Rab Uluidanotae
Rab Uluidanotae
Dibuat Oleh :
Konsultan Perencana
CV. BILLINDO ENGINEERING CONSULTANT
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : PEMBANGUNAN PUSKESMAS ULUIDANOTAE
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 6.667 102,000.00 680,034.00
2 Mandor L.04 OH 0.333 170,000.00 56,610.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 13.334 102,000.00 1,360,068.00
2 Mandor L.04 OH 0.666 170,000.00 113,220.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.100 102,000.00 10,200.00
2 Mandor L.04 OH 0.050 170,000.00 8,500.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 102,000.00 20,400.00
2 Tukang Kayu L.02 OH 0.400 135,000.00 54,000.00
3 Kepala Tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.020 170,000.00 3,400.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.100 102,000.00 10,200.00
2 Tukang Kayu L.02 OH 0.100 135,000.00 13,500.00
3 Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.100 102,000.00 10,200.00
2 Tukang L.02 OH 0.020 135,000.00 2,700.00
3 Mandor L.03 OH 0.010 170,000.00 1,700.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.030 102,000.00 3,060.00
2 Mandor L.02 OH 0.005 170,000.00 850.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.0590 102,000.00 6,018.00
2 Mandor L.04 OH 0.0059 170,000.00 1,003.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.750 102,000.00 76,500.00
2 Mandor L.04 OH 0.025 170,000.00 4,250.00
Jumlah Harga Tenaga Kerja 80,750.00
B Bahan -
-
Jumlah Harga Bahan -
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.500 102,000.00 51,000.00
2 Mandor L.04 OH 0.050 170,000.00 8,500.00
Jumlah Harga Tenaga Kerja 59,500.00
B Bahan -
-
Jumlah Harga Bahan -
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.500 102,000.00 51,000.00
2 Mandor L.04 OH 0.050 170,000.00 8,500.00
Jumlah Harga Tenaga Kerja 59,500.00
B Bahan -
Tanah Urug m3 1.200 153,144.50 183,773.40
Jumlah Harga Bahan 183,773.40
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 102,000.00 30,600.00
2 Mandor L.04 OH 0.010 170,000.00 1,700.00
Jumlah Harga Tenaga Kerja 32,300.00
B Bahan -
Pasir Urug m3 1.200 150,077.82 180,093.38
Jumlah Harga Bahan 180,093.38
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.250 102,000.00 25,500.00
2 Mandor L.04 OH 0.025 170,000.00 4,250.00
Jumlah Harga Tenaga Kerja 29,750.00
B Bahan -
Sirtu m3 1.200 181,157.82 217,389.38
Jumlah Harga Bahan 217,389.38
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.780 102,000.00 79,560.00
2 Tukang batu L.02 OH 0.390 135,000.00 52,650.00
3 Kepala tukang L.03 OH 0.039 150,000.00 5,850.00
4 Mandor L.04 OH 0.039 170,000.00 6,630.00
Jumlah Harga Tenaga Kerja 144,690.00
B Bahan -
1 Batu kali 15/20 m3 1.200 210,137.82 252,165.38
2 Pasir urug m3 0.432 -
Jumlah Harga Bahan 252,165.38
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.500 102,000.00 153,000.00
2 Tukang batu L.02 OH 0.750 135,000.00 101,250.00
3 Kepala tukang L.03 OH 0.075 150,000.00 11,250.00
4 Mandor L.04 OH 0.075 170,000.00 12,750.00
Jumlah Harga Tenaga Kerja 278,250.00
B Bahan -
1 Batu kali 15/20 m3 1.200 210,137.82 252,165.38
2 Semen portland Kg 163.000 2,146.34 349,854.13
3 Pasir pasang m3 0.520 214,127.82 111,346.47
Jumlah Harga Bahan 713,365.97
C Peralatan
Jenis Pekerjaan : Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran
1SP : 2PP
Harga Satuan : Rp 485,356.35
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.600 102,000.00 61,200.00
2 Tukang batu L.02 OH 0.200 135,000.00 27,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.030 170,000.00 5,100.00
Jumlah Harga Tenaga Kerja 96,300.00
B Bahan -
1 Bata merah Bh 140.000 1,537.52 215,252.80
2 Semen Portland Kg 43.500 2,146.34 93,365.98
3 Pasir Pasang m3 0.080 214,127.82 17,130.23
Jumlah Harga Bahan 325,749.00
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.600 102,000.00 61,200.00
2 Tukang batu L.02 OH 0.200 135,000.00 27,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.030 170,000.00 5,100.00
Jumlah Harga Tenaga Kerja 96,300.00
B Bahan -
1 Bata merah Bh 140.000 1,537.52 215,252.80
2 Semen Portlan Kg 26.550 2,146.34 56,985.44
3 Pasir Pasang m3 0.093 214,127.82 19,913.89
Jumlah Harga Bahan 292,152.13
C Peralatan
Jenis Pekerjaan : Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran
1SP : 2PP
Harga Satuan : Rp 235,274.45
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 102,000.00 30,600.00
2 Tukang batu L.02 OH 0.100 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.015 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 48,150.00
B Bahan -
1 Bata merah Bh 70.000 1,537.52 107,626.40
2 Semen Portlan Kg 18.950 2,146.34 40,673.23
3 Pasir Pasang m3 0.038 214,127.82 8,136.86
Jumlah Harga Bahan 156,436.48
C Peralatan
Jenis Pekerjaan : Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran
1SP :4PP
Harga Satuan : Rp 218,116.88
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 102,000.00 30,600.00
2 Tukang batu L.02 OH 0.100 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.015 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 48,150.00
B Bahan -
1 Bata merah Bh 70.000 1,537.52 107,626.40
2 Semen Portland Kg 11.500 2,146.34 24,682.96
3 Pasir Pasang m3 0.043 214,127.82 9,207.50
Jumlah Harga Bahan 141,516.86
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 102,000.00 30,600.00
2 Tukang batu L.02 OH 0.1500 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.0150 150,000.00 2,250.00
4 Mandor L.04 OH 0.0150 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 55,650.00
B Bahan -
1 Semen portland Kg 10.2240 2,146.34 21,944.22
2 Pasir pasang m3 0.0200 214,127.82 4,282.56
Jumlah Harga Bahan 26,226.78
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 102,000.00 30,600.00
2 Tukang batu L.02 OH 0.1500 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.0150 150,000.00 2,250.00
4 Mandor L.04 OH 0.0150 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 55,650.00
B Bahan -
1 Semen portlan Kg 6.2400 2,146.34 13,393.19
2 Pasir pasang m3 0.0240 214,127.82 5,139.07
Jumlah Harga Bahan 18,532.26
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.3000 102,000.00 30,600.00
2 Tukang batu L.02 OH 0.1500 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.0150 150,000.00 2,250.00
4 Mandor L.04 OH 0.0150 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 55,650.00
B Bahan -
1 Semen portlan Kg 6.3400 2,146.34 13,607.82
2 Pasir pasang m3 0.0120 214,127.82 2,569.53
Jumlah Harga Bahan 16,177.36
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 102,000.00 20,400.00
2 Tukang batu L.02 OH 0.1000 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.0100 150,000.00 1,500.00
4 Mandor L.04 OH 0.0100 170,000.00 1,700.00
Jumlah Harga Tenaga Kerja 37,100.00
B Bahan -
1 Semen portland Kg 3.2500 2,146.34 6,975.62
Jumlah Harga Bahan 6,975.62
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.2000 102,000.00 20,400.00
2 Tukang batu L.02 OH 0.1000 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.0100 150,000.00 1,500.00
4 Mandor L.04 OH 0.0100 170,000.00 1,700.00
Jumlah Harga Tenaga Kerja 37,100.00
B Bahan -
1 Waterprofing Kg 0.3900 74,215.94 28,944.22
Jumlah Harga Bahan 28,944.22
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.0700 102,000.00 7,140.00
2 Tukang besi L.02 OH 0.0700 135,000.00 9,450.00
3 Kepala tukang L.03 OH 0.0070 150,000.00 1,050.00
4 Mandor L.04 OH 0.0040 170,000.00 680.00
Jumlah Harga Tenaga Kerja 18,320.00
B Bahan -
1 Besi beton polos/ulir Kg 10.5000 13,753.46 144,411.32
2 Kawat beton Kg 0.1000 23,675.96 2,367.60
Jumlah Harga Bahan 146,778.91
C Peralatan
Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c
= 0,56
Harga Satuan : Rp 1,673,091.25
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 102,000.00 168,300.00
2 Tukang batu L.02 OH 0.2750 135,000.00 37,125.00
3 Kepala tukang L.03 OH 0.0280 150,000.00 4,200.00
4 Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 223,735.00
B Bahan -
1 Semen portland Kg 384.000 2,146.34 824,196.22
2 Pasir beton Kg 692.000 156.70 108,435.32
3 Kerikil (maks. 30 mm) Kg 1,039.000 235.56 244,745.41
4 Air Ltr 215.000 250.00 53,750.00
Jumlah Harga Bahan 1,231,126.95
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 102,000.00 168,300.00
2 Tukang batu L.02 OH 0.2750 135,000.00 37,125.00
3 Kepala tukang L.03 OH 0.0280 150,000.00 4,200.00
4 Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 223,735.00
B Bahan -
1 Semen portland Kg 326.000 2,146.34 699,708.25
2 Pasir beton Kg 760.000 156.70 119,090.82
3 Kerikil (maks. 30 mm) Kg 1,029.000 235.56 242,389.82
4 Air Ltr 215.000 250.00 53,750.00
Jumlah Harga Bahan 1,114,938.89
C Peralatan
Jenis Pekerjaan : Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c =
0,78
Harga Satuan : Rp 1,423,708.82
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 102,000.00 168,300.00
2 Tukang batu L.02 OH 0.2750 135,000.00 37,125.00
3 Kepala tukang L.03 OH 0.0280 150,000.00 4,200.00
4 Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 223,735.00
B Bahan -
1 Semen portland Kg 276.000 2,146.34 592,391.04
2 Pasir beton Kg 828.000 156.70 129,746.31
3 Kerikil (maks. 30 mm) Kg 1,012.000 235.56 238,385.32
4 Air Ltr 215.000 250.00 53,750.00
Jumlah Harga Bahan 1,014,272.67
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.6500 102,000.00 168,300.00
2 Tukang batu L.02 OH 0.2750 135,000.00 37,125.00
3 Kepala tukang L.03 OH 0.0280 150,000.00 4,200.00
4 Mandor L.04 OH 0.0830 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 223,735.00
B Bahan -
1 Semen portland Kg 247.000 2,146.34 530,147.05
2 Pasir beton Kg 869.000 156.70 136,170.95
3 Kerikil (maks. 30 mm) Kg 999.000 235.56 235,323.06
4 Air Ltr 215.000 250.00 53,750.00
Jumlah Harga Bahan 955,391.06
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.5200 102,000.00 53,040.00
2 Tukang batu L.02 OH 0.2600 135,000.00 35,100.00
3 Kepala tukang L.03 OH 0.0260 150,000.00 3,900.00
4 Mandor L.04 OH 0.0260 170,000.00 4,420.00
Jumlah Harga Tenaga Kerja 96,460.00
B Bahan -
1 Kayu kelas III m3 0.040 2,203,192.51 88,127.70
2 Paku 5 - 10 cm Kg 0.300 19,790.96 5,937.29
3 Minyak bekisting Ltr 0.100 -
Jumlah Harga Bahan 94,064.99
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.5200 102,000.00 53,040.00
2 Tukang batu L.02 OH 0.2600 135,000.00 35,100.00
3 Kepala tukang L.03 OH 0.0260 150,000.00 3,900.00
4 Mandor L.04 OH 0.0260 170,000.00 4,420.00
Jumlah Harga Tenaga Kerja 96,460.00
B Bahan -
1 Kayu kelas III m3 0.045 2,203,192.51 99,143.66
2 Paku 5 - 10 cm Kg 0.300 19,790.96 5,937.29
3 Minyak bekisting Ltr 0.100 -
Jumlah Harga Bahan 105,080.95
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.660 102,000.00 67,320.00
2 Tukang batu L.02 OH 0.330 135,000.00 44,550.00
3 Kepala tukang L.03 OH 0.033 150,000.00 4,950.00
4 Mandor L.04 OH 0.033 170,000.00 5,610.00
Jumlah Harga Tenaga Kerja 122,430.00
B Bahan -
1 Kayu kelas III m3 0.040 2,203,192.51 88,127.70
2 Paku 5 - 10 cm Kg 0.400 19,790.96 7,916.38
3 Minyak bekisting Ltr 0.200 -
4 Balok kayu kelas III m3 0.015 2,203,192.51 33,047.89
5 Plywood t=9 mm Lbr 0.350 -
6 Dolken kayu Ø 8-10 cm p= 4 m Btg 2.000 - -
Jumlah Harga Bahan 129,091.97
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.660 102,000.00 67,320.00
2 Tukang batu L.02 OH 0.330 135,000.00 44,550.00
3 Kepala tukang L.03 OH 0.033 150,000.00 4,950.00
4 Mandor L.04 OH 0.033 170,000.00 5,610.00
Jumlah Harga Tenaga Kerja 122,430.00
B Bahan -
1 Kayu kelas III m3 0.040 2,203,192.51 88,127.70
2 Paku 5 - 10 cm Kg 0.400 19,790.96 7,916.38
3 Minyak bekisting Ltr 0.200 -
4 Balok kayu kelas III m3 0.018 2,203,192.51 39,657.47
5 Plywood t=9 mm Lbr 0.350 -
6 Dolken kayu Ø 8-10 cm p= 4 m Btg 2.000 - -
Jumlah Harga Bahan 135,701.55
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.660 102,000.00 67,320.00
2 Tukang batu L.02 OH 0.330 135,000.00 44,550.00
3 Kepala tukang L.03 OH 0.033 150,000.00 4,950.00
4 Mandor L.04 OH 0.033 170,000.00 5,610.00
Jumlah Harga Tenaga Kerja 122,430.00
B Bahan -
1 Kayu kelas III m3 0.040 2,203,192.51 88,127.70
2 Paku 5 - 10 cm Kg 0.400 19,790.96 7,916.38
3 Minyak bekisting Ltr 0.200 -
4 Balok kayu kelas III m3 0.015 2,203,192.51 33,047.89
5 Plywood t=9 mm Lbr 0.350 -
6 Dolken kayu Ø 8-10 cm p= 4 m Btg 6.000 - -
Jumlah Harga Bahan 129,091.97
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.660 102,000.00 67,320.00
2 Tukang batu L.02 OH 0.330 135,000.00 44,550.00
3 Kepala tukang L.03 OH 0.033 150,000.00 4,950.00
4 Mandor L.04 OH 0.033 170,000.00 5,610.00
Jumlah Harga Tenaga Kerja 122,430.00
B Bahan -
1 Kayu kelas III m3 0.030 2,203,192.51 66,095.78
2 Paku 5 - 12 cm Kg 0.400 19,790.96 7,916.38
3 Minyak bekisting Ltr 0.150 -
4 Balok kayu kelas III m3 0.015 2,203,192.51 33,047.89
5 Plywood t=9 mm Lbr 0.350 -
6 Dolken kayu Ø 8-10 cm p= 4 m Btg 2.000 - -
Jumlah Harga Bahan 107,060.05
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.240 102,000.00 24,480.00
2 Tukang batu L.02 OH 0.120 135,000.00 16,200.00
3 Kepala tukang L.03 OH 0.012 150,000.00 1,800.00
4 Mandor L.04 OH 0.012 170,000.00 2,040.00
Jumlah Harga Tenaga Kerja 44,520.00
B Bahan -
1 Ubin teralux marmer Bh 3.100 30,703.50 95,180.83
2 Semen Portlan Kg 9.600 2,146.34 20,604.91
3 Semen warna Kg 1.500 4,082.54 6,123.82
4 Pasir pasang m3 0.045 214,127.82 9,635.75
Jumlah Harga Bahan 131,545.31
C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 176,065.31
E Overhead + Profit (15%) 15% x D 26,409.80
F Harga Satuan Pekerjaan per-m (D+E) 202,475.10
ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : PEMBANGUNAN PUSKESMAS ULUIDANOTAE
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.250 102,000.00 25,500.00
2 Tukang batu L.02 OH 0.125 135,000.00 16,875.00
3 Kepala tukang L.03 OH 0.013 150,000.00 1,950.00
4 Mandor L.04 OH 0.013 170,000.00 2,210.00
Jumlah Harga Tenaga Kerja 46,535.00
B Bahan -
1 Ubin granit 40/40 cm Bh 6.630 10,691.45 70,884.34
2 Semen Portland Kg 9.800 2,146.34 21,034.17
3 Semen Warna Kg 1.300 4,082.54 5,307.31
4 Pasir pasang m3 0.045 214,127.82 9,635.75
Jumlah Harga Bahan 106,861.57
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.070 102,000.00 7,140.00
2 Tukang batu L.02 OH 0.350 135,000.00 47,250.00
3 Kepala tukang L.03 OH 0.035 150,000.00 5,250.00
4 Mandor L.04 OH 0.035 170,000.00 5,950.00
Jumlah Harga Tenaga Kerja 65,590.00
B Bahan -
1 Ubin keramik 25/25 Cm Bh 16.150 8,632.53 139,415.30
2 Semen Portland Kg 10.400 2,146.34 22,321.98
3 Semen Warna Kg 1.620 4,082.54 6,613.72
4 Pasir pasang m3 0.045 214,127.82 9,635.75
Jumlah Harga Bahan 177,986.75
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.090 102,000.00 9,180.00
2 Tukang batu L.02 OH 0.090 135,000.00 12,150.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 23,530.00
B Bahan -
1 Ubin warna 10/40 Bh 2.550 4,324.83 11,028.31
2 Semen Portland Kg 1.140 2,146.34 2,446.83
3 Semen Warna Kg 0.100 4,082.54 408.25
4 Pasir pasang m3 0.003 214,127.82 642.38
Jumlah Harga Bahan 14,525.78
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.090 102,000.00 9,180.00
2 Tukang batu L.02 OH 0.090 135,000.00 12,150.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 23,530.00
B Bahan -
1 Ubin warna Bh 1.850 10,286.10 19,029.28
2 Semen Portland Kg 1.140 2,146.34 2,446.83
3 Semen Warna Kg 0.100 4,082.54 408.25
4 Pasir pasang m3 0.003 214,127.82 642.38
Jumlah Harga Bahan 22,526.75
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.090 102,000.00 9,180.00
2 Tukang batu L.02 OH 0.450 135,000.00 60,750.00
3 Kepala tukang L.03 OH 0.045 150,000.00 6,750.00
4 Mandor L.04 OH 0.045 170,000.00 7,650.00
Jumlah Harga Tenaga Kerja 84,330.00
B Bahan -
1 Keramik uk. 25 x 45 cm Bh 9.000 15,446.62 139,019.58
2 Semen Portland Kg 9.300 2,146.34 19,961.00
3 Pasir pasang m3 0.018 214,127.82 3,854.30
4 Semen Warna Kg 1.940 4,082.54 7,920.14
Jumlah Harga Bahan 170,755.02
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.090 102,000.00 9,180.00
2 Tukang batu L.02 OH 0.450 135,000.00 60,750.00
3 Kepala tukang L.03 OH 0.045 150,000.00 6,750.00
4 Mandor L.04 OH 0.045 170,000.00 7,650.00
Jumlah Harga Tenaga Kerja 84,330.00
B Bahan -
1 granit uk. 60 x 60 cm Bh 3.100 30,703.50 95,180.83
2 Semen Portland Kg 9.300 2,146.34 19,961.00
3 Pasir pasang m3 0.018 214,127.82 3,854.30
4 Semen Warna Kg 1.940 4,082.54 7,920.14
Jumlah Harga Bahan 126,916.27
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.700 102,000.00 71,400.00
2 Tukang batu L.02 OH 0.350 135,000.00 47,250.00
3 Kepala tukang L.03 OH 0.035 150,000.00 5,250.00
4 Mandor L.04 OH 0.035 170,000.00 5,950.00
Jumlah Harga Tenaga Kerja 129,850.00
B Bahan -
1 Batu temple hitam m2 1.100 275,202.62 302,722.88
2 Semen Portland Kg 11.750 2,146.34 25,219.55
3 Pasir Pasang m3 0.035 214,127.82 7,494.47
Jenis Pekerjaan : Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 7.0000 102,000.00 714,000.00
2 Tukang batu L.02 OH 21.0000 135,000.00 2,835,000.00
3 Kepala tukang L.03 OH 2.1000 150,000.00 315,000.00
4 Mandor L.04 OH 0.3500 170,000.00 59,500.00
Jumlah Harga Tenaga Kerja 3,923,500.00
B Bahan -
1 Balok kayu m3 1.100 4,866,937.51 5,353,631.26
2 Paku 10 cm Kg 1.250 19,790.96 24,738.70
3 Lem kayu Kg 1.000 51,761.44 51,761.44
Jumlah Harga Bahan 5,430,131.40
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 1.0000 102,000.00 102,000.00
2 Tukang batu L.02 OH 3.0000 135,000.00 405,000.00
3 Kepala tukang L.03 OH 0.3000 150,000.00 45,000.00
4 Mandor L.04 OH 0.0500 170,000.00 8,500.00
Jumlah Harga Tenaga Kerja 560,500.00
B Bahan -
1 Papan kayu m3 0.040 4,866,937.51 194,677.50
2 Lem kayu Kg 0.500 51,761.44 25,880.72
Jumlah Harga Bahan 220,558.22
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.850 102,000.00 86,700.00
2 Tukang L.02 OH 0.850 135,000.00 114,750.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 203,650.00
B Bahan -
Kaca temperet t=12 mm M2 1.76 661,060.62 1,163,466.69
Floor hinges / dudukan pintu Set 1.00 1,515,000.00 1,515,000.00
Top patch fitting / jepitan atas engsel Set 1.00 270,000.00 270,000.00
Bottom patch fitting / jepitan bawah engsel Set 1.00 270,000.00 270,000.00
Bottom patch lock + cylinder / kunci bawah Set 1.00 435,000.00 435,000.00
Pull handle Set 1.00 865,000.00 865,000.00
-
Jumlah Harga Bahan 4,518,466.69
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.850 102,000.00 86,700.00
2 Tukang L.02 OH 0.850 135,000.00 114,750.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 203,650.00
B Bahan -
Kaca temperet t=12 mm M2 1.54 661,060.62 1,018,033.35
Floor hinges / dudukan pintu Set 1.00 1,515,000.00 1,515,000.00
Top patch fitting / jepitan atas engsel Set 1.00 270,000.00 270,000.00
Bottom patch fitting / jepitan bawah engsel Set 1.00 270,000.00 270,000.00
Bottom patch lock + cylinder / kunci bawah Set 1.00 435,000.00 435,000.00
Pull handle Set 1.00 865,000.00 865,000.00
-
Jumlah Harga Bahan 4,373,033.35
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.017 102,000.00 1,734.00
2 Tukang L.02 OH 0.170 135,000.00 22,950.00
3 Kepala tukang L.03 OH 0.017 150,000.00 2,550.00
4 Mandor L.04 OH 0.001 170,000.00 153.00
Jumlah Harga Tenaga Kerja 27,387.00
B Bahan -
Kaca temperet tebal 10 mm M2 1.100 587,620.62 646,382.68
sealant Kg 0.070 18,500.26 1,295.02
-
Jumlah Harga Bahan 647,677.70
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.017 102,000.00 1,734.00
2 Tukang L.02 OH 0.170 135,000.00 22,950.00
3 Kepala tukang L.03 OH 0.017 150,000.00 2,550.00
4 Mandor L.04 OH 0.001 170,000.00 153.00
Jumlah Harga Tenaga Kerja 27,387.00
B Bahan -
Kaca temperet tebal 12 mm M2 1.100 661,060.62 727,166.68
sealant Kg 0.070 18,500.26 1,295.02
Besi Siku M' 4.100 22,244.59 91,202.81
-
Jumlah Harga Bahan 819,664.51
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.0430 102,000.00 4,386.00
2 Tukang L.02 OH 0.0430 135,000.00 5,805.00
3 Kepala tukang L.03 OH 0.0043 150,000.00 645.00
4 Mandor L.04 OH 0.0021 170,000.00 357.00
Jumlah Harga Tenaga Kerja 11,193.00
B Bahan -
Profil alluminium M 1.100 194,317.43 213,749.17
Skrup fixer buah 2.000 197.91 395.82
sealant tube 0.060 18,500.26 1,110.02
-
Jumlah Harga Bahan 215,255.01
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.0850 102,000.00 8,670.00
2 Tukang L.02 OH 0.0850 135,000.00 11,475.00
3 Kepala tukang L.03 OH 0.0085 150,000.00 1,275.00
4 Mandor L.04 OH 0.0042 170,000.00 714.00
Jumlah Harga Tenaga Kerja 22,134.00
B Bahan -
profil alluminium M 4.4000 194,317.43 854,996.70
Alluminium strip M 14.6000 157,462.43 2,298,951.50
-
Jumlah Harga Bahan 3,153,948.20
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.425 102,000.00 43,350.00
2 Tukang L.02 OH 0.425 135,000.00 57,375.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 102,925.00
B Bahan -
pintu alluminium uk. 0,7x2,00 m M2 0.433 3,153,948.20 1,366,290.36
Engsel Bh 2.000 19,332.76 38,665.52
Kunci Tanam Bh 1.000 235,020.26 235,020.26
Jumlah Harga Bahan 1,639,976.15
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.425 102,000.00 43,350.00
2 Tukang L.02 OH 0.425 135,000.00 57,375.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 102,925.00
B Bahan -
pintu alluminium M2 0.320 3,176,082.20 1,016,346.30
Kaca M2 1.000 106,405.10 106,405.10
sealant tube 0.270 18,500.26 4,995.07
aksesories 100% x bahan kaca 1.000 106,405.10 106,405.10
Jumlah Harga Bahan 1,234,151.58
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.425 102,000.00 43,350.00
2 Tukang L.02 OH 0.425 135,000.00 57,375.00
3 Kepala tukang L.03 OH 0.009 150,000.00 1,350.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 102,925.00
B Bahan -
pintu alluminium M2 0.460 3,176,082.20 1,460,997.81
Kaca t=8mm M2 1.086 551,002.62 598,609.25
sealant tube 0.270 18,500.26 4,995.07
Jumlah Harga Bahan 2,064,602.13
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.015 102,000.00 1,530.00
2 Tukang L.02 OH 0.150 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.015 150,000.00 2,250.00
4 Mandor L.04 OH 0.008 170,000.00 1,360.00
Jumlah Harga Tenaga Kerja 25,390.00
B Bahan -
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.015 102,000.00 1,530.00
2 Tukang L.02 OH 0.150 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.001 150,000.00 120.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 22,750.00
B Bahan -
Kaca tebal 5 mm M2 1.100 106,405.10 117,045.61
sealant tube 0.050 18,500.26 925.01
-
Jumlah Harga Bahan 117,970.62
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.015 102,000.00 1,530.00
2 Tukang L.02 OH 0.150 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.015 150,000.00 2,250.00
4 Mandor L.04 OH 0.0008 170,000.00 136.00
Jumlah Harga Tenaga Kerja 24,166.00
B Bahan -
Engsel pintu Bh 1.000 19,332.76 19,332.76
-
Jumlah Harga Bahan 19,332.76
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.010 102,000.00 1,020.00
2 Tukang L.02 OH 0.100 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.0005 170,000.00 85.00
Jumlah Harga Tenaga Kerja 16,105.00
B Bahan -
Engsel kupu-kupu Bh 1.000 15,470.26 15,470.26
-
Jumlah Harga Bahan 15,470.26
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.010 102,000.00 1,020.00
2 Tukang L.02 OH 0.500 135,000.00 67,500.00
3 Kepala tukang L.03 OH 0.050 150,000.00 7,500.00
4 Mandor L.04 OH 0.0050 170,000.00 850.00
Jumlah Harga Tenaga Kerja 76,870.00
B Bahan -
Kunci tanam biasa Bh 1.000 235,020.26 235,020.26
-
Jumlah Harga Bahan 235,020.26
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.010 102,000.00 1,020.00
2 Tukang L.02 OH 0.100 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.0050 170,000.00 850.00
Jumlah Harga Tenaga Kerja 16,870.00
B Bahan -
Grendel Jendela Bh 1.000 7,436.26 7,436.26
-
Jumlah Harga Bahan 7,436.26
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.050 102,000.00 5,100.00
2 Tukang L.02 OH 0.500 135,000.00 67,500.00
3 Kepala tukang L.03 OH 0.050 150,000.00 7,500.00
4 Mandor L.04 OH 0.0030 170,000.00 510.00
Jumlah Harga Tenaga Kerja 80,610.00
B Bahan -
Grendel besar Bh 1.000 17,839.26 17,839.26
-
Jumlah Harga Bahan 17,839.26
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Tukang Besi L.02 OH 0.750 102,000.00 76,500.00
2 Kepala Tukang L.03 OH 0.075 135,000.00 10,125.00
3 Pekerja L.01 OH 0.250 150,000.00 37,500.00
4 Mandor L.04 OH 0.010 170,000.00 1,700.00
Jumlah Harga Tenaga Kerja 125,825.00
B Bahan
1 Profil Baja ringan K-Truss Btg 0.444 112,334.59 49,876.56
2 Profil Baja ringan Reng 40.0,55 Btg 0.711 86,504.59 61,504.76
3 Baut Baja Ringan Kg 0.178 1,965.06 349.78
4 Dina Bolt Bh 0.080 2,731.03 218.48
Jumlah Harga Bahan 111,949.58
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Tukang Besi L.02 OH 0.750 102,000.00 76,500.00
2 Kepala Tukang L.03 OH 0.075 135,000.00 10,125.00
3 Pekerja L.01 OH 0.250 150,000.00 37,500.00
4 Mandor L.04 OH 0.010 170,000.00 1,700.00
Jumlah Harga Tenaga Kerja 125,825.00
B Bahan
1 pipa galvanis M' 2.000 83,949.59 167,899.18
2 Pengelasan CM 2.000 1,920.10 3,840.21
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 102,000.00 20,400.00
2 Tukang L.02 OH 0.100 135,000.00 13,500.00
3 Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
4 Mandor L.04 OH 0.001 170,000.00 170.00
Jumlah Harga Tenaga Kerja 35,570.00
B Bahan
1 Atap genteng metal 0.35 mm m2 1.020 59,347.15 60,534.09
2 Baut besar baja ringan Kg 0.200 1,965.06 393.01
Jumlah Harga Bahan 60,927.11
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.250 102,000.00 25,500.00
2 Tukang L.02 OH 0.150 135,000.00 20,250.00
3 Kepala tukang L.03 OH 0.015 150,000.00 2,250.00
4 Mandor L.04 OH 0.013 170,000.00 2,210.00
Jumlah Harga Tenaga Kerja 50,210.00
B Bahan
1 Nok Atap Genteng Metal T=0.35 mm bh 1.100 21,968.25 24,165.07
2 Baut baja ringan Kg 0.050 1,965.06 98.25
Jumlah Harga Bahan 24,263.32
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 102,000.00 20,400.00
2 Tukang L.02 OH 0.200 135,000.00 27,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.001 170,000.00 170.00
Jumlah Harga Tenaga Kerja 50,570.00
B Bahan
1 Seng plat m' 1.050 14,530.75 15,257.28
2 Baut baja ringan Kg 0.015 1,965.06 29.48
3 Papan kayu kealas - III m3 0.019 2,203,192.51 41,860.66
Jumlah Harga Bahan 57,147.42
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.100 102,000.00 10,200.00
2 Tukang kayu L.02 OH 0.200 135,000.00 27,000.00
3 Kepala tukang L.03 OH 0.020 150,000.00 3,000.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 41,050.00
B Bahan
1 papan GRC L 25 cm M' 1.050 15,643.82 16,426.01
2 Baut baja ringan Kg 0.100 1,965.06 196.51
Jumlah Harga Bahan 16,622.52
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.175 102,000.00 17,850.00
2 Tukang L.02 OH 0.175 135,000.00 23,625.00
3 Kepala Tukang L.03 OH 0.018 150,000.00 2,625.00
4 Mandor L.04 OH 0.009 170,000.00 1,487.50
Jumlah Harga Tenaga Kerja 45,587.50
B Bahan
1 Furing s-roof 0.035mm Thickness m' 4.000 2,326.15 9,304.61
2 Assesoris (perkuatan,dll) 30%xrangka 0.300 2,326.15 697.85
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.100 102,000.00 10,200.00
2 Tukang kayu L.02 OH 0.050 135,000.00 6,750.00
3 Kepala tukang L.03 OH 0.005 150,000.00 750.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 18,550.00
B Bahan
1 Plafond PVC t = 6 mm M2 1.050 154,417.22 162,138.08
2 Paku skrup kg 0.110 19,790.96 2,177.01
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.050 102,000.00 5,100.00
2 Tukang kayu L.02 OH 0.050 135,000.00 6,750.00
3 Kepala tukang L.03 OH 0.005 150,000.00 750.00
4 Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Harga Tenaga Kerja 13,110.00
B Bahan -
1 List profil PVC m’ 1.050 6,331.89 6,648.48
2 Paku skrup kg 0.010 19,790.96 197.91
Jumlah Harga Bahan 6,846.39
C Peralatan
Jenis Pekerjaan : Pemasangan 1 m2 rangka besi siku 30x30x2,8 mm, modul 60 x 120 cm,
dinding ACP
Harga Satuan : Rp 1,098,751.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.250 102,000.00 25,500.00
2 Tukang L.02 OH 0.250 135,000.00 33,750.00
3 Kepala Tukang L.03 OH 0.025 150,000.00 3,750.00
4 Mandor L.04 OH 0.013 170,000.00 2,210.00
Jumlah Harga Tenaga Kerja 65,210.00
B Bahan
1 Besi Siku L30x30x2,8 mm m' 3.500 22,244.59 77,856.06
2 ACP m2 1.150 367,500.00 422,625.00
3 Assesoris (perkuatan, las dll) 100%xrangka 1.000 389,744.59 389,744.59
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.350 102,000.00 35,700.00
2 Tukang L.02 OH 0.350 135,000.00 47,250.00
3 Kepala Tukang L.03 OH 0.035 150,000.00 5,250.00
4 Mandor L.04 OH 0.018 170,000.00 2,975.00
Jumlah Harga Tenaga Kerja 91,175.00
B Bahan
1 Besi Siku L30x30x2,8 mm m' 3.500 21,968.25 76,888.86
2 ACP m2 1.150 551,002.62 633,653.01
3 Assesoris (perkuatan, las dll) 100%xrangka 1.000 572,970.87 572,970.87
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.150 102,000.00 15,300.00
2 Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Harga Tenaga Kerja 15,810.00
B Bahan
1 Soda api Kg 0.0500 3,603.46 180.17
Jenis Pekerjaan : Pengecatan 1m2 Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat
Penutup )
Harga Satuan : Rp 41,791.10
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.020 102,000.00 2,040.00
2 Tukang Cat L.02 OH 0.063 135,000.00 8,505.00
3 Kepala tukang L.03 OH 0.006 150,000.00 945.00
4 Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Harga Tenaga Kerja 12,000.00
B Bahan
1 Plamur Kg 0.100 13,530.96 1,353.10
2 Cat dasar Kg 0.100 40,385.96 4,038.60
3 Cat penutup/tembok Kg 0.260 72,878.46 18,948.40
Jumlah Harga Bahan 24,340.09
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.070 102,000.00 7,140.00
2 Tukang Cat L.02 OH 0.105 135,000.00 14,175.00
3 Kepala tukang L.03 OH 0.004 150,000.00 600.00
4 Mandor L.04 OH 0.003 170,000.00 510.00
Jumlah Harga Tenaga Kerja 22,425.00
B Bahan
1 Cat Meni Kg 0.200 36,490.96 7,298.19
2 Plamuur Kg 0.150 13,530.96 2,029.64
3 Cat dasar Kg 0.170 40,385.96 6,865.61
4 Cat penutup/cat kayu Kg 0.350 70,315.96 24,610.59
5 Kuas Bh 0.010 15,553.46 155.53
6 Pengencer Kg 0.030 35,158.46 1,054.75
7 Ampelas Lbr 0.200 25,853.46 5,170.69
Jumlah Harga Bahan 39,886.82
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.010 102,000.00 1,020.00
2 Tukang batu L.02 OH 0.400 135,000.00 54,000.00
3 Kepala tukang L.03 OH 0.040 150,000.00 6,000.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 61,870.00
B Bahan
1 Kran Air Bh 1.000 71,608.46 71,608.46
2 Seal tape Bh 0.025 8,030.96 200.77
Jumlah Harga Bahan 71,809.23
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.010 102,000.00 1,020.00
2 Tukang batu L.02 OH 0.400 135,000.00 54,000.00
3 Kepala tukang L.03 OH 0.040 150,000.00 6,000.00
4 Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 61,870.00
B Bahan
1 Stop Kran Air Bh 1.000 135,000.00 135,000.00
2 Seal tape Bh 0.025 8,030.96 200.77
Jumlah Harga Bahan 135,200.77
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.036 102,000.00 3,672.00
2 Tukang batu L.02 OH 0.060 135,000.00 8,100.00
3 Kepala tukang L.03 OH 0.006 150,000.00 900.00
4 Mandor L.04 OH 0.002 170,000.00 340.00
Jumlah Harga Tenaga Kerja 13,012.00
B Bahan
1 Pipa PVC D 1/2" m' 1.200 7,243.46 8,692.15
2 Perlengkapan % 0.350 7,243.46 2,535.21
Jumlah Harga Bahan 11,227.36
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
1 Pekerja L.01 OH 0.036 102,000.00 3,672.00
2 Tukang batu L.02 OH 0.060 135,000.00 8,100.00
3 Kepala tukang L.03 OH 0.006 150,000.00 900.00
4 Mandor L.04 OH 0.002 170,000.00 340.00
Jumlah Harga Tenaga Kerja 13,012.00
B Bahan
1 Sambungan Reduser Pipa Reduce Socket 1" - 3/4" m' 1.200 6,615.00 7,938.00
2 Perlengkapan % 0.350 6,615.00 2,315.25
Jumlah Harga Bahan 10,253.25
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.081 102,000.00 8,262.00
Tukang batu L.02 OH 0.135 135,000.00 18,225.00
Kepala tukang L.03 OH 0.014 150,000.00 2,025.00
Mandor L.04 OH 0.004 170,000.00 680.00
Jumlah Harga Tenaga Kerja 29,192.00
B Bahan
Pipa PVC tipe AW Ø 3" m' 1.200 54,650.96 65,581.15
Perlengkapan % 0.350 54,650.96 19,127.84
Jumlah Harga Bahan 84,708.99
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.081 102,000.00 8,262.00
Tukang batu L.02 OH 0.135 135,000.00 18,225.00
Kepala tukang L.03 OH 0.0135 150,000.00 2,025.00
Mandor L.04 OH 0.004 170,000.00 680.00
Jumlah Harga Tenaga Kerja 29,192.00
B Bahan
Pipa PVC tipe AW Ø 4" m' 1.200 85,205.96 102,247.15
Perlengkapan % 0.350 85,205.96 29,822.09
Jumlah Harga Bahan 132,069.24
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.135 102,000.00 13,770.00
Tukang batu L.02 OH 0.225 135,000.00 30,375.00
Kepala tukang L.03 OH 0.023 150,000.00 3,450.00
Mandor L.04 OH 0.007 170,000.00 1,190.00
Jumlah Harga Tenaga Kerja 48,785.00
B Bahan
Pipa galvanis 3” m' 1.200 104,660.84 125,593.01
Perlengkapan % 0.350 104,660.84 36,631.29
Jumlah Harga Bahan 162,224.30
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.135 102,000.00 13,770.00
Tukang batu L.02 OH 0.225 135,000.00 30,375.00
Kepala tukang L.03 OH 0.023 150,000.00 3,450.00
Mandor L.04 OH 0.007 170,000.00 1,190.00
Jumlah Harga Tenaga Kerja 48,785.00
B Bahan
Pipa galvanis 2” m' 1.200 83,949.59 100,739.51
Perlengkapan % 0.350 83,949.59 29,382.36
Jumlah Harga Bahan 130,121.86
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.040 102,000.00 4,080.00
Tukang batu L.02 OH 0.020 135,000.00 2,700.00
Kepala tukang L.03 OH 0.002 150,000.00 300.00
Mandor L.04 OH 0.002 170,000.00 340.00
Jumlah Harga Tenaga Kerja 7,420.00
B Bahan
Kawat las listrik Kg 0.400 13,753.46 5,501.38
Solar Ltr 0.300 7,903.46 2,371.04
Minyak pelumas Ltr 0.040 35,103.46 1,404.14
Jumlah Harga Bahan 9,276.56
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 1.670 102,000.00 170,340.00
Tukang Las L.03 OH 1.670 135,000.00 225,450.00
Kepala tukang L.03 OH 0.167 150,000.00 25,050.00
Mandor L.04 OH 0.083 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 434,950.00
B Bahan
Besi strip Kg 6.177 13,753.46 84,955.12
Pengelasan Ltr 27.080 1,920.10 51,996.43
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 1.670 102,000.00 170,340.00
Tukang Las L.03 OH 1.670 135,000.00 225,450.00
Kepala tukang L.03 OH 0.167 150,000.00 25,050.00
Mandor L.04 OH 0.083 170,000.00 14,110.00
Jumlah Harga Tenaga Kerja 434,950.00
B Bahan
-
Besi Beton Kg 9.469 13,753.46 130,237.55
AHSP. A.4.2.1.5 Cm 6.699 19,201.04 128,621.39
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 3.300 102,000.00 336,600.00
Tukang batu L.02 OH 1.100 135,000.00 148,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.160 170,000.00 27,200.00
Jumlah Harga Tenaga Kerja 513,800.00
B Bahan
Closet duduk Unit 1.000 2,416,034.59 2,416,034.59
Shower cebok Unit 1.000 277,200.00 277,200.00
Perlengkapan dan aksesories 60%x harga closet 0.060 2,693,234.59 161,594.08
Jumlah Harga Bahan 2,854,828.66
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 1.000 102,000.00 102,000.00
Tukang batu L.02 OH 1.000 135,000.00 135,000.00
Kepala tukang L.03 OH 0.100 150,000.00 15,000.00
Mandor L.04 OH 0.050 170,000.00 8,500.00
Jumlah Harga Tenaga Kerja 260,500.00
B Bahan
Urinoir Unit 1.000 2,205,100.09 2,205,100.09
Semen Portland Kg 6.000 2,146.34 12,878.07
Pasir pasang M3 0.010 214,127.82 2,141.28
Perlengkapan 30%x harga urinoir 0.300 2,205,100.09 661,530.03
Jumlah Harga Bahan 2,881,649.46
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 1.200 102,000.00 122,400.00
Tukang batu L.02 OH 1.450 135,000.00 195,750.00
Kepala tukang L.03 OH 0.150 150,000.00 22,500.00
Mandor L.04 OH 0.060 170,000.00 10,200.00
Jumlah Harga Tenaga Kerja 350,850.00
B Bahan
Wastafel Unit 1.200 1,636,934.59 1,964,321.51
Semen Portland Kg 6.000 2,146.34 12,878.07
Pasir pasang M3 0.010 214,127.82 2,141.28
Perlengkapan 12%x harga wastafel 0.120 1,636,934.59 196,432.15
Jumlah Harga Bahan 2,175,773.00
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.030 102,000.00 3,060.00
Tukang batu L.02 OH 0.300 135,000.00 40,500.00
Kepala tukang L.03 OH 0.030 150,000.00 4,500.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 50,610.00
B Bahan
Bak cuci piring Unit 1.000 851,034.59 851,034.59
Waterdrain Bh 1.000 495,703.46 495,703.46
Jumlah Harga Bahan 1,346,738.05
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.030 102,000.00 3,060.00
Tukang batu L.02 OH 0.300 135,000.00 40,500.00
Kepala tukang L.03 OH 0.030 150,000.00 4,500.00
Mandor L.04 OH 0.015 170,000.00 2,550.00
Jumlah Harga Tenaga Kerja 50,610.00
B Bahan
Bak cuci piring Unit 1.000 1,001,034.59 1,001,034.59
Waterdrain Bh 1.000 495,703.46 495,703.46
Jumlah Harga Bahan 1,496,738.05
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.010 102,000.00 1,020.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 16,870.00
B Bahan
Floor drain Unit 1.000 145,103.46 145,103.46
-
Jumlah Harga Bahan 145,103.46
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Pekerja L.01 OH 0.010 102,000.00 1,020.00
Tukang batu L.02 OH 0.100 135,000.00 13,500.00
Kepala tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.005 170,000.00 850.00
Jumlah Harga Tenaga Kerja 16,870.00
B Bahan
Tempat sabun Unit 1.000 350,000.00 350,000.00
-
Jumlah Harga Bahan 350,000.00
C Peralatan
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.107 -
Asisten Instalatur Listrik L.01 OH 0.053 102,000.00 5,440.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.160 135,000.00 21,600.00
Asisten Instalatur Listrik L.01 OH 0.080 102,000.00 8,160.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.320 135,000.00 43,200.00
Asisten Instalatur Listrik L.01 OH 0.160 102,000.00 16,320.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.320 135,000.00 43,200.00
Asisten Instalatur Listrik L.01 OH 0.160 102,000.00 16,320.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.320 135,000.00 43,200.00
Asisten Instalatur Listrik L.01 OH 0.160 102,000.00 16,320.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.480 135,000.00 64,800.00
Asisten Instalatur Listrik L.01 OH 0.240 102,000.00 24,480.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.384 135,000.00 51,840.00
Asisten Instalatur Listrik L.01 OH 0.192 102,000.00 19,584.00
HARGA JUMLAH
NO URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA SATUAN
(Rp) (Rp)
A Tenaga Kerja
Tukang listrik L.02 OH 0.320 135,000.00 43,200.00
Asisten Instalatur Listrik L.01 OH 0.160 102,000.00 16,320.00
Dibuat Oleh :
Konsultan Perencana
CV. BILLINDO ENGINEERING CONSULTANT
RENCANA ANGGARAN BIAYA (RAB)
PROYEK : DINAS KESEHATAN KABUPATEN NIAS SELATAN
PEKERJAAN : PEMBANGUNAN PUSKESMAS ULUIDANOTAE
LOKASI : KABUPATEN NIAS SELATAN KECAMATAN LOLOMATUA
TAHUN ANGGARAN : 2020
HARGA JUMLAH
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
( Rp ) ( Rp )
I PEKERJAAN PERSIAPAN
1 Pekerjaan Mobilisasi dan Demobilisasi Lumpsum 1.00 Ls 26,500,000.00 26,500,000.00
2 Pekerjaan Pemasangan Bouwplank Taksir 1.00 Ls 2,500,000.00 2,500,000.00
3 Pemagaran dan Pengamanan Lokasi Pekerjaan AHSP. A. 2.2.1.2*) 50.00 M' 211,969.33 10,598,466.50
4 Penyediaan Air Kerja dan Listrik Kerja Taksir 1.00 Ls 3,000,000.00 3,000,000.00
5 Sistem Management Keselamatan Konstruksi/P3K Taksir 1.00 Ls 3,000,000.00 3,000,000.00
JUMLAH - I 45,598,466.50
II PEKERJAAN PEMATANGAN LAHAN
1 Pek. Galian Pematangan Lahan AHSP. A. 4.1 514.23 M2 22,613.44 11,628,507.05
2 Pek. Timbunan Tanah Peninggian Feil Lahan/Tapak AHSP. A.2.3.1.10 45.44 M3 279,764.41 12,712,494.79
JUMLAH - II 24,341,001.84
III PEKERJAAN PONDASI
1 Pek. Galian tanah pondasi AHSP. A.2.3.1.1 194.13 M3 92,862.50 18,027,545.71
2 Pek. Urugan tanah galian pondasi AHSP. A.2.3.1.9 64.71 M3 68,425.00 4,427,818.24
3 Pek. Lantai Kerja AHSP. A.3.2.1.9 26.90 M3 456,383.69 12,278,911.88
4 Pek. Pasangan Batu Kali Camp. 1:4 AHSP. A.3.2.1.2 86.72 M3 1,140,358.37 98,892,333.96
5 Pek. Tapak Pondasi K1 -
- Bekisting AHSP. A.4.1.1.20 16.30 M2 73,034.58 1,190,463.63
- Pembesian AHSP. A.4.1.1.17 2,135.16 Kg 18,986.38 40,538,948.66
- Cor beton (K-250) AHSP. A.4.1.1.8 16.25 M3 1,673,091.25 27,187,732.74
JUMLAH - III 202,543,754.82
IV PEKERJAAN BETON
1 Pek. Pedestal Pondasi (K1)
- Bekisting AHSP. A.4.1.1.22 48.75 M2 96,416.76 4,700,316.84
- Pembesian AHSP. A.4.1.1.17 1,630.05 Kg 18,986.38 30,948,740.73
- Cor beton (K-250) AHSP. A.4.1.1.8 3.05 M3 1,673,091.25 5,102,928.30
2 Pek. Balok Sloof Uk. 20 x 40 Cm -
- Bekisting AHSP. A.4.1.1.21 275.86 M2 77,257.36 21,312,216.52
- Pembesian AHSP. A.4.1.1.17 4,403.24 Kg 18,986.38 83,601,566.30
- Cor beton (K-250) AHSP. A.4.1.1.8 27.59 M3 1,673,091.25 46,160,587.46
3 Pek. Kolom Uk. 25 x 25 Cm (K1) -
- Bekisting AHSP. A.4.1.1.22 273.00 M2 96,416.76 26,321,774.30
- Pembesian AHSP. A.4.1.1.17 4,721.81 Kg 18,986.38 89,650,055.82
- Cor beton (K-250) AHSP. A.4.1.1.8 17.06 M3 1,673,091.25 28,542,936.65
4 Pek. Kolom Uk. 13 x 13 Cm (K2) -
- Bekisting AHSP. A.4.1.1.22 13.18 M2 96,416.76 1,270,772.84
- Pembesian AHSP. A.4.1.1.17 1,403.63 Kg 18,986.38 26,649,845.68
- Cor beton (K-250) AHSP. A.4.1.1.8 2.11 M3 1,673,091.25 3,530,222.53
5 Pek. Lantai Beton Elv. -0,20 Meter (parkir stay) -
- Bekisting AHSP. A.4.1.1.24 2.10 M2 96,416.76 202,475.19
- Pembesian AHSP. A.4.1.1.17 260.32 Kg 18,986.38 4,942,533.17
- Cor beton (K-250) AHSP. A.4.1.1.8 6.08 M3 1,673,091.25 10,172,394.77
6 Pek. Balok Uk, 13 x 15 Cm Elv. ±2,20 Meter diatas pintu -
- Bekisting AHSP. A.4.1.1.23 34.40 M2 98,950.43 3,403,894.69
- Pembesian AHSP. A.4.1.1.17 589.56 Kg 18,986.38 11,193,607.30
- Cor beton (K-250) AHSP. A.4.1.1.8 1.29 M3 1,673,091.25 2,158,287.71
JUMLAH - IV 399,865,156.79
V PEKERJAAN SELASAR DAN DRAINASE BANGUNAN
1 Pek. Galian Tanah AHSP. A.2.3.1.1 25.25 M3 92,862.50 2,344,963.85
2 Pek. Beksiting AHSP. A.4.1.1.21 323.77 M2 77,257.36 25,013,616.84
3 Pek. Pembesian AHSP. A.4.1.1.17 1,120.48 Kg 18,986.38 21,273,853.57
4 Pek. Cor Beton K-175 AHSP. A. A.4.1.1.5 21.60 M3 1,539,474.97 33,252,659.40
5 Pek. Plesteran Permukaan berikut Acian AHSP. A.4.4.2.4 146.56 M2 85,309.59 12,502,974.20
JUMLAH - V 94,388,067.87
VI PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Dinding batu bata 1 : 4 AHSP. A.4.4.1.9 1,314.09 M2 218,116.88 286,624,235.12
2 Pek. Plesteran dinding 1 : 4 (berikut acian) AHSP. A.4.4.2.4 1,087.85 M2 85,309.59 92,804,042.61
3 Pek. Acian pada Kolom AHSP. A.4.4.2.27 273.00 M2 50,686.96 13,837,540.61
JUMLAH - VI 393,265,818.34
VII PEKERJAAN KOZEN VENTILASI PINTU, JENDELA KACA
1 Pek. Kozen Pintu Kayu AHSP. A.4.6.1.1 0.30 M3 10,756,676.11 3,227,002.83
2 Pek. Pintu Panel Kayu pakai kaca (P5) Hitung-2 1.00 Daun 1,577,079.06 1,577,079.06
3 Pek. Pintu Panel Kayu (P4) Hitung-1 8.00 Daun 1,509,004.49 12,072,035.88
9 Pek. Kaca 5 mm tanpa bingkai AHSP. A.4.6.2.17 7.47 M2 161,828.72 1,209,184.18
10 Pek. Pintu Aluminium untuk KM (komplit) Dihitung-5 6.00 Daun 2,004,336.32 12,026,017.90
11 Pasang Kaca Cermin untuk KM dan Wastafel Uk. 70 x 100 Cm AHSP. A.4.6.2.20 11.20 M2 408,954.81 4,580,293.92
12 Pek. Engsel Pintu Kayu AHSP. A.4.6.2.5 27.00 Bh 50,023.58 1,350,636.56
13 Pek. Kunci Tanam Pintu Kayu AHSP. A.4.6.2.2 9.00 Bh 358,673.80 3,228,064.21
JUMLAH - VII 39,270,314.56
VIII PEKERJAAN LANTAI
1 Pek. Pasir urug dibawah lantai AHSP. A.2.3.1.11 21.32 M3 244,252.39 5,207,460.94
2 Pek. Cor Lantai (K-100) AHSP. A.4.1.1.1 71.09 M3 1,355,994.97 96,397,682.19
6 Pek. Pemasangan Lantai Keramik Uk. 40 x 40 cm untuk selasar AHSP. A.4.4.3.11 108.62 M2 176,406.05 19,160,520.06
Pek. Dinding keramik Uk. 25 x 45 cm (meja dapur, meja gudang obat, meja bayi ruang bersalin) dipasangan mulai AHSP. A.4.4.3.54*) 30.43 M2 293,347.77 8,925,399.31
7 dari bawah (H=2,20 M')
8 Pek. Dinding keramik Uk. 25 x 45 cm pada ruang Laboratorium H=2,20 meter AHSP. A.4.4.3.54*) 33.73 M2 293,347.77 9,893,446.95
9 Pek. Pemasangan Plin keramik 10 x 60 cm (warna hitam) pada ruangan AHSP. A.4.4.3.28 978.38 M' 52,965.27 51,820,157.90
10 Pek. Pemasangan Plin keramik 10 x 40 cm untuk selasar AHSP. A.4.4.3.24*) 135.77 M' 43,764.15 5,941,858.66
11 Pek. Pemasangan Lantai keramik Uk. 25 x 25 cm untuk KM dan Ruang Cuci AHSP. A.4.4.3.37 29.19 M2 280,113.27 8,175,890.01
12 Pek. Dinding keramik Uk. 25 x 45 cm untuk KM, ruang cuci AHSP. A.4.4.3.54*) 71.17 M2 293,347.77 20,877,472.92
13 Pek. Waterprofing untuk Cor Dak AHSP. A.4.4.2.27*) 187.51 M' 75,950.85 14,241,544.08
JUMLAH - VIII 240,641,433.01
IX PEKERJAAN ATAP
HARGA JUMLAH
NO. URAIAN PEKERJAAN ANALISA VOLUME SATUAN SATUAN HARGA
( Rp ) ( Rp )
Dibuat Oleh :
Konsultan Perencana
CV. BILLINDO ENGINEERING CONSULTANT
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
A Jumlah 2,711,364,126.96
B PPN (10%) 271,136,412.70
C Grand Total 2,982,500,539.66
Dibulatkan 2,982,500,000.00
TERBILANG : # Dua Miliar sembilan ratus delapan puluh dua juta lima ratus ribu rupiah #
Dibuat Oleh :
Konsultan Perencana
CV. BILLINDO ENGINEERING CONSULTANT
0 0
Direktur Team Leader
Diperiksa Oleh :