244,436.50 ###
292,946.50 ###
1,077,939.50 ###
60,676.00 ###
1,331,332.75 ###
914,210.00 ###
921,175.75 ###
1,049,697.00 ###
20,900.00 ###
108,834.00 ###
231,990.00 ###
1,730,630.00 ###
865,315.00 ###
95,150.00 ###
116,820.00 ###
138,842.00 ###
126,632.00 ###
192,060.00 ###
153,120.00 ###
6,930.00 ###
41,690.00 ###
69,300.00 ###
69,300.00 ###
153,560.00 ###
84,260.00 ###
119,790.00 ###
376,860.00 ###
1,145,438.25 ###
1,091,321.00 ###
1,053,833.00 ###
1,027,463.25 ###
991,353.00 ###
673,893.00 ###
2,862,426.60 ###
1,138,208.50 ###
1,006,055.29 ###
1,051,586.50 ###
1,086,039.95 ###
920,040.29 ###
1,128,363.59 ###
1,166,224.60 ###
1,198,344.54 ###
1,214,565.64 ###
1,242,283.43 ###
1,250,792.83 ###
HARGA SATUAN
KET.
2020 (Rp)
1,353,814.47 ###
1,364,933.72 ###
15,151.40 ###
16,745.30 ###
15,045.03 ###
16,508.12 ###
16,959.16 ###
197,131.00 ###
207,031.00 ###
341,473.00 ###
349,723.00 ###
363,473.00 ###
340,923.00 ###
320,160.50 ###
94,435.00 ###
4,406,699.00 ###
5,359,937.00 ###
8,418,927.00 ###
6,553,327.00 ###
5,682,754.00 ###
5,589,859.00 ###
6,136,537.00 ###
84,964.00 ###
121,104.50 ###
9,867.00 ###
15,939.00 ###
12,903.00 ###
71,203.00 ###
38,863.00 ###
38,863.00 ###
1,336.96 ###
2,612.24 ###
619,300.00 ###
136,401.10 ###
496,100.00 ###
301,400.00 ###
104,588.00 ###
137,093.00 ###
175,103.18 ###
195,874.45 ###
350,559.00 ###
336,067.05 ###
326,825.95 ###
321,309.78 ###
317,751.50 ###
165,679.80 ###
159,121.38 ###
155,179.75 ###
152,689.57 ###
151,069.93 ###
148,483.50 ###
81,677.70 ###
87,257.90 ###
79,860.18 ###
HARGA SATUAN
KET.
2020 (Rp)
76,540.57 ###
74,372.76 ###
73,008.72 ###
71,972.93 ###
71,361.66 ###
70,750.39 ###
106,864.32 ###
83,914.18 ###
99,515.68 ###
97,729.04 ###
96,315.91 ###
41,746.72 ###
76,172.25 ###
61,835.18 ###
36,184.19 ###
17,197.40 ###
73,365.16 ###
46,700.50 ###
256,506.25 ###
247,411.45 ###
351,911.45 ###
264,575.85 ###
307,545.70 ###
307,545.70 ###
324,673.25 ###
421,473.25 ###
162,258.80 ###
47,179.00 ###
56,402.50 ###
60,082.00 ###
265,270.50 ###
128,524.00 ###
83,028.00 ###
74,382.00 ###
77,616.00 ###
74,613.00 ###
75,190.50 ###
151,404.00 ###
96,426.00 ###
119,526.00 ###
147,259.20 ###
102,938.00 ###
60,236.00 ###
44,731.50 ###
209,283.80 ###
214,055.60 ###
34,463.00 ###
8,842,350.00 ###
6,996,550.00 ###
6,336,550.00 ###
323,983.00 ###
293,183.00 ###
784,300.00 ###
729,300.00 ###
HARGA SATUAN
KET.
2020 (Rp)
592,240.00 ###
559,240.00 ###
883,300.00 ###
795,300.00 ###
632,720.00 ###
730,400.00 ###
695,200.00 ###
709,830.00 ###
627,330.00 ###
7,296,080.00 ###
5,783,580.00 ###
5,178,580.00 ###
9,336,690.00 ###
7,374,510.00 ###
171,380.00 ###
229,130.00 ###
74,344.60 ###
125,510.00 ###
117,040.00 ###
123,585.00 ###
114,620.00 ###
91,410.00 ###
76,560.00 ###
90,420.00 ###
75,570.00 ###
238,128.00 ###
222,728.00 ###
322,740.00 ###
412,335.00 ###
66,946.00 ###
229,768.00 ###
222,090.00 ###
149,633.00 ###
51,730.80 ###
36,498.00 ###
54,648.00 ###
38,148.00 ###
306,328.00 ###
48,246.00 ###
119,328.00 ###
73,040.00 ###
378,488.00 ###
59,628.80 ###
209,305.80 ###
245,605.80 ###
269,805.80 ###
274,025.40 ###
232,848.00 ###
20,218.00 ###
3,168.00 ###
4,048.00 ###
46,744.50 ###
65,785.50 ###
26,158.00 ###
32,406.00 ###
32,406.00 ###
59,763.00 ###
HARGA SATUAN
KET.
2020 (Rp)
33,951.50 ###
22,495.00 ###
30,354.50 ###
25,162.50 ###
85,360.00 ###
40,040.00 ###
76,917.50 ###
179,850.00 ###
171,325.00 ###
52,833.00 ###
3,035,010.00 ###
861,591.50 ###
589,176.50 ###
3,188,423.70 ###
2,224,393.38 ###
1,481,150.00 ###
367,620.00 ###
124,492.50 ###
56,540.00 ###
574,744.50 ###
851,031.50 ###
1,038,856.50 ###
54,114.50 ###
88,027.50 ###
65,538.00 ###
76,791.00 ###
106,595.50 ###
373,565.50 ###
516,785.50 ###
23,229.25 ###
27,065.50 ###
30,475.50 ###
46,992.00 ###
51,254.50 ###
74,662.50 ###
95,975.00 ###
138,600.00 ###
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
ASESORIS PERPIPAAN
1 METERAN AIR
Water meter Brass 1/2 " bh Rp 487,500.00
Water meter Brass 3/4 " bh Rp 804,600.00
Water meter Brass 1 " bh Rp 1,370,700.00
Water meter Plastic 1/2 " bh Rp 438,500.00
Water meter Flange 2,5" bh Rp 1,620,600.00
Water meter Flange 3" bh Rp 1,897,200.00
Water meter Flange 4" bh Rp 2,124,900.00
Water meter Flange 6" bh Rp 2,959,400.00
Water meter Flange 8" Rp 3,875,400.00
Tutup Water meter bh Rp 58,000.00
Ball Valve 1/2" bh Rp 83,025.00
ALPE 1/2" x 1/2" bh Rp 133,200.00
2 GATE VALVE (u. Membuka & menutup aliran)
- Gate Valve 1,5" unit Rp 810,000.00
- Gate Valve 2" unit Rp 887,000.00
- Gate Valve 2,5" unit Rp 1,109,600.00
- Gate Valve 3" unit Rp 1,319,600.00
- Gate Valve 4"" unit Rp 1,683,200.00
- Gate Valve 5"" unit Rp 2,520,000.00
- Gate Valve 6"" unit Rp 2,958,300.00
- Gate Valve 8"" unit Rp 4,724,200.00
3 CHECK VALVE (u. Mencegah aliran balik)
- Check Valve 1,5" unit Rp 810,000.00
- Check Valve 2" unit Rp 936,900.00
- Check Valve 2,5" unit Rp 1,170,000.00
- Check Valve 3" unit Rp 1,468,800.00
- Check Valve 4" unit Rp 1,980,000.00
- Check Valve 5" unit Rp 2,790,000.00
- Check Valve 6" unit Rp 3,510,000.00
- Check Valve 8" unit Rp 6,931,800.00
AIR VALVE (u. Pembuangan udara dalam pipa)
- Air Valve 1,5" unit Rp 891,000.00
- Air Valve 2" unit Rp 1,139,200.00
- Air Valve 2,5" unit Rp 1,260,000.00
- Air Valve 3" unit Rp 1,568,900.00
- Air Valve 4" unit Rp 2,018,700.00
- Air Valve 5" unit Rp 2,340,000.00
- Air Valve 6" unit Rp 3,150,500.00
- Air Valve 8" unit Rp -
4 CAP/DOP
- Dia. 63 mm unit Rp 39,400.00
- Dia. 75 mm unit Rp 51,500.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
- Dia. 90 mm unit Rp 64,600.00
- Dia. 110 mm unit Rp 114,000.00
- Dia. 140 mm unit Rp 118,050.00
- Dia. 160 mm unit Rp 189,100.00
- Dia. 200 mm unit Rp 403,300.00
5 STUB FLANGE
- Dia. 63 mm unit Rp 202,200.00
- Dia. 75 mm unit Rp 265,000.00
- Dia. 90 mm unit Rp 298,000.00
- Dia. 110 mm unit Rp 393,000.00
- Dia. 140 mm unit Rp 523,300.00
- Dia. 160 mm unit Rp 675,200.00
- Dia. 200 mm unit Rp 1,132,200.00
6 EQUAL TEE (HDPE)
- Tee Dia. 63 mm unit Rp 94,000.00
- Tee Dia. 75 mm unit Rp 133,100.00
- Tee Dia. 90 mm unit Rp 192,000.00
- Tee Dia. 110 mm unit Rp 300,000.00
- Tee Dia. 140 mm unit Rp 447,300.00
- Tee Dia. 160 mm unit Rp 638,200.00
- Tee Dia. 200 mm unit Rp 1,040,000.00
4 REDUCING TEE
- Dia. 63 x 50 mm unit Rp 70,900.00
- Dia. 75 x 50 mm unit Rp 102,300.00
- Dia. 75 x 63 mm unit Rp 110,200.00
- Dia. 90 x 63 mm unit Rp 201,500.00
- Dia. 90 x 75 mm unit Rp 157,300.00
- Dia. 110 x 63 mm unit Rp 268,000.00
- Dia. 110 x 90 mm unit Rp 272,000.00
- Dia. 140 x 90 mm unit Rp 401,200.00
- Dia. 140 x 110 mm unit Rp 432,700.00
- Dia. 160 x 90 mm unit Rp 767,500.00
- Dia. 160 x 110 mm unit Rp 763,000.00
- Dia. 200 x 110 mm unit Rp 1,141,500.00
- Dia. 200 x 160 mm unit Rp 1,039,000.00
7 REDUCER
- Dia. 63 x 50 mm unit Rp 48,200.00
- Dia. 75 x 50 mm unit Rp 67,500.00
- Dia. 75 x 63 mm unit Rp 70,900.00
- Dia. 90 x 50 mm unit Rp 83,400.00
- Dia. 90 x 63 mm unit Rp 94,400.00
- Dia. 90 x 75 mm unit Rp 102,300.00
- Dia. 110 x 50 mm unit Rp 122,800.00
- Dia. 110 x 63 mm unit Rp 133,800.00
- Dia. 110 x 75 mm unit Rp 141,600.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
- Dia. 110 x 90 mm unit Rp 157,300.00
- Dia. 140 x 63 mm unit Rp 212,500.00
- Dia. 140 x 90 mm unit Rp 236,000.00
- Dia. 140 x 110 mm unit Rp 251,700.00
- Dia. 160 x 75 mm unit Rp 330,400.00
- Dia. 160 x 90 mm unit Rp 346,100.00
- Dia. 160 x 110 mm unit Rp 369,800.00
- Dia. 160 x 140 mm unit Rp 393,300.00
8 BEND 90º
- Dia. 63 mm unit Rp 82,000.00
- Dia. 75 mm unit Rp 115,000.00
- Dia. 90 mm unit Rp 164,200.00
- Dia. 110 mm unit Rp 273,000.00
- Dia. 140 mm unit Rp 480,000.00
- Dia. 160 mm unit Rp 672,000.00
- Dia. 200 mm unit Rp 847,000.00
7 BEND 45º
- Dia. 63 mm unit Rp 80,000.00
- Dia. 75 mm unit Rp 97,600.00
- Dia. 90 mm unit Rp 133,800.00
- Dia. 110 mm unit Rp 204,500.00
- Dia. 140 mm unit Rp 355,000.00
- Dia. 160 mm unit Rp 484,400.00
- Dia. 200 mm unit Rp 660,700.00
9 SOCKET
(STRAIGHT COUPLING COMPRESSION)
- Dia. 20 mm unit Rp 10,900.00
- Dia. 25 mm unit Rp 13,500.00
- Dia. 32 mm unit Rp 18,200.00
- Dia. 40 mm unit Rp 34,300.00
- Dia. 50 mm unit Rp 48,600.00
- Dia. 63 mm unit Rp 76,300.00
- Dia. 75 mm unit Rp 134,800.00
- Dia. 90 mm unit Rp 158,300.00
- Dia. 110 mm unit Rp 355,200.00
10 CLAMP SADDLE
- Dia. 32 x 3/4 mm unit Rp 27,600.00
- Dia. 32 x 1 mm unit Rp 28,700.00
- Dia. 50 x 1/2 mm unit Rp 23,100.00
- Dia. 50 x 3/4 mm unit Rp 28,000.00
- Dia. 63 x 1/2 mm unit Rp 34,100.00
- Dia. 63 x 3/4 mm unit Rp 34,100.00
- Dia. 63 x 1 mm unit Rp 34,800.00
- Dia. 63 x 1.1/4 mm unit Rp 38,300.00
- Dia. 75 x 1 mm unit Rp 55,200.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
- Dia. 75 x 1.1/2 mm unit Rp 63,000.00
- Dia. 75 x 2 mm unit Rp 65,200.00
- Dia. 90 x 1/2 mm unit Rp 59,500.00
- Dia. 90 x 3/4 mm unit Rp 59,500.00
- Dia. 90 x 1 mm unit Rp 62,000.00
- Dia. 90 x 1.1/4 mm unit Rp 67,800.00
- Dia. 90 x 1.1/2 mm unit Rp 70,300.00
- Dia. 90 x 2 mm unit Rp 70,800.00
- Dia. 110 x 1/2 mm unit Rp 80,600.00
- Dia. 110 x 3/4 mm unit Rp 80,600.00
- Dia. 110 x 1 mm unit Rp 82,800.00
- Dia. 110 x 1.1/4 mm unit Rp 86,800.00
- Dia. 110 x 1.1/2 mm unit Rp 91,500.00
- Dia. 110 x 2 mm unit Rp 91,700.00
11 FERRULE THREADED WITH KNIFE
FERRULE COMPRESSION JOINT WITH KNIFE
- Dia. 1.1/4" x 3/4" mm unit Rp 97,500.00
- Dia. 1.1/4" x 25mm mm unit Rp 70,500.00
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
- Dia. 110 x 4" mm unit Rp 251,200.00
14 ELBOW 90º (KNEE) SEGMENTED
- Dia. 20 mm unit Rp 10,600.00
- Dia. 25 mm unit Rp 14,300.00
- Dia. 32 mm unit Rp 20,500.00
- Dia. 40 mm unit Rp 38,500.00
- Dia. 50 mm unit Rp 54,700.00
- Dia. 63 mm unit Rp 86,800.00
- Dia. 75 mm unit Rp 154,100.00
- Dia. 90 mm unit Rp 176,000.00
- Dia. 110 mm unit Rp 397,500.00
15 MALE THREAD ELBOW 90º
(KNEE DRAT LUAR)
- Dia. 20 x 1/2" mm unit Rp 7,000.00
- Dia. 25 x 3/4" mm unit Rp 9,400.00
- Dia. 32 x 1" mm unit Rp 12,500.00
- Dia. 40 x 1.1/4" mm unit Rp 25,000.00
- Dia. 50 x 1.1/2" mm unit Rp 35,200.00
- Dia. 63 x 2" mm unit Rp 52,600.00
- Dia. 75 x 2.1/2" mm unit Rp 93,800.00
- Dia. 90 x 3" mm unit Rp 113,000.00
- Dia. 110 x 4" mm unit Rp 223,700.00
16 FEMALE THREAD ELBOW 90º
- Dia. 20 x 1/2" mm unit Rp 6,200.00
- Dia. 25 x 3/4" mm unit Rp 8,400.00
- Dia. 32 x 1" mm unit Rp 11,900.00
- Dia. 40 x 1.1/4" mm unit Rp 21,300.00
- Dia. 50 x 1.1/2" mm unit Rp 35,800.00
- Dia. 63 x 2" mm unit Rp 55,200.00
- Dia. 75 x 2.1/2" mm unit Rp 99,300.00
- Dia. 90 x 3" mm unit Rp 114,900.00
- Dia. 110 x 4" mm unit Rp 251,200.00
17 END CAP (DOP) - SEGMENTED
- Dia. 20 mm unit Rp 5,300.00
- Dia. 25 mm unit Rp 7,500.00
- Dia. 32 mm unit Rp 9,900.00
- Dia. 40 mm unit Rp 19,700.00
- Dia. 50 mm unit Rp 27,600.00
- Dia. 63 mm unit Rp 70,909.09
- Dia. 75 mm unit Rp 87,272.73
- Dia. 90 mm unit Rp 109,090.91
- Dia. 110 mm unit Rp 169,090.91
18 EQUAL TEE SEGMENTED
- Dia. 20 mm unit Rp 14,900.00
- Dia. 25 mm unit Rp 20,600.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
- Dia. 32 mm unit Rp 28,500.00
- Dia. 40 mm unit Rp 54,600.00
- Dia. 50 mm unit Rp 78,300.00
- Dia. 63 mm unit Rp 128,600.00
- Dia. 75 mm unit Rp 222,500.00
- Dia. 90 mm unit Rp 256,600.00
- Dia. 110 mm unit Rp 566,900.00
19 REDUCING TEE SEGMENTED
- Dia. 25 x 20 mm unit Rp 19,100.00
- Dia. 32 x 20 mm unit Rp 25,600.00
- Dia. 32 x 25 mm unit Rp 26,800.00
- Dia. 40 x 32 mm unit Rp 50,000.00
- Dia. 50 x 32 mm unit Rp 69,300.00
- Dia. 50 x 40 mm unit Rp 76,100.00
- Dia. 63 x 50 mm unit Rp 118,900.00
- Dia. 110 x 90 mm unit Rp 652,600.00
20 PLUG KRAN
- Dia. 1/2" unit Rp 47,000.00
21 DOUBLE NEPPLE
- Dia. 1/2" unit Rp 19,750.00
- Dia. 3/4" unit Rp 32,500.00
22 FLANGE SPIGOT / FLANGE SOCKET
Dia. 1.1/2" / 50mm unit Rp 94,100.00
Dia. 2" / 63mm unit Rp 149,100.00
Dia. 2.1/2" / 75mm unit Rp 370,000.00
Dia. 3" / 90mm unit Rp 206,300.00
Dia. 4" /110mm unit Rp 261,600.00
Dia. 5" / 140mm unit Rp 888,000.00
Dia. 6" / 160mm unit Rp 513,100.00
Dia. 8" / 200mm unit Rp 799,100.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
( HARGA TIDAK TERMASUK PPN )
TAHUN 2021
A. UPAH
L.01 Pekerja oh Rp 110,000.00
- Pembantu supir / kenek oh Rp 110,000.00
- Supir personil / mobil ringan oh Rp 120,000.00
- Supir material / truck oh Rp 140,000.00
- Pembantu operator oh Rp 100,000.00
- Operator kurang terlatih oh Rp 100,000.00
- Operator terlatih oh Rp 125,000.00
L.02 Tukang oh Rp 125,000.00
L.02 Tukang gali sumur oh Rp 125,000.00
L.02 Tukang ledeng / pipa oh Rp 125,000.00
L.02 Tukang listrik oh Rp 125,000.00
L.02 Tukang cat oh Rp 125,000.00
L.02 Tukang besi / tukang las oh Rp 125,000.00
L.02 Tukang kayu oh Rp 125,000.00
L.02 Tukang batu oh Rp 125,000.00
L.03 Kepala tukang oh Rp 150,000.00
- Mekanik pembantu oh Rp 130,000.00
- Mekanik oh Rp 175,000.00
L.04 Mandor oh Rp 160,000.00
B. MATERIAL/BAHAN
1 Air Ltr Rp 50.00
2 Alat-alat bantu set Rp 150,000.00
3 Aluminium foil m² Rp 6,000.00
4 Agregat kls A m3 Rp 381,625.00
5 Ampelas lembar Rp 8,000.00
6 Aspal kg Rp 16,680.00
7 Aspal Emulsi Prime Coat Ltr Rp 14,377.00
8 Aspal Emulsi Tack Coat Ltr Rp 13,381.00
9 Atap Alluminium Gelombang tebal 0.55 (Galvalum) m² Rp 55,000.00
10 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 51,000.00
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN
11 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 63,000.00
12 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 73,500.00
13 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm lembar Rp 84,000.00
14 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm lembar Rp 94,500.00
15 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm lembar Rp 105,000.00
16 Atap monolayer 3 mm (ex. Onduline Clasic) lembar Rp 155,000.00
17 Atap Genteng monolayer 3 mm (ex. Onduvilla) lembar Rp 48,800.00
18 Atap Genteng monolayer 3 mm (ex. Onduline Tile) lembar Rp 145,000.00
19 Nok / Ridge (ex. Onduline) lembar Rp 82,000.00
20 Atap genteng (standar KIA) buah Rp 5,500.00
21 Atap genteng beton ( jenis press) buah Rp 9,000.00
22 Atap genteng keramik buah Rp 12,000.00
23 Atap metal (biasa / polos) lembar Rp 30,000.00
24 Atap metal Pasir lembar Rp 54,000.00
25 Atap seng fibreglass lembar Rp 128,000.00
26 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) lembar Rp 36,000.00
27 Atap Polycarbonat m2 Rp 115,000.00
28 Bak cuci piring (sink) stainless steel 1 lobang buah Rp 250,000.00
29 Bak cuci piring (sink) stainless steel 2 lobang buah Rp 450,000.00
30 asesoris bak cuci piring set Rp 35,000.00
31 Bak mandi fibreglass buah Rp 250,000.00
32 Batako buah Rp 1,700.00
33 Bata Ringan/Hebel (10 x 20 x 60 cm) buah Rp 9,000.00
34 Bata tempel hitam buah Rp 210,000.00
35 Bata paras buah Rp 130,000.00
36 Batu bata merah (lokal) buah Rp 1,600.00
37 Batu belah/Batu Kali/Batu Gunung m³ Rp 362,500.00
38 Batu belah 15 - 20 (cm) m³ Rp 425,000.00
39 Batu pecah 0,5 - 1 (cm) m³ Rp 425,000.00
40 Batu pecah 1 - 2 (cm) m³ Rp 425,000.00
41 Batu pecah 2 - 3 (cm) m³ Rp 425,000.00
42 Batu pecah 3 - 5 (cm) m³ Rp 425,000.00
43 Batu pecah 5 - 7 (cm) m³ Rp 425,000.00
44 Batu pecah 7 - 10 (cm) m³ Rp 425,000.00
45 Batu pecah 0,5 - 1 (cm) (Kg) kg Rp 314.81
46 Batu pecah 1 - 2 (cm) (Kg) kg Rp 314.81
47 Batu pecah 2 - 3 (cm) (Kg) kg Rp 314.81
No. URAIAN / NAMA / JENIS BARANG SATUAN HARGA SATUAN
C. PERALATAN
1 Papan Proyek buah Rp 100,000.00
2 Excavator Jam #NAME?
Diverifikasi Oleh,
Diketahui Oleh,
PDTI Kec. Simpangkatis
Kepala Desa Beruasak
ISWADI
ZAKARIA, S.T.
RENCANA PENGGUNAAN UPAH DAN BAHAN
KEGIATAN : PEMASANGAN RANGKA + ATAP SPANDEK
LOKASI : DESA SIMPANGKATIS
SUMBER DANA :-
VOLUME
No. URAIAN / NAMA / JENIS BARANG SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
PEMBULATAN
A. UPAH
L.01 Pekerja oh 52.2 52 Rp 110,000.00 Rp 5,739,035.24
L.02 Tukang oh 68.7 69 Rp 130,000.00 Rp 8,936,113.99
JUMLAH A Rp 14,675,149.23
B. MATERIAL/BAHAN
1 Atap Spandek m2 180.4 180 Rp 67,000.00 Rp 12,088,523.11
2 Baja Ringan C.75.75 batang 101.7 102 Rp 137,000.00 Rp 13,932,145.90
3 Dina bolt / ramset bh 262.4 262 Rp 2,500.00 Rp 656,093.52
4 Listplank GRC lbr 18.4 18 Rp 45,000.00 Rp 826,074.90
5 Nok Spandek m 17.5 18 Rp 32,000.00 Rp 560,545.92
6 Paku sekrup bh 314.7 315 Rp 200.00 Rp 62,939.04
7 Reng batang 98.4 98 Rp 65,000.00 Rp 6,396,911.82
8 Skrup 10x16-16 bh 3376.0 3376 Rp 150.00 Rp 506,402.28
9 Skrup 12-4x50 bh 984.1 984 Rp 300.00 Rp 295,242.08
JUMLAH B Rp 35,324,878.57
JUMLAH A+B Rp 50,000,027.80
PEMBULATAN Rp 50,000,000.00
TAKE OF SHEET (TOS)
VOLUME = 15.92 m
KODE ANALISA = Dihitung
Upah :
Pekerja = 0.020 x 15.92 = 0.32 Oh
Tukang = 0.080 x 15.92 = 1.27 Oh
Bahan :
Nok Spandek = 1.100 x 15.92 = 17.52 m
Skrup 10x16-16 = 6.000 x 15.92 = 95.55 bh
VOLUME = 52.45 m
KODE ANALISA = Dihit.
Upah :
Pekerja = 0.110 x 52.45 = 5.77 Oh
Tukang = 0.220 x 52.45 = 11.54 Oh
Bahan :
Listplank GRC = 0.350 x 52.45 = 18.36 lbr
Paku sekrup = 6.000 x 52.45 = 314.70 bh
PERHITUNGAN PAJAK
(BAHAN) PPH
Harga Patokan Harga Toko Pajak Daerah 1,5 % Jumlah Pajak Jumlah PPN Jumlah PPH
NO. URAIAN Volume PPN 10 %
Pajak Daerah (Rp) (Ton) (ALAT BERAT) Daerah (Rp) (Rp) (Rp)
PPH 2 %
1 2 3 4 5 6 7 8 9 = 3*6 10 = 3*7 11 = 3*8
1 Atap Spandek 180.4 m2 67,000 6,700 1,005 - 1,208,852 181,328
2 Baja Ringan C.75.75 101.7 batang 137,000 13,700 2,055 - 1,393,215 208,982
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? 40,000 #NAME? 12,000 - #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? 40,000 #NAME? 11,600 - #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 Dina bolt / ramset 262.4 bh 2,500 250 38 - 65,609 9,841
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
(BAHAN) PPH
Harga Patokan Harga Toko Pajak Daerah 1,5 % Jumlah Pajak Jumlah PPN Jumlah PPH
NO. URAIAN Volume PPN 10 %
Pajak Daerah (Rp) (Ton) (ALAT BERAT) Daerah (Rp) (Rp) (Rp)
PPH 2 %
1 2 3 4 5 6 7 8 9 = 3*6 10 = 3*7 11 = 3*8
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 Listplank GRC 18.4 lbr 45,000 4,500 675 - 82,607 12,391
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
5 Nok Spandek 17.5 m 32,000 3,200 480 - 56,055 8,408
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
6 Paku sekrup 314.7 bh 200 20 3 - 6,294 944
### #NAME? #NAME? #NAME? 50,000 #NAME? 14,000 - #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
7 Reng 98.4 batang 65,000 6,500 975 - 639,691 95,954
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
(BAHAN) PPH
Harga Patokan Harga Toko Pajak Daerah 1,5 % Jumlah Pajak Jumlah PPN Jumlah PPH
NO. URAIAN Volume PPN 10 %
Pajak Daerah (Rp) (Ton) (ALAT BERAT) Daerah (Rp) (Rp) (Rp)
PPH 2 %
1 2 3 4 5 6 7 8 9 = 3*6 10 = 3*7 11 = 3*8
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
8 Skrup 10x16-16 3376.0 bh 150 15 2 - 50,640 7,596
9 Skrup 12-4x50 984.1 bh 300 30 5 - 29,524 4,429
### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
51 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
52 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Diverifikasi Oleh,
Diketahui Oleh,
PDTI Kec. Simpangkatis
Kepala Desa Beruasak
ISWADI
ZAKARIA, S.T.
REKAPITULASI RENCANA ANGGARAN BIAYA
Provinsi : Bangka Belitung Kecamatan : Simpangkatis
Kabupaten : Bangka Tengah Desa : Beruas
Jenis Kegiatan Jenis Kegiatan Jenis Kegiatan
Pembangunan Posyandu
No. Uraian Bobot % Bobot % Bobot % Jumlah Total (Rp) Bobot %
Ukuran / Dimensi Ukuran / Dimensi Ukuran / Dimensi
63
No. RAB : 1 No. RAB : No. RAB :
1 2 3 4 5 6 7 8 9 10
I Upah 14,675,149 #NAME? - 0% - 0% 14,675,149 #NAME?
II Bahan / Material 35,324,879 #NAME? - 0% - 0% 35,324,879 #NAME?
III Peralatan #NAME? #NAME? - 0% - 0% #NAME? #NAME?
Jumlah #NAME? #NAME? - 0% - 0% #NAME? #NAME?
Total #NAME?
Jumlah PPH #NAME?
Jumlah PPN #NAME?
Jumlah Pajak Daerah #NAME?
Jumlah Total #NAME?
Pembulatan #NAME?
Jumlah Biaya Upah 14,675,149 - - 14,675,149
Jumlah HOK Konstruksi 121 HOK - HOK - HOK 121 HOK
Beruas, September 2021
Disetujui Oleh, Dibuat Oleh,
Ketua TPK Desa Beruas Tenaga Teknis
ISWADI
ZAKARIA, S.T.
Kepala Desa Beruasak
ISWADI
ZAKARIA, S.T.
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
A. UPAH
L.01 Pekerja oh Rp 110,000.00
- Pembantu supir / kenek oh Rp 110,000.00
- Supir personil / mobil ringan oh Rp 120,000.00
- Supir material / truck oh Rp 140,000.00
- Pembantu operator oh Rp 100,000.00
- Operator kurang terlatih oh Rp 100,000.00
- Operator terlatih oh Rp 125,000.00
L.02 Tukang gali sumur oh Rp 130,000.00
L.02 Tukang ledeng / pipa oh Rp 130,000.00
L.02 Tukang listrik oh Rp 130,000.00
L.02 Tukang Cat oh Rp 130,000.00
L.02 Tukang besi / tukang las oh Rp 130,000.00
L.02 Tukang kayu oh Rp 130,000.00
L.02 Tukang batu oh Rp 130,000.00
L.03 Kepala tukang oh Rp 150,000.00
- Mekanik pembantu oh Rp 130,000.00
- Mekanik oh Rp 175,000.00
L.04 Mandor oh Rp 160,000.00
B. MATERIAL/BAHAN
1 Air Ltr Rp 50.00
2 Alang-alang Ikat Rp 15,000.00
3 Alat-alat bantu set Rp 150,000.00
4 Aluminium foil m² Rp 6,000.00
5 Agregat kls A m3 Rp 337,443.00
6 Ampelas m' Rp 8,000.00
7 Aspal kg Rp 17,700.00
8 Atap Alluminium Gelombang tebal 0.55 (Galvalum) m² Rp 60,000.00
9 Atap asbes gelombang uk. 1,50 x 0,90 (m) tebal 4 mm lembar Rp 51,000.00
10 Atap asbes gelombang uk. 1,80 x 1,05 (m) tebal 4 mm lembar Rp 63,000.00
11 Atap asbes gelombang uk. 2,10 x 1,05 (m) tebal 4 mm lembar Rp 73,500.00
12 Atap asbes gelombang uk. 2,40 x 1,05 (m) tebal 4 mm lembar Rp 84,000.00
13 Atap asbes gelombang uk. 2,70 x 1,05 (m) tebal 4 mm lembar Rp 94,500.00
14 Atap asbes gelombang uk. 3,00 x 1,05 (m) tebal 4 mm lembar Rp 105,000.00
15 Atap monolayer 3 mm (ex. Onduline Clasic) lembar Rp 155,000.00
16 Atap Genteng monolayer 3 mm (ex. Onduvilla) lembar Rp 48,800.00
17 Atap Genteng monolayer 3 mm (ex. Onduline Tile) lembar Rp 145,000.00
18 Nok / Ridge (ex. Onduline) lembar Rp 82,000.00
19 Atap genteng (standar KIA) buah Rp 5,500.00
20 Atap genteng beton ( jenis press) buah Rp 9,000.00
21 Atap genteng kodok buah Rp 8,500.00
22 Atap genteng keramik buah Rp 12,000.00
2 Atap metal (biasa / polos) lembar Rp 30,000.00
3 Atap metal Pasir lembar Rp 54,000.00
4 Atap seng fibreglass lembar Rp 128,000.00
5 Atap seng gelombang bjls 20 uk. 0,914 x 1,829 (m) lembar Rp 36,000.00
6 Atap Polycarbonat m2 Rp 115,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
6 Baja Ringan C.75.75 batang Rp 95,000.00
7 Bak cuci piring (sink) stainless steel 1 lobang buah Rp 250,000.00
8 Bak cuci piring (sink) stainless steel 2 lobang buah Rp 450,000.00
9 Asesoris bak cuci piring set Rp 35,000.00
10 Bak mandi fibreglass volume 0,15 m³ buah Rp 225,000.00
11 Bak mandi fibreglass volume 0,30 m³ buah Rp 235,000.00
12 Bak mandi fibreglass volume 1,00 m³ buah Rp 250,000.00
1 Batako buah Rp 1,800.00
2 Bata Ringan/Hebel (10 x 20 x 60 cm) buah Rp 17,500.00
3 Bata tempel hitam buah Rp 210,000.00
4 Bata paras buah Rp 130,000.00
5 Batu bata merah (lokal) buah Rp 1,600.00
2 Batu belah/Batu Kali/Batu Gunung m³ Rp 368,700.00
3 Batu belah 15 - 20 (cm) m³ Rp 415,000.00
4 Batu pecah 0,5 - 1 (cm) m³ Rp 415,000.00
5 Batu pecah 1 - 2 (cm) m³ Rp 415,000.00
3 Batu pecah 2 - 3 (cm) m³ Rp 415,000.00
4 Batu pecah 3 - 5 (cm) m³ Rp 415,000.00
5 Batu pecah 5 - 7 (cm) m³ Rp 415,000.00
6 Batu pecah 7 - 10 (cm) m³ Rp 415,000.00
7 Batu pecah 0,5 - 1 (cm) (Kg) kg Rp 307.41
8 Batu pecah 1 - 2 (cm) (Kg) kg Rp 307.41
9 Batu pecah 2 - 3 (cm) (Kg) kg Rp 307.41
10 Batu pecah 3 - 5 (cm) (Kg) kg Rp 307.41
11 Batu pecah 5 - 7 (cm) (Kg) kg Rp 307.41
12 Batu pecah 7 - 10 (cm) (Kg) kg Rp 307.41
13 Baut klem buah Rp 2,000.00
14 Bensin Pertalite liter Rp 7,850.00
15 Besi baja profil IWF kg Rp 17,000.00
16 Besi baut kuda-kuda kg Rp 15,000.00
4 Besi beton Polos kg Rp 11,000.00
5 Besi beton Ulir kg Rp 13,358.81
6 Besi jaring kawat baja kg Rp 21,000.00
7 Besi prestressed polos kg Rp 13,000.00
8 Besi strip kg Rp 13,000.00
9 Besi hollow 4cm x 4cm x 1,2 mm m1 Rp 26,000.00
10 Besi hollow Plafond m1 Rp 6,500.00
11 Besi Wiremesh M-6 (2.1 m x 5.4 m) kg Rp 12,315.00
12 Besi Wiremesh M-8 (2.1 m x 5.4 m) kg Rp 13,619.00
13 Besi Wiremesh M-10 (2.1 m x 5.4 m) kg Rp 14,021.00
14 Bubungan atap (nok) alumunium standar 40 cm, swg. 22 buah Rp 25,000.00
15 Bubungan atap (nok) asbes sepasang buah Rp 5,000.00
16 Bubungan atap (nok) genteng (standar KIA) buah Rp 5,000.00
17 Bubungan atap (nok) genteng beton buah Rp 7,000.00
18 Bubungan atap (nok) genteng kodok buah Rp 6,000.00
19 Bubungan atap (nok) genteng soka buah Rp 14,500.00
7 Bubungan atap (nok) metal (biasa / polos) buah Rp 37,500.00
8 Bubungan atap (nok) metal (standar Rainbow) buah Rp 35,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
9 Buis beton bertulang ø 40 cm buah Rp 180,000.00
10 Buis beton bertulang ø 60 cm buah Rp 400,000.00
11 Buis beton bertulang ø 80 cm buah Rp 700,000.00
12 Buis beton bertulang ø 100 cm buah Rp 750,000.00
13 Buis beton tak bertulang ø 100 cm buah Rp 580,000.00
14 Buis beton tak bertulang ø 80 cm tebal 5 cm buah Rp 180,000.00
15 Buis beton tak bertulang ø 60 cm buah Rp 250,000.00
16 Buis beton tak bertulang ø 40 cm buah Rp 150,000.00
5 Cat Dasar kg Rp 22,500.00
6 Cat genteng KW I kg Rp 44,375.00
7 Cat genteng KW II kg Rp 38,000.00
8 Cat jalan (road line) kg Rp 49,000.00
9 Cat jembatan kg Rp 58,000.00
10 Cat menie kg Rp 45,000.00
11 Cat minyak kg Rp 57,000.00
12 Cat tembok (ex platon) kg Rp 20,000.00
6 Cat tembok in (ex mowilex) kg Rp 60,000.00
7 Cat tembok ext (ex mowilex) kg Rp 100,000.00
8 Cat vernis kg Rp 70,000.00
9 Closed duduk lengkap tabung dan jet waser buah Rp 2,100,000.00
10 Closed jongkok keramik buah Rp 180,000.00
11 Closed jongkok + Flushing buah Rp 3,425,000.00
12 Closed jongkok porcelaint (lokal) buah Rp 421,250.00
13 Conblock tebal 6 cm (polos) segi enam buah Rp 1,700.00
14 Conblock tebal 6 cm (warna) segi enam buah Rp 1,700.00
15 Conblock tebal 6 cm segi enam (polos) m² Rp 42,500.00
16 Conblock tebal 6 cm segi enam (warna) m² Rp 45,000.00
17 Conblock tebal 6 cm persegi panjang (polos) bh Rp 1,600.00
18 Dempul kg Rp 35,000.00
19 Dina bolt / ramset buah Rp 2,500.00
20 Dop PVC ø 50 mm unit Rp 10,000.00
21 Door Closer unit Rp 200,000.00
22 Door Holder unit Rp 30,000.00
23 Door Stop unit Rp 50,000.00
10 Elbow Pipa Listrik buah Rp 500.00
11 Elektroda penghantar bumi untuk penangkal petir buah Rp 170,000.00
12 Emulsi liter Rp 12,337.00
13 Engsel pintu / jendela 3" buah Rp 17,500.00
11 Engsel pintu / jendela 4" buah Rp 23,500.00
12 Engsel pintu / jendela 5" buah Rp 30,000.00
13 Engsel pintu kaca 10 mm buah Rp 900,000.00
14 Engsel Casement (Jendela Alumunium) buah Rp 26,000.00
15 Eternit asbes uk. 1 x 1 (m), tebal 4 mm lembar Rp 26,000.00
16 Eternit asbes uk. 1 x 1 (m), tebal 5 mm lembar Rp 28,000.00
17 Espagnolette buah Rp 182,000.00
18 Fibre Plat 0,60 x 1,20 (m), tebal 4 mm lembar Rp 72,000.00
19 Fibre Plat 1,20 x 2,40 (m), tebal 4 mm lembar Rp 75,000.00
27 Fititing Downlight buah Rp 65,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
12 Fitting buah Rp 15,000.00
13 Floor drain Plastik buah Rp 11,000.00
14 Floor drain Stainlessteel buah Rp 35,000.00
15 Formite/penjaga jarak bekisting/spacer buah Rp 1,500.00
16 Grease (minyak gemuk) kg Rp 18,750.00
17 Grendel (biasa) buah Rp 18,000.00
18 Grendel (istimewa) buah Rp 20,000.00
19 Gypsum board uk. 1.22 x 2.44 (m), tebal 9 mm lembar Rp 67,500.00
20 Glass block buah Rp 27,500.00
21 Grasblock m2 Rp 72,000.00
22 Handle jendela buah Rp 10,000.00
23 Handle pintu buah Rp 150,000.00
24 Handle untuk meubelair (furniture) + kunci buah Rp 12,000.00
25 ijuk kg Rp 15,000.00
26 inbow doos buah Rp 7,000.00
27 las doop buah Rp 1,250.00
28 isolasi listrik buah Rp 9,000.00
13 T doos buah Rp 2,500.00
14 Jendela nako (kerangka) m² Rp 159,000.00
15 jet washer buah Rp 90,000.00
16 Kabel biasa m1 Rp 4,000.00
14 Kabel listrik NYA 2.5 mm² m1 Rp 3,500.00
15 Kabel listrik NYM 2 x 2,5 mm² m1 Rp 9,500.00
16 Kabel listrik NYM 3 x 2,5 mm² m1 Rp 25,000.00
17 Kabel listrik NYY 4 x 2,5 mm² m1 Rp 26,000.00
18 Kabel listrik NYY 4 x 4 mm² m1 Rp 27,000.00
19 Klem Kabel no. 10 buah Rp 12,500.00
20 Klem Kabel no. 12 buah Rp 15,000.00
21 Kabel slink m1 Rp 28,700.00
22 Kaca bening tebal 3 mm m² Rp 150,000.00
23 Kaca bening tebal 5 mm m² Rp 180,000.00
24 Kaca bening tebal 8 mm m² Rp 200,000.00
25 Kaca bening tebal 10 mm m² Rp 215,000.00
26 Kaca gelap (ray band) tebal 5 mm m² Rp 200,000.00
27 Kaca gelap (ray band) tebal 10 mm m² Rp 240,000.00
28 Kaca gelap (ray band) tebal 12 mm m² Rp 320,000.00
29 Kaca buram 12mm m² Rp 340,000.00
30 Kaca cermin 5 mm m² Rp 170,000.00
31 Kaca patri m² Rp 1,138,500.00
32 Kain kassa m² Rp 4,000.00
33 Kait angin (biasa) buah Rp 10,000.00
34 Kait angin (istimewa) buah Rp 35,000.00
35 Kepek buah Rp 8,000.00
36 Kapur bakar kg Rp 30,000.00
37 Kapur sirih kg Rp 40,000.00
38 Karet kaca m' Rp 10,000.00
39 Karpet talang, lebar 0,60 m' m' Rp 14,000.00
40 Kawat nyamuk logam m1 Rp 30,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
41 Kawat nyamuk plastik m1 Rp 30,000.00
42 Kawat berduri roll Rp 180,000.00
7 Kawat beton kg Rp 25,000.00
8 Kawat bronjong uk 3x1,5x0,5 m2 Rp 10,900.00
9 Kawat burung m1 Rp 15,000.00
10 Kawat harmonika m1 Rp 30,000.00
11 Kawat kassa / kawat loket m2 Rp 20,000.00
12 Kawat Las Listrik Kg Rp 27,000.00
13 Kawat seng kg Rp 30,000.00
8 Kayu dolken ø 3 - 6 (cm) panjang 4 m / kiau batang Rp 5,000.00
9 Kayu gelam ø 8 - 10 (cm) panjang 4 m / kiau / cerucuk batang Rp 15,000.00
10 Kayu gergajian kelas I, balok m³ Rp 3,750,000.00
11 Kayu gergajian kelas I, papan m³ Rp 3,750,000.00
9 Kayu gergajian kelas II, balok m³ Rp 2,500,000.00
18 Kayu gergajian kelas II, papan m³ Rp 2,500,000.00
19 Kayu gergajian kelas III, balok m³ Rp 2,000,000.00
10 Kayu gergajian kelas III, papan m³ Rp 1,800,000.00
11 Kayu gergajian kelas IV, balok m³ Rp 1,500,000.00
12 Kayu gergajian kelas IV, papan m³ Rp 1,500,000.00
13 Kayu untuk konstruksi jembatan m³ Rp 2,500,000.00
14 Kayu untuk perancah m³ Rp 1,750,000.00
15 Keramik 10 x 20 (cm) gelap m2 Rp 70,000.00
16 Keramik 10 x 20 (cm) polos m2 Rp 65,000.00
17 Keramik 10 x 20 (cm) terang m2 Rp 65,000.00
18 Keramik 20 x 20 (cm) polos m2 Rp 65,000.00
19 Keramik 25 x 25 (cm) m2 Rp 65,000.00
20 Keramik 25 x 40 (cm) m2 Rp 65,000.00
19 Keramik 20 x 25 (cm) gelap m2 Rp 60,000.00
20 Keramik 30 x 30 (cm) gelap m2 Rp 65,000.00
21 Keramik 30 x 30 (cm) polos m2 Rp 60,000.00
22 Keramik 30 x 30 (cm) putih / berwarna m2 Rp 60,000.00
20 Keramik 40 x 40 (cm) m2 Rp 55,000.00
21 Keramik 60 x 60 (cm) putih / berwarna ex granito m2 Rp 175,000.00
22 Keramik 60 x 60 (cm) putih / berwarna ex KIA m2 Rp 150,000.00
23 Keramik KM/WC anti slip 20 x 20 (cm) m2 Rp 65,000.00
21 Klem Pipa Listrik buah Rp 500.00
22 Knee / elbow PVC 1(inch) buah Rp 5,000.00
22 Knee / elbow PVC 3/4 (inch) buah Rp 4,000.00
23 Knee / elbow PVC 1/2 (inch) buah Rp 3,000.00
24 Knee / elbow Pipa Listrik buah Rp 500.00
24 Kompon gypsum kg Rp 10,000.00
23 Kran air ø 0,5 (inch) buah Rp 20,000.00
24 Kran air ø 0,75 (inch) buah Rp 25,000.00
25 Kran air ø 1,50 (inch) buah Rp 27,000.00
26 Kuas 4 Inch buah Rp 30,000.00
27 Kunci jendela (lokal) set Rp 10,000.00
28 Kunci pintu tanam (biasa) set Rp 120,000.00
29 Kunci pintu tanam (istimewa) set Rp 185,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
30 Kunci pintu untuk meubelair (furniture) set Rp 15,000.00
31 Kunci Selot buah Rp 12,500.00
32 Kunci Silinder buah Rp 62,500.00
24 Kunci tanam buah Rp 127,500.00
25 Kusen pintu / jendela alumunium 3" (warna silver) m1 Rp 90,000.00
26 Kusen pintu / jendela alumunium 4" (warna silver) m1 Rp 100,000.00
27 Kusen pintu / jendela alumunium 3" (warna gelap) m1 Rp 95,000.00
28 Kusen pintu / jendela alumunium 4"(warna gelap) m1 Rp 105,000.00
29 Lampu Baret buah Rp 220,000.00
30 Lampu pijar 18 watt buah Rp 38,000.00
31 Lampu TL D 36 Watt buah Rp 150,000.00
32 Lampu taman 20 W + aksesoris unit Rp 700,000.00
33 Lampu taman triple 20 W + aksesoris unit Rp 2,250,000.00
34 Lampu TL 20 W buah Rp 14,000.00
35 Lampu TL 40 W buah Rp 19,000.00
25 Lampu SL bulat 11 W buah Rp 30,000.00
26 Lampu SL bulat 32 W buah Rp 42,000.00
28 Lem (standar Aica Aibond) @ 100 cc kaleng Rp 12,000.00
29 Lem (standar Fox) kaleng Rp 10,000.00
26 Lem Kayu kg Rp 20,000.00
27 List gypsum sedang m1 Rp 25,000.00
28 List gypsum kecil m1 Rp 15,000.00
29 List Plafond PVC m1 Rp 30,000.00
29 Mata lampu + instalasi titik Rp 115,000.00
27 MCB 10 a 1 phasa buah Rp 70,000.00
11 Minyak bekisting liter Rp 27,500.00
12 Minyak pelarut/pengencer cat (solvent) liter Rp 8,000.00
13 Minyak pelumas (oli) liter Rp 35,000.00
14 Minyak solar industri liter Rp 13,092.00
15 Dexlite liter Rp 10,400.00
16 Multiplek tebal 12 mm 4 x 8 (inch) lembar Rp 190,000.00
17 Multiplek tebal 15 mm 4 x 8 (inch) lembar Rp 230,000.00
18 Multiplek tebal 18 mm 4 x 8 (inch) lembar Rp 260,000.00
19 Multiplek tebal 6 mm uk. 1.22 x 2.44 (m) lembar Rp 90,000.00
20 Multiplek tebal 9 mm 4 x 8 (inch) lembar Rp 135,000.00
21 Pagar panel beton buah Rp 300,000.00
29 Paku anti Karat kg Rp 60,000.00
30 Paku asbes kg Rp 35,000.00
30 Paku biasa (1/2" - 1") kg Rp 20,000.00
12 Paku biasa 2" - 5" kg Rp 18,000.00
13 Paku jembatan kg Rp 33,900.00
14 Paku kait kg Rp 14,900.00
32 Paku sekrup (kg) kg Rp 100,000.00
33 Paku skrup 1 cm – 2,5 cm bh Rp 350.00
34 Paku seng kg Rp 40,000.00
35 Paku tembok kg Rp 65,000.00
36 Panel listrik / MCB, 1 group / fase buah Rp 18,000.00
37 Panel listrik / MCB, 2 group / fase buah Rp 20,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
38 Panel listrik / MCB, 3 group / fase buah Rp 20,000.00
39 Panel listrik / MCB, 4 group / fase buah Rp 35,000.00
40 Parquette lantai m2 Rp 275,000.00
13 Pasir ayak untuk beton (m3) m³ Rp 50,000.00
14 Pasir ayak untuk beton (m3) harga u/ lokasi basecamp m³ Rp 216,500.00
33 Pasir ayak untuk beton (kg) kg Rp 35.71
14 Pasir pasang m³ Rp 87,500.00
15 Pasir urug / timbun m³ Rp 50,000.00
16 Pelitur Jadi ltr Rp 35,000.00
17 Pembersih / cleaner untuk keramik / porcelaint kg Rp 20,000.00
18 Pintu alumunium - swing + door closer unit Rp 1,600,000.00
19 Pintu alumunium - swing + floorhinge unit Rp 1,250,000.00
20 Pintu besi m² Rp 425,000.00
21 Pintu besi lipat (folding door) m² Rp 750,000.00
22 Pintu PVC unit Rp 250,000.00
23 Pipa besi galvanis ø 0,5 (inch) m1 Rp 16,700.00
24 Pipa besi galvanis ø 0,75 (inch) m1 Rp 23,400.00
25 Pipa besi galvanis ø 1 (inch) m1 Rp 30,000.00
26 Pipa besi galvanis ø 1,25 (inch) m1 Rp 33,400.00
27 Pipa besi galvanis ø 1,5 (inch) m1 Rp 37,500.00
28 Pipa besi galvanis ø 2 (inch) m1 Rp 43,400.00
29 Pipa besi galvanis ø 3 (inch) m1 Rp 187,700.00
30 Pipa besi galvanis ø 4 (inch) m1 Rp 271,700.00
31 Pipa besi ø 0,5 (inch) m1 Rp 16,700.00
32 Pipa besi ø 0,75 (inch) m1 Rp 22,500.00
33 Pipa besi ø 1 (inch) m1 Rp 27,500.00
34 Pipa besi ø 1,25 (inch) m1 Rp 30,900.00
35 Pipa besi ø 1,5 (inch) m1 Rp 33,400.00
36 Pipa besi ø 2 (inch) m1 Rp 41,700.00
35 Pipa PVC ø 1/2 (inch) AW, panjang 4 m m1 Rp 5,250.00
36 Pipa PVC ø 3/4 (inch) AW, panjang 4 m m1 Rp 7,500.00
37 Pipa PVC ø 1 (inch) AW, panjang 4 m m1 Rp 9,500.00
38 Pipa PVC ø 1,5 (inch) AW, panjang 4 m m1 Rp 15,000.00
36 Pipa PVC ø 2 (inch) AW, panjang 4 m m1 Rp 17,500.00
37 Pipa PVC ø 2,5 (inch) AW, panjang 4 m m1 Rp 25,000.00
38 Pipa PVC ø 3 (inch) AW, panjang 4 m m1 Rp 37,500.00
39 Pipa PVC ø 4 (inch) AW, panjang 4 m m1 Rp 62,500.00
40 Pipa PVC ø 6 (inch) AW, panjang 4 m m1 Rp 125,000.00
37 Pipa listrik 5/8" btg Rp 10,000.00
38 Plafond PVC m² Rp 55,000.00
15 Plamuer tembok kg Rp 12,000.00
16 Plywood uk. 0,30 x 0,60 (m), tebal 4mm lembar Rp 75,000.00
17 Plywood uk. 0,30 x 0,60 (m), tebal 6mm lembar Rp 95,000.00
18 Plywood uk. 1,22 x 2,44 (m), tebal 4 mm lembar Rp 115,000.00
16 Plywood uk. 1,22 x 2,44 (m), tebal 9 mm lembar Rp 150,000.00
17 Pompa air (dengan otomatis) buah Rp 712,500.00
18 Pompa air (jet pump) buah Rp 2,000,000.00
19 Pompa air (non otomatis) buah Rp 475,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
20 Profil Aluminium "T" m1 Rp 8,500.00
21 Profil Kaca m' Rp 10,000.00
22 Profil Daun Pintu Alumunium (warna siver) m1 Rp 85,000.00
23 Profil Daun Jendela Alumunium (warna silver) m1 Rp 55,000.00
24 Daun Pintu Alumunium (warna siver) m1 Rp 1,500,000.00
25 Daun Jendela Alumunium (warna gelap) m1 Rp 800,000.00
26 Daun Pintu Alumunium (warna gelap) m1 Rp 1,600,000.00
27 Rangka Baja Ringan, panjang 6m m2 Rp 155,000.00
28 Reducer PVC dari 1/2 (inch) ke 1 (inch) buah Rp 5,000.00
29 Reducer PVC dari 1/2 (inch) ke 3/4 (inch) buah Rp 5,000.00
30 Reducer PVC dari 3/4 (inch) ke 1 (inch) buah Rp 5,000.00
31 Rel Pintu Dorong buah Rp 250,000.00
32 Reng UTS. 30 mm batang Rp 50,000.00
32 Residu atau Ter liter Rp 50,000.00
33 Rolling dor - alumunium tebal m² Rp 350,000.00
34 Rolling dor - alumunium tipis m² Rp 300,000.00
35 Rolling door galfalum m² Rp 750,000.00
36 Roll Cat buah Rp 35,000.00
37 Rooflight fibreglass uk. 1,8 x 0,9 (m) lembar Rp 80,500.00
38 Rooster block uk. 12 x 11 x 24 (cm) buah Rp 20,000.00
40 Rooster block uk. 20 x 20 (cm) buah Rp 10,000.00
41 Rooster keramik 20 x 20 (cm) buah Rp 50,000.00
42 Rooster keramik 30 x 30 (cm) buah Rp 60,000.00
43 Rumah Lampu buah Rp 15,000.00
44 Sabun kg Rp 15,000.00
45 Saklar tunggal buah Rp 20,000.00
41 Saklar dobel buah Rp 25,000.00
42 Saklar triple buah Rp 30,000.00
43 Saklar engkel buah Rp 20,000.00
44 Sealant Tube Rp 35,000.00
42 Sealtape buah Rp 5,000.00
17 Semen PC @ 50 kg kg Rp 1,340.00
18 Semen putih kg Rp 6,850.00
44 Semen warna kg Rp 15,000.00
45 Semen kolot (sika graut) kg Rp 10,000.00
46 Seng fibreglass lembar Rp 82,500.00
47 Seng plat BJLS 27 uk. 0.3 x 1.83 (m) lembar Rp 40,850.00
48 Seng plat BJLS 27 uk. 0.9 x 1.83 (m) lembar Rp 40,850.00
49 Seng Gelombang 3" x 6" BJLS 28 lembar Rp 45,000.00
50 Skrup fixer buah Rp 300.00
51 Shower buah Rp 225,000.00
52 Sirtu m³ Rp 259,250.00
53 sikat baja buah Rp 15,000.00
54 Slot jendela buah Rp 10,000.00
55 Slot pintu buah Rp 20,000.00
56 Slot ventilasi / bouwvenlight buah Rp 10,000.00
57 Socket PVC ø 1 (inch) buah Rp 5,000.00
58 Socket PVC ø 1/2 (inch) buah Rp 3,000.00
HARGA SATUAN UMUM UPAH, BAHAN DAN PERALATAN
BIDANG KONSTRUKSI
( HARGA TIDAK TERMASUK PPN )
TAHUN 2020
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
59 Socket PVC ø 3/4 (inch) buah Rp 5,000.00
60 Soda api Kg Rp 28,000.00
61 spring Knip buah Rp 25,000.00
62 Softboard uk. 1,20 x 2,40 (m), tebal 4 mm lembar Rp 613,000.00
63 Stone Coating kg Rp 45,000.00
64 Stop kontak buah Rp 20,000.00
65 Stop Kontak + Instalasi titik Rp 143,900.00
66 Sunscreen alumunium lembar Rp 1,600,000.00
67 Tangki air / hydrant umum polyethylene 5.000 liter buah Rp 10,050,000.00
68 Tangki air fiberglass (oranye) 1.000 liter buah Rp 1,850,000.00
69 Tangki air fiberglass (oranye) 2.000 liter buah Rp 3,100,000.00
70 Tangki air fiberglass (oranye) 3.000 liter buah Rp 5,200,000.00
71 Tangki air fiberglass (oranye) 5.000 liter buah Rp 8,500,000.00
72 Tangki air fiberglass (oranye) 500 liter buah Rp 1,000,000.00
73 Teak Oil ltr Rp 3,500.00
74 Tempat sabun keramik buah Rp 65,000.00
75 Teralis pintu lubang Rp 1,200,000.00
76 Teralis jendela lubang Rp 475,000.00
77 Ter, isi 8 kg Kaleng Rp 100,000.00
78 Thinner Kg Rp 30,000.00
45 Timbunan biasa m³ Rp 35,000.00
46 Timbunan pilihan / tanah puru m³ Rp 60,000.00
46 Tralis Besi Hollow m2 Rp 450,000.00
47 Triplek tebal 2.5 mm uk. 1.22 x 2.44 (m) lembar Rp 65,000.00
48 Triplek tebal 4 mm uk. 1.22 x 2.44 (m) lembar Rp 80,000.00
49 Urinoir Unit Rp 2,000,000.00
50 Wallpaper bermotif m² Rp 45,000.00
51 Wallpaper polos m² Rp 35,000.00
47 Wastafel set Rp 1,250,000.00
48 Listplank GRC Board/Calsiboard, panjang 3 m m1 Rp 23,400.00
48 Listplank GRC Board, panjang 2,44 m lembar Rp 45,000.00
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
16 Pipa UPVC S-12,5 dia. 160 m1 Rp 227,250.00
17 Pipa UPVC S-12,5 dia. 200 m1 Rp 346,790.00
18 Pipa Air Limbah dia. 63 m1 Rp 49,260.00
19 Pipa Air Limbah dia. 75 m1 Rp 61,260.00
20 Pipa Air Limbah dia. 90 m1 Rp 75,080.00
21 Pipa Air Limbah dia. 110 m1 Rp 95,190.00
22 Pipa Air Limbah dia. 160 m1 Rp 173,120.00
23 Pipa Air Limbah dia. 200 m1 Rp 258,800.00
HARGA YANG
No. URAIAN / NAMA / JENIS BARANG SATUAN
DIGUNAKAN
A. 4.4.1.2 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1 batu, camp. 1 SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.600 110,000.00 66,000.00
2 Tukang Batu L.02 OH 0.200 130,000.00 26,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L,04 OH 0.030 160,000.00 4,800.00
JUMLAH TENAGA KERJA 99,800.00
B. BAHAN
1 Batu bata merah (lokal) buah 96.000 1,600.00 153,600.00
2 Semen PC @ 50 kg kg 32.950 1,340.00 44,153.00
3 Pasir pasang m3 0.091 87,500.00 7,962.50
JUMLAH HARGA BAHAN 205,715.50
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 305,515.50
E. Profit 10% xD 30,551.55
F. Harga Satuan Pekerjaan (D+E) 336,067.05
A. 4.4.1.3 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1 batu, camp. 1 SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.600 110,000.00 66,000.00
2 Tukang Batu L.02 OH 0.200 130,000.00 26,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L,04 OH 0.030 160,000.00 4,800.00
JUMLAH TENAGA KERJA 99,800.00
B. BAHAN
1 Batu bata merah (lokal) buah 96.000 1,600.00 153,600.00
2 Semen PC @ 50 kg kg 26.550 1,340.00 35,577.00
3 Pasir pasang m3 0.093 87,500.00 8,137.50
JUMLAH HARGA BAHAN 197,314.50
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 297,114.50
E. Profit 10% xD 29,711.45
F. Harga Satuan Pekerjaan (D+E) 326,825.95
A. 4.4.1.4 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1 batu, camp. 1 SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.600 110,000.00 66,000.00
2 Tukang Batu L.02 OH 0.200 130,000.00 26,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L,04 OH 0.030 160,000.00 4,800.00
JUMLAH TENAGA KERJA 99,800.00
B. BAHAN
1 Batu bata merah (lokal) buah 96.000 1,600.00 153,600.00
2 Semen PC @ 50 kg kg 22.220 1,340.00 29,774.80
3 Pasir pasang m3 0.102 87,500.00 8,925.00
JUMLAH HARGA BAHAN 192,299.80
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 292,099.80
E. Profit 10% xD 29,209.98
F. Harga Satuan Pekerjaan (D+E) 321,309.78
A. 4.4.1.5 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1 batu, camp. 1 SP : 6PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.600 110,000.00 66,000.00
2 Tukang Batu L.02 OH 0.200 130,000.00 26,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L,04 OH 0.030 160,000.00 4,800.00
JUMLAH TENAGA KERJA 99,800.00
B. BAHAN
1 Batu bata merah (lokal) buah 96.000 1,600.00 153,600.00
2 Semen PC @ 50 kg kg 18.500 1,340.00 24,790.00
3 Pasir pasang m3 0.122 87,500.00 10,675.00
JUMLAH HARGA BAHAN 189,065.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 288,865.00
E. Profit 10% xD 28,886.50
F. Harga Satuan Pekerjaan (D+E) 317,751.50
A. 4.4.1.6 Pemasangan 1 m2 dinding bata merah (8x8x20)cm tebal 1 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.600 110,000.00 66,000.00
2 Tukang Batu L.02 OH 0.200 130,000.00 26,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L,04 OH 0.030 160,000.00 4,800.00
JUMLAH TENAGA KERJA 99,800.00
B. BAHAN
1 Batu bata merah (lokal) buah 96.000 1,600.00 153,600.00
2 Semen PC @ 50 kg kg 10.080 1,340.00 13,507.20
3 Kapur padam m3 0.0275 #N/A #N/A
4 Pasir pasang m3 0.0925 87,500.00 8,093.75
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 10% xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.7 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 18.950 1,340.00 25,393.00
3 Pasir pasang m3 0.038 87,500.00 3,325.00
JUMLAH HARGA BAHAN 100,718.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 150,618.00
E. Profit 10% xD 15,061.80
F. Harga Satuan Pekerjaan (D+E) 165,679.80
A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 14.370 1,340.00 19,255.80
3 Pasir pasang m3 0.040 87,500.00 3,500.00
JUMLAH HARGA BAHAN 94,755.80
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 144,655.80
E. Profit 10% xD 14,465.58
F. Harga Satuan Pekerjaan (D+E) 159,121.38
A. 4.4.1.9 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 11.500 1,340.00 15,410.00
3 Pasir pasang m3 0.043 87,500.00 3,762.50
JUMLAH HARGA BAHAN 91,172.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 141,072.50
E. Profit 10% xD 14,107.25
F. Harga Satuan Pekerjaan (D+E) 155,179.75
A. 4.4.1.10 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 5PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 9.680 1,340.00 12,971.20
3 Pasir pasang m3 0.045 87,500.00 3,937.50
JUMLAH HARGA BAHAN 88,908.70
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 138,808.70
E. Profit 10% xD 13,880.87
F. Harga Satuan Pekerjaan (D+E) 152,689.57
A. 4.4.1.11 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 6PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 8.320 1,340.00 11,148.80
3 Pasir pasang m3 0.049 87,500.00 4,287.50
JUMLAH HARGA BAHAN 87,436.30
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 137,336.30
E. Profit 10% xD 13,733.63
F. Harga Satuan Pekerjaan (D+E) 151,069.93
A. 4.4.1.12 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 8PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 6.500 1,340.00 8,710.00
3 Pasir pasang m3 0.050 87,500.00 4,375.00
JUMLAH HARGA BAHAN 85,085.00
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 134,985.00
E. Profit 10% xD 13,498.50
F. Harga Satuan Pekerjaan (D+E) 148,483.50
A. 4.4.1.13 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SP : 3KP : 10PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg kg 4.500 1,340.00 6,030.00
3 Kapur padam m3 0.015 #N/A #N/A
4 Pasir pasang m3 0.050 87,500.00 4,375.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 10% xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.14 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SM : 1KP : 1PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg m3 0.018 1,340.00 24.12
3 Kapur padam m3 0.018 #N/A #N/A
4 Pasir pasang m3 0.018 87,500.00 1,575.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 10% xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.15 Pemasangan 1 m2 dinding bata merah (8x8x20) cm tebal 1/2 batu, camp. 1 SM : 1KP : 2PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.100 130,000.00 13,000.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 49,900.00
B. BAHAN
1 Batu bata merah (lokal) buah 45.000 1,600.00 72,000.00
2 Semen PC @ 50 kg m3 0.014 1,340.00 18.76
3 Kapur padam m3 0.014 #N/A #N/A
4 Pasir pasang m3 0.028 87,500.00 2,450.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 10% xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 cm, camp. 1 SP : 3PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.300 110,000.00 33,000.00
2 Tukang Batu L.02 OH 0.150 130,000.00 19,500.00
3 Kepala tukang L.03 OH 0.015 150,000.00 2,250.00
4 Mandor L,04 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 57,150.00
B. BAHAN
1 Bata berongga ekspose buah 70.000 #N/A #N/A
2 Semen PC @ 50 kg kg 14.000 1,340.00 18,760.00
3 Pasir pasang m3 0.032 87,500.00 2,800.00
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
- -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) #N/A
E. Profit 10% xD #N/A
F. Harga Satuan Pekerjaan (D+E) #N/A
A. 4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan Mortar Siap Pakai (MSP)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
1 Pekerja L.01 OH 0.670 110,000.00 73,700.00
2 Tukang Batu L.02 OH 1.300 130,000.00 169,000.00
3 Kepala tukang L.03 OH 0.130 150,000.00 19,500.00
4 Mandor L,04 OH 0.003 160,000.00 480.00
JUMLAH TENAGA KERJA 262,680.00
B. BAHAN
1 Bata ringan tebal 7,5 cm m3 8.400 #N/A #N/A
2 Mortar siap pakai (MSP) kg 0.473 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C. PERALATAN
Peralatan % 10.000 - -