Anda di halaman 1dari 2

INSPECTION REPORT SHELTER

PROJECT : PEMBANGUNAN TALUD PLTMG ALOR 10 MW Report No


Contractor : PT.HYDRO TECHNO UTAMA AFI No.
Location / Area : ALOR , NUSA TENGGARA TIMUR Drawing No 0707-KIT.03.01-F46000000-2023
Inspected Item : Pekerjaan Shelter
Reference :

VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL

1 Shelter 200 M²

Result Accepted Rejected

Dibuat Oleh : Diperiksa Oleh : Disetujui Oleh :


PT. HYDRO TECHNO UTAMA PLN PUSMANPRO PLN UPP NUSRA 3

SOLIHIN MARGARETA NEWA MINA EDHO TORSESA JAROSMAN


1 2 3 4 5 6 7 8 9 10 11 12 13 14

400
Nok 7/10
SHOP DRAWING
200 Rangka Atap Nok 7/10 Balok 10/10 Balok 10/10 Atap Spandek
100 100 Balok Sokong 7/10
Gording 5/7
KETERANGAN :
A Balok Tarik 7/10
A
1. BALOK KAYU KELAS II
120

120
50 50 Balok 10/10 50 50
100

100
400

400

400
B B
200

200
25

25
400 400 400 400 400 400 400 175 175 175 175

C 2800 700 C

POTONGAN A POTONGAN B
SKALA 1:100 SKALA 1:100

100 Atap Spandek 100


D Atap Spandek
D
120

120
50 50 50 50
100

100
400

400

400
E E

PT. PLN (Persero)


200

200
UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
400 400 400 400 400 400 400 175 175 175 175

2800 700

CONTRACT NO :
F F
TAMPAK DEPAN TAMPAK SAMPING
SKALA 1:100 SKALA 1:100
0028.Pj/DAN.01.03/F46000000/2022

CONTRACTOR :
175

G G
PT. HYDRO TECHNO UTAMA
Batu Kali

30
175

A PROJECT :
700

PEKERJAAN PEMBANGUNAN TALUD

50
175

PLTMG ALOR 10 MW
H H
50
175

400 400 400 400 400 400 400


SHELTER
DETAIL PONDASI
SKALA 1:50
2800

I SCALE DRAWN SURVEYOR CHECKED APPROVED I

DENAH SHELTER
SKALA 1:100
SYAIKHAN.A DEDEN. H
B DATE DATE DATE DATE
SHELTER SHEET NO : CONTRACTOR DRAWING NO: REVISION:
SCALE 1:100

J 044 SD.ALORPLTMG/HTU/02-2023 J

PLN DRAWING NO :

1 2 3 4 5 6 7 8 9 10 11 12 13 14

Anda mungkin juga menyukai