Anda di halaman 1dari 3

Report By : SUKMA BAYU WIJAYANTO

Customer : NAVIRI MULTI KONSTRUKSI


Unit : PC200-8M0
Serial No. : C16826
REPORT DATE Thursday, March 23, 2023 MACHINE MODEL PC200-8M0
BRANCH SURABAYA MACHINE SERIAL NO. C16826
CUSTOMER NAME NAVIRI MULTI KONSTRUKSI ENGINE MODEL SAA6D107E-1
MACHINE LOCATION KUPANG-KEFAMENANU ENGINE NUMBER 26643995
UNIT CODE EXC605 KILO METER/HM 13214
MEKANIK NAME SUKMA BAYU WIJAYANTO DELIVERY DATE 11.03.2017

SYMPTOM :

BACK LOG UNIT

CAUSED ANALYSIS : ( Describe detail of failure,analisys the cause,operating condition)

UNIT KONDISI STAND BY

ANALYSIS
Dari hasil pengecheckan pada unit, di dapatkan kondisi sebagai berikut:
HM Unit sudah masuk life time overhaul, Arm Cylinder mengalami leakage

FOTO UNIT

SERIAL NO. UNIT KONDISI UNIT KONDISI UNIT

KONDISI UNIT KONDISI UNIT KONDISI MONITOR PANEL

SUGGESTION / SARAN DAN REKOMENDASI :


- Kondisi unit secara keseluruhan masih baik hanya pada bagian Arm Cylinder perlu dilakukan reseal
- Perlu dipersiapkan overhaul pada komponen utama mengingat unit sudah melewati masa life time (12.000)
Price ( IDR )
NO Figur No Index No Part Number Description Q'ty
@ Total
PART GENERAL SERVICE
1 07000-13025 ORING 20 67,100 1,342,000
2 07000-13032 ORING 20 67,100 1,342,000
3 707-99-50520 SEAL KIT 1 2,828,500 2,828,500
Total Parts 5,512,500
GRAND TOTAL PARTS 5,512,500

RINCIAN JASA
1 RESEAL CYLINDER ARM 7,800,000
2 TRANSPORTATION & ACCOMODATION 1,000,000
GRAND TOTAL JASA 8,800,000

Catatan : Harga terlampir belum termasuk Ppn 11%

Anda mungkin juga menyukai