Pekerjaan :
1. Pembangunan Saluran Drainase Tersier Pasar Wameo
Konsultan Perencana :
BACK UP DATA QUANTITY
Berat Besi
Total Berat Besi / Unit Plat Total Berat Besi / Unit Plat
Kg = Kg 10 x Tot P Kg = Kg 10 x Tot P
Kg = 0.6165 x 130.75 Kg = 1.2083 x 187.05
= 80.60738 kg = 226 kg
Bekisting
A1 = 13.000 x 0.6
= 7.8 m2
A2 = 13.000 x 0.2 x 2
= 5.2 m2
Total = 13.000 m2
BALOK DUDUKAN PLAT
V = P x L x t x n TOTAL BETON = 2.600 + 1.040
= 13.000 x 0.200 x 0.200 x 2.000 = 3.640 M3
= 1.040 M3
Total Berat Besi / Unit Plat Total Berat Besi / Unit Plat
Kg = Kg 12 x Tot P Kg = Kg 10 x Tot P
Kg = 0.88776 x 104 Kg = 0.6165 x 84.5
= 92.327 kg = 52.0943 kg
L = 300.150 L = 2.150
n = 7.00 n = 1000.00
Tot P = L x n Tot P = L x n
Tot P = 300.150 x 7.00 Tot P = 2.15 x 1000.00
= 2101.05 m' = 2150 m'
Berat Besi
Kg = Kg 10 x Tot P Kg = Kg 10 x Tot P
Kg = 0.6165 x 2101.1 Kg = 0.6165 x 2150
= 1295.297 kg = 1325.475 kg
Total Kg = 1295.3 + ###
= ### Kg
Bekisting
A1 = 150.000 x 0.6
= 90 m2
BAK PENANGKAP
P L T V SAT
Saluran 1 Galian 4.35 0.55 0.3 0.72 M3
Pasangan 4.35 1.05 0.15 0.69 M3
Plesteran 4.35 1.05 4.57 M2
P L T n Volume Total
Penangkap Galian 0.8 0.65 0.4 12 2.50 M3 Galian 5.51 M3
Pasangan 1.9 0.5 0.15 12 1.71 M3 Pasangan 5.03 M3
0.5 0.5 0.15 12 0.45 M3 Plesteran 36.98 M2
Plesteran 1.9 0.65 12 14.82 M2
0.5 0.5 12 3.00 M2
PLAT PENUTUP RUAS II
BETON
V = 47.000 x 1.000 x 0.150 = 6.402
Plat Besi Penutup = 12 Unit
L = 94.150 L = 2.150
n = 7.00 n = 314.00
Tot P = L x n Tot P = L x n
Tot P = 94.150 x 7.00 Tot P = 2.15 x 314.00
= 659.05 m' = 675.1 m'
Berat Besi
Kg = Kg 10 x Tot P Kg = Kg 10 x Tot P
Kg = 0.6165 x 659.05 Kg = 0.6165 x 675.1
= 406.304 kg = 416.199 kg
Total Kg = 406.304 + 416.2
= 822.500 Kg
Bekisting
A1 = 47.000 x 0.6
= 28.2 m2
PLAT PENUTUP RUAS III
BETON
V = 94.505 x 1.000 x 0.150 = 12.8798
Plat Besi Penutup = 24 Unit
L = 189.160 L = 2.150
n = 7.00 n = 631.00
Tot P = L x n Tot P = L x n
Tot P = 189.160 x 7.00 Tot P = 2.150 x 631.00
= 1324.12 m' = 1356.65 m'
Berat Besi
Kg = Kg 10 x Tot P Kg = Kg 10 x Tot P
Kg = 0.6165 x 1324.12 Kg = 0.6165 x 1356.65
= 816.32 kg = 836.375 kg
Total Kg = 816.32 + 836.4
= ### Kg
Bekisting
A1 = 94.505 x 0.6
= 56.703 m2
PEMERINTAH KOTA BAUBAU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
Jl. Dayanu Ikhsanuddin No. 1 Tlp. (0402)
Pekerjaan :
PEMBANGUNAN DRAINASE KAWASAN PASAR WAMEO
Konsultan Perencana :
RENCANA ANGGARAN BIAYA (RAB)
TOTAL HARGA
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
A TENAGA
1 Pekerja Penganyam L.01 OH 1.6350 Rp 80,000.00 Rp 130,800.00
2 Tukang Penganyam L.02 OH 0.5450 Rp 120,000.00 Rp 65,400.00
3 Pekerja Pengisi Batu L.01 OH 0.6500 Rp 80,000.00 Rp 52,000.00
4 Mandor L.04 OH 0.2290 Rp 150,000.00 Rp 34,350.00
Jumlah Harga Tenaga Kerja Rp 282,550.00
B BAHAN
1 Batu / batu belah M.06.a m3 2.6000 Rp 300,000.00 Rp 780,000.00
2 Kawat Bronjong dia 2,7 mm M.68 Kg 21.7100 Rp 30,000.00 Rp 651,300.00
Jumlah Harga Bahan Rp 1,431,300.00
C PERALATAN
Rp -
Jumlah Harga Alat Rp -
D Jumlah (A+B+C) Rp 1,713,850.00
E Overhead & Profit (Contoh 15 %) 15% x D Rp 257,077.50
F Harga Satuan Pekerjaan (D+E) Rp 1,970,927.50
DAFTAR UPAH KERJA DAN HARGA BAHAN
Kegiatan : Pengadaan Bangunan Konservasi Tanah dan Air
Pekerjaan : Pembuatan Bangunan Konservasi Tanah dan Air (Bronjong)
Lokasi : Desa Warinta Kecamatan Pasarwajo
Tahun Anggaran : 2018
HARGA
NO. URAIAN SATUAN KODE KET.
SATUAN (Rp)
1 2 3 4 5
`
I. UPAH KERJA
1 Pekerja Hari L.01 80,000.00
2 Tukang (Batu, Gali, Besi, Anyaman & Kayu Hari L.02 120,000.00
3 Kepala Tukang Hari L.03 150,000.00
4 Mandor Hari L.04 150,000.00
5 Operator pompa Hari L.05 100,000.00
A. PEKERJAAN UMUM
1 Pengukuran Kembali & Shopdrawing Ls 0.00 #REF! #REF! #REF! #REF! #REF! 100
3 Administrasi dan Dokumentasi Ls 1.00 #REF! #REF! #REF! #REF! #REF!
4 Papan Nama Proyek Ls 1.00 #REF! #REF! #REF! #REF! #REF! #REF!
5 Barak Kerja Ls 1.00 #REF! #REF!
KOP PERUSAHAAN
7 Pengadaan Air Kerja Ls 0.00 #REF! #REF!
8 Pengadaan Rambu Keselamatan Lalulintas Unit 0.00 #REF! #REF! #REF! #REF! 75
6 Pembersihan Akhir Ls 1.00 #REF! #REF!
B. PEKERJAAN STRUKTUR
B 1. PEKERJAAN SALURAN IRIGASI
1 Pekerjaan Galian Tanah Lumpur M3 130.24 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 50
........................,.................................2017
Dibuat Oleh : Dibuat Oleh :
Kontraktor Pelaksana Kontraktor Pelaksana
PT./CV./Fa.................................................. PT./CV./Fa..................................................