Rp 98,996.00
Rp 117,493.00
Rp 144,663.00
Rp 172,323.00
Rp 156,332.00
Rp 237,435.00
Rp 189,213.00
Rp 8,648.00
Rp 51,452.00
Rp 86,487.00
Rp 86,487.00
Rp 772,997.00
Rp 225,808.00
Rp 25,946.00
Rp 492,043.00
Rp 1,889,516.00
Rp 1,808,160.00
Rp 405,033.00
Rp 405,033.00
Rp 405,033.00
Rp 405,033.00
Rp 405,033.00
Rp 405,033.00
Rp 1,131,977.00
Rp 732,292.00
Rp 1,530,691.00
Rp 1,938,251.00
Rp 2,001,076.00
Rp 2,049,936.00
Rp 1,827,960.00
Rp 2,107,973.00
Rp 2,163,205.00
Rp 2,205,154.00
Rp 2,232,368.00
Rp 2,279,743.00
Rp 2,294,160.00
Rp 2,438,074.00
Rp 2,457,244.00
Rp 414,048.00
Rp 16,201.00
Rp 268,191.00
Rp 21,601.00
Rp 29,941.00
Rp 19,087.00
Rp 128,466.00
Rp 279,187.00
Rp 295,082.00
Rp 626,387.00
Rp 638,102.00
Rp 925,587.00
Rp 798,922.00
Rp 593,772.00
Rp 176,419.00
Rp 1,425,546.00
Rp 1,615,254.00
Rp 2,013,174.00
Rp 1,747,659.00
Rp 1,426,196.00
Rp 717,201.00
Rp 1,615,254.00
Rp 42,046.00
Rp 69,435.00
Rp 12,209,199.00
Rp 26,080.00
Rp 32,623.00
Rp 38,998.00
Rp 48,949.00
Rp 178,842.00
Rp 9,187.00
Rp 9,187.00
Rp 12,638.00
Rp 20,347.00
Rp 16,492.00
Rp 107,985.00
Rp 110,953.00
Rp 100,037.00
Rp 68,872.00
Rp 62,704.00
Rp 85,319.00
Rp 10,303.00
Rp 10,303.00
Rp 10,303.00
Rp -
Rp -
Rp 97,353.00
Rp 55,248.00
Rp 121,998.00
Rp 51,979.00
Rp 32,245.00
Rp 87,900.00
Rp 1,562,878.00
Rp 40,737.00
Rp 1,061,175.00
Rp 441,952.00
Rp 166,895.00
Rp 187,715.00
Rp 379,307.00
Rp 191,197.00
Rp 1,087,128.00
Rp 276,348.00
Rp 132,880.00
Rp 1,873,742.00
Rp 521,983.00
Rp 73,658.00
Rp 73,658.00
Rp 123,191.00
Rp 191,199.00
Rp 297,880.00
Rp 288,411.00
Rp 278,398.00
Rp 936,808.00
Rp 434,093.00
Rp 413,012.00
Rp 397,396.00
Rp 140,156.00
Rp 140,156.00
Rp 140,156.00
Rp 207,237.00
Rp 196,406.00
Rp 190,676.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 89,166.00
Rp 89,166.00
Rp 77,664.00
Rp 77,664.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 70,078.00
Rp 81,006.00
Rp 81,123.00
Rp 83,433.00
Rp 131,446.00
Rp 119,985.00
Rp 115,364.00
Rp 111,931.00
Rp 110,365.00
Rp 81,006.00
Rp 81,006.00
Rp 81,006.00
Rp 84,093.00
Rp 84,093.00
Rp 84,093.00
Rp 84,093.00
Rp 160,672.00
Rp 131,518.00
Rp 149,731.00
Rp 147,845.00
Rp 108,498.00
Rp 118,809.00
Rp 40,734.00
Rp 100,287.00
Rp 121,740.00
Rp 121,740.00
Rp 85,065.00
Rp 40,734.00
Rp 19,132.00
Rp 104,934.00
Rp 62,548.00
Rp 81,006.00
Rp 54,004.00
Rp 67,736.00
Rp 67,736.00
Rp 73,136.00
Rp 67,736.00
Rp 70,205.00
Rp 73,136.00
Rp 67,736.00
Rp 70,205.00
Rp 67,736.00
Rp 70,205.00
Rp 67,736.00
Rp 70,205.00
Rp 64,805.00
Rp 67,736.00
Rp 70,205.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 36,042.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 34,260.00
Rp 97,208.00
Rp 189,015.00
Rp 189,015.00
Rp 189,015.00
Rp 429,631.00
Rp 412,028.00
Rp 283,754.00
Rp 189,015.00
Rp 39,894.00
Rp 39,894.00
Rp 39,894.00
Rp 284,603.00
Rp 189,015.00
Rp 64,604.00
Rp 45,516.00
Rp 189,015.00
Rp 189,015.00
Rp 270,022.00
Rp 243,020.00
Rp 243,020.00
Rp 243,020.00
Rp 243,020.00
Rp 243,020.00
Rp 456,011.00
Rp 351,029.00
Rp 270,022.00
Rp 189,015.00
Rp 189,015.00
Rp 57,018.00
Rp 90,605.00
Rp 45,516.00
Rp 30,344.00
Rp 45,516.00
Rp 248,223.00
Rp 312,932.00
Rp 92,379.00
Rp 92,379.00
Rp 425,689.00
Rp 20,733.00
Rp 45,516.00
Rp 45,516.00
Rp 37,930.00
Rp 78,694.00
Rp 303,446.00
Rp 73,242.00
Rp 189,653.00
Rp 19,087.00
Rp 95,273.00
Err:509
Rp 40,625.00
Rp 40,734.00
Rp 40,734.00
Rp 103,603.00
Rp 103,603.00
Rp 103,603.00
Rp 37,212.00
Rp 39,249.00
Rp 39,249.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 37,803.00
Rp 40,882.00
Rp 40,882.00
Rp 40,882.00
Rp 40,882.00
Rp 40,882.00
Rp 40,882.00
Rp 48,181.00
Rp 40,882.00
Rp 54,004.00
Rp 91,867.00
Rp 51,801.00
Rp 51,801.00
Rp 81,251.00
Rp 108,009.00
Rp 74,673.00
Rp 73,092.00
Rp 74,673.00
Rp 108,527.00
Rp 72,712.00
Rp 188,754.00
Rp 245,657.00
Rp 35,161.00
Rp 409,087.00
Rp 234,635.00
Rp 13,972,557.00
Rp 9,735,110.00
Rp 285,879.00
Rp 285,879.00
Rp 1,143,697.00
Rp 849,508.00
Rp 1,307,377.00
Rp 571,513.00
Rp 653,158.00
Rp 1,032,809.00
Rp 653,158.00
Rp 694,102.00
Rp 11,892,122.00
Rp 14,833,530.00
Rp 10,198,658.00
Rp 37,930.00
Rp 323,490.00
Rp 45,516.00
Rp 172,983.00
Rp 169,675.00
Rp 105,283.00
Rp 104,403.00
Rp 122,589.00
Rp 122,589.00
Rp 163,289.00
Rp 489,868.00
Rp 20,458.00
Rp 27,002.00
Rp 140,786.00
Rp 448,043.00
Rp 439,661.00
Rp 455,061.00
Rp 92,958.00
Rp 67,464.00
Rp 58,686.00
Rp 36,971.00
Rp 67,221.00
Rp 117,444.00
Rp 46,928.00
Rp 117,444.00
Rp 103,765.00
Rp 140,786.00
Rp 58,673.00
Rp 357,758.00
Rp 526,633.00
Rp 39,901.00
Rp 58,673.00
Rp 36,971.00
Rp 41,884.00
Rp 36,971.00
Rp 44,902.00
Rp 420,208.00
Rp 23,009.00
Rp 23,009.00
Rp 24,233.00
Rp 49,918.00
Rp 71,951.00
Rp 56,095.00
Rp 121,043.00
Rp 22,228.00
Rp 85,480.00
Rp 35,767.00
Rp 24,863.00
Rp 14,072.00
Rp 23,105.00
Rp 7,644.00
Rp 47,295.00
Rp 51,008.00
Rp 93,557.00
Rp 106,220.00
Rp 49,061.00
Rp 269,038.00
Rp 242,104.00
Rp 229,564.00
Rp 1,913,967.00
Rp 1,274,339.00
Rp 488,592.00
Rp 379,307.00
Rp 3,381,257.00
Rp 175,799.00
Rp 1,562,660.00
Rp 1,554,052.00
Rp 1,562,660.00
Rp 1,162,977.00
Rp 36,659,800.00
Rp 73,697.00
Rp 122,828.00
Rp 74,065.00
Rp 480,822.00
Rp 707,934.00
Rp 707,934.00
Rp 86,422.00
Rp 138,399.00
Rp 101,123.00
Rp 121,914.00
Rp 167,979.00
Rp 311,617.00
Rp 620,497.00
Rp 40,110.00
Rp 18,949.00
Rp 46,570.00
Rp 64,732.00
Rp 81,884.00
Rp 42,514.00
Rp 156,116.00
Rp 219,823.00
Rp 21,601.00
Rp 16,201.00
Rp 37,803.00
Rp 102,608.00
Rp 3,988,392.00
Rp 3,446,943.00
Rp 8,223,114.00
Rp 242,210.00
Rp 367,263.00
Rp 450,417.00
Rp 493,499.00
Rp 643,277.00
Rp 93,420.00
Rp 781,911.00
Rp 121,647.00
Rp 1,221,239.00
Rp 1,839,095.00
Rp 3,132,830.00
Rp 4,012,265.00
Rp 6,114,184.00
Rp 367,066.00
Rp 398,846.00
Rp 11,125,502.00
Rp 631,580.00
Rp 711,972.00
Rp 790,192.00
Rp 868,560.00
Rp 480,608.00
Rp 103,905.00
Rp 116,152.00
Rp 130,178.00
Rp 181,441.00
Rp 201,885.00
Rp 206,626.00
Rp 243,939.00
Rp 297,579.00
Rp 346,385.00
Rp 374,355.00
Rp 695,701.00
Rp 885,402.00
Rp 1,105,201.00
Rp 1,221,445.00
Rp 1,407,322.00
Rp 96,390.00
Rp 665,458.00
Rp 125,212.00
Rp 1,087,975.00
Rp 1,713,000.00
Rp 3,010,317.00
Rp 3,906,251.00
Rp 6,418,492.00
Rp 473,700.00
Rp 516,319.00
Rp 11,291,100.00
Rp 827,542.00
Rp 706,804.00
Rp 944,868.00
Rp 1,039,955.00
Rp 1,137,429.00
Rp 1,258.00
Rp 3,702.00
Rp 5,922.00
Rp 8,291.00
Rp 21,862.00
Rp 34,791.00
Rp 41,850.00
Rp 89,915.00
Rp 82,813.00
Rp 140,647.00
Rp 168,925.00
Rp 295,704.00
Rp 309,769.00
Rp 349,001.00
Rp 387,989.00
Rp 426,976.00
Rp 542.00
Rp 1,726.00
Rp 2,565.00
Rp 4,440.00
Rp 11,844.00
Rp 18,160.00
Rp 24,428.00
Rp 48,017.00
Rp 61,291.00
Rp 75,356.00
Rp 145,959.00
Rp 163,200.00
Rp 247,639.00
Rp 305,132.00
Rp 336,073.00
Rp 439,363.00
Rp 5,280.00
Rp 15,791.00
Rp 24,922.00
Rp 35,630.00
Rp 92,284.00
Rp 128,706.00
Rp 136,700.00
Rp 200,360.00
Rp 230,217.00
Rp 255,484.00
Rp 234,413.00
Rp 425,297.00
Rp 480,422.00
Rp 535,695.00
Rp 591,212.00
Rp 646,485.00
Rp 15,013.00
Rp 23,656.00
Rp 33,828.00
Rp 77,780.00
Rp 101,139.00
Rp 108,598.00
Rp 199,762.00
Rp 241,442.00
Rp 278,482.00
Rp 278,036.00
Rp 551,826.00
Rp 715,636.00
Rp 853,815.00
Rp 1,004,587.00
Rp 1,168,249.00
Rp 6,073.00
Rp 17,927.00
Rp 28,248.00
Rp 39,014.00
Rp 101,139.00
Rp 140,796.00
Rp 158,082.00
Rp 305,791.00
Rp 297,148.00
Rp 330,976.00
Rp 305,148.00
Rp 557,161.00
Rp 630,842.00
Rp 704,870.00
Rp 778,700.00
Rp 852,727.00
Rp 387,989.00
Rp 465,124.00
Rp 465,124.00
Rp 542,850.00
Rp 930,839.00
Rp 930,839.00
Rp 1,085,700.00
Rp 385,768.00
Rp 387,989.00
Rp 484,862.00
Rp 465,124.00
Rp 697,907.00
Rp 814,275.00
Rp 814,275.00
Rp 28,868.00
Rp 58,725.00
Rp 88,582.00
Rp 118,439.00
Rp 178,152.00
Rp 208,009.00
Rp 237,866.00
Rp 297,579.00
Rp 357,293.00
Rp 417,006.00
Rp 476,720.00
Rp 536,433.00
Rp 596,147.00
Rp 655,860.00
Rp 1,383.00
Rp 1,383.00
Rp 1,834.00
Rp 21,626.00
Rp 1,860.00
Rp 1,879.00
Rp 79,926.00
Rp 140,426.00
Rp 1,999.00
Rp 313,126.00
Rp 3,250,940.00
Rp 65,653.00
Rp 760,127.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 135,000 459,000.00
Tukang Batu L.02.03 OH 0.8500 179,000 152,150.00
Kepala Tukang L.03.01 OH 0.0850 197,000 16,745.00
Mandor L.04.01 OH 0.1700 222,500 37,825.00
JUMLAH TENAGA KERJA 665,720.00
B BAHAN
Batu belah m3 0.4800 -
Semen portland Kg 194.0000 -
Pasir Beton m3 0.3120 -
Kerikil m3 0.4680 -
Besi beton (polos/ulir) Kg 126.0000 -
Kawat beton Kg 1.8000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 665,720.00
E Overhead & Profit 10% 10% 66,572.00
F Harga Satuan Pekerjaan (D+E) - 732,292.00
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 135,000 162,000.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0600 222,500 13,350.00
JUMLAH TENAGA KERJA 215,090.00
B BAHAN
Semen portland kg 230.0000 2,390 549,700.00
Pasir Beton kg 893.0000 443 395,599.00
Koral Beton kg 1027.0000 459 471,393.00
Air Liter 200.0000 150 30,000.00
JUMLAH HARGA BAHAN 1,446,692.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,661,782.00
E Overhead & Profit 10% 166,178.20
F Harga Satuan Pekerjaan (D+E) - 1,827,960.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 326.0000 2,390 779,140.00
Pasir Beton kg 760.0000 443 336,680.00
Koral Beton kg 1029.0000 459 472,311.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,620,381.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,916,339.50
E Overhead & Profit 10% 191,633.95
F Harga Satuan Pekerjaan (D+E) - 2,107,973.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 352.0000 2,390 841,280.00
Pasir Beton kg 731.0000 443 323,833.00
Koral Beton kg 1031.0000 459 473,229.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,670,592.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,966,550.50
E Overhead & Profit 10% 196,655.05
F Harga Satuan Pekerjaan (D+E) - 2,163,205.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 371.0000 2,390 886,690.00
Pasir Beton kg 698.0000 443 309,214.00
Koral Beton kg 1047.0000 459 480,573.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,708,727.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,004,685.50
E Overhead & Profit 10% 200,468.55
F Harga Satuan Pekerjaan (D+E) - 2,205,154.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 384.0000 2,390 917,760.00
Pasir Beton kg 692.0000 443 306,556.00
Koral Beton kg 1039.0000 459 476,901.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,733,467.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,029,425.50
E Overhead & Profit 10% 202,942.55
F Harga Satuan Pekerjaan (D+E) - 2,232,368.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 406.0000 2,390 970,340.00
Pasir Beton kg 684.0000 443 303,012.00
Koral Beton kg 1026.0000 459 470,934.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,776,536.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,072,494.50
E Overhead & Profit 10% 207,249.45
F Harga Satuan Pekerjaan (D+E) - 2,279,743.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 413.0000 2,390 987,070.00
Pasir Beton kg 681.0000 443 301,683.00
Koral Beton kg 1021.0000 459 468,639.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,789,642.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,085,600.50
E Overhead & Profit 10% 208,560.05
F Harga Satuan Pekerjaan (D+E) - 2,294,160.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 135,000 283,500.00
Tukang Batu L.02.03 OH 0.3500 179,000 62,650.00
Kepala Tukang L.03.01 OH 0.0350 197,000 6,895.00
Mandor L.04.01 OH 0.1050 222,500 23,362.50
JUMLAH TENAGA KERJA 376,407.50
B BAHAN
Semen portland kg 439.0000 2,390 1,049,210.00
Pasir Beton kg 670.0000 443 296,810.00
Koral Beton kg 1006.0000 459 461,754.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,840,024.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,216,431.50
E Overhead & Profit 10% 221,643.15
F Harga Satuan Pekerjaan (D+E) - 2,438,074.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 135,000 283,500.00
Tukang Batu L.02.03 OH 0.3500 179,000 62,650.00
Kepala Tukang L.03.01 OH 0.0350 197,000 6,895.00
Mandor L.04.01 OH 0.1050 222,500 23,362.50
JUMLAH TENAGA KERJA 376,407.50
B BAHAN
Semen portland kg 448.0000 2,390 1,070,720.00
Pasir Beton kg 667.0000 443 295,481.00
Koral Beton kg 1000.0000 459 459,000.00
Air Liter 215.0000 150 32,250.00
JUMLAH HARGA BAHAN 1,857,451.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,233,858.50
E Overhead & Profit 10% 223,385.85
F Harga Satuan Pekerjaan (D+E) - 2,457,244.00
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0700 135,000 9,450.00
Tukang Pipa L.02.13 OH 0.0350 179,000 6,265.00
Kepala Tukang L.03.01 OH 0.0040 197,000 788.00
Mandor L.04.01 OH 0.0070 222,500 1,557.50
JUMLAH TENAGA KERJA 18,060.50
B BAHAN
Waterstop lebar 200 mm m 1.0500 215,000 225,750.00
JUMLAH HARGA BAHAN 225,750.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 243,810.50
E Overhead & Profit 10% 24,381.05
F Harga Satuan Pekerjaan (D+E) - 268,191.00
A.4.1.1.37 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) (SNI 7394 : 2008)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.3000 135,000 715,500.00
Tukang batu L.02.03 OH 0.2750 179,000 49,225.00
Tukang kayu L.02.04 OH 1.3000 179,000 232,700.00
Tukang besi L.02.05 OH 1.0500 179,000 187,950.00
Kepala tukang L.03.01 OH 0.2650 197,000 52,205.00
Mandor L.04.01 OH 0.2650 222,500 58,962.50
JUMLAH TENAGA KERJA 1,296,542.50
B BAHAN
Kayu kelas III m3 0.3200 2,890,000 924,800.00
Paku campur kg 3.2000 30,200 96,640.00
Minyak bekisting Liter 1.6000 15,000 24,000.00
Besi beton (polos/ulir) kg 157.5000 23,100 3,638,250.00
Kawat beton kg 2.2500 36,000 81,000.00
Semen portland kg 336.0000 2,390 803,040.00
Pasir Beton m3 0.5400 620,000 334,800.00
Kerikil m3 0.8100 620,000 502,200.00
Balok kayu matoa m3 0.1200 3,550,000 426,000.00
Multipelks 9 mm lbr 2.8000 250,000 700,000.00
Balok 5x5x400, ky matoa (btg btg 32.0000 71,000 2,272,000.00
JUMLAH HARGA BAHAN 9,802,730.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 11,099,272.50
E Overhead & Profit 10% 1,109,927.25
F Harga Satuan Pekerjaan (D+E) - 12,209,199.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 135,000 20,250.00
Tukang L.02.01 OH 0.3000 179,000 53,700.00
Kepala tukang L.03.01 OH 0.0300 197,000 5,910.00
Mandor L.04.01 OH 0.0080 222,500 1,780.00
JUMLAH TENAGA KERJA 81,640.00
B BAHAN
Seng talang 0.3 x 45 m 1.0500 19,000 19,950.00
Paku Campur kg 0.0100 30,200 302.00
Besi strip tebal 4mm kg 0.5000 20,200 10,100.00
JUMLAH HARGA BAHAN 30,352.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 111,992.00
E Overhead & Profit 10% 11,199.20
F Harga Satuan Pekerjaan (D+E) - 123,191.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 135,000 33,750.00
Tukang Besi L.02.05 OH 0.2500 179,000 44,750.00
Kepala Tukang L.03.01 OH 0.0250 197,000 4,925.00
Mandor L.04.01 OH 0.0130 222,500 2,892.50
JUMLAH TENAGA KERJA 86,317.50
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 12,500 43,750.00
Assesoris (perkuatan, las dll) Ls 1.0000 43,750 43,750.00
JUMLAH HARGA BAHAN 87,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 173,817.50
E Overhead & Profit 10% 17,381.75
F Harga Satuan Pekerjaan (D+E) - 191,199.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 135,000 102,654.00
Tukang Besi L.02.05 OH 0.7604 179,000 136,111.60
Kepala Tukang L.03.01 OH 0.0760 197,000 14,972.00
Mandor L.04.01 OH 0.0380 222,500 8,455.00
JUMLAH TENAGA KERJA 262,192.60
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 262,192.60
E Overhead & Profit 10% 10% 26,219.26
F Harga Satuan Pekerjaan (D+E) - 288,411.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 135,000 99,090.00
Tukang Besi L.02.05 OH 0.7340 179,000 131,386.00
Kepala Tukang L.03.01 OH 0.0730 197,000 14,381.00
Mandor L.04.01 OH 0.0370 222,500 8,232.50
JUMLAH TENAGA KERJA 253,089.50
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 253,089.50
E Overhead & Profit 10% 25,308.95
F Harga Satuan Pekerjaan (D+E) - 278,398.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 135,000 27,000.00
Tukang Besi L.02.05 OH 0.4500 179,000 80,550.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 120,645.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 93,500 347,820.00
Screw Truss CT 10-16x19 bh 28.0000 4,375 122,500.00
Dynabol dia 12 x 120 mm bh 2.0000 7,500 15,000.00
Reng Canai Dingin M' 5.4000 39,050 210,870.00
Talang / Jurai Canai Dingin M' 0.1240 -
JUMLAH HARGA BAHAN 696,190.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 69,619.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 851,644.50
E Overhead & Profit 10% 85,164.45
F Harga Satuan Pekerjaan (D+E) - 936,808.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1. Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6500 135,000 87,750.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 134,165.00
B BAHAN
Batu Tela (9x18x27) bh 25.0000 4,500 112,500.00
Semen portland Kg 43.5000 2,390 103,965.00
Pasir Pasang m3 0.0800 550,000 44,000.00
JUMLAH HARGA BAHAN 260,465.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 394,630.00
E Overhead & Profit 10% 39,463.00
F Harga Satuan Pekerjaan (D+E) - 434,093.00
A.4.4.1.2. Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6500 135,000 87,750.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 134,165.00
B BAHAN
Batu Tela (9x18x27) m3 25.0000 4,500 112,500.00
Semen portland Kg 32.9500 2,390 78,750.50
Pasir Pasang m3 0.0910 550,000 50,050.00
JUMLAH HARGA BAHAN 241,300.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 375,465.50
E Overhead & Profit 10% 37,546.55
F Harga Satuan Pekerjaan (D+E) - 413,012.00
A.4.4.1.3. Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6500 135,000 87,750.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 134,165.00
B BAHAN
Batu Tela (9x18x27) m3 25.0000 4,500 112,500.00
Semen portland Kg 26.5500 2,390 63,454.50
Pasir Pasang m3 0.0930 550,000 51,150.00
JUMLAH HARGA BAHAN 227,104.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 361,269.50
E Overhead & Profit 10% 36,126.95
F Harga Satuan Pekerjaan (D+E) - 397,396.00
A.4.4.1.7 Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1/2 batu campuran 1 SP : 2 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Batu Tela (9x18x27) m3 13.0000 4,500 58,500.00
Semen portland Kg 18.9500 2,390 45,290.50
Pasir Pasang m3 0.0380 550,000 20,900.00
JUMLAH HARGA BAHAN 124,690.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 188,398.00
E Overhead & Profit 10% 18,839.80
F Harga Satuan Pekerjaan (D+E) - 207,237.00
A.4.4.1.8 Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1/2 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Batu Tela (9x18x27) m3 13.0000 4,500 58,500.00
Semen portland Kg 14.3700 2,390 34,344.30
Pasir Pasang m3 0.0400 550,000 22,000.00
JUMLAH HARGA BAHAN 114,844.30
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 178,551.80
E Overhead & Profit 10% 17,855.18
F Harga Satuan Pekerjaan (D+E) - 196,406.00
A.4.4.1.9 Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1/2 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Batu Tela (9x18x27) m3 13.0000 4,500 58,500.00
Semen portland Kg 11.5000 2,390 27,485.00
Pasir Pasang m3 0.0430 550,000 23,650.00
JUMLAH HARGA BAHAN 109,635.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 173,342.50
E Overhead & Profit 10% 17,334.25
F Harga Satuan Pekerjaan (D+E) - 190,676.00
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 9.6800 -
Pasir Pasang m3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 8.3200 -
Pasir Pasang m3 0.0490 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 6.5000 -
Pasir Pasang m3 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen portland Kg 4.5000 -
Kapur m3 0.0150 -
Pasir Pasang m3 0.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen Merah Kg 0.0180 -
Kapur m3 0.0180 -
Pasir Pasang m3 0.0180 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata merah m3 70.0000 -
Semen Merah Kg 0.0140 -
Kapur m3 0.0140 -
Pasir Pasang m3 0.0280 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata rooster m3 30.0000 -
Semen portland Kg 11.0000 -
Pasir Pasang m3 0.0350 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 63,707.50
B BAHAN
Bata berongga m3 30.0000 -
Semen portland Kg 11.0000 -
Pasir Pasang m3 0.0350 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,707.50
E Overhead & Profit 10% 10% 6,370.75
F Harga Satuan Pekerjaan (D+E) - 70,078.00
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 135,000 47,250.00
Tukang Batu L.02.03 OH 0.130 179,000 23,270.00
Kepala Tukang L.03.01 OH 0.013 197,000 2,561.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 73,748.50
B BAHAN
Bata ringan tebal 7,5 cm m3 0.075 -
Mortar siap pakai Kg 2.772 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 73,748.50
E Overhead & Profit 10% 10% 7,374.85
F Harga Satuan Pekerjaan (D+E) - 81,123.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 135,000 47,250.00
Tukang Batu L.02.03 OH 0.130 179,000 23,270.00
Kepala Tukang L.03.01 OH 0.013 197,000 2,561.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 73,748.50
B BAHAN
Bata ringan (10x20x60) cm m3 0.1 20,000 2,000.00
Mortar siap pakai Kg 4.4 -
JUMLAH HARGA BAHAN 2,000.00
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 2,000 200.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 75,848.50
E Overhead & Profit 10% 10% 7,584.85
F Harga Satuan Pekerjaan (D+E) - 83,433.00
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 135,000 40,500.00
Tukang Batu L.02.03 OH 0.1500 179,000 26,850.00
Kepala Tukang L.03.01 OH 0.0150 197,000 2,955.00
Mandor L.04.01 OH 0.0150 222,500 3,337.50
JUMLAH TENAGA KERJA 73,642.50
B BAHAN
Semen portland Kg 6.3400 2,390 15,152.60
Pasir Pasang m3 0.0120 550,000 6,600.00
JUMLAH HARGA BAHAN 21,752.60
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 95,395.10
E Overhead & Profit 10% 9,539.51
F Harga Satuan Pekerjaan (D+E) - 104,934.00
A.4.4.2.27. Pemasangan 1 m2 acian.
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 135,000 27,000.00
Tukang Batu L.02.03 OH 0.1000 179,000 17,900.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0100 222,500 2,225.00
JUMLAH TENAGA KERJA 49,095.00
B BAHAN
Semen portland Kg 3.2500 2,390 7,767.50
JUMLAH HARGA BAHAN 7,767.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 56,862.50
E Overhead & Profit 10% 5,686.25
F Harga Satuan Pekerjaan (D+E) - 62,548.00
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 135,000 33,750.00
Tukang Batu L.02.03 OH 0.1250 179,000 22,375.00
Kepala tukang L.03.01 OH 0.0130 197,000 2,561.00
Mandor L.04.01 OH 0.0130 222,500 2,892.50
JUMLAH TENAGA KERJA 61,578.50
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 -
Semen portland kg 9.8000 -
Semen Warna Kg 1.3000 -
Pasir Pasang M3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 61,578.50
E Overhead & Profit 10% 10% 6,157.85
F Harga Satuan Pekerjaan (D+E) - 67,736.00
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 135,000 32,400.00
Tukang Batu L.02.03 OH 0.1200 179,000 21,480.00
Kepala tukang L.03.01 OH 0.0120 197,000 2,364.00
Mandor L.04.01 OH 0.0120 222,500 2,670.00
JUMLAH TENAGA KERJA 58,914.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 -
Semen portland kg 9.6000 -
Semen Warna Kg 1.5000 -
Pasir Pasang M3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 58,914.00
E Overhead & Profit 10% 10% 5,891.40
F Harga Satuan Pekerjaan (D+E) - 64,805.00
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 135,000 33,750.00
Tukang Batu L.02.03 OH 0.1250 179,000 22,375.00
Kepala tukang L.03.01 OH 0.0130 197,000 2,561.00
Mandor L.04.01 OH 0.0130 222,500 2,892.50
JUMLAH TENAGA KERJA 61,578.50
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 -
Semen portland kg 9.8000 -
Semen Warna Kg 1.3000 -
Pasir Pasang M3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 61,578.50
E Overhead & Profit 10% 10% 6,157.85
F Harga Satuan Pekerjaan (D+E) - 67,736.00
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 135,000 35,100.00
Tukang Batu L.02.03 OH 0.1300 179,000 23,270.00
Kepala tukang L.03.01 OH 0.0130 197,000 2,561.00
Mandor L.04.01 OH 0.0130 222,500 2,892.50
JUMLAH TENAGA KERJA 63,823.50
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh 11.8700 -
Semen portland kg 10.0000 -
Semen Warna Kg 1.5000 -
Pasir Pasang M3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 63,823.50
E Overhead & Profit 10% 10% 6,382.35
F Harga Satuan Pekerjaan (D+E) - 70,205.00
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 135,000 94,500.00
Tukang Batu L.02.03 OH 0.3500 179,000 62,650.00
Kepala tukang L.03.01 OH 0.0350 197,000 6,895.00
Mandor L.04.01 OH 0.0350 222,500 7,787.50
JUMLAH TENAGA KERJA 171,832.50
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh 106.0000 -
Semen portland Kg 8.1900 -
Pasir Pasang M3 0.0450 -
Semen Warna Kg 3.2000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171,832.50
E Overhead & Profit 10% 10% 17,183.25
F Harga Satuan Pekerjaan (D+E) - 189,015.00
A.4.4.3.34. Pemasangan 1m2 lantai keramik ukuran 33cm x 33cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 135,000 94,500.00
Tukang Batu L.02.03 OH 0.3500 179,000 62,650.00
Kepala tukang L.03.01 OH 0.0350 197,000 6,895.00
Mandor L.04.01 OH 0.0350 222,500 7,787.50
JUMLAH TENAGA KERJA 171,832.50
B BAHAN
keramik ukuran 33cm x 33cm Bh 10.0000 -
Semen portland Kg 8.1900 -
Pasir Pasang M3 0.0450 -
Semen Warna Kg 1.6200 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 171,832.50
E Overhead & Profit 10% 10% 17,183.25
F Harga Satuan Pekerjaan (D+E) - 189,015.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 135,000 13,500.00
Tukang kayu L.02.04 OH 0.1000 179,000 17,900.00
Kepala tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0050 222,500 1,112.50
JUMLAH TENAGA KERJA 34,482.50
B BAHAN
Tripleks Lembar 0.3750 96,500 36,187.50
Paku tripleks kg 0.0300 29,000 870.00
JUMLAH HARGA BAHAN 37,057.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 71,540.00
E Overhead & Profit 10% 7,154.00
F Harga Satuan Pekerjaan (D+E) - 78,694.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 135,000 67,500.00
Tukang kayu L.02.04 OH 0.5000 179,000 89,500.00
Kepala tukang L.03.01 OH 0.0500 197,000 9,850.00
Mandor L.04.01 OH 0.0250 222,500 5,562.50
JUMLAH TENAGA KERJA 172,412.50
B BAHAN
Profil Allum"T" m 3.6000 -
Kawat dia 4 mm kg 0.1500 -
Ramset Buah 1.0500 -
Akustik 60 x 120 Lembar 1.5000 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 172,412.50
E Overhead & Profit 10% 10% 17,241.25
F Harga Satuan Pekerjaan (D+E) - 189,653.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 135,000 135,000.00
Tukang kayu L.02.04 OH 3.0000 179,000 537,000.00
Kepala tukang L.03.01 OH 0.3000 197,000 59,100.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 742,225.00
B BAHAN
kayu Papan Besi m3 0.0400 6,200,000 248,000.00
Lem Aica Aibon Kg 0.5000 99,000 49,500.00
JUMLAH HARGA BAHAN 297,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,039,725.00
E Overhead & Profit 10% 103,972.50
F Harga Satuan Pekerjaan (D+E) - 1,143,697.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 135,000 108,000.00
Tukang kayu L.02.04 OH 2.4000 179,000 429,600.00
Kepala tukang L.03.01 OH 0.2400 197,000 47,280.00
Mandor L.04.01 OH 0.0400 222,500 8,900.00
JUMLAH TENAGA KERJA 593,780.00
B BAHAN
kayu Papan Besi m3 0.0240 6,200,000 148,800.00
Lem Aica Aibon Kg 0.3000 99,000 29,700.00
JUMLAH HARGA BAHAN 178,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 772,280.00
E Overhead & Profit 10% 77,228.00
F Harga Satuan Pekerjaan (D+E) - 849,508.00
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 135,000 135,000.00
Tukang kayu L.02.04 OH 3.0000 179,000 537,000.00
Kepala tukang L.03.01 OH 0.3000 197,000 59,100.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 742,225.00
B BAHAN
kayu Papan Besi m3 0.0640 6,200,000 396,800.00
Lem Aica Aibon Kg 0.5000 99,000 49,500.00
JUMLAH HARGA BAHAN 446,300.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,188,525.00
E Overhead & Profit 10% 118,852.50
F Harga Satuan Pekerjaan (D+E) - 1,307,377.00
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 135,000 20,250.00
Tukang kayu L.02.04 OH 0.3 179,000 53,700.00
Kepala tukang L.03.01 OH 0.03 197,000 5,910.00
Mandor L.04.01 OH 0.075 222,500 16,687.50
JUMLAH TENAGA KERJA 96,547.50
B BAHAN
Kayu 5/7 m3 0.0154 3,550,000 54,670.00
Paku Campur kg 0.2 30,200 6,040.00
JUMLAH HARGA BAHAN 60,710.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 157,257.50
E Overhead & Profit 10% 15,725.75
F Harga Satuan Pekerjaan (D+E) - 172,983.00
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 135,000 27,000.00
Tukang kayu L.02.04 OH 0.3 179,000 53,700.00
Kepala tukang L.03.01 OH 0.03 197,000 5,910.00
Mandor L.04.01 OH 0.01 222,500 2,225.00
JUMLAH TENAGA KERJA 88,835.00
B BAHAN
Kayu 5/7 m3 0.0163 3,550,000 57,865.00
Paku Campur kg 0.25 30,200 7,550.00
JUMLAH HARGA BAHAN 65,415.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 154,250.00
E Overhead & Profit 10% 15,425.00
F Harga Satuan Pekerjaan (D+E) - 169,675.00
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 135,000 13,500.00
Tukang kayu L.02.04 OH 0.2 179,000 35,800.00
Kepala tukang L.03.01 OH 0.02 197,000 3,940.00
Mandor L.04.01 OH 0.005 222,500 1,112.50
JUMLAH TENAGA KERJA 54,352.50
B BAHAN
Kayu Papan Besi m3 0.0108 3,550,000 38,340.00
Paku Campur kg 0.1 30,200 3,020.00
JUMLAH HARGA BAHAN 41,360.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 95,712.50
E Overhead & Profit 10% 9,571.25
F Harga Satuan Pekerjaan (D+E) - 105,283.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 135,000 13,500.00
Tukang kayu L.02.04 OH 0.2 179,000 35,800.00
Kepala tukang L.03.01 OH 0.02 197,000 3,940.00
Mandor L.04.01 OH 0.005 222,500 1,112.50
JUMLAH TENAGA KERJA 54,352.50
B BAHAN
Kayu Papan Besi m3 0.011 3,550,000 39,050.00
Paku Campur kg 0.05 30,200 1,510.00
JUMLAH HARGA BAHAN 40,560.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 94,912.50
E Overhead & Profit 10% 9,491.25
F Harga Satuan Pekerjaan (D+E) - 104,403.00
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 135,000 3,780.00
Tukang cat L.02.08 OH 0.042 179,000 7,518.00
Kepala tukang L.03.01 OH 0.004 197,000 827.40
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 12,792.90
B BAHAN
Cat dasar Tembok Kg 0.120 36,000 4,320.00
Cat Penutup Tembok Kg 0.180 30,500 5,490.00
JUMLAH HARGA BAHAN 9,810.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 22,602.90
E Overhead & Profit 10% 2,260.29
F Harga Satuan Pekerjaan (D+E) - 24,863.00
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.400 135,000 54,000.00
Tukang cat L.02.08 OH 0.700 179,000 125,300.00
Kepala tukang L.03.01 OH 0.070 197,000 13,790.00
Mandor L.04.01 OH 0.020 222,500 4,450.00
JUMLAH TENAGA KERJA 197,540.00
B BAHAN
Cat Besi Kg 0.300 74,000 22,200.00
Pengencer L 0.010 35,500 355.00
JUMLAH HARGA BAHAN 22,555.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 220,095.00
E Overhead & Profit 10% 22,009.50
F Harga Satuan Pekerjaan (D+E) - 242,104.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 326.0000 2,390 779,140.00
Pasir Beton kg 760.0000 443 336,680.00
Koral Beton kg 1029.0000 459 472,311.00
Air Liter 215.0000 500 107,500.00
JUMLAH HARGA BAHAN 1,695,631.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,991,589.50
E Overhead & Profit 10% 199,158.95
F Harga Satuan Pekerjaan (D+E) - 2,190,748.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 384.0000 2,390 917,760.00
Pasir Beton kg 692.0000 443 306,556.00
Koral Beton kg 1039.0000 459 476,901.00
Air Liter 215.0000 500 107,500.00
JUMLAH HARGA BAHAN 1,808,717.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,104,675.50
E Overhead & Profit 10% 210,467.55
F Harga Satuan Pekerjaan (D+E) - 2,315,143.00
A.4.1.1.37 Membuat 1 m3 plat beton bertulang (150 kg besi + bekisting) (SNI 7394 : 2008)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.3000 135,000 715,500.00
Tukang batu L.02.03 OH 0.2750 179,000 49,225.00
Tukang kayu L.02.04 OH 1.3000 179,000 232,700.00
Tukang besi L.02.05 OH 1.0500 179,000 187,950.00
Kepala tukang L.03.01 OH 0.2650 197,000 52,205.00
Mandor L.04.01 OH 0.2650 222,500 58,962.50
JUMLAH TENAGA KERJA 1,296,542.50
B BAHAN
Kayu kelas III m3 0.3200 2,890,000 924,800.00
Paku campur kg 3.2000 30,200 96,640.00
Minyak bekisting Liter 1.6000 35,500 56,800.00
Besi beton (polos/ulir) kg 157.5000 23,100 3,638,250.00
Kawat beton kg 2.2500 36,000 81,000.00
Semen portland kg 336.0000 2,390 803,040.00
Pasir Beton m3 0.5400 620,000 334,800.00
Kerikil m3 0.8100 620,000 502,200.00
Balok kayu matoa m3 0.1200 3,550,000 426,000.00
Multipelks 9 mm lbr 2.8000 250,000 700,000.00
Balok 5x5x400, ky matoa (btg btg 32.0000 134,000 4,288,000.00
JUMLAH HARGA BAHAN 11,851,530.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 13,148,072.50
E Overhead & Profit 10% 1,314,807.25
F Harga Satuan Pekerjaan (D+E) - 14,462,879.00
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg besi profil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0600 135,000 8,100.00
Tukang Las Konstruksi L.02.10 OH 0.0600 179,000 10,740.00
Kepala tukang L.03.01 OH 0.0060 197,000 1,182.00
Mandor L.04.01 OH 0.0030 222,500 667.50
JUMLAH TENAGA KERJA 20,689.50
B BAHAN
Besi Profil Kg 1.1500 23,100 26,565.00
JUMLAH HARGA BAHAN 26,565.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 47,254.50
E Overhead & Profit 10% 4,725.45
F Harga Satuan Pekerjaan (D+E) - 51,979.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 135,000 20,250.00
Tukang L.02.01 OH 0.3000 179,000 53,700.00
Kepala tukang L.03.01 OH 0.0300 197,000 5,910.00
Mandor L.04.01 OH 0.0080 222,500 1,780.00
JUMLAH TENAGA KERJA 81,640.00
B BAHAN
Seng talang 0.3 x 45 m 1.0500 19,000 19,950.00
Paku Campur kg 0.0100 30,200 302.00
Besi strip tebal 4mm kg 0.5000 20,200 10,100.00
JUMLAH HARGA BAHAN 30,352.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 111,992.00
E Overhead & Profit 10% 11,199.20
F Harga Satuan Pekerjaan (D+E) - 123,191.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 135,000 102,654.00
Tukang Besi L.02.05 OH 0.7604 179,000 136,111.60
Kepala Tukang L.03.01 OH 0.0760 197,000 14,972.00
Mandor L.04.01 OH 0.0380 222,500 8,455.00
JUMLAH TENAGA KERJA 262,192.60
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 262,192.60
E Overhead & Profit 10% 10% 26,219.26
F Harga Satuan Pekerjaan (D+E) - 288,411.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 135,000 99,090.00
Tukang Besi L.02.05 OH 0.7340 179,000 131,386.00
Kepala Tukang L.03.01 OH 0.0730 197,000 14,381.00
Mandor L.04.01 OH 0.0370 222,500 8,232.50
JUMLAH TENAGA KERJA 253,089.50
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 253,089.50
E Overhead & Profit 10% 25,308.95
F Harga Satuan Pekerjaan (D+E) - 278,398.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 135,000 27,000.00
Tukang Besi L.02.05 OH 0.4500 179,000 80,550.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 120,645.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 93,500 347,820.00
Screw Truss CT 10-16x19 bh 28.0000 4,375 122,500.00
Dynabol dia 12 x 120 mm bh 2.0000 7,500 15,000.00
Reng Canai Dingin M' 5.4000 39,050 210,870.00
Talang / Jurai Canai Dingin M' 0.1240 -
JUMLAH HARGA BAHAN 696,190.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 69,619.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 851,644.50
E Overhead & Profit 10% 85,164.45
F Harga Satuan Pekerjaan (D+E) - 936,808.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.2. Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6500 135,000 87,750.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 134,165.00
B BAHAN
Batu Tela (9x18x27) m3 25.0000 4,500 112,500.00
Semen portland Kg 32.9500 2,390 78,750.50
Pasir Pasang m3 0.0910 550,000 50,050.00
JUMLAH HARGA BAHAN 241,300.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 375,465.50
E Overhead & Profit 10% 37,546.55
F Harga Satuan Pekerjaan (D+E) - 413,012.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 135,000 81,000.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 127,415.00
B BAHAN
Bata merah m3 140.0000 4,500 630,000.00
Semen portland Kg 22.2000 2,390 53,058.00
Pasir Pasang m3 0.1020 550,000 56,100.00
JUMLAH HARGA BAHAN 739,158.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 866,573.00
E Overhead & Profit 10% 10% 86,657.30
F Harga Satuan Pekerjaan (D+E) - 953,230.00
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 135,000 32,400.00
Tukang Batu L.02.03 OH 0.1200 179,000 21,480.00
Kepala tukang L.03.01 OH 0.0120 197,000 2,364.00
Mandor L.04.01 OH 0.0120 222,500 2,670.00
JUMLAH TENAGA KERJA 58,914.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 98,750 306,125.00
Semen portland kg 9.6000 2,390 22,944.00
Semen Warna Kg 1.5000 26,150 39,225.00
Pasir Pasang M3 0.0450 550,000 24,750.00
JUMLAH HARGA BAHAN 393,044.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 451,958.00
E Overhead & Profit 10% 10% 45,195.80
F Harga Satuan Pekerjaan (D+E) - 497,153.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 135,000 27,000.00
Tukang Besi L.02.05 OH 0.4500 179,000 80,550.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 120,645.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 93,500 347,820.00
Screw Truss CT 10-16x19 bh 28.0000 4,375 122,500.00
Dynabol dia 12 x 120 mm bh 2.0000 7,500 15,000.00
Reng Canai Dingin M' 5.4000 39,050 210,870.00
Talang / Jurai Canai Dingin M' 0.1240 -
JUMLAH HARGA BAHAN 696,190.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 69,619.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 851,644.50
E Overhead & Profit 10% 85,164.45
F Harga Satuan Pekerjaan (D+E) - 936,808.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 135,000 135,000.00
Tukang kayu L.02.04 OH 3.0000 179,000 537,000.00
Kepala tukang L.03.01 OH 0.3000 197,000 59,100.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 742,225.00
B BAHAN
kayu Papan Besi m3 0.0400 6,200,000 248,000.00
Lem Aica Aibon Kg 0.5000 99,000 49,500.00
JUMLAH HARGA BAHAN 297,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,039,725.00
E Overhead & Profit 10% 103,972.50
F Harga Satuan Pekerjaan (D+E) - 1,143,697.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 135,000 108,000.00
Tukang kayu L.02.04 OH 2.4000 179,000 429,600.00
Kepala tukang L.03.01 OH 0.2400 197,000 47,280.00
Mandor L.04.01 OH 0.0400 222,500 8,900.00
JUMLAH TENAGA KERJA 593,780.00
B BAHAN
kayu Papan Besi m3 0.0240 6,200,000 148,800.00
Lem Aica Aibon Kg 0.3000 99,000 29,700.00
JUMLAH HARGA BAHAN 178,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 772,280.00
E Overhead & Profit 10% 77,228.00
F Harga Satuan Pekerjaan (D+E) - 849,508.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 135,000 13,500.00
Tukang kayu L.02.04 OH 0.2 179,000 35,800.00
Kepala tukang L.03.01 OH 0.02 197,000 3,940.00
Mandor L.04.01 OH 0.005 222,500 1,112.50
JUMLAH TENAGA KERJA 54,352.50
B BAHAN
Kayu Papan Besi m3 0.011 3,550,000 39,050.00
Paku Campur kg 0.05 30,200 1,510.00
JUMLAH HARGA BAHAN 40,560.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 94,912.50
E Overhead & Profit 10% 9,491.25
F Harga Satuan Pekerjaan (D+E) - 104,403.00
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 135,000 9,450.00
Tukang cat L.02.08 OH 0.009 179,000 1,611.00
Kepala tukang L.03.01 OH 0.006 197,000 1,182.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 12,910.50
B BAHAN
Cat menie kayu Kg 0.200 32,000 6,400.00
Plamuur kayu Kg 0.150 51,000 7,650.00
Cat dasar Kayu Kg 0.170 36,000 6,120.00
Cat Penutup Kayu Kg 0.260 36,000 9,360.00
Kuas Bh 0.010 17,500 175.00
Pengencer Kg 0.030 35,500 1,065.00
Ampelas kayu Lbr 0.200 8,500 1,700.00
JUMLAH HARGA BAHAN 32,470.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 45,380.50
E Overhead & Profit 10% 4,538.05
F Harga Satuan Pekerjaan (D+E) - 49,918.00
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 135,000 9,450.00
Tukang cat L.02.08 OH 0.105 179,000 18,795.00
Kepala tukang L.03.01 OH 0.004 197,000 788.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 29,700.50
B BAHAN
Cat menie kayu Kg 0.200 32,000 6,400.00
Plamuur kayu Kg 0.150 51,000 7,650.00
Cat dasar Kayu Kg 0.170 36,000 6,120.00
Cat Penutup Kayu Kg 0.350 36,000 12,600.00
Kuas Bh 0.010 17,500 175.00
Pengencer Kg 0.030 35,500 1,065.00
Ampelas kayu Lbr 0.200 8,500 1,700.00
JUMLAH HARGA BAHAN 35,710.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 65,410.50
E Overhead & Profit 10% 6,541.05
F Harga Satuan Pekerjaan (D+E) - 71,951.00
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 135,000 432,000.00
Tukang batu L.02.03 OH 1.150 179,000 205,850.00
Kepala tukang L.03.01 OH 0.011 197,000 2,167.00
Mandor L.04.01 OH 0.016 222,500 3,560.00
JUMLAH TENAGA KERJA 643,577.00
B BAHAN
Bata merah bh 123.000 -
Semen portland Kg 114.000 -
Pasir pasang M3 0.184 -
Pasir beton M3 0.120 -
Kerikil M3 0.033 -
Baja tulangan Kg 4.850 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 643,577.00
E Overhead & Profit 10% 10% 64,357.70
F Harga Satuan Pekerjaan (D+E) - 707,934.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 135,000 8,100.00
Tukang batu L.02.03 OH 0.030 179,000 5,370.00
Kepala tukang L.03.01 OH 0.003 197,000 591.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 14,728.50
B BAHAN
Pipa tanah Bh 1.600 -
Semen portland Kg 0.680 -
Pasir pasang M3 0.013 -
Pasir urug M3 0.011 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 14,728.50
E Overhead & Profit 10% 10% 1,472.85
F Harga Satuan Pekerjaan (D+E) - 16,201.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 326.0000 2,390 779,140.00
Pasir Beton kg 760.0000 443 336,680.00
Koral Beton kg 1029.0000 459 472,311.00
Air Liter 215.0000 500 107,500.00
JUMLAH HARGA BAHAN 1,695,631.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,991,589.50
E Overhead & Profit 10% 199,158.95
F Harga Satuan Pekerjaan (D+E) - 2,190,748.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 135,000 222,750.00
Tukang Batu L.02.03 OH 0.2750 179,000 49,225.00
Kepala Tukang L.03.01 OH 0.0280 197,000 5,516.00
Mandor L.04.01 OH 0.0830 222,500 18,467.50
JUMLAH TENAGA KERJA 295,958.50
B BAHAN
Semen portland kg 384.0000 2,390 917,760.00
Pasir Beton kg 692.0000 443 306,556.00
Koral Beton kg 1039.0000 459 476,901.00
Air Liter 215.0000 500 107,500.00
JUMLAH HARGA BAHAN 1,808,717.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 2,104,675.50
E Overhead & Profit 10% 210,467.55
F Harga Satuan Pekerjaan (D+E) - 2,315,143.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 135,000 20,250.00
Tukang L.02.01 OH 0.3000 179,000 53,700.00
Kepala tukang L.03.01 OH 0.0300 197,000 5,910.00
Mandor L.04.01 OH 0.0080 222,500 1,780.00
JUMLAH TENAGA KERJA 81,640.00
B BAHAN
Seng talang 0.3 x 45 m 1.0500 19,000 19,950.00
Paku Campur kg 0.0100 30,200 302.00
Besi strip tebal 4mm kg 0.5000 20,200 10,100.00
JUMLAH HARGA BAHAN 30,352.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 111,992.00
E Overhead & Profit 10% 11,199.20
F Harga Satuan Pekerjaan (D+E) - 123,191.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 135,000 102,654.00
Tukang Besi L.02.05 OH 0.7604 179,000 136,111.60
Kepala Tukang L.03.01 OH 0.0760 197,000 14,972.00
Mandor L.04.01 OH 0.0380 222,500 8,455.00
JUMLAH TENAGA KERJA 262,192.60
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 262,192.60
E Overhead & Profit 10% 10% 26,219.26
F Harga Satuan Pekerjaan (D+E) - 288,411.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 135,000 99,090.00
Tukang Besi L.02.05 OH 0.7340 179,000 131,386.00
Kepala Tukang L.03.01 OH 0.0730 197,000 14,381.00
Mandor L.04.01 OH 0.0370 222,500 8,232.50
JUMLAH TENAGA KERJA 253,089.50
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 253,089.50
E Overhead & Profit 10% 25,308.95
F Harga Satuan Pekerjaan (D+E) - 278,398.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 135,000 27,000.00
Tukang Besi L.02.05 OH 0.4500 179,000 80,550.00
Kepala Tukang L.03.01 OH 0.0100 197,000 1,970.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 120,645.00
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 93,500 347,820.00
Screw Truss CT 10-16x19 bh 28.0000 4,375 122,500.00
Dynabol dia 12 x 120 mm bh 2.0000 7,500 15,000.00
Reng Canai Dingin M' 5.4000 39,050 210,870.00
Talang / Jurai Canai Dingin M' 0.1240 -
JUMLAH HARGA BAHAN 696,190.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 69,619.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 851,644.50
E Overhead & Profit 10% 85,164.45
F Harga Satuan Pekerjaan (D+E) - 936,808.00
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.2. Pemasangan 1m2 dinding batu tela (9x18x27) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6500 135,000 87,750.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 134,165.00
B BAHAN
Batu Tela (9x18x27) m3 25.0000 4,500 112,500.00
Semen portland Kg 32.9500 2,390 78,750.50
Pasir Pasang m3 0.0910 550,000 50,050.00
JUMLAH HARGA BAHAN 241,300.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 375,465.50
E Overhead & Profit 10% 37,546.55
F Harga Satuan Pekerjaan (D+E) - 413,012.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 135,000 81,000.00
Tukang Batu L.02.03 OH 0.2000 179,000 35,800.00
Kepala Tukang L.03.01 OH 0.0200 197,000 3,940.00
Mandor L.04.01 OH 0.0300 222,500 6,675.00
JUMLAH TENAGA KERJA 127,415.00
B BAHAN
Bata merah m3 140.0000 -
Semen portland Kg 22.2000 -
Pasir Pasang m3 0.1020 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 127,415.00
E Overhead & Profit 10% 10% 12,741.50
F Harga Satuan Pekerjaan (D+E) - 140,156.00
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 135,000 32,400.00
Tukang Batu L.02.03 OH 0.1200 179,000 21,480.00
Kepala tukang L.03.01 OH 0.0120 197,000 2,364.00
Mandor L.04.01 OH 0.0120 222,500 2,670.00
JUMLAH TENAGA KERJA 58,914.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 -
Semen portland kg 9.6000 -
Semen Warna Kg 1.5000 -
Pasir Pasang M3 0.0450 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 58,914.00
E Overhead & Profit 10% 10% 5,891.40
F Harga Satuan Pekerjaan (D+E) - 64,805.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 135,000 135,000.00
Tukang kayu L.02.04 OH 3.0000 179,000 537,000.00
Kepala tukang L.03.01 OH 0.3000 197,000 59,100.00
Mandor L.04.01 OH 0.0500 222,500 11,125.00
JUMLAH TENAGA KERJA 742,225.00
B BAHAN
kayu Papan Besi m3 0.0400 6,200,000 248,000.00
Lem Aica Aibon Kg 0.5000 99,000 49,500.00
JUMLAH HARGA BAHAN 297,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,039,725.00
E Overhead & Profit 10% 103,972.50
F Harga Satuan Pekerjaan (D+E) - 1,143,697.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 135,000 108,000.00
Tukang kayu L.02.04 OH 2.4000 179,000 429,600.00
Kepala tukang L.03.01 OH 0.2400 197,000 47,280.00
Mandor L.04.01 OH 0.0400 222,500 8,900.00
JUMLAH TENAGA KERJA 593,780.00
B BAHAN
kayu Papan Besi m3 0.0240 6,200,000 148,800.00
Lem Aica Aibon Kg 0.3000 99,000 29,700.00
JUMLAH HARGA BAHAN 178,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 772,280.00
E Overhead & Profit 10% 77,228.00
F Harga Satuan Pekerjaan (D+E) - 849,508.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 135,000 13,500.00
Tukang kayu L.02.04 OH 0.2 179,000 35,800.00
Kepala tukang L.03.01 OH 0.02 197,000 3,940.00
Mandor L.04.01 OH 0.005 222,500 1,112.50
JUMLAH TENAGA KERJA 54,352.50
B BAHAN
Kayu Papan Besi m3 0.011 3,550,000 39,050.00
Paku Campur kg 0.05 30,200 1,510.00
JUMLAH HARGA BAHAN 40,560.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 94,912.50
E Overhead & Profit 10% 9,491.25
F Harga Satuan Pekerjaan (D+E) - 104,403.00
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 135,000 9,450.00
Tukang cat L.02.08 OH 0.009 179,000 1,611.00
Kepala tukang L.03.01 OH 0.006 197,000 1,182.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 12,910.50
B BAHAN
Cat menie kayu Kg 0.200 32,000 6,400.00
Plamuur kayu Kg 0.150 51,000 7,650.00
Cat dasar Kayu Kg 0.170 36,000 6,120.00
Cat Penutup Kayu Kg 0.260 36,000 9,360.00
Kuas Bh 0.010 17,500 175.00
Pengencer Kg 0.030 35,500 1,065.00
Ampelas kayu Lbr 0.200 8,500 1,700.00
JUMLAH HARGA BAHAN 32,470.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 45,380.50
E Overhead & Profit 10% 4,538.05
F Harga Satuan Pekerjaan (D+E) - 49,918.00
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 135,000 9,450.00
Tukang cat L.02.08 OH 0.105 179,000 18,795.00
Kepala tukang L.03.01 OH 0.004 197,000 788.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 29,700.50
B BAHAN
Cat menie kayu Kg 0.200 32,000 6,400.00
Plamuur kayu Kg 0.150 51,000 7,650.00
Cat dasar Kayu Kg 0.170 36,000 6,120.00
Cat Penutup Kayu Kg 0.350 36,000 12,600.00
Kuas Bh 0.010 17,500 175.00
Pengencer Kg 0.030 35,500 1,065.00
Ampelas kayu Lbr 0.200 8,500 1,700.00
JUMLAH HARGA BAHAN 35,710.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 65,410.50
E Overhead & Profit 10% 6,541.05
F Harga Satuan Pekerjaan (D+E) - 71,951.00
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 135,000 432,000.00
Tukang batu L.02.03 OH 1.150 179,000 205,850.00
Kepala tukang L.03.01 OH 0.011 197,000 2,167.00
Mandor L.04.01 OH 0.016 222,500 3,560.00
JUMLAH TENAGA KERJA 643,577.00
B BAHAN
Bata merah bh 123.000 -
Semen portland Kg 114.000 -
Pasir pasang M3 0.184 -
Pasir beton M3 0.120 -
Kerikil M3 0.033 -
Baja tulangan Kg 4.850 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 643,577.00
E Overhead & Profit 10% 10% 64,357.70
F Harga Satuan Pekerjaan (D+E) - 707,934.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 135,000 8,100.00
Tukang batu L.02.03 OH 0.030 179,000 5,370.00
Kepala tukang L.03.01 OH 0.003 197,000 591.00
Mandor L.04.01 OH 0.003 222,500 667.50
JUMLAH TENAGA KERJA 14,728.50
B BAHAN
Pipa tanah Bh 1.600 -
Semen portland Kg 0.680 -
Pasir pasang M3 0.013 -
Pasir urug M3 0.011 -
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 14,728.50
E Overhead & Profit 10% 10% 1,472.85
F Harga Satuan Pekerjaan (D+E) - 16,201.00
I BAHAN SANITAIR
1 Bak mandi Fiber glass 110 ltr bh Rp 825,000.00
2 Floor Drain bh Rp 45,000.00
3 Kloset Duduk Keramik + ACC (Toto) bh Rp 2,000,000.00
4 Kloset Jongkok Keramik + ACC (setara KIA) bh Rp 670,000.00
5 Wastafel + ACC + Cermin bh Rp 1,925,000.00
6 Kran Wastafel bh Rp 85,000.00
7 Kran Jet Shower (Kloset Duduk) bh Rp 125,000.00
8 Stop Kran Ø 1/2 " - 1" + ACC bh Rp 43,500.00
9 Pompa Air Listrik unit Rp 3,000,000.00
10 Kran dinding unit
11 Kran shower unit Rp 156,000.00
J BAHAN ME
1 Pipa GIP Ø 1/2"-6m, Medium A m' Rp 29,250.00
2 Pipa GIP Ø 3/4"-6m, Medium A m' Rp 37,500.00
3 Pipa GIP Ø 1"-6m, Medium A m' Rp 49,167.00
4 Pipa GIP Ø 1 1/2"-6m, Medium A m' Rp 62,500.00
5 Pipa GIP Ø 2"-6m, Medium A m' Rp 83,333.33
6 Pipa GIP Ø 3"-6m, Medium A m' Rp 135,000.00
7 Pipa GIP Ø 4"-6m, Medium A m' Rp 308,333.33
8 Pipa PVC Ø 1/2"-4m (AW) m' Rp 11,875.00
9 Pipa PVC Ø 1"-4m (AW) m' Rp 15,500.00
10 Pipa PVC Ø 1 1/2"-4m (AW) m' Rp 20,375.00
11 Pipa PVC Ø 2"-4m (AW) m' Rp 30,000.00
12 Pipa PVC Ø 3"-4m (AW) m' Rp 63,750.00
13 Pipa PVC Ø 4"-4m (AW) m' Rp 99,500.00
14 Elbow bh Rp 121,800.00
15 Elbow Clipsal bh Rp 23,250.00
16 T. Doos PVC 3/4 bh Rp 30,600.00
17 Sock PVC Clipsal bh Rp 11,100.00
18 Sealtape bh Rp 15,000.00
19 Lem Pipa pcs Rp 65,000.00
20 Kawat Las kg Rp 41,200.00
21 Waterstop lebar 200 mm m' Rp 215,000.00
22 Plastik Cor m2 Rp 3,000.00
23 Karung bh Rp 20,000.00
24 Kabel NYY 2x2,5 mm m' Rp 27,500.00
25 Kabel NYM 2x2,5 mm m' Rp 20,500.00
26 Kabel NYM 3x2,5 mm m' Rp 30,000.00
27 Kabel TV m' Rp 3,000.00
28 Kabel Telephone m' Rp 9,000.00
29 Kabel BC 16 m' Rp 30,500.00
30 Lampu TL 2x40 watt + cassing bh Rp 460,000.00
31 Lampu Stick SL 18 watt + Cassing R 15 (downlight) bh Rp 280,000.00
32 Fitting bh Rp 80,500.00
33 Saklar Single bh Rp 41,000.00
34 Saklar Double bh Rp 60,000.00
35 Stop Kontak bh Rp 40,700.00
36 Stop Kontak AC bh Rp 50,000.00
37 Outlet TV set Rp 56,000.00
38 Outlet Telephone set Rp 59,000.00
39 Klem Clipsal bh Rp 3,600.00
40 Pipa Clipsal m' Rp 5,625.00
41 Pipa Kabel Union (Conduit) btg Rp 33,500.00
42 Las Dop Legrand 4 mm2 bh Rp 5,400.00
43 Sekring Otomatis bh Rp 33,750.00
44 Box Sekring 1 Group set Rp 62,000.00
45 Box Sekring 2 Group set Rp 85,000.00
46 MCB 25 Ampere bh Rp 93,750.00
47 Klem Besi bh Rp 7,523.00
48 Klem PVC bh Rp 1,500.00
49 Kabel Track lebar 20 cm m' Rp 30,000.00
50 Kabel BC 16 m' Rp 35,000.00
51 Grounded Tembaga set Rp 1,500,000.00
52 Mangkok Listrik bh Rp 5,000.00
53 Air ltr Rp 1,000.00
DIBULATKAN #NAME?
Terbilang : #NAME?
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN RUMAH TYPE 36 M2
LOKASI : KOTA JAYAPURA
TAHUN : 2022
BERAT
NO. URAIAN PEKERJAAN Sat. Panjang Lebar Tinggi Jumlah Keliling Luas JENIS BESI Volume
1 2 3 4 5 6 7 8 9 10
I. PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek Ls 1.00
2 Keamanan, Kesehatan dan Keselamatan Kerja (K3) Ls 1.00
5 Pembuatan Direksi Keet dan Gudang Bahan m² 3.000 3.000 9.00
6 Penyiapan Air dan Listrik Kerja Ls 1.00
7 Pengukuran dan Pasang Bouwplank m¹ -
PEK
V =
Keterangan : V = Volume
A = Lebar Atas
B = Lebar Bawah
T = Tinggi
Px = Panjang Keseluruhan
PEKERJAAN STRUKTUR
Pek. Beton K - 250 V
Keterangan : V = Volume
Keterangan : V = Volume
Pek. Bekesting 25 cm V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
PEKERJAAN ARSITEKTUR
Pek. Dinding Batu Tela V
Keterangan : V = Volume
Pek. Plesteran V
Keterangan : V = Volume
Pek. Acian V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Pek. Plafond V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Pek. Lantai Keramik Toilet V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
PEKERJAAN ATAP
Pek. Kuda-Kuda Ringan Lapis Galvanis V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Pekerjaan Listplank 30 cm V
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Keterangan : V = Volume
Pek. Bekesting 25 cm V
Keterangan : V = Volume
Keterangan : V = Volume
Pek. Plesteran V
Keterangan : V = Volume
Pek. Acian V
Keterangan : V = Volume
Keterangan : V = Volume
PEKERJAAN PLUMBING
- PVC 15 mm V
Keterangan : V = Volume
- PVC 20 mm V
Keterangan : V = Volume
- PVC 25 mm V
Keterangan : V = Volume
- PVC 15 mm V
Keterangan : V = Volume
- PVC 25 mm V
Keterangan : V = Volume
- PVC 50 mm V
Keterangan : V = Volume
- PVC 100 mm V
Keterangan : V = Volume
VOLUME
PEMBERSIHAN LOKASI PEKERJAAN
V = PXL
Keterangan : V = VOLUME 16
P = Panjang 4
L = Lebar 4
V = P X L X PX
Keterangan : V = Volume m³ 0.61
p= Panjang m¹ 0.05
L = Lebar m¹ 0.8
Px = Panjang keseluruhan m¹ 15.15
P X L X
m³ 2.18 0.73 urugan kembali
m¹ 0.3
m¹ 0.8
m¹ 0.6
ang Keseluruhan m¹ 15.15
PEKERJAAN URUGAN TANAH KEMBALI
PEKERJAAN URUGAN TANAH KEMBALI
= (P X L X
Keterangan : V = Volume 1.03
P = Panjang m
L = Lebar m 0.15
T = Tinggi m 0.25
PX = Panjang Total Sloof m 27.546
= PX X BBS X BJS
Keterangan : V = Volume
Px = Panjang Keseluruhan m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
= PS X BBS X BJS
= PX / 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= P X L X 2 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
2 = Sisi m
PX = Panjang Total Sloof m
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Banyaknya Kolom bh
= P X BBS X BJS X
Keterangan : V = Volume
P = Panjang Besi m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
PX = Banyaknya Kolom m
= PS X BBS X BJS
= PX / 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= P X L X 2 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
2 = Sisi
PX = Banyaknya Kolom m
= P X L X 2 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
2 = Sisi
PX = Banyaknya Kolom m
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Banyaknya Kolom bh
= P X BBS X BJS X
Keterangan : V = Volume
P = Panjang Besi m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
PX = Banyaknya Kolom m
= PS 17.82 BBS X BJS
= PX 18.82 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= P X L X 4 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
4 = Sisi
PX = Banyaknya Kolom m
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Panjang Total Ring Balok m
= PX X BBS X BJS
Keterangan : V = Volume
Px = Panjang Keseluruhan m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
= PS X BBS X BJS
= PX / 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= PX X L X 2
Keterangan : V = Volume
L = Lebar m
2 = Sisi
PX = Panjang Keseluruhan m
= PX X L X 1
Keterangan : V = Volume
L = Lebar m
1 = Sisi
PX = Panjang Keseluruhan m
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Panjang Total Sloof m
= BBS X 2 X BJS X
= PS / 0.1
Keterangan : V = Volume
PS = Panjang 1 Besi m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
0,1 = Jarak Tulangan Sengkang m
2 = Atas dan Bawah
= BBS X 2 X BJS X
= PS / 0.1
Keterangan : V = Volume
PS = Panjang 1 Besi m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
0,1 = Jarak Tulangan Sengkang m
2 = Atas dan Bawah
= P X L X 2
Keterangan : V = Volume
P= Panjang m
L = Lebar m
2 = Sisi m
= PX X L X 2
Keterangan : V = Volume
P= Panjang m
L = Lebar m
2 = Sisi m m
= PX X L X 1
Keterangan : V = Volume
P= Panjang m
L = Lebar m
1 = Sisi m m
PEKERJAAN STRUKTUR MEJA BETON
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Panjang Total Sloof m
= BBS X 2 X BJS X
= PS / 0.1
Keterangan : V = Volume
PS = Panjang 1 Besi m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
0,1 = Jarak Tulangan Sengkang m
2 = Atas dan Bawah
= BBS X 2 X BJS X
= PS / 0.1
Keterangan : V = Volume
PS = Panjang 1 Besi m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
0,1 = Jarak Tulangan Sengkang m
2 = Atas dan Bawah
PEKERJAAN DINDING
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L X T X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal
PX = Banyaknya Kusen Pintu dan Jendela
= P X L X T X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal
PX = Banyaknya Pintu dan Jendela
= P X L X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
PEKERJAAN PENGECATAN/PELABURAN
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
PEKERJAAN PONDASI
= P X L X PX
Keterangan : V = Volume
P = Panjang
L = Lebar
Px = Panjang Keseluruhan
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
= P X L X T
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tebal m
+ B / 2 X T X
m³
m¹
m¹
m¹
ang Keseluruhan m¹
PEKERJAAN STRUKTUR PAGAR
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Panjang Total Sloof m
= PX X BBS X BJS
Keterangan : V = Volume
Px = Panjang Keseluruhan m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
= PS X BBS X BJS
= PX / 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= P X L X 2 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
2 = Sisi m
PX = Panjang Total Sloof m
= (P X L X T) X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
T = Tinggi m
PX = Banyaknya Kolom bh
= P X BBS X BJS X
Keterangan : V = Volume
P = Panjang Besi m
BBS = Banyaknya Besi m
BJS = Berat Jenis Besi m
PX = Banyaknya Kolom m
= PS X BBS X BJS
= PX / 0.1
Keterangan : V = Volume
PS = Panjang Sengkan m
BBS = Banyaknya Besi Sengkang m
BJS = Berat Jenis Besi m
Px = Panjang Keseluruhan m
0,1 = Jarak Tulangan Sengkang m
= P X L X 4 X
Keterangan : V = Volume
P = Panjang m
L = Lebar m
4 = Sisi
PX = Banyaknya Kolom m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P X L
Keterangan : V = Volume
P = Panjang m
L = Lebar m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
Pipa Air Panas (PVC class 10 kg/cm2, incl. accessories)
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
Pipa Air Bersih (PVC class 10 kg/cm2, incl. accessories)
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
Pipa Air Bersih (PVC class 10 kg/cm2, incl. accessories)
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
= P + P = PX
Keterangan : V = Volume
P = Panjang m
PX = Panjang Total m
PX
PX
PX
PX
AH PONDASI
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
PX
VOLUME PAS DINDING
V = Px X L X T - kusen
V = P X L X T
= 2.1 X 0.8 X 0.1
= 0.168
HRISONTAL
V = P X L
= 2.1 X 0.8
= 1.68
HRISONTAL
V = P X L X T
= 1.25 X 1.19 X 0.005
= 0.007438
HRISONTAL
V = P X L
= 1.1 X 1.25
= 1.375
HRISONTAL
V = P X L X T
= 2.15 X 0.9 X 0.005
= 0.009675
HRISONTAL
V = P X L
= 2.1 X 0.88
= 1.848
HRISONTAL
V = P X L X PX Ukuran 15/25 cm
= 0.15 X 0.2 X 15.15
= 0.4545 Panjang untuk 1 m3
Kolom 15/15
V = P X L X PX Ukuran 15/15 cm
RingBalk 15/25
Beton RING BALOK 15/20
V = P X L X PX Ukuran 15/15 cm
= 0.2 X 2 X 13.95
= 5.58
V2 = L X SISI X PX
= 0.15 X 1 X 13.95
= 2.0925
V. Total = 7.6725
PERHITUNGAN BESI BETON UNTUK 1 M3 BETON
Luas =
Luas =
Luas =
V = 5 X 5 X 0.05
= 1.25
V = 6 X 5.7
= 32.49
V = 1.6 X 1.34
= 2.14
Volume Dinding Pasangan Batu Km/wc Kusen Kamar Mandi
v = P x L v = P x
= 1.25 x 1.5 = 1.9 x
= 1.875 x 2 = 1.33
= 3.75
v = P x L
= 2.3 x 1.35
= 3.105 x 2
= 6.21
Volume Total = 9.96 - 1.33
= 8.63
L
0.7
Volume Dak Beton
V = P x L x T
= 5.15 x 5.15 x 10
= 265.225