VOLUME
NO. POINT DEVIATION REMARKS
DESIGN ACTUAL
1 Shelter 200 M²
400
Nok 7/10
SHOP DRAWING
200 Rangka Atap Nok 7/10 Balok 10/10 Balok 10/10 Atap Spandek
100 100 Balok Sokong 7/10
Gording 5/7
KETERANGAN :
A Balok Tarik 7/10
A
1. BALOK KAYU KELAS II
120
120
50 50 Balok 10/10 50 50
100
100
400
400
400
B B
200
200
25
25
400 400 400 400 400 400 400 175 175 175 175
C 2800 700 C
POTONGAN A POTONGAN B
SKALA 1:100 SKALA 1:100
120
50 50 50 50
100
100
400
400
400
E E
200
UNIT INDUK PEMBANGUNAN NUSRA
UNIT PELAKSANA PROYEK NUSRA
400 400 400 400 400 400 400 175 175 175 175
2800 700
CONTRACT NO :
F F
TAMPAK DEPAN TAMPAK SAMPING
SKALA 1:100 SKALA 1:100
0028.Pj/DAN.01.03/F46000000/2022
CONTRACTOR :
175
G G
PT. HYDRO TECHNO UTAMA
Batu Kali
30
175
A PROJECT :
700
50
175
PLTMG ALOR 10 MW
H H
50
175
DENAH SHELTER
SKALA 1:100
SYAIKHAN.A DEDEN. H
B DATE DATE DATE DATE
SHELTER SHEET NO : CONTRACTOR DRAWING NO: REVISION:
SCALE 1:100
J 044 SD.ALORPLTMG/HTU/02-2023 J
PLN DRAWING NO :
1 2 3 4 5 6 7 8 9 10 11 12 13 14