HARGA SATUAN PEKERJAAN
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 125,000 25,000.00
Tukang Kayu L.02.04 OH 0.4000 150,000 60,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0200 175,000 3,500.00
JUMLAH TENAGA KERJA 91,500.00
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 7,150 8,937.50
Semen portland Kg 2.5000 1,500 3,750.00
Seng gelombang Lbr 1.2000 69,000 82,800.00
Pasir beton m3 0.0050 190,000 950.00
Koral beton m3 0.0090 175,000 1,575.00
Kayu 5/7 kelas III m3 0.0720 3,250,000 234,000.00
Paku biasa Kg 0.0600 25,000 1,500.00
Meni besi Liter 0.4500 35,000 15,750.00
JUMLAH HARGA BAHAN 349,262.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 440,762.50
E Overhead & Profit 10% 10% 44,076.25
F Harga Satuan Pekerjaan (D+E) - 484,838.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA - -
Pekerja L.01.01 OH 0.2000 125,000 25,000.00
Tukang Kayu L.02.04 OH 0.3000 150,000 45,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0200 175,000 3,500.00
JUMLAH TENAGA KERJA 76,500.00
B BAHAN - -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 7,150 7,150.00
Semen portland Kg 2.0000 1,500 3,000.00
Kawat duri M’ 25.0000 4,576 114,400.00
Pasir beton m3 0.0050 190,000 950.00
Koral beton m3 0.0090 175,000 1,575.00
Paku biasa 2” - 5” Kg 0.0600 25,000 1,500.00
JUMLAH HARGA BAHAN 128,575.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 205,075.00
E Overhead & Profit 10% 10% 20,507.50
F Harga Satuan Pekerjaan (D+E) - 225,582.00
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 125,000 425,000.00
Tukang Batu L.02.03 OH 0.8500 150,000 127,500.00
Kepala Tukang L.03.01 OH 0.0850 150,000 12,750.00
Mandor L.04.01 OH 0.1700 175,000 29,750.00
JUMLAH TENAGA KERJA 595,000.00
B BAHAN
Batu belah m3 0.4800 185,000 88,800.00
Semen portland Kg 194.0000 1,500 291,000.00
Pasir Beton m3 0.3120 190,000 59,280.00
Kerikil m3 0.4680 190,000 88,920.00
Besi beton (polos/ulir) Kg 126.0000 15,000 1,890,000.00
Kawat beton Kg 1.8000 25,000 45,000.00
JUMLAH HARGA BAHAN 2,463,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 3,058,000.00
E Overhead & Profit 10% 10% 305,800.00
F Harga Satuan Pekerjaan (D+E) - 3,363,800.00
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 125,000 150,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0600 175,000 10,500.00
JUMLAH TENAGA KERJA 193,500.00
B BAHAN
Semen portland kg 230.0000 1,500 345,000.00
Pasir Beton Kg kg 893.0000 136 121,189.03
Kerikil (Maks 30 mm) Kg kg 1027.0000 149 152,920.30
Air Liter 200.0000 15 3,000.00
JUMLAH HARGA BAHAN 622,109.33
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 815,609.33
E Overhead & Profit 10% 10% 81,560.93
F Harga Satuan Pekerjaan (D+E) - 897,170.00
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 326.0000 1,500 489,000.00
Pasir Beton Kg kg 760.0000 136 103,139.60
Kerikil (Maks 30 mm) Kg kg 1029.0000 149 153,218.10
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 748,582.70
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,014,807.70
E Overhead & Profit 10% 10% 101,480.77
F Harga Satuan Pekerjaan (D+E) - 1,116,288.00
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 352.0000 1,500 528,000.00
Pasir Beton Kg kg 731.0000 136 99,204.01
Kerikil (Maks 30 mm) Kg kg 1031.0000 149 153,515.90
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 783,944.91
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,050,169.91
E Overhead & Profit 10% 10% 105,016.99
F Harga Satuan Pekerjaan (D+E) - 1,155,186.00
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 371.0000 1,500 556,500.00
Pasir Beton Kg kg 698.0000 136 94,725.58
Kerikil (Maks 30 mm) Kg kg 1047.0000 149 155,898.30
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 810,348.88
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,076,573.88
E Overhead & Profit 10% 10% 107,657.39
F Harga Satuan Pekerjaan (D+E) - 1,184,231.00
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 384.0000 1,500 576,000.00
Pasir Beton Kg kg 692.0000 136 93,911.32
Kerikil (Maks 30 mm) Kg kg 1039.0000 149 154,707.10
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 827,843.42
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,094,068.42
E Overhead & Profit 10% 10% 109,406.84
F Harga Satuan Pekerjaan (D+E) - 1,203,475.00
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 406.0000 1,500 609,000.00
Pasir Beton Kg kg 684.0000 136 92,825.64
Kerikil (Maks 30 mm) Kg kg 1026.0000 149 152,771.40
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 857,822.04
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,124,047.04
E Overhead & Profit 10% 10% 112,404.70
F Harga Satuan Pekerjaan (D+E) - 1,236,451.00
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 125,000 206,250.00
Tukang Batu L.02.03 OH 0.2750 150,000 41,250.00
Kepala Tukang L.03.01 OH 0.0280 150,000 4,200.00
Mandor L.04.01 OH 0.0830 175,000 14,525.00
JUMLAH TENAGA KERJA 266,225.00
B BAHAN
Semen portland kg 413.0000 1,500 619,500.00
Pasir Beton Kg kg 681.0000 136 92,418.51
Kerikil (Maks 30 mm) Kg kg 1021.0000 149 152,026.90
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 867,170.41
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,133,395.41
E Overhead & Profit 10% 10% 113,339.54
F Harga Satuan Pekerjaan (D+E) - 1,246,734.00
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 125,000 262,500.00
Tukang Batu L.02.03 OH 0.3500 150,000 52,500.00
Kepala Tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.1050 175,000 18,375.00
JUMLAH TENAGA KERJA 338,625.00
B BAHAN
Semen portland kg 439.0000 1,500 658,500.00
Pasir Beton Kg kg 670.0000 136 90,925.70
Kerikil (Maks 30 mm) Kg kg 1006.0000 149 149,793.40
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 902,444.10
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,241,069.10
E Overhead & Profit 10% 10% 124,106.91
F Harga Satuan Pekerjaan (D+E) - 1,365,176.00
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 125,000 262,500.00
Tukang Batu L.02.03 OH 0.3500 150,000 52,500.00
Kepala Tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.1050 175,000 18,375.00
JUMLAH TENAGA KERJA 338,625.00
B BAHAN
Semen portland kg 448.0000 1,500 672,000.00
Pasir Beton Kg kg 667.0000 136 90,518.57
Kerikil (Maks 30 mm) Kg kg 1000.0000 149 148,900.00
Air Liter 215.0000 15 3,225.00
JUMLAH HARGA BAHAN 914,643.57
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,253,268.57
E Overhead & Profit 10% 10% 125,326.86
F Harga Satuan Pekerjaan (D+E) - 1,378,595.00
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 125,000 20,625.00
Tukang batu L.02.03 OH 0.0280 150,000 4,200.00
Kepala tukang L.03.01 OH 0.0030 150,000 450.00
Mandor L.04.01 OH 0.0080 175,000 1,400.00
JUMLAH TENAGA KERJA 26,675.00
B BAHAN
Semen portland Kg 32.6000 1,500 48,900.00
Pasir beton Kg 76.0000 190,000 14,440,000.00
Kerikil (Maks 30 mm) Kg 102.9000 190,000 19,551,000.00
Air L 21.5000 15 322.50
JUMLAH HARGA BAHAN 34,040,222.50
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 34,066,897.50
E Overhead & Profit 10% 10% 3,406,689.75
F Harga Satuan Pekerjaan (D+E) - 37,473,587.00
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 125,000 24,750.00
Tukang batu L.02.03 OH 0.0330 150,000 4,950.00
Kepala tukang L.03.01 OH 0.0030 150,000 450.00
Mandor L.04.01 OH 0.0100 175,000 1,750.00
JUMLAH TENAGA KERJA 31,900.00
B BAHAN
Semen portland Kg 32.1200 1,500 48,180.00
Pasir beton Kg 91.2000 190,000 17,328,000.00
Kerikil (Maks 30 mm) Kg 123.4800 190,000 23,461,200.00
Air L 25.8000 15 387.00
JUMLAH HARGA BAHAN 40,837,767.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 40,869,667.00
E Overhead & Profit 10% 10% 4,086,966.70
F Harga Satuan Pekerjaan (D+E) - 44,956,633.00
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 125,000 31,000.00
Tukang batu L.02.03 OH 0.0410 150,000 6,150.00
Kepala tukang L.03.01 OH 0.0040 150,000 600.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 40,025.00
B BAHAN
Semen portland Kg 48.9000 1,500 73,350.00
Pasir beton Kg 114.0000 190,000 21,660,000.00
Kerikil (Maks 30 mm) Kg 154.3500 190,000 29,326,500.00
Air L 32.2500 15 483.75
JUMLAH HARGA BAHAN 51,060,333.75
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 51,100,358.75
E Overhead & Profit 10% 10% 5,110,035.88
F Harga Satuan Pekerjaan (D+E) - 56,210,394.00
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 125,000 500.00
Tukang batu L.02.03 OH 0.0380 150,000 5,700.00
Kepala tukang L.03.01 OH 0.0040 150,000 600.00
Mandor L.04.01 OH 0.0010 175,000 175.00
JUMLAH TENAGA KERJA 6,975.00
B BAHAN
Kayu kaso 5/7 kelas II m3 0.0050 3,750,000 18,750.00
Phenol film 12mm Lbr 0.0430 - -
Minyak bekisting L 0.2000 11,000 2,200.00
Dynabol dia 12 x 120 mm Bh 0.6930 3,000 2,079.00
JUMLAH HARGA BAHAN 23,029.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 30,004.00
E Overhead & Profit 10% 10% 3,000.40
F Harga Satuan Pekerjaan (D+E) - 33,004.00
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 125,000 500.00
Tukang batu L.02.03 OH 0.0380 150,000 5,700.00
Kepala tukang L.03.01 OH 0.0040 150,000 600.00
Mandor L.04.01 OH 0.0010 175,000 175.00
JUMLAH TENAGA KERJA 6,975.00
B BAHAN
Kayu kaso 5/7 kelas II m3 0.0040 3,750,000 15,000.00
Phenol film 12mm Lbr 0.0480 - -
Minyak bekisting L 0.2000 11,000 2,200.00
Paku Biasa Kg 0.0460 25,000 1,150.00
Dynabol dia 12 x 120 mm Bh 0.6930 3,000 2,079.00
JUMLAH HARGA BAHAN 20,429.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 27,404.00
E Overhead & Profit 10% 10% 2,740.40
F Harga Satuan Pekerjaan (D+E) - 30,144.00
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 125,000 6,625.00
Tukang kayu L.02.04 OH 0.0180 150,000 2,700.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 10,200.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 10,200.00
E Overhead & Profit 10% 10% 1,020.00
F Harga Satuan Pekerjaan (D+E) - 11,220.00
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 125,000 11,125.00
Tukang kayu L.02.04 OH 0.0300 150,000 4,500.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 16,500.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 16,500.00
E Overhead & Profit 10% 10% 1,650.00
F Harga Satuan Pekerjaan (D+E) - 18,150.00
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 125,000 8,875.00
Tukang kayu L.02.04 OH 0.0240 150,000 3,600.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 13,350.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 13,350.00
E Overhead & Profit 10% 10% 1,335.00
F Harga Satuan Pekerjaan (D+E) - 14,685.00
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 125,000 131,250.00
Tukang Las L.02.11 OH 1.0500 150,000 157,500.00
Kepala tukang L.03.01 OH 0.1050 150,000 15,750.00
Mandor L.04.01 OH 0.0520 175,000 9,100.00
JUMLAH TENAGA KERJA 313,600.00
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 3,935 59,024.55
Besi plat baja Kg 32.8000 16,500 541,200.00
Kawat las Kg 0.0500 38,000 1,900.00
JUMLAH HARGA BAHAN 602,124.55
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 915,724.55
E Overhead & Profit 10% 10% 91,572.46
F Harga Satuan Pekerjaan (D+E) - 1,007,297.00
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm ( Karpet Talang Lebar 90cm)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 125,000 25,000.00
Tukang L.02.01 OH 0.2000 150,000 30,000.00
Kepala tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0010 175,000 175.00
JUMLAH TENAGA KERJA 58,175.00
B BAHAN
Seng plat m m 1.0500 5,000 5,250.00
Paku Biasa kg 0.0150 25,000 375.00
Kayu Papan kelas II m3 0.0190 3,750,000 71,250.00
JUMLAH HARGA BAHAN 76,875.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 135,050.00
E Overhead & Profit 10% 10% 13,505.00
F Harga Satuan Pekerjaan (D+E) - 148,555.00
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 125,000 18,750.00
Tukang L.02.01 OH 0.3000 150,000 45,000.00
Kepala tukang L.03.01 OH 0.0300 150,000 4,500.00
Mandor L.04.01 OH 0.0080 175,000 1,400.00
JUMLAH TENAGA KERJA 69,650.00
B BAHAN
Seng plat m m 1.0500 5,000 5,250.00
Paku Biasa kg 0.0100 25,000 250.00
Besi strip kg 0.5000 16,500 8,250.00
JUMLAH HARGA BAHAN 13,750.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 83,400.00
E Overhead & Profit 10% 10% 8,340.00
F Harga Satuan Pekerjaan (D+E) - 91,740.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 125,000 31,250.00
Tukang Besi L.02.05 OH 0.2500 150,000 37,500.00
Kepala Tukang L.03.01 OH 0.0250 150,000 3,750.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 74,775.00
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 30,000 105,000.00
Assesoris (perkuatan, las dll) Ls 1.0000 30,000 30,000.00
JUMLAH HARGA BAHAN 135,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 209,775.00
E Overhead & Profit 10% 10% 20,977.50
F Harga Satuan Pekerjaan (D+E) - 230,752.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 125,000 95,050.00
Tukang Besi L.02.05 OH 0.7604 150,000 114,060.00
Kepala Tukang L.03.01 OH 0.0760 150,000 11,400.00
Mandor L.04.01 OH 0.0380 175,000 6,650.00
JUMLAH TENAGA KERJA 227,160.00
B BAHAN
Baja ringan canai dingin C75 Kg kg 4.0500 25,490 103,235.29
JUMLAH HARGA BAHAN 103,235.29
C PERALATAN - -
Alat Rangka Atap Baja Canai Dingin 0.1000 130,000 10,323.53
JUMLAH HARGA ALAT 10,323.53
D Jumlah (A+B+C) - 340,718.82
E Overhead & Profit 10% 10% 34,071.88
F Harga Satuan Pekerjaan (D+E) - 374,790.00
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 125,000 91,750.00
Tukang Besi L.02.05 OH 0.7340 150,000 110,100.00
Kepala Tukang L.03.01 OH 0.0730 150,000 10,950.00
Mandor L.04.01 OH 0.0370 175,000 6,475.00
JUMLAH TENAGA KERJA 219,275.00
B BAHAN
Baja ringan canai dingin C75 Kg kg 4.0500 25,490 103,235.29
JUMLAH HARGA BAHAN 103,235.29
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 130,000 10,323.53
JUMLAH HARGA ALAT 10,323.53
D Jumlah (A+B+C) - 332,833.82
E Overhead & Profit 10% 10% 33,283.38
F Harga Satuan Pekerjaan (D+E) - 366,117.00
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 125,000 25,000.00
Tukang Besi L.02.05 OH 0.4500 150,000 67,500.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 102,750.00
B BAHAN
Baja ringan canai dingin C75 m M' 3.7200 23,333 86,800.00
Baut (Srew driver) bh 28.0000 500 14,000.00
Dynabol dia 12 x 120 mm bh 2.0000 3,000 6,000.00
Reng Canai Dingin M' 5.4000 5,500 29,700.00
Talang / Jurai Canai Dingin M' 0.1240 25,000 3,100.00
JUMLAH HARGA BAHAN 139,600.00
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 130,000 13,960.00
JUMLAH HARGA ALAT 13,960.00
D Jumlah (A+B+C) - 256,310.00
E Overhead & Profit 10% 10% 25,631.00
F Harga Satuan Pekerjaan (D+E) - 281,941.00
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 125,000 75,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 113,250.00
B BAHAN
Bata merah m3 140.0000 1,000 140,000.00
Semen portland Kg 32.9500 1,500 49,425.00
Pasir Pasang m3 0.0910 190,000 17,290.00
JUMLAH HARGA BAHAN 206,715.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 319,965.00
E Overhead & Profit 10% 10% 31,996.50
F Harga Satuan Pekerjaan (D+E) - 351,961.00
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 125,000 75,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 113,250.00
B BAHAN
Bata merah m3 140.0000 1,000 140,000.00
Semen portland Kg 26.5500 1,500 39,825.00
Pasir Pasang m3 0.0930 190,000 17,670.00
JUMLAH HARGA BAHAN 197,495.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 310,745.00
E Overhead & Profit 10% 10% 31,074.50
F Harga Satuan Pekerjaan (D+E) - 341,819.00
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 125,000 75,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 113,250.00
B BAHAN
Bata merah m3 140.0000 1,000 140,000.00
Semen portland Kg 22.2000 1,500 33,300.00
Pasir Pasang m3 0.1020 190,000 19,380.00
JUMLAH HARGA BAHAN 192,680.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 305,930.00
E Overhead & Profit 10% 10% 30,593.00
F Harga Satuan Pekerjaan (D+E) - 336,523.00
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 125,000 75,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 113,250.00
B BAHAN
Bata merah m3 140.0000 1,000 140,000.00
Semen portland Kg 18.5000 1,500 27,750.00
Pasir Pasang m3 0.1220 190,000 23,180.00
JUMLAH HARGA BAHAN 190,930.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 304,180.00
E Overhead & Profit 10% 10% 30,418.00
F Harga Satuan Pekerjaan (D+E) - 334,598.00
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 125,000 75,000.00
Tukang Batu L.02.03 OH 0.2000 150,000 30,000.00
Kepala Tukang L.03.01 OH 0.0200 150,000 3,000.00
Mandor L.04.01 OH 0.0300 175,000 5,250.00
JUMLAH TENAGA KERJA 113,250.00
B BAHAN
Bata merah m3 140.0000 1,000 140,000.00
Semen portland Kg 10.0800 1,500 15,120.00
Kapur m3 0.0275 18,590 511.23
Pasir Pasang m3 0.0925 190,000 17,575.00
JUMLAH HARGA BAHAN 173,206.23
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 286,456.23
E Overhead & Profit 10% 10% 28,645.62
F Harga Satuan Pekerjaan (D+E) - 315,101.00
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 18.9500 1,500 28,425.00
Pasir Pasang m3 0.0380 190,000 7,220.00
JUMLAH HARGA BAHAN 105,645.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 162,270.00
E Overhead & Profit 10% 10% 16,227.00
F Harga Satuan Pekerjaan (D+E) - 178,497.00
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 14.3700 1,500 21,555.00
Pasir Pasang m3 0.0400 190,000 7,600.00
JUMLAH HARGA BAHAN 99,155.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 155,780.00
E Overhead & Profit 10% 10% 15,578.00
F Harga Satuan Pekerjaan (D+E) - 171,358.00
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 11.5000 1,500 17,250.00
Pasir Pasang m3 0.0430 190,000 8,170.00
JUMLAH HARGA BAHAN 95,420.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 152,045.00
E Overhead & Profit 10% 10% 15,204.50
F Harga Satuan Pekerjaan (D+E) - 167,249.00
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 9.6800 1,500 14,520.00
Pasir Pasang m3 0.0450 190,000 8,550.00
JUMLAH HARGA BAHAN 93,070.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 149,695.00
E Overhead & Profit 10% 10% 14,969.50
F Harga Satuan Pekerjaan (D+E) - 164,664.00
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 8.3200 1,500 12,480.00
Pasir Pasang m3 0.0490 190,000 9,310.00
JUMLAH HARGA BAHAN 91,790.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 148,415.00
E Overhead & Profit 10% 10% 14,841.50
F Harga Satuan Pekerjaan (D+E) - 163,256.00
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 6.5000 1,500 9,750.00
Pasir Pasang m3 0.0500 190,000 9,500.00
JUMLAH HARGA BAHAN 89,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 145,875.00
E Overhead & Profit 10% 10% 14,587.50
F Harga Satuan Pekerjaan (D+E) - 160,462.00
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen portland Kg 4.5000 1,500 6,750.00
Kapur m3 0.0150 18,590 278.85
Pasir Pasang m3 0.0500 190,000 9,500.00
JUMLAH HARGA BAHAN 86,528.85
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 143,153.85
E Overhead & Profit 10% 10% 14,315.39
F Harga Satuan Pekerjaan (D+E) - 157,469.00
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen Merah Kg 0.0180 16,000 288.00
Kapur m3 0.0180 18,590 334.62
Pasir Pasang m3 0.0180 190,000 3,420.00
JUMLAH HARGA BAHAN 74,042.62
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 130,667.62
E Overhead & Profit 10% 10% 13,066.76
F Harga Satuan Pekerjaan (D+E) - 143,734.00
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata merah m3 70.0000 1,000 70,000.00
Semen Merah Kg 0.0140 16,000 224.00
Kapur m3 0.0140 18,590 260.26
Pasir Pasang m3 0.0280 190,000 5,320.00
JUMLAH HARGA BAHAN 75,804.26
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 132,429.26
E Overhead & Profit 10% 10% 13,242.93
F Harga Satuan Pekerjaan (D+E) - 145,672.00
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata rooster m3 30.0000 45,000 1,350,000.00
Semen portland Kg 11.0000 1,500 16,500.00
Pasir Pasang m3 0.0350 190,000 6,650.00
JUMLAH HARGA BAHAN 1,373,150.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,429,775.00
E Overhead & Profit 10% 10% 142,977.50
F Harga Satuan Pekerjaan (D+E) - 1,572,752.00
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 125,000 37,500.00
Tukang Batu L.02.03 OH 0.1000 150,000 15,000.00
Kepala Tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0150 175,000 2,625.00
JUMLAH TENAGA KERJA 56,625.00
B BAHAN
Bata berongga m3 30.0000 950,000 28,500,000.00
Semen portland Kg 11.0000 1,500 16,500.00
Pasir Pasang m3 0.0350 190,000 6,650.00
JUMLAH HARGA BAHAN 28,523,150.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 28,579,775.00
E Overhead & Profit 10% 10% 2,857,977.50
F Harga Satuan Pekerjaan (D+E) - 31,437,752.00
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 125,000 43,750.00
Tukang Batu L.02.03 OH 0.130 150,000 19,500.00
Kepala Tukang L.03.01 OH 0.013 150,000 1,950.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 65,725.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.075 1,500,000 112,500.00
Mortar siap pakai Kg 2.772 2,375 6,583.50
JUMLAH HARGA BAHAN 119,083.50
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 119,084 11,908.35
JUMLAH HARGA ALAT 11,908.35
D Jumlah (A+B+C) - 196,716.85
E Overhead & Profit 10% 10% 19,671.69
F Harga Satuan Pekerjaan (D+E) - 216,388.00
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 125,000 43,750.00
Tukang Batu L.02.03 OH 0.130 150,000 19,500.00
Kepala Tukang L.03.01 OH 0.013 150,000 1,950.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 65,725.00
B BAHAN
Bata ringan tebal 7,5 cm m3 0.1 1,500,000 150,000.00
Mortar siap pakai Kg 4.4 2,375 10,450.00
JUMLAH HARGA BAHAN 160,450.00
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 160,450 16,045.00
JUMLAH HARGA ALAT 16,045.00
D Jumlah (A+B+C) - 242,220.00
E Overhead & Profit 10% 10% 24,222.00
F Harga Satuan Pekerjaan (D+E) - 266,442.00
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 125,000 31,250.00
Tukang Batu L.02.03 OH 0.1250 150,000 18,750.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 54,225.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 120,000 795,600.00
Semen portland kg 9.8000 1,500 14,700.00
Semen Warna Kg 1.3000 16,000 20,800.00
Pasir Pasang M3 0.0450 190,000 8,550.00
JUMLAH HARGA BAHAN 839,650.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 893,875.00
E Overhead & Profit 10% 10% 89,387.50
F Harga Satuan Pekerjaan (D+E) - 983,262.00
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 125,000 30,000.00
Tukang Batu L.02.03 OH 0.1200 150,000 18,000.00
Kepala tukang L.03.01 OH 0.0120 150,000 1,800.00
Mandor L.04.01 OH 0.0120 175,000 2,100.00
JUMLAH TENAGA KERJA 51,900.00
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 135,000 418,500.00
Semen portland kg 9.6000 1,500 14,400.00
Semen Warna Kg 1.5000 16,000 24,000.00
Pasir Pasang M3 0.0450 190,000 8,550.00
JUMLAH HARGA BAHAN 465,450.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 517,350.00
E Overhead & Profit 10% 10% 51,735.00
F Harga Satuan Pekerjaan (D+E) - 569,085.00
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 125,000 31,250.00
Tukang Batu L.02.03 OH 0.1250 150,000 18,750.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 54,225.00
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 120,000 795,600.00
Semen portland kg 9.8000 1,500 14,700.00
Semen Warna Kg 1.3000 16,000 20,800.00
Pasir Pasang M3 0.0450 190,000 8,550.00
JUMLAH HARGA BAHAN 839,650.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 893,875.00
E Overhead & Profit 10% 10% 89,387.50
F Harga Satuan Pekerjaan (D+E) - 983,262.00
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 125,000 32,500.00
Tukang Batu L.02.03 OH 0.1300 150,000 19,500.00
Kepala tukang L.03.01 OH 0.0130 150,000 1,950.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 56,225.00
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh 11.8700 100,000 1,187,000.00
Semen portland kg 10.0000 1,500 15,000.00
Semen Warna Kg 1.5000 16,000 24,000.00
Pasir Pasang M3 0.0450 190,000 8,550.00
JUMLAH HARGA BAHAN 1,234,550.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,290,775.00
E Overhead & Profit 10% 10% 129,077.50
F Harga Satuan Pekerjaan (D+E) - 1,419,852.00
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 125,000 87,500.00
Tukang Batu L.02.03 OH 0.3500 150,000 52,500.00
Kepala tukang L.03.01 OH 0.0350 150,000 5,250.00
Mandor L.04.01 OH 0.0350 175,000 6,125.00
JUMLAH TENAGA KERJA 151,375.00
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh 106.0000 1,500 159,000.00
Semen portland Kg 8.1900 1,500 12,285.00
Pasir Pasang M3 0.0450 190,000 8,550.00
Semen Warna Kg 3.2000 16,000 51,200.00
JUMLAH HARGA BAHAN 231,035.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 382,410.00
E Overhead & Profit 10% 10% 38,241.00
F Harga Satuan Pekerjaan (D+E) - 420,651.00
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 125,000 12,500.00
Tukang kayu L.02.04 OH 0.1000 150,000 15,000.00
Kepala tukang L.03.01 OH 0.0100 150,000 1,500.00
Mandor L.04.01 OH 0.0050 175,000 875.00
JUMLAH TENAGA KERJA 29,875.00
B BAHAN
Tripleks Lembar 0.3750 65,000 24,375.00
Paku tripleks kg 0.0300 25,000 750.00
JUMLAH HARGA BAHAN 25,125.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 55,000.00
E Overhead & Profit 10% 10% 5,500.00
F Harga Satuan Pekerjaan (D+E) - 60,500.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 125,000 62,500.00
Tukang kayu L.02.04 OH 0.5000 150,000 75,000.00
Kepala tukang L.03.01 OH 0.0500 150,000 7,500.00
Mandor L.04.01 OH 0.0250 175,000 4,375.00
JUMLAH TENAGA KERJA 149,375.00
B BAHAN
Profil Allum"T" m 3.6000 10,000 36,000.00
Kawat dia 4 mm kg 0.1500 80,000 12,000.00
Ramset Buah 1.0500 2,500 2,625.00
Akustik 60 x 120 Lembar 1.5000 20,500 30,750.00
JUMLAH HARGA BAHAN 81,375.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 230,750.00
E Overhead & Profit 10% 10% 23,075.00
F Harga Satuan Pekerjaan (D+E) - 253,825.00
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 125,000 750,000.00
Tukang kayu L.02.04 OH 18.0000 150,000 2,700,000.00
Kepala tukang L.03.01 OH 1.8000 150,000 270,000.00
Mandor L.04.01 OH 0.3000 175,000 52,500.00
JUMLAH TENAGA KERJA 3,772,500.00
B BAHAN
Balok kayu kelas II m3 1.2000 3,750,000 4,500,000.00
Paku Biasa Kg 1.2500 25,000 31,250.00
Lem Kayu/Karet Kg 1.0000 60,000 60,000.00
JUMLAH HARGA BAHAN 4,591,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 8,363,750.00
E Overhead & Profit 10% 10% 836,375.00
F Harga Satuan Pekerjaan (D+E) - 9,200,125.00
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 125,000 43,750.00
Tukang kayu L.02.04 OH 1.0500 150,000 157,500.00
Kepala tukang L.03.01 OH 0.1050 150,000 15,750.00
Mandor L.04.01 OH 0.0180 175,000 3,150.00
JUMLAH TENAGA KERJA 220,150.00
B BAHAN
kayu Papan kelas III m3 0.0400 3,250,000 130,000.00
Paku Biasa Kg 0.0500 25,000 1,250.00
JUMLAH HARGA BAHAN 131,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 351,400.00
E Overhead & Profit 10% 10% 35,140.00
F Harga Satuan Pekerjaan (D+E) - 386,540.00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 125,000 125,000.00
Tukang kayu L.02.04 OH 3.0000 150,000 450,000.00
Kepala tukang L.03.01 OH 0.3000 150,000 45,000.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 628,750.00
B BAHAN
kayu Papan kelas II m3 0.0400 3,750,000 150,000.00
Lem Kayu/Karet Kg 0.5000 60,000 30,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 808,750.00
E Overhead & Profit 10% 10% 80,875.00
F Harga Satuan Pekerjaan (D+E) - 889,625.00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 125,000 100,000.00
Tukang kayu L.02.04 OH 2.4000 150,000 360,000.00
Kepala tukang L.03.01 OH 0.2400 150,000 36,000.00
Mandor L.04.01 OH 0.0400 175,000 7,000.00
JUMLAH TENAGA KERJA 503,000.00
B BAHAN
kayu Papan kelas II m3 0.0240 3,750,000 90,000.00
Lem Kayu/Karet Kg 0.3000 60,000 18,000.00
JUMLAH HARGA BAHAN 108,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 611,000.00
E Overhead & Profit 10% 10% 61,100.00
F Harga Satuan Pekerjaan (D+E) - 672,100.00
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 125,000 125,000.00
Tukang kayu L.02.04 OH 3.0000 150,000 450,000.00
Kepala tukang L.03.01 OH 0.3000 150,000 45,000.00
Mandor L.04.01 OH 0.0500 175,000 8,750.00
JUMLAH TENAGA KERJA 628,750.00
B BAHAN
kayu Papan kelas II m3 0.0640 3,750,000 240,000.00
Lem Kayu/Karet Kg 0.5000 60,000 30,000.00
JUMLAH HARGA BAHAN 270,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 898,750.00
E Overhead & Profit 10% 10% 89,875.00
F Harga Satuan Pekerjaan (D+E) - 988,625.00
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 125,000 87,500.00
Tukang kayu L.02.04 OH 2.1000 150,000 315,000.00
Kepala tukang L.03.01 OH 0.2100 150,000 31,500.00
Mandor L.04.01 OH 0.0350 175,000 6,125.00
JUMLAH TENAGA KERJA 440,125.00
B BAHAN
kayu Papan kelas II m3 0.0250 3,750,000 93,750.00
Paku Biasa kg 0.0300 25,000 750.00
Lem Kayu/Karet kg 0.5000 60,000 30,000.00
Plywood 4 mm Lembar 1.0000 82,000 82,000.00
JUMLAH HARGA BAHAN 206,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 646,625.00
E Overhead & Profit 10% 10% 64,662.50
F Harga Satuan Pekerjaan (D+E) - 711,287.00
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 125,000 100,000.00
Tukang kayu L.02.04 OH 2.4000 150,000 360,000.00
Kepala tukang L.03.01 OH 0.2400 150,000 36,000.00
Mandor L.04.01 OH 0.0400 175,000 7,000.00
JUMLAH TENAGA KERJA 503,000.00
B BAHAN
kayu Papan kelas II m3 0.0256 3,750,000 96,000.00
Paku Biasa kg 0.0300 25,000 750.00
Lem Kayu/Karet kg 0.5000 60,000 30,000.00
Plywood 4 mm Lembar 1.0000 82,000 82,000.00
JUMLAH HARGA BAHAN 208,750.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 711,750.00
E Overhead & Profit 10% 10% 71,175.00
F Harga Satuan Pekerjaan (D+E) - 782,925.00
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.85 125,000 106,250.00
Tukang kayu L.02.04 OH 2.550 150,000 382,500.00
Kepala tukang L.03.01 OH 0.255 150,000 38,250.00
Mandor L.04.01 OH 0.043 175,000 7,525.00
JUMLAH TENAGA KERJA 534,525.00
B BAHAN
Kayu Papan kelas II m3 0.025 3,750,000 93,750.00
Paku Biasa kg 0.03 25,000 750.00
Lem Kayu/Karet kg 0.8 60,000 48,000.00
Teakwood 4 mm 90 x 220 cm Lembar 1.000 - -
Formika Lembar 0.5 160,000 80,000.00
JUMLAH HARGA BAHAN 222,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 757,025.00
E Overhead & Profit 10% 10% 75,702.50
F Harga Satuan Pekerjaan (D+E) - 832,727.00
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.000 125,000 500,000.00
Tukang kayu L.02.04 OH 12.000 150,000 1,800,000.00
Kepala tukang L.03.01 OH 1.200 150,000 180,000.00
Mandor L.04.01 OH 0.2 175,000 35,000.00
JUMLAH TENAGA KERJA 2,515,000.00
B BAHAN
Balok kayu kelas II m3 1.100 3,750,000 4,125,000.00
Besi strip kg 15.000 16,500 247,500.00
Paku Biasa kg 5.600 25,000 140,000.00
JUMLAH HARGA BAHAN 4,512,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 7,027,500.00
E Overhead & Profit 10% 10% 702,750.00
F Harga Satuan Pekerjaan (D+E) - 7,730,250.00
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 125,000 18,750.00
Tukang kayu L.02.04 OH 0.3 150,000 45,000.00
Kepala tukang L.03.01 OH 0.03 150,000 4,500.00
Mandor L.04.01 OH 0.075 175,000 13,125.00
JUMLAH TENAGA KERJA 81,375.00
B BAHAN
Kayu 5/7 kelas III m3 0.0154 3,250,000 50,050.00
Paku Biasa kg 0.2 25,000 5,000.00
JUMLAH HARGA BAHAN 55,050.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 136,425.00
E Overhead & Profit 10% 10% 13,642.50
F Harga Satuan Pekerjaan (D+E) - 150,067.00
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 125,000 25,000.00
Tukang kayu L.02.04 OH 0.3 150,000 45,000.00
Kepala tukang L.03.01 OH 0.03 150,000 4,500.00
Mandor L.04.01 OH 0.01 175,000 1,750.00
JUMLAH TENAGA KERJA 76,250.00
B BAHAN
Kayu 5/7 kelas III m3 0.0163 3,250,000 52,975.00
Paku Biasa kg 0.25 25,000 6,250.00
JUMLAH HARGA BAHAN 59,225.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 135,475.00
E Overhead & Profit 10% 10% 13,547.50
F Harga Satuan Pekerjaan (D+E) - 149,022.00
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 125,000 12,500.00
Tukang kayu L.02.04 OH 0.2 150,000 30,000.00
Kepala tukang L.03.01 OH 0.02 150,000 3,000.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 46,375.00
B BAHAN
Kayu Papan kelas I m3 0.0108 5,000,000 54,000.00
Paku Biasa kg 0.1 25,000 2,500.00
JUMLAH HARGA BAHAN 56,500.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102,875.00
E Overhead & Profit 10% 10% 10,287.50
F Harga Satuan Pekerjaan (D+E) - 113,162.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 125,000 12,500.00
Tukang kayu L.02.04 OH 0.2 150,000 30,000.00
Kepala tukang L.03.01 OH 0.02 150,000 3,000.00
Mandor L.04.01 OH 0.005 175,000 875.00
JUMLAH TENAGA KERJA 46,375.00
B BAHAN
Kayu Papan kelas I m3 0.011 5,000,000 55,000.00
Paku Biasa kg 0.05 25,000 1,250.00
JUMLAH HARGA BAHAN 56,250.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 102,625.00
E Overhead & Profit 10% 10% 10,262.50
F Harga Satuan Pekerjaan (D+E) - 112,887.00
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 125,000 18,750.00
Tukang kayu L.02.04 OH 0.45 150,000 67,500.00
Kepala tukang L.03.01 OH 0.045 150,000 6,750.00
Mandor L.04.01 OH 0.008 175,000 1,400.00
JUMLAH TENAGA KERJA 94,400.00
B BAHAN
Balok kayu kelas II m3 0.028 3,750,000 105,000.00
Paku Biasa kg 0.15 25,000 3,750.00
JUMLAH HARGA BAHAN 108,750.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 203,150.00
E Overhead & Profit 10% 10% 20,315.00
F Harga Satuan Pekerjaan (D+E) - 223,000.00
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 125,000 8,750.00
Tukang cat L.02.08 OH 0.009 150,000 1,350.00
Kepala tukang L.03.01 OH 0.006 150,000 900.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 11,525.00
B BAHAN
Cat menie Kg 0.200 60,000 12,000.00
Plamuur Kg 0.150 12,000 1,800.00
Cat dasar Kayu Kg 0.170 65,000 11,050.00
Cat Penutup Kayu Kg 0.260 60,000 15,600.00
Kuas Bh 0.010 22,000 220.00
Pengencer Kg 0.030 31,000 930.00
Ampelas Lbr 0.200 7,000 1,400.00
JUMLAH HARGA BAHAN 43,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 54,525.00
E Overhead & Profit 10% 10% 5,452.50
F Harga Satuan Pekerjaan (D+E) - 59,977.00
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 125,000 8,750.00
Tukang cat L.02.08 OH 0.105 150,000 15,750.00
Kepala tukang L.03.01 OH 0.004 150,000 600.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 25,625.00
B BAHAN
Cat menie Kg 0.200 60,000 12,000.00
Plamuur Kg 0.150 12,000 1,800.00
Cat dasar Kayu Kg 0.170 65,000 11,050.00
Cat Penutup Kayu Kg 0.350 60,000 21,000.00
Kuas Bh 0.010 22,000 220.00
Pengencer Kg 0.030 31,000 930.00
Ampelas Lbr 0.200 7,000 1,400.00
JUMLAH HARGA BAHAN 48,400.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 74,025.00
E Overhead & Profit 10% 10% 7,402.50
F Harga Satuan Pekerjaan (D+E) - 81,427.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.020 125,000 2,500.00
Tukang cat L.02.08 OH 0.063 150,000 9,450.00
Kepala tukang L.03.01 OH 0.006 150,000 945.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 13,420.00
B BAHAN
Plamuur Kg 0.100 12,000 1,200.00
Cat dasar Tembok Kg 0.100 14,300 1,430.00
Cat Penutup Tembok Kg 0.260 66,000 17,160.00
JUMLAH HARGA BAHAN 19,790.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 33,210.00
E Overhead & Profit 10% 10% 3,321.00
F Harga Satuan Pekerjaan (D+E) - 36,000.00
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 125,000 3,500.00
Tukang cat L.02.08 OH 0.042 150,000 6,300.00
Kepala tukang L.03.01 OH 0.004 150,000 630.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 10,955.00
B BAHAN
Cat dasar Tembok Kg 0.120 14,300 1,716.00
Cat Penutup Tembok Kg 0.180 66,000 11,880.00
JUMLAH HARGA BAHAN 13,596.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 24,551.00
E Overhead & Profit 10% 10% 2,455.10
F Harga Satuan Pekerjaan (D+E) - 27,000.00
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 125,000 7,500.00
Tukang cat L.02.08 OH 0.060 150,000 9,000.00
Kepala tukang L.03.01 OH 0.012 150,000 1,800.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 18,825.00
B BAHAN
Cat Besi Kg 0.300 66,000 19,800.00
Kuas Bh 0.010 22,000 220.00
Pengencer L 0.010 31,000 310.00
JUMLAH HARGA BAHAN 20,330.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 39,155.00
E Overhead & Profit 10% 10% 3,915.50
F Harga Satuan Pekerjaan (D+E) - 43,070.00
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.400 125,000 50,000.00
Tukang cat L.02.08 OH 0.700 150,000 105,000.00
Kepala tukang L.03.01 OH 0.070 150,000 10,500.00
Mandor L.04.01 OH 0.020 175,000 3,500.00
JUMLAH TENAGA KERJA 169,000.00
B BAHAN
Cat Besi Kg 0.300 66,000 19,800.00
Pengencer L 0.010 31,000 310.00
JUMLAH HARGA BAHAN 20,110.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 189,110.00
E Overhead & Profit 10% 10% 18,911.00
F Harga Satuan Pekerjaan (D+E) - 208,021.00
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.160 125,000 270,000.00
Tukang batu L.02.03 OH 0.720 150,000 108,000.00
Kepala tukang L.03.01 OH 0.072 150,000 10,800.00
Mandor L.04.01 OH 0.011 175,000 1,925.00
JUMLAH TENAGA KERJA 390,725.00
B BAHAN
Bata merah bh 40.000 1,000 40,000.00
Semen portland Kg 44.000 1,500 66,000.00
Pasir pasang M3 0.070 190,000 13,300.00
Pasir beton M3 0.060 190,000 11,400.00
Kerikil M3 0.070 190,000 13,300.00
Baja tulangan Kg 1.600 15,000 24,000.00
JUMLAH HARGA BAHAN 168,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 558,725.00
E Overhead & Profit 10% 10% 55,872.50
F Harga Satuan Pekerjaan (D+E) - 614,597.00
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 125,000 400,000.00
Tukang batu L.02.03 OH 1.150 150,000 172,500.00
Kepala tukang L.03.01 OH 0.011 150,000 1,650.00
Mandor L.04.01 OH 0.016 175,000 2,800.00
JUMLAH TENAGA KERJA 576,950.00
B BAHAN
Bata merah bh 70.000 1,000 70,000.00
Semen portland Kg 77.000 1,500 115,500.00
Pasir pasang M3 0.130 190,000 24,700.00
Pasir beton M3 0.090 190,000 17,100.00
Kerikil M3 0.020 190,000 3,800.00
Baja tulangan Kg 2.600 15,000 39,000.00
JUMLAH HARGA BAHAN 270,100.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 847,050.00
E Overhead & Profit 10% 10% 84,705.00
F Harga Satuan Pekerjaan (D+E) - 931,755.00
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 125,000 400,000.00
Tukang batu L.02.03 OH 1.150 150,000 172,500.00
Kepala tukang L.03.01 OH 0.011 150,000 1,650.00
Mandor L.04.01 OH 0.016 175,000 2,800.00
JUMLAH TENAGA KERJA 576,950.00
B BAHAN
Bata merah bh 123.000 1,000 123,000.00
Semen portland Kg 114.000 1,500 171,000.00
Pasir pasang M3 0.184 190,000 34,960.00
Pasir beton M3 0.120 190,000 22,800.00
Kerikil M3 0.033 190,000 6,270.00
Baja tulangan Kg 4.850 15,000 72,750.00
JUMLAH HARGA BAHAN 430,780.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 1,007,730.00
E Overhead & Profit 10% 10% 100,773.00
F Harga Satuan Pekerjaan (D+E) - 1,108,503.00
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 125,000 7,500.00
Tukang batu L.02.03 OH 0.030 150,000 4,500.00
Kepala tukang L.03.01 OH 0.003 150,000 450.00
Mandor L.04.01 OH 0.003 175,000 525.00
JUMLAH TENAGA KERJA 12,975.00
B BAHAN
Pipa tanah Bh 1.600 - -
Semen portland Kg 0.680 1,500 1,020.00
Pasir pasang M3 0.013 190,000 2,470.00
Pasir urug M3 0.011 100,000 1,100.00
JUMLAH HARGA BAHAN 4,590.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 17,565.00
E Overhead & Profit 10% 10% 1,756.50
F Harga Satuan Pekerjaan (D+E) - 19,321.00
*) Pemasangan semua aksesoris Ø 50 - 100 mm dan aksesoris selain Tee dan Valve menggunakan harga
dasar bahan, karena SNI no.28-2016 tidak menyediakan AHSP
*) AHSP pemasangan aksesoris Valve berlaku untuk semua jenis fungsi
*) HSP pemasangan aksesoris = Harga dasar material (sesuai jenis aksesoris) + AHSP
A.8.4.3.15 (K3) Pemasangan 1 buah Tee Ø 150 mm (termasuk Bend, Reducer, Dop End, Gibolt Joint, Flexible Joint, Dismanting Joint dan
Flange Socket Steel)
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1060 125,000 13,250.00
Tukang pipa L.02.13 OH 0.0530 150,000 7,950.00
Mandor L.04.01 OH 0.0110 175,000 1,925.00
JUMLAH TENAGA KERJA 23,125.00
B BAHAN
Tee Ø 150 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.0280 200,000 5,600.00
JUMLAH HARGA ALAT 5,600.00
D Jumlah (A+B+C) - 28,725.00
E Overhead & Profit 10% 10% 2,872.50
F Harga Satuan Pekerjaan (D+E) - 31,597.00
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6460 125,000 205,750.00
Tukang pipa L.02.13 OH 0.8230 150,000 123,450.00
Mandor L.04.01 OH 0.1650 175,000 28,875.00
JUMLAH TENAGA KERJA 358,075.00
B BAHAN
Pipa Ø 100 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.6500 200,000 130,000.00
Sewa Genset 1500 watt hari 0.1590 200,000 31,800.00
Sewa Pompa Submersible 3m3/h hari 1.0780 400,000 431,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 200,000 182,200.00
JUMLAH HARGA ALAT 775,200.00
D Jumlah (A+B+C) - 1,133,275.00
E Overhead & Profit 10% 10% 113,327.50
F Harga Satuan Pekerjaan (D+E) - 1,246,602.00
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.0960 125,000 262,000.00
Tukang pipa L.02.13 OH 1.0480 150,000 157,200.00
Mandor L.04.01 OH 0.2100 175,000 36,750.00
JUMLAH TENAGA KERJA 455,950.00
B BAHAN
Pipa Ø 150 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.7600 200,000 152,000.00
Sewa Genset 1500 watt hari 0.3690 200,000 73,800.00
Sewa Pompa Submersible 3m3/h hari 1.3530 400,000 541,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 200,000 205,200.00
JUMLAH HARGA ALAT 972,200.00
D Jumlah (A+B+C) - 1,428,150.00
E Overhead & Profit 10% 10% 142,815.00
F Harga Satuan Pekerjaan (D+E) - 1,570,965.00
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.5460 125,000 318,250.00
Tukang pipa L.02.13 OH 1.2730 150,000 190,950.00
Mandor L.04.01 OH 0.2550 175,000 44,625.00
JUMLAH TENAGA KERJA 553,825.00
B BAHAN
Pipa Ø 200 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.8700 200,000 174,000.00
Sewa Genset 1500 watt hari 0.5790 200,000 115,800.00
Sewa Pompa Submersible 3m3/h hari 1.6280 400,000 651,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 200,000 228,200.00
JUMLAH HARGA ALAT 1,169,200.00
D Jumlah (A+B+C) - 1,723,025.00
E Overhead & Profit 10% 10% 172,302.50
F Harga Satuan Pekerjaan (D+E) - 1,895,327.00
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.9960 125,000 374,500.00
Tukang pipa L.02.13 OH 1.4980 150,000 224,700.00
Mandor L.04.01 OH 0.3000 175,000 52,500.00
JUMLAH TENAGA KERJA 651,700.00
B BAHAN
Pipa Ø 250 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 0.9800 200,000 196,000.00
Sewa Genset 1500 watt hari 0.7890 200,000 157,800.00
Sewa Pompa Submersible 3m3/h hari 1.9030 400,000 761,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.2560 200,000 251,200.00
JUMLAH HARGA ALAT 1,366,200.00
D Jumlah (A+B+C) - 2,017,900.00
E Overhead & Profit 10% 10% 201,790.00
F Harga Satuan Pekerjaan (D+E) - 2,219,690.00
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4460 125,000 430,750.00
Tukang pipa L.02.13 OH 1.7230 150,000 258,450.00
Mandor L.04.01 OH 0.3450 175,000 60,375.00
JUMLAH TENAGA KERJA 749,575.00
B BAHAN
Pipa Ø 300 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.0900 200,000 218,000.00
Sewa Genset 1500 watt hari 0.9990 200,000 199,800.00
Sewa Pompa Submersible 3m3/h hari 2.1780 400,000 871,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.3710 200,000 274,200.00
JUMLAH HARGA ALAT 1,563,200.00
D Jumlah (A+B+C) - 2,312,775.00
E Overhead & Profit 10% 10% 231,277.50
F Harga Satuan Pekerjaan (D+E) - 2,544,052.00
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.3460 125,000 543,250.00
Tukang pipa L.02.13 OH 2.1730 150,000 325,950.00
Mandor L.04.01 OH 0.4350 175,000 76,125.00
JUMLAH TENAGA KERJA 945,325.00
B BAHAN
Pipa Ø 400 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.3100 200,000 262,000.00
Sewa Genset 1500 watt hari 1.4190 200,000 283,800.00
Sewa Pompa Submersible 3m3/h hari 2.7280 400,000 1,091,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.6010 200,000 320,200.00
JUMLAH HARGA ALAT 1,957,200.00
D Jumlah (A+B+C) - 2,902,525.00
E Overhead & Profit 10% 10% 290,252.50
F Harga Satuan Pekerjaan (D+E) - 3,192,777.00
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.7960 125,000 599,500.00
Tukang pipa L.02.13 OH 2.3980 150,000 359,700.00
Mandor L.04.01 OH 0.4800 175,000 84,000.00
JUMLAH TENAGA KERJA 1,043,200.00
B BAHAN
Pipa Ø 450 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.4200 200,000 284,000.00
Sewa Genset 1500 watt hari 1.6290 200,000 325,800.00
Sewa Pompa Submersible 3m3/h hari 3.0030 400,000 1,201,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.7160 200,000 343,200.00
JUMLAH HARGA ALAT 2,154,200.00
D Jumlah (A+B+C) - 3,197,400.00
E Overhead & Profit 10% 10% 319,740.00
F Harga Satuan Pekerjaan (D+E) - 3,517,140.00
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.2460 125,000 655,750.00
Tukang pipa L.02.13 OH 2.6230 150,000 393,450.00
Mandor L.04.01 OH 0.5250 175,000 91,875.00
JUMLAH TENAGA KERJA 1,141,075.00
B BAHAN
Pipa Ø 500 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.5300 200,000 306,000.00
Sewa Genset 1500 watt hari 1.8390 200,000 367,800.00
Sewa Pompa Submersible 3m3/h hari 3.2780 400,000 1,311,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 1.8310 200,000 366,200.00
JUMLAH HARGA ALAT 2,351,200.00
D Jumlah (A+B+C) - 3,492,275.00
E Overhead & Profit 10% 10% 349,227.50
F Harga Satuan Pekerjaan (D+E) - 3,841,502.00
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.1460 125,000 768,250.00
Tukang pipa L.02.13 OH 3.0730 150,000 460,950.00
Mandor L.04.01 OH 0.6150 175,000 107,625.00
JUMLAH TENAGA KERJA 1,336,825.00
B BAHAN
Pipa Ø 600 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.7500 200,000 350,000.00
Sewa Genset 1500 watt hari 2.2590 200,000 451,800.00
Sewa Pompa Submersible 3m3/h hari 3.8280 400,000 1,531,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.0610 200,000 412,200.00
JUMLAH HARGA ALAT 2,745,200.00
D Jumlah (A+B+C) - 4,082,025.00
E Overhead & Profit 10% 10% 408,202.50
F Harga Satuan Pekerjaan (D+E) - 4,490,227.00
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0460 125,000 880,750.00
Tukang pipa L.02.13 OH 3.5230 150,000 528,450.00
Mandor L.04.01 OH 0.7050 175,000 123,375.00
JUMLAH TENAGA KERJA 1,532,575.00
B BAHAN
Pipa Ø 700 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 1.9700 200,000 394,000.00
Sewa Genset 1500 watt hari 2.6790 200,000 535,800.00
Sewa Pompa Submersible 3m3/h hari 4.3780 400,000 1,751,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.2910 200,000 458,200.00
JUMLAH HARGA ALAT 3,139,200.00
D Jumlah (A+B+C) - 4,671,775.00
E Overhead & Profit 10% 10% 467,177.50
F Harga Satuan Pekerjaan (D+E) - 5,138,952.00
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.9460 125,000 993,250.00
Tukang pipa L.02.13 OH 3.9730 150,000 595,950.00
Mandor L.04.01 OH 0.7950 175,000 139,125.00
JUMLAH TENAGA KERJA 1,728,325.00
B BAHAN
Pipa Ø 800 mm bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder hari 2.1900 200,000 438,000.00
Sewa Genset 1500 watt hari 3.0990 200,000 619,800.00
Sewa Pompa Submersible 3m3/h hari 4.9280 400,000 1,971,200.00
Sewa Tripot/Tackel & handle crane 2 T hari 2.5210 200,000 504,200.00
JUMLAH HARGA ALAT 3,533,200.00
D Jumlah (A+B+C) - 5,261,525.00
E Overhead & Profit 10% 10% 526,152.50
F Harga Satuan Pekerjaan (D+E) - 5,787,677.00
AHSP 2022
Pemasangan 1 M2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai Dingin) Profil C75
4.2.1.23 Dingin) Profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 125,000 95,050.00
Tukang besi L.02.03 OH 0.7604 150,000 114,060.00
Kepala tukang L.03.01 OH 0.0760 150,000 11,400.00
Mandor L.04.01 OH 0.0380 175,000 6,650.00
JUMLAH TENAGA KERJA 227,160.00
B BAHAN
Baja ringan canai dingin C75 btg btg 0.873 140,000 122,220.00
JUMLAH HARGA BAHAN 122,220.00
C PERALATAN
Aksesoris % bahan 10.0000 1,222 12,222.00
JUMLAH HARGA ALAT 12,222.00
D Jumlah (A+B+C) - 361,602.00
E Overhead & Profit 10% 10% 36,160.20
F Harga Satuan Pekerjaan (D+E) - 397,762.00
Pemasangan 1 m2 rangka Baja Ringan hollow 20.40.0,2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 125,000 31,250.00
Tukang Besi L.02.05 OH 0.2500 150,000 37,500.00
Kepala Tukang L.03.01 OH 0.0250 150,000 3,750.00
Mandor L.04.01 OH 0.0130 175,000 2,275.00
JUMLAH TENAGA KERJA 74,775.00
B BAHAN
Rangka Baja Ringan hollow 20.40.0,2 mm M1 3.5000 20,000 70,000.00
Assesoris (perkuatan dll) Ls 1.0000 20,000 20,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) - 164,775.00
E Overhead & Profit 10% 10% 16,477.50
F Harga Satuan Pekerjaan (D+E) - 181,000.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
HARGA PERKIRAAN SENDIRI
(HPS)
Program : .......
Kegiatan : .......
Pekerjaan : PEMELIHARAAN RUTIN GEDUNG KANTOR
Lokasi : DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KAB. GORONTALO
T.A. : 2022 sisa
1 2 3 4 5 6 = (4) x (5)
I PEKERJAAN PERSIAPAN
1 Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu m2 20.30 Rp 223,000.00 Rp 4,525,829.60
kelas II atau III
2 Pemasangan 1 m2 langit-langit & Dinding gypsum board ukuran m2 40.59 Rp 56,000.00 Rp 2,273,062.40
(120x240x9) mm, tebal 9 mm
3 Memasang 1 m2 Pasang Dinding, Kolom dan Rak HPL m2 5.03 Rp 749,000.00 Rp 3,770,466.00
4 Membuat Meja Resepsionis (Pelayanan) Bahan Multipleks 9mm, Ls 1.00 Rp 18,550,000.00 Rp 18,550,000.00
Multipleks 15mm, Rangka Kayu Kelas II, Fhinising lantai Meja
HPL Motif Marmer dan Finishing Dinding Meja HPL Motif Kayu +
Kaca Polos 5mm + Laci 2 Pintu + Asisoris Penggantung P. 4,7m
L. 0,6m Tinggi 1,20m
5 Membuat Pintu Bahan Multipleks 9mm, Multipleks 15mm, Ls 1.00 Rp 5,100,000.00 Rp 5,100,000.00
Finishing HPL Motif Uk. 3,2x78x200cm, 2 Bh
7 Pemasangan 1 buah kunci tanam biasa 2 Slag Bh 1.00 Rp 269,000.00 Rp 269,000.00
6 Pemasangan 1 buah kunci tanam Elektrik (smart lock) Pintu Bh 1.00 Rp 62,000.00 Rp 62,000.00
Kayu
8 Pemasangan 1 buah engsel pintu Bh 6.00 Rp 62,000.00 Rp 372,000.00
9 Pemasangan 1 buah door closer Bh 1.00 Rp 428,000.00 Rp 428,000.00
10 Pengecatan 1 m2 tembok/ plafond lama ( 1 lapis cat dasar, 2 m3 45.66 Rp 36,000.00 Rp 1,643,742.00
lapis cat penutup)
11 Pengecatan 1 m2 tembok/ plafond baru ( 1 lapis plamuur, 1 m3 46.41 Rp 27,000.00 Rp 1,253,080.80
lapis cat dasar, 2 lapis cat penutup)
12 Memasang 1 Titik Instalasi Penerangan m3 5.00 Rp 152,000.00 Rp 760,000.00
13 Stop Kontak x Panasonic Bh 1.00 Rp 25,000.00 Rp 25,000.00
14 Lampu Selang Led Warna Glg 2.00 Rp 300,000.00 Rp 600,000.00
15 Lampu LED BULB 11 Watt Philips Bh 4.00 Rp 75,000.00 Rp 300,000.00
16 Stop Kontak 5 Mata m3 2.00 Rp 60,000.00 Rp 120,000.00
Jumlah Harga Pekerjaan III (Dipindahkan ke Rekapitulasi Perkiraan Harga Pekerjaan) 40,052,180.80
VOLUM HARGA SATUAN JUMLAH HARGA
NO. URAIAN SAT.
E (Rp.) (Rp.)
1 2 3 4 5 6 = (4) x (5)
1 Pemasangan 1 m kusen pintu/ Dinding Partisi Kaca alluminium m1 23.30 Rp 210,000.00 Rp 4,893,000.00
4" (warna putih)
2 Pintu Aluminium Panel Kaca Polos 5mm Uk. 100x185cm Ls 1.00 Rp 2,500,000.00 Rp 2,500,000.00
3 Pemasangan 1 m2 kaca tebal 5 mm m2 10.00 Rp 454,000.00 Rp 4,540,000.00
4 Pemasangan 1 m2 rangka Baja ringan hollow 20.40.0,2mm, m2 10.00 Rp 181,000.00 Rp 1,810,000.00
modul 60 x 120 cm, dinding partisi
5 Pemasangan 1 m2 langit-langit & Dinding gypsum board ukuran m2 20.00 Rp 56,000.00 Rp 1,120,000.00
(120x240x9) mm, tebal 9 mm
6 Pemasangan 1 buah kunci tanam Elektrik (smart lock) Pintu Bh 1.00 Rp 3,351,000.00 Rp 3,351,000.00
7 Aluminium
Pemasangan 1 buah engsel pintu Bh 3.00 Rp 62,000.00 Rp 186,000.00
8 Pemasangan 1 buah door closer Bh 1.00 Rp 428,000.00 Rp 428,000.00
9 Pengecatan 1 m2 tembok/ plafond baru ( 1 lapis plamuur, 1 m3 20.00 Rp 27,000.00 Rp 540,000.00
lapis cat dasar, 2 lapis cat penutup)
V PEKERJAAN LAIN-LAIN
1 Tulisan dan Logo Dinas Perkim Kabupaten Gorontalo Ls 1.00 Rp 1,510,000.00 Rp 1,510,000.000
2 Administrasi dan dokumentasi Ls 1.00 Rp 1,572,146.77 Rp 1,572,146.770
3 Pembersihan Akhir Ls 1.00 Rp 500,000.00 Rp 500,000.00
Program : .......
Kegiatan : .......
Pekerjaan : PEMELIHARAAN RUTIN GEDUNG KANTOR
Lokasi : DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KAB. GORONTALO