BANTUAN STIMULAN PERUMAHAN SWADAYA (BSPS) TAHUN 2023 DESA : BIDO KEC. MOROTAI UTARA KPB : NUNUHU SENG GEL SENG GEL KAWAT CAT MATA SEMEN PC KAWAT SENG PAKU KUAS NO NAMA PENERIMA BANTUAN BATA/TELA BESI 10" BESI 8" (0,25) (0,20) RAM/ PAKU 12 PAKU 10 PAKU 7 TEMBOK (5 BOR 50 KG BENDRAT PLAT SENG ROLL WARNA PUTIH WIREMASH KG) TEMBOK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
JUMLAH BAHAN BANGUNAN 297 13,300 100 104 8 330 506 42 39 28 10.84 28.42 9.89 26 - 8 SATUAN Zak Buah Staff Staff Kg Lbr Lbr M' Kg M' Kg Kg Kg Klg Buah Buah HARGA SATUAN Rp 116,000 Rp 2,700 Rp 118,000 Rp 88,000 Rp 40,000 Rp 92,000 Rp 76,000 Rp 43,000 Rp 58,000 Rp 200,000 Rp 38,000 Rp 38,000 Rp 38,000 Rp 103,000 Rp 40,000 Rp 42,000 JUMLAH HARGA Rp 34,452,000 Rp 35,910,000 Rp11,800,000 Rp 9,152,000 Rp 320,000 Rp 30,360,000 Rp 38,456,000 Rp 1,806,000 Rp 2,262,000 Rp 5,600,000 Rp 412,000 Rp 1,080,000 Rp 376,000 Rp 2,678,000 Rp - Rp 336,000 TOTAL HARGA Rp 175,000,000 JUMLAH HARGA/PB Rp 17,500,000 JUMLAH PENERIMA BANTUAN 10.00