JADWAL PELAKSANAAN ( KURVA S )

BOBOT BULAN I BULAN II BULAN III BULAN IV BULAN V BULAN VI BULAN VII
NO URAIAN PEKERJAAN PEKERJAAN
(%) MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17 MINGGU 18 MINGGU 19 MINGGU 20 MINGGU 21 MINGGU 22 MINGGU 23 MINGGU 24 MINGGU 25 MINGGU 26

A B 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
21-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d
25-Apr 2-May 9-May 16-May 23-May 30-May 6-Jun 13-Jun 20-Jun 27-Jun 4-Jul 11-Jul 18-Jul 25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct

PEKERJAAN PERSIAPAN
I. PEKERJAAN PERSIAPAN 1.222 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049 0.049
JUMLAH I.PEKERJAAN PERSIAPAN

PEKERJAAN STANDAR
I. PEKERJAAN STRUKTUR
1.1. PEKERJAAN STRUKTUR LANTAI SATU 1.884 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188
1.2. PEKERJAAN STRUKTUR LANTAI DUA 2.171 0.181 0.181 0.181 0.181 0.181 0.181 0.181 0.181 0.181 0.181 0.181 0.181
1.3. PEKERJAAN STRUKTUR LANTAI TIGA 15.623 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116 1.116
1.4. PEKERJAAN STRUKTUR LANTAI EMPAT 13.920 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994 0.994

LIBUR HARI RAYA


1.5. PEKERJAAN STRUKTUR LANTAI DAK 5.311 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531 0.531
1.6. PEKERJAAN STRUKTUR GWT 2.981 0.497 0.497 0.497 0.497 0.497 0.497
JUMLAH I.PEKERJAAN STRUKTUR
II. PEKERJAAN ARSITEKTUR
2.1. PEKERJAAN ARSITEKTUR LANTAI SATU 4.209 1.052 1.052 1.052 1.052
2.2. PEKERJAAN ARSITEKTUR LANTAI DUA 4.065 1.016 1.016 1.016 1.016
2.3. PEKERJAAN ARSITEKTUR LANTAI TIGA 8.240 1.373 1.373 1.373 1.373 1.373 1.373
2.4. PEKERJAAN ARSITEKTUR LANTAI EMPAT 8.158 1.360 1.360 1.360 1.360 1.360 1.360
2.5. PEKERJAAN ARSITEKTUR ATAP 1.932 0.483 0.483 0.483 0.483
JUMLAH II.PEKERJAAN ARSITEKTUR
III. PEKERJAAN MEKANIKAL ELEKTRIKAL
3.1. PEKERJAAN TITIK INSTALASI DAYA DAN ARMATUR PENERANGAN 2.871 0.478 0.478 0.478 0.478 0.478 0.478
3.2. PEKERJAAN PLUMBING 5.817 1.454 1.454 1.454 1.454
JUMLAH III.PEKERJAAN MEKANIKAL ELEKTRIKAL
PEKERJAAN NON STANDAR
I. PEKERJAAN STRUKTUR BAWAH
1.1. PEKERJAAN PONDASI DAN SLOOF 8.747 1.093 1.093 1.093 1.093 1.093 1.093 1.093 1.093
JUMLAH I.PEKERJAAN STRUKTUR BAWAH
II. PEKERJAAN ARSITEKTUR
IDUL FITRI

2.1. PEKERJAAN FINISHING GEDUNG FASHAD LUAR 4.867 1.622 1.622 1.622
JUMLAH II.PEKERJAAN ARSITEKTUR
III. PEKERJAAN MEKANIKAL ELEKTRIKAL
3.1. PEKERJAAN PANEL DAN KABEL FEEDER 0.168 0.056 0.056 0.056
3.2. PEKERJAAN KABEL TRAY 0.254 0.085 0.085 0.085
3.3. PEKERJAAN FIRE ALARM 0.707 0.354 0.354
3.4. PEKERJAAN TATA UDARA 0.557 0.186 0.186 0.186
3.5. PEKERJAAN ALAT PEMADAM RINGAN 0.246 0.246
3.6. PEKERJAAN ALAT PEMADAM KEBAKARAN 6.049 0.550 0.550 0.550 0.550 0.550 0.550 0.550 0.550 0.550 0.550 0.550
JUMLAH III.PEKERJAAN MEKANIKAL ELEKTRIKAL

JUMLAH BIAYA PEKERJAAN 100.000


PPN 10 % 0.05 0.24 0.24 - 0.24 0.24 0.24 1.33 1.51 1.51 3.62 3.62 3.43 3.43 5.02 5.49 5.49 6.86 6.31 6.65 8.40 8.49 9.03 9.81 5.14 3.61
JUMLAH TOTAL - 0.05 0.29 0.52 0.52 0.76 1.00 1.24 2.57 4.08 5.59 9.21 12.83 16.27 19.70 24.72 30.21 35.70 42.56 48.87 55.52 63.92 72.41 81.43 91.25 96.39 100.00

Jakarta , 15 Maret 2021


Dibuat Oleh

KSO PT DEBITINDO JAYA - SAMUDRA ANUGRAH


INDAH PERMAI

DEBORA SIHOMBING
KUASA DIREKTUR KSO