Anda di halaman 1dari 1

JADWAL WAKTU PELAKSANAAN PEKERJAAN

: Peningkatan Jalan Lingkar Ruas 2 Bukit Asri - Batu Popi

No. Mata Waktu Pelaksanaan = 210 Hari Kalender

Pemba- U R A I A N Sat I II III IV V VI VII VIII IX X XI XII XIII Persentase


Bobot
Kuantitas
(%)
yaran M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4

100
DIVISI 1. UMUM

1.2 Mobilisasi LS 1.00 1.217 0.036 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.072 0.036

1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.198 0.002 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.002

1.8.(2) Jembatan Sementara LS 1.00 0.255 0.09 0.085 0.085

90
1.17.(1k) Pengujian Parameter Kualitas Air Lainnya Buah 2.00 0.055 0.018 0.018 0.018

1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 2.00 0.000 0.000 0.000 0.000

1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 2.00 0.000 0.000 0.000 0.000

1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah 2.00 0.000 0.000 0.000 0.000

80
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 0.896 0.009 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.018 0.009

1.21 Manajemen Mutu LS 1.00 0.394 0.004 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.004

DIVISI 2. DRAINASE

2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 2,800.00 0.239 0.040 0.040 0.040 0.040 0.040 0.040

70
2.2.(1) Pasangan Batu dengan Mortar M3 2,635.00 7.353 2.101 2.101 2.101 1.050

DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK

3.1.(1) Galian Biasa M3 36,074.67 5.515 0.251 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.251

3.1.(3) Galian Batu M3 9,936.49 3.887 0.389 0.777 0.777 0.777 0.777 0.389

3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter M2 432.00 0.071 0.029 0.029 0.014 60

3.2.(1b) Timbunan Biasa dari hasil galian buah 33,000.00 4.675 0.167 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.334 0.167

3.2.(2a) Timbunan Pilihan dari sumber galian buah 16,500.00 5.727 0.151 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.301 0.151

DIVISI 4. PEKERJAAN PREVENTIF

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 50

5.1.(1) Lapis Pondasi Agregat Kelas A M³ 4,875.00 8.333 1.515 1.515 1.515 1.515 1.515 0.758

5.1.(2) Lapis Pondasi Agregat Kelas B M³ 7,000.00 11.386 1.035 2.070 2.070 2.070 2.070 2.070

5.1.(3) Lapis Pondasi Agregat Kelas S M³ 8,375.00 11.375 3.250 3.250 3.250 1.625

DIVISI 6. PERKERASAN ASPAL


40

6.1 (1) Lapis Resap Pengikat - Aspal Emulsi Liter 25,500.00 2.200 0.220 0.440 0.440 0.440 0.440 0.220

6.3.(4) Lataston Lapis Fondasi (HRS-Base) Ton 2,748.00 15.140 1.514 3.028 3.028 3.028 3.028 1.514

DIVISI 7. STRUKTUR

7.1 (6a) Beton struktur, fc’25 Mpa M3 293.69 2.052 0.171 0.342 0.342 0.342 0.342 0.342 0.171
30

7.1 (10) Beton, fc’10 Mpa M3 19.44 0.102 0.068 0.034

7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 7,000.40 0.584 0.058 0.117 0.117 0.117 0.117 0.058

7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 29,367.83 2.583 0.199 0.397 0.397 0.397 0.397 0.397 0.397

7.9.(1) Pasangan Batu M3 2,760.00 6.928 0.495 0.990 0.990 0.990 0.990 0.990 0.990 0.495
20

7.14.(1) Papan Nama Jembatan Buah 4.00 0.012 0.012

DIVISI 8. REHABILITASI JEMBATAN

DIVISI 9. PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN

9.2.(1) Marka Jalan Termoplastik M2 2,501.50 2.788 0.697 0.697 0.697 0.697
10
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 4.00 0.012 0.012

9.2.(5) Patok Pengarah Buah 80.00 0.038 0.015 0.015 0.008

9.2.(7) Rel Pengaman M1 690.00 5.985 1.995 1.995 1.995

DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA

0
Jumlah Bobot Pekerjaan 100.000

Rencana Prestasi Fisik Mingguan 0.047 0.093 0.097 0.456 0.603 0.631 0.794 1.341 1.793 1.721 2.216 2.711 3.153 3.240 2.421 2.171 4.343 3.388 2.465 1.565 0.570 0.331 0.331 0.331 1.438 2.401 2.505 2.401 2.473 2.401 1.846 1.846 1.918 1.846 1.846 1.089 0.403 1.764 3.498 3.498 3.569 3.498 2.065 3.430 3.351 3.977 4.347 2.722 2.841 0.041 0.125 0.047

Komulatif Rencana Prestasi Fisik Mingguan 0.00 0.047 0.140 0.237 0.692 1.295 1.927 2.721 4.062 5.855 7.576 9.792 12.503 15.656 18.896 21.317 23.488 27.831 31.219 33.684 35.248 35.818 36.150 36.481 36.812 38.250 40.651 43.156 45.558 48.031 50.432 52.278 54.125 56.043 57.889 59.735 60.824 61.227 62.991 66.488 69.986 73.556 77.053 79.119 82.549 85.901 89.877 94.224 96.946 99.787 99.828 99.953 100.00

Baubau, 25 Oktober 2021

PT. MEUTIA SEGAR

LA ODE SYAFRUDDIN
Wakil Direktur