LAPORAN PENGGUNAAN DANA

PEMBANGUNAN GEDUNG PINK (KAMPUS 1)

No Tanggal Keterangan Nominal


1 10/3/2022 spandex, genteng Rp 1,220,000
2 10/3/2022 karpet talang,skrup 1", paku beton 1" Rp 1,273,000
3 10/4/2022 refil cutter, saringan got Rp 178,000
4 10/4/2022 saringan stenlis, kuas1" Rp 157,000
5 10/5/2022 papan gypsum Rp 540,000
6 10/5/2022 kain kasa gypsum Rp 20,000
7 10/5/2022 semen Rp 580,000
8 10/6/2022 cat propan pink tua Rp 868,000
9 10/6/2022 lis plafon gypsum Rp 126,000
10 10/6/2022 kurnis, paku 2" Rp 93,000
11 7/27/2022 L 1/4, V 1 1/4x1 (Nota Berkah Jaya) Rp 25,000
TOTAL Rp 5,080,000