REALISASI MINGGU INI 1,20 2,30 1,85 3,20 3,50 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
KUMULATIF RENCANA s/d MINGGU INI 1,20 3,50 5,35 8,55 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05 12,05
DEVIASI
PENARIKAN TERMYN
Ni Nyoman Indah Pramadewi, ST., M.Eng Herianto Waluyadi, ST., MT. Rizka Farobi, ST.
NIP. 19810424 200912 2 004 NIP. 19750504 200212 1 002 Ketua Tim / Team Leader
LAMPIRAN HAL - 1
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
11-May - 17-May
18-May - 25-May
26-May - 1-Jun
10-Feb - 16-Feb
17-Feb - 24-Feb
25-Feb - 3-Mar
12-Mar - 18-Mar
19-Mar - 26-Mar
27-Mar - 2-Apr
15-Sep - 22-Sep
(M/M)
16-Aug - 23-Aug
24-Aug - 30-Aug
31-Aug - 7-Sep
26-Jan - 1-Feb
10-Jun - 16-Jun
17-Jun - 24-Jun
25-Jun - 1-Jul
11-Apr - 17-Apr
18-Apr - 25-Apr
26-Apr - 2-May
3-May - 10-May
10-Jul - 16-Jul
17-Jul - 24-Jul
25-Jul - 31-Jul
2-Feb - 9-Feb
4-Mar - 11-Mar
8-Sep - 14-Sep
1-Aug - 8-Aug
9-Aug - 15-Aug
2-Jun - 9-Jun
3-Apr - 10-Apr
2-Jul - 9-Jul
No Jabatan Nama Personil Keterangan
Renc. Real.
8 Ahli Cost Estimator/Dok. Tender Yayan Rachmadi Utomo, ST, MT 1,00 1 Org @ 1 Bulan
B TENAGA PENDUKUNG
Ni Nyoman Indah Pramadewi, ST., M.Eng Herianto Waluyadi, ST., MT. Rizka Farobi, ST.
NIP. 19810424 200912 2 004 NIP. 19750504 200212 1 002 Ketua Tim / Team Leader
LAMPIRAN HAL - 2
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
11-May - 17-May
18-May - 25-May
26-May - 1-Jun
10-Feb - 16-Feb
17-Feb - 24-Feb
25-Feb - 3-Mar
12-Mar - 18-Mar
19-Mar - 26-Mar
27-Mar - 2-Apr
15-Sep - 22-Sep
(M/M)
16-Aug - 23-Aug
24-Aug - 30-Aug
31-Aug - 7-Sep
26-Jan - 1-Feb
10-Jun - 16-Jun
17-Jun - 24-Jun
25-Jun - 1-Jul
11-Apr - 17-Apr
18-Apr - 25-Apr
26-Apr - 2-May
3-May - 10-May
10-Jul - 16-Jul
17-Jul - 24-Jul
25-Jul - 31-Jul
2-Feb - 9-Feb
4-Mar - 11-Mar
8-Sep - 14-Sep
1-Aug - 8-Aug
9-Aug - 15-Aug
2-Jun - 9-Jun
3-Apr - 10-Apr
2-Jul - 9-Jul
No Nama Alat Keterangan
Renc. Real.
A PERALATAN KANTOR
1 Sewa Kantor 8,00 1 Unit @ 8 Bulan
2 Sewa Basecamp 2,00 1 Unit @ 2 Bulan
3 Biaya Komunikasi 8,00 1 LS @ 8 Bulan
4 ATK 8,00 1 LS @ 8 Bulan
5 Sewa Komputer 16,00 1 Unit @ 8 Bulan
6 Sewa Printer A3 8,00 1 Unit @ 8 Bulan
7 Sewa Scanner 8,00 1 Unit @ 8 Bulan
B PERALATAN TRANSPORTASI
1 Kendaraan Roda 4 1,00 1 Unit @ 8 Bulan
2 Sewa Kendaraan Roda 2 6,00 3 Unit @ 1 Bulan
C PERALATAN SURVEY LAPANGAN
1 Core Box 2,00 20 Bh @ 1 Bulan
2 Bahan Pengukuran BM 21,00 20 Bh @ 1 Bulan
3 Bahan Pengukuran CP 20,00 20 Bh @ 1 Bulan
4 Bahan Pengukuran Patok Kayu 1,00 1 Ls @ 1 Bulan
5 Bahan Pengukuran Buku Ukur 20,00 20 Bh @ 1 Bulan
6 Sewa GPS Geodetic 3,00 2 Unit @ 3 Hari
7 Sewa TS 4,00 2 Unit @ 2 Bulan
8 Sewa Waterpass 4,00 2 Unit @ 2 Bulan
9 Pengambilan Video dengan Drone 1,00 1 Unit @ 9 Hari
10 Sewa Kamera Digital 1,00 1 Unit @ 1 Bulan
Ni Nyoman Indah Pramadewi, ST., M.Eng Herianto Waluyadi, ST., MT. Rizka Farobi, ST.
NIP. 19810424 200912 2 004 NIP. 19750504 200212 1 002 Ketua Tim / Team Leader
LAMPIRAN HAL - 3
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
Tenaga Pendukung
1 Surveyor Pengukuran 1 Adi Widya Fauzi, ST.
2 Surveyor Pengukuran 2 Loura Dian Tino, ST.
3 Tenaga Lokal Pengukuran To be named (6 orang)
4 Surveyor Sosial Ekonomi 1 Maksum, S.Sos.
5 Surveyor Sosial Ekonomi 2 Syaifudin Faizal Riza, SE.
6 Surveyor Sosial Ekonomi 3 Sri Utami, SE.
7 Surveyor Sosial Ekonomi 4 Yuli Nursubekti, ST.
8 Juru Gambar/Operator CAD 1 Taufiqur Rohman, ST.
9 Administrasi/Operator Komputer Yohan Nur Cahya, A.Md
10 Driver Machrus Zainur Rozikin
Ni Nyoman Indah Pramadewi, ST., M.Eng Herianto Waluyadi, ST., MT. Rizka Farobi, ST.
NIP. 19810424 200912 2 004 NIP. 19750504 200212 1 002 Ketua Tim / Team Leader
LAMPIRAN HAL - 4
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN 5 : KEGIATAN DISKUSI
LAMPIRAN HAL - 5
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 6
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 7
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 8
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 9
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 10
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 11
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 12
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 13
LAPORAN BULAN KE-1
SID REHABILTASI PARTISIPATIF DI PACAL
LAMPIRAN HAL - 14