WINNERS
Consulting engineering
Perum Bumi Mondoroko Raya AM-65 Kel. Watu Gede, Kec. Singosari
Telp. 082132721987
TOTAL
DIBULATKAN / ROUNDED
TERBILANG :
" TIGA RATUS JUTA RUPIAH "
Disetujui oleh :
NAWAWI S, Pdi
AN BIAYA
Jumlah Harga
Rp 4,500,000.00
Rp 1,815,450.00
Rp 51,502,385.89
Rp 29,982,640.80
Rp 20,142,218.27
Rp 11,069,116.00
Rp 12,380,445.00
Rp 7,189,890.00
Rp 41,537,004.07
Rp 180,119,150.04
Rp 180,000,000.00
Malang
Dibuat oleh :
Konsultan Perencanaan
CV. Orion Java Consultant
BAMBANG ABINOTO
CV. WINNERS
Consulting engineering
Perum Bumi Mondoroko Raya AM-65 Kel. Watu Gede, Kec. Singosari
Telp. 082132721987
2 Titik Instalasi Stop Kontak (NYM - 3x2.5 mm2 ) 4 0.09 Titik Rp 66,127.50
Disetujui oleh :
NAWAWI S, Pdi
Jumlah Harga
Rp 4,500,000.00
Rp 4,500,000.00
Rp 1,282,750.00
Rp 532,700.00
Rp 1,815,450.00
Rp 27,070,740.48
Rp 1,998,582.01
Rp 6,118,108.20
Rp 16,314,955.20
Rp 51,502,385.89
Rp 4,363,500.00
Rp 25,619,140.80
Rp 29,982,640.80
Rp 295,560.00
Rp 295,560.00
Rp 13,762,218.27
Rp 3,190,000.00
Rp 3,190,000.00
Rp 3,190,000.00
Rp 20,142,218.27
Rp 180,000.00
Rp 180,000.00
Rp 180,000.00
Rp 540,000.00
Rp 803,010.00
Rp 3,000,000.00
Rp 2,242,890.00
Rp 1,400,000.00
Rp 1,400,000.00
Rp 111,072.00
Rp 222,144.00
Rp 960,000.00
Rp 750,000.00
Rp 180,000.00
Rp 11,069,116.00
Rp 6,609,645.00
Rp 5,770,800.00
Rp 12,380,445.00
Rp 896,436.00
Rp 264,510.00
Rp 5,233,644.00
Rp 255,300.00
Rp 540,000.00
Rp 7,189,890.00
Rp 27,166,840.73
Rp 14,370,163.34
Rp 41,537,004.07
Rp 90,000,000.00
Rp 15,000,000.00
Rp 105,000,000.00
Rp 285,954,710.04
Malang
Dibuat oleh :
Konsultan Perencanaan
CV. WINNERS
BAMBANG ABINOTO
ENGINEER'S ESTIMATE K3
NAMA KEGIATAN #REF!
NAMA PEKERJAAN #REF!
PEMILIK #REF!
LOKASI #REF!
TAHUN ANGGARAN #REF!
Kode Harga Satuan Jumlah Harga
No. Item Pekerjaan Volume Sat. Analisa (Rp) (Rp)
1 PEKERJAAN K3 Jumlah Rp 6,965,500
- Topi Pelindung (Safety Helmet); 23.00 bh Non Ans Rp 40,000 Rp 920,000
- Pelindung Pernafasan dan Mulut (Masker); 100.00 pcs Non Ans Rp 5,000 Rp 500,000
- Sarung Tangan (Safety Gloves); 23.00 set Non Ans Rp 5,500 Rp 126,500
- Sepatu Bot Keselamatan (Safety Boot-Plastik); 23.00 set Non Ans Rp 120,000 Rp 2,760,000
- Rompi Keselamatan (Safety Vest); 23.00 bh Non Ans Rp 63,000 Rp 1,449,000
- Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll); 2.00 ls Non Ans Rp 200,000 Rp 400,000
- Spreyer Elektrik (untuk desinfektan) 1.00 bh Non Ans Rp 810,000 Rp 810,000
- Thermogun 1.00 bh Non Ans Rp 900,000 Rp 900,000
Dibuat :
Konsultan Perencana
CV. ASRIMAS JANALOKA
1 2 3 4 5
SATUAN HARGA UPAH (ASB FISIK)
1 L.01 Pekerja OH 101,000.00
2 L.02 Tukang OH 125,000.00
3 L.03 Kepala Tukang OH 135,000.00
4 L.04 Mandor OH 145,000.00
SATUAN HARGA ALAT (ASB FISIK)
51 E.31 Pemadat timbunan (vibro roller kecil/stamper) Sewa-hari 150,000.00
86 M.02b Air Liter 180.00
89 M.04.a Batu bata / merah bakar kelas I Buah 950.00
91 M.04.c Batu bata / merah bakar kw biasa Buah 700.00
93 M.05 Batu kali / Batu belah M3 135,000.00
125 M.107.10 Pipa PVC 2 1/2” M' 12,000.00
126 M.107.11 Pipa PVC 3” M' 13,000.00
127 M.107.13 Pipa PVC 4” M' 15,000.00
129 M.107.6 Pipa PVC 1/2” M' 8,000.00
130 M.107.12 Pipa PVC 3/4” M' 9,000.00
131 M.107.7 Pipa PVC 1” M' 10,000.00
157 M.110.a Asbes gelombang besar uk. 105 x 180, 5mm Lembar 87,500.00
165 M.115.d Cat tembok interior Kg 38,500.00
177 M.12 Kerikil/Koral/Agregat Beton M3 215,000.00
178 M.12.1 Kerikil/Koral Kg 120.00
191 M.129 Minyak bekisting Liter 15,000.00
211 M.14.a Pasir beton M3 187,000.00
212 M.14.a1 Pasir beton Kg 133.57
213 M.14.b Pasir pasang kali/gunung M3 130,000.00
214 M.14.d Pasir urug M3 128,000.00
215 M.14.TB Pasir Katel / Tanah Katel untuk Taman M3 50,000.00
237 M.147.c1 Ubin granit 60 60 Buah 73,750.00
260 M.147.k5 Lantai keramik 20 25 Buah 2,750.00
268 M.15 Portland Cemen (PC 50 kg/zak) Kg 1,325.00
273 M.15a Portland Cemen / semen Gresik Kg 1,325.00
275 M.15c Semen warna Kg 3,600.00
276 M.16 Sirtu M3 110,000.00
297 M.31.e Dolken kayu φ8-10/400 cm Batang 28,800.00
299 M.33.a Kayu balok klas 2 (Kamper Banjar) M3 12,568,000.00
301 M.33.d Kayu balok klas 3 (Albasta) M3 2,160,000.00
306 M.35.e Kayu papan klas 3 (Albasta) M3 2,160,000.00
307 M.35.f Kayu papan 2/30 M3 12,000,000.00
310 M.37.b Kayu usuk/kaso klas 3 (Albasta) M3 2,160,000.00
313 M.38.c Multiplek tebal 1,2 cm Lembar 168,000.00
314 M.38.d Multiplek tebal 1,8 cm Lembar 210,000.00
318 M.40.a Teakwood 3mm 120 x 240 Lembar 240,000.00
322 M.42.b Trifflex t=4mm Lembar 66,000.00
327 M.46.a Plywood 9mm Lembar 132,000.00
337 M.54.i Besi Baja IWF Kg 18,000.00
338 M.55.d Baja Tulangan U 24 (besi beton blasa) Polos Kg 13,000.00
339 M.55.e Baja Tulangan U 32 Polos Kg 13,000.00
340 M.56.a Baut dia 10 mm panjang 5 cm Buah 2,640.00
341 M.56.e Baut Angkur Dia. 19 Panjang 30cm Buah 35,000.00
350 M.60 Kawat beton / Bendrat Kg 20,000.00
363 M.65.1 Paku skrup 1 cm – 2,5 cm Buah 350.00
364 M.65.3 Paku tripleks Buah 250.00
367 M.65.6 Skrup fixer Buah 750.00
369 M.65.c Paku biasa 2cm - 5 cm Kg 21,000.00
370 M.65.d Paku 2"-3" Kg 23,000.00
371 M.65.e Paku 5 - 10 cm Kg 26,000.00
373 M.65.g Paku biasa ½”-1” Kg 23,000.00
375 M.65.i Paku hak panj 15cm Kg 23,000.00
376 M.65.j Paku 1 cm – 2,5 cm Kg 23,000.00
377 M.66.c Paku seng gelombang Kg 45,000.00
385 M.89 Seng plat Lembar 79,000.00
386 M.89.a Seng pelat BJLS-30 lebar 0,6 m' M' 79,000.00
395 M.97 Hollow Galvalum 4x4 M' 12,500.00
396 M.98 Hollow Galvalum 2x4 M' 8,500.00
397 M.99 Galvalum C. 75 M' 17,500.00
400 NA.100 Bak cuci piring Unit 478,000.00
401 NA.101 Waterdrain Buah 30,000.00
402 NA.102 Kran air M' 64,000.00
403 NA.103 Sealtape Buah 3,200.00
406 NA.105.a Pipa tanah dia 15 M' 180,000.00
458 NA.114 Besi Profil Kg 18,000.00
464 NA.120 Besi lis kaca (1 x 1) cm M' 27,750.00
473 NA.13 Plafon asbes 3 mm (1x1 m) Lembar 15,600.00
476 NA.132 Paving Block 6cm K-225 M2 73,500.00
477 NA.133 Kanstin 40 x 20 x 10cm Bh 28,500.00
484 NA.14 Jendela kaca nako Daun 35,000.00
491 NA.146 Pipa Listrik 5/8" Batang 6,000.00
492 NA.147 Kabel M' 3,500.00
493 NA.148 T Dus Buah 500.00
494 NA.149 L Bow Buah 750.00
495 NA.150 Las Dop Buah 250.00
496 NA.151 Klem Buah 100.00
497 NA.152 Bola Lampu 20 Watt Buah 45,000.00
498 NA.153 Saklar Buah 33,000.00
499 NA.154 Fitting Buah 15,000.00
511 NA.31.c Kunci silinder Buah 56,000.00
512 NA.31.d Kunci slot Buah 30,000.00
526 NA.44 Lem Kg 40,000.00
528 NA.46 Vinyl M2 75,000.00
530 NA.49 HPL M2 15,000.00
534 NA.52 Gypsum board Lembar 97,500.00
535 NA.53 Profil Aluminium 4'' M' 96,000.00
536 NA.53.a Alluminium strip M' 5,500.00
537 NA.53.b Alluminium profil 4/7 M' 85,000.00
551 NA.59.c Nok standar 40x18 Buah 81,000.00
554 NA.61 Galvalum KR-5 T. 0,3 Lembar 120,000.00
556 NA.63 Engsel pintu Buah 45,000.00
557 NA.63.a Engsel kupu-kupu Buah 9,200.00
560 NA.65 Kait angin Buah 17,000.00
564 NA.69 Rel pintu sorong Set 240,000.00
565 NA.69.a Rel Laci Set 37,500.00
568 NA.70.a Kaca tebal 5mm M2 105,000.00
570 NA.70.c Pintu Kaca Tempered 12mm + Asesoris floor hinge Set 5,000,000.00
571 NA.71 Sealant Kg 54,000.00
577 NA.77 Plamuur Kg 30,000.00
592 NA.92 Closet duduk Unit 1,945,000.00
595 NA.94 Wastafel Unit 236,000.00
598 NA.96a Biotank
Pasangan@1m3
Batu (Gali+
ukuranPemasangan)
20/50, t=40cm Unit 4,750,000.00
603 P.01d.1) M3 650,000.00
p
X = Bentang Terpendek
Y = Bentang Terpanjang
Y X tinggi volume
1.40 1.40 0.30 0.59 m3
BESI
diameter jarak panjang panjang
jumlah kg/m' TOTAL
tulangan tulangan tulangan total (m')
D16 0.15 9.33 2.40 22.40 1.58 35.39 kg
D16 0.15 9.33 2.34 21.84 1.58 34.51 kg
D16 0.15 9.33 2.40 22.40 1.58 35.39 kg
D16 0.15 9.33 2.34 21.84 1.58 34.51 kg
D13 0.20 (0.50) 4.96 (2.48) 1.04 (2.58) kg
jumlah = 137.22 kg
per m3 = 233.37 kg/m3
BEKISTING
kell ( 4 x 1m' ) tinggi (m') volume beton = 1.00 m3
5.60 0.30 1.68 m2 besi = 233.37 kg
per m3 = 2.86 m2/m3 bekesting = 2.86 m2
p
X = Bentang Terpendek
Y = Bentang Terpanjang
Y X tinggi volume
1.00 1.00 0.30 0.30 m3
BESI
diameter jarak panjang panjang
jumlah kg/m' TOTAL
tulangan tulangan tulangan total (m')
D16 0.15 6.67 2.40 16.00 1.58 25.28 kg
D16 0.15 6.67 2.34 15.60 1.58 24.65 kg
D16 0.15 6.67 2.40 16.00 1.58 25.28 kg
D16 0.15 6.67 2.34 15.60 1.58 24.65 kg
D13 0.20 (0.50) 3.36 (1.68) 1.04 (1.75) kg
jumlah = 98.11 kg
per m3 = 327.03 kg/m3
BEKISTING
kell ( 4 x 1m' ) tinggi (m') volume beton = 1.00 m3
4.00 0.30 1.20 m2 besi = 327.03 kg
per m3 = 4.00 m2/m3 bekesting = 4.00 m2
kl
B H PJG volume
0.30 0.30 1.00 0.28 m3 1.00 m3
BESI TB
panjang
diamerter jarak jumlah panjang kg/m' kg
tulangan
tulangan tulangan (btg) total (m')
d10 1.00 6.00 1.00 6.00 0.62 3.72 kg
d6 0.13 8.00 1.06 8.48 0.22 1.87 kg
beton = 1.00 m3
besi = 13.16 kg/m3
6.60 kg/m3
bekisting = 4.25 m2/m3
kl
B H PJG volume
0.40 0.40 1.00 0.16 m3 1.00 m3
BESI TB
panjang
diamerter jarak jumlah panjang kg/m' kg
tulangan
tulangan tulangan (btg) total (m')
D19 1.00 16.00 1.00 16.00 2.23 35.68 kg
d10 0.13 8.00 1.46 11.68 0.62 7.24 kg
kl
B H PJG volume
0.30 0.30 1.00 0.09 m3 1.00 m3
BESI TB
panjang
diamerter jarak jumlah panjang kg/m' kg
tulangan
tulangan tulangan (btg) total (m')
D19 1.00 16.00 1.00 16.00 2.23 35.68 kg
d10 0.13 8.00 1.06 8.48 0.62 5.26 kg
beton = 1.00 m3
besi = 396.44 kg/m3
58.42 kg/m3
bekisting = 13.33 m2/m3
kolom 35x35
B H PJG volume
0.35 0.35 1.00 0.12 m3 1.00 m3
BESI TB
panjang
diamerter jarak jumlah panjang kg/m' kg
tulangan
tulangan tulangan (btg) total (m')
D16 1.00 16.00 1.00 16.00 1.58 25.28 kg
d10 0.13 8.00 1.26 10.08 0.62 6.25 kg
beton = 1.00 m3
besi = 206.37 kg/m3
51.02 kg/m3
bekisting = 11.43 m2/m3
kl Praktis
B H PJG volume
0.15 0.15 1.00 0.02 m3 1.00 m3
BESI TB
panjang
diamerter jarak jumlah panjang kg/m' kg
tulangan
tulangan tulangan (btg) total (m')
d10 1.00 4.00 1.00 4.00 0.62 2.48 kg
d6 0.15 6.67 0.46 3.07 0.22 0.67 kg
beton = 1.00 m3
besi = 140.21 kg/m3
bekisting = 13.33 m2/m3
GB1
B H PJG volume
0.2 0.3 1 0.060 m3 1.00
BESI TB
panjang
dia jarak jumlah panjang kg/m' kg
tulangan
tulangan (btg) total (m')
tul pokok D13 1.00 4.00 1.00 4.00 1.58 6.32
tul begel d10 0.13 8.00 0.86 6.88 0.62 4.27
10.59
176.43
BEKISTING
kell sisi pjg (m') volume
0.60 1 0.60 m2
per m3 = 10.00 m2/m3
beton = 1.00 m3
besi = 176.43 kg/m3
bekisting = 10.00 m2/m3
PLAT S1 Teras
X Y tinggi volume
1.00 1.00 0.08 0.08 m3 1.00
BESI
jarak jumlah panjang panjang
kg/m'
tulangan tulangan total (m') TOTAL
arah Y d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
arah X d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
jumlah = 13.02
per m3 = 235.99
BEKISTING
kell ( 4 x 1m' ) tinggi (m') volume
1.00 0.08 1.32 m2
per m3 = 16.50 m2/m3
beton = 1.00 m3
besi = 235.99 kg/m3
bekesting = 16.50 m2/m3
PLAT S1 Ramp
X Y tinggi volume
1.00 1.00 0.15 0.15 m3 1.00
BESI
jarak jumlah panjang panjang
kg/m'
tulangan tulangan total (m') TOTAL
arah Y d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
arah X d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
jumlah = 13.02
per m3 = 125.86
BEKISTING
kell ( 4 x 1m' ) tinggi (m') volume
1.00 0.15 1.60 m2
per m3 = 10.67 m2/m3
beton = 1.00 m3
besi = 125.86 kg/m3
bekesting = 10.67 m2/m3
PLAT S1 Lantai
X Y tinggi volume
1.00 1.00 0.12 0.12 m3 1.00
BESI
jarak jumlah panjang panjang
kg/m'
tulangan tulangan total (m') TOTAL
arah Y d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
arah X d10 0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
0.3 3.33 1.05 3.50 0.62 2.17
jumlah = 13.02
per m3 = 157.33
BEKISTING
kell ( 4 x 1m' ) tinggi (m') volume
1.00 0.12 1.48 m2
per m3 = 12.33 m2/m3
beton = 1.00 m3
besi = 157.33 kg/m3
bekesting = 12.33 m2/m3
B1
B H PJG volume
0.3 0.5 1 0.150 m3 1.00
BESI TB
panjang
dia jarak jumlah panjang kg/m' kg
tulangan
tulangan (btg) total (m')
tul pokok D16 1.00 11.00 1.00 11.00 1.58 17.38
tul begel d10 0.10 10.00 1.46 14.60 0.62 9.05
17.38
9.05
115.87
60.35
BEKISTING
kell sisi pjg (m') volume
1.00 1 1.00 m2
per m3 = 6.67 m2/m3
beton = 1.00 m3
besi = 115.87 kg/m3
60.35 kg/m3
bekisting = 6.67 m2/m3
B2
B H PJG volume
0.25 0.4 1 0.100 m3 1.00
BESI TB
panjang
dia jarak jumlah panjang kg/m' kg
tulangan
tulangan (btg) total (m')
tul pokok D16 1.00 6.00 1.00 6.00 1.58 9.48
tul begel d8 0.15 6.67 1.16 7.73 0.393 3.04
9.48
3.04
94.80
30.39
BEKISTING
kell sisi pjg (m') volume
0.80 1 0.80 m2
per m3 = 8.00 m2/m3
beton = 1.00 m3
besi = 94.80 kg/m3
30.39 kg/m3
bekisting = 8.00 m2/m3
B3
B H PJG volume
0.2 0.3 1 0.060 m3 1.00
BESI TB
panjang
dia jarak jumlah panjang kg/m' kg
tulangan
tulangan (btg) total (m')
tul pokok D16 1.00 4.00 1.00 4.00 1.58 6.32
tul begel d8 0.15 6.67 0.86 5.73 0.22 1.26
6.32
1.26
105.33
21.02
BEKISTING
kell sisi pjg (m') volume
0.60 1 0.60 m2
per m3 = 10.00 m2/m3
beton = 1.00 m3
besi = 105.33 kg/m3
21.02 kg/m3
bekisting = 10.00 m2/m3