RENCANA KERJA

PAKET WAEPESI -CODONG KABUPATEN MANGGARAI

MEI JUNI JULI AGUSTUS SEPTEMBER


NO NAMA KEGIATAN KETERANGAN
### 15-May 22-May 29-May 5-Jun 12-Jun 19-Jun 26-Jun 3-Jul 10-Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-Sep 18-Sep 25-Sep 28-Sep

Divisi 1. UMUM
Mobilisasi dan Demobilisasi
Keselamatan dan Kesehatan Kerja (K3)
Divisi 3. DRAINASE
Galian Selokan, Drainase dan Saluran Air
Pasangan Batu Dengan Mortar
Divisi 4. PEKERJAAN TANAH
Galian Biasa
Urugan pilihan (Item Baru)
Penyiapan Badan Jalan
Divisi 6. PERKERASAN BERBUTIR
Lapis Pondasi Agregat Kelas A
Lapis Pondasi Agregat Kelas B
Divisi 7. PERKERASAN ASPAL
Lapis Resap Pengikat - Aspal Cair/Emulsi
Lapis Perekat
Laston - Lapis Aus (AC-WC)
Divisi 8. STRUKTUR
Beton fc'=15 Mpa
Beton fc"=20 mpa (Item Baru)
Pasangan Batu
BJ-U24 Polos (Item Baru)
Divisi 10. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
Marka Jalan Thermoplastic
Divisi 11. PEKERJAAN PEMELIHARAAN KINERJA
Perbaikan Campuran Aspal Panas
Pembersihan Drainase dan Saluran Samping
Pengendalian Tanaman