ANALISA HARGA SATUAN PEKERJAAN

TAMBAHAN PEKERJAAN REVIT RUSUN ASN PROVINSI MALUKU UTARA

I ANALISA HARGA PEKERJAAN YANG SUDAH ADA MENGIKUTI KONTRAK AWAL


1 PEKERJAAN GALIAN M3 Err:509
2 PEKERJAAN BETON K100 M3 Err:509
3 PEKERJAAN PLESTERAN + ACIAN M2 Err:509
4 PEKERJAAN WATERPROFING M2 Err:509

II HARGA JASA/TENAGA
Pekerja OH 115,000.00
Tukang OH 126,500.00
Kepala Tukang OH 139,150.00
Mandor OH 153,065.00

III ANALISA HARGA PEKERJAAN BARU BERDASARKAN PERMEN NO. 11/2013


An. SNI PERMEN 11/2013 2.2.1.9. PEMBERSIHAN 1 M2 LAPANGAN & PERATAAN H. 373
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.100 115,000 11,500
2 Mandor OH 0.050 153,065 7,653
JUMLAH HARGA TENAGA KERJA 19,153

B BAHAN
JUMLAH HARGA BAHAN -

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 19,153
E OVERHEAD & PROFIT (15%) 2,872.99
F HARGA SATUAN PEKERJAAN 22,026.24

An. PEKERJAAN SUMUR BOR


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A Jasa Pengeboran M 1.000 625,000 625,000
B Pipa Black Stell M 1.000 276,500 276,500

C JUMLAH A + B + C 901,500
D OVERHEAD & PROFIT (15%) 135,225.00
E HARGA SATUAN PEKERJAAN 1,036,725.00

An. SNI PERMEN 11/2013 A.4.4.2.27 PEKERJAAN PERBAIKAN RETAK DINDING MINOR 1 M2, H. 454
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.250 115,000 28,750
2 Tukang OH 0.125 126,500 15,813
3 Kepala Tukang OH 0.013 139,150 1,739
4 Mandor OH 0.013 153,065 1,913
JUMLAH HARGA TENAGA KERJA 48,215

B BAHAN
1 Semen Putih KG 3.250 10,000 32,500
JUMLAH HARGA BAHAN 32,500

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 80,715.19
E OVERHEAD & PROFIT (15%) 12,107.28
F HARGA SATUAN PEKERJAAN 92,822.47
An. SNI PERMEN 11/2013 A.5.1.1.1. PEKERJAAN PEMASANGAN 1 BH CLOSET DUDUK H. 547
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 3.300 115,000 379,500
2 Tukang OH 1.100 126,500 139,150
3 Kepala Tukang OH 0.010 139,150 1,392
4 Mandor OH 0.160 153,065 24,490
JUMLAH HARGA TENAGA KERJA 544,532

B BAHAN
1 Closet Duduk Unit 1.000 2,975,000 2,975,000
2 Perlengkapan LS 1.000 178,500 178,500
JUMLAH HARGA BAHAN 3,153,500

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 3,698,032
E OVERHEAD & PROFIT (15%) 554,704.79
F HARGA SATUAN PEKERJAAN 4,252,736.69

An. SNI PERMEN 11/2013 A.4.4.1.8 PEKERJAAN 1 M2 DINDING BATA CAMP. 1 SP : 4 PP H. 433
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.300 115,000 34,500
2 Tukang OH 0.100 126,500 12,650
3 Kepala Tukang OH 0.010 139,150 1,392
4 Mandor OH 0.015 153,065 2,296
JUMLAH HARGA TENAGA KERJA 50,837

B BAHAN
1 Batu Bata 5 x 11 x 22 CM BH 70.00 3,500 245,000
2 Semen Portland KG 11.500 1,640 18,860
3 Pasir Pasang M3 0.043 216,667 9,317
JUMLAH HARGA BAHAN 273,177

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 324,014
E OVERHEAD & PROFIT (15%) 48,602.12
F HARGA SATUAN PEKERJAAN 372,616.26

An. HARGA 1 M3 PELAT BETON BERTULANG mutu f’c = 14,5 MPa (K 175)
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
1 Beton M3 1.000 1,622,814 1,622,814
2 Tulangan Utama KG 47.330 25,184 1,191,959
Tulangan Sengkang KG 106.460 25,184 2,681,089
Bekisting Sloof M2 20.000 250,467 5,009,340
3 Pembongkaran OH 2.000 115,000 230,000
HARGA 1 M3 SLOOF BETON 10,735,201

An PEKERJAAN PEMASANGAN HPL


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.200 115,000 23,000
2 Tukang OH 0.100 126,500 12,650
3 Kepala Tukang OH 0.010 139,150 1,392
4 Mandor OH 0.010 153,065 1,531
JUMLAH HARGA TENAGA KERJA 38,572

B BAHAN
1 HPL M2 1.100 297,500 327,250
JUMLAH HARGA BAHAN 327,250
C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 365,822
E OVERHEAD & PROFIT (15%) 54,873.32
F HARGA SATUAN PEKERJAAN 420,695.47

An. SNI PERMEN 11/2013 A.4.6.18. PEKERJAAN PEMASANGAN 1 M2 KACA, H. 534


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.063 115,000 7,188
2 Tukang OH 0.625 126,500 79,063
3 Kepala Tukang OH 0.063 139,150 8,697
4 Mandor OH 0.003 153,065 497
JUMLAH HARGA TENAGA KERJA 95,444

B BAHAN
1 Kaca Tempred 10 M2 1.100 589,000 647,900
JUMLAH HARGA BAHAN 647,900

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 743,344
E OVERHEAD & PROFIT (10%) 111,501.65
F HARGA SATUAN PEKERJAAN 854,845.99

An. SNI PERMEN 11/2013 4.6.2.2. PEKERJAAN PEMASANGAN 1 BH KUNCI TANAM, H. 526
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.020 115,000 2,300
2 Tukang OH 0.600 126,500 75,900
3 Kepala Tukang OH 0.060 139,150 8,349
4 Mandor OH 0.006 153,065 918
JUMLAH HARGA TENAGA KERJA 87,467

B BAHAN
1 Kunci Tanam BH 1.000 412,000 412,000
JUMLAH HARGA BAHAN 412,000

C PERALATAN
JUMLAH HARGA ALAT -

D JUMLAH A + B + C 499,467
E OVERHEAD & PROFIT (10%) 74,920.11
F HARGA SATUAN PEKERJAAN 574,387.50

An. SNI PERMEN 11/2013 4.2.1.13 PEKERJAAN 1 M2 BH RANGKA ALUMUNIUM H.424


NO URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH HARGA
A TENAGA
1 Pekerja OH 0.085 115,000 9,775
2 Tukang OH 0.085 126,500 10,753
3 Kepala Tukang OH 0.009 139,150 1,252
4 Mandor OH 0.005 153,065 765
JUMLAH HARGA TENAGA KERJA 22,545

B BAHAN
1 Profil Alumunium M 4.400 217,500 957,000
Sealant TUBE 0.270 87,500 23,625
JUMLAH HARGA BAHAN 980,625

C PERALATAN
JUMLAH HARGA ALAT -
D JUMLAH A + B + C 1,003,170
E OVERHEAD & PROFIT (10%) 150,475.53
F HARGA SATUAN PEKERJAAN 1,153,645.70
1,003,022,570
BOQ PEKERJAAN REVIT RUSUN BRIMOB MALUKU UTARA
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
REVIT RUMAH SUSUN MKO BRIMOB POLDA MALUKU UTARA 911,838,699
I PEKERJAAN PERSIAPAN 22,365,000
1 Sewa Tempat Ls 1.00 10,465,000 10,465,000
2 Papan Nama Proyek Buah 1.00 500,000 500,000
3 Foto Proyek 3 Fase (warna) Set 3.00 1,000,000 3,000,000
4 Air Kerja Bulan 3.00 500,000 1,500,000
5 Listrik Kerja Bulan 3.00 500,000 1,500,000
6 Laporan Ls 1.00 2,400,000 2,400,000
7 Peralatan dan Perlengkapan K3 Ls 1.00 3,000,000 3,000,000

II ARSITEKTUR
A PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING 71,586,926
DINDING LANTAI 1-3
1 Pek. Pasangan Dinding GRC Penutup Ruang Shaft M2 150.00 49,710 7,456,500

LANTAI 2 ( DUA ) -
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54.00 223,880 12,089,520
-
LANTAI 3 ( TIGA ) -
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54.00 223,880 12,089,520

LANTAI ATAP -
1 Pek. Water profing Talang Air m2 130.00 223,880 29,104,400
1 Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin m2 48.45 223,880 10,846,986

B PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA 43,350,450


LANTAI 1 ( SATU ) -
1 Pasangan Pintu PVC KM / WC unit 15.00 922,350 13,835,250
-
LANTAI 2 ( DUA ) -
1 Pasangan Pintu PVC KM / WC unit 16.00 922,350 14,757,600

LANTAI 3 ( TIGA ) -
1 Pasangan Pintu PVC KM / WC unit 16.00 922,350 14,757,600

C PEKERJAAN PERBAIKAN PLAFOND 259,250,850


LANTAI 1 ( SATU ) -
1 Pembongkaran 1 m2 langit-langit m2 360.00 46,550 16,758,000
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00 126,760 38,661,800
3 Pekerjaan Plafond Gypsum 9mm (indoor) m2 360.00 63,200 22,752,000
4 Pekerjaan List Plafond Type LP 2 m1 103.00 80,050 8,245,150
-
LANTAI 2 ( DUA ) -
1 Pembongkaran 1 m2 langit-langit m2 360.00 46,550 16,758,000
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00 126,760 38,661,800
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 360.00 63,200 22,752,000
4 Pekerjaan List Plafond Type LP 2 m1 103.00 80,050 8,245,150
-
LANTAI 3 (TIGA ) -
1 Pembongkaran 1 m2 langit-langit m2 360.00 46,550 16,758,000
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00 126,760 38,661,800
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 360.00 63,200 22,752,000
4 Pekerjaan List Plafond Type LP 2 m1 103.00 80,050 8,245,150
-
D PEKERJAAN PERBAIKAN UTILITAS (MEP) 54,626,220
LANTAI 1 ( SATU ) -
1 Pasang kran 0,5" bh 15.00 76,610 1,149,150
2 Pasang shower + kran type double (terpasang) bh 15.00 81,490 1,222,350
3 Pasangan floor drain stainless bh 15.00 80,280 1,204,200
4 Pasangan Bak Kontrol Minyak Dapur bh 15.00 473,080 7,096,200
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 60.00 112,700 6,762,000
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
-
LANTAI 2 ( DUA ) -
1 Pasang kran 0,5" bh 16.00 76,610 1,225,760
2 Pasang shower + kran type double (terpasang) bh 16.00 81,490 1,303,840
3 Pasangan floor drain stainless bh 16.00 80,280 1,284,480
4 Pasangan Bak Kontrol Wastafel bh 16.00 473,080 7,569,280
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64.00 112,700 7,212,800
-
LANTAI 3 ( TIGA ) -
1 Pasang kran 0,5" bh 16.00 76,610 1,225,760
2 Pasang shower + kran type double (terpasang) bh 16.00 81,490 1,303,840
3 Pasangan floor drain stainless bh 16.00 80,280 1,284,480
4 Pasangan Bak Kontrol Wastafel bh 16.00 473,080 7,569,280
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64.00 112,700 7,212,800
-
E PEKERJAAN PENGECATAN KEMBALI 119,982,600
LANTAI I ( SATU ) -
1 Pengecatan Plafond m2 160.00 90,520 14,483,200
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00 90,520 4,526,000
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00 83,940 20,985,000
-
LANTAI II ( DUA ) -
1 Pengecatan Plafond m2 160.00 90,520 14,483,200
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00 90,520 4,526,000
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00 83,940 20,985,000
-
LANTAI III ( TIGA ) -
1 Pengecatan Plafond m2 160.00 90,520 14,483,200
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00 90,520 4,526,000
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00 83,940 20,985,000
-
F PEKERJAAN LUAR GEDUNG 225,258,489
PENGECATAN DINDING LUAR -
1 Cat dinding dan kolom bag. Luar (exterior) M2 823.99 125,660 103,542,583

PASANGAN PAVING BLOK -


1 Pek. Pasangan Paving 5 x 70 M2 350.00 267,290 93,551,500

GROUND WATER TANK -


1 Cat dinding dan kolom bag. Luar (exterior) M2 53.12 125,660 6,675,059
2 Cat plafond expose di R. Pompa dan Ground Tank M2 23.56 90,520 2,132,651
-
G PEK. LAMPU TAMAN -
1 NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 16.00 534,793 8,556,695
2 Pergantian Lampu Taman ttk 16.00 675,000 10,800,000
-
I PEKERJAAN TAMBAHAN 115,418,164.80
1 Pek. Sumur Bor/ Pengeboran Air Bersih M 60.00 1,036,725 62,203,500
2 Pek. Pergantian Closet Duduk Komplit BH 6.00 4,252,736 25,516,415
3 Pek. Perbaikan Sistim Elektrikal Dalam Gedung (pergantian Veten, Lampu, TTK 75.00 172,810 12,960,750
Saklar dan Stop kotak)
4 Pek. Perbaikan Sistim Plumbing Dalam Gedung ( Pipa dan sambungan Pipa TTK 75.00 196,500 14,737,500
Air Bersih dan Air Kotor)

JUMLAH 911,838,699
PPN 10% 91,183,870
JUMLAH TOTAL 1,003,022,569
PEMBULATAN 1,003,022,570

Ternate, Maret 2020


PPK RUMAH SUSUN DANB RUMAH KHUSUS
SNVT PnP MALUKU UTARA
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN

ABDUL MUIN, ST
NIP. 19810227 201001 1 016
445,883,940

BOQ PEKERJAAN REVIT RUSUN POLDA MALUKU UTARA


RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
REVIT RUMAH SUSUN POLDA MALUKU UTARA 405,349,035
I PEKERJAAN PERSIAPAN 14,440,750
1 Sewa Tempat Ls 1.00 2,500,000 2,500,000
2 Papan Nama Proyek Buah 1.00 540,000 540,000
3 Foto Proyek 3 Fase (warna) Set 3.00 1,000,000 3,000,000
4 Air Kerja Bulan 3.00 500,125 1,500,375
5 Listrik Kerja Bulan 3.00 500,125 1,500,375
6 Laporan Ls 1.00 2,400,000 2,400,000
7 Peralatan dan Perlengkapan K3 Ls 1.00 3,000,000 3,000,000

II PEKERJAAN ARSITEKTUR
A. PEK. PERBAIKAN LANTAI, DINDING & WATERPROOFING 72,242,668
LANTAI 1 (SATU)
1 Pembongkaran Keramik Lantai KM m2 40.50 13,490 546,345
2 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 40.50 223,880 9,067,140
3 Pemasangan Keramik Lantai KM m2 40.50 315,860 12,792,330
4 Pergantian Keramik lantai Pecah m2 50.50 259,270 13,093,135

LANTAI 2 (DUA)
1 Pembongkaran Keramik Lantai KM m2 42.75 13,490 576,698
2 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 42.75 223,880 9,570,870
3 Pemasangan Keramik Lantai KM m2 42.75 315,860 13,503,015
4 Pergantian Keramik lantai Pecah m2 50.50 259,270 13,093,135

B. PEK. PERBAIKAN KUSEN PINTU & JENDELA 58,527,000


LANTAI 1 ( SATU )
1 Memasang 1 M2 Teakwood rangkap lapis formika, rangka Expose Kayu Klas II + Kunci
unit 9.00 1,167,900 10,511,100
Tanam Kualitas Baik
2 Pemasangan Pintu KM kualitas terbaik unit 9.00 922,350 8,301,150

LANTAI 2 ( DUA )
1 Memasang 1 M2 Teakwood rangkap lapis formika, rangka Expose Kayu Klas II + Kunci
unit 19.00 1,167,900 22,190,100
Tanam Kualitas Baik
2 Pemasangan Pintu KM kualitas terbaik unit 19.00 922,350 17,524,650

C. PEK. PERBAIKAN PLAFOND 59,697,000


LANTAI 1 ( SATU )
1 Pembongkaran 1 m2 langit-langit m2 120.00 46,550 5,586,000
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 100.00 126,760 12,676,000
3 Pekerjaan Plafond Gypsum 9mm (indoor) m2 120.00 63,200 7,584,000
4 Pekerjaan List Plafond Type LP 2 m1 50.00 80,050 4,002,500

LANTAI 2 ( DUA )
1 Pembongkaran 1 m2 langit-langit m2 120.00 46,550 5,586,000
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 100.00 126,760 12,676,000
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 120.00 63,200 7,584,000
4 Pekerjaan List Plafond Type LP 2 m1 50.00 80,050 4,002,500

D. PEKERJAAN PERBAIKAN UTILITAS 7,427,970


RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
A LANTAI 1 ( SATU ) -
1 Pasang kran 0,5" bh 10.00 76,610 766,100
2 Pasang shower + kran type double (terpasang) bh 10.00 81,490 814,900
3 Pasangan floor drain stainless bh 10.00 80,280 802,800
4 Pasang Keran Wastafel bh 1.00 171,650 171,650
-
B LANTAI 2 ( DUA ) -
1 Pasang kran 0,5" bh 19.00 76,610 1,455,590
2 Pasang shower + kran type double (terpasang) bh 19.00 81,490 1,548,310
3 Pasangan floor drain stainless bh 19.00 80,280 1,525,320
4 Pasang Keran Wastafel bh 2.00 171,650 343,300

E. PEKERJAAN PENGECATAN KEMBALI 21,724,800


A LANTAI I ( SATU ) -
1 Pengecatan Plafond m2 120.00 90,520 10,862,400
-
B LANTAI II ( DUA ) -
1 Pengecatan Plafond m2 120.00 90,520 10,862,400

III PEKERJAAN MEP 28,217,280


A. PEK. INSTALASI LISTRIK 2,438,580
1 Pek. Pasang Saklar ttk 54.00 25,980 1,402,931
2 Pek. Pasang Stop Kontak ttk 36.00 28,768 1,035,650

B. PEK. PLUMBING 25,778,700


1 Pek. Pergantian Pipa Saluran Air Bersih dari Roof Tank AW 2" m' 80.00 226,450 18,116,000
2 Pek. Pasang Pipa Air Bersih ke dalam KM AW 1/2" m' 74.00 83,380 6,170,120
3 Pek. Pergantian sambungan pipa bocor Titik 74.00 20,170 1,492,580

VII PEKERJAAN ATAP 912,500


A LANTAI ATAP -
1 Tangga M ke roof tank unit 1.00 912,500 912,500
-
VIII PEKERJAAN LUAR GEDUNG 97,129,602
-
A GROUND WATER TANK -
1 Cat dinding dan kolom bag. Luar (exterior) M2 364.00 125,660 45,740,240
2 Cat plafond expose di R. Pompa dan Ground Tank M2 23.56 90,520 2,132,651
3 Pek. Pemasangan Pompa air unit 2.00 22,628,355 45,256,710
-
C PEK. SEPTICTANK KONVENSIONAL -
1 Pek. Penyedotan Isi Septiktank m3 8.00 500,000 4,000,000
-
IX PEKERJAAN TAMBAHAN 45,029,466.00
B Pek. Perbaikan Retak Dinding Minor M2 112.00 45,340 5,078,080
F Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin M2 48.45 223,880 10,846,986
G Pek. Waterprofing Talang Air Hujan, bitudin M2 130.00 223,880 29,104,400

JUMLAH 405,349,035
PPN 10% 40,534,904
JUMLAH TOTAL 445,883,939
PEMBULATAN 445,883,940

Ternate, Maret 2020


RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN

PPK RUMAH SUSUN DANB RUMAH KHUSUS


SNVT PnP MALUKU UTARA

ABDUL MUIN, ST
NIP. 19810227 201001 1 016
REKAPITULASI PERHITUNGAN
TINGKAT KOMPONEN DALAM NEGERI (TKDN)
Kode Tender : 63501064
Nama Tender : Revit Rusun Polres Halmahera Barat
Penyedia : CV. CENTURY PERMAI

NILAI GABUNGAN BARANG / JASA ( Rp ) TKDN


URAIAN PEKERJAAN TOTAL
RIBU % BARANG / JASA GABUNGAN
DN LN
Rp KDN
(1) (2) (3) (4) (5) (6) (7)
BARANG

I. Material Langsung ( Bahan baku ) 419,084,099 - 419,084,099 100 419,084,099


II. Peralatan (Barang jadi) 41,908,410 - 41,908,410 100 41,908,410
A. Sub Total Barang 460,992,509 - 460,992,509 100 460,992,509
JASA
III. Manajemen Proyek dan Pereka - 419,084,099 - 419,084,099 419,084,099
yasaan
IV. Alat Kerja / Fasilitas Kerja 41,908,410 - 41,908,410 41,908,410
V. Konstruksi dan Fabrikasi 419,084,099 - 419,084,099 419,084,099
VI. Jasa Umum 41,908,410 - 41,908,410 41,908,410
B. Sub Total Jasa 41,908,410 - 41,908,410 41,908,410
C. TOTAL BIAYA (A + B) 460,992,509 - 460,992,509 460,992,509

Catatan :
1. Nilai Gabungan Barang/Jasa, tidak termasuk keuntungan, overhead perusahaan dan pajak keluaran.

2. Biaya Komponen Dalam Negeri (KDN) adalah biaya material langsung (bahan baku), peralatan (barang jadi), Manajemen Proyek dan
Perekayasaan, Alat Kerja / Fasilitas Kerja, Konstruksi dan Fabrikasi, dan jasa lainnya dari dalam negeri.

Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3A)


% TKDN =
Nilai Gabungan Barang dan Jasa (9C)

460,992,509 - -
% TKDN = = 100.00%
460,992,509
KURVA S
Kode Tender : 63501064
Nama Tender : Revit Rusun Polres Halmahera Barat
Penyedia : CV. CENTURY PERMAI

WAKTU PELAKSANAAN PEKERJAAN


JUMLAH HARGA
NO. URAIAN PEKERJAAN PEKERJAAN BOBOT (%) May-20 Jun-20 Jul-20 Aug-20
(Rp) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M12

I. PEKERJAAN PERSIAPAN 15,000,000.00 3.58 0.89 0.89 0.89


Rencana Jadwal Waktu Pelaksanaan
II. ARSITEKTUR

A. PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING 30,980,040.00 7.39 1.48 1.48 1.48 1.48

B. LANTAI ATAP 39,951,386.00 9.53 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19

C. PEKERJAAN PERBAIKAN PLAFOND 165,469,560.00 39.48 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04

D. PEKERJAAN PERBAIKAN UTILITAS (MEP) 47,195,520.00 11.26 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41

E. PEKERJAAN PENGECATAN KEMBALI 52,338,000.00 12.49 1.56 1.56 1.56 1.56

F. PEKERJAAN LUAR GEDUNG 26,408,835.00 6.30

G. PEKERJAAN TAMBAHAN 41,740,758.00 9.96 1.66 1.66

JUMLAH 419,084,099.00
PPN 10% 41,908,409.90 100.00
JUMLAH TOTAL 460,992,508.90
BOBOT RENCANA PER MINGGU 0.89 0.89 0.89 4.23 5.64 5.64 5.64 5.64 8.68 8.68 10.34 9.14
KOMULATIF BOBOT RENCANA PER MINGGU 0.89 1.79 2.68 6.91 12.55 18.19 23.82 29.46 38.14 46.81 57.15 66.29
Sep-20 KET

M13 M14 M15 M16 M17

0.89 100%
PELAKSANAAN PHO

1.48

3.04 3.04 3.04 3.04 50%

1.56 1.56 1.56 1.56

1.58 1.58 1.58 1.58

1.66 1.66 1.66 1.66 0%

10.21 7.83 7.83 7.83 0.00


76.50 84.33 92.17 100.00 100.00
REKAPITULASI HARGA
Kode Tender : 63501064
Nama Tender : Revit Rusun Polres Halmahera Barat
Penyedia : CV. CENTURY PERMAI

No. URAIAN PEKERJAAN JUMLAH HARGA


(Rp)
(a) (b) (c)
I. PEKERJAAN PERSIAPAN Rp 15,000,000.00
II. ARSITEKTUR
A. PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING Rp 30,980,040.00
B. LANTAI ATAP Rp 39,951,386.00
C. PEKERJAAN PERBAIKAN PLAFOND Rp 165,469,560.00
D. PEKERJAAN PERBAIKAN UTILITAS (MEP) Rp 47,195,520.00
E. PEKERJAAN PENGECATAN KEMBALI Rp 52,338,000.00
F. PEKERJAAN LUAR GEDUNG Rp 26,408,835.00
G. PEKERJAAN TAMBAHAN Rp 41,740,758.00

JUMLAH HARGA PEKERJAAAN ( TERMASUK BIAYA UMUM DAN KEUNTUNGAN ) Rp 419,084,099.000

PAJAK PERTAMBAHAN NILAI ( PPN 10 % ) Rp 41,908,409.900

JUMLAH TOTAL HARGA PEKERJAAN Rp 460,992,508.900

PEMBULATAN Rp 460,992,508.900

TERBILANG : EMPAT RATUS ENAM PULUH JUTA SEMBILAN RATUS SEMBILAN PULUH DUA RIBU RUPIAH
DAFTAR KUNTITAS DAN HARGA
Kode Tender : 63501064
Nama Tender : Revit Rusun Polres Halmahera Barat
Penyedia : CV. CENTURY PERMAI

HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)

(a) (b) (c) (d) (e) f = (d x e )


I PEKERJAAN PERSIAPAN
1 Sewa Tempat Ls 1 Rp 2,500,000.00 Rp 2,500,000.00
2 Papan Nama Proyek Buah 1 Rp 500,000.00 Rp 500,000.00
3 Foto Proyek 3 Fase (warna) Set 3 Rp 1,000,000.00 Rp 3,000,000.00
4 Air Kerja Bulan 3 Rp 500,000.00 Rp 1,500,000.00
5 Listrik Kerja Bulan 3 Rp 500,000.00 Rp 1,500,000.00
6 Laporan Ls 1 Rp 3,000,000.00 Rp 3,000,000.00
7 Peralatan dan Perlengkapan K3 Ls 1 Rp 3,000,000.00 Rp 3,000,000.00
II ARSITEKTUR
A PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING
DINDING LANTAI 1-3
1 Pek. Pasangan Dinding GRC Penutup Ruang Shaft M2 150 Rp 45,340.00 Rp 6,801,000.00
LANTAI 2 ( DUA )
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54 Rp 223,880.00 Rp 12,089,520.00
LANTAI 3 ( TIGA )
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54 Rp 223,880.00 Rp 12,089,520.00
B LANTAI ATAP
1 Pek. Water profing Talang Air m2 130 Rp 223,880.00 Rp 29,104,400.00
1 Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin m2 48 Rp 223,880.00 Rp 10,846,986.00
C PEKERJAAN PERBAIKAN PLAFOND
LANTAI 1 ( SATU )
1 Pembongkaran 1 m2 langit-langit m2 148 Rp 46,550.00 Rp 6,889,400.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 148 Rp 126,760.00 Rp 18,760,480.00
3 Pekerjaan Plafond Gypsum 9mm (indoor) m2 148 Rp 63,200.00 Rp 9,353,600.00
4 Pekerjaan List Plafond Type LP 2 m1 57 Rp 80,050.00 Rp 4,522,825.00
LANTAI 2 ( DUA )
1 Pembongkaran 1 m2 langit-langit m2 148 Rp 46,550.00 Rp 6,889,400.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 148 Rp 126,760.00 Rp 18,760,480.00
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 148 Rp 63,200.00 Rp 9,353,600.00
4 Pekerjaan List Plafond Type LP 2 m1 57 Rp 80,050.00 Rp 4,522,825.00
LANTAI 3 (TIGA )
1 Pembongkaran 1 m2 langit-langit m2 360 Rp 46,550.00 Rp 16,758,000.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305 Rp 126,760.00 Rp 38,661,800.00
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 360 Rp 63,200.00 Rp 22,752,000.00
4 Pekerjaan List Plafond Type LP 2 m1 103 Rp 80,050.00 Rp 8,245,150.00
D PEKERJAAN PERBAIKAN UTILITAS (MEP)
LANTAI 1 ( SATU )
1 Pasangan floor drain stainless bh 15 Rp 80,280.00 Rp 1,204,200.00
2 Pasangan Bak Kontrol Minyak Dapur bh 15 Rp 473,080.00 Rp 7,096,200.00
3 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 60 Rp 112,700.00 Rp 6,762,000.00
LANTAI 2 ( DUA )
1 Pasangan floor drain stainless bh 16 Rp 80,280.00 Rp 1,284,480.00
2 Pasangan Bak Kontrol Wastafel bh 16 Rp 473,080.00 Rp 7,569,280.00
3 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64 Rp 112,700.00 Rp 7,212,800.00
LANTAI 3 ( TIGA )
1 Pasangan floor drain stainless bh 16 Rp 80,280.00 Rp 1,284,480.00
2 Pasangan Bak Kontrol Wastafel bh 16 Rp 473,080.00 Rp 7,569,280.00
3 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64 Rp 112,700.00 Rp 7,212,800.00
E PEKERJAAN PENGECATAN KEMBALI
LANTAI I ( SATU )
1 Pengecatan Plafond m2 100 Rp 90,520.00 Rp 9,052,000.00
2 Pengecatan dinding bagian dalam bangunan (interior) m2 100 Rp 83,940.00 Rp 8,394,000.00
LANTAI II ( DUA )
1 Pengecatan Plafond m2 100 Rp 90,520.00 Rp 9,052,000.00
2 Pengecatan dinding bagian dalam bangunan (interior) m2 100 Rp 83,940.00 Rp 8,394,000.00
LANTAI III ( TIGA )
1 Pengecatan Plafond m2 100 Rp 90,520.00 Rp 9,052,000.00
2 Pengecatan dinding bagian dalam bangunan (interior) m2 100 Rp 83,940.00 Rp 8,394,000.00
HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)

F PEKERJAAN LUAR GEDUNG


GROUND WATER TANK
1 Cat dinding dan kolom bag. Luar (exterior) M2 20 Rp 125,660.00 Rp 2,513,200.00
2 Cat plafond expose di R. Pompa dan Ground Tank M2 14 Rp 90,520.00 Rp 1,267,280.00
3 Pek. Pemasangan Pompa air unit 1 Rp 22,628,355.00 Rp 22,628,355.00
PEKERJAAN TAMBAHAN
1 Pergantian Profil Roof Tank Kap. 2200 liter Unit 3 Rp 4,680,836.00 Rp 14,042,508.00

3 Pek. Perbaikan Sistim Elektrikal Dalam Gedung (pergantian Veten, Lampu, Sa TTK 75 Rp 172,810.00 Rp 12,960,750.00

4 Pek. Perbaikan Sistim Plumbing Dalam Gedung ( Pipa dan sambungan Pipa Air TTK 75 Rp 196,500.00 Rp 14,737,500.00

JUMLAH HARGA PEKERJAAAN ( TERMASUK BIAYA UMUM DAN KEUNTUNGAN ) Rp 419,084,099.000

PAJAK PERTAMBAHAN NILAI ( PPN 10 % ) Rp 41,908,409.900

JUMLAH TOTAL HARGA PEKERJAAN Rp 460,992,508.900


ANALISA HARGA SATUAN
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
A005 1 M² Bongkaran Lantai
b Tenaga Kerja
Pekerja 0.10 Oh 110,000 11,000.00
Mandor 0.01 Oh 126,500 1,265.00
  JUMLAH Rp : 12,265.00
KEUNTUNGAN 10% Rp : 1,226.50
JUMLAH TOTAL Rp : 13,491.50
PEMBULATAN Rp : 13,490.00

1 M2 Pekerjaan water proofing (coating)


a Bahan
pre treatment/ cleaning 1.00 m2 17,883 17,882.59
curbing sudut 0.40 m' 110,700 44,280.00
bahan waterproofting coating 2.50 kg 41,433 103,583.13
b Tenaga Kerja -
tukang batu 0.20 Oh 115,500 23,100.00
kepala tukang batu 0.02 Oh 121,000 2,420.00
pekerja 0.10 Oh 110,000 11,000.00
mandor 0.01 Oh 126,500 1,265.00
  JUMLAH Rp : 203,530.72
KEUNTUNGAN 10% Rp : 20,353.07
JUMLAH TOTAL Rp : 223,883.79
PEMBULATAN Rp : 223,880.00

F021 Membuat 1 M2 Acian


A Bahan Material
Semen portland 3.25 Kg 1,599 5,196
B Tenaga Kerja
Pekerja 0.20 Oh 110,000 22,000
Tukang Batu 0.10 Oh 115,500 11,550
Kepala Tukang 0.01 Oh 121,000 1,210
Mandor 0.01 Oh 126,500 1,265
  JUMLAH Rp : 41,221
KEUNTUNGAN 10% Rp : 4,122.12
JUMLAH TOTAL Rp : 45,343.34
PEMBULATAN Rp : 45,340.00

I.007 Memasang 1 m2 pintu bahan plastik/PVC


a Bahan Material
Pintu PVC 1.00 M2 731,175 731,175.00
b Tenaga Kerja
Pekerja 0.44 Oh 110,000 48,400.00
Tukang 0.44 Oh 115,500 50,820.00
Kepala Tukang 0.04 Oh 121,000 5,324.00
Mandor 0.02 Oh 126,500 2,783.00
  JUMLAH Rp : 838,502.00
KEUNTUNGAN 10% Rp : 83,850.20
JUMLAH TOTAL Rp : 922,352.20
PEMBULATAN Rp : 922,350.00
I.008 1 M2 MEMBONGKAR PLAFOND ( SNI. Edisi Rev. 2005)
a Bahan Material

b Tenaga Kerja
Pekerja 0.10 Oh 110,000 11,000.00
Tukang 0.25 Oh 115,500 28,875.00
Kepala Tukang 0.02 Oh 121,000 1,815.00
Mandor 0.01 Oh 126,500 632.50
  JUMLAH Rp : 42,322.50
KEUNTUNGAN 10% Rp : 4,232.25
JUMLAH TOTAL Rp : 46,554.75
PEMBULATAN Rp : 46,550.00
I.009 PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1X40X40.2MM, MODUL 60X60 CM
a Bahan Material
Rangka metal hollow 4.00 m 5,961 23,843.45
Assesoris 1.00 LS 5,961 5,960.86
b Tenaga Kerja
Pekerja 0.35 Oh 110,000 38,500.00
Tukang 0.35 Oh 115,500 40,425.00
Kepala Tukang 0.04 Oh 121,000 4,235.00
Mandor 0.02 Oh 126,500 2,277.00
  JUMLAH Rp : 115,241.32
KEUNTUNGAN 10% Rp : 11,524.13
JUMLAH TOTAL Rp : 126,765.45
PEMBULATAN Rp : 126,760.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
PEMASANGAN 1 M2 PLAFON GYSUMBOARD 9 MM

NO. KEBUTUHAN SATUAN INDEKS HARGA SATUAN JUMLAH HARGA


( Rp. ) ( Rp. )
A Bahan
1 Gypsumboard 9 mm lbr 0.36 Rp 104,544.38 38,054.15
2 Paku Skrup Kg 0.11 Rp 12,673.70 1,394.11

B Tenaga Kerja
1 Pekerja OH 0.10 Rp 110,000.00 11,000.00
2 Tukang Kayu OH 0.05 Rp 115,500.00 5,775.00
3 Kepala Tukang OH 0.01 Rp 121,000.00 605.00
4 Mandor OH 0.01 Rp 126,500.00 632.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) 57,460.76
Overhead & Profit 10% 5,746.08
Total 63,206.84
Dibulatkan 63,200.00
PEMASANGAN 1 M2 GRC 4 MM
1 GRC 4 mm lbr 0.36 Rp 70,842.57 25,786.70
2 Paku Skrup GRC Kg 0.11 Rp 12,673.70 1,394.11

B Tenaga Kerja
1 Pekerja OH 0.10 Rp 110,000.00 11,000.00
2 Tukang Kayu OH 0.05 Rp 115,500.00 5,775.00
3 Kepala Tukang OH 0.01 Rp 121,000.00 605.00
4 Mandor OH 0.01 Rp 126,500.00 632.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) 45,193.30
Overhead & Profit 10% 4,519.33
Total 49,712.63
Dibulatkan 49,710.00

H009 Memasang 1 M1 List Plafond Gypsum Profil 15 cm


A Bahan Material
List Gypsum Profil 1.05 M¹ 53,565.24 56,243.50
Tepung Gypsum + skrup 0.15 Kg 12,673.70 1,901.06
B Tenaga Kerja -
Pekerja 0.06 Oh 110,000.00 6,600.00
Tukang Kayu 0.06 Oh 115,500.00 6,930.00
Kepala Tukang 0.01 Oh 121,000.00 726.00
Mandor 0.00 Oh 126,500.00 379.50
  JUMLAH Rp : 72,780.05
KEUNTUNGAN 10% Rp : 7,278.01
JUMLAH TOTAL Rp : 80,058.06
PEMBULATAN Rp : 80,050.00

N.035 Memasang 1 buah kran diameter 3/4" atau 1/2"


A Bahan Material
Kran air 1.00 Buah 55,023 55,023.36
Seal tape 0.03 buah 5,502 137.56
B Tenaga Kerja
Pekerja 0.01 Oh 110,000.00 1,100.00
Tukang Batu 0.10 Oh 115,500.00 11,550.00
Kepala Tukang 0.01 Oh 121,000.00 1,210.00
Mandor 0.01 Oh 126,500.00 632.50
JUMLAH Rp : 69,653.41
KEUNTUNGAN Rp : 6,965.34
JUMLAH TOTAL Rp : 76,618.76
PEMBULATAN Rp : 76,610.00

N.036 Memasang 1 buah Shower + Kran double Outlet


A Bahan Material
Shower 1.00 Buah 120,364 120,363.59
Kran air 1.00 Buah 55,711 55,711.15
Seal tape 0.03 buah 155,441 3,886.02
B Tenaga Kerja
Pekerja 0.01 Oh 110,000.00 1,100.00
Tukang Batu 0.10 Oh 115,500.00 11,550.00
Kepala Tukang 0.01 Oh 121,000.00 1,210.00
Mandor 0.01 Oh 126,500.00 632.50
JUMLAH Rp : 74,089.67
KEUNTUNGAN Rp : 7,408.97
JUMLAH TOTAL Rp : 81,498.64
PEMBULATAN Rp : 81,490.00

N.037 Memasang 1 buah floor drain


A Bahan Material
Floor drain 1.00 buah 58,494 58,494.00
B Tenaga Kerja
Pekerja 0.01 Oh 110,000.00 1,100.00
Tukang Batu 0.10 Oh 115,500.00 11,550.00
Kepala Tukang 0.01 Oh 121,000.00 1,210.00
Mandor 0.01 Oh 126,500.00 632.50
JUMLAH Rp : 72,986.50
KEUNTUNGAN Rp : 7,298.65
JUMLAH TOTAL Rp : 80,285.15
PEMBULATAN Rp : 80,280.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
N.038 Memasang 1 buah Bak Kontrol Minyak Dapur
A Bahan Material
Bak Kontrol Wastafel (Grease Trap) 1.00 buah 365,588 365,587.50
Aksesoris 1.00 Ls 50,000 50,000.00
B Tenaga Kerja
Pekerja 0.01 Oh 110,000.00 1,100.00
Tukang Batu 0.10 Oh 115,500.00 11,550.00
Kepala Tukang 0.01 Oh 121,000.00 1,210.00
Mandor 0.01 Oh 126,500.00 632.50
JUMLAH Rp : 430,080.00
KEUNTUNGAN Rp : 43,008.00
JUMLAH TOTAL Rp : 473,088.00
PEMBULATAN Rp : 473,080.00

1 M2 PENGECATAN PLAFOND VINILEX (3x)


A Bahan Material
Cat tembok vinilex 0.20 Kg 63,369 12,673.70
Plamir tembok 0.16 Kg 49,865 7,978.39
Rol cat 0.01 bh 34,390 343.90
Ampelas 0.50 lbr 4,127 2,063.38
B Tenaga Kerja
Pekerja 0.20 Oh 110,000 22,000.00
Tukang cat 0.28 Oh 115,500 32,340.00
Kepala tukang cat 0.03 Oh 121,000 3,630.00
Mandor 0.01 Oh 126,500 1,265.00
JUMLAH Rp : 82,294.36
KEUNTUNGAN Rp : 8,229.44
JUMLAH TOTAL Rp : 90,523.79
PEMBULATAN Rp : 90,520.00

1 M2 PENGECATAN DINIDNG VINILEX (3x)


A Bahan Material
Cat tembok vinilex 0.18 Kg 63,369 11,089.49
Plamir tembok 0.16 Kg 49,865 7,978.39
Rol cat 0.01 bh 34,390 343.90
Ampelas 0.50 lbr 4,127 2,063.38
B Tenaga Kerja
Pekerja 0.16 Oh 110,000 17,600.00
Tukang cat 0.28 Oh 115,500 32,340.00
Kepala tukang cat 0.03 Oh 121,000 3,630.00
Mandor 0.01 Oh 126,500 1,265.00
JUMLAH Rp : 76,310.15
KEUNTUNGAN Rp : 7,631.01
JUMLAH TOTAL Rp : 83,941.16
PEMBULATAN Rp : 83,940.00

1 M2 PENGECATAN DINIDNG Dulux Wattershield


A Bahan Material
Cat tembok Dulux Wattershield 0.18 Kg 295,751 51,756.34
Cat Dasar 0.16 Kg 32,739 5,238.22
Rol cat 0.01 bh 34,390 343.90
Ampelas 0.50 lbr 4,127 2,063.38
B Tenaga Kerja
Pekerja 0.16 Oh 110,000 17,600.00
Tukang cat 0.28 Oh 115,500 32,340.00
Kepala tukang cat 0.03 Oh 121,000 3,630.00
Mandor 0.01 Oh 126,500 1,265.00
JUMLAH Rp : 114,236.84
KEUNTUNGAN Rp : 11,423.68
JUMLAH TOTAL Rp : 125,660.52
PEMBULATAN Rp : 125,660.00

O.006 Memasang 1 m2 paving block natural 8 cm


A Bahan Material
Paving block natural 8 cm 1.00 M2 111,789 111,789.12
Pasir beton 0.10 M³ 175,482 17,548.20
Peralatan 1.00 ls 25,000 25,000.00
B Tenaga Kerja
Pekerja 0.25 Oh 110,000 27,500.00
Tukang Batu 0.50 Oh 115,500 57,750.00
Kepala Tukang 0.03 Oh 121,000 3,025.00
Mandor 0.00 Oh 126,500 379.50
JUMLAH Rp : 242,991.82
KEUNTUNGAN Rp : 24,299.18
JUMLAH TOTAL Rp : 267,291.00
PEMBULATAN Rp : 267,290.00

N.026 Memasang 1 m' pipa PVC tipe AW diameter 3/4"


a Bahan Material
Pipa PVC 3/4" 1.20 M' 58,462 70,154.7789
Perlengkapan 35.0% harga pipa 20,462 20,462
B Tenaga Kerja
Pekerja 0.04 Oh 110,000 3,960.0000
Tukang Batu 0.06 Oh 115,500 6,930.0000
Kepala Tukang 0.01 Oh 121,000 726.0000
Mandor 0.00 Oh 126,500 227.7000
JUMLAH Rp : 102,460.29
KEUNTUNGAN Rp : 10,246.03
JUMLAH TOTAL Rp : 112,706.32
PEMBULATAN Rp : 112,700.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
J.036 Memasang 1 m2 Lantai Keramik, Ukuran (20x20) cm
a Bahan Material
Ubin Keramik 26.50 Buah 4,952 131,230.70
Semen Portland 10.40 Kg 1,599 16,627.89
Pasir Pasang 0.05 M³ 201,752 9,078.85
Semen Warna 1.62 Kg 2,545 4,122.62
b Tenaga Kerja -
Pekerja 0.70 Oh 110,000 77,000.00
Tukang batu 0.35 Oh 115,500 40,425.00
Kepala Tukang 0.04 Oh 121,000 4,235.00
Mandor 0.04 Oh 126,500 4,427.50
JUMLAH Rp : 287,147.58
KEUNTUNGAN Rp : 28,714.76
JUMLAH TOTAL Rp : 315,862.34
PEMBULATAN Rp : 315,860.00

G012 Memasang 1 M2 Teakwood rangkap lapis formika, rangka Expose Kayu Klas II
A Bahan Material
Papan Kayu 0.03 M3 6,098,422 152,460.55
Paku 1 cm - 2,5 cm 0.03 Kg 21,322 639.65
Lem Kayu 0.80 Kg 39,892 31,913.55
Teakwood Tebal 4mm Uk.(90x220)c 1.00 Lembar 161,631 161,631.11
Formika 0.50 Lembar 221,469 110,734.50
Kunci Tanam Kualitas Baik 1.00 unit 180,032 180,031.84
B Tenaga Kerja -
Pekerja 0.85 Oh 110,000 93,500.00
Tukang Kayu 2.55 Oh 115,500 294,525.00
Kepala Tukang 0.26 Oh 121,000 30,855.00
Mandor 0.04 Oh 126,500 5,439.50
JUMLAH Rp : 1,061,730.69
KEUNTUNGAN Rp : 106,173.07
JUMLAH TOTAL Rp : 1,167,903.76
PEMBULATAN Rp : 1,167,900.00

N.035 Memasang 1 buah kran leher angsa


A Bahan Material
Kran air leher angsa 1.00 Buah 140,653 140,653.45
Seal tape 0.03 buah 36,225 905.62
B Tenaga Kerja
Pekerja 0.01 Oh 110,000.00 1,100.00
Tukang Batu 0.10 Oh 115,500.00 11,550.00
Kepala Tukang 0.01 Oh 121,000.00 1,210.00
Mandor 0.01 Oh 126,500.00 632.50
JUMLAH Rp : 156,051.57
KEUNTUNGAN Rp : 15,605.16
JUMLAH TOTAL Rp : 171,656.73
PEMBULATAN Rp : 171,650.00

N.026 Memasang 1 m' pipa PVC tipe AW diameter 2"


a Bahan Material
Pipa PVC 2" 1.20 M' 125,178 150,213.7619
Perlengkapan 35.0% harga pipa 43,812 43,812
B Tenaga Kerja
Pekerja 0.04 Oh 110,000 3,960.0000
Tukang Batu 0.06 Oh 115,500 6,930.0000
Kepala Tukang 0.01 Oh 121,000 726.0000
Mandor 0.00 Oh 126,500 227.7000
JUMLAH Rp : 205,869.81
KEUNTUNGAN Rp : 20,586.98
JUMLAH TOTAL Rp : 226,456.79
PEMBULATAN Rp : 226,450.00

N.026 Memasang 1 m' pipa PVC tipe AW diameter 1/2"


a Bahan Material
Pipa PVC 1/2" 1.20 M' 41,268 49,521.0204
Perlengkapan 35.0% harga pipa 14,444 14,444
B Tenaga Kerja
Pekerja 0.04 Oh 110,000 3,960.0000
Tukang Batu 0.06 Oh 115,500 6,930.0000
Kepala Tukang 0.01 Oh 121,000 726.0000
Mandor 0.00 Oh 126,500 227.7000
JUMLAH Rp : 75,808.35
KEUNTUNGAN Rp : 7,580.84
JUMLAH TOTAL Rp : 83,389.19
PEMBULATAN Rp : 83,380.00

N.026 Memasang Sambungan pipa PVC diameter 1/2"


a Bahan Material
Sambungan Pipa 1/2" 1.00 M' 4,815 4,815
Perlengkapan 35.0% harga pipa 1,685 1,685
B Tenaga Kerja
Pekerja 0.04 Oh 110,000 3,960.0000
Tukang Batu 0.06 Oh 115,500 6,930.0000
Kepala Tukang 0.01 Oh 121,000 726.0000
Mandor 0.00 Oh 126,500 227.7000
JUMLAH Rp : 18,343.33
KEUNTUNGAN Rp : 1,834.33
JUMLAH TOTAL Rp : 20,177.67
PEMBULATAN Rp : 20,170.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH

J.036 Memasang 1 m Lantai Keramik, Ukuran (40x40) cm


2

a Bahan Material
Ubin Keramik 6.00 Buah 13,297 79,783.89
Semen Portland 10.40 Kg 1,599 16,627.89
Pasir Pasang 0.05 M³ 201,752 9,078.85
Semen Warna 1.62 Kg 2,545 4,122.62
b Tenaga Kerja -
Pekerja 0.70 Oh 110,000 77,000.00
Tukang batu 0.35 Oh 115,500 40,425.00
Kepala Tukang 0.04 Oh 121,000 4,235.00
Mandor 0.04 Oh 126,500 4,427.50
JUMLAH Rp : 235,700.76
KEUNTUNGAN Rp : 23,570.08
JUMLAH TOTAL Rp : 259,270.83
PEMBULATAN Rp : 259,270.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
PENGUKURAN DAN PEMASANGAN BOUPLANK / M'
HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Kayu Kelas III (Kaso 5/7) M3 0.012 Rp 1,462,350.00 Rp 17,548.20
2 Papan Kayu Kelas III M3 0.007 Rp 1,462,350.00 Rp 10,236.45
3 Paku 5 - 12 cm Kg 0.020 Rp 16,507.01 Rp 330.14
Jumlah Harga Bahan (A) Rp 28,114.79
B Tenaga Kerja
1 Pekerja OH 0.100 Rp 110,000.00 Rp 11,000.00
2 Tukang Kayu OH 0.100 Rp 115,500.00 Rp 11,550.00
3 Kepala Tukang Kayu OH 0.010 Rp 121,000.00 Rp 1,210.00
4 Mandor OH 0.005 Rp 126,500.00 Rp 632.50
Jumlah Harga Tenaga Kerja (B) Rp 24,392.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 52,507.29
Overhead & Profit 10% Rp 5,250.73
Total Rp 57,758.02
Dibulatkan Rp 57,700.00

1 GALIAN TANAH BIASA SEDALAM 1 METER / M3


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan

Jumlah Harga Bahan (A) Rp -


B Tenaga Kerja
1 Pekerja OH 0.750 Rp 110,000.00 Rp 82,500.00
2 Mandor OH 0.025 Rp 126,500.00 Rp 3,162.50

Jumlah Harga Tenaga Kerja (B) Rp 85,662.50


Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 85,662.50
Overhead & Profit 10% Rp 8,566.25
Total Rp 94,228.75
Dibulatkan Rp 94,200.00

2 PEMASANGAN 1 M3 BATU KOSONG (ANSTAMPING)


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Batu Belah M3 1.200 Rp 259,068.30 Rp 310,881.96
2 Pasir Urug M3 0.432 Rp 231,556.62 Rp 100,032.46

Jumlah Harga Bahan (A) Rp 410,914.42


B Tenaga Kerja
1 Pekerja OH 0.780 Rp 110,000.00 Rp 85,800.00
2 Tukang batu OH 0.390 Rp 115,500.00 Rp 45,045.00
3 Kepala Tukang OH 0.039 Rp 121,000.00 Rp 4,719.00
4 Mandor OH 0.039 Rp 126,500.00 Rp 4,933.50
Jumlah Harga Tenaga Kerja (B) Rp 140,497.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 551,411.92
Overhead & Profit 10% Rp 55,141.19
Total Rp 606,553.11
Dibulatkan Rp 606,500.00

5 URUGAN PASIR URUG / M3


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Pasir Urug M3 1.200 Rp 231,556.62 Rp 277,867.95

Jumlah Harga Bahan (A) Rp 277,867.95


B Tenaga Kerja
1 Pekerja OH 0.300 Rp 110,000.00 Rp 33,000.00
2 Mandor OH 0.010 Rp 126,500.00 Rp 1,265.00

Jumlah Harga Tenaga Kerja (B) Rp 34,265.00


Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 312,132.95
Overhead & Profit 10% Rp 31,213.29
Total Rp 343,346.24
Dibulatkan Rp 343,300.00

1 PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP / M3


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Batu Belah 15 - 20 Cm M3 1.200 Rp 259,068.30 Rp 310,881.96
2 Portland Cement (PC) Kg 163.000 Rp 1,598.84 Rp 260,610.27
3 Pasir Pasang (PP) M3 0.520 Rp 201,752.31 Rp 104,911.20

Jumlah Harga Bahan (A) Rp 676,403.43


B Tenaga Kerja
1 Pekerja OH 1.500 Rp 110,000.00 Rp 165,000.00
2 Tukang Batu OH 0.750 Rp 115,500.00 Rp 86,625.00
3 Kepala Tukang OH 0.075 Rp 121,000.00 Rp 9,075.00
4 Mandor OH 0.075 Rp 126,500.00 Rp 9,487.50
Jumlah Harga Tenaga Kerja (B) Rp 270,187.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 946,590.93
Overhead & Profit 10% Rp 94,659.09
Total Rp 1,041,250.02
Dibulatkan Rp 1,041,200.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH

MEMBUAT 1 M3 BETON MUTU f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Semen Portland Kg 326.000 Rp 1,599 Rp 521,220.54
2 Pasir Beton Kg 760.000 Rp 201 Rp 153,082.84
3 Kerikil Kg 1,029.000 Rp 171.44 Rp 176,410.23
4 Air L 215.000 Rp 672.16 Rp 144,515.33

Jumlah Harga Bahan (A) Rp 995,228.93


B Tenaga Kerja
1 Pekerja OH 1.650 Rp 110,000.00 Rp 181,500.00
2 Tukang batu OH 0.275 Rp 115,500.00 Rp 31,762.50
3 Kepala Tukang OH 0.028 Rp 121,000.00 Rp 3,388.00
4 Mandor OH 0.083 Rp 126,500.00 Rp 10,499.50
Jumlah Harga Tenaga Kerja (B) Rp 227,150.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 1,222,378.93
Overhead & Profit 10% Rp 122,237.89
Total Rp 1,344,616.82
Dibulatkan Rp 1,344,600.00

3 URUGAN KEMBALI EX. GALIAN TANAH / M3


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan

Jumlah Harga Bahan (A) Rp -


B Tenaga Kerja
1 Pekerja OH 0.500 Rp 110,000.00 Rp 55,000.00
2 Mandor OH 0.050 Rp 126,500.00 Rp 6,325.00

Jumlah Harga Tenaga Kerja (B) Rp 61,325.00


Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 61,325.00
Overhead & Profit 10% Rp 6,132.50
Total Rp 67,457.50
Dibulatkan Rp 67,400.00

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU ULIR


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Besi Beton Kg 10.500 Rp 14,623.50 Rp 153,546.75
2 Kawat Beton Kg 0.150 Rp 20,633.76 Rp 3,095.06

Jumlah Harga Bahan (A) Rp 156,641.81


B Tenaga Kerja
1 Pekerja OH 0.070 Rp 110,000.00 Rp 7,700.00
2 Tukang Besi OH 0.070 Rp 115,500.00 Rp 8,085.00
3 Kepala Tukang OH 0.007 Rp 121,000.00 Rp 847.00
4 Mandor OH 0.004 Rp 126,500.00 Rp 506.00
Jumlah Harga Tenaga Kerja (B) Rp 17,138.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 173,779.81
Overhead & Profit 10% Rp 17,377.98
Total Rp 191,157.80
Dibulatkan Rp 191,100.00
Dibulatkan Per KG Rp 19,110.00

1 PEMASANGAN 1 M2 BEKISTING UNTUK SLOOF DENGAN PAPAN 3/20


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Kayu Kelas III M3 0.045 Rp 1,462,350.00 Rp 65,805.75
3 Paku 5 cm - 10 cm Kg 0.300 Rp 16,507.01 Rp 4,952.10
4 Minyak Bekisting L 0.100 Rp 47,240.30 Rp 4,724.03

Jumlah Harga Bahan (A) Rp 75,481.88


B Tenaga Kerja
1 Pekerja OH 0.520 Rp 110,000.00 Rp 57,200.00
2 Tukang Kayu OH 0.260 Rp 115,500.00 Rp 30,030.00
3 Kepala Tukang OH 0.026 Rp 121,000.00 Rp 3,146.00
4 Mandor OH 0.026 Rp 126,500.00 Rp 3,289.00
Jumlah Harga Tenaga Kerja (B) Rp 93,665.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 169,146.88
Overhead & Profit 10% Rp 16,914.69
Total Rp 62,020.52
Dibulatkan Rp 62,000.00

1 M2 Pasang Bata Tebal 1/2 Bata, 1pc : 5ps


A Bahan
Bata Bh 50.000 2521.90 54,250.00
Semen Portland Kg 9.680 1,598.84 13,610.08
Pasir Pasang M3 0.045 201,752.31 10,503.00
B Tenaga Kerja Jumlah Harga Bahan (A) Rp 78,363.08
Pekerja Oh 0.320 110,000.00 13,440.00
Tukang Batu Oh 0.100 115,500.00 6,500.00
Kepala Tukang Oh 0.010 121,000.00 750
Mandor Oh 0.015 126,500.00 1,200.00
Jumlah Harga Tenaga Kerja (B) Rp 21,890.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 100,253.08
Overhead & Profit 10% Rp 10,025.31
Total Rp 110,278.39
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
Dibulatkan Rp 110,200.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH

PLESTERAN TEBAL 15 MM, CAMPURAN 1 PC : 4 PP / M2


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Portland Cement (PC) Kg 6.240 Rp 1,598.84 Rp 9,976.74
2 Pasir Pasang (PP) M3 0.024 Rp 201,752.31 Rp 4,842.06

Jumlah Harga Bahan (A) Rp 14,818.79


B Tenaga Kerja
1 Pekerja OH 0.300 Rp 110,000.00 Rp 33,000.00
2 Tukang Batu OH 0.150 Rp 115,500.00 Rp 17,325.00
3 Kepala Tukang OH 0.015 Rp 121,000.00 Rp 1,815.00
4 Mandor OH 0.015 Rp 126,500.00 Rp 1,897.50
Jumlah Harga Tenaga Kerja (B) Rp 54,037.50
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 68,856.29
Overhead & Profit 10% Rp 6,885.63
Total Rp 75,741.92

ACIAN / M2
HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Portland Cement (PC) Kg 3.250 Rp 1,598.84 Rp 5,196.22

Jumlah Harga Bahan (A) Rp 5,196.22


B Tenaga Kerja
1 Pekerja OH 0.200 Rp 110,000.00 Rp 22,000.00
2 Tukang Batu OH 0.100 Rp 115,500.00 Rp 11,550.00
3 Kepala Tukang OH 0.010 Rp 121,000.00 Rp 1,210.00
4 Mandor OH 0.010 Rp 126,500.00 Rp 1,265.00
Jumlah Harga Tenaga Kerja (B) Rp 36,025.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 41,221.22
Overhead & Profit 10% Rp 4,122.12
Total Rp 45,343.34
Dibulatkan Rp 45,300.00

PEMASANGAN PINTU PVC


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SAT INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Pintu PVC Unit 1.0 731,175 Rp 731,175.00
2 Upah Pasang Ls 1.0 115,500 Rp 115,500.00

Jumlah Harga Rp 846,675.00


Overhead & Profit 10% Rp 84,667.50
Total Rp 931,342.50
Dibulatkan Rp 931,300.00

1 m2 Pasang Kuda-kuda Baja ringan + Reng untuk atap asbes / spandek


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 C - 75, 0,75 M 1.488 Rp 16,277.74 Rp 24,221.28
C - 75, 0,60 M 2.232 Rp 13,755.84 Rp 30,703.03
Baut Buah 28.000 Rp 1,375.58 Rp 38,516.35
Dynabolt Buah 1.600 Rp 4,126.75 Rp 6,602.80
Reng M 3.600 Rp 6,877.92 Rp 24,760.51
Talang Jurai M 0.124 Rp 21,550.81 Rp 2,672.30
Jumlah Harga Bahan (A) Rp 127,476.28
B Tenaga Kerja
1 Pekerja OH 0.200 Rp 110,000.00 Rp 22,000.00
2 Tukang Besi OH 0.450 Rp 115,500.00 Rp 51,975.00
3 Kepala Tukang OH 0.010 Rp 121,000.00 Rp 1,210.00
4 Mandor OH 0.050 Rp 126,500.00 Rp 6,325.00
Jumlah Harga Tenaga Kerja (B) Rp 81,510.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 208,986.28
Overhead & Profit 10% Rp 20,898.63
Total Rp 229,884.90
Dibulatkan Rp 229,800.00

1 m2 Pasangan Atap Spandek Zincalume


HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Atap Spandek Zincalume M2 1.100 Rp 107,921.43 Rp 118,713.57
Screw Cteks 12 -4 x 50 Buah 6.000 Rp 1,031.69 Rp 6,190.13
Screw Cteks 10 x 16 - 16 Buah 2.000 Rp 341.22 Rp 682.43

Jumlah Harga Bahan (A) Rp 125,586.13


B Tenaga Kerja
1 Pekerja OH 0.020 Rp 110,000.00 Rp 2,200.00
2 Tukang Besi OH 0.080 Rp 115,500.00 Rp 9,240.00
3 Kepala Tukang OH 0.010 Rp 121,000.00 Rp 1,210.00
4 Mandor OH 0.006 Rp 126,500.00 Rp 759.00
Jumlah Harga Tenaga Kerja (B) Rp 13,409.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 138,995.13
Overhead & Profit 10% Rp 13,899.51
Total Rp 152,894.64
Dibulatkan Rp 152,800.00
KODE URAIAN PEKERJAAN KOOFISIEN SATUAN HARGA SATUAN JUMLAH
PEMASANGAN 1 M2 RANGKA BESI HOLLOW 1X40X40.2MM, MODUL 60X60 CM
HARGA SATUAN JUMLAH HARGA
NO. KEBUTUHAN SATUAN INDEKS
( Rp. ) ( Rp. )
A Bahan
1 Rangka metal hollow m' 4.000 Rp 5,960.86 Rp 23,843.45
2 Assesoris Ls 100%xRangka Rp 5,960.86 Rp 5,960.86

Jumlah Harga Bahan (A) Rp 29,804.32


B Tenaga Kerja
1 Pekerja OH 0.350 Rp 110,000.00 Rp 38,500.00
2 Tukang Besi OH 0.350 Rp 115,500.00 Rp 40,425.00
3 Kepala Tukang OH 0.0350 Rp 121,000.00 Rp 4,235.00
4 Mandor OH 0.0180 Rp 126,500.00 Rp 2,277.00
Jumlah Harga Tenaga Kerja (B) Rp 85,437.00
Jumlah Harga Bahan dan Tenaga Kerja (A+B) Rp 115,241.32
Overhead & Profit 10% Rp 11,524.13
Total Rp 126,765.45
Dibulatkan Rp 126,700.00
DAFTAR HARGA SATUAN UPAH

UPAH (SWAKELOLA) UPAH (KONTRAKTUAL)


URAIAN
Org/jam Org/hr Org/jam Org/hr

Mandor Rp 14,375.00 Rp 115,000.00 Rp 14,375.00 Rp 126,500.00


Kepala Tukang Batu Rp 13,750.00 Rp 110,000.00 Rp 13,750.00 Rp 121,000.00
Kepala Tukang Kayu Rp 13,750.00 Rp 110,000.00 Rp 13,750.00 Rp 121,000.00
Kepala Tukang Besi Rp 13,750.00 Rp 110,000.00 Rp 13,750.00 Rp 121,000.00
Kepala Tukang Cat Rp 13,750.00 Rp 110,000.00 Rp 13,750.00 Rp 121,000.00
Kepala Tukang Listrik Rp 13,750.00 Rp 110,000.00 Rp 13,750.00 Rp 121,000.00
Tukang Batu Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Kayu Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Besi/Baja Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Aluminium Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Cat Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Listrik Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Pipa Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Plitur Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Tukang Taman Rp 13,125.00 Rp 105,000.00 Rp 13,125.00 Rp 115,500.00
Pembantu Tukang Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Pekerja Biasa Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Penjaga Malam Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Sopir Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Operator Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Mekanik Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Pembantu Sopir Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Pembantu Operator Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
Pembantu Mekanik Rp 12,500.00 Rp 100,000.00 Rp 12,500.00 Rp 110,000.00
BOQ PEKERJAAN REVIT RUSUN POLRES HALMAHERA BARAT

HARGA PENAWARAN
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
REVIT RUMAH SUSUN POLRES HALMAHERA BARAT 454,545,417
I PEKERJAAN PERSIAPAN 14,401,000
1 Sewa Tempat Ls 1.00 2,500,125 2,500,125
2 Papan Nama Proyek Buah 1.00 500,125 500,125
3 Foto Proyek 3 Fase (warna) Set 3.00 1,000,000 3,000,000
4 Air Kerja Bulan 3.00 500,125 1,500,375
5 Listrik Kerja Bulan 3.00 500,125 1,500,375
6 Laporan Ls 1.00 2,400,000 2,400,000
7 Peralatan dan Perlengkapan K3 Ls 1.00 3,000,000 3,000,000

II PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING 15,027,643


A LANTAI 2 ( DUA ) -
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 45.00 166,974 7,513,821
-
B LANTAI 3 ( TIGA ) -
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 45.00 166,974 7,513,821
-
III PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA 138,123,464
A LANTAI 1 ( SATU ) -
1 Kusen Type (Alumunium) unit 15.00 3,069,410 46,041,155
-
B LANTAI 2 ( DUA ) -
1 Kusen Type (Alumunium) unit 15.00 3,069,410 46,041,155

B LANTAI 3 ( TIGA ) -
1 Kusen Type (Alumunium) unit 15.00 3,069,410 46,041,155
IV PEKERJAAN PERBAIKAN PLAFOND 75,508,625
A LANTAI 1 ( SATU ) -
1 Pembongkaran 1 m2 langit-langit m2 120.00 29,033 3,484,016
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 100.00 124,512 12,451,212
3 Pekerjaan Plafond Gypsum 9mm (indoor) m2 120.00 67,172 8,060,644
#REF! Pekerjaan List Plafond Type LP 2 m1 20.00 58,683 1,173,670
-
B LANTAI 2 ( DUA ) -
1 Pembongkaran 1 m2 langit-langit m2 120.00 29,033 3,484,016
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 100.00 124,512 12,451,212
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 120.00 67,172 8,060,644
#REF! Pekerjaan List Plafond Type LP 2 m1 20.00 58,683 1,173,670
-
C LANTAI 3 (TIGA ) -
1 Pembongkaran 1 m2 langit-langit m2 120.00 29,033 3,484,016
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 100.00 124,512 12,451,212
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 120.00 67,172 8,060,644
#REF! Pekerjaan List Plafond Type LP 2 m1 20.00 58,683 1,173,670
-
V PEKERJAAN PERBAIKAN UTILITAS 29,189,753
A LANTAI 1 ( SATU ) -
1 Pasang kran 0,5" bh 10.00 77,126 771,256
2 Pasang shower + kran type double (terpasang) bh 10.00 320,033 3,200,331
3 Pasangan floor drain stainless bh 10.00 77,098 770,980
4 Wastafel bh 1.00 2,992,410 2,992,410
-
B LANTAI 2 ( DUA ) -
1 Pasang kran 0,5" bh 10.00 77,126 771,256
2 Pasang shower + kran type double (terpasang) bh 10.00 320,033 3,200,331
3 Pasangan floor drain stainless bh 10.00 77,098 770,980
4 Wastafel bh 2.00 2,992,410 5,984,819
-
C LANTAI 3 ( TIGA ) -
HARGA PENAWARAN
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
1 Pasang kran 0,5" bh 10.00 77,126 771,256
2 Pasang shower + kran type double (terpasang) bh 10.00 320,033 3,200,331
3 Pasangan floor drain stainless bh 10.00 77,098 770,980
4 Wastafel bh 2.00 2,992,410 5,984,819
-
VI PEKERJAAN PENGECATAN KEMBALI 13,348,630
A LANTAI I ( SATU ) -
1 Pengecatan Plafond m2 120.00 32,717 3,926,068
2 Pengecatan List Plafond Type LP 2, Plafond m2 16.00 32,717 523,476
-
B LANTAI II ( DUA ) -
1 Pengecatan Plafond m2 120.00 32,717 3,926,068
2 Pengecatan List Plafond Type LP 2, Plafond m2 16.00 32,717 523,476
-
C LANTAI III ( TIGA ) -
1 Pengecatan Plafond m2 120.00 32,717 3,926,068
2 Pengecatan List Plafond Type LP 2, Plafond m2 16.00 32,717 523,476
- -
VII PEKERJAAN ATAP 912,500
A LANTAI ATAP -
1 Tangga M ke roof tank bh 1.00 912,500 912,500
-
VIII PEKERJAAN LUAR GEDUNG 27,430,987
-
B GROUND WATER TANK -
1 Cat dinding dan kolom bag. Luar (exterior) M2 53.12 33,265 1,767,025
2 Cat plafond expose di R. Pompa dan Ground Tank M2 23.56 28,959 682,267
-
C PEK. LAMPU TAMAN -
1 NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 16.00 534,793 8,556,695
-
D PEK. SEPTICTANK KONVENSIONAL -
1 Pek. Septictank Konvensional UNIT 1.00 16,425,000 16,425,000
-
IX PEKERJAAN TAMBAHAN 140,602,814.92
A Pek. Sumur Bor/ Pengeboran Air Bersih M 60.00 1,036,725 62,203,500
B Pek. Perbaikan Retak Dinding Minor M2 10.00 92,822 928,225

D Pek. Pergantian Closet Duduk Komplit BH 6.00 4,252,737 25,516,420

F Pek. Perbaikan Sistim Elektrikal Dalam Gedung TTK 40.00 380,000 15,200,000
G Pek. Perbaikan Sistim Plumbing Dalam Gedung TTK 40.00 173,955 6,958,194
H Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin M2 48.45 166,974 8,089,881
I Pek. Waterprofing Talang Air Hujan, bitudin M2 130.00 166,974 21,706,595

JUMLAH 454,545,417
PPN 10% 45,454,542
JUMLAH TOTAL 499,999,959
PEMBULATAN 500,000,000
KEMENTERIAN PUPR DIRJEN PERUMAHAN RAKYAT
SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

PROGRES PEKERJAAN MINGGU KE -


REVIT RUSUN ASN PROVINSI MALUKU UTARA

1-4
MINGGU KE I - IV BULAN AGUSUTUS 2019

PEKERJAAN PERSIAPAN

SATKER : SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA WAKTU MULAI KERJA : 6-Aug-19 KONTRAKTOR PELAKSANA
PEKERJAAN : REVIT RUSUN ASN PROVINSI MALUKU UTARA PROGRESS WAKTU : 3-Sep-19
NO. KONTRAK : HK0203/SNVT-PnPMU/SP/REVIT.RUSUN-01/APBN/2019 REALISAI HARI KERJA : 28 HARI CV. NINI PERMAI
PELAKSANA : CV. NINI PERMAI Kontraktor - Leveransir - Jasa Konsturksi
PENGAWAS : CV. RANI ENGINEERING SISA WAKTU KERJA : 122 HARI Provinsi Maluku
LOKASI : PROVINSI MALUKU UTARA (SOFIFI - WEDA - JAILOLO) KONSULTAN PENGAWAS
OKASI WAKTU : 150 HARI, 21 MINGGU, 5 BULAN PROGRESS KERJA : Err:509 %
CV. RANI
ENGINEERING

SESUAI KONTRAK REALISASI LAPANGAN


BOBOT
NO ITEM PEKERJAAN SAT REALISASI
JUMLAH JUMLAH HARGA VOL. PEKERJAAN
VOL. HARGA SATUAN TERHADAP
HARGA SETELAH PAJAK REALISASI S/D MINGGU INI
KONTRAK (%)
(%)

REVIT RUMAH SUSUN POLDA MALUKU UTARA Err:509 Err:509 Err:509 Err:509
I PEKERJAAN PERSIAPAN 14,440,750.00 15,884,825.00 100.00 Err:509
1 Sewa Tempat Ls 1.00 2,500,000.00 2,500,000.00 2,750,000.00 1.00 100.00 Err:509
2 Papan Nama Proyek Buah 1.00 540,000.00 540,000.00 594,000.00 1.00 100.00 Err:509
3 Foto Proyek 3 Fase (warna) Set 3.00 1,000,000.00 3,000,000.00 3,300,000.00 3.00 100.00 Err:509
4 Air Kerja Bulan 3.00 500,125.00 1,500,375.00 1,650,412.50 3.00 100.00 Err:509
5 Listrik Kerja Bulan 3.00 500,125.00 1,500,375.00 1,650,412.50 3.00 100.00 Err:509
6 Laporan Ls 1.00 2,400,000.00 2,400,000.00 2,640,000.00 1.00 100.00 Err:509
7 Peralatan dan Perlengkapan K3 Ls 1.00 3,000,000.00 3,000,000.00 3,300,000.00 1.00 100.00 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 40.50 223,880.00 9,067,140.00 9,973,854.00 40.50 100.00 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


0 LANTAI 1 ( SATU )
1 Pembongkaran 1 m2 langit-langit m2 120.00 46,550.00 5,586,000.00 6,144,600.00 120.00 100.00 Err:509

4 Pekerjaan List Plafond Type LP 2


0 - - - - - - - #DIV/0! Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

2 Pekerjaan Rangka Hollow 4x4, 2x4 cm Err:509 Err:509 Err:509 Err:509


3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4,
4 Pekerjaan List Plafond Type LP 2 m1 50.00 80,050.00 4,002,500.00 4,402,750.00 50.00 100.00 Err:509
0 - - - - - - - #DIV/0! Err:509
III PEKERJAAN MEP - - - - - - #DIV/0! Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
A. PEK. INSTALASI LISTRIK - - - - - - #DIV/0! Err:509

2 Pek. Pasang Stop Kontak


Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
0 - - - - - - - #DIV/0! Err:509
B. PEK. PLUMBING - - - - - - #DIV/0! Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1 Pek. Pergantian Pipa Saluran Air Bersih dari Roof Tank AW 2" m' 80.00 226,450.00 18,116,000.00 19,927,600.00 80.00 100.00 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

VII PEKERJAAN ATAP Err:509 Err:509 Err:509 Err:509


A LANTAI ATAP
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1 Tangga M ke roof tank unit 1.00 912,500.00 912,500.00 1,003,750.00 1.00 100.00 Err:509
VIII PEKERJAAN LUAR GEDUNG Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

A GROUND WATER TANK


1 Cat dinding dan kolom bag. Luar (exterior) M2 364.00 125,660.00 45,740,240.00 50,314,264.00 364.00 100.00 Err:509
2 Cat plafond expose di R. Pompa dan Ground Tank M2 23.56 90,520.00 2,132,651.20 2,345,916.32 23.56 100.00 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

C PEK. SEPTICTANK KONVENSIONAL


1 Pek. Penyedotan Isi Septiktank m3 8.00 500,000.00 4,000,000.00 4,400,000.00 8.00 100.00 Err:509

IX PEKERJAAN TAMBAHAN Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
B Pek. Perbaikan Retak Dinding Minor M2 112.00 45,340.00 5,078,080.00 5,585,888.00 112.00 100.00 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin M2 48.45 223,880.00 10,846,986.00 11,931,684.60 48.45 100.00 Err:509
F Pek. Waterprofing Talang Air Hujan, bitudin M2 130.00 223,880.00 29,104,400.00 32,014,840.00 130.00 100.00 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 - - Err:509 0.00


Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 ### Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

JUMLAH TOTAL TERMASUK PPN 10% Err:509 Err:509 Err:509 Err:509


KEMENTERIAN PUPR DIRJEN PERUMAHAN RAKYAT
SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

REKAP LAPORAN PROGRES BULAN KE -

1
REVIT RUSUN ASN PROVINSI MALUKU UTARA
MINGGU KE I - IV BULAN KE I (AGUSUTUS 2019)

KONTRAKTOR PELAKSANA
SATKER : SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA WAKTU MULAI KERJA : 6-Aug-19
PEKERJAAN : REVIT RUSUN ASN PROVINSI MALUKU UTARA PROGRESS WAKTU : 3-Sep-19 CV. NINI PERMAI
NO. KONTRAK : HK0203/SNVT-PnPMU/SP/REVIT.RUSUN-01/APBN/2019 REALISAI HARI KERJA : 28 HARI Kontraktor - Leveransir - Jasa Konsturksi
PELAKSANA : CV. NINI PERMAI Provinsi Maluku
PENGAWAS : CV. RANI ENGINEERING SISA WAKTU KERJA : 122 HARI KONSULTAN PENGAWAS
LOKASI : PROVINSI MALUKU UTARA (SOFIFI - WEDA - JAILOLO)
ALOKASI WAKTU : 150 HARI, 21 MINGGU, 5 BULAN PROGRESS KERJA : Err:509 % CV. RANI
ENGINEERING

120.00

100.00

80.00
PROGRES PEKERJAAN (%)

60.00 RUSUS SOFIFI


RUSUS WEDA
RUSUS JAILOLO

40.00

20.00

-
PEK. PERRSIAPAN PEK. WATERPROFING PEK. KUSEN PINTU PEK. PLAFOND PEK. UTILITAS PEK. PENGECATAN PEK. ATAP VOID PEK. LUAR GEDUNG PEK. TAMBAHAN
& DINDING JENDELA
20.00

-
PEK. PERRSIAPAN PEK. WATERPROFING PEK. KUSEN PINTU PEK. PLAFOND PEK. UTILITAS PEK. PENGECATAN PEK. ATAP VOID PEK. LUAR GEDUNG PEK. TAMBAHAN
& DINDING JENDELA

REALISASI RUSUN ASN SOFIFI REALISASI RUSUN ASN WEDA REALISASI RUSUN ASN JAILOLO

PERSENTASE REALISASI PERSENTASE REALISASI PERSENTASE REALISASI


NO URAIAN PEKERJAAN TERHADAP TERHADAP TERHADAP TERHADAP TERHADAP TERHADAP
JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
KONTRAK KONTRAK KONTRAK KONTRAK KONTRAK KONTRAK
(%) (%) (%) (%) (%) (%)

I PEK. PERRSIAPAN 15,884,825.00 Err:509 100.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II PEK. WATERPROFING & DINDING Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
III PEK. KUSEN PINTU JENDELA Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IV PEK. PLAFOND Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
V PEK. UTILITAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VI PEK. PENGECATAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
VII PEK. ATAP VOID Err:509 Err:509 Err:509 - - - - - -
VIII PEK. LUAR GEDUNG Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
IX PEK. TAMBAHAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
X PEK. TAMBAHAN KANTOR KEJAKSAAN - - - - Err:509 Err:509 - - -

JUMLAH Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
LAMPIRAN :
Nomor : 07.A .01/BA-KL.Neg/PP13-BP2JK.WIL-MU/401686/APBN/2019
Tentang Negosiasi Harga

REKAP PEKERJAAN REVIT RUSUN ASN PROVINSI MALUKU UTARA

JANGKA WAKTU PELAKSANAAN


JUMLAH BOBOT
No. URAIAN PEKERJAAN BULAN KE I BULAN KE II BULAN KE III BULAN KE IV BULAN KE V KET
HARGA %
M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4 M1 M2 M3 M4
REVIT RUMAH SUSUN ASN PEMDA PROVINSI MALUKU UTARA (SOFIFI)
I PEKERJAAN PERSIAPAN 15,884,825 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100.00
II PEKERJAAN PERBAIKAN LANTAI, DINDING & WATERPROFING Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 90.00
III PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA Err:509 Err:509 Err:509 Err:509 80.00
IV PEKERJAAN PERBAIKAN PLAFOND Err:509 Err:509 Err:509 Err:509 Err:509 70.00
V PEKERJAAN PERBAIKAN UTILITAS Err:509 Err:509 Err:509 Err:509 Err:509 60.00
VI PEKERJAAN PENGECATAN KEMBALI Err:509 Err:509 Err:509 Err:509 Err:509 50.00
VII PEKERJAAN ATAP VOID Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 40.00
VIII PEKERJAAN LUAR GEDUNG Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 30.00
IX PEKERJAAN TAMBAHAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 20.00
JUMLAH Err:509 Err:509
BOBOT RENCANA MINGGUAN (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT RENCANA KUMULATIF (%) ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### Err:509

REVIT RUMAH SUSUN ASN PEMDA HALMAHERA TENGAH (WEDA)


I PEKERJAAN PERSIAPAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100.00
II PEKERJAAN PERBAIKAN LANTAI, DINDING & WATERPROFING Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 90.00
III PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA Err:509 Err:509 Err:509 Err:509 80.00
IV PEKERJAAN PERBAIKAN PLAFOND Err:509 Err:509 Err:509 Err:509 Err:509 70.00
V PEKERJAAN PERBAIKAN UTILITAS Err:509 Err:509 Err:509 Err:509 Err:509 60.00
VI PEKERJAAN PENGECATAN KEMBALI Err:509 Err:509 Err:509 Err:509 Err:509 50.00
VII PEKERJAAN LUAR GEDUNG Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 40.00
VIII PEKERJAAN TAMBAHAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 30.00
JUMLAH Err:509 Err:509
BOBOT RENCANA MINGGUAN (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT RENCANA KUMULATIF (%) ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### Err:509

REVIT RUMAH SUSUN ASN PEMDA HALMAHERA BARAT (JAILOLO)


I PEKERJAAN PERSIAPAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 100.00
II PEKERJAAN PERBAIKAN LANTAI, DINDING & WATERPROFING Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 90.00
III PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA Err:509 Err:509 Err:509 Err:509 80.00
IV PEKERJAAN PERBAIKAN PLAFOND Err:509 Err:509 Err:509 Err:509 Err:509 70.00
V PEKERJAAN PERBAIKAN UTILITAS Err:509 Err:509 Err:509 Err:509 Err:509 60.00
VI PEKERJAAN PENGECATAN KEMBALI Err:509 Err:509 Err:509 Err:509 Err:509 50.00
VII PEKERJAAN LUAR GEDUNG Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 40.00
VIII PEKERJAAN TAMBAHAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 30.00
JUMLAH Err:509 Err:509
BOBOT RENCANA MINGGUAN (%) Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
BOBOT RENCANA KUMULATIF (%) ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### Err:509
KEMENTERIAN PUPR DIRJEN PERUMAHAN RAKYAT
SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

LAPORAN BACKUP DATA HARIAN HARI KE -


REVIT RUSUN ASN PROVINSI MALUKU UTARA
TA. 2019

PEKERJAAN TAMBAHAN
LOKASI RUSUN : HARI : TGL : BLN : KONTRAKTOR PELAKSANA

CV. NINI PERMAI


Kontraktor - Leveransir - Jasa Konsturksi
SATKER : SNVT PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA WAKTU MULAI KERJA : 6-Aug-19 Provinsi Maluku
EKERJAAN : REVIT RUSUN ASN PROVINSI MALUKU UTARA WAKTU BERAKHIR KERJA : 4-Dec-19 KONSULTAN PENGAWAS
KONTRAK : HK0203/SNVT-PnPMU/SP/REVIT.RUSUN-01/APBN/2019 START ACTION : 1-Sep-19
LAKSANA : CV. NINI PERMAI REALISASI WAKTU KERJA : 120 HARI CV. RANI
LAKSANA : CV. RANI ENGINEERING SISA WAKTU KERJA : 94 HARI ENGINEERING
LOKASI : PROVINSI MALUKU UTARA (SOFIFI - WEDA - JAILOLO)
NO ITEM PEKERJAAN SAT DIMENSI & VOLUME PEKERJAAN

__________._____________________ 2019
MENGETAHUI DIBUAT OLEH :
KONSULTAN PENGAWAS PELAKSANA PEKERJAAN
CV. RANI ENGINEERING CV. NINI PERMAI

_________________________________________ _____________________________________________
_________________________________________ _____________________________________________
C. HARGA SATUAN DASAR BAHAN DAN MATERIAL

STANDAR BIAYA BAHAN/MATERIAL BANGUNAN

HARGA
SPESIFIKASI
NO BAHAN / MATERIAL BAHAN SAT SATUAN HARGA
KONTRAKTUAL

A. Agregat Kasar, Bahan Perekat & Bahan Jadinya


1 Pasir Urug m3 237,518.33 231,556.62
2 Tanah Urug Pilihan m3 183,900.33 179,284.43
3 Sirtu m3 239,870.00 233,849.26
4 Pasir Teras m3 180,000.00 175,482.00
5 Pasir Pasang Kali m3 206,946.67 201,752.31
6 Pasir Beton m3 289,255.00 281,994.70
7 Abu Batu m3 298,661.67 291,165.26
8 Koral Beton m3 216,353.33 210,922.86
9 Batu Gosok (Apung) Kg 29,913.20 29,162.38
10 Batu Pecah Mesin 1/2 m3 315,123.33 307,213.74
11 Batu Pecah Mesin 2/3 m3 348,752.17 339,998.49
12 Batu Pecah Mesin 3/5 m3 293,958.33 286,579.98
13 Batu Pecah Mesin 5/7 m3 283,305.28 276,194.32
14 Batu Belah Pondasi m3 265,738.33 259,068.30
15 Batu Bronjol (Untuk Bronjong) m3 309,009.00 301,252.87
16 Batu Koral Beton Kali m3 316,534.33 308,589.32
17 Batu Tempel Hitam m2 266,208.67 259,526.83
18 Batu Pinggir Beton 10 x 20 x 35 buah 24,692.50 24,072.72

19 Batu Pinggir Beton 15 x 35 x 50 K-225 buah 88,893.00 86,661.79


20 Batu Telor m3 124,168.00 121,051.38
21 Batako Kecil 8 x 10 x 20 buah 2,586.83 2,521.90
22 Batako Besar 8 x 20 x 30 buah 3,527.50 3,438.96
23 Con Block 8 x 20 x 40 buah 7,407.75 7,221.82
24 Bata Merah Bakar Kelas I buah 1,152.32 1,123.39
25 Bata Merah Bakar Kelas II buah 905.39 882.67
26 Bata Merah Oven (Klingker) buah 1,105.28 1,077.54
27 Bata Ringan buah 9,222.50 8,991.02
28 Rooster Beton 20 x 20 buah 13,263.40 12,930.49
29 Rooster Beton 30 x 30 buah 9,877.00 9,629.09
30 Rooster Jalusi 39 x 18,5 x 9 buah 11,993.50 11,692.46
31 Rooster Motif 20 x 20 buah 25,398.00 24,760.51
32 Rooster Polos 20 x 20 buah 20,812.25 20,289.86
33 Rooster Silang 20 x 20 buah 23,634.25 23,041.03
34 Rooster Espana buah 31,747.50 30,950.64
35 Rooster / Bata Kerawang buah 8,254.35 8,047.17
36 Rooster Keramik 30 x 30 buah 49,385.00 48,145.44
37 Rooster Keramik 20 x 20 buah 35,275.00 34,389.60
38 Rooster Keramik 18 x 18 buah 33,158.50 32,326.22
39 Grass Block 20 x 20 buah 21,494.23 20,954.73
40 Grass Block 30 x 30 buah 24,974.70 24,347.84
41 Paving Blok Natural 8 cm m2 114,667.27 111,789.12
42 Paving Blok Warna 8 cm m2 134,374.23 131,001.44
43 Paving Blok Natural 6 cm m2 97,594.17 95,144.55
44 Paving Blok Warna 6 cm m2 112,174.50 109,358.92
45 Canstin Paving Blok m' 110,481.30 107,708.22
46 Semen PC/ 50 Kg zak 82,000.00 79,941.80
47 Semen Putih zak 130,517.50 127,241.51
48 Semen Mortar Utama (MU) Zak 84,660.00 82,535.03
49 Kanstin Jalan Ukuran Besar (Bina Marga) 1 63,368.50
buah = 60 cm buah 65,000.00
50 -
K550, Tanpa Pompa
Readymix Beton m3
51 (Selang) 1,622,650.00 1,581,921.49
K500, Tanpa Pompa
Readymix Beton (Selang) m3
52 1,552,100.00 1,513,142.29
K400, Tanpa Pompa
Readymix Beton (Selang) m3
53 1,340,450.00 1,306,804.71
K350, Tanpa Pompa
Readymix Beton (Selang) m3
54 1,251,086.67 1,219,684.39
K300, Tanpa Pompa
Readymix Beton (Selang) m3
55 1,213,460.00 1,183,002.15
K250, Tanpa Pompa
Readymix Beton (Selang) m3
56 1,171,130.00 1,141,734.64
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
K225, Tanpa Pompa
Readymix Beton (Selang) m3
57 1,145,261.67 1,116,515.60
K175, Tanpa Pompa
Readymix Beton (Selang) m3
58 1,126,448.33 1,098,174.48
K125, Tanpa Pompa
Readymix Beton (Selang) m3
59 1,072,360.00 1,045,443.76
60 Kapur Pasang/kapur Tembok m3 485,054.77 472,879.89
61 Kapur Sirih kg 13,169.33 12,838.78
62 Semen warna kg 13,639.67 13,297.31
63 Tanah Liat m3 76,723.13 74,797.37
64 Air liter 689.47 672.16
65 Formite/spacer buah 28,220.00 27,511.68
66 Hollow/Con Blok 8 x 20 x 40 buah 5,538.18 5,399.17
67 Hollow/Con Blok 8 x 15 x 40 buah 6,490.60 6,327.69
68 Hollow/Con Blok 8 x 10 x 40 buah 5,996.75 5,846.23
69 Semen Nat kg 9,000.00 8,774.10
70 Kapur padam m3 82,300.00 80,234.27
71 Semen merah m3 300,000.00 292,470.00
72 kerikil kg 1,700.00 1,657.33
73 Batu Granit kg 3,900.00 3,802.11
74 Batu Teraso kg 2,400.00 2,339.76
75 alat bantu lot 66,000.00 64,343.40

B. Laburan, Pengisi dan Alatnya


1 Plamir Tembok kg 51,148.75 49,864.92
2 Cat Tembok ICI Eksterior (Beton) liter 130,517.50 127,241.51
Cat Tembok ICI Interior (Plafon dan 89,412.95
3 Dinding) liter 91,715.00
-
4 Cat Tembok Vinilex Kg 65,000.00 63,368.50
5 Cat dasar ICI untuk Interior (2 pelapis) liter 138,278.00 134,807.22
6 Cat Tembok Sanlex kg 21,635.33 21,092.28
7 Cat dasar kg 33,581.80 32,738.90
8 Cat Tahan Asam liter 126,990.00 123,802.55
9 Cat Genteng liter 65,611.50 63,964.65
10 Weatershield liter 303,365.00 295,750.54
Pelapis Alkali ICI (Cat Dasar Beton
11 Eksterior) kg
190,485.00 185,703.83
12 Cat Marka/Spotlight kg 117,254.10 114,311.02
13 Water Profing Emulsion kg 90,304.00 88,037.37
14 Water Profing Membrance ml 112,880.00 110,046.71
15 Rol Cat Tembok buah 35,275.00 34,389.60
16 Kape Tembok buah 12,699.00 12,380.26
17 Kape Kayu buah 10,582.50 10,316.88
18 Soligneum 1 blek kg 39,508.00 38,516.35
19 Plincote m3 38,449.75 37,484.66
20 Pengawetan Kayu m3 423,300.00 412,675.17
21 Pengopenan Kayu buah 634,950.00 619,012.76
22 Kwas 3" buah 18,343.00 17,882.59
23 Oker bks 25,398.00 24,760.51
24 Oyan bks 2,822.00 2,751.17
25 Oten (Pewarna Plitur) liter 5,644.00 5,502.34
26 Spirtus kg 14,815.50 14,443.63
27 Bahan Pelitur Kripik (Sirlak India) kg 64,906.00 63,276.86
28 Dempul Lilin kg 38,802.50 37,828.56
29 Dempul Plitur kg 43,741.00 42,643.10
30 Dempul Halus / Impra (Wood Filler) liter 38,097.00 37,140.77
31 Dempul Jadi kg 35,275.00 34,389.60
32 Politur liter 64,906.00 63,276.86
33 Politur Jadi liter 66,317.00 64,652.44
34 Terpentin kg 20,459.50 19,945.97
35 Tiner A kg 28,220.00 27,511.68
36 Tiner B liter 23,987.00 23,384.93
37 Kumpon lbr 93,831.50 91,476.33
38 Melamik kg 67,728.00 66,028.03
39 Dempul Plastik kg 61,378.50 59,837.90
40 Dempul Duco kg 40,919.00 39,891.93
41 Ampelas lbr 4,233.00 4,126.75
42 Dempul kayu cap Kucing kg 31,747.50 30,950.64
43 Meni Kayu / Besi kg 24,692.50 24,072.72
44 Sincromat kg 46,563.00 45,394.27
45 Cat Kayu Sieve liter 68,786.25 67,059.72
46 Cat Besi liter 65,258.75 63,620.76
47 Cat Besi Duco Danaglos / ICI buah 112,880.00 110,046.71
48 Cat Bron kg 88,187.50 85,973.99
49 Karet Lis buah 21,165.00 20,633.76
50 Minyak Cat kg 35,275.00 34,389.60
51 Glass Beet kg 25,398.00 24,760.51
52 Residu liter 35,275.00 34,389.60
54 Vernis ltr 104,300.00 101,682.07
55 Kuas Roll 9" buan 25,000.00 24,372.50
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 5 s/d 7 btg 15,000.00 14,623.50
2 Bambu 7 s/d 10 btg 20,000.00 19,498.00
3 Bambu Gombong btg 53,712.07 52,363.89
Kayu Samarinda Kls
4 Kayu Kamper Singkil / kapur II m3
8,867,664.67 8,645,086.28
5 Kayu Balok Borneo Super m3 6,100,223.33 5,947,107.73
6 Kayu Papan Borneo Super m3 6,255,433.33 6,098,421.96
7 Kayu Balok Kamper Medan (Kruing) m3 8,075,623.33 7,872,925.19
8 Kayu Papan Kamper Medan (Kruing) m3 8,748,200.00 8,528,620.18
9 Kayu Balok Kamper Banjar m3 8,040,348.33 7,838,535.59
10 Kayu Papan Kamper Banjar m3 8,604,748.33 8,388,769.15
11 Kayu Balok Kamper Samarinda m3 10,606,016.67 10,339,805.65
12 Kayu Papan Kamper Samarinda m3 11,290,822.00 11,007,422.37
13 Kayu Balok Rasamala m3 3,922,580.00 3,824,123.24
14 Kayu Jati Jatim Tua dia. 40 cm m3 14,506,961.33 14,142,836.60
15 Kayu Jati Jateng Tua 40 cm m3 22,719,922.00 22,149,651.96
16 Kayu Jati Jabar Tua dia. 40 cm m3 11,982,212.00 11,681,458.48

17 Kayu Jati Jabar Tua dia. 40 cm Kebawah m3 10,380,021.50 10,119,482.96


Segeng, Mahoni,
18 Kayu Hutan Kelas I m3
Laban 3,527,500.00 3,438,959.75

19 Kayu Balok Albasia Kayu Balok Albasia m3 2,822,000.00 2,751,167.80

20 Kayu Papan Albasia Kayu Papan Albasia m3 2,963,100.00 2,888,726.19


21 Dolken 5 s/d 7 Dolken 5 s/d 7 btg 21,306.10 20,771.32
22 Dolken 7 s/d 10 Dolken 7 s/d 10 btg 43,458.80 42,367.98
23 List Profil Kamper 1 cm 1 cm m' 11,852.40 11,554.90
24 List Profil Kamper 2 cm 2 cm m' 14,251.10 13,893.40
25 List Profil Kamper 4 cm 4 cm m' 15,521.00 15,131.42
26 List Profil Kamper 5 cm 5 cm m' 29,866.17 29,116.53
27 List Profil Kamper 10 cm 10 cm m' 55,029.00 53,647.77
28 Pegangan Tangga Profil Jati m' 177,550.83 173,094.31
29 Pegangan Tangga Profil Kamper m' 68,433.50 66,715.82
30 Kayu Kaso 4/6 m3 4,938,500.00 4,814,543.65
31 Kayu Kaso 5/7 m3 4,938,500.00 4,814,543.65
32 Kayu Reng 2/3 Borneo Super m' 22,000.00 21,447.80
33 Kayu Reng 2/3 Kamper Banjar m' 10,000.00 9,749.00
34 Kayu Reng 3/4 Kamper Banjar m' 35,000.00 34,121.50
35 Kayu Papan Terentang m3 3,019,540.00 2,943,749.55
36 Kayu Balok Terentang m3 2,222,325.00 2,166,544.64
37 Batang Kelapa btg 846,600.00 825,350.34
38 Tali Ijuk kg 21,165.00 20,633.76
39 Lapisan Ijuk tebal 10 cm tebal 10 cm m2 21,165.00 20,633.76
40 Venetion Blind m2 268,090.00 261,360.94
41 Vertikal Blind m2 615,196.00 599,754.58
42 Kayu papan Kelas I m3 3,000,000.00 2,924,700.00
43 Kayu Balok Kelas I m3 3,000,000.00 2,924,700.00
44 Kayu Papan Kelas II m3 2,600,000.00 2,534,740.00
45 Kayu Balok Kelas II m3 2,500,000.00 2,437,250.00
46 Kayu papan Kelas III m3 1,500,000.00 1,462,350.00
47 Kayu Balok Kelas III m3 1,500,000.00 1,462,350.00
Dolken Kayu Galam Panjang 4 meter 22,000.00
48 ukuran 8-10 btg 21,447.80
49 Kayu Papan 3/20 4 m m3 2,100,000.00 2,047,290.00

D. BAHAN PENUTUP RANGKA PLAFOND


1 Plafond Enternit 4 mm m2 28,220.00 27,511.68
2 Plafond Hardpleks 5 mm 120 x 240 lbr 80,427.00 78,408.28
3 Plafond Asbes Semen 5 mm m2 72,666.50 70,842.57
4 Plafond Asbes Semen 3,5 mm m2 22,576.00 22,009.34
120 x 240 t = 9 mm
5 Gypsum ex DN lbr 88,187.50 85,973.99
120 x 240 t = 9 mm
6 Gypsum ex Luar lbr 107,236.00 104,544.38
7 Tepung Gypsum kg 70,550.00 68,779.20
8 Acustik Amstrong 60 x 120 lbr 208,122.50 202,898.63
9 Cotton Plester buah 14,110.00 13,755.84
(120 x 240) cm, t =
10 GRC 4 mm lbr 72,666.50 70,842.57
11 Cornice Coumpound zak 119,935.00 116,924.63
12 List Gypsum m' 5,644.00 5,502.34
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

E. BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr 67,492.83 65,798.76
2 Triplek 4 mm 120 x 240 lbr 84,895.17 82,764.30

3 Triplek 4 mm ukuran pintu lbr 64,906.00 63,276.86


4 Triplek 6 mm 120 x 240 lbr 125,579.00 122,426.97
5 Triplek 9 mm 120 x 240 lbr 184,841.00 180,201.49
6 Jabar Wood 4 mm lbr 131,223.00 127,929.30
7 Bilik Bambu (Tanpa Kulit) m2 25,398.00 24,760.51
8 Bilik Bambu (dengan Kulit) m2 32,453.00 31,638.43
9 Bilik Bambu Hitam Variasi m2 40,213.50 39,204.14
10 Wall Paper (kelas Biasa) m2 35,275.00 34,389.60

(kelas
11 Wall Paper Menengah/sedang) m2 88,187.50 85,973.99
12 Wall Paper (kelas Baik) m2 134,045.00 130,680.47
13 Multiplek 9 mm 120 x 240 lbr 194,718.00 189,830.58

14 Multiplek 12 mm 120 x 240 lbr 255,391.00 248,980.69

15 Multiplek 18 mm 120 x 240 lbr 347,811.50 339,081.43

16 Plywood 18 mm 120 x 240 lbr 401,429.50 391,353.62


17 Plywood 9 mm 120 x 240 lbr 176,375.00 171,947.99
18 Plywood 4 mm 120 x 240 lbr 236,190.82 230,262.43
19 TeakWood 3 mm 120 x 240 lbr 93,126.00 90,788.54
20 TeakWood 4 mm 120 x 240 lbr 165,792.50 161,631.11
3 mm 120 x 240 Uk.
21 TeakWood Pintu lbr 134,045.00 130,680.47

22 TeakWood ukuran pintu 4 mm lbr 124,873.50 121,739.18


23 Tacon (Bahan Bakar) m2 131,928.50 128,617.09
24 Supercon m2 74,783.00 72,905.95
25 Melamin 4 mm 120 x 240 lbr 130,517.50 127,241.51
26 Melamin TOK 4 mm lbr 186,252.00 181,577.07
27 Formika 120 x 240 lbr 227,171.00 221,469.01
28 Formika Ukuran Pintu lbr 172,142.00 167,821.24
29 Formika Warna 4" x 8" lbr 315,076.30 307,167.88

F. BAHAN LANTAI DAN PELAPIS DINDING


1 Tegel PC 20 x 20 20 x 20 buah 1,566.21 1,526.90
2 Plin Tegel PC 20 x 20 20 x 20 buah 1,298.12 1,265.54
3 Tegel PC 30 x 30 30 x 30 buah 3,200.93 3,120.59
4 Plin Tegel PC 15 x 30 15 x 30 buah 999.46 974.37
5 Tegel Warna 20 x 20 20 x 20 buah 3,703.88 3,610.91
6 Plin Tegel Warna 10 x 20 10 x 20 buah 1,500.00 1,462.35
7 Tegel Warna 30 x 30 30 x 30 buah 4,233.00 4,126.75
8 Plin Tegel Warna 15 x 30 15 x 30 buah 1,148.60 1,119.77
9 Tegel Wafel PC 20 x 20 20 x 20 buah 4,671.82 4,554.56
10 Tegel Wafel Warna 20 x 20 20 x 20 buah 3,527.50 3,438.96
11 Tegel Badak PC 30 x 30 30 x 30 buah 5,323.70 5,190.08
11 x 11 warna
12 Poslin 11 x 11 warna standar DN standar DN buah 1,411.00 1,375.58
11 x 11 Warna
13 Poslin 11 x 11 Warna Khusus DN Khusus DN buah 1,411.00 1,375.58

14 Keramik 10 x 20 dan 20 x 20
KW 1 DN
Putih/polos Mulia buah 3,094.75 3,017.07
10 x 20 KW 1
15 Keramik Corak/Warna/ Anti
slip Mulia buah 2,920.00 2,846.71

20 x 20 (KM) KW 1
16 Keramik DN
Corak/Warna/Anti
Slip Mulia buah 2,822.00 2,751.17
20 x 20 (KM) KW 1
17 Keramik DN Putih polos
Mulia buah 2,892.52 2,819.92
20 x 25 Dinding
18 Keramik (KM) KW 1 DN
Corak Mulia buah 3,703.86 3,610.89
19 Keramik 30 x 30 KW 1 Dn
Putih Polos Mulia buah 5,836.41 5,689.92
30 x 30 KW 1
20 Keramik Warna/Corak (Anti
Slip) Mulia buah 7,568.09 7,378.13
40 x 40 KW 1 DN
21 Keramik Putih Polos Mulia buah 11,288.00 11,004.67
40 x 40 KW 1 DN
22 Keramik Warna/Corak (Anti
Slip) Mulia buah 13,639.67 13,297.31
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

10 x 20 dan 20 x 20
23 Keramik KW 1 DN
Putih/polos Roman
buah 2,822.00 2,751.17
10 x 20 KW 1 DN
24 Keramik Corak/Warna/Anti
Slip Roman buah 3,259.41 3,177.60
20 x 20 (KM) KW 1
DN
25 Keramik
Corak/Warna/Anti
Slip Roman
buah 3,866.14 3,769.10
20 x 20 (KM) KW 1
26 Keramik Dn Putih Polos
Roman buah 5,079.60 4,952.10
20 x 25 Dinding
27 Keramik (KM) KW 1 DN
Coarak Roman buah 3,950.80 3,851.63
Keramik 30 x 30 KW 1 DN
28 Polos Roman buah 9,428.05 9,191.41

30 x 30 KW 1 DN
29 Keramik Warna/Corak (Anti
Slip) Roman
buah 7,439.82 7,253.08
Keramik 40 x 40 KW 1 DN
30 Polos Roman buah 11,523.17 11,233.94

40 x 40 KW 1 DN
31 Keramik Warna/Corak (Anti
Slip) Roman
buah 8,979.09 8,753.71

Keramik 60 x 60 (Masterina
32 Polos) buah 30,571.67 29,804.32

Keramik 60 x 60 (Masterina
33 Corak) buah 37,302.14 36,365.86

Keramik 60 x 60 (Masterina
34 Muda) buah 50,448.42 49,182.16
Keramik 60 x 60 (Masterina
35 Tua) buah 52,186.78 50,876.89
Keramik 60 x 60 (Roman
36 Polos) buah 40,416.67 39,402.21
Keramik 60 x 60 (Roman
37 Corak) buah 47,551.17 46,357.64
Keramik
38 60 x 60 (KIA Polos) buah 31,000.00 30,221.90
Keramik
39 60 x 60 (KIA Corak) buah 33,028.69 32,199.67
Keramik 60 x 60 (Mulia
40 Polos) buah 29,153.61 28,421.85
Keramik 60 x 60 (Mulia
41 Corak) buah 32,775.18 31,952.52
42 Plin Keramik 60 x 60 buah 48,021.97 46,816.62

10 x 60 cm
43 Plin Ubin Granito (berbagai ukuran)
buah 5,910.40 5,762.05
44
Stepnosing Keramik (Berbagai ukuran) buah 6,000.00 5,849.40
45 Stepnosing Granito (kelas Baik) buah 6,036.43 5,884.92
46 Vinyl Lantai Dasar m2 86,917.60 84,735.97
47 Karpet kelas baik LN m2 1,534,095.64 1,495,589.84
48 Karpet Kelas sedang LN m2 511,035.98 498,208.98
49 Parquet Jati m2 468,159.92 456,409.11
50 Stairnosing Keramik 10/20 buah 1,675.35 1,633.30
51 Stairnosing Fiber m 24,880.16 24,255.67
52 Taraso Kerang 30 x 30 m2 41,503.15 40,461.42
53 Plin Taraso 10 x 30 buah 34,441.10 33,576.63
54 Graniit Alam LN Ukuran Besar m2 1,975,400.00 1,925,817.46
55 Graniit Alam LN Ukuran Kecil m2 917,150.00 894,129.54
56 Graniit Alam DN Ukuran Besar m2 1,889,075.02 1,841,659.24
57 Graniit Alam DN Ukuran Kecil m2 1,650,130.64 1,608,712.36
ukuran 40 x 40
58 Granito Tile Essenza Polis m2
113,820.67 110,963.77
59 Granito Tile Essenza ukuran 30 x 30 m2 93,126.00 90,788.54
60 Granito Tile Essenza ukuran 40 x 40 m2
Unpolis 95,242.50 92,851.91
61 Marmer m2 660,065.80 643,498.15
Lampung ukuran
62 Marmer Alam Besar m2 772,522.50 753,132.19
Lampung ukuran
63 Marmer Alam Kecil m2 613,785.00 598,379.00
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
64 Marmer Alam ukuran Besar m2 518,542.50 505,527.08
65 Marmer Alam ukuran Kecil m2 317,475.00 309,506.38
66 Marmer Sintesis m2 285,727.50 278,555.74
67 Granito Tile Essenza 60 x 60 Polis m2 677,280.00 660,280.27
68 Granito Tile Essenza 60 x 60 Unpolis m2 571,455.00 557,111.48
69 Batu Tempel Hitam m2 335,393.29 326,974.92
70 Bata Karawang buah 23,793.69 23,196.47
71 Campuran untuk Kedap Air (AM) liter 493,800.62 481,406.22
72 Plin Keramik 10 x 20 buah 18,343.00 17,882.59
73 Plin Keramik 10 x 25 buah 18,343.00 17,882.59
74 Plin Keramik 10 x 30 buah 18,343.00 17,882.59
75 Plin Keramik 10 x 40 buah 5,975.59 5,825.60
76 Plin Keramik 15 x 30 buah 6,410.17 6,249.28
77 Plin Keramik 15 x 40 buah 2,328.15 2,269.71
78 Plin Granito 10 x 30 buah 13,472.23 13,134.08
79 Plin Granito 10 x 40 buah 14,993.29 14,616.95
80 Plin Granito 15 x 30 buah 16,514.34 16,099.83
81 Plin Granito 15 x 40 buah 21,294.81 20,760.31
82 Keramik Artistik 10 X 20 Cm buah 960.00 935.90
83 Keramik Artistik 5 X 20 Cm buah 1,860.00 1,813.31
84 Ubin Keramik 10 x 20 buah 1,050.00 1,023.65
560.00
85 Ubin Keramik (10 x 10) atau (5 x 20) cm buah 545.94
86 Ubin Keramik 33 x 33 cm buah 4,500.00 4,387.05
Ubin Keramik 10 x 33 cm, variasi/border 1,400.00
87 buah 1,364.86
88 Mozaik 30 x 30 Cm buah 30,000.00 29,247.00
89 Ubin Teraso 30 x 30 Cm buah 5,348.00 5,213.77
90 underlayer / Rubber Corrugated m2 85,000.00 82,866.50
91 Gymfloor m2 125,000.00 121,862.50
92 Vinyl buah 17,000.00 16,573.30
93 Vinyl karet (15 x 30) cm buah 55,000.00 53,619.50
94 Vinyl Kayu Kelas II (2 x 10) cm m2 7,750,000.00 7,555,475.00
95 Floor hardener kg 28,000.00 27,297.20
96 Plin Keramik Artistik 10 x 10 cm buah 10,000.00 9,749.00
97 Plin Keramik Artistik 5 X 20 Cm buah 5,000.00 4,874.50
98 Plin Teraso 10 X 30 Cm buah 3,480.00 3,392.65
99 Internal cove (5 x 5 x20) cm buah 6,500.00 6,336.85
-
G. BAHAN SALURAN AIR KOTOR / BERSIH
1 Grafel U 20 cm' m' 42,330.00 41,267.52
2 Grafel U 30 cm' m' 56,440.00 55,023.36
3 Grafel U 40 cm' m' 126,990.00 123,802.55
4 Buis Beton 20 cm (1 m') m' 66,787.33 65,110.97
5 Buis Beton 30 cm (1 m') m' 92,890.83 90,559.27
6 Buis Beton 40 cm (1 m') m' 122,757.00 119,675.80
7 Buis Beton 50 cm (1 m') stk 169,320.00 165,070.07
8 Buis Beton 60 cm (1 m') stk 221,997.33 216,425.20
9 Buis Beton 100 cm (0.50 m') stk 564,400.00 550,233.56
10 Buis Beton 80 cm (0.50 m') stk 409,190.00 398,919.33
11 Buis Tanah 10 cm (0.50 m') stk 16,932.00 16,507.01
12 Buis Tanah 15 cm (0.50 m') stk 21,165.00 20,633.76
13 Buis Tanah 20 cm (0.50 m') stk 28,220.00 27,511.68
14 Buis Tanah 25 cm (0.50 m') stk 35,275.00 34,389.60
15 Injuk Gulung 9,524.25 9,285.19

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata-rata kg 15,000.00 14,623.50
U-39 / U-32 Rata-
2 Besi Beton rata kg 21,400.00 20,862.86
U-24 dia. 10 mm,
3 btg
Besi Beton panjang 12 m 65,000.00 63,368.50
U-24 dia. 12 mm,
4 btg
Besi Beton panjang 12 m 95,000.00 92,615.50
U-24 dia. 16 mm,
5 panjang 12 m btg
Besi Beton 165,000.00 160,858.50
U-24 dia. 19 mm,
6 panjang 12 m btg
Besi Beton 218,500.00 213,015.65
7 Pagar BRC lengkap tiang (tanpa Pondasi) m2
176,375.00 171,947.99
8 Bondek m2 184,135.50 179,513.70
9 Besi WF ex DN SII kg 13,686.70 13,343.16
10 Besi WF ex Jepang kg 29,008.75 28,280.63
11 Besi Profil Dn SII kg 15,521.00 15,131.42
12 Besi Profil ex LN kg 18,343.00 17,882.59
13 Besi C Lip Chanel kg 15,521.00 15,131.42
14 Ongkos Galfanis Besi kg 22,815.87 22,243.19
15 Kawat Beton kg 21,165.00 20,633.76
16 Kawat Duri kg 51,501.50 50,208.81
17 Kawat Pengikat m' 16,932.00 16,507.01
18 Kawat Bronjong 4 mm kg 31,747.50 30,950.64
19 Kawat Tembaga kg 37,038.75 36,109.08
20 Ram Nyamuk Hijau m2 32,100.25 31,294.53
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
21 Ram Kawat 1 x 1 (Putih) m2 21,517.75 20,977.65
22 Ram Ayam m2 20,106.75 19,602.07
23 Kawat Kasa 1 x 1 (Putih) m2 25,750.75 25,104.41
24 Kawat Harmonika 4 cm m2 38,802.50 37,828.56
25 Kawat Harmonika 2 cm m2 48,679.50 47,457.64
26 Kawat Las Listrik kg 38,802.50 37,828.56
27 Wiremess M8 m2 476,212.50 464,259.57
28 Wiremess M6 m2 297,015.50 289,560.41
29 Timah kg 35,275.00 34,389.60
30 Timah Hitam kg 56,440.00 55,023.36
31 Ram Nyamuk Alluminium m2 28,220.00 27,511.68

32 Plat Strip θ 2 x 30 mm (6 m') θ 2 x 30 mm (6 m') btg 45,152.00 44,018.68

33 Plat Strip θ 3 x 30 mm (6 m') θ 3 x 30 mm (6 m') btg 61,378.50 59,837.90


34 Plat Strip btg 49,108.44 47,875.82
35 Besi Strip kg 55,518.62 54,125.10
36 Plat Alluminium 0.2 mm 0.2 mm m2 82,543.50 80,471.66
37 Plat Alluminium 0.3 mm 0.3 mm m2 148,155.00 144,436.31
38 Plat Alluminium 0.4 mm 0.4 mm m2 180,608.00 176,074.74
39 Plat Alluminium 0.5 mm 0.5 mm m2 214,472.00 209,088.75
40 Plat Alluminium 0.6 mm 0.6 mm m2 248,336.00 242,102.77
41 Plat Alluminium 0.1 mm 0.1 mm m2 70,550.00 68,779.20
Kusen Aluminium Natural 1.3 mm t = 1,3 1.3 mm t = 1,3 mm
42 mm (4") (4") m'
75,000.00 73,117.50
Kusen Aluminium Warna 1.3 mm t = 1,3 1.3 mm t = 1,3 mm
43 m'
mm (4") (4") 85,000.00 82,866.50
Kusen Aluminium Natural 1.3 mm t = 1,3 1.3 mm t = 1,3 mm
44 m'
mm (3") (3") 60,000.00 58,494.00
Kusen Aluminium Warna 1.3 mm t = 1,3 1.3 mm t = 1,3 mm
45 mm (3") (3") m'
75,000.00 73,117.50
Daun Jendela Aluminium Natural (tanpa
46 kaca dan accesoris) m2
115,000.00 112,113.50
Daun Jendela Aluminium Warna (tanpa
47 kaca dan accesoris) m2
132,000.00 128,686.80
Daun Pintu Aluminium Natural (tanpa kaca
48 dan accesoris) m2
115,000.00 112,113.50
Daun Pintu Aluminium Natural (tanpa kaca
49 dan accesoris) m2
132,000.00 128,686.80
50 Pintu PVC (Kualitas Sedang) buah 450,000.00 438,705.00
51 Pintu PVC (Kualitas Baik) buah 750,000.00 731,175.00
Handle Aluminium (Tarikan Pintu
52 Aluminium) buah
352,750.00 343,895.98
53 Kait angin Aluminium ps 155,691.15 151,783.30
54 Karet Accesoris Kusen/Pintu Aluminium m'
30,638.45 29,869.43
55 Jalusi Aluminium m' 59,755.85 58,255.98
56 Sunscreen Aluminium m2 521,505.60 508,415.81

57 Seng Plat BJLS 30 60 cm (100 m') 30 60 cm (100 m') roll 21,165.00 20,633.76

58 Seng Plat BJLS 30 90 cm (100 m') 30 90 cm (100 m') roll 32,453.00 31,638.43
59 Plat Besi Tipis 1 mm 1 mm kg 19,754.00 19,258.17
60 Plat Besi Tipis 0.5 mm 0.5 mm kg 21,165.00 20,633.76
61 Plat Besi 2 mm s/d 5 mm 2 mm s/d 5 mm kg 16,932.00 16,507.01
62 Plat Besi 6 mm s/d 10 mm 6 mm s/d 10 mm kg 16,932.00 16,507.01
63 Plat Besi 10 mm keatas 10 mm keatas kg 16,932.00 16,507.01
64 Kabel Presstress polos kg 36,070.80 35,165.43
65 Jaring Kawat baja kg 100,498.48 97,975.96
66 Lem Kuning (Aibond) kg 88,893.00 86,661.79
67 Lem Fox kg 40,919.00 39,891.93
68 Lem Vinyl kg 28,220.00 27,511.68
69 Besi Strip Kaca Nako kg 50,086.27 48,829.10
70 Profil Aluminium m' 25,532.05 24,891.19
( 2 x 4 x 4 ) cm (400
71 Besi Hollow ( 2 x 4 x 4 ) cm (400 cm) cm) btg 15,521.00 15,131.42

72 Besi Hollow 4 x 4 cm (400 cm) 4 x 4 cm (400 cm) btg 6,114.33 5,960.86


73 Besi Rail Pengamanan kg 706,205.50 688,479.74
74 Jendela Besi m2 493,850.00 481,454.37
75 Jendela Besi Tahan Api m2 663,522.75 646,868.33
76 Pintu Gulung Besi m2 597,636.11 582,635.44
77 Pintu Rolling Door m2 455,036.92 443,615.49
78 Jendela Nako Kaca Ryben + Tralis 6 klips set 273,674.03 266,804.81
79 Jendela Nako Kaca Ryben + Tralis 7 klips set 304,172.80 296,538.06
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
80 Jendela Nako Kaca Ryben + Tralis 8 klips set 337,814.57 329,335.42
81 Jendela Nako Kaca Ryben + Tralis 10 klips set 471,450.38 459,616.97
82 Jendela Nako Kaca Bening + Tralis 4 klips set 209,300.69 204,047.24
83 Jendela Nako Kaca Bening + Tralis 5 klips set 206,739.72 201,550.55
84 Jendela Nako Kaca Bening + Tralis 6 klips set 244,106.53 237,979.45
85 Jendela Nako Kaca Bening + Tralis 7 klips set 313,136.18 305,276.46
86 Jendela Nako Kaca Bening + Tralis 8 klips set 333,507.49 325,136.45
87 Jendela Nako Kaca Bening + Tralis 10 klips set 424,887.38 414,222.70
88 Hollow 60 x 60 x 1.8 btg 156,917.31 152,978.69
89 Hollow 60 x 60 x 1.6 btg 314,300.25 306,411.31
90 Hollow 50 x 50 x 2.5 btg 220,962.60 215,416.44
91 Hollow 50 x 50 x 1.0 btg 117,338.76 114,393.56
92 Hollow 50 x 50 x 1.6 btg 205,723.80 200,560.13
93 Hollow 50 x 50 x 1.3 btg 156,959.64 153,019.95
94 Hollow 40 x 60 x 2.0 btg 217,914.84 212,445.18
95 Hollow 40 x 60 x 1.6 btg 198,104.40 193,131.98
96 Hollow 40 x 40 x 1.8 btg 167,626.80 163,419.37
97 Hollow 40 x 40 x 1.6 FL btg 234,444.71 228,560.14
98 Hollow 40 x 40 x 1.6 btg 164,579.04 160,448.11
99 Hollow 40 x 40 x 1.3 btg 124,958.16 121,821.71
100 Hollow 40 x 40 x 1.0 btg 102,099.96 99,537.25
101 Hollow 40 x 40 x 1.0 B btg 122,227.88 119,159.96

102 Hollow 40 x 40 x 0.8 / 4 m btg 174,029.21 169,661.08


103 Hollow 30 x 60 x 1.8 btg 198,104.40 193,131.98
104 Hollow 30 x 60 x 1.6 btg 182,865.60 178,275.67
105 Hollow 30 x 30 x 2.0 btg 131,053.68 127,764.23
106 Hollow 30 x 30 x 1.6 btg 121,910.40 118,850.45
107 Hollow 30 x 30 x 1.3 btg 92,956.68 90,623.47
108 Hollow 30 x 30 x 1.0 btg 68,574.60 66,853.38
109 Hollow 30 x 30 x 1.0 B btg 105,232.38 102,591.05
110 Hollow 30 x 30 x 1.0 C btg 116,058.28 113,145.21

111 Hollow 30 x 30 x 0.8 / 4 m btg 58,669.38 57,196.78


112 Hollow 20 x 40 x 1.8 btg 138,673.08 135,192.39
113 Hollow 20 x 40 x 1.8 B btg 140,211.07 136,691.77
114 Hollow 20 x 40 x 1.6 btg 122,672.34 119,593.26
115 Hollow 20 x 40 x 1.6 B btg 173,796.40 169,434.11
116 Hollow 20 x 40 x 1.3 btg 92,956.68 90,623.47
117 Hollow 20 x 40 x 1.3 B btg 165,827.78 161,665.50
118 Hollow 20 x 40 x 1.0 btg 89,908.92 87,652.21
119 Hollow 20 x 40 x 1.0 B btg 892,729.12 870,321.62

120 Hollow 20 x 40 x 0.8 / 4 m btg 60,955.20 59,425.22


121 Hollow 50 x 25 x 2.0 btg 175,246.20 170,847.52
122 Hollow 50 x 25 x 1.6 btg 146,292.48 142,620.54
123 Hollow 50 x 25 x 1.3 btg 115,814.88 112,907.93
124 Hollow 50 x 25 x 1.0 btg 85,337.28 83,195.31

125 Hollow 50 x 25 x 0.8 / 4 m btg 113,264.50 110,421.56


126 Hollow 20 x 20 x 2.0 btg 89,146.98 86,909.39
127 Hollow 20 x 20 x 1.6 btg 77,717.88 75,767.16
128 Hollow 20 x 20 x 1.3 btg 62,479.08 60,910.86
129 Hollow 20 x 20 x 1.0 btg 44,192.52 43,083.29

130 Hollow 20 x 20 x 0.8 / 4 m btg 32,904.52 32,078.62


131 Besi Siku L 30 x 30 x 3 kg 48,000.00 46,795.20
132 Scuare Tube m 24,100.00 23,495.09
133 Pintu Folding Door m2 429,990.00 419,197.25
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

Pengelasan teralis jendela,pintu,roster,void


134 ukuran (100 x 50) cm cm 150,000.00
146,235.00
135 Pengelasan pagar m2 350,000.00 341,215.00
136 Pengelasan kanopi m2 285,000.00 277,846.50
137 Pintu aluminium natural m2 211,800.00 206,483.82

138 Pintu aluminium swing + kaca polos 5 mm m 1,000,000.00 974,900.00


Pintu Frameless (tempered 12 mm polos)
139 floor hinge dorma BTS 84 m 3,000,000.00
2,924,700.00
Pintu fitting (tempered 12 mm polos) floor
140 hinge dorma BTS 84 m 3,750,000.00
3,655,875.00
powder coating aluminium berbagai warna m' 20,000.00
141 19,498.00
tirai (Venetion blind and vertical blind) m2 537,300.00
142 523,813.77
143 folding gate 0.5 mm m2 400,000.00 389,960.00
144 Baja Strip 0,2 X 2 cm btg 22,396.80 21,834.64
145 Besi Strip Kaca kg 50,710.00 49,437.18

I. BAHAN KACA
1 Kaca Polos 2 mm (ASAHI) m2 107,706.33 105,002.90
2 Kaca Polos 3 mm (ASAHI) m2 112,409.67 109,588.18
3 Kaca Polos 5 mm (ASAHI) m2 124,168.00 121,051.38
4 Kaca Polos 8 mm (ASAHI) m2 207,417.00 202,210.83
5 Kaca Polos Sanblas 5 mm m2 317,475.00 309,506.38
6 Kaca Biasa 6 mm m2 294,743.79 287,345.72
7 Kaca Reyband 5 mm (ASAHI) m2 169,320.00 165,070.07
8 Kaca Reyband 6 mm m2 310,420.00 302,628.46
9 Kaca Reyband 8 mm (ASAHI) m2 423,300.00 412,675.17
10 Kaca Reyband 12 mm (ASAHI) m2 846,600.00 825,350.34
11 Kaca Es / Susu 3 mm m2 137,882.92 134,422.06
12 Kaca Es / Susu 5 mm m2 229,804.00 224,035.92
13 Kaca Cermin 5 mm m2 285,727.50 278,555.74
14 Kaca Cermin 6 mm m2 277,049.85 270,095.90
15 Kaca Cermin 8 mm m2 333,329.00 324,962.44
16 Kaca Patri Lokal Terpasang (ASAHI) m2 2,058,973.53 2,007,293.29
17 Kaca Patri ex Luar Negeri Terpasang m2 5,284,195.00 5,151,561.71
18 Kaca 6 mm Gravver m2 1,844,177.00 1,797,888.16
19 Kaca Lukis Terpasang m2 138,439.59 134,964.75
20 Glass Block DN 20 x 20 (Kedawung) buah 32,453.00 31,638.43
21 Glass Block DN 20 x 20 ex LN buah 125,579.00 122,426.97
22 Sealant kg 197,540.00 192,581.75
23 Jendela Nako buah 49,385.00 48,145.44
-
J. BAHAN PAKU DAN MUR BAUT
1 Paku 1 cm s/d 3 cm kg 21,870.50 21,321.55
2 Paku 4 cm s/d 7 cm kg 16,932.00 16,507.01
3 Paku 8 cm s/d 15 cm kg 16,932.00 16,507.01
4 Paku Beton 2 cm s/d 5 cm buah 3,174.75 3,095.06
5 Paku Kait Lengkap buah 2,116.50 2,063.38
6 Paku Cacing kg 79,016.00 77,032.70
7 Besi Beugeul Kuda-kuda kg 22,576.00 22,009.34
8 Duk Angker buah 25,398.00 24,760.51

9 Angker Mur Baut dia. 19 / Panjang 60 cm buah 8,466.00 8,253.50


10 Mur Baut HTB dia. 19 s/d 16 (5 cm) buah 10,582.50 10,316.88
11 Mur Baut Biasa dia. 19 s/d 16 (5 cm) buah 7,055.00 6,877.92
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
12 Piser dia. 12 s/d 20 cm buah 14,110.00 13,755.84
13 Paku Sekrup 3" buah 1,058.25 1,031.69
14 Ramset / Dinabolt buah 4,233.00 4,126.75
15 Baut Besar buah 11,288.00 11,004.67
16 Baut Kecil buah 1,411.00 1,375.58
17 Paku GRC kg 36,686.00 35,765.18
18 Paku Gypsum kg 35,275.00 34,389.60
19 Sekrup Fixer buah 1,411.00 1,375.58
20 Paku Skrup 5 cm kg 13,000.00 12,673.70
21 Paku Seng kg 18,000.00 17,548.20
22 Cotton Plaster buah 67,650.00 65,951.99
23 Cornice Coumpound zak 91,300.00 89,008.37
24 Paku Hak Panjang 15 cm kg 13,300.00 12,966.17
-
K. BAHAN PERPIPAAN
1 Besi Pipa untuk Hydrant BSP 1" btg 224,349.00 218,717.84
2 Besi Pipa untuk Hydrant BSP 1.15" btg 256,802.00 250,356.27
3 Besi Pipa untuk Hydrant BSP 1.5" btg 304,776.00 297,126.12
4 Besi Pipa untuk Hydrant BSP 2" btg 410,601.00 400,294.91
5 Besi Pipa untuk Hydrant BSP 2.5" btg 701,972.50 684,352.99
6 Besi Pipa untuk Hydrant BSP 3" btg 809,208.50 788,897.37
7 Besi Pipa untuk Hydrant BSP 4" btg 1,077,298.50 1,050,258.31
8 Besi Pipa untuk Hydrant BSP 6" btg 2,225,147.00 2,169,295.81
9 Besi Pipa Hitam 1" t = 2 mm btg 138,905.90 135,419.36
10 Besi Pipa Hitam 2" t = 2 mm btg 270,206.50 263,424.32
11 Besi Pipa Hitam 3" t = 2 mm btg 465,747.58 454,057.32
12 Besi Pipa Hitam 4" t = 2 mm btg 565,928.58 551,723.78
13 Besi Pipa Hitam 6" t = 2 mm btg 1,030,030.00 1,004,176.25
14 Pipa GIP Medium A 1/2" (6 m') btg 211,650.00 206,337.59
15 Pipa GIP Medium A 3/4" (6 m') btg 268,090.00 261,360.94
16 Pipa GIP Medium A 1" (6 m') btg 306,892.50 299,189.50
17 Pipa GIP Medium A 1 1/4" (6 m') btg 380,970.00 371,407.65
18 Pipa GIP Medium A 1 1/2" (6 m') btg 359,805.00 350,773.89
19 Pipa GIP Medium A 1 3/4" (6 m') btg 486,795.00 474,576.45
20 Pipa GIP Medium A 2" (6 m') btg 684,335.00 667,158.19
21 Pipa GIP Medium A 2 1/2" (6 m') btg 846,600.00 825,350.34
22 Pipa GIP Medium A 4" (6 m') btg 1,502,715.00 1,464,996.85
23 Pipa GIP Medium A 3" (6 m') btg 1,171,130.00 1,141,734.64
24 Macam-macam Sambungan GIP 1/2" buah 9,524.25 9,285.19
25 Macam-macam Sambungan GIP 3/4" buah 11,993.50 11,692.46
26 Macam-macam Sambungan GIP 1" buah 17,284.75 16,850.90
27 Macam-macam Sambungan GIP 1 1/4" buah 23,281.50 22,697.13
28 Macam-macam Sambungan GIP1 1/2" buah 27,161.75 26,479.99
29 Macam-macam Sambungan GIP 1 3/4" buah 31,042.00 30,262.85
30 Macam-macam Sambungan GIP 2" buah 56,440.00 55,023.36
31 Macam-macam Sambungan GIP 2 1/2" buah 67,022.50 65,340.24
32 Macam-macam Sambungan GIP 3" buah 106,370.35 103,700.46
33 Macam-macam Sambungan GIP 4" buah 140,538.77 137,011.25
34 Pipa PVC RUCIKA type AW 1/2" btg 42,330.00 41,267.52
35 Pipa PVC RUCIKA type AW 3/4" btg 59,967.50 58,462.32
36 Pipa PVC RUCIKA type AW 1" btg 57,851.00 56,398.94
37 Pipa PVC RUCIKA type AW 1 1/4" btg 81,838.00 79,783.87
38 Pipa PVC RUCIKA type AW 1 1/2" btg 97,711.75 95,259.19
39 Pipa PVC RUCIKA type AW 2" btg 128,401.00 125,178.13
40 Pipa PVC RUCIKA type AW 2 1/2" btg 156,973.75 153,033.71
41 Pipa PVC RUCIKA type AW 3" btg 240,222.75 234,193.16
42 Pipa PVC RUCIKA type AW 4" btg 385,908.50 376,222.20
43 Pipa PVC RUCIKA type AW 6" btg 1,008,865.00 983,542.49
44 Pipa PVC RUCIKA type AW 8" btg 1,242,385.50 1,211,201.62
45 Pipa PVC MASPION ABU type AW 1/2" btg 37,391.50 36,452.97
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
46 Pipa PVC MASPION ABU type AW 3/4" btg 159,301.90 155,303.42
47 Pipa PVC MASPION ABU type AW 1" btg 122,895.28 119,810.61

48 Pipa PVC MASPION ABU type AW 1 1/4" btg 45,152.00 44,018.68

49 Pipa PVC MASPION ABU type AW 1 1/2" btg 48,679.50 47,457.64


50 Pipa PVC MASPION ABU type AW 2" btg 69,844.50 68,091.40

51 Pipa PVC MASPION ABU type AW 2 1/2" btg 158,737.50 154,753.19


52 Pipa PVC MASPION ABU type AW 3" btg 218,705.00 213,215.50
53 Pipa PVC MASPION ABU type AW 4" btg 331,585.00 323,262.22

54 Macam-macam Sambungan Paralon 1/2" buah 4,938.50 4,814.54

55 Macam-macam Sambungan Paralon 3/4" buah 6,702.25 6,534.02


56 Macam-macam Sambungan Paralon 1" buah 7,407.75 7,221.82

57 Macam-macam Sambungan Paralon 1 1/4" buah 9,877.00 9,629.09

58 Macam-macam Sambungan Paralon 1 1/2" buah 13,404.50 13,068.05

59 Macam-macam Sambungan Paralon 1 3/4" buah 13,404.50 13,068.05


60 Macam-macam Sambungan Paralon 2" buah 21,870.50 21,321.55

61 Macam-macam Sambungan Paralon 2 1/2" buah 32,453.00 31,638.43


62 Macam-macam Sambungan Paralon 3" buah 40,919.00 39,891.93
63 Macam-macam Sambungan Paralon 4" buah 60,673.00 59,150.11
64 Sambungan Pipa PVC Jenis AW 4" TY buah 123,462.50 120,363.59
65 Lem Paralon tube 14,110.00 13,755.84
66 Solatif Ledeng gl 5,644.00 5,502.34
67 Pipa PVC 4" Berlobang Jenis AW m' 80,779.75 78,752.18
68 PVC Waterstop Lebar 150 m' 70,077.32 68,318.37
69 PVC Waterstop Lebar 200 m' 69,316.79 67,576.93
70 PVC Waterstop Lebar 230 m' 80,290.13 78,274.85
71 PVC Waterstop Lebar 250 m' 90,285.66 88,019.49
72 PVC Waterstop Lebar 300 m' 101,910.89 99,352.92
73 PVC Waterstop Lebar 320 m' 109,624.82 106,873.24
74 Strorox - 100 kg 38,500.00 37,533.65
75 Pipa Tanah buah 10,850.00 10,577.67
76 Pipa Beton buah 49,000.00 47,770.10
L. BAHAN SANITAIR
1 Stop Kran 3/4" KIT buah 112,880.00 110,046.71
2 Stop Kran 1" KIT buah 159,443.00 155,440.98
3 Stop Kran 1 1/2" KIT buah 318,886.00 310,881.96
4 Stop Kran 2" KIT buah 486,089.50 473,888.65
5 Stop Kran 2 1/2" KIT buah 1,223,337.00 1,192,631.24
6 Stop Kran 3" KIT buah 1,579,614.50 1,539,966.18
7 Check Valve 1/2" buah 94,537.00 92,164.12
8 Double Neple 1/2" buah 57,145.50 55,711.15
9 Water Mur 1/2" buah 50,090.50 48,833.23
10 Gate Walve 1/2" buah 74,077.50 72,218.15
11 Saringan Air Lt. KM Stainless Steel buah 70,902.75 69,123.09
12 Apooer Bath Tube buah 232,815.00 226,971.34
13 Kran Stainless Lokal Kait buah 56,440.00 55,023.36
14 Shower dengan Tiang buah 226,465.50 220,781.22
15 Shower Tanpa Tiang buah 123,462.50 120,363.59
16 Kran Tembok Sun Eui dia. 1/2" buah 82,543.50 80,471.66
17 Kran Tembok ITAP dia. 1/2" buah 45,857.50 44,706.48
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
18 Kran Bebek Sun Eui 1/2" buah 144,274.75 140,653.45
19 Kran Bebek ITAP 1/2" buah 75,841.25 73,937.63
20 Kran Panas Dingin Sun Eui Standard buah 330,174.00 321,886.63
21 Bath Cape Washteren unit 3,342,659.00 3,258,758.26
22 Tempat Sabun Poslin buah 76,899.50 74,969.32
23 Wastafel Lengkap TOTO LW 230 unit 1,329,162.00 1,295,800.03
24 Wastafel Lengkap INA unit 804,270.00 784,082.82
25 Closet Jongkok Poslin Warna TOTO unit 321,002.50 312,945.34
26 Closet Jongkok Standard Putih Poslin TOTO unit
283,611.00 276,492.36
27 Closet Jongkok Lengkap Sistem Jet TOTO unit
2,803,657.00 2,733,285.21
28 Closet Duduk Warna Standard TOTO C 240 unit
Lengkap 2,522,868.00 2,459,544.01
29 Closet Jongkok KIA buah 169,117.94 164,873.08
30 Closet Jongkok INA (Wanan gelap) buah 271,617.50 264,799.90
31 Closet Duduk KIA unit 854,656.81 833,204.92
32 Closet Dudduk Ina (Warna Gelap) buah 1,692,720.26 1,650,232.98

33 Wastafel Bulat Warna Standard Lengkap unit 1,434,987.00 1,398,968.83


34 Wastafel Type Amerika Standard buah 115,560.90 112,660.32
35 Wastafel Meja buah 795,228.66 775,268.42

36 Closet Duduk Warna Standar INA Lengkap buah 1,891,445.50 1,843,970.22

37 Urinoir Lengkap TOTO Warna Standard unit 2,735,929.00 2,667,257.18


38 Penyekat Poslin Urinoir TOTO lbr 846,600.00 825,350.34
Kitchen Zink Stainless Standard Lokal ( 1
39 Lubang) buah
546,057.00 532,350.97
Kitchen Zink Stainless Non Standard
40 buah
Franke( 1 Lubang) 1,413,116.50 1,377,647.28
Kitchen Zink Stainless Non Standard
41 buah
Franke( 1 Lubang) 1,596,546.50 1,556,473.18
42 Talang PVC U-15 cm btg 63,495.00 61,901.28
43 Floor Drain + Acsesoris set 60,000.00 58,494.00
44 Clean Out buah 885,374.28 863,151.39
Septictank Biofil (Type BF-03, BF-06-08,
45 dst) unit 6,750,000.00
6,580,575.00
46 Septictank Ipal Biofil (Type R-05, R-10, dst) unit
13,600,000.00 13,258,640.00

M. BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr 84,448.35 82,328.70
Atap Fiber Glass Tipis 80 x 180
2 (Gelombang) lbr
84,660.00 82,535.03
3 Atap Fiber Glass Tebal 80 x 180 lbr
(Gelombang) 82,543.50 80,471.66

4 Atap Aluminium Natura USR 26 (JAINDO) m2 149,566.00 145,811.89

5 Atap Aluminium Warna USR 26 (JAINDO) m2 251,158.00 244,853.93


6 Atap Asbes Gel. Kecil 80 x 180 x 4 mm lbr 91,715.00 89,412.95

7 Atap Asbes Gel. Besar 80 x 180 x 4 mm lbr 125,579.00 122,426.97


Atap Seng Gelombang 80 cm x 180 cm x 3
8 lbr
mm 70,550.00 68,779.20
Atap Seng Gelombang 80 cm x 180 cm x 5
9 mm lbr
91,009.50 88,725.16
Atap Seng Gelombang 270 cm x 106 cm x 4
10 mm lbr
110,763.50 107,983.34
Atap Seng Gelombang 240 cm x 105 cm x 4
11 mm lbr
98,064.50 95,603.08
Atap Seng Gelombang 210 cm x 105 cm x 4
12 mm lbr
87,482.00 85,286.20
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
Atap Seng Gelombang 150 cm x 105 cm x 4
13 mm lbr
63,495.00 61,901.28
Atap Seng Gelombang 150 cm x 102 cm x 5
14 mm lbr
63,495.00 61,901.28
Atap Seng Gelombang 180 cm x 102 cm x 5
15 mm lbr
128,203.46 124,985.55
Atap Seng Gelombang 300 cm x 105 cm x 4
16 lbr
mm 123,462.50 120,363.59
17 Atap Tegola Kubota, lengkap m2 759,118.00 740,064.14
18 Atap Tegola Kubota Kwalitas sedang m2 420,478.00 409,924.00
19 Aluminium Foil m2 27,161.75 26,479.99

20 Atap Genteng Plentong Pres Bakar KW 1 buah 2,645.63 2,579.22


Atap Genteng Plentong Pres Molen Oven
21 KW 2 buah
2,645.63 2,579.22
Atap Genteng Flam pres Molen Oven
22 Jatiwangi buah
2,645.63 2,579.22

23 Bubung Genteng pres Bulat ex Jatiwangi buah 7,055.00 6,877.92

24 Genteng Bubungan ex Jatiwangi Segitiga buah 4,233.00 4,126.75


25 Genteng Bubungan Beton buah 14,124.11 13,769.59
26 Genteng Metal (Rainbow Roof) m2 81,838.00 79,783.87
27 Genteng Metal Hana m2 228,375.99 222,643.76
28 Nok Atas Metal (Rainbow Roof) lbr 135,456.00 132,056.05
29 Nok Atas Metal Hana lbr 118,524.00 115,549.05
30 Nok Pinggir Metal (Rainbow Roof) lbr 99,475.50 96,978.66
31 Nok Pinggir Metal Hana lbr 148,155.00 144,436.31
32 Wall Flasing (Rainbow Roof) lbr 150,977.00 147,187.48
33 Wall Flasing Hana lbr 117,113.00 114,173.46
34 Atap Genteng Beton Warna 14.5/m2 m2 130,517.50 127,241.51
35 Genteng Beton Natural m2 91,715.00 89,412.95
36 Sirap Kelas 1 buah 155,210.00 151,314.23

37 Genteng Keramik Natural Intan 14.5/m2 m2 130,500.00 127,224.45


38 m2
Genteng Keramik Glasur Standard 14.5/m2 137,750.00 134,292.48
39 Genteng Keramik Glasur Spesial 14.5/m2
m2 100,886.50 98,354.25
40 Genteng Keramik Glasur Premium 14.5/m2 m2
112,174.50 109,358.92

41 Genteng Murando Natural 1 m2 = 18 buah buah 4,500.00 4,387.05

42 Genteng Murando Glasur 1 m2 = 18 buah buah 6,000.00 5,849.40


43 Bubung Murando Natural buah 9,171.50 8,941.30
44 Bubung Murando Glasur buah 11,640.75 11,348.57
45 Bubungan Genteng Keramik buah 24,692.50 24,072.72
46 Atap Genteng Kodok buah 3,574.53 3,484.81
47 Bubungan Genteng Kodok buah 7,055.00 6,877.92
48 Bubungan Genteng Plentong buah 7,055.00 6,877.92
49 Bubungan Stel Gelombang buah 13,363.58 13,028.16
50 Nok Genteng Metal lbr 75,770.70 73,868.86
51 Nok Atap Seng lbr 50,846.80 49,570.54
52 Nok Standar 40 cm 18, SWG 22 m2 74,423.20 72,555.17
53 Pelat Asbes tebal 4 mm lbr 21,165.00 20,633.76
54 Pelat Asbes tebal 3.5 mm lbr 30,964.40 30,187.19
55 Trusses ZAM-75 t = 0.8 Rangka Utama m' 36,722.69 35,800.95
56 Trusses ZAM-75 t = 0.8 Rangka Utama m' 37,157.27 36,224.63
57 Reng 16-DB Roof Battens t = 0.48 mm m' 47,974.00 46,769.85
58 Foot Plate t = 1.22 mm m' 13,037.64 12,710.40
59 PLD - Diafragma Plate buah 6,301.53 6,143.36
60 Wind Bracing m' 3,042.12 2,965.76
61 Tensioner (Pengaku Tali Angin) buah 9,343.64 9,109.12
62 Acrilic m2 1,273,145.30 1,241,189.35
63 Policarbonate m2 1,273,145.30 1,241,189.35
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
64 Atap Zingkalum m2 108,647.00 105,919.96
65 Atap Spandek m2 121,467.35 118,418.52
66 Atap Superdek m2 144,935.10 141,297.23
67 Atap Bondek m2 159,276.50 155,278.66
68 Bubungan Atap Zingkalum m' 100,607.12 98,081.88
69 Bubungan Atap Spandek m' 249,562.16 243,298.15
70 Bubungan Atap Superdek m' 117,664.70 114,711.32
71 Bubungan Atap Bondek m' 60,190.44 58,679.66
Genteng Keramik setara KIA (S-1 Standard
72 Unglassed) buah
10,000.00 9,749.00
Genteng Keramik setara KIA (S-1 Standard
73 Natural) buah
10,000.00 9,749.00
74 Genteng Keramik setara KIA (S-1 Standard buah
Standard) 11,299.29 11,015.68
Genteng Keramik setara KIA (S-1 Standard
75 buah
Spesial) 14,124.11 13,769.59
Genteng Keramik setara KIA (S-1 Standard
76 Premium) buah
19,339.17 18,853.75
Genteng Keramik setara KIA (S-1 Standard
77 Exlusive) buah
21,077.52 20,548.47
Genteng Keramik setara KIA (S-2 Nok
78 Unglassed) buah
21,620.75 21,078.07
Genteng Keramik setara KIA (S-2 Nok
79 Natural) buah
22,163.99 21,607.67
Genteng Keramik setara KIA (S-2 Nok
80 Standard) buah
26,075.28 25,420.79
Genteng Keramik setara KIA (S-2 Nok
81 Spesial) buah
28,791.46 28,068.79
82 Genteng Keramik setara KIA (S-2 Nok buah
Premium) 31,398.98 30,610.87
Genteng Keramik setara KIA (S-2 Nok
83 buah
Exlusive) 36,505.39 35,589.11
Genteng Keramik setara KIA (S-3 List Plang
84 Kiri Unglassed) buah
31,181.69 30,399.03
Genteng Keramik setara KIA (S-3 List Plang
85 Kiri Natural) buah
26,401.22 25,738.55
Genteng Keramik setara KIA (S-3 List Plang
86 Kiri Standard) buah
27,053.10 26,374.07
Genteng Keramik setara KIA (S-3 List Plang
87 Kiri Spesial) buah
28,030.93 27,327.35
Genteng Keramik setara KIA (S-3 List Plang
88 Kiri Premium) buah
30,964.40 30,187.19
89 Genteng Keramik setara KIA (S-3 List Plang buah
Kiri Exlusive) 35,527.57 34,635.83
Genteng Keramik Setara. M-Class (M-1
90 bh
Standard Natural) 10,104.17 9,850.56
Genteng Keramik Setara M-Class (M-1
91 Standard Standard) bh
10,104.17 9,850.56
Genteng Keramik Setara M-Class (M-1
92 Standard Special) bh
12,820.35 12,498.56
Genteng Keramik Setara M-Class (M-1
93 Standard Premium) bh
16,405.70 15,993.91
Genteng Keramik Setara M-Class (M-2 NOK
94 Natural) bh
23,141.81 22,560.95
Genteng Keramik Setara M-Class (M-2
95 NOK Standard) bh
25,966.63 25,314.87
Genteng Keramik Setara M-Class (M-2 NOK
96 Special) bh
29,443.34 28,704.31
97 Genteng Keramik Setara M-Class (M-2 NOK bh
Premium) 34,875.69 34,000.31
Genteng Keraxnik Setara M-Class (M-3 List
98 bh
Plang Kiri Natural) 30,529.81 29,763.51
Genteng Keramik Setara. M-Class (M-3 List
99 Plang Kiri Standard) bh
21,403.46 20,866.23
Genteng Keramik Setara M-Class (M-3 List
100 Plang Kiri Special) bh
23,902.34 23,302.39
Genteng Keramik Setara M-Class (M-3 List
101 Plang Kiri Premium) bh
27,704.99 27,009.59
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

102 Genteng Beton Garuda Natural (9.5 Bh/m2) bh


24,336.93 23,726.07
Genteng Beton Garuda Cat Minyak (9.5
103 Bh/m2) bh
48,891.15 47,663.98
104 Genteng Beton Garuda Cat Air (9.5 Bh/m2) bh
37,157.27 36,224.63
105 Genteng Beton Flat Natural (10 Bh/m2) bh
32,702.75 31,881.91
106 Genteng Beton Flat Cat Minyak (10 Bh/m2) bh
22,163.99 21,607.67
107 Genteng Beton Flat Cat Air (10 Bh/m2) bh
18,144.05 17,688.63
Genteng Beton Nok Bulat Besar (NBB, P-D
108 91 cm -19 cm) bh
73,336.73 71,495.97
Genteng Beton Nok Atas Besar (NAB, P-L-T
109 91 cm - 8 cm - 10 cm) bh
179,376.20 174,873.85
Genteng Keramik Setara SAHARA (S-1
110 Standard Unglazed) bh
62,472.03 60,903.98
Genteng Keramik Setara SAHARA (S-1
111 Standard Natural) bh
11,299.29 11,015.68
112 Genteng Keramik Setara SAHARA (S-1 bh
Standard Standard) 12,928.99 12,604.48
Genteng Keramik Setara SAHARA (S-1
113 bh
Standard Khusus) 16,731.64 16,311.67
Genteng Keramik Setara SAHARA (S-1
114 Standard Premium) bh
21,403.46 20,866.23
Genteng Keramik Setara SAHARA (S-2 NOK
115 Unglazed) bh
24,988.81 24,361.59
Genteng Keramik Setara SAHARA (S-2 NOK
116 Natural) bh
26,401.22 25,738.55
Genteng Keramik Setara SAHARA (S-2 NOK
117 Standard) bh
32,702.75 31,881.91
Genteng Keramik Setara SAHARA (S-2 NOK
118 Khusus) bh
38,786.98 37,813.43
Genteng Keramik Setara SAHARA (S-3 List
119 Plang Kiri Unglazed) bh
33,897.86 33,047.03
Genteng Keramik Setara SAHARA (S-3 List
120 bh
Plang Kiri Natural) 21,946.69 21,395.83
Genteng Keramik Setara SAHARA (S-3 List
121 bh
Plang Kiri Standard) 31,507.63 30,716.79
Genteng Kerarnik Setara SAHARA (S-3 List
122 Plang Kiri Khusus) bh
36,396.75 35,483.19
Genteng Keramik Setara SAHARA (S-3 List
123 Plang Kiri Premium) bh
39,004.27 38,025.27
Genteng Keramik Setara GRAND (Type
124 Elabana, P=420 mm, L=335 mm, Isi=9/m2, bh
Berat=4.20 Kg) 59,755.85 58,255.98
Genteng Keramik Setara GRAND (Type
125 Garuda Besar, P=420 mm, L=335 mm, bh
Isi=9/m2, Berat=4.20 Kg) 36,939.98 36,012.79
Genteng Keramik Setara GRAND (Type
126 Centurion, P=420 mm, L=335 mm, bh
Isi=9/m2, Berat=4.20 Kg) 8,365.82 8,155.84
Genteng Keramik Setara GRAND (Type
127 Royal, P=368 mm, L=300 mm, Isi=13/m2, bh
Berat = 3.20 Kg) 6,627.47 6,461.12
Genteng Keramik Setara GRAND (Type
128 Garuda Kecil, P=392 mm, L=292 mm, bh
Isi=9/m2, Berat=3.20 Kg) 5,541.00 5,401.92
Nok Bulat Standard (NBS, P-D 37.5 cm - 12
129 cm) bh
90,177.01 87,913.57
Nok Atas Standard (NAS, P-L-T 91 cm - 5 cm
130 - 6.5 cm) bh
83,440.90 81,346.53
Nok Pinggir (NPG, P-L-T 91.4 cm - 10 cm - 7
131 cm) bh
60,190.44 58,679.66
132 Asbes Motif Genteng lbr 95,609.36 93,209.57
133 Nok Stel Gelombang 1000 mm Ibr 68,121.67 66,411.82
134 Nok Stel Rata lbr 68,990.85 67,259.17
135 Nok Paten Gelombang lbr 59,103.97 57,620.46
136 Nok Paten Rata Ibr 37,591.86 36,648.31
137 Hipcapping Besar lbr 450,885.05 439,567.84
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
138 Ujung Nok lbr 637,214.66 621,220.57
139 Shednok Natural 6 lbr 58,017.50 56,561.26
140 Penutup Atas lbr 129,289.93 126,044.75
141 Penutup Bawah Type B lbr 128,746.70 125,515.15
142 Penutup Bawah Type C lbr 123,857.58 120,748.75
143 Lisplang Simetris lbr 923,499.50 900,319.66
144 Lisplang Siku-siku lbr 2,645,554.45 2,579,151.03
(3000 x 200 x 8.0
145 Lisplang Kalsiplang lbr
mm) 50,372.70 49,108.35
(2400 x 200 x 8.0
146 Lisplang Kalsiplang mm) lbr
40,001.85 38,997.80
(3000 x 200 x 12.0
147 Lisplang Kalsiplang mm) lbr
75,559.05 73,662.52
(2400 x 200 x 12.0
148 Lisplang Kalsiplang mm) lbr
60,743.55 59,218.89
(3000 x 300 x 8.0
149 Lisplang Kalsiplang mm) lbr
75,559.05 73,662.52
(2400 x 300 x 8.0
150 Lisplang Kalsiplang mm) lbr
60,002.78 58,496.71
(3000 x 300 x 12.0
151 Lisplang Kalsiplang mm) lbr
113,338.58 110,493.78
152 Lisplang Kalsiplang (2400 x 300 x 12.0 lbr
mm) 91,856.10 89,550.51
120 x 240 (t = 12
153 Papan Gypsum lbr
mm Ex. DN) 78,522.15 76,551.24
120 x 240 (t = 12
154 Papan Gypsum mm Ex. LN) lbr
80,003.70 77,995.61

(Setara Jaya Board


155 List Plafond Gypsum Polos Siku Btg
Panjang 2 m)
54,944.34 53,565.24

(Setara Jaya Board


156 List Plafond Gypsum Polos Siku Panjang 5 m) Btg
29,567.51 28,825.36

(Setara Jaya Board


157 List Plafond Gypsum Polos Siku Panjang 10 m) Btg
32,012.06 31,208.56

(Setara Jaya Board


158 List Plafond Gypsum Polos Siku Panjang 15 m) Btg
32,244.88 31,435.53

(Setara Jaya Board


159 List Plafond Gypsum Polos Panjang 2 m) Big
16,297.05 15,887.99

160 List Plafond Gypsum Polos (Setara Jaya Board Btg


Panjang 5 m)
17,778.60 17,332.36

(Setara Jaya Board


161 List Plafond Gypsum Polos Panjang 10 m) Btg
20,741.70 20,221.08

(Setara Jaya Board


162 List Plafond Gypsum Polos Panjang 15 m) Btg
26,667.90 25,998.54

(Setara Jaya Board


163 List Plafond Gypsum Ombak Panjang 2 m) Btg
217,837.24 212,369.52

164 List Plafond Gypsum Ombak (Setara Jaya Board Btg


Panjang 5 m)
96,369.89 93,951.00

(Setara Jaya Board


165 List Plafond Gypsum Ombak Panjang 10 m) Btg
97,130.42 94,692.44

(Setara Jaya Board


166 List Plafond Gypsum Ombak Pandang 15 m) Btg
103,323.30 100,729.88
167 Genteng Plentong buah 1,550.00 1,511.10
168 Jabesmen gelombang 150x105 mm buah 40,000.00 38,996.00
169 Jabesmen gelombang 180x105 mm buah 46,000.00 44,845.40
170 Jabesmen gelombang 210x105 mm buah 52,000.00 50,694.80
171 Jabesmen gelombang 240x105 mm buah 60,000.00 58,494.00
172 Jabesmen gelombang 270x105 mm buah 68,000.00 66,293.20
173 Jabesmen gelombang 300x105 mm buah 76,000.00 74,092.40
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

N. BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 ml
1 (18.6 kW) unit 84,287,552.44
82,171,934.87
Electrical Pump kap. 750 gln/menit 120 ml
2 (90 kW) unit 353,531,037.89
344,657,408.83
3 Diesel Pump kap. 750 gln/menit 120 ml unit 883,828,303.74
(105 kW) 861,644,213.32
4 Presure Tank kap. 500 liter lengkap unit 51,681,014.48 50,383,821.01
5 Hydran Box dlm Gedung ( Lengkap ) unit 9,163,471.41 8,933,468.28
6 Fire House 1.5 x 30 m + nose unit 7,371,049.89 7,186,036.54
7 Exhose Fan H 360 W 60 x 60 cm unit
7,610,701.19 7,419,672.59
H 380 W CFM 55 x
8 Exhose Fan unit
55 cm 8,579,232.75 8,363,894.01
9 Exhose Fan H 100 W 40 x 40 cm unit
1,351,406.42 1,317,486.11
3 PK Setara
10 AC Split TOSHIBA unit
30,941,028.84 30,164,409.02
2 PK Setara
11 AC Split TOSHIBA unit
17,898,535.00 17,449,281.77
1 PK Setara
12 AC Split TOSHIBA unit
4,642,190.00 4,525,671.03
Mesin AC Split DAIKIN (Indoor / Outdoor
13 Unit) 1 BTU
19,559,620.64 19,068,674.16
-
O. BAHAN ELEKTRIKAL

1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ) ROLL


158,361.23 154,386.37
2 Kabel NYA 1 x 2.5 Prima ( 1 ml = 50 m' ) ROLL
241,995.91 235,921.81
3 Kabel NYM 2 x 1.5 Prima ( 1 ml = 50 m' ) m'
7,574.72 7,384.59
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' ) m'
9,563.76 9,323.71
5 Kabel NYM 2 x 2.5 Prima ( 1 ml = 50 m' ) m'
12,552.73 12,237.65
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) m'
15,488.55 15,099.78
7 Kabel NYM 4 x 2.5 Prima ( 1 ml = 50 m' ) m'
8,978.19 8,752.84
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m'
7,553.08 7,363.50
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m'
18,832.15 18,359.46
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m'
25,413.99 24,776.10
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' ) m'
13,538.55 13,198.73
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' ) m'
17,813.88 17,366.75
13 Kabel NYM 4 x 6 Supreme ( 1 ml = 50 m' ) m'
29,317.76 28,581.88
14 Kabel NYM 2 x 10 Supreme (1 rol = 50 m') m'
22,374.23 21,812.63
15 Kabel NYM 3 x 10 Supreme (1 rol = 50 m') m'
29,642.29 28,898.27
16 Kabel NYM 4 x 10 Supreme (1 rol = 50 m') m'
32,635.02 31,815.88
17 Kabel NYM 4 x 16 Supreme (1 rol = 50 m') m'
44,605.94 43,486.33
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' ) m'
13,538.55 13,198.73
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' ) m'
20,624.12 20,106.45
20 Kabel NYY 4 x 4 Supreme ( 1 ml = 50 m' ) m'
30,438.09 29,674.10
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' ) m'
13,396.03 13,059.79
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' ) m'
26,580.42 25,913.25
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' ) m'
27,647.13 26,953.19
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m') m'
23,799.34 23,201.97
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m') m'
32,492.51 31,676.95
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m') m'
50,119.66 48,861.66
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m') m'
63,559.91 61,964.55
28 NSFB FUJI EA - 100 A bh 1,254,096.80 1,222,618.97
29 NSFB FUJI EA - 150 A bh 2,565,198.00 2,500,811.53
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 213,766.50 208,400.96
31 Skring Kas 2 grop Biasa unt 267,337.47 260,627.30
32 Skring Kas 3 grop Biasa unt 327,380.22 319,162.98
33 Skring Kas 5 grop Biasa unt 672,134.55 655,263.98
34 MCB 1 PAS bh 71,255.50 69,466.99
35 MCB 3 PAS bh 86,931.71 84,749.72
36 Tahanan 50 A Merk Fuji bh 766,709.18 747,464.78
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh
26,649.09 25,980.19
38 Saidar Broko Seri Standard ( 1 Phase ) bh 29,508.71 28,768.04
39 Stop Kontak Broko Standard ( 1 Phase ) bh
29,217.11 28,483.76
40 Stop Kontak Broko 3 Phase (Out Bow) bh 121,134.35 118,093.88
41 Stop Kontak Broko 3 Phase ( In Bow) bh 205,215.84 200,064.92
42 Stop Kontak Handle 3 Phase bh 119,709.24 116,704.54
Instalasi Titik Lampu / Stop Kontak (Upah
43 dan Alat) ttk
179,600.00 175,092.04
44 Lampu pijar 25 Watt s/d 100 Watt bh 13,519.73 13,180.39
45 Lampu Neon Phillips 20 Watt bh 45,246.07 44,110.39
46 Lampu Neon Phillips 40 Watt bh 62,272.13 60,709.10
47 Trapo TL 20 W (Phillips) bh 67,692.73 65,993.64
48 Trapo TL 40 W (Phillips) bh 71,255.50 69,466.99
49 Trapo TL 20 W (Sinar) bh 35,627.75 34,733.49
50 Trapo TL 40 W (sinar) bh 42,753.30 41,680.19
51 Stater Neon Phillips bh 7,125.55 6,946.70
52 Stater Neon Biasa bh 4,987.89 4,862.69
Rumah TL In Bow / Out Bow 2 x 20 W
53 (kosongan Sonora) bh 178,138.75
173,667.47
54 Down Light + SL 25 W bh 413,281.90 402,908.52
55 Lampu SL Philip 25 W bh 178,138.75 173,667.47
56 Lampu Sirkel TL 20 W Lengkap bh 149,636.55 145,880.67
57 Lampu Mercuri 80 W bh 171,746.92 167,436.07
58 Lampu Taman + Tiang + Lampu 1 Buah bh
541,541.80 527,949.10
59 Lampu Baret 30 cm + Neon bh 285,022.00 277,867.95
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh
1,054,581.40 1,028,111.41
61 Jarum Penangkal Petir 16 bh 135,385.45 131,987.28
62 Kawat BC ( Tembaga ) kg 57,004.40 55,573.59
63 Pentanahan Penangkal Petir ttk 598,546.20 583,522.69
64 Pentanahan Panel ttk 256,519.80 250,081.15
65 Balk TL 1 x 18 W bh 1,061,372.54 1,034,732.09
66 Balk TL 1 x 36 W bh 1,116,999.81 1,088,963.11
67 TKO TL 1 x 18 W bh 43,360.03 42,271.69
68 TKO TL 2 x 18 W bh 58,866.92 57,389.36
69 TKO TL 1 x 36 W bh 91,698.07 89,396.45
70 TKO TL 2 x 36 W bh 115,491.76 112,592.92
71 Kabel NYGBY ml 155,147.92 151,253.70

Jenis Tarik 1000 A


72 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 31,393,254.34
30,605,283.66

Jenis Tetap 1000 A


73 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 31,238,580.52
30,454,492.15

Jenis Tetap 1250 A


74 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 31,038,670.04
30,259,599.42

Jenis Tetap 1250 A


75 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 32,030,419.61
31,226,456.08

76 Panel ACB 4 Pase ACB Ml0H1 4P Jenis Tetap 2500 A bh 55,250,752.76


Tanpa Unit Trip MG
53,863,958.87

Jenis Tetap 2500 A


77 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 56,244,971.58
54,833,222.79

Jenis Tetap 1000 A


78 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 31,474,344.51
30,684,338.46

Jenis Tetap 3200 A


79 Panel ACB 4 Pase ACB Ml0H1 4P Tanpa Unit Trip MG bh 60,870,271.91
59,342,428.09
125 - 160 A, 36 KA
80 Panel MCCB 3 Pase MCCB (NS160N) MG bh 4,392,795.75
4,282,536.58
50 - 63 A, 25 KA
81 Panel MCCB 3 Pase MCCB (NS100N) MG bh
4,334,422.68 4,225,628.67
40 - 50 A, 25 KA
82 . Panel MCCB 3 Pase MCCB (NS100N) MG bh
1,088,149.09 1,060,836.55
32 - 50 A, 25 KA
83 Panel MCCB 3 Pase MCCB (NS100N) MG bh
790,160.00 770,326.98
32 - 50 A, 10 KA
84 Panel MCCB 3 Pase MCCB (NC45H) MG bh
6,026,254.01 5,874,995.03
85 Panel MCCB 3 Pase MCCB 20 - 10 A, 10 KA bh
(NC45H) MG 3,970,060.15 3,870,411.64
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
160 - 200 A, 36 KA
86 Panel MCCB 3 Pase MCCB (NS250N) MG bh
3,997,616.98 3,897,276.79
80 - 100 A, 26 KA
87 Panel MCCB 3 Pase MCCB (NS100) MG bh
2,477,250.37 2,415,071.39
20 - 25 A, KA
88 Panel MCCB 3 Pase MCCB (NS100) MG bh
397,549.25 387,570.76
13 - 16 A, KA
89 Panel MCCB 3 Pase MCCB bh
(NS100) MG 405,036.02 394,869.61
16 A, 5 KA (NC45a)
90 Panel MCCB 3 Pase MCCB bh
MG 344,628.28 335,978.11
10 A, 5 KA (NC45a)
91 Panel MCCB 3 Pase MCCB MG bh
319,313.53 311,298.76
6 A, 5 KA (NC45a)
92 Panel MCCB 3 Pase MCCB MG bh
159,602.44 155,596.42
25 A, 25 KA
93 Panel MCCB 3 Pase MCCB (NS100N) MG bh
87,608.99 85,410.00
16 A, 5 KA
94 Panel MCCB 3 Pase MCCB (NS100N) MG bh
3,761,260.37 3,666,852.73
95 Panel MCCB 3 Pase MCCB 32 A, 25 KA MG bh 3,801,558.53 3,706,139.41
80 - 100 A, 25 KA
96 Panel MCCB 3 Pase MCCB (NS100) MG bh
585,212.25 570,523.42
50 - 63 A,(NS100)
97 Panel MCCB 3 Pase MCCB MG bh
549,101.94 535,319.48
350 - 500 A / 70
98 Panel MCCB 3 Pase MCCB KA / 3 Pole NS630 bh
bN/H/L 583,651.68 569,002.03
224 - 320 A / 70
99 Panel MCCB 3 Pase MCCB KA / 3 Pole NS400 bh
bN/H/L 560,944.46 546,864.76
175 -.250 A / 70
100 Panel MCCB 3 Pase MCCB KA / 3 Pole NS250 bh
bN/H/L 564,964.40 550,783.79
160 - 300 A / 70
101 Panel MCCB 3 Pase MCCB KA / 3 Pole NS400 bh
bN/H/L 569,201.63 554,914.67
64 - 80 A / 70 KA /
102 Panel MCCB 3 Pase MCCB 3 Pole NS100 bh
bN/H/L 549,753.82 535,955.00
44 - 63 A / 70 KA /
103 Panel MCCB 3 Pase MCCB 3 Pole NS100 bh
bN/H/L 639,170.30 623,127.13
32 - 40 A / 70 KA /
104 Panel MCCB 3 Pase MCCB 3 Pole NS100 bh
bN/H/L 651,990.65 635,625.68
400 A / 3 Pole LCI -
105 Panel MCCB 3 Pase Contraktor bh
F3304 1,648,718.23 1,607,335.40
250 A / 3 Pole LCI -
106 Panel MCCB 3 Pase Contraktor F1504 bh
2,485,082.83 2,422,707.25
200 A / 3 Pole LCI -
107 Panel MCCB 3 Pase Contraktor F1154 bh
560,025.90 545,969.25
160 A / 3 Pole LCI -
108 Panel MCCB 3 Pase Contraktor F1154 bh
571,048.63 556,715.31
16 A, 5 KA (NC45a)
109 Panel MCB 3 Pase MCB MG bh
401,993.90 391,903.85
10 A, 5 KA (NC45a)
110 Panel MCB 3 Pase MCB MG bh
396,452.90 386,501.94
6 A, 5 KA (NC45a)
111 Panel MCB 3 Pase MCB MG bh
260,329.50 253,795.23
112 Panel MCB 3 Pase MCB 10 A, 6 KA, 10 A, 6 K bh
MG 260,329.50 253,795.23
50 A, 10 A
113 Panel MCB 3 Pase MCB bh
(NC100H) MG 591,209.00 576,369.65
16 A, 6 KA
114 Panel MCB 3 Pase MCB (NC45aD) MG bh
260,329.50 253,795.23
6 A, 6 KA (NC45aD)
115 Panel MCB 3 Pase MCB MG bh
311,831.00 304,004.04
63 A, 10 KA
116 Panel MCB 3 Pase MCB (NC100H) MG bh
591,209.00 576,369.65
32 A, 10 KA
117 Panel MCB 3 Pase MCB (NC100H) MG bh
302,659.50 295,062.75
16 A, 8 KA
118 Panel MCB 3 Pase MCB (NC10014) MG bh
301,650.64 294,079.20
119 Panel MCB 3 Pase MCB 16 A, 5 KA (NC45N) bh
MG 302,038.66 294,457.49
16 A, 10 KA
120 Panel MCB 3 Pase MCB bh
(NC100H) MG 301,340.22 293,776.58
25 A, 8 KA (NC45N)
121 Panel MCB 3 Pase MCB MG bh
285,353.59 278,191.21
40 A, 8 KA L
122 Panel MCB 3 Pase MCB (NC45N) MG bh
262,149.69 255,569.73
10 A, 8 KA (NC45N)
123 Panel MCB 3 Pase MCB MG bh
283,491.07 276,375.44
20 A, 10 KA
124 Panel MCB 1 Pase MCB (NC45N) MG bh
130,609.22 127,330.92
10 A, 8 KA (NC45N)
125 Panel MCB 1 Pase MCB MG bh
62,860.05 61,282.26
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
6 A, 8 KA (NC45N)
126 Panel MCB 1 Pase MCB MG bh
55,029.00 53,647.77
20 A, 8 KA (NC45N)
127 Panel MCB 1 Pase MCB MG bh
55,029.00 53,647.77
20 A, 5 KA
128 Panel MCB 1 Pase MCB (NC45Na) MG bh
62,860.05 61,282.26
10 A, 5 KA
129 Panel MCB 1 Pase MCB bh
(NC45Na) MG 64,955.39 63,325.00
6 A, 5 KA (NC45Na)
130 Panel MCB 1 Pase MCB bh
MG 65,809.04 64,157.23
25 A, 5 KA
131 Panel MCB 1 Pase MCB (NC45Na) MG bh
71,862.23 70,058.49
16 A, 5 KA
132 Panel MCB 1 Pase MCB (NC45Na) MG bh
65,653.83 64,005.92
16 A, 5 KA (NC45N)
133 Panel MCB 1 Pase MCB MG bh
65,110.60 63,476.32
6 A, 6 KA (NC45aD)
134 Panel MCB 1 Pase MCB MG bh
65,809.04 64,157.23
20 A, 8 KA (NC45N)
135 Panel MCB 1 Pase MCB MG bh
65,809.04 64,157.23
136 Panel MCB 1 Pase MCB 10 A, 8 KA (NC45N) bh
MG 65,809.04 64,157.23
16 A, 5 KA (NC45N)
137 Panel MCB 1 Pase MCB bh
MG 65,809.04 64,157.23
6 A, 5 KA (NC45N)
138 Panel MCB 1 Pase MCB MG bh
158,857.44 154,870.11
25 A, 5 KA (NC45N)
139 Panel MCB 1 Pase MCB MG bh
156,529.29 152,600.40
50 A, 10 KA
140 Panel MCB 1 Pase MCB (NC100H) MG bh
656,383.09 639,907.87
-
P. BAHAN ALAT PENGANTUNG DAN KUNCI

Kunci Silinder ALFA untuk Pintu


1 Alumunium bh
451,131.98 439,808.56
2 Tarikan Pintu Alumunium bh 460,973.70 449,403.26
3 Kunci 2 Slaag ROYAL bh 184,666.98 180,031.84
4 Rel Henderson Lengkap bh 1,198,722.11 1,168,634.18
5 Rel maraton I Pintu unt 257,789.70 251,319.18
6 Kunci 2 Slaag Silinder SEIS Asli Tipe 210 s/d type bh
226 408,366.92 398,116.91
7 Kunci 2 Slaag Ancor Asli bh 198,433.63 193,452.95
8 Kunci 2 Slaag ISO bh 260,654.03 254,111.61
9 Kunci KM Bulat Kualitas Biasa bh 94,687.51 92,310.85
10 Kunci kM Bulat ALFA bh 78,769.08 76,791.97
11 Kunci 2 Slaag Silinder Utama Standard bh 771,936.94 752,561.32
12 Kunci Gembok Besar bh 93,586.93 91,237.89
13 Kunci 2 Slaag Kuda Terbang bh 118,869.70 115,886.07
14 Kunci Lemari bh 113,613.72 110,762.02
15 Espangolet ps 60,602.45 59,081.33
16 Espangolet St. Steel bh 533,358.00 519,970.71
17 Casement ps 75,000.00 73,117.50
18 Grendel 15 cm bh 42,475.80 41,409.66
19 Grendel 5 cm bh 13,075.27 12,747.08
20 Grendel 7 cm bh 88,469.70 86,249.11
21 Hak Angin Kait Jendela Biasa ps 22,787.65 22,215.68
22 Hak Angin Jendela Antik ps 32,899.82 32,074.03
23 Hak Angin Sendok Stainless / Kuningan bh
43,693.97 42,597.25
24 Sloot Pintu Berikut Rantai bh 34,549.75 33,682.55
25 Sloot Jendela Tunggal bh 30,944.64 30,167.93
26 Sloot Handle Jendela bh 24,554.22 23,937.91
27 Engsel Pintu Union Standard ps 15,000.00 14,623.50
28 Engsel Jendela Unilon ps 35,000.00 34,121.50
29 Engsel Patrun ps 14,251.10 13,893.40
30 Engsel Harmonika ps 20,142.03 19,636.46
31 Floor Hinge ps 3,259,410.00 3,177,598.81
32 Door Closer Kelas Standard ( Kelas Sedang ) unt
646,238.00 630,017.43
33 Door Closer Kelas Standard ( Kelas Balk) unt
675,869.00 658,904.69
34 Door Closer Kelas Rendah unt 265,268.00 258,609.77
35 Door Holder unt 88,300.00 86,083.67
36 Door Stoper unt 88,300.00 86,083.67
37 Tarikan Almari Rata-rata bh 21,400.17 20,863.02
38 Rambuncis bh 25,000.00 24,372.50
39 Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' ) ml
123,205.70 120,113.23
40 Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' ) ml
70,077.32 68,318.37
41 Seng BJLS 30 / 3 x 0.3 mm lbr 103,214.65 100,623.96
42 Seng Plat lbr 69,751.37 68,000.61
43 Waterstop Lebar 200 mm ml 71,055.14 69,271.65
44 Kunci Tanam biasa buah 132,400.00 129,076.76
45 Kunci Tanam antik buah 150,000.00 146,235.00
46 Kunci Tanam Kamar Mandi buah 63,500.00 61,906.15
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

Q. BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


1 Aspal Bitumen kg 47,974.00 46,769.85
2 Aspal ( ESO ) 1 Drum 155 kg kg 13,404.50 13,068.05
3 Aspal Emulsi kg 16,106.55 15,702.28
4 Aspal Curah kg 18,173.68 17,717.52
5 Aspal Concrete / Laston (AC -WC) ton 1,624,815.89 1,584,033.01
6 Aspal Threated Base ( ATB ) ton 1,580,320.00 1,540,653.97
7 Lataston / Hot Rolls Sheet ( HRS ) ton 1,855,465.00 1,808,892.83
8 Asphal RC 70 (Cilacap) Kg 15,521.00 15,131.42
9 Asphal Concrete (ATB) AC Base Ton 1,552,100.00 1,513,142.29
10 Asphal Concrete (ATB) AC -BC Ton 1,693,200.00 1,650,700.68

11 Asphal Concrete Wearing Course / AC-WC Ton 1,664,980.00 1,623,189.00


12 Lapis Asphal Resap Pengikat Ton 22,576.00 22,009.34
13 Lapis Asphal Perekat Ton 19,754.00 19,258.17
14 Beton Mortar M3 1,312,230.00 1,279,293.03
15 Beton BO M3 1,058,250.00 1,031,687.93
16 Beton K 100 M3 1,086,470.00 1,059,199.60
17 Beton K 125 M3 1,087,175.50 1,059,887.39
18 Beton K 150 M3 1,107,635.00 1,079,833.36
19 Beton K 175 M3 1,243,443.75 1,212,233.31
20 Beton K 200 M3 1,299,389.90 1,266,775.21
21 Beton K 225 M3 1,325,493.40 1,292,223.52
22 Beton K 250 M3 1,342,284.30 1,308,592.96
23 Beton K 275 M3 1,359,039.93 1,324,928.02
24 Beton K 300 M3 1,408,530.75 1,373,176.63
25 Beton K 325 M3 1,426,450.45 1,390,646.54
26 Beton K 350 M3 1,451,742.63 1,415,303.89
27 Beton K 375 M3 1,484,089.80 1,446,839.15
28 Beton K 400 M3 1,505,572.28 1,467,782.41
29 Beton K 425 M3 1,529,538.11 1,491,146.70
30 Beton K 450 M3 1,589,511.96 1,549,615.21
31 Beton K 475 M3 1,411,000.00 1,375,583.90
32 Beton K 500 M3 1,672,035.00 1,630,066.92
33 Beton K 550 M3 1,552,100.00 1,513,142.29
34 Beton K 600 M3 1,693,200.00 1,650,700.68
35 Beton K 650 M3 1,834,300.00 1,788,259.07

R. BAHAN PENGISAP AIR SUMUR DALAM


1 Pompa Kodok unit 270,912.00 264,112.11
2 Pompa Dragon Tegal unit 499,494.00 486,956.70
3 Pompa Dragon Asli unit 1,164,187.88 1,134,966.76
4 Mesin Pompa Air 100 W - Sanyo unit 1,530,935.00 1,492,508.53
5 Mesin Pompa Air 150 W - Sanyo unit 2,661,851.50 2,595,039.03
6 Pompa Zet Pump 250 W - Sanyo unit 8,154,451.20 7,949,774.47
7 Pompa Zet Pump 450 W - Sanyo unit 12,952,133.40 12,627,034.85
Pompa. Submersible kap. 150 liter / menit 3
8 KW unit
51,150,866.50 49,866,979.75
9 Gear Pump Kap. 60 liter / menit unit 23,210,950.00 22,628,355.16
Deep Well dengan kelengkapannya kap. 150
10 liter / menit unit 202,644,236.06
197,557,865.73
11 Hand Oil Pump unit 6,999,971.00 6,824,271.73

S. BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 1,058,250.00 1,031,687.93
2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 1,693,200.00 1,650,700.68
3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 3,245,300.00 3,163,842.97
Tangki SST Tanpa Kaki GS-700 TK (Volume
4 600 Liter, D-T 87 - 115) unit 1,515,414.00
1,477,377.11
Tangki SST Tanpa Kaki GS-1000 TK
5 (Volume 800 Liter, D-T 87 - 140) unit 1,515,414.00
1,477,377.11
Tangki SST Tanpa Kaki GS-1500 TK
6 (Volume 1000 Liter, D-T 99 - 145) unit 1,752,462.00
1,708,475.20
7 Tangki SST Tanpa Kaki GS-1800 TK unit 1,752,462.00
(Volume 1500 Liter, D-T 99 - 205) 1,708,475.20
Tangki SST Tanpa Kaki GS-2000 TK
8 unit 1,752,462.00
(Volume 1000 Liter, D-T 99 - 145) 1,708,475.20
Tangki SST Tanpa Kaki GS-2500 TK
9 (Volume 1500 Liter, D-T 99 - 205) unit 1,752,462.00
1,708,475.20
Tangki SST Tanpa Kaki GS-3000 TK
10 (Volume 2100 Liter, D-T 145 - 150) unit 3,555,720.00
3,466,471.43
Tangki SST Tanpa Kaki GS-4000 TK
11 (Volume 3100 Liter, D-T 145 - 210) unit 5,308,182.00
5,174,946.63
Tangki SST Tanpa Kaki GS-5000 TK
12 (Volume 4000 Liter, D-T 145 - 265) unit 17,483,475.24
17,044,640.01
Tangki SST Tanpa Kaki GS-6000 TK
13 (Volume 5000 Liter, D-T 145 - 325) unit 20,673,139.51
20,154,243.71
14 Tangki SST Pakai Kaki 700 TK (Volume 660 unit 2,879,145.50
Liter, D-T 87 - 155) 2,806,878.95
Tangki SST Pakai Kaki 1000 TK (Volume
15 unit 3,498,433.40
800 Liter, D-T 87 - 175) 3,410,622.72
Tangki SST Pakai Kaki 1500 TK (Volume
16 1100 Liter, D-T 99 - 180) unit 4,128,586.00
4,024,958.49
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
Tangki SST Pakai Kaki 1800 TK (Volume
17 1500 Liter, D-T 99 - 240) unit 5,627,914.60
5,486,653.94
Tangki SST Pakai Kaki 2000 TK (Volume
18 1100 Liter, D-T 99 - 180) unit 4,878,250.30
4,755,806.22
Tangki SST Pakai Kaki 2500 TK (Volume
19 1500 Liter, D-T 99 - 240) unit 6,627,467.00
6,461,117.58
Tangki SST Pakai Kaki 3000 TK (Volume
20 unit 9,813,787.20
2300 Liter, D-T 145 - 195) 9,567,461.14
Tangki SST Pakai Kaki 4000 TK (Volume
21 unit 13,867,308.00
3200 Liter, D-T 145 - 250) 13,519,238.57
Tangki Silinder Excel GE - 250 (Volume 250
22 Liter) unit 906,433.46
883,681.98
Tangki Silinder Excel GE - 300 (Volume 300
23 Liter) unit 906,433.46
883,681.98
Tangki Silinder Excel GE - 550 (Volume 550
24 Liter) unit 1,417,067.30
1,381,498.91
Tangki Silinder Excel GE - 600 (Volume 600
25 Liter) unit 1,414,245.30
1,378,747.74
Tangki Silinder Excel GE - 700 (Volume 700
26 Liter) unit 1,509,064.50
1,471,186.98
27 Tangki Silinder Excel GE - 800 (Volume 800 unit 1,889,329.00
Liter) 1,841,906.84
Tangki Silinder Excel GE - 1100 VB (Volume
28 unit 2,278,059.50
1050 Liter) 2,220,880.21
Tangki Silinder Excel GE - 1200 VB (Volume
29 1050 Liter) unit 2,278,059.50
2,220,880.21
Tangki Silinder Excel GE - 1100 (Volume
30 1150 Liter) unit 2,458,526.40
2,396,817.39
Tangki Silinder Excel GE - 1100 GT (Volume
31 1150 Liter) unit 2,458,526.40
2,396,817.39
Tangki Silinder Excel GE - 1600 (Volume
32 1600 Liter) unit 3,336,450.60
3,252,705.69
Tangki Silinder Excel GE - 2000 (Volume
33 2000 Liter) unit 4,364,349.99
4,254,804.81
Tangki Silinder Excel GE - 2250 (Volume
34 2250 Liter) unit 4,801,350.80
4,680,836.89
Tangki Silinder Excel GE - 3100 (Volume
35 unit 6,422,872.00
3100 Liter) 6,261,657.91
Tangki Silinder Excel GE -3250 (Volume
36 unit 83,021,829.00
3250 Liter) 80,937,981.09
Tangki Silinder Excel GE - 5200 (Volume
37 5200 Liter) unit 10,246,569.12
9,989,380.24
Tangki Sunder Excel GE - 11000 (Volume
38 11000 Liter) unit 24,224,824.05
23,616,780.97
Tangki Silinder Dapat Disusun Excel GE -
39 1000 SN (Volume 1000 Liter) unit 2,669,456.79
2,602,453.42
Tangki Silinder Dapat Disusun Excel GE -
40 2000 SN (Volume 2000 Liter) unit 4,448,883.00
4,337,216.04
Tangki Silinder Dapat Disusun Excel GE -
41 3000 SN (Volume 3000 Liter) unit 7,519,219.00
7,330,486.60
Tangki Tanam / Pendam (Dengan
42 Pelindung Beton) Excel Lumba-Lumba GE - unit 1,938,714.00
550 K (Volume 550 Liter) 1,890,052.28
Tangki Tanam / Pendam (Dengan
43 Pelindung Beton) Excel Lumba-Lumba GE - unit 3,622,037.00
1100 K (Volume 1100 Liter) 3,531,123.87
Tangki Tanam / Pendam (Dengan
44 Pelindung Beton) Excel Lumba-Lumba GE - unit 6,990,094.00
2100 K (Volume 2100 Liter) 6,814,642.64
Tangki Tanam / Pendam (Dengan
45 Pelindung Beton) Excel Lumba-Lumba GE - unit 8,985,248.00
2500 K (Volume 2500 Liter) 8,759,718.28

Tangki Tanam / Pendam (Langsung


46 Pendam) GE - 550 ST (Volume 550 Liter) unit 1,938,714.00
1,890,052.28

Tangki Tanam / Pendam (Langsung


47 Pendam) GE - 1100 ST (Volume 1100 Liter) unit 3,622,037.00
3,531,123.87

Tangki Tanam / Pendam (Langsung


48 Pendam) GE - 2100 ST (Volume 2100 Liter) unit 6,990,094.00
6,814,642.64
Tangki Tanam / Pendam (Langsung
49 Pendam) GE - 2500 ST (Volume 2500 . unit 8,985,248.00
Liter) 8,759,718.28
Tangki Horisontal GE - 5000 H (Volume 550
50 unit 16,600,415.00
Liter) 16,183,744.58
51 Bak KM Fiber 60 x 60 bh 352,750.00 343,895.98
52 Bak Taraso WC 40 x 40 bh 70,550.00 68,779.20
53 Bak KM Taraso 60 x 60 bh 203,184.00 198,084.08
53 Bak Kontrol Minyak Dapur bh 375,000.00 365,587.50
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

T. ALAT TUKANG
1 Palu 0.5 kg bh 90,304.00 88,037.37
2 Cangkul bh 97,359.00 94,915.29
3 Singkup bh 90,304.00 88,037.37
4 Sekrop bh 97,359.00 94,915.29
5 Pengki bh 21,165.00 20,633.76
6 Linggis bh 97,359.00 94,915.29
7 Rool Meter 30 meter ( Bahan Plastik ) bh 128,401.00 125,178.13
8 Rool Meter 5 meter ( Bahan Besi ) bh 36,686.00 35,765.18
9 Selang Plastik untuk Water Pas dia. 0.5cm m
2,822.00 2,751.17
10 Water Pas Alumunium 60 cm bh 60,673.00 59,150.11

U. BAHAN BAKAR DAN PELUMAS


1 Minyak Tanah lt 28,220.00 27,511.68
2 Kayu Bakar dari Kayu Karet m3 98,770.00 96,290.87
3 Bahan Bakar Residu lt 8,466.00 8,253.50
4 Minyak Solar lt 8,500.00 8,286.65
5 Bensin Premium lt 9,000.00 8,774.10
6 Plus Oil lt 56,440.00 55,023.36
7 Oil Mesran 40 SAE lt 56,440.00 55,023.36
8 Elpiji / botol 15 kg 173,553.00 169,196.82
15.1
9 Asitilin / Botol kg btl 148,155.00 144,436.31
10 Angin ( 02 ) / botol btl 98,770.00 96,290.87
11 Karbit kg 17,637.50 17,194.80
12 Minyak Bekisting ltr 48,456.56 47,240.30
13 Rapidrant Gln 27,704.99 27,009.59
14 Soda Api kg 41,285.86 40,249.58
15 Sabun kg 10,104.17 9,850.56
16 Arang Kayu kg 10,973.35 10,697.92
17 Kawat Las bh 35,275.00 34,389.60

V. BAHAN PAGAR
1 Panel Beton Pracetak lbr 183,430.00 178,825.91
2 Kolom Beton Pracetak btg 406,368.00 396,168.16

W. BAHAN PENANGKAL PETIR


1 EF Lighting Terminal Radius > 110 m2 unit 714,354.03 696,423.74
2 Counecting Sleeve bh 214,795.12 209,403.76
3 EF Coaxcial Cable ml 695,340.80 677,887.75

Grounding Terdiri Dan Earth Steel Coppir


4 Rod 5/8", Earth Road Camping, Earth Road unit
Clomp, Driving TIP & Driving Stud
46,935,504.00 45,757,422.85
5 Indelek Prevectron 2 Type S 4.50 unit 3,969,309.50 3,869,679.83
6 Grounding System Max. 2 OHM + Box unit 209,471.42 204,213.68
7 Biaya Instalasi unit 7,212,284.17 7,031,255.84

X. FIRE ALARM
1 Alarm Bell unit 289,109.67 281,853.01
2 Manual Break Glass Push Button unit 573,982.10 559,575.15
3 Sirine unit 473,483.63 461,599.19
4 Smoke Detector unit 310,839.07 303,037.01
5 Heat Detector unit 170,249.85 165,976.58
-
Y. BIDANG PERTAMANAN
1 Aglonema batang 63,914.86 62,310.59
2 Bambu krisik/jepang batang 63,914.86 62,310.59
3 Furadan kg 28,356.87 27,645.11
4 Kompos/pupuk kandang karung 32,050.87 31,246.39
5 M atoa (2 m) batang 44,762.56 43,639.02
6 Palm (botol, ekor tupai, putri, dll) tinggi 2 m batang
135,156.87 131,764.43
7 Philo batang 96,695.83 94,268.76
Pohon pelindung (angsana, mahoni,
8 kamboja dll) tinggi 2m batang
29,117.40 28,386.55
Pohon perdu (kaca piring, puring, mawar,
9 melati, dll) batang
16,948.93 16,523.51
10 Rumput gajah mini m2 21,294.81 20,760.31

Z. BIDANG PENGAIRAN
1 Batu Belah 10 - 15 cm M3 216,997.69 211,551.05
2 Batu Pecah 5 - 7 cm M3 282,200.00 275,116.78
3 Batu Pecah 0,5 - 1 cm M3 292,570.85 285,227.32
4 Batu Pecah tersaring A M3 241,097.57 235,046.02
5 Batu Pecah tersaring B M3 233,294.74 227,439.04
6 Timbunan Pilthan M3 198,132.62 193,159.49
7 Makadam M3 114,079.35 111,215.96
8 Kayu Damar Laut M3 7,231,248.01 7,049,743.68
9 Kayu Klas I M3 5,974,794.84 5,824,827.49
10 Kayu Klas III M3 2,671,333.42 2,604,282.95
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
11 Kayu Kano 4/6 BTG 72,497.18 70,677.50
12 Papas 2/20 x 4 LBR 91,461.02 89,165.35
13 Balok Kayu 6 - 8 - 10 /4 m BTG 399,327.11 389,304.00
14 Batang Kelapa 13TG 576,125.41 561,664.66
15 Lempengen rumput M2 48,002.22 46,797.36
16 Triplek tb. 3 mm LBR 67,492.83 65,798.76
17 Triplek tb. 4 mm LBR 84,895.17 82,764.30
18 Triplek tb. 6 mm LBR 64,906.00 63,276.86
19 Triplek tb. 9 mm LBR 125,579.00 122,426.97
20 Multiplek 12 mm LBR 177,687.23 173,227.28
21 Seng gelombang BJLS 30 LBR 33,864.00 33,014.01
22 Seng Plat 3 x 6 BWG 30 M2 49,385.00 48,145.44
23 Conblock M2 53,928.42 52,574.82
24 Batako PSPM BH 5,432.35 5,296.00
25 Pipa Beton Tidak Bertulang dia 0,50 m M' 151,710.72 147,902.78
26 Pipa Beton Tidak Bertulang dia 0,60 m M' 183,712.20 179,101.02
27 Pipa Beton Tidak Bertulang dia 0,80 m M' 261,246.65 254,689.36
28 Pipa Beton Tidak Bertulang dia 1,00 m M' 339,077.41 330,566.57
29 Pipa Beton Bertulang dia 0,50 m M' 160,698.79 156,665.25
30 Pipa Beton Bertulang dia 0,60 m M' 205,441.60 200,285.02
31 Pipa Beton Bertulang dia 0,80 m M' 399,919.73 389,881.74
32 Pipa Beton Bertulang dia 1,00 m M' 265,493.76 258,829.87
33 Besi Beton U24 dia. 14 mm BTG 125,536.67 122,385.70
34 Besi Beton U24 dia. 22 mm BTG 287,321.93 280,110.15
35 Besi Beton U24 dia. 25 mm BTG 366,634.24 357,431.72
36 Besi Beton U32 dia. 10 mm BTG 228,158.70 222,431.92
37 Besi Beton U32 dia. 12 mm BTG 130,376.40 127,103.95
38 Besi Beton U32 dia. 16 mm BIG 167,711.46 163,501.90
39 Besi Beton U32 dia. 19 mm BIG 266,185.15 259,503.90
40 Besi Beton U32 dia. 22 mm BIG 336,805.70 328,351.88
41 Besi Beton U32 dia. 25 mm BTG 380,264.50 370,719.86
42 Besi Beton Ulir 10 BIG 103,412.19 100,816.54
43 Besi Beton Ulir 12 BIG 135,216.13 131,822.21
44 Besi Beton Ulir 16 BTG 201,490.80 196,433.38
45 Besi Beton Ulir 19 BIG 270,432.26 263,644.41
46 Besi Beton Ulir 22 BIG 366,140.39 356,950.27
47 Besi Beton Ulir 25 BTG 475,182.47 463,255.39
48 Baja U 24 KG 77,336.91 75,395.75
49 Baja U 32 KG 36,544.90 35,627.62
50 Baja U 36 KG 82,966.80 80,884.33
51 Baja U 42 KG 115,363.36 112,467.74
52 Wermes 06 M2 244,455.75 238,319.91
53 Wermes 08 M2 461,749.75 450,159.83
54 Wermes 10 M2 597,558.50 582,559.78
55 Besi Pofil 4x4 KG 26,075.28 25,420.79
56 Besi Struktur H- Beam KG 29,235.92 28,502.10
57 Besi C macam-macaw ukuran KG 16,297.05 15,887.99
58 Besi L macam-macam ukuran KG 22,815.87 22,243.19
59 Pipa Galvanis 2,5" BTG 309,643.95 301,871.89
60 Pipa Galvanis 3" BTG 543,235.00 529,599.80
61 Pipa Galvanis 4" BTG 706,205.50 688,479.74
62 Kawat Bronjong 3 mm KG 87,213.91 85,024.84
63 Kawat Bronjong 5 mm KG 125,339.13 122,193.12
64 Stempet / Gemuk KG 54,224.73 52,863.69
65 0li SAE 140 LTR 66,274.67 64,611.18
66 Oli SAE 90 LTR 71,114.40 69,329.43
67 Oli SAE 20 LTR 45,730.51 44,582.67
68 Laston SPC TONNE 1,303,764.00 1,271,039.52
69 Cat (untuk besi profil) KG 54,817.35 53,441.43
70 Meni KG 30,915.01 30,139.04
71 Glass Bead KG 14,124.11 13,769.59
72 Cat Marka Jalan (thermo pastic) 5 KG 119,511.70 116,511.96
73 Kapur Hidrasi M3 9,235.00 9,003.20
74 Pipa PVC dia 5" BTG 554,099.70 540,191.80
75 Pipa PVC dia 12" BTG 1,035,702.22 1,009,706.09
76 Saluran Beton (Uditch) Stu 50/50 - 120 M'
1,303,764.00 1,271,039.52
77 Saluran Beton (Uditch) Stu 60/60 - 120 M'
1,521,058.00 1,482,879.44
78 Saluran Beton (Uditch) Stu 80/80 - 120 M'
2,814,945.00 2,744,289.88
79 Saluran Beton (Uditch) Stu 100/100 - 120 M'
4,291,556.50 4,183,838.43
80 Box Culvert BC 50-50-100 M' 1,097,758.00 1,070,204.27
81 Box Culvert BC 60-60-100 M' 1,207,533.80 1,177,224.70
82 Box Culvert BC 80-80-100 M' 2,650,704.60 2,584,171.91
83 Box Culvert BC 100-100-100 M' 3,230,766.70 3,149,674.46
84 Karet Penyambung Piga dia 50 cm BH 83,954.50 81,847.24
85 Karet Penyambung Piga dia 60 cm BH 105,387.59 102,742.36
86 Karet Penyambung Pipa dia 80 cm BH 146,673.45 142,991.95
87 Karet Penyambung Pipa dia 100 cm BH 239,023.40 233,023.91
88 Plat Penjepit 12x4x8 mm LBR 2,879,145.50 2,806,878.95
BTG/ 6
89 Besi UNP 20 (200x80x7,5 mm) m 706,205.50 688,479.74
90 Besi Essentaal 1,5-64 mm KG 59,755.85 58,255.98
91 Kuningan 3" KG 157,044.30 153,102.49
92 Bambu BH 31,507.63 30,716.79
93 Baud 1,5 BH 11,161.01 10,880.87
94 Baud Uk 3/4 - 7 cm BH 40,693.24 39,671.84
95 Baud Uk 3/4 - 17 cm BH 34,075.65 33,220.35
96 Cat Glotek Hitam (setara) KG 51,557.94 50,263.84
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL
97 Cat Glotek Biru (setara) KG 53,138.26 51,804.49
98 Amplas LBR 5,531.12 5,392.29
99 Prasasti 40 can x 60 cm BH 651,882.00 635,519.76
100 Prasasti 20 cm x 30 cm BH 543,235.00 529,599.80
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

Tambahan Harga Bahan


Rangka hollow besi Alucobond 40 x 60 x
1 2,1mm 40 x 60 x 2,1mm bt 41,388.86
40,350.00
Rangka hollow besi Alucobond 40 x 40 x
2 1,1mm 40 x 40 x 1,1mm bt 19,919.09
19,419.12

3 Braket siku besi Alucobond 40 x 40 x 4mm 40 x 40 x 4mm bt 7,760.50 7,565.71


4 Brazing Alucobond m2 62,084.00 60,525.69
5 Braket Alucobond m2 2,116.50 2,063.38
6 Aluminium Composite Panel / ACP bh 260,752.80 254,207.90
7 Main frame 170cm ( STEGER ) bt 232,815.00 226,971.34
8 Cross Brace bh 70,550.00 68,779.20
9 Join Pin bh 7,055.00 6,877.92
-
PRODUK GALVALUM TRUSS
1 Truss Profil U, T min 0.83 mm m' 31,747.50 30,950.64
2 PROFIL U 75 TEBAL 0.53 mm m' 22,105.67 21,550.81
3 PROFIL U 100 TEBAL 0.53 mm m' 29,160.67 28,428.73
4 PROFIL U 100 TEBAL 0.83 mm m' 43,505.83 42,413.84
5 PROFIL U 60 TEBAL 0.53 MM m' 19,989.17 19,487.44
6 RENG 39 m' 10,582.50 10,316.88
7 RENG 36 m' 9,406.67 9,170.56
8 RENG 29 m' 8,230.83 8,024.24
9 PROFIL C75 TEBAL 0.6 MM m' 14,110.00 13,755.84
10 PROFIL C75 TEBAL 0.65 MM m' 15,050.67 14,672.89
11 PROFIL C75 TEBAL 0.7 MM m' 16,226.50 15,819.21
12 PROFIL C75 TEBAL 0.75 MM m' 16,696.83 16,277.74
13 PROFIL C75 TEBAL 0.95 MM m' 22,105.67 21,550.81
14 RENG m' 7,055.00 6,877.92
HARGA
SPESIFIKASI
NO BAHAN / MATERIAL SAT SATUAN HARGA
BAHAN KONTRAKTUAL

Semen Mortar Utama


1 MU-100 Plester Premium40 kg kg 2,116.50 2,063.38
2 MU-200 Acian Plester & Beton 5 kg kg 6,067.30 5,915.01
3 MU-200 Acian Plester & Beton 40 kg kg 5,591.09 5,450.75
4 MU-260 Acian Profil 25 kg kg 10,751.82 10,481.95
5 MU-270 Acian Putih 25 kg kg 8,804.64 8,583.64
6 MU-300 Pasangan Bata 40 kg kg 1,781.39 1,736.67
7 MU-301 Pas Bata & Plester 10 kg kg 296.31 288.87
8 MU-301 Pas Bata & Plester 40 kg kg 2,028.31 1,977.40
9 MU-380 Perekat Bata Ringan 5 kg kg 5,926.20 5,777.45
10 MU-380 Perekat Bata Ringan 40 kg kg 5,291.25 5,158.44
11 MU-400 Perekat Keramik Dinding 5 kg kg 9,877.00 9,629.09
12 MU-410 Self Leveling Floor 25 kg kg 14,392.20 14,030.96
13 MU-440 Perata Lantai 40 kg kg 1,940.13 1,891.43
14 MU-445 Perata Lantai Premium 40 kg kg 3,703.88 3,610.91
15 MU-450 Perekat Keramik Lantai 5 kg kg 9,453.70 9,216.41
16 MU-450 Perekat Keramik Lantai 40 kg kg 57,851.00 56,398.94

17 MU-460 Perekat Keramik Daerah Basah 25 kg kg 24,748.94 24,127.74


18 MU-470 White Tile Addesive 25 kg kg 21,729.40 21,183.99

19 MU-480 Perekat Keramik diatas Keramik 5 kg kg 21,306.10 20,771.32


20 MU-L500 Perekat Mortar & Beton 2 kg karung 289,960.50 282,682.49
21 MU-600 Pelapis Kedap Air 3 kg karung 162,265.00 158,192.15
22 MU-600 Pelapis Kedap Air 30 kg kg 6,608.18 6,442.32
23 MU-700 Floor Hardener 25 kg kg 8,861.08 8,638.67
24 MU-800 Non-Shrink Grout 40 kg kg 5,538.18 5,399.17
25 MU-830 Perbaikan Permukaan Beton 40 kg kg 9,277.33 9,044.46
26 MU-840 Finish Coat Repair 25 kg kg 18,343.00 17,882.59

Bahan Pabrikasi

1 Plavond PVC (setara shunda, Flat Gloss Half m2 99,000.00


Silver 96,515.10
2 screw buah 350.00 341.22
3 Plat Bondex m2 140,000.00 136,486.00
Aluminum Composite Panel type PVDF 0.3
4 warna Silver m2 450,000.00
438,705.00
Water Proofing Coating setara
5 Fosroc/Sika/Aquaproof kg 42,500.00
41,433.25
6 Rangkap baja ringan + Genteng metal pasir m2 190,000.00
185,231.00
7 Spardek m2 110,700.00 107,921.43
8 Kayu Bekisting m3 1,500,000.00 1,462,350.00

Keterangan :
Untuk harga material di atas sudah termasuk keuntungan dan ketentuan pajak yang berlaku.
DAFTAR BAGIAN PEKERJAAN YANG DISUBKONTRAKKAN
Pekerjaan : 63501064
Penawar : Revit Rusun Polres Halmahera Barat
Tahun Anggaran : CV. CENTURY PERMAI

No. Jenis Pekerjaan yang wajub disubkontrakkan

Pekerjaan Utama (kepada penyedia Jasa Spesialis)

1.

2.

Dst..

Pekerjaan bukan pekerjaan Utama

1.

2.

Dst..
ANALISA HARGA SATUAN POKOK KEGIATAN TAHUN 2017
KOTA SURABAYA

NO. URAIAN KEGIATAN KOEF. SAT. HARGA SATUAN JUMLAH HARGA


( Rp. ) ( Rp. )

1 2 3 4 5 6

1 M2 PEMBERSIHAN LAPANGAN

UPAH
Pekerja ( 10 orang - selama 8 hari ) 80.00 hr - -
Mandor 20.00 hr - -

ALAT
Truck + bbm + driver 56.00 jam - -

Harga Satuan Pekerjaan -

1 ls Mob demob

UPAH
Mob demob tenaga kerja 1.00 ls - -
Mob demob alat 1.00 ls - -
Peralatan 1.00 ls - -

- -

Harga Satuan Pekerjaan -

1 m2 bongkar genteng

UPAH
Pekerja 0.08 hr - -
Mandor 0.01 hr - -

Harga Satuan Pekerjaan -

1 m bongkar nok

UPAH
Pekerja 0.08 hr - -
Mandor 0.01 hr - -

Harga Satuan Pekerjaan -

1 m bongkar usuk + reng

UPAH
Pekerja 0.08 hr - -
Mandor 0.01 hr - -

Harga Satuan Pekerjaan -


1 m bongkar jurai dalam + talang

UPAH
Pekerja 0.08 hr - -
Mandor 0.01 hr - -

Harga Satuan Pekerjaan -

1 m2 bongkar gording kayu

UPAH
Pekerja 0.08 hr - -
Mandor 0.01 hr - -

Harga Satuan Pekerjaan -

1 ls bongkar + pasang kembali penangkal petir

UPAH
Upah 1.00 ls - -

MATERIAL
Material baru 1.00 ls - -

Harga Satuan Pekerjaan -

1 M2 PASANG USUK GALVALUME 5 / 7 CM ( BERSISIK ) +


RENG GALVALUME BESAR ( MULCINDO )

Bahan
Usuk galvalume 5/7 cm ( bersisik ) t. 0,50 mm 2.75 m' - -
Reng galvalume besar ( Royal ) t. 0,50 mm 5.5 m' - -
Sekrup + plat 0.25 kg - -
-
Upah
Pekerja / pembantu tukang 0.10 O.H - -
Tukang kayu 0.10 O.H - -
Kepala tukang kayu 0.03 O.H - -
Mandor 0.03 O.H - -
-

Harga Satuan Pekerjaan -


1 M2 PASANG ALUMUNIUM FOIL ZELLTECH ZT-02FW

Bahan
Alumunium foil 1.05 m2 - -
Mat bantu 1.00 ls -
-
Upah
Pekerja / pembantu tukang 0.03 O.H - -
Tukang kayu 0.03 O.H - -
Kepala tukang kayu 0.01 O.H - -
Mandor 0.01 O.H - -
-

Harga Satuan Pekerjaan -

1 KG PABRIKASI DAN PEMASANGAN BESI CANAL

Bahan
Besi Canal 1.05 kg - -
-
Upah
Pekerja / pembantu tukang 0.04 O.H - -
Tukang besi 0.04 O.H - -
Kepala tukang besi 0.01 O.H - -
Mandor 0.01 O.H - -
-

Harga Satuan Pekerjaan -


1 M2 PENGECATAN DASAR ( MENI ZINCHROMATE)

Bahan
Cat menie ( besi ) 0.20 kg - -
Thiner 0.05 ltr - -
Kuas 0.02 bh - -
-
Upah
Pekerja / pembantu tukang 0.02 O.H - -
Tukang cat 0.10 O.H - -
Kepala tukang cat 0.02 O.H - -
Mandor 0.01 O.H - -
-

Harga Satuan Pekerjaan -

1 M2 PEMASANGAN GENTENG KARANGPILANG

Bahan
Genteng Karangpilang ( resiko pecah - baru ) 4.00 buah - -
-
Upah
Pekerja / pembantu tukang 0.10 O.H - -
Tukang kayu 0.05 O.H - -
Kepala tukang kayu 0.01 O.H - -
Mandor 0.01 O.H - -
-

Harga Satuan Pekerjaan -

1 M' PEMASANGAN WUWUNG GENTENG KARANG PILANG

Bahan

Wuwung genteng Karang pilang ( resiko pecah - 20% ) 0.80 buah - -


Pasir pasang 0.03 m3 - -
Semen Pc @ 40 kg 0.10 zak - -
-
Upah
Pekerja / pembantu tukang 0.03 O.H - -
Tukang kayu 0.10 O.H - -
Kepala tukang kayu 0.02 O.H - -
Mandor 0.02 O.H - -
-

Harga Satuan Pekerjaan -

1 M2 PASANGAN DINDING

1 M2 PAS. BATU BATA 1 PC : 5 PS


Batu bata 70.00 bj - -
Semen PC 9.68 kg - -
Pasir pasang 0.05 m3 - -
UPAH
Pekerja 0.13 hr - -
Tukang batu 0.07 hr - -
Kepala tukang batu 0.01 hr - -
Mandor 0.02 hr - -
Harga Satuan Pekerjaan -

1 M2 PLESTERAN DINDING 1 PC : 5 PS
Semen PC 5.18 kg - -
Pasir pasang 0.03 m3 - -
UPAH
Pekerja 0.17 hr - -
Tukang batu 0.08 hr - -
Kepala tukang batu 0.02 hr - -
Mandor 0.02 hr - -
Harga Satuan Pekerjaan -
1 M2 ACIAN
Semen Pc @ 40 kg 0.08 zak - -
Upah
Pekerja / pembantu tukang 0.10 O.H - -
Tukang batu 0.05 O.H - -
Kepala tukang batu 0.01 O.H - -
Mandor 0.01 O.H - -
Harga Satuan Pekerjaan -

1 M2 PENGECATAN DINDING EKSTERIOR


Bahan
Cat dinding exterior 0.18 kg - -
Cat dasar / alkali 0.12 ltr - -
Kertas gosok 0.50 lbr - -
Upah
Pekerja / pembantu tukang 0.04 O.H - -
Tukang cat 0.05 O.H - -
Kepala tukang cat 0.02 O.H - -
Mandor 0.01 O.H - -
Harga Satuan Pekerjaan -

1 M2 PEMBERSIHAN DAK BETON

UPAH
Pekerja 0.13 hr - -
Mandor 0.03 hr - -

ALAT
1 1.00 ls - -

Harga Satuan Pekerjaan -

1 M2 SCREED 1 PC : 5 PS- 3.5 CM


BAHAN
Semen PC 12.10 kg - -
Pasir pasang 0.06 m3 - -

UPAH
Pekerja 0.17 hr - -
Tukang batu 0.08 hr - -
Kepala tukang batu 0.02 hr - -
Mandor 0.02 hr - -

Harga Satuan Pekerjaan -

1 M2 WATER PROOFING

Bahan
Water proofing anti UV 1.00 m2 - -
-
Upah
Pekerja / pembantu tukang 0.05 O.H - -
Tukang cat 0.08 O.H - -
Kepala tukang cat 0.01 O.H - -
Mandor 0.00 O.H - -
-

Harga Satuan Pekerjaan -

1 BH ROOF DRAIN PVC - 4"

Bahan
Roof drain 1.00 bh - -
grouting 0.50 kg - -
-
Upah
Tukang pipa 0.15 O.H - -
Kepala tukang pipa 0.03 O.H - -
-

Harga Satuan Pekerjaan -


BILL OF QUANTITY (BOQ)

PAKET PEKERJAAN REVIT RUSUN TAHAP II

RUMAH SUSUN POLDA MALUKU UTARA


TAHUN ANGGARAN 2019
BILL OF QUANTITY (BOQ)

PAKET PEKERJAAN REVIT RUSUN TAHAP II

RUMAH SUSUN MAKO BRIMOB POLDA MALUKU


UTARA
TAHUN ANGGARAN 2019
BILL OF QUANTITY (BOQ)

PAKET PEKERJAAN REVIT RUSUN TAHAP II

RUMAH SUSUN POLRES HALMAHERA BARAT


TAHUN ANGGARAN 2019
1,002,302,000
REKAPITULASI
PAKET : REVIT RUSUN TAHAP II
LOKASI : SOFIFI, MAKO BRIMOB POLDA MALUKU UTARA
T.A. : 2020

No. URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 22,365,000

II ARSITEKTUR
A PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING 70,931,426

B PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA 43,350,450

C PEKERJAAN PERBAIKAN PLAFOND 259,250,850


-
D PEKERJAAN PERBAIKAN UTILITAS 54,626,220
-
E PEKERJAAN PENGECATAN KEMBALI 119,982,600
-
F PEKERJAAN LUAR GEDUNG 225,258,489
-
I PEKERJAAN TAMBAHAN 115,418,170.11

JUMLAH 911,183,205
PPN 10% 91,118,320
JUMLAH TOTAL 1,002,301,525
PEMBULATAN 1,002,302,000

Ternate, Maret 2020

PPK RUSUN DAN RUSUS


SNVT PnP MALUKU UTARA

ABDUL MUIN, ST
NIP. 19810227 201001 1 016
-
REKAPITULASI
PAKET : REVIT RUSUN TAHAP II
LOKASI : SOFIFI, POLDA MALUKU UTARA
T.A. : 2020

No. URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 14,440,750

II PEKERJAAN ARSITEKTUR
A. PEK. PERBAIKAN LANTAI, DINDING & WATERPROOFING 72,242,668

B. PEK. PERBAIKAN KUSEN PINTU & JENDELA 58,527,000

C. PEK. PERBAIKAN PLAFOND 59,697,000

D. PEKERJAAN PERBAIKAN UTILITAS 7,427,970

E. PEKERJAAN PENGECATAN KEMBALI 21,724,800

III PEKERJAAN MEP 28,217,280


A. PEK. INSTALASI LISTRIK 2,438,580

B. PEK. PLUMBING 25,778,700

VII PEKERJAAN ATAP 912,500


-
VIII PEKERJAAN LUAR GEDUNG 97,129,602
-
IX PEKERJAAN TAMBAHAN 45,029,466.00

JUMLAH 405,349,035
PPN 10% 40,534,904
JUMLAH TOTAL 445,883,939
PEMBULATAN 445,883,940

Ternate, Maret 2020

PPK RUSUN DAN RUSUS


SNVT PnP MALUKU UTARA

ABDUL MUIN, ST
NIP. 19810227 201001 1 016
-
BOQ PEKERJAAN REVIT RUSUN BRIMOB MALUKU UTARA
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
REVIT RUMAH SUSUN MKO BRIMOB POLDA MALUKU UTARA
I PEKERJAAN PERSIAPAN
1 Sewa Tempat Ls 1.00
2 Papan Nama Proyek Buah 1.00
3 Foto Proyek 3 Fase (warna) Set 3.00
4 Air Kerja Bulan 3.00
5 Listrik Kerja Bulan 3.00
6 Laporan Ls 1.00
7 Peralatan dan Perlengkapan K3 Ls 1.00

II ARSITEKTUR
A PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING
DINDING LANTAI 1-3
1 Pek. Pasangan Dinding GRC Penutup Ruang Shaft M2 150.00

LANTAI 2 ( DUA )
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54.00

LANTAI 3 ( TIGA )
1 Pek. Water profing Lantai Kamar Mandi + List tinggi 15 cm , bitudin m2 54.00

LANTAI ATAP
1 Pek. Water profing Talang Air m2 130.00
1 Pek. Waterprofing Rooftank + List tinggi 15 cm , bitudin m2 48.45

B PEKERJAAN PERBAIKAN KUSEN PINTU & JENDELA


LANTAI 1 ( SATU )
1 Pasangan Pintu PVC KM / WC unit 15.00

LANTAI 2 ( DUA )
1 Pasangan Pintu PVC KM / WC unit 16.00

LANTAI 3 ( TIGA )
1 Pasangan Pintu PVC KM / WC unit 16.00

C PEKERJAAN PERBAIKAN PLAFOND


LANTAI 1 ( SATU )
1 Pembongkaran 1 m2 langit-langit m2 360.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00
3 Pekerjaan Plafond Gypsum 9mm (indoor) m2 360.00
4 Pekerjaan List Plafond Type LP 2 m1 103.00

LANTAI 2 ( DUA )
1 Pembongkaran 1 m2 langit-langit m2 360.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 360.00
4 Pekerjaan List Plafond Type LP 2 m1 103.00

LANTAI 3 (TIGA )
1 Pembongkaran 1 m2 langit-langit m2 360.00
2 Pekerjaan Rangka Hollow 4x4, 2x4 cm m2 305.00
3 Pekerjaan Plafond Gypsum 9mm, Rangka Hollow 4x4, m2 360.00
4 Pekerjaan List Plafond Type LP 2 m1 103.00

D PEKERJAAN PERBAIKAN UTILITAS (MEP)


LANTAI 1 ( SATU )
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
1 Pasang kran 0,5" bh 15.00
2 Pasang shower + kran type double (terpasang) bh 15.00
3 Pasangan floor drain stainless bh 15.00
4 Pasangan Bak Kontrol Minyak Dapur bh 15.00
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 60.00
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN

LANTAI 2 ( DUA )
1 Pasang kran 0,5" bh 16.00
2 Pasang shower + kran type double (terpasang) bh 16.00
3 Pasangan floor drain stainless bh 16.00
4 Pasangan Bak Kontrol Wastafel bh 16.00
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64.00

LANTAI 3 ( TIGA )
1 Pasang kran 0,5" bh 16.00
2 Pasang shower + kran type double (terpasang) bh 16.00
3 Pasangan floor drain stainless bh 16.00
4 Pasangan Bak Kontrol Wastafel bh 16.00
5 Memasang 1 m' pipa PVC tipe AW diameter 3/4" m 64.00

E PEKERJAAN PENGECATAN KEMBALI


LANTAI I ( SATU )
1 Pengecatan Plafond m2 160.00
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00

LANTAI II ( DUA )
1 Pengecatan Plafond m2 160.00
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00

LANTAI III ( TIGA )


1 Pengecatan Plafond m2 160.00
2 Pengecatan List Plafond Type LP 2, Plafond m 50.00
3 Pengecatan dinding bagian dalam bangunan (interior) m2 250.00

F PEKERJAAN LUAR GEDUNG


PENGECATAN DINDING LUAR
1 Cat dinding dan kolom bag. Luar (exterior) M2 823.99

PASANGAN PAVING BLOK


1 Pek. Pasangan Paving 5 x 70 M2 350.00

GROUND WATER TANK


1 Cat dinding dan kolom bag. Luar (exterior) M2 53.12
2 Cat plafond expose di R. Pompa dan Ground Tank M2 23.56

G PEK. LAMPU TAMAN


1 NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 16.00
2 Pergantian Lampu Taman ttk 16.00
I PEKERJAAN TAMBAHAN
1 Pek. Sumur Bor/ Pengeboran Air Bersih M 60.00
2 Pek. Pergantian Closet Duduk Komplit BH 6.00
3 Pek. Perbaikan Sistim Elektrikal Dalam Gedung (pergantian Veten, Lampu, TTK 75.00
Saklar dan Stop kotak)
4 Pek. Perbaikan Sistim Plumbing Dalam Gedung ( Pipa dan sambungan Pipa TTK 75.00
Air Bersih dan Air Kotor)

JUMLAH
PPN 10%
JUMLAH TOTAL
PEMBULATAN

Ternate, Maret 2020


PPK RUMAH SUSUN DANB RUMAH KHUSUS
RAB
No. URAIAN PEKERJAAN SAT HARGA
VOL JUMLAH
SATUAN
SNVT PnP MALUKU UTARA

ABDUL MUIN, ST
NIP. 19810227 201001 1 016
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
MINGGU KE -
PEMELIHARAAN & PERAWATAN RUSUN STKIP KOTA TERNATE
MINGGU KE 1
LOKASI PEKERJAAN RUSUN STKIP KOTA TERNATE
DOKUMENTASI MOBILISASI MATERIAL
1
DOKUMENTASI PEKERJAAN
MINGGU KE -
PEMELIHARAAN & PERAWATAN RUSUN STKIP KOTA TERNATE
MINGGU KE 1
LOKASI PEKERJAAN RUSUN STKIP KOTA TERNATE
DOKUMENTASI PEMBUATAN BEDENG PEKERJA DAN GUDANG
MATERIAL
1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN

BALAI PELAKSANA PENYEDIAAN PERUMAHAN MALUKU


SATUAN KERJA PENYEDIAAN PERUMAHAN
PROVINSI MALUKU UTARA

LAPORAN PROGRES
BULAN KE ... MINGGU... PROGRES …...%

PEKERJAAN
PEMELIHARAAN DAN PERAWATAN RUSUN XXXXXXXXX
TAHUN ANGGARAN 2022

LOKASI
KEL. XXXXX, KEC. XXXXX, KOTA TERNATE
PROVINSI MALUKU UTARA

SUMBER DANA
APBN

PELAKSANA KEGIATAN

CV. XXXXXXXXX
Alamat Perusahaaan
PROVINSI MALUKU UTARA

CV.XXXXXXXXX
Alamat Perusahaan

Nomor
Lampiran : 1 (Satu) Berkas
Perihal : Penyampaian Laporan Progres Pekerjaan Pemeliharaan dan Perawatan Rusun xxxxxxx

Progres …... %

Kepada Yth, :
Pejabat Pejabat Pembuat Komitmen (PPK)
Pembangunan Rumah Susun dan Rumah Khusus
di -
Tempat

Sehubungan dengan pelaksanaan Kontrak Pekerjaan Pemeliharaan dan Perawatan Rusun XXXX yang
berlokasi di XXXX, Kota Ternate, sebagaimana Surat Perjanjian Kerja/ Kontrak nomor :
HK0201/SP/SATKER-PnP.MU/PPK.RSRK/PEMEL-XX/APBN/2022, Tanggal 23 September 2022,
Maka melalui surat ini, kami bermaksud menyampaikan Dokumen Hasil Pelaksanaan Pekerjaan
Pengawasan, yang terdiri atas :
1 Progres Pekerjaan
Rekapitulasi LaporanPemeliharaan dan Perawatan Rusundan
Progres PekerjaanPemeliharaan Perawatan Rusun MBR
XXXX

2 Halmahera Timur
3 Kurva S Realisasi Pekerjaan Pemeliharaan dan Perawatan Rusun MBR Halmahera Timur
4 Dokumentasi Pekerjaan
Demikian Penyampaian kami, untuk dapat ditindaklanjuti sebagaimana mestinya, atas perhatiannya
diucapkan terima kasih

Tempat, DD / MM / YY
Dibuat Oleh :
Kontraktor Pelaksana
CV. XXXXX

NAMA GELAR
JABATAN
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PENYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105, Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

MINGGU KE -
PROGRES PEKERJAAN

1
PEMELIHARAAN DAN PERAWATAN RUSUN MBR HALMAHERA TIMUR
MINGGU KE ... BULAN …. 2022

KONTRAKTOR PELAKSANA
SATKER : SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA WAKTU MULAI KERJA : 10 Juni 2020 CV. XXXX
PEKERJAAN : PEMELIHARAAN DAN PERAWATAN RUSUN XXXX PROGRESS WAKTU : 17 Juni 2020
NO. KONTRAK : HK0201/SP/SATKER-PnP.MU/PPK.RSRK/PEMEL-XX/APBN/2022 REALISAI HARI KERJA : 7 HARI
PELAKSANA : CV. XXXX Provinsi Maluku Utara
PENGAWAS : CV. XXXX SISA WAKTU KERJA : 113 HARI KONSULTAN PENGAWAS
LOKASI : Kel. XXXX, Kec. XXXX, Kota Ternate CV. XXXX
ALOKASI WAKTU : 90 Hari, 12 Minggu, 3 Bulan PROGRESS KERJA : 0.00 %

REKAPITULASI
ITEM PEKERJAAN Progres
Pekerjaan (%) 1.2

PEKERJAAN PERSIAPAN - 1
ARSITEKTUR
PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING - 0.8
LANTAI ATAP -
PEKERJAAN PERBAIKAN PLAFOND - 0.6
PEKERJAAN PERBAIKAN UTILITAS (MEP) -
PEKERJAAN PENGECATAN KEMBALI - 0.4
PEKERJAAN LUAR GEDUNG #REF!
PEKERJAAN TAMBAHAN #REF! 0.2

#REF! 0
1

SESUAI KONTRAK REALISASI


VOL. REALISASI BOBOT REALISASI
NO ITEM PEKERJAAN SAT JUMLAH HARGA
VOL. HARGA SATUAN JUMLAH HARGA
SETELAH PAJAK Minggu Lalu Minggu ini s/d Minggu PEKERJAAN S/D TERHADAP
ini MINGGU INI (%) KONTRAK (%)
PEMELIHARAAN DAN PERAWATAN RUSUN MBR HALMAHERA TIMUR - - #REF! -
SESUAI KONTRAK REALISASI
VOL. REALISASI BOBOT REALISASI
NO ITEM PEKERJAAN SAT JUMLAH HARGA
VOL. HARGA SATUAN JUMLAH HARGA s/d Minggu PEKERJAAN S/D TERHADAP
SETELAH PAJAK Minggu Lalu Minggu ini
ini MINGGU INI (%) KONTRAK (%)
PEMELIHARAAN DAN PERAWATAN RUSUN MBR HALMAHERA TIMUR - - #REF! -

Ternate, DD / MM / YY
Diketahui Oleh : Disetujui Oleh : Dibuat Oleh :
Direksi Teknis - PPK Rumah Susun dan Rumah Khusus Konsultan Supervisi Kontraktor Pelaksana
Satuan kerja Penyediaan Perumahan Prov. Maluku Utara CV. XXXX CV. XXXX

NAMA. NAMA NAMA


NIP. JABATAN SITE MANAGER
Satuan kerja Penyediaan Perumahan Prov. Maluku Utara CV. XXXX CV. XXXX

SESUAI KONTRAK REALISASI


VOL. REALISASI BOBOT REALISASI
NO ITEM PEKERJAAN SAT JUMLAH HARGA
VOL. HARGA SATUAN JUMLAH HARGA s/d Minggu PEKERJAAN S/D TERHADAP
SETELAH PAJAK Minggu Lalu Minggu ini
NAMA. NAMA ini MINGGU INI (%)
NAMA KONTRAK (%)
NIP.
PEMELIHARAAN DAN PERAWATAN RUSUN MBR HALMAHERA TIMUR JABATAN - - #REF!
SITE MANAGER -
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

1
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

2
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

3
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

4
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

5
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-1
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-2
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-3
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-4
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-5
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-6
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
DIREKTORAT JENDERAL PERUMAHAN
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara

DOKUMENTASI PEKERJAAN
PEMELIHARAAN & PERAWATAN RUSUN UNKHAIR KOTA TERNATE
MINGGU KE -

6
MINGGU KE 3
LOKASI PEKERJAAN RUSUN UNKHAIR KOTA TERNATE
DOKUMENTASI HARI KE-7
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 9/28/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI TENAGA KEPALA TUKANG 1 OH
5 OH
KERJA TUKANG 1 OH
PEKERJA 3 OH

JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 9/29/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI TENAGA KEPALA TUKANG 1 OH
5 OH
KERJA TUKANG 1 OH
PEKERJA 3 OH

JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 9/30/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI TENAGA KEPALA TUKANG 1 OH
KERJA 5 OH TUKANG 1 OH
PEKERJA 3 OH

JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/1/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI MATERIAL Kayu 5 x 10 48 Batang
PEKERJAAN Tripleks 2 mm 20 Lembar
PERSIAPAN Seng 25 Lembar
Papan 25 Lembar
Lata 5 x 5 50 Batang
Paku 3 Cm 0,5 kg
Paku 5 Cm 3 kg
Paku 7 Cm 5 kg
Paku 10 Cm 5 kg

JUMLAH 0
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/2/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI MATERIAL Helm Kuning 5 Pcs KEPALA TUKANG 1 OH PALU 2 PCS
Helm Orens 5 Pcs TUKANG 1 OH GERGAJI 2 PCS
PEMBUATAN GUDANG
SEMEN DAN 3 M2 Rompi Orens 5 Pcs PEKERJA 3 OH
PERALATAN Rompi Hijau 10 Pcs
Karung 50 pcs
Gembok 2 Pcs
Over 2
Engsel 2
Kabel @50m 1 Rolll
Tali Plastik (Biru) @50m 1 Roll
Sarung Tangan @20 pc 2 Dus
Pacol 1 Unit
Stop kontak @3 lubang 1 pcs
skop 1 pcs
linggis 1 pcs
Scofolding 38 Set
Sambungan 77 Pcs
Join Pin 100 Pcs

JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/3/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI MATERIAL kawat (Bendrat) @4 KEPALA TUKANG 2 OH PALU 3 PCS
4 Gulung
gulung kecil TUKANG 2 OH GERGAJI 4 PCS
PEMBUATAN GUDANG
SEMEN DAN 3 M2 Aplas P120 1 Gulung PEKERJA 6 OH
PERALATAN Kapa Sedang 3 bh
PEMBUATAN BEDENG Kapa Kecil 2 bh
3 M2
PEKERJA

JUMLAH 10
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/4/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMBUATAN BEDENG Besi Hollow 20 Btg KEPALA TUKANG 1 OH PALU 2 PCS
3 M2
PEKERJA Compoun 2 dos TUKANG 1 OH GERGAJI 2 PCS
MOBILISASI MATERIAL Gypsum 30 lbr PEKERJA 3 OH
PELAPORAN DAN Ember 10 bh
DOKUMENTASI 0.08 Ls Skop 2 pcs
Kawat Bendrat 4 roll
Lampu 15 watt 3 bh
Skrup Gypsum 2 dos
Fiberglass (nat plafon) 5 pcs
Lakban Listrik 2 pcs
Paku 3 mm 2 dos
colokan 5 pcs
Fiting 4 pcs
Stop Kontak 4 pcs
Meteran 5 m 1 bh
Pisau Dumpul 3" 3 pcs
Pisau Dumpul 5" 3 pcs
Kapi 3" 5 pcs
Kapi 5" 5 pcs
Roll besar 5 pcs
Roll Kecil 5 pcs
Kuas Tangan Besar 5 pcs
Baki Cat 5 pcs
Pacul 2 pcs
JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

ARDIAN HARIO WIBOWO, ST., MT. …. RUWAEDA DJAFAR, ST


NIP.199104152020121006 TENAGA AHLI SUPERVISI Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/5/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN KEPALA TUKANG 1 OH PAHAT BESAR 1 PCS


7.1 M2
KERAMIK TOILET LT.3 TUKANG 1 OH PAHAT KECIL 1 PCS
PEMBUATAN PAPAN PEKERJA 3 OH ALAT DRIL 1 SET
1 Ls
NAMA PROYEK PALU 1 PCS
GERGAJI 1 PCS

JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/6/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN TUKANG KERAMIK 1 OH PAHAT BESAR 1 PCS


8 M2
KERAMIK TOILET LT.3 PEKERJA 3 OH PAHAT KECIL 1 PCS
ALAT DRIL 1 SET

JUMLAH 4
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/7/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMBONGKARAN TUKANG KERAMIK 1 OH PAHAT BESAR 1 PCS
8 M2
KERAMIK TOILET LT.3 PEKERJA 3 OH PAHAT KECIL 1 PCS
ALAT DRIL 1 SET

JUMLAH 4
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/8/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN TUKANG KERAMIK 1 OH PAHAT BESAR 1 PCS


9 M2
KERAMIK TOILET LT.3 PEKERJA 3 OH PAHAT KECIL 1 PCS
PEMBONGKARAN TUKANG PLAFOND 1 OH ALAT DRIL 1 SET
PLAFON LT. 3 7.5 M2 PEKERJA 1 OH PALU 1 PCS
KATER 1 PCS

JUMLAH 6
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/9/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMBONGKARAN TUKANG KERAMIK 1 OH PAHAT BESAR 1 PCS
3 M2
KERAMIK TOILET LT.3 PEKERJA 3 OH PAHAT KECIL 1 PCS
PEMBONGKARAN TUKANG PLAFOND 1 OH ALAT DRIL 1 SET
6.12 M2
PLAFON LT. 3 PEKERJA 1 OH PALU 1 PCS
KATER 1 PCS

JUMLAH 6
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/10/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMASANGAN Kacamata 5 bh TUKANG PLAFOND 1 OH OBENG 2 PCS
RANGKA PLAFOND 8 M2 Viting 2 bh PEKERJA 1 OH PALU 1 PCS
LT.3 Lampu 10 watt 1 bh
MOBILISASI MATERIAL Stop Kontak 1 bh
Sekren 1 bh
Police Line 1 bh

JUMLAH 2
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-2
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/11/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMASANGAN TUKANG PLAFOND 1 OH OBENG 2 PCS


RANGKA PLAFOND 5.62 M2 PEKERJA 1 OH PALU 1 PCS
LT.3
PEMASANGAN
LANGIT-LANGIT 7.1 M2
PLAFOND LT.3

JUMLAH 2
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/12/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMASANGAN KAPI GYPSUM 2 bh TUKANG BATU 1 OH PAHAT BESAR
GYPSUM LT. DAK BAUT DYNABOLT 55 bh PEKERJA 3 OH PAHAT KECIL
PEMBONGKARAN TUKANG PLAFOND 1 OH ALAT DRILL
KERAMIK K. MANDI LT. PEKERJA 3 OH PALU
3 AREA KANAN
PEMBONGKARAN
KERAMIK K. MANDI LT.
2 AREA KIRI

JUMLAH 8
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/13/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN TUKANG BATU 1 OH PAHAT BESAR


KERAMIK K. MANDI LT. PEKERJA 3 OH PAHAT KECIL
2 AREA KANAN TUKANG PLAFON 1 OH PALU
PEMBONGKARAN PEKERJA 1 OH ALAT DRILL
KERAMIK K. MANDI LT.
3 AREA KIRI
PEMASANGAN
KOMPON GYPSUM LT.
DAK

JUMLAH 6
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/14/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN TUKANG BATU 1 PAHAT BESAR


KERAMIK K. MANDI LT. PEKERJA 6 PAHAT KECIL
2 AREA KANAN TUKANG PLAFON 1 PALU
PEMBONGKARAN PEKERJA 1 ALAT DRILL
KERAMIK K. MANDI LT.
3 AREA KIRI
PEMASANGAN
RANGKA PLAFOND LT.
3 AREA TENGAH
MOBILISASI MATERIAL
KE LT. DAK
ACIAN KNOPI LT. DAK
BAGIAN BELAKANG

JUMLAH 9
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/15/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI PASIR KE GRC 6 mm 15 lbr PEKERJA 8 OH
LT. DAK Atap Multiroof 3 lbr

JUMLAH 8
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/16/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
CAT DASAR PUTIH 10 Paul PEKERJA 8
PEMBERSIHAN SISA SELANG 50 m
KERAMIK BEKAS LT. 3

SCREAD PLAT LANTAI


LT. DAK BARAT

ACIAN KNOPI LT. DAK


BAGIAN BELAKANG

JUMLAH 8
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/17/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
KAYU 5X10 9 btg TUKANG 1 OH
SCREAD PLAT LANTAI KAYU 11 btg PEKERJA 10 OH
LT. DAK BARAT SCAFFOLDING 33 set
PEMBERSIHAN SISA SILANGAN
KERAMIK LT. 3 SCAFFOLDING
PEMBERSIHAN SISA JOIN PIN
KERAMIK LT. 2 SCAFFODING
MOBILISASI PASIR KE SARUNG TANGAN 2 lusin
LT. DAK KARUNG 63 bh

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-3
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/18/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
TUKANG 1 OH
SCREAD PLAT LANTAI PEKERJA 10 OH
LT. DAK AREA BARAT
ACIAN PLAT LANTAI
KNOPI DEPAN &
BELAKANG
PEMASANGAN
SCHAFOLDING

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/19/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
MOBILISASI PASIR KE PASIR 1 rit PEKERJA 6
LT. DAK KAYU 5X10 50 btg
KAWAT BENDRAT 4 kg
PAKU BETON 2 dos
SEMEN 35 sak
KARUNG 50 lbr

JUMLAH 6
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH & HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/20/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEKERJA 10 SEKOP
SCREAD PLAT LANTAI RASKAM
LT. DAK AREA TIMUR
LANGSIR PUING
KERAMIK K. MANDI LT.
2
LANGSIR MATERIAL
(PASIR & SEMEN) LT.
DAK AREA TIMUR

JUMLAH 10
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/21/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
ACIAN PLAT LT. DAK PEKERJA 7 OH
AREA TIMUR
PENGEROKAN CAT
TEMBOK LAMA AREA
DEPAN
PENGECATAN DASAR
TEMBOK LAMA AREA
DEPAN

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/22/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PENGECATAN TUKANG CET 1 OH KUAS
TEMBOK EXTERIOR PEKERJA 6 OH ROL

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/23/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PENGISIAN DAN
PENGECETAN PEKERJA 8 OH
DINDING EXTERIOR
LT. DAK AREA TIMUR
PERBAIKAN DUDUKAN
TORN AIR LT. DAK
AREA TIMUR
PENGISIAN DAN
PENGECETAN
DINDING EXTERIOR
LT. DAK AREA BARAT
PERBAIKAN DUDUKAN
TORN AIR LT. DAK
AREA BARAT

JUMLAH 8
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/24/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PENGUKUURAN PIPA PEKERJA 7 OH KUAS
AIR BERSIH

PENGECEKAN PINTU
DI SETIAP LANTAI

PEMBERSIHAN
DUDUKAN TOREN
AREA BARAT DAN
TIMUR
PENGECETAN LT. DAK
AREA BARAT DAN
TIMUR
PENGISIAN DAN
PENGECETAN
DINDING EXTERIOR
AREA BARAT
PENGECATAN DASAR
INTERIOR LT. 1

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-4
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/25/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
Kompon 2 sak TUKANG CET 1 OH KUAS
PENGECETAN DASAR Keramik 40x40 50 dus PEKERJA 6 OH ROLL BESAR
INTERIOR LT.1 Pipa D 1 1/2 15 btg ROLL KECIL
Pipa 3/4 AW 15 btg
PENGECETAN DASAR Cat Dulux 6 pal
INTERIOR LT. 2 Sika 2 pal
PENGECETAN WARNA Kaca Blok 16 dus
EXTERIOR AREA Sambungan Pipa 1 dus
BARAT Lem Pipa 2 kaleng
Kuas 3" 3 pcs

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/26/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
BATU ROSTER 100 PCS TUKANG CET 1 OH
PENGECETAN WARNA KUAS 5 INCH 3 PCS PEKERJA 6 OH
DINDING EXTERIOR ROLL BESAR 5 PCS TUKANG PIPA 1 OH
PEMASANGAN PIPA PEKERJA 4 OH
AIR BERSIH K. MANDI TUKANG PLAFOND 1 OH
LT. 2 PEKERJA 2 OH
PEMASANGAN PIPA
AIR BERSIH K. MANDI
LT. 3 AREA TIMUR
PEMBONGKARAN
PLAFOND LT. 3 AREA
TIMUR
PEMASANGAN
GYPSUM PLAFOND LT.
3 AREA TIMUR
JUMLAH 15
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/27/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEKERJA 12 OH
PEMASANGAN PIPA
AIR BERSIH D 1 1/2 LT.
1 AREA BELAKANG

PEMASANGAN
SCAFOLDING AREA
LUAR DEPAN
PENGECETAN
PLAFOND LT. 3 AREA
TENGAH
PEMASANGAN PIPA
AIR BERSIH D 3/4 LT. 3
TIMUR
PENGECETAN
PLAFOND LT. ATAP
AREA BARAT

PEMASANGAN GRC
LT. ATAP AREA BARAT

JUMLAH 12
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/28/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PENGECETAN WARNA PIPA D 1 1/2 6 BTG TUKANG CET 1
EXTERIOR SAMBUNGAN T 1 1/2 1 PCS PEKERJA 6
ACIAN (MOKUP) K. GYMPSUM 70 LBR TUKANG BATU 1
MANDI LT.2 AREA BAUT SKRUP GYPSUM 2 DUS PEKERJA 3
TIMUR REDUSCER LURUS 3/4 1 PCS
SAMBUNGAN T 3/4 1 PCS
PEMASANGAN BATU TALI RUKI 2 GULUNG
ROSTER & KACA BLOK MATA GURINDA
LT. 3 AREA BARAT HOLLOW 2X4 15 BTG
SKRUP GYPSUM 2 DUS

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/29/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PENGECETAN CAT PUTIH 10 PALL TUKANG CET 1


EXTERIOR BAGIAN PEKERJA 6
TIMUR TUKANG PIPA 1
PEMASANGAN PIPA PEKERJA 1
AIR BERSIH LT. 1 AREA TUKANG PLAFOND 1
BELAKANG PEKERJA 1
PEMASANGAN PIPA
AIR BERSIH K. MANDI
LT.3 AREA TIMUR
PEMASANGAN
PLAFOND GYPSUM LT.
3 AREA TIMUR

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/30/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
ACIAN AREA K. MANDI PEKERJA 5 OH
LT. 2 AREA TIMUR
ACIAN AREA K. MANDI
LT. 3 AREA BARAT
KOMPON PLAFOND
GYPSUM LT. 3 AREA
TIMUR

PEMASANGAN BATU
ROSTER&GLASS
BLOCK LT. 3 AREA
TIMUR

PEMASANGAN
FIBER&SIKA LT. 2
AREA TIMUR
(PERCOBAAN)
JUMLAH 5
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/31/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
KOMPON APLUS 5 SAK PEKERJA 10
PEMASANGAN SIKA &
FIBER AREA K. MANDI PIPA WAVIN AW D. 1 1/2 22 BTG
LT. 2 AREA TIMUR DAN LEM PIPA 2 KALENG
BARAT SAMBUNGAN T AW D. 1 1/2 3 PCS
PEMASANGAN SAMBUNGAN L AW D. 1 3 PCS
PLAFOND GYPSUM FIBER 1 ROLL
LT.3 AREA BARAT

PEMASANGAN BATU
ROSTER&GLASS
BLOCK LT. 3 AREA
BARAT
PEMASANGAN
SCAFOLDING AREA
BELAKANG

JUMLAH 10
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/1/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEKERJA 13 OH
PEMASANGAN SIKA &
FIBER AREA K. MANDI
LT. 2 BAGIAN TIMUR &
BARAT

PEMASANGAN
PLAFOND GYPSUM
DAN KOMPON LT. 3
AREA BARAT
PENGECETAN
PLAFOND LT. 3 AREA
TIMUR

PEMASANGAN BATU
ROSTER & GLASS
BLOCK LT. 3 AREA
BARAT

PENGECETAN WARNA
DINDING EXTERIOR
LT. 1 AREA BELAKANG
JUMLAH 13
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
N HARIAN
GU KE-1
I KE-1
RABU
10/26/2022
N HARIAN
GU KE-1
I KE-2
KAMIS
10/27/2022
N HARIAN
GU KE-1
I KE-3
JUMAT
10/28/2022
N HARIAN
GU KE-1
I KE-4
SABTU
10/29/2022
N HARIAN
GU KE-1
I KE-5
MINGGU
10/30/2022
N HARIAN
GU KE-1
I KE-6
SENIN
10/31/2022
N HARIAN
GU KE-1
I KE-7
SELASA
11/1/2022
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/2/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMASANGAN CAT PUTIH 10 PALL PEKERJA 7 OH ROLL


KOMPON GYPSUM LT. KACA BLOK 12 DUS KUAS BESAR
3 AREA BARAT BATU ROSTER 100 PCS KUAS KECIL
PENGECETAN BATU BATA 76 PCS
PLAFOND LT. 3 AREA KACA MATA 10 PCS
TIMUR SKRUP GYPSUM 3 DUS
PENGECETAN WARNA PAKU BETON 4 DUS
EXTERIOR AREA PLASTIK AMPLAS 1 ROLL
BELAKANG

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 10/3/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
TALI 150 M PEKERJA 2 OH
PEMASANGAN
KOMPON LT. DAK PLAT MOTIF 1 LBR
AREA TIMUR KAWAT LAS 1 DUS
MATA GURINDA 1 DUS
PENGECETAN
PLAFOND LT. 3 AREA CAT HITAM BESI 2 KALENG
KORIDOR KUAS 3 INCH 3 PCS
SIKA 2 PALL
CAT DULUX EXTERIOR 6 PALL

JUMLAH 2
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/4/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEKERJA 11 OH
PEMASANGAN SIKA
DAN FIBER AREA K.
MANDI&WC LT. 3 AREA
TIMUR

PEMASANGAN BATU
ROSTER&GLASS
BLOCK LT. 3 AREA
BARAT & TIMUR
PEMASANGAN PIPA
AIR BERSIH LT. 1 AREA
BELAKANG

PENGECETAN WARNA
LT. 1 AREA BELAKANG

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/5/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PELAPISAN SIKA & PEKERJA 11 OH


FIBER WC LT. 3 AREA
TIMUR
PELAPISAN ACIAN LT.
3 AREA K. MANDI

PEMASANGAN BATU
ROSTER &
GLASSCBLOCK LT.2
AREA BARAT
PENGECETAN
EXTERIOR AREA
BELAKANG

JUMLAH 11
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/6/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PASIR 1 DAM

JUMLAH 0
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/7/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

ACIAN AREA KNOPI LT. PEKERJA 2 OH


2 & 3 AREA DEPAN &
BELAKANG

JUMLAH 2
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-1
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SELASA
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/8/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
ACIAN KNOPI LT 3 PEKERJA 2 OH
AREA DEPAN

JUMLAH 2
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-1
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : RABU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/9/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PENGECETAN PLAFON PASIR 1 DAM PEKERJA 8 OH


LT. ATAP AREA KIRI KACA BLOK 5 DUS
TIMUR BATU ROSTER 50 PCS
KOMPON PLAFON CAT DULUX INTERIOR 4 PALL
GRC LT. ATAP AREA FLOOR DRAIN 90 PCS
KIRI TIMUR
PEMASANGAN
KERAMIK TOILET WC
LT. 2
LANGSIR PASIR KE LT.
2 DAN 3
PEMASANGAN PLAT
TANGGA LT. ATAP
AREA KANAN BARAT
PEMASANGAN SILENT
ATAP GEDUNG

JUMLAH 8
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-2
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : KAMIS
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/10/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PENGECETAN PLAFON PEKERJA 7


LT. ATAP AREA KIRI
TIMUR
PENGELASAN BESI
TANGGA LT. ATAP &
LT. 3 AREA BARAT
PEMASANGAN
KERAMIK TOILET K.
MANDI LT. 2
PENGIKISAN DINDING
AREA LUAR
BELAKANG
PEMASANGAN SILENT
ATAP GEDUNG

JUMLAH 7
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-3
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : JUMAT
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/11/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMBONGKARAN METERAN 5M PEKERJA 18 OH


PLAFON LT. 2 AREA LEM PILIPIN 2 KALENG
TIMUR SKRUP GYPSUM 5 MM
PEMASANGAN HOLLOW GYPSUM 2X4 30 STAF
RANGKA PLAFON LT. 2 BESI 4X4 4 STAF
AREA TIMUR KACA BLOK 3 DUS
PEMASANGAN
PLAFON GYPSUM LT. 2
AREA TIMUR
PEMASANGAN
KERAMIK TOILET K.
MANDI LT. 2
PENGIKISAN DINDING
AREA LUAR BAGIAN
BELAKANG
PLAMIRAN DINDING
AREA LUAR BAGIAN
BELAKANG
PENGECETAN AREA
DALAM SELASAR LT. 1,
2&3
JUMLAH 18
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-4
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SABTU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/12/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMASANGAN BESI 4X4 4 STAF PEKERJA 10 OH


KERAMIK LT.3 AREA CET BESI ITAM DOP 2 KALENG
TIMUR TINER BESAR 1 KALENG
PEMASANGAN AMPLAS 1 ROLL
RANGKA PLAFON LT. 2 DINABOLT 10 MM 40 PCS
AREA TIMUR CET WARNA INTERIOR 3 PALL
PEMASANGAN KUAS 3 " 6 PCS
PLAFON GYPSUM LT. 2 ROLL BESAR 4 PCS
AREA TIMUR LEM KERTAS 8 PCS
PEMASANGAN FLOOR CET INTERIOR 2 PALL
DRAIN & NAT TOILET
K. MANDI LT.2
PENGECETAN PLAFON
LT.2 AREA SELASAR
TENGAH

PEMASANGAN KACA
BLOK & BATU ROSTER
LT. 2 AREA BARAT
PLAMIRAN DINDING
AREA TANGGA DALAM
GEDUNG
PLAMIRAN DINDING
AREA LUAR BAGIAN
BELAKANG
PENGELASAN BESI
TANGGA

JUMLAH 10
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA
CATATAN /SARAN:

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-5
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : MINGGU
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/13/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

PEMASANGAN PEKERJA 18 OH
KERAMIK & FD LT.3
AREA TIMUR

PEMASANGAN
KOMPON WC & K.
MANDI LT.2 BAGIAN
TIMUR

PEMBONGKARAN
PLAFON LT.2 AREA
TOILET BAGIAN BARAT
PENGECETAN KNOPI
LT. 1 AREA LUAR
SILENT LT. ATAP
PENGECETAN
INTERIOR LT. 1, 2, DAN
3
JUMLAH 18
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-6
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI : SENIN
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL : 11/14/2022

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.

JUMLAH 0
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT LAPORAN HARIAN
DIREKTORAT JENDERAL PERUMAHAN MINGGU KE-7
BALAI PELAKSANA PEYEDIAAN PERUMAHAN MALUKU HARI KE-7
SATUAN KERJA PENYEDIAAN PERUMAHAN PROVINSI MALUKU UTARA HARI :
Jalan Salim Fabanyo No. 105 Kel. Tanah Raja Kec. Ternate Tengah Kota Ternate Provinsi Maluku Utara TANGGAL :

PEKERJAAN HARI INI VOL. SAT. MATERIAL / BAHAN VOL. SAT. TENAGA KERJA VOL. SAT. PERALATAN VOL. SAT.
PEMBERSIHAN TUKANG KAYU
BEDENG KERJA
PEMBUATAN DIREKSI
KIT

JUMLAH 0
PELAKSAAN PEKERJAAN PUKUL : 08.00 S/D 12.00 dan 13.00 S/D 17.00 CUACA : CERAH / MENDUNG / HUJAN
CATATAN /SARAN:
Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Teknis Satker Penyediaan Perumahan Konsultan Supervisi Kontraktor Pelaksana
Provinsi Maluku Utara CV. KETNA WIRANDANI CV. DELTA KARYA

NAMA NAMA Ar. DRY KRISPIAN FASHAR. ST IAI


NIP JABATAN Site Manager
N HARIAN
GU KE-7
I KE-1
RABU
11/9/2022
N HARIAN
GU KE-7
I KE-2
KAMIS
11/10/2022
N HARIAN
GU KE-7
I KE-3
JUMAT
11/11/2022
N HARIAN
GU KE-7
I KE-4
SABTU
11/12/2022
N HARIAN
GU KE-7
I KE-5
MINGGU
11/13/2022
N HARIAN
GU KE-7
I KE-6
SENIN
11/14/2022
N HARIAN
GU KE-7
I KE-7
KURVA S
Unit Kerja : SNVT Penyediaan Perumahan Provinsi Maluku Utara
Nama Paket : Revit Rusun Polres Halmahera Barat
Penyedia : CV. CENTURY PERMAI

WAKTU PELAKSANAAN PEKERJAAN


JUMLAH HARGA
NO. URAIAN PEKERJAAN PEKERJAAN BOBOT (%) May-20 Jun-20 Jul-20 Aug-20 Sep-20 KET

(Rp) M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M12 M13 M14 M15 M16 M17

I. PEKERJAAN PERSIAPAN 15,000,000.00 3.58 0.89 0.89 0.89 0.89 100%

II. ARSITEKTUR
Rencana Jadwal Waktu Pelaksanaan

PELAKSANAAN PHO
A. PEK. PERBAIKAN LANTAI, DINDING & WATERPROFING 30,980,040.00 7.39 1.48 1.48 1.48 1.48 1.48

B. LANTAI ATAP 39,951,386.00 9.53 1.19 1.19 1.19 1.19 1.19 1.19 1.19 1.19

C. PEKERJAAN PERBAIKAN PLAFOND 165,469,560.00 39.48 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 3.04 50%

D. PEKERJAAN PERBAIKAN UTILITAS (MEP) 47,195,520.00 11.26 1.41 1.41 1.41 1.41 1.41 1.41 1.41 1.41

E. PEKERJAAN PENGECATAN KEMBALI 52,338,000.00 12.49 1.56 1.56 1.56 1.56 1.56 1.56 1.56 1.56

F. PEKERJAAN LUAR GEDUNG 26,408,835.00 6.30 1.58 1.58 1.58 1.58

realisasi Pelaksanaan
G. PEKERJAAN TAMBAHAN 41,740,758.00 9.96 1.66 1.66 1.66 1.66 1.66 1.66 0%

JUMLAH 419,084,099.00
PPN 10% 41,908,409.90 100.00
JUMLAH TOTAL 460,992,508.90
BOBOT RENCANA PER MINGGU 0.89 0.89 0.89 4.23 5.64 5.64 5.64 5.64 8.68 8.68 10.34 9.14 10.21 7.83 7.83 7.83 0.00
KOMULATIF BOBOT RENCANA PER MINGGU 0.89 1.79 2.68 6.91 12.55 18.19 23.82 29.46 38.14 46.81 57.15 66.29 76.50 84.33 92.17 100.00 100.00
BOBOT REALISASI PER MINGGU 0.00 0.00 #REF!
KOMULATIF BOBOT REALISASI PER MINGGU 0.00 0.00 #REF!
DEVIASI -0.89 -1.79 #REF!

Diketahui Oleh : Ternate, 11 Juni 2020


PPK Rumah Susun dan Rumah Khusus Diperiksa Oleh : Dibuat Oleh :
SNVT Penyediaan Perumahan Prov. Maluku Utara Konsultan Supervisi Kontraktor Pelaksana
CV. DELA CONCIETA CV. CENTURY PERMAI

ABDUL MUIN , ST
NIP. 19810227 201001 1 016 SYAHRIL TAHA, ST INDRO ARIFIANTO, ST
TENAGA AHLI SITE MANAGER