A.4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), Slump (12 **2) cm, w/c = 0,87
A.4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), Slump (12 **2) cm, w/c = 0,78
A.4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), Slump (12 **2) cm, w/c = 0,72
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), Slump (3-6) cm, w/c = 0,87
A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), Slump (12 **2) cm, w/c = 0,66
A.4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), Slump (12 **2) cm, w/c = 0,61
A.4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), Slump (12 **2) cm, w/c = 0,58
A.4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), Slump (12 **2) cm, w/c = 0,56
A.4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), Slump (12 **2) cm, w/c = 0,53
A.4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), Slump (12 **2) cm, w/c = 0,52
A.4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), Slump (12 **2) cm, w/c = 0,49
A.4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), Slump (12 **2) cm, w/c = 0,48
A.4.1.1.13. Membuat 1 m3 beton kedap air dengan strorox - 100
A.4.1.1.14. Pemasangan 1 m' PVC Waterstop lebar 150 mm
A.4.1.1.15. Pemasangan 1 m' PVC Waterstop lebar 200 mm
A.4.1.1.16. Membuat 1 m' PVC Waterstop lebar 230 mm - 320 mm
A.4.1.1.17. Pembesian 10kg dengan besi polos atau besi ulir
A.4.1.1.18. Pemasangan 10 kg kabel presstressed polos/strands
A.4.1.1.19. Pemasangan 10 kg jaring kawat baja (wiremesh)
A.4.1.1.20. Pemasangan 1 m2 bekisting untuk pondasi
A.4.1.1.21. Pemasangan 1 m2 bekisting untuk sloof
A.4.1.1.22. Pemasangan 1 m2 bekisting untuk kolom
A.4.1.1.23. Pemasangan 1 m2 bekisting untuk balok
A.4.1.1.24. Pemasangan 1 m2 bekisting untuk lantai
A.4.1.1.25. Pemasangan 1 m2 bekisting untuk dinding
A.4.1.1.26. Pemasangan 1 m2 bekisting untuk tangga
A.4.1.1.27. Pemasangan 1 m2 jembatan untuk pengecoran beton
A.4.1.1.28. Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
A.4.1.1.29. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
A.4.1.1.30. Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
A.4.1.1.32. Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
A.4.1.1.33. Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
A.4.1.1.34. Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
A.4.1.1.35. Membuat 1 m3 kolom praktis beton bertulang (11 x11) cm.
A.4.1.1.36. Membuat 1 m3 ring balok beton bertulang (10 x15) cm.
A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak (5 kali pakai)
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak
A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok pracetak
A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom pracetak
A.4.1.2.14. Mendirikan 1 buah komponen plat pracetak
A.4.1.2.15. Mendirikan 1 buah komponen balok pracetak
A.4.1.2.16. Mendirikan 1 buah komponen kolom pracetak
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak (+- 20 m)
A.4.1.2.18. Melangsir 1 buah komponen balok pracetak (+- 20 m)
A.4.1.2.19. Melangsir 1 buah komponen kolom pracetak (+- 20 m)
A.4.1.2.20. Bahan 1 m3 grouting campuran
A.4.1.2.21. Bahan 1 m3 grouting tidak campuran
A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak
A.4.1.2.24. Upah 1 titik join dengan sling
A.4.4.1.1. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:2PP
A.4.4.1.2. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3PP
A.4.4.1.3. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:4PP
A.4.4.1.4. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:5PP
A.4.4.1.5. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:6PP
A.4.4.1.6. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3KP:10PP
A.4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
A.4.4.1.8. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
A.4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
A.4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:5PP
A.4.4.1.11. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:6PP
A.4.4.1.12. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:8PP
A.4.4.1.13. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3KP:10PP
A.4.4.1.14. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM:1KP:1PP
A.4.4.1.15. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM:1KP:2PP
A.4.4.1.16. Pemasangan 1 m2 dinding conblock HB20 campuran 1SP:3PP
A.4.4.1.17. Pemasangan 1 m2 dinding conblock HB20 campuran 1SP:4PP
A.4.4.1.18. Pemasangan 1 m2 dinding conblock HB15 campuran 1SP:3PP
A.4.4.1.19. Pemasangan 1 m2 dinding conblock HB15 campuran 1SP:4PP
A.4.4.1.20. Pemasangan 1 m2 dinding conblock HB10 campuran 1SP:3PP
A.4.4.1.21. Pemasangan 1 m2 dinding conblock HB10 campuran 1SP:4PP
A.4.4.1.22. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP:3PP
A.4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP:4PP
A.4.4.1.24. Pemasangan 1 m2 dinding bata berongga ekspose 12x11x24 campuran 1SP:3PP
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm, dan 6mm
A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm
A.4.5.1.3. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 60) cm
A.4.5.1.4. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4mm & 6mm
A.4.5.1.6. Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm, berikut rangka allumunium
A.4.5.1.9. Pemasangan 1 m' list langit-langit kayu profil
A.4.5.1.10. Pemasangan 1 m2 rangka langit-langit besi hollow 40.40
A.4.6.1.1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
A.4.6.1.2. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
A.4.6.1.3. Pembuatan dan Pemasangan 1 m2 pintu klamp standar, kayu kelas II
A.4.6.1.4. Pembuatan dan Pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
A.4.6.1.5. Pembuatan dan Pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
A.4.6.1.6. Pembuatan dan Pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
A.4.6.1.7. Pembuatan dan Pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
A.4.6.1.9. Pembuatan 1 m2 daun pintu plywood rangkap, rangka ekspose kayu kelas I atau II
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II
A.4.6.1.11. Pemasangan 1 m2 teakwood rangkap, rangka ekspose kayu kelas I
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka ekspose kayu kelas II
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 m
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
A.4.6.1.16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II
A.4.6.1.17. Pemasangan 1 m2 rangka atap genteng beton kayu kelas II
A.4.6.1.18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50x100)cm, kayu kelas II atau III
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60x60)cm, kayu kelas II atau III
A.4.6.1.21. Pemasangan 1 m' lisplank (3x20)cm, kayu kelas I atau II
A.4.6.1.22. Pemasangan 1 m' lisplank ukuran (3x30)cm, kayu kelas I atau II
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60x120)cm, kayu kelas II atau III
A.4.6.1.24. Pemasangan 1 m2 dinding pemisah teakwood rangkap, rangka kayu kelas II
A.4.6.1.25. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I
A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm
A.4.6.1.28. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 180,460.00
E. Overhead & Profit 15 % x D 27,069.00
F. Harga Satuan Pekerjaan ( D + E ) 207,529.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.02 OH 0.400 85,000.00 34,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 241,600.00
E. Overhead & Profit 15 % x D 36,240.00
F. Harga Satuan Pekerjaan ( D + E ) 277,840.00
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.02 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 210,560.00
E. Overhead & Profit 15 % x D 31,584.00
F. Harga Satuan Pekerjaan ( D + E ) 242,144.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 204,775.00
E. Overhead & Profit 15 % x D 30,716.25
F. Harga Satuan Pekerjaan ( D + E ) 235,491.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.000 70,000.00 140,000.00
Tukang Kayu L.02 OH 2.000 85,000.00 170,000.00
Kepala Tukang L.03 OH 1.000 90,000.00 90,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 773,040.00
E. Overhead & Profit 15 % x D 115,956.00
F. Harga Satuan Pekerjaan ( D + E ) 888,996.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.02 OH 1.500 85,000.00 127,500.00
Kepala Tukang L.03 OH 0.150 90,000.00 13,500.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 706,625.00
E. Overhead & Profit 15 % x D 105,993.75
F. Harga Satuan Pekerjaan ( D + E ) 812,618.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.02 OH 2.000 85,000.00 170,000.00
Kepala Tukang L.03 OH 0.200 90,000.00 18,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 691,190.00
E. Overhead & Profit 15 % x D 103,678.50
F. Harga Satuan Pekerjaan ( D + E ) 794,868.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.02 OH 2.000 85,000.00 170,000.00
Kepala Tukang L.03 OH 0.200 90,000.00 18,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 793,840.00
E. Overhead & Profit 15 % x D 119,076.00
F. Harga Satuan Pekerjaan ( D + E ) 912,916.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 11,750.00
E. Overhead & Profit 15 % x D 1,762.50
F. Harga Satuan Pekerjaan ( D + E ) 13,512.50
A.2.2.1.10. Pembuatan 1 m2 steger/perancah dari bambu
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.02 OH 2.000 85,000.00 170,000.00
Kepala Tukang L.03 OH 0.200 90,000.00 18,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 277,947.00
E. Overhead & Profit 15 % x D 41,692.05
F. Harga Satuan Pekerjaan ( D + E ) 319,639.05
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Kayu L.02 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.03 OH 0.030 90,000.00 2,700.00
D. Jumlah ( A + B + C ) 165,480.00
E. Overhead & Profit 15 % x D 24,822.00
F. Harga Satuan Pekerjaan ( D + E ) 190,302.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Mandor L.04 OH 0.005 95,000.00 475.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 13.000 70,000.00 910,000.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 910,475.00
E. Overhead & Profit 15 % x D 136,571.25
F. Harga Satuan Pekerjaan ( D + E ) 1,047,046.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.667 70,000.00 466,690.00
Mandor L.04 OH 0.333 95,000.00 31,635.00
D. Jumlah ( A + B + C ) 498,325.00
E. Overhead & Profit 15 % x D 74,748.75
F. Harga Satuan Pekerjaan ( D + E ) 573,073.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.042 70,000.00 2,940.00
Tukang Kayu L.02 OH 0.004 85,000.00 340.00
Kepala Tukang L.03 OH 0.002 90,000.00 180.00
Mandor L.04 OH 0.042 95,000.00 3,990.00
D. Jumlah ( A + B + C ) 10,396.87
E. Overhead & Profit 15 % x D 1,559.53
F. Harga Satuan Pekerjaan ( D + E ) 11,956.40
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.375 70,000.00 26,250.00
Tukang Kayu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.019 95,000.00 1,805.00
D. Jumlah ( A + B + C ) 159,560.00
E. Overhead & Profit 15 % x D 23,934.00
F. Harga Satuan Pekerjaan ( D + E ) 183,494.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.750 70,000.00 52,500.00
Mandor L.04 OH 0.025 95,000.00 2,375.00
D. Jumlah ( A + B + C ) 54,875.00
E. Overhead & Profit 15 % x D 8,231.25
F. Harga Satuan Pekerjaan ( D + E ) 63,106.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 67,275.00
E. Overhead & Profit 15 % x D 10,091.25
F. Harga Satuan Pekerjaan ( D + E ) 77,366.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.00
Mandor L.04 OH 0.067 95,000.00 6,365.00
D. Jumlah ( A + B + C ) 79,865.00
E. Overhead & Profit 15 % x D 11,979.75
F. Harga Satuan Pekerjaan ( D + E ) 91,844.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Mandor L.04 OH 0.032 95,000.00 3,040.00
D. Jumlah ( A + B + C ) 73,040.00
E. Overhead & Profit 15 % x D 10,956.00
F. Harga Satuan Pekerjaan ( D + E ) 83,996.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Mandor L.04 OH 0.060 95,000.00 5,700.00
D. Jumlah ( A + B + C ) 110,700.00
E. Overhead & Profit 15 % x D 16,605.00
F. Harga Satuan Pekerjaan ( D + E ) 127,305.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 3,975.00
E. Overhead & Profit 15 % x D 596.25
F. Harga Satuan Pekerjaan ( D + E ) 4,571.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.330 70,000.00 23,100.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 24,050.00
E. Overhead & Profit 15 % x D 3,607.50
F. Harga Satuan Pekerjaan ( D + E ) 27,657.50
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 39,750.00
E. Overhead & Profit 15 % x D 5,962.50
F. Harga Satuan Pekerjaan ( D + E ) 45,712.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 99,750.00
E. Overhead & Profit 15 % x D 14,962.50
F. Harga Satuan Pekerjaan ( D + E ) 114,712.50
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 117,950.00
E. Overhead & Profit 15 % x D 17,692.50
F. Harga Satuan Pekerjaan ( D + E ) 135,642.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang L.02 OH 0.400 85,000.00 34,000.00
Kepala Tukang L.03 OH 0.040 90,000.00 3,600.00
Mandor L.04 OH 0.080 95,000.00 7,600.00
D. Jumlah ( A + B + C ) 208,600.00
E. Overhead & Profit 15 % x D 31,290.00
F. Harga Satuan Pekerjaan ( D + E ) 239,890.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 11,925.00
E. Overhead & Profit 15 % x D 1,788.75
F. Harga Satuan Pekerjaan ( D + E ) 13,713.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Mandor L.04 OH 0.025 95,000.00 2,375.00
D. Jumlah ( A + B + C ) 253,875.00
E. Overhead & Profit 15 % x D 38,081.25
F. Harga Satuan Pekerjaan ( D + E ) 291,956.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 813,935.00
E. Overhead & Profit 15 % x D 122,090.25
F. Harga Satuan Pekerjaan ( D + E ) 936,025.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 769,265.00
E. Overhead & Profit 15 % x D 115,389.75
F. Harga Satuan Pekerjaan ( D + E ) 884,654.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 738,305.00
E. Overhead & Profit 15 % x D 110,745.75
F. Harga Satuan Pekerjaan ( D + E ) 849,050.75
A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 716,535.00
E. Overhead & Profit 15 % x D 107,480.25
F. Harga Satuan Pekerjaan ( D + E ) 824,015.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 686,705.00
E. Overhead & Profit 15 % x D 103,005.75
F. Harga Satuan Pekerjaan ( D + E ) 789,710.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 533,842.60
E. Overhead & Profit 15 % x D 80,076.39
F. Harga Satuan Pekerjaan ( D + E ) 613,918.99
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 634,505.00
E. Overhead & Profit 15 % x D 95,175.75
F. Harga Satuan Pekerjaan ( D + E ) 729,680.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.500 70,000.00 105,000.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 613,555.00
E. Overhead & Profit 15 % x D 92,033.25
F. Harga Satuan Pekerjaan ( D + E ) 705,588.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.780 70,000.00 54,600.00
Tukang Batu L.02 OH 0.390 85,000.00 33,150.00
Kepala Tukang L.03 OH 0.039 90,000.00 3,510.00
Mandor L.04 OH 0.039 95,000.00 3,705.00
D. Jumlah ( A + B + C ) 429,525.00
E. Overhead & Profit 15 % x D 64,428.75
F. Harga Satuan Pekerjaan ( D + E ) 493,953.75
A.3.2.1.10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.400 70,000.00 238,000.00
Tukang Batu L.02 OH 0.850 85,000.00 72,250.00
Kepala Tukang L.03 OH 0.085 90,000.00 7,650.00
Mandor L.04 OH 0.170 95,000.00 16,150.00
D. Jumlah ( A + B + C ) 2,759,770.00
E. Overhead & Profit 15 % x D 413,965.50
F. Harga Satuan Pekerjaan ( D + E ) 3,173,735.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.400 70,000.00 168,000.00
Tukang Batu L.02 OH 0.800 85,000.00 68,000.00
Kepala Tukang L.03 OH 0.080 90,000.00 7,200.00
Mandor L.04 OH 0.119 95,000.00 11,305.00
D. Jumlah ( A + B + C ) 825,925.00
E. Overhead & Profit 15 % x D 123,888.75
F. Harga Satuan Pekerjaan ( D + E ) 949,813.75
A.4.1.1.1. Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100),slump (12±2) cm, w/c = 0,87
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 828,297.14
E. Overhead & Profit 15 % x D 124,244.57
F. Harga Satuan Pekerjaan ( D + E ) 952,541.71
A.4.1.1.2. Membuat 1 m3 beton mutu f'c = 9,8 Mpa (K 125), Slump (12±2) cm, w/c = 0,78
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 864,394.66
E. Overhead & Profit 15 % x D 129,659.20
F. Harga Satuan Pekerjaan ( D + E ) 994,053.86
A.4.1.1.3. Membuat 1 m3 beton mutu f'c = 12,2 Mpa (K 150), Slump (12±2) cm, w/c = 0,72
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 892,023.81
E. Overhead & Profit 15 % x D 133,803.57
F. Harga Satuan Pekerjaan ( D + E ) 1,025,827.38
A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), Slump (3-6) cm, w/c = 0,87
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.060 95,000.00 5,700.00
D. Jumlah ( A + B + C ) 774,837.83
E. Overhead & Profit 15 % x D 116,225.67
F. Harga Satuan Pekerjaan ( D + E ) 891,063.50
A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K 175), Slump (12±2) cm, w/c = 0,66
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 925,516.35
E. Overhead & Profit 15 % x D 138,827.45
F. Harga Satuan Pekerjaan ( D + E ) 1,064,343.80
A.4.1.1.6. Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), Slump (12±2) cm, w/c = 0,61
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 956,207.73
E. Overhead & Profit 15 % x D 143,431.16
F. Harga Satuan Pekerjaan ( D + E ) 1,099,638.89
A.4.1.1.7. Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), Slump (12±2) cm, w/c = 0,58
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 981,140.15
E. Overhead & Profit 15 % x D 147,171.02
F. Harga Satuan Pekerjaan ( D + E ) 1,128,311.17
A.4.1.1.8. Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), Slump (12±2) cm, w/c = 0,56
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 995,063.23
E. Overhead & Profit 15 % x D 149,259.48
F. Harga Satuan Pekerjaan ( D + E ) 1,144,322.71
A.4.1.1.9. Membuat 1 m3 beton mutu f'c = 24,0 Mpa (K 275), Slump (12±2) cm, w/c = 0,53
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 1,018,995.71
E. Overhead & Profit 15 % x D 152,849.36
F. Harga Satuan Pekerjaan ( D + E ) 1,171,845.07
A.4.1.1.10. Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), Slump (12±2) cm, w/c = 0,52
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Kepala Tukang L.03 OH 0.028 90,000.00 2,520.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 1,026,337.99
E. Overhead & Profit 15 % x D 153,950.70
F. Harga Satuan Pekerjaan ( D + E ) 1,180,288.69
A.4.1.1.11. Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), Slump (12±2) cm, w/c = 0,49
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.105 95,000.00 9,975.00
D. Jumlah ( A + B + C ) 1,095,145.52
E. Overhead & Profit 15 % x D 164,271.83
F. Harga Satuan Pekerjaan ( D + E ) 1,259,417.35
A.4.1.1.12. Membuat 1 m3 beton mutu f'c = 31,2 Mpa (K 350), Slump (12±2) cm, w/c = 0,48
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.105 95,000.00 9,975.00
Jumlah Biaya Untuk Upah 189,875.00
B. BAHAN
Semen Portland kg 448.000 1,280.00 573,440.00
Pasir Beton kg 667.000 107.14 71,464.29
Kerikil (Maks 30mm) kg 1,000.000 259.26 259,259.26
Air Ltr 215.000 50.00 10,750.00
D. Jumlah ( A + B + C ) 1,104,788.55
E. Overhead & Profit 15 % x D 165,718.28
F. Harga Satuan Pekerjaan ( D + E ) 1,270,506.83
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.100 70,000.00 147,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.105 95,000.00 9,975.00
D. Jumlah ( A + B + C ) 702,133.84
E. Overhead & Profit 15 % x D 105,320.08
F. Harga Satuan Pekerjaan ( D + E ) 807,453.92
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Batu/Pipa L.02 OH 0.030 85,000.00 2,550.00
Kepala Tukang L.03 OH 0.003 90,000.00 270.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 7,305.00
E. Overhead & Profit 15 % x D 1,095.75
F. Harga Satuan Pekerjaan ( D + E ) 8,400.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang Batu/Pipa L.02 OH 0.035 85,000.00 2,975.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 8,900.00
E. Overhead & Profit 15 % x D 1,335.00
F. Harga Satuan Pekerjaan ( D + E ) 10,235.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang Batu/Pipa L.02 OH 0.040 85,000.00 3,400.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 9,740.00
E. Overhead & Profit 15 % x D 1,461.00
F. Harga Satuan Pekerjaan ( D + E ) 11,201.00
A.4.1.1.17. Pembesian 10kg dengan besi polos atau besi ulir
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang Besi L.02 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.03 OH 0.007 90,000.00 630.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 165,760.00
E. Overhead & Profit 15 % x D 24,864.00
F. Harga Satuan Pekerjaan ( D + E ) 19,062.40
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang Besi L.02 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.03 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 158,635.00
E. Overhead & Profit 15 % x D 23,795.25
F. Harga Satuan Pekerjaan ( D + E ) 182,430.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.00
Tukang Besi L.02 OH 0.025 85,000.00 2,125.00
Kepala Tukang L.03 OH 0.025 90,000.00 2,250.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 7,470.00
E. Overhead & Profit 15 % x D 1,120.50
F. Harga Satuan Pekerjaan ( D + E ) 8,590.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.520 70,000.00 36,400.00
Tukang Kayu L.02 OH 0.260 85,000.00 22,100.00
Kepala Tukang L.03 OH 0.026 90,000.00 2,340.00
Mandor L.04 OH 0.026 95,000.00 2,470.00
D. Jumlah ( A + B + C ) 125,810.00
E. Overhead & Profit 15 % x D 18,871.50
F. Harga Satuan Pekerjaan ( D + E ) 144,681.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.520 70,000.00 36,400.00
Tukang Kayu L.02 OH 0.260 85,000.00 22,100.00
Kepala Tukang L.03 OH 0.026 90,000.00 2,340.00
Mandor L.04 OH 0.026 95,000.00 2,470.00
D. Jumlah ( A + B + C ) 132,810.00
E. Overhead & Profit 15 % x D 19,921.50
F. Harga Satuan Pekerjaan ( D + E ) 152,731.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang Kayu L.02 OH 0.330 85,000.00 28,050.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 261,292.50
E. Overhead & Profit 15 % x D 39,193.88
F. Harga Satuan Pekerjaan ( D + E ) 300,486.38
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang Kayu L.02 OH 0.330 85,000.00 28,050.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 269,692.50
E. Overhead & Profit 15 % x D 40,453.88
F. Harga Satuan Pekerjaan ( D + E ) 310,146.38
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang Kayu L.02 OH 0.330 85,000.00 28,050.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 301,292.50
E. Overhead & Profit 15 % x D 45,193.88
F. Harga Satuan Pekerjaan ( D + E ) 346,486.38
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang Kayu L.02 OH 0.330 85,000.00 28,050.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 271,292.50
E. Overhead & Profit 15 % x D 40,693.88
F. Harga Satuan Pekerjaan ( D + E ) 311,986.38
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.660 70,000.00 46,200.00
Tukang Kayu L.02 OH 0.330 85,000.00 28,050.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 246,292.50
E. Overhead & Profit 15 % x D 36,943.88
F. Harga Satuan Pekerjaan ( D + E ) 283,236.38
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.02 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.03 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 103,880.00
E. Overhead & Profit 15 % x D 15,582.00
F. Harga Satuan Pekerjaan ( D + E ) 119,462.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.300 70,000.00 371,000.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.300 85,000.00 110,500.00
Tukang Besi L.02 OH 1.050 85,000.00 89,250.00
Kepala Tukang L.03 OH 0.262 90,000.00 23,580.00
Mandor L.04 OH 0.265 95,000.00 25,175.00
D. Jumlah ( A + B + C ) 4,213,960.00
E. Overhead & Profit 15 % x D 632,094.00
F. Harga Satuan Pekerjaan ( D + E ) 4,846,054.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.650 70,000.00 395,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.560 85,000.00 132,600.00
Tukang Besi L.02 OH 1.400 85,000.00 119,000.00
Kepala Tukang L.03 OH 0.323 90,000.00 29,070.00
Mandor L.04 OH 0.323 95,000.00 30,685.00
D. Jumlah ( A + B + C ) 5,232,810.00
E. Overhead & Profit 15 % x D 784,921.50
F. Harga Satuan Pekerjaan ( D + E ) 6,017,731.50
D. Jumlah ( A + B + C ) 8,441,385.00
E. Overhead & Profit 15 % x D 1,266,207.75
F. Harga Satuan Pekerjaan ( D + E ) 9,707,592.75
A.4.1.1.31. Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.350 70,000.00 444,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.650 85,000.00 140,250.00
Tukang Besi L.02 OH 1.400 85,000.00 119,000.00
Kepala Tukang L.03 OH 0.333 90,000.00 29,970.00
Mandor L.04 OH 0.318 95,000.00 30,210.00
D. Jumlah ( A + B + C ) 6,373,385.00
E. Overhead & Profit 15 % x D 956,007.75
F. Harga Satuan Pekerjaan ( D + E ) 7,329,392.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.300 70,000.00 371,000.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.300 85,000.00 110,500.00
Tukang Besi L.02 OH 1.050 85,000.00 89,250.00
Kepala Tukang L.03 OH 0.265 90,000.00 23,850.00
Mandor L.04 OH 0.265 95,000.00 25,175.00
D. Jumlah ( A + B + C ) 5,511,230.00
E. Overhead & Profit 15 % x D 826,684.50
F. Harga Satuan Pekerjaan ( D + E ) 6,337,914.50
D. Jumlah ( A + B + C ) 5,431,230.00
E. Overhead & Profit 15 % x D 814,684.50
F. Harga Satuan Pekerjaan ( D + E ) 6,245,914.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.650 70,000.00 395,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.560 85,000.00 132,600.00
Tukang Besi L.02 OH 1.400 85,000.00 119,000.00
Kepala Tukang L.03 OH 0.323 90,000.00 29,070.00
Mandor L.04 OH 0.283 95,000.00 26,885.00
D. Jumlah ( A + B + C ) 6,040,135.00
E. Overhead & Profit 15 % x D 906,020.25
F. Harga Satuan Pekerjaan ( D + E ) 6,946,155.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.180 70,000.00 12,600.00
Tukang Batu L.02 OH 0.020 85,000.00 1,700.00
Tukang Kayu L.02 OH 0.020 85,000.00 1,700.00
Tukang Besi L.02 OH 0.020 85,000.00 1,700.00
Kepala Tukang L.03 OH 0.006 90,000.00 540.00
Mandor L.04 OH 0.009 95,000.00 855.00
D. Jumlah ( A + B + C ) 108,365.00
E. Overhead & Profit 15 % x D 16,254.75
F. Harga Satuan Pekerjaan ( D + E ) 124,619.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.297 70,000.00 20,790.00
Tukang Batu L.02 OH 0.033 85,000.00 2,805.00
Tukang Kayu L.02 OH 0.033 85,000.00 2,805.00
Tukang Besi L.02 OH 0.033 85,000.00 2,805.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 126,000.00
E. Overhead & Profit 15 % x D 18,900.00
F. Harga Satuan Pekerjaan ( D + E ) 144,900.00
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.132 70,000.00 9,240.00
Tukang Batu L.02 OH 0.022 85,000.00 1,870.00
Kepala Tukang L.03 OH 0.002 90,000.00 180.00
Mandor L.04 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 84,129.40
E. Overhead & Profit 15 % x D 12,619.41
F. Harga Satuan Pekerjaan ( D + E ) 96,748.81
A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.165 70,000.00 11,550.00
Tukang Batu L.02 OH 0.028 85,000.00 2,380.00
Kepala Tukang L.03 OH 0.003 90,000.00 270.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 105,178.00
E. Overhead & Profit 15 % x D 15,776.70
F. Harga Satuan Pekerjaan ( D + E ) 120,954.70
A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.198 70,000.00 13,860.00
Tukang Batu L.02 OH 0.033 85,000.00 2,805.00
Kepala Tukang L.03 OH 0.003 90,000.00 270.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 117,186.60
E. Overhead & Profit 15 % x D 17,577.99
F. Harga Satuan Pekerjaan ( D + E ) 134,764.59
A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c 14,5 Mpa (K 175) slump (12 +- 2) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.248 70,000.00 17,360.00
Tukang Batu L.02 OH 0.041 85,000.00 3,485.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 157,767.00
E. Overhead & Profit 15 % x D 23,665.05
F. Harga Satuan Pekerjaan ( D + E ) 181,432.05
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.007 70,000.00 490.00
Tukang Batu L.02 OH 0.076 85,000.00 6,460.00
Kepala Tukang L.03 OH 0.008 90,000.00 720.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 1,710,085.00
E. Overhead & Profit 15 % x D 256,512.75
F. Harga Satuan Pekerjaan ( D + E ) 1,966,597.75
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.004 70,000.00 280.00
Tukang Batu L.02 OH 0.038 85,000.00 3,230.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 18,965.00
E. Overhead & Profit 15 % x D 2,844.75
F. Harga Satuan Pekerjaan ( D + E ) 21,809.75
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.004 70,000.00 280.00
Tukang Batu L.02 OH 0.038 85,000.00 3,230.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 17,455.00
E. Overhead & Profit 15 % x D 2,618.25
F. Harga Satuan Pekerjaan ( D + E ) 20,073.25
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.053 70,000.00 3,710.00
Tukang Kayu L.02 OH 0.180 85,000.00 15,300.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 19,485.00
E. Overhead & Profit 15 % x D 2,922.75
F. Harga Satuan Pekerjaan ( D + E ) 22,407.75
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.089 70,000.00 6,230.00
Tukang Kayu L.02 OH 0.030 85,000.00 2,550.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 9,255.00
E. Overhead & Profit 15 % x D 1,388.25
F. Harga Satuan Pekerjaan ( D + E ) 10,643.25
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.071 70,000.00 4,970.00
Tukang Kayu L.02 OH 0.024 85,000.00 2,040.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 7,485.00
E. Overhead & Profit 15 % x D 1,122.75
F. Harga Satuan Pekerjaan ( D + E ) 8,607.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.064 70,000.00 4,480.00
Tukang Batu L.02 OH 0.244 85,000.00 20,740.00
Tukang Vibrator L.02 OH 0.128 85,000.00 10,880.00
Kepala Tukang L.03 OH 0.034 90,000.00 3,060.00
Mandor L.04 OH 0.073 95,000.00 6,935.00
D. Jumlah ( A + B + C ) 46,095.00
E. Overhead & Profit 15 % x D 6,914.25
F. Harga Satuan Pekerjaan ( D + E ) 53,009.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.069 70,000.00 4,830.00
Tukang Batu L.02 OH 0.242 85,000.00 20,570.00
Tukang Vibrator L.02 OH 0.138 85,000.00 11,730.00
Kepala Tukang L.03 OH 0.037 90,000.00 3,330.00
Mandor L.04 OH 0.073 95,000.00 6,935.00
D. Jumlah ( A + B + C ) 47,395.00
E. Overhead & Profit 15 % x D 7,109.25
F. Harga Satuan Pekerjaan ( D + E ) 54,504.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.061 70,000.00 4,270.00
Tukang Batu L.02 OH 0.213 85,000.00 18,105.00
Tukang Vibrator L.02 OH 0.122 85,000.00 10,370.00
Kepala Tukang L.03 OH 0.033 90,000.00 2,970.00
Mandor L.04 OH 0.073 95,000.00 6,935.00
D. Jumlah ( A + B + C ) 42,650.00
E. Overhead & Profit 15 % x D 6,397.50
F. Harga Satuan Pekerjaan ( D + E ) 49,047.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.067 70,000.00 4,690.00
Tukang Batu L.02 OH 0.067 85,000.00 5,695.00
Tukang Erection L.02 OH 0.134 85,000.00 11,390.00
Kepala Tukang L.03 OH 0.067 90,000.00 6,030.00
Mandor L.04 OH 0.067 95,000.00 6,365.00
D. Jumlah ( A + B + C ) 92,251.20
E. Overhead & Profit 15 % x D 13,837.68
F. Harga Satuan Pekerjaan ( D + E ) 106,088.88
A.4.1.2.15. Mendirikan 1 buah komponen balok pracetak
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.061 70,000.00 4,270.00
Tukang Batu L.02 OH 0.061 85,000.00 5,185.00
Tukang Erection L.02 OH 0.122 85,000.00 10,370.00
Operator Crane OH 0.061 90,000.00 5,490.00
Pembantu Operator Crane OH 0.061 80,000.00 4,880.00
Kepala Tukang L.03 OH 0.061 90,000.00 5,490.00
Mandor L.04 OH 0.061 95,000.00 5,795.00
D. Jumlah ( A + B + C ) 94,637.00
E. Overhead & Profit 15 % x D 14,195.55
F. Harga Satuan Pekerjaan ( D + E ) 108,832.55
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.083 70,000.00 5,810.00
Tukang Batu L.02 OH 0.083 85,000.00 7,055.00
Tukang Erection L.02 OH 0.166 85,000.00 14,110.00
Operator Crane OH 0.083 90,000.00 7,470.00
Pembantu Operator Crane OH 0.083 80,000.00 6,640.00
Kepala Tukang L.03 OH 0.083 90,000.00 7,470.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 128,449.90
E. Overhead & Profit 15 % x D 19,267.49
F. Harga Satuan Pekerjaan ( D + E ) 147,717.39
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.019 70,000.00 1,330.00
Tukang Batu L.02 OH 0.038 85,000.00 3,230.00
Operator Crane OH 0.019 90,000.00 1,710.00
Pembantu Operator Crane OH 0.019 80,000.00 1,520.00
D. Jumlah ( A + B + C ) 24,293.90
E. Overhead & Profit 15 % x D 3,644.09
F. Harga Satuan Pekerjaan ( D + E ) 27,937.99
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.019 70,000.00 1,330.00
Tukang Batu L.02 OH 0.038 85,000.00 3,230.00
Operator Crane OH 0.019 90,000.00 1,710.00
Pembantu Operator Crane OH 0.019 80,000.00 1,520.00
D. Jumlah ( A + B + C ) 24,293.90
E. Overhead & Profit 15 % x D 3,644.09
F. Harga Satuan Pekerjaan ( D + E ) 27,937.99
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.019 70,000.00 1,330.00
Tukang Batu L.02 OH 0.038 85,000.00 3,230.00
Operator Crane OH 0.019 90,000.00 1,710.00
Pembantu Operator Crane OH 0.019 80,000.00 1,520.00
D. Jumlah ( A + B + C ) 24,293.90
E. Overhead & Profit 15 % x D 3,644.09
F. Harga Satuan Pekerjaan ( D + E ) 27,937.99
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
-
D. Jumlah ( A + B + C ) 17,500.00
E. Overhead & Profit 15 % x D 2,625.00
F. Harga Satuan Pekerjaan ( D + E ) 20,125.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
-
D. Jumlah ( A + B + C ) 20,000.00
E. Overhead & Profit 15 % x D 3,000.00
F. Harga Satuan Pekerjaan ( D + E ) 23,000.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Batu L.02 OH 0.367 85,000.00 31,195.00
Kepala Tukang L.03 OH 0.074 90,000.00 6,660.00
Mandor L.04 OH 0.037 95,000.00 3,515.00
D. Jumlah ( A + B + C ) 41,370.00
E. Overhead & Profit 15 % x D 6,205.50
F. Harga Satuan Pekerjaan ( D + E ) 47,575.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.147 70,000.00 10,290.00
Tukang Kayu L.02 OH 0.147 85,000.00 12,495.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.005 95,000.00 475.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.220 70,000.00 15,400.00
Tukang Kayu L.02 OH 0.220 85,000.00 18,700.00
Kepala Tukang L.03 OH 0.220 90,000.00 19,800.00
Mandor L.04 OH 0.011 95,000.00 1,045.00
D. Jumlah ( A + B + C ) 54,945.00
E. Overhead & Profit 15 % x D 8,241.75
F. Harga Satuan Pekerjaan ( D + E ) 63,186.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Las Konstruksi L.03 OH 0.060 85,000.00 5,100.00
Kepala Tukang L.03 OH 0.006 90,000.00 540.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 27,720.00
E. Overhead & Profit 15 % x D 4,158.00
F. Harga Satuan Pekerjaan ( D + E ) 31,878.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Las Konstruksi L.03 OH 0.060 85,000.00 5,100.00
Kepala Tukang L.03 OH 0.006 90,000.00 540.00
Mandor L.04 OH 0.003 95,000.00 285.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Besi Konstruksi L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.001 90,000.00 90.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 29,265.00
E. Overhead & Profit 15 % x D 4,389.75
F. Harga Satuan Pekerjaan ( D + E ) 33,654.75
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.00
Tukang Las Biasa L.03 OH 1.050 85,000.00 89,250.00
Kepala Tukang L.03 OH 0.105 90,000.00 9,450.00
Mandor L.04 OH 0.052 95,000.00 4,940.00
D. Jumlah ( A + B + C ) 937,440.00
E. Overhead & Profit 15 % x D 140,616.00
F. Harga Satuan Pekerjaan ( D + E ) 1,078,056.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang Besi Konstruksi L.03 OH 0.020 85,000.00 1,700.00
Kepala Tukang L.03 OH 0.002 90,000.00 180.00
Mandor L.04 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 69,280.00
E. Overhead & Profit 15 % x D 10,392.00
F. Harga Satuan Pekerjaan ( D + E ) 79,672.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.650 70,000.00 45,500.00
Tukang Las Biasa L.03 OH 0.650 85,000.00 55,250.00
Kepala Tukang L.03 OH 0.065 90,000.00 5,850.00
Mandor L.04 OH 0.320 95,000.00 30,400.00
D. Jumlah ( A + B + C ) 137,000.00
E. Overhead & Profit 15 % x D 20,550.00
F. Harga Satuan Pekerjaan ( D + E ) 157,550.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang Las Biasa L.03 OH 1.200 85,000.00 102,000.00
Kepala Tukang L.03 OH 0.120 90,000.00 10,800.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 197,370.00
E. Overhead & Profit 15 % x D 29,605.50
F. Harga Satuan Pekerjaan ( D + E ) 226,975.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.440 70,000.00 30,800.00
Tukang L.03 OH 0.440 85,000.00 37,400.00
Kepala Tukang L.03 OH 0.044 90,000.00 3,960.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 74,250.00
E. Overhead & Profit 15 % x D 11,137.50
F. Harga Satuan Pekerjaan ( D + E ) 85,387.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang L.03 OH 8.000 85,000.00 680,000.00
Kepala Tukang L.03 OH 0.080 90,000.00 7,200.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 693,180.00
E. Overhead & Profit 15 % x D 103,977.00
F. Harga Satuan Pekerjaan ( D + E ) 797,157.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Khusus Allumunium L.03 OH 1.000 85,000.00 85,000.00
Kepala Tukang L.03 OH 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 718,750.00
E. Overhead & Profit 15 % x D 107,812.50
F. Harga Satuan Pekerjaan ( D + E ) 826,562.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.043 70,000.00 3,010.00
Tukang Khusus Allumunium L.03 OH 0.043 85,000.00 3,655.00
Kepala Tukang L.03 OH 0.0043 90,000.00 387.00
Mandor L.04 OH 0.0021 95,000.00 199.50
D. Jumlah ( A + B + C ) 85,141.50
E. Overhead & Profit 15 % x D 12,771.23
F. Harga Satuan Pekerjaan ( D + E ) 97,912.73
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.00
Tukang Khusus Allumunium L.03 OH 0.085 85,000.00 7,225.00
Kepala Tukang L.03 OH 0.0085 90,000.00 765.00
Mandor L.04 OH 0.0042 95,000.00 399.00
D. Jumlah ( A + B + C ) 1,067,039.00
E. Overhead & Profit 15 % x D 160,055.85
F. Harga Satuan Pekerjaan ( D + E ) 1,227,094.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.00
Tukang Allumunium/Kaca L.03 OH 0.085 85,000.00 7,225.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 352,965.00
E. Overhead & Profit 15 % x D 52,944.75
F. Harga Satuan Pekerjaan ( D + E ) 405,909.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang L.03 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 59,110.00
E. Overhead & Profit 15 % x D 8,866.50
F. Harga Satuan Pekerjaan ( D + E ) 67,976.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.670 70,000.00 116,900.00
Tukang Las L.03 OH 1.670 85,000.00 141,950.00
Kepala Tukang L.03 OH 0.167 90,000.00 15,030.00
Mandor L.04 OH 0.083 95,000.00 7,885.00
D. Jumlah ( A + B + C ) 380,597.00
E. Overhead & Profit 15 % x D 57,089.55
F. Harga Satuan Pekerjaan ( D + E ) 437,686.55
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 36,840.00
E. Overhead & Profit 15 % x D 5,526.00
F. Harga Satuan Pekerjaan ( D + E ) 42,366.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 153,750.00
E. Overhead & Profit 15 % x D 23,062.50
F. Harga Satuan Pekerjaan ( D + E ) 176,812.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 125,170.00
E. Overhead & Profit 15 % x D 18,775.50
F. Harga Satuan Pekerjaan ( D + E ) 143,945.50
A.4.2.1.19. Pemasangan 1 m talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang L.03 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.03 OH 0.030 90,000.00 2,700.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 86,460.00
E. Overhead & Profit 15 % x D 12,969.00
F. Harga Satuan Pekerjaan ( D + E ) 99,429.00
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x120 cm, dinding partisi
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Besi L.03 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.03 OH 0.025 90,000.00 2,250.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 42,235.00
E. Overhead & Profit 15 % x D 6,335.25
F. Harga Satuan Pekerjaan ( D + E ) 48,570.25
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60x60 cm, plafon
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Besi L.03 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 59,110.00
E. Overhead & Profit 15 % x D 8,866.50
F. Harga Satuan Pekerjaan ( D + E ) 67,976.50
A.4.4.1.1. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:2PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 197,830.00
E. Overhead & Profit 15 % x D 29,674.50
F. Harga Satuan Pekerjaan ( D + E ) 227,504.50
A.4.4.1.2. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 185,976.00
E. Overhead & Profit 15 % x D 27,896.40
F. Harga Satuan Pekerjaan ( D + E ) 213,872.40
A.4.4.1.3. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:4PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 178,084.00
E. Overhead & Profit 15 % x D 26,712.60
F. Harga Satuan Pekerjaan ( D + E ) 204,796.60
A.4.4.1.4. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:5PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 173,866.00
E. Overhead & Profit 15 % x D 26,079.90
F. Harga Satuan Pekerjaan ( D + E ) 199,945.90
A.4.4.1.5. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:6PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 172,130.00
E. Overhead & Profit 15 % x D 25,819.50
F. Harga Satuan Pekerjaan ( D + E ) 197,949.50
A.4.4.1.6. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP:3KP:10PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Batu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 156,927.40
E. Overhead & Profit 15 % x D 23,539.11
F. Harga Satuan Pekerjaan ( D + E ) 180,466.51
A.4.4.1.7. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:2PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 95,031.00
E. Overhead & Profit 15 % x D 14,254.65
F. Harga Satuan Pekerjaan ( D + E ) 109,285.65
A.4.4.1.8. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 89,468.60
E. Overhead & Profit 15 % x D 13,420.29
F. Harga Satuan Pekerjaan ( D + E ) 102,888.89
A.4.4.1.9. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:4PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 86,245.00
E. Overhead & Profit 15 % x D 12,936.75
F. Harga Satuan Pekerjaan ( D + E ) 99,181.75
A.4.4.1.10. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:5PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 84,215.40
E. Overhead & Profit 15 % x D 12,632.31
F. Harga Satuan Pekerjaan ( D + E ) 96,847.71
A.4.4.1.11. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:6PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 83,074.60
E. Overhead & Profit 15 % x D 12,461.19
F. Harga Satuan Pekerjaan ( D + E ) 95,535.79
A.4.4.1.12. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:8PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 80,895.00
E. Overhead & Profit 15 % x D 12,134.25
F. Harga Satuan Pekerjaan ( D + E ) 93,029.25
A.4.4.1.13. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SP:3KP:10PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 78,335.00
E. Overhead & Profit 15 % x D 11,750.25
F. Harga Satuan Pekerjaan ( D + E ) 90,085.25
A.4.4.1.14. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM:1KP:1PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 67,810.10
E. Overhead & Profit 15 % x D 10,171.52
F. Harga Satuan Pekerjaan ( D + E ) 77,981.62
A.4.4.1.15. Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1SM:1KP:2PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 69,302.30
E. Overhead & Profit 15 % x D 10,395.35
F. Harga Satuan Pekerjaan ( D + E ) 79,697.65
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Batu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 192,323.60
E. Overhead & Profit 15 % x D 28,848.54
F. Harga Satuan Pekerjaan ( D + E ) 221,172.14
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Batu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 191,166.80
E. Overhead & Profit 15 % x D 28,675.02
F. Harga Satuan Pekerjaan ( D + E ) 219,841.82
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.320 70,000.00 22,400.00
Tukang Batu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.016 95,000.00 1,520.00
D. Jumlah ( A + B + C ) 150,811.20
E. Overhead & Profit 15 % x D 22,621.68
F. Harga Satuan Pekerjaan ( D + E ) 173,432.88
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.320 70,000.00 22,400.00
Tukang Batu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.016 95,000.00 1,520.00
D. Jumlah ( A + B + C ) 149,800.00
E. Overhead & Profit 15 % x D 22,470.00
F. Harga Satuan Pekerjaan ( D + E ) 172,270.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 109,833.80
E. Overhead & Profit 15 % x D 16,475.07
F. Harga Satuan Pekerjaan ( D + E ) 126,308.87
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 109,555.40
E. Overhead & Profit 15 % x D 16,433.31
F. Harga Satuan Pekerjaan ( D + E ) 125,988.71
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 51,155.00
E. Overhead & Profit 15 % x D 7,673.25
F. Harga Satuan Pekerjaan ( D + E ) 58,828.25
A.4.4.1.23. Pemasangan 1 m2 dinding terawang (rooster) 12x11x24 campuran 1SP:4PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 51,155.00
E. Overhead & Profit 15 % x D 7,673.25
F. Harga Satuan Pekerjaan ( D + E ) 58,828.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 59,245.00
E. Overhead & Profit 15 % x D 8,886.75
F. Harga Satuan Pekerjaan ( D + E ) 68,131.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 58,770.12
E. Overhead & Profit 15 % x D 8,815.52
F. Harga Satuan Pekerjaan ( D + E ) 67,585.64
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 52,611.72
E. Overhead & Profit 15 % x D 7,891.76
F. Harga Satuan Pekerjaan ( D + E ) 60,503.48
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 49,928.28
E. Overhead & Profit 15 % x D 7,489.24
F. Harga Satuan Pekerjaan ( D + E ) 57,417.52
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 48,112.20
E. Overhead & Profit 15 % x D 7,216.83
F. Harga Satuan Pekerjaan ( D + E ) 55,329.03
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 43,160.52
E. Overhead & Profit 15 % x D 6,474.08
F. Harga Satuan Pekerjaan ( D + E ) 49,634.60
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 46,227.48
E. Overhead & Profit 15 % x D 6,934.12
F. Harga Satuan Pekerjaan ( D + E ) 53,161.60
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 45,763.08
E. Overhead & Profit 15 % x D 6,864.46
F. Harga Satuan Pekerjaan ( D + E ) 52,627.54
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 45,298.68
E. Overhead & Profit 15 % x D 6,794.80
F. Harga Satuan Pekerjaan ( D + E ) 52,093.48
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 70,000.00 25,200.00
Tukang Batu L.03 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 47,512.80
E. Overhead & Profit 15 % x D 7,126.92
F. Harga Satuan Pekerjaan ( D + E ) 54,639.72
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 70,000.00 25,200.00
Tukang Batu L.03 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 45,030.00
E. Overhead & Profit 15 % x D 6,754.50
F. Harga Satuan Pekerjaan ( D + E ) 51,784.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 70,000.00 25,200.00
Tukang Batu L.03 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 39,557.55
E. Overhead & Profit 15 % x D 5,933.63
F. Harga Satuan Pekerjaan ( D + E ) 45,491.18
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 70,000.00 25,200.00
Tukang Batu L.03 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 40,453.65
E. Overhead & Profit 15 % x D 6,068.05
F. Harga Satuan Pekerjaan ( D + E ) 46,521.70
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Batu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 70,388.96
E. Overhead & Profit 15 % x D 10,558.34
F. Harga Satuan Pekerjaan ( D + E ) 80,947.30
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 56,156.04
E. Overhead & Profit 15 % x D 8,423.41
F. Harga Satuan Pekerjaan ( D + E ) 64,579.45
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Batu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 64,339.60
E. Overhead & Profit 15 % x D 9,650.94
F. Harga Satuan Pekerjaan ( D + E ) 73,990.54
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Batu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 62,987.36
E. Overhead & Profit 15 % x D 9,448.10
F. Harga Satuan Pekerjaan ( D + E ) 72,435.46
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Batu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 61,826.64
E. Overhead & Profit 15 % x D 9,274.00
F. Harga Satuan Pekerjaan ( D + E ) 71,100.64
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Batu L.03 OH 0.220 85,000.00 18,700.00
Kepala Tukang L.03 OH 0.022 90,000.00 1,980.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 53,487.55
E. Overhead & Profit 15 % x D 8,023.13
F. Harga Satuan Pekerjaan ( D + E ) 61,510.68
D. Jumlah ( A + B + C ) 28,890.52
E. Overhead & Profit 15 % x D 4,333.58
F. Harga Satuan Pekerjaan ( D + E ) 33,224.10
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang Batu L.03 OH 0.400 85,000.00 34,000.00
Kepala Tukang L.03 OH 0.040 90,000.00 3,600.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 46,170.00
E. Overhead & Profit 15 % x D 6,925.50
F. Harga Satuan Pekerjaan ( D + E ) 53,095.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.450 70,000.00 31,500.00
Tukang Batu L.03 OH 0.225 85,000.00 19,125.00
Kepala Tukang L.03 OH 0.023 90,000.00 2,070.00
Mandor L.04 OH 0.023 95,000.00 2,185.00
D. Jumlah ( A + B + C ) 1,320,180.00
E. Overhead & Profit 15 % x D 198,027.00
F. Harga Satuan Pekerjaan ( D + E ) 1,518,207.00
A.4.4.2.22. Pemasangan 1 m2 plesteran traso 1SP : 2 traso tebal 1 cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.450 70,000.00 31,500.00
Tukang Batu L.03 OH 0.225 85,000.00 19,125.00
Kepala Tukang L.03 OH 0.023 90,000.00 2,070.00
Mandor L.04 OH 0.023 95,000.00 2,185.00
D. Jumlah ( A + B + C ) 67,680.00
E. Overhead & Profit 15 % x D 10,152.00
F. Harga Satuan Pekerjaan ( D + E ) 77,832.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 38,254.60
E. Overhead & Profit 15 % x D 5,738.19
F. Harga Satuan Pekerjaan ( D + E ) 43,992.79
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Batu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.03 OH 0.008 90,000.00 720.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 22,333.24
E. Overhead & Profit 15 % x D 3,349.99
F. Harga Satuan Pekerjaan ( D + E ) 25,683.23
A.4.4.2.25. Pemasangan 1 m2 finishing siar pasangan conblock ekspose
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang Batu L.03 OH 0.035 85,000.00 2,975.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 10,663.00
E. Overhead & Profit 15 % x D 1,599.45
F. Harga Satuan Pekerjaan ( D + E ) 12,262.45
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 46,440.20
E. Overhead & Profit 15 % x D 6,966.03
F. Harga Satuan Pekerjaan ( D + E ) 53,406.23
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Batu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 28,510.00
E. Overhead & Profit 15 % x D 4,276.50
F. Harga Satuan Pekerjaan ( D + E ) 32,786.50
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 49,824.00
E. Overhead & Profit 15 % x D 7,473.60
F. Harga Satuan Pekerjaan ( D + E ) 57,297.60
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 50,080.00
E. Overhead & Profit 15 % x D 7,512.00
F. Harga Satuan Pekerjaan ( D + E ) 57,592.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.270 70,000.00 18,900.00
Tukang Batu L.02 OH 0.135 85,000.00 11,475.00
Kepala Tukang L.03 OH 0.014 90,000.00 1,260.00
Mandor L.04 OH 0.014 95,000.00 1,330.00
D. Jumlah ( A + B + C ) 53,027.00
E. Overhead & Profit 15 % x D 7,954.05
F. Harga Satuan Pekerjaan ( D + E ) 60,981.05
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 52,359.00
E. Overhead & Profit 15 % x D 7,853.85
F. Harga Satuan Pekerjaan ( D + E ) 60,212.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.02 OH 0.130 85,000.00 11,050.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 54,130.00
E. Overhead & Profit 15 % x D 8,119.50
F. Harga Satuan Pekerjaan ( D + E ) 62,249.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.270 70,000.00 18,900.00
Tukang Batu L.02 OH 0.135 85,000.00 11,475.00
Kepala Tukang L.03 OH 0.014 90,000.00 1,260.00
Mandor L.04 OH 0.014 95,000.00 1,330.00
D. Jumlah ( A + B + C ) 56,186.00
E. Overhead & Profit 15 % x D 8,427.90
F. Harga Satuan Pekerjaan ( D + E ) 64,613.90
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 52,359.00
E. Overhead & Profit 15 % x D 7,853.85
F. Harga Satuan Pekerjaan ( D + E ) 60,212.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.02 OH 0.130 85,000.00 11,050.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 54,130.00
E. Overhead & Profit 15 % x D 8,119.50
F. Harga Satuan Pekerjaan ( D + E ) 62,249.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 463,419.00
E. Overhead & Profit 15 % x D 69,512.85
F. Harga Satuan Pekerjaan ( D + E ) 532,931.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.02 OH 0.130 85,000.00 11,050.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 790,070.00
E. Overhead & Profit 15 % x D 118,510.50
F. Harga Satuan Pekerjaan ( D + E ) 908,580.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 52,359.00
E. Overhead & Profit 15 % x D 7,853.85
F. Harga Satuan Pekerjaan ( D + E ) 60,212.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.02 OH 0.130 85,000.00 11,050.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 54,130.00
E. Overhead & Profit 15 % x D 8,119.50
F. Harga Satuan Pekerjaan ( D + E ) 62,249.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.240 70,000.00 16,800.00
Tukang Batu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.012 95,000.00 1,140.00
D. Jumlah ( A + B + C ) 51,183.00
E. Overhead & Profit 15 % x D 7,677.45
F. Harga Satuan Pekerjaan ( D + E ) 58,860.45
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Batu L.02 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 52,359.00
E. Overhead & Profit 15 % x D 7,853.85
F. Harga Satuan Pekerjaan ( D + E ) 60,212.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.260 70,000.00 18,200.00
Tukang Batu L.02 OH 0.130 85,000.00 11,050.00
Kepala Tukang L.03 OH 0.013 90,000.00 1,170.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 54,130.00
E. Overhead & Profit 15 % x D 8,119.50
F. Harga Satuan Pekerjaan ( D + E ) 62,249.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,947.00
E. Overhead & Profit 15 % x D 2,692.05
F. Harga Satuan Pekerjaan ( D + E ) 20,639.05
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
Jumlah Biaya Untuk Upah 15,235.00
B. BAHAN
Plint Ubin PC bh 3.530 - -
Semen Portland kg 1.240 1,280.00 1,587.20
Pasir Pasang m3 0.003 150,000.00 450.00
D. Jumlah ( A + B + C ) 17,272.20
E. Overhead & Profit 15 % x D 2,590.83
F. Harga Satuan Pekerjaan ( D + E ) 19,863.03
A.4.4.3.18. Pemasangan 1 m' plint ubin PC Abu-abu ukuran 10cm x 40cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,272.20
E. Overhead & Profit 15 % x D 2,590.83
F. Harga Satuan Pekerjaan ( D + E ) 19,863.03
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 57,619.20
E. Overhead & Profit 15 % x D 8,642.88
F. Harga Satuan Pekerjaan ( D + E ) 66,262.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 70,995.20
E. Overhead & Profit 15 % x D 10,649.28
F. Harga Satuan Pekerjaan ( D + E ) 81,644.48
A.4.4.3.26. Pemasangan 1 m' plint ubin Teralux kerang ukuran 10cm x 40cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
A.4.4.3.27. Pemasangan 1 m' plint ubin Teralux kerang ukuran 10cm x 30cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
A.4.4.3.28. Pemasangan 1 m' plint ubin Teralux marmer ukuran 10cm x 60cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
A.4.4.3.29. Pemasangan 1 m' plint ubin Teralux marmer ukuran 10cm x 40cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
A.4.4.3.30. Pemasangan 1 m' plint ubin Teralux marmer ukuran 10cm x 30cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.009 90,000.00 810.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,339.20
E. Overhead & Profit 15 % x D 2,600.88
F. Harga Satuan Pekerjaan ( D + E ) 19,940.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.360 70,000.00 25,200.00
Tukang Batu L.02 OH 0.180 85,000.00 15,300.00
Kepala Tukang L.03 OH 0.018 90,000.00 1,620.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 44,025.00
E. Overhead & Profit 15 % x D 6,603.75
F. Harga Satuan Pekerjaan ( D + E ) 50,628.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 107,820.70
E. Overhead & Profit 15 % x D 16,173.11
F. Harga Satuan Pekerjaan ( D + E ) 123,993.81
A.4.4.3.33. Pemasangan 1 m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 108,698.20
E. Overhead & Profit 15 % x D 16,304.73
F. Harga Satuan Pekerjaan ( D + E ) 125,002.93
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
Jumlah Biaya Untuk Upah 85,225.00
B. BAHAN
Ubin Keramik Bh 10.000 - -
Semen Portland Kg 8.190 1,280.00 10,483.20
Pasir Pasang m3 0.045 150,000.00 6,750.00
Semen Warna Kg 1.620 1,950.00 3,159.00
D. Jumlah ( A + B + C ) 105,617.20
E. Overhead & Profit 15 % x D 15,842.58
F. Harga Satuan Pekerjaan ( D + E ) 121,459.78
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 107,700.00
E. Overhead & Profit 15 % x D 16,155.00
F. Harga Satuan Pekerjaan ( D + E ) 123,855.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 217,096.00
E. Overhead & Profit 15 % x D 32,564.40
F. Harga Satuan Pekerjaan ( D + E ) 249,660.40
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.050 70,000.00 73,500.00
Tukang Batu L.02 OH 0.525 85,000.00 44,625.00
Kepala Tukang L.03 OH 0.530 90,000.00 47,700.00
Mandor L.04 OH 0.530 95,000.00 50,350.00
D. Jumlah ( A + B + C ) 379,290.50
E. Overhead & Profit 15 % x D 56,893.58
F. Harga Satuan Pekerjaan ( D + E ) 436,184.08
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 162,202.00
E. Overhead & Profit 15 % x D 24,330.30
F. Harga Satuan Pekerjaan ( D + E ) 186,532.30
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.005 95,000.00 475.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 19,581.70
E. Overhead & Profit 15 % x D 2,937.26
F. Harga Satuan Pekerjaan ( D + E ) 22,518.96
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.090 70,000.00 6,300.00
Tukang Batu L.02 OH 0.090 85,000.00 7,650.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 18,554.95
E. Overhead & Profit 15 % x D 2,783.24
F. Harga Satuan Pekerjaan ( D + E ) 21,338.19
A.4.4.3.42. Pemasangan 1 m' plint internal cove artistik 5cm x 5cm x 20cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.750 70,000.00 52,500.00
Tukang Batu L.02 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.03 OH 0.075 90,000.00 6,750.00
Mandor L.04 OH 0.038 95,000.00 3,610.00
D. Jumlah ( A + B + C ) 128,714.20
E. Overhead & Profit 15 % x D 19,307.13
F. Harga Satuan Pekerjaan ( D + E ) 148,021.33
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 103,725.70
E. Overhead & Profit 15 % x D 15,558.86
F. Harga Satuan Pekerjaan ( D + E ) 119,284.56
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.170 70,000.00 11,900.00
Tukang Kayu L.02 OH 0.170 85,000.00 14,450.00
Kepala Tukang L.03 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.009 95,000.00 855.00
D. Jumlah ( A + B + C ) 40,985.00
E. Overhead & Profit 15 % x D 6,147.75
F. Harga Satuan Pekerjaan ( D + E ) 47,132.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Kayu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 32,500.00
E. Overhead & Profit 15 % x D 4,875.00
F. Harga Satuan Pekerjaan ( D + E ) 37,375.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Kayu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 106,225.00
E. Overhead & Profit 15 % x D 15,933.75
F. Harga Satuan Pekerjaan ( D + E ) 122,158.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Kayu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 95,125.00
E. Overhead & Profit 15 % x D 14,268.75
F. Harga Satuan Pekerjaan ( D + E ) 109,393.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Batu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 139,279.00
E. Overhead & Profit 15 % x D 20,891.85
F. Harga Satuan Pekerjaan ( D + E ) 160,170.85
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 129,541.50
E. Overhead & Profit 15 % x D 19,431.23
F. Harga Satuan Pekerjaan ( D + E ) 148,972.73
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 127,962.00
E. Overhead & Profit 15 % x D 19,194.30
F. Harga Satuan Pekerjaan ( D + E ) 147,156.30
A.4.4.3.51. Pemasangan 1 m2 dinding keramik artistik 10cm x 20cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 129,541.50
E. Overhead & Profit 15 % x D 19,431.23
F. Harga Satuan Pekerjaan ( D + E ) 148,972.73
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 129,834.00
E. Overhead & Profit 15 % x D 19,475.10
F. Harga Satuan Pekerjaan ( D + E ) 149,309.10
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 129,541.50
E. Overhead & Profit 15 % x D 19,431.23
F. Harga Satuan Pekerjaan ( D + E ) 148,972.73
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.900 70,000.00 63,000.00
Tukang Batu L.02 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 195,700.00
E. Overhead & Profit 15 % x D 29,355.00
F. Harga Satuan Pekerjaan ( D + E ) 225,055.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.300 70,000.00 91,000.00
Tukang Batu L.02 OH 0.650 85,000.00 55,250.00
Kepala Tukang L.03 OH 0.065 90,000.00 5,850.00
Mandor L.04 OH 0.065 95,000.00 6,175.00
D. Jumlah ( A + B + C ) 224,665.70
E. Overhead & Profit 15 % x D 33,699.86
F. Harga Satuan Pekerjaan ( D + E ) 258,365.56
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Batu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
Jumlah Biaya Untuk Upah 121,750.00
B. BAHAN
Bata Pelapis Bh 63.000 475.00 29,925.00
Semen Portland Kg 12.440 1,280.00 15,923.20
Pasir Pasang m3 0.025 150,000.00 3,750.00
Semen Warna Kg 2.750 1,950.00 5,362.50
D. Jumlah ( A + B + C ) 151,675.00
E. Overhead & Profit 15 % x D 22,751.25
F. Harga Satuan Pekerjaan ( D + E ) 174,426.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 106,037.50
E. Overhead & Profit 15 % x D 15,905.63
F. Harga Satuan Pekerjaan ( D + E ) 121,943.13
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 105,515.00
E. Overhead & Profit 15 % x D 15,827.25
F. Harga Satuan Pekerjaan ( D + E ) 121,342.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Batu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 25,360.00
E. Overhead & Profit 15 % x D 3,804.00
F. Harga Satuan Pekerjaan ( D + E ) 29,164.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Batu L.02 OH 0.175 85,000.00 14,875.00
Kepala Tukang L.03 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 41,095.00
E. Overhead & Profit 15 % x D 6,164.25
F. Harga Satuan Pekerjaan ( D + E ) 47,259.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Batu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 20,250.00
E. Overhead & Profit 15 % x D 3,037.50
F. Harga Satuan Pekerjaan ( D + E ) 23,287.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang Batu L.02 OH 0.080 85,000.00 6,800.00
Kepala Tukang L.03 OH 0.008 90,000.00 720.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 13,500.00
E. Overhead & Profit 15 % x D 2,025.00
F. Harga Satuan Pekerjaan ( D + E ) 15,525.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Batu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 34,763.75
E. Overhead & Profit 15 % x D 5,214.56
F. Harga Satuan Pekerjaan ( D + E ) 39,978.31
A.4.5.1.1. Pemasangan 1 m2 langit-langit asbes semen, tebal 4mm, 5mm, dan 6mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.00
Tukang Kayu L.02 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.03 OH 0.007 90,000.00 630.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 9,270.00
E. Overhead & Profit 15 % x D 1,390.50
F. Harga Satuan Pekerjaan ( D + E ) 10,660.50
A.4.5.1.2. Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Kayu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 21,300.00
E. Overhead & Profit 15 % x D 3,195.00
F. Harga Satuan Pekerjaan ( D + E ) 24,495.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Kayu L.02 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 21,300.00
E. Overhead & Profit 15 % x D 3,195.00
F. Harga Satuan Pekerjaan ( D + E ) 24,495.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 17,925.00
E. Overhead & Profit 15 % x D 2,688.75
F. Harga Satuan Pekerjaan ( D + E ) 20,613.75
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3mm, 4mm & 6mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 38,880.00
E. Overhead & Profit 15 % x D 5,832.00
F. Harga Satuan Pekerjaan ( D + E ) 44,712.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang Kayu L.02 OH 0.800 85,000.00 68,000.00
Kepala Tukang L.03 OH 0.080 90,000.00 7,200.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
D. Jumlah ( A + B + C ) 135,210.00
E. Overhead & Profit 15 % x D 20,281.50
F. Harga Satuan Pekerjaan ( D + E ) 155,491.50
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.03 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.005 95,000.00 475.00
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm, berikut rangka allumunium
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.500 70,000.00 35,000.00
Tukang Kayu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.025 95,000.00 2,375.00
D. Jumlah ( A + B + C ) 88,125.00
E. Overhead & Profit 15 % x D 13,218.75
F. Harga Satuan Pekerjaan ( D + E ) 101,343.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang Kayu L.02 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.03 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 19,135.00
E. Overhead & Profit 15 % x D 2,870.25
F. Harga Satuan Pekerjaan ( D + E ) 22,005.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.11 OH 0.0075 90,000.00 675.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 67,060.00
E. Overhead & Profit 15 % x D 10,059.00
F. Harga Satuan Pekerjaan ( D + E ) 77,119.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.11 OH 0.008 90,000.00 720.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 55,855.00
E. Overhead & Profit 15 % x D 8,378.25
F. Harga Satuan Pekerjaan ( D + E ) 64,233.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.11 OH 0.008 90,000.00 720.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 48,355.00
E. Overhead & Profit 15 % x D 7,253.25
F. Harga Satuan Pekerjaan ( D + E ) 55,608.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.11 OH 0.020 90,000.00 1,800.00
Mandor L.15 OH 0.002 95,000.00 190.00
Jumlah Biaya Untuk Upah 46,990.00
B. BAHAN
Genteng Bubung Bh 5.000 4,500.00 22,500.00
Semen Portland Kg 8.000 1,280.00 10,240.00
Pasir Pasang m3 0.032 150,000.00 4,800.00
D. Jumlah ( A + B + C ) 84,530.00
E. Overhead & Profit 15 % x D 12,679.50
F. Harga Satuan Pekerjaan ( D + E ) 97,209.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.11 OH 0.020 90,000.00 1,800.00
Mandor L.15 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 87,030.00
E. Overhead & Profit 15 % x D 13,054.50
F. Harga Satuan Pekerjaan ( D + E ) 100,084.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.11 OH 0.020 90,000.00 1,800.00
Mandor L.15 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 80,030.00
E. Overhead & Profit 15 % x D 12,004.50
F. Harga Satuan Pekerjaan ( D + E ) 92,034.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.067 85,000.00 5,695.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 17,540.00
E. Overhead & Profit 15 % x D 2,631.00
F. Harga Satuan Pekerjaan ( D + E ) 20,171.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.11 OH 0.008 90,000.00 720.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 57,655.00
E. Overhead & Profit 15 % x D 8,648.25
F. Harga Satuan Pekerjaan ( D + E ) 66,303.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.11 OH 0.008 90,000.00 720.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 65,655.00
E. Overhead & Profit 15 % x D 9,848.25
F. Harga Satuan Pekerjaan ( D + E ) 75,503.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 65,045.00
E. Overhead & Profit 15 % x D 9,756.75
F. Harga Satuan Pekerjaan ( D + E ) 74,801.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 77,045.00
E. Overhead & Profit 15 % x D 11,556.75
F. Harga Satuan Pekerjaan ( D + E ) 88,601.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 45,045.00
E. Overhead & Profit 15 % x D 6,756.75
F. Harga Satuan Pekerjaan ( D + E ) 51,801.75
D. Jumlah ( A + B + C ) 50,645.00
E. Overhead & Profit 15 % x D 7,596.75
F. Harga Satuan Pekerjaan ( D + E ) 58,241.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 52,245.00
E. Overhead & Profit 15 % x D 7,836.75
F. Harga Satuan Pekerjaan ( D + E ) 60,081.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 57,845.00
E. Overhead & Profit 15 % x D 8,676.75
F. Harga Satuan Pekerjaan ( D + E ) 66,521.75
A.4.5.2.16. Pemasangan 1 m2 atap asbes gelombang 1,05m x 1,50m x 4mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 81,045.00
E. Overhead & Profit 15 % x D 12,156.75
F. Harga Satuan Pekerjaan ( D + E ) 93,201.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 46,645.00
E. Overhead & Profit 15 % x D 6,996.75
F. Harga Satuan Pekerjaan ( D + E ) 53,641.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 47,445.00
E. Overhead & Profit 15 % x D 7,116.75
F. Harga Satuan Pekerjaan ( D + E ) 54,561.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 53,845.00
E. Overhead & Profit 15 % x D 8,076.75
F. Harga Satuan Pekerjaan ( D + E ) 61,921.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 56,245.00
E. Overhead & Profit 15 % x D 8,436.75
F. Harga Satuan Pekerjaan ( D + E ) 64,681.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Kayu L.03 OH 0.070 85,000.00 5,950.00
Kepala Tukang L.11 OH 0.007 90,000.00 630.00
Mandor L.15 OH 0.007 95,000.00 665.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 26,613.00
E. Overhead & Profit 15 % x D 3,991.95
F. Harga Satuan Pekerjaan ( D + E ) 30,604.95
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.084 70,000.00 5,880.00
Tukang Kayu L.03 OH 0.125 85,000.00 10,625.00
Kepala Tukang L.11 OH 0.013 90,000.00 1,170.00
Mandor L.15 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 23,368.00
E. Overhead & Profit 15 % x D 3,505.20
F. Harga Satuan Pekerjaan ( D + E ) 26,873.20
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.11 OH 0.010 90,000.00 900.00
Mandor L.15 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 112,800.00
E. Overhead & Profit 15 % x D 16,920.00
F. Harga Satuan Pekerjaan ( D + E ) 129,720.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.11 OH 0.003 90,000.00 270.00
Mandor L.15 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 94,107.50
E. Overhead & Profit 15 % x D 14,116.13
F. Harga Satuan Pekerjaan ( D + E ) 108,223.63
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.11 OH 0.010 90,000.00 900.00
Mandor L.15 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 26,495.00
E. Overhead & Profit 15 % x D 3,974.25
F. Harga Satuan Pekerjaan ( D + E ) 30,469.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.166 70,000.00 11,620.00
Tukang Kayu L.03 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.11 OH 0.025 90,000.00 2,250.00
Mandor L.15 OH 0.008 95,000.00 760.00
Jumlah Biaya Untuk Upah 35,880.00
B. BAHAN
Sirap kayu Bh 30.000 -
Paku Biasa 1/2" - 1" Kg 0.200 15,000.00 3,000.00
D. Jumlah ( A + B + C ) 38,880.00
E. Overhead & Profit 15 % x D 5,832.00
F. Harga Satuan Pekerjaan ( D + E ) 44,712.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.11 OH 0.020 90,000.00 1,800.00
Mandor L.15 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 70,024.00
E. Overhead & Profit 15 % x D 10,503.60
F. Harga Satuan Pekerjaan ( D + E ) 80,527.60
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.00
Tukang Kayu L.03 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.11 OH 0.025 90,000.00 2,250.00
Mandor L.15 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 33,570.00
E. Overhead & Profit 15 % x D 5,035.50
F. Harga Satuan Pekerjaan ( D + E ) 38,605.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Kayu L.03 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.11 OH 0.015 90,000.00 1,350.00
Mandor L.15 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 33,585.00
E. Overhead & Profit 15 % x D 5,037.75
F. Harga Satuan Pekerjaan ( D + E ) 38,622.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.125 70,000.00 8,750.00
Tukang Kayu L.03 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.11 OH 0.025 90,000.00 2,250.00
Mandor L.15 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 49,120.00
E. Overhead & Profit 15 % x D 7,368.00
F. Harga Satuan Pekerjaan ( D + E ) 56,488.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Kayu L.03 OH 0.060 85,000.00 5,100.00
Kepala Tukang L.11 OH 0.006 90,000.00 540.00
Mandor L.15 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 40,810.00
E. Overhead & Profit 15 % x D 6,121.50
F. Harga Satuan Pekerjaan ( D + E ) 46,931.50
D. Jumlah ( A + B + C ) 29,350.00
E. Overhead & Profit 15 % x D 4,402.50
F. Harga Satuan Pekerjaan ( D + E ) 33,752.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.750 85,000.00 63,750.00
Kepala Tukang L.11 OH 0.080 90,000.00 7,200.00
Mandor L.15 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 82,020.00
E. Overhead & Profit 15 % x D 12,303.00
F. Harga Satuan Pekerjaan ( D + E ) 94,323.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 1.000 85,000.00 85,000.00
Kepala Tukang L.11 OH 0.100 90,000.00 9,000.00
Mandor L.15 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 105,750.00
E. Overhead & Profit 15 % x D 15,862.50
F. Harga Satuan Pekerjaan ( D + E ) 121,612.50
A.4.5.2.42. Pemasangan 1 m2 allumunium foil / sisalation
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.11 OH 0.005 90,000.00 450.00
Mandor L.15 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 47,722.50
E. Overhead & Profit 15 % x D 7,158.38
F. Harga Satuan Pekerjaan ( D + E ) 54,880.88
A.4.6.1.1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 7.000 70,000.00 490,000.00
Tukang Kayu L.03 OH 21.000 85,000.00 1,785,000.00
Kepala Tukang L.03 OH 2.100 90,000.00 189,000.00
Mandor L.04 OH 0.350 95,000.00 33,250.00
D. Jumlah ( A + B + C ) 9,132,500.00
E. Overhead & Profit 15 % x D 1,369,875.00
F. Harga Satuan Pekerjaan ( D + E ) 10,502,375.00
A.4.6.1.2. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.000 70,000.00 420,000.00
Tukang Kayu L.03 OH 18.000 85,000.00 1,530,000.00
Kepala Tukang L.03 OH 1.800 90,000.00 162,000.00
Mandor L.04 OH 0.300 95,000.00 28,500.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Kayu L.03 OH 1.050 85,000.00 89,250.00
Kepala Tukang L.03 OH 0.105 90,000.00 9,450.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 275,660.00
E. Overhead & Profit 15 % x D 41,349.00
F. Harga Satuan Pekerjaan ( D + E ) 317,009.00
A.4.6.1.4. Pembuatan dan Pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.350 70,000.00 24,500.00
Tukang Kayu L.03 OH 1.050 85,000.00 89,250.00
Kepala Tukang L.03 OH 0.105 90,000.00 9,450.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 237,660.00
E. Overhead & Profit 15 % x D 35,649.00
F. Harga Satuan Pekerjaan ( D + E ) 273,309.00
A.4.6.1.5. Pembuatan dan Pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.03 OH 3.000 85,000.00 255,000.00
Kepala Tukang L.03 OH 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 529,000.00
E. Overhead & Profit 15 % x D 79,350.00
F. Harga Satuan Pekerjaan ( D + E ) 608,350.00
A.4.6.1.6. Pembuatan dan Pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang Kayu L.03 OH 2.400 85,000.00 204,000.00
Kepala Tukang L.03 OH 0.240 90,000.00 21,600.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
D. Jumlah ( A + B + C ) 388,750.00
E. Overhead & Profit 15 % x D 58,312.50
F. Harga Satuan Pekerjaan ( D + E ) 447,062.50
A.4.6.1.7. Pembuatan dan Pemasangan 1 m2 pintu dan jendela jalusi, kayu kelas I atau II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Kayu L.03 OH 3.000 85,000.00 255,000.00
Kepala Tukang L.03 OH 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 627,400.00
E. Overhead & Profit 15 % x D 94,110.00
F. Harga Satuan Pekerjaan ( D + E ) 721,510.00
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Kayu L.03 OH 2.100 85,000.00 178,500.00
Kepala Tukang L.03 OH 0.210 90,000.00 18,900.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 503,425.00
E. Overhead & Profit 15 % x D 75,513.75
F. Harga Satuan Pekerjaan ( D + E ) 578,938.75
A.4.6.1.9. Pembuatan 1 m2 daun pintu plywood rangkap, rangka ekspose kayu kelas I atau II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang Kayu L.03 OH 2.400 85,000.00 204,000.00
Kepala Tukang L.03 OH 0.240 90,000.00 21,600.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
D. Jumlah ( A + B + C ) 550,310.00
E. Overhead & Profit 15 % x D 82,546.50
F. Harga Satuan Pekerjaan ( D + E ) 632,856.50
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.670 70,000.00 46,900.00
Tukang Kayu L.03 OH 2.000 85,000.00 170,000.00
Kepala Tukang L.03 OH 0.200 90,000.00 18,000.00
Mandor L.04 OH 0.335 95,000.00 31,825.00
D. Jumlah ( A + B + C ) 514,975.00
E. Overhead & Profit 15 % x D 77,246.25
F. Harga Satuan Pekerjaan ( D + E ) 592,221.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.800 70,000.00 56,000.00
Tukang Kayu L.03 OH 2.400 85,000.00 204,000.00
Kepala Tukang L.03 OH 0.240 90,000.00 21,600.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
D. Jumlah ( A + B + C ) 484,050.00
E. Overhead & Profit 15 % x D 72,607.50
F. Harga Satuan Pekerjaan ( D + E ) 556,657.50
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka ekspose kayu kelas II
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.850 70,000.00 59,500.00
Tukang Kayu L.03 OH 2.550 85,000.00 216,750.00
Kepala Tukang L.03 OH 0.255 90,000.00 22,950.00
Mandor L.04 OH 0.043 95,000.00 4,085.00
D. Jumlah ( A + B + C ) 501,435.00
E. Overhead & Profit 15 % x D 75,215.25
F. Harga Satuan Pekerjaan ( D + E ) 576,650.25
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 m
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.000 70,000.00 280,000.00
Tukang Kayu L.03 OH 12.000 85,000.00 1,020,000.00
Kepala Tukang L.03 OH 1.200 90,000.00 108,000.00
Mandor L.04 OH 0.200 95,000.00 19,000.00
D. Jumlah ( A + B + C ) 8,351,000.00
E. Overhead & Profit 15 % x D 1,252,650.00
F. Harga Satuan Pekerjaan ( D + E ) 9,603,650.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.700 70,000.00 469,000.00
Tukang Kayu L.03 OH 20.100 85,000.00 1,708,500.00
Kepala Tukang L.03 OH 2.010 90,000.00 180,900.00
Mandor L.04 OH 0.335 95,000.00 31,825.00
D. Jumlah ( A + B + C ) 9,914,225.00
E. Overhead & Profit 15 % x D 1,487,133.75
F. Harga Satuan Pekerjaan ( D + E ) 11,401,358.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.700 70,000.00 469,000.00
Tukang Kayu L.03 OH 20.100 85,000.00 1,708,500.00
Kepala Tukang L.03 OH 2.010 90,000.00 180,900.00
Mandor L.04 OH 0.335 95,000.00 31,825.00
D. Jumlah ( A + B + C ) 5,755,225.00
E. Overhead & Profit 15 % x D 863,283.75
F. Harga Satuan Pekerjaan ( D + E ) 6,618,508.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 160,625.00
E. Overhead & Profit 15 % x D 24,093.75
F. Harga Satuan Pekerjaan ( D + E ) 184,718.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 219,425.00
E. Overhead & Profit 15 % x D 32,913.75
F. Harga Satuan Pekerjaan ( D + E ) 252,338.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.120 70,000.00 8,400.00
Tukang Kayu L.03 OH 0.120 85,000.00 10,200.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.006 95,000.00 570.00
Jumlah Biaya Untuk Upah 20,250.00
B. BAHAN
Kayu Kelas II m3 0.014 -
Paku 5-10 cm m3 0.057 15,000.00 855.00
D. Jumlah ( A + B + C ) 21,105.00
E. Overhead & Profit 15 % x D 3,165.75
F. Harga Satuan Pekerjaan ( D + E ) 24,270.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.03 OH 0.030 90,000.00 2,700.00
Mandor L.04 OH 0.075 95,000.00 7,125.00
D. Jumlah ( A + B + C ) 91,945.00
E. Overhead & Profit 15 % x D 13,791.75
F. Harga Satuan Pekerjaan ( D + E ) 105,736.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.300 85,000.00 25,500.00
Kepala Tukang L.03 OH 0.030 90,000.00 2,700.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 80,500.00
E. Overhead & Profit 15 % x D 12,075.00
F. Harga Satuan Pekerjaan ( D + E ) 92,575.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 72,055.00
E. Overhead & Profit 15 % x D 10,808.25
F. Harga Satuan Pekerjaan ( D + E ) 82,863.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 72,125.00
E. Overhead & Profit 15 % x D 10,818.75
F. Harga Satuan Pekerjaan ( D + E ) 82,943.75
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60x120)cm, kayu kelas II atau III
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 134,210.00
E. Overhead & Profit 15 % x D 20,131.50
F. Harga Satuan Pekerjaan ( D + E ) 154,341.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Kayu L.03 OH 0.450 85,000.00 38,250.00
Kepala Tukang L.03 OH 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 221,495.00
E. Overhead & Profit 15 % x D 33,224.25
F. Harga Satuan Pekerjaan ( D + E ) 254,719.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang Kayu L.03 OH 0.600 85,000.00 51,000.00
Kepala Tukang L.03 OH 0.060 90,000.00 5,400.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 291,315.00
E. Overhead & Profit 15 % x D 43,697.25
F. Harga Satuan Pekerjaan ( D + E ) 335,012.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang Kayu L.03 OH 1.800 85,000.00 153,000.00
Kepala Tukang L.03 OH 0.180 90,000.00 16,200.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 250,891.25
E. Overhead & Profit 15 % x D 37,633.69
F. Harga Satuan Pekerjaan ( D + E ) 288,524.94
A.4.6.1.27. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.00
Tukang Kayu L.03 OH 0.075 85,000.00 6,375.00
Kepala Tukang L.03 OH 0.008 90,000.00 720.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 70,190.00
E. Overhead & Profit 15 % x D 10,528.50
F. Harga Satuan Pekerjaan ( D + E ) 80,718.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.03 OH 0.050 85,000.00 4,250.00
Kepala Tukang L.03 OH 0.005 90,000.00 450.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 43,155.00
E. Overhead & Profit 15 % x D 6,473.25
F. Harga Satuan Pekerjaan ( D + E ) 49,628.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Kayu L.02 OH 0.600 85,000.00 51,000.00
Kepala Tukang L.03 OH 0.060 90,000.00 5,400.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 60,885.00
E. Overhead & Profit 15 % x D 9,132.75
F. Harga Satuan Pekerjaan ( D + E ) 70,017.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang Kayu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 163,175.00
E. Overhead & Profit 15 % x D 24,476.25
F. Harga Satuan Pekerjaan ( D + E ) 187,651.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.005 70,000.00 350.00
Tukang Kayu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 47,635.00
E. Overhead & Profit 15 % x D 7,145.25
F. Harga Satuan Pekerjaan ( D + E ) 54,780.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.005 70,000.00 350.00
Tukang Kayu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 45,226.00
E. Overhead & Profit 15 % x D 6,783.90
F. Harga Satuan Pekerjaan ( D + E ) 52,009.90
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang Kayu L.02 OH 0.100 85,000.00 8,500.00
Kepala Tukang L.03 OH 0.010 90,000.00 900.00
Mandor L.04 OH 0.0005 95,000.00 47.50
D. Jumlah ( A + B + C ) 27,647.50
E. Overhead & Profit 15 % x D 4,147.13
F. Harga Satuan Pekerjaan ( D + E ) 31,794.63
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang Kayu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.0005 95,000.00 47.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 15,910.00
E. Overhead & Profit 15 % x D 2,386.50
F. Harga Satuan Pekerjaan ( D + E ) 18,296.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 15,910.00
E. Overhead & Profit 15 % x D 2,386.50
F. Harga Satuan Pekerjaan ( D + E ) 18,296.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang Kayu L.02 OH 0.500 85,000.00 42,500.00
Kepala Tukang L.03 OH 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 275,785.00
E. Overhead & Profit 15 % x D 41,367.75
F. Harga Satuan Pekerjaan ( D + E ) 317,152.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang Kayu L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.001 95,000.00 95.00
D. Jumlah ( A + B + C ) 20,295.00
E. Overhead & Profit 15 % x D 3,044.25
F. Harga Satuan Pekerjaan ( D + E ) 23,339.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang Kayu L.02 0.500 85,000.00 42,500.00
Kepala Tukang L.03 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 50,785.00
E. Overhead & Profit 15 % x D 7,617.75
F. Harga Satuan Pekerjaan ( D + E ) 58,402.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang Kayu L.02 0.100 85,000.00 8,500.00
Kepala Tukang L.03 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 10,575.00
E. Overhead & Profit 15 % x D 1,586.25
F. Harga Satuan Pekerjaan ( D + E ) 12,161.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Kayu L.02 0.600 85,000.00 51,000.00
Kepala Tukang L.03 0.060 90,000.00 5,400.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 60,885.00
E. Overhead & Profit 15 % x D 9,132.75
F. Harga Satuan Pekerjaan ( D + E ) 70,017.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.00
Tukang Kayu L.02 0.250 85,000.00 21,250.00
Kepala Tukang L.03 0.025 90,000.00 2,250.00
Mandor L.04 OH 0.0013 95,000.00 123.50
D. Jumlah ( A + B + C ) 25,373.50
E. Overhead & Profit 15 % x D 3,806.03
F. Harga Satuan Pekerjaan ( D + E ) 29,179.53
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 86,726.00
E. Overhead & Profit 15 % x D 13,008.90
F. Harga Satuan Pekerjaan ( D + E ) 99,734.90
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 108,726.00
E. Overhead & Profit 15 % x D 16,308.90
F. Harga Satuan Pekerjaan ( D + E ) 125,034.90
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.017 70,000.00 1,190.00
Tukang Kayu L.02 OH 0.170 85,000.00 14,450.00
Kepala Tukang L.03 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.0009 95,000.00 85.50
D. Jumlah ( A + B + C ) 17,255.50
E. Overhead & Profit 15 % x D 2,588.33
F. Harga Satuan Pekerjaan ( D + E ) 19,843.83
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.025 70,000.00 1,750.00
Tukang Kayu L.02 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.03 OH 0.025 90,000.00 2,250.00
Mandor L.04 OH 0.0013 95,000.00 123.50
D. Jumlah ( A + B + C ) 25,373.50
E. Overhead & Profit 15 % x D 3,806.03
F. Harga Satuan Pekerjaan ( D + E ) 29,179.53
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 15,910.00
E. Overhead & Profit 15 % x D 2,386.50
F. Harga Satuan Pekerjaan ( D + E ) 18,296.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.017 70,000.00 1,190.00
Tukang Kayu L.02 OH 0.170 85,000.00 14,450.00
Kepala Tukang L.03 OH 0.017 90,000.00 1,530.00
Mandor L.04 OH 0.009 95,000.00 855.00
D. Jumlah ( A + B + C ) 18,025.00
E. Overhead & Profit 15 % x D 2,703.75
F. Harga Satuan Pekerjaan ( D + E ) 20,728.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.015 70,000.00 1,050.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 15,910.00
E. Overhead & Profit 15 % x D 2,386.50
F. Harga Satuan Pekerjaan ( D + E ) 18,296.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.075 70,000.00 5,250.00
Tukang Kayu L.02 OH 0.150 85,000.00 12,750.00
Kepala Tukang L.03 OH 0.015 90,000.00 1,350.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 1,889,730.00
E. Overhead & Profit 15 % x D 283,459.50
F. Harga Satuan Pekerjaan ( D + E ) 2,173,189.50
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 12,297.50
E. Overhead & Profit 15 % x D 1,844.63
F. Harga Satuan Pekerjaan ( D + E ) 14,142.13
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 11,335.00
E. Overhead & Profit 15 % x D 1,700.25
F. Harga Satuan Pekerjaan ( D + E ) 13,035.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 11,810.00
E. Overhead & Profit 15 % x D 1,771.50
F. Harga Satuan Pekerjaan ( D + E ) 13,581.50
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang Cat L.02 OH 0.009 85,000.00 765.00
Kepala Tukang L.03 OH 0.006 90,000.00 540.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 20,245.00
E. Overhead & Profit 15 % x D 3,036.75
F. Harga Satuan Pekerjaan ( D + E ) 23,281.75
A.4.7.1.5. Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang Cat L.02 OH 0.105 85,000.00 8,925.00
Kepala Tukang L.03 OH 0.004 90,000.00 360.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 28,225.00
E. Overhead & Profit 15 % x D 4,233.75
F. Harga Satuan Pekerjaan ( D + E ) 32,458.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang Cat L.02 OH 0.630 85,000.00 53,550.00
Kepala Tukang L.03 OH 0.630 90,000.00 56,700.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 113,335.00
E. Overhead & Profit 15 % x D 17,000.25
F. Harga Satuan Pekerjaan ( D + E ) 130,335.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang Cat L.02 OH 0.060 85,000.00 5,100.00
Kepala Tukang L.03 OH 0.016 90,000.00 1,440.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 41,225.00
E. Overhead & Profit 15 % x D 6,183.75
F. Harga Satuan Pekerjaan ( D + E ) 47,408.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 13,922.50
E. Overhead & Profit 15 % x D 2,088.38
F. Harga Satuan Pekerjaan ( D + E ) 16,010.88
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.160 70,000.00 11,200.00
Tukang Cat L.02 OH 0.160 85,000.00 13,600.00
Kepala Tukang L.03 OH 0.016 90,000.00 1,440.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 28,500.00
E. Overhead & Profit 15 % x D 4,275.00
F. Harga Satuan Pekerjaan ( D + E ) 32,775.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang Cat L.02 OH 0.063 85,000.00 5,355.00
Kepala Tukang L.03 OH 0.0063 90,000.00 567.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 18,207.00
E. Overhead & Profit 15 % x D 2,731.05
F. Harga Satuan Pekerjaan ( D + E ) 20,938.05
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang Cat L.02 OH 0.042 85,000.00 3,570.00
Kepala Tukang L.03 OH 0.0042 90,000.00 378.00
Mandor L.04 OH 0.003 95,000.00 285.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang Cat L.02 OH 0.042 85,000.00 3,570.00
Kepala Tukang L.03 OH 0.0042 90,000.00 378.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 6,193.00
E. Overhead & Profit 15 % x D 928.95
F. Harga Satuan Pekerjaan ( D + E ) 7,121.95
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.150 70,000.00 10,500.00
Tukang Cat L.02 OH 0.001 85,000.00 85.00
Kepala Tukang L.03 OH 0.0001 90,000.00 9.00
Mandor L.04 OH 0.0025 95,000.00 237.50
D. Jumlah ( A + B + C ) 11,481.50
E. Overhead & Profit 15 % x D 1,722.23
F. Harga Satuan Pekerjaan ( D + E ) 13,203.73
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang Cat L.02 OH 0.005 85,000.00 425.00
Kepala Tukang L.03 OH 0.0005 90,000.00 45.00
Mandor L.04 OH 0.0025 95,000.00 237.50
D. Jumlah ( A + B + C ) 4,807.50
E. Overhead & Profit 15 % x D 721.13
F. Harga Satuan Pekerjaan ( D + E ) 5,528.63
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang Cat L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.0025 95,000.00 237.50
D. Jumlah ( A + B + C ) 27,437.50
E. Overhead & Profit 15 % x D 4,115.63
F. Harga Satuan Pekerjaan ( D + E ) 31,553.13
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang Cat L.02 OH 0.200 85,000.00 17,000.00
Kepala Tukang L.03 OH 0.020 90,000.00 1,800.00
Mandor L.04 OH 0.0025 95,000.00 237.50
D. Jumlah ( A + B + C ) 23,717.50
E. Overhead & Profit 15 % x D 3,557.63
F. Harga Satuan Pekerjaan ( D + E ) 27,275.13
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Cat L.02 OH 0.225 85,000.00 19,125.00
Kepala Tukang L.03 OH 0.0225 90,000.00 2,025.00
Mandor L.04 OH 0.0075 95,000.00 712.50
D. Jumlah ( A + B + C ) 45,722.50
E. Overhead & Profit 15 % x D 6,858.38
F. Harga Satuan Pekerjaan ( D + E ) 52,580.88
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.250 70,000.00 17,500.00
Tukang Cat L.02 OH 0.250 85,000.00 21,250.00
Kepala Tukang L.03 OH 0.025 90,000.00 2,250.00
Mandor L.04 OH 0.0013 95,000.00 123.50
D. Jumlah ( A + B + C ) 49,683.50
E. Overhead & Profit 15 % x D 7,452.53
F. Harga Satuan Pekerjaan ( D + E ) 57,136.03
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Cat L.02 OH 0.060 85,000.00 5,100.00
Kepala Tukang L.03 OH 0.012 90,000.00 1,080.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 11,225.00
E. Overhead & Profit 15 % x D 1,683.75
F. Harga Satuan Pekerjaan ( D + E ) 12,908.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Cat L.02 OH 0.800 85,000.00 68,000.00
Kepala Tukang L.03 OH 0.080 90,000.00 7,200.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 105,660.00
E. Overhead & Profit 15 % x D 15,849.00
F. Harga Satuan Pekerjaan ( D + E ) 121,509.00
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Cat L.02 OH 0.700 85,000.00 59,500.00
Kepala Tukang L.03 OH 0.070 90,000.00 6,300.00
Mandor L.04 OH 0.020 95,000.00 1,900.00
D. Jumlah ( A + B + C ) 95,980.00
E. Overhead & Profit 15 % x D 14,397.00
F. Harga Satuan Pekerjaan ( D + E ) 110,377.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 1.100 85,000.00 93,500.00
Kepala Tukang L.03 0.010 90,000.00 900.00
Mandor L.04 OH 0.160 95,000.00 15,200.00
D. Jumlah ( A + B + C ) 130,600.00
E. Overhead & Profit 15 % x D 19,590.00
F. Harga Satuan Pekerjaan ( D + E ) 150,190.00
D. Jumlah ( A + B + C ) 235,380.00
E. Overhead & Profit 15 % x D 35,307.00
F. Harga Satuan Pekerjaan ( D + E ) 270,687.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Batu L.02 1.500 85,000.00 127,500.00
Kepala Tukang L.03 0.150 90,000.00 13,500.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
D. Jumlah ( A + B + C ) 228,255.00
E. Overhead & Profit 15 % x D 34,238.25
F. Harga Satuan Pekerjaan ( D + E ) 262,493.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.000 70,000.00 70,000.00
Tukang Batu L.02 1.000 85,000.00 85,000.00
Kepala Tukang L.03 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 95,000.00 4,750.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.200 70,000.00 84,000.00
Tukang Batu L.02 1.450 85,000.00 123,250.00
Kepala Tukang L.03 0.150 90,000.00 13,500.00
Mandor L.04 OH 0.060 95,000.00 5,700.00
D. Jumlah ( A + B + C ) 1,255,630.00
E. Overhead & Profit 15 % x D 188,344.50
F. Harga Satuan Pekerjaan ( D + E ) 1,443,974.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.075 70,000.00 5,250.00
Tukang Batu L.02 0.750 85,000.00 63,750.00
Kepala Tukang L.03 0.750 90,000.00 67,500.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 1,436,785.00
E. Overhead & Profit 15 % x D 215,517.75
F. Harga Satuan Pekerjaan ( D + E ) 1,652,302.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang Batu L.02 4.500 85,000.00 382,500.00
Kepala Tukang L.03 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.900 95,000.00 85,500.00
D. Jumlah ( A + B + C ) 982,500.00
E. Overhead & Profit 15 % x D 147,375.00
F. Harga Satuan Pekerjaan ( D + E ) 1,129,875.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.000 70,000.00 420,000.00
Tukang Batu L.02 3.000 85,000.00 255,000.00
Kepala Tukang L.03 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.030 95,000.00 2,850.00
D. Jumlah ( A + B + C ) 986,400.00
E. Overhead & Profit 15 % x D 147,960.00
F. Harga Satuan Pekerjaan ( D + E ) 1,134,360.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang Batu L.02 4.500 85,000.00 382,500.00
Kepala Tukang L.03 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.900 95,000.00 85,500.00
D. Jumlah ( A + B + C ) 982,500.00
E. Overhead & Profit 15 % x D 147,375.00
F. Harga Satuan Pekerjaan ( D + E ) 1,129,875.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02 0.450 85,000.00 38,250.00
Kepala Tukang L.03 0.045 90,000.00 4,050.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 364,725.00
E. Overhead & Profit 15 % x D 54,708.75
F. Harga Satuan Pekerjaan ( D + E ) 419,433.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.500 70,000.00 245,000.00
Tukang Batu L.02 4.500 85,000.00 382,500.00
Kepala Tukang L.03 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 633,710.00
E. Overhead & Profit 15 % x D 95,056.50
F. Harga Satuan Pekerjaan ( D + E ) 728,766.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.030 70,000.00 2,100.00
Tukang Batu L.02 0.300 85,000.00 25,500.00
Kepala Tukang L.03 0.030 90,000.00 2,700.00
Mandor L.04 OH 0.015 95,000.00 1,425.00
D. Jumlah ( A + B + C ) 50,700.00
E. Overhead & Profit 15 % x D 7,605.00
F. Harga Satuan Pekerjaan ( D + E ) 58,305.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.050 70,000.00 3,500.00
Tukang Batu L.02 0.500 85,000.00 42,500.00
Kepala Tukang L.03 0.050 90,000.00 4,500.00
Mandor L.04 OH 0.025 95,000.00 2,375.00
D. Jumlah ( A + B + C ) 104,950.00
E. Overhead & Profit 15 % x D 15,742.50
F. Harga Satuan Pekerjaan ( D + E ) 120,692.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang Batu L.02 0.100 85,000.00 8,500.00
Kepala Tukang L.03 0.010 90,000.00 900.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 35,575.00
E. Overhead & Profit 15 % x D 5,336.25
F. Harga Satuan Pekerjaan ( D + E ) 40,911.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.160 70,000.00 151,200.00
Tukang Batu L.02 0.720 85,000.00 61,200.00
Kepala Tukang L.03 0.072 90,000.00 6,480.00
Mandor L.04 OH 0.011 95,000.00 1,045.00
D. Jumlah ( A + B + C ) 339,245.00
E. Overhead & Profit 15 % x D 50,886.75
F. Harga Satuan Pekerjaan ( D + E ) 390,131.75
A.5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.00
Tukang Batu L.02 1.150 85,000.00 97,750.00
Kepala Tukang L.03 0.011 90,000.00 990.00
Mandor L.04 OH 0.016 95,000.00 1,520.00
D. Jumlah ( A + B + C ) 496,070.00
E. Overhead & Profit 15 % x D 74,410.50
F. Harga Satuan Pekerjaan ( D + E ) 570,480.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.200 70,000.00 224,000.00
Tukang Batu L.02 1.150 85,000.00 97,750.00
Kepala Tukang L.03 0.011 90,000.00 990.00
Mandor L.04 OH 0.016 95,000.00 1,520.00
D. Jumlah ( A + B + C ) 585,755.00
E. Overhead & Profit 15 % x D 87,863.25
F. Harga Satuan Pekerjaan ( D + E ) 673,618.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang Batu L.02 0.090 85,000.00 7,650.00
Kepala Tukang L.03 0.009 90,000.00 810.00
Mandor L.04 OH 0.027 95,000.00 2,565.00
D. Jumlah ( A + B + C ) 222,405.00
E. Overhead & Profit 15 % x D 33,360.75
F. Harga Satuan Pekerjaan ( D + E ) 255,765.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.010 70,000.00 700.00
Tukang Batu L.02 0.400 85,000.00 34,000.00
Kepala Tukang L.03 0.040 90,000.00 3,600.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 75,887.50
E. Overhead & Profit 15 % x D 11,383.13
F. Harga Satuan Pekerjaan ( D + E ) 87,270.63
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang Batu L.02 0.090 85,000.00 7,650.00
Kepala Tukang L.03 0.009 90,000.00 810.00
Mandor L.04 OH 0.027 95,000.00 2,565.00
D. Jumlah ( A + B + C ) 270,105.00
E. Overhead & Profit 15 % x D 40,515.75
F. Harga Satuan Pekerjaan ( D + E ) 310,620.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang Batu L.02 0.090 85,000.00 7,650.00
Kepala Tukang L.03 0.009 90,000.00 810.00
Mandor L.04 OH 0.027 95,000.00 2,565.00
D. Jumlah ( A + B + C ) 374,805.00
E. Overhead & Profit 15 % x D 56,220.75
F. Harga Satuan Pekerjaan ( D + E ) 431,025.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.108 70,000.00 7,560.00
Tukang Batu L.02 0.180 85,000.00 15,300.00
Kepala Tukang L.03 0.018 90,000.00 1,620.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 24,955.00
E. Overhead & Profit 15 % x D 3,743.25
F. Harga Satuan Pekerjaan ( D + E ) 28,698.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.135 70,000.00 9,450.00
Tukang Batu L.02 0.225 85,000.00 19,125.00
Kepala Tukang L.03 0.023 90,000.00 2,070.00
Mandor L.04 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 31,310.00
E. Overhead & Profit 15 % x D 4,696.50
F. Harga Satuan Pekerjaan ( D + E ) 36,006.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.135 70,000.00 9,450.00
Tukang Batu L.02 0.225 85,000.00 19,125.00
Kepala Tukang L.03 0.023 90,000.00 2,070.00
Mandor L.04 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 1,915,310.00
E. Overhead & Profit 15 % x D 287,296.50
F. Harga Satuan Pekerjaan ( D + E ) 2,202,606.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.00
Tukang Batu L.02 0.060 85,000.00 5,100.00
Kepala Tukang L.03 0.006 90,000.00 540.00
Mandor L.04 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 35,950.00
E. Overhead & Profit 15 % x D 5,392.50
F. Harga Satuan Pekerjaan ( D + E ) 41,342.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.00
Tukang Batu L.02 0.060 85,000.00 5,100.00
Kepala Tukang L.03 0.006 90,000.00 540.00
Mandor L.04 OH 0.002 95,000.00 190.00
D. Jumlah ( A + B + C ) 44,350.00
E. Overhead & Profit 15 % x D 6,652.50
F. Harga Satuan Pekerjaan ( D + E ) 51,002.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.036 70,000.00 2,520.00
Tukang Batu L.02 0.060 85,000.00 5,100.00
Kepala Tukang L.03 0.006 90,000.00 540.00
Mandor L.04 OH 0.002 95,000.00 190.00
Jumlah Biaya Untuk Upah 8,350.00
B. BAHAN
Pipa PVC 1" m 1.200 40,000.00 48,000.00
Perlengkapan % 35.000
D. Jumlah ( A + B + C ) 56,350.00
E. Overhead & Profit 15 % x D 8,452.50
F. Harga Satuan Pekerjaan ( D + E ) 64,802.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang Batu L.02 0.090 85,000.00 7,650.00
Kepala Tukang L.03 0.009 90,000.00 810.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 90,525.00
E. Overhead & Profit 15 % x D 13,578.75
F. Harga Satuan Pekerjaan ( D + E ) 104,103.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.054 70,000.00 3,780.00
Tukang Batu L.02 0.090 85,000.00 7,650.00
Kepala Tukang L.03 0.009 90,000.00 810.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 102,525.00
E. Overhead & Profit 15 % x D 15,378.75
F. Harga Satuan Pekerjaan ( D + E ) 117,903.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang Batu L.02 0.135 85,000.00 11,475.00
Kepala Tukang L.03 0.0135 90,000.00 1,215.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 18,740.00
E. Overhead & Profit 15 % x D 2,811.00
F. Harga Satuan Pekerjaan ( D + E ) 21,551.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang Batu L.02 0.135 85,000.00 11,475.00
Kepala Tukang L.03 0.0135 90,000.00 1,215.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 222,740.00
E. Overhead & Profit 15 % x D 33,411.00
F. Harga Satuan Pekerjaan ( D + E ) 256,151.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang Batu L.02 0.135 85,000.00 11,475.00
Kepala Tukang L.03 0.0135 90,000.00 1,215.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 348,740.00
E. Overhead & Profit 15 % x D 52,311.00
F. Harga Satuan Pekerjaan ( D + E ) 401,051.00
A.5.1.1.33. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 20 cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.080 70,000.00 5,600.00
Tukang Batu L.02 0.040 85,000.00 3,400.00
Kepala Tukang L.03 0.004 90,000.00 360.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 57,760.00
E. Overhead & Profit 15 % x D 8,664.00
F. Harga Satuan Pekerjaan ( D + E ) 66,424.00
A.5.1.1.34. Pemasangan 1 m' pipa air limbah jenis pipa tanah diameter 15 cm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang Batu L.02 0.030 85,000.00 2,550.00
Kepala Tukang L.03 0.003 90,000.00 270.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 11,005.40
E. Overhead & Profit 15 % x D 1,650.81
F. Harga Satuan Pekerjaan ( D + E ) 12,656.21
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang Batu L.02 0.070 85,000.00 5,950.00
Kepala Tukang L.03 0.007 90,000.00 630.00
Mandor L.04 OH 0.007 95,000.00 665.00
D. Jumlah ( A + B + C ) 32,395.43
E. Overhead & Profit 15 % x D 4,859.31
F. Harga Satuan Pekerjaan ( D + E ) 37,254.74
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.380 70,000.00 26,600.00
Tukang Batu L.02 0.190 85,000.00 16,150.00
Kepala Tukang L.03 0.019 90,000.00 1,710.00
Mandor L.04 OH 0.019 95,000.00 1,805.00
D. Jumlah ( A + B + C ) 74,380.25
E. Overhead & Profit 15 % x D 11,157.04
F. Harga Satuan Pekerjaan ( D + E ) 85,537.29
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.081 70,000.00 5,670.00
Tukang Pipa L.02 OH 0.041 85,000.00 3,485.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 84,915.00
E. Overhead & Profit 15 % x D 12,737.25
F. Harga Satuan Pekerjaan ( D + E ) 97,652.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.094 70,000.00 6,580.00
Tukang Pipa L.02 OH 0.047 85,000.00 3,995.00
Mandor L.04 OH 0.009 95,000.00 855.00
D. Jumlah ( A + B + C ) 181,430.00
E. Overhead & Profit 15 % x D 27,214.50
F. Harga Satuan Pekerjaan ( D + E ) 208,644.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.105 70,000.00 7,350.00
Tukang Pipa L.02 OH 0.053 85,000.00 4,505.00
Mandor L.04 OH 0.011 95,000.00 1,045.00
D. Jumlah ( A + B + C ) 287,900.00
E. Overhead & Profit 15 % x D 43,185.00
F. Harga Satuan Pekerjaan ( D + E ) 331,085.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.118 70,000.00 8,260.00
Tukang Pipa L.02 OH 0.059 85,000.00 5,015.00
Mandor L.04 OH 0.012 95,000.00 1,140.00
D. Jumlah ( A + B + C ) 499,415.00
E. Overhead & Profit 15 % x D 74,912.25
F. Harga Satuan Pekerjaan ( D + E ) 574,327.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.189 70,000.00 13,230.00
Tukang Pipa L.02 OH 0.095 85,000.00 8,075.00
Mandor L.04 OH 0.019 95,000.00 1,805.00
D. Jumlah ( A + B + C ) 903,110.00
E. Overhead & Profit 15 % x D 135,466.50
F. Harga Satuan Pekerjaan ( D + E ) 1,038,576.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.256 70,000.00 17,920.00
Tukang Pipa L.02 OH 0.128 85,000.00 10,880.00
Mandor L.04 OH 0.026 95,000.00 2,470.00
D. Jumlah ( A + B + C ) 31,270.00
E. Overhead & Profit 15 % x D 4,690.50
F. Harga Satuan Pekerjaan ( D + E ) 35,960.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.294 70,000.00 20,580.00
Tukang Pipa L.02 OH 0.147 85,000.00 12,495.00
Mandor L.04 OH 0.029 95,000.00 2,755.00
D. Jumlah ( A + B + C ) 35,830.00
E. Overhead & Profit 15 % x D 5,374.50
F. Harga Satuan Pekerjaan ( D + E ) 41,204.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.544 70,000.00 38,080.00
Tukang Pipa L.02 OH 0.272 85,000.00 23,120.00
Mandor L.04 OH 0.054 95,000.00 5,130.00
D. Jumlah ( A + B + C ) 66,330.00
E. Overhead & Profit 15 % x D 9,949.50
F. Harga Satuan Pekerjaan ( D + E ) 76,279.50
D. Jumlah ( A + B + C ) 81,670.00
E. Overhead & Profit 15 % x D 12,250.50
F. Harga Satuan Pekerjaan ( D + E ) 93,920.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.809 70,000.00 56,630.00
Tukang Pipa L.02 OH 0.405 85,000.00 34,425.00
Mandor L.04 OH 0.081 95,000.00 7,695.00
D. Jumlah ( A + B + C ) 98,750.00
E. Overhead & Profit 15 % x D 14,812.50
F. Harga Satuan Pekerjaan ( D + E ) 113,562.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.957 70,000.00 66,990.00
Tukang Pipa L.02 OH 0.479 85,000.00 40,715.00
Mandor L.04 OH 0.096 95,000.00 9,120.00
D. Jumlah ( A + B + C ) 116,825.00
E. Overhead & Profit 15 % x D 17,523.75
F. Harga Satuan Pekerjaan ( D + E ) 134,348.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.618 70,000.00 113,260.00
Tukang Pipa L.02 OH 0.809 85,000.00 68,765.00
Mandor L.04 OH 0.162 95,000.00 15,390.00
D. Jumlah ( A + B + C ) 197,415.00
E. Overhead & Profit 15 % x D 29,612.25
F. Harga Satuan Pekerjaan ( D + E ) 227,027.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.691 70,000.00 118,370.00
Tukang Pipa L.02 OH 0.846 85,000.00 71,910.00
Mandor L.04 OH 0.169 95,000.00 16,055.00
D. Jumlah ( A + B + C ) 206,335.00
E. Overhead & Profit 15 % x D 30,950.25
F. Harga Satuan Pekerjaan ( D + E ) 237,285.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.895 70,000.00 132,650.00
Tukang Pipa L.02 OH 0.948 85,000.00 80,580.00
Mandor L.04 OH 0.190 95,000.00 18,050.00
D. Jumlah ( A + B + C ) 231,280.00
E. Overhead & Profit 15 % x D 34,692.00
F. Harga Satuan Pekerjaan ( D + E ) 265,972.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.099 70,000.00 146,930.00
Tukang Pipa L.02 OH 1.050 85,000.00 89,250.00
Mandor L.04 OH 0.210 95,000.00 19,950.00
Jumlah Biaya Untuk Upah 256,130.00
B. BAHAN
Pipa PVC diameter 1100 mm m 1.000 -
D. Jumlah ( A + B + C ) 256,130.00
E. Overhead & Profit 15 % x D 38,419.50
F. Harga Satuan Pekerjaan ( D + E ) 294,549.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.303 70,000.00 161,210.00
Tukang Pipa L.02 OH 1.152 85,000.00 97,920.00
Mandor L.04 OH 0.230 95,000.00 21,850.00
D. Jumlah ( A + B + C ) 280,980.00
E. Overhead & Profit 15 % x D 42,147.00
F. Harga Satuan Pekerjaan ( D + E ) 323,127.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.035 70,000.00 2,450.00
Tukang Pipa L.02 OH 0.017 85,000.00 1,445.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 4,180.00
E. Overhead & Profit 15 % x D 627.00
F. Harga Satuan Pekerjaan ( D + E ) 4,807.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 70,000.00 2,800.00
Tukang Pipa L.02 OH 0.020 85,000.00 1,700.00
Mandor L.04 OH 0.004 95,000.00 380.00
D. Jumlah ( A + B + C ) 4,880.00
E. Overhead & Profit 15 % x D 732.00
F. Harga Satuan Pekerjaan ( D + E ) 5,612.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.045 70,000.00 3,150.00
Tukang Pipa L.02 OH 0.023 85,000.00 1,955.00
Mandor L.04 OH 0.005 95,000.00 475.00
D. Jumlah ( A + B + C ) 5,580.00
E. Overhead & Profit 15 % x D 837.00
F. Harga Satuan Pekerjaan ( D + E ) 6,417.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.062 70,000.00 4,340.00
Tukang Pipa L.02 OH 0.031 85,000.00 2,635.00
Mandor L.04 OH 0.006 95,000.00 570.00
D. Jumlah ( A + B + C ) 7,545.00
E. Overhead & Profit 15 % x D 1,131.75
F. Harga Satuan Pekerjaan ( D + E ) 8,676.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.102 70,000.00 7,140.00
Tukang Pipa L.02 OH 0.051 85,000.00 4,335.00
Mandor L.04 OH 0.010 95,000.00 950.00
D. Jumlah ( A + B + C ) 12,425.00
E. Overhead & Profit 15 % x D 1,863.75
F. Harga Satuan Pekerjaan ( D + E ) 14,288.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.133 70,000.00 9,310.00
Tukang Pipa L.02 OH 0.067 85,000.00 5,695.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 16,240.00
E. Overhead & Profit 15 % x D 2,436.00
F. Harga Satuan Pekerjaan ( D + E ) 18,676.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.170 70,000.00 11,900.00
Tukang Pipa L.02 OH 0.085 85,000.00 7,225.00
Mandor L.04 OH 0.017 95,000.00 1,615.00
D. Jumlah ( A + B + C ) 20,740.00
E. Overhead & Profit 15 % x D 3,111.00
F. Harga Satuan Pekerjaan ( D + E ) 23,851.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.290 70,000.00 20,300.00
Tukang Pipa L.02 OH 0.145 85,000.00 12,325.00
Mandor L.04 OH 0.029 95,000.00 2,755.00
D. Jumlah ( A + B + C ) 35,380.00
E. Overhead & Profit 15 % x D 5,307.00
F. Harga Satuan Pekerjaan ( D + E ) 40,687.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.359 70,000.00 25,130.00
Tukang Pipa L.02 OH 0.180 85,000.00 15,300.00
Mandor L.04 OH 0.036 95,000.00 3,420.00
D. Jumlah ( A + B + C ) 43,850.00
E. Overhead & Profit 15 % x D 6,577.50
F. Harga Satuan Pekerjaan ( D + E ) 50,427.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.433 70,000.00 30,310.00
Tukang Pipa L.02 OH 0.216 85,000.00 18,360.00
Mandor L.04 OH 0.043 95,000.00 4,085.00
D. Jumlah ( A + B + C ) 52,755.00
E. Overhead & Profit 15 % x D 7,913.25
F. Harga Satuan Pekerjaan ( D + E ) 60,668.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.512 70,000.00 35,840.00
Tukang Pipa L.02 OH 0.256 85,000.00 21,760.00
Mandor L.04 OH 0.051 95,000.00 4,845.00
D. Jumlah ( A + B + C ) 62,445.00
E. Overhead & Profit 15 % x D 9,366.75
F. Harga Satuan Pekerjaan ( D + E ) 71,811.75
D. Jumlah ( A + B + C ) 108,875.00
E. Overhead & Profit 15 % x D 16,331.25
F. Harga Satuan Pekerjaan ( D + E ) 125,206.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.353 70,000.00 94,710.00
Tukang Pipa L.02 OH 0.677 85,000.00 57,545.00
Mandor L.04 OH 0.135 95,000.00 12,825.00
D. Jumlah ( A + B + C ) 165,080.00
E. Overhead & Profit 15 % x D 24,762.00
F. Harga Satuan Pekerjaan ( D + E ) 189,842.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.659 70,000.00 116,130.00
Tukang Pipa L.02 OH 0.830 85,000.00 70,550.00
Mandor L.04 OH 0.166 95,000.00 15,770.00
D. Jumlah ( A + B + C ) 202,450.00
E. Overhead & Profit 15 % x D 30,367.50
F. Harga Satuan Pekerjaan ( D + E ) 232,817.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.818 70,000.00 127,260.00
Tukang Pipa L.02 OH 0.909 85,000.00 77,265.00
Mandor L.04 OH 0.182 95,000.00 17,290.00
D. Jumlah ( A + B + C ) 221,815.00
E. Overhead & Profit 15 % x D 33,272.25
F. Harga Satuan Pekerjaan ( D + E ) 255,087.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.370 70,000.00 165,900.00
Tukang Pipa L.02 OH 1.185 85,000.00 100,725.00
Mandor L.04 OH 0.237 95,000.00 22,515.00
D. Jumlah ( A + B + C ) 289,140.00
E. Overhead & Profit 15 % x D 43,371.00
F. Harga Satuan Pekerjaan ( D + E ) 332,511.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.345 70,000.00 24,150.00
Tukang Pipa L.02 OH 0.172 85,000.00 14,620.00
Mandor L.04 OH 0.034 95,000.00 3,230.00
D. Jumlah ( A + B + C ) 42,000.00
E. Overhead & Profit 15 % x D 6,300.00
F. Harga Satuan Pekerjaan ( D + E ) 48,300.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.400 70,000.00 28,000.00
Tukang Pipa L.02 OH 0.200 85,000.00 17,000.00
Mandor L.04 OH 0.040 95,000.00 3,800.00
Jumlah Biaya Untuk Upah 48,800.00
B. BAHAN
Pipa GIP diameter 100 mm m 1.000 1,570,000.00 1,570,000.00
D. Jumlah ( A + B + C ) 1,618,800.00
E. Overhead & Profit 15 % x D 242,820.00
F. Harga Satuan Pekerjaan ( D + E ) 1,861,620.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.448 70,000.00 31,360.00
Tukang Pipa L.02 OH 0.224 85,000.00 19,040.00
Mandor L.04 OH 0.045 95,000.00 4,275.00
D. Jumlah ( A + B + C ) 54,675.00
E. Overhead & Profit 15 % x D 8,201.25
F. Harga Satuan Pekerjaan ( D + E ) 62,876.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.506 70,000.00 35,420.00
Tukang Pipa L.02 OH 0.253 85,000.00 21,505.00
Mandor L.04 OH 0.051 95,000.00 4,845.00
D. Jumlah ( A + B + C ) 2,694,270.00
E. Overhead & Profit 15 % x D 404,140.50
F. Harga Satuan Pekerjaan ( D + E ) 3,098,410.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.796 70,000.00 55,720.00
Tukang Pipa L.02 OH 0.398 85,000.00 33,830.00
Mandor L.04 OH 0.080 95,000.00 7,600.00
D. Jumlah ( A + B + C ) 97,150.00
E. Overhead & Profit 15 % x D 14,572.50
F. Harga Satuan Pekerjaan ( D + E ) 111,722.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.949 70,000.00 66,430.00
Tukang Pipa L.02 OH 0.475 85,000.00 40,375.00
Mandor L.04 OH 0.095 95,000.00 9,025.00
D. Jumlah ( A + B + C ) 115,830.00
E. Overhead & Profit 15 % x D 17,374.50
F. Harga Satuan Pekerjaan ( D + E ) 133,204.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.958 70,000.00 67,060.00
Tukang Pipa L.02 OH 0.479 85,000.00 40,715.00
Mandor L.04 OH 0.096 95,000.00 9,120.00
D. Jumlah ( A + B + C ) 116,895.00
E. Overhead & Profit 15 % x D 17,534.25
F. Harga Satuan Pekerjaan ( D + E ) 134,429.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.212 70,000.00 84,840.00
Tukang Pipa L.02 OH 0.606 85,000.00 51,510.00
Mandor L.04 OH 0.121 95,000.00 11,495.00
D. Jumlah ( A + B + C ) 147,845.00
E. Overhead & Profit 15 % x D 22,176.75
F. Harga Satuan Pekerjaan ( D + E ) 170,021.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.353 70,000.00 94,710.00
Tukang Pipa L.02 OH 0.676 85,000.00 57,460.00
Mandor L.04 OH 0.135 95,000.00 12,825.00
D. Jumlah ( A + B + C ) 164,995.00
E. Overhead & Profit 15 % x D 24,749.25
F. Harga Satuan Pekerjaan ( D + E ) 189,744.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.469 70,000.00 102,830.00
Tukang Pipa L.02 OH 0.735 85,000.00 62,475.00
Mandor L.04 OH 0.147 95,000.00 13,965.00
D. Jumlah ( A + B + C ) 179,270.00
E. Overhead & Profit 15 % x D 26,890.50
F. Harga Satuan Pekerjaan ( D + E ) 206,160.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.327 70,000.00 92,890.00
Tukang Pipa L.02 OH 0.664 85,000.00 56,440.00
Mandor L.04 OH 0.133 95,000.00 12,635.00
D. Jumlah ( A + B + C ) 161,965.00
E. Overhead & Profit 15 % x D 24,294.75
F. Harga Satuan Pekerjaan ( D + E ) 186,259.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.327 70,000.00 162,890.00
Tukang Pipa L.02 OH 1.163 85,000.00 98,855.00
Mandor L.04 OH 0.233 95,000.00 22,135.00
D. Jumlah ( A + B + C ) 283,880.00
E. Overhead & Profit 15 % x D 42,582.00
F. Harga Satuan Pekerjaan ( D + E ) 326,462.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.623 70,000.00 183,610.00
Tukang Pipa L.02 OH 1.312 85,000.00 111,520.00
Mandor L.04 OH 0.262 95,000.00 24,890.00
D. Jumlah ( A + B + C ) 320,020.00
E. Overhead & Profit 15 % x D 48,003.00
F. Harga Satuan Pekerjaan ( D + E ) 368,023.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.911 70,000.00 203,770.00
Tukang Pipa L.02 OH 1.456 85,000.00 123,760.00
Mandor L.04 OH 0.291 95,000.00 27,645.00
D. Jumlah ( A + B + C ) 355,175.00
E. Overhead & Profit 15 % x D 53,276.25
F. Harga Satuan Pekerjaan ( D + E ) 408,451.25
D. Jumlah ( A + B + C ) 390,400.00
E. Overhead & Profit 15 % x D 58,560.00
F. Harga Satuan Pekerjaan ( D + E ) 448,960.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.488 70,000.00 244,160.00
Tukang Pipa L.02 OH 1.744 85,000.00 148,240.00
Mandor L.04 OH 0.349 95,000.00 33,155.00
D. Jumlah ( A + B + C ) 425,555.00
E. Overhead & Profit 15 % x D 63,833.25
F. Harga Satuan Pekerjaan ( D + E ) 489,388.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.489 70,000.00 34,230.00
Tukang Pipa L.02 OH 0.098 85,000.00 8,330.00
Mandor L.04 OH 0.049 95,000.00 4,655.00
D. Jumlah ( A + B + C ) 47,215.00
E. Overhead & Profit 15 % x D 7,082.25
F. Harga Satuan Pekerjaan ( D + E ) 54,297.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.547 70,000.00 38,290.00
Tukang Pipa L.02 OH 0.109 85,000.00 9,265.00
Mandor L.04 OH 0.055 95,000.00 5,225.00
D. Jumlah ( A + B + C ) 52,780.00
E. Overhead & Profit 15 % x D 7,917.00
F. Harga Satuan Pekerjaan ( D + E ) 60,697.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.613 70,000.00 42,910.00
Tukang Pipa L.02 OH 0.123 85,000.00 10,455.00
Mandor L.04 OH 0.061 95,000.00 5,795.00
D. Jumlah ( A + B + C ) 59,160.00
E. Overhead & Profit 15 % x D 8,874.00
F. Harga Satuan Pekerjaan ( D + E ) 68,034.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.855 70,000.00 59,850.00
Tukang Pipa L.02 OH 0.171 85,000.00 14,535.00
Mandor L.04 OH 0.085 95,000.00 8,075.00
D. Jumlah ( A + B + C ) 82,460.00
E. Overhead & Profit 15 % x D 12,369.00
F. Harga Satuan Pekerjaan ( D + E ) 94,829.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.951 70,000.00 66,570.00
Tukang Pipa L.02 OH 0.190 85,000.00 16,150.00
Mandor L.04 OH 0.095 95,000.00 9,025.00
Jumlah Biaya Untuk Upah 91,745.00
B. BAHAN
Pipa DCI diameter 250 mm m 1.000 -
D. Jumlah ( A + B + C ) 91,745.00
E. Overhead & Profit 15 % x D 13,761.75
F. Harga Satuan Pekerjaan ( D + E ) 105,506.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.973 70,000.00 68,110.00
Tukang Pipa L.02 OH 0.195 85,000.00 16,575.00
Mandor L.04 OH 0.097 95,000.00 9,215.00
D. Jumlah ( A + B + C ) 93,900.00
E. Overhead & Profit 15 % x D 14,085.00
F. Harga Satuan Pekerjaan ( D + E ) 107,985.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.545 70,000.00 108,150.00
Tukang Pipa L.02 OH 0.309 85,000.00 26,265.00
Operator Alat Berat L.08 OH 0.093 90,000.00 8,370.00
Mandor L.04 OH 0.154 95,000.00 14,630.00
D. Jumlah ( A + B + C ) 157,415.00
E. Overhead & Profit 15 % x D 23,612.25
F. Harga Satuan Pekerjaan ( D + E ) 181,027.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.813 70,000.00 126,910.00
Tukang Pipa L.02 OH 0.363 85,000.00 30,855.00
Operator Alat Berat L.08 OH 0.143 90,000.00 12,870.00
Mandor L.04 OH 0.181 95,000.00 17,195.00
D. Jumlah ( A + B + C ) 187,830.00
E. Overhead & Profit 15 % x D 28,174.50
F. Harga Satuan Pekerjaan ( D + E ) 216,004.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.047 70,000.00 143,290.00
Tukang Pipa L.02 OH 0.409 85,000.00 34,765.00
Operator Alat Berat L.08 OH 0.193 90,000.00 17,370.00
Mandor L.04 OH 0.205 95,000.00 19,475.00
D. Jumlah ( A + B + C ) 214,900.00
E. Overhead & Profit 15 % x D 32,235.00
F. Harga Satuan Pekerjaan ( D + E ) 247,135.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.011 70,000.00 140,770.00
Tukang Pipa L.02 OH 0.402 85,000.00 34,170.00
Operator Alat Berat L.08 OH 0.293 90,000.00 26,370.00
Mandor L.04 OH 0.201 95,000.00 19,095.00
D. Jumlah ( A + B + C ) 220,405.00
E. Overhead & Profit 15 % x D 33,060.75
F. Harga Satuan Pekerjaan ( D + E ) 253,465.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.859 70,000.00 270,130.00
Tukang Pipa L.02 OH 0.772 85,000.00 65,620.00
Operator Alat Berat L.08 OH 0.493 90,000.00 44,370.00
Mandor L.04 OH 0.386 95,000.00 36,670.00
Jumlah Biaya Untuk Upah 416,790.00
B. BAHAN
Pipa DCI diameter 800 mm m 1.000 -
D. Jumlah ( A + B + C ) 416,790.00
E. Overhead & Profit 15 % x D 62,518.50
F. Harga Satuan Pekerjaan ( D + E ) 479,308.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.995 70,000.00 349,650.00
Tukang Pipa L.02 OH 0.999 85,000.00 84,915.00
Operator Alat Berat L.08 OH 0.593 90,000.00 53,370.00
Mandor L.04 OH 0.499 95,000.00 47,405.00
D. Jumlah ( A + B + C ) 535,340.00
E. Overhead & Profit 15 % x D 80,301.00
F. Harga Satuan Pekerjaan ( D + E ) 615,641.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.931 70,000.00 415,170.00
Tukang Pipa L.02 OH 1.186 85,000.00 100,810.00
Operator Alat Berat L.08 OH 0.793 90,000.00 71,370.00
Mandor L.04 OH 0.693 95,000.00 65,835.00
D. Jumlah ( A + B + C ) 653,185.00
E. Overhead & Profit 15 % x D 97,977.75
F. Harga Satuan Pekerjaan ( D + E ) 751,162.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.949 70,000.00 486,430.00
Tukang Pipa L.02 OH 1.390 85,000.00 118,150.00
Operator Alat Berat L.08 OH 0.793 90,000.00 71,370.00
Mandor L.04 OH 0.695 95,000.00 66,025.00
D. Jumlah ( A + B + C ) 741,975.00
E. Overhead & Profit 15 % x D 111,296.25
F. Harga Satuan Pekerjaan ( D + E ) 853,271.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 8.056 70,000.00 563,920.00
Tukang Pipa L.02 OH 1.611 85,000.00 136,935.00
Operator Alat Berat L.08 OH 0.893 90,000.00 80,370.00
Mandor L.04 OH 0.806 95,000.00 76,570.00
D. Jumlah ( A + B + C ) 857,795.00
E. Overhead & Profit 15 % x D 128,669.25
F. Harga Satuan Pekerjaan ( D + E ) 986,464.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.028 70,000.00 1,960.00
Tukang Pipa L.02 OH 0.006 85,000.00 510.00
Mandor L.04 OH 0.003 95,000.00 285.00
D. Jumlah ( A + B + C ) 2,755.00
E. Overhead & Profit 15 % x D 413.25
F. Harga Satuan Pekerjaan ( D + E ) 3,168.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.085 70,000.00 5,950.00
Tukang Pipa L.02 OH 0.017 85,000.00 1,445.00
Mandor L.04 OH 0.008 95,000.00 760.00
D. Jumlah ( A + B + C ) 8,155.00
E. Overhead & Profit 15 % x D 1,223.25
F. Harga Satuan Pekerjaan ( D + E ) 9,378.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.133 70,000.00 9,310.00
Tukang Pipa L.02 OH 0.027 85,000.00 2,295.00
Mandor L.04 OH 0.013 95,000.00 1,235.00
D. Jumlah ( A + B + C ) 12,840.00
E. Overhead & Profit 15 % x D 1,926.00
F. Harga Satuan Pekerjaan ( D + E ) 14,766.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.184 70,000.00 12,880.00
Tukang Pipa L.02 OH 0.037 85,000.00 3,145.00
Mandor L.04 OH 0.018 95,000.00 1,710.00
D. Jumlah ( A + B + C ) 17,735.00
E. Overhead & Profit 15 % x D 2,660.25
F. Harga Satuan Pekerjaan ( D + E ) 20,395.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.476 70,000.00 33,320.00
Tukang Pipa L.02 OH 0.095 85,000.00 8,075.00
Mandor L.04 OH 0.048 95,000.00 4,560.00
D. Jumlah ( A + B + C ) 45,955.00
E. Overhead & Profit 15 % x D 6,893.25
F. Harga Satuan Pekerjaan ( D + E ) 52,848.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.663 70,000.00 46,410.00
Tukang Pipa L.02 OH 0.133 85,000.00 11,305.00
Mandor L.04 OH 0.066 95,000.00 6,270.00
D. Jumlah ( A + B + C ) 63,985.00
E. Overhead & Profit 15 % x D 9,597.75
F. Harga Satuan Pekerjaan ( D + E ) 73,582.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.745 70,000.00 52,150.00
Tukang Pipa L.02 OH 0.149 85,000.00 12,665.00
Mandor L.04 OH 0.074 95,000.00 7,030.00
D. Jumlah ( A + B + C ) 71,845.00
E. Overhead & Profit 15 % x D 10,776.75
F. Harga Satuan Pekerjaan ( D + E ) 82,621.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.440 70,000.00 100,800.00
Tukang Pipa L.02 OH 0.288 85,000.00 24,480.00
Mandor L.04 OH 0.144 95,000.00 13,680.00
Jumlah Biaya Untuk Upah 138,960.00
B. BAHAN
Pipa baja diameter 400 mm bh 1.000 -
D. Jumlah ( A + B + C ) 138,960.00
E. Overhead & Profit 15 % x D 20,844.00
F. Harga Satuan Pekerjaan ( D + E ) 159,804.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.399 70,000.00 97,930.00
Tukang Pipa L.02 OH 0.280 85,000.00 23,800.00
Mandor L.04 OH 0.140 95,000.00 13,300.00
D. Jumlah ( A + B + C ) 135,030.00
E. Overhead & Profit 15 % x D 20,254.50
F. Harga Satuan Pekerjaan ( D + E ) 155,284.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.558 70,000.00 109,060.00
Tukang Pipa L.02 OH 0.312 85,000.00 26,520.00
Mandor L.04 OH 0.156 95,000.00 14,820.00
D. Jumlah ( A + B + C ) 150,400.00
E. Overhead & Profit 15 % x D 22,560.00
F. Harga Satuan Pekerjaan ( D + E ) 172,960.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.437 70,000.00 100,590.00
Tukang Pipa L.02 OH 0.287 85,000.00 24,395.00
Mandor L.04 OH 0.144 95,000.00 13,680.00
Jumlah Biaya Untuk Upah 138,665.00
B. BAHAN
Pipa baja diameter 600 mm bh 1.000 -
D. Jumlah ( A + B + C ) 138,665.00
E. Overhead & Profit 15 % x D 20,799.75
F. Harga Satuan Pekerjaan ( D + E ) 159,464.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.624 70,000.00 183,680.00
Tukang Pipa L.02 OH 0.525 85,000.00 44,625.00
Mandor L.04 OH 0.262 95,000.00 24,890.00
D. Jumlah ( A + B + C ) 253,195.00
E. Overhead & Profit 15 % x D 37,979.25
F. Harga Satuan Pekerjaan ( D + E ) 291,174.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.971 70,000.00 207,970.00
Tukang Pipa L.02 OH 0.594 85,000.00 50,490.00
Mandor L.04 OH 0.297 95,000.00 28,215.00
D. Jumlah ( A + B + C ) 286,675.00
E. Overhead & Profit 15 % x D 43,001.25
F. Harga Satuan Pekerjaan ( D + E ) 329,676.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.319 70,000.00 232,330.00
Tukang Pipa L.02 OH 0.664 85,000.00 56,440.00
Mandor L.04 OH 0.332 95,000.00 31,540.00
D. Jumlah ( A + B + C ) 320,310.00
E. Overhead & Profit 15 % x D 48,046.50
F. Harga Satuan Pekerjaan ( D + E ) 368,356.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.667 70,000.00 256,690.00
Tukang Pipa L.02 OH 0.733 85,000.00 62,305.00
Mandor L.04 OH 0.367 95,000.00 34,865.00
D. Jumlah ( A + B + C ) 353,860.00
E. Overhead & Profit 15 % x D 53,079.00
F. Harga Satuan Pekerjaan ( D + E ) 406,939.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.015 70,000.00 281,050.00
Tukang Pipa L.02 OH 0.803 85,000.00 68,255.00
Mandor L.04 OH 0.402 95,000.00 38,190.00
D. Jumlah ( A + B + C ) 387,495.00
E. Overhead & Profit 15 % x D 58,124.25
F. Harga Satuan Pekerjaan ( D + E ) 445,619.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.429 70,000.00 100,030.00
Tukang Pipa L.02 OH 0.715 85,000.00 60,775.00
Mandor L.04 OH 0.143 95,000.00 13,585.00
Jumlah Biaya Untuk Upah 174,390.00
B. BAHAN
Valve diameter 150 mm bh 1.000 -
D. Jumlah ( A + B + C ) 174,390.00
E. Overhead & Profit 15 % x D 26,158.50
F. Harga Satuan Pekerjaan ( D + E ) 200,548.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang Pipa L.02 OH 0.857 85,000.00 72,845.00
Mandor L.04 OH 0.171 95,000.00 16,245.00
D. Jumlah ( A + B + C ) 209,070.00
E. Overhead & Profit 15 % x D 31,360.50
F. Harga Satuan Pekerjaan ( D + E ) 240,430.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang Pipa L.02 OH 0.857 85,000.00 72,845.00
Mandor L.04 OH 0.171 95,000.00 16,245.00
D. Jumlah ( A + B + C ) 209,070.00
E. Overhead & Profit 15 % x D 31,360.50
F. Harga Satuan Pekerjaan ( D + E ) 240,430.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.000 70,000.00 140,000.00
Tukang Pipa L.02 OH 1.000 85,000.00 85,000.00
Mandor L.04 OH 0.200 95,000.00 19,000.00
D. Jumlah ( A + B + C ) 244,000.00
E. Overhead & Profit 15 % x D 36,600.00
F. Harga Satuan Pekerjaan ( D + E ) 280,600.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.429 70,000.00 240,030.00
Tukang Pipa L.02 OH 1.715 85,000.00 145,775.00
Mandor L.04 OH 0.343 95,000.00 32,585.00
D. Jumlah ( A + B + C ) 418,390.00
E. Overhead & Profit 15 % x D 62,758.50
F. Harga Satuan Pekerjaan ( D + E ) 481,148.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.429 70,000.00 240,030.00
Tukang Pipa L.02 OH 1.715 85,000.00 145,775.00
Mandor L.04 OH 0.343 95,000.00 32,585.00
D. Jumlah ( A + B + C ) 418,390.00
E. Overhead & Profit 15 % x D 62,758.50
F. Harga Satuan Pekerjaan ( D + E ) 481,148.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.000 70,000.00 280,000.00
Tukang Pipa L.02 OH 2.000 85,000.00 170,000.00
Mandor L.04 OH 0.400 95,000.00 38,000.00
D. Jumlah ( A + B + C ) 488,000.00
E. Overhead & Profit 15 % x D 73,200.00
F. Harga Satuan Pekerjaan ( D + E ) 561,200.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.421 70,000.00 99,470.00
Tukang Pipa L.02 OH 0.711 85,000.00 60,435.00
Mandor L.04 OH 0.142 95,000.00 13,490.00
D. Jumlah ( A + B + C ) 173,395.00
E. Overhead & Profit 15 % x D 26,009.25
F. Harga Satuan Pekerjaan ( D + E ) 199,404.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.429 70,000.00 100,030.00
Tukang Pipa L.02 OH 0.715 85,000.00 60,775.00
Mandor L.04 OH 0.143 95,000.00 13,585.00
D. Jumlah ( A + B + C ) 174,390.00
E. Overhead & Profit 15 % x D 26,158.50
F. Harga Satuan Pekerjaan ( D + E ) 200,548.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.786 70,000.00 125,020.00
Tukang Pipa L.02 OH 0.893 85,000.00 75,905.00
Mandor L.04 OH 0.179 95,000.00 17,005.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.714 70,000.00 119,980.00
Tukang Pipa L.02 OH 0.857 85,000.00 72,845.00
Mandor L.04 OH 0.171 95,000.00 16,245.00
D. Jumlah ( A + B + C ) 209,070.00
E. Overhead & Profit 15 % x D 31,360.50
F. Harga Satuan Pekerjaan ( D + E ) 240,430.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.571 70,000.00 179,970.00
Tukang Pipa L.02 OH 1.286 85,000.00 109,310.00
Mandor L.04 OH 0.257 95,000.00 24,415.00
D. Jumlah ( A + B + C ) 313,695.00
E. Overhead & Profit 15 % x D 47,054.25
F. Harga Satuan Pekerjaan ( D + E ) 360,749.25
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang Pipa L.02 OH 1.500 85,000.00 127,500.00
Mandor L.04 OH 0.300 95,000.00 28,500.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.000 70,000.00 210,000.00
Tukang Pipa L.02 OH 1.500 85,000.00 127,500.00
Mandor L.04 OH 0.300 95,000.00 28,500.00
D. Jumlah ( A + B + C ) 366,000.00
E. Overhead & Profit 15 % x D 54,900.00
F. Harga Satuan Pekerjaan ( D + E ) 420,900.00
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.106 70,000.00 7,420.00
Tukang Pipa L.02 OH 0.053 85,000.00 4,505.00
Mandor L.04 OH 0.011 95,000.00 1,045.00
D. Jumlah ( A + B + C ) 12,970.00
E. Overhead & Profit 15 % x D 1,945.50
F. Harga Satuan Pekerjaan ( D + E ) 14,915.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.216 70,000.00 15,120.00
Tukang Pipa L.02 OH 0.208 85,000.00 17,680.00
Mandor L.04 OH 0.022 95,000.00 2,090.00
D. Jumlah ( A + B + C ) 34,890.00
E. Overhead & Profit 15 % x D 5,233.50
F. Harga Satuan Pekerjaan ( D + E ) 40,123.50
A.8.4.3.17. Pemasangan 1 buah Tee diameter 250 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.326 70,000.00 22,820.00
Tukang Pipa L.02 OH 0.163 85,000.00 13,855.00
Mandor L.04 OH 0.033 95,000.00 3,135.00
D. Jumlah ( A + B + C ) 39,810.00
E. Overhead & Profit 15 % x D 5,971.50
F. Harga Satuan Pekerjaan ( D + E ) 45,781.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.436 70,000.00 30,520.00
Tukang Pipa L.02 OH 0.218 85,000.00 18,530.00
Mandor L.04 OH 0.044 95,000.00 4,180.00
D. Jumlah ( A + B + C ) 53,230.00
E. Overhead & Profit 15 % x D 7,984.50
F. Harga Satuan Pekerjaan ( D + E ) 61,214.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.656 70,000.00 45,920.00
Tukang Pipa L.02 OH 0.328 85,000.00 27,880.00
Mandor L.04 OH 0.066 95,000.00 6,270.00
D. Jumlah ( A + B + C ) 80,070.00
E. Overhead & Profit 15 % x D 12,010.50
F. Harga Satuan Pekerjaan ( D + E ) 92,080.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.766 70,000.00 53,620.00
Tukang Pipa L.02 OH 0.383 85,000.00 32,555.00
Mandor L.04 OH 0.077 95,000.00 7,315.00
D. Jumlah ( A + B + C ) 93,490.00
E. Overhead & Profit 15 % x D 14,023.50
F. Harga Satuan Pekerjaan ( D + E ) 107,513.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.876 70,000.00 61,320.00
Tukang Pipa L.02 OH 0.438 85,000.00 37,230.00
Mandor L.04 OH 0.088 95,000.00 8,360.00
D. Jumlah ( A + B + C ) 106,910.00
E. Overhead & Profit 15 % x D 16,036.50
F. Harga Satuan Pekerjaan ( D + E ) 122,946.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.096 70,000.00 76,720.00
Tukang Pipa L.02 OH 0.548 85,000.00 46,580.00
Mandor L.04 OH 0.110 95,000.00 10,450.00
D. Jumlah ( A + B + C ) 133,750.00
E. Overhead & Profit 15 % x D 20,062.50
F. Harga Satuan Pekerjaan ( D + E ) 153,812.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.316 70,000.00 92,120.00
Tukang Pipa L.02 OH 0.658 85,000.00 55,930.00
Mandor L.04 OH 0.132 95,000.00 12,540.00
D. Jumlah ( A + B + C ) 160,590.00
E. Overhead & Profit 15 % x D 24,088.50
F. Harga Satuan Pekerjaan ( D + E ) 184,678.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.536 70,000.00 107,520.00
Tukang Pipa L.02 OH 0.768 85,000.00 65,280.00
Mandor L.04 OH 0.154 95,000.00 14,630.00
D. Jumlah ( A + B + C ) 187,430.00
E. Overhead & Profit 15 % x D 28,114.50
F. Harga Satuan Pekerjaan ( D + E ) 215,544.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.756 70,000.00 122,920.00
Tukang Pipa L.02 OH 0.878 85,000.00 74,630.00
Mandor L.04 OH 0.176 95,000.00 16,720.00
D. Jumlah ( A + B + C ) 214,270.00
E. Overhead & Profit 15 % x D 32,140.50
F. Harga Satuan Pekerjaan ( D + E ) 246,410.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.976 70,000.00 138,320.00
Tukang Pipa L.02 OH 0.988 85,000.00 83,980.00
Mandor L.04 OH 0.198 95,000.00 18,810.00
D. Jumlah ( A + B + C ) 241,110.00
E. Overhead & Profit 15 % x D 36,166.50
F. Harga Satuan Pekerjaan ( D + E ) 277,276.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.196 70,000.00 153,720.00
Tukang Pipa L.02 OH 1.098 85,000.00 93,330.00
Mandor L.04 OH 0.220 95,000.00 20,900.00
D. Jumlah ( A + B + C ) 267,950.00
E. Overhead & Profit 15 % x D 40,192.50
F. Harga Satuan Pekerjaan ( D + E ) 308,142.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.416 70,000.00 169,120.00
Tukang Pipa L.02 OH 1.208 85,000.00 102,680.00
Mandor L.04 OH 0.242 95,000.00 22,990.00
D. Jumlah ( A + B + C ) 294,790.00
E. Overhead & Profit 15 % x D 44,218.50
F. Harga Satuan Pekerjaan ( D + E ) 339,008.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.466 70,000.00 102,620.00
Tukang Pipa L.02 OH 0.733 85,000.00 62,305.00
Mandor L.04 OH 0.147 95,000.00 13,965.00
D. Jumlah ( A + B + C ) 348,890.00
E. Overhead & Profit 15 % x D 52,333.50
F. Harga Satuan Pekerjaan ( D + E ) 401,223.50
A.8.4.4.2. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 100 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 1.646 70,000.00 115,220.00
Tukang Pipa L.02 OH 0.823 85,000.00 69,955.00
Mandor L.04 OH 0.165 95,000.00 15,675.00
D. Jumlah ( A + B + C ) 475,850.00
E. Overhead & Profit 15 % x D 71,377.50
F. Harga Satuan Pekerjaan ( D + E ) 547,227.50
A.8.4.4.3. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 150 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.096 70,000.00 146,720.00
Tukang Pipa L.02 OH 1.048 85,000.00 89,080.00
Mandor L.04 OH 0.210 95,000.00 19,950.00
D. Jumlah ( A + B + C ) 740,750.00
E. Overhead & Profit 15 % x D 111,112.50
F. Harga Satuan Pekerjaan ( D + E ) 851,862.50
A.8.4.4.4. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 200 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.546 70,000.00 178,220.00
Tukang Pipa L.02 OH 1.273 85,000.00 108,205.00
Mandor L.04 OH 0.255 95,000.00 24,225.00
D. Jumlah ( A + B + C ) 1,190,650.00
E. Overhead & Profit 15 % x D 178,597.50
F. Harga Satuan Pekerjaan ( D + E ) 1,369,247.50
A.8.4.4.5. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 250 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 2.996 70,000.00 209,720.00
Tukang Pipa L.02 OH 1.498 85,000.00 127,330.00
Mandor L.04 OH 0.300 95,000.00 28,500.00
D. Jumlah ( A + B + C ) 365,550.00
E. Overhead & Profit 15 % x D 54,832.50
F. Harga Satuan Pekerjaan ( D + E ) 420,382.50
A.8.4.4.6. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 300 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 3.446 70,000.00 241,220.00
Tukang Pipa L.02 OH 1.723 85,000.00 146,455.00
Mandor L.04 OH 0.345 95,000.00 32,775.00
D. Jumlah ( A + B + C ) 420,450.00
E. Overhead & Profit 15 % x D 63,067.50
F. Harga Satuan Pekerjaan ( D + E ) 483,517.50
A.8.4.4.7. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 400 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.346 70,000.00 304,220.00
Tukang Pipa L.02 OH 2.173 85,000.00 184,705.00
Mandor L.04 OH 0.435 95,000.00 41,325.00
D. Jumlah ( A + B + C ) 530,250.00
E. Overhead & Profit 15 % x D 79,537.50
F. Harga Satuan Pekerjaan ( D + E ) 609,787.50
A.8.4.4.8. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 450 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.796 70,000.00 335,720.00
Tukang Pipa L.02 OH 2.398 85,000.00 203,830.00
Mandor L.04 OH 0.480 95,000.00 45,600.00
D. Jumlah ( A + B + C ) 585,150.00
E. Overhead & Profit 15 % x D 87,772.50
F. Harga Satuan Pekerjaan ( D + E ) 672,922.50
A.8.4.4.9. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 500 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 5.246 70,000.00 367,220.00
Tukang Pipa L.02 OH 2.623 85,000.00 222,955.00
Mandor L.04 OH 0.525 95,000.00 49,875.00
Jumlah Biaya Untuk Upah 640,050.00
B. BAHAN
Pipa diameter 500 mm bh 1.000 -
D. Jumlah ( A + B + C ) 640,050.00
E. Overhead & Profit 15 % x D 96,007.50
F. Harga Satuan Pekerjaan ( D + E ) 736,057.50
A.8.4.4.10. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 600 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 6.146 70,000.00 430,220.00
Tukang Pipa L.02 OH 3.073 85,000.00 261,205.00
Mandor L.04 OH 0.615 95,000.00 58,425.00
D. Jumlah ( A + B + C ) 749,850.00
E. Overhead & Profit 15 % x D 112,477.50
F. Harga Satuan Pekerjaan ( D + E ) 862,327.50
A.8.4.4.11. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 700 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 7.046 70,000.00 493,220.00
Tukang Pipa L.02 OH 3.523 85,000.00 299,455.00
Mandor L.04 OH 0.705 95,000.00 66,975.00
D. Jumlah ( A + B + C ) 859,650.00
E. Overhead & Profit 15 % x D 128,947.50
F. Harga Satuan Pekerjaan ( D + E ) 988,597.50
A.8.4.4.12. Penyambungan 1 buah pipa baru ke pipa yang ada, diameter 800 mm
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 7.946 70,000.00 556,220.00
Tukang Pipa L.02 OH 3.973 85,000.00 337,705.00
Mandor L.04 OH 0.795 95,000.00 75,525.00
D. Jumlah ( A + B + C ) 969,450.00
E. Overhead & Profit 15 % x D 145,417.50
F. Harga Satuan Pekerjaan ( D + E ) 1,114,867.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,248.10
E. Overhead & Profit 15 % x D 187.22
F. Harga Satuan Pekerjaan ( D + E ) 1,435.32
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 636.20
E. Overhead & Profit 15 % x D 95.43
F. Harga Satuan Pekerjaan ( D + E ) 731.63
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,248.40
E. Overhead & Profit 15 % x D 187.26
F. Harga Satuan Pekerjaan ( D + E ) 1,435.66
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,248.90
E. Overhead & Profit 15 % x D 187.34
F. Harga Satuan Pekerjaan ( D + E ) 1,436.24
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,249.55
E. Overhead & Profit 15 % x D 187.43
F. Harga Satuan Pekerjaan ( D + E ) 1,436.98
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,250.45
E. Overhead & Profit 15 % x D 187.57
F. Harga Satuan Pekerjaan ( D + E ) 1,438.02
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,251.55
E. Overhead & Profit 15 % x D 187.73
F. Harga Satuan Pekerjaan ( D + E ) 1,439.28
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,254.30
E. Overhead & Profit 15 % x D 188.15
F. Harga Satuan Pekerjaan ( D + E ) 1,442.45
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,255.90
E. Overhead & Profit 15 % x D 188.39
F. Harga Satuan Pekerjaan ( D + E ) 1,444.29
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.008 70,000.00 560.00
Mandor L.04 OH 0.0008 95,000.00 76.00
D. Jumlah ( A + B + C ) 1,262.15
E. Overhead & Profit 15 % x D 189.32
F. Harga Satuan Pekerjaan ( D + E ) 1,451.47
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 0.700 70,000.00 49,000.00
Tukang Batu L.02 OH 0.350 85,000.00 29,750.00
Kepala Tukang L.03 OH 0.035 90,000.00 3,150.00
Mandor L.04 OH 0.035 95,000.00 3,325.00
D. Jumlah ( A + B + C ) 107,700.00
E. Overhead & Profit 15 % x D 16,155.00
F. Harga Satuan Pekerjaan ( D + E ) 123,855.00
A.4.1.1.37. Membuat 1 m3 pelat beton (100 Kg Besi + Bekisting).
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH 4.950 70,000.00 346,500.00
Tukang Batu L.02 OH 0.275 85,000.00 23,375.00
Tukang Kayu L.02 OH 1.300 85,000.00 110,500.00
Tukang Besi L.02 OH 0.700 85,000.00 59,500.00
Kepala Tukang L.03 OH 0.230 90,000.00 20,700.00
Mandor L.04 OH 0.245 95,000.00 23,275.00
D. Jumlah ( A + B + C ) 4,625,005.00
E. Overhead & Profit 15 % x D 693,750.75
F. Harga Satuan Pekerjaan ( D + E ) 5,318,755.75
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Listrik L.02 OH 0.800 85,000.00 68,000.00
D. Jumlah ( A + B + C ) 171,034.38
E. Overhead & Profit 15 % x D 25,655.16
F. Harga Satuan Pekerjaan ( D + E ) 196,689.54
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Listrik L.02 OH 0.400 85,000.00 34,000.00
D. Jumlah ( A + B + C ) 75,409.38
E. Overhead & Profit 15 % x D 11,311.41
F. Harga Satuan Pekerjaan ( D + E ) 86,720.79
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Listrik L.02 OH 0.400 85,000.00 34,000.00
D. Jumlah ( A + B + C ) 96,909.38
E. Overhead & Profit 15 % x D 14,536.41
F. Harga Satuan Pekerjaan ( D + E ) 111,445.79
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Tukang Listrik L.02 OH 0.400 80,000.00 32,000.00
D. Jumlah ( A + B + C ) 68,950.00
E. Overhead & Profit 15 % x D 10,342.50
F. Harga Satuan Pekerjaan ( D + E ) 79,292.50
Harga Jumlah
No. Uraian Kode Satuan Koefesien Satuan Harga
( Rp.) ( Rp.)
A. TENAGA
Pekerja L.01 OH - 60,000.00 -
Tukang Listrik L.02 OH 0.400 80,000.00 32,000.00
Mandor L.04 OH - 90,000.00 -
D. Jumlah ( A + B + C ) 85,450.00
E. Overhead & Profit 15 % x D 12,817.50
F. Harga Satuan Pekerjaan ( D + E ) 98,267.50
DAFTAR HARGA BAHAN DAN UPAH
SEMESTER I TAHUN 2018
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
A HARGA UPAH
1 Mandor Hari 95,000.00
2 Kepala Tukang Hari 90,000.00
3 Tukang Hari 85,000.00
4 Pekerja Hari 70,000.00
5 Operator Terampil Hari 90,000.00
6 Pembantu Operator Hari 80,000.00
7 Supir Terampil Hari 80,000.00
8 Pembantu Supir Hari 75,000.00
9 Buruh Terampil Hari 80,000.00
10 Buruh Tak terampil Hari 70,000.00
11 Ahli Bor Hari 90,000.00
B HARGA BAHAN :
1 Abu Batu 0-0.5 cm M3 408,900.00
2 AC-BC Ton 1,351,500.00
3 Accessories listrik Set 8,500.00
4 AC-WC Ton 1,382,500.00
5 Agregat Halus M3 300,000.00
6 Agregat Kasar M3 310,000.00
7 Air Kerja liter 50.00
8 Alat Bantu Unit 49,500.00
9 Alat Bantu /Perlengkapan Unit 2,500.00
10 Alumunium M" 75,000.00
11 Alumunium strip M" 49,500.00
12 Alumunium voil M2 30,250.00
13 Amplas Lembar 6,500.00
14 Asbes Bubungan Lbr 28,000.00
15 Asbes Gelombang (180x 80 x 0,4) cm Lembar 35,000.00
16 Asbes Gelombang (240x80x0,35) cm Lembar 46,000.00
17 Asbes Gelombang (300x105x0,4)cm Lbr 80,000.00
18 Aspal Kg 12,000.00
19 Atap Kran 1/2" Buah 21,175.00
20 Atap Kran 3/4" Buah 36,300.00
21 Baja Ringan + Atap Polos M2 210,000.00
22 Baja Ringan + Atap Berpasir M2 220,000.00
23 Bak besar Porselen Buah 1,300,000.00
24 Bak Mandi Fiber 50.50.70 Buah 300,000.00
25 Bak Kecil Porselen Buah 245,000.00
26 Bambu Dia 6-8/600cm Batang 10,000.00
27 Batu Andesit M2 150,000.00
28 Batu Apung Kg 21,175.00
29 Batu bata Buah 475.00
30 Batu Belah Hitam Utk Pondasi M3 250,000.00
31 Batu Candi M2 145,000.00
32 Batu Jagung (gravel)dia= 5 s/d 7 mm Kg 4,500.00
33 Batu muka M2 65,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
34 Clear (pengilap batu) Kaleng 80,000.00
35 Batu Palimanan M2 125,000.00
36 Batu Pecah 0.5-1 cm (Screening) M3 302,300.00
37 Batu Pecah 1-2 cm (Split) M3 350,000.00
38 Batu Pecah 2-3 cm (Split) M3 350,000.00
39 Batu Pecah 3-5 cm (Split) M3 300,000.00
40 Batu Pecah 5-7 cm (Steenslag) M3 300,000.00
41 Batu Pecah 10-15 cm (Onderlaag) M3 292,800.00
42 Baut Buah 500.00
43 Baut Baja Ringan Bh 800.00
44 Baut skrup zink Bh 2,500.00
45 Besi Beton Polos Kg 14,300.00
46 Besi Beton Ulir Kg 15,300.00
47 Besi hollow blok 2/4 utk rangka plafond galvanis btg 30,000.00
48 Besi hollow blok 4 X 4 utk rangka plafond galvanis btg 35,000.00
49 Besi hollow blok 4 X 4 utk pagar btg 110,000.00
50 Besi hollow blok 4x6 btg 150,000.00
51 Besi hollow blok 5x5 btg 180,000.00
52 Besi hollow blok 6 X 6 btg 250,000.00
53 Besi plat 1 mm M2 16,000.00
54 Besi plat 1,2 mm M2 16,500.00
55 Besi Siku Kg 15,200.00
56 Besi Strip Kg 16,000.00
57 Box headwell Unit 650,000.00
58 Box meter Unit 55,000.00
59 Box sekering+sekering Buah 67,500.00
60 Box Zekering/ Termis Buah 35,000.00
60 Bubungan Genteng Metal M1 50,000.00
61 Bubungan Asbes Lembar 28,000.00
62 Bubungan Genteng Beton Buah 7,500.00
63 Bubungan Genteng Kodok Buah 5,000.00
64 Bubungan Genteng Mantili Buah 4,000.00
65 Bubungan Genteng Plentong Buah 4,500.00
66 Bubungan karpet M 8,450.00
67 Cat Genteng Kg 50,000.00
68 Cat Marka (Non Thermoplast) Kg 40,000.00
69 Cat Marka Thermoplast Kg 38,500.00
70 Cat Meni kayu / besi Kg 50,000.00
71 Cat Taman Kg 25,000.00
72 Cat Tembok Kg 25,000.00
73 Cat tembok Epoxy Kg 85,000.00
74 Cat tembok weathershield Kg 75,000.00
75 Cat Warna kg 24,000.00
76 Cat zincromat Kg 60,000.00
77 Chek Valve 11/2" Buah 242,000.00
78 Chek Valve 11/4" Buah 193,600.00
79 Cherlag Kg 72,600.00
80 Clemp Sadle dia 2" Buah 34,800.00
81 Clemp Sadle dia 3" Buah 48,700.00
82 Clemp Sadle dia 4" Buah 62,600.00
83 Dempul Kayu Kg 26,500.00
84 Dempul Tembok Kg 20,000.00
85 Doble Nepel 1/2" Buah 17,500.00
86 Doble Nepel 3/4" Buah 24,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
87 Doble Nepel 1" Buah 30,000.00
88 Door closer Buah 225,000.00
89 Dop 2"AW Buah 15,000.00
90 Dop 3"AW Buah 20,000.00
91 Dop 4" PVC Buah 25,000.00
92 Dop 6" PVC Buah 40,000.00
93 Engsel Jendela Buah 17,500.00
94 Engsel Pintu Buah 30,000.00
95 Eternit (240 x 120 x 0,3)cm M2 50,000.00
96 Exhaust walf fan Unit 350,000.00
97 Filler Kg 650.00
98 Floordrain Plastik Buah 15,000.00
99 Floordrain stainless Buah 25,000.00
100 Floordrain stainless buka tutup Buah 45,000.00
101 Folding Gate 05 mm M2 550,000.00
102 Gebalan rumput M2 6,500.00
103 Gembok + Grendel Kunci Buah 30,000.00
104 Generator Hari 75,000.00
105 Genset 2500 watt Unit 3,500,000.00
106 Genteng Beton Buah 8,000.00
107 Genteng Keramik Buah 8,500.00
108 Genteng Kodok Buah 1,500.00
109 Genteng Mantili Buah 1,200.00
110 Genteng Plentong besar Buah 2,500.00
111 Genteng Plentong kecil Buah 1,950.00
112 Glass Block Buah 25,000.00
113 Granit 40 x 40 cm Buah 62,000.00
114 Granit Gelap 60 x 60 cm Buah 83,500.00
115 Granit Gelap 80 x 80 cm Buah 143,000.00
116 Granit Polos 60 x 60 cm Buah 70,000.00
117 Granit Polos 80 x 80 cm Buah 130,000.00
118 Grass block Buah 10,000.00
119 GRC cetak dan rangka M2 615,000.00
120 Grendel Jendela Set 20,000.00
121 Grendel Pintu Buah 25,000.00
122 Grounding kawat BC Set 1,400,000.00
123 Gypsum Lembar 75,000.00
124 GRC Lembar 70,000.00
125 Hak Angin / pengkait Set 30,500.00
126 Handle pintu stainless Psg 250,000.00
127 Harplek 1 x 1 m M2 24,200.00
128 Headsumur dari plat penutup 5 mm Unit 300,000.00
129 Hidran 3 m3 Buah 5,687,000.00
130 Isolasi Listrik Bh 7,500.00
131 Jet jump Unit 2,846,250.00
132 Jet shower Bh 125,000.00
133 Kabel Pompa M' 18,150.00
134 kabel Listrik 2x1.5 mm M' 7,000.00
135 Kabel Listrik 3x1.5 mm M' 10,000.00
136 Kabel Listrik 3x2.5 mm M' 10,000.00
137 Kabel Listrik NYA 1 x 1,5 mm Rol 175,000.00
138 Kabel Listrik NYA 1 x 2,5 mm Rol 275,000.00
139 Kabel Listrik NYM 2 x 1,5 mm Rol 320,000.00
140 Kabel Listrik NYM 2 x 2,5 mm Rol 430,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
141 Kabel Listrik NYM 3 x 2,5 mm Rol 575,000.00
142 Kabel Listrik NYM 3 x 1,5 mm Rol 440,000.00
143 Kabel Listrik temba 4 x 6 mm Rol 1,800,000.00
144 Kabel Listrik temba 4 x 10 mm Rol 3,400,000.00
145 Kaca Patri M2 1,700,000.00
146 Kaca Putih/Polos 5mm M2 85,000.00
147 Kaca Putih/Polos 3mm M2 65,000.00
148 Kaca Ribben/Buram 3 mm M2 75,000.00
149 Kaca Ribben/Buram 5 mm M2 95,000.00
150 Kapek Buah 11,000.00
151 Kawat Berduri Kg 6,000.00
152 kawat Beton Kg 25,000.00
153 Kawat Bronjong Kg 30,000.00
154 Kawat dia 4mm Kg 25,000.00
155 Kawat Harmonika M2 20,550.00
156 Kawat Las / Electroda Dus 150,000.00
157 Kawat Nyamuk M2 18,150.00
158 Kayu Bakar M3 100,000.00
159 Kayu Balok kelas I M3 6,000,000.00
160 Kayu Balok kelas II M3 2,800,000.00
161 Kayu Balok kelas III M3 2,200,000.00
162 Kayu Dolken batang 10,000.00
163 Kayu Kasau kelas I M3 6,000,000.00
164 Kayu Kasau kelas II M3 2,800,000.00
165 Kayu Kasau kelas III M3 2,200,000.00
166 Kayu kelas IV / Perancah / Dolken M3 1,400,000.00
167 Kayu Papan kelas I M3 4,100,000.00
168 Kayu Papan kelas II M3 3,750,000.00
169 Kayu Papan kelas III M3 2,800,000.00
170 Kayu Reng kelas I M3 6,000,000.00
171 Kayu Reng Kelas II M3 2,800,000.00
172 Kayu Reng kelas III M3 2,200,000.00
173 Keramik 20x25 cm Buah 3,250.00
174 Keramik 25x25 cm Buah 3,750.00
175 Keramik 30x30 cm Buah 4,100.00
176 Keramik 40x40 cm Buah 9,600.00
177 Keramik 50x50 cm Buah 27,500.00
178 Keramik 60x60 cm Buah 28,750.00
179 Keramik Dinding 20/20 cm polos Buah 6,250.00
180 Keramik Dinding 20/20 cm warna Buah 8,000.00
181 Keramik Dinding 25/40 cm motif Buah 9,000.00
182 Keramik Motif 30x30 cm Buah 7,200.00
183 Keramik Motif 40x40 cm Buah 15,200.00
184 Kerikil Kali disaring M3 157,500.00
185 Kitchen Sink lubang lengkap (+kran bebek) Buah 750,000.00
186 Kithen Sink lubang s lengkap (+kran bebek) Buah 600,000.00
187 Klem sadle 0,5" Buah 22,500.00
188 Klem sadle 0,75" Buah 32,500.00
189 Klem sadle 1" Buah 45,000.00
190 Kloset Duduk porselin Buah 1,950,000.00
191 Kloset Jongkok Porselin Buah 305,000.00
192 Knie GIP Ø 1" Buah 10,000.00
193 Knie GIP Ø 1/2" Buah 5,400.00
194 Knie GIP Ø 2" Buah 11,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
195 Knie GIP Ø 3/4" Buah 6,650.00
196 Knie PVC 1/2" Buah 4,000.00
197 Knie PVC 3/4" Buah 4,000.00
198 Knie PVC Ø 1" Buah 5,000.00
199 Knie PVC Ø 2" Buah 7,000.00
200 Kran air stenlis Ø 1/2" Buah 37,000.00
201 Kran air stenlis Ø 3/4" Buah 37,000.00
202 Kran cabang 1/2" utk jet shower / shower Bh 190,000.00
203 Kran engkol Bh 160,000.00
204 Kran steinless Buah 63,350.00
205 Kuas cat 4" Buah 28,000.00
206 Kuku macan M' 12,000.00
207 Kunci pintu 1 slag Buah 115,000.00
208 Kunci pintu 2 slag Buah 115,000.00
209 Kunci pintu 2 slag Kualitas baik Buah 250,000.00
210 Kuas Roll Bh 30,000.00
211 Lampu Down Light 5" Buah 62,000.00
212 Lampu Down Light 4" Buah 50,000.00
213 Lampu Down Light 3" Buah 40,000.00
214 Lampu Hias/sorot LED 10 Watt Buah 100,000.00
215 Lampu Hias/sorot LED 20 Watt Buah 200,000.00
216 Lampu Hias/sorot LED 30 Watt Buah 280,000.00
217 Lampu Pijar 40 Watt Buah 9,100.00
218 Lampu TL 2 X 18 Watt (Lengkap) Set 250,000.00
219 Lampu Lilin 18 Watt (Kwalitas Baik) bergaransi Buah 40,000.00
220 Lapis Alumunium t = 0,25 mm terpasangdenganlem M2 60,000.00
221 Lem plastic Kg 15,000.00
222 Lem Plastik / Kayu Kg 17,500.00
223 Lem PVC Buah 8,500.00
224 Lem aibon Kg 35,000.00
225 Lem Kayu Kg 16,500.00
226 Lem kramik abu abu Kg 12,000.00
227 Lem kramik Putih Kg 6,750.00
228 Lengan Kran dan accessories Dg pipa PVC dia 1" Unit 12,000.00
229 Lis Gypsum M' 10,000.00
230 Lis Kaca M' 8,800.00
231 Lis Kramik Buah 6,050.00
232 List Plafond Propil 4 cm btg 13,000.00
233 Listplank GRC uk. 0.20 x 4.00 Lembar 65,000.00
234 Listplank GRC uk. 0.30 x 4.00 Lembar 90,000.00
235 Mangkokan listrik (Durados) Buah 7,000.00
236 Mata bor Buah 20,000.00
237 MCB 10 ampere BH 50,000.00
238 MCB 32 Ampere BH 65,000.00
239 Meny Kayu/Besi Kg 30,000.00
240 Minyak bekisting Liter 20,000.00
241 Minyak pelumas / Oli Liter 45,000.00
242 Minyak Tanah/Kerosin Liter 10,000.00
243 Nok Asbes Gelombang STL 30,000.00
244 Nok Pinggir Lapis Zinc Alumunium M' 40,700.00
245 Otomatis Pompa Unit 55,000.00
246 Over Sock GIP Ø 3/4" x Ø 1/2" Buah 7,250.00
247 Over Sock/Reducer 6-4" Buah 22,000.00
248 Paku Cacing Kg 20,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
249 Paku GRC Kg 27,000.00
250 Paku Gypsum Kg 21,000.00
251 Paku Kasau/balok/reng/papan Kg 15,000.00
252 Paku Keling Buah 1,050.00
253 Paku Papan / Reng Kg 15,000.00
254 Paku Sekrup (50 Bh / Kg) Kg 44,275.00
255 Paku Seng (100 Bh / Kg) Kg 30,000.00
256 Paku Triplek Kg 21,000.00
257 Panel Pompa Unit 1,512,500.00
258 Papan GRC Lembar 65,000.00
259 Pasang Dudukan Lampu Dinding Unit 200,000.00
260 Pasang Lubang Control Plat Besi Unit 300,000.00
261 Pasang Tangga Control Pipa GIP dia 1,5" dan 1" Unit 400,000.00
262 Pasir beton M3 150,000.00
263 Pasir Pasang M3 150,000.00
264 Pasir Urug M3 80,000.00
265 Paving Blok (Local) Buah 1,600.00
266 Paving Blok Sinar Laut 8 cm Buah 2,875.00
267 Penangkal Petir Unit 3,025,000.00
268 Penyambungan Alumunium Voil M' 45,540.00
269 Penyambungan Api Listrik 1300 VA Unit 2,420,000.00
270 Penyelesaian sumur (sampling test dan uji air di lab) Unit 1,500,000.00
271 Pintu Fibber KM Buah 210,000.00
272 Pintu Kaca 12 mm tempered frameless P1 Double Unit 9,000,000.00
273 Pipa GIP diameter 0,50" (galvanis) Btg 173,000.00
274 Pipa GIP diameter 0,75"(galvanis) Btg 212,750.00
275 Pipa GIP diameter 1,00"(galvanis) Btg 300,000.00
276 Pipa GIP diameter 1,25"(galvanis) Btg 390,000.00
277 Pipa GIP diameter 1,50"(galvanis) Btg 540,000.00
278 Pipa GIP diameter 2,00"(galvanis) Btg 600,000.00
279 Pipa GIP diameter 4,00"(galvanis) Btg 1,570,000.00
280 Pipa GIP diameter 6,00"(galvanis) Btg 2,632,500.00
281 Pipa hawa pada hydrant Unit 26,000.00
282 Pipa PCV diameter 0,50" PVC AW Btg 23,000.00
283 Pipa PCV diameter 0,75" PVC AW Btg 30,000.00
284 Pipa PCV diameter 1,00" PVC AW Btg 40,000.00
285 Pipa PCV diameter 1,25" PVC AW Btg 65,000.00
286 Pipa PCV diameter 1,50" PVC AW Btg 65,000.00
287 Pipa PCV diameter 2,00" PVC AW Btg 75,000.00
288 Pipa PCV diameter 3,00" PVC AW Btg 170,000.00
289 Pipa PCV diameter 4,00" PVC AW Btg 275,000.00
290 Pipa PCV diameter 6,00" PVC AW Btg 485,000.00
291 Pipa PCV diameter 8,00" PVC AW Btg 880,000.00
292 Plamir kayu / besi Kg 14,500.00
293 Plamir Tembok Kg 16,000.00
294 Plat 400 x 300/3 Batang 48,400.00
295 Plat mur, Plong, baut / Begel U Kg 18,150.00
296 Plint Keramik 10x10 cm Buah 1,500.00
297 Plint Keramik 10x20 cm Buah 1,900.00
298 Plint Keramik 10x30 cm Buah 3,600.00
299 Plint Marmer 10x30 cm Buah 18,150.00
300 Plint Marmer 10x40 cm Buah 21,700.00
301 Plitur Jadi Liter 50,000.00
302 Plywood (240x120x0,9) cm Lembar 151,250.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
303 Plywood (240x120x0,12) cm Lembar 170,000.00
304 Polycarbonate Lbr 1,500,000.00
305 Pompa sentrifugal h40 Q=0,8 m3/h Unit 1800000 s/d 3600000
306 Pompa Submersible SP 3/4 HP H=40m, Q=2,4M3/h Unit 9,317,000.00
307 Pompa Submersible SP 1 HP H=40m, Q=3 m3/h Unit 10,285,000.00
308 Premium Ltr 6,450.00
309 Rolling Door M2 450,000.00
310 Rolling Door Alumunium M2 550,000.00
311 Roster Buah 25,000.00
312 Rumput Gajah mini M2 35,000.00
313 Rumput Golf M2 40,000.00
314 Sabun Buah 11,000.00
315 Saklar Ganda Buah 22,000.00
316 Saklar Triple kwalitas Buah 30,000.00
317 Saklar tunggal Buah 18,000.00
318 Sambungan /joint kabel submersible 3M" unit 325,000.00
319 Seal tape Buah 4,500.00
320 Sealant Tube 31,500.00
321 Sekrup fisher Bh 500.00
322 Semen PC (50 Kg) Zak 64,000.00
323 Semen Putih (50 Kg) Zak 97,500.00
324 Seng Alumunium M2 58,000.00
325 Seng Bubungan M' 26,500.00
326 Seng Gelombang Lembar 45,500.00
327 Seng Rata Lembar 37,000.00
328 Septicktank dan Peresapan Unit 3,725,000.00
329 Sewa mesin las jam 75,000.00
330 Sirtu M3 195,000.00
331 Sock 1/2" GIP Buah 4,200.00
332 Sock 1/2" PVC Buah 3,000.00
333 Sock 3/4" GIP Buah 6,050.00
334 Sock 3/4" PVC Buah 3,025.00
335 Sock 1" GIP Buah 7,850.00
336 Sock 1" PVC Buah 4,000.00
337 Sock 2" GIP Buah 18,150.00
338 Sock 2" PVC Buah 6,000.00
339 Sock derat Luar 1/2" Buah 3,000.00
340 Sock derat Luar 3/4" Buah 4,000.00
341 Sock derat Luar 1" Buah 5,500.00
342 Sock derat Luar 1 1/4" Buah 6,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
343 Sock derat Luar 2" Buah 9,650.00
344 Socket galvanis dia 1 1/2" Buah 16,500.00
345 Soda api Kg 30,250.00
346 Solar Liter 8,700.00
347 Spandek M2 65,000.00
348 Stainless Pagar M2 750,000.00
349 Stainless Gerbang M2 900,000.00
350 Stop kontak Buah 25,000.00
351 Stop Kran 1/2" Buah 20,000.00
352 Stop Kran 3/4" Buah 20,000.00
353 Stop Kran 1" Buah 27,000.00
354 Stop Kran 11/4" Buah 50,000.00
355 Stop Kran 2" Buah 70,000.00
356 Stop Kran 3" Buah 137,500.00
357 Talang Fiber M' 30,000.00
358 Talang karpet M' 25,000.00
359 Tali Ijuk Kg 14,500.00
360 Tambang Plastik 8 mm M' 4,500.00
361 Tarikan Jendela Buah 31,625.00
362 Teakwood (240 x 120 x 0,3) cm Lembar 90,750.00
363 TEE GIP 1,5" Buah 55,000.00
364 TEE Over 2" ke 1" PVC Buah 32,000.00
365 TEE Over 3" ke 2" PVC Buah 15,125.00
366 TEE 1/2" GIP Buah 7,250.00
367 TEE 1/2" PVC Buah 4,000.00
368 TEE 3/4" GIP Buah 9,075.00
369 TEE 3/4" PVC Buah 5,000.00
370 TEE 1" GIP Buah 12,100.00
371 TEE 1" PVC Buah 6,000.00
372 TEE 2" GIP Buah 33,275.00
373 TEE 2" PVC Buah 7,500.00
374 Tegel 20x20 cm Buah 1,450.00
375 Tegel 30x30 cm Buah 2,400.00
376 Tepung Gypsum/kornis kg 4,000.00
377 Ter / Residu Kg 18,150.00
378 Thinner Ltr 28,000.00
379 Timbunan Tanah M3 50,000.00
380 Penampung air kapasitas 1000 Ltr stainless Unit 3,800,000.00
381 Tralis Besi M2 400,000.00
382 Triplek (240x120x0,3) cm Lbr 57,000.00
383 Triplek (240x120x0,5) cm Lbr 82,000.00
384 Triplek (240x120x0,9) cm Lbr 140,000.00
385 Triplek /plywood (240x120x0,3) cm Lbr 104,000.00
386 Type I (0,3x0,6x0,18x0,21) Bh 60,000.00
387 Type II (0,3x0,6x0,18x0,21)berlubang Bh 62,000.00
388 Type III (0,45x0,6x0,18x0,25) Bh 65,000.00
389 Ubin Granito 30x30 cm Buah 38,500.00
390 Urinoir Buah 950,000.00
391 U-ditch, uk. 39 x 39 x 120 Buah 750,000.00
392 Wall flashing M' 39,600.00
393 Water drain + asesories Set 18,975.00
394 Tower air kapasitas 1000 Ltr fiber Unit 1,950,000.00
395 Watter Moor 11/2" Buah 50,000.00
396 Watter Moor 11/4" Buah 44,000.00
HARGA UPAH/BAHAN
NO. URAIAN SATUAN
(Rp)
397 Westafel Porselen Buah 850,000.00
398 wood filler Ltr 45,000.00
BACK UP DATA PERHITUNGAN
PEKERJAAN : REHAB RUMAH LANTAI 2 DAN BALKON
LOKASI : Kecamatan Wai Hui, Kab. Lampung Selatan.
TAHUN : 2022
DETAIL PERHITUNGAN
N0. KOMPONEN PEKERJAAN VOLUME
P L T Jumlah Koef.
I PEKERJAAN PERSIAPAN
1 Dokumentasi dan pelaporan 3.00 Bulan
2 Pembersihan dan Perataan
Bidang A 4.94 2.52 12.45 M2
Bidang B 4.65 3.13 14.55 M2
Bidang C 4.94 2.52 12.45 M2
39.45 M2
3 Pekerjaan Bongkaran sebagian Bata Untuk Kolom 4.94 2.52 0.15 0.11 0.21 M3
4 Pekerjaan Penurunan Lantai Lama 4.94 2.52 12.45 M2
II PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi
Pondasi Telapak 0.60 0.60 0.55 8.00 1.00 1.58 m3
1.58 m3
2 Urugan Pasir DI Bawah Pondasi
Pondasi Telapak 0.60 0.60 0.05 8.00 0.14 m3
0.14 m3
III PEKERJAAN PASANGAN, BETON DAN PLESTERAN
1 Pekerjaan Pondasi Telapak (P1)
a Pekerjaan Beton adk 1:2:3 0.60 0.60 0.55 8.00 1.00 1.58 m3
1.58 m3
2 Pekerjaan Plat Beton Bertulang Lantai H : 12 Cm
a Pekerjaan Beton adk 1:2:3
Bidang A 4.94 2.52 0.12 1.00 1.00 1.49 m3
Bidang B 4.65 3.13 0.12 1.00 1.00 1.75 m3
3.24 m3
b Pekerjaan Pembesian Bidang A
ukuran plat 4.94 2.52 0.12
besi pokok vertikal Ø 10 - 150 (atas-bwh) 4.94 33.60 0.617 102.36 Kg
besi bagi horizontal Ø 10 - 150 (atas-bwh) 2.52 65.87 0.617 102.36 Kg
10.24 10.24 Kg
214.95 Kg
Pekerjaan Pembesian Bidang B
ukuran plat 4.65 3.13 0.12
besi pokok vertikal Ø 10 - 150 (atas-bwh) 4.65 41.73 0.617 119.67 Kg
besi bagi horizontal Ø 10 - 150 (atas-bwh) 3.13 62.00 0.617 119.67 Kg
11.97 11.97 Kg
251.31 Kg
466.26
c Pekerjaan Begisting Bidnag A
ukuran plat 4.94 2.52 0.12
4.94 2.52 1.00 12.45 m2
12.45 m2
c Pekerjaan Begisting Bidang B
ukuran plat 4.65 3.13 0.12
4.65 3.13 1.00 14.55 m2
14.55 m2
27.00
3 Pekerjaan Dinding Pasangan Batu Bata , adk 1:4
Bidang A 1.80 1.00 2.25 1.00 1.00 4.05 m2
Bidang B 10.91 1.00 0.34 1.00 1.00 3.71 m2
Bidang C 2.52 1.00 0.36 1.00 1.00 0.91 m2
8.67 m2
PENGURANGAN
Loster A 1.40 1.00 2.36 1.00 1.00 3.30 m2
5.36 m2
4 Pekerjaan Plesteran Dinding , adk 1:4
plesteran dinding = pasangan bata x 2 sisi 10.73 m2
5 Pekerjaan Acian Dinding
acian = plesteran 10.73 m2
10.73 m2
1 2 3
4 6 7
ERSIAPAN
3.00 Bulan 250,000.00 750,000.00
39.45 M2 2,415.00 95,276.82
0.21 M3 494,488.50 103,878.93
12.45 M2 23,000.00 286,322.40
1,235,478.15
H DAN PASIR
1.58 M3 54,337.50 86,070.60
0.14 M3 132,135.00 19,027.44
105,098.04
TON DAN PLESTERAN
TOTAL
NO URAIAN PEKERJAAN BIAYA
(Rp)
1 2 3
TERBILANG : Delapan Puluh Juta Dua Ratus Tujuh Puluh Enam Ribu Rupiah
### Delapan Puluh Juta Dua Ratus Tujuh Puluh Enam Ribu Rupiah
DELAPAN PULUH JUTA DUA RATUS TUJUH PULUH ENAM RIBU RUPIAH
Delapan Puluh Juta Dua Ratus Tujuh Puluh Enam Ribu Rupiah
delapan puluh juta dua ratus tujuh puluh enam ribu rupiah
8
### - - sembilan delapan puluh juta dua ratus tujuh puluh enam ribu rupiah
### - - sembilan delapan puluh juta dua ratus tujuh puluh enam ribu rupiah
### 80,000,000### delapan delapan delapadelapan puluh juta dua ratus tujuh puluh enam ribu rupiah
### - - sembilan juta juta dua ratus tujuh puluh enam ribu rupiah
### 200,000### dua dua dua ra dua ratus tujuh puluh enam ribu rupiah
### 70,000### tujuh tujuh tujuh tujuh puluh enam ribu rupiah
### 6,000### enam enam enam renam ribu rupiah
### - - sembilan rupiah
### - - sembilan rupiah
### - - sembilan