PEKERJAAN PERSIAPAN \/ PEND 1.00 0.00 0.00 0.00 0.00
Papan Nama Proyek Ls 1.00 250,000.00 11.00 27,500.00 277,500.00
Pengukuran Awal\/AkhiLs 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pek. Pembongkaran palm2 192.96 7,475.00 11.00 158,661.36 1,601,037.36
Pek. Pembongkaran atam2 266.68 12,477.50 11.00 366,024.97 3,693,524.67
Pek. Pembongkaran Instttk 45.00 10,000.00 11.00 49,500.00 499,500.00
Pek. Pembongkaran lantm2 120.75 12,477.50 11.00 165,732.39 1,672,390.52
Pek. Pembongkaran DauLs 1.00 124,775.00 11.00 13,725.25 138,500.25
Kelengkapan K3 (PakaiaLS 1.00 2,000,000.00 11.00 220,000.00 2,220,000.00
PEKERJAAN DINDING 1.00 0.00 0.00 0.00 0.00
Pengerukan\/ PengupasM2 432.47 18,722.00 11.00 890,637.37 8,987,340.71
Pekerjaan Pengecetan M2 432.47 37,904.00 11.00 1,803,157.72 ###
PEKERJAAN PINTU\/JENDELA KAY 1.00 0.00 0.00 0.00 0.00
Pekerjaan Panel Daun PM2 12.30 809,743.75 11.00 1,095,583.29 ###
Pekerjaan Bingkai JendeM2 25.80 809,743.75 11.00 2,298,052.76 ###
Pekerjaan Kaca JendelaM2 22.25 225,834.70 11.00 552,730.43 5,577,552.50
Pekerjaan Pemasangan Bh E 27.00 67,514.20 11.00 200,517.17 2,023,400.57
Pekerjaan Pemasangan Bh 79.00 52,977.63 11.00 460,375.60 4,645,608.37
Pekerjaan Pemasangan Bh 6.00 257,916.25 11.00 170,224.73 1,717,722.23
Pekerjaan Pemasangan Bh 43.00 92,929.20 11.00 439,555.12 4,435,510.72
Pekerjaan Pemasangan Bh 79.00 49,197.00 11.00 427,521.93 4,314,084.93
Pekerjaan Pengecetan KM2 89.90 54,620.40 11.00 540,141.14 5,450,515.10
Pekerjaan Pemasangan Bh 1.00 1,250,000.00 11.00 137,500.00 1,387,500.00
Pekerjaan Pemasangan M2 Tr 14.48 335,000.00 11.00 533,588.00 5,384,388.00
Pekerjaan Pemasangan M2 T 25.80 335,000.00 11.00 950,730.00 9,593,730.00
Pas. Tegel Lantai KeramM2 117.70 337,848.67 11.00 4,374,126.73 ###
Pas. Tegel Lantai KeramM2 3.05 385,907.23 11.00 129,471.88 1,306,488.93
Pas. Tegel dinding Kera M2 10.08 382,917.23 11.00 424,578.62 4,284,384.30
Pekerjaan Kuda - Kuda M2 266.68 248,143.03 11.00 7,279,226.16 ###
Pekerjaan Pemasangan M2 266.68 118,375.25 11.00 3,472,514.28 ###
Pekerjaan Bubungan Atm 55.00 106,490.00 11.00 644,264.50 6,501,214.50
Pek. Listplan GRC M1 80.05 87,314.90 11.00 768,851.35 7,758,409.10
Pengecetan Lisplank M2 24.32 257,916.25 11.00 689,977.55 6,962,500.75
Pek. Talang Air Untuk Ls 1.00 350,000.00 11.00 38,500.00 388,500.00
Pek. Pem. Rangka besi M2 192.96 168,538.25 11.00 3,577,325.48 ###
Pekerjaan Plafond PVC M2 192.96 27,184.85 11.00 577,014.75 5,822,603.41
List Profil PVC M1 181.55 52,988.55 11.00 1,058,207.84 ###
Instalasi Downlight La bh 22.00 90,000.00 11.00 217,800.00 2,197,800.00
Downlight Lampu LED 8bh 2.00 84,500.00 11.00 18,590.00 187,590.00
Saklar Tunggal + instalaBH 2.00 196,305.00 11.00 43,187.10 435,797.10
Stop Kontak + instalasi BH 13.00 196,305.00 11.00 280,716.15 2,832,681.15
Saklar Ganda+ Instalasi BH 6.00 196,305.00 11.00 129,561.30 1,307,391.30
Kran Air 3\/4 bh 2.00 86,700.00 11.00 19,074.00 192,474.00
Galian Tanah Pondasi M3 2.50 85,818.75 11.00 23,600.16 238,147.03
Urugan Tanah Kembali BM3 0.46 62,387.50 11.00 3,156.81 31,855.06
Pek. Pondasi Batu Gun M3 2.04 1,108,703.50 11.00 248,793.07 2,510,548.21
Pekerjaan Pondasi Rabat M2 2.88 1,108,703.50 11.00 351,237.27 3,544,303.35
Tulangan Kg 52.91 25,759.37 11.00 149,922.11 1,512,850.38
Bekisting M2 2.38 139,670.38 11.00 36,565.71 368,981.21
Beton K.175 M3 0.36 1,490,827.51 11.00 59,036.77 595,734.67
Bekisting M2 0.22 236,978.35 11.00 5,734.88 57,870.11
Beton K.175 M3 0.10 1,490,827.51 11.00 16,399.10 165,481.85
Pasangan Dinding Batu M2 14.05 306,671.94 11.00 473,961.48 4,782,702.24
Pekerjaan Plesteran Di M2 28.10 77,957.58 11.00 240,966.88 2,431,574.88
Pekerjaan Pengecetan DM2 28.10 25,097.31 11.00 77,575.79 782,810.20
Pekerjaan Beton Lantai m3 1.96 1,490,827.51 11.00 321,422.41 3,243,444.33
Pekerjaan Urugan Pasir m3 0.88 236,152.50 11.00 22,859.56 230,673.76
Pekerjaan Pipa GalvanisM1 61.35 100,000.00 11.00 674,850.00 6,809,850.00
Pekerjaan Pipa GalvanisM1 31.92 130,000.00 11.00 456,456.00 4,606,056.00
Pekerjaan Pipa GalvanisM1 68.12 170,000.00 11.00 1,273,844.00 ###
Pekerjaan Pipa GalvanisM1 18.90 230,000.00 11.00 478,170.00 4,825,170.00
Pekerjaan Kawat Ram WM1 5.90 130,000.00 11.00 84,370.00 851,370.00
Pemasangan Plastik UV M2 53.68 40,000.00 11.00 236,192.00 2,383,392.00
Pemasangan Jaring InseM2 1.95 40,000.00 11.00 8,580.00 86,580.00
Pemasangan Spring ClipM1 82.60 30,000.00 11.00 272,580.00 2,750,580.00
Pipa PVC Dia. 1\/2 M1 15.00 27,703.50 11.00 45,710.78 461,263.28
Kran Air Bh 1.00 92,713.00 11.00 10,198.43 102,911.43
Tandon Air Kap. 500 Lit Bh 1.00 800,000.00 11.00 88,000.00 888,000.00
Perlengkapan Perpipaa Ls 1.00 500,000.00 11.00 55,000.00 555,000.00
Pembuatan Menara Tang Ls 1.00 4,000,000.00 11.00 440,000.00 4,440,000.00
Pekerjaan Galian TanahM3 1.19 85,818.75 11.00 11,233.67 113,357.99
Pekerjaan Pasangan BatM2 31.55 306,671.94 11.00 1,064,304.97 ###
Pekerjaan Timbunan TaM3 11.50 165,427.50 11.00 209,265.79 2,111,682.04
Pekerjaan Plesteran M2 31.55 77,957.58 11.00 270,551.78 2,730,113.43
Pekerjaan Acian M2 31.55 47,104.00 11.00 163,474.43 1,649,605.63
Pekerjaan Rabat Beton M3 3.23 1,490,827.51 11.00 529,691.01 5,345,063.87
Pek. Papan Nama Akrili Bh 4.00 450,000.00 11.00 198,000.00 1,998,000.00
As Built Drawing dan L LS 1.00 2,500,000.00 11.00 275,000.00 2,775,000.00
Keterangan PDN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Anda mungkin juga menyukai