Anda di halaman 1dari 1

T = 9,24

W=0,995

H=1,32
POTONGAN MELINTANG
1 SALURAN PRIMER 01

m=1,5

b = 5,28

T = 7,88
W=0,958

POTONGAN MELINTANG
H=1,2 SALURAN SKUNDER 01
1 SKALA

m=1,5

b = 4,28 UNIVERSITAS 17 AGUSTUS SURABAYA


FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
PROVINCE
JAWA TIMUR

TUGAS BESAR IRIGASI BANGUNAN AIR


POTONGAN MELINTANG
SALURAN PRIMER 01 REGISTER DATE : 18-12-2022

DRAWING NO : 01

SKALA 1:100 NILAI KETERANGAN


NAMA : ILHAM MAULANA SYAFI'
NBI : 1432000097 CHECKED

DOSEN PEMBIMBING : Faradlillah Saves, ST.,MT.


APPROVED
NPP.20430.15.0674

Anda mungkin juga menyukai