Anda di halaman 1dari 4

RENCANA ANGGARAN PELAKSANAAN

RUMAH TINGGAL KIREI ALTERNATIF 1 TIPE 65

Material Upah
No. Jenis Pekerjaan Vol Sat Sub Jumlah
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga

I PEKERJAAN PERSIAPAN -
1 Pembersihan Lokasi 1.00 ls - -
2 Bowplank 34.34 m' - -
3 Listrik & air kerja (supply by owner) 1.00 ls - -
4 Pantek sumur air kerja (suplly by owner) 1.00 ls - -
5 Dokumentasi & laporan harian 1.00 ls - -
6 Koordinasi 1.00 ls - -

II PEKERJAAN TANAH PONDASI BATU KALI DAN ROLAG -


1 Pondasi Batu Kali
- Galian Tanah Pondasi Batu Kali 18.44 m3 - -
- Urug kembali pondasi 4.61 m3 - -
- Pondasi Batu Kali 13.83 m3 - -

2 Pondasi Rolag
- Galian Tanah Pondasi Rolag 0.34 m3 - -
- Urug kembali pondasi - m3 - -
- Pondasi Rolag 0.34 m 3
- -

3 Pekerjaan Galian Tanah Kamar Mandi 1.96 m 3


- -

III PEKERJAAN BETON DAN STRUKTUR -


1 Pondasi Tapak (80x80)
- Besi Tulangan D10 272.00 kg - -
- Galian Pondasi Tapak 6.72 m3 - -
- Urugan Pondasi Tapak 5.04 m 3
- -
- Benton Site Mix K225 1.26 m3 - -
- Bekisting 6.30 m2 - -

2 Sloof (25x15) dan (20x15) Lantai 1


- Besi Tulangan D10 & d8 301.04 kg - -
- Galian Pondasi Sloof Dasar 9.40 m3 - -
- Urugan Pondasi Sloof Dasar 7.44 m3 - -
- Benton Site Mix K225 2.14 m3 - -
- Bekisting 28.50 m2 - -

3 Kolom Utama (30x15) Lantai 1


- Besi Tulangan D10 & d8 355.01 kg - -
- Benton Site Mix K225 2.87 m3 - -
- Bekisting 57.45 m2 - -

3 Kolom Praktis (15x15) Lantai 1


- Besi Tulangan d10 & d8 193.75 kg
- Benton Site Mix K225 1.23 m3
- Bekisting 32.85 m2

4 Kolom praktis (15x15) Lantai 2


- Besi Tulangan d10 & d8 271.91 kg - -
- Benton Site Mix K225 1.99 m3 - -
- Bekisting 52.94 m2 - -

5 Balok (25x15) dan (20x15) Lantai 2


- Besi Tulangan D10 & d8 307.75 kg - -
- Benton Site Mix K225 2.16 m3 - -
- Bekisting 37.93 m2 - -

6 Balok (25x15) Lantai Atap


- Besi Tulangan D10 & d8 81.48 kg - -
- Benton Site Mix K225 0.55 m3 - -
- Bekisting 10.00 m2 - -

6 Balok (20x15) Lantai Atap


- Besi Tulangan d10 & d8 113.69 kg
- Benton Site Mix K225 0.90 m3
- Bekisting 16.44 m2

7 Balok Sopi-sopi & Ornamen Atap (15x15)


- Besi Tulangan d10 & d6 97.99 kg - -
- Benton Site Mix K225 0.72 m3 - -
- Bekisting 14.31 m2 - -

7 Balok Latai (15x5)


- Besi Tulangan d8 9.52 kg - -
- Benton Site Mix K225 0.09 m3 - -
- Bekisting 3.02 m2 - -

8 Pelat Lantai 1 (t = 12 cm)


- Besi Tulangan m8 324.99 kg - -
- Benton Site Mix K225 3.26 m3 - -
- Bekisting 7.38 m2 - -

9 Pelat Lantai 2 (t = 12 cm)


- Besi Tulangan m8 308.80 kg - -
- Benton Site Mix K225 3.03 m3 - -
- Bondex 25.21 m2 - -

10 Pelat Lantai Atap (t = 12 cm )


- Besi Tulangan m8 81.96 kg - -
- Benton Site Mix K225 0.65 m3 - -
RENCANA ANGGARAN PELAKSANAAN
RUMAH TINGGAL KIREI ALTERNATIF 1 TIPE 65

Material Upah
No. Jenis Pekerjaan Vol Sat Sub Jumlah
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
- Bekisting 5.40 m 2
- -

11 Pelat Tangga (t = 12 cm )
- Besi Tulangan d8 58.66 kg - -
- Benton Site Mix K225 0.67 m3 - -
- Bekisting 5.58 m2 - -

12 Pelat Kanopi (t = 12 cm )
- Besi Tulangan m8 26.05 kg - -
- Benton Site Mix K225 0.18 m3 - -
- Bekisting 1.48 m2 - -

13 Rabat Beton Bench (t = 12 cm )


- Besi Tulangan m8 3.39 kg - -
- Benton Sit Mix K100 0.05 m3 - -
- Bekisting 0.70 m2 - -

13 Rabat Beton Carport


- Beton Site Mix K300 3.81 m3

V PEKERJAAN DINDING -
1 Pasangan Dinding Bata Ringan 10 cm 303.43 m2 - -
2 Pasangan Roster 6.48 m 2
- -
3 Plesteran Bata 1:7 615.89 m2 - -
4 Plesteran Teksture 0.73 m2 - -
5 Acian 594.23 m2 - -
6 Kisi-Kisi Facade (Conwood) 9.51 m2 - -
7 Tali Air 79.56 m - -

VI PEKERJAAN KERAMIK + HALAMAN -


1 Keramik Ruang Keluarga, Kamar, dan Dapur (60x60) 43.24 m2 - -
2 Keramik Teras (15x90) 7.89 m 3
- -
3 Keramik Tangga (15x90) (Conwood) 4.83 m2 - -
4 Keramik Lantai KM/WC (20x20) 3.87 m2 - -
5 Keramik Dinding KM/WC (10x20) 18.22 m2 - -
6 Keramik Dinding Dapur (10x20) 3.23 m2 - -
7 Plint keramik (10x20) 84.65 m - -
8 Finishing Aci Kasar (Carport) 13.24 m2 - -
9 Taman Kering 2.19 m2 - -
10 Taman Kontur 6.01 m2 - -

VII PEKERJAAN KUSEN & DAUN JENDELA -


1 Kusen Pintu Utama Alumunium Fin Powdercoating 3" (Dacon) 1.00 unit - -
2 Kusen Pintu Kamar Tidur Alumunium Fin Powdercoating 3" (Dacon) 3.00 unit - -
3 Kusen Pintu KM/WC Alumunium Fin Powdercoating 3" (Dacon) 2.00 unit - -
4 Kusen Pintu Teras Atas Alumunium Fin Powdercoating 3" (Dacon) 1.00 unit - -
5 Kusen Pintu Geser Alumunium Fin Powdercoating 3" (Dacon) 1.00 unit -
6 Daun Pintu Utama (PU) 1.00 unit - -
7 Daun Pintu Kamar Tidur (P1) 3.00 unit - -
8 Daun Pintu KM/WC (P2) 2.00 unit - -
9 Daun Pintu Teras Atas (P3) 1.00 unit - -
10 Daun Pintu Geser (PG) 1.00 unit - -
11 Kusen & Daun Jendela 1 Alumunium Fin Powdercoating 3" (J1) 1.00 unit - -
12 Kusen & Daun Jendela 2 Alumunium Fin Powdercoating 3" (J2) 2.00 unit - -
13 Kusen & Daun Jendela 3 Alumunium Fin Powdercoating 3" (J3) 1.00 unit - -
14 Kusen & Daun Jendela BV Alumunium Fin Powdercoating 3" (BV) 1.00 unit - -

VIII PEKERJAAN PENUTUP ATAP -


1 Genteng 55.82 m2 - -
2 Kerpus 5.18 m - -
3 Baja Ringan 55.82 m2 - -
4 Listplank 15.82 m - -

IX PEKERJAAN FLAFON -
1 Gypsum 9mm 54.06 m2 - -
2 GRC 9mm 10.16 m 2
- -
3 Shadow Line 92.80 m

X PEKERJAAN BESI DAN KAYU -


1 Railing Tangga 3.93 m - -
2 Handle Kayu Tangga 13.94 m - -

XI PEKERJAAN CAT & COATING -


1 Cat Eksterior 318.16 m2 - -
2 Cat Interior 279.21 m2 - -
3 Cat Plafond 64.86 m2 - -
4 Cat Roster 6.55 m2 - -
5 Cat Kisi-Kisi Façade 9.61 m2 - -
6 Cat Besi (Kanopi) 0.77 m 2
- -
8 Cat Listplank 3.20 m 2
- -

XII PEKERJAAN PENGGANTUNG & KUNCI -


1 Handle Pintu Utama (Bardi) 1.00 set - -
2 Handle Pintu Kamar / Belakang / KM/WC (Solid) 7.00 set - -
3 Engsel Pintu (Solid) 21.00 bh - -
4 Slot Pengunci Pintu (Solid) 8.00 bh - -

XIII PEKERJAAN INSTALASI LISTRIK -


1 Titik Lampu Inbow 6W + Instalasi 8.00 ttk - -
2 Titik Lampu Inbow 12W + Instalasi 9.00 ttk - -
RENCANA ANGGARAN PELAKSANAAN
RUMAH TINGGAL KIREI ALTERNATIF 1 TIPE 65

Material Upah
No. Jenis Pekerjaan Vol Sat Sub Jumlah
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga
3 Titik Lampu Acrylic +Instalasi 1.00 ttk - -
4 Titik Lampu Outbow 2.00 ttk
5 Stop Kontak + Instalasi 15.00 ttk - -
6 Stop Kontak AC + Instalasi 4.00 ttk - -
7 Stop Kontak Antena + Instalasi 2.00 ttk - -
8 Saklar Single + Instalasi 5.00 ttk - -
9 Saklar Double + Instalasi 7.00 ttk - -
10 KWh Meter 1.00 ttk - -
11 MCB Box - -
- Box Mcb 12 lot 2.00 ttk - -
- Mcb 6 Ampere 12.00 ttk - -
RENCANA ANGGARAN PELAKSANAAN
RUMAH TINGGAL KIREI ALTERNATIF 1 TIPE 65

Material Upah
No. Jenis Pekerjaan Vol Sat Sub Jumlah
Harga Satuan Jumlah Harga Harga Satuan Jumlah Harga

XIV PEKERJAAN SANITASI -


1 Sanitary
- Closet duduk + Jet Washer 2.00 unit - -
- Wastafel 2.00 unit - -
- Hand Shower 2.00 unit - -
- Kran Shower (KM Lt. 1) 1.00 unit - -
- Kran Shower (KM Lt. 2) 1.00 unit - -
- Kitchen zink 1.00 unit

INSTALASI AIR BERSIH


2 Pipa PVC 1/2" 18.00 m - -
3 Pipa PVC 3/4" 50.00 m - -
13 Kran 1/2" 5.00 bh
14 Kran Leher Angsa 1/2" (Dapur) 1.00 bh
15 Ball Valve 1" (Stop Kran) 1.00 bh

INSTALASI AIR BEKAS & KOTOR


5Pipa PVC 2,5" 40.00 m - -
6Pipa PVC 3" 28.00 m - -
Pipa PVC 4" 2.00 m
7 Sumur saptictank 800 L (Bioeco) 1.00 unit - -
12 Floor drain 2.00 unit

INSTALASI AIR HUJAN


8 Pipa PVC 3" 16.00 m - -
10 Roof Drain 2.00 bh - -

XV PEKERJAAN LAIN-LAIN -
1 Kanopi 11.37 m2 - -
2 Batas Dinding Taman dengan Carpot (Kansteen) 3.69 m - -
3 Bak kontrol tertutup 40x40 cm 1.00 unit - -
4 Mesin pompa air + instalasi 1.00 unit - -
5 Tandon air kapasitas 350 liter 1.00 unit - -
6 Sambungan Daya Listrik 2.200W 1.00 ls - -

Harga Konstruksi Pembangunan : - - -

Total Harga Pembangunan : - - -

Anda mungkin juga menyukai