JUMLAH HARGA
395,210.00
606,580.00
290,320.00
484,140.00
169,360.00
186,690.00
115,090.00
1,587,040.00
1,370,960.00
1,348,140.00
12,500.00
203,940.00
1,066,650.00
533,320.00
426,350.00
168,950.00
121,260.00
104,040.00
64,390.00
17,210.00
58,750.00
72,000.00
85,450.00
78,200.00
118,500.00
94,500.00
4,250.00
25,750.00
42,500.00
19,580.00
24,000.00
28,480.00
26,060.00
39,500.00
31,500.00
42,500.00
203,500.00
131,550.00
159,250.00
111,250.00
25,590.00
270,180.00
20,170.00
676,720.00
634,450.00
605,140.00
584,530.00
556,290.00
307,860.00
2,408,920.00
743,000.00
735,000.00
701,200.00
812,750.00
844,600.00
869,490.00
785,000.00
898,990.00
948,300.00
1,035,830.00
1,099,170.00
1,130,790.00
1,157,210.00
1,204,740.00
1,262,780.00
1,051,610.00
144,110.00
145,160.00
139,390.00
395,950.00
601,360.00
761,720.00
5,100.00
196,900.00
212,350.00
139,970.00
508,650.00
359,600.00
222,700.00
521,760.00
372,710.00
229,250.00
864,250.00
417,100.00
251,450.00
265,300.00
588,500.00
364,920.00
225,360.00
477,750.00
117,210.00
84,390.00
104,490.00
4,295,450.00
4,295,450.00
5,356,590.00
8,893,590.00
8,893,590.00
6,891,090.00
6,891,090.00
6,223,220.00
6,223,220.00
5,933,150.00
5,933,150.00
6,293,290.00
6,293,290.00
240,970.00
229,820.00
222,190.00
218,420.00
217,490.00
116,610.00
111,260.00
108,230.00
106,320.00
105,360.00
103,270.00
563,620.00
563,620.00
250,210.00
267,060.00
60,440.00
54,580.00
52,070.00
50,340.00
49,390.00
48,610.00
48,200.00
47,780.00
73,030.00
58,290.00
67,320.00
66,110.00
65,020.00
30,430.00
47,030.00
47,030.00
39,910.00
23,030.00
10,980.00
48,240.00
29,460.00
29,150.00
30,198,700.00
17,095,050.00
686,000.00
387,000.00
1,556,180.00
941,500.00
1,009,700.00
640,900.00
2,254,160.00
1,270,670.00
803,080.00
1,130,060.00
736,660.00
2,036,830.00
1,114,810.00
2,908,810.00
740,340.00
13,210,150.00
32,843,050.00
11,779,750.00
14,309,750.00
540,250.00
757,600.00
194,950.00
149,950.00
153,840.00
344,900.00
129,260.00
130,150.00
285,300.00
386,790.00
491,430.00
47,440.00
52,960.00
647,700.00
647,700.00
97,420.00
167,440.00
171,010.00
181,930.00
200,710.00
172,770.00
172,770.00
28,090.00
18,630.00
441,200.00
244,870.00
221,750.00
228,650.00
212,480.00
212,480.00
318,070.00
203,560.00
252,550.00
170,450.00
115,190.00
365,040.00
33,180.00
253,450.00
465,770.00
599,200.00
38,750.00
63,750.00
69,050.00
45,340.00
581,700.00
31,350.00
41,820.00
42,900.00
39,080.00
39,910.00
24,710.00
24,020.00
28,620.00
33,410.00
27,740.00
15,740.00
330,210.00
169,390.00
156,080.00
735,530.00
1,512,880.00
197,910.00
185,260.00
212,600.00
457,510.00
95,590.00
144,860.00
242,680.00
135,080.00
75,980.00
100,710.00
97,420.00
207,330.00
229,410.00
82,050.00
129,620.00
127,550.00
85,040.00
89,540.00
83,490.00
93,390.00
61,520.00
64,040.00
61,120.00
61,970.00
74,920.00
90,320.00
88,580.00
82,520.00
85,280.00
99,400.00
41,060.00
81,570.00
102,680.00
141,180.00
123,330.00
67,100.00
64,600.00
112,100.00
104,120.00
123,620.00
130,640.00
129,850.00
30,980.00
114,580.00
81,040.00
71,300.00
40,180.00
131,940.00
229,990.00
334,870.00
21,530.00
1,826,300.00
2,865,800.00
425,650.00
2,431,850.00
4,151,100.00
1,601,870.00
1,483,100.00
376,900.00
62,400.00
73,950.00
129,930.00
134,440.00
146,210.00
378,150.00
570,160.00
703,490.00
61,780.00
71,290.00
101,000.00
139,530.00
203,390.00
324,510.00
455,230.00
18,140.00
20,730.00
24,610.00
41,320.00
51,440.00
104,640.00
137,810.00
283,080.00
472,260.00
1,087,220.00
218,450.00
245,950.00
188,450.00
390,750.00
360,950.00
257,450.00
378,700.00
256,800.00
150,250.00
169,670.00
175,670.00
130,250.00
1,134,900.00
1,006,900.00
288,900.00
208,200.00
79,200.00
57,800.00
55,550.00
54,920.00
94,920.00
382,000.00
49,600.00
303,000.00
86,950.00
427,800.00
82,200.00
81,800.00
104,800.00
53,800.00
104,750.00
144,710.00
274,170.00
269,920.00
142,700.00
691,130.00
12,260.00
35,460.00
55,010.00
70,390.00
28,810.00
67,920.00
60,690.00
66,840.00
71,050.00
37,290.00
28,770.00
42,050.00
21,950.00
31,140.00
19,910.00
19,890.00
26,200.00
44,310.00
45,610.00
130,840.00
141,250.00
143,970.00
138,500.00
178,500.00
43,640.00
481,530.00
584,070.00
790,610.00
144,480.00
184,730.00
272,850.00
1,827,780.00
2,594,920.00
3,452,630.00
184,100.00
340,000.00
160,000.00
105,000.00
167,810.00
172,990.00
180,000.00
180,000.00
23,750.00
260,000.00
21,250.00
95,660.00
83,610.00
173,740.00
174,860.00
293,490.00
481,310.00
RENCANA ANGGARAN BIAYA PEMBANGUNAAN PERPUSTAKA
II Pekerjaan Tanah
1. Galian Pondasi 26.92 M3
2. Urugan tanah kembali 8.97 M3
Bahan:
Tanah Urug M3
3. Urugan pasir bawah pondasi 1.70 M3
Bahan:
Pasir urug M3
4. Urugan pasir bawah lantai 5.59 M3
Bahan:
Pasir urug M3
5. Urugan tanah bawah lantai 14.03 M3
Bahan:
Tanah Urug M3
Sub Jumlah (2)
V Pekerjaan Pasangan
1. Pasangan dinding trasram 1PC : 4PP 9.89 M2
Bahan:
Bata merah Buah
Semen PC KG
Pasir pasang M3
2. Pasangan dinding 1PC : 8PP 138.34 M2
Bahan:
Bata merah Buah
Semen PC KG
Pasir pasang M3
Sub Jumlah (5)
VI Pekerjaan Plesteran
1. Plesteran dinding 1PC : 4PP 19.78 M2
Bahan:
Semen PC KG
Pasir pasang M3
2. Plesteran dinding 1PC : 8PP 276.68 M2
Bahan:
Semen PC KG
Pasir pasang M3
3. Acian 296.46 M2
Bahan:
Semen PC KG
4. Benangan 194.52 Ml
Bahan:
Semen PC KG
Sub Jumlah (6)
X Pekerjaan Plafon
1. Pasang rangka plafon 50x100 95.25 M2
Bahan:
Kayu meranti usuk 5/7 M3
Paku kayu 10 cm KG
2. Pasang penutup plafon calsiboard 120x240 95.25 M2
Bahan:
Kalsiboard Ling 4 (240x120) tebal 4 Lembar
Paku kayu 2-3 cm KG
3. Pasang list plafon gypsum 143.24 Ml
Bahan:
List profil gypsum Ml
Serbuk Gypsum KG
Sub Jumlah (10)
Rp 12,500 Rp 900,000
Rp 115,090 Rp 4,833,780
Rp 5,733,780
Rp 25,590 Rp 688,883
Rp 42,500 Rp 381,225
Rp 203,500 Rp 345,950
Rp 203,500 Rp 1,137,565
Rp 42,500 Rp 596,275
Rp 3,149,898
Rp 307,860 Rp 2,093,448
Rp 584,530 Rp 8,288,635
Rp 10,382,083
Rp 5,356,590 Rp 6,267,210
Rp 8,893,590 Rp 8,537,846
Rp 8,893,590 Rp 2,845,949
Rp 84,390 Rp 1,012,680
Rp 104,490 Rp 6,781,401
Rp 8,893,590 Rp 933,827
Rp 417,100 Rp 1,067,776
Rp 27,446,689
Rp 222,190 Rp 2,197,459
Rp 103,270 Rp 14,286,372
Rp 16,483,831
Rp 50,340 Rp 995,725
Rp 47,780 Rp 13,219,770
Rp 29,460 Rp 8,733,712
Rp 29,150 Rp 5,670,258
Rp 28,619,465
Rp 17,095,050 Rp 12,821,288
Rp 941,500 Rp 4,387,390
Rp 640,900 Rp 3,537,768
Rp 144,710 Rp 850,895
Rp 21,597,340
Rp 13,210,150 Rp 3,302,538
Rp 14,309,750 Rp 9,444,435
Rp 14,309,750 Rp 1,030,302
Rp 116,140 Rp 12,978,645
Rp 47,440 Rp 676,020
Rp 52,960 Rp 2,380,552
Rp 29,812,492
Rp 64,600 Rp 7,219,050
Rp 104,120 Rp 1,483,710
Rp 8,702,760
Rp 42,900 Rp 4,086,225
Rp 42,900 Rp 4,086,225
Rp 31,350 Rp 4,490,574
Rp 12,663,024
Rp 181,930 Rp 10,595,603
Rp 18,630 Rp 156,119
Rp 10,751,723
Rp 150,250 Rp 300,500
Rp 79,200 Rp 237,600
Rp 54,920 Rp 164,760
Rp 57,800 Rp 635,800
Rp 54,920 Rp 659,040
Rp 94,920 Rp 1,139,040
Rp 3,136,740
Rp 173,740 Rp 868,700
Rp 174,860 Rp 524,580
Rp 174,860 Rp 524,580
Rp 481,310 Rp 481,310
Rp 2,399,170
Rp 42,050 Rp 12,466,143
Rp 28,770 Rp 2,740,343
Rp 60,690 Rp 832,060
Rp 16,038,545
Rp 196,917,541
ma Ratus Empat Puluh Satu Rupiah
RENCANA ANGGARAN BIAYA
( RAB )
RUT YUNIAR KUSUMAWARDANI
XII DPIB 2 (26)
SUB KEGIATAN :
PEMBANGUNAN PERPUSTAKAAN SD NEGERI 1 KUMENDUNG
LOKASI :
KECAMATAN MUNCAR - KABUPATEN BANYUWANGI
RENCANA ANGGARAN BIAYA PEMBANGUNAAN PERPUS
II Pekerjaan Tanah
1. Galian Pondasi 26.92 M3
2. Urugan tanah kembali 8.95 M3
3. Urugan pasir bawah pondasi 1.70 M3
4. Urugan pasir bawah lantai 5.59 M3
5. Urugan tanah bawah lantai 14.03 M3
Sub Jumlah (2)
V Pekerjaan Pasangan
1. Pasangan dinding trasram 1PC : 4PP 9.89 M2
2. Pasangan dinding 1PC : 8PP 138.34 M2
Sub Jumlah (5)
VI Pekerjaan Plesteran
1. Plesteran dinding 1PC : 4PP 19.78 Ml
2. Plesteran dinding 1PC : 8PP 276.68 Ml
3. Acian 296.46 Ml
4. Benangan 196.52 Ml
Sub Jumlah (6)
X Pekerjaan Plafon
1. Pasang rangka plafon 50x100 95.25 M2
2. Pasang penutup plafon calsiboard 100x200 95.25 M2
3. Pasang list plafon gypsum 143.24 Ml
Sub Jumlah (10)
Rp 12,500 Rp 900,000
Rp 115,090 Rp 4,833,780
Rp 5,733,780
Rp 25,590 Rp 688,883
Rp 42,500 Rp 380,375 1.2
Rp 203,500 Rp 345,950 1.2
Rp 203,500 Rp 1,137,565 1.2
Rp 42,500 Rp 596,275 1.2
Rp 3,149,048
Rp 307,860 Rp 2,093,448
Rp 584,530 Rp 9,118,668
Rp 11,212,116
Rp 5,356,590 Rp 6,267,210
Rp 8,893,590 Rp 8,537,846
Rp 8,893,590 Rp 3,112,757
Rp 84,390 Rp 1,012,680
Rp 104,490 Rp 6,781,401
Rp 8,893,590 Rp 933,827
Rp 417,100 Rp 1,067,776
Rp 27,713,497
Rp 222,190 Rp 2,197,459
Rp 103,270 Rp 14,286,372
Rp 16,483,831
Rp 50,340 Rp 995,725
Rp 47,780 Rp 13,219,770
Rp 29,460 Rp 8,733,712
Rp 29,150 Rp 5,728,558
Rp 28,677,765
Rp 17,095,050 Rp 12,821,288
Rp 941,500 Rp 4,387,390
Rp 640,900 Rp 3,537,768
Rp 144,710 Rp 850,895
Rp 21,597,340
Rp 13,210,150 Rp 3,302,538
Rp 14,309,750 Rp 9,444,435
Rp 14,309,750 Rp 1,030,302
Rp 116,140 Rp 12,978,645
Rp 47,440 Rp 581,140
Rp 52,960 Rp 2,380,552
Rp 29,717,612
Rp 64,600 Rp 7,219,050
Rp 104,120 Rp 1,483,710
Rp 8,702,760
Rp 42,900 Rp 4,086,225
Rp 42,900 Rp 4,086,225
Rp 31,350 Rp 4,490,574
Rp 12,663,024
Rp 181,930 Rp 10,595,603
Rp 18,630 Rp 156,119
Rp 10,751,723
Rp 150,250 Rp 300,500
Rp 79,200 Rp 475,200
Rp 54,920 Rp 164,760
Rp 57,800 Rp 1,271,600
Rp 54,920 Rp 659,040
Rp 94,920 Rp 2,088,240
Rp 4,959,340
Rp 173,740 Rp 868,700
Rp 174,860 Rp 524,580
Rp 174,860 Rp 524,580
Rp 481,310 Rp 481,310
Rp 2,399,170
Rp 42,050 Rp 12,466,143
Rp 28,770 Rp 2,740,343
Rp 60,690 Rp 832,060
Rp 16,038,545
kaan Rp 199,799,551
Lima Ratus Empat Puluh Satu Rupiah
DAFTAR ANALISA SATUAN PEKERJAAN
PEMERINTAH KABUPATEN BANYUWANGI
TAHUN 2019
Lamp-PermenPUPR28-2016
B Tenaga
1.400 OH Pekerja @ Rp. 75,000.00 = Rp. 105,000.00
0.140 OH Mandor Lapangan @ Rp. 100,000.00 = Rp. 14,000.00
C Peralatan* Jumlah (II) = Rp. 119,000.00
0.008 Buah Palu/godam @ Rp. 67,000.00 = Rp. 536.00
0.012 Buah Pahat beton (beton keras) @ Rp. 27,000.00 = Rp. 324.00
0.020 Buah Linggis @ Rp. 70,000.00 = Rp. 1,400.00
Jumlah (III) = Rp. 2,260.00
Harga satuan pekerjaan = Rp. 121,260.00
Harga setelah dibulatkan = Rp. 121,260.00
*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0
18 P.01.e 2) Bongkar 1 m3 pasangan batu (manual)
A Bahan
B Tenaga
1.200 OH Pekerja @ Rp. 75,000.00 = Rp. 90,000.00
0.120 OH Mandor Lapangan @ Rp. 100,000.00 = Rp. 12,000.00
C Peralatan* Jumlah (II) = Rp. 102,000.00
0.006 Buah Palu/godam @ Rp. 67,000.00 = Rp. 402.00
0.009 Buah Pahat beton (beton keras) @ Rp. 27,000.00 = Rp. 243.00
0.020 Buah Linggis @ Rp. 70,000.00 = Rp. 1,400.00
Jumlah (III) = Rp. 2,045.00
Harga satuan pekerjaan = Rp. 104,045.00
Harga setelah dibulatkan = Rp. 104,040.00
*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0
**) Hasil pembersihan 1m3 pasangan batu yang dibongkar, umumnya menghasilkan 0,55 - 0,65 m3 batu
B Tenaga
0.600 OH Pekerja @ Rp. 75,000.00 = Rp. 45,000.00
0.060 OH Mandor Lapangan @ Rp. 100,000.00 = Rp. 6,000.00
C Peralatan Jumlah (II) = Rp. 51,000.00
0.050 Hari Sewa Jack Hammer @ Rp. 267,800.00 = Rp. 13,390.00
Jumlah (III) = Rp. 13,390.00
Harga satuan pekerjaan = Rp. 64,390.00
Harga setelah dibulatkan = Rp. 64,390.00
4) Pembersihan 1 m3 bongkaran pasangan batu untuk pemanfaatan kembali material batu **)
20 P.01.e
A Bahan
B Tenaga
0.200 OH Pekerja @ Rp. 75,000.00 = Rp. 15,000.00
0.020 OH Mandor Lapangan @ Rp. 100,000.00 = Rp. 2,000.00
C Peralatan* Jumlah (II) = Rp. 17,000.00
0.002 Buah Palu/godam @ Rp. 67,000.00 = Rp. 134.00
0.003 Buah Pahat beton (beton keras) @ Rp. 27,000.00 = Rp. 81.00
Jumlah (III) = Rp. 215.00
Harga satuan pekerjaan = Rp. 17,215.00
Harga setelah dibulatkan = Rp. 17,210.00
*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0
**) Hasil pembersihan 1m3 pasangan batu yang dibongkar, umumnya menghasilkan
0,55 - 0,65 m3 batu
BAHAN: Besi (kg); Baut ( ø dan panjang cm); Pelat strip (panjang-lebar-tebal mm); engsel (buah) atau kelengkapan lainnya
PERALATAN: Alat bantu manual, semi mekanis dan mekanis (sewa-hari;jam)
1 m2
kayu sengon 350000
diganti trucu 1m3 66,667
2,000,000
0.118
koral beton
325,000 #REF!
575,710 #REF!
421,790 #REF!
koral beton
134,220 #REF!
148,930
93,410 #REF!
1,169,790 #REF!
1,332,030 #REF!
11,500 #REF!
1,170,670 #REF!
0 m3
0 kg
0 m3
0 OH
0 OH
191,150 #REF!
933,310 #REF!
466,650 #REF!
#REF!
151,950 #REF!
107,580
92,190
57,390
15,380
51,250 #REF!
63,000 #REF!
74,950 #REF!
68,200 #REF!
103,500 #REF!
82,500 #REF!
3,750 #REF!
22,450 #REF!
Analis Permen
17,080 #REF!
Lama
21,000 #REF!
Lama
24,980 #REF!
Lama
22,730 #REF!
Lama
34,500 #REF!
Lama
27,500 #REF!
37,500 #REF!
200,500 #REF!
130,050 #REF!
156,750 #REF!
136,050 #REF!
688,390 #REF!
640,270 #REF!
606,910 #REF!
583,450 #REF!
551,310 #REF!
298,230 #REF!
2,162,130 #REF!
702,840 #REF!
10 m3 27
812,980 #REF!
875,070 #REF!
911,990 #REF!
940,600 #REF!
847,480 #REF!
974,810 #REF!
1,031,860 #REF!
1,113,670 #REF!
1,131,270 #REF!
1,143,000 #REF!
1,154,730 #REF!
1,213,380 #REF!
Analis Permen Baru
1,151,060 #REF!
126,620 #REF!
137,120 #REF!
122,080 #REF!
36 2.1 75.60
14 5.4 75.60
151.20
18,710 #REF!
601,360 #REF!
761,720 #REF!
33.333333
0.2
2
13.3333333
0.045
0.2
5
207,480 #REF!
134,940 #REF!
366,340 #REF!
366,340 #REF!
8.33333333
9.16666667
383,590 #REF!
231,390 #REF!
423,840 #REF!
251,520 #REF!
251,340 #REF!
378,560 #REF!
378,560 #REF!
228,880 #REF!
335,430 #REF!
116,370 #REF!
78,470 #REF!
95,000 #REF!
3,934,140 #REF!
3,934,140 #REF!
4,837,750 #REF!
8,198,550 #REF!
8,198,550 #REF!
6,447,370 #REF!
6,447,370 #REF!
5,845,980 #REF!
5,845,980 #REF!
5,684,710 #REF!
5,684,710 #REF!
5,879,800 #REF!
5,879,800 #REF!
240,500 #REF!
227,760 #REF!
219,170 #REF!
214,750 #REF!
213,270 #REF!
115,960 #REF!
109,910 #REF!
106,450 #REF!
- #REF!
103,110 #REF!
100,750 #REF!
#REF!
465,770
465,770 #REF!
59,010 #REF!
52,360 #REF!
49,490 #REF!
47,520 #REF!
46,410 #REF!
45,520 #REF!
45,040 #REF!
44,550 #REF!
70,070 #REF!
56,250 #REF!
63,560 #REF!
62,150 #REF!
60,900 #REF!
29,330 #REF!
44,300 #REF!
44,300 #REF!
1 #REF!
21,620 #REF!
10,350 #REF!
45,440 #REF!
27,450 #REF!
27,100 #REF!
24,574,420 #REF!
14,000,920 #REF!
567,430 #REF!
1,142,120 #REF!
815,800 #REF!
759,270 #REF!
563,480 #REF!
1,597,910 #REF!
1,075,800 #REF!
608,300 #REF!
860,700 #REF!
651,850 #REF!
1,424,910 #REF!
935,430 #REF!
1,329,930 #REF!
705,860 #REF!
4.71 kg
10,520,800 #REF!
26,597,900 #REF!
9,278,300 #REF!
11,808,300 #REF!
383,120 #REF!
528,020 #REF!
158,390 #REF!
130,960 #REF!
133,370 #REF!
234,770 #REF!
90,780 #REF!
90,780 #REF!
219,070 #REF!
359,090 #REF!
358,600 #REF!
33,340 #REF!
55,020 #REF!
646,040 #REF!
646,040 #REF!
25
#REF!
95,600
160,190 #REF!
163,760 #REF!
6.25 1.11
0.96
172,480 #REF!
190,510 #REF!
165,580 #REF!
165,580 #REF!
50
26,910 #REF!
23,290 #REF!
80
505,090 #REF!
472000
781520
1253520
626760
235,010 #REF!
211,900 #REF!
218,800 #REF!
202,630 #REF!
202,630 #REF!
216,920 #REF!
150,480 #REF!
164,500 #REF!
72,190 #REF!
748
173,210
1,900,000
950,000
361,560
12650
32,470 #REF!
2
301,520 #REF!
Memasang 1 m2 Homogeneus Tile ukuran (80 x 80) cm
Bahan
2 buah
10 kg
0 m3
1 kg
Tenaga
1 OH
0 OH
0 OH
0 OH
458,490 #REF!
591,920 #REF!
1.2
2.9768
60,080 #REF!
74,490 #REF!
82,960 #REF!
43,450 #REF!
40,240 #REF!
39,880 #REF!
422,430 #REF!
22,290 #REF!
22,280 #REF!
22,600 #REF!
22,600 #REF!
7,997
29,270 #REF!
29,230 #REF!
25,760 #REF!
25,760 #REF!
269,150 #REF!
122,740 #REF!
109,430 #REF!
923,920 #REF!
1,510,820 #REF!
per lonjor
733,660 #REF!
683,060 #REF!
520,710 #REF!
436,860 #REF!
#REF!
0,9x20
18.00
9,722.22
84,270 #REF!
142,230 #REF!
189,480 #REF!
62,880 #REF!
6 27,500 4,583
4 18,333 18,300
79,860 #REF!
96,710 #REF!
93,320
1 m membutu 2.75
218,370.00
217,240
new 2018 42,860
80,550 #REF!
126,820 #REF!
309,660 #REF!
8.89
57,320 #REF!
81,200 #REF!
5000 2,667
53,100 #REF!
63,100 #REF!
110,600 #REF!
101,320 #REF!
120,820 #REF!
126,160 #REF!
80,790
#REF!
48,080
113,180 new 2018
73,930 #REF!
62,910 #REF!
35,110 #REF!
127,400 #REF!
0.04035513
135,710 #REF!
24.78 7,426,000.00
299,677
189,220 #REF!
1,787,700 #REF!
2,884,800 #REF!
407,550 #REF!
2,416,750 #REF!
4,958,250 #REF!
709,100 #REF!
946,520 #REF!
334,850 #REF!
61,230 #REF!
72,780 #REF!
126,720 #REF!
131,230 #REF!
143,000 #REF!
361,820 #REF!
541,180 #REF!
677,350 #REF!
60,700 #REF!
70,210 #REF!
99,920 #REF!
201,230 #REF!
137,370 #REF!
321,810 #REF!
452,520 #REF!
17,420 #REF!
20,010 #REF!
23,890 #REF!
40,240 #REF!
50,360 #REF!
103,020 #REF!
136,190 #REF!
281,460 #REF!
470,640 #REF!
1,085,600 #REF!
62,550 #REF!
245,250 #REF!
124,450 #REF!
85,250 #REF!
99,550 #REF!
256,750 #REF!
336,350 #REF!
134,450 #REF!
120,620 #REF!
156,320 #REF!
161,850 #REF!
1,745,850 #REF!
692,250 #REF!
595,850 #REF!
40,150 #REF!
34,250 #REF!
24,800 #REF!
63,850 #REF!
39,770 #REF!
24,470 #REF!
254,700 #REF!
42,100 #REF!
99,500 #REF!
STP-BZ851
75,550 #REF!
70,650 #REF!
99,200 #REF!
100,700 #REF!
35,420 #REF!
146,650 #REF!
225,440 #REF!
126,710 #REF!
602,270 #REF!
11,660 #REF!
37,060 #REF!
45,760 #REF!
59,270 #REF!
59,270 #REF!
75,290 #REF!
#REF!
#REF!
35,120 #REF!
30,200 #REF!
35,920 #REF!
14,560 #REF!
14,560 #REF!
#REF!
#REF!
26,710 #REF!
25,440 #REF!
41,910 #REF!
siip
pasir beton
166,950 152,860
siip
113,650 138,500 #REF!
siip
220.5
35 279,099
75 598,070
454,250 #REF!
573,920 #REF!
792,170 #REF!
131,320 #REF!
60 247,250
1 x
4,121
179,650 #REF!
796330
398165
320,950 #REF!
1,291,570 #REF!
2,686,200 #REF!
3,633,990 #REF!
182,280 #REF!
300,000 #REF!
140,000 #REF!
95,000 #REF!
166,880 #REF!
167,740 #REF!
200,000 #REF!
200,000 #REF!
21,250 #REF!
230,000 #REF!
7.74
18,750 #REF!
#N/A
Tukang kayu
Kepala Tukang
Memasang 1 m2 Homogeneus Tile ukuran (80 x 80) cm
12 Pekerjaan Dinding
Bahan
70.000 buah Bata merah 138.34 9683.8
6.500 kg Semen PC 138.34 899.21
0.050 m3 Pasir pasang 138.34 6.917
15 Acian
Bahan
3.250 kg Semen PC 296.46 963.495
16 Benangan
Bahan
3.000 kg Semen PC 196.52 589.56
36 Pasang stopkontak
Bahan
10.000 m' Kabel NYM 2x2,5 mm2 3 30
6.000 m' Pipa konduit 20 mm 3 18
1.000 m' Flexible Konduit 20 mm 3 3
38 Pengecatan kayu
Bahan
0.200 kg Politur (interior) 13.71 2.742
0.150 kg Wood filler 13.71 2.0565
0.170 kg Cat dasar melamine sanding sealer 13.71 2.3307
0.350 kg Cat penutup melamine 13.71 4.7985
0.010 bh Kuas uk. 4" 13.71 0.1371
0.030 kg Thiner 13.71 0.4113
0.200 lbr Amplas 13.71 2.742
ANALISA UPAH KEBUTUHAN PERPUSTAKAAN