3.35 1.7
1.75 2.1
1.15 1.25 1.25 1.25
+ 3.35
+0.000
+ 0.250 +0.050 +0.000
1.097 1.25
1.25 1.1
+0.050 + 0.250
2.543
2.5
1.676
+0.050
+ 2.100
+ 0.250
1.25 Pas. Keramik Uk 20/25
1.25 1.25 +0.050
+ 1.850
1.25
+0.050 + 0.250
+ 0.050
1.2 1.2
1.25 1.4 1.25
+0.050 + 0.250
2.492
Pas. Keramik Uk 30/30 Pas. Keramik Uk 30/30
1.633 +0.050 +0.050 + 0.000 + 0.000
1.765 0.96 Teras ± 0.000
1.25
1.25 1.15 +0.050 1.15
Luas dinding = p x t
= 20.32 x 3.10 = 62.98 m2
0.75
+ 0.250 +0.050
+0.000
0.45
+0.000
0.3 0.15
1.25 1.1 1.65
1.1 1.25
1.828
+0.050 + 0.250 0.267
2.5 0.402
2.543
+ 0.250 +0.050
2.041 1.676 2.1
1.25 +0.050
1.1 1.25 1.25
+ 0.250
1.15
+0.050 0.723
+ 0.050
0.45
+ 0.250 +0.050 0.45
0.15
1.05 1.2 1.25 1.4 1.25
+0.050 + 0.250
Luas = p x t
= 8.97 x 0.21 = 1.88 m2
Pembongkaran Dinding = 1.88 x 0.15 = 0.28
TOTAL 0.28 m3
Volume = Luas x t x n
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
+0.050 + 0.250
2.5
2.543
+ 0.250 +0.050
1.524
+0.050 + 0.250
+ 0.050 4.8
1.2
1.2
1.25 1.4 1.25
+0.050 + 0.250
2.492
1.479
1.765 0.96
1.25
1.25
1.15 +0.050 1.15
+0.050 + 0.250
2.52 1.61
3.98
3.85
TOTAL 36.77 m2
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI
PERAWATAN DAN KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
A Pekerjaan Lantai
a Pasir Urug 3.012 m3
b Beron K175 3.012 m3
2 Kolom 15x15
a Bekisting 34.476 m2
b Besi 1009.314 kg
c Beton 21.7 Mpa 0.847 m3
2 Pekerjaan Plesteran
a Pekerjaan Plesteran Dinding 1pc:2ps 92.10 m2
b Pekerjaan Plesteran Dinding 1pc:4ps 101.82 m2
D Pekerjaan Flafon
a Pasangan flafon ,Panel PVC Wc dan Tempat Wuduk 38.23 m2
b Pasangan lis flafon ,panel PVC Wc t = 9 mm 66.23 m2
E Perlengkapan
1 Pekerjaan Pintu dan Kuzen Jendela
a Pintu Ukuran 80x 205 2.0 Unit
b Pintu Ukuran 70x 205 7.0 Unit
c Jendela Ukuran 35x75 7.0 Unit
G Sanitari
1 Pipa Air Bersih 55.00 m
2 Piapa Air Kotor 25.00 m
3 Pipa Kotoran 17.00 m
H Eletrikal
1 Saklar Tunggal 0.00 unit
2 Saklar Ganda 7.00 unit
3 Saklar Triple 2.00 unit
4 Kabel 66.00 m
5 Lampu 13.00 unit
PERHITUNGAN KUANTITAS / VOLUME PEKERJAAN
1.78 SP SP SP SP SP SP 1.75
SP
SP SP SP SP SP SP
0.975 1.25 1.25 1.25 1.35 1.25 1.25
0.7
1.6
0.7
Tempat Wuduk
SP 0.75 Wc Wanita Wc Pria SP
Tempat Wuduk
+ 0.050 + 0.050
3.255
SP 1.9
1.5
1.6
4.13 3.85
a Sloof praktis (kp) a pekerjaan Sloof praktis (tipe kp) 13 x 13cm fc = 21.7 mpa
1 Luas (A) (a) (b)
= 0.15 x 0.2 = 0.030 m2
1.78 SP SP SP SP SP SP 1.75
SP
SP SP SP SP SP SP
0.975 1.25 1.25 1.25 1.35 1.25 1.25
0.7
1.6
0.7
Tempat Wuduk
SP 0.75 Wc Wanita Wc Pria SP
Tempat Wuduk
+ 0.050 + 0.050
3.255
SP 1.9
1.5
1.6
4.13 3.85
A Arah Horizontal
1 Penulangan Sloof Arah Horizontal
a tulangan pokok 4 D 16 8.650 0.096 0.096 - - - - - 8.842 1.578 4.0 55.819 kg
b begel utama
tumpuan jarak 100 22.6 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 22.6 8.369 kg
Lapangan jarak 150 44.3 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 44.3 16.368 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
c Jumlah Sloff 1 unit
TOTAL 80.556 kg
2 Penulangan Sloof Arah Horizontal
a tulangan pokok 4 D 16 1.350 0.096 0.096 - - - - - 1.542 1.578 4.0 9.735 kg
b begel utama
tumpuan jarak 100 4.38 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 4.4 1.618 kg
Lapangan jarak 150 7.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 7.8 2.867 kg
b begel utama
tumpuan jarak 100 6.13 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 6.1 2.266 kg
Lapangan jarak 150 11.3 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 11.3 4.161 kg
b begel utama
tumpuan jarak 100 5.13 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 5.1 1.896 kg
Lapangan jarak 150 9.25 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 9.3 3.422 kg
b begel utama
tumpuan jarak 100 2.88 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 2.9 1.063 kg
Lapangan jarak 150 4.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 4.8 1.757 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
c Jumlah Sloff 1 unit
TOTAL 8.767 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
2 Penulangan Sloof Arah Vertikal
a tulangan pokok 4 D 16 1.900 0.096 0.096 - - - - - 2.092 1.578 4.0 13.207 kg
b begel utama
tumpuan jarak 100 5.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 5.8 2.127 kg
Lapangan jarak 150 10.5 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 10.5 3.884 kg
I PEKERJAAN STRUKTUR
A VOLUME KOLOM
KP KP KP KP KP KP
1.78 SP SP SP SP SP SP 1.75
KP
SP KP SP KP SP KP SP KP SP KP SP KP SP KP
0.7
1.6
0.7
Tempat Wuduk
KP
SP 0.75 Wc Wanita Wc Pria KP2 SP KP
Tempat Wuduk
+ 0.050 + 0.050
3.255
SP KP2
1.9
1.5
1.6
4.13 3.85
a kolom praktis (kp) 1 pekerjaan kolom praktis (tipe kp) 13 x 13cm fc = 21.7 mpa
1 Luas (A) (a) (b)
= 0.13 x 0.13 = 0.02 m2
b kolom praktis (kp2) 2 pekerjaan kolom praktis (tipe kp) 13 x 13cm fc = 21.7 mpa
1 Luas (A) (a) (b)
= 0.13 x 0.13 = 0.02 m2
KP KP KP KP KP KP
1.78 SP SP SP SP SP SP 1.75
KP
SP KP SP KP SP KP SP KP SP KP SP KP SP KP
0.7
1.6
0.7
Tempat Wuduk
KP
SP 0.75 Wc Wanita Wc Pria KP2 SP KP
Tempat Wuduk
+ 0.050 + 0.050
3.255
SP KP2
1.9
1.5
1.6
4.13 3.85
1 Penulangan KP1
A pada wc
a tulangan pokok 4 d 12 3.100 0.072 0.072 - - - - - 3.244 2.226 4.0 57.758 kg
b begel utama
tumpuan jarak 100 8.75 Ø 8 0.090 0.090 0.090 0.090 0.048 0.048 - - 0.456 0.395 8.8 1.574 kg
Lapangan jarak 150 16.5 Ø 8 0.090 0.090 0.090 0.090 0.048 0.048 - - 0.456 0.395 16.5 2.969 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
e Jumlah KP 15 unit 934.512
TOTAL 934.512 kg
1 Penulangan KP2
A pada wc
a tulangan pokok 4 d 12 1.800 0.072 0.072 - - - - - 1.944 2.226 4.0 34.612 kg
b begel utama
tumpuan jarak 100 5.5 Ø 8 0.090 0.090 0.090 0.090 0.048 0.048 - - 0.456 0.395 5.5 0.990 kg
Lapangan jarak 150 10 Ø 8 0.090 0.090 0.090 0.090 0.048 0.048 - - 0.456 0.395 10.0 1.799 kg
Untuk 2 unit
TOTAL 0.06 m3
Untuk 2 unit
TOTAL 0.57 m2
Tulangan sengkang
Panjang besi = 0.36 m
Berat kg/m = 0.39 kg/m
TOTAL 10.06 kg
TOTAL 0.31 m3
Lebar = 0.13 m
Lebar = 7.87 m
Jumlah sisi = 1.00 m
Volume = 0.13 x 7.87 x 1.00 = 1.02 m2
TOTAL 5.77 m2
Tulangan sengkang
Panjang besi = 0.50 m
Berat kg/m = 0.39 kg/m
jumlah 3 unit
TOTAL 64.35 kg
I PEKERJAAN STRUKTUR
A VOLUME KOLOM 1.3 1.25 1.25 1.25 1.35 1.25 1.25
KP KP KP KP KP KP
1.78 RB RB RB RB RB RB 1.75
KP
RB KP RB KP RB KP RB KP RB KP RB KP RB KP
0.7
1.6
0.7
Tempat Wuduk
KP
SP 0.75 Wc Wanita Wc Pria KP2 RB KP
Tempat Wuduk
+ 0.050 + 0.050
3.255
RB KP2
1.9
1.5
1.6
4.13 3.85
a Sloof praktis (kp) a pekerjaan Sloof praktis (tipe kp) 13 x 13cm fc = 21.7 mpa
Teras ± 0.000
1 Luas (A) (a) Teras ± 0.000(b)
= 0.15 x 0.2 = 0.030 m2
KP KP KP KP KP KP
1.78 RB RB RB RB RB RB 1.75
KP
RB KP RB KP RB KP RB KP RB KP RB KP RB KP
0.7
1.6
0.7
Tempat Wuduk
KP
SP 0.75 Wc Wanita Wc Pria KP2 RB KP
Tempat Wuduk
+ 0.050 + 0.050
3.255
RB KP2
1.9
1.5
1.6
4.13 3.85
KP KP KP KP KP KP
1.78 RB RB RB RB RB RB 1.75
KP
RB KP RB KP RB KP RB KP RB KP RB KP RB KP
0.7
1.6
0.7
Tempat Wuduk
KP
SP 0.75 Wc Wanita Wc Pria KP2 RB KP
Tempat Wuduk
+ 0.050 + 0.050
3.255
RB KP2
1.9
1.5
1.6
4.13 3.85
A Arah Horizontal
1 Penulangan Sloof Arah Horizontal
a tulangan pokok 4 D 16 8.650 0.096 0.096 - - - - - 8.842 1.578 4.0 55.819 kg
Teras ± 0.000 Teras ± 0.000
b begel utama
tumpuan jarak 100 22.6 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 22.6 8.369 kg
Lapangan jarak 150 44.3 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 44.3 16.368 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
c Jumlah Sloff 1 unit
TOTAL 80.556 kg
2 Penulangan Sloof Arah Horizontal
a tulangan pokok 4 D 16 1.350 0.096 0.096 - - - - - 1.542 1.578 4.0 9.735 kg
b begel utama
tumpuan jarak 100 4.38 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 4.4 1.618 kg
Lapangan jarak 150 7.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 7.8 2.867 kg
b begel utama
tumpuan jarak 100 6.13 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 6.1 2.266 kg
Lapangan jarak 150 11.3 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 11.3 4.161 kg
b begel utama
tumpuan jarak 100 5.13 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 5.1 1.896 kg
Lapangan jarak 150 9.25 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 9.3 3.422 kg
b begel utama
tumpuan jarak 100 2.88 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 2.9 1.063 kg
Lapangan jarak 150 4.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 4.8 1.757 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
c Jumlah Sloff 1 unit
TOTAL 8.767 kg
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Panjang dimensi Panjang Berat besi Quantity Kebutuhan
NO Uraian Pekerjan Diameter Sketsa
a(m) b(m) c(m) d(m) e(m) f(m) g(m) h(m) Potongan (m) (Kg/ m ) ( Unit ) ( Kg )
2 Penulangan Sloof Arah Vertikal
a tulangan pokok 4 D 16 1.900 0.096 0.096 - - - - - 2.092 1.578 4.0 13.207 kg
b begel utama
tumpuan jarak 100 5.75 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 5.8 2.127 kg
Lapangan jarak 150 10.5 Ø 10 0.120 0.120 0.120 0.120 0.060 0.060 - - 0.600 0.617 10.5 3.884 kg
1 PEKERJAAN PLESTERAN
SKETSA PEK.DINDING DAN PLESTERAN 1PC : 2PS
+ 0.230 + 0.230
1.78 1.75
+ 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030
WC WC WC WC WC WC WC
1.6
0.7
Tempat Wuduk
0.6
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050
3.255
1.75
1.35
W1 W1 1.6
4.13 3.85
+ 0.230 + 0.230
1.78 1.75
+ 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030
WC WC WC WC WC WC WC
0.7
1.451.6
1.577
0.7
Tempat Wuduk
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050
3.255
1.9
1.5
1.451.6
1.373
P1 3.98 3.7 P1
4.13 3.85
c Plesteran Ulang dinding 1pc:2ps
Luas dinding = p x t
= 34.35 x 1.50 = 51.53 m2
+ 0.230 + 0.230
1.78 1.75
+ 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030
WC WC WC WC WC WC WC
1.6
0.7
Tempat Wuduk
0.6
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050
3.255
1.75
1.35
W1 W1 1.6
4.13 3.85
Luas dinding Wc = p x t
= 17.53 x 1.60 = 28.04 m2
+ 0.230 + 0.230
1.78 1.75
+ 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030
WC WC WC WC WC WC WC
0.7
1.451.6
1.577
0.7
Tempat Wuduk
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050
3.255
1.9
1.5
1.451.6
1.373
P1 3.98 3.7 P1
4.13 3.85
f Plesteran Ulang dinding 1pc:4ps a Pasangan Bata 1pc:4ps (wc) = l (m) n(bh)
Panjang Dinding = 1.10 x 5.00 = 5.50 m H
= 1.15 x 1.00 = 1.15 m H
= 1.20 x 1.00 = 1.20 m H
= 3.98 x 1.00 = 3.98 m H
= 3.70 x 1.00 = 3.70 m H
= 1.78 x 1.00 = 1.78 m V
= 1.57 x 1.00 = 1.57 m V
= 1.37 x 1.00 = 1.37 m V
= 3.20 x 1.00 = 3.20 m V
= 3.20 x 1.00 = 3.20 m V
= 1.45 x 1.00 = 1.45 m V
= 1.45 x 1.00 = 1.45 m V
= 1.60 x 3.00 = 4.80 m V
Total 34.35 m
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
Luas dinding = p x t
= 34.35 x 1.60 = 54.96 m2
1.633
A B C D E F G 1.6
0.838
4.572
H I
3.98 3.7
1 Pasangan flafon ,Panel PVC Wc dan Tempat Wuduk a Pasangan flafon ,Panel PVC Wc DAN Tempat Wuduk
Luas = 0.99 x 1.60 x 1.00 = 1.59 m2 A
= 1.10 x 1.60 x 1.00 = 1.76 m2 B
= 1.10 x 1.60 x 1.00 = 1.76 m2 C
= 1.10 x 1.60 x 1.00 = 1.76 m2 D
= 1.20 x 1.60 x 1.00 = 1.92 m2 E
= 1.10 x 1.60 x 1.00 = 1.76 m2 F
= 1.10 x 3.05 x 1.00 = 3.36 m2 G
= 4.28 x 3.05 x 1.00 = 13.04 m2 H
= 3.70 x 3.05 x 1.00 = 11.29 m2 I
= 38.23 m2
TOTAL 38.23 m2
b Pasangan lis flafon ,panel PVC Wc t =9 mm
Kegiatan : BELANJA JASA KONSULTANSI PERENCANAAN ARSITEKTUR-JASA PENILAI PERAWATAN DAN
KELAYAKAN BAGUNAN GEDUNG
Pekerjaan : Rehabilitas WC Gedung BPKA Kota Padang
Lokasi : Kota Padang
Tanun : 2021
4.572
0.838
1.6
1.73 Pas. Keramik Uk 60x60
Pas. Keramik Uk 60x60
Tempat Wuduk
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050 3.05
3.102
1.9
1.5 H I
1.6
1.525
3.98 3.7
4.13 3.85
8.9
1.3 1.25 1.25 1.25 1.35 1.25 1.25
+ 0.230 + 0.230
1.6 1.75
1.78 1.628 + 0.030
+ 0.030 + 0.030 + 0.030 + 0.030 + 0.030 + 0.030
WC WC WC WC WC WC WC
0.7
Tempat Wuduk
0.6
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 3.05 + 0.050
3.255 3.105
1.75
1.35
1.5
1.45 1.6
0.6
3.98 3.7
4.13 3.85
Luas dinding = p x t
= 19.63 x 1.50 = 29.44 m2
Wc Wanita Wc Pria
Tempat Wuduk
Tempat Wuduk
Wc Wanita Wc Pria
Tempat Wuduk
+ 0.050 + 0.050 3.05
3.102
1.9
1.5 H I Luas Dinding = 2.05 x 0.15 = 0.31 m2
1.525
1.6
= 1.83 x 0.15 = 0.27 m2
0.58 m2
3.98
4.13
3.7
3.85
Luas Keseluruhan lantai = 38.23 - 0.58 = 37.65 m2
TOTAL 37.65 m2
1 Pekerjaan Pasir Urug Luas Keseluruhan Lantai = 37.65 m2
Volume Pekerjaan Pasir urug = p x t
= 37.65 x 0.08 = 3.01 m3
TOTAL 3.01 m3
2 Pekerjaan Beton Tumbuk K175
Luas Keseluruhan Lantai = 37.65 m2
3 Pasangan Bata 1pc : 2ps Tempat Wuduk 1 Pasangan Bata 1pc : 2ps
Luas = P x l
Toilet Wanita = 3.05 x 0.36 = 1.08 m2
Toilet Pria = 3.15 x 0.36 = 1.12 m2
2.20 m2
Keramik Uk. 20 x 20
0.45 TOTAL 2.20 m2
Cor Beton 1 : 3 : 5
0.2
0.2 0.355
Pasir Urug 2 Pasangan Granit 60x60
luas = P x l
Toilet Wanita = 3.05 x 0.78 = 2.38 m2
Toilet Pria = 3.15 x 0.78 = 2.46 m2
0.3
4.84 m2
0.15
TOTAL 4.84 m2
KEGIATAN : Rehabilitas Toilet BPKA
PEKERJAAN : Wc Utama Lantai 1 BPKA
LOKASI : Kota Padang
Ø8 - 15
KEGIATAN Cor :Beton Camp. 1:2:3 Rehabilitas Toilet BPKA
PEKERJAAN : Wc Utama Lantai 1 BPKA
LOKASI : Kota Padang
Balok uk. 13 x 20 cm
2.06
+ 0.050
1.37 1.509
1.8 1.8
1.5
2.21
2.21 1.52
1 PEK.PLESTERAN 1.37
a Plesteran dinding 1pc:2ps
Trasram
a Pasangan Bata 1pc:2ps (wc) = l (m) n(bh)
Panjang dinding = p x n(bh)
Arah H = 2.06 x 1.00 = 2.06 m
Arah H = 2.06 x 1.00 = 2.06 m
Arah V = 1.37 x 1.00 = 1.37 m
Arah V = 1.37 x 1.00 = 1.37 m
Total = 6.86 m
Luas Dinding = p x t
= 6.86 x 1.50 = 10.29 m2
2.21
TOTAL 2.82 m2