Anda di halaman 1dari 37

JANGKA WAKTU PELAKSANAAN PEKERJAAN MUTUAL CHECK 0%

KEGIATAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
TAHUN ANGGARAN : 2022, 2023 Dan 2024
WAKTU PELAKSANAAN PEKERJAAN 450 HARI KALENDER

BOBOT (%)
NO. URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65 KET.

26-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 20-Feb 27-Feb 6-Mar 13-Mar 20-Mar 27-Mar 3-Apr 10-Apr 17-Apr 24-Apr 1-May 8-May 15-May 22-May 29-May 5-Jun 12-Jun 19-Jun 26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 2-Oct 9-Oct 16-Oct 23-Oct 30-Oct 6-Nov 13-Nov 20-Nov 27-Nov 4-Dec 11-Dec 18-Dec 25-Dec 1-Jan 8-Jan 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 4-Mar 11-Mar 19-Mar

DIVISI 1. UMUM

1.2 Mobilisasi 1.00 ls 35,680,000.00 0.14 0.048 0.048 0.048

1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 ls 34,880,000.00 0.14 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

1.8.(2) Jembatan Sementara 1.00 ls 43,250,000.00 0.17 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 113,810,000.00 0.46

APD 1.00 ls 31,849,031.00 0.13 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

DIVISI 3. DRAINASE 31,849,031.00

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5601.84 M3 391,286,584.34 1.57 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

2.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 132,711,520.00 0.53 0.27 0.27

2.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 367,282,135.00 1.47 0.29 0.29 0.29 0.29 0.29

2.3.(30) Saluran berbentuk U Tipe DS 5 2397.00 M1 4,253,498,073.00 17.03 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37

DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK 5,144,778,312.34 20.60

3.1.(1) Galian Biasa 90.20 m3 2,186,799.60 0.01 0.00 0.00 0.00

DIVISI 8. STRUKTUR 2,186,799.60 0.01

7.1 (7a) Beton strukur, fc’20 MPa 2144.47 M3 4,484,228,615.22 17.95 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35 0.35

7.1 (8) Beton , fc’15 Mpa 126.22 M3 237,258,035.45 0.95 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
P
7.1 (10) Beton, fc’10 Mpa 436.05 M3 689,370,048.47 2.76 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
R
7.3 (1) Baja Tulangan Polos-BjTP 280 118109.60 Kg 2,646,110,943.06 10.59 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
O
7.15.(2) Pembongkaran Beton 380.09 M3 242,149,332.50 0.97 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
S
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2917.60 M1 198,552,405.33 0.79 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
E
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 8,497,669,380.03 34.02
S
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) 3194.00 M1 740,476,131.49 2.96 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07

9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) 2816.00 M1 445,107,718.95 1.78 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
P
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 49.00 Buah 7,493,131.34 0.03 0.015 0.015
H
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,725,177.30 0.03 0.013 0.013
O
9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,201,761.47 0.02 0.012 0.012

9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 60x60) 4653.60 M2 2,253,624,914.91 9.02 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

9.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 30x30) 5301.10 M2 2,787,444,990.03 11.16 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37

9.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1906.70 M2 1,445,448,074.61 5.79 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19 0.19

9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 575,372,234.22 2.30 0.58 0.58 0.58 0.58

9.2.(23) Semak / Perdu Taman 197.80 M2 8,039,581.00 0.03 0.008 0.008 0.008 0.008

9.2.(24) Pohon Jenis Tabebuya 120.00 Buah 19,258,800.00 0.08 0.019 0.019 0.019 0.019

9.3.(1) Kursi Taman 98.00 Buah 343,000,000.00 1.37 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11 0.11

9.3.(2) Grill Pohon 22.00 Buah 60,500,000.00 0.24 0.05 0.05 0.05 0.05 0.05

9.3.(3) Grill Tangkapan Air 1202.00 Buah 1,081,800,000.00 4.33 0.54 0.54 0.54 0.54 0.54 0.54 0.54 0.54

9.3.(4) Manhole penutup saluran 589.00 Buah 795,150,000.00 3.18 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

9.3.(5) Stand Bollard (Bulat) 158.00 Buah 189,600,000.00 0.76 0.19 0.19 0.19 0.19

9.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 420,000,000.00 1.68 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21

11,185,242,515.32 44.78

24,975,536,038.29 199.9

PROSENTASE RENCANA KEMAJUAN PEKERJAAN 0.05 0.00 0.00 0.00 0.10 0.05 0.05 0.12 0.61 0.95 0.98 0.98 0.98 0.98 0.98 1.06 1.13 1.13 1.13 1.13 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.15 2.15 2.15 2.15 3.09 3.30 3.30 3.35 4.14 4.14 4.18 4.18 2.25 2.04 2.04 1.06 0.72 0.00 0.00 0.05 0.00

PROSENTASE KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0 0.05 0.05 0.05 0.05 0.15 0.21 0.26 0.38 0.99 1.95 2.93 3.91 4.89 5.87 6.86 7.92 9.04 10.17 11.29 12.42 13.59 14.76 15.93 17.10 18.28 19.45 20.62 21.79 22.96 25.00 27.04 29.07 31.11 33.15 35.19 37.23 39.27 41.31 43.34 45.38 47.42 49.45 51.49 53.53 55.68 57.83 59.98 62.13 65.23 68.53 71.83 75.18 79.32 83.46 87.65 91.83 94.08 96.12 98.15 99.22 99.94 99.94 99.95 100.00 100.00

PROSENTASE REALISASI KEMAJUAN PEKERJAAN


PROSENTASE KUMULATIF REALISASI KEMAJUAN PEKERJAAN
DEVIASI PROSENTASE KEMAJUAN PEKERJAAN

Banjarmasin, 26 Desember 2022


Penawar
PT. BINA SARANA BERSAMA

Ir. H. AHMAD RUBANI


Direktur
JADWAL PELAKSANAAN PEKERJAAN
KEGIATAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
TAHUN ANGGARAN : 2022 s/d 2024
NO KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022
TANGGAL KONTRAK : 26 Desember 2022
NO ADDENDUM : -
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN

WAKTU PELAKSANAAN PEKERJAAN 450 HARI KALENDER

BOBOT (%)
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12 BULAN 13 BULAN 14 BULAN 15 BULAN 16
NO. URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65
8-Jan 16-Jan 23-Jan 30-Dec 8-Feb 16-Feb 24-Feb 30-Dec 10-Mar 17-Mar 24-Mar 30-Dec 8-Apr 16-Apr 24-Apr 30-Dec 9-May 16-May 23-May 30-Dec 7-Jun 15-Jun 23-Jun 30-Dec 8-Jul 15-Jul 23-Jul 30-Dec 8-Aug 15-Aug 23-Aug 30-Dec 7-Sep 15-Sep 23-Sep 30-Dec 8-Oct 15-Oct 23-Oct 30-Dec 8-Nov 15-Nov 23-Nov 30-Dec 8-Dec 15-Dec 23-Dec 30-Dec 7-Jan 15-Jan 23-Jan 30-Dec 8-Feb 15-Feb 23-Feb 30-Dec 9-Mar 16-Mar 23-Mar 30-Dec 26-Mar 02/04 09/04 16/04 22/04

DIVISI 1. UMUM
1.2 Mobilisasi 1.00 ls 35,680,000.00 0.14 0.035 0.035 0.035 0.035 0.083

1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 ls 34,880,000.00 0.14


1.8.(2) Jembatan Sementara 1.00 ls 43,250,000.00 0.17
DIVISI 2. SISTEM MANAJEMEN KESELAMATAN
KONSTRUKSI (SMKK)
2.3.(2) APD 1.00 ls 31,849,031.00 0.13 0.232 0.232 0.234 0.002

DIVISI 3. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5610.52 M3 391,892,991.27 1.57

2.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 132,711,520.00 0.53

2.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 367,282,135.00 1.47

2.3.(30) Saluran berbentuk U Tipe DS 5 2397.00 M1 4,253,498,073.00 17.03

DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK


3.1.(1) Galian Biasa 90.20 m3 2,186,799.60 0.01

DIVISI 8. STRUKTUR
7.1 (7a) Beton strukur, fc’20 MPa 2144.18 M3 4,483,622,206.03 17.95

7.1 (8) Beton, fc’15 Mpa 126.22 M3 237,258,035.45 0.95

7.1 (10) Beton, fc’10 Mpa 436.05 M3 689,370,048.47 2.76 P


7.3 (1) Baja Tulangan Polos-BjTP 280 118109.60 Kg 2,646,110,943.06 10.59 R
7.15.(2) Pembongkaran Beton 380.09 M3 242,149,332.50 0.97 O
S
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2917.60 M1 198,552,405.33 0.79
E
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-
LAIN S
9.2(10a) Kereb Pracetak Jenis 1 (Peninggi / Mountable) 3194.00 M1 740,476,131.49 2.96
P
9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit / Gutter) 2816.00 M1 445,107,718.95 1.78
H
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 49.00 Buah 7,493,131.34 0.03 O
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,725,177.30 0.03

9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,201,761.47 0.02
Perkerasan Blok Beton pada Trotoar dan Median (Jenis
9.2.(12a) 4653.60 M2 2,253,624,914.91 9.02
Granite Tile Antiskid R12 Ukuran 60x60)
Perkerasan Blok Beton pada Trotoar dan Median (Jenis
9.2.(12a)(2) 5301.10 M2 2,787,444,990.03 11.16
Granite Tile Antiskid R12 Ukuran 30x30)
Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis
9.2.(12a)(3) 1906.70 M2 1,445,448,074.61 5.79
Granite)
9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 575,372,234.22 2.30

9.2.(23) Semak / Perdu Taman 197.80 M2 8,039,581.00 0.03

9.2.(24) Pohon Jenis Tabebuya 120.00 Buah 19,258,800.00 0.08

9.3.(1) Kursi Taman 98.00 Buah 343,000,000.00 1.37

9.3.(2) Grill Pohon 22.00 Buah 60,500,000.00 0.24


9.3.(3) Grill Tangkapan Air 1202.00 Buah 1,081,800,000.00 4.33

9.3.(4) Manhole penutup saluran 589.00 Buah 795,150,000.00 3.18


9.3.(5) Stand Bollard (Bulat) 158.00 Buah 189,600,000.00 0.76

9.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 420,000,000.00 1.68

24,975,536,036.0 100.0

PROSENTASE RENCANA KEMAJUAN PEKERJAAN 0.05 0.00 0.00 0.00 0.10 0.05 0.05 0.12 0.61 0.95 0.98 0.98 0.98 0.98 0.98 1.06 1.13 1.13 1.13 1.13 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 1.17 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.04 2.15 2.15 2.15 2.15 3.09 3.30 3.30 3.35 4.14 4.14 4.18 4.18 2.25 2.04 2.04 1.06 0.72 0.00 0.00 0.05

PROSENTASE KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0 0.05 0.05 0.05 0.05 0.15 0.21 0.26 0.38 0.99 1.95 2.93 3.91 4.89 5.87 6.86 7.92 9.04 10.17 11.29 12.42 13.59 14.76 15.93 17.10 18.28 19.45 20.62 21.79 22.96 25.00 27.04 29.07 31.11 33.15 35.19 37.23 39.27 41.31 43.34 45.38 47.42 49.45 51.49 53.53 55.68 57.83 59.98 62.13 65.23 68.53 71.83 75.18 79.32 83.46 87.65 91.83 94.08 96.12 98.2 99.2 99.9 99.9 99.9 100.0
PROSENTASE REALISASI KEMAJUAN PEKERJAAN 0.04 0.04 0.27 0.27 0.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PROSENTASE KUMULATIF REALISASI KEMAJUAN PEKERJAAN 0 0.04 0.07 0.34 0.60 0.92 0.92

DEVIASI PROSENTASE KEMAJUAN PEKERJAAN -0.01 0.02 0.29 0.55 0.77 0.72

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60 M61 M62 M63 M64 M65

Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas Kontraktor Pelaksana


Penyelenggaraan Jalan Kabupaten/Kota CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
Dinas PUPR Bidang Bina Marga Kab. Tanah Bumbu

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
bln 1 mg bln 2 mg bln 3 mg bln 4 mg bln 5 mg bln 6 mg bln 7 mg
26/12/22 1 1 1/25/2023 1 1 2/25/2023 1 1 3/25/2023 1 1 4/25/2023 1 1 5/25/2023 1 1 6/25/2023 1 1

12/27/2022 2 2 1/26/2023 2 2 2/26/2023 2 2 3/26/2023 2 2 4/26/2023 2 2 5/26/2023 2 2 6/26/2023 2 2

12/28/2022 des 3 3 1/27/2023 jan 3 3 2/27/2023 feb 3 3 3/27/2023 mar 3 3 4/27/2023 apr 3 3 5/27/2023 mei 3 3 6/27/2023 jun 3 3

12/29/2022 1 4 4 1/28/2023 1 4 4 2/28/2023 1 4 4 3/28/2023 1 4 4 4/28/2023 1 4 4 5/28/2023 1 4 4 6/28/2023 1 4 4

12/30/2022 5 5 1/29/2023 5 5 3/1/2023 5 5 3/29/2023 5 5 4/29/2023 5 5 5/29/2023 5 5 6/29/2023 5 5

12/31/2022 6 6 1/30/2023 6 6 3/2/2023 mar 6 6 3/30/2023 6 6 4/30/2023 6 6 5/30/2023 6 6 6/30/2023 6 6

1/1/2023 jan 7 7 1/31/2023 7 7 3/3/2023 7 7 3/31/2023 7 7 5/1/2023 mei 7 7 5/31/2023 7 7 7/1/2023 jul 7 7

1/2/2023 1 8 2/1/2023 8 8 3/4/2023 1 8 4/1/2023 8 8 5/2/2023 8 8 6/1/2023 1 8 7/2/2023 1 8

1/3/2023 2 9 2/2/2023 1 9 3/5/2023 2 9 4/2/2023 1 9 5/3/2023 1 9 6/2/2023 2 9 7/3/2023 2 9

1/4/2023 3 10 2/3/2023 2 10 3/6/2023 3 10 4/3/2023 2 10 5/4/2023 2 10 6/3/2023 3 10 7/4/2023 3 10

1/5/2023 jan 4 11 2/4/2023 feb 3 11 3/7/2023 mar 4 11 4/4/2023 apr 3 11 5/5/2023 mei 3 11 6/4/2023 jun 4 11 7/5/2023 jul 4 11

1/6/2023 2 5 12 2/5/2023 2 4 12 3/8/2023 2 5 12 4/5/2023 2 4 12 5/6/2023 2 4 12 6/5/2023 2 5 12 7/6/2023 2 5 12

1/7/2023 6 13 2/6/2023 5 13 3/9/2023 6 13 4/6/2023 5 13 5/7/2023 5 13 6/6/2023 6 13 7/7/2023 6 13

1/8/2023 7 14 2/7/2023 6 14 3/10/2023 7 14 4/7/2023 6 14 5/8/2023 6 14 6/7/2023 7 14 7/8/2023 7 14

1/9/2023 8 15 2/8/2023 7 15 3/11/2023 1 15 4/8/2023 7 15 5/9/2023 7 15 6/8/2023 8 15 7/9/2023 1 15

1/10/2023 1 16 2/9/2023 8 16 3/12/2023 2 16 4/9/2023 8 16 5/10/2023 1 16 6/9/2023 1 16 7/10/2023 2 16

1/11/2023 jan 2 17 2/10/2023 1 17 3/13/2023 mar 3 17 4/10/2023 1 17 5/11/2023 2 17 6/10/2023 2 17 7/11/2023 jul 3 17

1/12/2023 3 3 18 2/11/2023 2 18 3/14/2023 3 4 18 4/11/2023 2 18 5/12/2023 mei 3 18 6/11/2023 jun 3 18 7/12/2023 3 4 18

1/13/2023 4 19 2/12/2023 3 19 3/15/2023 5 19 4/12/2023 apr 3 19 5/13/2023 3 4 19 6/12/2023 3 4 19 7/13/2023 5 19

1/14/2023 5 20 2/13/2023 feb 4 20 3/16/2023 6 20 4/13/2023 3 4 20 5/14/2023 5 20 6/13/2023 5 20 7/14/2023 6 20

1/15/2023 6 21 2/14/2023 3 5 21 3/17/2023 7 21 4/14/2023 5 21 5/15/2023 6 21 6/14/2023 6 21 7/15/2023 7 21

1/16/2023 7 22 2/15/2023 6 22 3/18/2023 1 22 4/15/2023 6 22 5/16/2023 7 22 6/15/2023 7 22 7/16/2023 8 22

1/17/2023 1 23 2/16/2023 7 23 3/19/2023 2 23 4/16/2023 7 23 5/17/2023 1 23 6/16/2023 8 23 7/17/2023 1 23

1/18/2023 jan 2 24 2/17/2023 8 24 3/20/2023 mar 3 24 4/17/2023 8 24 5/18/2023 2 24 6/17/2023 1 24 7/18/2023 2 24

1/19/2023 4 3 25 2/18/2023 1 25 3/21/2023 4 4 25 4/18/2023 1 25 5/19/2023 3 25 6/18/2023 jun 2 25 7/19/2023 4 3 25

1/20/2023 4 26 2/19/2023 2 26 3/22/2023 5 26 4/19/2023 2 26 5/20/2023 mei 4 26 6/19/2023 4 3 26 7/20/2023 jul 4 26

1/21/2023 5 27 2/20/2023 feb 3 27 3/23/2023 6 27 4/20/2023 apr 3 27 5/21/2023 4 5 27 6/20/2023 4 27 7/21/2023 5 27

1/22/2023 6 28 2/21/2023 4 4 28 3/24/2023 7 28 4/21/2023 4 4 28 5/22/2023 6 28 6/21/2023 5 28 7/22/2023 6 28

1/23/2023 7 29 2/22/2023 5 29 29 4/22/2023 5 29 5/23/2023 7 29 6/22/2023 6 29 7/23/2023 7 29

1/24/2023 8 30 2/23/2023 6 30 30 4/23/2023 6 30 5/24/2023 8 30 6/23/2023 7 30 7/24/2023 8 30

31 2/24/2023 7 31 4/24/2023 7 31 31 6/24/2023 8 31 31


bln 8 mg bln 9 mg bln 10 mg bln 11 mg bln 12 mg bln 13 mg bln 14 mg
1 1
7/25/2023 1 8/25/2023 1 9/25/2023 1 1 10/25/2023 1 1 11/25/2023 1 1 12/25/2023 1 1 1/25/2024 1 1
2 2
7/26/2023 2 8/26/2023 2 9/26/2023 2 2 10/26/2023 2 2 11/26/2023 2 2 12/26/2023 2 2 1/26/2024 2 2

7/27/2023 jul 3 3 8/27/2023 agst 3 3 9/27/2023 spte 3 3 10/27/2023 okt 3 3 11/27/2023 nop 3 3 12/27/2023 des 3 3 1/27/2024 jan 3 3

7/28/2023 1 4 4 8/28/2023 1 4 4 9/28/2023 1 4 4 10/28/2023 1 4 4 11/28/2023 1 4 4 12/28/2023 1 4 4 1/28/2024 1 4 4

7/29/2023 5 5 8/29/2023 5 5 9/29/2023 5 5 10/29/2023 5 5 11/29/2023 5 5 12/29/2023 5 5 1/29/2024 5 5

7/30/2023 6 6 8/30/2023 6 6 9/30/2023 6 6 10/30/2023 6 6 11/30/2023 6 6 12/30/2023 6 6 1/30/2024 6 6

7/31/2023 7 7 8/31/2023 7 7 10/1/2023 okt 7 7 10/31/2023 7 7 12/1/2023 des 7 7 12/31/2023 7 7 1/31/2024 7 7

8/1/2023 agst 8 8 9/1/2023 1 8 10/2/2023 1 8 11/1/2023 nop 8 8 12/2/2023 1 8 1/1/2024 1 8 2/1/2024 feb 8 8

8/2/2023 1 9 9/2/2023 2 9 10/3/2023 2 9 11/2/2023 1 9 12/3/2023 2 9 1/2/2024 2 9 2/2/2024 1 9

8/3/2023 2 10 9/3/2023 3 10 10/4/2023 3 10 11/3/2023 2 10 12/4/2023 3 10 1/3/2024 3 10 2/3/2024 2 10

8/4/2023 agst 3 11 9/4/2023 spte 4 11 10/5/2023 okt 4 11 11/4/2023 nop 3 11 12/5/2023 des 4 11 1/4/2024 jan 4 11 2/4/2024 feb 3 11

8/5/2023 2 4 12 9/5/2023 2 5 12 10/6/2023 2 5 12 11/5/2023 2 4 12 12/6/2023 2 5 12 1/5/2024 2 5 12 2/5/2024 2 4 12

8/6/2023 5 13 9/6/2023 6 13 10/7/2023 6 13 11/6/2023 5 13 12/7/2023 6 13 1/6/2024 6 13 2/6/2024 5 13

8/7/2023 6 14 9/7/2023 7 14 10/8/2023 7 14 11/7/2023 6 14 12/8/2023 7 14 1/7/2024 7 14 2/7/2024 6 14

8/8/2023 7 15 9/8/2023 8 15 10/9/2023 1 15 11/8/2023 7 15 12/9/2023 1 15 1/8/2024 8 15 2/8/2024 7 15

8/9/2023 1 16 9/9/2023 1 16 10/10/2023 2 16 11/9/2023 1 16 12/10/2023 2 16 1/9/2024 1 16 2/9/2024 1 16

8/10/2023 2 17 9/10/2023 2 17 10/11/2023 okt 3 17 11/10/2023 nop 2 17 12/11/2023 des 3 17 1/10/2024 2 17 2/10/2024 2 17

8/11/2023 3 3 18 9/11/2023 spte 3 18 10/12/2023 3 4 18 11/11/2023 3 3 18 12/12/2023 3 4 18 1/11/2024 jan 3 18 2/11/2024 feb 3 18

8/12/2023 agst 4 19 9/12/2023 3 4 19 10/13/2023 5 19 11/12/2023 4 19 12/13/2023 5 19 1/12/2024 3 4 19 2/12/2024 3 4 19

8/13/2023 5 20 9/13/2023 5 20 10/14/2023 6 20 11/13/2023 5 20 12/14/2023 6 20 1/13/2024 5 20 2/13/2024 5 20

8/14/2023 6 21 9/14/2023 6 21 10/15/2023 7 21 11/14/2023 6 21 12/15/2023 7 21 1/14/2024 6 21 2/14/2024 6 21

8/15/2023 7 22 9/15/2023 7 22 10/16/2023 8 22 11/15/2023 7 22 12/16/2023 8 22 1/15/2024 7 22 2/15/2024 7 22

8/16/2023 8 23 9/16/2023 8 23 10/17/2023 1 23 11/16/2023 8 23 12/17/2023 1 23 1/16/2024 8 23 2/16/2024 8 23

8/17/2023 1 24 9/17/2023 1 24 10/18/2023 2 24 11/17/2023 1 24 12/18/2023 2 24 1/17/2024 1 24 2/17/2024 1 24

8/18/2023 2 25 9/18/2023 2 25 10/19/2023 okt 3 25 11/18/2023 nop 2 25 12/19/2023 des 3 25 1/18/2024 2 25 2/18/2024 feb 2 25

8/19/2023 agst 3 26 9/19/2023 spte 3 26 10/20/2023 4 4 26 11/19/2023 4 3 26 12/20/2023 4 4 26 1/19/2024 4 3 26 2/19/2024 4 3 26

8/20/2023 4 4 27 9/20/2023 4 4 27 10/21/2023 5 27 11/20/2023 4 27 12/21/2023 5 27 1/20/2024 jan 4 27 2/20/2024 4 27


5 5
8/21/2023 28 9/21/2023 28 10/22/2023 6 28 11/21/2023 5 28 12/22/2023 6 28 1/21/2024 5 28 2/21/2024 5 28
6 6
8/22/2023 29 9/22/2023 29 10/23/2023 7 29 11/22/2023 6 29 12/23/2023 7 29 1/22/2024 6 29 2/22/2024 6 29
7 7
8/23/2023 30 9/23/2023 30 10/24/2023 8 30 11/23/2023 7 30 12/24/2023 8 30 1/23/2024 7 30 2/23/2024 7 30
8 8
8/24/2023 31 9/24/2023 31 31 11/24/2023 8 31 31 1/24/2024 8 31 2/24/2024 8 31
bln 15 mg
1
2/25/2024 1
2
2/26/2024 2

2/27/2024 feb 3 3

2/28/2024 1 4 4

2/29/2024 5 5

3/1/2024 mar 6 6

3/2/2024 7 7

3/3/2024 1 8

3/4/2024 2 9

3/5/2024 3 10

3/6/2024 mar 4 11

3/7/2024 2 5 12

3/8/2024 6 13

3/9/2024 7 14

3/10/2024 1 15

3/11/2024 2 16

3/12/2024 mar 3 17

3/13/2024 3 4 18

3/14/2024 5 19

3/15/2024 6 20

3/16/2024 7 21

3/17/2024 1 22

3/18/2024 2 23

3/19/2024 mar 3 24

3/20/2024 4
3/21/2024

3/22/2024

3/23/2024

3/24/2024
PEMERINTAH KABUPATEN TANAH BUMBU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA

Monthly Certificate 01
( MC 01 )

PAKET PEKERJAAN :

PEMBANGUNAN PEDESTRIAN JL. BATULICIN - SIMPANG EMPAT - SARI


GADUNG (MULTI YEARS)

SUMBER DANA :
APBD TAHUN ANGGARAN 2022, 2023 DAN 2024

LOKASI :
KEC. BATULICIN DAN KEC. SIMPANG EMPAT, KABUPATEN TANAH BUMBU

NOMOR KONTRAK :
T/027.2/036/KONT/DPUPR-BM.1/XII/2022, TANGGAL 26 DESEMBER 2022

KONSULTAN SUPERVISI :

CV. ARSA DELAPAN

KONTRAKTOR PELAKSANA :
PEMERINTAH KABUPATEN TANAH BUMBU
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG BINA MARGA

MUTUAL CHECK 0%
( BACKUP PERHITUNGAN VOLUME )

PAKET PEKERJAAN :

PEMBANGUNAN PEDESTRIAN JL. BATULICIN - SIMPANG EMPAT - SARI


GADUNG (MULTI YEARS)

SUMBER DANA :
APBD TAHUN ANGGARAN 2022, 2023 DAN 2024

LOKASI :
KEC. BATULICIN DAN KEC. SIMPANG EMPAT, KABUPATEN TANAH BUMBU

NOMOR KONTRAK :
T/027.2/036/KONT/DPUPR-BM.1/XII/2022, TANGGAL 26 DESEMBER 2022

KONSULTAN SUPERVISI :

CV. ARSA DELAPAN

KONTRAKTOR PELAKSANA :
JANGKA WAKTU PELAKSANAAN PEKERJAAN MUTUAL CHECK 0%
KEGIATAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
TAHUN ANGGARAN : 2022, 2023 Dan 2024
WAKTU PELAKSANAAN PEKERJAAN 450 HARI KALENDER

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5 BULAN 6 BULAN 7 BULAN 8 BULAN 9 BULAN 10 BULAN 11 BULAN 12 BULAN 13 BULAN 14 BULAN 15

BOBOT (%)
NO. URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA KET.
26-Dec 2-Jan 10-Jan 17-Jan 25-Jan 2-Feb 10-Feb 18-Feb 25-Feb 4-Mar 11-Mar 18-Mar 25-Mar 2-Apr 10-Apr 18-Apr 25-Apr 3-May 10-May 17-May 25-May 1-Jun 9-Jun 17-Jun 25-Jun 2-Jul 9-Jul 17-Jul 25-Jul 2-Aug 9-Aug 17-Aug 25-Aug 1-Sep 9-Sep 17-Sep 25-Aug 2-Oct 9-Oct 17-Oct 25-Oct 2-Nov 9-Nov 17-Nov 25-Nov 2-Dec 9-Dec 17-Dec 25-Dec 1-Jan 9-Jan 17-Jan 25-Jan 2-Feb 9-Feb 17-Feb 25-Feb 3-Mar 10-Mar 17-Mar

1-Jan 9-Jan 16-Jan 24-Jan 1-Feb 9-Feb 17-Feb 24-Feb 3-Mar 10-Mar 17-Mar 24-Mar 1-Apr 9-Apr 17-Apr 24-Apr 2-May 9-May 16-May 24-May 31-May 8-Jun 16-Jun 24-Jun 1-Jul 8-Jul 16-Jul 24-Jul 1-Aug 8-Aug 16-Aug 24-Aug 31-Aug 8-Sep 16-Sep 24-Aug 1-Oct 8-Oct 16-Oct 24-Oct 1-Nov 8-Nov 16-Nov 24-Nov 1-Dec 8-Dec 16-Dec 24-Dec 31-Dec 8-Jan 16-Jan 24-Jan 1-Feb 8-Feb 16-Feb 24-Feb 2-Mar 9-Mar 16-Mar 19-Mar

DIVISI 1. UMUM

1.2 Mobilisasi 1.00 ls 35,680,000.00 0.14 0.035

1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 ls 34,880,000.00 0.14

1.8.(2) Jembatan Sementara 1.00 ls 43,250,000.00 0.17

DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 113,810,000.00

APD 1.00 ls 31,849,031.00 0.13 0.232

DIVISI 3. DRAINASE 31,849,031.00

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5601.84 M3 391,286,584.34 1.57

2.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 132,711,520.00 0.53

2.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 367,282,135.00 1.47

2.3.(30) Saluran berbentuk U Tipe DS 5 2397.00 M1 4,253,498,073.00 17.03

DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK 5,144,778,312.34

3.1.(1) Galian Biasa 90.20 m3 2,186,799.60 0.01

DIVISI 8. STRUKTUR 2,186,799.60

7.1 (7a) Beton strukur, fc’20 MPa 2144.47 M3 4,484,228,615.22 17.95

7.1 (8) Beton , fc’15 Mpa 126.22 M3 237,258,035.45 0.95 P


7.1 (10) Beton, fc’10 Mpa 436.05 M3 689,370,048.47 2.76 R
7.3 (1) Baja Tulangan Polos-BjTP 280 118109.60 Kg 2,646,110,943.06 10.59 O
7.15.(2) Pembongkaran Beton 380.09 M3 242,149,332.50 0.97 S
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2917.60 M1 198,552,405.33 0.79
E
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 8,497,669,380.03
S
9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) 3194.00 M1 740,476,131.49 2.96
P
9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) 2816.00 M1 445,107,718.95 1.78 H
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 49.00 Buah 7,493,131.34 0.03 O
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,725,177.30 0.03

9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,201,761.47 0.02

9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 60x60) 4653.60 M2 2,253,624,914.91 9.02

9.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 30x30) 5301.10 M2 2,787,444,990.03 11.16

9.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1906.70 M2 1,445,448,074.61 5.79

9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 575,372,234.22 2.30

9.2.(23) Semak / Perdu Taman 197.80 M2 8,039,581.00 0.03

9.2.(24) Pohon Jenis Tabebuya 120.00 Buah 19,258,800.00 0.08

9.3.(1) Kursi Taman 98.00 Buah 343,000,000.00 1.37

9.3.(2) Grill Pohon 22.00 Buah 60,500,000.00 0.24

9.3.(3) Grill Tangkapan Air 1202.00 Buah 1,081,800,000.00 4.33

9.3.(4) Manhole penutup saluran 589.00 Buah 795,150,000.00 3.18

9.3.(5) Stand Bollard (Bulat) 158.00 Buah 189,600,000.00 0.76

9.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 420,000,000.00 1.68

11,185,242,515.32

24,975,536,038.29 100.0

PROSENTASE RENCANA KEMAJUAN PEKERJAAN 0.05 0.00 0.00 0.00 0.10 0.05 0.05 0.05 0.33 0.95 0.97 1.01 1.04 1.08 1.09 1.16 1.34 1.34 1.34 1.34 1.39 1.39 1.39 1.39 1.39 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 2.82 2.99 2.99 2.99 2.99 2.99 3.01 3.01 3.01 3.01 3.12 3.12 3.36 3.38 3.63 3.16 3.14 2.95 2.52 2.36 0.58 0.30 0.00

PROSENTASE KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0.05 0.05 0.05 0.05 0.15 0.20 0.26 0.31 0.64 1.59 2.56 3.57 4.60 5.68 6.77 7.94 9.28 10.62 11.96 13.30 14.69 16.08 17.47 18.86 20.25 21.78 23.30 24.83 26.36 27.88 29.41 30.93 32.46 33.98 35.51 37.04 38.56 41.39 44.38 47.37 50.36 53.36 56.35 59.36 62.37 65.38 68.38 71.51 74.63 77.99 81.37 85.01 88.17 91.31 94.26 96.77 99.13 99.71 100.00 100.00

PROSENTASE REALISASI KEMAJUAN PEKERJAAN 0.04 0.00 0.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

PROSENTASE KUMULATIF REALISASI KEMAJUAN PEKERJAAN 0.04 0.04 0.27 0.27

DEVIASI PROSENTASE KEMAJUAN PEKERJAAN -0.01 -0.01 0.22 0.22

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60

Banjarmasin, 26 Desember 2022


Penawar
PT. BINA SARANA BERSAMA

Ir. H. AHMAD RUBANI


Direktur
JANGKA WAKTU PELAKSANAAN PEKERJAAN MUTUAL CHECK 0%
KEGIATAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
TAHUN ANGGARAN : 2022, 2023 Dan 2024
WAKTU PELAKSANAAN PEKERJAAN 450 HARI KALENDER

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33 M34 M35 M36 M37 M38 M39 M40 M41 M42 M43 M44 M45 M46 M47 M48 M49 M50 M51 M52 M53 M54 M55 M56 M57 M58 M59 M60

BOBOT (%)
NO. URAIAN PEKERJAAN VOL. SAT. JUMLAH HARGA KET.
26/12/22 02/01/23 10/01/23 17/01/23 25/01/23 02/02/23 10/02/23 18/02/23 25/02/23 04/03/23 11/03/23 18/03/23 25/03/23 02/04/23 10/04/23 18/04/23 25/04/23 03/05/23 10/05/23 17/05/23 25/05/23 02/07/23 09/07/23 17/07/23 25/07/23 02/08/23 09/08/23 17/08/23 25/08/23 02/08/23 09/08/23 17/08/23 25/08/23 01/09/23 09/09/23 17/09/23 25/09/23 02/10/23 09/10/23 17/10/23 25/10/23 02/11/23 09/11/23 17/11/23 25/11/23 02/12/23 09/12/23 17/12/23 25/12/23 01/01/24 09/01/24 17/01/24 25/01/24 02/02/24 09/02/24 17/02/24 25/02/24 03/03/24 10/03/24 17/03/24

01/01/23 09/01/23 16/01/23 24/01/23 01/02/23 09/02/23 17/02/23 24/02/23 03/03/23 10/03/23 17/03/23 24/03/23 01/04/23 09/04/23 17/04/23 24/04/23 02/05/23 09/05/23 16/05/23 24/05/23 31/05/23 08/06/23 16/06/23 24/06/23 01/07/23 08/07/23 16/07/23 24/07/23 01/08/23 08/08/23 16/08/23 24/08/23 31/08/23 08/09/23 16/09/23 24/08/23 01/10/23 08/10/23 16/10/23 24/10/23 01/11/23 08/11/23 16/11/23 24/11/23 01/12/23 08/12/23 16/12/23 24/12/23 31/12/23 08/01/24 16/01/24 24/01/24 01/02/24 08/02/24 16/02/24 24/02/24 02/03/24 09/03/24 16/03/24 19/03/24

DIVISI 1. UMUM

1.2 Mobilisasi 1.00 ls 35,680,000.00 0.14 0.048 0.048 0.048

1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 ls 34,880,000.00 0.14 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

1.8.(2) Jembatan Sementara 1.00 ls 43,250,000.00 0.17 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003 0.003

DIVISI 2. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 113,810,000.00

APD 1.00 ls 31,849,031.00 0.13 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002 0.002

DIVISI 3. DRAINASE 31,849,031.00

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5601.84 M3 391,286,584.34 1.57 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

2.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 132,711,520.00 0.53 0.27 0.27

2.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 367,282,135.00 1.47 0.29 0.29 0.29 0.29 0.29

2.3.(30) Saluran berbentuk U Tipe DS 5 2397.00 M1 4,253,498,073.00 17.03 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47

DIVISI 4. PEKERJAAN TANAH DAN GEOSINTETIK 5,144,778,312.34

3.1.(1) Galian Biasa 90.20 m3 2,186,799.60 0.01 0.00 0.00 0.00

DIVISI 8. STRUKTUR 2,186,799.60

7.1 (7a) Beton strukur, fc’20 MPa 2144.47 M3 4,484,228,615.22 17.95 0.35 0.35 0.35 0.35 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39

7.1 (8) Beton , fc’15 Mpa 126.22 M3 237,258,035.45 0.95 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.04 0.04 0.04 0.04 0.04 P
7.1 (10) Beton, fc’10 Mpa 436.05 M3 689,370,048.47 2.76 0.05 0.05 0.05 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 R
7.3 (1) Baja Tulangan Polos-BjTP 280 118109.60 Kg 2,646,110,943.06 10.59 0.21 0.21 0.21 0.21 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 O
7.15.(2) Pembongkaran Beton 380.09 M3 242,149,332.50 0.97 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
S
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2917.60 M1 198,552,405.33 0.79 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
E
S
DIVISI 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 8,497,669,380.03

9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) 3194.00 M1 740,476,131.49 2.96 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
P
9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) 2816.00 M1 445,107,718.95 1.78 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 H
9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) 49.00 Buah 7,493,131.34 0.03 0.015 0.015 O
9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,725,177.30 0.03 0.013 0.013

9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) 49.00 Buah 6,201,761.47 0.02 0.012 0.012

9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 60x60) 4653.60 M2 2,253,624,914.91 9.02 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45

9.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran 30x30) 5301.10 M2 2,787,444,990.03 11.16 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56

9.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1906.70 M2 1,445,448,074.61 5.79 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29

9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 575,372,234.22 2.30 0.33 0.33 0.33 0.33 0.33 0.33 0.33

9.2.(23) Semak / Perdu Taman 197.80 M2 8,039,581.00 0.03 0.01 0.01 0.01 0.01 0.01 0.01

9.2.(24) Pohon Jenis Tabebuya 120.00 Buah 19,258,800.00 0.08 0.01 0.01 0.01 0.01 0.01 0.01

9.3.(1) Kursi Taman 98.00 Buah 343,000,000.00 1.37 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

9.3.(2) Grill Pohon 22.00 Buah 60,500,000.00 0.24 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

9.3.(3) Grill Tangkapan Air 1202.00 Buah 1,081,800,000.00 4.33 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

9.3.(4) Manhole penutup saluran 589.00 Buah 795,150,000.00 3.18 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

9.3.(5) Stand Bollard (Bulat) 158.00 Buah 189,600,000.00 0.76 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

9.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 420,000,000.00 1.68 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17

11,185,242,515.32

24,975,536,038.29 100.0

PROSENTASE RENCANA KEMAJUAN PEKERJAAN 0.05 0.00 0.00 0.00 0.10 0.05 0.05 0.05 0.33 0.95 0.97 1.01 1.04 1.08 1.09 1.16 1.34 1.34 1.34 1.34 1.39 1.39 1.39 1.39 1.39 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 1.53 2.82 2.99 2.99 2.99 2.99 2.99 3.01 3.01 3.01 3.01 3.12 3.12 3.36 3.38 3.63 3.16 3.14 2.95 2.52 2.36 0.58 0.30 0.00

PROSENTASE KUMULATIF RENCANA KEMAJUAN PEKERJAAN 0.05 0.05 0.05 0.05 0.15 0.20 0.26 0.31 0.64 1.59 2.56 3.57 4.60 5.68 6.77 7.94 9.28 10.62 11.96 13.30 14.69 16.08 17.47 18.86 20.25 21.78 23.30 24.83 26.36 27.88 29.41 30.93 32.46 33.98 35.51 37.04 38.56 41.39 44.38 47.37 50.36 53.36 56.35 59.36 62.37 65.38 68.38 71.51 74.63 77.99 81.37 85.01 88.17 91.31 94.26 96.77 99.13 99.71 100.00 100.00

PROSENTASE REALISASI KEMAJUAN PEKERJAAN


PROSENTASE KUMULATIF REALISASI KEMAJUAN PEKERJAAN
DEVIASI PROSENTASE KEMAJUAN PEKERJAAN

Banjarmasin, 26 Desember 2022


Penawar
PT. BINA SARANA BERSAMA

Ir. H. AHMAD RUBANI


Direktur
SERTIFIKAT BULANAN (S.B)
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu THN ANGGARAN : 2022 s/d 2024
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA NOMOR S.B : 1
KONSULTAN PENGAWAS : CV. ARSA DELAPAN S.B BULAN : JANUARI
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 TGL LAPORAN : 26 Desember 2022
TANGGAL KONTRAK : 26 Desember 2022 : 24 Januari 2023
NILAI KONTRAK : Rp 27,722,845,000

PROGRESS PROSENTASE
NO. URAIAN KEGIATAN NILAI KONTRAK BOBOT KONTRAK PEKERJAAN PROGRES (%) NILAI (Rp)

1 I UMUM 113,810,000.00 0.46 0.005 1.10 1,250,000.00


2 II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 31,849,031.00 0.13 0.030 23.23 7,399,547.80
3 III DRAINASE 5,145,384,719.27 20.60 - - -
4 IV PEKERJAAN TANAH DAN GEOSINTETIK 2,186,799.60 0.01 - - -
8 VIII STRUKTUR 8,497,062,970.85 34.02 - - -
9 IX REHABILITASI JEMBATAN - - - - -
10 X PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN 11,185,242,515.32 44.78 - - -
11 XI PEKERJAAN PEMELIHARAAN KINERJA - - - - -

A TOTAL NILAI KEGIATAN 24,975,536,036.04 100.00 0.03 8,649,547.80


B PPN 11 % X ( A ) 2,747,308,963.96 864,954.78
C JUMLAH KESELURUHAN ( A + B ) 27,722,845,000.00 9,514,000.00
D TOTAL KEMAJUAN BULAN LALU 0.03
E JUMLAH KOTOR PEKERJAAN BULAN INI (C - D ) 9,513,999.97
G JUMLAH KOTOR SERTIFIKAT BULAN INI (E-F) 9,513,999.97
H POTONGAN - POTONGAN
1. MATERIAL BULAN INI
2. UANG RETENSI (5% X E) 475,700.00
3. ANGSURAN PEMBAYARAN
PENGEMBALIAN UANG MUKA ( 15% X E ) 1,427,099.99
TOTAL POTONGAN ( 1 + 2 + 3 ) 1,902,799.99
NILAI BERSIH SERTIFIKAT BULAN INI (G-H) 7,611,199.97
I
7,611,000.00
Terbilang : #NAME?
PERSENTASE PERKEMBANGAN S/D BULAN INI ( % ) 0.03
S/D BULAN LALU ( % ) 0.00
BULAN INI ( % ) 0.03

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Kepala Bidang Bina Marga Konsultan Supervisi Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur

Diketahui Oleh
Pengguna Anggaran
DPUPR Tanah Bumbu

Hernadi Wibisono, M.T


NIP. 19710124 200604 1 011
SERTIFIKAT BULANAN (S.B)
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu THN ANGGARAN : 2022 s/d 2024
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA NOMOR S.B : 2
KONSULTAN PENGAWAS : CV. ARSA DELAPAN S.B BULAN : PEBRUARI
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 TGL LAPORAN : 26 Januari 2023
TANGGAL KONTRAK : 26 Desember 2022 : 22 Februari 2023
NILAI KONTRAK : Rp 27,722,845,000

PROGRESS PROSENTASE
NO. URAIAN KEGIATAN NILAI KONTRAK BOBOT KONTRAK PEKERJAAN PROGRES (%) NILAI (Rp)

1 I UMUM 113,810,000.00 0.46 - - -


2 II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) 31,849,031.00 0.13 - - -
3 III DRAINASE 5,145,384,719.27 20.60 - - -
4 IV PEKERJAAN TANAH DAN GEOSINTETIK 2,186,799.60 0.01 - - -
5 V PEKERJAAN PREVENTIF - - - - -
6 VI PEKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN - - - - -
7 VII PERKERASAN ASPAL - - - - -
8 VIII STRUKTUR 8,497,062,970.85 34.02 - - -
9 IX REHABILITASI JEMBATAN - - - - -
10 X PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN 11,185,242,515.32 44.78 - - -
11 XI PEKERJAAN PEMELIHARAAN KINERJA - - - - -

A TOTAL NILAI KEGIATAN 24,975,536,036.04 100.00 0.00 0.00


B PPN 11 % X ( A ) 2,747,308,963.96 0.00
C JUMLAH KESELURUHAN ( A + B ) 27,722,845,000.00 0.00
D TOTAL KEMAJUAN BULAN LALU 0.00
E JUMLAH KOTOR PEKERJAAN BULAN INI (C - D ) 0.00
F MATERIAL DI LAPANGAN 0.00
G JUMLAH KOTOR SERTIFIKAT BULAN INI (E-F) 0.00
H POTONGAN - POTONGAN
1. MATERIAL BULAN INI
2. UANG RETENSI (5% X E) 0.00
3. ANGSURAN PEMBAYARAN
PENGEMBALIAN UANG MUKA ( 20% X E ) 0.00
TOTAL POTONGAN ( 1 + 2 + 3 ) 0.00
NILAI BERSIH SERTIFIKAT BULAN INI (G-H) 0.00
I
0.00
Terbilang : DUA PULUH TIGA JUTA DELAPAN RATUS TIGA PULUH ENAM RIBU RUPIAH
PERSENTASE PERKEMBANGAN S/D BULAN INI ( % ) 0.00
S/D BULAN LALU ( % ) 0.00
BULAN INI ( % ) 0.00

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Kepala Bidang Bina Marga Konsultan Supervisi Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur

Diketahui Oleh
Pengguna Anggaran
DPUPR Tanah Bumbu

Subhansyah,ST.MT
NIP. 19720121 2003 12 1 008
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI I UMUM Jumlah Harga Pekerjaan Rp. 113,810,000.00


NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

1.2 Mobilisasi LS 1.00 0.035 35,680,000.00 1,250,000.00


1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.00 34,880,000.00 0.00
1.8.(2) Jembatan Sementara LS 1.00 0.00 43,250,000.00 0.00

JUMLAH SAMPAI DENGAN SAAT INI 1,250,000.00


PROSENTASE TERHADAP DIVISI INI 1.10
PROSENTASE TERHADAP TOTAL KONTRAK 0.01

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI II SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI Jumlah Harga Pekerjaan Rp. 31,849,031.00
NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

2.3.(2) APD, antara lain :


- Topi pelindung (Safety Helmet) Bh 150.00 14 75,000.00 1,050,000.00
- Pelindung mata (Googles, Spectacles) Bh 40.00 0 25,000.00 0.00
- Pelindung pernafasan dan mulut Bh 305.00 50 10,000.00 500,000.00
(masker, masker respirator)
- Sarung tangan (Safety Gloves) Psg 100.00 30 15,000.00 450,000.00
- Sepatu keselamatan Psg 30.00 14 324,968 4,549,547.80
(Safety Shoes, rubber safety shoes and toe cap)
- Rompi keselamatan (Safety Vest) Bh 100.00 14 50,000.00 700,000.00
- Rambu petunjuk Bh 4.00 2 75,000.00 150,000.00

JUMLAH SAMPAI DENGAN SAAT INI 7,399,547.80


PROSENTASE TERHADAP DIVISI INI 23.23
PROSENTASE TERHADAP TOTAL KONTRAK 0.03

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI III DRAINASE Jumlah Harga Pekerjaan Rp. 5,144,778,312.34


NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 5610.52 0.00 69,849.67 0.00
2.3.(24) Saluran berbentuk U Tipe DS 2 M1 85.00 0.00 1,561,312.00 0.00
2.3.(28) Saluran berbentuk U Tipe DS 4 M1 215.00 0.00 1,708,289.00 0.00
2.3.(30) Saluran berbentuk U Tipe DS 5 M1 2397.00 0.00 1,774,509.00 0.00

JUMLAH SAMPAI DENGAN SAAT INI 0.00


PROSENTASE TERHADAP DIVISI INI 0.00
PROSENTASE TERHADAP TOTAL KONTRAK 0.00

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI IV PEKERJAAN TANAH DAN GEOSINTETIK Jumlah Harga Pekerjaan Rp. 2,186,799.60
NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

3.1.(1) Galian Biasa M3 90.20 0.00 24,243.90 0.00

JUMLAH SAMPAI DENGAN SAAT INI 0.00


PROSENTASE TERHADAP DIVISI INI 0.00
PROSENTASE TERHADAP TOTAL KONTRAK 0.00

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI VIII STRUKTUR Jumlah Harga Pekerjaan Rp. 8,497,669,380.03


NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

7.1 (7a) Beton strukur, fc’20 MPa M3 2144.18 0.00 2,091,066.14 0.00
7.1 (8) Beton , fc’15 Mpa M3 126.22 0.00 1,879,718.23 0.00
7.1 (10) Beton, fc’10 Mpa M3 436.05 0.00 1,580,942.66 0.00
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 118109.60 0.00 22,403.86 0.00
7.15.(2) Pembongkaran Beton M3 380.09 0.00 637,084.20 0.00
7.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) M1 2917.60 0.00 68,053.33 0.00

JUMLAH SAMPAI DENGAN SAAT INI 0.00


PROSENTASE TERHADAP DIVISI INI 0.00
PROSENTASE TERHADAP TOTAL KONTRAK 0.00

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
RINCIAN SERTIFIKAT BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN THN ANGGARAN : 2022 s/d 2024
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 NOMOR S.B : 1
TANGGAL KONTRAK : 26 Desember 2022 S.B BULAN : JANUARI
NILAI KONTRAK : Rp 27,722,845,000.00 TGL LAPORAN : 26 Desember 2022
24 Januari 2023
KONTRAK SEBELUM PPN : Rp 24,975,536,036.04

DIVISI X PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN Jumlah Harga Pekerjaan Rp. 11,185,242,515.32
NO. MATA VOLUME VOLUME HARGA
NILAI FISIK
PEMBAYARAN URAIAN KEGIATAN SATUAN KONTRAK SAAT SATUAN
INI (Rp) (Rp.)

9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 3194.00 0.00 231,833.48 0.00


9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) M1 2816.00 0.00 158,063.82 0.00
9.2.(10g)
Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 49.00 0.00 152,921.05 0.00
9.2.(10h)
Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 49.00 0.00 137,248.52 0.00
9.2.(10i)
Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 49.00 0.00 126,566.56 0.00
9.2.(12a)
Perkerasan Blok Beton pada Trotoar dan Median (Jenis
Granite Tile Antiskid R12 Ukuran 60x60) M2 4653.60 0.00 484,275.60 0.00
9.2.(12a)(2)
Perkerasan Blok Beton pada Trotoar dan Median (Jenis
Granite Tile Antiskid R12 Ukuran 30x30) M2 5301.10 0.00 525,823.88 0.00
9.2.(12a)(3)
Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas
Jenis Granite) M2 1906.70 0.00 758,088.88 0.00
9.2.(14)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 48.00 0.00 11,986,921.55 0.00
9.2.(23) Semak / Perdu Taman M2 197.80 0.00 40,645.00 0.00
9.2.(24) Pohon Jenis Tabebuya Buah 120.00 0.00 160,490.00 0.00
9.3.(1) Kursi Taman Buah 98.00 0.00 3,500,000.00 0.00
9.3.(2) Grill Pohon Buah 22.00 0.00 2,750,000.00 0.00
9.3.(3) Grill Tangkapan Air Buah 1202.00 0.00 900,000.00 0.00
9.3.(4) Manhole penutup saluran Buah 589.00 0.00 1,350,000.00 0.00
9.3.(5) Stand Bollard (Bulat) Buah 158.00 0.00 1,200,000.00 0.00
9.3.(6) Stand Bollard (Bentuk L) Buah 280.00 0.00 1,500,000.00 0.00

JUMLAH SAMPAI DENGAN SAAT INI 0.00


PROSENTASE TERHADAP DIVISI INI 0.00
PROSENTASE TERHADAP TOTAL KONTRAK 0.00

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

M. Ramdhan M.N, ST Sahidhan Azmi, ST Ir. H. Ahmad Rubani


NIP. 19840608 201504 1 002 Direktur Direktur
REALISASI PELAKSANAAN PEKERJAAN BULANAN

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. Bina Sarana Bersama
KONSULTAN PENGAWAS : CV. Arsa Delapan
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 BULAN KE : 1
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 26 Desember 2022
NILAI KONTRAK : Rp 27,722,845,000.00 24 Januari 2023

KONTRAK AWAL ADDENDUM / CCO REALISASI PELAKSANAAN PEKERJAAN


NO. s/d BULAN LALU BULAN INI s/d BULAN INI
MATA URAIAN PEKERJAAN SAT HARGA SATUAN JUMLAH HARGA BOBOT HARGA SATUAN JUMLAH HARGA BOBOT
PEMB. VOLUME VOLUME BOBOT BOBOT BOBOT
Rp. Rp. (%) Rp. Rp. (%) VOLUME VOLUME VOLUME
% % %
DIVISI 1 UMUM
1.2 Mobilisasi Ls 1.00 35,680,000.00 35,680,000.00 0.14 - - 0.035 0.01 0.035 0.005

1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 34,880,000.00 34,880,000.00 0.14 - - - - - -

1.8.(2) Jembatan Sementara Ls 1.00 43,250,000.00 43,250,000.00 0.17 - - - - - -

JUMLAH DIVISI 1 113,810,000.00 0.46 - 0.01 0.01


DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
2.3.(2) APD Ls 1.00 31,849,031.00 31,849,031.00 0.13 - - 0.23 0.03 0.23 0.03

JUMLAH DIVISI 2 31,849,031.00 0.13 - 0.030 0.030


DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 5,610.52 69,849.67 391,892,991.27 1.57 - - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 M1 85.00 1,561,312.00 132,711,520.00 0.53 - - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 M1 215.00 1,708,289.00 367,282,135.00 1.47 - - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 M1 2,397.00 1,774,509.00 4,253,498,073.00 17.03 - - - - - -
JUMLAH DIVISI 3 5,145,384,719.27 20.60 - - -
DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK
4.1.(1) Galian Biasa M3 90.20 24,243.90 2,186,799.60 0.01 - - - - - -
JUMLAH DIVISI 4 2,186,799.60 0.01 - - -
DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa M3 2,144.18 2,091,066.14 4,483,622,206.03 17.95 - - - - - -
8.1 (8) Beton , fc’15 Mpa M3 126.22 1,879,718.23 237,258,035.45 0.95 - - - - - -
8.1 (10) Beton, fc’10 Mpa M3 436.05 1,580,942.66 689,370,048.47 2.76 - - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 Kg 118,109.60 22,403.86 2,646,110,943.06 10.59 - - - - - -
8.15.(2) Pembongkaran Beton M3 380.09 637,084.20 242,149,332.50 0.97 - - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) M1 2,917.60 68,053.33 198,552,405.33 0.79 - - - - - -
JUMLAH DIVISI 8 8,497,062,970.85 34.02 - - -
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) M1 3,194.00 231,833.48 740,476,131.49 2.96 - - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) M1 2,816.00 158,063.82 445,107,718.95 1.78 - - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) Buah 49.00 152,921.05 7,493,131.34 0.03 - - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) Buah 49.00 137,248.52 6,725,177.30 0.03 - - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) Buah 49.00 126,566.56 6,201,761.47 0.02 - - - - - -

10.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran M2 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - - -
60x60)

10.2.(12a)(2) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 Ukuran M2 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - - -
30x30)
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) M2 1,906.70 758,088.88 1,445,448,074.61 5.79 - - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 48.00 11,986,921.55 575,372,234.22 2.30 - - - - - -
10.2.(23) Semak / Perdu Taman M2 197.80 40,645.00 8,039,581.00 0.03 - - - - - -
10.2.(24) Pohon Jenis Tabebuya Buah 120.00 160,490.00 19,258,800.00 0.08 - - - - - -
10.3.(1) Kursi Taman Buah 98.00 3,500,000.00 343,000,000.00 1.37 - - - - - -
10.3.(2) Grill Pohon Buah 22.00 2,750,000.00 60,500,000.00 0.24 - - - - - -
10.3.(3) Grill Tangkapan Air Buah 1,202.00 900,000.00 1,081,800,000.00 4.33 - - - - - -
10.3.(4) Manhole penutup saluran Buah 589.00 1,350,000.00 795,150,000.00 3.18 - - - - - -
10.3.(5) Stand Bollard (Bulat) Buah 158.00 1,200,000.00 189,600,000.00 0.76 - - - - - -
10.3.(6) Stand Bollard (Bentuk L) Buah 280.00 1,500,000.00 420,000,000.00 1.68 - - - - - -
JUMLAH DIVISI 10 11,185,242,515.32 44.78 - - -
A JUMLAH 24,975,536,036.04 100.00 - 0.01 0.01
B PAJAK PERTAMBAHAN NILAI (PPn) = 11% X A 2,747,308,963.96 - Rencana s/d bulan ini 0.05
C JUMLAH TOTAL HARGA TERMASUK PPn = A + B 27,722,845,000.00 - Realisasi s/d bulan ini 0.01
D DIBULATKAN 27,722,845,000.00 - DEVIASI (0.05)

Disetujui Oleh : Diperiksa Oleh : Dibuat


Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas, Kontraktor Pelaksana,
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
M. Ramdhan M.N, ST Muhammad Lupiandi, ST IRWAN RIDHANI, ST
NIP. 19840608 201504 1 002 Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 1
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 26 Desember 2022
NILAI KONTRAK : Rp 27,722,845,000 01 Januari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 - 0.035 0.035 3.50 1,250,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 - - - - -
Topi pelindung (Safety Helmet) 150.00 Bh 75,000.00
Pelindung mata (Googles, Spectacles) 40.00 Bh 25,000.00
Pelindung pernafasan dan mulut (masker, masker respirator) 305.00 Bh 10,000.00
Sarung tangan (Safety Gloves) 100.00 Psg 15,000.00
Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe cap) 30.00 Psg 324,967.70
Rompi keselamatan (Safety Vest) 100.00 Bh 50,000.00
Rambu petunjuk 4.00 Bh 75,000.00

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -

DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -

10.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) Ukuran 30x30) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi minggu ini (Rp) 1,250,000.00


Realisasi s/d minggu ini (Rp)
(%) 0.01
Rencana s/d minggu ini 0.05
DEVIASI (0.04)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
Ahmad Rifani Muhammad Lupiandi, ST IRWAN RIDHANI, ST
Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 2
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 02 Januari 2023
NILAI KONTRAK : Rp 27,722,845,000 09 Januari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.035 - 0.035 3.50 1,250,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 - - - - -

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -
-
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -

10.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) Ukuran 30x30) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 1,250,000.00


(%) 0.01
Rencana s/d minggu ini 0.05
DEVIASI (0.04)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST IRWAN RIDHANI, ST


Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 3
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 10 Januari 2023
NILAI KONTRAK : Rp 27,722,845,000 16 Januari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.035 - 0.035 3.50 1,250,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 - 0.232 0.232 23.23 7,399,547.80

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -

DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -

10.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) Ukuran 30x30) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 8,649,547.80


(%) 0.03
Rencana s/d minggu ini 0.05
DEVIASI (0.02)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST IRWAN RIDHANI, ST


Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 4
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 17 Januari 2023
NILAI KONTRAK : Rp 27,722,845,000 24 Januari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.035 - 0.035 3.50 1,250,000.00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 0.232 0.232 23.23 7,399,547.80

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -

DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN


10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -

10.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) Ukuran 30x30) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 8,649,547.80


(%) 0.03
Rencana s/d minggu ini 0.05
DEVIASI (0.02)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST Irwan Ridhani, ST


Pengawas Lapangan Inspector Manajer Pelaksana
BACK UP DATA

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
KONTRAKTOR : PT. BINA SARANA BERSAMA
KOSULTAN : CV. ARSA DELAPAN
ITEM PEMBAYARAN : 2.3.(2) APD

VOLUME
NO. URAIAN SATUAN REALISASI HARGA SATUAN JUMLAH
KONTRAK
1 2 3 4 5 6 7=5x6

A Peralatan
1 Topi pelindung (Safety Helmet) Bh 150 14 Rp 75,000 1,050,000.00
2 Pelindung mata (Googles, Spectacles) Bh 40 Rp 25,000 -
3 Pelindung pernafasan dan mulut (masker, mas Bh 305 50 Rp 10,000 500,000.00
4 Sarung tangan (Safety Gloves) Psg 100 30 Rp 15,000 450,000.00
5 Sepatu keselamatan (Safety Shoes, rubber saf Psg 30 14 Rp 324,968 4,549,547.80
6 Rompi keselamatan (Safety Vest) Bh 100 14 Rp 50,000 700,000.00
7 Rambu petunjuk Bh 4 2 Rp 75,000 150,000.00
-
-
-

NILAI KONTRAK BAB I 31,849,031.00 TOTAL 7,399,547.80


VOLUME S/D SAAT INI 0.232

Disetujui Oleh Diperiksa Oleh, Dibuat Oleh


Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST Irwan Ridhani, ST


Pengawas Lapangan Inspector Manajer Pelaksana
BACK UP DATA

PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
KONTRAKTOR : PT. BINA SARANA BERSAMA
KOSULTAN : CV. ARSA DELAPAN
ITEM PEMBAYARAN : 1.2 MOBILISASI

VOLUME
NO. URAIAN SATUAN REALISASI HARGA SATUAN JUMLAH
KONTRAK
1 2 3 4 5 6 7=5x6

A Peralatan
1 COMPRESSOR 4000-6500 L\M Unit 1 Rp 250,000 -
2 CONCRETE MIXER 0.3-0.6 M3 Unit 2 1.00 Rp 300,000 300,000.00
3 DUMP TRUCK 2 - 3 M3 Unit 2 1.00 Rp 250,000 250,000.00
4 EXCAVATOR 80-140 HP Unit 1 Rp 9,000,000 -
5 FLAT BED TRUCK 3-4 TON Unit 1 1.00 Rp 250,000 250,000.00
6 GENERATOR SET Unit 1 1.00 Rp 300,000 300,000.00
7 CONCRETE VIBRATOR Unit 2 1.00 Rp 50,000 50,000.00
8 WATER PUMP 70-100 mm Unit 1 1.00 Rp 50,000 50,000.00
9 JACK HAMMER Unit 1 1.00 Rp 50,000 50,000.00
10 CONCRETE PUMP Unit 1 Rp 6,000,000 -
11 TRUK MIXER (AGITATOR) Unit 2 Rp 1,500,000

NILAI KONTRAK BAB I 35,680,000.00 TOTAL 1,250,000.00


VOLUME S/D SAAT INI 0.035

Disetujui Oleh Diperiksa Oleh, Dibuat Oleh


Direksi Teknis Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST Irwan Ridhani, ST


Pengawas Lapangan Inspector Manajer Pelaksana
BACK UP DATA

Pekerjaan : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
Nomor Kontrak : T/027.2/036/KONT/DPUPR-BM.1/XII/2022
Tahun Anggaran : 2023
Pekerjaan : Galian untuk Selokan Drainase dan Saluran Air

GAMBAR / SKETSA
L1
Luas I = L1 + L2 / 2 x T1

T1

L2

Perhitungan
Situasi

No. STA m Ukuran Luas Panjang Volume Ket.


L1 L2 T1 Luas 1 L3 L4 T2 Luas 2 Rata-rata ( M' ) ( M3 )
( M2 )
1 2 3 4 5 6 7 8 9 10 11 12=(7 - 11) 13 14 =(12x13) 15
0+792
1 58 0.70 0.50 0.30 0.18 0.75 0.50 0.37 0.23 0.206 58.00 11.93
0+850
0+746
2 46 0.73 0.52 0.34 0.21 0.76 0.49 0.35 0.22 0.216 46.00 9.92
0+792
0+678
3 65 0.74 0.55 0.32 0.21 0.74 0.53 0.33 0.21 0.208 65.00 13.52
0+743
0+636
4 48 0.73 0.52 0.33 0.21 0.77 0.55 0.36 0.24 0.222 48.00 10.65
0+588

0+496
5 42 0.71 0.51 0.33 0.20 0.71 0.52 0.32 0.20 0.199 42.00 8.360
0+538
0+414
6 82 0.72 0.53 0.34 0.21 0.68 0.50 0.32 0.19 0.201 82.00 16.453
0+496
0+222
7 192 0.74 0.52 0.32 0.20 0.81 0.50 0.35 0.23 0.215 192.00 41.362
0+414
0+138
8 84 0.72 0.50 0.32 0.20 0.73 0.52 0.33 0.21 0.201 84.00 16.861
0+222

11 - - - -

12 - - - -

13 - - - -

14 - - - -

15 - - - -

- - - -
16

Sub. Jumlah 129.05


Total Jumlah 129.05

Mengetahui/Disetujui : Diperiksa Oleh : Dibuat Oleh :


Direksi Pekerjaan Pengawas Lapangan Pelaksana Lapangan
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA

Ahmad Rifani Muhammad Lupiandi, ST Irwan Ridhani, ST


Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 6
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 26 Januari 2023
NILAI KONTRAK : Rp 27,722,845,000 01 Februari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.083 - 0.083 8.27 2,949,079.18
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 0.234 0.002 0.236 23.64 7,530,561.27

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -
-
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a) 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
Ukuran 30x30) M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 10,479,640.45


(%) 0.04
Rencana s/d minggu ini 0.21
DEVIASI (0.16)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
xxxxxxx xxxxxxx xxxxxxx IRWAN RIDHANI, ST
Kordinator Lapangan Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 7
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 02 Februari 2023
NILAI KONTRAK : Rp 27,722,845,000 08 Februari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.083 - 0.083 8.27 2,949,079.18
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 0.236 - 0.236 23.64 7,530,561.27

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -
-
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a) 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
Ukuran 30x30) M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 10,479,640.45


(%) 0.0420
Rencana s/d minggu ini 0.26
DEVIASI (0.22)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
xxxxxxx xxxxxxx xxxxxxx IRWAN RIDHANI, ST
Kordinator Lapangan Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 8
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 09 Februari 2023
NILAI KONTRAK : Rp 27,722,845,000 15 Februari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.08 - 0.08 8.27 2,949,079.18
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 0.24 - 0.24 23.64 7,530,561.27

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -
-
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a) 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
Ukuran 30x30) M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 10,479,640.45


(%) 0.04
Rencana s/d minggu ini 0.38
DEVIASI (0.34)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
xxxxxxx xxxxxxx xxxxxxx IRWAN RIDHANI, ST
Kordinator Lapangan Pengawas Lapangan Inspector Manajer Pelaksana
RINGKASAN KEMAJUAN FISIK PEKERJAAN MINGGUAN
PEKERJAAN : Pembangunan Pedestrian Jl. Batulicin - Simpang Empat - Sari Gadung (Multi Years)
LOKASI : Kabupaten Tanah Bumbu
KONTRAKTOR PELAKSANA : PT. BINA SARANA BERSAMA
KONSULTAN PENGAWAS : CV. ARSA DELAPAN
NOMOR KONTRAK : T/027.2/036/KONT/DPUPR-BM.1/XII/2022 MINGGU : 9
TANGGAL KONTRAK : 26 Desember 2022 PERIODE : 16 Februari 2023
NILAI KONTRAK : Rp 27,722,845,000 22 Februari 2023

Volume Harga Satuan Jumlah Harga Bobot Volume Fisik Per Item Jumlah
Divisi Uraian Pekerjaan Satuan
Kontrak (Rp) (Rp) (%) s/d Minggu Lalu Minggu Ini s/d Minggu Ini Pekerjaan (%) (Rp)

DIVISI 1 UMUM
1.2 Mobilisasi 1.00 Ls 35,680,000.00 35,680,000.00 0.14 0.08 - 0.08 8.27 2,949,079.18
1.8.(1) Manajemen dan Keselamatan Lalu Lintas 1.00 Ls 34,880,000.00 34,880,000.00 0.14 - - - - -
1.8.(2) Jembatan Sementara 1.00 Ls 43,250,000.00 43,250,000.00 0.17 - - - - -

DIVISI 2 SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


2.3.(2) APD 1.00 Ls 31,849,031.00 31,849,031.00 0.13 0.24 - 0.24 23.64 7,530,561.27

DIVISI 3 DRAINASE
3.1.(1) Galian untuk Selokan Drainase dan Saluran Air 5,610.52 M3 69,849.67 391,892,991.27 1.57 - - - - -
3.3.(24) Saluran berbentuk U Tipe DS 2 85.00 M1 1,561,312.00 132,711,520.00 0.53 - - - - -
3.3.(28) Saluran berbentuk U Tipe DS 4 215.00 M1 1,708,289.00 367,282,135.00 1.47 - - - - -
3.3.(30) Saluran berbentuk U Tipe DS 5 2,397.00 M1 1,774,509.00 4,253,498,073.00 17.03 - - - - -

DIVISI 4 PEKERJAAN TANAH DAN GEOSINTETIK


4.1.(1) Galian Biasa 90.20 M3 24,243.90 2,186,799.60 0.01 - - - - -

DIVISI 8 STRUKTUR
8.1 (7a) Beton strukur, fc’20 MPa 2,144.18 M3 2,091,066.14 4,483,622,206.03 17.95 - - - - -
8.1 (8) Beton , fc’15 Mpa 126.22 M3 1,879,718.23 237,258,035.45 0.95 - - - - -
8.1 (10) Beton, fc’10 Mpa 436.05 M3 1,580,942.66 689,370,048.47 2.76 - - - - -
8.3 (1) Baja Tulangan Polos-BjTP 280 118,109.60 Kg 22,403.86 2,646,110,943.06 10.59 - - - - -
8.15.(2) Pembongkaran Beton 380.09 M3 637,084.20 242,149,332.50 0.97 - - - - -
8.16.(3a) Pipa Drainase PVC type AW diameter 4" (114 mm) 2,917.60 M1 68,053.33 198,552,405.33 0.79 - - - - -
-
DIVISI 10 PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN -
10.2(10a) Kerb Pracetak Jenis 1 (Peninggi / Mountable) 3,194.00 M1 231,833.48 740,476,131.49 2.96 - - - - -
10.2.(10c) Kerb Pracetak Jenis 3 (Kerb Berparit / Gutter) 2,816.00 M1 158,063.82 445,107,718.95 1.78 - - - - -
10.2.(10g) Kerb Pracetak Jenis 7 (Kerb pada Pelandaian Trotoar) 49.00 Buah 152,921.05 7,493,131.34 0.03 - - - - -
10.2.(10h) Kerb Pracetak Jenis 8 (Kerb pada Pelandaian Trotoar) 49.00 Buah 137,248.52 6,725,177.30 0.03 - - - - -
10.2.(10i) Kerb Pracetak Jenis 9 (Kerb pada Pelandaian Trotoar) 49.00 Buah 126,566.56 6,201,761.47 0.02 - - - - -
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a) 4,653.60 484,275.60 2,253,624,914.91 9.02 - - - - -
Ukuran 60x60) M2
Perkerasan Blok Beton pada Trotoar dan Median (Jenis Granite Tile Antiskid R12
10.2.(12a)(2) 5,301.10 525,823.88 2,787,444,990.03 11.16 - - - - -
Ukuran 30x30) M2
10.2.(12a)(3) Perkerasan Blok Beton pada Trotoar (Untuk Distabilitas Jenis Granite) 1,906.70 M2 758,088.88 1,445,448,074.61 5.79 - - - - -
10.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED 48.00 Buah 11,986,921.55 575,372,234.22 2.30 - - - - -
10.2.(23) Semak / Perdu Taman 197.80 M2 40,645.00 8,039,581.00 0.03 - - - - -
10.2.(24) Pohon Jenis Tabebuya 120.00 Buah 160,490.00 19,258,800.00 0.08 - - - - -
10.3.(1) Kursi Taman 98.00 Buah 3,500,000.00 343,000,000.00 1.37 - - - - -
10.3.(2) Grill Pohon 22.00 Buah 2,750,000.00 60,500,000.00 0.24 - - - - -
10.3.(3) Grill Tangkapan Air 1,202.00 Buah 900,000.00 1,081,800,000.00 4.33 - - - - -
10.3.(4) Manhole penutup saluran 589.00 Buah 1,350,000.00 795,150,000.00 3.18 - - - - -
10.3.(5) Stand Bollard (Bulat) 158.00 Buah 1,200,000.00 189,600,000.00 0.76 - - - - -
10.3.(6) Stand Bollard (Bentuk L) 280.00 Buah 1,500,000.00 420,000,000.00 1.68 - - - - -

JUMLAH 24,975,536,036.04 100.0 Realisasi s/d minggu ini (Rp) 10,479,640.45


(%) 0.04
Rencana s/d minggu ini 0.99
DEVIASI (0.95)

Disetujui Diperiksa Dibuat


Pengawas Lapangan Konsultan Pengawas Kontraktor Pelaksana
DPUPR Tanah Bumbu CV. ARSA DELAPAN PT. BINA SARANA BERSAMA
xxxxxxx xxxxxxx xxxxxxx IRWAN RIDHANI, ST
Kordinator Lapangan Pengawas Lapangan Inspector Manajer Pelaksana
COMPRESSOR 4000-6500 L\M E05
CONCRETE MIXER 0.3-0.6 M3 E06
DUMP TRUCK 2 - 3 M3 E08
EXCAVATOR 80-140 HP E10
FLAT BED TRUCK 3-4 TON E11
GENERATOR SET E12
CONCRETE VIBRATOR E20
WATER PUMP 70-100 mm E22
JACK HAMMER E26
CONCRETE PUMP E28
TRUK MIXER (AGITATOR) E49
Unit 1 250,000 250,000
Unit 2 300,000 600,000
Unit 2 250,000 500,000
Unit 1 9,000,000 9,000,000
Unit 1 250,000 250,000
Unit 1 300,000 300,000
Unit 2 50,000 100,000
Unit 1 50,000 50,000
Unit 1 50,000 50,000
Unit 1 6,000,000 6,000,000
Unit 2 1,500,000 3,000,000