.70 T.7mm bh 1,540,000.00
191 Pompa Submersible 1,5 KW-2HP 380 V Set 17,336,550.00
192 Pompa Submersible 2,2 KW-3HP 380 V Set 20,051,900.00
193 Pompa Submersible 3,0 KW-4HP 380 V Set 24,221,450.00
194 Pompa Submersible 4,0 KW-5,5HP 380 V Set 30,904,500.00

VI - 1090
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

195 Panel pompa Set 5,500,000.00


196 Pemasangan Box Street dia. 8" bh 5,500.00
197 Band all socket (RRJ) 2" x 45 bh 84,350.00
198 Band all socket (RRJ) 2" x 90 bh 101,650.00
199 Band all socket (RRJ) 3" x 45 bh 177,850.00
200 Band all socket (RRJ) 3" x 90 bh 208,100.00
201 Band all socket (RRJ) 4" x 45 bh 291,300.00
202 Band all socket (RRJ) 4" x 90 bh 391,300.00
203 Flange Socket 2" bh 372,700.00
204 Flange Socket 3" bh 580,050.00
205 Flange Socket 4" bh 846,150.00
206 Flange Socket 6" bh 1,376,650.00
207 Reduser Socket RR 63 x 50 bh 35,550.00
208 Reduser Socket RR 90 x 63 bh 115,600.00
209 Reduser Socket RR 90 x 50 bh 91,750.00
210 Reduser Socket RR 110 x 90 bh 145,050.00
211 Reduser Socket RR 110 x 63 bh 155,850.00
212 Reduser Socket RR 160 x 110 bh 292,900.00
213 Cap/Dop RR 20 bh 4,200.00
214 Cap/Dop RR 25 bh 5,650.00
215 Cap/Dop RR 32 bh 7,500.00
216 Cap/Dop RR 40 bh 11,000.00
217 Cap/Dop RR 50 bh 16,750.00
218 Cap/Dop RR 63 bh 50,450.00
219 Cap/Dop RR 90 bh 87,600.00
220 Cap/Dop RR 110 bh 148,650.00
221 Cap/Dop RR 160 bh 246,350.00
222 Tee PVC ND 20 bh 6,500.00
223 Tee PVC ND 25 bh 8,450.00
224 Tee PVC ND 32 bh 13,150.00
225 Tee PVC ND 40 bh 19,300.00
226 Tee PVC ND 50 bh 27,450.00
227 Tee PVC ND 63 bh 83,300.00
228 Tee PVC ND 90 bh 229,600.00
229 Tee PVC ND 110 bh 365,000.00
230 Knee PVC 20 bh 4,750.00
231 Knee PVC 25 bh 6,400.00
232 Knee PVC 32 bh 9,300.00
233 Knee PVC 40 bh 13,950.00
234 Knee PVC 50 bh 21,450.00
235 Knee PVC 63 bh 78,550.00
236 Knee PVC 90 bh 182,300.00
237 Knee PVC 110 bh 310,650.00
238 Valve Adaptor SDL 20 bh 8,550.00
239 Valve Adaptor SDL 25 bh 10,350.00
240 Valve Adaptor SDL 32 bh 14,200.00
241 Valve Adaptor SDL 40 bh 19,950.00
242 Valve Adaptor SDL 50 bh 35,350.00
243 Valve Adaptor SDL 63 bh 56,700.00
244 Valve Adaptor SDL 90 bh 148,350.00
245 Valve Adaptor SDL 110 bh 249,600.00
246 Paucket SDD 20 bh 15,000.00
247 Paucket SDD 25 bh 18,400.00
248 Paucket SDD 32 bh 29,850.00
249 Paucket SDD 40 bh 36,500.00
250 Paucket SDD 50 bh 54,650.00
251 Paucket SDD 63 bh 82,350.00
252 Paucket SDD 90 bh 226,000.00
253 Paucket SDD 110 bh 334,700.00
254 Knee drat PVC 20 bh 8,800.00
255 Knee drat PVC 25 bh 13,200.00
256 Knee drat PVC 32 bh 16,500.00
257 Floting Valve (pelampung bola) 2" bh 9,075,000.00
258 Floting Valve (pelampung bola) 3" bh 11,858,000.00

VI - 1091
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

259 Air Valve 1" bh 1,512,500.00


260 Air Valve 2" bh 1,936,000.00
261 Air Valve 3" bh 5,324,000.00
262 Air Valve 4" bh 7,865,000.00

VI - 1092
NO

HARGA SATUAN
URAIAN BAHAN/UPAH/ALAT KODE SAT. KET.
Rp

B. UPAH
1 Mandor /hari 120,000.00
2 Kepala tukang /hari 120,000.00
3 Tukang kayu / besi /hari 110,000.00
4 Tukang batu /hari 110,000.00
5 Tukang bor /hari 110,000.00
6 Tukang Las /hari 120,000.00
7 Pembantu tukang/Pekerja /hari 80,000.00
8 Operator terlatih /hari 140,000.00
9 Operator kurang terlatih /hari 85,000.00
10 Pembantu operator /hari 80,000.00
11 Supir truk /hari 90,000.00
12 Pembantu supir /hari 80,000.00
13 Mekanik /hari 90,000.00
14 Pembantu mekanik /hari 80,000.00
15 Buruh lapangan terlatih /hari 100,000.00
16 Buruh lapangan kurang terlatih /hari 80,000.00
17 Buruh lapangan tak terlatih / pekerja /hari 80,000.00

C. ALAT
1 Sewa crane (10 Ton) unit/hari 4,485,000.00
2 Sewa pipe support buah/hari 341,550.00
3 Sewa scaffolding unit/hari 341,550.00
4 Sewa Tripot/Tackel & handle crane 2 T unit/hari 4,025,000.00
5 Sewa excavator type 225 kapasitas 0,5 - 1,0 m3 unit/hari 1,835,400.00
6 Peralatan potong pipa T1/manual (gergaji) /saw unit/hari 57,500.00
7 Peralatan potong pipa T2/manual (gergaji) /saw unit/hari 57,500.00
8 Mobile crane £ 3 ton unit/hari 1,667,500.00
9 Sewa Genset 1500 watt unit/hari 1,420,020.00
10 Sewa Pompa Submersible 3 m3/h unit/hari 379,500.00
11 Sewa crane (3 Ton) Jam 132,250.00
12 Compressor Jam 78,556.50
13 Driling rig + perlengkapan (daerah batuan keras) m 805,000.00
14 Driling rig + perlengkapan (daerah batuan sedang) m 603,750.00
15 Mesin Las Jam 230,000.00
16 Mesin Blower Jam 345,000.00

ALAT JALAN
1 EXCAVATOR 80-140 HP E10 Jam 383,917.43
2 DUMP TRUCK 3.5 TON E08 Jam 218,351.62
3 WHEEL LOADER 1.0-1.6 M3 E15 Jam 435,196.50
4 MOTOR GRADER >100 HP E13 Jam 394,059.68
5 VIBRATORY ROLLER 5-8 T. E19 Jam 242,040.15
6 WATER TANKER 3000-4500 L. E23 Jam 313,608.03
7 TANDEM ROLLER 6-8 T. E17 Jam 406,739.23
8 ASPHALT DISTRIBUTOR E41 Jam 342,947.33
9 COMPRESSOR 4000-6500 L\M E05 Jam 129,446.21
10 TIRE ROLLER 8-10 T. E18 Jam 440,375.31
11 ASPHALT MIXING PLANT E01 Jam 7,795,898.87
12 GENERATOR SET E12 Jam 297,098.16
13 ASPHALT FINISHER E02 Jam 280,799.72
14 DUMP TRUCK 5 TON E09 Jam 345,406.65
15 THREE WHEEL ROLLER 6-8 T E16 Jam 216,136.39
16 ASPHALT SPRAYER E03 Jam 57,689.63
17 Beton Mixer E06 Jam 75,186.43
18 Concrete Vibrator E20 Jam 42,267.10
19 Flat Bed Truck E11 Jam 274,692.64

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan


Pertanahan Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

VI - 1093
HARGA PERKIRAAN SENDIRI (HPS)
RENCANA BIAYA : PEMBANGUNAN / REHABILITASI
TAHUN : 2022
DESA :
KECAMATAN :
KABUPATEN : C I R E B O N

HARGA
JUMLAH
NO JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp Rp
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 (K3) Pembuatan 1 m2 gudang semen dan peralatan A. 2.2.1.7. m2 -
2 Pengukuran dan pemasangan 1 m’ Bouwplank A. 2.2.1.4. m' -
3 (K3) Pembuatan 1 m2 steger/perancah dari bambu A. 2.2.1.10. m2 -
4 Papan nama proyek SNI.100.03 bh -
-

II PEKERJAAN BONGKARAN
1 Pembongkaran 1 m3 beton bertulang A. 2.2.1.13. m3 -
2 Pembongkaran 1 m3 dinding tembok bata A. 2.2.1.14. m3 -
-

III PEKERJAAN GALIAN/URUGAN


1 Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1. m3 -
2 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9. m3 -
3 (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10. m3 -
4 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
-

IV PEKERJAAN PONDASI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -
2 (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9. m3 -
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP A.3.2.1.3 m3 -
-

V PEKERJAAN BETON/PEMBESIAN
1 Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg -
2 (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 -
3 (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 -
4 (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 -
5 (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 -
6 (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 -
7 (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 -
8 (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 -
Membuat 1 m3 beton mutu f’c = 7,4 Mpa (sama dengan K 100),
9 A.4.1.1.1 m3
setara dengan beton rabat -
10 Membuat 1 m3 beton mutu f’c = 9,8 Mpa (sama dengan K-125) A.4.1.1.2 m3 -
11 Membuat 1 m3 beton mutu f’c = 12,2 Mpa (sama denga K 150) A.4.1.1.3 m3 -
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6)
12 A.4.1.1.4 m3
cm, w/c = 0,87 -
Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
13 A.4.1.1.5. m3
(sama dengan K 175) -
14 Membuat 1 m3 beton mutu f’c = 16,9 Mpa (sama dengan K 220) A.4.1.1.6 m3 -
15 Membuat 1 m3 beton mutu f’c = 19,3 Mpa (sama dengan K 225) A.4.1.1.7. m3 -
16 Membuat 1 m3 beton mutu f’c = 21,7 Mpa (sama dengan K 250) A.4.1.1.8. m3 -
17 Membuat 1 m3 beton mutu f’c = 24,0 Mpa (sama dengan K 325) A.4.1.1.9. m3 -

VII - 1094
18 Membuat 1 m3 beton mutu f’c = 26,4 Mpa (sama dengan K 350) A.4.1.1.10. m3 -
19 Membuat 1 m3 beton mutu f’c = 28,8 Mpa (sama dengan K 375) A.4.1.1.11. m3 -
Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
20 A.4.1.1.12. m3
(sama dengan K 425) -
21 Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 -
22 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' -
23 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' -
-

VI PEKERJAAN PASANGAN DINDING BATA


Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu
1 A. 4.4.1.4. m2
campuran 1SP : 5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu
2 A. 4.4.1.10 m2
campuran 1SP :5PP -
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu
3 A. 4.4.1.15 m2
campuran 1SM : 1KP :2PP -
4 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5. m2 -
5 Pemasangan 1 m2 acian A.4.4.2.27. m2 -
6 Pemasangan 1 m2 plesteran granit 1SP : 2 granit tebal 1cm A.4.4.2.21. m2 -
7 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP A.4.4.2.23. m2 -
8 Pemasangan 1 m2 finishing siar pasangan conblock ekspose A.4.4.2.25. m2 -
Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP
9 A.4.4.2.26. m2
: 2PP -
10 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm A.4.4.3.54. m2 -
-
-
VII PEKERJAAN KUSEN,PINTU DAN JENDELA
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
1 A.4.6.1.1. m3
kayu kelas I -
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
2 A.4.6.1.2. m3
kayu kelas II atau III -
Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu
3 A.4.6.1.6. m2
kelas I atau II -
Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu
4 A.4.6.1.7. m2
kelas I atau II -

5 Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11. m2


-
Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose
6 A.4.6.1.12. m2
kayu kelas II -
7 Pemasangan 1 m kusen pintu alluminium A.4.2.1.11. m' -
8 Pemasangan 1 m2 pintu alluminium strip lebar 8 cm A.4.2.1.12. m2 -
Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9)
9 A.4.5.1.7. m2
mm, tebal 9 mm -
10 Pemasangan 1 m’ list langit-langit kayu profil A.4.5.1.9. m' -
11 Pemasangan 1 m2 kaca tebal 3 mm A.4.6.2.16. m2 -
12 Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17. m2 -
13 Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18. m2 -
14 Pemasangan 1 m2 kaca buram tebal 12 mm A.4.6.2.19. m2 -
15 Pemasangan 1 m2 kaca cermin tebal 5 mm A.4.6.2.20. m2 -
-

VIII PEKERJAAN KUDA-KUDA / ATAP

1 - Atap Baja Ringan Pelana Bentang < 9 m Zinc-Alumunium G.550 - m2


-

2 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16. m2


-

3 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17. m2


-
4 Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18. m2 -
Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas
5 A.4.6.1.19. m2
II atau III -
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas
6 A.4.6.1.20. m2
II atau III -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
7 A.4.6.1.21. m'
kelas II -

VII - 1095
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
8 A.4.6.1.22. m'
kelas II -
Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu
9 A.4.6.1.23. m2
kelas II atau III -
10 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26. m2 -
11 Pemasangan 1 m2 atap genteng palentong kecil A.4.5.2.1. m2 -
12 Pemasangan 1 m2 atap genteng palentong besar/super A.4.5.2.3. m2 -
13 Pemasangan 1 m’ bubung genteng palentong A.4.5.2.4. m' -
14 Pemasangan 1 m’ bubung genteng palentong besar A.4.5.2.6. m' -
Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau
15 A.4.6.1.21. m'
kelas II -
Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau
16 A.4.6.1.22. m'
kelas II -

17 Pemasangan 1 m2 atap asbes gelombang 0,92 m x 2 ,5 m x 5 mm A.4.5.2.8. m2


-
18 Pemasangan 1 m’ bubung stel gelombang 0,92 m A.4.5.2.22. m' -
19 Pemasangan 1 m’ nok paten 0,92 m A.4.5.2.22. m' -
-

IX PEKERJAAN LANTAI
1 Pengurugan 1 m3 dengan pasir urug A.2.3.1.11. m3 -

2 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm A.4.4.3.1. m2


-

3 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm A.4.4.3.4. m2


-

4 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm A.4.4.3.9. m2


-
Pemasangan 1 m2 lantai ubin teralux marmer ukuran 40 cm x 40
5 A.4.4.3.14. m2
cm -
6 Pemasangan 1 m2 lantai keramik ukuran 33 cm x 33 cm A.4.4.3.34. m2 -
7 Pemasangan 1m2 lantai keramik ukuran 30 cm x 30 cm A.4.4.3.35. m2 -
8 Pemasangan 1m2 lantai keramik ukuran 20 cm x 20 cm A.4.4.3.36. m2 -
9 Pemasangan 1 m2 dinding keramik 20 cm x 20 cm A.4.4.3.54. m2 -

10 Pemasangan 1 m’ plint ubin Pc abu-abu ukuran 10cm x 40cm A.4.4.3.18. m'


-
11 Pemasangan 1 m’ plint ubin warna ukuran 10 cm x 40 cm A.4.4.3.21. m' -
12 Pemasangan 1 m’ plint ubin granit ukuran 10 cm x 40 cm A.4.4.3.24. m' -
13 Pemasangan 1 m’ plint keramik ukuran 10 cm x 20 cm A.4.4.3.39. m' -
14 Pemasangan 1 m2 paving block natural tebal 6 cm A.4.4.3.64. m2 -
15 Pemasangan 1 m2 paving block berwarna tebal 6 cm A.4.4.3.66. m2 -
-

X PEKERJAAN BESI / LAIN-LAIN


1 Pemasangan 1 buah kunci tanam biasa A.4.6.2.2. bh -
2 Pemasangan 1 buah engsel pintu A.4.6.2.5. bh -
3 Pemasangan 1 buah kait angin A.4.6.2.9. bh -
4 Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6. bh -
5 Pemasangan 1 buah door closer A.4.6.2.10. bh -
6 Pemasangan 1 buah kunci slot (grendel) A.4.6.2.11. bh -
7 (K3) Pemasangan 1 buah closet duduk/monoblock A.5.1.1.1. bh -
8 Pemasangan 1 buah closet jongkok porselen A.5.1.1 2. bh -
9 (K3) Pemasangan 1 buah urinoir A.5.1.1 4. bh -
10 (K3) Pemasangan 1 buah wastafel A.5.1.1 5. bh -
11 Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1 12. bh -
12 Pemasangan 1 buah floor drain A.5.1.1 14. bh -

13 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1 15. bh
-
14 Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1 18. m' -
15 Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1 25. m' -
16 (K3) Pemasangan 1 buah titik lampu (Instalasi) A.8.4.6.1 bh -
17 (K3) Pemasangan 1 buah MCB (Penyambungan Daya ke PLN) A.8.4.6.1 bh -
-

VII - 1096
XI PEKERJAAN MENGECAT
1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat
1 A.4.7.1.4. m2
dasar, 2 lapis cat penutup) -
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2
2 A.4.7.1.10. m2
lapis cat penutup) -
3 Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16. m2 -

4 Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis A.4.7.1.18. m2


-
5 Plituran 10 m2 dengan plitur melamic A.4.7.1.22. m2 -
6 Pemasangan 1 m2 wallpaper A.4.7.1.15. m2 -
7 1 m2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1. m2 -
-

REKAPITULASI
I PEKERJAAN PERSIAPAN Rp -
II PEKERJAAN BONGKARAN Rp -
III PEKERJAAN GALIAN/URUGAN Rp -
IV PEKERJAAN PONDASI Rp -
V PEKERJAAN BETON/PEMBESIAN Rp -
VI PEKERJAAN PASANGAN DINDING BATA Rp -
VII PEKERJAAN KUSEN,PINTU DAN JENDELA Rp -
VIII PEKERJAAN KUDA-KUDA / ATAP Rp -
IX PEKERJAAN LANTAI Rp -
X PEKERJAAN BESI / LAIN-LAIN Rp -
XI PEKERJAAN MENGECAT Rp -
JUMLAH -

PPN 10 % Rp -
JUMLAH TOTAL Rp -

DIBULATKAN Rp -

TERBILANG : ( ………………………………………….. )

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan


Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

VII - 1097
RISALAH ANALISA
- Pemasangan 1 m2 dinding bata berongga ekspose 5 x 10,5 x 21 campuran
1SP :3PP (Pemasangan Tanpa Spasi)
dibuat 16 Mei 2017 pengganti analisa A. 4.4.1.24.rob
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang batu L.02 OH 0.150 110,000.00 16,500.00
Kepala tukang L.03 OH 0.015 120,000.00 1,800.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 44,100.00
B BAHAN
Bata Berongga ekspose buah 83.000 3,000.00 249,000.00
Semen Portland Kg 19.000 1,420.00 26,980.00
Pasir pasang m3 0.032 203,000.00 6,496.00
JUMLAH HARGA BAHAN 282,476.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 326,576.00


E Overhead & Profit 10.00% 32,657.60
F Harga Satuan Pekerjaan (D+E) 359,233.60

VIII - 1098
A.4.5.2.1. rob1 ATAP BITUMEN SELULOSA MONOLAYER UK.195 X 96 CM
dibuat 13 Juni 2017
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Selulosa 0.650 172,500.00 112,125.00
Paku/Screw 12.000 1,400.00 16,800.00
JUMLAH HARGA BAHAN 128,925.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 149,505.00


E Overhead & Profit 10.00% 14,950.50
F Harga Satuan Pekerjaan (D+E) 164,455.50

NOK/BUBUNGAN UNTUK ATAP SELULOSA MONOLAYER


A.4.5.2.1. rob2 (SAMPING)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.042 94,900.00 98,885.80
Paku/Screw 8.330 1,400.00 11,662.00
JUMLAH HARGA BAHAN 110,547.80
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 147,097.80


E Overhead & Profit 10.00% 14,709.78
F Harga Satuan Pekerjaan (D+E) 161,807.58

VIII - 1099
A.4.5.2.1. rob3 ATAP BITUMEN SELULOSA MONOLAYER UK. 106 X 40 CM

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 28,320.00
B BAHAN
Atap Selulosa 3.230 58,100.00 187,663.00
Paku/Screw 16.150 1,400.00 22,610.00
JUMLAH HARGA BAHAN 210,273.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 238,593.00


E Overhead & Profit 10.00% 23,859.30
F Harga Satuan Pekerjaan (D+E) 262,452.30

A.4.5.2.1. rob4 NOK/BUBUNG UNTUK ATAP SELULOSA MONOLAYER (ATAS)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.084 80,000.00 6,720.00
Tukang batu L.02 OH 0.125 110,000.00 13,750.00
Kepala tukang L.03 OH 0.130 120,000.00 15,600.00
Mandor L.04 OH 0.004 120,000.00 480.00
JUMLAH TENAGA KERJA 36,550.00
B BAHAN
Nok Selulosa 1.300 101,200.00 131,560.00
Paku/Screw 10.000 1,400.00 14,000.00
JUMLAH HARGA BAHAN 145,560.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 182,110.00


E Overhead & Profit 10.00% 18,211.00
F Harga Satuan Pekerjaan (D+E) 200,321.00

VIII - 1100
A.4.5.2.1. rob5 1m2 Pasang Atap Bitumen Bergelombang Monolayer 3 mm
( kemiringan atap Minimum 10o - 15o ) Uk. 200 x 95 x 0.30 cm,
Jarak Rangka Gording atau Reng max. 45 cm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 80,000.00 11,200.00
Tukang batu L.02 OH 0.070 110,000.00 7,700.00
Kepala tukang L.03 OH 0.007 120,000.00 840.00
Mandor L.04 OH 0.007 120,000.00 840.00
JUMLAH TENAGA KERJA 20,580.00
B BAHAN
Atap Bitumen Bergelombang Monolayer 3 mm 0.650 189,200.00 122,980.00
Paku atau Sekrup 9.100 1,400.00 12,740.00
JUMLAH HARGA BAHAN 135,720.00
C PERALATAN

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 156,300.00


E Overhead & Profit 10.00% 15,630.00
F Harga Satuan Pekerjaan (D+E) 171,930.00

Cirebon, 2022

Kepala Dinas Perumahan, Kawasan Permukiman dan Pertanahan


Kabupaten Cirebon

Ir. H. ADIL PRAYITNO, MT


NIP. 19660330 199403 1 002

VIII - 1101
1 m3 Angkutan Bahan Material Jarak Angkut Setiap 100 m

Kode Analisa T.15.a.6

Harga Satuan Jumlah Harga


No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
A. TENAGA
1 Pekerja OH 0.6000 80,000.00 48,000.00
3 Mandor OH 0.0300 120,000.00 3,600.00
JUMLAH TENAGA KERJA 51,600.00
B. BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah harga tenaga, bahan dan peralatan (A + B + C) 51,600.00


E Overhead & profit 10 % X D 5,160.00
F Harga satuan pekerjaan (D + E) 56,760.00
G Dibulatkan 56,760.00

1 m2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi dari Tanaman/Tumbuhan dia
< 15 cm
Kode Analisa T.02

Harga Satuan Jumlah Harga


No Uraian Satuan Koefisien
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5
A. TENAGA
1 Pekerja OH 0.0750 80,000.00 6,000.00
3 Mandor OH 0.0075 120,000.00 900.00
JUMLAH TENAGA KERJA 6,900.00
B. BAHAN
1 Minyak tanah L 0.0100 11,800.00 118.00
JUMLAH HARGA BAHAN 118.00
C. PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah harga tenaga, bahan dan peralatan (A + B + C) 7,018.00


E Overhead & profit 10 % X D 701.80
F Harga satuan pekerjaan (D + E) 7,719.80
G Dibulatkan 7,710.00

Kepala Dinas Perumahan, Kawasan Permukiman dan


Pertanahan Kabupaten Cirebon
Ir. H. ADIL PRAYITNO, MT
NIP. 19660330 199403 1 002